Loading...
2b. 2007 Street Improvement Project No. 07-02: Award Contract CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us J-b ....-..... .........- MEMORANDUM TO: Qc:l Paul Oehme, Director of Public Works/City Engineer ~ .- Alyson Fauske, Assistant City Engineer Q*' Mf May 14, 2007 FROM: DATE: SUBJECT: Award Contract for 2007 Street Rehabilitation, Project No. 07-02 REQUESTED ACTION Approve resolution accepting bid and awarding a contract to GMH Asphalt Corporation in the amount of $428,356.75 for the 2007 Street Rehabilitation, Project No. 07-02. Councilmember Brian Litsey should step down for this item since he is in the project area and included in the assessment roll. BACKGROUND On February 26, 2007, Council approved the plans and specifications and authorized the advertisement for bids for the 2007 Street Rehabilitation Project. The improvements included in this project are as follows: · Rehabilitating (milling and overlaying) Pleasant View Cove, Bighorn Drive, Shadowmere Terrace, Hill Street, Pimlico Lane, Preakness Lane, Derby Drive, Canterbury Circle, Belmont Lane, South Shore Drive, and South Shore Court. · Repair of damaged pavement areas and replacing severelyctamaged concrete curb and gutter and other miscellaneous improvements. · Draintile and storm sewer improvements are proposed in the South Shore Court area. · Sanitary sewer manhole adjustments and improvements are proposed in Ya.rious areas throughout the project area to help reduce infiltration (surface water) entering into the sanitary sewer system. These improvements are proposed to be constructed during the 2007 construction season. Bids were opened for the project on Friday, March 30, 2007 at 10:00 a.m. AsuItll1lary of bidders and bid amounts .are as follows: Bidder Total Bid Amount GMH Asphalt Corporation $428,356.75 Northwest Asphalt $432,849.50 ASTECH Corporation $459,158.50 Midwest Asphalt $468,171.55 Valley Paving $477,270.60 Hardrives, Inc. $498,705.00 WM Mueller & SOIlS, Inc. $509,200.00 Bituminous Roadways, Inc. $512,936.75 The City 01 Chanhassen · A growing communitvbwith clp.aalakaso.oualitv_schoals,.a charmiaQ rlowntnw~..thriYinQ businesses1winding trails, and beautiful parks. A great place to live, work, and play. g:\eng\prt )11(:\07- 220 7 roati nili<iblltation\ :1-14-07 award cdnttact rev .doc All bids were submitted with a proper bid guarantee in the amount of 5% of the bid. GMH Asphalt Corporation was the low bidder with a total bid amount of $428,356.75. The bid was substantially lower then the estimate in the feasibility study. The feasibility study anticipated a significant spike in oil and fuel prices from 2006. Also, contractors showed a lot of interest in this project and bids were very competitive. GMH Asphalt Corporation was the contractor for City Project 05-01, Lake Lucy Road and City Project 07-01, Chanhassen Hills Street Rehabilitation and Lake Ann Parking Lot Improvement Project. GMH Asphalt Corporation work has been satisfactory . Award of the contract is recommended to GMH Asphalt Corporation. Funding for this project is proposed through a combination of special assessments to the benefiting properties, revolving assessment funds, storm sewer utility funds, and sanitary sewer utility funds. The construction contract amount is for $428,356.75. The total project cost including engineering, soil borings, legal costs etc. is $546,908.37. Funding for the total project cost (including all indirect costs) is proposed as follows: Feasibility Bid Amount Funding Source Estimate Amount Assessed: $212,612.30 Streets $874,600.00 $531,530.75 Revolving Assessment Fund: $318,918.45 Storm Sewer $50,000.00 $11,378.23 Storm Sewer Utility Fund Sanitary $50,000.00 $3,999.38 Sanitary Sewer Utility Fund Sewer $974,600.00 $546,908.37 The proposed schedule for the project is as follows: A ward Contract! Assessment Hearing Start Construction Construction Complete May 14, 2007 May, 2007 August, 2007 Attachment: Resolution c: Chadd Larson, Kimley-Horn & Associates g:\eng\public\07-02 2007 road rehabilitation\OS-14-07 award contract rev l.doc