92-79 City of Chanhassen
Carver and Hennepin Counties, Minnesota
DATE: July 13, 1992
RESOLUTION NO: 92-79
MOTION BY: Dimler
SECONDED BY: Win~
A RESOLUTION ACCEPTING SUPPLEMENTAL FEASIBILITY REPORT
ON STREET AND UTILITY IMPROVEMENTS TO TETON LANE AND LILAC LANE,
PROJECT NO. 91-4
WHEREAS, on February 10, 1992, the City Council authorized
Engelhardt and Associates to prepare an updated feasibility study
for street, utility, and drainage improvements to Teton Lane (Lilac
Lane to Ashton Court) and Lilac Lane (Teton Lane to County Road
17), Project No. 91-4.
NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council
that the supplemental feasibility study as prepared by Engelhardt
and Associates is hereby accepted contingent upon the following:
1)
The developer for the Ithilien subdivision waiving his
right to a public hearing, accepting a 20% assessment of
the smaller project cost, and agreeing to pay the full
costs of the larger Teton Lane project.
2)
A connection charge for the storm sewer improvements to
Lilac Lane be adopted for the Johnson, Pickard, Ware and
Natole properties for collection at such time that
future subdivision would occur at any of these properties
based on a rate of $2,687 per acre of contributing area
as presented in the revised cost schedule and annually
adjusted for installation based on construction cost
index.
Passed and adopted by the Chanhassen City Council this 13th
day of July, 1992.
ATTEST:
Don Ashworth, City Clerk/Manager
YES NO
DOnald J.~-el, Mayor
ABSENT
Chmiel
Mason
Winq
Workman
Dimler
None
None