3b. Koehnen/Yosemite Reconstruction Project 07-01: Award Contract
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952,227,1100
Fax: 952,227.1110
Building Inspections
Phone: 952,227.1180
Fax: 952,227,1190
Engineering
Phone: 952,227.1160
Fax: 952.227.1170
Finance
Phone: 952,227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952,227.1120
Fax: 952,227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952,227,1400
Fax: 952.227,1404
Planning &
Natural Resources
Phone: 952,227,1130
Fax: 952,227,1110
Public Works
1591 Park Road
Phone: 952.227,1300
Fax: 952.227.1310
Senior Center
Phone: 952,227,1125
Fax: 952,227,1110
Web Site
www.ci.chanhassen.mn.us
gb
-
MEMORANDUM
TO:
Paul Oehme, Director of Public Works/City Engineer
Alyson Fauske, Assistant City Engineer at -t.-../.
tJ'4"
April 23, 2007
-r::: t:J .
FROM:
DATE:
SUBJECT:
Koehnen/Yosemite Reconstruction, Project No. 07-01:
Award Contract
REQUESTED ACTION
Approve resolution accepting bid and awarding a contract to S.M. Hentges &
Sons, Inc. in the amount of $2,271,502.88 for the Koehnen Area/Yosemite
Avenue street and utility reconstruction.
BACKGROUND
On January 8, 2007, Council approved the plans and specifications and authorized
the advertisement for bids for the Koehnen Area/Yosemite A venue street and
utility reconstruction project. The improvements included in this project are as
follows:
. Reconstruction of Yosemite A venue, Blue Jay Circle, Audubon Circle,
Cardinal A venue, West 63rd Street, and Koehnen Circle East and West.
· Replacement of all watermain.
. Replacement of approximately 1,900 feet of sanitary sewer.
· Installation of storm sewer and construction of three storm water
These improvements are proposed to be constructed during the.2007 construction
season.
Bids were opened for the project on Thursday, March 15, 2007 at 10:00 A
summary of bidders and bid amounts are as follows:
Bidder Base Bid Amount
S.M. Hentges & Sons, Inc. $2,271,502.88
Park Construction Company $2,396,883.36
Minger Construction, Inc. $2,526,148.30
S.R. Weidema, Inc. $2,597,270.42
Randy Kramer Excavating, Inc. $2,660,171.92
Engineer's estimate $2,685,203.00
g:\eng\public\07-01 koehnenyosemite road imp\04-23-07
contract.doc
The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks, A great place to live, work, and play,
07 -01 A ward Contract
April 23, 2007
Page 2
The bids were tabulated and minor errors were found; however, they did not change the low
bidder. The bid was submitted with a proper bid guarantee in the amount of 5% of the bid.
S.M. Hentges & Sons, Inc. was the low bidder with a total base bid amount of $2,271,502.88.
The low bid is approximately 15% less than the Engineer's Estimate. The bid was also lower
then the estimate in the feasibility study.
The bids included a bid alternate for the construction of surmountable curb and gutter. This
alternate was included since a couple of residents requested surmountable curb and gutter
instead of the high-back curb and gutter. At the April!!, 2007 neighborhood meeting,
residents did not express a preference for either type of curb and gutter. The high-back curb
and gutter design provides for better storm water flow and reduces the likelihood of sod
damage from snow plow operations. Also, the high back curb provides less of a bump at
driveway entrances. This bid alternate would result in a deduct of $2,950.50. Staff
recommends that this bid alternate not be accepted due to the performance benefits of the
high-back curb and gutter and since it is not a substantial cost difference between the
surmountable curb.
A bid alternate was also submitted for the installation of High Density Polyethylene (HDPE)
storm sewer pipe in lieu of reinforced concrete pipe. This alternate was included due to
potential cost savings. This bid alternate would result in a deduction of $13,306.29. Staff has
reviewed this bid alternative and is recommending the Council not accept the alternate. In
discussions with contractors and other consultants the pipe may cause more problems in the
future then it is worth with a short up front cost savings.
S.M. Hentges & Sons, Inc. is working on City Project 06-05,2005 MUSA Phase I improvements
and has worked on other development projects within the City. They are also working on the
MnDOT 101 GAP project. S.M. Hentges & Sons, Inc. work has been satisfactory. Award of the
contract is recommended to S.M. Hentges & Sons, Inc.
Funding for this project is proposed through a combination of special assessments to the
benefiting properties, revolving assessment funds, MnDOT State Aid funds, storm sewer utility
funds, water utility funds, and sanitary sewer utility funds. The special assessment amount for
individual property owners is $6,390.81/1ot and is based on the bid price. Any additional project
costs will be funded through a combination of revolving assessment funds, storm sewer utility
funds, water utility funds, and sanitary sewer utility funds. Funding for the total project cost
(including all indirect costs) is proposed as follows:
07 -01 A ward Contract
April 23, 2007
Page 3
Funding Source Amount Feasibility Bid Amount
Funded Estimate
Streets, MSA State Aid $500,000.00 $582,100.00 $499,502.05
Streets, Non-MSA Revolving $1,200,000.00 $1,099,788.00 $968,200.69
Assessment Fund
Watermain Trunk Water Fund $660,000.00 $610,284.00 $442,384.97
Sanitary Sewer Trunk Sewer Fund $230,000.00 $191,808.00 $165,562.11
Storm Sewer Storm Sewer Fund $610,000.00 $599,750.00 571591.87
$3,200,000,00 $3,083,730,00 $2,647,241,69
The proposed schedule for the project is as follows:
A ward Contract/Assessment Hearing
Start Construction
Construction Complete
April 23, 2007
May, 2007
August, 2007
Attachment: 1. Resolution
2. Bid Letter from S.M. Hentges & Sons, Inc.
c: Marcus Thomas, Bolton & Menk, Inc.
g:\eng\public\07 -01 koehnenyosemite road imp\04-23-07 award contract.doc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE:
Aoril23.2007
RESOLUTION NO:
2007-
MOTION BY:
SECONDED BY:
A RESOLUTION A WARDING CONTRACT FOR THE KOEHNEN AREA/YOSEMITE
A VENUE STREET RECONSTRUCTION PROJECT NO, 07-01
WHEREAS, pursuant to an advertisement for bids for the Koehnen AreaIY o semite A venue
Street Reconstruction Project, bids were received, opened and tabulated according to law, and the
following bids were received complying with the advertisement:
Bidder Base Bid Amount
S.M. Hentges & Sons, Inc. $2,271,502.88
Park Construction Company $2,396,883.36
Minger Construction, Inc. $2,526,148.30
S.R. Weidema, Inc. $2,597,270.42
Randy Kramer Excavating, Inc. $2,660,171.92
Engineer's Estimate $2,685,203.00
AND WHEREAS, it appears that S.M. Hentges, Inc. is the lowest responsible bidder.
NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council:
1. The mayor and clerk are hereby authorized and directed to enter into a contract with S.M.
Hentges, Inc. in the name of the City of Chanhassen for the Koehnen ArealY osemite
Avenue Street Reconstruction Project No. 07-01 according to the plans and specifications
therefore approved by the City Council and on file in the office of the city clerk.
2. The city clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposits of the successful bidder and the next
lowest bidder shall be retained until a contract has been signed.
Passed and adopted by the Chanhassen City Council this 23rd day of April, 2007.
ATTEST:
Todd Gerhardt, City Manager
Thomas A. Furlong, Mayor
YES
NO
ABSENT
01 ~ 0 ,
650 Quaker Avenue · P.O. Box 69 · Jorda.n, MN 55352
Phone: 952.492.5700 · r<lx: 952.492.5705 . www.smh.::ntge~.(:tJlTl.to-m<lil:mailbox@smhentges.com
March 21,2007
City of Chanhassen
Paul Oehme
Public Works Director
7700 Market Blvd,
PO BOl( 147
Chanhi:lssen, MN 55317-0147
Re: 2007 Koehnen Area Improvements
Chanhassen, MN
Dear Mr. Oehme,
On March 16, 2007 S.M. Hentges & Sons Inc. submitted a bid for the Koehnen Area Impro'"ements and is
the apparent low bidder. '
The proposal has an alternate B for the substituting surmoun~able curb and gutter instead of 6618 'that
was in the base bid.
S.M. Hentges & Sons rnc. during the writing out of our proposal indirectly bid that alternat<!! B
surmountable ctJrb as a .25 IF credit instead of a .25 LF add.
The base bid 8618 fits the catch basin castings and IS used at all radiuses regardless of the (;urb styles. .
Trying to adapt B618 to surmountable curb at all eaten basins and radius can be done but tl1e final
product does not look as nice as if were all B618.
Please use the base bid of B618 curb on this project as it will fit and look all the same throughout the
job.
If you have any questions please feel free to give me a call.
2;~
.Senior Project Manager
"'-