Loading...
1b 2007 Street Rehabilitation: Approve Plans & Specs CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us MEMORANDUM <7&. TO: Paul Oehme, Director of Public Works/City Engineer "t.~. FROM: Alyson Fauske, Assistant City Engineer oW :1b On August 14, 2006, staff discussed the proposed scope of the 2007 Street Improvement Project with Council. A neighborhood meeting was held on November 6, 2006. Approximately 12 residents representing 11 properties attended the meeting. On January 8, 2007, City Council.accepted the feasibility report and called the public hearing. On January 22, 2007, City Council held the public hearing and authorized the preparation of plans and specifications. Streets in the 2007 Rehabilitation Project were identified using the City's Pavement Management System. These streets were also visually inspected and identified for improvements. The streets have deteriorated to the point were minor maintenance (seal coating, patching and crack sealing) is no longer economically recommended. The streets proposed for improvements were all constructed in the 1980's and coated in 1997. Approximately 9,200 linear feet of streets are proposed to overlaid. The rehabilitation includes repair of damaged pavement areas and replacing severely damaged concrete curb and gutter and other miscellaneous improvements. Draintile and storm sewer improvements are proposed in the South Shore Court area. Sanitary sewer manhole adjustments and improvements are proposed in various areas project area to help reduce infiltration (surface water) entering into the system. A map of the 2007 Street Improvement Project Area is attached. DATE: February 26, 2007 The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. SUBJECT: 2007 Street Rehabilitation, Project No. 07-02: Approve Plans and Specifications; Authorize Ad for Bids BACKGROUND DISCUSSION The area for improvements include: Pleasant View Cove, Bighorn Drive, Terrace, Hill Street, Pimlico Lane, Preakness Lane, Derby Drive, Belmont Lane, South Shore Drive, and South Shore Court. The rehabilitation is consistent for all the streets. Paul Oehme February 26, 2007 Page 2 of 3 A resident at the public hearing questioned why the eastern portion of Bighorn Drive is included in the project since this section of the road is newer then the western portion of the road. The section of Bighorn Drive from Kerber Boulevard to approximately 250 feet east of Frontier Trail was constructed in 1986 with the Chanhassen Vista 2nd Addition project. The remainder of Bighorn Drive was constructed in 1987 with the Shadowmere development. The Pavement Management System indicates that the condition of both sections of Bighorn Drive meet warrants for resurfacing. Staff does not feel it makes sense to resurface only half of Bighorn Drive and not resurface the rest. METHOD OF FINANCING The 2007 Street Improvement Project No. 07-02 is proposed to be financed through special assessments to the benefiting properties and City funds. No funding changes have been made since the public hearing. The following is the preliminary financing plan for the project. Financing Source Revolving Assessment Fund Storm Sewer Fund Sanitary Sewer Fund Total Amount $ 874,600 $ 50,000 $ 50,000 $ 974,600 ESTIMATED ASSESSMENTS Special assessments are proposed to be levied against benefiting properties for the improvements included in this project. The City will assess benefiting property owners based on the construction bid amount of the improvements. The costs for the improvements are proposed to be assessed to the benefiting properties on a per unit basis. Costs incurred by individual lots are 40% of total project cost divided evenly among 173 property owners. The following is a summary of the estimated assessment rates for the roadway improvements: Total Estimated Cost: Total Assessable Cost: Total Assessable Properties: $974,600 $389,840 173 units Estimated Assessment Rate: $2,254/unit Assessments will be for 8 years at 6% interest. SCHEDULE The anticipated schedule of the project is as follows: March 30, 2007 April 9, 2007 May 14, 2007 May 21, 2007 August, 2007 Open bids Call the Assessment Hearing Hold Assessment Hearing; Accept Bids; Award Contract Construction begins Substantial project completion Paul Oehme February 26, 2007 Page 3 RECOMMENDA TION Staff recommends that City Council approve the plans and specifications and order the ad for bids for City Project No. 07-02. Attachment c: J on Horn, Kimley Horn Chadd Larson, Kimley Horn G:\ENG\PUBLIC\07 -02 2007 Road Rehabilitation\02-12-07 approve P&S order ad for bid.doc 2007 STREET REHABiliTATION IMPROVEMENTS CITY PROJECT 07-02 '\ ~ in- p.>-'.J> ~ "\=={ ~ \ d~i11~/X/AY^ \~ Pleasantview ~ ~//L 1\: JH \ ~~n= ~(~ Curve ~.. \ 111 1-'1 .I, "'-\ ~'( ~~ = D.... ~I r;F~fm{1J-JJ ~ ~~J~ ~ ;: M~)g~r:;J9~ -;- ~~~ ~~~~ 'c(~~. r ~~~r \'0):= ~ :c ~~ ~ c=i ~ ~~~ ~ $/fJtfj fA "'\ t:J ]H'I:r W//;:;;I=~ y~~: ~1ilt ~ I p~~~~~ lca~l~~r~ ~. :D\ t8 DerbY~);.. f1 \ \:l' '"1 TI 11'\1 Drive~~ ?E! ~ \ ~ ~ (/ZTIT JL Shadowmerel ~ ;;r ~ '\ e mon,(A.'\>.:;'::l.. '\.L ~ Terrace I 8~ ;L '\ '~~~11 ), Bighorn ): V ~ r\"S>~ ..; II ~f ~ DriveA=rl'^ V L71 1- :~ H tttttr:; 1">- ~\ y lJj r Q)1 H T I( ~ y", ~ ~ -w ll- 1111 ~~~ I: Hill - L-/ _' ~. ~&\;;: ,~ ~iSS::hOShoref~)l) Str:et~ ffi '" >;~ P- ~ft Dnve ~,l ~ 3: ./ "~~1- \ ~_. ~)l ~~ n ~II~~~~ 1~:r9r--- ~~ ~I~TC:HS~ \~l v," xJ: 7 ~ ~~ 1~ Sout~hO~~lY ~~, I ~T.y/G~~(l /. ~~ourtvc ~ ~lf~r\ ~.qy.~-,~l, ~ ~'lr Not to Scale N t ,'. - -,' - -Updated: November 14,2006