Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
CAS-09_PIONEER PASS - RYLAND HOMES FILE 2 OF 2N
!yr a �tr'rar G
Ccwty Rd Is Lyman BW Cwrrty Rd 18
a „
•" q9 f
""Vy
�C1� Z AY
g
SITE
r
d
�fi j ",6 s..
a Bhh c' '. rya+c`xPs�Ov 212
Er ,lo^ n Coo" 11
51mc+,s �r ShOf
�Ef
O
Q,
VC
3{ yV T
neerirei�. �' �n B
U"'"
PIONEER PASS 2ND
A T1TITTT(1W
CHANHASSEN, MINNESOTA
FINAL GRADING, DRAINAGE &
CONTROL PLAN
FOR
RYLAND HOMES
TITLE SHEET 1.1
SITE INFORMATION 1.2-1.3
2.1
VV EROSION E R O S I O N F NALGRAD NG, SEDIMENT CONTROL DETAILS DRAINAGE, &3.1-3.4
EROSION CONTROL PLAN
MITIGATION PLAN 4.1
STREET PROFILES 5.1-5.2
FINAL LANDSCAPE PLAN 6.1
DETAILS 7.1
7599 ANAGRAM DRIVE, EDEN PRAIRIE, MN 55344 LEGEND
PHONE: (952) 229-6000 FAX: (952) 229-6024 EXISTING ASPHALT SURFACE
EXISTING
CONCRETE SURFACE
EXISTING
GRAVEL SURFACE
s
yawn _�
EXISTING
DELINEATED WETLAND
------ ---
WETLAND
DELINEATION
0 EXISTING
TREE LINE/TREES
SI TE MAP / / I ------1000------ EXISTING CONTOUR
NO SCALE I / EXISTING BOULDER RETAINING WALL
/ / I
I
EXISTING WATERMAIN
�^� EXISTING SANITARY SEWER
0 / - - - - - I - >�> EXISTING STORM SEWER
- - - ppopvo ems/ po p p�Qg * * i I ®p o g- - - - TI oHPoHP EINISTING E/POWEREPOLED POWER
n ITI nT �,-U I Ip p ® EXISTING WELL
/ In EXISTING TELEPHONE PEDESTAL
p pQ �� 20 / �� D\ ___ ____ _==_ - --=== EXISTING CURB
p \ i ,\ 1s
pp / p x- X x X x EXISTING FENCE
ANY
' `\\ p \ \ EXISTING SOIL BORING
BENCHMARK _- _-"- 17 BLUFF CREEK OVERLAY DISTRICT SIGN
--_
/ O�
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER r - __ _ _ _ _ - 4 % �� `\ e / a / 1 EXISTING HEAVY-DUTY SILT FENCE
POLE WEST OF DRIVEWAY N. SIDE OF I "�- - _ _ - - / `C J< �y '
_- �_ _ _i-:-= � _ _ "-�- � ,` � ,. I cc,n =� � �=r�=����x EXISTING SILT FENCE
PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM 15 `! 4
BM #2: TOP ALUM R/W MONUMENT ® SOUTH =Dflr = -l� / I EXISTING WIMCO
PROPERTY LINE ON PROPOSED R/W LINE.J� _ _ - 1 `14 ; ' a n / / / ^ - - »- - -»- - -»- - -» - T
ELEV.= 913.67 NAVD 88 DATUM - - �' _ _ / 33 i / " \ EXISTING SEDIMENTION OUTLET PIPE
0y=--- =_�Q _"
- - J ��`.I a / / PROPOSED SINGLE TIER RETAINING WALL
- _ _ _ _ - - = 6= fl cp =t(YI .T, ,� 32 \ ✓ = �� \ (CONTRACTOR TO PROVIDE DESIGN BY OTHERS)
�L _-_ ;. y r s —1 OOO PROPOSED CONTOUR
- - -, 12 \ �' 31 , / / «\ f� >� f >—®--> PROPOSED STORM SEWER
PROPOSED DRAINTILE
f ,�
20= 3 PROPOSED RIPRAP
10
PROPOSED SPOT ELEVATION
41 � � PROPOSED CONCRETE SURFACE
22' j \ `<' 28 2
_ ' nl n r, nT r,!-' 1 , `\ i 1- \ `-�'% ,�n'�' ; PROPOSED ASPHALT SURFACE
DRAINAGE AND UTILITY EASEMENTS = - _ _- - _ - / \ - PROPOSED CURB
ARE SHOWN THUS = _ _ _ _ _ _ _ ( I 6 I / \ 17 \ I'
{
PROPOSED HEAVY-DUTY SILT FENCE
5 I li' 7 \i `-_.`. - `,` 24 'll', 26 % PROPOSED SILT FENCE
p I I 5 1 I 1 1 1 ,16
``
5�i I -�_ _ ::' P i I_ ; L e ` = 25 \l Tom; ��, `.� / PROPOSED HEAVY-DUTY SILT FENCE
(TO BE INSTALLED AFTER COMPLETION
`, _••-- - 'nl ITI nJs 1= --' -' 1 _ _ _'-2_-9 I 1 \ /? / / OF GRADING)
a-- 1 - -4 - _ 1 15 PROPOSED TREE PROTECTION
li \� / / / /, -.. ,; -. _..__-•p--__-_Tp ___—
o I I o D- ", I I I t 3 1 r �I ' 14
I I Q-f I i �IFENCE
�(� I , 1 3 , I , I , )
n
I I i I __� I�--_____— ___ I
----i-----� �-----}---- p� ® I "-____--- I ---------- -_;--__ pQ PROPOSED TEMPORARY ROCK
p -- -"l 10 ----
I\ , l' I , , = ^ ' `� / �� CONSTRUCTION ENTRANCE
I I I 2 I I ' '�' J/ /\I ITI nT !\ 1\ `'1 `\
g' 2 I; - 13 i / I \\ / / / / , ; PROPOSED TEMPORARY
� ,, - V V I L. V 1
0
p - _ ---_ --3 -_-_-_ --__' ® J
BEING 5 FEET IN WIDTH AND ADJOINING _ / SEDIMENTATION BASIN
SIDE LOT LINES, AND H FEET D WIDTH '\ �/ I 1 11 2 �� p /// _ / PROPOSED 10' AQUATIC/SAFETY
BENCH (10: 1 MAX SLOPE)
AND ADJOINING STREET LINES AND
REAR LOT LINES, UNLESS OTHERWISE
INDICATED ON THE PLAT. 4 " -. �- /� 7-71 UNDISTURBED AREA
•-_ rIy111 VIVL�-V I(l VL��AI\IIVI LIVI VI
-- 4 - --- Igo -,r r,^ r / �11D
OHN KI PROPOSED SEED & MnDOT CATEGORY
FFF CREEK BL`N -- - -Iyr\Ir�lly� RI\rl l vl
yam- J \
I I � j`--' , -" "^' N0. ��=:';gip;3 EROSION CONTROL BLANKET
(TO BE INSTALLED AFTER COMPLETION
4j�m C-m�.._,.� r j #STMEPlTS� �� \
-;� - - -- -14 477
41R fl A T . r25.0221300Fl �f R
` - ( / OF GRADING)
At_4 NVESTMENTS L
2,5.0221300 T - _ II �/ PROPOSED REAR YARD CB PROTECTION
TO BE INSTALLED AFTER COMPLETION
MINIMUM
CITY
SETBACKS
FRONT
25
FEET
_ SIDE
(HOUSE)
5
FEET
SIDE
(GARAGE)
5
FEET
3
SIDE
(STREET)
20
FEET
A
REAR
25
FEET
I
Znow
SCALE IN FEET
0 150 300 450
1 inch = 150 feet
PROJECT CONTACTS
PROJECT ENGINEER
DEVELOPER:
CITY:
NPDES OFFICER:
CONTRACTOR REPRESENTATIVE:
CONTRACTOR SUPERINTENDENT
OF STORM SEWER CONSTRUCTION)
PROPOSED DITCH BLOCKING-MnDOT TYPE 3
'IV (TO BE INSTALLED AFTER COMPLETION OF
GRADING)
JOEL G. COOPER, P.E. - JAMES R. HILL, INC.
(952)-890-6044
(0)
(,l
PROPOSED WIMCO
(612)-508-6480
(M)
MARK SONSTEGARD - LAND DEVELOPMENT MANAGER - RYLAND HOMES
(952)-229-6007
(0)
PAUL OEHME - PUBLIC WORKS DIRECTOR/CITY ENGINEER - CITY OF CHANHASSEN
(952)-227-1169
(0)
v ;j i y
PROPOSED 25' MITIGATION BUFFER
TEDDI SEIBRING-TROFIN - MPCA
(651)-757-2719
(0)
TO BE DETERMINED
(XXx)-XXX-XXXX
TO BE DETERMINED
(XXX)-XXX-XXXX
0
PROPOSED MITIGATION AREA
PROPOSED WETLAND FILL AREA
PROPOSED SEDIMENTION OUTLET PIPE
■
N
M
Z
N
—
■
V J
L
O
J
m
=
\
z
�
Nm�
�
N
W
W
X
z
O
L¢
Z
ZN
w
o
to
00
00
�wLLJ
U
Z
c
Q
o
O
0
a
E
m
m
0 TO y
O — IJ
v
N
.-
no�o°co a
0
3 y m m
i
0
O m
N ZV
L O
C a m O
5
oE�dcl�c�
8�
L am da o+o
0
0
0- 4
FE-4- I It
Q�
QL0
�/� z
VI :2
Q E-4 w L-L
Z z w 0 d
w
Z C/)0Aw
7/ 1 W LJ
>
0
W z
z
W a
O)
w �
z
0
a
DRAWN BY
CJK
DATE
9/9/11
REVISIONS
9/30/11 REVISED PER
CITY COMMENTS
10/14/11 REVISED PER
CITY COMMENTS
CAD FILE
21996-22TS
PROJECT NO.
21996-21
1.1
e .
y{
i a z •�4#
_a rYRt xrx � erf a• � ' r+o-.r e a r. S
17
PEMAd
goo
,n f a. wx• xxc. xara � b'' x ., � i - ';+A` 1.� '� <_ '
F � _ a t.• � x x 4 �� � ... Y � � �-_ �i x � • f ' :. + t J ie..,!f'. �t'�` � x
r ff�� pp p
�� i r i is a.. • re•• � �' � T i � J � � ` ,. ;.� • i't,.rt ' • �,,,..i(p �p�P is
x � x • • Y � � � e � � � i t"fa � � x pg(g j#j{
«,.r � • • x• y,r x a - + e � L-,, x $ aP • px k i A>x
i
4 Y r V `-� h v � i �� �• � �
X' 41
�``s.. \.4 , g ($�' y * s y'6 _' _ t `_ ,'A -fir # • a ` r i ,frs,
}�� a �•Wt .. - �>' a.+l _ __, is � � �\ �\ cwta i' _ ti � �.;i, s�..+�a � m Y�' ;� i T
I�•.^•• a,'•_'ft, �J i-�� � � i v i ` x"k.i kl, � �' a"•. _."� �� /ji • S
i �rav r
sY _
y �-.,.... ue'..'. "� .,� � ha.s-�, , v .;. �....=.m,.x...4.-a•.,.,,"..-,...n...».-.:>. ,.-. ,. v o-,wr I—y - .. F lh`�-'.. r^44 .r= S
yOtc �- r BLUFF CREEK` IS AN IIAPAIRED °
WATER FOR TURBIDITY AND NOS _
DISCHARGE WATER WALL BE
".: �' •i i ?� ' * Y ALLOWED TO THE CREEK OR
1 :1•'"6 �/_ 4/ TO THE FfGE WETLANQ
a'
• 122
J
AUDUBON ROAD
VIAL
Y` max.1. . � f. aYt*� ry a:..-•>' ,y.*r r may{ r / �a•c�'x^-sa� "IS ... ° //�� f K i � i � 3 I
�r
t t * �
• �` a`� �^.r"-, �,y..,.si x rx ate ,,..� x �
u1 1'• f�' • a / Y,1 ,{i ,+ X�*.,s'9Y' '. � >� C 'l' Y� y ,� , .`•y ,f t� y�y„ J
44
� � r •,, , ',� • r a f. . a
10
L2 ,i
X 3,
•' - �i a 1�, . °,� `,. �"• �s .fir � ��t''. n -
USGS MAP
1 inch = 1000 feet
z (2�
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY - N. SIDE OF
PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT Q SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
MIN
--- „B/D„
SOIL I/
\ GROUP I
I
\ � I
I
I
I
\
\
\
\
I
/ „B/D„ 1
SOIL t
t I t
GROUP /
I
,i B„ SOIL. GROUP,;.
f
SOIL GROUP MAP
1 inch = 200 feet
Z n
NEW
Hydrologic Soil Group Soil Textures
A Sand, loamy sand, or sandy loam
B Silt loam or loam
C Sandy clay loam
D Clay loam, silty clay loam, sandy clay, silty clay, or clay
O
,M
LO
N
iT
00
m
N
.�
W
LLJ
C
�i
/Z_�
V
t
Z
V)
'^
W
CD
V ♦
�
CO
\
O
N
Of
00
CN
W
U
�
Z
Q
J
o
CD
a
CL
N
d
O
14
M
zz
0
Q
f-
E
W
w
C \L
�
Q
U�
Z
v,
O U
pc,
A
w
�n
Q
z
Z
as
=
U
W
Q
01
E-1
1--I
N
Fey
U
a
Z
W
W
z
0
a
DRAWN BY
CJK
DATE
9/9/11
REVISIONS
10/14/11 REVISED PER
CITY COMMENTS
CAD FILE
21996-22SI
PROJECT NO.
21996-21
1.2
A
EXISTING
DRAINAGE
inch — 200 feet
:�l
a Z
u NOW
0 ■
IF
a4\
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY - N. SIDE OF
PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT @ SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
- - ---- --
— --
PROPOSED DRAINAGE
1 inch — 200 feet
2C n
NOW
V
cn
o
M
w
Ck:�
Z
O
rn
\
Z
00
¢
N
.
W
w
X
:zN
L¢L
Z
�
�
O
N
a-
Co
W
U
I
Z
Z
�
W
Q
O
J
N
a-
E
P
O N
�
O W
aoEoC0 a
y 3 yL o
�o d o a
u
O O
2
0 0 0
L N O
C d w LO O
T N O .n
L CTL O�,�J
U 0 au J:2 W
_ O
T O J S
\
m
aOi y N O
O
I•-4
It
ZZ
O
V�
Q
0
!-1
zZ
o
a
cQZx
xz
w
unNw`LAw
zoo
0
�n
a
z
>
Z
aa
=w
Q
E
�0
a
�
z
a
w
z
0
P--1
a
DRAWN BY
CJK
DATE
9/9/11
REVISIONS
10/14/11 REVISED PER
CITY COMMENTS
CAD FILE
21996-22SI
PROJECT NO.
21996-21
1.3
-,I
In
TEMPORARY EROSION & SEDIMENTATION CONTROL METHODS
NPDES RE9UIREMENTS
(THE FOLLOWING METHODS WILL REQUIRE MULTIPLE SITE
VISITS DURING THE DIFFERENT STAGES OF CONSTRUCTION (INCIDENTAL TO
CONSTRUCTION)).
PART IL SUBMITTING THE APRICATION
PART IV. CONSTRUCTION ACTIVITY REWIREMEXTS
ELAPPLICATION AND DURATION a cD'rtRACE
1. TEMPORARY MULCH MnDOT TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED.
A. STORM WATER POLLUTION PREVENTION PLAN
D.OEWAIERING AND flASIN fWAIkNG
we
S.Cnmga of COrwega. Far construction projects wnwa the owner or Opwvtw change., (e.g., an wigind devNopr aMk po-liene PI the
2. HYOROSPREAD MnDOT TYPE 6 HYDRAULIC 901E STABILIZER
o site to a w
to wridue ameba den w perk property Ter):
M1 w Me copy
a. The d' anal/Nmml omw anal) Nerds a copy of the complete notice of tmmistian/Dmmli mwl0wtldn farm (w required I Pat IL0.2.p)
The Pwmittw a must' implement IM SNPPP sad IM1e r u manta of this art. The GNP. identified in the SWPPP one in the permit must be
O TIP ce it P
aNwted, ,stmlw, and maaiainw in an ammpriale ON luncliaal manner that is in acmtlanca with rebwnt monubctdp WedlBwtione and
r alo arak, rNalta ail
1.Daxaier a rosin tlr0,h a um dwM / ) Y Y
tea emt, the Toot ma nave
e.
STABILIZER MnDOT TYPE 6 AT A RATE OF 350 LBS 1000
a. HYDRAULIC SOIL /
ad
(0 Ins new omru ins origi owed Mall aovbe a SWPpp to me caw owns ana opxa[a teat weders, y wbeson. tee
accepted engineering practice.
a tom rc di bra n
posse aadinmt berm the tame water mart Madischarged edito o ttat mY a p�mnmpnt nvoked tat'ar bawl eq the proJttreatment I rhewne
s. from Ins le or Dmmawnl pwimen lows 0. checked to aware is Obtained
end
GALIR OF $ALLOY.
NOM.nt
Ping construction an Nob. Tha notice of tarminal'm/permit mwifbation brm raplwa IM1e auDtlMaiu registration. permit
B. FR040N PREVENTION PRACTICES
t ... It rant eaaot lot
. It to .at.O.
G polo.. 2) vim eel reate hom lb discharge. If
In the an, One that n pedrmr (sae Minn. R. ) W10. 2I .
In the t cowlti
b. WATER 875 GAL[.ONS/L000 GALLONS OF SLURRY.
;
d wr Iwminacm forma
tronal ana nonce
works SHIFT, .an that Ina
.d t Dana Dear io me sdbst rarer, i, bin treated wino lee
to a
3. TEMPORARY SEED &MULCH (SEASONAL)
memtd men whorl[ o campkt OnO Ngned Permit maaifor pIXo t (permit protliTiwikna acluna construion
a ..OrrcOr o su
D. The new owner
bona(«) the 1«min«;m/Permit torso to ma MPCA to
1 The Parmiltee(s) must plan For and implement opproprble conabwt'an Dhaaag, wgeloliw huller .trip.. hrrizmtal None grad ng. and other
iiscnaryea
wnel
ingenteringt
of admtoibn
must teboethat
Oiachorgt dew not a0wrwly affect IM rwNdnd .der w domalr.mn landowners. The Permitta.(s) moat mare lM1ol diemerqe pasta are
M dwok d other
tlii mw w dwwaed tongs.
a or wbca of modification Arid cam cog cmrtndim
regimolbn w Dmma
construction mcticae that Minimum maim, as me, ma and of The
p r(a
IHim o comgiad
adequate, dolmka hoe erwim ma amour. a moat over natural rack pone q.
are atN q
a. SEED MMnD SEED MIX AT A RATE 40 LBS/ACRE
y site or innMINN later man sewn Q) Tye Irking ownership of the property. IM net Pwmktee(a) are rewonsble for
with on t. a
of dwa not to be tluWrbed mwt be dNaaotw a. with Ira e, atakw. s' na, sll fence etc.) u the eawlopment ails before soh
, .takes. , wit
ago,
( q q N
e r discharge on. su
o«.plea energy aisepatbn meowrca. Adequate aM:nmtation control measures on ..gates rm alsmarge word that contaaa wapenaee
O
IL MULCH : MnDOT TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED.
T A
comp c with w Imma conditions of mla" ru o Part
w sit.
canon
Algae
sal
.a.
c. FERTILIZER 10-IO-20 AT A RATE OF 200 LBS/ACRE
heI.&ILa
Ma
ant or
C. a m operand O gmerd canlroda M1w sus, and mein ,.it. gi of rat tr IM tee n no Iongw in a pouted poled of co project. and
Of on operator
at eonlrodud sligafana between the Omer and mpralor w gwwd contractor .dating to compliance with ma liana and cmainae of
2.All ewwwa all dens must be as sae as pweak to licit mil emoram but st no ilea. laho than tic sow ice construction on
All eats fr.char we Our ca d nwin IXa,ing actial In moat be discharged a a mmner that does not puce o the nce<mdli0lma uaiOn In
r«adnq anon^she a w OownNape prapertiey or inunaa/'an m rellande emvnq significant aawrw a•oet to me wexma,
RY SEED & MULCH (SPRING)
4. TEMPORARY
this permit how Deem met, me monitor « general conlracta, may transfer permit cawrage back to the cranes a to a new Aerator
acuHt in that wnm or ens Ntw has teen wars a nmp tweed. Temporary stockpiles without significant 1. d
into t eat. eb p nk
Y p s Y pear^ Y p Y aOnY r dqa
PCmpmmb (e.g., clean 0te lit, role alactpmu vend a) ma me pnalrudw lows c panmis of raw..,
a. SEED MnDOT SEED MIX y110 AT A RATE OF 100 LBS/ACRE.
SEED
using ice notice of lermewl'wn/permit moaifbatim form A agnalun from Dom ice oewr and operator k raqutw.
ore this
Parking mmpq with part Iv.Os.
surfaces a caso
Iola and amibr aurfaaw era exempt hwm this rputwnenl but moat comply with
E. NSpECn,Y15 AND MAINTENANCE
ANCHORED.
b. MULCH MnDOT10 TYPE I AT A RATE OF 2 TONS/ACRE AND DISC ANCH
c. TcaMINAnoH m n]VEReGE
3.TM mama wel[m (meld of m its or w ohm( Aran ditch or mole that drains rater hen an 0dion of the amsbudtn
Dp Y Dan Y Der'^ age Y D
or min 200 Metl feet soon the amen a
around site, must a a y Oge, or hom Ua Paint o! dwnage ate
Line a) (either the owner d o, eh i kmlified in the SWPPP moat routinely Impact Ice mnrc construction site at Iwal
wear a ) yer
c. FERTILIZER : 30-10-20 AT A RATE OF 200 LBS/ACRE.
surface2 l f t to a wrracw ester.
ace w e fir za own after emep
wpm, on
my aeon of mt last zap maaa rest suet ne wmplelw
al.cMn ona within 24 ecuro inner a rainfall Mu own[ tlwi 0.5 ilmw I Following
awry sawn construction
a owney t dam aunts active
5. TEMPORARY SEED & MULCH (WINTER)
1 P n b [ this must Notice r Termination (NOT) A. Compliance with INrs
wishing wmaalt mmi under t r Perm;l u submit a of u a it irmina ( D) to M Comp
. ermit
erw;r rma
connecting
St inn patin al any temporary al Permanent a cedes must D< complete within H wed ng to
conducted
n arm, na.l inspection moat be cmdudw within wean T tle aXw tlwl.
h M .ft Mat.
on ingrwlim whim paws within c
cm i m
court after a ra ftl t rpm O w
be thew rwIXtla maw M retained oM
a. SEED MnDOT SEED NIX AT A RATE 100 RE.
to re midnight n
permit k muted & o m Ise NOT Oo. TM ed to Met M coverage anw. this permit tam Mo(w at mianipmi m the pmtmoa pone of
submitted.
m. NOT, Of ana daer co erne NOT k wbmalw 1p kr. MPCA_
donstru owarhy ey O wN1 d or
mW and cuseh ON . in tent Dai m of me ,t Ma h ,mix. ly a DmremmtlY cawea.T , ILL.., f pmmanml ditches .
a surface to
a d.. that a awinm (aim mentor row stab d:.am, No rails, art aka. etc.) col
ardor men era hared used w a
conducted Ouraf eachWctim muff r«prow a ..thing an rim
2.S ,spein ono mM twwih Part HIED. Records f wcM1 inspection and maintenance actMt anal, include:
in wkM1 Port IILD. Racwae a ewac r
O RE AN
b. MULCH MnD10 TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED.
T A
e,
2Tmmination al cowmge werad«:
staammt
Thaw areas must I longs i
I..at within 24 npn after no longer being. w warnnl cO ainment
sw
Pepe to et .must
aMote time of i
o.0ab and Imo of in 1'
.wc'ma
OF 200 L63/ACRE.
d IIX me entire
a. TwmAN
be or Trim oft o tooter.
4.Pae outlets Two De Vovidaa with tempaarY a pmmanent energy dissipation within N Aare alter connotation l0 a surfatt water.
b.Nama of parwm(a) conducting g
c. FERTILIZER 10-10-20 AT A RATE
Perlost
Twritproject,
ow(S) m a mI of the
i. AN Perr meat NOT pima Part plate) n loam
pow onm Find Stabilization iiity
hico me for caredtM actions:
enw,ge d bmednme Inducing raMummm
item s
s Include
Alto fa which the Pmmillw la responsible ma all cfar th ti been If ant
which) an has e�n
adMt nee bem cam b[be If me Nte
°8P r p p
L. SEDDAENT LONTROL axALn[ES
s art cam sl' maintmancs adiAliea
(Including ,. a completing
O.C.U.dLomactiw .time taken r«utl tlate, time . part, PI M )
6. HYDR09PIiEAD SEED, FERTILIZER, & MnDOT TYPE 8 HYDRAULIC SOD. STABILIZER.
Normwlw management awtema, IM nmuiremmk la roam tlmnwt/mmnlenatt moat be performed w required a Find SIa011aalbn.
requirements l rew.h Find
spate and ...at of on a Qwter than 1/2 Ich (0.5 benw) a hours;
s. SEED MnDO1 SEED MIX g190 AT A RATE OF 10 LBS GALLONS SLURRY.
Pert IV G2.
meOcn hwn entering alarm xwp akk.
entire. mtlueinq ..no ana gentp system.anemia
LO.T.Mot caevd aN mlttch and
dM
m ma of
I. Documentation or mange. made to the SWPPP as raquied in Part
to
R
b. ID-LO-2I AT A RATE OF 50 LBS/5000 GALLONS OF SLURRY
with.. 3a sew after ink mite site ineladlmq raa4 and slonnmtw intmatmetae, ow
N.M Parmntee(s) must submit a NOTanother
at .a t s
c c iMl de wei as port of o sediment containment Ewtam (e.g., all[hee
permanent trained. a;tmw ma ceaimaoo
i ea
nmaae rs amen parts ma r a, inspections of the dwa with
t aunt
3.Wlmms pork d the
art Vita caw Deena^ant cows, but
ATE OF
a HYDRAULIC SOIL STABILIZER M6DOT TYPE B AT A RATE OF 350 LBS/1000
HYDRAULIC
is ban.rw.a b maln.r omen ae described in Pdt 11.8.5.
m in Fort
.1, Nor
with rock cnttt dame) raauire aMmmf canard podices Try w omrmriole fur site cuditana.
with hook c c
nstr
en w,,P
pmmawnt ram may be cMzced to dome Per ,mom. M. construction ben aka M1Ow perrwnenl caber on or pumth soil Grow and w
May be
b. �ion d comaw la a potion of me timbre Project
lo anytime m ins site. tle site must be la a pww 01 (me IRimmoons may
(ruc
GALLONS OF SLURRY
Adrmintith
All Fermat «rat ail transferring lime of ailc fo mother on
w(s) (L aye g wildly per party
a eroO w;ma seven a attar the w m
b.lf the dean gradient treatment awlwm k Omloedea. additional uDWadmt aedinwni cmlyd practices a ramnwni BMPa mast be Iwltlle0
ofpeded
o confirs
a<has ,ion i war may w
ion M
Iowa the feel nit onm in cover and ^a construction
w ceaaa0 during keen ground cu0itiue). Fd 9 D Y De< Y
be ceased ring f ground ed
OF SLURRY.
d. WATER : 875 GALLONS/L000 GALLONS U
r the The W muse compliance with the pemnll
and may lager one axed d and of the she being VINE to roomer In m
to the ovMwdrq, one iM SWPPP moat M omwww to Identify mna awitimd Dr«tkw as rwulrw in vast IILA4, o.
twf oxen unit cmatrudiw, of in set w aw
is once agora Fabled in anon if rotuiw in wrbegi by me MPCA. Wbwa work has been eat
r
aa[Y
eon r cl e
one .edtnmt antra men art be N pkn). lee Imm sue[ induw Ngnelune awn Up
(rig. as temporary oan u Statement control
Ibwit a
Waugh c.
the A
frozen sound condMne, n. required aRed;wp and maintenance ecneMla must begin within $ M1pap after runoff omit at Ms Nla a
he q
7. TEMPORARY SEDIMENTATION BASINS WITH STANDPIPE OUTLET &EMERGENCY SPILLWAY
Original Pawnkt malt iinf for lM new omw of me property
and contact
a, area rtgroom meat Dow and minima.. rill. and/or gulliaA there Mall be no unbroken Napa Iengm of 9rwler flan ]5 lest ld
Prior to conetmdla, comes first.
Pr
(SEE DETAIL).
using .l'an
c. Tmminalien d comaq. obtained wag o wbdivieian rpklral'an.
mo
h
smn rile p 9ra0e of S1 a steeper.
en;cnem
n Winwh BMP. must M it poled to ensue inn II dM effwliwnew. All nawn<Iiaol BNpi must be
4.Ale eroNm wed. w an aedYnmt
as a w w r
If pupil cawrage ran abtaaad using the eubduebn rpetrwu proceed, Permi[lee(s) arc raqulred to submit a NOT vithh 30 saw titer
.paired, rwpl«per w sumkmmted with lu«limd BNPs .;thin N hours altar tliwowry, w m onm as fiNtl cadtia...Noe accw. unlaw
with f
TRAP WITH SPILLWAY SEE DETAIL).
6. TEMPORARY SEDIMENTATION ( )
emiavag renal sima:obm (.w Pen PVC.).
2.Sadmml control pnancw ma.t M wlmfiMed m al rpm gradient Perimeters wfae any apywiant land drmnag «DADw n.qm. maw
in Put
comer lime same is mined boor. lee vermak.(.) mmi awaugak and comdy can the Idb.inq ivsDenrwn ma maintenance
},p..Ill..(.) that use an dtanotiw method for the Permanent 51bamealer Managerunt 5Yatem as aewraea in Pat AI.C.5, aro prohibited
practices Mall remain in Dace until Final Stabilization has been esladimw accordance With IV,G.
requirement:
ham tmminotN mk monk unit noel 5labraation her ban cchia.ed On zits and either:
9 P
].IM1e Ikng, Of me tbn of a +Mai -term onm a+ dear o
9 D Y Pw 9 r
wntrd r«tkG may De w' tee to 0ccankly
ern n nonfunctional w the sediment reaches f 3 of the height of
e.Nl it f must r KKw a in lerhoom m they b.1cone nmw s anw.. ue be re aired, pp Y / 9
D T
9. ROCK CONSTRUCTION ENTRANCE (SEE DETAIL).
a. ens two sum of mmkdira data rputw in Part n.C.S has D.en submitted to the SPCA era ma MPCA has detmmk,.e tool the r.q„tea
Any st
ge of I I control
anw as quickly a bin and mp pediment he bo Clow must
boa d passage of oMidn. An Mod -tams adiril moat be ow Me sediment
W g• v 9 Y r a a Y raw' era
'min 24 noura of aiamm or ae son ac ible cmasmr dbx occaw.
me Ience. aMw ro ail. muss w maw rA
D r
Ms wen weiead, Pennines be notified in writing rim, ,lo sew alive Ice polo has been aubmliled. If
the
oym
tw Installed!wef octdy offer Ina activityk complete. Howam, aedimmt central Vacli<w meat be Ialatled Mlorr the nnl PrwiPiloliu
10. HORIZONTAL $Ii)PE GRADING SEE DETAIL).
( )
Peml itY
the Pwmittw has .at rn the Pens can submit NOT.
i, squired data, the
hwm a MPCA within ]0 pop offer mbtwo
,ant awn i the b not ctected e.
the
for to
ml collected d M.
b. pwmmm[ rwinwnbliw Maine M .arks mtl awimml rcmvw Men IM tlepm of sediment
ne that
it a
can submit u NOT, wen ;f iM tinwhamw ie kw onm two ywrq i( uw MPCA utermiwt that the dlwnanw mamw is
0. lee ,r a
withdisarminginl
Write wring continuation anti all ways 1 m[enlbl the et
4.NI alarm ana Nak meat it protected bye
Man Try m eaf
a at, I
banal reaches 1/2 Ice storage ,dome. manage ma remold roust w completed within R open al niwowry, or as soon as ilNa
yeg then
acIM replier lrwlmmL
nancrem far . i
for a Particular inlet it a apecifk safety cuxwn (abwl flwtlingwheezing) low bem
haw been Ink, protection may De if .
cwMitiore allow wcppw (w Part IV 0.).
ll. DITCH CHECKS MT TYPE 3-12' BEDROLL WITH MnDOT CATEGORY 3 EROSION
the
During the
Moorh ens .wlual;On of lit. atarnabw m.enw, the pmmkW i. not rwgmrak rd stow Pmmlt ..p.twnmfr that new Mm
et the P new roe. Me him c (p.g. sky/.pony/te
femme a met ma Phe
earwPonamw .secs me ymmenten
CONTROL BLANKET (SEE DETAIL).
(S
as
transkmed as Om<dbw in pert II.dS
n Me Sy
within SWPPP awnode within hours upon
need fa month must be ntw in 72 hours u
mgixw) wilting the need remover, Me Nrlhe
deposition.
<.S water.. Indust drainage dtmw Ona cmwwnw .wtwT„ .swat be inwwoed iw sAdifince of eroeian one Allotment n.
c taimmi in r, the c hie io
un not be wtdned ;n o tknNy manner, the wwocu ante d
nmedia Yemen written si col be romawtl alenah.72 m.
a Pe remove tll oM ewimm[ tlepwiled in surface rollers, including udng a
The Ppmitlee(.) a
rear rota plch Mato, VIM otter
12. EROSION CONTROL BLANKET MnDOT CATEGORY 3 (SEE DETAIL).
PART IY.STORNWAIER DISCHARGE DESIGN REWIREMENTS
HaIXleenw
mcs ;n Ua it
immediate wiw, concern. Harrower, to written be l in Me and
r c
A ..
Me
o-ainma awlama ma mtmdiza me aroma .owe aedtnmt rwnowl .wlb in wpowa adl. me remold ma stabilization meat rate N«e
and
erorb
c sal
. Par sod an 0 concern u a ott ore the )ups ti
to rernave inet aotectbn Dosed On a specific safety ro«am meal sun be abtained Iran the )friedk[iud
noun uDm requN. mot
wgiNn rem dao amY Precluded or lead, Tha pwmnta anal ,sec at
a pmust
13. PERIMETER SILT FENCE (SEE DETAILS).
D.RECORD RETENTION
, of main
sumodtY rilhin 30 dam a( rwnowl.
E.Tamaorary .d .making. must owe at force a omer ofbctM sediment contra, ana
in
d stribdy,
t ke p4o d within se
reasdnble efforts to Main acceu a prwwaeG. rcdi to , r gioDNxoMt must rate plow wimp wean (m ng my mw of staining
for b ain . 11
«case. The is razponaale for conkding ail lad, regional, elate VIM federal authaitln and .welArg OnY applicable permit,
The SWPPP (wgatl a corks) aclutlag, all manses to it, and inerrectiOns ana maFlmmtt nwde moat be kept at IM she erring
.at be alacw turb.e watan, includnq ammew r cmm,mm. such a. curb and ill swlema, or conduits and aitMw unless rope
prior to conducting my Bork.
cling m
14. INLET PROTECTION (SEE DETAILS).
ccatmoben by the Pwmilttt who has "national control of that portion of the sita.ma SWPPP an Ds kepi a Nmer IM1e fited oMcal w in an
la a bypass in rbc. red Me wbrmwatw.
d.Canbuctbn site winkle nit locations must be Iwetted fa evidence of off -.its tied man tract O, onto wwtl AM ... .sawed
a n Nta uahlck during ndmtl rdking noun.
of me sits) moat
n elta (w onto ..ors, m.1. not by BMpa such ns alto
6.Venios rocs hOn the coot
sediment must be r rmved hdn ail po,we surfaces. wilnn 24 hour. of ekcowry, or IF wplica ls, within a th-ter tiro. 1a c mpl, with Part
15. FLOATING SILT CURTAIN (SEE DETAIL)
follow., file la NOT
el
cwarsts or at" raM note w wuildent syNpma Slrwl swpwlg molt b. used if wcn BUPA are not wpgaab to waYmt aedimmt hwm
. or at rmn .W ust sediment
Part
W.C.B.
Au omer(a) mual k eon the SWPPP, amend with the utlitional record., a in. (3) worn w1 er submittd of me oa
lowing trwkaa Onto lM street (see IV E.4.6).
w,me Parmiltse(s) are responsible fed the enaction and maintenance of lwnpwdy and permanent rrolw quality managmrmt BMPs, we "I
outlined in Part H.C. Tha Muse not include any sworeft after submittal of the NOT.
7.11wr Permitter mart install temporary wdimentalion bailout ce required in Part III.B. of this permit.
as all wwlm premention and snfirmel emtrol BMPs, for the duration of the construction work at the sae. The Prmitere(a) a
PERMANENT EROSION &SEDIMENTATION CONTROL METHODS
1.Any other permlk required fa me aoNcn
txped'mn VIM maintenance eonpones owe and
im (ew Pdt Iincl
2.Ag
remon.al. ante site another Pwmittw hap gemmed astral according to Part sub om all the or me Alto onm caw not Deep Melly
dmnizea the al[e ergae Final slmuizatim, ma a NOT has own mbmitled to the uPCA
undergone
(THE FOLLOWING METHODS WILL REQUIRE MULTIPLE SITE
per nail
ins all wor conntt);
3.aI permanent appal'« as moaknwe ograammte that Mw low^ ingemmta% including all d,y,t of soy, carccb, cownmk VIM aloes
pot been
I. If sentiment escapes IM cusWCUon sit, off -Ate accumulotlons of watnmo meat M ..mows a a manner ma at o frequency sufficient
t he
VISITS DURING THE DIFFERENT STAGES OF CONSTRUCTION (INCIDENTAL TO
CONSTRUCTION)).
binding requirenent ragading permtual maaternmew and
4.AA Mouth d wioubtbn fa design of the temporary mtl Pmmmmt Stdmwtar Management Sleteme.
b mbimae off -wit impala (e.q., wgitiw sedtmmt in ,t.0 .to be mined into at. severs by the not reI and/d paw a safety
M.ae I. u era of publicatreat).
S.Ail Ifillmtka drew must Minapwled to anauro that no sediment from o^gaing matndran boy A[y I. reaming the afiltraran ores and
1. GENERAL SEED & MULCH (MIN. 6" TOPSOIL)
thew areas err Protected hwm cdowo.6m see to construction ega"Pmenl driving caws the inmtratim area.
a, SEED . MnDOT SEED MIX k250 AT A RATE OF 70 LBS/ACRE.
ROCK CONSTRUCTION
REQUIREMENTS
b. FERTILIZER : 22-5-10 80% W.I.N. OR CL AT A RATE OF 350 LBS.ACRE.
RESPONSIBILITY
a MULCH : drOOT TYPE I AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED.
THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS THE PROPOSED
PERMANENT PONDS
2. POND SEED & MULCH (MIN. 6" TOPSOIL).
a. SEED : MnOOT SEED MIX p310 AT A RATE OF 82 LBS/ACRE.
CITY OF CHANHASSEN WILL HAVE RESPONSIBILITY FOR IpNC
A
b. FERTILIZER : 18-1-8 NATURAL BASE AT A RATE OF 120 LBS/ACRE.
TERM OPERATION AND MAINTENANCE THE PERMANENT STORM
c. MULCH : NnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED.
WATER MANAGEMENT SYSTEM.
3. WETLAND SEED & MULCH (MIN V HYDRIC TOPSOIL)
a. SEED : MnDOT SEED MIX A325 AT A RATE OF 84 LBS/ACRE.
CONTRACTOR WILL HAVE RESPONSIBILITY FOR
b. FERTILIZER : 18-1-5 NATURAL BASE AT A RATE OF 150 LBS/ACRE,
IMPLEMENTATION OF THE SWPPP BEFORE AND DURING CONSTRUCTION,
c. MULCH MnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED.
THE CONTRACTOR SHALL PROVIDE THE OWNER WITH A CHAIN OF
4. UPLAND BUFFER SEED &MULCH (6IN. 8" TOPSOIL).
RESPONSIBILITY WITH ALL OPERATORS ON SITE TO ENSURE THAT THE
a. SEED : MnDOT SEED MIX #328 AT A RATE OF 86 LBS/ACRE.
SWPPP WILL BE IMPLEMENTED AS FOLLOWS:
b. FERTILIZER : 18-1-6 NATURAL BASE AT A RATE OF 150 LBS/ACRE.
c. MULCH : Mn1NOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED.
CONTRACTOR
5. TEMPORARY COVER CROP FOR UPLAND BUFFERS & WETLAND MITIGATION
BUSINESS NAME
a. SEED MnDOT SEED MIX F110 (SPRING) OR #100 (WINTER) AT A RATE OF 100 LBS/ACRE.
b. FERTILIZER : 18-1-8 NATURAL BASE AT A RATE OF-150 LBS/ACRE.
CONTACT PERSON TELEPHONE (INCLUDE AREA CODE)
c. MULCH : MRDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED.
8. GENERAL NATIVE SEED At MULCH (MINIMUM 6" TOPSOIL)
CONTACT PERSON TELEPHONE (INCLUDE AREA CODE)
a. SEED : Mri SEED MIX #350 AT A RATE OF 84.5 LBS/ACRE.
b. FERTILIZER ! 18-1-8 NATURAL BASE AT A RATE OF 120 LBS/ACRE.
c. MULCH : MnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED.
CONTACT PERSON TELEPHONE (INCLUDE AREA CODE)
7. SOD
THE CONTRACTOR SHALL FOLLOW THE IMPLEMENTATION SEQUENCE AS
SHOWN ON THIS SHEET.
NARReTIVR &NOTES
CONTRACTOR SHALL ADHERE TO ALL THE REQUIREMENTS OF THE MINNESOTA
L DESCRIPTION OF CONSTRUCTION ACTIVITY.
POLLUTION CONTROL N.P.D.E.S. PERMIT.
PIONEER PASS IS A SINGLE-FAMILY RESIDENTIAL DEVEDOPMENT ENCOMPASSING
63.39 ACRES. THE CONSTRUCTION WELL INCLUDE MASS GRADING, UTILITY AND STREET
ALL BEST MANAGEMENT PRACTICES (BMP'S) SELECTED SHALL BE
INSTALLATION, AND STABILIZATION OF THESE AREAS.
APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS AND ESTIMATED
DURATION OF USE.
2. PHASE CONSTRUCTION TO MINIMIZE SOIL Loss.
3, ALL EROSION & SEDIMENT CONTROL MEASURES CALLED FOR ON THESE PLANS
A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER
AND SPECIFICATIONS. WHICH MAY INCLUDE SILT FENCE, TEMPORARY SEDIMENTATION
CONSTRUCTION IS IN PROGRESS.
BASINS OR TEMPORARY SEDIMENT TRAPS. SHALL BE CONSTRUCTED AND
SERVICEABLE IN THE FOLLOWING ORDER. AS REQUIRED.
TRAINING REGLITREMr1_.NT5
a. ROCK CONSTRUCTION ENTRANCES.
--
b. SILT FENCE & TREE PROTECTION FENCE.
JOEL COOPER, P.E.
c. EXISTING INLET PROTECTION.
SITE MANAGEMENT CERTIFICATION (2014)
d. TEMPORARY CULVERTS.
UNIVERSITY OF MINNESOTA
e. TEMPORARY SEDIMENTATION BASINS, TRAPS, AND OUTFALL FACILITIES.
INSTRUCTORS : LEO HOLM & DWAYNE STENLUND
1. STORM WATER POND CONSTRUCTION.
ii COMMON EXCAVATION AND EMBANKMENT, UTILITY INSTALLATION AND
STREET CONSTRUCTION.
h. TEMPORARY SEED AND/OR MULCH.
nRVFLOPMENT SUMMARY
L. HORIZONTAL SLOPE GRADING.
J. DITCH CHECK SILT FENCE, & EROSION CONTROL
TOTAL PLATTED AREA 18.89 AC.
BLANKET.
NUMBER OF SINGLE FAMILY LOTS 53 EA
k. PERMANENT SEED AND MULCH AND/OR SOD.
TOTAL DISTURBED AREA 19.84 AC.
4. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION & SEDIMENT
EXISTING IMPERVIOUS AREA 0.01 AC.
CONTROL MEASURES AS SHOWN ON THESE PLANS AND SPECIFICATIONS
PROPOSED IMPERVIOUS AREA 5.95 AC.
AND IMPLEMENT ANY ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES
NECESSARY IN ORDER TO PROTECT ADJACENT PROPERTY.
5. ALL EROSION At SEDIMENT CONTROL FACILITIES SHALL BE MAINTAINED BY
THE CONTRACTOR DURING CONSTRUCTION OPERATIONS. ANY TEMPORARY
PROPOSED EMSION/SEDDIE141 CONTROL GUA►±TIT_rRS
FACILITIES WHICH ARE TO BE REMOVED AS CALLED FOR ON THESE
HEAVY-DUTY SILT FENCE 4,840 LF
PLANS AND SPECIFICATIONS SHALL BE REMOVED BY THE CONTRACTOR
SILT FENCE 153 LF
WHEN DIRECTED BY THE ENGINEER THE CONTRACTOR SHALL THEN
ENTRANCE 1 EA
STAND PIPE DETAIL
PERFORATED STANDPIPE W/FILTER
FABRIC TO OUTLET ELEVATION
/ , EMERGENCY SPILLWAY
TEMPORARY SEDIMENTATION BASIN WITH STAND PIPE OUTLET
6" PVC PERFORATED
STANDPIPE W/RLTFR
FABRIC EMERGENCY SPILLWAY CREST
(RIP RAP OR EROSION CONTROL BLANKET)
l�T - -WTLEi ELEVATION
PROPOSED 12" HOpE
STORAGE PIPE
VOLUME 3 CY CL3 RIP RAP
ANTISEEPAGE COLLAR (TYP.)
CAP SKIMMER(EG. 5 GALLON
BUCKET) TO BE BOLTED TO
THE PERFORATED RISER PIPE
/��}��� 3"
JAI/ HEX B T
HEX BOLTS
1"-2" WASHED ROCK CONE :::I / 3 W/LOCK NUT
HEIGHT - 1/3 Z NOTE" TOP M W I6. N
PIPE MATERIAL
7" HOLES SPACED SHOULD BE RIGID
B" TO 10" ON CENTER
TEMPORARY SEDIMENTATION BASIN
TYPICAL PROTECTION AROUND
BACKYARD CB'S
INSTALL IMMEDIATELY AFTER
CB INSTALLATION)
HEAVY DUTY SILT FENCE
-FASTEN TO STAKES
POST EACH CORNER
RESTORE THE SUBSEQUENTLY DISTURBED AREA IN ACCORDANCE WITH k� 11 � REAR YARD STORM SEWER
CATEGORY 3 FIBER BLANKET 21,026 SY
THESE PLANS AND SPECIFICATIONS. STRUCTURE
MnDOT /j250 SEED &MULCH (GENERAL) 17.04 AC
6 HE STORM WATER�DRAINAGE FAR S14ALL CILITIESVIDE RAS MAY HE REQIUUIIREDTL
O ALLOW MnDOT #325 SEED & MULCH (WETLAND) 0.42 AC REAR YARD CATCH BASIN INLET PROTECTION
THE CONTRACTOR TO CONDUCT CONSTRUCTION OPERATIONS WTI'IIN THE MnDOT #310 SEED & MULCH (AQUATIC BENCH) 0.22 AC
FUNDING AREAS AS SHOWN ON THE PLAN AND AT THE SAME TIME MnDOT TYPE 3 DITCH CHECK 10 EA NOTE: PREMOLDED SEDIMENT CONTROL BARRIERS
MAINTAIN STORM WATER DRAINAGE THROUGH THE SERIES OF AFFECTED TREE PROTECTION FENCE 174 IF SUCH AS ROYAL'S INFRASAFE COVER OR EQUIVALENT
STORM WATER PORTING AREAS. REAR YARD INLET PROTECTION 9 EA
ARE AN ACCEPTABLE ALTERNATIVE.
7. DO NOT DISTURB ANY AREA UNTIL IT IS NECESSARY FOR CONSTRUCTION
To PROCEED. PROJECT COORDINATES
8. WHEREVER POSSIBLE, PRESERVE THE EXISTING TREES, GRASS, AND OTHER N 44' 49' 50"
VEGETATIVE COVER TO HELP FILTER RUNOFF. W 93. 33' 55" HEAVY DUTY SILT FENCE AT FLARED END SECTION
TOP OF SILT FENCE TO BE LOWER THAN
9. COVER OR STABILIZE ALL DISTURBED AREAS AS SOON AS POSSIBLE 6' STEEL FENCEPOSTS LOWEST ADJACENT OVERFLOW
(SEE TIMELINE : PART IV B2).
6'-B' SPACING BETWEEN POSTS HEAVY DUTY
10. TIME CONSTRUCTION ACTIVITIES TO LIMIT IMPACT FROM SEASONAL SILT FENCE
CLIMATE CHANGES OR WEATHER EVENTS. �0--0 0
U. DELAY CONSTRUCTION OF INFILTRATION MEASURES UNTIL THE END OF -FLOW
THE CONSTRUCTION PROJECT WHEN UPSTREAM DRAINAGE AREAS HAVE
BEEN STABILIZED,
12. DO NOT REMOVE TEMPORARY PERIMETER CONTROLS UNTIL AFTER ALL POLYETHYLENE SNOWFENCING FLARED END SECTION
UPSTREAM AREAS ARE FINALLY STABILIZED. PROFILE PLAN
13. IT IS THE RESPONSBBLLTY OF THE CONTRACTOR TO KEEP PUBLIC
STREETS, TRAVEL WAYS, PARKING LOTS AND TRAILS UTILIZED FOR FLARED END SECTION INLET PROTECTION
INGRESS TO AND EGRESS FROM THE CONSTRUCTION SITE FREE OF DIRT
AND OTHER DEBRIS WHICH RESULTS FROM SAID CONSTRUCTION.
COST FOR THIS SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT.
14. ADEQUATE CONTROL OF DUST SHALL BE MAINTAINED BY THE CONTRACTOR;
NO PAYMENT FOR DUST CONTROL WILL BE MADE. P
' Spacing on upper end
2"x2"xt8" MIN. WOOD STAKE TREE PROTECTION FENCE 4" Overlap
-2' MAXIMUM SPACING 12" BIOROLL /.'
/ re asis
re
WATER
l FLOW
CROSS SECTION PROFILE VIEW
DITCH CHECK - MnDOT TYPE 3
MnDOT CATEGORY 3
EROSION CONTROL BLANKET
-STAPLED & TRENCHED IN
DITCH GRADE
3'
Minimum
level
1' Spacing
on Staples
Anchor slot •MINIMUM ANCHORING SHOWN __�
alternative
Fold under 6"-
EROSION CONTROL BLANKET -CATEGORY 3
(TO BE INSTALLED PER MANUFACTURE'S SPECIFICATIONS)
�l
_�_
2 EACH
DUMP STRAP -
V (25 onm) REBAR
FOR BAG REMOVAL
FROM INLET
SILTSACK
EXPANSION RESTRAINT
(1/4" (6 torn) NYLON ROPE,
2" (51 rift) FLAT WASHERS]
DUMP STRAP
ADDITIONAL
ALTERNATIVES: THE CONTRACTOR MAY
REQUEST, FROM
THE
ENGINEER,
APPROVAL
OF ALTERNATIVE
DEVICES.
CATCH BASIN
INLET PROTECTION
-
SEDIMENT
FILTER
SACK
TEMPORARY FENCE-,,,, � I' M 2" WASHED RICK
�&Qfi'•i
4.6.4 •LyA
f K:•ir�:t�fi":
hiG.N f~N,'l
I rH rl r• •I .'
r rrr;
•/ •fM1 eon
Y or rfre
Pr'pi p...
•.•. 11M•.
L-2• I a'xa.
PLAN VIEW
I
D
s
Ia{yl�vltaL"::I9
NOTE:
1F NN. REVERSE CRAWEMr D - 5 MIN., 5' MAX.
A -A W - 10' MIN., 2V MAX.
MINIMUM SIZE - 1800 CU. Fr. OF STORAGE VOLUME
FOR EACH ACRE DRAINING TO THE TRAP
TEMPORARY SEDIMENT TRAP
VEGETATION
DIVERSION
C
0 --+m.e I. awed sc
REAR YARD CATCH BASIN INLET PROTECTION
\. i
DOZER TREADS CREATE Sx,- ..el
GROOVES PERPENDICULAR TO
SLOPE DIRECTION
HORIZONTAL
SLOPE GRADING
WIMCO ROAD DRAIN
PROJECT CON"
PROJECT ENGINEER
DEVELOPER:
CITY:
NPDES OFFICER:
CONTRACTOR REPRESENTATIVE:
CONTRACTOR SUPERINTENDENT:
F
The Permitter(.) men Implement the following pmulbn Variation management measures on the elk:
I.Sdra Warta: Collection eatlknml a malt and concrete mill' . fl rn ep comply
, « q call papa.. pwtk, Idric, con,ndim and damolilion dwrie one
alhp wwlw meat be Oiepoeed of properly ma Taal comply with MPCA tlkpwol requken•nl,
2.1fiazwmus Materials: 011, Worries, paint and any woomou. substawn must be Voparly, atwa4 including .day containment, to prawn,
Ills. looks te omw Muntenia. Reslrectea access to store areas must w ovinf:d to I n II antl wl I
Wills. 9, W a seven po w son Storage tlsDo 0
M1azdnapce with MioC wwte must be in cam Ier A r equbibna.
J.EYlwn0l washing of trucks and omen cmalrudim wnidae moat be limilatl to a nafinea des of the .it. Runoff moat as contained and
waste VaperlY tlfirmad of. No engine aegrawng I. a110and! on as.
4Cancwb waN:wt maib: MI liquid and aerie .at. comers w by -..is woanaut cp.mnme moat a am ad In a I.ak-pmaf
containment facility d Impermeable Hoer. A compacted day leer that dos not aloe smMmt liquids to enter ,..d water i. consMaed on
Impemwbla lbw. The liquid and solid wastes must not contact the ground and there must not w runoff harm me concrete washout
watlon. or ors.. Liquid and valid wool must be di pow of Ontl in r ce with MPCA regulations, A : n must M m 9 sp ment o amp raqu ..One. N
installed aa' cent to a«h washout Twilit to inlartn concrete equipment .polar ili n (Militia.
p ap p op 9 to ut ze the er Y pm
G FINAL STABUZATION
The Pmmittee(e) must anw. Final Slmiira,ion of the site. Final Stabilization resume all of Part. IV.te I-5 d Part IV.G.6
I.FYwI Stabilization requires that all doll dialwbinq «ndtiae at the site haw been completed and all pods must be stabilized by a uniform
pRennlal we etati,e cam .in a dmaity of 7= over the Wher Perviwa surface o.0, d other e4Malmt means nKKevy to Vewnt was
figure under moaiw, madlibn..
2.11a Ppmitlee a must ensure that Me Omenl stermwolm treatment It lean meet. all requirement. In Part III C. Me Include. but ;e
() Perm w tous
not limited to, a Md dean act st Mnpnr, Or a pwmOnmt sedimentation arsiu that are to be used n Dmmenro enter quality
management ba:M and find hmabumim w maintenance of inflltraiion mains NI w?nmt meal by remowtl from conwyonca swlemr and
dlmn must is on of th with pmmoneni cover.
].noon to mowed 01 the NOT, ail the .R. ar teach mtl romituwl .swim Vbla EII and walment cancer BNPe (sum as Bill s ono
wl st rtmowe t Me t in III s of Ma Bile iw rnicM1 1M Pmmi11w is responsible. BMP• dngned l0 Wcompaw On ails (sum w sums
woman Iona) may ru left in place.
4Por rmaenro nt parudion am ol0hm b Iota m etedand Mal hanceMed it me sold t her
are finer & temporary erosionheres
W r () p Y protection
mxn r lent r I n I n r n n r. A i' cal me Pwmittw meal
un g w Dwrmelp control a been completed and f e e.,ence r ban add to line of th n era M y
aiarr'IDute the MPCA'.. "Homeowwr Pact 91wet" to the Mmwwwr b inform lM homeowner al the nab ion end Wne11U of.
Arms cant pear.
S.ma be ayuctsbarccompl hed by on tend used for s6zed lone) Me pars onst ddonpipeline, icrow crop or range land) Final 9bDllisatkn
s be accomplished y ter b ntuer the tralle low low l0 Ile nmf All cons tion Activity
use.
may co P Y "8 P ^8
B.A t 1. addition w may Port T e cer r nectars VpriorG.3 to completion of all c Part IVGA or Par If ell of tle folkeing sntlltbw ere
Tel le racti.M Pori e. O. thou n Peet IV. On VIM wrens Ikebb Pee[ IV.C.d or Part IY.G.6.
B PP
a. Ca leassi c6At her c red for at beet 90 days
w
b. an bast NiBOX (by one) of all erlgiwlly prone.l eea4wnon adihty her been completed and pernannt cover eatblbhed
n thaw as.
c. On flrcen wnerc covs[rwtlor ectlht la no[ complete. R him.eeNPermanent cove[ Dee <n Dken<6
Y D
NOTES: 1. FILTER AGGREGATE TO BE 3/4" CLEAR ROCK.
2. 1/2" X 1/2" WIRE MESH.
ADDITIONAL ALTERNATIVE: 6"
ROCK LOG FILLED
WITH 1 1/2"
CLEAR ROCK
CATCH BASIN INLET
PROTECTION
-FILTER
AGGREGATE
....m r. '.` .w<,
M
err
w�r�,..,.
1 eq l
a..
:Yi:C 9 a"~ •' rW.0
Y •
rwwn rl now
H VIS
FF-
� - r -sit
al"
ap9 A.�.H-a
1M
4L- FT6. NMk14E 9Y£ri Y)•
-o r ..g r. .n.r m.le'Do
.:. D r A
H::
•,. a. -tle :l r„ . yes JL
,J
C a l Yin Sr�tlF: 'r
it
/! N'li�'n w.�3k(.Y RE�i. B.'-o'l-
= I,,,
$_T =VILE. 1Z 511ET(JJ
1 \• ...?(t_ j _ =-
�r
L9 •n - I'll ran
s cr''.
. s - .%, L
P1 Tyr .. _H
i '_]:: ib
rtR•za =9 w"T.41-, sons 3l
+"xE: r n r T
,v
I,S:TIyVp A_T =-tkM
<-slw. a.w +", vow
.W 2_Gln1Al ecn M,_
)
WLM V
PAC :• - --
, LL J
V
' LIR ll g U'a-S
�
J
YF3L-rn.CE
fagR FF:`Fiiy r=x m1rF^
affIf
1
RLT
FENCE
ENGINE=RING
DEPARTIAENT
is'.: DaUO
w•z,ptdpVresWs
�f.
r -• "�9
V
qi « S
,.A
11 I
r 1
r-IF:
i BvrE._t UW4
a'IA>I aw tit VV .1
I L1E0Fu,IF''a TH
-u-IkF el IC sine. I • _n
Jll 3 :.?F: TENSILE erElcT-
1. am: p r 1- Ply
J Vy
J.,I,
=` ail
d
=l mP.F]
W+ RP
c;-C-r,(._ A
RM
OFFROAD CATCHBASIN
Run
nL-Ri BARRIER
trA�`�;'°
ENGINEEPHO
)WASIfMENr
turn w, 5302
.hom. x
_ `n
A
.:10T� F
A' W J 11 -Lit ,TV.
I:i'IYL="i FOR W'.Xkin
I- :Alex a:J9 LJ 4.e1
le smut. C, MI Baia
Ia UIl Neu . Mn
r< ro:•c
Vii ST:!; FFI' 11_kAli''I PXFiJiF-jTk `:�,
Emu I ROCK
L'UNSIMUC NUN
MIIIIIIIIIIIIIIIIIIIII
Lh IRANCL
aI.: m_ra b 1GCCGInG DEPnRTVCY- New, Fn'l.iOl
-.z red- q, alas
S_]IA_NI IR:I'
"AV.p:"dPS r' VAHXILI,c:aulr. :, Vr.,
?1S *RC . ^. KP H;Ar•. MV. CR Fi,A
3]i'fXdF,V.:J�=1'P'YMI.- r.YJI'I:pJ wa.,..o .w.... ...
M(: 11-1 ;i:;(' i
i "
AI. 1.
y 11 f.KINIarr-wIlkwIdzr
'� ` j j'.y, ry`,r . maim,
• �r. ill. `''' I.
�`11
�'11 I,
I ? .?
ytl
., I t
I .I C4V v'4--
..-As r.w., ,
,.R..
- a l l 1. al -o a Ir IN'r H.N VI41 .AI: ITFIT' x u l . 1,
an,
D. JENtL
_ "C. a_nm:..._a r rF,sr,._e_-ti' w L. _.. vial ,.rME -
CATCH TRAP
SEG NEN- TRAP
nn�.I ENGINEERING DEcAATVENT RcmNOI h,502n
1-
JOEL G. COOPER, P.E. - JAMES R. HILL, INC.
MARK SONSTEGARD - LAND DEVELOPMENT MANAGER - RYLAND HOMES
PAUL QEHME - PUBLIC WORKS DIRECTOR/CITY ENGINEER - CITY OF CHANHASSEN
TEDDI SEIBRING-TROFIN - MPCA
TO BE DETERMINED
TO BE DETERMINED
(952)-890-6044 (0)
(612)-508-6480 (M)
(952)-229-6007 (0)
(952)-227-1169 (0)
(651)-757-2719 (0)
(XXX)-XXX-XXXX
(XXX)-XXX-XXXX
a
En
I_
of
O
I\
ru-)
17
In
w
Ln
wal�>
Uf
Z
�
N
�
(O
a iiiiiiiiiiiiii=
U)
1
O
M
5
tyt
V)d'
x
CV
In
Uf
m
,
LJJ
W
p
N
X
Z
Li
i
Z
n
�
W
o
to
Cl
LO
\
(z)o MU-)Y
00
CV
n
W
V
T
Z
Z
3
LLI
6)
I
J
O
V
N
d
,N
E
N
O1
v
C L
- W
E
TO
f
a 0
p C O C_
L �,- of to Of
Z
1-, 0 o OL
m
o �'o o , 0 0 00
r ,O_� p0
T , N 0 m
woE W 0I, D
_
t , T, C �,C J
U0� p 0, 5 W
m
11
D V O m
W 0
T
0 0 N 0�,oh y0
ei
- N Q� O W n
-
z
5
O
Ismael
Ismael
QhM
A
1-4
Lit
Lit
wi
W
co
�
A�0
Q
H
E-s-4
W
�<
W
Zj
z
U
o-
�M
Esesso
xz
LLI
U)
z
w
(A
FI O
!
A
�W
Li
>
V `
a
Sall z
E
P-4
w
�
Q
N
F+i
0
I�
U
O�
z
z
Q
W(D
w
Z
rn
z
0
Eawasell
O
0
a
w
DRAWN BY
CJK
DATE
9/9/11
REVISIONS
9/30/11 REVISED PER
CITY COMMENTS
CAD FILE
21996-22ERD
PROJECT NO.
21996-21
2.1
r/L
0i�wu�-/�T ZD1I 1 \`'7�\ f �0/�w�� w� �� SINGLE TIER RETAINING WALL/(CONTRACTOR TO PROVIDE
p DESIGN BY OTHERS)o
8
Hw
snNWEND tl
moat mu1K rmuuc mWtc mwrc +ssw.. muu� mave. -Huu< main muVr. -_ t h I EJ i / / yuu� ywa- /. :.:e :> 'i, lY,••. •� I , I I f\ "C
"NO WETLAND IMPACT yi
mulr� moue- move- mum m,ur� ywre ..,,,„ wua. mwrcL (318,424 S.F.) u� mue ',,,,, muu� /mum moves mu1l� mWa- mwrt. /mLL14- mul(c muV� _J l / / �' / � I l
s,� �� �. Tw `.6:� • •�• ,i`'/ �°�y \/, j , 1 `� \ �� ' ! \ I �' `'
65.1 N.G. - �w� �_� �� SIP RAP TO TOE OF SLObb
PE
/ mWs w� maw mu wu m65.6� 63.OX / \ Tw d' ::. �� / >t /% • / / / / %`:11 i't"/ �L`��9�i / /
6X0 MITIGATION AREA
ww
OLE 865.1
ww, N.G. `O 100YR.HWL 865.400
Tw n.o \ 0 ` .• /
!65;618,464 S.F.
/
�- / yaw. maw. ,woe. Faun. mll�C mau_ - � - a, ., , / !/ / / \ :i X •/! %�
/
19
! m
6 Q a
/PR P D MPSRAR`fi;i •. OS
C' d x 4 - cP
,
8 0 /
2 6
Q '1 DIM
:g
/
6 /
` .0 � / � - '�' r FLIP / / •;
h DETAIL O
/ SEE
&- malty, ma'%"4WDmad4 m_wl< ally ( I / �.ija _ - V V • V ` • / / ! 'l
SHEET 2.1)AL
4j,
V / -
:,.ww.- vwm ua malty- ��, wu.. / / ,SS �x�•-:,,�'.�`,:k°1.�-''•• ',`.:. •i. •`::•: ,'';`: ...- -- -- ._ ,'. � 'p / � V1
7,
GRADING10
.25' MITIGATION BUFFER AREA / LIMIT LINE
15,303 S.F.
�- 5:1 MAX. SLOPEWilk � 's'�• •s '. / / -,. 0 '� / 1 �� '} ii.l '•.�•.:,_•'.:`: i /
;�5: is '
00
11 y� .� 9 - ... - - - Q Q - -� � � \ -- - / � ! 0� � � I tflj � / ei .F Ee�j � } •'3 CO
mWu- muuE moue. ,.tee- maul- .Wwg �Ig0. `I'\ \ >• �� \x -1b6 *W
ii
x� o• rn
�wx ��- wuv. awe - /� O,, :i ' I I III 1 / / / �9 C9 - � .. � !'4 \\ \ � I 1 i 10, •••'• j CP
i I I I I I i 1 ii 3_
/ � si I I I III / /,// r/ �o -N- ' \ ,� h.� i\9 \� \\\6 - _ c �. � 6\� 1'�•6 1� �,.. w
"- y� ' �,� '"- y� '- �� '"- �� " �- `- �- � �• � II I 1 I I I I I r � � �91 z J \ \ \6, a'
ma¢ mW muhp muu ' 140' BCOD BUILDING
u- \t- o TBACIK LIMIT LINE
/
y� � \ J � � : I I I I I I I I � \ \ �- � 1- _ \ � \ s�4 ! � / 9� y(� �p•.�
10' WIDE TRW i:s I I , I BLU�� 6R EK \ \ / \ / \ / / 1Gf /g1 /
SPILLWAY 1� / 11OVERLAY DISTRICT
ELEV=870.0E°Y m / ' f I { LINE (BCOD)
(SEE DETAIL)
24
RI/
E
33.3.7\
Huu m W X71.
J / C9 � \ � \ � \ / / 1f7 1 t• \ � /
... a�,. m. 3_ _a -v_ � / :_, i� _ , ; / i � I � -1 N `I, O> n N � - � I• - - � / / 1 / / / , \ \ /
-Hurt- ywr� - �ww-- �+auW I. :,il•. / / / - _ }o1x1N� 2 .4_ y� I� c1 O/ / /Y'D c,, ( '•O 15 \ /
.r H_ -n. _..._.� LL / / 1 ii'. / / � Man-1•N i ' � \ � \ \ � � - _ J1n��� � _ ! O, / ! � ,`. \ \ \ \/ r
I OD
01
- �., y� � .. m 1 :i .� -i 'ii •'i •:3 •:::i: •e: �0 p0 / % :• # iF l I / `Lv �- _ � \ \ \ I -- -�!1 / ! X % \ 9S! \
+f i . •i. i, fi .i5:: % / / /••:•'. / J /� ._ � �\\ \ � �I \\''- 1 / /1/ /' / � � \R\ 2.
1. •
y au Ha G - a /' P _ ND 2 2 c� N
J I cn L - ��. C4
N 3 \ 6 \ � /
1 YR. H WL ` is
.maa- moue. , \
\ \\
oHuec moot N 00 / / •ii •.; : •i •3 'i :i is I i .:. i; d "' �•{�y,7�' Cii N \ t 9 ,7 / ( �\ \ W N N 14 _ J '•
%
\ .�uu. � � I ? •i �` ' iE c �� I .i I 1 I { I / , 1 N / I p �N � � _ � .99/ j28
10o w
i I '•:':,•'•:�'.:? :il:' :::.; :.::i :::i : I I I i d' ,J , / NI .rya' I \ / � : ;�
r� / I I 'j• � ' z7• >C� °1 L. 2 _ - I O / \� / 1 1 i � �• � - - :._ '
iC
\ \ \ \ . / ' a , � , :? .�• • •:_ �'• ••' • : " / / ko ( I i I � , co N I � � a •� 2g g � � - tit- - - _ x. ce � � .
\ \ \ \ ' . ' ii is i .' _ / / I I� I I I aD ' ~ Nr �A "•�' 3 \ 0 Z /x y�" RE=941.9 y:
10 -
/ I O -
\ '� \\ \ \ � � �` � ` _ >...�i..,..?..'r.�.:r,•...::: s:: / I I I 1 rn � J I / G G 931.5(2
/ .5 \ 9
..:...:.:..::.: .. ...
13
_ ` \ _ - _ -- - _ _ -- - _ _ Via. �:�`.:' •.ii ::i . / / / l n _- _ 25.8 ro • /
a9D----------___ S1-105 z1
_
- - - --= _ _/,, /rn / a 6D-_` _- _ _� 6' LF 924.2 2
2.
--------- -_ , Sj 1 / _'��U _- ��X -
7��5�1 ) / EJ04. ( ROPE cp - - -. _ - -
� \ N BE IN CONST. - 3L. '
I =905.3E : ••'
> Y... ,,, - ! I:.., �_ - -`• - C�& -
--
N
p-+ram.. _ _ _--. - -
r �- _ - --..___.- --
.. \. ;`�� �vj5,. RCP,. �•:
t
SA,
,.� '. -y EX 24" 24" Ri,F x Ex. �15 RCF -...� ..•_�, c _ -_,- 1' �EX. 1- K-- _ W ____ _______ _____ :"�/�: `l .• _ y_ nc-.-+-" __ __ ° h a
- \ �� ',;-_ t '' _. - -:---- -`- r... _'---- '---•, l _`.r c- _ - _ - - - _X. 8" PVC SAPd -_- -_-- - -
\ \ _17- _- -
- s
___
/ •\ \ \ \ �'r�\ __ __- ____� - __-__ ____-=_-.---ect EX . 12' CiP VvM _
'_-- ._____ '`s
- -_
\ - -
--'_' - EX. BMH /EX. SSMH EX. CB:, ....>
/ EX. 15" RCP A I_ / RE=935.54 - J RE=93Z.80 "
v v ax-sse+r� - EX. � E RE-s24.54 BLUFF CREEK BLVD v
RE -9,L \ \ ( RE=911. 2 / I E 15" RCP / - / - -93a- ` - JE 9B2. 4( 1 1=933.23
\ I / "•`� I 886.3E I { I IE=90 23 / EX. CB / IE917.27(W) - _ _ / IE= 0� - - - - - - - Y -- -
\\ ` IEr88Q.03�S� / - - /- , : EX. IidMjl i - - / / �2s Ld J
\ L 66 - / RE=923.81
\ __ r / I ! IE-919.16 ."` RE= 49 i--\ ._..i-. \ /
a8.45( ) r ) l: I1 ><'f~-� Tn r-n I"r,,� 1 1k,.! / / _----------
IE-8>99.48 DROf� ! - - - i 1 I - -� --_ - \ +
,9,., / \ l;.J T\- 1� {7.s ()I ?I----�-'F _1"Ci.'I`_„C_-152>d' I .... ,., L _ L �\..,c„ t / I
\ \\ �� \ COMMONWEALTH ; is 1 917'.7�4O I / / ------------- 0 > .+
BLVD a38 1 I I m
\ t I r 1 /
i NOTES:
32: 1. CONTRACTOR SHALL PROVIDE
\ \ EROSION CONTROL PROTECTION
FOR ALL TEMPORARY TOPSOIL
STOCKPILES LOCATED ON -SITE.
2. BLUFF CREEK IS AN IMPAIRED
WATER FOR TURBIDITY AND NO
' 92601,1 ,DISCHARGE WATER WILL BE ALLOWED
92
TO THE CREEK OR TO THE FRINGE
WETLAND
ST-
934.0
25
/
M
%r
/ r
'r \
z EX. S4
RE=9e
G / IE=90
� IE=90:
l
EX. I CBOH
;I RET94a.28
LOT DATA
LOTNUMBFR
BLOCKNUMBER
FRONTPADSEMACK
1
1
25
2
1
25
3
1
25
a
1
2s
5
1
25
6
1
25
7
1
25
8
1
25
9
1
25
10
1
25
11
I
2$
12
1
2$
13
1
25
14
1
30
15
I
30
16
1
30
17
1
30
18
1
30
19
I
30
20
1
30
1
2
25
2
2
30
3
2
zs
4
2
25
5
2
25
6
2
25
7
2
25
8
2
25
9
2
25
10
2
30
11
2
30
12
2
30
13
2
30
14
2
30
15
2
25
16
2
30
17
2
30
18
2
30
19
2
25
20
2
z5
21
2
25
22
2
25
23
2
25
24
2
30
25
2
30
26
2
30
27
2
30
28
2
25
29
2
25
30
2
25
31
2
25
32
2
25
33
2
25
n
z
SCALE IN FEET
0 50 100 150
1 inch = 50 feet
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY - N. SIDE OF
PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT ® SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
■
U
N
M
O
N
■
N
�
O
J
00
00
N
m
Cr
IN
w
W
X
z
C7
o
�w
to
\Cq
o
LrL.ILo
U
Obi
Cc
Q
o
0
C
N
O_
E
O
m
C T O y
- w
v
lD
aoEaco a
Of
cd�o0
_oEHdm�c�
C T 5:C J
� W
•U 0. U J � �
N
�
r ay dv o+o
0
- N 2D OWN
O
O
F4 FA
I. -I
qM
A Za L0
z
/y
�a O wLj
�
Aup p� �Q
ZiZ z xa C\2 w
MCC) o
rn 0) � -4 L
z
z
NIr
0 WQ
Q
W �w 0)
z z
wold
O
DRAWN BY
CJK
DATE
9 9 11
REVISIONS
9/30/11 REVISED PER
CITY COMMENTS
10/14/11 REVISED PER
CITY COMMENTS
CAD FILE
21996-22C
PROJECT NO.
21996-21
3.1
V III
' �
—�/
! / I �— e9 /-- I -- n
i 93�I 1 936 � 9
28 I / =r
I I .3 � 38.8 �' -- •..
) 7 /r- 9
• � .!-� l % �� — // I /,////�7} / /lI-"/ l 1 � I 1 / \ , 1 1 g2 I �_------�'I------�I� y �� 40.5
,/ J II Li I L0 — Ii _-- _— -- -
/ % / / / / /J \ f I 'g 1 8( / \ W���O - 93 8 941.3
LO
'i �' / J J /( / \ 7 G ��--- — — _ J (I__ 943.8 LQ' -
/ �St/5 g34. N� i J 945 i
X 3 l TW 04.0 g�0 �A — — —1 �93
/ }}c..JJ" ss5. 7•" i ( ��� � \ \ _�
v _ —
/
'- /yam '- � / •:. '. .•` .' ..i I I ��\ � / / `� �x�` � � ..' 2< «_.-� �' `� ------------
LOCK _
I
RIP RAP TO TOE OF SLOPE TW ��OCK_ VI/AY
w ens ..1 6`•.`'_ �.`"?"/ / j• % \ ��\ I
•� / ' ' / 9 '' I YI I I
�� ' �� � �•���°'•�/ ' �' 1 / // ��i i � � 1�{, Sri � I� I /..
' „• x •,. \ ' 15 :,'; / / Ol / / j — END CONST.
E2EN 03 J
TW E4EV 9`22.42 i \\ \ \ \ \ \ 'i ,``."^ ' ( / v\
WWW \ Bw
EXISTING SEDIMENTATION BASIN & v >
/ -- Wu I �i °i: '`,`9� / // / / ! ^� OUTLET PIPE TO BE LEFT IN PLACE 1// gh� 1 :,
'76oa , / UNTIL PROPOSED TEMPORARY /
', / // s :. •� I / , / / !// / / :;_, ;• :;� 1 1 SEDIMENTATION BASIN &OUTLET ARE
- -"-` I i' % ,>•wt- -xwu- -- �- .:i . .. . '.: I/o-. X�6/'- .':5 �j`
(•; i � 1 INSTALLED. AT WHICH TIME EXISTING
Tw o d t�j I �Q' / sod ': �', BASIN (c OUFT ARE TORE REMO D. i� / \
`� \ \ �o \ \
' 1 1 ly / \ / / ! �.RE o \, \, \\ \' \ — y t \ 99
\� \ / J/ / 1 .':s '.:�` — \
yuu.- .�- swd I a j[uu.- �- yuw. " „ .wua. � -"ww�. •. 1 ` \��• / " 0 _ _. / i \ \ !.,\ \ �� — � �
is •: •:
/ewe-� avo- �vwk- max- �w�- �+ �vwx- -�wY, ' \ • \ •` 8 -• c / / �� \ `? \ /
K SINGLE TIER RETAINING WALL'� \ \\ \
CONTRACTOR TO PROVIDE-,\cp
x y DESIGN BY OTHERS
a8
7$,7°;:' � M I I ( I •� .1 •x 1 ' r'?� / 1 '' \ \\ \\ pk� � � ��,�, \ \\
.wm 4r \SN i�\� \\ t\
\\Pill
\ i
All
DRIP RAP TO TOE OF SLOE : • •• • • � / ! / /! \ i I :• _ � \ .6, �� \ \ �/ / / �`� \ \
/ Tw r..::. :,. / �5'i / / \ I I y Q \ \ \ \ \ \o \
.��- -- .... 30 \ � \ \ \ \ \ \ � � `,, �\��� ',• � ;
4 w :::';. ;.::; 9 032.0'
,,~Tw....i`r� + ,.. •:°'r:.';yrf""=` �`:.. •:q�: °: - \ �9 � q y J � / / �• , � \ 9,j% $hi X i
ew-87 :.:: v�r:-.•"'.'2'"+'A�.. .. _ —a/e � i / / / / % � •' "� / •/ i '� GF ' \ 34 7` \ � \
\ \ O ..�•``,:�'�'������` _ / o / / / y ' "•':20 // - � � � 1.
_ — . � '�� i is ` �°°:° �'.: ':.. �.:.'.:-.:::..: � o ,( � • / � / / � 19 � ��� � $
/PR POS D T M, RAR :;, ;i / tJd iCp P 9 \ \ i /
— ::::.�i..::::..:::••:.:.:::::.::::.:s ..::.: — 29
—aao / i SEDIM tT�TI�N BASINr._ /No
rn T-1 \ \ to \ \ \ e \\
5
UL�T PIP / •
..:.::..::.. .
! 1
/
� SEE DETAIL 0 �
\ ...,ii;.,.:-., '., .. - � -,. � � i I , SHEET 2.1) / �� •: 'tf` °� � \ \ � \ c3` '
r
8 I /O 7 Q Q \\ �1
07 z � O
,
—aj oft 1 / :.::22 t" w 37.
\ _ — % \ Igrw \ j�J 1 -1p6cc r c; / p` 38.35
39.851\ N
38.35 CA
I I `
N �, ,� \ /\`9 \ \ \ 6 - - '\. fn / l 91`Z / 39.2 \ �, I ° I �r�-
s
x
cc
g,/ / y ( / / p ( ( :i`L''' . \ 3 9•/' I / i t I �o� I
go9• > > I � � / /g��� �€:°�'��•t° � � �•s__ �� � • y / 1�N 1 0. I /
v — — ��• . � _ v v � os. v � , � � � v � / i ,� � � ,5. / � � ••' _ .��� o. 942.5 G � 9
wo
21� \� 545
i24
_
Jg�3.5^`2i
1 1 pj 2 \ /� \ / , J a J J 16 /,F / 2 / \ 23.0 7\ 934.0 / ��� 8 - }— c�
pia Q / a
-•
s. 51- ♦♦ /
-C�
25
—
t ! 1 IN N N O �\`fla\ 1\ °' —�cV NI/ / /GF o; \ \ \ \ / /. / 1; 1 1 ( I I ( I 11�1
a � � / � , �- — — c1q 9 C*4 J N, J �• / J J / / // / G� \ \ 6,\\ \ \ ;''ir1: - J y _ / I I \ � � �
V
NOTES:
1. CONTRACTOR SHALL PROVIDE
EROSION CONTROL PROTECTION
FOR ALL TEMPORARY TOPSOIL
STOCKPILES LOCATED ON —SITE.
2. BLUFF CREEK IS AN IMPAIRED
WATER FOR TURBIDITY AND NO
DISCHARGE WATER WILL BE ALLOWED
TO THE CREEK OR TO THE FRINGE
WETLAND
LOT DATA
LOTNUMBFR
BLOCKNUMBFR
FRONTPADSMACK
1
1
25
2
1
25
3
1
25
4
1
25
5
1
25
6
1
25
7
1
25
8
1
25
9
1
25
10
1
25
11
1
25
12
I
25
13
I
25
14
1
30
15
1
30
16
1
30
17
1
30
18
30
19
1
30
20
1
30
1
2
25
2
2
30
3
2
25
4
1 2
25
6
2
25
7
2
25
8
2
25
9
2
25
10
2
30
ll
2
30
12
2
30
13
2
30
14
2
30
15
2
25
16
2
30
17
2
30
18
2
30
19
2
25
20
2
25
21
2
25
22
2
25
23
2
25
24
2
30
25
2
30
26
2
30
27
2
30
28
2
25
29
2
25
30
2
25
31
2
25
32
2
25
33
2
25
ZMINNOW�
SCALE IN FEET
0 50 100 150
1 inch = 50 feet
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY — N. SIDE OF
PIONEER TRAIL — ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT ® SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
■
oO
M
w
W%>
V)
w
00
J
m
\
5
00
_CN
0
.Ld
w
Z
cn
,^
W
o
Lill
o�
m
w
Ln
Z
w
Q
O
o
OZ
CL
04
a
E
o
d
T� Y
v
o
o w
aoEoco a
y•-�odo a
O
a�- oo�mo0
I
O N
wL
_ o E Z'
0
C
J
�
s •W N N v Orn p
°%
_aa'v owin
o
0
0-4 w
Q za
�rl z
ill
w Ld
o� Ld
(�v,q� �Q
;4Z -Z OW
^
5. �LIIFh"T��III Q
mow/ U O�>
�a� Z o
z
z
Q
W �w
w z
zo w�
I. —I
a
DRAWN BY
CJK
DATE
9/9/11
REVISIONS
9/30/11 REVISED PER
CITY COMMENTS
10/14/11 REVISED PER
CITY COMMENTS
CAD FILE
21996-22G
PROJECT NO.
21996-21
Fr/
1 Fill
nI
nI
r
13
/
i/
/
I,
9�0 81��
39.85
ST-
934.0
25
%i
`\ \ \ \ \OTO\ \ ': '� `�} \ iCS% / \ � \ � 'Q\ '\ I�J I ti �i//%— � .\ { `,` `, •w �, � � U \\ \ `\ I � \�\\ �cn6' `�6' f'
y�/\ \\\\ Lo`\n--
oc
9 \ \ \ \\\\ -o\ \ \\\ .�� \ �/ 1 \� \ , ,, \ \\G\ NOTES:
7.\ \\ \�\ `\,.'� - \ , ' /,/ `< �� t-�- �-- --� N`� \ ,P \�� 1. CONTRACTOR SHALL PROVIDE
\ \-� \ \ \\ ``':, - \ \ : '\� ► `' �-- �',, �� �� �,, N.,\ \ EROSION CONTROL PROTECTION
I�\ \ \ \o , �% s \, ` N N \ 1 ,i ' , ' y N \\ \ FOR ALL TEMPORARY TOPSOIL
_ Q \ o 00\ Lo
y 1 �\ \ \
\ \ ,\,oF , �'' , \I ``` \ \ STOCKPILES LOCATED ON —SITE.
ZIP\ \\ `
, It� ', C� �1 �; \�--'\ \ It ,\ `,` ; _��'� ,\\; \ 2. BLUFF CREEK IS AN IMPAIRED
� y \ \\ c�5 `", 5 y y y y 1 \ 10- ` , ;; ( \ \\\ \ \-
E \ `,,\moo I ,,� y t l y �1 �,, �� i a� , - , \� \ \\\ ,\'-- => `� WATER FOR TURBIDITY AND NO
37.81 1`t�
I \ c001$1t-109�' y 1` ii \�i,` \ �o\\\\\ \�_�3�8 930 _ - D
{ '/� DISCHARGE WATER WILL BE ALLOWED
\ _ \ > _ TO THE CREEK OR TO THE FRINGE
271 w A / - -- WETLAND
j I
I� I I ,r III 1 �11 o�\ 4 1, - -- -
I / ` Co Iw,1 -
1�� V Ir� I I��r III ' 0 1 i \ �� _--
N I IoN� �01 i I w� I \� \ I ,' - CR Bw -
y4N \BLUFF T
'K
r
2 _
IL
a
1.9
CNv
IN
rni :,�,r�• �\\\\� ,'
LLB I0�
1
- \
/ 1 I
It
ClCT)
I T/ /J1T
CONTRACTOR SHALL CONSTRUCT EARHTEN
�. 15" RCP BLISTER OVER EXISTING BLUFF CREEK BLVD I / / / / ; I I I`'�`'``• ` "' _'" --t- y>t\
FOR TRANSPORTING MATERIAL TO COMPLETE I / / / I I I '•'°` ' `_ '' ' ' ` \ f
PARK GRADING. LOCATION TO BE DETERMINED I / / �� / // i i "_ •_ _ _ _ 'li { �9 /
s IN THE FIELD. THE BLISTER MAY REMAIN IN y / / / f ::'_,_;,;:::': 0 _
ceMHMUST
W M T _ TH E WEEK, BUT US BE
ACED DURING �
=942.08
PLACE ,
2 i
7 N
E 93 .00e RE
MOVED ED FOR
WEEKEND TRAFFIC CONTRACTOR
OR
,
,
/
e
-
E-9 .9
S/ 0 l (
SHALL PROVIDE ROAD CLOSED BARRICADES AT, -
ROUNDABOUT AND AT MAYAPPLE- PASS. LS7
;,)G4 EX. 8" PVC VJAA
r`1lF.- ' - - -9�E- •/ • _.- \ IE=916.48 �� :9i"•e• '-' E ? ., _�- 1
n A I N//I I`
-- - --
;,: \ \ �\ t / \`_-- \ \ , \ / EX. �' PvcsaTa\\\\\\\\III { I i �y
EX. S zMH\
RE=94 68 / 1 �------932----------1\ \ e"` ;l —_ �� \\ \ I I I I , T A
IE=90-3.2s�w) \ - - - - - - - - % I pl - - \ 1 I I { I I I 1 I
E=903.15(N) -- -- --- I : / --- ----
I I
NI n vi
v/-\ I
•S I / , t--f- { ' I / / ---- w I _iL
!> EX.Icer,IH-� ✓ nll II� \ /F-^Tt A r I\ IT:11
f, RE-94 28 40— _ -- " I L %-� L_ )—A-- ; \ I I — ♦ { ) x �� I I i I I 1
II
' l_L,-i --t�__ C"i_ �_===�>i /-� l}JI \ I \L= �� 11 V V L_ .� I IVI L_
E-935. 0 N) �- -- -- ___- / 111 I a { o I I I I
IE�934.22�E) / g \ _ _ _ _ _ / r- 4 u \ — —r ^ 20' WIDE
IE=E 34.12(W '`- ---- --------------------------_ ------ — — — — — — — -- — — — — / / '-/J I " �, — �r —� J �— �7�, Jl'
T L 1 i 1 f —`\++ , — — — — — _ — / i II L/ + I V \ r. L �� lJ Z� -492n kJ_ INSTALL DOUBLE ROW OF WOOD INSTALL DOUBLE ROW OF WOOD
MULCH LOG FOR ENTIRE LENGTH MULCH LOG FOR ENTIRE LENGTH
OF BLISTER. - 3. OF BUSTER.
I i/-936-- — — — — — — \I N y _ — — { .. 36' THICK BLISTER
_15"I RCA
40' ROW 40• ROW
PL
r I, ,
— — — .— — —. — — — — -- % u ___,. / ... 3fi" THICK BUSTER 3fi' THICK BLISTER
d 1
.. .. -. - ...
I P ry II
0.-' ,'� / -----930---------//---
ROAD BLISTER DETAIL
ZMINNOW
SCALE IN FEET
0 50 100 150
1 inch = 50 feet
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY — N. SIDE OF
PIONEER TRAIL — ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT ® SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
M
O
o
U-)
w
�
z
�
.�
N
o
J
z
00
°°
N
�
N
m
O�
w
W
a
X
Z
z
N
w
o
co
00
N
00
W
m
ICU
Q
o
0
CN
a
E
C T O y
a
p. N E o •�
-o
c�- 03da
0 w a
y
O E> N m C
C
3
^'mm�v rna
� 0 a' awin
0
�I 1 �/•1 z
�V 1.4 V i
/\i O pq W
�-4 q
zz z xz C\2 - c o
Co LUI
�Zvq>
Ufa<4Z ^70
= z
0.1a�� �<
= 0 Q
Of
U /y
0 WQ
Z
NN Q
Fil
W �w
z z rl
Or
W 88
H�
a
DRAWN BY
CJK
DATE
9/9/11
REVISIONS
9/30/11 REVISED PER
CITY COMMENTS
10/14/11 REVISED PER
CITY COMMENTS
CAD FILE
21996-22G
PROJECT NO.
21996-21
3-3
Y\ / /18
f
TW 904.0 p'•�: '�`
W 895.5
70� C
�iui< �Llti� --���-__--�' sLuvr< 3! /! !! / / !! � ' i � �'�•_1r'•�:.: ��•�•.-�`"� ! O 1 ` �\ �
IL SIL I / SIL 11 ! ! / / � I ]; •k' I \ \ \ 1 � \ '�`
TW 92.5 :..;:a .:;:.�►.,;.. ' \ \ \ \ ` \
/ / \ \
N _ RIP RAP TO TOE OF SLOPE BW 879.4
/ LTW 888.5 / / \�.
IL �� IL 11L \/ 11L !' l i
BW
/fib
wC W W / l : :..ai :•i;f I
L �dL S \ 11L - 11L / / / I '.I. .;�-•�. -:.f.• :,; / � / / / g//,G
s,\ut>� �\ / \u1v� ,\wi< s\wi< / / I I ' ' •� •I:: •: i' fi:.�='.; :� / f ,/ / r I '� �i
TW 88 .0 .:.' •::/ , / / / / , I I \ .. �.
Q t':.. .•� :: ,✓/ / / r i I T I �'`T
L 1L 1L 1L\ SIL _Y I ' BW 87 ✓•;•••;:'f• / / / / / O \ \
00
..• / / V
SIZ SIL SIL I :�:•.;:�. ��j�- r /Cbr /
TW 888.0 t / I • ►� !
BW 878.7.• '`-•_��••-`
o- 01 W `N
IL 11L I
IL SIL J, I L SIL , 11L 11L 11L 111J _ JJ �• / / ✓ \ ,
4>uL_ �u� � � I Dui :::: : r'.::::'.;:' ( / / ���• I ,// / /6 R / / ��
AN._tlr_ gib_ I mod,_ _� _W_ _W_ _W_ _W_ I _W_ y; ; I. . • I / % / / �� /
L SIL 1L J — 1L 11L 1L 1L SIL 4
77. �;; •;�; �3 : I � ! / /
�wi� �_ . ' I I T % / /\ / / X 1611'
Q 1 i Q)
/ l _W_ _W_ _tlr_ _W_ W_ TW 8 0.0 7 yf / I /
IL SIL JIL JIL SIL 1 � 11L SIL JIL 11L JIL SIL BW
0 7 • 7' '' I I I I O,� r YY Ci �h/' /
_N\>u.L -W-/ _/Z Lu-Z / �w-Z
_tlL -IV- -w- -W-
L 11L JIL SIL 11L T I /- SIL SIL SIL 1L SIL /, SIL SIL J .:: •. �`•: 'I t 1 1�� y, ` \\ /V\
�144- _N\111_/z-
W_ IL_ _W_ _W_ `L- �. j � � / / '�_ _,L_ _W_ _w_ _W_ /,_W_ _W_ t ; • •\ �(I '� /�\•.(�J \ A- \ \ \ \ � \ � / `� .•,,, � � /� /
IL1L `-�N 11L JIL SIL 11L -11L 11L SIL 11L 11L JIL JIL 11/7/ p•. ._ \ C V� � ('�� / � 'J /f�c _
l �1 VV v
_NL11//< �llll�/ �llll� �11ll/ i :: ;' ; :; . • - \ I + \ \ \ � � _W_ _W_ RW_� \ _0_ (�}/� _W_ _W_ �L_ _W_ _W_ I _W_ •
IL SIL 11L SIL 11L SIL JIL �IL /11L 11L 11L JIL 11L / _11L
\ BW87
,sum ,�U,< �u� SINGLE TIER RETAINING WALL ,'
/ (CONTRACTOR TO PROVIDE // :r : :: � '� �/�/
_11L SIL SIL -�.LLIL 11 -• /�.•: •. •:-'
__ 11L 11L SIL SIL �7L J,IL / DESIGN BY OTHERS) ' - ';�! ;rr / C)j, ' l I ,' r` !�• l l r l
a\ll11 a\lll� a�lll�-�111/� 3111/< w I I _�\_ll</ DL-
,N_ _W_-3�•u< _w_ TW♦ 8 '•• -f:- •:� :�•: •
_ JIL SI SIL SIL IIL SIL, SIL SIL � SIL / JIL JIL 1L 11�� l '•'• )? � .j� I !
/ / �' BW 878.7 f1 / ! j
Luz �111L� /< /< I �1� L> /�l>ll/ �111L/�. Sll/<.J �1111�/ �l_w/Z- �Lu/< �1111� < 1 •2 ;.; (t�
Di / _a,_jr-_w_ / �_ A, -9r- ., i /
ACT _Jr_ _W_ _W_ _W_ ,Nr_ _N. , lb
/
SIL 1L 1L JIL 11{L 1L 11L _1L 1L 11L JIL SIL S i�/'' �•-.• •''�'•- I / ! / l � � l I I � j �.
/ y N.,
ji-
AL
_�i<'- 11L �.I� 11L SIL SIL SIL JIL �IL 11L JIL 1V' - /
/ � / ..W,878,7:':• .;.:', �I'sz6,
IN.G. -'` RIP RAP TO TOE OF SLOPE :' ::::'/ I l /!
/�. �11
�' / I / O Q l / l\ t
6 6. 0W_ W W" W/' / :• •:y 1.(1:';' / l ! ! O/ it
l'
W 884.0: t p
.- -..� — a� _ � � .. 11L/ � V JIL SIL SIL , / J ..: • , / ! � ! , �� ! ! , � / / / / \ I I l l / 1` I
19
::11 u ,y
u >..
/ TW 884
RE # ;.TW 887.0::-..;::''
1 _>
4 Q �[ \ /
/ /
872.
F.
....:.:.. . p(0
20 ,
19,/ \
/
� T
.I /-':��•'•.��� " __- �� 9 :/ ��, �.' PROPOSED TEMPORARY:::•':.:_.:� ::�,�
_%�SEDIMENTATION� N \:..:. :: r:• -:. �_ .'�, / •�,/ ,
— , ! .P P' BASIN : 'C)
_ _ _ _ ' / & OUTLET I E / / d9
(SEE DETAIL ON
3 — --- - ------ej9— _ / �o �t, ! SHEET 2.1) / / / :21.
A2n B �t I�L— •'• • • �� �1 Qt /l t /�. 1 j— '� l\\l �K / a / `\: ! ! 19�0 ! ! ou?� ,.:Z •: :j: / \
BLUFF CREEK
OVERLAY
DISTRICT LINE
3.
PROPOSED
GRADE
J878.7
EXISTING
—GRADE —
:,
UNSUITABLE
MATERIALS
A///
SUITABLE
MATERIALS
RETAINING WALL CROSS—SECTION
LJR WITH TNP AFC" -
TO nLl LL
I
N
L C T
11 —s
l qNT WEUD ALL JGNTS ON CLEAN OJT (NON ASKETED)
V 'HaTS SHALL 'E
Six''. D AT -9C INTERVALS (MAXWJMI
�OF
SUB -SURFACE
PVC DRAINTILE
cffmum
CLEANOUT
ENGINEERING DEPARTMENT
was 5234
Fl�wyc:ce c sFccs szr.
SLOPE TO GRAIN
NOS SQUARE POLYETHYLENE
GRATE WITH U.V. INHIBITOR.
SLOPE TO DRAIN
COMPACTED SOIL
NOS M66-6' SEWER k DRAIN
PIPE RISER(LENGTH AS REO'D)
NDS 1201 SPEE-D BASIN
WITH LOCKING OUTLET
SEWER AND DRAIN PIPE
INVERT ELEVATION
CRUSHED STONE
NDS SQUARE GRATE WITH NDS SPEE-D BASIN
NOT TO SCALE
NDS SQUARE POLYETHYLENE
GRATE WITH U.V. INHIBITOR.
SLOPE TO DRAIN SLOPE TO DRAIN
III —III —I
I
— COMPACTED SOIL
NDS 66-6- SEWER M DRAIN
III—i
I
- PIPE RISER(LENGTH AS REQ D)
II
III NDS #101 SPEE-D BASIN
-III
ri
I _
I- WITH LOCKING OUTLET
SEWER AND DRAIN PIPE
INVERT ELEVATION
CRUSHED STONE
NDS SQUARE GRATE WITH NDS SPEE-D BASIN
NOT TO SCALE
Z �
SCALE IN FEET
0 30 60 90
1 inch = 30 feet
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY — N. SIDE OF
PIONEER TRAIL — ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT ® SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
Ln
w
�
00
�
rn
°°
N
�
N
Co
W
LLJ
O
z
L¢L
L1�
CD
00
N00
W
U
m
z
v
cc
3
<Z
z
N
d
E d
rn
o - w
aAEaco a
0
•- " mo o aV'i o R
d
° @7
O N
o E rn v�m�Lj
N J
O)
U 0 O
yyy�v'.o+o
�0
as owin
a°
E-4 PA
IA -I
M
A � a �,
Z
a w Lj
A~a0
C\ 2 Z x a
�� w
Z C) 0
C0 AL
aAZ
x QQi�i o
I� Z
0
Cl) Q'i a
Z
Q
W ZW L0
o r=4 � III
a
DRAWN BY
CJK
DATE
9/9/11
REVISIONS
9/30/11 REVISED PER
CITY COMMENTS
10/14/11 REVISED PER
CITY COMMENTS
CAD FILE
21996-22G
PROJECT NO.
21996-21
3.4
I.
Vegetation Management Plan _ ' 11L 11L11L JIL JIL 11L11L 1L `'\�11L SIL SIL 11L 11L 1L 11L l.\� 11L V SIL 1L 1L 1L ♦ f' / 1L / 1L SIL SIL 1L
Pioeeencen, r Pass / \ 1
CmhmMre insote
/ /�Ll/<�LW� / �lll/< �b'1
Tne gual for the weaarld mitigation badn All be to establish a Type Hype 3 III_ JII_ _W_ % _w_ _w_ VI_ _ f_ _VI_ _JI_ JV_ _W_ _w_ Al _w_ _111_ _w_ JU_ AI_ Al Ar_ III_ VI_ _JI_ /x\II \ \ _w_ � V �V_ JII_ Al _IV_
wetkntl with a relive W ffn on me os sole o! me wemm-The site pepsration / \, /--yylJJ,�
and Invasive species Writercontrol metmtlsare mtof Md wailsWOW- 1L SIL 1L 1L 11 SIL SIL SIL SIL JIL SIL SIL 1L 11L 1 11L SIL SIL SIL 1L JIL 1L 1L SIL /11L 1L JIL SIL 1L
SINGLE TIER RETAINING W� I. SitePrepeagMn
A Site Preparation shell consist of the following. x1 /< x1 � x1111 xUll/< x\11Li< �lll� _1ll� �lll� �lll� �111iL x1ilU< Attic 411 �111� �lll� �111� - li �1LW� -li �Lw z- -, ,i ,96w z- �1llZ-
/ '�m� . �11L� /
1. Preparation of the seedbed pares the in a manner thal pre ` - r
protect she for sped. After final grading has been (CONTRACTOR TO P R O V I D E
cempleled, the ale will m wgrvate0 Prim a lithht tlkMn9 _\U_ fib_ _Jr_ _Jr_ _Jr_ Ar_ Ar_ _Jr_ _Jr_ _w_ _W_ JI_ _Jr_ _w_ Jr_ _Jr_ _w_ _Jr_ Al _rb_ _w_ _JI_ _JI_ ` _dI_
anddragging so mat ma surface re relatively level, fie SIL 1L '1L JIL SIL 11L S1L 11L 11L SIL IL 1L SIL 11 11L SIL SIL SIL SIL SIL SIL �.YL SIL 1L 1L 1L L 1,1.
old not overly compacted. r / DESIGN BY OTHER
S) S. Install seed ace Voting m spediiramrm offer seedbed is // j /
Mepared. x1ll1/L x111Li< x1Y11/< xlll/< �L4al;- x111L/< 11LK- �lll/< _NL4u< -pi /< x1LL[i< x1_ x11111� x1LL11� x111L< _NS U< x1llU< x111L/< x111U4_ _1Labl< xSlll/<-3L111/< i1L� x111[/< >\ll!/<- x111U<
ill. In the absence of suitable organk o hyd i sills at INS,
depth, a hold tlown snail be avatetl Such 1 / I /
matam nimumd IDirxdhesINwhabla rgani or hydre �V_ _W_ w_ r _VI_ Ill _w_ _VI_ AlAl- AI_ _\b_ _VI_ W_ _tb_ _N_ _W_ _ill_ _JI_ _w_ I I _w_ � _ \b_ _Jr_ -\ _w_ w / w It Ib 9 ' �
materials can be placed to the proposed flnkhed - i
elevator. SIL 11L JIL 1L 1L 11L SIL SIL 11 SIL JIL 1L 1L 1L SIL SIL SIL 11L /1L 111 S1L, 11L JIL SIL / 11L SIL SIL 1L/
II. Bead Specifications
A. Use native throes seed:barn. Gran. dry new-cropaeed oomplving _N\i 4.4i --W-k- -1ll!/< .�Llll� x1111� �UIU< x1ll!/< �1111� 111/< x1111/ � � � � �WW� xrlll/< x\ll!/< xWl/< x\lll� xylll� � /L I->1111/� �1 �11!/e.� x1111/L L �� .�11ll�/ -3L � 4L i
with the A66ociaBpn of Off Seed Analysts' •Rwae far Testing EXISTING WETLAND B i J
Seeds" far perry and germination tolerances. I ,
B. Seed mixes shall be handed b the Cortherch rain Me Standard _IU_ _W_ _W_ _w_ _w_ AU_ AI_ _VI_ Al _ _ Jb_ JI_ _w_ _III_ w W_ _w_ .� fib_ _W_ �h_ W_Al _W_ AI_ _w_ _w_ \ib� ✓
sprciosaMration. Reed mu sycies antl ratlos sha�lmguaranteetl 11L JIL I SIL 1L 1L SIL SIL 11L JIL 1L 11L 1IL 11L 11L NO WETLAND IMPACT SIL 1L 11L 11L SIJL� 11L 11L JIL SIL ;JSIL SIL 1IL 111,.�y
by the contractor to be true to specifications as regmred. The /
contractor shall supply and plant native l aied as port live aged /� (318,424 S . F .) / / (PLS). See pending Fo n lar Planting schedule. All want shall have �111/< J _ .,.G r� � � x\_WL_ _iLlll� �L111I �lll� �111� .�llu xV1L x\111/ \Ill/ \Il!/L 11/< Ulf/< \SIl/< 11L/< / /Sll/< UIl/ x\11L/< x\Sl!/< Ill/�. / 11:/L x\ll!/L -s lua<
the proper stratification afoot scarification ro breax cormancy for 1\`-.-.�/J'C` 3_� 3_-�i_ 3__ �L_- /x1_- �_�- .✓'.I/�
aphng darling. No trealment required for seed used in Summer andfiall /-�
C SeeddasooFB shall be Ruin an approvedleamsed nurserywhowill be AI_ _Ilk_ _II_ _Ile_ AI_ A/_ _ _w_ •VI _w_ _w_ _hb_ _w_N. G. _w_ _1L_ 1l_ 11_ _JI_ sIg _W_ Alm _JI_ _w_ VL Ar_ _w_ / _IU_
required to specify the origin of the eared used M Me site. SIL 1L / 1L SIL SIL 0 SIL SIL SIL 1L 1L SIL SIL SIL 1L �r Sl 1L 11� 11L 11L 1IL 11L 11L 11L 1L 1L JI/�y/
Ill. Seeding Fruit (includes Wet and and Upland al Areas) 6 5. 1
/ RIP RAP T 0 TOE 0 F SLOPE
A. Fall seeding shall occur between mid Oppose and mid November. 4yll� / / / �\11� _NUlUx1111_ /< L -I\ Lx111L� 4111U< _NL11U< AL/< _N\ �Llll� �Llll� �LIJlJ� x1111/< x\ W /< x1 /< /L __=/Z_ x1111� �LW� 4hL11UL x1A/< x\ll
Seed may be hare-0roadcasi or planted using a propel calitirate l 6 6 . 0 Red tlrn over the site at me rotes and with the suedes Px per _w_ 14y _w_ _III_ _ _ _J1_ JI_ AI_ _II_ _w_ _III_ _Ib_ _Vr_ ♦ `\ \\ `\\ \\ \\ \` `\ \ \ ter_ Jr_ �U_ _dr_
esed sutl Aber sardine, the site will be gooddragged o and al l oncetl
seatl suppl er's sgecilkations fo ensure goad aeetlksoJ concept. SIL SIL SIL SIL SIL SIL SIL SIL SIL SIL SIL \\\,\\\\\\,\\\\\\ `\`'`"•'�` ` -� `v -�� , \ \ \ 11L�� 11' 11L 11L i 1 _
lv. Cover Crap / \ \ \\ \ \ \\ .- - �''. "' +++ \ \♦ \ \ „'
A. Oats or wrier wmal shouN be used as apeafietl in Steer Seed \ \ \ \ \ '
Musa. �Llll� �� x1W� �Llill� x1 �� LIE _NLWL- III>u� \ +• \\ \\ , 2-- /�/
\\\\h
4 \
V. Monitoring \ /
A. Annual 0 moringwillm Conde; mininmence Ineeweb WCA rules._W_ I _QI_ If- _VI_ _w_ AI_ At,
\ \ •+. \ \ \ `\
Results sp well Below deie[enngCo mlMtks whichcould \ `
9 11L SIL IL 11L ..IL .JIL 11L SIL N . G. SIL \
differ rain mole specified below tlepentlinp on performance of the \
wetkfM erhd uplantl bNler. Bare soils tlevoq of arnargam veBatatan ,r� � , ♦ / � •
willbenoWWdngmniW,nga inbeswihatoverseedingafl& x\111/L \ _/Z_ �11L/< x\111/L -ll \Ill/ 165.6 / K + \ \ \ /Oil
the Initial seeding can be mnsmredif deemed appropriate. l�lJ} 3 3_�- �i/< x\lll/L x1 x11�1 \\,\\♦ \, /! \ . •;
VI. Maimenarrs ,f f•' , \ \ \ \ \ \ TW 884.
A. Year One: Mow, using a llal type moor, m a height of 5 me W_ _IU_ _w_ _W_ _ _w_ A1_ _VI_ _W_ \\ \ \ \ \\,\\\ , \ \\\\' // BW 87R O :
In11 lust over Me Might of the emarging native plants mfore JIL 1 L 1 L L SIL 1 L 1IL 1 LJ V Y lJ CJ : ; : ✓
weeds W to seed. Assume three Inpwinps In tin first season tluring \ \\ \, \ \\ \\ \ \ \ \\ \♦ `\\ \ \, `\
the penotl of June September. My areas within the Attend or (�
r landbpfftrthatha.elmrowilsma beovemee whh � .� �_ �>uL �� �w� _NL4/< x1111 ` I TI G A TI 0 N AREA '/{/j}/• 1'... p p'7 r� 1
tip kk seadadeamatl mriayie to renadwa taatn - t i // \ \ \ `\ `• \ `\ \\ \ \ \♦ \ \ , \ �"'� W 88 O�- 1 ppropr apP P Promo nags t \ \ \ \ \ \ \ \ \ , \ -r
a. Year Two: Spot mow and spray invasive weed species as _JI_ _w_ lS AL _Jt_ AI_ _w_ \ l'v� `\ `\ `\ ` ` \ \ ♦ \\ \\ \\ \\\ \, `\ `\\ \\ `\ ` - •�••. �' 1 _
necessary. Any areas within the otland or upland buffer Mal have 11L 11L SIL SIL JIL OLE 865.1 , \ \ \ \ , \ \ \ W 877 7
IL L
bare 'I may m ovarsceded with o riate seed it deemed I sits Y aapr P \ \
Z
SCALE IN FEET
0 30 60 90
1 inch = 30 feet
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST
POWER POLE WEST OF DRIVEWAY - N.
SIDE OF PIONEER TRAIL -
ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT ® SOUTH
PROPERTY LINE ON PROPOSED R/W
LINE. ELEV.= 913.67 NAVD 88 DATUM
25'
VARIES
FOPS01L (MIN.) - -
- ri AX.
TOPSOIL (MIN.)
UPLAND BUFFER
& WETLAND MITIGATION DETAIL
p wto onwlenalveve elaeon estahllsM1manf. r'a"S \ `♦ \ \ TW 8(JOx \ \
C. YeaT ce: Spot mow am spreyinvasive weetl species as �Llll� 111E N.G. �L/ \\ �•/ 100YR. H WL 865rece at .4 \\\ \ \ , \\ PROPOSED 25' MITIGATION BUFFER
��� `
o.Year Four: S mow and ra masivewredspecies as \ N p p c Q/ '•'' ` (ELEV 865.1 - ELEV 870.1)
necessaryormntluct Presailaed Win if mndNonkpk. - \\\ ::..! TW U�2.o W U7V. �:•''''. •.• :,Y:•• /y�'� \ `\
- AI- -W- -VI- -JL AI_ _III_ _W _w -9 [::•--•:••:: V
E. Year F'me: Spot mow and spray imasve oetl specks az 6 5 . 6 , \ , �j. 18,464 S.F.
•.�.'
necessary 1L 11L 11L 1L 1L / 11L \ \ \ l / ,.a 'c� _ �;•:a:•'
\ \ \�BW 872.0 ''
V -
/ \ \ .�^: �� \ -- '.•\•: �' _ ;,:`:��: PROPOSED MITIGATION AREA
Part.. Ill/ Ill/< xWl/L x\llL/<
VIIarhce Standards x\ _ < x1_- -_- -__ / _ '•. �:?.
j. _
II II win Performance \ / V A. Monitoring resells will m min red to me b o Mp - (ELEV 863.0 ELEV 865.1 pa B Ded
.�` tea. �•�[�''�•'•°'-'•"
standards Tarim otlaM and upland buffer planwgs: \ ♦ \ \ - •.• :•' •-.-
3 _w_ AI_ r_II_ _III_ \ •-�:• �'�• _ L Year One (first row son MS used i n* At keel _IV_ 1V_
( growing sae ) \ \
Y
'I
natives ffor from Me seed mixes used m me weave , and '..w.:... \ /
_ 11L _I 1L SIL SIL
r n I urin morsrorin antl relive ✓ \ \ M,a ntsMal s a risaat nradd B th - J �•'':.: • \ / PROPOSED 10' AQUATIC SAFETY BENCH
Mall at least l0%areal coverage \ \ -
apeciersha wmprse g -
mitigazionhaarea�._.:< ;;j .j ,�.: (10: 1 MAX SLOPE)
in I. Ythevie At areal 5plane suedeshamthenew mixes used "�--� --- , _ \ \ ♦ \ a \ \ \ \ /
the wetiandadrpMnd brha,ael mrma atl doing \ ♦ ` ` `.\, ' 8: (ELEV 856.5 - ELEV 866.5)
moni coverage
asp native ecies snail comprise at least 25% x \ \ \ \ - • •:-*s•'' - -�"
areal ragege in the mitigation basic. gib_ AL _Jr_ _w_ AL J Ar_
SIL SIL alL \ \ \ \ \ ' _ ;.:1"`
7
III. Year Three: At leas[ 5 native ea from ma aeetl mixaz � �a.x aped \ \
_ - 'o project, as proposed, meets the criteria o - Please see e attached The mitigation \ \ #22 The ro proposed wetland mitigation n act, titans f MN #30 a the attar h Carver County soil survey.wetland will
/ rr rr'' \ \ n - P P g P 1 P Po nb' Y
... used m the wenene and upland fwner Snell oa observed \ C. . L J l l:-• \ \ L • • • -.
during Moitodn and naWeseciesshe lwmprsea[least _ --- '.'••.:• •�:-•• - '•Tt:,•• - Ru1e8420.0526. beconstrudedlnHM Hamelloam. The mitigationbasin will beexcavated toa
40% areal coverage In Me mitigation Main. - < �L_� �� \ \ \ \ \ / _. -
iv. Year Four: At least 5 reeve spaces from the ceaU moss \ \ \ \ maximum depth of 2.5 feet below existing grades. At that depth, Hamel loam consists
\ \ \ \ 1.0
/ , - �-•.' - • •' #23 -The major watershed is #33 Minnesota River -Shako a and the Bank Service of dark clay loam according to the Web Soil SurveyOrtlelal Series Descriptions which
used in [M1e wetland and upland thee• shall m observed ,p_ _w_ _IU_ Ar_ ♦ '
durilg monitoring antl reeve species sFal comprse az least \ , \ \ \ \ ` / - 'T • - T '+':'•�*' i - p t j Y g,
� �, 11L 11L 1IL SIL ♦ \ \ \ \ f i / � - --- •:'s�. Area is 9. will lend itself well to establishment of the wetland basin.
6e°/ areal coverage in the mitigatlDn basin. \ \ '_ _ _
v_ Year Frva. Atleeal5 naWe species from the e0ed mixes,��'',•.••• - •'\;''°, _ _ _
u ad in the wetland and upland buffer shall m observed 1 \ \ \ ` / / f; v •''' `•"
s P ,. ,_I �/ x / �/ �/ \ •. \ r:', :::. / Q - •-:; • rY24 -The owner has executed on the city development agreement. #31 -The mitigation basin is planned to be constructed this fall before freeze-up and a
during train and and native species shall comprise at least �. �L_� 1yu� 3L_� �L_.� \ \ -
]0%amal mvera w the inn inn main. f \ \ \ \ / �8 - _ dormant seeding of the Type 2 wetland and the upland buffer would be conducted after
Bar gar � "''.' -':••::'�• •": ''... :': -
Tne wetiand megaton area Shan bar seeded according to li seed Mu 3zs ill_ _w_ _w_ �, �ti_ _uI_ \ \ \ \ \ _ 842#25 The probed is consistent with the special considerations listed in MN Rute final grading.
and the upland buffer according to Mil Seed Mix 329 as duel s - `, .: , \ \. \ 8420.051 S Subpart 2 - 10.
P 9 Marv' Y Peamd L IL SIL SIL SIL \ e'
b ma ro a die a. iL \ / / g • r:'-: - •--; �:y•:-:�:.'�:'' • - - - - #32 - A co of the signed replacement Ian application is attached.
r p tar.+ ngirwer (APPen l \ \ \71.
/ �8 - -\ PY 9 W P PP
A rmapentCQnservatiop aaaamarn will be placed oven the mwgaaon wealknd �/ \ \ \ . \ \ _ - _ - _ #26 - The mitigation plan is to create a palustrine emergent wetland which would be
ry nAct mks. �1. (y�^�,,�j111>� �L_� r , ♦ \ \ \ / / / / �j6 .;'' - - - - #33-NA
and buperareasin acwNence with WalerM Conte am � L�,�- � \ \\ \ \ � � � 8 T consistent with the existing wetland it is being constructed next to. Although it is a
AI_ _ell_ _w_ , `\,'`\ ♦` \ \\ \ �' / / / / / / • / - / _ - _ _ - wetland creation, R will blend in well with the existing wetland which is a large complex
11J- 8� _- - . • •-+• • -..:. - so that hydrology in the 18,464 square -foot wetland should not be a concern. The #34 - City of Chanhassen grading permit.
- mitigation wetland is being designed with three lower areas to ensure that it does not
\ `\ ` i •' • �f i 390 '� L - . ri become a monotypic stand of reed canary grass which could become the case it the #35 - Construction of the mitigation basin will not jeopardize existing drainage or
�,�� L _u� �A _NLUI� ��� �_ x11112 �>u ' 20 BCOD GRADING -- - / y ----
\ \ 'Z- : ! - "' • -• • • topography of the mitigation basin was flat and not undulating. property uses of any neighboring parcels.
..':i`
1 • '- - #27 - Please see the attached U.S.G.S. map showing the approximate location of the #36 - See attached Vegetation Management Plan.
11L 11L 11L2 5 MITIGATION BUFFER AREA •r: - JJ' / / LIMIT, LINE / - _ _ _ - - - -" - - - gation wetland in relation to Bluff Creek which is approximately 200 feet east of the
/ '' '�' '' '-'r: '= • / , J J / / � � - - 7 _ - _ � mitigation basin. #37 -The wetland is planned to be 18,484 square feet of Type 2/3 wetland as well as
x1 /< (15, 303 S. F.) - x, %[; • t; J: / / / / , // / - - / /✓� p9 - 15,303 square feet of upland buffer.
1 / / / : • : \ #28 Please see the attached profile and plan views of the mitigation basin.
Al 5:1 MAX. SLOPE ,- \� T.:�:-
11L 11L 11L. 11L SIL SIL SIL 11L
/ � % : j :(.: [ / / / / / / / / / oy -� _ - - - #29 -The replacement wetland will be constructed through excavation into existing
is
• : • / / , / • • •' �' �'=' �' _ -. -'� - upland next to wetland adjacent to Bluff Creek. The wetland type expected to be
/ x1>u� �lu� �Liu� .�Lul� x1111� x1>u� �Lu_�i/�- aL �.: ' )r / / % / , / / / / f - •' '- •' - - - \ Type 2/3 and is planned to measure 18,464 square feet. No outlet structures are
- - -\- planned for the mitigation basin. The natural outlet is planned to beat the 865.1'
_III_ gib_ AL �ti_ _Iu_ _w_ j ! ;: �;t i:r '� I / // / / / / / ,/ - - - - ^ _L elevation and will drain out into the existing wetland. Standard BMP's will be used to
SIL 11L 11L SIL 1IL 11L 11L 1IL I i �: •. �c •; J / ! _ G (I� • �: ' - -,�-1- �- �.� prevent erosion during construction of the mitigation wetland and upslope grading. The
existing wetland will be protected with silt fence during construction of the mitigation
wetland.
SECTION Al-A2
SECTION 131-132
N
r~J
L4
0% �>
wassanniss
ftf
Z
CV
anninninno
J
J
00
N
00
z
v
m
�
w
CD
X
<
Z
`-
Z
cn
a
LLJ
O
0
N
�
00
LI--I
U
Ob
Z
w
Q
0
J
o
N
d
d
C TO up
v
I
O UJ
E
f
a o
Or c o a
L 3 T7 0 b1 CrZ
L 5 v m o d
m
Q
i 00 C E.E O U
a� 1 oar a,
_ 0 E 0 0 to C U
i c T c J
M
ai
yv0 oor,p
�tnd
aV OWln
O
O
loo-eal
lo."
A
h•M
A
u 0
ZI-
r�
Z
Q
aVl
W
w
�
z0
Ed
Z
o
� d
c�:z
xZ
Ld
wIfeei
p0Ao
UU11aa
'
Y
aa
Z
U
E-
/Ny
Z
^
W
0)
W
L0
Z
O
H�
a
DRAWN BY
CJK
DATE
10/3/11
REVISIONS
10/06/11 REVISED PER
CITY COMMENTS
10/14/11 REVISED PER
CITY COMMENTS
CAD FILE
21996-22MIT
PROJECT NO.
21996-21
4.1
DRAWN BY
CJK
DATE
9/9/11
REVISIONS
CAD FILE
21996-22PRF
PROJECT NO.
21996-21
5.1
� o
W
z �
N
J O
5 rn
to 00
N
NN m rn
� W
W C x
Z O a�
Z
'^ W O
V ♦
A \ O
W'M; a'
N � �
CV
W � �
U �
cc
_ +-_ . '-
-- -'I. '_} OO O
�T Y •
QsI -..-
i
rn A_ rn }
I
cv i I I i
gi,
i- 955- + -+'1 - 955
+rt
I- - -
r
1 7 trl
935 - - - 93 - - 950
r 5 950
I r 7= 1
'
!Ti-
Ft
rn
930 - - - _ - - - - - ° w
rM 930 945 + fi+. 945 ay E ° o
- - - t - - i7 - �3 Z
H - -,, t _ +i�Is c
I � t
{
- - I4-1
_ —_ 92 40 T*t L - - r c- 940 �
+� r 925 - 5 g + =a��
T I
,- . ... u°eau �O
_ - - _. - I- - - - i-- - i -
I-1-� y as ° w V, o
ra ++ w{ - 920 935t-+
920 }935
�+ a + . —
I
POSED CENTERLINE Y fl t :_ r r '- tui
r J L f - f o"
o f
915 r 915 930 O - rt 930
,
J
-- 1 _ Qi �r r ,
910
{ 925 - T 925Lj
v�
_ _ _
910 o
1. a � II - - G_ r� __ a �z0 0a
i_ 0. t Z W O w
905 t t 905 920 - �i+r # \ m o 920 U1 � A
- fi v _
cf)a -
T i_ T
+ T ,
a% -
- 1+00. 0 Pw-t t .. - - - p'' f�
900 _ - 9009151
vc=1 0 00' -
- - ,- - - - P4 co a
t- M=1.1 r: t 1 4 r .- ?.009 w rn
f
895 - } + - - - - -- - - _ _ 910
I
895 910 r + r +,
,r
Q
Ni ... 1 v - 0--- 11-- . -1 F- 3 + r U'
a
T
�, _ - E f +#i 1t_ _ -
890 890 905 F -- DR BY
Y" 905 DRAWN
z - x
w CJK
U 1
Y �,_ - - i - * �_ -I- - -I- �,_ ^ _ _ _i _ T- _ _ _ T _— _ _ _ _ N O --{
1 ti �_
c� DATE
r R
88 00
i
t
T
9 +
,
o
- _ 4+00 3+00 2+00 900
885
4+00 3+00 2+00 1 +00 0+00
1+00 0+00� REVISIONS
STREET A STREET B
a
0
0
0
N
O
CAD FILE
21996-22PRF
3
PROJECT NO.
N 21996-21
N
5.2
N
, \v j __sari /' / / / ___zz
\ - ✓1.\ 1
'/T// lrrrr / J�1"i / i f . z-' -/-r�� 1 - , :-/: i -/� /,,,.L •r ez
/II ♦`ate _ ( �,\ y \o e /
�J,/�//,ii//%i j// / / r •- \ '_ __- " ___�_ st / / / I / / \��`�� � -� /__ /1-1-I / i I r i� �/y_ - _'- -\ � ` c \ __\`♦�, ``` � \ `�� `�
/ r _ I i I I /i;' 1 ll \ )-s>-`- -/ 1 / ,r\� 9�4 \.♦� 1 ,\♦� ♦� \♦ �` ♦\`, ( \
/\ I v `\`\♦� ```\\�\``♦`\\\\,
/ 1
iN.
' ,`\♦ \\`
/
/
'/'////'//�.;',",�.(,-�, ,.C_ : I �/' ,,�" ,-.•�''✓- // I /lit///// [r// /II/1If --+ _ -.-- �_- \ \IN\\ \
IN k
ii" ::: :�'. �' J ��`il' _ll--'�� /\ ,. / ,/ .,,. LL .•y'+•% - I J i/i///t / r!/' �/ // / / l 14 /-L�/-' _/ k- -c.: _ , ! - `\� s' __ \\\ \\ 1 \, \ \ \\ \ ` \\ \\ \7
/iP._ _ _�\ \ x \ ` \ \4
/ / /[ : / [ [ r 'r / A /, �11 --- -"-- �'\ SCALE IN FEET
/����/,/,/,'//��//'"/� \ ..♦T- 1 /'/// l,.„".». m,• ' al.: ' .�/ --- / / ,'i ///l//// [I I/i//r1[/ Ill �zo 1-` K I�! 1 / �� \- \,-�pr \ a `a �,s \\\\\\
I I / / / ,:. _ ... ..._ ,_\ i T , ` , /! // / /J/„/ I / l //,1�, , I /y�� 1 i- ;-q _ Tlf /
�1 _ \\ ` `P \ \ \ \\P\\
f
\
'/j ��/i % ♦\.. \\ I I I � � � I I I I I 7/ - - % IN .�� i / / I � ,/„/ '///li l 7 11 / .. J//'!9i=_, � , -\ _' ♦ 3fi_� `` Sso \ - � \�[7„1-, _v .,♦` ,\ r I \ \\ \ g\ \\ \ \\\\ \\ \ \
✓ %_ \ n r e /- - a - - t ' // i/ / / � 1 \ \ / \ \ \ \ \ 1 inch - 100 feet
fl //I ♦\ \ I i /, -ii- 1� - \1 fill °\ L. _ y. _-. :� J :.I '/^\A '� `e(,� ` \�`..• \ , , \ / �/ 1 ` + 1 \ \ \ 1
It / ` - \ \ , ' .'/j �.r 'Y =f� /---'if � j / // /'i r'i i \ \\ '' i.y,� , •� _ .`f - ., - /
' •tea ! I'7-�, / -1_ - - = /� l/
\ \ / /'/ / /i // / / / '�'�l / Ili /_' T-[d i-• - t .:._ ,.- ..:_ .:�'"W - r' •' / / I / / 1 / '
�` \ / ri' ///, /i'ii/ /�•'Tr''d. > -. � -"" /+W/-- _�•, .� .. _ .�.- _. ✓�.' -. _ •.: jp �
.' /i // /' / /, t •.� . `rrr-i-' ' T /' / i _i "% r I ./ , p I \\` "`'=' r. --7.`-=•--- _ 1 �< : �,\\
y'm11� / _ / - _ _ - _ _ - _ 4 / I - ,� , o\yY \, ___r. _ \ a/; w\��Q-
1 / / / / - re'l /..,� l,» ,/.:. .1, ... ,,. v.. .,. .•✓ "..: d / \. i / 1 / 1 �,�=\`' _ I .- ' - _ I I - \ \\ ` --I.f. 11
/ y �/
I+Y��9 FT -. _ _ .. -. .,. -. -' __,/ _ , 1 1 I 1 •v �/ ill / / /`1 / i_�r9 I \ I ,L'Y, / \\ \ \ t \ \ \ \ \
I
°
41,
/t -a
/1 t "t V AA AA A
\\/!/�[�//�% if �.1ll _l'iA ,.._ - _
/ / [ /[ 1 /d TT r+-r lw? / "" T- _ _ ._ \ L / ,r :'.. \ I 1 I .5 J \i \ \ \ \
r-lf lit/ h`--".,/-..•___ _`<-__,.. \/���� "/•{��I 1� / I \ \ .I�/'/
�//////�i /, [�//�[ r/ // iv ��.-�/r ._ _r ..-_ .. _. ._ `+ (( - -- ; _r_ _ I ,`i�, ! :/ // / x _/ . o\, L \ /?'s'� �� ... �, � an ) 8 \ _ "\' ` // \\ \ ..-`♦ � \\\ �_\ \\\ � t 1 \1 \ \ \ \\`\\\
,','////�// [///J r/ // ,�/1 / /--..-_/_.. __-_-_-...',. .. _-_- '� �� -4-�• _ ,yI I�%_ / 1`\`\ ill\ - -�- '� � , \\ * \ \� \\\-) �\\ \\ \\ \ _
Y
/ / / i / / / . f ..,/ ,., :. .,- .v, ,.. VVV// .. .... .m. •,. .W. - . .., xy .,. «. .rr 7. ,... i 1 + \, i m F \ � :; \ \ \ • \ _ 1 \ /, :- J \ L �� \ \ \ \�, \ \ 1.
/ /,,i // / �// /[ / / /, / / /,;y //j. .. / a.. .:r .... .,. -,.. __ ......... �.. .,a 1 r' h ' / ! d 1 1 i 1 , \ \ �'I,� �\\ \ \ /\\�\(\ . \ �� . \ �' \ \ \ \+,n _ \\\ \ .... \\ \. 1 \ \ \\\ \\ \. \♦`\ N
I%.\ \_F. ,+ \\\\ \ \ i� r\ \ -\ c,\\\ \ ♦ ♦ `
_ _,. �:. .:;: r �1-..- .,.,,•» .,, .J..- _... / 1 Cis\ 'K �-> 9c' l r"\�� k \\\\ ''Q / � �\,\ \. T,\���`-� \\ IN
\ � \ \ 1 ♦ \ \ ,\
//'i /,/ / r /�/i//i ,// •. r _ - _.. / ..._. _" -- - _ _ ,� -. _ _ _ - .. p \ ,_ _ i _ f l r t l ' \ \ \ - \ \''; ea \ \ `,x\. N 1\ \ \ \ p�` ♦ ; ` \\
-�i%' //r .�' //'i'/ ice/ / �, i _ •. _. • -, ' _ ... ` ._ • _ •- _ - - - .. �'t. _ • -_d ` i i '% j RA- / i I' -.a I I ['\/ \\\, �- \ �.. �,,! \\ .� `\ w� . ` •�\\ .\ , , �\ 1`\ 2 \`♦``\ `\ `\♦\\\`\�\
.r//i✓ �/ %i //% I/ / .., .... �. 1 .._ .... .� __ _. _. .._ ,_ _ ,.-. •.:,. ... _.., ,,.- ... A. ... ,,.. q _. .... y 1 'd 1T I / // N , `\ � r '♦\ -�Q i�' \l\\ •a\ p \ V `\ \\\\\ $\ ` \\ ___ � ♦ \\ \` `, `\ \\\\`�,� �•-�\
,T// / ' r' `� /// [ -. _ _. /,.\ �_ a` L yY T. � ,. _ .. _ �/ / J.h pq• l l I ,1 I / / �\\\ �i \ `\ \:: \ _ \♦ \ , , , \ \ . C,
1"\\ f \ / / /Hi/ /„' �.\.,r,- I-ti .•K./-Wi ... /..:u r. "_ iZ 7Y I ,I - l\\\\ , \\ \ \ ::\\ /- \ \\\�
\ r/ /e P, ./... ... .4 ... 1. ..- .._ _.. ,. ". .._ -... _ -. ..- )„1. / ..X � � / / � I , \ �� \ \ .:: \ \ \\ \ \\ $' � � \ �'\\� \ \ 1 \ ' �� \ `\ \ `� \ \ ,o•.f`'',.
/i ,.. - - - - - - ., - _ /.::.. y, `y[ - -/ /:9P / r� ilk• I y lI \. {. \\\ ,\,\,_ \ \'._ \ _`.\\\\\ \. \ \. \: \\\li�' �\\ i \♦♦ , , \`\\`\\ I y'
._. 11- Y ". \\ \\' I. 1 )\
���� ��.�... I I , \\6 \�In
\\ :,•\\� w ( \\\\\ -;\\,\F. \ / ♦ ` \ \ \ ,`\`,`'6�.1'/'`.
L % _ ' r -/- / " 1 \ \ \\ 'r \� \ ^.. s - \\ L'�\ \\.. \ \°b, \ \ \ `, \
../r / l �' I l 1 \\ \\\\\\\ \ •. \ c \\\ \ \ _ l , \ n, \\` \ ` \ ! \\ \ \ \ \ \\ 9/ A
1 ail -/ "/� / [ \\\\ \ .\ \ "\ L� \'
`�i i//'i/ / i �i r~ / � ... •:.. .., "._ .... .. ... _. / -. _. ../-' Ai ,.\\Y\\\,N t. \ � '\\ /� -•,\�, , \ ,\ �\ \ \ \
\
\ \ \\ , / i//,/ �` , u -1 _ •� _.\ U/ .a-. > __ - i ail e/e ., / [ \ \\�,. > \\\\- -`. N -'-o \ \\ \ \ \ \ t \ 10-`\\\ \ \ N \♦ \ \\\ \\ \\\\♦\,\(�_
I�A
\1 11 /�•. • // �- _ _ .�,C _ ✓. / \\ \ 7- - ✓, \- \_ -P \\ TYPE N NO $EfD MIX`,
\\ d�l ' `1 �•\ \
\ \ \ n ,e _ - __ / / / m / F \ \ \ \1,-•-,� a1+ \ �%' r \ i-- I 1 1 N , \�s•�.
_i
SEE PLAN NOTES.
TYPE NASEED MIX
SEE PLAN
NOT
AN NOTES.
"\ \1 \\ `+2 \. _ .. .. ♦ .. (((/ ////. �-� .--- '_ n _ _ ' '' l ( //'/ 1• ' ( G i .o'' \ \. \ \%'. / \,�siy .. `I'. '-� '�1 a �_1.TIr �i'J ,1.,{�y r��-\.\\\ �/,,// //P / \; 111
'{ ....' / G_ /I r _ a .. _ ..:. \•_ � � < I / / / / / a _-`-_7s %< / -Y.Y1 /. _ � ,, \ \t�^O�' I e,. 11 2 ,' 11..., I 1 \ \\\` \`- ',\\ _ Jam\ �_ /'9ij '/.- j �`\\\``\`\ �\ ''E :... , �� // :«, ...:. a,.. ... _.- .,. .y,. ,..I I/ ///// // / // -9e"x� _=r >.� -__ .f-'`, � 1 ✓ / / 27 `' s5-\ I.n \\1\�-,�. I '"-'(/ -11 -, I i'j. I \ ^0 \'.o a\\ \ - - _ wyL�I ��--
�-
�II I II / // [ / /
11; I///// /4-j, _sua _ _ d ♦ \ ,_ - 1 II I�, Ir m' _ ,v 1 I5 \\1_ Y ' y 11 , "-!fir` ,n \ \\\ - /ir.,�,_I- // / /, \\\ \ I
„ .\..,: \ 1 � \ � ,,:. ... ... w. ..:,, ..,. ... J e a; I 1 / ))•� YYY___ �J , / I i I' 1� : : ` �m _ / -�-,-a+y<----ter "* � C� .�^'/ / -- t.. r (" _1 .r s / I / I / ` / `
-
r r
T \ \ 1 1 l 1 l \ / \ "v w .. +' , , I I I I \ 1 , / _ ,! / l qs.. 1 - 1 1 f t _ /i I 1 \ ) f • / / i l / / J ' / / , ` S
cl \\ N_ .,. .,.. .._ .»
- - - \_ , 11111 I I I / / ! A �� ^ .\,� \ _ , / 1i �,. / ( 1-- 1 R\ .\ I I11 \, ;\\ f. `' / i / \ i ( 1 l j / / /♦\:\ I -. _\ •• a •� , I I III I I I II / -aI x, „ :.. 1'a_ \'` - \, t \ '.... /_.-"- � ".. _ ,_ ,-.. .". /\ '% / / ' i \ T / / / ♦\\ ,' ;:....
,.,, •. 't\\\,\\�\\;\\\\� \� \ ,.,, w .,. ... d. a. .,/,.,, I I I 1\1+\ 1 I ti-III _ s' ,\--. � 9oe z' I/ \/ � / / � 1 J 1' :� \ d - I r \, \ I - EK - -- -.. '\ / /'\/ / + \ l l l/ , �r:\♦`�'�
\ \\ \ <_. Lip /y%.. / hie - / . f / I
\ 1 \ \ \ \ \ ^ x 10 MADE Irar "T 1\ [ j , / p / / ' /. (. \ � ' 8 _ \ - - % / %x / ✓ / / \ \
,.. \\\�\\\\ \\\\�\�,\\ 1 .,,. .r•. - ,- m.N I P 11�1�11; +G-
,.SPILLWAY
+++r11
/
x 7 _
• \\ \\1 \ �\ ,..,,. .,. ELE V=Bi0.0. .:.. .r / l 1 1 \\\\ � \I, � , , ` � / / I Il \ ? _ _-I< : �--_-;--�922 -- _- i EI�AO /SEED/MIX/ / / //� � ////'/ �////,!♦\\``�\\`��.
�. .\ \\ \\\` \ \ •,.'.. _ _ .. 1 \\\ \ \ I m0 \ ♦-AT "-_ 1 / 16 - /- / - - o' `s\�� / 1E ., / %/ /� / I/ \♦ \��i\\\
\\\\\\\\ 1\\\ 1
j I
1.4 .� .... d,»°y,.e. ('• \ \I - 915. Y / /, ` LVO ---- ./i.� "�•. r �_ _ a.<\`�` ..\- -/ 9^ / / / / J ' //.' / /, // ., nl 11\
_--_' /l+\\,III II 11 1 111 yT // / // /\ tq _ 8 __ -ri -7L
1 II m I I r - `� • - ,/ EiJ / / '_s-[' '.\ A \ F .. .. ,.,. ._.,
\ \\\\\ \\ I.� .�.. �. ... ... r L o, � \ D „ OF \\ PGNDPER
'', 26 B x; _ , [ I r J \ \ �.,♦ \ / A. /,. `(/ / .�'
\ \\\ \1\\\\\\\\\\ .,.. �.... /- / f S.7 A _ _, _ -r ®._♦ ` _ / / `1,. ___\.� _ 5 WA YO - / / y w It/
__.-., __.. ... \\x g.,.7 -) , l( /// - / _ � - \\ t -9GT ,/ / ♦ �\yv \ S ,. / �� / / a / / I -A\ ;�.
c !
\ \ \\\1\\\\\\\\1 m .,�: .,.. .,,_ .,,. -� 'J� L )' ) i g` •F�A� -/ / 11 ml 1 _' - ID� � \_ \\\\. 1 6' / / / / c. /ij j _
•\ '; \\\ \\ \ _ .. _-..-..-_'/ell° `; {�,,9-�f-. / .. -'... .:. .+� "/' / �/, �a.\ _ - _ _�'•v!r / + / [/ ///�'' / _ _ _ /
v T'
i / 1
\ \ \\\\\��� \\`\\\\\ r -_ _. �.- / /� � , P k14s . •=Ajj 1 i ii 4 Iv I o / / ✓ e \ r / 'h / \'" -_ � -
\\
/
1\ \ \ \\\\\ \\\\ \ `..- _ _ _ . /:• ''�! - -- � �b-T'F.1 Y I ( \,:\ , .�{ ' / ` / ' / / & . \ ': , ':_ LT.- _<. .� ' I : ! •�,; l i yw° - ' a3" i 9 / / ,a\' ..' 1F/ S `�_\.; -�i� �\ _ � i_9\6 _rc _- -" J / // /////q//// /i,/ � � - __- _- _
-
b_-
., Pa1sINc
S\ \\ \\ \\\l\\\\ \ _ , .\ 1 - y.«. \ m -a / � / \ - , / Y i x :> / _ \, u-9\e _ ;��� _yam.• � `\ /// // //1 ( /l �/ / / ' � __� _-
'\\=--
\ N,
_4
.,.: � � I o .,r w •\ \- / _ n;, _L_ _ /' \ / / / / 1 I ; I / d
NOTE
,I
\ / `\ / / / / / 1 1 / i .`
r
\ q / I h II MI / 1 UNLESS NOTED
\\\ \`\�\`,\ b / ;k )�' / 1 �: IIII I I I � i -\'CONIFER TO HAVE SH EDDED
-
\ \ \j • \ \ I 11 r I _��/'' p \ � HARDWOOD MULCH
i OTHERWISE. NO MULCH TO BE IN
\ \\\\\\\ \ , ,\ ♦ ♦• ' ;•' .n /•! / 1 \, _ - I I \ _ _ \ ,! / , , i ill 111 \\ CONTACTWITHTRUNK.
f" _ /--r--' \t\ _-__ PLACE ROOT BALL 50 THAT BASAL
I\ ` \ \\� \\\\ `� \\\\� \, \\� .\`' .\ .CY / / 1 / 1 _ 1 I I ! I \ \,'/ '� w
N./ i '--('- / GAREIS 1- ABOVE SURROUNDING
r / 1" _
,j I /PARK AREA PER / T 11 I 1 \ /-f B�"�/'
�y J GRADE.
\ \ \;; \\ \\\, .\,� ,1`::,,Y\.` • 4,�,'`-•,. - m/ � / , ,, [ lot 1 I , Y l,n m - - - ---- , , , � I 1 m I c � ,,, 1
,f(A \ 7 ' I I IT T f ; ` / 1 m ! 1`ml°' \ / "
/,�\\\\\\\ \\r\\\J•\\\\\\� / ?iu I -' / I --� _ _ -91 E,; \ - fr'� > v Iillll I _`_ [ `..
/ / i (.•NIL B y J 1 I I RESPONSIBLEU FOR
/ , / \ \ \ \ \ \\ \\ , �` ,\ \\ �\`\`` �� q g'/! /( / ,� y , 9 , 5 J„1_\J _ {, .,, \` .•`\ i / pT/IN \// U ! L y'C./ , V / I , ( 1 y , / [� - � THE CONTACTOR S
-CONTRACTOR SHALL OGNS'TRLIGT EARH TEN I / J , J ( I I (1 11 I \ / +\ `�- O ENSURING THE TREES ARE IN A�I�
-/ ,/ \\\\ ♦\\� `�`� f , Y t 1 I 1 ` yl - PoSRION THROUGHOUT THEW
' /�/'/ ' ,`\ \\ ♦\��� �\ // / y I' I 'd, 132��Y r , -� / BLISTER OVER EXISTING NG BLUR CREEK BLET I ! / / / / i 1 1 I 1 _ j 1 \ /. \ a _ PERIOD.
FOR TRANSPORTIN;, MATERIAL TO COMPLETE I / / ,� / / , 1 `-' / 22 / -
/' 'see w >'
/ 1'\\ l �� x / ! / t: e PARK GRADING L:;CA'cON TO BE DETERMINED l / J i , a"; /I I L/ 1\I �,,' o RDDTBALLTOSITONMOUNDEO
-_-_= {! J, / /(/ l / ' 1 �, =1 \, \ r 27 .-\ IN THE FIELD. THE DUSTER PRAY REMAIN IN 1 d / / J � J" ! 1\r � SUBGRADE, REMOVE BURLAP
�/ / / /'" -� _ -�_ _ _________ __✓/ / / / r J `G/ A\ I _ -- { � -f 1 \ r T / a / w' -__ _� - / ti � � FROM TOP 1I30F ROOT BALL
//,`PLACE LURING THE WEEK. BUT MUST 6E e v' h h-r ��- +,� i a`+
1 _ >T
REMOVED FOR WEEKEND TRAFFIC. GOIVTRACTOR , / , _ / / � ✓ �
ss
-/-- /Y 1 ce �-MULCH-4"DEEP -SEE SPED
SHALL PROVIDE ROAD CLOSED BARRICA.CES AT/
lI G f '
/
ROUNDABOUT ANO AT MAYAPPLE PASS, / / _ �/ -' / ' j r [ , /
/' �i'' / j i 1 +\\ \\ ♦ "'...,_ -�---_._- - • _.- ./ r,: _ _ _ - i X /--__�'�m'=44'E _ _-_ - �' ._ _ 1 93�- \ - , % / c l�+ `\ \\�"1\ / 1
1
`/ 1 T1 T
rh
_- �-_ \ [/�'-' / � SS__.-_\ �`� \`����-� •� _ / �4 • ` ?_ =-E-4-.1-'T i--- _� z_.I-{-\t_L I 1111111 y Li
' _ / / \ ` --- ---_�I , I 1 fy---- IIII, 11111 1j i, \ IF
BLUFF CREEK BLVD_ --b
11/ _/ _•_/-�__-__ I / I - ..-.. I._'I iI III i / -
_ _ _
:V \ ?' I /~.� I 1 I-. II I I II 11 I11 I /li + I \N! T
-�• r ' I T I I� N III III III -I I
yi ` � I I--I-F-, y �J , 1 / I 1 1 v r -III Irl I Lill II
DEVELOPMENT WIDE LANDSCAPE PLAN: Tvva aAU �
AI11�DV
Landscape Notes:
1. Tree saucer mulch to be four Inches (4) depth natural singleahred hardwood bail( fortress outside of a plant bed. Instal per tree planting deter. TOTAL TREES REQUIRED BY TREE PRESERVATION: 343 , C O N I F E R O U S T R
PLANTING PALETTE. TOTAL TREES PROVIDED THIS PLAN: 343 6 1
2. Refer to civil plan sheets for grading, drainage, she dimensions, survey, tree removal, proposed ufilhi%& erosion control.
3. All plant material shell comply win the latest edition of the American Standard for Nursery, American Association of Nurserymen. Unless noted otherwise, deciduous shmbs shall have at least 5 calmest the specified shrub height. Plant material shall be dehven d as
specified.
4. Plan takes precedence war plant schedule If discrepancies In quanthles exist.
5. All proposed plants shall be located and staked as an~.
S. Adjustment In location of proposed plant material may be needed in fell. Should an adjustment be required, the diem will provide fleld approval. Significant changes may require city revfewand approval.
7. The project landscape contractor shall be held responsible for watering and properly handling all plant materiels brought on the she both before and after installation. Schedule plant deliveries to coincide with expected installation time within 36 hours.
8. All plant materiels shall be fertilized upon installation as specified.
9. If the landscape Contractor is concerned or perceives any defldencieS in the plant selections, soil conditions, drainage or any other site condition that might negatively affect plant establishment, survival or guarantee, they must bring these deficiences to the attention of the
landscape architect & diem prior to bid submission.
10. Contractor is responsible for ongoing maintenance of all newly installed material until time of owner acceptance. Any ads or vandalism or damage which may occur prior to owner acceptance shall be the responsibility of the contractor. Contractor shall provide the owner
with a maintenance program including, but not Limited to, pruning, fertilization and disease/pest control.
ii
Q 11. The contractor shall guarantee newly planted material through one calendar year from the date of written owner acceptance. Plants that exhibit more then 10% die -back damage shall be replaced at no additional cost to the owner. The connector shall also provide
,n adequate tree wrap and deer/rodent protection measures for the plantings during the warranty period.
12. The landscape contractor shall be responsible for obtaining any permits and coordinating inspections as required throughout the work process.
13. Plant atre & species subatkutlons must be approved In writing prior to acceptance In the geld.
N 14. Landscape Contractor is responsible for coordination with the General Contractor, to prated the new Improvements on and off -die during landscape work activities. Repoli any damage to the General Contractor immediately.
`- 15. The landscape contractor shall contact Gopher State One Cal no lase than 48 hours before digging for field utility locations.
Z:) Id. The landscape contractor shall be responsible for the removal of erosion control meawres once vegetation has been established to the satisfaction of the municipal staff. This includes silt curtain fencing and sediment bgs placed in the landscape.
17. Type I Seed Mb: Wet Sedge Meadow Glass MIX Wet Sedge Meadow VMldi ewer Miff
Rafe: 40 lbs. per sae Rate: 10 bs. per sue
Application: Billion Seeder and Straw Application: Brillion Seeder & Straw
3 Vendor. Prairie Reeforaficna, Inc. (or equal) Vendor Prairie Restorations, Inc. (or equal)
a
_j Type II Seed MI K: Northam Upland Meadow Gran IX
Upland Meadow VNldfiowsr Mb
N Rate: 40 be. per acre Rate: 10 bs. par am
S d If Straw A licetion' Brilliant Seeder & straw
NOTES:
DO NOT HEAVILY PRUNE THE TREE AT PLANrIR
PRUNE ONLY CROSSOVER UMBS, CO-DOMINA
LEADERS, AND BROKEN OR DEAD BRANCHES.
INTERIOR TWIGS AND LATERAL BRANCHES MA
PRUNED; HOWEVER, DO NOT REMOVE THE TEI
BUDS OF BRANCHES THAT EXTEND TO THE ED
THE CROWN.
FIELD STAKE TREES FOR THE APPROVAL OF TI
LANDSCAPE ARCHITECT
WRAP TREE TRUNKS BY NOV.15TH AND
REMOVE BY JUNE 15T.
MARK THE NORTH SIDE OF THE TREE N THE
NURSERY, AND ROTATE TREE TO FACE
NORTH AT THE SITE WHEN EVER POSSIBLE.
SET TOP OF ROOT BALL FLUSH TO
GRADE OR 1.2 INOILS. HIGHER IN SLOWLY
GRAININGDE
SOILS.
WOOD MULCH. DOING PLACE MULCH IN -
CONTACTWITH TREE TRUNK MAINTAIN -III
THE MULCH WEEDFREE FORAFTER -
PLANTING.
NOTE. FOR DIMENSIONS OF PLAITING AREAS SEE
PLAN. SOIL BACKFILL SHALL BE GARDEN BLEND
SOIL ( EQUAL MIX OF COMPOST, SAND & SAL) PER
NOTES.
2 DECIDUOUS THE
6.1 NMToscALE
N Application. Bnllron ae or an PP
Vendor. Prairie Restorations, Inc. (or equal Vendor. Prairie Restorations, Inc. (or equal)
LANDSCAPE DETAILS, NOTES, AND SCHEDULES:
ID
QUAN: I
COMMON NAME
LATIN NAME
SIZE (MIN.)
ROOT
COMMENT
CONIFEROUS TREES
A
17
BALSAM FIR
Abies balsamea
V HGT.
B&B
FULL FORM
B
25
NORWAY SPRUCE
Puss abies
V HGT.
B&B
FULL FORM
C
29
BLACK HILLS SPRUCE
Picea giauca var. densata
V HGT.
B&B
FULL FORM
D
13
AUSTRIAN PINE
Pinus rtigra
8' HGT.
B&B
SPECIMEW FULL FORM
DECIDUOUS TREES
F
41
REDMOND LINDEN
Tllla americena'Redmond'
2.5" CAL.
B&B
HEALTHY/FULL
G
28
COMMON HACKBERRY
Celtis ocddentalis
2.5" CAL.
B&B
HEALTHY/FULL
H
13
NORTHERN RED OAK
Quercus rubra
2.5" CAL.
B&B
SPRING DUG
1
37
AUTUMN BLAZE MAPLE
Acer X freemanii 'Jetfersred'
2.5" CAL.
B&B
HEALTHY/FULL
J
19
DISCOVERY ELM
Ulmus davidana var.
japonica 'Discovery'
2.5" CAL.
B&B
HEALTHY/FULL
K
18
WHITE OAK
Quercus alba
2.5" CAL.
B&B
SPRING DUG
L
45
FALL FIESTA SUGAR MAPLE
Acer saccharum'Bailsta'
2.5" CAL.
B&B
HEALTHY/FULL
M
40
BUR OAK
Quercus macrocarpa
2.5" CAL.
B&B
SPRING DUG
N
13
WHITESPIRE BIRCH
Betula jacquemontii'Whitespire'
2" CAL
B&B
3-CANE CLUMP
O
7
PRAIRIEFIRE CRABAPPLE
Mauls X'Praidetire
2" CAL
B&B
HEALTHY/FULL
DECIDUOUS SHRUBS
Q
40
ISANTI DOGWOOD
Comus sericea Island'
3 GAL
POT
HEALTHY/FULL
R
1 38
AMERICAN CRANBERRYBUSH
Vibumum trilobum
2 GAL
POT
HEALTHYIFULL
S
1 79
COMMON PURPLE LILAC
Sydnga vulgads
2 GAL
POT
HEALTHY/FULL
PLANTING SOIL -SEE SPEC.
TOMAHAWK TREE STABILIZER STAKES.
MINIMUM (2) PERTREE.
DRAIN SYSTEM IS NECESSARY
FOR HEAVY CLAY SOILS.
W DIAMETER AUGERED HOLE,
471 MIN. DEPTH FILLED W/ 3W
DIAMETER DRAIN ROCK. COVER
W/W FILTER FABRIC.
ITINr, - .qFrT
-EACH TREE MUST BE PLANTED SUCH THAT THE
TRUNK FLARE IS VISIBLE AT THE TOP OF THE ROOT
BALL. TREES WHERE THE TRUNK FLARE R NOT
VISIBLE SHALL BE REJECTED. DO NOT COVER THE
TOP OFTHE ROOT HALL WITH SOU
MULCH RING 6 FT. DAM. MIN.. 8FT. DAM.
PREFERRED
4 IM HIGH EARTH SAUCER BEYOND EDGE OF
ROOT BALL.
TOMAHAWK TREE STABILIZER STAKES.
_ MNIMIM(2)PERTREE.
REMOVE ALL PAINE, HOPE AND WRE, AND BURLAP
,III, -III FROM TOP HALF OF ROOT BALL
IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE ROOT BALL
CUT THE WRE BASKET IN FOUR PLACES AND FOLD DOWN B N. INTO
PLANTING HOLE.
PUCE ROOT BALL ON UNEXCAVATED OR TAMPED SOIL
TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT
PRESSURE 50 THAT ROOT HNl DOES NOT SHIFT.
E PLANTING - SECTION
C
C
C
ato
V
C_0
J O1
� m
of 2 E E
Q 73 __8.
cc = 6
Eli
O
L is
V 3 f0 py
V y
d
N
V X
MINES
M
Q N �
xQ -Z d
L
aaa�
Vto
J e-
E rg
j G_
�
i
N C
. ail A
T L
-
t i
0 Is
m n m '
CQ
.t... d O aF O
-
6' A t -
M
u3FLE
at www
m �
ryv � LLL�3999 �
L
G
OV J W d
(D
z
O
z14,
14
In
a
v�
Z
A
a
r
W
w
�a
LLi
-
W
z
�
it^
a
C 1
Id -I
Z
W
Z
W
VJ0Ao
v
azOf
Z
�
0.r
a
S
Q
U
�
�!
ICI
Z
Q
wz
a)
w
r-r
m
z
O
a
DRAWN BY
BDH
DATE
9/9/11
REVISIONS
9/30/11 REVISED PER
CITY COMMENTS
10/14/11 REVISED PER
CITY COMMENTS
CAD FILE
21996-22L
PROJECT NO.
21996-21
6.1
V It
GENERAL GRADING NOTES:
1. SPECIFICATIONS WHICH APPLY ARE THE MOST RECENT EDITIONS OF THE
MUNICIPALITY IN WHICH THE WORK IS LOCATED AND THE MINNESOTA
DEPARTMENT OF TRANSPORTATION SPECIFICATIONS FOR HIGHWAY
CONSTRUCTION UNLESS MODIFIED HEREIN ON THESE CONTRACT DOCUMENTS.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE THE
"GOPHER STATE ONE CALL" EXCAVATION NOTICE SYSTEM AS REQUIRED UNDER
MINNESOTA STATUTE CHAPTER 216D, 48 HOURS PRIOR TO PERFORMING ANY
EXCAVATION (PHONE 651-454-0002 IN THE TWIN CITIES METRO AREA OR
TOLL FREE 1-800-252-1166).
3. GRADING CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF
ALL UNDERGROUND UTILITIES WITH THE RESPECTIVE UTILITY COMPANIES
PRIOR TO CONSTRUCTION.
4. ALL CONSTRUCTION AS CALLED FOR ON THESE CONTRACT DOCUMENTS
SHALL BE PERFORMED IN ACCORDANCE WITH ALL OSHA REQUIREMENTS.
5. ALL LOT AND EASEMENT DIMENSIONS ARE SUBJECT TO FINAL PLAT.
6. ALL EROSION CONTROL MEASURES CALLED FOR ON THESE PLANS AND
SPECIFICATIONS, WHICH MAY INCLUDE FILTER FENCE,SEDIMENTATION
BASINS OR TEMPORARY SEDIMENT TRAPS, SHALL BE CONSTRUCTED AND
SERVICEABLE IN THE FOLLOWING ORDER, AS REQUIRED.
a. ROCK CONSTRUCTION ENTRANCES.
b. FILTER FENCE.
c. TEMPORARY CULVERTS.
d. TEMPORARY SEDIMENTATION BASINS AND OU TFALL FACILITIES.
e.STORM WATER POND CONSTRUCTION.
f. COMMON EXCAVATION AND EMBANKMENT (GRADING CONSTRUCTION).
9. SEED AND MULCH (SEE NOTE 14).
H. STRAW BALE BARRIERS IN FINISHED GRADED AREAS.
i. INLET AND OUTLET FACILITIES SUBSEQUENT TO STORM SEWER
CONSTRUCTION.
7. GRADING CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION
CONTROL MEASURES AS SHOWN ON THESE PLANS AND SPECIFICATIONS
AND IMPLEMENT ANY ADDITIONAL EROSION CONTROL MEASURES
NECESSARY IN ORDER TO PROTECT ADJACENT PROPERTY.
8. ALL EROSION CONTROL FACILITIES SHALL BE MAINTAINED BY THE
GRADING CONTRACTOR DURING GRADING OPERATIONS. ANY TEMPORARY
FACILITIES WHICH ARE TO BE REMOVED AS CALLED FOR ON THESE PLANS
AND SPECIFICATIONS SHALL BE REMOVED BY THE GRADING CONTRACTOR
WHEN DIRECTED BY THE ENGINEER. THE GRADING CONTRACTOR SHALL
THEN RESTORE THE SUBSEQUENTLY DISTURBED AREA IN ACCORDANCE
WITH THESE PLANS AND SPECIFICATIONS,
9. IT IS THE RESPONSIBILITY OF THE GRADING CONTRACTOR TO DISPOSE
OFF -SITE ALL TREES, STUMPS, BRUSH, OR OTHER DEBRIS THAT EXISTS
WITHIN THE CONSTRUCTION AREAS. TREES TO REMAIN SHALL BE
DESIGNATED BY THE ENGINEER,
10. THE GRADING CONTRACTOR SHALL SCHEDULE THE SOILS ENGINEER SO
THAT CERTIFICATION OF ALL CONTROLLED FILLS CAN BE FURNISHED TO
THE OWNER DURING AND UPON COMPLETION OF THE PROJECT.
11. DENSITY TESTS SHALL BE TAKEN TO EVALUATE THE COMPACTION WITHIN
THE STREETS, TRAVEL WAYS OR PARKING LOTS. WITHIN THE UPPER 3 FEET
OF STREET, TRAVEL WAYS OR PARKING LOT SUBGRADE, THE CONTRACTOR
SHALL INSURE THAT ALL SOILS BE NOT MORE THAN ONE PERCENTAGE POINT
OVER THE SOIL'S STANDARD PROCTOR OPTIMUM MOISTURE CONTENT, AND
THAT COMPACTION TO A MINIMUM OF 100% OF STANDARD PROCTOR DENSITY
BE PROVIDED. IN AREAS BELOW THE UPPER THREE FEET OF SUBGRADE OF
THE STREETS, TRAVEL WAYS OR PARKING LOTS, THE CONTRACTOR SHALL
INSURE THAT ALL SOILS BE NOT MORE THAN THREE PERCENTAGE POINTS
OVER THE SOIL'S STANDARD PROCTOR OPTIMUM MOISTURE CONTENT, AND
THAT COMPACTION TO A MINIMUM OF 95% OF STANDARD PROCTOR DENSITY
BE PROVIDED. THE GRADING TOLERANCE FOR THESE AREAS SHALL BE
WITHIN 0.1't.
12. LOT GRADING AND/OR THE PREPARATION OF BUILDING PADS SHALL BE
CONSTRUCTED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS.
THE GRADING TOLERANCE SHALL BE 0.25't. ALL EARTHWORK OPERATIONS
SHALL BE PERFORMED IN ACCORDANCE WITH THE HUD -FHA DATA SHEET
79G "LAND DEVELOPMENT WITH CONTROLLED EARTHWORK", PROVIDING
FOR A MINIMUM OF 95% STANDARD DENSITY, OR AS OTHERWISE SPECIFIED
BY THE CEO -TECHNICAL ENGINEER.
13. IN AREAS WHERE RETAINING WALLS ARE PROPOSED ON CONTROLLED FILL
AREAS, A MINIMUM 95% STANDARD DENSITY NEEDS TO BE ATTAINED
WHERE FILL THICKNESSES EXCEED 10' BELOW WALL FOUNDATION
ELEVATIONS, A HIGHER MINIMUM OF 98% SHALL BE ATTAINED
14. BUILDING PADS SHOWN ON EACH LOT ARE TYPICAL ONLY. THE DEPTH OF THE
PAD FROM FRONT TO BACK SHALL BE GRADED THROUGHOUT THE FULL WIDTH
OF THE LOT OR AS NECESSARY TO ALLOW FOR CONSTRUCTION OF A BUILDING
AT THE MINIMUM SIDE YARD SETBACKS. (REFER TO THE PLANS FOR SPECIFIC
SETBACK DISTANCES.) IF UNSUITABLE SOIL CONDITIONS ARE ENCOUNTERED
WITHIN A PROPOSED BUILDING PAD THAT CANNOT BE CORRECTED OR
REMOVED, IT IS THE RESPSONSIBILITY OF THE CONTRACTOR TO NOTIFY
THE ENGINEER OF THE CONDITIONS AND TO LOCATE THE LIMITS OF THE
UNSUITABLE AREAS.
15. UNLESS OTHERWISE SPECIFICALLY NOTED, THE FOLLOWING SITE
RE -VEGETATION TECHNIQUES SHALL BE IMPLEMENTED. ALL DISTURBED
AREAS, EXCEPT STREETS, AND POND AREAS SHALL BE COVERED WITH A
MINIMUM OF 6" TOPSOIL AND SHALL BE SEEDED WITH MnDOT #250 MIX AT
70LBS./ACRE. SEEDED AREAS SHALL BE MULCHED WITH MnDOT TYPE 1
AT 2 TONS/ACRE AND DISC ANCHORED. SEEDING AND MULCHING SHALL
BE COMPLETED WITHIN 2 WEEKS AFTER EARTH MOVING OPERATIONS
ARE COMPLETED. ALL SLOPES THAT EXCEED 3(H):1(V) SHALL BE SEEDED
WITH A WOOD FIBER BLANKET. FERTILIZER SHALL BE 22-5-10 80% W.I.N., 07 CL OR
EQUIVALENT AND APPLIED AT 350 POUNDS PER ACRE. FERTILIZER IS
TO BE INCORPORATED INTO THE TOP 3 TO 4 INCHES BY DISCING OR
SOME OTHER SUITABLE MEANS. WHEN SEEDING AFTER NOVEMBER 1,
OR WHEN TEMPERATURES DO NOT EXCEED 40 DEGREES FAHRENHEIT,
THE CONTRACTOR SHALL DORMANT SEED ALONG ALL DISTURBED AREAS.
DORMANT SEED BED PREPARATION, SEEDING RATES, AND MULCH
REQUIREMENTS SHALL BE THE SAME AS THOSE DESCRIBED IN THIS
SECTION EXCEPT THAT NO SEED SHALL BE PLACED ON SNOW OR ICE
WHICH IS GREATER THAN 2 INCHES IN DEPTH. ANY SEEDED AREAS WHICH
DO NOT BECOME ESTABLISHED SHALL BE RE -SEEDED AT THE
CONTRACTOR'S EXPENSE.
16. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO KEEP PUBLIC
STREETS, TRAVEL WAYS, PARKING LOTS AND TRAILS UTILIZED FOR INGRESS
TO AND EGRESS FROM THE CONSTRUCTION SITE FREE OF DIRT AND
OTHER DEBRIS WHICH RESULTS FROM SAID GRADING CONSTRUCTION.
17. THE SITE GRADING TOLERANCE FOR THE SITE SHOULD BE 0.1' FOR STREETS
AND 0.30' FOR LANDSCAPED/OPEN AREAS.
SPECIFIC GRADING NOTES:
1. THE EXISTING TOPOGRAPHY AND CONTOUR ELEVATIONS ON THE PLANS
WERE PROVIDED BY JAMES R. HILL, INC. ON OR ABOUT 09/20/05. THE
DEGREE OF ACCURACY OF THE EXISTING CONTOURS SHOWN ON THE PLAN
IS EQUAL TO t ONE HALF THE CONTOUR INTERVAL.
LOT BENCHING DETAIL
STREET
65'
GRAD NG
RAMBLER SECTION (F)
RECOMMENDED HOUSE TYPES
STANDARD LOT- FINISHED GRADE ELEVATION IS THE SAME AT
THE FRONT AND REAR OF HOUSE. LOT CAN ACCOMMODATE
F RAMBLER, SPLIT ENTRY OR TWO STORY HOME. LOWEST
BASEMENT FLOOR ELEVATION MAY BE EITHER 8.0' OR 3.5'
BELOW FINISHED GROUND LEVEL.
WALKOUT LOT- FINISHED GRADE ELEVATION FOR REAR
BASEMENT WALKOUT IS 8.0' LOWER THAN FINISHED GROUND
WO ELEVATION SHOW AT FRONT OF HOUSE. BASEMENT FLOOR
ELEVATION IS 0.5' ABOVE REAR FINISHED GROUND ELEVATION SHOWN
CUSTOM WALKOUT LOT- FINISHED GRADE ELEVATION FOR SIDE
BASEMENT WALKOUT IS 8.0' LOWER THAN FINISHED HOUSE FLOOR (H
ELEVATION SHOW SWO OF HOSE. ASEMENT FLOOR
ELEVATION IS0 5 AABOVENREAR F NISHED G ROUND ELEVATION SHOWN
DEEP WINDOW OR LOOKOUT LOT -THE FINISHED GRADE AT
THE REAR OF THE HOUSE IS 5.0' BELOW GROUND AT THE FRONT
OF THE HOUSE TO ACCOMMODATE FULL WINDOWS. WINDOW OPENINGS
LO ARE 0.5' ABOVE THE GROUND AT THE REAR OF THE HOUSE.
DEEP WINDOW OR LOOKOUT LOT -THE FINISHED GRADE AT
THE SIDE OF THE HOUSE IS 5.0' BELOW HOUSE FLOOR ELEVATION (H
THE FRONT OF THE HOUSE TO ACCOMMODATE FULL WINDOWS. WINDO
SILO ARE 0.5' ABOVE THE GROUND AT THE REAR OF THE HOUSE.
NOTE: FOR ALL RECOMMENDED HOUSE TYPES, GARAGE FLOOR
ELEVATION IS 0.3' ABOVE FINISHED GROUND ELEVATION
SHOWN AT FRONT OF HOUSE. TOP OF BLOCK ELEVATIONS IS
0.7' ABOVE FINISHED GROUND ELEVATION SHOWN AT FRONT OF HOUS
916 - LOT NUMBER
PROPOSED CONTOUR
6
PROPERTY LINE 920-
/ I
SURFACE DRAINAGE
920.0 f
RWO�-
F)
F) AT
W OPENINGS
E.
EXISTING CONTOUR
-FINISHED GRADE ELEVATION
RECOMMENDED HOUSE TYPE
SUGGESTED GARAGE SIDE G 928.0 FINISHED GRADE ELEVATION
PROPOSED DRIVEWAY (675 S.F,f) TYPICAL ETBACKFR FRONT
YARD)
FINISHED ELEVATION - 2311 224- PROPOSED ROW
:a .
AT LOT CORNER
C&G 26 8 �� FINISHED CE GRADE
- I -
CENTERLINE 51 "v- 100' � STATION
TYPICAL LOT
1
�
•l e, :� yam
I
f F
I
VN
Emil .c.,m
ly t al
properly his.
ram,
N/A
us,
ND t
f
At drac emvh 'o x
eurterte< I.. Im
`'1
c' PiPR langde xymtl
YO L:
xi a1ncRA
Wedcr oar. to hc.
,hLLcLe
A, .iad b,c
� .1• a-d ve iJe
t-c.
its' li II
1 n u
MI Pa:;cs J utlaxelk.
bej
TYPICAL
�MI�N6pL�
11
INILHSLCIION
Rwscw 2-0k
ENGINEERING DEPARTMIEN
���
1DOi
tC uAYE 0.. C e ,aM
X
Y
`
A
wit
FOR DRAINAGE
� AND `Do
1 d
26592'SWIMIC
M
b`
�b
eD 26'
PRUJY 45 S" RAONS+765.86'/3Eff �. ---"'-b•1
1
STANDARD CUL-DE-SAC
_ x T• _
Doti 80' 1 46'. RAO.
U"AM OV RAD. 45.Y RAD.
"Now F6d PAD. 4W. RI
wD
FIR WgSINS ARE MEASLiRF-D 70 HAUL OG C::RE
STREET
L ly GRA
1. PLUS 6' GRAVfl. 3±Otk2YR. {RWAI)
TYPICAL
CUL-DE-SAC
Xptyy' `_,a
ENGINEERING DEPAfiTMf:Ni
5205
RL NMC ¢
PROPOSED BUILDING
SITE
PL
30'
15.5' to Back 15:5' to I
Wem Course to be 1/2'
ApoTc Edgs of Gutter
4" Topsoil, Seed'-L
& Mulch r Sod.
Draintile
Surmmfte, c e-
Goncrete Curb
PL
�-ts : 1
I' Dr.mUlle
1 1/2'_MNOOT 2350 111011 0308
Tack Coat - 2357
2"-MNOOT 23W LVNw35D30R
12'-U.a 5 A99regate Base, 100% Cr -M1
24' MNDOT 3149.28 Se1ad
Granular Barrow (-See Nate 7)
1� MSinmum Right -of -Way R,W,ad - N'.
2. Maximum shed grace T.0%
feel de U7 %.
3 40' Top t a 5 .
9
4 4. Roll. sd ed In d slurped a eas.
0 op D ac
s 2 bit coo ben a aura
1 e or Noce the next conshuct"on
6 lM bilu. nw ng W p d
reaeet .[Ifollowing , pho, ..i dins bitumi I a. bare.
J. A teat roll of fhe p. city
sbbgmtle h, c be p the atl by the owner
In the grata b,, d m ,, Ikcr base The city hat the authority to rPootre
onisrof al allbr tle marreatiw boretl ,d the test roll.
6. if.WdA snail be Pacetl along both saes of roadway see plate 5232 hr
aetaile.
TYPICAL
RESIDENTIAL
mom STREET SECTION
r¢Msm:1 ,n ENGINEERING DEPARTMENT 'uIT "a' 5200
ERE NAML mAaIs�sPEGsWnD
r
VARIABLE Ig
6 1'
HYDRANT
- VALVE BOX 6- 6'
(SVARIES
SEE PLAN5)
1/4" PER FT
SLOPE TO ROADWAY
URIT
4'F�MS 5 BASE
NIn.
CONCRETE SEE MOTES , A
NOTES:
1. TYPICAL 6" THEl< CONCRETE SIDEWALK.
2, USE S" THICK FOR COMMERICAL DRIVEWAY CROSSING.
3, JOINT SPACING AT 5' INTERVALS. EXPANSION JOINT SPACING At 100'
INTERVALS AND WHEN ABUT'ING EXISTING CCNCREE OR STRUCTURE.
QR� CONCRETE
SIDEWALK
Roan' , 1D ENGINEERING DEPARTMENT RAT[ NOJ 5214
rxc NALIea �Ea a214
ALL 3:1 SLOPES MUST BE EITHER SEEDED
& STABILIZED WITH FIBER BLANKET OR, IF
SODDING, THE SOD SHALL BE STAKED (TYP.)
PL CL PL
Wear Course to be 1/2'
Above Eate or Gutter
1111 1 3.0% 20X
41' Topsa,. SesaN L �
& Mulch or Said. 2'-MNDOT 2MO MVWE35035D
8-615 Cmaele Curb Y-MNDOT 2350 MVNW35035B
2 1/2'-MNDOT 2350 MVNw350356
12'-Gass 5 Agdegale Base. 100% Oushsc
24" MI 3149.2E Select
Granular Borrow (see Note 7)
Took Coat - 2357
Tock Coat - 2357
NOTES
1. Minevum Right -of -Way Revutred - 60'.
2. Maximum street grade 7.0%
3. Minmurn atheist gads 0.75%.
4 4o" T .wY se n disturbed areas
W P
5. 2 NOT. said bahAa.,b-
S.
the btumiowin smog int of snail be placed lma next <onsfrucFon
subson hall
t DI emend of the bituminous base
7. A test re of the prepared aector, he c tq as the g by the owner
c the Presence d a city ti o posse. The city has Me 0utnonty to reRulre
additiMd subgrotla correction posed on one fast halt
QP�GP TYPICAL
COMMERCIAL/INDUSTRIAL
STREET SECTION
R6VIsm 2-1° ENGINEERING DEPARTMENT PUTS ea. 5201
ne NWE ¢VNc ezm
eEFVl1E io YATCX 6 �A-
ff .IAg_RI-9A4 OIANE1Ek
/-
BACK OF WITS
DOME SECTW,
coaavo om ,sre'-e sm'
FIR FACE `8. 6. T•
000anm
AJ o 0
PLAN VIEW OF DIAGONAL RAMP 16ASTT'"') s/rtw s/6Tax.
DOME SPACING
WRB 4 LaThX
5 4^ l a
ro Fr./rT. w nAr1ER� a
1 SECTION A -A &
aoa rT. /:i uOPE c4 F1AR@ sltK. (r }
E&ST�O IOCCRM1pX5 Do NOT pE� o MAY f7'
UY aas FEAPEr ELEVATION OF RAMP X 9'
� 1/2 11 PREiORM@ JOINT Ru,R NATRNA_ AA 70 M 21).
T tAM RAMPS AND A 60" LAKING NE�MfFN
® THEN A MEDIAN IS NaT MOf fNWIl1 PER M FEOE$
r M. TIE PCETSITAN,WOU LROSsN6 SHAH BE CIIT THRWp1 TIE 11A rRi AT STREET T TA
® R• PJ N' IS PX MWIRE6 OFF!4i 6 THE iMINCARO OaME AREA gNIN T6 IiNNT rALE Of
cDA
O ApA REgnuD muxcAl@ DauE NieA sHAu RE r D• wN lu InREcxbx of oust ANa SHALL
reo. ,HE ruu. WOIH (A' 0' 1YP.j L£ TIE ClXal Ra,JP. TW$ r V er a• o^ A1om dTR.)
TtUNCAI{➢ pgAE AFEA SHALL CMTRh$i NSUAl1Y X1M TR AO.MCENi WAWNC SURFACE TIE
ENTRE TRHN[Ai@ CCpE AREA SHALL BE A I1G41 LCILR (GRAY) MEN TIE APYCENI
4OFVAn( IE A E A CAOUT i E ENTIRE A -A& D R U( AFQA SHALL 6E A oARx CCLCF
wairA WAN TIC ADJACFTE 4DEWAIJf s A'MHI1C OR NEXT EL N CEMENT A L0AED001.01t.
SURFACE MPU@ TRUNCATED OOAIES N lido CONCRETE DULL NOT bi ALLOYED.
CURRENT@ OOT AREA AOS F R ffEcTA OETECTARIF WARNING PUTE Rs9d4 TiAi MEE1: 1.
CURRENT MNDOT $IANDAf1DS FOR aEIECTARIE WARN NG SYS"IENS
QPfff PEDESTRIAN
mom CURB RAMP
loan: 110 ENGINEERING DEPARTMENT ' N0" 5215
NE N41AE:G 0 CS 5Z,5
AQUATIC
BENCH
10
aw
as
wo
NOTE: AQUATIC BENCH OF THE POND SHALL BE
SEEDED WITH
THE MN DOT NO. 310 SEED
x
MIXTURE. THE
AREA BELOW
THE AQUATIC
BENCH NEED NOT BE SEEDED.
o
OLE
FINISHED
GROUND
10: 1
3. 7
TYPICAL STORMWATER
BASIN
CROSS SECTION
Gvr
30'
- BUILDING
SETBACK LINE
r 6" TOPSOIL
r-FINISHED GRADING GRADE
�1r I
/1/A
i
�� ( TT,`7� J C`/ 7~7 n� �- SELECT - {
�--SELEECCTBACKFILL f ' N N BACKFILL
I \ i
UNSUITABLE
MATERIAL )
\ _ _ SUB -GRADE CORRECTION
LIMITS
NON -SELECT BACKFILL MATERIAL
SUITABLE
MATERIAL
BOTTOM OF UNSUITABLE MATERIAL
(TO BE VERIFIED BY SOILS ENGINEER
PRIOR TO PLACEMENT OF SELECT MATERIAL)
BUILDING SITE & STREET SUB -GRADE CORRECTION DETAIL
EXISTING
GRADE
1J�^, .!✓- x- ,/2 r-Irp GxM^inuc 'd,mR
t••f
� W 3�a�_x
6" R W YT R613
ItanttAU I: 'b MiS :.uf4<
131Wr i,u
1I O D E
Mn LT
c, r� a-d ae-:r
T
:I]--
1 Dor.i•� Lcts, c� Mstlicrts
e'E
R
RillnN„-r M-:rri-A
}
EA'R�To•
j
-IT
IL
2D'
r'
1 s
y ki1,.9Px'I x
T _
I
(iayi
111iOP
-YPICAL CURB
AND CUTTER
R 110
_NGIN= RING DCP.4RTMENT
IXATE NO. 52113
3
_y
vAPiAPo F _ v
it
M1NLM I"
FP R 51 i3' V
--J TOPSOIL TYF:AL - 3
3" xNDDT i i5tl LVa7=4!%I -
A' CI A55 3 iS r-
(Text :AIISHFh`
041'II 'i1;i JLNY
Phi of FnrrtFPx
S LO. LELRS UL :ACK LLLa 4,U R_ 101El M It 3' t O :A_ AYJ
PE \W ETATED Ax"H 5CC OF SEED I M Luh
2, It- C`Dh TRAC OR OP C%,E i ", ALL SUP -Y A 2 YC r I % MAKlEMA1YL
BCND If01 d ' AGCE'TA.NC=
3. 'H5 DETAIL ;{EC/N:A11 N5 ARE MHIVU41 RE7.9RD,E A.-OIT04AL D'ACK
:NA" FF R�NIIPF': rF'RLIW nW FxiSTa= Q i-GRY,F tCl iICNNTpAe
4. P. TUMINO.'. -RHLS 'JA" hC7 DC Y ISTlLCTD Orl J\N!ITFO - `% S IY• Wo<;X
AATRAI. R Arx r i- f1F OR.'.ANL'. SOTS AIC-01
1m/Wp1�ltYpiL� BITLMINOUS
(� TRAIL
4tMS@. 1-10 M4 NO.:
ENGINEER NO 7EDARTLI ENT 5216
fL WWE:6 fN6 SPEC9`5210
CAP UNIT
IMPERVIOUS FILL
ADHERE TO TOP UNIT
C 12' DEEP
W/VERSA-LOK OR EQUAL
\
CONCRETE ADHESIVE
DRAINAGE AGGREGATE
VERSA-LOK OR EQUAL .':' 12' THICK MIN.
MODULAR CONCRETE
FACING UNITS
IMPERVIOUS FILL.
-I RETAINED BACKFILL
7�= I
APPROX.
EXCAVATION LINE
REINFORCED SACKFlLL
COMPACTED 959 OF MAXIMUM
I I STANDARD PROCTOR DENSITY
O DM (MIN.) DRAIN PIPE
OUTLET O END OF WALL
OR O 40
•- «v'4}'^ ' CENTERS MAX.
SLOPE TO DRAIN (1/6'/17.)
=I I IAI YP W/FILTER FABRIC
T.I,I IMPERVIOUS FILL
T T
GRANULAR LEVELING PAD
V THICK MIN.
WE OF WALL ON APPROVED
SUBGRADE (BY SOILS ENGINEER)
RETAINING WALL DETAIL (TYPICAL)
(CONTRACTOR TO PROVIDE DESIGN BY OTHERS)
r- 3' 10' 3--1
3T 31
TURF REINFORCEMENT MAT
(TO BE INSTALLED PER
MANUFACTURE SPECIFICATIONS)
16'
SPILLWAY AREA
a. SEED: MnDOT SEED MIX #328 (PAGE 2.1)
b. TURF REINFORCEMENT MAT: NAG-C350
c. 0.5' TOPSOIL (MIN.)
10' TURF REINFORCEMENT MAT (TRM) SPILLWAY
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY - N. SIDE OF
PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT ® SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
N
0
r�J
Lf7
L[ )
w
�
N
Ld
O
J
CJ)
=
ON
' )
2
�
N
n
L L
m
cr)
LLJ
lit
><
'4
Li
'z^
V
r_
Z
�
c/N
�
o
coV ♦
`D
0
O
Cn
N
N
W
o
cc
Z
3
Z
O
d
Cl-
CN
IN
E
N
°
C TO w
0 - M
�
aoEpco CL
t3 •L+'to N Of
Z
o m o a
m
O a 0 U, aft 66
IY
OCIL pU
T` y O c, N
U O Dt y C W
n
m
U 0
V VI T N 0
TO
o
O w N
oo
U
z
0
��
H�
A
AL'
Z
Q
H
W
LLi
Z�j
O
z
r/1
K
Of
a
C\2
z
w
C0
O
BUJ
V 1
coLLI
V)
rZ.
W
I,-G��G��yy
>
z
Z
I�1
�vVV
0
0.1a
=
v
�Of
Q
N
W
�
�
z
Z
Q
W
in
rl
I-�
z
0
a
DRAWN BY
CJK
DATE
9/9/11
REVISIONS
9/30/11 REVISED PER
CITY COMMENTS
10/14/11 REVISED PER
CITY COMMENTS
CAD FILE
21996-22D
PROJECT NO.
21996-21
7.1
0■
A®40 C4Wly Rd, B
R µ11.e4mi6
y
` �aa
t.e• .
d:�r
s
Lin, w BMd C.9, Rd 18
SITE
a °�s
Elan s
N a m tnd-
o�iW14
Irk $,
slmwn Jt 3 1114 1,.
,±t1CUrlln bYcoyA 4. �l�f"
ir
r #
t� 212
n
reer Tfad r
SITE MAP
NO SCALE
PIONEER PASS 2ND ADDITION
INDEX
TITLE SHEET 1.1
CHANHASSEN, MINNESOTA SITE INFORMATION 1.2-1.3
FINAL
EROSION &SEDIMENT CONTROL DETAILS 2.1
SANITARY WATERMAIN STORM
FINAL EROSION &SEDIMENT CONTROL PLAN 2.2
> > SANITARY SEWER & WATERMAIN CONSTRUCTION
SEWER, STREET CONSTRUCTION & EROSION & HSANITARY SEWER
EMLOCK WAY CONNECTION 3.2
STREET A & STREET B OF CHARKAI 3.3
SEDIMENT CONTROL PLAN RECE{VEDVEQ
STORM SEWER CONSTRUCTION 4.1-4.2
FOR STREET CONSTRUCTION Huy 0 8 4UII
HEMLOCK WAY CHANHASSEN PLA41N113<3DFPT 5.1
RYLAND HOMES STREET A & STREET B 5.2
DETAILS 6.1-6.2
7599 ANAGRAM DRIVE,
EDEN PRAIRIE,
MN
55344 LEGEND
PHONE: (952) 229-6000
FAX: (952)
229-6024
[
EXISTING ASPHALT SURFACE
EXISTING CONCRETE SURFACE
EXISTING GRAVEL SURFACE
EXISTING DELINEATED WETLAND
t_ 3_
- -- ---- WETLAND DELINEATION
0 EXISTING TREE LINE/TREES
i
� I i EXISTING WATERMAIN
EXISTING SANITARY SEWER
EXISTING STORM SEWER
EXISTING OVERHEAD POWER
' o
/ LINE/POWER POLES
x 1
p—0 �o 0 * - 00 -0 EXISTING - - - - - --- - - - - - ® WELL
0 0 0 0 * m EXISTING TELEPHONE PEDESTAL
0`. -0 -1 / 0 0 0 0 0 / I Y ____ __=_ ---- - - EXISTING CURB
MINIMUM CITY SETBACKS / / _�O vI 8
n ITI T/n / 0 _, / 0 * EXISTING FENCE
FRONT 25 FEET �" / / / 00 - I - 3 T _ 80 o EXISTING HEAVY-DUTY SILT FENCE
SIDE HOUSE - / �Z? I / 0 0 0 /,\ zo 1 I I ua7x a rxc�:::: : x,
_ 0\ EXISTING SILT FENCE
(HOUSE) �"'S, FEET � . , ,
19
SIDE (GARAGE) 5 FEET %{ I 5 / -- EXISTING POST GRADING HEAVY-DUTY
/ = = = = - y=, cT /® , 16 \, \\ I o \
/ - - " _ e a , / 0 SILT FENCE
( 1 --�-:_ _ _ _ - _-- i - < / `\\. _ rn _._rP—..—.—rF—._ E
b \1 XISTING TREE PROTECTION FENCE
REAR 25-FEET s I �-; - _ _ _ _ _=r---,frr Q: _:�� /f 0 � f� � 17 ' / /0 EXISTING TEMPORARY ROCK
I /
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY - N. SIDE OF
PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT 0 SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.- 913.67 NAVD 88 DATUM
STORM SEWER STRUCTURE SCHEDULE
STRUCTURE NO, BUILD INSIDE DIM. NEENAH CASTING
STMH 100
8 05'
60" DIA.
R-1642
STMH 101
10.42'
60" DIA.
R-1642
CBMH 102
14.07'
60" DIA.
R-3067-V
CBMH 103
13.98'
72" DIA.
R-3067-V
CBMH 104
10.96'
48" DIA.
R-3067-V
CBMH 105
3.50'
48" DIA.
R-4342
CB 106
3.50'
27" DIA.
R-4342
CBMH 107
6 47'
96" DIA.
R-3067-V
CBMH 108
4.18'
48" DIA.
R-3067-V
CBMH 108A
4 04'
48" DIA.
R-3067-V
CB 108AA
4.00'
2' x 3'
R-3067-V
CBMH 109
5.46'
84" DIA.
R-3067-V
CB 109A
4 50'
2' x 3'
R-3067-V
CBMH 110
4 67'
48 DIA.
R-3067-V
CBMH 111
5 00'
48" DIA.
R 4342
CBMH 112
6 26'
48' DIA.
R-4342
CB 113
3.50'
27" DIA.
R-4342
CBMH 114
4 00
84" DIA.
R 3067 V
CBMH 115
4,38'
48" DIA.
R-3067-V
CB 115A
4 00'
2' x 3'
R-3067-V
CBMH 116
3.50'
60" DIA.
R-3067-V
CB 116A
3.50'
2' x 3'
R-3067-V
CBMH 117
2.73'
48" DIA.
R-3067-V
CBMH 119
6.70'
4B" DIA.
R-4342
DRAINAGE AND UTILITY EASEMENTS
ARE SHOWN THUS:
I I
I I
I I
5 �+
I I
I
�5
I I
I I
1 I
I I
0 O
BEING 5 FEET IN WIDTH AND ADJOINING
SIDE LOT LINES, AND 10 FEET IN WIDTH
AND ADJOINING STREET LINES AND
REAR LOT LINES, UNLESS OTHERWISE
INDICATED ON THE PLAT.
- -_ _ r = - - -. $- _ - / 8 " 4 CONSTRUCTION ENTRANCE
V I EXISTING TEMPORARY
SEDIMENTATION BASIN
_ _ *f , SSMH 12, / B
_ 6
V
�_ _.h _ __ -- __- / _ __ _ % CBMH 116 / EXISTING 10' AQUATIC SAFETY
= /- _53 i / / / �\ BENCH (10:1 MAX SLOPE)
-fl-6----- _- _ ./ 13\ '7 //
-- p- iat- a' 32 a� _
--- -
\' EXISTING SEED & MnDOT
6 \ CATEGORY 3 EROSION CONTROL
S \\ -- --
l / � / , � / / ' \ ''�i'� � '� ,- � BLANKET
31 EXISTING WIMCO
BLUFF CREEK OVERLAY DISTRICT SIGN
1D
GLER = _ _ _ __ _ - �� \ \ �" >�--> PROPOSED STORM SEWER
0 ____ - 9
-� sMn�,°° I ``V AV 1 �21 1 m� �29�
8 �, —»—»—» »—>
_ _ _ _ / CBMH 108 \ / / \�'` / G A° �- >—»— PROPOSED DRAINTILE-4" PVC SDR 35
919
�-_—_
--
2� PROPOSED DRAINTILE-4" PERFORATED PVC
_ _ _ _ i I I 1 CBMH 102 SSMH 13 , -�` 22 > V ' 26 / ,'. f ^\ ,r .:
/ i' I FES 99 -I ✓ ^1 p (1T 1 _ """ / \ '+ - i <.uT F$� �'o____________________________________ '
'I' _ -♦ PROPOSED DRAINTILE SERVICE-4' PVC SDR 35
BMM 10]6 ^ ,\ f ` ' 18 "� ` ek- 2 1 16� t
j l I 1
SSMH 3
7 `
5
---_FES 120-
— 5 r SSNH 4 I - 1
FES 118 11 8 I_
_ ____ __1 r ___ ___R 1 "
CCCYYY '
0 i 1 I � I
_Q _/ �/�I ITI /\T I LSSN-- _ _ 1ip
9 1
I J I 3
I i SSMH 2
r r _
______— - y/ 1 2 li i 2
____J L— � I II
12 23
CBMH 112 1`
17 e/
iz
i 1 !
' nMH t
I — - -
I
BLVFFF CREEK BLVD
�om -
r
AU NV2ESTIVEN3TS 00L� j
Z - n
SCALE IN FEET
0 150 300 450
1 inch = 150 feet
14
15
13
I
1 SH 1
SLIB
25 y,
StI
I
PROJECT CONTACTS
V V I L_V I v
11--'4--ALlP.-0 IV E`3lYVILNTS' CLI. T '�
J ll� V
I 7,-7-I P 25.0221300 ;
—
I
PROJECT ENGINEER
DEVELOPER:
CITY:
NPDES OFFICER:
CONTRACTOR REPRESENTATIVE:
CONTRACTOR SUPERINTENDENT
M PROPOSED RIPRAP
W— _ II PROPOSED
ED WATERMAIN
PROPOSED SANITARY SEWER
PROPOSED SANITARY SERVICE-6" SOLVENT JOINT PVC SDR 26
--------------PROPOSED WATER SERVICE-1" COPPER TYPE K
I I
00 PROPOSED CONCRETE SURFACE
00 �_Qyy / / �� PROPOSED CURB
G/ / 0�J PROPOSED SEED & MnDOT CATEGORY 3
I 0 / EROSION CONTROL BLANKET(TO BE INSTALLED
..................::::
r "�� _ AFTER COMPLETION OF UTILITY CONSTRUCTION)
--= PROPOSED REAR YARD CB PROTECTION
t
-�— (TO BE INSTALLED AFTER COMPLETION OF
'VUN `` ; T T^D -,&\T\ :11 0'- / ® UTILITY CONSTRUCTION)
IrrI ^IY �1 A— n I�� I 1 / JOHN KI
1 / �1D NO. PROPOSED DITCH BLOCKING-MnDOT TYPE 3
(I / (TO BE INSTALLED AFTER COMPLETION OF
\ / UTILITY CONSTRUCTION)
PROPOSED WIMCO (TO BE INSTALLED AFTER
COMPLETION OF STREET CONSTRUCTION)
PROPOSED HEAVY-DUTY SILT FENCE
(TO BE INSTALLED AFTER COMPLETION OF
UTILITY CONSTRUCTION)
JOEL G. COOPER, P.E. - JAMES R. HILL, INC.
(952)-890-6044
(0)
PROPOSED
HEAVY-DUTY SILT FENCE
(612)-508-6480
(M)
(TO BE INSTALLED AFTER COMPLETION
MARK
SONSTEGARD - LAND DEVELOPMENT MANAGER - RYLAND HOMES
(952)-229-6007
(0)
OF UTILITY
CONSTRUCTION)
PAUL
OEHME - PUBLIC WORKS DIRECTOR/CITY ENGINEER - CITY OF CHANHASSEN
(952)-227-1169
(0)
--,
TEDDI
SEIBRING-TROFIN - MPCA
(651)-757-2719
(0)
PROPOSED
25' MITIGATION BUFFER
TO BE
DETERMINED
(XXX)-XXX-XXXX
J
TO BE
DETERMINED
(XXX)-XXX-XXXX
PROPOSED MITIGATION AREA
UNDISTURBED AREA
■
o
w
Ln
CV
co
.�
o
J
Cn
00
z
N
m
�
■
w
w
X
¢i
z
O
z
�
�-
w
o
C14
a�
14-
00
N�00
�
UI
LL-I
U
rn
z
3
W
J
CN
z
O
N
a-
N
E
41
v
o w
aoEaco a
3
� .l � rn �
Z
s od H'O
a�io cat ou
T - y O N
p E
IJ
o
O J '7
0_m
U J C y
� U Q
Y
w CO
O
0
AM
A
Lo
uo
z
A
W
a
Z
z
w
0h�
a
v�
g
�oAoW
W
Z
Co
Z
W
r ,
Q
L
a=�
U
EI
�a
Cif
NW
U
a
Z
W
a
lfi
z
O
a
DRAWN BY
CJK
DATE
11 /2/11
REVISIONS
CAD FILE
21996-22TSU
PROJECT NO.
21996-21
1.1
1' fi
l`}
f
. --
-1
i
l i J ti i
• s
' i � i •
•
in
� v E
• 'ear
Nw
m #_
7 f
? � BLUFF CREEK IS AN 4APAIRED d
WATER FOR TURBIDITY AND NO �
DISCHARGE WATER WALL BE ' },
HALLOWED TO THE CREEK OR
TO THE FRINGE WETLAW , €
,
v � _
.. a AUDUBON ROAD„ l • ate'-.. ....,. < t.
au+.,•.r4• �.ir4Fi4,��Y.ei�"...-sy'r"` _t...- r'' +�
i iw •l if Nabti i i rt'-„3 � ! � i wt+i4 �• 5
/ 4 p♦� �.`
Yi !
��� k.r..� w;.y w .1 i+i .,,.jv..:. �a^� -q ._.. ._'•+R! dMnlil��I-�"_'ZA
4
{ " •
USGS MAP
1 inch = 1000 feet
Z
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY - N. SIDE OF
PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT © SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
\ J'
\ - j
SOIL
\\ GROUP 1 -0
\ _ 1
\
r
I
l j j SOIL j
GROUP /
SOIL GROUP MAP
1 inch = 200 feet
Z n
now
Hydrologic Soil Group Soil Textures
A Sand, loamy sand, or sandy loam
B Silt loam or loam
C Sandy clay loam
D Clay loam, silty clay loam, sandy clay, silty clay, or clay
N
Q.'
M
O
W
n
.�>
Qf
Z
N
to
•
C)
J
0o
N
(V
IY
Cn
.
W
LLJ
O
¢�
Z
z
(n
d-
,^
W
o
V ♦
C'4
cD
\
CN
Ln
W
r,
0.)
c
z
3
Uj
Q
C)
CD
CV
2
N
E
d
a
_O ryj
E
a o o c o a
"�vmo d
m
o n o m d o
o d 4 o v
rr
T 0 y O N
oEw�m�c�
N O T pi pCj D � J
° 0�
N
O
O N J 0
_ TN
O
H�
1^-4
I�
It
M
Ln
0
V)
M
O
w
N/wV
Y
Zj
Z
O
a
\2
m
x
Z
w
Z
O0
EdUn0w�Aw
C0Qz>
Z
aa
=w
�
Q
EI
0
Q
t/ ram.
1�1
~'
Z
w
lli
7
z
0
1-4
DRAWN BY
CJK
DATE
11 /2/11
REVISIONS
CAD FILE
21996-22SIU
PROJECT NO.
21996-21
1.2
8 p
1 c
E_
Y
v
F 1 \
qW3�
r�'- ' � T 2 .OS Acres
AyrEi 1 3.72 efs. ' 0�
O ®cA O� ' 1\
a
- y -
r
i {
i
EXISTING DRAINAGE
1 inch = 200 feet
Z
u■
Ill
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY - N. SIDE OF
PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT @ SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
PROPOSED DRAINAGE
1 Inch = 200 feet
Z
V
Ln
af
M
O
Ln
Ld
\n
Z
N
to
w
O
J
rn
S
00
�
N
m
(3r)
■
L1_.I
ON
�
z
z
�
�
LLB
CDv,w
a
00
N
w
E
Z
J
O
CD
N
d
E
d
C T
v
W
O W
E o
ay
0 00o a
r 3« y w I
Z
•-•. �v m o a
o a o .0
cc
O'oco-Mov
r N 0 w
E!oymC�j
U O a U j O
N
U'V U U J E- i
v y d a rn p
N
0 a b o w` in
o0
0
0L4
L�
�1
It
M
V7
p
U)
QI-
~
O
E�
Lj►--i
ZZ
a
V
w
ra
Lw
w
Q
z
;
Z
u
^
^
LJ
aa
=
U
w
a
�
EI
~I
C?
Q
Z
WCl)
rn
V!
Q
W
°'
N
7
z
rl
0
a
DRAWN BY
CJK
DATE
11 /2/11
REVISIONS
CAD FILE
21996-22SIU
PROJECT NO.
21996-21
1.3
TEMPORARY EROSION & SEDIMENTATION CONTROL METHODS
(THE FOLLOWING METHODS WILL REQUIRE MULTIPLE SITE
VISITS DURING THE DIFFERENT STAGES OF CONSTRUCTION (INCIDENTAL TO
CONSTRUCTION)).
PART n. suBMlTnxc me Pp lcana
B. APPLICATION AND WRATDIJ CIEAT COVTRA(.i
1. TEMPORARY MULCH MnOCT TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED.
_
&Change of Cowmga For cdastruclim praj.cly Mere the ow operator changes, (eq., an wigind deMaP. hale portion. of the
T TYPE HYDRAULIC 301E STABILIZER
2. HYDROSPREAD Mn➢0 E 6 HYD C
property to niom hamebuaee-a w aNls the Mfre she to o new owner):
a. The spinal/carrot owner onall provide a Copy Of the complete notice of termllgtion/permit modification farm (de focused t Pat II.G2.D)
a. HYDRAULIC SOIL STABILIZER : MnDOT TYPE 6 AT A RATE OF 350 LBS/1000
to the new owner. The arighal/current owner email provide a SWPP to the new owner and oparotw that specifically odpea the
GALLONS OF SLURRY
remaining construction activity. Note: Thar notice of tmmtoion/parch modification bin milaces the subdivision registration, permit
B WATER : 875 GALLONS/1000 GALLONS OF SLURRY.
tsarefer/modification and notice Or termincetion fora
3. TEMPORARY SEED &MULCH SEASONAL )
b. The new owner Or Operator snail submit a complete and signed permit mdaificatian Pestlan (permit Irk4icatma head. Subdivision
Subdivision(
registration Or Permit transfer) of the notice of tamnation/permit mawfcatim farm to Me MPCA price to cornmencin, can.truclion
a. SEED : MCI SEED MIX #150 AT A RATE OF 40 LBS ACRE.
/
activity da site or in no Coca later than sewn ] a f 1 hi f n f
y O cep after la ep omen p o the propply. Thar her PermiNee(a) ore raspanaba w
It MULCH MnD10 TYPE t AT A RATE OF 2 TONS/ACRE AND ❑LSO ANCHORED.
or tame areal of this m dewrDed or Part e.B.2.
c. FERTILIZER 10-10-20 AT A RATE OF 200 fSS/ACRE.
If On operator ootor has ed the of the alas
c. N al operates ol penesl .completes their wore tr lM rile
f no longer in Operational the
itoncl,
rorFictionof
t n
between the owns
mlpal a with the tame one calWO of
opartar or gmad <antraclIX Mating to terms
m conlmit
4. TEMPORARY SEED &MULCH (SPRING)
he . . ene
lhl] Il maw D.M m61 lase ate IX MNOI CM VpcIIX may 1faMta all COKE N I In MN l n aolw
e a book to
Pearl spa a r per ere Doc 1 r o ir a o new ea
a. SEED MnDOT SEED MIX y110 AT A RATE OF 100 LBS/ACRE.
using the notice of ewmholidn/permit modification for. A signature from Senn Ins owner and operator is required.
I. MULCH : MNNDOT TYPE I AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED.
C. TERMpeT OF mvERAOF
In. FERTILIZER : 10-10-20 AT A RATE OF 200 LBS/ACRE
5. TEMPO ARY SEED MULCH T R
R & L H(WINE)
I.Permittee(.) wishing to terminate Coverage unMr this permit must Submit o NoNce of Termi.cAm (NOT) to Me MPCA, Compyanee with this
a. SEED : MnDOT SEED MIX #100 AT A RATE OF 100 LBS/ACRE,
era it b reduced onto a NOT is Submitted. The Permnt s con a under thismin midnight h mark date of
the NOT, w an the date No cracks NOT IS Submitted to the MPCA "g permit terminates at a qlt M the pool
b. MULCH : Mrl TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED.
2.Tmmtatdn of comme, .I.:
e. FERTILIZER 10-10-20 AT A RATE OF 200 f93/ACRE
a. Ternolim of con fa the entire project
I. AN Pennittees)yarectl submit a WIT within 30 data after Find SWbiliection (am Pest IV.G) has Dam comgetwo an ail pwteas of the
8. HYDROSPREAD SEED, FERTILIZER, & MnDOT TYPE 6 HYDRAULIC SOIL STABILIZER
site for motto the Penaltiesla re
site *II construction aclNhy nod been competes II Me Site includes pefmment
stwmenter management Systems, the regumayeas far Mal dmnwf/mainteoann must We pprwmed W required in Find Stabilization.
a. SEED : MnDOT SEED MIX #190 AT A RATE OF 10 LBS/1000 GALLONS OF SLURRY.
Part lv G.2.
b. FERTIIZER : 10-10-20 AT A RATE OF 50 LBS/3000 GALLONS OF SLURRY.
R. Permium(.) most submit a NOT within So dap otter earn, the .(he site induwng room ono rtarmter infroatlucture, and!
c. HYDRAULIC SOIL STABILIZERMnDOT TYPE a AT A RATE OF 350 LBS/1000
eaver.q. is henefer..e to another owner as described in Part II.S.S.
GALLONS OF SLURRY.
D. Tertstian ail Coverage fa o portion of Ma more project.
d. WATER 875 GALLONS 1000 GALLONS OF SLURRY.
All Pemium s must submit a NOT whnn .oven ] tla after Selling w otherwise el tronsferrm Miens or Me Site to another art
() ys 9 lately 9 v party
/
and Me or Ion Me Owner or ate. he atian of the I' with all
E ail. Deity still b anoMa M must De in compliance I thy M
y
eon nt
(erg. astemporary;on protection crowd meawf must be in piece). The farm most include Signatures man !M1e
�eedfar
7, TEMPORARY SEDIMENTATION BASINS WITH STANDPIPE OUTLET &EMERGENCY SPILLWAY
informal'. t t
for the new owns of the property.
wigind Pon of
md edalned ming
(SEE DETAIL).
.!'on
c ver
.. Tornatian or m..rags eed whoa o wnwvihbo registration.
psmit ro woe obtained Part Me zlDwdsiDn registration pracees, Pmmitlee(e) aro rep,ned b Submit o NOT rliht 30 tivys aftp
B. TEMPORARY SEDIMENTATION TRAP WITH SPILLWAY (SEE DETAIL).
a<niabinq Final
. al St im (.
per Part IV.Dj.
useaauda
S.Porite a that use on alternative nWMed Ica the Permanent Stesmral. Man meet S t r in Part il. a cited
M) am as described a G5, es pen one p
9. ROCK CONSTRUCTION ENTRANCE (SEE DETAIL).
hen terminate, the pail Iota Final Sted! in Hda nod been Wan S on she n e either-
.. P and
d. The Ion of monitoringiee data required a Part Ie. has been wbmitthin to Ua MPCA anal Ua MPCA nod aslas that tltt roused
t Me
treatment has The wtll no ed. If
It notified! In [Subing ittnbl days after the data has been
10. HORIZONTAL SLOPE GRADING (SEE DETAIL).
pored.
the PsmRtee e. he MPCA n themonitoringt
Cool nave man the MPCA .,Mid b dap often an It NOT
the deter, the Pmmitl« cal submits
ache
...
b. The PvmiN.e con Submit a NOT, awn if the tme6ame is lam iM1M be yaaq 11 1M MPCA tlatereni„m that the eltpneew method is
two s, MI met
11. DITCH CHECKS MnDOT TYPE 3-12" BEDROLL WITH MDDOT CATEGORY 3 EROSION
achieving the mQured treatment.
Deng the monitoring and evolution of the alternative method, the Penalties to net rerpondble far other pwmil eauiement. that have been
CONTROL BLANKET (SEE DETAIL).
von.formal as deecdmd In PIXI ILaa
12. EROSION CONTROL BLANKET MnDOT CATEGORY 3 (SEE DETAIL).
PART R.STORMWATER DISCHARGE DESCN REQUIREMENTS
13. PERIMETER SILT FENCE (SEE DETAILS).
D.RECORD RETENTION
The SVPPP (wend or copies) including, all changes to it. and hematites and maintemace records most be kept at the site Wring
14. INLET PROTECTION (SEE DETAILS).
construction by the Perim« who has operational central of that portion of the em.The SNPPP Can law kept in either the RNd off or ,n an
on Site ashler during adrenal working hours.
15. FLOATING SILT CURTAIN (SEE DETAIL)
AN Soma(.) most keep We Sw P. doing with Me fdlowin, additional rcCoras, da Me fee ina (3) faun after Submittal of the NOT as
outlined in Part N.C. %is aides not include any records after wall of the NOT.
PERMANENT EROSION & SEDIMENTATION CONTROL METHODS
I.Any other Permits mdumed fair the PrOpCb
2.Recwde of all inspection one maintenance conductsel during construction (me Part IV.E. Inapeclion. and Monbnalce);
(THE FOLLOWING METHODS WILL REQUIRE MULTIPLE SITE
3.All p.mement operation and maintenance "honorMta that haK been Implemented, including ail right of way, contracts. Covsnmts and other
VISITS DURING THE DIFFERENT STAGES OF CONSTRUCTION (INCIDENTAL TO
CONSTRUCTION)).
Atli binding requirements
far odesygnot"tthe temppora"rryy'vW Permanent Stwmwdts MMagement splpna.
1. GENERAL SEED & MULCH (MIN. 6" TOPSOIL)
a. SEED : MnDOT SEED MIX #250 AT A RATE OF 70 Les/ACRE.
b. FERTILIZER : 22-5-10 80% W.I.N. OS CL AT A RATE OF 350 LBS.ACRE.
RESPONSD3NITY REQUIREMENTS
c. MULCH Nz11X)T TYPE 1 AT A RATE OF 2 TONS/ACRE AND DISC ANCHORED.
THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS THE PROPOSED
PERMANENT PONDS
2, POND SEED & MULCH (MIN. 8" TOPSOIL).
A RATE OF LBS2ACRE.
a. SEED Mn00T SEED NIX URA
CITY OF CHANHASSEN NIL1. HAVE RESPONSIBILITY FOR LONG
B E
I. FERTILIZER : 18-1-6 NATURAL BASE AT A RATE OF I20 LB3/ACRE.
a MULCH : MnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED.
TERM OPERATION AND MAINTENANCE OF THE PERMANENT STORK
WATER MANAGEMENT SYSTEM.
3. WETLAND SEED & MULCH (MIN 1' HYDRIC TOPSOIL)
a. SEED : MnDOT SEED MIX #325 AT A RATE OF 84 LBS/ACRE.
CONTRACTOR WILL HAVE RESPONSIBILITY FOR
b. FERTILIZER 18-1-8 NATURAL BASE AT A RATE OF 150 LBS/ACRE,
IMPLEMENTATION OF THE SWPPP BEFORE AND DURING CONSTRUCTION.
c. MULCH : MnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED.
THE CONTRACTOR SHALL PROVIDE THE OWNER WITH A CHAIN OF
4. UPLAND BUFFER SEED &MULCH (ION. 8" TOPSOIL).
RESPONSIBILITY WITH ALL OPERATORS ON SITE TO ENSURE THAT THE
a. SEED : Hill SEED MIX p328 AT A RATE OF 86 LiEl ACRE.
SWPPP WILL BE IMPLEMENTED AS FOLLOWS:
It. FERTILIZER : 18-1-8 NATURAL RASE AT A RATE OF 150 LBS/ACRE.
c. MULCH : MnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE At DISC ANCHORED.
CONTRACTOR :
BUSINESS NAME
5. TEMPORARY COVER CROP FOR UPLAND BUFFERS & WETLAND MITIGATION
a. SEED : MnDOT SEED MIX p110 (SPRING) OR #100 (WINTER) AT A RATE OF 100 LBS/ACRE.
I. FERTILIZER : 18-1-8 NATURAL BASE AT A RATE OF 150 LBS/ACRE.
CONTACT PERSON TELEPHONE (INCLUDE AREA CODE)
c. MULCH NnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE &DISC ANCHORED.
B. GENERAL NATIVE SEED & MULCH (MINIMUM (' TOPSOIL)
CONTACT PERSON TELEPHONE (INCLUDE AREA CODE)
a. SEED : MnDOT SEED MIX #350 AT A RATE OF 84.5 LBS/ACRE.
b. FERTILIZER : 16-1-8 NATURAL BASE AT A RATE OF 120 LBS/ACRE.
c. MULCH : MnDOT TYPE 3 AT A RATE OF 2 TONS/ACRE & DISC ANCHORED.
CONTACT PERSON TELEPHONE (INCLUDE AREA CODE)
7. SOD
THE CONTRACTOR SHALL FOLLOW THE IMPLEMENTATION SEQUENCE AS
SHOWN ON THIS SHEET.
NARRATIVE & NOTES
CONTRACTOR SHALL ADHERE TO ALL THE REQUIREMENTS OF THE MINNESOTA
1. DESCRIPTION OF CONSTRUCTION ACTIVITY.
POLLUTION CONTROL N.P.D.E.S. PERMIT.
PIONEER PASS IS A SINGLE-FAMILY RESIDENTIAL DEVELOPMENT ENCOMPASSING
83.39 ACRES. THE CONSTRUCTION WILL INCLUDE MASS GRADING, UTILITY AND STREET
ALL BEST MANAGEMENT PRACTICES (BMP'S) SELECTED SHALL BE
INSTALLATION, AND STABILIZATION OF THESE AREAS.
APPROPRIATE FOR THE TIME OF YEAR SITE CONDITIONS AND ESTIMATED
DURATION OF USE.
2. PHASE CONSTRUCTION TO MINIMIZE SOD. LOSS,
3, ALL EROSION &SEDIMENT CONTROL MEASURES CALLED FOR ON THESE PLANS
A COPY OF THESE PLANS MUST BE ON THE JOB SITE WHENEVER
AND SPECIFICATIONS, WHICH MAY INCLUDE SILT FENCE, TEMPORARY BEDTINNTATION
CONSTRUCTION IS IN PROGRESS.
BASINS OR TEMPORARY SEDIMENT TRAPS, SHALL BE CONSTRUCTED AND
SERVICEABLE IN THE FOLLOWING ORDER, AS REQUIRED.
TRAINING REQUD2EMENTS
a. ROCK CONSTRUCTION ENTRANCES.
b. SILT FENCE & TREE PROTECTION FENCE.
JOEL COOPER, P.E.
c. EXISTING INLET PROTECTION.
SITE MANAGEMENT CERTIFICATION (2014)
d. TEMPORARY CULVERTS.
UNIVERSITY OF MINNESOTA
e. TEMPORARY SEDIMENTATION BASINS, TRAPS, AND OUTFALL FACILITIES.
INSTRUCTORS : LEO HOLM & DWAYNE STENLUND
P. STORM WATER POND CONSTRUCTION.
Fi. COMMON EXCAVATION AND EMBANKMENT, UTILITY INSTALLATION AND
STREET CONSTRUCTION.
h. TEMPORARY SEED AND/OR MULCH.
DEVELOPMENT SUMMARy
L HORIZONTAL SLOPE GRADING.
J. DITCH CHECK, SILT FENCE, AN EROSION CONTROL
TOTAL PLATTED AREA 18.89 AC.
BLANKET.
NUMBER OF SINGLE FAMILY LOTS 53 EA
It. PERMANENT SEED AND MULCH AND/OR SOD.
TOTAL DISTURBED AREA 5.02 AC.
4. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL EROSION & SEDIMENT
EXISTING IMPERVIOUS AREA 0.01 AC,
CONTROL MEASURES AS SHOWN ON THESE PLANS AND SPECIFICATIONS
PROPOSED IMPERVIOUS AREA 5.95 AC.
AND IMPLEMENT ANY ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES
NECESSARY IN ORDER TO PROTECT ADJACENT PROPERTY.
5. ALL EROSION & SEDIMENT CONTROL FACILITIES SHALL BE MAINTAINED BY
THE CONTRACTOR DURING CONSTRUCTION OPERATIONS. ANY TEMPORARY
FACILITIES WHICH ARE TO BE REMOVED AS CALLED FOR ON THESE
PROPOSE EROSION/SEDD[ENT CONTROL QUANTITUIS
PLANS AND SPECIFICATIONS SHALL BE REMOVED BY THE CONTRACTOR
WHEN DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL THEN
HEAVY-DUTY SILT FENCE 67 IF
NKET 1268 SY
STAND PIPE DETAIL
PERFORATED STANDPIPE W/FILTER
FABRIC TO CURET ELEVATION
/I EMERGENCY SPILLWAY
NPDES REQUIREMENTS
PART IV, CONSIRU M ACTIVITY REWIREW.N
A. STORM WATER POLLUTION PRVy1EN N RAN
The Permitter a noun in Iement the SWPPP antl the r uiroments of this art. The SUP. identified In Me SwPPP and in this permit must be
O p w v
mlKted. naldled. era maintained n an oppropfiob and funCliesnl Manner that is in accordance with relevant manwfadper specifrolione ono
vcnated engineering praclbes
B. EROSON PREVENTION PRACTICES
1.The Permllles(s) must Plan foe and implement appropriate ednalruelion phasing, vegetative buffer Strips, haizmlol elope gradinq and other
on.tructim practices that m se that the inspection and maintenance m u ements of Part IV.E. we can Iva with. The
ar« minimal can cep ea it p
location ei a net le be aelufbed moat be dN'ma4d (e.q with Ilape, acmes, ipna, sill once eta) on Ma development site belwe work
bonne.
2.MI icy in t Kil areas must bar to stabilized o6 temporarily
a6 poN•b to Ilnif Kil BTemp Out Yt c0 ileN later .i, 14 tlaw after IM1e Construction
rnic
eativitY n that proton of the Si[a M1oe IempomrilY or pmmanmtlY cmasd. Temporary aackpbe without synilkont silt, cbY or organic
wnponesto (e.g., own aggregate stackpba, demolition Concrete stockpiles, send stockpiles) and the roanhuded box campmente, of .Dads,
Darkng Iola and similar herboke are.emal, from the mWimment Out must comply with Part W.C.S.
3.Me normal wetted 'vrlelor Of Mlea aof a nent den ditch Of 9 that makes role, hewn an Pori of Me Construction
Der r mud r Derma ^age seas r v
IN-. or dints wale rand the site, t be Seoul
within t I Based feet from the Property edge. or from the surface
of [¢nape ten
surface wo1M. Sterol @ion ti the f an 2te Meal or moat Ice on Ie s within za noun alter Cone wit to a days
off water.
=nY „a 9
Slabilfaceon to Me remaining iontin t o1 any on of the
or DermanM1 ditches es [wales must be cemDlel< within 14 dep elver connecting to
v surface ware and construction as a In tool Conte m ins ditch hoe h properly
IX permanentlyd!mak c ditch Morcle, clorr or psmonsn! .itenm au
noes Nat ve bebp urea m a.. most cantalnment spleen (with water dewgned .eraacbe . bis rail; and ekes etc) do Coal
need to be emusiZbe ThBN [Win most err KabPermtal Permanent
energy
have after , Ippp being uNd « a xdiion t Containment Surface
enter.
6Pba altlole moat De wovi4d with temporary a permanent Magy OiaNpdoan Within 24 here ailp connection to a wrfam cat..
_�DUEYLS}YIIOL PRACTICES
CO �=`DYE OL F ACT CESy[NT cS T LLI a PR CTICES C. 5E _ _
I.Sedimart control practices must minimize makeent from entering wrbn voters, including curb and gutter systems and seam .ewer Islas.
a.Ternporary or permanent mainage ditches and sedment boilers that are designed as poet of a esdrmmt cantatmmt .plea (e.g•• ditch..
with rack check dens) nwhe sediment canna Practices only as appropriate for Site conditions.
b.11 Me dawn adlMt treatments tam a anlaadea, additional u od.t sediment Centro recuces es redundant BMP. must be Installed
g ys pg P
to Ngh C. Me oveneawng, and Ms SwPPP must as ]merged to rMlily chess adeitlanal peatlnt as rtwbed In part IILA4, C.
through a
aid pad. b msinial enrol lbw and minimize file and/err gullies tops abet be no unDfakm Mops IMgU of grater than 75 I«I Ica
daps wiM d 9rode of 3:1 a steeps.
2.Sadment Control Practices must be evlmlehed an all down gradient perimeters Were any upgadenl land disturbing activities begin. Dams
entices mall remain it law until Final Staba'vation has Dam established in a Ke with Pat IV,G.
IX 0 undo
3. ra limn of ins idldlawi e a An, Short-term
canto practices mu be ed led too cammaaate anal -farm activities enth oar dawn a
9 D Y Fla 9
No installed
w immediately
of vehicles. Any PION-tmm activity meat , agnant atl tr l am.t as poust b is the Whew, control pncibes must
No nrtdl.a i in.a ctYy aN. Ma activity b OompNted Hoesn, aMMnenl control Proclkav meal De neldeed baf.a Mt npl precipibtian
rant ersn if Me activity is net complete.
4. h steno drop Mats most pr Portion y appropriate BNPe daring adaalet ii a sariapoe are .raSafety c witno (street
fair m g/on in) the inlet
have been and!
M Po Mat pwthalion may be removed Is a particular inlet it a .pxif «bit acne«. (stint floediht.wvdN ek Con been
identifier) had are Phe nee fa have re=ehe. written corespondents hen the ocumctiand authority (e.g. cityvacounty/isle 72 hours u
sgbst. When w Ma Coma ch remoed, me t we cereal in
n a t ..at De documented! i Me &Note io available be emov ]2 alle upon
request. wfien y cone rn. However, can not bar aim wned ina timely mannonce w.m st didear mkt l in th tan cm be removed to within
72 the
mmstlbia safety cancers. Hower, effortorecas Intel
obtain written b correspondence on . Mca mast be cowmMbtl ;n the . damPPP and rishMe julasi J2
own upon him ML Parmesan,ofrmto remove Inrt prateCtbn edam m a mmiNa surly wnCem moat still De weaned own Me )anmbeiyntl
Suliyphy within hi [aye of removal.
5,.n .net
mi placed
In , mat have Gilt Iota IX oleo arr«tHe sedirrom .l controls, co and
cmndl be plan pi a wrfam salon, irldWtnp slmmwal. canveyoncah wpm as aro and cans sptama, a caWuils end tlilmm unless Mae
is ai erodes n Penn fair W from
thater.
B. Concrete nice tracking of ash race lion ins construction site (w onto aNnely MUM Me site) ucht De are not by BM% such « [ten pads,
ror star vohe racks (.n Part l syslema Street awaoyp must be used it each BMP. an Cool adepuob 10 prevent aedimanl from
Deinp nacres mio the match
to pare Part IV.EA.4).
].The Permiltva mud install temporary maimenlalion Weft as rmu✓.d in Par( 111.8. of are permit.
TEMPORARY SEDIMENTATION BASIN WTH STAND PIPE OUTLET
6" PVC PERFORATED
STANDPIPE W/FILTER
FABRIC EMERGENCY SPILLWAY CREST
(RIP RAP OR EROSION CONTROL BLANKET)
�i i
-OU LET E EVATIONPROPOSED 12'STORAGE PI
VOLUME 3 CY CL3 RIP RAP
AN➢SEEPAGE COLLAR (TW,)
CAP SKIMMER(EG. 5 GALLON
BUCKET) TO BE BOLTED TO
THE PERFORATED RISER PIPE
3"
2-1/2" DIA.
HEX BOLTS
1"-2" WASHED ROCK CONE ::: / 3 W/LOCK NUT
HEIGHT - 1/3 Z NOTE.
TOP VIEW
I5,
PIPE MATERIAL
7w HOLES SPACED SHOOED BE RIGID
8' TO 10" ON CENTER
TEMPORARY SEDIMENTATION BASIN SEDIMENTATION BASIN
TYPICAL PROTECTION AROUND
BACKYARD CBS
INSTALL IMMEDIATELY AFTER
CB INSTALLATION)
HEAVY DUTY SILT FENCE
-FASTEN TO STAKES
POST EACH CORNER
RESTORE THE SUBSEQUENTLY DISTURBED AREA IN ACCORDANCE WITH CATEGORY 3 FIBER BLA tI - tI REAR YARD STORM SEWER
THESE PLANS AND SPECIFICATIONS. MnDOT #250 SEED & MULCH (GENERAL) 1.92 AC
MnDOT TYPE S DITCH CHECK 6 EA STRUCTURE
6. THE CONTRACTOR SHALL PROVIDE OR CONSTRUCT TEMPORARY WMCOS 14 EA
STORM WATER DRAINAGE FACILITIES AS MAY BE REQUIRED TO ALLOW REAR YARD INLET PROTECTION 5 EA REAR YARD CATCH BASIN INLET PROTECTION
THE CONTRACTOR TO CONDUCT CONSTRUCTION OPERATIONS WITHIN THE
POINTING AREAS AS SHOWN ON THE PLAN AND AT THE SAME TIME NOTE: PREMOLDED SEDIMENT CONTROL BARRIERS
MAINTAIN STORM WATER DRAINAGE THROUGH THE SERIES OF AFFECTED PROJECT COORDINATES
STORM WATER BONDING AREAS. N 44. 4s' 50" SUCH AS ROYAL'& INFRASCOVER OR EQUIVALENT
W 93° 33' 55" ARE AN ACCEPTABLE ALTERNATIVE.
7. DO NOT DISTURB ANY AREA UNTIL IT IS NECESSARY FOR CONSTRUCTION
TO PROCEED.
B. WHEREVER POSSIBLE, PRESERVE THE EXISTING TREES, GRASS, AND OTHER HEAVY DUN SILT FENCE AT FLARED END SECTION
VEGETATIVE COVER TO HELP FILTER RUNOFF.
TOP OF SILT FENCE TO BE LOWER THAN
9. COVER OR STABILIZE ALL DISTURBED AREAS AS SOON AS POSSIBLE 6' STEEL FENCEPOSTS LOWEST ADJACENT OVERFLOW
(SEE TIMELINEPART 1V B2). 6'-8' SPACING BETWEEN POSTS HEAVY DUTY
10. TIME CONSTRUCTION ACTIVITIES TO LIMIT IMPACT FROM SEASONAL SILT FENCE
CLIMATE CHANGES OR WEATHER EVENTS. ��-o
11. DELAY CONSTRUCTION OF INFILTRATION MEASURES UNTIL THE END OF -FLOW
THE CONSTRUCTION PROJECT WHEN UPSTREAM DRAINAGE AREAS HAVE
BEEN STABILIZED.
12. DO NOT REMOVE TEMPORARY PERIMETER CONTROLS UNTIL AFTER All POLYETHYLENE SNOWFENCING FLARED END SECTION
UPSTREAM AREAS ARE FINALLY STABILIZED. PROFILE PLAN
13. IT IS THE RESPONSIBILTY OF THE CONTRACTOR TO KEEP PUBLIC
STREETS, TRAVEL WAYS, PARKING LOTS AND TRAILS UTILIZED FOR FLARED END SECTION INLET PROTECTION
INGRESS TO AND EGRESS FROM THE CONSTRUCTION SITE FREE OF DIRT III AND OTHER DEBRIS WHICH RESULTS FROM SAID CONSTRUCTION.
COST FOR THIS SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT.
14. ADEQUATE CONTROL OF DUST SHALL BE MAINTAINED BY THE CONTRACTOR;
NO PAYMENT FOR DUST CONTROL WILL BE MADE.
21k2"X18" MIN. WOOD STAKE TREE PROTECTION FENCE
-2' MAXIMUM SPACING ,12" BIOROLL
j MnDOT CATEGORY 3
y EROSION CONTROL BLANKET
v -STAPLED & TRENCHED IN
- / E FLOW- WATER DITCH GRADE
�� CROSS SECTION PROFILE VIEW
11 Spacing on upper end
•••
••
•NN4" Overlap
•• 3
•• T3,
I -I 1
3'
Minimum
level
" YrliRtikFA \�(\
6
1' Spacing
on Staples
*MINIMUM ANCHORING SHOWN __�
Fold under 6"-
EROSION CONTROL BLANKET -CATEGORY 3
(TO BE INSTALLED PER MANUFACTURE'S SPECIFICATIONS)
6"
Anchor slot
alternative
L�
2 EACH
O OEWAIERING aN0 flA$IN IMa1WNG
VM<n dlld, cute tor drafro related to Ins CMatNttion Kllvit tlml may have TDerIbid is
IX basin prsthq (erg., pumped must
W di / er Y Y
tasc .. fedrnent Indian heat p wales must be wachaged to o temporary m permanent hewroal is m brio eq Me propel cats whenever
In Me.. bash
and t ban the lemponary w paw Mon/ aadime O210. hasp, mast bar t result cram t to sonars adequate M tm item car is obtained
di the beet and that mannuisance dish
pains tees Minn, R. ]05rface . ter, z) call net result from tie discharge. It N• such comet be
discharged to a sedimentation bast prier, to entering the wrfam water, it must Da treated itn the must appropriate BNPe, such that Me
discharge com not oawnaly offset the receiving water err downstream landowner. ins Pamitlm(c) must mines Uol wamwge points or.
Yp 9 ode uowl Protected from erosion and Saw. Tee discharge must Oe disported over natural rook riDrop. send Wins, plmlb sheeting, es other
g
accepted MagY deaipolbn mewurca. adequate mdimentolida Contrd measures ore rewined far decM1age rater that edatoina wmendea
sales
n n s Mthat aM9 not Coact to nuisance Cmditim8 eladM n
z.All rota amen Mwataing a basin training activiliee must bar discharged!
race, channels a on dexnd a rhea a �nuntlalon in relbnde coal '"significant aerorm impact la Me we11.M.
receiving op Prom M
EANSPECTWS AND MAINTENANCE
1.The Parmul«(a) (either the owner or operator, rhmwr is identified in the SWPPP) mane routinely napect the Ml'm construction site at twat
once every Sewn (7) days during active Construction and within 24 hours after a rainfall event greater than 0.5 Inches h 24 hours. Fdlowinq
on inspection which «tun Within 24 hours aft. a rainfall event, the mot inapecti« most be CmWcted within awn (J) days [Her tint.
2.AII Inapectbns and mayn«once conducted "Ing conetructian must ON recorded h writing bad them rKarda must be fetainea Win the
SAPPP in .am. with Part IN D. Records of «ch Inspection and mainlendan activity shak tread.:
a.Dab and lies of ins octior,
6Name of permn(s) conducting tepoetwm;
e.Findings of inspKlims, including recoveramendations, far Correctiro actions,
and art completing maintenance activities *Onto and *moony taken(including Sala limes, p omq ),
m � f. Doc me amount of on ainidl bents e S than 1/2 el (0.5 Inches) t e! oars;
1. m.'It.t.I t of mangey meds to ins SYiPP as required in Part eemoHILAV, a,M
3.•M.e pentB of the e, be Shen t have per .i cover, but ass thoo .I «overt pmU of Me Site, Inspections cane le of the aaai d
ith
vmm*mmt carver may be reduced to Mc* pa he Site,
where ro must
be ail« hove pamroncat f We M all mPo.ed soil afy« and no
ber C.... tan push,
activity bground
occurring onyrMre an the aye. lase ea That DB tf cam Ice 0 period of trove tru monMa fine spa tins may
dlin I the la, ltn m«M or elbrlm«l CaAy the no A. ft ii« k has , inspections may be
De ceased Wring kazoo grwntl canditidas). Foaming P Y sped Y
in M it natilied in writs D ina MPCA, what r work nod Dsen pu Sneed duo
terminated unto traction activity is toted w sown. w Cons
to r to
meaning
ronstida., nM1e muince "nseeslione and maintenance KM1etluls mint bags within 24 nave after runoff Dan at lM Site w
prier i rewmtg on marl construction, whichever Comm last.
cat to en integrity orb See Samnasa. All n«.al B. must be
4All eresbn pevenlion aha sediment ronlyd BMpa must W inep ed can agr y
mother, replaced, w woplemd bet with bnoiMd BNPe moon
Within 24 own after
.ad Ciia pi, with
o he rem as field conditionsand assw accros unless
mother time frame is epeciied below. The PpmiNte(s) must nmlipole antl comply rlMrtne Idloainq inspection ma main[«ono
menb:
rpune
..Al sal lames most be repaired. replaced, a Supplemented! cavil lha became omlenctiold w the es6i.lt o... 1 ] of the M1ai Col or
v / e cep •rep
itnin 24 enure it aiscan IX are sown are IMtl cmdhions dba a«ma. ins fence hrom nDaln ..at bar mode w Y•
b.Temp. , and p.mmMc aMlnMtetim bolos must be declined end the sediment moveol when the death of sedmmt cdl«iwr in the
Dawn reaches 1/2 the storage volume. Drahege and removal must be competed within 72 hours of discovery, on a. Scion a. laws
Conditions .It.. mesas (sod Part IV.D.).
c.Surface wales, including painogt ditches and cdavepnce System, must be inwected fa evidence of erosion and Sediment deposition.
The Parmiltee(s) must remove ail aeltas and Sediment deposited in wrfoce caters, includeg drainage ways, catch basins, mM other
arch". SSA.n, and romatC a Me arose where md'ment remawl result. in .posed mil. The r6mgral and Stabilization must take play
within seven (7) sap of discovery unless precluded by legal, wiWatory, w physical access Constraints The Permitter shall ime all
,awmoDe eRIXIE to latch actesa It prKlumiI, mmowl and ataDilizalhn must take place atthb sewn (7) cilendw dap o1 obtaining
dccesa The Peanitt« to reasonable for contacting Of lead, m ,imal, state and federal authorities and m cidaq any cpplia.M. permits.
prior to Conducting any work.
d.Constraclim sib Khble emit locations .at m inmetted Ica audience of off -site Sediment tacking data coved wrfans. Tracked
moment must Dw .cal from no peed surfaces. wiitb 24 houn of aieeany, err if applicable. Sion o shador time to .wooly with Pori
IV.CA
w The Permittee(s) are responsible far the Wamti.n and maintenance of mempwory and permanent water wtlity manegwment BMPa, as .w
der all season prevention and sediment Contra BMPs. for the Wralim of Me construction week at the site. Taw Pmmittee(s) are
responsible until another Permitted has assumed control accIXding to Pat ILa5 over all pram al the site Mat have not been finally
Vdialoed or the one Iwo and". Field 51COMOctim. and a NOT he. been Submitted 10 IM MPCA_
f. If sediment escape the construction alto 0f1-rile eacumYlotions of mdbnent must bar removed In a manner and at a frequency wlfickmt
to minimize off -site impacts (ag., fugitive m.knent in ]lent. could be salved Mn at. mwem by Me nest ran and/or pone a NoNly
^ zora to ham of publicma comes).
5.AII infiltration ofery must W napecled to msun that m maifrsent from engwng Construction activity is reaming Me infiltration Orion and
them areas m Protected from comeadion due to construction equipment driving a rum the infiltration area.
DUMP STRAP -
I" (25 men) REBAR
FOR BAG REMOVAL
FROM INLET
SILTSACK
EXPANSION RESTRAINT
[1/4" (6 men) NYLON ROPE,
2" (51 men) FLAT WASHERS]
DUMP STRAP
ADDITIONAL ALTERNATIVES: THE CONTRACTOR MAY REQUEST, FROM THE ENGINEER,
APPROVAL OF ALTERNATIVE DEVICES.
CATQH BASIN INLET PROTECTION - SEDIMENT FILTER SACK
TEMPORARY FENCE ,-I• TO 2" WASHED Racer
of 1T fk -lI l,>.., •,
• •IR• m
r r -.
n • • 4 •. .. ,., •.I.
I.
.....
Ti._- i if•4
rr. r
%•11 .. % 7
1.•,.•a..f..m
t.r.1..,
.r..a. alb.•fyl
L - 2A I er Mp.
PLAN VIEW
,r,V tea,
I 6
D
- - CEATENRIE FA C
No1E:
lE MN. REVERSE CRAINENT o - I1 aft. MIN 6' YAK.
A -A w - to• MIN., 20' MASS.
MINIMUM SIZE - 1800 CU. FT. OF STORAGE VOLUME
FOR EACH ACRE DRAINING TO THE TRAP
TEMPORARY SEDIMENT TRAP
UNDISTURBED VEGETATION
Rw.em wxm xad awl
REAR YARD CATCH BASIN INLET PROTECTION
DOZER TREADS CREATE '`
GROOVES PERPENDICULAR TO
SLOPE DIRECTION
HORIZONTAL SLOPE GRADING
WIMCO ROAD DRAIN
PROJECT CONTACTS
PROJECT ENGINEER
DEVELOPER:
CITY:
NPDES OFFICER:
CONTRACTOR REPRESENTATIVE:
CONTRACTOR SUPERINTENDENT:
F
Me Pennitt s shdl m lament the fdlowin motion eventim man ement measures M the site:
ee() D a 0 p a9
LSolkd Nate: ust be sediment asphalt and t most mid i M cWris f n and tlemelilida tleerie and
ep Ipa, ac g ,paper, pl«I'c, abrb, conalruct'o
other aasles must De wepoeed of Promdy ono most OomD1Y wiM MPCA disposal requhenwnta
2.14czwtlws Material.: OIL goecline, point .ad any hmesaw. substances ..at be pnpwrl, atered tdamnq Secondary eontdomML to prevent
leak es other r . Restricted i at= r mu t be r tvandalism. a and di sal Or
wi s. 8 t to i qe access a ge areas s provided to pr<VM Storage xM
ham dSuv waste mutt be is d oche Co with MPCA r detians
3.waste Wyworingd d led of antl engi conecimating is olio mart be limiter to a refined w.a of the sib. Runoff must be conlaned and
ward disposed : I l engine l rid war is genera an site.
4 Canaan ntN.yw y or is All able antl A ompaCstes generated Inner
thacont
retedam hot outdrove
neMout must be contenter rtl I. a tek-proal
Impermeable
facility es impermeable lino. A s must no clay I'ner Mat routs Ilan dthe Cog most
ojYie9 runoff
enter ground water a <Mra sternal, on
i peamMDle limp. Th! liauid and solo rOebs meal not creed! top pettygrounda and comma muse ail De Naoe ham 1s Con gn stW
operations a eaten. Liquid and Baia wales must by dnpoe a of equipment
o and in to atiaz,t wiM MPCA eliki. liven. A Sion mat be
installed! adjacent Ig pace xaNlwt (Kill( IO Interim CMCI01e Y mete operators t0 YIIIIIp In1 p laclltipa P Y m ip p prop
GFesa STABI117ATKNIN Th. Pennill most ensure Final Stmaization of the site. Find Stociization r . all of Part. IV.Gt-5 a Part IV.G.6
es(e) awn
LFirl Stabilization repair. that atl .it disturbing activities at the Site have been completed and are sail. must be .tobil'aee by a mibrm
pWnnid vegetative a.V. SIM a density Of JDS, On Me Mlke pyrviWs .dace .... or .in. ewNmMl meMa necemay to Revent ask
failure under pasha conditions,
II I IN. C. ThO includes but e 2.TM limited
m s find MWfe Inaf to mot wIXnent Sedimentation
dimLTMI system matt O be used
in ten () Permanent ys ep
not limiter is a Nod dam out of 1 ce maimenton t bases that are to be aged o ease wale dill temporary or permanent a Amman w Y
ditches m Cot be Ste and rood construction or maintenance of infiltration baeina All vedinmt moat be removed hem conveyance eyNeme and
ditches t must iS Etmnized with permanent con.
3..a.' Ice Supobabn of the NOT, all temporary She apiMBC and NruCtuml I.
responsible.
Prevention *ad Sediment t CMhal BYes (wcn ( sill tote)
use be mm) m on the in pia of the silo Ica which IM Pmmittes is mponsible. BMPa deegned W dmompom an site (sum «came
cor residential
lags) may De left in piece.
4.Fa rosidMibl construction Onl naivbud Ipb as considered (mall stabilized it the structure a are finished & temporary erosionttee
he D Y protection Y•
antl dens the M l peens[. control nod bStr et' NO ea and Ins residence oar been add to Me homeowner. AOditidend the Permitter must
dislrDun the NPCA'a "Nommwmr Pml 3hesC to the homeowner W inform the homeowner of the need for. evtl benefits at
perw cant a car.
&For Mw acconan a hic!praentsby et blind uthe for e4rbufood porpoises pro onsiti Dition M edro.a crop Or ron¢e IaM) Plpel 9MDIIWtlon
me be sanm y toy a ld Per lea .blurted bM to ple rerof a all
cosh ticlilwrel um.
Y P 1 ^8 P a8
ma o atl , IV n err PS folbNl modllbas are
B.A Permitter y termirMta permit edKre�e prior to rnmple0on f constructions y B all of the D6
mat o ..titbon Ct Pert e. as tiro h Pert st SO ens where a ilcebb Pert IV. C.4 or Parl rv. C.6.
fag PP
a Comtruclion actiril her c red !or et bent W days.
A
b. AL Most Si(by tree) of all oryimlly prepared eonaUaction activity has been Completed aro permemcover es nt tabibned
n there am.
C. On Sens wn<rc nas[ruclbn activity b not eompbb, permanent cover has Deen established.
NOTES: 1. FILTER AGGREGATE TO BE 3/4" CLEAR ROCK.
2. 1/2" X 1/2" WIRE MESH.
FILTER AGGREGATE
CURB INLET
GRATE
WIRE MESH
0
RUNOFF WATER o
0
SEDIMENT
ADDITIONAL
ALTERNATIVE: 6"
ROCK LOG FILLED
WITH 1 1/2"
CLEAR ROCK
CATCH
BASIN INLET
PROTECTION
- FILTER
AGGREGATE
it's""--"�iF -9l.. u. :..e. e, '".L :°:::':_-87`:i:I rev
-i/�` m"sm. sw, ,.7 yea.
.a- x ro-' _,,__ roevu+Rn mess, _
9
- _/ -mow -a..
rii
.yY`ra:-s lu ,x r1.I .... ,e. v Is
WW
S L- FTC', MAEFINE!IEZr( .. ..n
tar„ Y A e:u
L •4 I ,' y\'l_�il: 'I:• WY
/ -FB WKFY M rl d'XFl
a WTI AJvFE Y T2 SON
-
a , 3 ".4w..iR 4F $a"e 3-A,
a A wt; IN Cr IL-0q ya-awr
_
-I _VX. 'REls:R31 (-,C , BAY., ---_,YE
1 ) <:
I'. rm, as t 4 n nr
1 iv. 1.\, J. ,;.1' ,
2 Iy S -
art a w ] a. nlsx -a cep4 q r=T"+ ]L 1 F'_ET
�� LJ.i)Y AT ?r{
d v_U LII CN W_
IV'` _
H1a9
., s .. N.ta. -
ow-
.nW'l
�vFIi.AIICN I'S, 11
_L. J TAT.M 3L M.CE
125 FF Fs T R c-arrI
QI'iQr E SILT
FENCE
n - - E�GINEERNG OEPARTMENI wAfe w.:
_M_._:en ._P Aar= 53UU
1' i,N_= tiCs r-CT
WIT
'i
a! M. 1 i LIYI!
T1
.. .. nu I sea,
tfA=lkLE-e TH
-ai11, IC '1! I GSM
_ , .
A-H 3 ,MS, T31]L' R:E%CT-
IiVrTin lP I-S pR
T- 157,amt,lI= S13')
.. svma N
N rt'i: xz�
I_ .,
a.Cl-R4 L.A
9 TFP.FI
W: =R-r
-f'- �, I`
affff
OFFROAD C
RRSIN
FlL-ER BAR?IEA,E?
svrwdyvo
ENGINEERING lEFAR'TUENT
fen' 5302
JOEL G. COOPER, P.E. - JAMES R. HILL, INC.
uµ��
- t. Y :Opel U:.19 LJ <LGl
M
{
/ :r �_ T
a Mn A41r cY .. �' �y
I.'Y,IYL=_A FMI W9: XElx a^'y... �. '3i
I :.. �. _P
J
..w
Wlim.u. 1:. .1 d-M J
lavu..l.vul emuN 11
rt rcoc
VC P IA Rai GF.1: MLA1T1.#a P F eJ.i FP.Y R::CR
(MR ROCK
GUNS I RUC I ION
LN IK.4NCL
PIAT' I.n.:
- m' :WNSRINlN OPARTWEN" 5.3p1
___ daQ5YW1
S_AN_NI IMiAl
v,kl r`..-Ir TC ".v r4HM_LLC.,cAWr' :, a'V.,
"f BR-',5., .r;R.-,'CAr, MN. R RiIA
.;n-,'r'An-...,,:�tr_ ;,;en,iw.n.eve...,,.« - ,
11
Mr: ,-1 bS
�f...-
T.1 P cat
�uxaysr. CS.-�aF.�,G�rear,
`
G / . ,,,,, ,,. , .0
�� / /,%f vwlxlr
1.`s��.� Za-11. f..' •-,` 1 `.l
:., '.r1,M::. i
,;blFn.
.IJI Ix 11 :1I RI IS IF'.N NVI. I. It FlI .1II.I..
!.:SCE: 'ATH SEE d]n.
1 k,I.IL_Ji!l�b_'I .aW I; -I- tI1N L. _r ._11
QITo CATY:H RA.'4N
[' SEDMEN_ TRAP
ENGINEERING DE7,W,NT R�NO. 5302A
re= w.v=c v
MARK SONSTEGARD - LAND DEVELOPMENT MANAGER - RYLAND HOMES
PAUL OEHME - PUBLIC WORKS DIRECTOR/CITY ENGINEER - CITY OF CHANHASSEN
TEDDI SEIBRING-TROFIN - MPCA
TO BE DETERMINED
TO BE DETERMINED
■
[O
N
_
(D
Ih
vM
LO
LLJ
M7
■% \
-
O:f
Z
N
�
(a
■iiiiiiiiiiiiiiiii;
N
4
I
o
J
M
N
Z
z
r
N
N
m
/T
`i
■
W
O
Q
Z-
Li
V
Z
(�
�
Lit
o
Ito
N
(fl
CZ)(7)V
�A•t
A
�/
�
N
W
1-
V
in
Z
cc
Z
3::'
L.I..I
Q
]
(CD
Z
CD
M)
11
N
a-
Jn
E
ay
0
C- ar o
V
car
0 W
E
-
a o p c o O_
O
L 3 .' N a.
Z
"3v0o a
0 a-o0 O
a°i
Is
T _ 0 O , No
'tar E.URNro cc9
L c T i- C C J
IN
u °�01au ��W
T O J
V m 0 0
N` TN
Q C, J N
N
N U
L 0 0 0 9 P p
- 0 ao O W N
z
O
'"'
QM
A
14-
A
a
n
N
T/)
A
Q
h-
E
w
-
�Lu
o
U
4
Of
0-
I^
:2G�,
E-
FFr�ll
Z
p
2
w
ct
Z 0
Ll�
V)
Q
54
F
�f:�Tn0
7
a
a
_
~I
w
I-�
<
V
T�
V /
�-[
a
CD
'Ar',
1�
a
Z
Q
W
WZ
Or, 11i
z
O
HH
r
0
'/O1 .
1"�1
w
DRAWN BY
CJK
DATE
11/2/11
REVISIONS
(952)-890-6044
(0)
(612)-508-6480
(M)
CAD FILE
(952)-229-6007
(0)
(952)-227-1169
(0)
21996-22ERDU
(651)-757-2719
(0)
PROJECT NO.
(XXX)-XXX-XXXX
(XXX)-XXX-XXXX
21996-21
2.1
nI
0 ■
i y
/1 1 I T I ND q /
i
_-= _ _ _ _ _
.'y ` 1
-- _
... ru. .". ....
w r /
„\ & L �1S J DEGLER - - - - -
rOr .0221400
\\V&
]VESTMENTS LLC
25.0221300
I \i
I IICI 2
a \
J,
N
1 \ Y y\y
v t t
AA, /
2 t 2
t�j
ty CREEK�6LVD -
r�
�6
\
y
I
� . •� I- L A rL��,�1 �JI
� I
I
I J
sr
i.. a p
�0m
I -- Y10
- u
AU -N\
j
I
r
Y
BLUFFF CREEK BLVD
Y i
Al
3TMENTS WC
_''
wm
i.0221300
m
I
ii
�I
I
NOTES
1. AQUATIC BENCH & STORMWATER POND AREA DISTURBED BY UTILITY CONTRACTOR MUST BE RESEEDED AND MULCHED
WITH APPROPRIATE SEED MIX IMMEDIATELY AFTER UTILITY CONSTRUCTION.
2. ALL REAR YARD CATCH BASINS MUST HAVE INLET PROTECTION INSTALLED ON THEM IMMEDIATELY AFTER INSTALLATION.
3. INLET PROTECTION (WIMCO) MUST BE INSTALLED IN ALL STREET CATCH BASINS UPON COMPLETION OF STREET
CONSTRUCTION.
4. ALL PROPOSED SILT FENCE/DITCH CHECKS/CB PROTECTION & EROSION CONTROL BLANKET MUST BE INSTALLED
IMMEDIATELY AFTER UTILITY CONSTRUCTION.
5. ALL EXISTING SILT FENCE OR EROSION CONTROL BLANKET TAKEN DOWN BY UTILITY CONTRACTOR MUST BE REPLACED
OR PUT BACK UP IMMEDIATELY AFTER UTILITY CONSTRUCTION.(INCIDENTAL TO CONSTRUCTION).
6. SOD MUST BE INSTALLED BEHIND ALL CONCRETE CURB & GUTTER/SIDEWALK AND ALL AREA DISTURBED BY UTILITY
CONSTRUCTION MUST BE SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION OF PRIVATE UTILITY (GTE) CONSTRUCTION.
Z �
SCALE IN FEET
0 100 200 300
1 inch = 100 feet
t71
%\ ITI /1T /N
V V I L.\J I v
-i i
AeIo,
VESTME-N-TS L-LC
25.0221300
\ Gj
`' It
a
II f _
/ AAlt\ AIf-^/1TA flf-L�A�F)TAAL-I,IT nl_ /
IVII VIVL_..: \J Ir1 L/L_i I- \I\IIVI L_IVI VI
TF7)A 1\I^_)rN F)T A TI/ KI [)If\I I- C/ 1 IT /,f-/
_-- ---_\ / I I\ I� I V .I V I\ I n I I VJ I V \\ 7
In)n I [)I-rlI n�
YYn L 1 U l/-�u /
JOHN KLINGELHUTZ \ /
__ II PID NO. 25.0270400
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY - N. SIDE OF
PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT ® SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
—o
LIJ
Ln
w �
�
V)
J00
O
S
Q'
N
N
mcn
■
W
W
O
x
z
L¢L
W
o
V ♦
Co
`o
o
N
cc
z
3
w
Q
o
O
oz
CNI
a
m
v
c r�
o w
m
aoEoco a
O
O
0 moo ago a
N 0 0 0 0 6 0
L
�a�oU
v o v
_oENd�c�
�C TIC C.SJ
Boa au
N
\
Cw)
d VOWJN O'J
T N
� v a�ida Pp
a
O
Ea
F--1 O
Q � �
L L0
L L0
o U]
w
Q�E-m pia
Zwz a_
F� z 0 a
C\2 �xz
� w
z q o 0
Co V)) A >
z
o
aa �
= a
U w
P�
W CD m
7 W �'
z
O
a
DRAWN BY
CJK
DATE
11/2/11
REVISIONS
CAD FILE
21996-22ERCU
PROJECT NO.
21996-21
2.2
OLE 866.5 /1 1 1 T I /1 T
100YR.H WL 870.0 U I L I
40' BCOD BUILDING
SETBACK LIMIT LINE
20' BCOD GRADING
LIMIT LINE
BLUFF CREEK
OVERLAY DISTRICT �� \
LINE (BCOD)
\ / 4
\ y
\
SCALE IN FEET BLUFF CREEK \40' BCOD BUILDING 0 50 100 150 SERVICE LEGEND
\ / OVERLAY DISTRICT` SETBACK LIMIT LINF�
\ LINE (BCOD)
\/ •< 20 BCOD GRADING
LIMIT LINE, 1 inch = 50 feet
P / �sG ' C.S. 950.0 CURB STOP BOX ELEV. L0
F BENCHMARK , CURB STOP fL STATION
WYE
(0+50) STA. OF WYE FROM NEAREST
\ BM #1: R.R. SPIKE SOUTH FACE OF 1ST
I C.S. 910.3 U U L _ U, POWER POLE WEST OF DRIVEWAY - wv. sao.o DOWNSTREAM MANHOLE �
/ (. C.S.915.2 C.S. 906.5 _� a, L
/ N \ 4+55 5+1E6 5+54 / 4� / / ` ! N. SIDE OF PIONEER TRAIL - SANITARY SEWER SERVICE z
5 WYE WYE..,� \ 6" PVC SDR 26 N
(0+39) LlNkV�
0+38) (0+06) / 9 %' a `` ELEV.= 910.34 NAVD 88 DATUM INV. ELEV. 9' PAST PROP. LINE p
�° INV. 905.2 900.3 INV. 896.5 % C.S. 901,0 / / \ {'' / • NL8"-22 h9 BEND 6+40 '`' / / �j <`"�/��' ° 1" TYPE "K" COPPER3+91 �' 8"-22 Y:" BEND WYE�� �� I ✓ BM #2: TOP ALUM R/W MONUMENT ® 9, i N
WYE - G (0+69) I .c ��_ i / 1 SOUTH PROPERTY LINE ON R/ CN
(0+19) J G - I I I I INV. 894.0 _ 1 0 �- �.„„ T �� .% I/ I I PROPOSED R W LINE. ELEV= N M
/ 3' TYPICAL m v
J INSTALL FH \<• Y%/ 1 14 15 913.67 NAVD 88 DATUM C&G - ■ INV. 909.8 •`` s" L - - - - -` / / a°` r<�.._ « T� - i 1 _ . .
LLJ
W-11 Y: BENDS^ , ` \ G W/6" GV 11 -�I• Y W �
8" 6" TEE
/ I I
/ I I
I
� \✓ / 6 II I
1
H /� \ \ \ C. 3+32 .5
'
WYE
I �
S) ��G \ \\ INV. 913.5 \
C S.
925.9
5' RCP �C2+56
\ I
7 \ I
\ I
\ I
' STA 6+59 C.S. 9025 1 �i T C.S. 916.5 ( Z L`
GIRD 902.9 , 7+26 - L 13 Cs. 9,2.7 „+22 16 jJ� - �17/4ORI
/� \ 18
PVC 1W 9 C.S. 902.E `<. _..... 10+47 0 5+ 8 j\i_ ...n.) 7+83 INSTALL SALVAG WYE ( ) C.S. 919.8 / W oINV. 892.2 WYE C.S. 904.8 FH W/6" GV (1+38) INV. 906.5 11+85 1C•S• 922 7EX C.S. 925.7 / c i co
(0+40) 8+75 (INCLUDE NEW GASKETS INV. 902.7 WYE I 12+4213+10 INV. 892.6 Wyt 8"-11 Yi BEND (0+30) WYE '-EX WYE / / o rn8" GV 1+32 8"x 6" TEE g"x 8" TEE INV. 909.8 (0+76 (0+56) / 00
8"x 8" TEE ( )STA 10+30 , I G ) /NINV. 894.8 4 INV. 912.7 INV. 915.7 NWYE-___8„„8"-11 Y� BEND YfjD 911.2 8" GV -- �_ G REMOVERY FLUSHING / / \ W
/ g $ e SSMH 8 L, p�C p� r V/ 8"-11 Ys° BEND C.S 909.3 4 FH W/6" GV & 8"x 6" REDUCER. /
/ j STA=5+71 7 F L G 9+74 G _ - _ J L _ / 19 3
INV. 915.9 \ j - 1 I -..„CONNECT TO EX 8" WATERMAIN. `\;Cc
1+57 SSMH 4 SSMH 7 �� ti a G WYE _ ----1 STA=12+45, 9.5' LT \ i�V Q o
WYE i STA=4+73 / / �'-_,, I I t._".`..� •,..�.. L '* o CD
STA=4+16 ` -
\ \ (1+39) i / / \ 'I - L- INV. 899.3 _ CONTRACTOR TO VERIFY / / \ N �
„•'(HEMLOCK WAY) / / \, �q L °
\ 1 \ \ JNV. 916.0 y
/ - - - _ _ _ J L _ - - - - . • �L� TION & ELE�(ATION. E C.S. 92 .2 / / \
\ \ \ INSTALL FH G /' /'\ \ E%' / / +� o • 8 OPV L \ _ G i f ...,/ \\\
X 13+70 9 /
REMOVE EX 8° PLUG & W/6" GV G \v /' / \ G C.S. 917.5 // // '`. \ \ \ r`` U _ 8„ PVC PVC o- I - 1 8 PVC - �� \\
CONNECT TO EX 8" 8"x 6" TEE \� 6 " <" �� o /� INVX+9N19 2 �%
f `�
/ WYE _ -8" o PVC f� O\
\ \ WATERMAIN W/8" GV. STA 2+13 ) \ SSMH 5 (0+22) / t % r4 PVC- _ - 8 PyC `� ! f \\
GRID 926.2 STA=3+00 INV. 907.5 / _ n- PVG-�
STA=0+79, 9.6 LT '� , - -�- LOCK
\ CONTRACTOR TO VERIFY /' P / Q �0 K
HEM c EX C.S. 931.9
a \ / SSMH 11 \ / /
a r \ LOCATION & ELEVATION. / JG `` ,'\ \ C.S. 923.7 / f' `, r ` f `_ ... a _ TA=11
\ C.S. 925.5 Q / \ N G 3+30 / STA=10+53 - - - - t
WYE / G ) / „� / ' / n STA=7+36 - n w_ N - C 3y �` \ EX 54)
0+82 \ /WYE
WYE 5 / SSMH 9 - _SSMH 10 HEMLOCK WAY „�„1 ® ,,\ IN 0+921 9 y
J \a v (2+04) j�v� `�!� // INV. 913.7 A A / / / (HEMLOCK WAY) STA=9+00�-------� > 10 3� I ✓
INV. 915.5 / [� \ \ / ++ / 7 �`.� ` / / ------ a _ EX. 15 RCP \ \
, / / \ \ / / / �.. / ' •s @ .67% a EX. CBMH /
C.S. 926.4 ' J / f I I RE 921.82 / r
� � � A \� � � � J / _ K"+ / 1 EX. I 916.42 h ��
2+0 �. \ � � / 7 / / I I / INV 917.52
WYE�/ / I EX. 8" PVC \
\ / (D+50) \ / /' \\ / CV ;l / / 20 ' @ 5.00% Q� EX SSMH
rf • / INV. 916.4
EX909.70/ O RE 921
e • N=u \.� • i .•"/ \ / q - . V S
X G 19 /
INV 910.20 ;F' •^,,,,. ..: {
;_: ,.q ��`•- ' > \ \ SSMH 6 f �<' U - I T �
CONNECT TO EX 8" \ \ s
I/
in
STA=0+86 �
/ / \ \ •.- 3 \ ' J / _ SANITRY SEWER.
C.S. 927.2\ '>
STA=12+40, 1.1' RT. ,o ✓`X/
% INV. ELEV. 909.70
G WYE \ i \ Gj / / X J / / / CONTRACTOR TO VERIFY ° <
(1+45) \ \ \ / ! / L / LOCATION & ELEVATION.
EX. SSMH \ \ / / Q % / '\
E=923 INV. 916.8 \ \ / �+ � � ;� `�' \ 21
/ <v �- / r"
IE=9 .63(W DROP < / / G r / EX. CBMH /• r , `'
\ / / i V J/
VE= 01.12(W) ,•'" ^ �a .jr�/!\ \ � O / � / INV 923,6j(
L �/ < � (9 � / .? RE 927.11 /
I E`~9 .79(S) � � '/ � � � �'"� � 6 3 � /l � '�
Cj
/ / 7
xz,
'
X. CBMH ,,,./ \\ \\ // \v/ / �f // // / L \\� // ` ry �/ / / fX��'r\�` \ \rr
IE- 16.69(W) C.S. 928.4\ \ '�/ %'`• �� / / / /m j1 IA
0+83 1 p Jh J�
=9 6.50 WYE V A/ •P / /'� V A C1 /22
/ / / `V f \�'•`� s� . �'''y ,� r� �A /
( / \
15" RCP INV. 916.4/
HEMLOCK WAY
•
■
■
'n■■■■:■■■N�•:■'
■
■
■N■■■■
■
SEEM■iN�■1
■a
■■Y�4■
■�■�l
iwu
Ammm�mm
■N1=■il■
•
�'■
I
■
g7■n�n�5j
■C719m■�
■
■■_
■Ili■
i1RMeWY•■■
It
nAt1�7�
■
■■'
i
"N
N�:1■■■■■
EEEEEEa1N
�nN■
■
N'
NHi��
■Y
r'
a
■1w
■
i�
■ii
�■Riiil
■■i■r'MGit�i■IN
E:
■■
=N■
N
■
'
iyu�"i■ui■�Ir
a_
•
■
VM"Ra'77r■r
■,■
■Eli
I■N_■:■%jii�
A■N■■■�■�■i■■■'�A�_
■
�
■
■
_
■
■
■
■11
•]I
1!
■■■■N
C
it■
.�i�■■N.■.
■N:
■
m
■■
■■
�N■h■''
��
■
■
��pIL.N1�se1■
■■RFi1y.i■
`
:
■
■
■
1►lrifGi■
!i
IRY!'
■
■
■
■
■■
It
I
r7191'7
■
W
II�
>
■
RZZ14
■
�■�
>■•J
• •
..
_
■
.�.�
�■
��
C
■
��i'
■
'■■::■:
��
C.....N■■...
�■
■
�.■C■■ry�■
_
■■
N�■
■N■
■
�C■■
�pNp�
.
�:
m
■■.■pp
O
■■
■
■:
■�
a
.�-n■
■
nIII
!
III
111
Iglm
�
��
�
.
`p.
NL>..
mom
fi
1!!
. r
-
.,
. ■.SIG
■•
�
■■
■
!r■■
��
.■■■..�
ppC
.
■
�
■■■■■
�■
'
■■■la
rvE3
�
�■
L9•'
■.
I
�
■
■N..
■
.
..
.�n
■
.
■
N�I
al
4IIk
i"
I
II
../■■■N■
.■
.
0=3
J
J
a.
C
..N
'
.
N.
■
IIH■�
■
■
p
■•0
��
:
N�
�..
4GNI�.
"pE
..
L
�.■
C
■
..
..
..
i
■..
(J�F_
1
ILtL4■
"'i
1
i
..
C
■
■
��
_...•I
q�
C�r!=1
■I�.
r
r
■
'..
'
��■
.
• •
'-
■
m
.■;=ji�j��I��i
■I
�pq�
.■■
■I
�
■
.m■■.n
N
■�11
■��■
mll°
••/7!
WI■
I
N"'�w
'■i
■
■N
■■■■■■
N■■■N
■qnN""■'■■■■
■NN■■■■p■■■■■■NN■N■■■
N■11
■■nNm■■■■■
■
N
■q
■■N
■
■N��■I
■
■■
'■■■
■N
■
■
N
■■N■■
■■
N
'■■
■■
■
�
N ■
.7ir■■
1■
�
■
■
-
i
_
�7
I�1
y`
.�■
M�
,
■
•�
'■
,�■■■
i
■■■■■■
■■■
•
■
■
■
�N/.■m■■■■■�■■■N■■n■�■■■■'1111'`\�,_
■NNNN■■
N■'■
p
■NN■'■
_
II
II�N■
1;�
gyp■
„�uq■\N■
■N■
n,
,•
..,�
�■��`II
.�
mn1►
■mp'
:
�p�1N1■N��■■•••ii■=i�i�i�i
il�i/�=�i�::i:_.::i�i�i■�■�:■
■■MENI��nl
�
�
■■■■■■■NN■■■■■■■'■■■■■N
�i
��
■
■■
■■
�■
■
..
,■,��
■
�■
■i��a''
■
■
■■i
N
■■■N\■■N■
■
■
■■■
i■
■
■
■�
■■�
■
■■
■N
■
■
■
■
�
'ryn
N■■■■
■nm■■■■■
NN■
■
■
■
■N■
■
■
�/
■�■
i■i■ii11ii1
■Ir.N■N■unN■mN■N
N�■■■11
iipiip■u�■
1
■■NN■■■�..■■■�■
■■■N■■■■
■p■
'■■
�/;:��//.0
A.u■ii■■
■
N
moo■
■■■■
'■m
r„!
w-
■■■■
„
■■■■�
■■■■■■■�111..
■
ni
.
■pppp
�■■
s
■
-
■
■
-
• •
'■:
■[nN�■■■
�fi■q��■_
■:■;NIIN■
■,
�C�
■
■��■■■■
■■■■■
:■■■�■■■■
�:■�
�N
:
N■■■■■■�■.Nh■
■�■
�I
■/r;
■ A
�10 In'
I
1
■
■t
•
./i■■KG■�■
•
=
�■.l■■
■
e_
/
■■
!
�:1j
I
■��
■
■
■■
•
•
!I
�1
�--■
'Lw�CS.iM-666"■n•��■NNN■N•
11T
_Yii=�■■��
I�IIH■■'■.•
-II!■
■■
►N.
■xk
■N■�■■�h�ph�
■■■■\=i-p
!\
i
iiiii
N■
■
n
II
11
■■�
�
■■
■.11■���
pry
�qN■�___����■■■■■■
.�■■�■�pii
�►r■■.
�■
■\
�
■�
■
��.�
ii
j
■
N
■■■■■N■�■':■:
■C
■■N
■
■■■■■
■■■
�C�
iGi■t�
■
■■
■
■
■■
■
_
■�
i■i■'ii'■i'
:"■
11■
!
■
■�
i■�i■iiiiii�
■■�■
■��
N�
::�._�r
.LrtlA�..�gi•Y
■^�:
�Nqq�■�
■
�■_■■�
1
■■
■
■■
�sm
�
■■�■gyp■■■�■C11■
�p�■�■■�N■
■
■��■..
C
■■N
p■
iC■�l
u.�
.
P
■■
.
■
'■
■
�'■p■....\
N■N■
■■■■bill!"
■
�■■N■■\�■:p
'NN■
..._■■r■i■■
"1■■■■�
�■
w
■
■■
■■"
■■■
.
�■■
■
.
■
■
■�
■11■
■
■
■■N
■
Mr°;
bJ
_
sJ
I
I
■
��
CC
711)'.
■
• •
■N■
■
■
■
■ri■N
■N■.■1!.■�N■■■■■.�N..■■■■
■'■■�■■■N�N�u���0■�■
•
■
pp
m
■
non
t■■■N■
■■■■■
C
■�■
■
:
■
■■
■
q■
■
■
■■
■
■
■■■
■
�■■■pp�■
■
■
wim
%
�■
■
l7FA\►■■/N\
'
it„3rtrffi,►=1\.
i■■�■
M1]•i�\
■
(._.
„■p.'
`
•Nt.
11
_
11 1
111
0
►■
�
■
■ .■■fit■■
p
■■
r�■
�■
■■
■■
■
.N■
��\\■'■_'■
■■■
_■
►V■��
■■■�
■
��■
■
■
■
■■■■
■■
■
■
N■/1■
■
■
■■�
■N■
■�■..
�■■
■'
■
N
■11
oi
■
1
1
■
�■
■
N/:N■■■
■p.
■■■
■
■
■
/i/■■
�
ON■
E
no
�r
�■■���■■■�
�■
mum
�■Ci
i■
■
�■
■
■■
C
■
p■
■■■■
■■
�■n■
■
1!
N�rp■p
■■
■
■
■ ■
■�■
■■■■■
■■■■■■
N■N■■■■■■NW■.N��
■■■■..■
■■■�
■■
N■
■
■■
■i■mm�
N.■N■
N�1IIu..p■■N■i
■
•�111
III■
llll■■■■■■■■.`i.N■N■�NM.n■Inl■-■R■.\■�■■�■..■■nNNr1■■■.��.�
■■
RC■2q■r■■
■ •■ter■■
■■
■
■■.■r..N■pp■
i■■i1111\►•1■
■■■�■■■■
.■
■
e
p
E
■
%i
F�
.
I
I
■■pp■■
�H■
■■■m■■■■■p
■'■���
■
■■■■■\■�11�.■/�■N■■■■■■R■■/��
■
■ to
11■
■/I■■■■■■■
■
rr-
p■
■
■■■N��■■■■N■�t�■-■■�■■■■
■[�u�i
■■■
■
■
■■
■
1
1
I
I
■■
■
■
■
■
■
■
• • •
•
• •
Mi■iii■'i
:11111
■
�N■
■■■■�■a■�■
■■■■■■■
a■�i■�■tl■i■
■
■■N
■■■■■■■■
■
■
■ipiipi'�■
■ ■
■■
■■.■/�■
■
■■
iiME
■
■i■��■■i
■■■�
■
aON■
■
�
■
■■
■
HII:(rJ
N■■■�
]
■NN■■�■■■
M
"
■■■■
■■F_■i.,,iiiiiul
Li
it/
■■
■li
.ir
r
�N
■
■�
111/
I N
II
III
III
111�
i■
r
r
■�
i
��`�
r■■■►■
■■
i■�'diii■i■■i■�
■.
■
��Bc.
■.
`i\.
11\\�u
■
`
■ou
u■■■
I, ■�■�
■'■■Illr
■ ■
1
1
In1
1
1
�
l
■ii
■
N
■■■
■�ij
■■
■ii■
■
■
'\�_pp■
■�-■-_
11�■N
N=■��
si.�■►�_
■■
;
�■X�p��i
RII�■
■•�
�i.
■
■■
■
■■..
■N■
■i
�,'..�/M
i■'
�i■'"■
NC
iS/•N
Y
=
SO
Ion
1
■
��■■■
'■'■
■■■■■q
■■
■
■
���
�ii��
■■■�N■Y
■
■■r■
r
■RJR
■
■
■
��N
■■_
■�6
��
'•
�r71i
l
■■
■
■■■
■\
■�N�'
■■�N
■■
�■ppp
ppppp■�
■
N
■
■.
..■■
■
■
�•
�■p�►1V
��
■
1
1
_.p
■I[
fi■■
r■�
■e■/i�
��u//�
iN■■
■■■
■�
■
■■
�■p■■■■
■■■
■■
■.�■■�
■'■
�■���1'
■
E
■■■
■■■■�
■■■/.■�■N■.■q�N�■■■
■■■
■■■
ullN
r
ri■■■■��R.N��■�:
�.
�
,I
'y�
P■
■■
■
■
1
I
1
1
1■
■
1
1
�
r
I
I�
ii
■
'
■
C
i
•
•
■■■
=G�i'■i■■C=■■EESE
. •
•
■
N
■iiN
■■■
i
■■N■.....■
■■■■
i■iiiNgi■i
N■
■■N■�
■■■N■N
.■
■■N■
■■
■■
■
I■■r■
■■■■
■■
N
■■
■
�■■
■
■■
qp
N
■■■
■■■
■
■
■■'■rTTT•
■■
■■
■■1�K19i.l76NPy■N•rlb;lU�
���0
�■
n■■■
f
■
f711113N
■
i�■
N��jpdmm
•1/'�
■■
•1111■aL:M■■r
:
iilnl
N■
,
pIgCll■■rh:
Illr■■■n
1111�
Iq�■3■O
rh;Y
r
��
.■�■
r■■
r
ri
■
'■■"
■■■
■■[
Na
N■
■li_N►N■lu
■fl
R�
■
-■
'•11
s�Il1��LSJa
,•.■n�
r��1u�\
■
■
■
■
■■■
■
�++■
WI�
crNl
�C
rtl!
11
illl
:r'
rl'
■
I
I
1.
-
tl
_
-
t
%
■,
i
G
"
\\
�'gj;
_=/_
n
■ ■�J
■
■ram
.
�:
rir
1
r
!%Ni
.i/
n!w
-
■i�i
�:V'
�■
_�
■
_
•
�'
Nf�tJ
�
���■■
■
■
■f■■�■�■
.
■_■■
■
■■
■■■
■■■
■
'iN
in
■■
■Ni■■
■�■
■ry■�N��L■
■
■�■�
■■
.■■■■�N■■
■■■■
q������N
■.■■
li■■
�NNN�■■■Ci��■
■■
■
■■
N■■■
■f■
■N„qm■N■
■■■■■_■■■■■N■■■■.,INI■Id�r11■■aN
■iY•Y
IifiN■■Yi■N
n
Iql�
Ig�ll�91.f11■
F■
i:tS1/
r■■.■�N
r■■
■■■■LlgmmNlllgl■i■N��
■
'1
In'�
11
.
�R��
�N<tA�_
'f�
N■D
6!JI!
n
■
�/■��
N �■!��/;�=�1
��m��r■
•
1■
C■■
■
�/
�'tf=GYii■■■
/.A3■iN■■■
t■7:h/NN�N�
,_��7�
■■
■
�N
■
NN
■■
■■■q■
■N
■
1�
1■
■■■■■N
�■
I
r�
r
■
■
n■NN■
■
■■N
■■■'Nm'■mN■■'■��N■��
N■
■■
■■p■■■■
. •
• •
C
■
■■■■■
■■N■
■■■■■
■■■
■�
m
N■
���
��■p
■■
■\■
■■1nN■■i■■■■■
■■�'�Q■N■'�'@•
■..■■■.NNN■■
■■
Nn■■N■N.■
■■:■.
N■■■
■
■■■■■■
■
�N■■�ii..■��■■i■■■■N
■■■■�N
■■■■■■'N■■■p.■■NN
��=■p�Ems�
■■■■
p
■N
■■�
"■
N■
■■■
■■N
■■■.■■■
..■
■
q
��
G
■
■■
■■
■
■■
mN\
■■■
■■■■
■�
�■
■
■
■
■
\.■■ME
■N'
�/.■�a■.�
NN
��
■
r.INN■=■■■■■■■
V01111
■_
■■�■.■■:■
■■■■■'■Np■C��
■
N�■■p■O
■■■
i�
■�„
H■■o■■■■NN'N■�■�■
■■■■_
■■
■
■■
■■�■
m
■
N
■.■■.I11
■■
■■Iql_
■■
i®IN�Ll�iilntr.
I I
I11
I 1
lilF■_■
■n■■F
F
■
■
r
;r�
rii■
��■
r■
■
■■■'■■7
■■N■h.'l
■
■■
�#
N__----
�Lj
1:+
JN
■li
$.
LBB-Z
N�pn,1�
••
---
■ ■N
■■
=�i
_M
'���
�
�
■�i
R••
-
■��
M1.
���a�H'■■�1
.
"
.�C����
: IYE■
r'Y
ral
�■
r/
1■
1
■NN■■■N■N■■
■
■�■�■■m■■■
■
!
■■
'i■�
��■
�N■■■.■�■�■�
■
■
■■N■Nn
■N■N�■■■■N■■
■■■NN
iu■■■■■�N�■�■
:pN■�
■■■
■
■■
■
N
:
i
E��
1■
■►v7
/Yri�
■N
■
�■
N
i
■
■
■■
■
■
■
i
I
II
1�
III■
■
■
■■
�i�
N
■
■
■■
■
CIF
�F�
r
IN
o
,
..■■■
r"•���•�.
f
!
n
■
■NN
mN■
■
■
■■■
�■
. •
• •
:
�®■•�1
_�
ii�
.Ns/
.rl
�rl(N■
i
a
I
'�
r;��-
r
"_i*f.1�J'�i.'.■Ni
Ip,
I•
■�w�.11�r�!■
■
■
�pN�■■�
■■�/■Ci3�
.
• •
N
■
■■N■■
■E
��[�me■
■■■■■�����
■
N■
H
mm■■■■■
.■■.I11,%M
■�■�C
■
®
ii■i■iui■N
•'
_
•_
.
r�
• '•'.
■
i
`••
•
�N■■�i�::ii
■
N'^II
:1!
i+n
■nll
■III
11
■
■�
■�■■■
N■
■
�q
:
■
■'■■.■■N
■
■
N■■■i
■N■
i
■■■■►01�
�iE■�i
■
ili
�
■
■
�■■
■
s�i
1
„, i
1
I
■
=
I l�1�
Ili
ii
■
.�irr�r.
�
�!��.
yE11
lII1,
hall'
�:
lY
�
mN
■
S
N
■IQ
�i
■
��
■'9i
i i
■
.n.�.�son�
Np
■
■
■NN■
■N■
■■■
■■■N�.G�N
i
■■■■',■ir�■
i
N■f!
t�■ii1�■Ni�■�.N■
�
_
■■,N■■■■■�
■■i
INss
pp
N■N■'
■OHIOiiii
■
■
■
■�
■■
so
n�
y
y�
tyi
N■
�i
ii1■�i
oil
t•■I■R
L�
i
!IJ•/�P�!
77u''
, °
�pN■�.L
I■ARNM�{:f
•1�■1�1L/1=.✓■�■,11�.
iu7a7i��BullNii�iiili�
_�.��•�_wrR
�Mgii��Na_
CZ:
'• 9
l!i
1
�j
�
■■pC
-
■r
--y
�PY�
�
E m
m
a
ao oco n
T y O N
o E-m��c�
_
DRAWN BY
CJK
DATE
11/2/11
REVISIONS
CAD FILE
21996-22SS
PROJECT NO.
21996-21
3.2
=1
1 +00
MMMMMM
2+00
3+00
4+00
5+00
6+00
NNNI
t3+00
NNNI
9+UU
R!-
1 Ltuu
9 G
sF 14
19 °A1 \��sFE 15
�� ^ I I 3 �' A �'/ G' vv 0 32 ,
10
\ ...- \ ° \ ' \ \ C.S.
z L------- ,» / ----- T \ C.S. 904.2 \ %L [ \ \ \ 0+93 0
_ ___ Q 7 WYL o \sue 1 17� - 21 WYE »- - - _ - i I- 9 11 11 U 11 1 (0+6) \ �� 8" GV Q
- - 1 0 CJ, - f'' INV. 904.6
\ \ 1 1 INV. 894.2 \ \ \ \ \ /
-- -- \ \ 1 1 IU L _ _ '// 22 \\ \\ . \ 8"-22 Y2' BEND 'Q o• h,F
I \ \ 1 C.S. 909.3 8 GV \ 1 �
\ ,+56 / 11 11 1 16 , -' \\ \ C.S. 923.8 'yl
WYE
C.S. 929.1 (0 5) G ' ` a� 1 i \ 2+06
i. C.S. 9 .4 4+08 C.S. 923.3 C.S. 916.4 IN2+54 V. 899.3 /' \ 1 1 V 23 \ WYE
4+�0 ( 3+27 WYE 8"-11 4 BEND. I� \ 1 5 1 '
11 (2+04) \ ` /' o. \ \ INV 8"-11 i,• BEN Q�� QJG +/ SSMH' +
I % EX7ENSION) INV. 918.4 WYE (0+51) \� ,�„ d +B. \•� \ , i \ \ / STA=0+00
1 \ \ \ / C.S. 2+90 2 moo. / (STREET 8) \
(1+24) INV. 906.4 1A
.(2�) � ��_'_..F- $ �G� A G V A / .Ip i� WYE H 76
INV. 913.3 G r Q / A � \
NV. 919.2 + C.S. 937.0 / MCP
8"-11 BEND ` 1 C \ / \ \ / %/ 24 3+65 (1+37) G �' '`R \' STA=0+72 @ 7y\
C' G R \ INV. 920.2 \ / \ C.S. 915.2
��� � � � \/ A � / WYE /' � \ � EX. INV 16.42'
INSTALL FH G I � '
EX. SSMH \
i . / �\ \ , _ ` 1 _ # \ �' \ 0+55 5. PVC
�I RE=935.54 W 6" GV C \A , 2 ` (2+12) \ G
+j I IE=9D2.0 S) 8"x 6" REDUCER \ \� 8"-22 Xr' BEND L--- P g+ P ,/ �/ C.S. 939.9 INV. 927.0 � /
WYE @ 5.00% \
� <\ 4+28 \ (0+55) X. INV 909.70 \
n' IE=901. (N) STA 4+63, 20.V RT _ - a R // STA=0+00 / (� EXTENSION) \ G / INV. 905.2
AJ(q EXTENSION) _1 / SSMH 13 (STREET A \ / � \ ` � WYE G / / / SSMH 17 EX. SSMH /
GIRD 928.8 , / l TA=1+00 \ / ` (2+74) \ \ \ / �� + TA=1+50 RE 921.52 '
INV. 929.0 \ \ \ INV 910.20/' �o
+', '� i � j i I _ J � � \ G C.S. 903.7 \ t• / � . PJ G "`_ � 1+11 / / �
0+56 WYE , 3 3
1 8" F`1 ,a ^" �j 1 (0) WYL`\ �\ / 0 / /a• \ INV. 907.6
4+88.5 C9 �' i INV. 893.7 v '� \ \ '
1 1 " v G C.S. 921.8
<.; (� EXTENSION) ! INSTALL FH C
{ I 1 SSMH 14 G \ \ \ \ / / 1+77
WYE % '• C.S. 907.4 , 25 W 6" GV / WYE / \ EX. CBMH
S 11 2 (2+32) r- 1 \ 2+00 l 1t31 8"x 6" REDUCER ° \ (0+24) n // '/ RE 921.82\
INV. 919.5 -� 1 G j (0+2) 19 p a ^ 3 STA 4+68, 7.8' RT I ■ 32' ,'/ NV 917.52
EX. BMH , I ' 1 C.S. 911.8 l INV. 897,4 �� C.S. 940. k \ INV. 911.8
G 1+94 \ \\ / / / \' \ EXTENSION (� EXTENSION) I / \ G C.S. 927.7 \ \ , / ��/ RE 92BMH > -"
/ t WYE �° \ \ (�k WYE , ) GIRD 939.5 / / 2WYE \\ \v q° /
wl / \ r �� / INV 923. ,
IE=9 .75(W) C.S. 917.4 0+91 (2+84) 0,
I IE=93 .65(N) C I ( ) ' `\ 20 J (0+96) \�
\ 2+81 INV. 901.8 18,1
� �•\ \ \ INV. 930�3
•z EX. 15" RCP SSMH 1 _ '\• C 0+98 \ \ r \ �'\ / '
\ C.S. 922.8 ( ) \ G
1 STA=4+37 % - - \ \ v- G7 \ / \ \ \ / �'' > { 1
3+30 INV. 907.4 \ ( \ 3+21
a I I (fL EXTENTION)` / WYE 1 , \ \ \ C.S. .7 / / '' 1
WYE
I /'' / (1+27) t T I _ \ \ \ SSMH 18 \ ,� (1+68)
GS�9829.4 G INV. 912.8 1 IIU _ \\ \ �' STA=4+39 / INV. 923.7 \\ 30�-
/' EXTENSION \ \ (q EXTENTION) / _ ,/�
(� WYE ) C. 4+129.2 1 16 J ��' \ \\ 22 \\ \ _ \\ CS 940.8 // 1 \\ \ / .' �1, r 1\ IN(2 1 9).4 (� EXTENSION) 1 1 _ `' \\ \\ G \ 4+81 G, G CS. 9383�/
(,WYE+96> 1,,- \ 23 \ \ \ %EXTENSION) 3+85 29-
�'. , \ INV. 9,9.2 \\ 15 ) �� \ \ WYE WYE,�-
\ \ v- 2+79 - 2+35
=r \\ 13 _ \ \ GInV \\ 26 INV. 930.6 C.S. 939.8 INV. 928.3 -/ j - - \ - % -
s 24 G / ' 'v 'V A % EX ISION) 2 800
�-
i G °f
EX. CB / \' ,�/// \\ / // • 7 \ `' \\ 2+6 /'�/ RE 934.44 V
( ) /lWYE� Q P
RE=941.95 / / \ V INV. 929.8 /@'5, //
IE=937.37 / //� f�/ /� ` 2 \\ /' / 1 ,(NOP�'/ \ INV 931.08/
14 ,
�Cn
o
LIJ
U-)
�
�
Z
�
N
ZD
Cn
o
J
00
\
S
00
�
N
�
m
v
-
W
W
NO
x
Z
l¢c
CD
H
Z
�
cn
�
d
DO
♦V
N
�
o0
Elf
M
W
rn
Z
Z
3
w
Q
o
0
�0-
o
E
0
d
C -- i
a
N
o v
noE`
oa0 a
yW,o0om8oO
ca`«ov
�j c T>
On
U nu �O
.-
a av y J d
y, 3 N
2a
VO
L d C -
- 0 a� OWN
C]
STREET A STREET B QCn
L_i- +- SERVICE LEGEND -r-r, o I Q Z
930
925
920
915
910
905
•••
890 T
3 -
l3 '_
885
I
I or
A`
VT�I +ttt
z
MEG
6" PVC SDR
925
C&G
rE -
920
915
910
6
C.S. 950.0-
1+00
WYE
(0+50)
INV. 940.0,
N
CURB STOP BOX ELEV.
CURB STOP � STATION 1940
STA. OF WYE FROM NEAREST
DOWNSTREAM MANHOLE
SANITARY SEWER SERVICE
INV. ELEV. 9' PAST PROP. LINE
1" TYPE "K" COPPER 935
Ll
+
905
SCALE IN FEET
0 50 100 150
1 inch = 50 feet
BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY - N. SIDE OF
PIONEER TRAIL - ELEV.- 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT ®SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
-
-
900
7
�-
r
$-
`
-
1
18, MIN, CE �_.
vF Pwe
895
\\
\'
sA A2
START WATERMAIN
DEFLECTION
STA=0-10
(WATERMAIN OVER
DEPTH INCIDENTAL)
t 890
T C7
STA=0+STA=0+AN02 DEFLEcnoN
(WATERMAIN OVER
DEPTH INCIDENTAL)
1885
_
wl
925
m■ : : ■N ■ N■■ Ca ■■m■ _ ■n �C �i■: ' ■ '� ■ ■
MOWN s
ME
all
ME
Is M1
Is
Is
Is . a.�ginon
ups
:��:.. �n ..:pia':■ : ' ■ : ■■
M Is DRAWN BY
ea�■►�::■ ■ ■■■.■��r ■■u. ■■ m ■ NCJK
Iiiisid
' a14
r'':z.C::■ !
i11- i'ijj-N§§ 7wj§1-■il ■i■ii■■ ■7t■§■i
WN
■■■■ ■■::■ :■■■■ ■■.■.■N■:I
'� 1i:■■�'■■��■p■■'■■:■::: is■■:i-■i■■:i■■■::I
• • • ILn■■■■■■■■ ■■■ ■:m■■
I�a� ■■■■ ■ ■■■Nn■IBill
:=1
�,II11 mV::
15" RCF
CAD FILE
•96
PROJECT NO.
■ 21996-21
■.■aa■u
POND 2
OLE 866.5
100YR.HWL 870.0
/1 I ITI �T
lJ I L L
iR L j �' CBMH ,10 \ ' p . S' 13
Q U - r r r r F . �)►
_ y , l FF_ - r 1 � \ \ STA=9+00
Ov
C
R EEK \ \ \ \ CBMH 111 ` . ..F y T , 14 /
\ LOT LINE
FES 120 - ' vt___ 17 \\ \\ \\
CBMH 119 1 16 \ \ \ CBMH 112
MITIGATION AREA '4 1 I \ \ \ LOT CORNER
. OLE 865.1
ry�rn 15
100YR.HWL 865.4
FES 118 2>>�;Z 18,464 S.F. 20 > �.
UJ I L _ \I 111 \\ \\
' 1 'o. �' JP ' / ` \ \ \ \ \
o > �, \ CB 113 1 �5 H N, \\ \\\ \\ 21 \\\ IN,
IN
N y I\LOT CORNER
\\ IN 22
r \ \fIN o\ \\ \ \ IN \ \ \`° � EX. 15�'�C
\
�\ 23 \ \ "� ® 3.677\
l J SCALE IN FEET \ \ ' ���' i m o. \ \ \ \ \ \ \ EX. INV 916.4
{ - 0 50 100 150 > i \\ \\ \\ \\ i / \\ \\ 33 E® 5.00
1 inch = 50 feet 24 IN, EX. SSMH
RE 921.52
IN. INV 910.20
BENCHMARK ��� ' �., / ` \ \\\ \\
I I I \\ 1 BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER �`�`�\ /i t / �\ \/ \\\\\\ 32
I I I I I \ Q I POLE WEST OF DRIVEWAY - N. SIDE OF\\
I I I I CBMH 104 \\ �q \ ' \\ 9 PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM ` \ \\
I I I I I I I STA=5+89 IN,
I I 1 I BM 2: TOP ALUM R W MONUMENT 0 SOUTH 4 ' \ \
I I I 3 I I 4 I 5 �Y_ \ # N 25 _ ,, 31 \ \ ,,�
2 1 I I I 5 y PROPERTY LINE ON PROPOSED R/W LINE. i ` \ / \ \ \ \ \ \\ / Ex. CBMH
1 I LOT CORNER �� \\ '/ \ \ �5a�� INV 923.66
ELEV. 913.67 NAVD 88 DATUM \ \ RE 927.11
X 1 1 I I I �' v ;
SEEMS
M
O
Ln
Lo
wj
�
wimmmm
z
(V
-
=
■�
N
w
O
J
5
rn
00
cn
m
(V
WLLJ
o
X
Z
Z
cn
W
o
Co
N
o
C
E
Z
�
w
j
o
O
0
E
IL ------ NN
L 15" HDPE;)r- ��o \ \ 1 0 \\ i �� \ r �/ \ \ \ \ \ \ i �� '' o m
- _----- -� L--- ���a - L- ---� ; \ \ L �.. \\ \�� \ 1 �� \ \ 29 \\ \ \ \' ���� I ao E o c o
��s� \ %� 5. \ \ \ m M o
------ \ \ \ Q �,d�ygeo \ \ ^\-- r i \ \ \ \2 /� Boa o
\ \ CB 106 I 2 1 1 , 1 \ \ I \ \ , / \ \ \ \ ,� \ oa�oFdd
- \ \ LOT CORNER I I 1 I 1 \ \ \ �`/' \ / \ \ \ \ i - o d w o
P \ 26 / / 1 \ \ \ \ �0EOV N
\ \ I I \ 1 \ 1 \ \ i T / / \ \ \ IN
IN
T� c
10
%`^ y` o Tc N
J
V A 1 1 V 1 �� \ / / 27 V ' / �Q � �� m a� owvr
E \ \ I I 1 1 \ 1 C ( P ,i \ �� \ / / \ \ kq. EX. C MH 1 r.. \ \ I 1 1 1 1'�•`''•�
1, EX. SSMH
AY INV 931.08 \Y/wP��
RE=935.54 \\ \\ - -J 11 -, *� ` ' �\ ``` < \\ // // \ \�� 1�N/
IE=901.94(N)
19 NOTES
1.
1. ALL DIMENSIONS ARE TO THE BACK OF CURB UNLESS OTHERWISE NOTED.
18 \\ \\ 2. AQUATIC BENCH & STORMWATER POND AREA DISTURBED BY UTILITY CONTRACTOR MUST BE RESEEDED AND MULCHED WITH APPROPRIATE SEED MIX IMMEDIATELY AFTER UTILITY CONSTRUCTION.
_ \
li 12 3. ALL REAR YARD CATCH BASINS MUST HAVE INLET PROTECTION INSTALLED ON THEM IMMEDIATELY AFTER INSTALLATION.
\ \ \
1 7 \\ \\ \ \'o " 4. INLET PROTECTION (WIMCO) MUST BE INSTALLED IN ALL STREET CATCH BASINS UPON COMPLETION OF STREET CONSTRUCTION.
EX. CBMH \
e d ,tz RE=937.58 1 \ \ \
IE=932.75(W) i� \ i 1 I 16 1\ \ \\ \ , 5. ALL PROPOSED SILT FENCE/DITCH CHECKS/CB PROTECTION & EROSION CONTROL BLANKET MUST BE INSTALLED IMMEDIATELY AFTER UTILITY CONSTRUCTION.
IE=932.65(N)
I' RCP \ < 15 1 1 \ \ 2 \ \ ''i\ 6. ALL EXISTING SILT FENCE OR EROSION CONTROL BLANKET TAKEN DOWN BY UTILITY CONTRACTOR MUST BE REPLACED OR PUT BACK UP IMMEDIATELY AFTER UTILITY CONSTRUCTION. (INCIDENTAL TO CONSTRUCTION).
EX15" . �� �� 1 \ V A V \
\ \, 1 1. 1\ \ \\ �' \ �/ 0 7. SOD MUST BE INSTALLED BEHIND ALL CONCRETE CURB & GUTTER/SIDEWALK AND ALL AREA DISTURBED BY UTILITY CONSTRUCTION MUST BE SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION OF PRIVATE UTILITY (GTE) CONSTRUCTION
$ B D E3=919.80 o 6
F , \, o r {
920 t I h- I
915
910
905
900
�1
I
3 890
a
885
o
L
w
z
\
�r
L 71
\
�- 1910
I mm
s�
e
6
fflo
1875
M1
865
INSTAL� 1
860 ,RAS
FER BLANKET AT FES.
18751
M
8551
00
Z - _ +-850
ter.•■ ■■: ■ ■::■:::: ■■■:r0 ::
anus E min
■ ■: ■q : q .■■: : ■ :: yin i � � ■■w •
■ �■ ■ ■ ■�■■'M u r IN aME W41
■■ ..
a ENO
am a
0016-1111111
ME a
• E :.�...�:: ON wo : : .: •
ME a 'His
■n ■ q ■ ■ ■ ■q■■■■ ■ n q C
■:::■■■:■on
■■■ ■■■:i ■■■ ■::■■■■■:■ ■■ 11I ■n:: ■
■■.H ■■■■■ ■so
HIS■■■■ ■■q ■�■�■■■■■■ PME ■■■■�■■ ■■ ■ ��■win
■■ ■ ■
ROME
onsi
Milo
■ ■ ■■■ : ■■ '■:■■��I■■ ■■ q
: H ::_:::::::::
■ ■■ ■■ ■■■■■■r.. q■q■■■ HE
q■■■ ■■ ■q rr7r�■■ ■ ■■■ ■ q■ ■
n ■:■n�!�.rs.� :n■ �i■■■q ■: ■Yti■q :i : ■ ::::■'i : C n■
■■n ■ ■gi■'iaifi aiiii Nmemmommomio
A III WEE 0
��' i ■■ �ugi:�i ■: ■ ■ ■
z
O
z
O
I�
E4
LJ
Lr)
Q°
E 4
W
w
zz(2
z
Q
a
L
o
xZ
o
�
z
w
V)
oAw
>
z
�
aa
=
U
W
<
Q
w
<
N
w
z
z
a
rn
W
N
W
°'
Z
O
�
o
171
a
DRAWN BY
CJK
DATE
11 /2/11
REVISIONS
CAD FILE
21996-22ST
PROJECT NO.
21996-21
4.2
1
r-,\ I ITI /1T / \\
\ 1 I 1
\ \\ I I I
I
I I
6 7
CURVE DAT
R=225.00
/\ \ 0=64'36'26" I
5 , 1 L=253.71 I
T=142.26
L------
/ v v 4 v v
BLUFF CREEK `40' BCOD BUILDING I ` A, NOTES
OVERLAY DISTRICT, m w
/ e SETBACK LIMIT LINE
/ °
LINE (BCOD) < < ` 1. ALL DIMENSIONS SHOWN ARE TO THE BACK OF CURB UNLESS
�/ / •. 20' BC00 GRADING � OTHERWISE NOTED.
J LIMIT Li E� 2. B618 CONCRETE CURB & GUTTER (TYP,) AT ALL INTERSECTION RADII
AND CATCH BASINS UNLESS OTHERWISE NOTED.
I L U , I\ �y / / \ \ Tom\ 3. TC ELEVATION AT INTERSECTION RADII AND CATCH BASINS TO BE TOP
8 \ // / \ �� OF 9618 CURB & GUTTER UNLESS OTHERWISE NOTED.
I
4. ALL INTERSECTION RADII TO BE A 20' RADIUS (TYP.) TO THE BACK
/ / V �� / A V OF CURB UNLESS OTHERWISE NOTED.
TC0 ` -T ��� / 5. INLET PROTECTION (WIMCO) MUST BE INSTALLED IN ALL STREET CATCH
5aos317 \ r-� BASINS UPON COMPLETION OF STREET CONSTRUCTION.
/ /�
1 p 6, SOD MUST BE INSTALLED BEHIND ALL CONCRETE CURB &
15 GUTTER/SIDEWALK AND ALL AREA DISTURBED BY UTILITY CONSTRUCTION
14 MUST BE SEEDED AND MULCHED IMMEDIATELY UPON COMPLETION OF
/ 1 16 CURVE DATA v v / 11 iN PRIVATE UTILITY (GTE) CONSTRUCTION.
A=10°01'37" v ��� vim' / SURMOUNTABLE CONCRETE I 12 1 1 13 1� CURVE DATA I I IXCURB
\ s R=400.00 155p� R0.ST 17 12+55.03 END CONSTRUCTION
\ \xp \ \ 3 \ \ L=175.01 / CURB & GUTTER (TYP). 1 n 92T 1
v i vp v v v v / . CURVE DATA 1 d=28 54'l1` I I END 5' HEMLOCK WAY
\T=87.73 / / - Tc/LP7cB L=201.79
Tc//ce v 7+scsz n REMOVE 2
_5+38.37- / �y 901.E / / 5 CONCRETE I R=540.00 1 1 1 a 1 I I CONCRETE / / SAWCUT 31 LF EX. BITUMINOUS
SIDEWALK 10+ 6.9z I I BARRICADES
=44 57'09" 1 v rc�cB T= 103 09 PERMANENT SIDEWALK & REMOVE. DISPOSE OF OFFSITE.
+`e.53 \ \ _ T=223.41 \1 9u.6z _ - J L _ FIELD VERIFY &MATCH HEMLOCK
L=42141 I -- 12+55.03 / / WAY EX. BITUMINOUS.
y/ X SURMOUNTABLE CONCRETE /
TcrsHP ' f Qy \ k CURB & GUTTER (TYP). ,' �. \ ------ -j
- J L -
CURB DATA \ \ \ 926.i6 i / `►' i �\ \ \ / / \
R-484.50 G� \ S 5 V% \
v CURVE DATA v v v v , V / v v v �p / Q/ cc v
A=O6°44'38"
\ R=500.00 \ \ \ L=57.03 \ \ qs O \\ \ \ Q/ 7+i \
sa1.e6
\ ,=06058'28" \ \ \ END c/Pc/c
\ L=60.86 \ \ TRANS noN /, `` \ / �/ 6 Toc+/K 7e
v T=30.47 v v y 1s3sesLT �� v v\
�, WO",
\ \ \
BEGIN 5'
v\ vv CONCRETE TRS�in\
aiaNv 10+840e.5i35T 47
qSIDEWALK TP
cr0+39.31 5 o
�UZ� 3�
15
2 \ s
CU DATA A\ \\ ,- /^, \VAS /
/ / �� / 9 234 9i
/ R=515.50 \ \ ,
A=07°1 V40"
TRAN9TON L=64.88
1+37.87 T=32.48LID
2 \ \\ 2z/
18
0+59.00 BEGIN CONSTRUCTION / / / \ \
a c�o6V HEMLOCK WAY �\ \\\ \\ \\ '� / C; < \\
\1e��.i6T SAWCUT 30 LF EX. BITUMINOUS
\'" \ 1 & REMOVE. DISPOSE OF OFFSITE.//' \
FIELD VERIFY & MATCH HEMLOCK
WAY EX. BITUMINOUS. H EM
LOCK
c/Pc�LP/ce yn WA Y TO/x/cB z
7+ 9.19 9+0�� 16+16.69
901.65 - - - 904.77 910.51
7+35.85 HEMLOCK WAY / -- }
0+00.00 STREET A / / 10+53.24 HEMLOCK WAY
/ 0+00.00 STREET B
J! 9 2 p 0+4151
0+3.22
/ 913.22 I4.3' /S„
SURMOUNTABLE CONCRETE
/ ` CURB & GUTTER (TYP).
ITI /1T /
11
12
MLOcK W,
\ } 100+8>7,15 11+5000
1 I 914.14 917.18 12+55p5.03 B /
12+56.12
/L TC/PCP/C
' 91298 SURMOUN ABLE CONCRETE
r CURB & GUTTER (TYP).
SCALE IN FEET
0 50 100 150
1 inch = 50 feet
�\ BENCHMARK
32 2 BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
o POLE WEST OF DRIVEWAY - N. SIDE OF
PIONEER TRAIL - ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT @ SOUTH
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
• �
■
■
N■G
. �g
aG=GG:.C:GG:..ZGG�.
'
'
fig•!
GJ'
•:IIGG
■■
GGG
H
Vygg.■��g''CGNuu■
GG
GGG'
'GGgG4
■■■
!�
•::GGSGc.
�Ga
..
g
CG
°GaG
G
..
■
V�
��■
Gg
.
g■
..:aaa:Gaaaa:■aGGGGGGGG
.
C■1
. ■a.
:GG.
9■
■
�..
■ _•
a
■
G
M:G:C"H
an
•G
■ °�■
GaGGG::
■�
S.N■
CCGCG
►�y
"
:
..
�.
C'
G
G.
GGG
g
a
a.0
aN:a.G
C
GGG
'
C
::
CrJ
:G
'
.
.•
°ii
.
G
N.
CN
=
g;g
.G:
G
i�
.,
■ ;'
.:GCGG
a
■
gg,�
a
'J
■
a GGGGG�'
■■7
Na:'aaaaaNNon
■..
■■
►
Gaa.
■
:::■:aa
■ '�■■■■
...
.
r
.:
■
a
H
GG
•�'
a.
■
.G
''wg
N
V
GaGaCG
..■ggaGg
gau■'
■
I
=a
GG
G
■
■
■
Gaa'
■
■I
a
1aa
■
■
ggG....g.GNGGggG
NNN
...g.......
■
n
NON
..
■
■
Nq
...
■■■■■
GaG
■
■
'GGG
aGG
..
■■■■■■
■■
a:Ga•G
■■
GGa'aa
■
■
■
CaGa
aaG
■
a
■
G
■
ag
■
a
■
■
�
■
■
'G'■
:
■■■■■■
•••
a
a
■
G
■■
CG
GG■GGNo
g'
■
■
G
■
■
:
■
q
�
■
GaG
■■■
■
■
G
■
■
a
g
■
GGG
■ a
NN
■
GGg■
G
�
MEN
...
NNg
Emus
.I
.
'I
■nGA■■
■ ,'�1C=:�gGa::
G
q
..G■
■■■■
■
■
■�■�■
..N.0
■■■N■
..
■■■
I
�
....
guA
G':
•
�
� -
- ,,�11,
��
■
GG
■
■
ii
■■■
Ng
■■
.
n�
■
...
■aG
pG
C
G■A
■a
..
■
■■
.G
■gNN
:
■
■■
n■
■■■�■
i'G:■
■.G..■
.GG.GGG
■
Ii
...■■■.
■
.G
■■
■
■:
: ■
.
■■■
q_�ggg�■
�.:CG"iS��
■■g
G.GG
..
■
u
.:■■
G■
i
.0
g■g■gg
■:
:'
'gGig�1
�=�■i■a
G:.
N
i'
�.i
_■
u■
.
'
■■
■■
i'
■gggM■
GG■
'i
.
N �
.
��
GG
G
G
Ga
GC
■
.
G
G'G
■■
■G:.Go
n
GG
�■�■gG
'i
....
alogo
■
g
...!■
q
■
G
a:
ii■
■�i■
■■■
G
■g
G'G'G..
■
■GGGGG
■
■■
nA
g■
A■u■■
■
.
..
..
..:
.
..
..
:
•
■
■
Ni
Agaa•G:�
■
g.
■■I
■
N.■,N
..;
■
.
■■■
n■■
W_
C
NNS
G■N
:Gg'g'HC'GNgG:g
G•
:.\���
N
;;g
■
■
■A■
AG
■
a
G GGC.
■
"
• ,
,g _
GSGG■---■-.■ice_.
,
'■
■
Ggaa:
N�ii
G�
N�
r:�:lA■
NASA
■
Q�N
'
:
■
■
Nu
1 11
• , ,1
: 1. ,
■ ■■i
NCA
GG'=NC
C
gg
q
■
■:gg
■■SS■
■
■
■
.
■■
■
�g■GN
■
'
g
■
N
■
..
a
NN
■
no
■
G
■N■■
G
G
■
ga
Na
a
■
GaNS
■N■
�■■�
Ng,.
ga
■
C�■■S�■H
NNS�
N■q■■■■
■::
CCGN
n
g
a
G
g=■GGGCC
■
■
•
■■
■
N■■
C■NNN
NN
:a
:
■
.Ga.
■
G
■
:
G
■■■■
�■■
Nq
■
■
G
■N
G
■
■
N■
G
a
■■■
H
:
■
g
■
•
�e
■■■■■■■
NNN'
n■S■Ca■I■■■■■GG■aun■�■:■N�1
C■
.Js�r
NIG
N■
�I■C■C■■■H■
p
n
�■�■
G•
GG
■
gg
--SS■
GCCG:
S■q■
GN.
NN
aaGa'-
NN
g■g�■�
C
■■■
NGGN
e
Ming
-
C:C
gg■
G
■■■■N■
■
G
■
■
�-_
G
■
.
�•j
q
III
■
►
uL..`
t��
��
fir
C■N�.
■■■■►
■
GNG
`!..
G ■
■■
G
'G'
g
■
■
:'���■
■AA
ua:■SNu■q■■■N■■■
A
=
s.
■
■
■
NNAGNN�■��■�gC
■■
nq
■
N
G
g
■■■
■
C
■
A
aa•G
q■
■
■p�
■
■:■:■■aN:■
G
�G
■q■
qg:q.
C
G
■
■
Ga:a
NN■
■■N■
=
Na
5■S■NCC
N■Aqq
N■
g■:pG
i■
S■
.Gg
■
G
■■
■■:n■aaa�■■S■■
■■
■
..i
■
gg
a
G
�
GCC
■■■
G
■
g
G'N
■
S■
1
��■
IIN
11
�I
11
1
SS■
g
n
■
:.
G
G■■■
■
G
■
■SS■q
■
G
N
g
g
■
��1■■■■
V-J
■�■■�■
■
C
,
■
■
■
•
N■nN■
■■■■■�■�■''
u■s1
a=■■[ilav
■
'GC�
N'G■�.■►■i''"'N■■■Na:A■■N■■■
''�■■■■H
n
■S■■
�\
\
■S■
■q
■■
■.
■��
■
■
c■.■■
■
a
■■G■■
■HHAN■SAN'■■
■�
■ii■n'■�G'i
■'■■■■■HGG'''"'"'MEGGG.'C'■u
■nA
gg■
:.
, •11
■
11 -
-•11
■N
C
■
G
■
■a.n
■
■
■
N■■.'�
■S�
N
■.■
■
SS
q
■
■■■■AgNhl
_
■
Ana'
gN
_
Nuu
ii
NNq
,a■
'g'I•
nGq■
SN■■■■
I
G
G
■N11
n
i�
■Loss
■
wS;r
.■M■
•
NgiGGg
G
moving
ag..a...I..NGG.
■aC�
'
■CG:�■G�■'g■ggg
.N..aG..
�gg�
'1
g�,':'G
=:
_gig■'■■■
CGG�G'.
.�.■:-
aG
ANaGaa'
'
gg
■
N
'G
pp ■
■�
.g.
\
GiGL.�a.aa.gG
.ggGg
.g.
A■■■�
.G
010
a
1g■■■
G
a.aggaggg
G
..
=
■..■■■■
■■
■
■
n■.■�
GG1GGa�GaaaGG.i'aCGG:GGGGaGGGGg.�aG■g..
■
G�ILJN
:�l^
-1L�
■GGG
■■
■aa
■■■N
N
Nu
■
'■
■
■p
:g
n.�n��■,■■SS
'GG"
■N
■N
■ggggN�■G'7.
�a
■
AnlN;■■■■q.■■
C
Ca
Ski
-
_G
NN
NNq�
n
"■
■C
■:■
G�
■
■
NI
N°��
-
'd„/i
■
GG
■A
■
a
C
ga
■ C
p
'
■■
'N
■
1�NCGNN
■
I
G
C
C
G
■■S
■
■
g
■
• ,
�■■�■�■■p�■■q�■�
�q
N
AG'■.
■
■I
IG■N■■■■_■aNSA■■
■
■■
CCC
CN.■NA■.■
■■N
■G■■NN
NN
G'
N
■
■■
�u
■■■NNNgg■■■■
■■■
GNN
■_ gCN
N■
A
C
NN
■
NGG
G
NGNn
/■■■
NN■NN■NN■
H ■�■NNN■NN■
H■■■N
N.
N..l�■■
.+■■■N
■■
G
r :ro
eTi1
g
T
0
',,
� do
■
�C
g
g
'
■
0�'
■■■■■■■■
GHa�n�
■■■
i7iiiaaC
■
NN■qn:q�■���11
CGGH■i'■C:CaiGHN:G1iiGGGGA■
N
NNE�■
N
■S■
"
■
C
■■
GG�iNN■
■
■■SnN■HiiiGiG'■iiii%CiiiiC`'A'►u■H■CG:■T■G:i:SN:Ga:iii:il�rii■i■�fi
NN��■�■�■N■�N
■
_
■�1
N
�►�`\■
.
■NN
NNr■■fiiNrY■
r�1�
71x�G���N
■■n■■:IC■Cl�iiii::■■.■■.■■.■■.�■■NGY�n■■S■■■Nq■n■N■■N■/.�■■S
■S�IIAA■■g�AN�NN
GS_�hg�gggG■
a�CC�GNH■G■■NwoSSGy
■■■■■NN
=
■■■
NNN
■n■
ng■SNriiSN
�/■
n.■'�'
IG�ig■iq■■C■■CC■GC■
N�
GH
..1
!_iۥ"N
�i
1�'°
•
■
a
..
as
■■
gg1�_
■Cgg
■
�GG
:
■
N
a:.a
ggGG
G■
G
"
GGG.D-.
�i
�,/.
■
■
din
G
■
11......
'GGN.�
'iGiii'
S:G
g
GSg
■■
aG
■
■
N
...
■
■g■N■
■
Gi"'='
■'
■■■
N■
■
■
G
NA
■
aN
G
Ei�i
GGG
NN
'iGG
C
C
■■
a
■■
G--GTi1p
Gg■
':
g
■
.....�7
:..
q■
.■
CGG
■
GG
G
•
gg
■
■
•
MG
• ,
•
NGN■■■
■
■_
'G
SSNNN■N.
■
:
■■■I
Gg;GC
G.
S■
■
.
G'a:CG'AG'C
a �■,gN■■■
■q■N
�Ga..■:GG
:GG•::•
: ■
■.g■Nggg
■
a'G
■
'Gag
■N
'.gg
'a
':G
G
a
a=
Ga
■
:■
■Gg
:
G
■
gg
■
■■
■
ggGG:GG:.
CG'
■p....='...p■
iNi-��I:g�N
N
■
.
IrA■w■■■G
1t
.
'
g■
�:
':
■
:
G■��
■ '.
��,_
a:i
a
■
..
Win■■
G
pq�■■■
gg
.
G'G.►�G.
G
■/1
1 �iag
I•SNN
'
N■
■`il
7I�.G:.G
1
°_
G
N
■
Ga'
NCN
■AN
g
■
qr
N
SNNN
•■
N■gGNgg7g
::GGG
a�N
NN■.BI
■
■■■Alip�
■
NNN■.N■
HH'GGaaa■G
■
■■.`YNNgg■CGN
C
GCNNN■G■NN�GGGGG:.GH'
N.gN
■GG
.0
■
NN
GGNGNG:.AN:G�.:�
GCN�SSg;■■::nA■
■gg�NggggN
"GG..■.GaG:GGGGC:':_-C'
■
w■
q■
NN
'
1"
Ng
GNa
■
HNC■NN■
..
gg.■S■.GNN.q:.
■■■■
■
■
■u■■■
Nq
■■■■
■
n
a
■
■
u
■
■u
■�
■
■
g
G'
u■
■
■■
GG
■■
gCaGC
■
uq•
■■
■
S■
■■■
■
a
NS
r
■
■-�■
G:Gg
■
AI
■A
141
..
N
_
S
�1
I
�•
1
r
G
..
■__��
��
G
_�G■GNGa:C►�::NC:C:a:N■■N■G:G'■NN
•A
.
■■
_
•
..
.a0
11
■�:
■
■
■gNG�CCCas
■N■
G
�C
-
•
■
■GgGG:gIr1'.■Ca'g�Hg:'CCgC'gg
G'G.::I
.G■■��I
a■■■■C�91
■Ng�asnuMpn■
'NAGN
■Ga■■N■■■N■NNN
G
"G:H':NG'G
.:G.M
Somali
.GqC
■
■;
G
�G.G■N
■
111.119
■CgGG
aNH
■
■A
g
.:
■
■gH::
p
■■■■q
GNN.
N
�.
GA
u
.
■
■
..
G:C
■
■
■
A
■
•
■
■■
MM
aNSS
An
gNCS
N�
q
■
C
a
■
•
G
Sal
p�
■■N
G
ggG
/G
Qiii:iiiiGGiigG'■aG�•�'•
■G��mpmom
gN
m
CCGgg
gN
GG.NNCG.
■S
uN
GGa
111■
C■■N
g
GG.
■MAN
■
"
N
• •
•
qq■
No
■G
NNN
ownG'IIII
■■L"JI
■
■GGGCGg■:■Gg'N'a:.i:G
aN.NGN■■■N■p■GNGGNa■■
N
G■■'G
■
GA
■
■CG
■■GGNGgGG
GN�■,�■I�il�}
:S�NG�
■=
w■
Gi'i
GAIi■GaG=G�q
n■
■
SSq;.■aa�■.■.
■
i
■GMason
■i
■■Ggag
NG■
,�.
gg
■
g
■
■
■Aug
■
Ai
�GSG■
Gag
■■
■�■■A■Sgg
SC77=GIN'NGa.r�".
G:
■■H
u�MAIN
GGG■GG.iiNN
g
■
■
■■■■
■
••
.
�
•
•
■
..
N:
■
■
n
■
■A■A��■N■■■A■m■■■grA■
AS
■
g
■
ga
■.
N
CGCC
■G
SSS■
Gg.S
.C'
N
■
: •
n■
..
NNGa
NNS■■NNN■SSgn.N
■GN.
NN
NNnuq■
NNNNSg/
■■■
■
■l■gNGN.■N
'.SAS■■.GC
■
■
•
■
NNN
■N,l
■■■
N■
■SNNNANNN
g�
HHH
G
GGG
.■g
■■■■■
N
G
�I
L'I
1-I
[a
.
Gg■■■
■■■CC■S■iGC.■C:�S■S■■■N:q■SS■
GGGggGGG•gg..■■■g
NS.G/.:G
somoso
IHG
■
GaG
...G
Cg
C.
■■q:�■■■/
NNNg.
'GCCCG
C■S■■n
■
'
aq■O■■■
:n'gC
■�■■�■■.
'G
:GG
■
as
G
HN
GaGG'C'Gg""gg
G■n
NnN■GNgSI�
G:..:G
\..�
■■■■CS
..
G
g
'.
■
.�G.■��
::a
■■S
■
a
■q■q■
'C.:
rJ
�
'
:Gga.
■■■
GN
GGG�a.:'GGGq
n
G.G'■gGga
qO■Nu
■
■
•
_
;
■
■
•
• •
•
q
°
n■�
..
F�CG'
s
CC
aaGaa'ac
■
G■N
a
C■■I'
�
'GGaGuG:G:a:G::GG:GG■:GG:GSGaGgaGGCGa■:G::H
N..G7la�■
■C.CL]Iggg■AggN
C71S■
_■
■RAN
ia:■iAGiGi■■G
■NNNNNCCg■
SNN
:Gg'G.gGg.....
■■�■■■■
■fig
�■.
■q■..
■a■
�■■■■■�■
C:nG'
NS■
■S■�
C
■
■N■
■
G.Gaa
■
■
■
n■
■
NG
C
■
■ggq�N■�GCN■'■■■"■■
CC
.■q
C
■
g■qN
q
■.
::���
'
■■■G
Gig:
NNNN
aa'
":
qMir.
�N=■C
HUCC�.G:::�:�iS�aGCaC
gG
g.
��1�'■.N.NN
A
..■��l■.G.
.g,M
''■iri■qq■■C
■■■■
: ■
'
g■
'a
NNN■■■Sa
.g
■�q■
.N.
N
■■
G
.
�■■■■■
■
C1�.G:GaN
■i'ia
■
::CCCaG■aCaaaaC
N
A■
■0NN�aa.
onNNN■N■�gN
■■■
'a'G
NN■
■
■�..
Na
GG
■
Ng
CG:G
,g
G
■:G
11
■
.g
■
.
■
NN
■
CG
AICaI
GG
G
•
■
•
•
-
■
%
:
■
S
�■�
q■■
G�G■1�.37'ix:n■N>;RCNNNN
■■'�i
■
,g�SS
C'.G:GaA�i:.NG.'Ga..G
■
::aGA
■
q
■
G
■
3�tiGYYi/L
■�a
N==■■N
■N■
■
■NN■
a.
N■■
NN
gG
■
C
C•
.NNNSNNq
■
NN
N■■■
■
u
N.N
:
■
N
N
■ ■qq
n
NNa51.�NN
■q■CJN
.1,�.■■■
C�'
■
C��.
■��r■N
■1!a■
■r..11i
■■Ag
■Ly
g
�H
■
■CC.a
■S
a
■■■N■
NN
�■■
N.N
■•
�■
■
:gN:
■■a
■
■g
g
■
•
•
• •
. .
'
Ya�1�u►L�
n
'G
■
■G■
■N
■
N
• •
..
■G��JC.
[��F:7
=
rr
■
-
■■SG
■
■:
�garaiHGG'H
■�nl■uG
Ntr1
G71q■.NiNG�C:u:GGN.G■��
-
■
■Cg•CNCCCggGH
.■
ii1Gn"NA■■■'Gi■
� N■N■■■U■■a
N...11s:=:..a:
N
GGC
C:p■.g■■�■■N.
■
:■■�a�
■."'
NN■�
mom
�,
a
"i■iii:u.
a■■
gGnN■S:■■N
■
■p
q
.i
■
■■■
■
iiii■-�iiiirii
NGG
■
■
NN
.■
■■
■■S.■SN■■■N.■■
NNNN
■u■gG..■Cggg
■■■
G
G
..■His'i:a'
OMENS
■
�g■
■-iG�■
N■NNNga
■N■N
:
■
G
■
■
■■■N■■■■■
■
■N
:
q■■■.
.�::::i...■■i
I■i�Gaa■
■■
■..Ng
�■
■
■gN''
■
H'
■
aaGCgg'�g
:saiu.GG:y=GG�I.i:■
Gliii�GiG
g■
■
■
g
..
■■N
G
'H
■
..
a■GG�C��N
::::::-.`i■:
�G�N
�
�■
'
H
g
G
=iiiiiia'iii
■
NG
■
■
G
aG�C
G
NNNN
�NNN�gGSnng■■■
■
■
■
■
■■agpAiiNN
ag
n
N■gAA■Au
■■�■
■�
':
gGCG�GG:
�g
:S■
■
Nlg
■
GGG
■■
■G
■
(3
N
a
M
Ln
Ln
w
-.4-
z
CN
CN
• SEEN
in
o
00
N
m
CV
rn
cr_
.
W
W
�
x
�
Z
Z
(n
W
o
C14
cn
\
o
M
V/
N
�
Wo
W
U
rn
/�
c
Z
3
Ljj
CD
z
a
E
T O Y
a
A°
LD
E
a o o co a
O O O p Oo
it
L N O
0�
T � N 0 O �
N
V O L Q u O
T O 3 J
d U d N A N O
Lv0���o
_ 0 n-o o win
o
z
0
Z
A
AO L0
�1 r~-� z
`4 o I--+ Qli w E
.1.ZL�
C\2 Qa
x z
1. �L V 1 ti LLI
ZZ0Ao
V''^^ Q LLI
1N
=vim
a=w
x
W �z
W EI
w1n
z
a
DRAWN BY
CJK
DATE
11/2/11
REVISIONS
CAD FILE
21996-22STR
PROJECT NO.
21996-21
5.1
0+00 1 +00 2+00 3+00 4+00 5+00 6+00
7+00
8+00
1 U+UU
11 tUU
WIMMMMMMI
1 Lt UU
MAMMMMMME
I I I I I I I I1 I
1 2 ,, 3 I 4 I 5
_ - 17
�\ 1
1 1 _ - � 5 /
__ - ti 1 � 15
I 1 \ I I >?
I _ g 1, _ 1 1 , - 6�
�\ /P - TC C CB
6 1 „ _ 9 0.5
\ I 20 \
— — 1 1 s� 1 \
_ \\ \ \\ �\\ \ 11 11 , — \\ \ \\ \ 110+053.24SHEMLOCK WAY / j / �' ,� H
_------- I -- 1 1 6 �\ s 1 T �� 16
— — — _ 0+00.00 STREET A /
---- -- - \ 1 i\\ TC/PC/CB
\ \ 90,.96 \ 7+ 5 85 HEMLOCK WAY L' \ \ \ \ 0+41.51 \
\ \ I 1 1 IN 1 1 \ \ \\ \ , \ \ CURVE DATA
i
\\ 1 7 P > 1 ,- 21 f \
1 1 \ rc c c9 i \ /
R=207.66 � >< • � /� � \
tP 902.35 / o \i
— c - i e \
-� —41 41 T
0 �3' o• c c c9 C' / I � /
\ \ I 1 1 8 I P \ 1 CURVE DATA - \ 1 \ \ \ \ �s• ,`ts
\ \ AI
n \ \ L=151.13 /
I I 1 _ � \ � . ata.ta
j v v 10 9 1 1 \ R-545.00 v
\ \ I 1 1 1 0 1 1 0 \ \� \ \ \2 \ \ \ \ T=79.09, \n / ' / ` �L \\
\ \ I —t A=23 20'33" - V Tcirc ce \
. 1 \
\ \ I 11 1 L=222.03 � —� \� '/ i \\ \ \ \\ \ \\ ��`� \ e• / s,z>e� \\ "' /'\
1 1p 1T=„2/58 23 <\ '9
f \ \2te°sz98 1 1 t Yr \ \ \ \ \ \ \ \
c -- ` 3+56.73 1 1 _ 1 5 - - 'SF 24 \ \\ \ \\ --' 2� \ 33
1,--- � •p, T�/p�/fig � \ \\\ \ \
— //gy�pp// \ \ -
L\ / --'902.34 CIM9.t8� O901.65 Lj \ \\
TC
�� pit b �`• '' \\ \\ \V 9� 935.68 32
m '� \ \ SURMOUNTABLE CONCRETE \\ \\
'\ SURMOUNTABLE CONCRETEI
4 — _ \ \ CURB & GUTTER (TYP).
TC
CURB &GUTTER TYP), v v - A
28.80 - \ \ \ \ \
12 1 0 \ \ 18 \ \ 25 Res - \\\ \ \ `\
\ \
C7 \ — — Tc 1 \ \ \ \ I �—�?? aO gy - Tc \ \
I 1 .73
2�O,S 11 1 \ \\ \\ \\ '' I �1 . / 934.92
30' D. 1 I 1 1 \\ \ \ \ J \ \ \\ v u
- \ / 1 17 . 30' RAID. \\ \ 30
- - \ 4+16.98 STREET A \ \ �
CENTER CUL—DE—SAC 1 Il \ \\ ^\ \ '/y�
\ \
i - -
2&32 \\ \\ 15 1 I 1 I I T I �, �, _ \\ \\ \\ - , \\ \ 29
11 4+18,97 STREET B
Tc 1 CENTER CUL—DE—SAC
13 21 26 93&OB \\
28 \\ \ 2
14 vv v v v vv v - 1 — — — — A _ - -
2 —
r=. A \27
23 \\ \ STREET B
24 v
�A -
v T MT-; (N33 M \ \ \ - Go M
01-00 i � I •r. t.�� y �-+-�- N ri f �D I �� �_ ' -
��
w) m 1 N
STREET A k - -
955 t \ k - 1 r - +t- rt ++ 955
m: ro n n 1 Lo -t-T-' 4 t -1 -- r F
oo� r- r rn
N (N N
r I�
935 I- I
920
-
nI■■I
' •
■■'
IN
11.E
11'nr■I
■
Irn.
®El
1 +00.
)3.63
-VC=1
F M-
1-
Is
NOTES {
935 950
1. ALL DIMENSIONS SHOWN ARE TO THE BACK OF CURB UNLESS
OTHERWISE NOTED.
2. B618 CONCRETE CURB & GUTTER (TYP.) AT ALL INTERSECTION RADII
AND CATCH BASINS UNLESS OTHERWISE NOTED.
930 3. TC ELEVATION AT INTERSECTION RADII AND CATCH BASINS TO BE TOP 945
OF 8618 CURB & GUTTER UNLESS OTHERWISE NOTED.
4. ALL INTERSECTION RADII TO BE A 20' RADIUS (TYP.) TO THE BACK
OF CURB UNLESS OTHERWISE NOTED.~
925 5. BASINS TUPONTCOMPLETOINCOF STR ETO) MUST B CONSTRUCTTIION• IN ALL STREET CATCH 940
6. SOD MUST BE INSTALLED BEHIND ALL CONCRETE CURB &
GUTTER/SIDEWALK AND ALL AREA DISTURBED BY UTILITY CONSTRUCTION
MUST 920 PRIVATBEEUTILITTYD(GTE) CONSTRUUCTAND MULCHED IONDIATELY UPON COMPLETION OF 935
T
9151 N
910
1 905
SCALE IN FEET
900 0 50 100 150
1 inch = 50 feet
895 BENCHMARK
BM #1: R.R. SPIKE SOUTH FACE OF 1ST POWER
POLE WEST OF DRIVEWAY — N. SIDE OF
PIONEER TRAIL — ELEV.= 910.34 NAVD 88 DATUM
BM #2: TOP ALUM R/W MONUMENT ® SOUTH
890
PROPERTY LINE ON PROPOSED R/W LINE.
ELEV.= 913.67 NAVD 88 DATUM
O
905
950
ter_ r t_ - Y h _
I- } . {-I-
!�}-r --1111
-11
900
Ln
�
O
LiJ
Ln
CC
z
`r
N
-
=>
m
cD
■�
N
J00
O
N
Z
m
N
�
w
o
X
Z
�5
Z
n
�*
o
�/ ♦
CO
\
o
CD
010
CY
Li.l
U
Z
�
W
z
J
o
0
N
2
N
E
c TO i
N
ny E o w
0 y oco a
m O
3 Y y
ZO
m
w o
_oE.'^a�m�c�
>�
O-o
T O V N J
d U N N O
N •O p- o O C�
N
L4pl
O.V OWIn
p
O
A z�
A� o
L0
QZo
ww
�Q
�E4
zLLJ
O
ZZ4d0ALod
Uo(LnLiO
w
=U
z
aUww
o
w
xa
Z
a
W E1E1
W v) v�
z
O
a
DRAWN BY
CJK
DATE
11 /2/11
REVISIONS
CAD FILE
21996-22STR
PROJECT NO.
21996-21
5.2
GENERAL UTILITY CONSTRUCTION NOTES
1. 5P JF TI .CATIONS: THE WORK SHALL BE DONE IN ACCORDANCE WITH
THE CITY OF CHANHASSEN MINNESOTA.
2. EXISTING FACILITIES: IT SHALL BE THE CONTRACTOR'S RESPONSIBILTY TO
DETERMINE THE LOCATION OF ALL EXISTING UTILITIES BEFORE STARTING
CONSTRUCTION, THIS INCLUDES, BUT 15 NOT LIMITED TO SANITARY AND
STORM SEWER, WATERMAIN, NATURAL GAS, ELECTRIC, TELEPHONE AND CABLE
TELEVISION SERVICES.
THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY CONFLICT BETWEEN
THE EXISTING UTILITIES AND THE PROPOSED CONSTRUCTION. THE ENGINEER IN
COOPERATION WITH THE UTILITY COMPANIES, SHALL DETERMINE THE NECESSITY
FOR ANY RELOCATION OF THESE FACILITIES.
THE CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES AND FACILITIES SO
THAT THEY WILL CONTINUE TO FUNCTION IN THEIR PROPER MANNER BOTH
DURING CONSTRUCTION AND IN THE FUTURE. ANY SUPPORTING STRUCTURE
THAT MAY BE REQUIRED BECAUSE OF THE CONTRACTORS OPERATION SHALL
BE PROVIDED BY HIM,
THE CONTRACTOR SHALL BRING TO THE ATTENTION OF THE ENGINEER ANY
CONDITIONS SUCH AS SAND IN MANHOLES OR VALVE BOXES EXISTING PRIOR
TO THE CONTRACTORS EXCAVATION. ONCE EXCAVATION HAS COMMENCED, IT
WILL BE ASSUMED THAT ALL DAMAGE TO UNDERGROUND UTILITIES HAS BEEN
CAUSED BY THE CONTRACTOR'S OPERATIONS AND IT WILL BE HIS
RESPONSIBILITY TO MAKE THE NECESSARY REPAIRS.
IBILI TIES: THE CONTRACTOR SHALL MAKE HIS OWN
3, CONTRACTOR RESPONS O
ECE ARRANGEMENTS FOR RECEIVING
I WATER FROM PUBLIC OR PRIVATE SOURCES
AND SECURE NECESSARY PERMITS AND PAY REGULAR CHARGES. ALL CITY
WATER SHALL BE METERED. DISPOSAL OF ANY WASTE WATER OR ANY TEST
WATER INTO THE CITY SANITARY SEWER SYSTEM IS SUBJECT 7O CITY CHARGE.
CONTRACTORS ARE NOT TO OPERATE GATE VALVES OR HYDRANTS ON CITY
WATER SUPPLY.
THE CITY ENGINEER AND THE ENGINEER SHALL BE NOTIFIED 48 HOURS PRIOR
TO COMMENCING WORK, CONTRACTORS SHALL BE SUBJECT TO SHUT DOWN IF
PROPER NOTIFICATION IS NOT GIVEN TO THE ENGINEER.
O
CITY STREETS THAT ARE UTILIZED FOR INGRESS TO OR EGRESS FROM THE
CONSTRUCTION SITE SHALL BE KEPT FREE OF DIRT AND OTHER DEBRIS
RESULTING FROM SAID CONSTRUCTION. COST FOR THIS SHALL BE CONSIDERED
INCIDENTAL TO THE CONTRACT,
THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN ADEQUATE STORM
DRAINAGE PROTECTION OF THE SITE IN ORDER TO PREVENT EROSION AND
SILTING OF ON -SITE AND OFF -SITE AREAS. THIS SHALL BE ACCOMPLISHED
BY PLACEMENT OF HAY BALES OR FILTER FABRIC FENCE AROUND THE
DRAINAGE INLETS AND OUTLETS AND BY CONSTRUCTION OF DITCHES, BERMS,
DEBRIS BASINS, FILTER FABRIC FENCING AND BY ANY OTHER ON -SITE
PROTECTION AS DETERMINED BY THE ENGINEER. UNLESS SPECIFICALLY
CALLED OUT AS A BID ITEM ON THE BID FORM, ANY TEMPORARY DITCHING,
CULVERTS, HAY BALES, AND FILTER FABRIC FENCE NECESSARY TO
ACCOMPLISH THIS SHALL DE AT THE CONTRACTOR'S EXPENSE.
IT IS THE RESPONSIBIUTY OF THE CONTRACTOR TO PROTECT AND LEAVE
UNDISTURBED THOSE MARKERS OR MONUMENTS SET FOR THE SUBDIVISION OF
LAND.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO UTILIZE THE
"GOPHER STATE ONE CALL" EXCAVATION NOTICE SYSTEM AS REQUIRED UNDER
MINNESOTA STATUTE CHAPTER 216D, 48 HOURS PRIOR TO PERFORMING ANY
EXCAVATION (PHONE 454-0002 IN THE TWIN CITIES METRO AREA OR TOLL
FREE 1-800-242-8511).
L BE 4. COMPACTION' DENSITY TESTS TAKEN ON ALL TRENCHES TO
VE A
EVALUATE THE COMPACTION ACHIEVED DURING UTILITY CONSTRUCTION, AND TO
EVALUATE THE COMPACTION WITHIN THE STREET CROSS SECTION. WITHIN THE
UPPER 3 FEET OF STREET SUBCRAOE THE CONTRACTOR SHALL INSURE THAT
ALL SOILS BE NOT MORE THAN ONE PERCENTAGE POINT OVER THE SOILS
STANDARD PROCTOR OPTIMUM MOISTURE CONTENT, AND THAT COMPACTION TO
A MINIMUM OF 100% OF STANDARD PROCTOR DENSITY (AASHTO T-99) BE
PROVIDED. WITHIN UTILITY TRENCHES IN OPEN SPACE AREAS(BUILDING PAD AREAS)
AND AREAS BELOW THE UPPER 3 FEET OF STREET SUBGRADE, THE CONTRACTOR
SHALL INSURE THAT ALL SOILS BE NOT MORE THAN THREE PERCENTAGE POINTS
OVER THE SOIL'S STANDARD PROCTOR OPTIMUM MOISTURE CONTENT, AND
THAT COMPACTION TO A MINIMUM OF 95% OF STANDARD PROCTOR DENSITY
BE PROVIDED. THE SURFACE OF ALL UTILITY TRENCHES SHALL BE FINISHED
GRADED TO THE ELEVATIONS AS STAKED BY THE ENGINEER TO MTHIN A
TOLERANCE OF t3" IN OPEN SPACE AREAS AND 30.1' WITHIN STREET RIGHT
OF WAYS. THE DENSITY WILL BE TESTED BY AN APPROVED TESTING
LABORATORY. AN APPROVED TESTING METHOD WHICH UTIUZES A NUCLEAR
DENSITY METER MAY BE USED FOR THE DENSITY TESTS. THE LOCATION OF
THE TESTS WILL BE AT THE DIRECTION OF THE ENGINEER
THE OWNER SHALL BEAR AL COSTS OF THE TESTING ANY AREAS WHICH
FAIL TO MEET THE
TE COMPACTION REQUIREMENTS OUTLINEDIN THIS SECT nu
SHALL BE CORRECTED AT THE CONTRACTORS EXPENSE ALL COSTS FQR ANY
RE -TESTING ASSOCIATED NTH ANY CORRECTIVE WORK SHALL BE AT THE
EXPENSE OF THE CONTRACTOR,
5. ALL DIP WATERMAIN TO BE POLYWRAPPEO.
6. ALL WATERMAIN TO BE INSTALLED NTH 7.5' MINIMUM COVER.
7. ALL 6", 8& 2 " 1 WATERMAIN TO BE CONSTRUCTED OF
CLA55 52 PIPE.
B. ALL GATE VALVE BOXES SHALL HAVE VALVE BOX ADAPTERS.
9. SANITARY SEWER PIPE TYPE & CLASS AS FOLLOWS:
a, 0' - 16' DEEP = PVC SDR 35
D, 16' - 26' DEEP = PVC SDR 26
c. > 26' DEEP = PVC SDR 18
,1.5"611. 'FEAR
-'Y FijFiji SASE
IRE BARRIER
---
SEE OE4TAL 2109
SPRECAST CON
NDE4 OR
pD515TNa RING'
ET OR BE SET CN A95
SEATA ART OR 11P.G911 FDGAI, � 6' THICK CCNCRETi.
�T7" DOLLAR
NOV: 2-PECE COVER RISER RINGS ARE NOT ALLOWED.
BIT. WEAR COURSE AD.A VTAIL
CASTING SIATL BE NEENAHtIrr 1-1542 W --�
P_lf JOS AND SHALL Till BEY SEATING
'YE STAVPFO SANITARY 4WE8 OR
C-VAPU
IIDS
'I JIM SEWER AS APPROPMAIE WTH TWO
�H: EA18D PICK HOLES - dlt. BASE
DR! Fill
EIIN. (2-P) ADJ. IRNCS ANU
° HOPE OR
MAX (Y4 ) ADJ_ R'NGS
r1-2" RING. WITH
'RECAST CONCRETE
Mi- 0..)
ADJUSTING RINGS
I&I 3ARRIE.2 --._
2]" _ E Ti CONCRET,
SEE GEATAIL :ISG
L_CIiAR
T�
[9T USE Ck BLIe ER "OURSL AOJ DETAIL
NCTES:
1. Pt <CAST CONCRETE A:i.USRN RINGS
SHALL BE BEGGED 'M TH 1/:" CD
k R R M.
.
U fOF
MANHOLE CASTING AND
Rum
ADJUSTING DETAIL
PEAs6o: a -II
ENGINEERING DEPARTMENT
pod" xo" 2110
FILE hi G NC EC$ ilia
MI
N
$
n
a`
`o
g
Net to Scale
Van
;
3'
I
%
(Hyo)
R/W
I
tD'
R/W
0
Cate wlw luseeion
n pallib n Of
property line
R w R / W
NOTE
A%i
rida.
hmmrnum hoe of
o s pipe Iemi beyond NOTE
".to wlva .,it dosed WrstA main to be an
"with plug Bob Back to north and west side
fee. of center Ine unkes
Notable pose co"At
With prapmed wheedle
O111fOF
TYPICAL
INTERSECTION
Pertm a-m
ENGINEERING DEPARTMENT
�� 1001
LE XAN.G dCSeSpi
MINIMUM FEET OF RESTRAINED PIPE REQUIRED
ON EACH SIDE OF BEND FOR DUCTILE IRON PIPE
INCREASE MINI
MUM LENGTHS BY THE FOLLOWING
AMOUNTS IF PIPE IS WRAPPED IN POLYETHYLENE.
50% INCREASE ON ALL DEAD ENDS.
20% INCREASE ON AL BENDS.
70
COVER
7.5
CODER
6.0'
CAMR
225
45
90
DEAD
END
225
45
#AD
Epp
225
45
pEAp
90 END .
2
3
8
16
2
3
8
18
1
3-
2
6
12
26
2
5
11
25
2
4
ti
''25
3
6
15
34
3
6
15
33
3
6
14
32
4
9
22
50
4
9
21
48
4
8
20
4'6
6
12
29
65
5
11
27
63
5
11
26
61
7
15
35
80
7
14
34
77
6
13
32
75
8
17
41
95
8
16
40
92
8
16
38
89
P124'
10
21
50
117
10
20
48
113
9
19
46
109
12
24
59
138
11
23
57
733
11
22
54
129
13
28
67
159
13
27
65
153
12
26
62
148
15
31
75
179
14
30
72
173
14
29
69
167
THE TABLE WAS DEVELOPED FROM CRITERIA IDENTIFIED IN THE 1992
EDITOR OF 'TBtUST RESTRAINT DESIGN FOR DUCTILE RON I'll"i AS
PUBLISHED BY T11E DUCTILE IRON PEE RESEARCH ASSOCIATION (DIPRA),
THE TABLE ASSUMES COH-GRAN SOIL AND TYPE UhNO CONDITIONS.
REFER TO DIPRA FOR MINWUM LENGTHS IF DIFFERENT SOIL OR LATING
ZONDIOONS ARE ENCOUNTERED.
WIOF I RESTRAINED PIPE
REQUIREMENT FOR DIP
REN1sEb 2-06 ENGINEERING DEPARTMENT 1011
TILE NWE:R CS 1M1
Use MNDOT 3149.2A-
GrarWlar Barrow
AIS
I
Use MNOOT 314A.211
Cause Filter Aqg.
(Pipe Fooedotin -
Matakll r -
Required)
The bottom f the trenh stall be
moped to fit n the pippee barred far at
Iwet 50S of the dutene diameter
Pipe Of., x D5 Min
'Oft" Denote. outside
diameter of pipe
HOLES.
When existing sail mfAitions are not acceptable far bound and/or co mpacUn
in the pipe era. pipe eedoing and backfdl what be used as mown above
2. A soils ngineer will be required to determine the depth of the pipe
foundation embedment materiol if needed. Pipe foundation moterid shill
be mca rm with BRIDGE 3149.2H course fYter aggregate
M!OF I PIPE BEDDING
IN POOR SOILS
wedsm:i-Id IENGINEERING DEPARTMENT staENou 2201
FIE£ WYE:¢ NG CS
NOBS:
ope ai back of h "hen
111
D y wry me long as you
,
st firm andistumad
.on,,
.
2. Drnharmon 2I,C2,173 should
be I no gM1 to make
D! 45,equal to a larger
3. DimerrWaP Al,Ati Amid
To as largge ae possible
without Interesting with
NJ belt.
4. B = 45 M Pourn.
5. Place pdyethyane between
dependsis p p .
6. NI thands Be ftt'ngs steal
be restrained *he Megaluge
boat rosh.ible or iii
a - See I.
BUTTRESS DIMENSIONS
PIPE
22 17Y SEND
45' BEND
SEE BEND E
SE
B
D
B
D 2
B 3
o
8"
i'-5'
f-5'
f-5"
t'-5"
7-Y
Y 6'
8'
1'-5-
1--5"
2-1-
i'-6"
2'-8"
2'-0"
12"
1 TO
V-10'
Y 4"
2' a"
4 9
2-fi"
1 `
6
3 O'
21
3' 10
3 L'
fi 2'
3-C
?0"
3 6
2-8'
ii
3' A'
B�
4-0'
24'
44
T-0"
6 10'
3 0
9 8
5'-p-
30"
9' J"
6'--"
17'-0
6'-0"
PLAN 5' BENDS
PLAN 90' BENDS
vmoa. S u A - see sire e
CONCRETE SHALL BE A
IN CONTACT WM .� '• A ID
THIS QUADRANT
OF PIPE
eE11pNG YgRp4
UND6RM DONDR T
SECTION A -A PLAN 22 1/T BENDS
c" OF CONCRETE
THRUST
BLOCKING
IcnsEp.x�e ENGINEERING DEPARTMENT nAlE ra 1002
DI£ wue 1
CL PL
VARIABLE
FENCE
s. POSTS
la
or WYE PLUGGED E
1 1 ME 8" PVC SDR-26 PPE Wis. SLOPE 1/4' PER FOOT
2'X2` MARKER
SEE NOTE 2.
1/2 PIPE DIAMETER MIN.
SANITARY $EWER
GRAVITY MAIN
SANITARY SEWER SERVICE CONNECTION DETAIL
SEItNCFS TO BE USED IN CONOLINCTUN WITH IUASDI
MAINS PER DEPTH OF COVER 16 El OR LESS.
NOTES:
1. SOLVENT WELL) ALL JOINTS (NON CASKETED
2. WHEN SANITARY SL"AER SERVICE IS NOT PANTED BY A WATER SERVICE IN
P N r X THE SAME FRENCH,INSTA A or HEAVY METAL FENCE OST NEXT O 2 2
LL
MpRNER AND PAINT TOP 8' OF POST PROPERTY
IF DI GREEN.
J. EXCEEDS 0FEET.REQUIRED ON PRIVATE PROPERTY IF DISTANCE FROM MAIN TO HOUSE
EXCEEDS 96 FEET.
4. ALL PIPE SMALL BE BEDDED ON GRANULAR BIXtftOW 314A lXt COURSE FILLER
PGG1RECATE (3149H ).
QFior TYPICAL SANITARY
0
SEWER SERVICE
Rnrs@}0e MEENGINEERING DEPARTMENT 2001
MNCG G
Compooted Normal Fill
Matti Co tw to
959 of the Standard
Indi Denary
Shaped l
Natural Ground to p',pe
NOTES
1. WT dti not arc table far beckfill and/or compaction
n existing re c ons are e / p
h the pipe zone pipe Sett g and backfti roll be used as mown On
a tail plate 22D1
2. A Sao engmee will be regebed to determine the depth of the Pipe
monoxide, ambadment mate,ial if headed. Pipe foundation malarial sbell
be accordance with MNDOT 31491 course fiter aggregate.
3. The Bottom of Me Trnn Sholl Be Shaped to Fit the Pipe Barrel for at
Leal Sot of the Outbid. Diameter.
Q[IOP PIPE BEDDING
�1B��D�g�■ IN GOOD SOILS
VL91ml■� RCP & DIP
REVISFb:I-Ip ENGINEERING DEPARTMENT N.aE X° 2202
i8E IIWLF. G SPEC$ NR
,yy
F
onW
O
he
V
o
I
i
n
a
m
j �
ii•
�
n
id
re I
r;�
a
R
m
S"
S
a 'Hal
c
,L •f',
H<
m
As In
INC
it, =
�
P
"J
p
6
OR
I
O
p
w�
�
lt
4
a
o
os
a
��
Y
a
mIN
d
,ai
o
$
xYW
s7
E
p
Re sr
`w
c
he
3 -Alpo
�wN
is
o
T
x
xi
eio
5
a,T14
lit!rr`T'p�
a
n
-
�
6
3 3r^
�p
O
a � �w
Zaa
F
Amy m
L
to
<
mP�N
OldBEW�
o n�ato
ro
ago
VOa>
2^ez.�, a`
of
wi¢�
02
0
In,
'y-pI
also,
`ii
�
Ini
j4_' OL
3w<.<<
Rrc
orto
<. u,
2KuN.
`slA ate
pV?1_5
>w £1,m1k
SF,rn
"-
��
TYPICAL
HYDRANT
CNIMINSTALLATION
"3-09
ENGINEERING DEPARTMENT
' MDI
1004
HtE
NwE
a\Lilc\sPE�\law
-. _
a
PL
VARIES 9'
Metal
Fense Post
174
J2'K2'..,
Bend oa Needed(x1.Y1z1) X..YaoZ his. Simits of Extobtion
6" PVC WR-26 Wye IN sei line.
Tamped FBI
Tee of Wye and 45' Sena
I C.Y Generate Encasement
SamberY Sewer
NOT
1L SSolwnt Weld all Joints. (Non Casketed)
2. Aftth en Sanitary Sewar ing axvIM a 6' not Heavy Metal Genre Past Next to 2aried by d Water vice2 n
ins Soma TPointt, y x
Marks and Pont Tap ll of eset ted to t l Crew.
3. Cle Use of Rents Shall be Restricted to the Two Shown on This Dean.
4. Faboo ut Required an RriwtE Propbty it Distance team Nana to Hasse
ExcAVlds )C Feel,
5 Dount,2z)Coardinhtea of aerv.W line at any R of Ganda at ROW (In Carver
..aunty CoorElnates).
QROF SANITARY SERVICE RISER
(GREATER THAN 16' DEEP)
RCR$Ep'z-m ENGINEERING DEPARTMENT PLATE Np, 2002
FILE 'G G CS XC
'Compact
BackM
12"
water id Etert
♦ a sea el
Founibut
1Re4Dared
aee N to 1)
I I
diameter Dn ot. outside
of pipe
NOTES:
1. A .0. Engine will be resulted to determine the death of the pipe fd.ntlbtian
emlfe"m t moteld it needed Pipe fidool ton material shall be b OCEdrdence
with MNDOT 3149.2H course fit., aggregate.
2. P.e,C. beddin snail be MNDOT 3149.2B select goratrr borrow with LOOS
a 3 94' sieve and lees than 1010 ssn a NO. 2CO sieve.
Thai / Po g I
PIPE BEDDING
FOR P.V.C. PIPE
REYWEa:z-Id ENGINEERING DEPARTMENT tpATE has 2203
N. NABEQ c c
V Street
Variable
6 metal feline past
derm(.g 1 d<..
TOO fi printed flue_
Curb be, with 1 1/4
stb,dppB and stationery sad
J
Yb e sc•vka
r"X1" Corporal Gn Cack Type Copper-
Gor Crete FBI Support -
\ -Sot, Moro
NOTES:
l Do not P S end, 01 b 9to,
2 Add b" fli Pl,C9F o iu,rt _tap.
The capper sinool, in, betilive, to ain and ddHb be.
dell be one -ritinous dece of pgn9. splices will not be fell I I
4 orpoa-on coi l be l ode diameter
5 - dd _ r d GIP d o d al s
d I m li t IRger
ea12�
b .rid wn eu r d ame, at . Ford e.vk Fh 0 :. ble strip
7 _'nla,� tool toddle" regwreJ o. all PVC wotammr_
Trff �
TYPICAL
WATER
SERVICE
R-O 2-11
ENGINEERING DEPARTMENT
PLATE :
LOOS
FILE WLE 4: C SPECS taW
Mellhals Costing and Ail
qfe Plate 2 nD
9 (See )
Provide IRE Bonier on all sanitary
..or manho sae alot. 2109
)
Manhde step, snail be
Neenah R-19d1J, 16' on center
o Steps Shall be OR Downstream
t Ski UNese Pipe Diameter is
18" Or Larger
All 'pints in mnhae to haw "O'ring
Field r sea Is . reguhle, by lib. En9l,wal
A Maximum of 2 Short Momi
Rises to be Used Greatly
Be. Co. Secibn
Pipe shell to Out out Rush
5" with Inside taco of wall.
�Kor-n seal required.
Precast Inverts MI be 1/2 of
SECTION VIEW saved12 moan, thheenmbd
Mrrimum thickness of precast base IN
6" for IIT deep or I.BR antl Tereasse
1` b, Nkeress far awy 4' of depth
grader than 14'.
N
1.
1. gar-n-sod m.nhak be equal wan ;, d acceptable eltemafe.
2. All tlog e manhole
shall be tchYbotn inside and .htstrO
3. Wfim the a Insde or catch bosh sear, turepas is d sign (M
Walloped
outside the aped n t to the
a witnam past and sign (MH)
st1ain be installed next to lne manM1de.
OIliOF STANDARD
MANHOLE
Reason)' 00 ENGINEERING DEPARTMENT IRATE xo.. 2101
ntE NVGG NG 5?
NOTE
i- V Grate Shown
2- VB Grata Shown shall be
used ¢t all low pomka I
Fees of Curb'V1
Dlracllrn of Flow
PLAN
Catnbabin casting
and yy ote Nnnah
R3D6]-V ar aqua)
Grote to be 2" bw elo
3" imoll curb box.
grOde-
pttn
traraii curb an each
¢tine of CatUlbaeln.
Prec pat For a of
HOPE dribbling rings.
Tap of Curb
Varies
Mmimom of 2-2".
6112
maximum of 5-2'
Vo ost
crate odjusment
24" x 36
rings allowed with 1/4'
Precast
minimum
to 1/2" bed of mortar
between each and a
6" thick cancmte collar
3" Grout
on the outside.
EMT.. base
Doghouse3 ship be
oron bath tie
SECTION
,de and aatsl
NOTES
1$ceps what be provided in all colts basin/manholes
and storm sawn --r -..
i. Coating to be totally encased in c ancrete Sorb section.
3. No block btruatare$ are oRcw xj.
4. No word shim. are pbrmIHetl ten the adjusting rings.
M OFM STORM SEWER CATCH BASIN
2e X 3' RECTANGULAR
REM4p:2-la aAtE to:
FEE xAAE:¢ a Ecs Ira ENGINEERING DEPARTMENT 3101
ZS' Minimum mn vrequired
Nuroll
File,DROP
No. B860
aver to, of water main.
�B�•�/
Mueller
ho. H-10381
Bibby Ste -Croix
No. B-5160
provide Val Slam Risers
To Within 6" Of the Suaaae
1 lhE Dibtane4 frpn
The Top WE Or The Von To
The Surface Is Greater Than 6'.
Grade
10
Adil l tap to 3/4" below
role,
No. 6860
M.
issde, Box to he set to
Mueller
No. H-loi
Do"
Provo$ 12" of od"thronl.
Roby Ste -Croix
No Ofoll
2Y'
Too No. BEING
Moeller No H 10357
EXTENSION
Blbby-Ste Crox B 5G01
Tyler
No. 58
AT
Gate wive box, screw type,
No. 59
18"
3 Deis, 5 1/4" waft. size
No 60
24"
G box, ] 6 extended.
Mueller
No. 56
14"
RIb roux, ease
No. 59
20,
VET81LbY-Ste-Croix
No. 57I
"
Gets Val. Adapter: 1/4'
W5211
vi
NO. 58Stahl
Wlh Protective
V952?
No. 59Coot
g 1/2" Rubber
VB523
No. 60Ce
k t FrAolled Bet.en
The Gate Valve And
NO
Gate Valero Adaptor.
T th
Tyer
No.
H-1Mueller No.
or American,
b Ste-Cr 1
a
W51Mueller
N vH51Flow
oY'
sitComand
WeBb
We a
Confoont
shiC-515- to
antl
Io bG-V,
5 ondartla
drud9Valor
wrappe a perStjo
p4atshe
A1I
All t ess
2GLSD
q ACC sec n 2.
O 3.Stool
to its
Nuts R Bolts.
Sidti
rI
18"XIB"X8" Candrete Black
TYPICAL GATE VALVE
AND BOX INSTALLATION
RLVISEn a-oa ENGINEERING DEPARTMENT P1ATE Ng.. 1006
nIE ruble°: I
t
te'
T I ' 72
PLAN SECTION
HORSESHOE DETAILS horse Coi and Adiustin,
Ring (Eeo Plate 21ID)
rPrawe e.b., - al +."NeY
sewworries (Axo pate 210g)
Nanni steae. Neenon RIMIJ
Cut btlI now OR
"A•
No has slaps shill be pbced
pin li staNkb
ea that offeet .Mica, pix,a
Hew rRok shore
of cone is bull aawnsonswen
ppw.i Nos
1 b
II pnte rn hdo to Is" 'Online
�Iwo9a.'e<a Inf en `d ,,ferns
4'_p•
s Is .,paired er one Ggmrr.
y ,w
A fill Al z $nth Mpnnde Rleps la
12"-16'
be Lead Dvwfly Below Gwx Shelia,
4
DM7E:
.Or ��
f-�"T
b am
w limn
fI. Kb-n-Feet mound,
Nag. or oPM'°wd
IbryOFoes filed
4 W.en the mantwle or notch basin
eM wrrenth
dr-b e is Oximetled oulonde
marten M all
Me travdM eadeay a wIt,,.
Q�a
saes (see ,alas
pOei rodm� elll he mottled
rl
edi
+/2 UIa of ppe
3. Pose nab c fluent eiu
Trade Nei, of wan.
n Al dog n Ahot Fixg.ort.d
on Ine had. and it
5. Prewar Thwart should be 1/2
r whop tluctihe
SW Loaadpbe it terrible depot
n' C Doom K-IL w housed.Wa 19' 7. Hntd their. what be of
Yipped P Y
Pncart who, bow
ewDYrrd
nlagrel Itn 6 a6Mion NinhiNm 'h sere of pre Wet brae
a c�mr 1V hero xh Ifi ma
ese 1' In tills1. SECTION VIEW .vat dePtn g.Yow mad l4' dan�.
CRE SANITARY SEWER OUTSIDE
DROP MANHOLE
Peal 2-ae ENGINEERING DEPARTMENT 2103
Ina NAUEc mEcs ,m
E' cone..1.1
24`xJDi" slab aporm, far NeenahR3067-V
or Squat
et,1- V Grata Mown
rN
2- YB Grates aAall be used at all low
printsNeenon
hot V casbng and
.to o qud
PLAN
Nummum Or 2 moximam of 5-2"
excrete odpatmrin ent rings with Ill
�pbest.
of moat.,.
H61+E scdius��lgt rings
-
6' precast wrifordect cw.erete, slob
Tap of berel section under top dab
2 blot MtRumndkgorsII nth
..goal.
All joints in manhole to have
varies
'O' ring rubber gaskets.
4-0 Ti-
RNdowt connote section
NOTES:
_5.
1. Dogh es shall be glouted OIL
both the Outside and m de.
2. Na block structures are oIt....
Moande steps, Neenah R19i or
equal, 16" a.c, Aluminum steps
opprowd.
4
-
dab llu 8' for 14'
depth,thidin.
depth. Increase lhcknes6 1' far
each 4' Of depth greater then 14',
and reinforce with linxii10/10 mash.
Grout bottom of maMale to 1/2
SECTION
aameter at Dow and slope
grout 2" toward Insist.
WIN I TYPICAL 4e DIAMETER
CATCH BASIN MANHOLE
Fewsm:z-m ENGINEERING DEPARTMENT P,A>E Iw 3102
sac xu£' c: c ECS 10:
J I L
Na.
I. MEGMIICS To ff L..1 / khossuICAL Joi
p. PLACE CONCItiTF MOCK UNDER ALL GATE WLY£5
No
3
YDR AT ALL LEES. aReaS ANb
A] CET AIN H
Al CERTAIN HWIS.
A
a. All NJ15. AND SXALL Be
v^SLEEVES
s A ex". TAR U W BY
A W4 GagL TAR COgT yPPUm 6Y
of ' UFACIP
IXE NANU
Dowes,F.
s. elmaNc AGAns1 uxdsluRam mlLs
TYPICAL
A
LOCAT1IONON
LOC
ENGINEERING DEPARTMENTF
N0 1009
VlL£ NYCQ RC CE IIUP
ONE EXTRA BAR W BOTTOM
A t ~I-T I� A
rI I �4
2 1- N TT TT
I 1 _ T 1
PIT
IL
L i Ili Sri-4
I
�1 TWO EXTRA BAR IN 801ION'
PLAN OF COVER
COVER MA f
K
t 27"
MANHOLE DIA.
st
DE
SECTION A -A
CQiOF MANHOLE
TOP SLAB
REASED t t0 ENGINEERING DEPARTMENT M.aE Iecr 2108
FiIE E4 XG IICE
N
BOTTOM
BARS
TOP
BARS
MANHOLE
DIAMETER
COVER
DIAMETER
WEIGHT OF
SECTION
T
48
as 5.
6
fi
54"_-
85"
2000 CBS.
B'
6'
NO. SO
ED"
2525 CBS.
6"
NO. 5a 4
N0. 3M 6-
86
79
31 5 CBS.
8
]
N0. 50 4
N0. O b
2
S74o CBS,_
B"
8
SB a
O.
JB
M03 CBS.
_
8'
6"
NO. SO 4
NQ 4
R4"
TD Le
B"
9"
N0. 'O 4
tl. 30 L
9C-
1
SB40 CBS.
e"
9"
NO. 50 4
N0. 30 4
1
8680 CBS.
NO. 30 4
I l E"
9'
]45O CBS.
8`
9
NO. 30 L
M0. 30 C
NEENN, R-..W (RATE as
Alneemll "shot
_ µWC....No RINGS 1Y)
s MA%
e, ThN% CWI is CD 1/4 YORigA sopu £H
mLtAR (m, l 1iolc45nxc RINGS R smuc'uRE.
1
CATCHBASIN (27" DIA.)
DESIGN SPECIAL 2
MORTAR Sill WIET Mntim
$PEC aged NO.
rW :
RT Buhp,'IXE TO Ctl1EIET OF
µ eTPs AT e' AST Fan, wA+s
• di be
��RECBA�xBEGIrtW
PPE -LASE OPENING s5 REQIIREC
Focul D NNRLAGE ONPEof
hNECAST a!H
Off If TYPICAL 27" DIAMETER
t�TmrPe CATCH BASIN
RM�Ep:2-to PLATE W-
ENGINEERING DEPARTMENT 3103
Flf£ DIME a: ,
V
�
of
O
M
n
w
In
■�
Lr0,4
�
GO
■
in
J
N
tT
�
N
K
N
�
Of
m
■
I..I..I
w
O
X
Z
Lai
Z
(�wI
wI
11
W
GO
N
v
I
N
f
00
CN
�.I..I
V
(T
�
Z
D_
0-
N
EL
E d
C T O i
�goE o
Q
C O
r 3 L O a
10
Cvis
O dl O
0 c w
C, a
v O cat 0
T ` a 0 � a
DOE>N,c
C
C Ts c C
0.0 aU ��
U d a J N 0
T N
y'u au a
t a 4) W 0 0 0
z
uOu
r�
AP'M
st t
A
un
Vl
Z
�
Q
W
c)
LLJ
�j
z
O
z
�
0-
{C\ `/
Y V.
z
�
1.4
��
Irr�
Z
w
Z
Of
U
LL
i�
LU
T^
Q
rirTisl
T�
�
LLJ
%
A
Q
U
U
�
N
Z
z
Q
W
WLn
z
O
IN
DRAWN BY
CJK
DATE
11/2/11
REVISIONS
CAD FILE
21996-22DU
PROJECT NO.
21996-21
6.1
noNtpafattertobe Nornotioneasoc.
N t`an`ft-3d6 /mir
-eV ocro[e
Vi{m C,ala.
A 4A
t
N
c o &W-347-tVB br 4shall be used I
R...rX Each wey
ISOMETRIC
No a.1.
Q £
` 5' Men. Transition H� 5' Min. Trarmdion Ifr
.Q chart 2 f w
Design gutter line grade" -- - _- V`,}4--60" LONG
R ban Evch way
Frame 6: (astiry
SECTION A -A
No SEATX
QAor CURB
CONSTRUCTION
man AT CATCH BASIN
R°'1-1p ENGINEERING DEPARTMENT Mh 3106
FILE xWEG c c toe
VARIABLE
�c
A
HYDRMT
VALVE BOX 6" 6'
VARY S-6'
(SEE PLANS)
1/4" PER ET.
YDRE 10�OADWAY
CURB
-r_
4' CLASS 5 BASE
2' 3' 2.5'
NM
CONCRETE SEE NOTES 1 h 3
NOTES.
i. TYPICAL 6' THICK CONCRETE SIDEWALK.
2, USE W T41M FOR COMMERICAL DRIVEWAY CROSSING.
3, JOINT SPACING AT 5' INTERVALS EXPANSION JQNT SPACING AT 100'
INTERVALS AND WHEN ABUTTING EXISTING CONCRETE OR STRUCTURE
MOF CONCRETE
SIDEWALK
Roil 1-10 ENGINEERING DEPARTMENT ' ww 5214
11LE NAWEG,NENG9PEiXi\S1A
PLAN
RIPRAP REOLIIELMLNTS NTS
SE DA. RIPRAP REWIRED GaULAR FILTER RECUIRED
TO 24' B to 12 CY CL.3 UNDER RIP RAP AND 2
EO 33' 14 to 20 CY CL3 LAYERS OF 5OUX WHAT
TO 48" 23 to 38 CY Cl FABRIC OR EWAL
AND UIR 62 CY and up CLA
to Cubic Yard Is opproxbnately 2,800 lbs.)
2' -RIPRAP
- G`Xr lar Filler (Mil 360L26;
SECTION A -A Gectexme Filler Type IR
TITS
RIPRAP
- - Grahular Filter (MMOT WOI1 28)
SECTION B-B ceplextue Filter rype III
NTS
Q110F RIP RAP
DETAIL
]-to FILE ENGINEERING DEPARTMENT NUE No,. 3107
n¢ c: xc 7
AGGREGATE BASE
MMOT SELECT GRANULAR BORROW
COURSE FILTER AGGREGATE
IIIIOOT 3149.2H
� 12' DEEP
� CLAY S
e PERFORATED PIPE
GEOTEXTILE WRAP (3733. TYPE 1)
TRENCH DETAIL
Perforated PVC, or
Duct Wo,l smooth
interior corrugated
PE pipe.
—}—
PIPE DETAIL
NOTES
1. CLEANWTS REWIRED AT 300' INTERVALS k
ALL ENDING POINTS.
2 SWING TIES TO BE SHOWN ON AS -Ell
FOR ALL ENDING POINTS TO ALL DRAINTILEi
3 OPENINGS IN STRUCTURE FOR DRAINTILE TO
BE FABRICATED OR CORE DRUM.
4 THIS DETAII TO BE USED WHEN 2' ON MORE
OF EXISTING SOII SUN CJT IS NECESSARY.
MOF 1 4e SUB -SURFACE
DRAINTILE
�D'e-09 ENGINEERING DEPARTMENT HATE no. 5232
me L. gotc sr>Ecs szrz
Sea City Plate No. 3107 for riprop placement
Tie last 3 pipe pile. -
Use 2 tie haft faatenas
per pint. Install at
I from top or bottom
of 'Fe
ISOMETRIC
NOTES.
All Reinforced Concrete Aprons sir l law f& install
ed without Trash Guurds
L. Al new Ramtpreed Cpncele Aprrns on new pipe
shall Be tied bock 3 pipe
Imgtm back froapron.
_. All newAd Concrete Aprrnfin s an eKsg pipe shall be tied to the I.rsY
pipe Adjacent
t to to the apron.
�poff 9� FLARED END SECTION
NLNam a-ro 1 ENGINEERING DEPARTMENT nATE No.. 3103
File NWeG cs be
H'JB WITH THREADED METAL PLUG
10 3E SET AT FINAL GRACE.
METAL TOR aLU^v WADE OF
IATMETAL TDETELT, R�OCATE'.
FINISHED SPACE
: KE PIECE PFC SUR,-35
GLEANOUT RISER
;SIZE AS PER PLAN)
E
SOLVANT WELD ALL .IDIN TS ON CLEAN GIi T. ;NON-GASFETEr.
2 :LEAN OUTS STALL BE SaACED AT 300' INTcR'v ALS ;MAXIM_'.I
A1q rip I SUB -SURFACE
PVC DRAINTILE
CLEANOUT
I¢v1sm: 1-to ENGINEERING DEPARTMENT Mre N0 5234
nIE NY1E:G L5 6534
TA
30'
CL
Pt.
Wew Course to be 1/2"
Above Edge of GLtter �r3oV`•
3.Ip; 2.OR°�
t' Dratnli�
4' topsol, Seed 1 1/2"-MNDOT 2350 LVWE350WB
k Mulch er Sod
D airpo Tack Cant - 2357
Spnnapnlabte 2"-MNDOT 2350 LVNW350308
Concrete Curb
12'-Gloss 5 Aggr.gote So., IOOF Cruelled
24' MMOT 314928 Select
Gr ll Bar. (gee Not. 7)
NOTES
1 Minonium Rght f way Required - 60.
2 Mn.irm..m street grade 7.DR
3 Murmum street gh.de 075%..
4 0. 0' TvF.ail laced in d'I.tarbed o..
5. 2 Rolle sod placed
lei,,
B. The btuminead wool EnHado shot oe Placea the neat construction
seoson following Po cement of the bllurldri hose
7. A the roll of . o pa city tl eu.ator. shall be performed by the owner
-n the presence of a city nat baea Tha city has the authority to re[ryre
additional tall be p correction based an Iha teat roll
B. dishu ile shall be placed along bath codes of roodwoy Sae plots 5232 for
details.
mw TYPICAL
RESIDENTIAL
STREET SECTION
FIN 1O �� ENGINEERING DEPARTMENT ii 5200
FIE RAIE:G bids,
1
NROjECT NAME
PROJECT DESCRIPTION -A 54 LOT SINGLE FAMILY
RESIDENTIAL SUBDIVISION
DEVELOPER- NAME
PHONE NUMBER
CONIACI- NAME
PHONE NUMBER
PERMITTED CONSTRUCTION HOURS-MON.-FRI.
7AM-6PM
SATURDAY
9AM-5PM
ABSOLUTELYIII NO CONSTRUCTION ACTIVITY,
MAINTENANCE OR DELIVERIES
ALLOWED ON SIIL OUISIUL
OF THESE HOURS,
CITY OF CHANHASSEN ENCCJNEMEC DEPARTMENT 952-227-1160
NOTES:
1. SIGN SHALL HAVE A MINIMUM OF TWO POSTS.
2. INSTALL SIGNS AT ALL CONSTRUCTION ENTRANCES.
3. SIGN SHALL HAVE WHITE BACKGROUND WITH
BLACK LETTERING.
4. LETTER SIZE TO FIT 8' X 6' SIGN.
m
ItFfOP DEVELOPMENT
INFO SIGN
R10 ENGINEERING DEPARTMENT �� N� 5313
Ae NAME:G C.L. S
_ Jota�s �o G_wr_ahle _
3 r Top eauminous Me".1l
maw
1.
1,7901 Cu B
Curb GrPmI
. mtl
Cc r Rfe
To, d"ta t aus Material
/2'r
ope
3/. PerI a or Fit
_-- C t Curn d ver
rra
6.. IL..-�
If_ Fcrc C e ly iL P vote D `e¢ovs,
nitro Lot, er Means
6
TOP BRumtnous Material
B"H
Lm an table
am Can, R
2b,
4'
"III' 1 1!8'r
Dhuminous
a¢
. _._.-mit,oaCurt
C Shot Form=d
OffOF
TYPICAL CURB
AND GUTTER
las>sED: 6-10
ENGINEERING DEPARTMENT
RUMS era 5203
nc xWEa VNGISIccs vc
FINISHED GRADE
WOVEN
FABRIC
IAG)
iFORATED
♦ = ; , , ♦ -lam
TWICAL RESIDENTIAL RADIUS - 20'
TWICAL COLLECTOR RADIUS - 30'
6 height
L I � 2'dro
10 long tanwLon I height rbn9 .
4' height
MNOOT 8618 CONC. C k G SURMOUNT0.BEE C k G
SECTION A -A
Imp TYPICAL CURB
RADIUS
nLwsm +-ro ENGINEERING DEPARTMENT " 5204
File Nu1Ea �EcsAa2o4
7
�Y .-
«T D2 ol"
/ � I
ii CIS R DcJ
F S AGE :Iiit�. fig AN 1 TT=R
`\ 285'52 Wl
. I ......_...
� oSJ,
6015'
CIRI,JM 4h RAUi�5�Z85.ba'/S6G --- --
�,'r O i4
STANDARD CUL-DE-SAC
Y.
um./ND. b-i RAD. 48 RAG_
kDAN SO' RAC. 455 RAC.
RURAL CO' RAC N0% RA^
DTTS ARE MEASORED TO BACK Cr
'RLRAL)
CRCOF TYPICAL
mom CUL-DE-SAC
ERF5EWME c�o cslN: 6 ENGINEERING DEPARTMENT MOH° 5205
V �
O M
W Ln
Will, ei
t9
■ N L
j O
rn
\ z GO
C14
N
W
W x
:ON
z Li
CD
Z = �
C�
coW O
V ♦
♦V o rn
N af 00
W U rn
cc
La..l
Q
Z
L O
MITI,
E
0 °)
CD
a
C T i
O - W
W
•-
C,C00 a
'
L3 R5 `S" lI1 N
Z
�00 3
0
d
..,`0im
O O 0 00
L N O
caw O U
T O N O 0 H
N- 0 E; h
T�CC.EJN
u°�CLU
0
0
N a
a0i 00 ChoO1
0 2RD 0 W to
r=-1
U0
M
ALn
'^
v`
Z
Q
H
GO
W
w
Of
z
q
O
D_
/\ 2
1. �L
z
m
1w1
ell
Fri
0
Z
�
Co
Z
LLj
�
rirTirl
O
IL
W
LLJ
%
'^
Qi=
Q
z
A
aa
=
<
Q
U
N
W
2::
�
N
Fes-{
Z
z
Q
W
W
m
Ln
z
O
H�
a
DRAWN BY
I
DATE
11/2/11
REVISIONS
CAD FILE
21996-22DU
PROJECT NO.
21996-21
6.2
Non -Scannable Item
Item
Descripdon
Folder Number
Folder Name
Job Number
Box Number
TDI<
CD-R80
700MB BOMIN
I IP To 5; . SPEED
4FI
f�S fl �NST
'PION,
EeR
�A SS
\ 00 A, R80
\ M/N
L Q
CITY OF
CHANHASSEN
7700 Markel Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phona 952.227.1100
Fax:952.227-1110
Building Inspections
Phone:952.227-1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone:952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
7901 Park Place
Phone: 952.227.1300
Fax:952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.d.chanhassen.mn.us
March 14, 2012
Mr. Mark Sonstegard
Ryland Homes
7599 Anagram Drive
Eden Prairie, MN 55344
Re: Pioneer Pass 2nd Addition Final Plat — Planning Case #10-09
Dear Mr. Sonstegard:
This letter is to confirm that on March 12, 2012, the Chanhassen City Council
approved the assessment reapportionment for Pioneer Pass 2nd Addition, the
Development Contract, Construction Plans and Specifications for Pioneer Pass 2nd
Addition, and the final plat for Pioneer Pass 2nd Addition, plans prepared by James R.
Hill, Inc., dated 11/2/11, subject to the following conditions:
1. Building Official:
a. The developer must provide street names for the two cul-de-sacs and revise
the plat and plans accordingly.
b. Developer to provide 1:200 scale plat drawing (with lot numbers, block
numbers and street names only) for addressing purposes.
c. A final grading plan and soils investigation/correction report must be
submitted to the Building Inspections Division before permits can be issued.
d. Retaining walls over four feet high require a building permit and must be
designed by a Structural Engineer registered in the State of Minnesota.
e. Each lot must be provided with separate sewer and water services.
f. The developer and/or their agent shall meet with the Inspections Division as
early as possible to discuss plan review and permit procedures.
2. Engineer:
a. The developer must continue to work with staff to resolve the grading issue in
the city park.
b. Retaining walls over four feet high require a building permit and must be
designed by a Structural Engineer registered in the State of Minnesota.
c. Retaining walls constructed with the development will be the responsibility of
the homeowners association.
Chanhassen is a Community for Life - Providing for Todayand Planning for Tomorrow
SCANNED
Mr. Mark Sonstegard
March 14, 2012
Page 2
d. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep
must be SDR 18.
e. The sanitary sewer between Lots 5 and 6, Block 1 must be installed within a steel casing
pipe.
f. A pressure -reducing valve is required within the homes with a low floor elevation of 935
feet or lower.
g. The property is subject to sanitary sewer and water hookup charges for all of the lots. A
portion of these fees will be collected with the final plat and is calculated as follows:
Partial Payment of Sanitary Sewer Hookup: 53 units x $632/unit = $33,496.00
Partial Payment of Watermain Hookup: 53 units x $1,715/unit = $90,895.00
The remainder of these hookup fees will be collected with the building permit at the rate
in effect at that time. The Met Council SAC charge will also be collected with the
building permit.
h. All of the utility improvements are required to be constructed in accordance with the
City's latest edition of Standard Specifications and Detail Plates.
i. Permits from the appropriate regulatory agencies will be required, including the MPCA,
NPDES, Dept. of Health, Carver County, MnDOT and Watershed District.
j. The owner of the exception parcels should work with MnDOT, the County and the City
to determine future access to these areas.
k. The letter of credit shall include $926,587.06 for the assessments plus interest accrued
until March 12, 2012.
The developer must include sump storm sewer manboles and SAFL baffles at Manholes
102, 107 and 114.
m. The developer must work with the City on redesign of the pond outlet.
3. Environmental Resource Specialist:
a. The applicant shall plant 343 trees within the development. Each lot shall have a
minimum of two overstory, deciduous trees planted in the yard.
b. The applicant shall be responsible for native plant restoration within the Bluff Creek
Overlay District as per the approved landscape plan. Native seed mix shall be used on all
disturbed areas within Outlots A and B. The applicant shall fully establish and maintain
the restoration area until accepted by the city.
Mr. Mark Sonstegard
March 14, 2012
Page 3
c. The applicant shall establish a native seed mix in the area below the retaining wall on lots
8-17, Blockk 1. Native seed mix is not required above the retaining wall on lots in Block
1.
4. Fire Marshal:
a. Add/relocate fire hydrants. Additional fire hydrants required in the following locations:
• Between Lots 4 and 5 on Hemlock Way.
• At the northeast quadrant of the intersection of Bluff Boulevard and Hemlock
Way.
■ Remove the hydrant between Lots 2 and 3 on Hemlock Way.
b. Water main and fire hydrants shall be installed and made serviceable prior to combustible
construction (2007 MSFC Sec. 503.1.1.).
c. A three-foot clear space shall be maintained around fire hydrants (2007 MSFC Sec.
508.5.4.).
d. Temporary street signs shall be installed as soon as construction begins. Signs shall be of
an approved size, weather resistant, and maintained until replaced by permanent signs
(2007 MSFC Sec. 505.2.).
e. Fire apparatus access roads and water supply for fire protection is required to be
installed. Such protection shall be installed and made serviceable prior to and during
time of construction except when approved alternate methods of protection are provided
(2007 MSFC Sec. 501.4.).
5. Planner:
a. The westerly lot line of Lot 20, Block 2, shall be adjusted to create the lot front on the
cul-de-sac street (Street B).
b. A 30 dBA attenuation shall be provided by the building design and construction along
with year-round climate control for the homes adjacent to the TH 212/Pioneer Trail right-
of-way.
c. The developer shall pay $13,334.00 as their portion of the 2005 AUAR for this phase of
the project.
d. Revise the construction plan title sheet Minimum City Setbacks notes as follows: Side
(House) 10 feet, delete Side (Street) 20 Feet, add Minimum House Separation 15 Feet.
6. Water Resources Coordinator:
a. All conditions for the wetland alteration permit must be met (Chapter 20 Article VI).
Mr. Mark Sonstegard
March 14, 2012
Page 4
b. Wetland buffers and setbacks shall be shown around all wetland features on or adjacent
to the subject property on the plat and grading plans (20-412).
c. Wetland buffers must be planted with native vegetation per Section 20-412.
d. SWMP fees of $67,102.62 shall be paid for this phase of the development prior to the
recording of the final plat.
e. The applicant or their agent must secure permissions from the Minnesota Department of
Transportation to discharge subcatchment area 8S to MnDOT right-of-way.
f The outlet for Pond 2 is to be moved as far west as is practical (19-144).
g. Applicant must demonstrate how the City can access Pond 2 for future maintenance.
h. Energy dissipation and soil stabilization best management practices such as ScourStopTM,
Erosion Control Blanket P42TM or similar shall be used in addition to rip -rap (18-62).
i. A SWPPP specific to this site shall be prepared and submitted to the City and Carver
SWCD (18-40).
1) The SWPPP must incorporate the requirements of Part III (Stormwater Discharge
Design Requirements), Part IV (Construction Activity Requirements) and Appendix
A for the project. A narrative describing the timing for installation of all erosion
prevention and sediment control BMPs required in Part III, Part IV and Appendix A
must also be included in the SWPPP.
j. Type 3, weed -free mulch shall be used in outlot B.
k. Inlet protection will be required on the existing CBMH at the northerly intersection of
Bluff Creek Boulevard and proposed Street A (18-62/63).
1. After the slopes are graded but before the erosion control blanket and seed is placed, the
use of silt fence with J-hooks, straw wattles, rock logs, biomll or other BMP will be
required to break up any run 75 feet or longer (18-62).
m. A detailed turf establishment plan shall be provided (19-145).
n. A note needs to be included on the plan set that top soils are to be scraped and stockpiled
and the soil stockpile area(s) need to be shown on the plan (19-145).
o. Signage for the Bluff Creek Overlay District must be posted on every other property
corner and at major lot angle changes where residential yards meet the primary zone
before final Letter Of Credit reduction.
Mr. Mark Sonstegard
March 14, 2012
Page 5
Two signed mylar copies of the final plat shall be submitted to our office for signatures. One
1 "=200' scale mylar reduction of the final plat and one 1 "=200' scale paper reduction of the final
plat with just street names and lot and block numbers shall be submitted. The executed
development contract and the required fees ($236,316.84) and security ($1,846,910.98) specified
therein shall be submitted to the City. In addition, a digital copy in .dxf format and a digital copy
in .tif format (pdf compatible) in Carver County coordinates of the final plat shall be submitted.
The City will submit all the necessary documents to Carver County for recording.
You are also reminded that you must comply with all the conditions of approval for the wetland
alteration permit and conditional use permit which were granted as part of the preliminary plat
approval. Additionally, all current year taxes must be paid in full and any delinquent property
taxes or green acres taxes must also be paid. If you have any questions, please feel free to
contact me at (952) 227-1131 or bQenerous@ci.chanhassen.mn.us.
Sine
Robert Generous, AICP
Senior Planner
ec: Kate Aanenson, Community Development Director
Alyson Fauske, Assistant City Engineer
Todd Gerhardt, City Manager
Todd Hoffman, Parks & Recreation Director
Terry Jeffery, Water Resources Coordinator
Jerry Mohn, Building Official
Paul Oehme, City Engineer
c: Peterson -Jacques Farm Land Co., LLC
Enclosure
g:\plan\2010 planning cases\I0-09 pioneer pass\pioneer pass 2nd addition\approval letter.doc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
PIONEER PASS 2ND
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
TABLE OF CONTENTS
SPECIAL PROVISIONS PAGE
1.
REQUEST FOR PLAT APPROVAL............................................................................SP-1
2.
CONDITIONS OF PLAT APPROVAL........................................................................SP-1
3.
DEVELOPMENT PLANS............................................................................................SP-1
4.
IMPROVEMENTS................................................................................... .....................
SP-2
5.
TIME OF PERFORMANCE.........................................................................................SP-2
6.
SECURITY....................................................................................................................SP-2
7.
NOTICE.........................................................................................................................SP-3
8.
OTHER SPECIAL CONDITIONS................................................................................SP-3
9.
GENERAL CONDITIONS...........................................................................................
SP-7
GENERAL CONDITIONS
1.
RIGHT TO PROCEED.................................................................................................GC-1
2.
PHASED DEVELOPMENT........................................................................................GC-1
3.
PRELIMINARY PLAT STATUS................................................................................GC-1
4.
CHANGES IN OFFICIAL CONTROLS.....................................................................GC-1
5.
IMPROVEMENTS.......................................................................................................GC-1
6.
IRON MONUMENTS..................................................................................................GC-2
7.
LICENSE......................................................................................................................GC-2
8.
SITE EROSION AND SEDIMENT CONTROL.........................................................GC-2
8A. EROSION CONTROL DURING CONSTRUCTION OF A DWELLING
OROTHER BUILDING..................................................................................GC-2
9.
CLEAN UP...................................................................................................................GC-3
10.
ACCEPTANCE AND OWNERSHIP OF IMPROVEMENTS....................................GC-3
11.
CLAIMS.......................................................................................................................GC-3
12.
PARK DEDICATION..................................................................................................GC-3
13.
LANDSCAPING..........................................................................................................GC-3
14.
WARRANTY...............................................................................................................GC-4
15.
LOTPLANS.................................................................................................................GC-4
16.
EXISTING ASSESSMENTS.......................................................................................GC-4
17.
HOOK-UP CHARGES.................................................................................................GC-4
18.
PUBLIC STREET LIGHTING.....................................................................................GC-4
19.
SIGNAGE.....................................................................................................................GC-5
20.
HOUSE PADS..............................................................................................................GC-5
21.
RESPONSIBILITY FOR COSTS................................................................................GC-5
22.
DEVELOPER'S DEFAULT.........................................................................................GC-6
22.
MISCELLANEOUS
A. Construction Trailers........................................................................................GC-6
B. Postal Service....................................................................................................GC-7
C. Third Parties......................................................................................................GC-7
D. Breach of Contract ............................................................................................GC-7
E. Severability .......................................................................................................GC-7
i
F.
Building Permits...............................................................................................GC-7
G.
Waivers/Amendments.......................................................................................GC-7
H.
Release..............................................................................................................GC-7
I.
Insurance...........................................................................................................GC-7
J.
Remedies...........................................................................................................GC-8
K.
Assignability ............................................ .........................................................
GC-8
L.
Construction Hours...........................................................................................GC-8
M.
Noise Amplification..........................................................................................GC-8
N.
Access...............................................................................................................GC-8
O.
Street Maintenance............................................................................................GC-8
P.
Storm Sewer Maintenance................................................................................GC-9
Q.
Soil Treatment Systems....................................................................................GC-9
R.
Variances...........................................................................................................GC-9
S.
Compliance with Laws, Ordinances, and Regulations.....................................GC-9
T.
Proof of Title.....................................................................................................GC-9
U.
Soil Conditions................................................................................................GC-10
V.
Soil Correction................................................................................................GC-10
W.
Haul Routes..........................................................................................................GC-10
X.
Development Signs..............................................................................................GC-10
Y.
Construction Plans...............................................................................................GC-10
Z.
As -Built Lot Surveys...........................................................................................GC-11
ii
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
PIONEER PASS 2ND ADDITION
SPECIAL PROVISIONS
AGREEMENT dated March 12, 2012 by and between the CITY OF CHANHASSEN, a
Minnesota municipal corporation (the "City"), and, The Ryland Group, Inc., a corporation under the
laws of the State of Maryland (the "Developer").
1. Request for Plat Approval The Developer has asked the City to approve a plat for
PIONEER PASS 2ND ADDITION (referred to in this Contract as the "plat"). The land is legally
described on the attached Exhibit "A".
2. Conditions of Plat Approval. The City hereby approves the plat on condition that
the Developer enter into this Contract, furnish the security required by it, and record the plat with
the County Recorder or Registrar of Titles within 30 days after the City Council approves the plat.
3. Development Plans. The plat shall be developed in accordance with the following
plans. The plans shall not be attached to this Contract. With the exception of Plan A, the plans may
be prepared, subject to City approval, after entering the Contract, but before commencement of any
work in the plat. If the plans vary from the written terms of this Contract, the written terms shall
control. The plans are:
Plan A: Final plat approved March 12, 2012, prepared by JR Hill and Associates.
Plan B: Grading, Drainage and Erosion Control Plan dated November 2, 2011, prepared by
JR Hill and Associates.
Plan C: Plans and Specifications for Improvements dated November 2, 2011, prepared by JR
Hill and Associates.
Plan D: Landscape Plan dated November 2, 2011, prepared by JR Hill and Associates.
SP-1
4. Improvements. The Developer shall install and pay for the following:
A. Sanitary Sewer System
B. Water System
C. Storm Water Drainage System
D. Streets
E. Concrete Curb and Gutter
F. Street Lights
G. Site Grading/Restoration
H. Underground Utilities (e.g. gas, electric, telephone, CATV)
I. Setting of Lot and Block Monuments
J. Surveying and Staking
K. Landscaping
L. Erosion Control
5. Time of Performance. The Developer shall install all required improvements
except for the wear course on public streets by November 15, 2012. The Developer may, however,
request an extension of time from the City Engineer. If an extension is granted, it shall be
conditioned upon updating the security posted by the Developer to reflect cost increases and the
extended completion date.
6. Security. To guarantee compliance with the terms of this Contract, payment of
special assessments, payment of the costs of all public improvements, and construction of all public
improvements, the Developer shall fin-nish the City with a letter of credit in the form attached
hereto, from a bank acceptable to the City, or cash escrow ("security") for $1,846,910.98. The
amount of the security was calculated as 110% of the following:
Sanitary Sewer $155,245.80
Watermain $113,007.50
Storm Sewer, Drainage System, including cleaning and maintenance $132,988.50
Streets $283,182.90
Sub -total, Construction Costs $684,424.70
Street lights and signs $6,400.00
Engineering, surveying, and inspection (7% of construction costs) $47,909.73
Landscaping (2% of construction costs) $13,688.49
Special assessments (to be re -assessed to the lots and outlots in the final plat) $926,587.06
Sub -total, Other Costs $994,585.28
TOTAL COST OF PUBLIC IMPROVEMENTS $1,679,009.98
SECURITY AMOUNT 110% of $1,679 009.98 $1,846,910.98
SP-2
This breakdown is for historical reference; it is not a restriction on the use of the security. The
security shall be subject to the approval of the City. The City may draw down the security, without
notice, for any violation of the terms of this Contract. If the required public improvements are not
completed at least thirty (30) days prior to the expiration of the security, the City may also draw it
down. If the security is drawn down, the draw shall be used to cure the default. With City approval,
the security may be reduced from time to time as financial obligations are paid, but in no case shall
the security be reduced to a point less than 10% of the original amount until (1) all improvements
have been completed, (2) iron monuments for lot comers have been installed, (3) all financial
obligations to the City satisfied, (4) the required "record" plans have been received by the City, (5) a
warranty security is provided, and (6) the public improvements are accepted by the City.
7. Notice. Required notices to the Developer shall be in writing, and shall be either
hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered
mail at the following address:
Mark Sonstegard
The Ryland Group, hrc.
7599 Anagram Drive
Eden Prairie MN 55344
Phone: 952-229-6000
Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or
mailed to the City by certified mail in care of the City Manager at the following address:
Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, Minnesota 55317,
Telephone (952) 227-1100.
8. Other Special Conditions.
A. SECURITIES AND FEES
A $1,846,910.98 letter of credit or escrow for the developer -installed improvements, the
$236,316.84 cash administration fee and the fully -executed development contract must
be submitted and shall be submitted prior to scheduling a pre -construction meeting.
2. The $236,316.84 cash fee was calculated as follows:
Administration Fee $ 18,688.49
AUAR Fee $ 13,334.00
Street Lighting Charge (for electricity), 6 lights at $300.00 $ 1,800.00
Final Plat Process (attorney and recording fees) $ 450.00
GIS fee, $25 (plat) + 53 parcels x $10/parcel $ 555.00
Surface Water Management Fee $ 77,098.35
Partial Sewer Hookup Fee, 53 units x $632/unit $ 33,496.00
Partial Water Hookup Fee, 53 units x $1,715/unit $ 90,895.00
$ 236,316.84
SP-3
B. PLANNING DEPARTMENT CONDITIONS OF APPROVAL
1. The westerly lot line of Lot 20, Block 2, shall be adjusted to create the lot front on the
cul-de-sac street (Street B).
2. A 30 dBA attenuation shall be provided by the building design and construction along
with year-round climate control for the homes adjacent to the TH 212/Pioneer Trail right-
of-way.
3. The developer shall pay $13,334.00 as their portion of the 2005 AUAR for this phase of
the project.
4. Revise the construction plan title sheet Minimum City Setbacks notes as follows: Side
(House) 10 feet, delete Side (Street) 20 Feet, add Minimum House Separation 15 Feet.
C. ENGINEERING DEPARTMENT CONDITIONS OF APPROVAL
The developer must continue to work with staff to resolve the grading issue in the city
park.
2. Retaining walls over four feet high require a building permit and must be designed by a
Structural Engineer registered in the State of Minnesota.
3. Retaining walls constructed with the development shall be owned and maintained by the
homeowners association.
4. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep
must be SDR 18.
5. The sanitary sewer between Lots 5 and 6, Block 1 must be installed within a steel casing
pipe.
6. A pressure reducing valve is required within the homes with a low floor elevation of 935
feet or lower.
7. The property is subject to sanitary sewer and water hookup charges for all of the lots. A
portion of these fees will be collected with the final plat and is calculated as follows:
Partial Payment of Sanitary Sewer Hookup: 53 units x $632/unit = $33,496.00
Partial Payment of Watermain Hookup: 53 units x $1,715/unit = $90,895.00
The remainder of these hookup fees will be collected with the building permit at the rate
in effect at that time. The Met Council SAC charge will also be collected with the
building permit.
SP-4
8. All of the utility improvements are required to be constructed in accordance with the
City's latest edition of Standard Specifications and Detail Plates.
9. Permits from the appropriate regulatory agencies will be required, including the MPCA,
NPDES, Dept. of Health, Carver County, MnDOT and Watershed District.
10. The owner of the exception parcels should work with MnDOT, the County and the City
to determine future access to these areas.
I I. The letter of credit shall include $926,587.06 for the assessments plus interest accrued
until March 12, 2012.
12. The developer must include sump storm sewer manholes and SAFL baffles at Manholes
102, 107 and 114.
D. WATER RESOURCES COORDINATOR CONDMONS OF APPROVAL
1. All conditions for the wetland alteration permit must he met (Chapter 20 Article VI).
2. Wetland buffers and setbacks shall be shown around all wetland features on or adjacent
to the subject property on the plat and grading plans (20-412).
3. Wetland buffers must be planted with native vegetation per Section 20-412.
4. SWMP fees of $67,102.62 shall be paid for this phase of the development prior to the
recording of the final plat.
5. The applicant or their agent must secure permissions from the Minnesota Department of
Transportation to discharge subcatchment area 8S to MnDOT right-of-way.
6. The outlet for Pond 2 is to be moved as far west as is practical (19-144).
7. Applicant must demonstrate how the City can access Pond 2 for future maintenance.
8. Energy dissipation and soil stabilization best management practices such as ScourStoprm,
Erosion Control Blanket P42T11 or similar shall be used in addition to rip -rap (18-62).
9. A SWPPP specific to this site shall be prepared and submitted to the City and Carver
SWCD (18-40).
a) The SWPPP must incorporate the requirements of Part IH (Stormwater Discharge
Design Requirements), Part IV (Construction Activity Requirements) and
Appendix A for the project. A narrative describing the timing for installation of
all erosion prevention and sediment control BMPs required in Part IH, Part IV and
Appendix A must also be included in the SWPPP.
SP-5
10. Type 3, weed -free mulch shall be used in Outlot B.
11. Inlet protection will be required on the existing CBMH at the northerly intersection of
Bluff Creek Boulevard and proposed Street A (18-62/63).
12. After the slopes are graded but before the erosion control blanket and seed is placed, the
use of silt fence with J-hooks, straw wattles, rock logs, bioroll or other BMP will be
required to break up any run 75 feet or longer (18-62).
13. A detailed turf establishment plan shall be provided (19-145).
14. A note needs to be included on the plan set that top soils are to be scraped and stockpiled
and the soil stockpile area(s) need to be shown on the plan (19-145).
15. Signage for the Bluff Creek Overlay District must be posted on every other property
corner and at major lot angle changes where residential yards meet the primary zone
before final Letter Of Credit reduction.
E. ENVIRONMENTAL RESOURCES COORDINATOR CONDMONS OF APPROVAL
1. The applicant shall plant 343 trees within the development. Each lot shall have a
minimum of two overstory, deciduous trees planted in the yard.
2. The applicant shall be responsible for native plant restoration within the Bluff Creek
Overlay District as per the approved landscape plan. Native seed mix shall be used on all
disturbed areas within Outlots A and B. The applicant shall fully establish and maintain
the restoration area until accepted by the city.
3. The applicant shall establish a native seed mix in the area below the retaining wall on lots
8-17, Blockk 1. Native seed mix is not required above the retaining wall on lots in Block
1.
F. BUILDING OFFICIAL CONDffIONS OF APPROVAL
1. Submit street names (streets A and B) to Fire Marshal and Building Official for review
and approval. Currently not shown on revised plans received 11.9.11. The developer
must provide street names for the two cul-de-sacs and revise the plat and plans
accordingly.
2. Developer to provide 1:200 scale plat drawing (with lot numbers, block numbers and
street names only) for addressing purposes.
3. A final grading plan and soils investigation/correction report must be submitted to the
Building Inspections Division before permits can be issued.
4. Retaining walls over four feet high require a building permit and must be designed by a
Structural Engineer registered in the State of Minnesota.
5. Each lot must be provided with separate sewer and water services.
6. The developer and/or their agent shall meet with the Inspections Division as early as
possible to discuss plan review and permit procedures.
G. FIRE MARSHAL CONDITIONS OF APPROVAL
1. Add/relocate fire hydrants. Additional fire hydrants required in the following locations.
a. Between Lots 4 and 5 on Hemlock Way.
b. At the northeast quadrant of the intersection of Bluff Creek Blvd. and Hemlock
Way.
c. Remove the hydrant between Lots 2 and 3 on Hemlock Way.
2. Water main and fire hydrants shall be installed and made serviceable prior to combustible
construction (2007 MSFC Sec. 503.1.1.).
3. A three-foot clear space shall be maintained around fire hydrants (2007 MSFC Sec.
508.5.4.).
4. Temporary street signs shall be installed as soon as construction begins. Signs shall be of
an approved size, weather resistant, and maintained until replaced by permanent signs
(2007 MSFC Sec. 505.2.).
5. Fire apparatus access roads and water supply for fire protection is required to be
installed. Such protection shall be installed and made serviceable prior to and during
time of construction except when approved alternate methods of protection are provided
(2007 MSFC Sec. 501.4.).
9. General Conditions. The general conditions of this Contract are attached as
Exhibit 'B" and incorporated herein.
SP-7
CITY OF CHANHASSEN
Im
(SEAL)
AND:
Thomas A. Furlong, Mayor
Todd Gerhardt, City Manager
THE RYLAND GROUP, INC:
1:IV
Printed Name:
Title:
STATE OF MINNESOTA )
(ss.
COUNTY OF CARVER )
The foregoing instrument was acknowledged before me this _ day of
2011, by Thomas A. Furlong, Mayor, and by Todd Gerhardt, City Manager, of the City of
Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the
authority granted by its City Council.
NOTARY PUBLIC
STATE OF )
(ss.
COUNTY OF
The foregoing instrument was acknowledged before me this _ day of
20, by I the of The Ryland Group, Inc., a
Corporation under the laws of the State of Maryland, on behalf of the corporation.
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
(952)227-1100
NOTARY PUBLIC
4W
EXHIBIT "A"
TO
DEVELOPMENT CONTRACT
LEGAL DESCRIPTION OF SUBJECT PROPERTY:
Outlot C, Pioneer Pass.
MORTGAGE HOLDER CONSENT
TO
DEVELOPMENT CONTRACT
which holds a mortgage on the subject property, the development of which is governed by the
foregoing Development Contract, agrees that the Development Contract shall remain in full force
and effect even if it forecloses on its mortgage.
Dated this _ day of 20_.
STATE OF MINNESOTA )
(ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of
20_, by
NOTARY PUBLIC
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
(952)227-1100
FEE OWNER CONSENT
TO
DEVELOPMENT CONTRACT
fee owners of all or part of the subject property, the development of which is governed by the
foregoing Development Contract, affirm and consent to the provisions thereof and agree to be
bound by the provisions as the same may apply to that portion of the subject property owned by
them.
Dated this day of 20_.
STATE OF MINNESOTA )
(ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of
20_, by
NOTARY PUBLIC
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
(952)227-1100
IRREVOCABLE LETTER OF CREDIT
No. _
Date:
TO: City of Chanhassen
7700 Market Boulevard, Box 147
Chanhassen, Minnesota 55317
Dear Sir or Madam
We hereby issue, for the account of (Name of Developer) and in your favor, our
Irrevocable Letter of Credit in the amount of $7 available to you by your draft drawn on sight
on the undersigned bank.
The draft must:
a) Bear the clause, "Drawn under Letter of Credit No. dated
2, of IName of Bank) "
b) Be signed by the Mayor or City Manager of the City of Chanhassen.
c) Be presented for payment at (Address of Bank) on or before 4:00 p.m on November 30,
2
This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty-
five (45) days prior to the next annual renewal date (which shall be November 30 of each year), the Bank
delivers written notice to the Chanhassen City Manager that it intends to modify the terms of, or cancel, this
Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the
U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed as follows:
Chanhassen City Manager, Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, MN
55317, and is actually received by the City Manager at least thirty (30) days prior to the renewal date.
This Letter of Credit sets forth in full our understanding which shall not in any way be modified,
amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not
referred to herein.
This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one drew
may be made under this Letter of Credit.
This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and
Practice for Documentary Credits, International Chamber of Commerce Publication No. 500.
We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly
honored upon presentation.
10
Its
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
EXI]MIT "B"
1. Right to Proceed. Within the plat or land to be platted, the Developer may not
grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets,
utilities, public or private improvements, or any buildings until all the following conditions have
been satisfied: 1) this agreement has been fully executed by both parties and filed with the City
Clerk, 2) the necessary security and fees have been received by the City, 3) the plat has been
recorded with the County Recorder's Office or Registrar of Title's Office of the County where the
plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been
satisfied and then the Developer may proceed
2. Phased Development. If the plat is a phase of a multiphased preliminary plat, the
City may refuse to approve final plats of subsequent phases if the Developer has breached this
Contract and the breach has not been remedied Development of subsequent phases may not
proceed until Development Contracts for such phases are approved by the City. Park charges and
area charges for sewer and water referred to in this Contract are not being imposed on outlots, if
any, in the plat that are designated in an approved preliminary plat for future subdivision into lots
and blocks. Such charges will be calculated and imposed when the outlots are final platted into lots
and blocks.
3. Preliminary Plat Status. If the plat is a phase of a multi -phased preliminary plat,
the preliminary plat approval for all phases not final platted shall lapse and be void unless final
platted into lots and blocks, not outlots, within two (2) years after preliminary plat approval.
4. Changes in Official Controls. For two (2) years from the date of this Contract, no
amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current
urban service area, or official controls shall apply to or affect the use, development density, lot size,
lot layout or dedications of the approved plat unless required by state or federal law or agreed to in
writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the
contrary, to the full extent permitted by state law the City may require compliance with any
amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements
enacted after the date of this Contract.
5. Improvements. The improvements specified in the Special Provisions of this
Contract shall be installed in accordance with City standards, ordinances, and plans and
specifications which have been prepared and signed by a competent registered professional engineer
furnished to the City and approved by the City Engineer. The Developer shall obtain all necessary
GC-1
Permits from the Metropolitan Council Environmental Services and other pertinent agencies before
Proceeding with construction. The City will, at the Developer's expense, have one or more
construction inspectors and a soil engineer inspect the work on a full or part-time basis. The
Developer shall also provide a qualified inspector to perform site inspections on a daily basis.
Inspector qualifications shall be submitted in writing to the City Engineer. The Developer shall
instruct its project engineer/inspector to respond to questions from the City Inspector(s) and to make
periodic site visits to satisfy that the construction is being performed to an acceptable level of
quality in accordance with the engineer's design. The Developer or his engineer shall schedule a
preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties
concerned, including the City staff, to review the program for the construction work
6. Iron Monuments. Before the security for the completion of utilities is released, all
monuments must be correctly placed in the ground in accordance with Minn. Stat § 505.02, Subd.
1. The Developer's surveyor shall submit a written notice to the City certifying that the monuments
have been installed
7. License. The Developer hereby grants the City, its agents, employees, officers and
contractors a license to enter the plat to perform all work and inspections deemed appropriate by the
City in conjunction with plat development.
8. Site Erosion and Sediment Control. Before the site is rough graded, and before
any utility construction is commenced or building permits are issued, the erosion and sediment
control plan, Plan B, shall be implemented, inspected, and approved by the City. The City may
impose additional erosion and sediment control requirements if they would be beneficial. All areas
disturbed by the excavation and backfilling operations shall be reseeded forthwith after the
completion of the work in that area Except as otherwise provided in the erosion and sediment
control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as possible.
All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The
parties recognize that time is of the essence in controlling erosion and sediment transport. If the
Developer does not comply with the erosion and sediment control plan and schedule of
supplementary instructions received from the City, the City may take such action as it deems
appropriate to control erosion and sediment transport at the Developer's expense. The City will
endeavor to notify the Developer at least 24 hours in advance of any proposed action, but failure of
the City to do so will not affect the Developer's and City's rights or obligations hereunder. No
development will be allowed and no building permits will be issued unless the plat is in full
compliance with the erosion and sediment control requirements. Erosion and sediment control
needs to be maintained until vegetative cover has been restored, even if construction has been
completed and accepted After the site has been stabilized to where, in the opinion of the City, there
is no longer a need for erosion and sediment control, the City will authorize the removal of the
erosion and sediment control, i.e. hay bales and silt fence. The Developer shall remove and dispose
of the erosion and sediment control measures.
8a. Erosion Control During Construction of a Dwelling or Other Building. Before
a building permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash
GC-2
escrow or letter of credit per lot shall also be furnished to the City to guarantee compliance with
City Code § 7-22.
9. Clean up. The Developer shall maintain a neat and orderly work site and shall daily
clean, on and off site, dirt and debris, including blowables, from streets and the surrounding area
that has resulted from construction work by the Developer, its agents or assigns.
10. Acceptance and Ownership of Improvements. Upon completion and acceptance
by the City of the work and construction required by this Contract, the improvements lying within
public easements shall become City property. After completion of the improvements, a
representative of the contractor, and a representative of the Developer's engineer will make a final
inspection of the work with the City Engineer. Before the City accepts the improvements, the City
Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved
plans and specifications and the Developer and his engineer shall submit a written statement to the
City Engineer certifying that the project has been completed in accordance with the approved plans
and specifications. The appropriate contractor waivers shall also be provided Final acceptance of
the public improvements shall be by City Council resolution.
11. Claims. In the event that the City receives claims from laborers, materialmen, or
others that work required by this Contract has been performed, the sums due them have not been
paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees
posted with the City, and if the claims are not resolved at least ninety (90) days before the security
required by this Contract will expire, the Developer hereby authorizes the City to commence an
Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts,
to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in
compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and
dismiss the City from any farther proceedings as it pertains to the letters of credit deposited with the
District Court, except that the Court shall retain jurisdiction to determine attorneys' fees.
12. Park Dedication. The City acknowledges that the Developer has heretofore
completed all required park land dedication in connection with development of the plat.
13. Landscaping. Landscaping shall be installed in accordance with Plan D. Unless
otherwise approved by the City, trees not listed in the City's approved tree list are prohibited The
minimum tree size shall be two and one-half (2'/z) inches caliper, either bare root in season, or
balled and burlapped. The trees may not be planted in the boulevard (area between curb and
property line). In addition to any sod required as a part of the erosion and sediment control plan,
Plan B, the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each
lot utilizing a minimum of four (4) inches of topsoil as a base. Seed or sod shall also be placed on
all disturbed areas of the lot. If these improvements are not in place at the time a certificate of
occupancy is requested, a financial guarantee of $750.00 in the form of cash or letter of credit shall
be provided to the City. These conditions must then be complied with within two (2) months after
the certificate of occupancy issued, except that if the certificate of occupancy is issued between
October 1 through May 1 these conditions must be complied with by the following July 1st. Upon
expiration of the time period, inspections will be conducted by City staff to verify satisfactory
GC-3
completion of all conditions. City staff will conduct inspections of incomplete items with a $50.00
inspection fee deducted from the escrow fund for each inspection. After satisfactory inspection, the
financial guarantee shall be returned If the requirements are not satisfied, the City may use the
security to satisfy the requirements. The City may also use the escrowed fimds for maintenance of
erosion control pursuant to City Code Section 7-22 or to satisfy any other requirements of this
Contract or of City ordinances. These requirements supplement, but do not replace, specific
landscaping conditions that may have been required by the City Council for project approval.
14. Warranty. The Developer wan -ants all improvements required to be constructed by
it pursuant to this Contract against poor material and faulty workmanship in accordance with the
terms and for the time periods provided below. The Developer shall submit either 1) a
warranty/maintenance bond for 100°/u of the cost of the improvement, or 2) a letter of credit for
twenty-five percent (25%) of the amount of the original cost of the improvements.
A. The required warranty period for materials and workmanship for the utility
contractor installing public sewer and water mains shall be two (2) years from the date of final
written City acceptance of the work.
B. The required warranty period for all work relating to street construction, including
concrete curb and gutter, sidewalks and trails, materials and equipment shall be subject to two (2)
years from the date of final written acceptance.
C. The required warranty period for sod, trees, and landscaping is one full growing
season following acceptance by the City.
15. Lot Plans. Prior to the issuance of building permits, an acceptable Grading,
Drainage, Erosion Control including silt fences, and Tree Removal Plan shall be submitted for each
lot for review and approval by the City Engineer. Each plan shall assure that drainage is maintained
away from buildings and that tree removal is consistent with development plans and City
Ordinance.
16. Existing Assessments. Any existing assessments against the plat will be re -spread
against the plat in accordance with City standards.
17. Hook-up Charges. At the time of final plat approval the Developer shall pay
30% of the City Sewer Hook-up charge and 30% of the City Water hook up charge for each lot
in the plat in the amount specified in Special Provision, Paragraph 8, of this Development
Contract. The balance of the hook-up charges is collected at the time building permits are issued
are based on 70% of the rates then in effect, unless a written request is made to assess the costs
over a four year term at the rates in effect at time of application.
18. Public Street Lighting. The Developer shall have installed and pay for public street
lights in accordance with City standards. The public street lights shall be accepted for City
ownership and maintenance at the same time that the public street is accepted for ownership and
GC-4
maintenance. A plan shall be submitted for the City Engineer's approval prior to the installation.
Before the City signs the final plat, the Developer shall pay the City a fee of $300.00 for each street
light installed in the plat. The fee shall be used by the City for famishing electricity and
maintaining each public street light for twenty (20) months.
19. Signage. All street signs, traffic signs, and wetland monumentation required by the
City as a part of the plat shall be famished and installed by the City at the sole expense of the
Developer.
20. House Pads. The Developer shall promptly furnish the City "as -built" plans
indicating the amount, type and limits of fill on any house pad location.
21. Responsibility for Costs.
A. The Developer shall pay an administrative fee, in the amount set forth in Section
8.A.(2) hereof in conjunction with the installation of the plat improvements. This fee is to cover the
cost of City Staff time and overhead for items such as review of construction documents,
preparation of the Development Contract, monitoring construction progress, processing pay
requests, processing security reductions, and final acceptance of improvements. This fee does not
cover the City's cost for construction inspections. The fee shall be calculated as follows:
i) if the cost of the construction of public improvements is less than $500,000,
three percent (3%) of construction costs;
ii) if the cost of the construction of public improvements is between $500,000
and $1,000,000, three percent (3°/u) of construction costs for the first
$500,000 and two percent (2%) of construction costs over $500,000;
iii) if the cost of the construction of public improvements is over $1,000,000, two
and one-half percent (2%2%) of construction costs for the fast $1,000,000 and
one and one-half percent (1'/2°/u) of construction costs over $1,000,000.
Before the City signs the final plat, the Developer shall deposit with the City a fee based upon
construction estimates. After construction is completed, the final fee shall be determined based
upon actual construction costs. The cost of public improvements is defined in paragraph 6 of the
Special Provisions.
B. In addition to the administrative fee, the Developer shall reimburse the City for
all costs incurred by the City for providing construction and erosion and sediment control
inspections at the CiWs customary hourly rates. This cost will be periodically billed directly to the
Developer based on the actual progress of the construction. Payment shall be due in accordance
with Article 21E of this Agreement.
C. Except for any claims arising out of the negligence or misconduct by the City, its
agents, employees or contractors, the Developer shall hold the City and its officers and employees
GC-5
harmless from claims made by itself and third parties for damages sustained or costs incurred
resulting from plat approval and development. The Developer shall indemnify the City and its
officers and employees for all costs, damages, or expenses which the City may pay or incur in
consequence of such claims, including reasonable attorneys' fees.
D. In addition to the administrative fee, the Developer shall reimburse the City for
costs incurred in the enforcement of this Contract, including engineering and attorneys' fees.
E. The Developer shall pay in full all bills submitted to it by the City for obligations
incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time,
the City may halt all plat development work and construction, including but not limited to the
issuance of building permits for lots which the Developer may or may not have sold, until the bills
are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of 8% per year.
F. In addition to the charges and special assessments referred to herein, other
charges and special assessments may be imposed such as, but not limited to, sewer availability
charges ("SAC"), City water connection charges, City sewer connection charges, and building
permit fees.
G. Private Utilities. The Developer shall have installed and pay for the installation
of electrical, natural gas, telephone, and cable television service in conjunction with the overall
development improvements. These services shall be provided in accordance with each of the
respective franchise agreements held with the City.
H. The developer shall pay the City a fee established by City Council resolution,
to reimburse the City for the cost of updating the City's base maps, GIS data base files, and
converting the plat and record drawings into an electronic format. Record drawings must be
submitted within four months of final acceptance of public utilities. All digital information
submitted to the City shall be in the Carver County Coordinate system.
22. Developer's Default. In the event of default by the Developer as to any of the work
to be performed by it hereunder, the City may, at its option, perform the work and the Developer
shall promptly reimburse the City for any expense incurred by the City, provided the Developer is
first given notice of the work in default, not less than fifteen (15) days in advance. This Contract is
a license for the City to act, and it shall not be necessary for the City to seek a Court order for
permission to enter the land. When the City does any such work, the City may, in addition to its
other remedies, assess the cost in whole or in part.
23. Miscellaneous.
A. Construction Trailers. Placement of on -site construction trailers and temporary
job site offices shall be approved by the City Engineer as a part of the pre -construction meeting for
installation of public improvements. Trailers shall be removed from the subject property within
thirty (30) days following the acceptance of the public improvements unless otherwise approved by
the City Engineer.
GC-6
B. Postal Service. The Developer shall provide for the maintenance of postal
service in accordance with the local Postmaster's request.
C. Third Parties. Third parties shall have no recourse against the City under this
Contract. The City is not a guarantor of the Developer's obligations under this Contract. The City
shall have no responsibility or liability to lot purchasers or others for the City's failure to enforce
this Contract or for allowing deviations from it.
D. Breach of Contract. Breach of the terms of this Contract by the Developer shall
be grounds for denial of building permits, including lots sold to third parties. The City may also
issue a stop work order halting all plat development until the breach has been cured and the City has
received satisfactory assurance that the breach will not reoccur.
E. Severability. If any portion, section, subsection, sentence, clause, paragraph, or
phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of
the remaining portion of this Contract.
F. Building Permits. Building permits will not be issued in the plat until sanitary
sewer, watetmam, and storm sewer have been installed, tested, and accepted by the City, and the
streets needed for access have been paved with a bituminous surface and the site graded and
revegetated in accordance with Plan B of the development plans.
G. Waivers/Amendments. The action or inaction of the City shall not constitute a
waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers
shall be in writing, signed by the parties and approved by written resolution of the City Council.
The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or
release.
H. Release. This Contract shall run with the land and may be recorded against the
title to the property. After the Developer has completed the work required of it under this Contract,
at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the
issuance of such a certificate, individual lot owners may make as written request for a certificate
applicable to an individual lot allowing a minimum of ten (10) days for processing.
I. Insurance. Developer shall take out and maintain until six (6) months after the
City has accepted the public improvements, public liability and property damage insurance covering
personal injury, including death, and claims for property damage which may arise out of
Developer's work or the work of its subcontractors or by one directly or indirectly employed by any
of them. Limits for bodily injury and death shall be not less than $500,000 for one person and
$1,000,000 for each occurrence; limits for property damage shall be not less than $500,000 for each
occurrence; or a combination single limit policy of $1,000,000 or more. The Cityshall benamed as
an additional insured on the policy, and the Developer shall file with the City a certificate
evidencing coverage prior to the City signing the plat. The certificate shall provide that the City
must be given ten (10) days advance written notice of the cancellation of the insurance. The
certificate may not contain any disclaimer for faihne to give the required notice.
GC-7
I Remedies. Each right, power or remedy herein conferred upon the City is
cumulative and in addition to every other right, power or remedy, expressed or implied, now or
hereafter arising, available to City, at law or in equity, or under any other agreement, and each and
every right, power and remedy herein set forth or otherwise so existing may be exercised from time
to time as often and in such order as may be deemed expedient by the City and shall not be a waiver
of the right to exercise at any time thereafter any other right, power or remedy.
K. Assignability. The Developer may not assign this Contract without the written
percussion of the City Council. The Developer's obligation hereunder shall continue in full force
and effect even if the Developer sells one or more lots, the entire plat, or any part of it.
L. Construction Hours. Construction hours, including pick-up and deliveries of
material and equipment and the operation of any internal combustion engine, may only occur from
7:00 am. to 6:00 p.m. on weekdays, from 9:00 am. to 5:00 p.m. on Saturdays with no such activity
allowed on Sundays or on legal holidays. Contractors must require their subcontractors, agents
and supplies to comply with these requirements and the Contractor is responsible for their failure to
do so. Under emergency conditions, this limitation may be waived by the written consent of the City
Engineer. If construction occurs outside of the permitted construction hours, the Contractor shall
pay the following administrative penalties:
First violation $ 500.00
Second violation $ 1,000.00
Third & subsequent violations All site development and construction must
cease for seven (7) calendar days
M. Noise Amplification. The use of outdoor loudspeakers, bullhorns, intercoms,
and similar devices is prohibited in conjunction with the construction of homes, buildings, and the
improvements required under this contract. The administrative penalty for violation of construction
hours shall also apply to violation of the provisions in this paragraph.
N. Access. All access to the plat prior to the City accepting the roadway
improvements shall be the responsibility of the Developer regardless if the City has issued building
permits or occupancy permits for lots within the plat.
O. Street Maintenance. The Developer shall be responsible for all street
maintenance (other than the snow plowing, which shall be the City's responsibility once the first lift
of asphalt has been installed) until streets within the plat are accepted by the City. Waming signs
shall be placed by the Developer when hazards develop in streets to prevent the public from
traveling on same and directing attention to detours. If streets become impassable, the City may
order that such streets shall be barricaded and closed The Developer shall maintain a smooth
roadway surface and provide proper surface drainage. The Developer may request, in writing, that
the City plow snow on the streets prior to final acceptance of the streets. The City shall have
complete discretion to approve or reject the request. The City shall not be responsible for reshaping
GC-8
or damage to the street base or utilities because of snow plowing operations. The provision of City
snow plowing service does not constitute final acceptance of the streets by the City.
P. Storm Sewer Maintenance. The Developer shall be responsible for cleaning and
maintenance of the storm sewer system (including ponds, pipes, catch basins, culverts and swales)
within the plat and the adjacent off -site storm sewer system that receives storm water from the plat.
The Developer shall follow all instructions it receives from the City concerning the cleaning and
maintenance of the storm sewer system. The Developer's obligations under this paragraph shall end
two (2) years after the public street and storm drainage improvements in the plat have been accepted
by the City. Twenty percent (20%) of the storm sewer costs, shown under section 6 of the special
provisions of this contract, will be held by the City for the duration of the 2-year maintenance
period.
Q. Soil Treatment Systems. If soil treatment systems are required, the Developer
shall clearly identify in the field and protect from alteration, unless suitable alternative sites are first
provided, the two soil treatment sites identified during the platting process for each lot. This shall
be done prior to the issuance of a Grading Permit. Any violation/disturbance of these sites shall
render them as unacceptable and replacement sites will need to be located for each violated site in
order to obtain a building permit.
R. Variances. By approving the plat, the Developer represents that all lots in the
plat are buildable without the need for variances from the Citys ordinances.
S. Compliance with Laws. Ordinances. and Regulations. In the development of the
plat the Developer shall comply with all laws, ordinances, and regulations of the following
authorities:
1. City of Chanhassen;
2. State of Minnesota, its agencies, departments and commissions;
3. United States Army Corps of Engineers;
4. Watershed District(s);
5. Metropolitan Government, its agencies, departments and commissions.
T. Proof of Title. Upon request, the Developer shall famish the City with evidence
satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to
enter into this Development Contract.
U. Soil Conditions. The Developer acknowledges that the City makes no
representations or warranties as to the condition of the soils on the property or its fitness for
construction of the improvements or any other purpose for which the Developer may make use of
such property. The Developer further agrees that it will indemnify, defend, and hold harmless the
City, its governing body members, officers, and employees from any claims or actions arising out of
the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or
pollutants were caused to be there by the City.
GC-9
V. Soil Correction. The Developer shall be responsible for soil correction work on
the property. The City makes no representation to the Developer concerning the nature of
suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots
which have no fill material a soils report from a qualified soils engineer is not required unless the
City's building inspection department determines from observation that there may be a soils
problem. On lots with fill material that have been mass graded as part of a multi -lot grading project,
a satisfactory soils report from a qualified soils engineer shall be provided before the City issues a
building permit for the lot. On lots with fill material that have been custom graded, a satisfactory
soils report from a qualified soils engineer shall be provided before the City inspects the foundation
for a building on the lot.
W. Haul Routes. The Developer, the Developer's contractors or subcontractors
must submit proposed haul routes for the import or export of soil, construction material,
construction equipment or construction debris, or any other purpose. All haul routes must be
approved by the City Engineer
X. Development Siggs. The Developer shall post a six foot by eight foot
development sign in accordance with City Detail Plate No. 5313 at each entrance to the project.
The sign shall be in place before construction of the required improvements commences and
shall be removed when the required improvements are completed, except for the final lift of
asphalt on streets. The signs shall contain the following information: project name, name of
developer, developer's telephone number and designated contact person, allowed construction
hours.
Y. Construction Plans. Upon final plat approval, the developer shall provide the
City with two complete sets of full-size construction plans and four sets of 11"x17" reduced
construction plan sets and three sets of specifications. Within four months after the completion of
the utility improvements and base course pavement and before the security is released, the
Developer shall supply the City with the following. (1) a complete set of reproducible Mylar
as -built plans, (2) two complete full-size sets of blue linalpaper as -built plans, (3) two complete sets
of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) location stationing
and swing ties of all utility stubs including draintile cleanouts, (6) bench mark network, (7) digital
file of as -built plans in both .dxf & .tif format (the .dxf file must be tied to the current county
coordinate system), (8) digital file of utility tie sheets in either .doc or .tif format, and (9) a
breakdown of lineal footage of all utilities installed, including the per lineal foot bid price. The
Developer is required to submit the final plat in electronic format.
Z. As -Built Lot Surveys. An as -built lot survey will be required on all lots prior to
the Certificate of Occupancy being issued. The as -built lot survey must be prepared, signed, and
dated by a Registered Land Surveyor. Sod and the bituminous driveways must be installed before
the as -built survey is completed If the weather conditions at the time of the as -built are not
conducive to paving the driveway and/or installing sod, a temporary Certificate of Occupancy may
be issued and the as -built escrow withheld until all work is complete.
Rev. 3/31/06
GC-10
CITY OF
CHANBASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone:952.227,1100
Fax: 952,227.1110
Building Inspections
Phone:952.227.1180
Fax:952.227.1190
Engineering
Phone:952.227.1160
Fax:952.227.1170
MEMORANDUM
TO: Todd Gerhardt, City Manager
FROM: Bob Generous, Senior Planner
DATE: March 12, 2012 OW, ,
SUBJ: Final Plat for Pioneer Pass 2"d Addition, Planning Case #2010-09
PROPOSED MOTION
"City Council approves the final plat for Pioneer Pass 2"d Addition creating 53
lots and right-of-way for public streets subject to the conditions of the staff
report."
City Council approval requires a majority vote of City Council present.
PROPOSAL/SUMMARY
Finance
Phone: 952,227.1140
The applicant is requesting final plat approval for the second phase of Pioneer Pass,
Fax:952.227.1110
which includes 53 single-family lots and right-of-way for public streets including the
Park & Recreation
extension of Hemlock Way from its current termination point to Bluff Creek
Phone: 952.227.1120
Boulevard. The entire development includes 94 single-family lots (see preliminary
Fax:952.227.1110
plat below).
Recreation Center
2310 Coulter Boulevard
Phone:952.227.1400
Fax:952,227.1404
Planning &
Natural Resources
Phone:952,227.1130
Fax:952.227.1110
Public Works
7901 Park Place
Phone:952.227.1300
Fax:952.227.1310
Senior Center
Phone:952.227.1125
Fax:952.227.1110
Web Site
www.ci.chanhassen.mn.us
Staff is recommending approval of the final plat for Pioneer Pass 2"d Addition subject
to the conditions of the staff report.
BACKGROUND
On September 26, 2011, the Chanhassen City
Council approved Addendum A to the Development
Contract; and approved Plans & Specifications for
mass grading for Pioneer Pass Phase Il.
On September 13, 2010, the Chanhassen City
Council approved the final plat for Pioneer Pass
creating 41 single-family lots, a neighborhood park,
right-of-way for public streets including the
extension of Bluff Creek Drive from Bluff Creek
Boulevard to Pioneer Trail, an oudot for access to
the property to the east (Outlot A), and outlots for
future development (Outlot C), a public park (Outlot
E), stormwater ponds (Oudot D) and the Bluff Creek
primary corridor (Outlot B).
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Todd Gerhardt
Pioneer Pass 2nd Addition Final Plat
March 12, 2012
Page 2 of 20
On July 12, 2010, the Chanhassen City Council approved the
Preliminary Plat creating 94 lots, 4 outlots and right-of-way for public
streets; a Conditional Use Permit for development within the Bluff
Creek Overlay District with a Variance for encroachment into the
Primary Zone for the construction of a stormwater pond; an Interim
Use Permit to allow site grading prior to final plat approval; and a
Wetland Alteration Permit for the grading and filling of wetlands on
site.
On September 25, 2006, the Chanhassen City Council approved the Final
Plat for Pioneer Pass (Planning Case #06-09). However, the plat was
never recorded nor was the development contract executed. The project
was, therefore, voided.
On April 24, 2006, the Chanhassen City Council approved the following:
Comprehensive plan Land Use Amendment from Residential — Medium Density and
Office/industrial to Residential - Low Density of the land within the Plat of Pioneer Pass except
for outlots within the Bluff Creek primary zone contingent on Metropolitan Council review.
(The Metropolitan Council subsequently reviewed the amendment and found it in conformance
with the metropolitan system plans, consistent with the Regional Development Framework and
that it has no impacts on the plans of other units of government.)
Rezoning of the land within the Plat for Pioneer Pass except for Outlots A, B, C, D and G,
Pioneer Pass, from Agricultural Estate District, A2, to Residential Low and Medium Density
District, RLM. (Ordinance #425)
The developer is requesting final plat approval, Pioneer
Pass 2"d Addition, to create 53 single-family lots as part of
the 94-lot Pioneer Pass development. In this phase, the
city park will be final graded and the development will
have city streets, sewer and water constructed for the north
half of the project.
The property is zoned Residential Low and Medium
Density District, RLM, and is guided for residential low -
density development. The proposed development is
consistent with the zoning and land use for the property.
It should be noted on the Pioneer Pass 2"d Addition
construction plans Title sheet that the required minimum
side setback (house) is 10 feet, not 5 feet. Street setbacks are 25 feet with no exception for side
(street) setback. In such instances, the lot has two front and two side setbacks. The minimum
separation between houses is 15 feet.
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 3 of 20
GRADING
The grading and retaining wall construction for this phase is being completed under Addendum
A to the Pioneer Pass development contract, approved by the City Council on September 26,
2011. The grading done under Addendum A is covered by the security posted with the first
addition.
Material from the 2"d Addition final plat area was placed in the city park on the west side of
Bluff Creek Boulevard. The park property was not graded according to the approved plan due to
placement of additional fill. Staff is working with the developer and the developer's engineer to
resolve this issue.
Trunk sanitary sewer and watermain to serve the proposed
development were constructed with the 2005 MUSA
Expansion Improvements, City Project 04-05. Lateral
sanitary sewer within the development will extend from
the existing trunk facilities within Bluff Creek Boulevard.
Due to the grade variation within the site, some segments
of the sanitary sewer will exceed 16 feet in depth. Sanitary
sewer that is 16 to 26 feet deep must be SDR 26; sewer in
excess of 26 feet deep must be SDR 18.
In order to minimize the depth of the pipe, lateral sanitary
sewer will extend from Bluff Creek Boulevard, through
Outlot B of the first addition, through the back of Lots 3-5,
Block 1, and through the side yard of Lots 5 and 6, Block 1
to Hemlock Way. The pipe between Lots 5 and 6 is
between 20.6' and 28.7' deep. If the pipe needed to be
repaired in the future, traditional open cut method would
47-kft F
not be possible due to the proximity of the homes;
therefore, this sewer segment must be installed within a steel casing pipe.
Lateral watermain will extend from the existing eight -inch stub off of the trunk watermain within
Bluff Creek Boulevard and the existing lateral within the first phase.
The property is subject to sanitary sewer and water hookup charges for all of the lots. A portion
of these fees will be collected with the final plat and is calculated as follows:
Partial Payment of Sanitary Sewer Hookup: 53 units x $632/unit = $33,496.00
Partial Payment of Watermain Hookup: 53 units x $1,715/unit = $90,895.00
The remainder of these hookup fees will be collected with the building permit at the rate in effect
at that time. The Met Council SAC charge will also be collected with the building permit.
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 4 of 20
The developer will be responsible for extending lateral sewer and water service to the lots;
therefore, the sanitary sewer and water connection charges do not apply.
All of the utility improvements are required to be constructed in accordance with the City's latest
edition of Standard Specifications and Detail Plates. Permits from the appropriate regulatory
agencies will be required, including the MPCA, NPDES, Dept. of Health, Carver County,
MnDOT and Watershed District.
STREETS
The developer proposes to extend Hemlock Way from the existing terminus in the first phase to
Bluff Creek Boulevard, and construct two cul-de-sacs. The developer must provide street names
for the two cul-de-sacs and revise the plat and plans accordingly. All public streets shall be 31
feet wide within a 60-foot wide right-of-way.
The Arterial Collector Roadway Fee will be waived since the developer constructed Bluff Creek
Drive (a collector road) with the first phase improvements.
On September 13, 2010, the City Council approved the reapportionment of three assessments on
the parent parcel of the Pioneer Pass development. The deferred assessments (with interest
calculated to December 12, 2011) applicable to this phase are summarized as follows:
1. 2005 MUSA Area Expansion: $185,974.48
2. Bluff Creek Boulevard Improvements: $624,065.46
3. Highways 101 and 212/Lyman Boulevard improvements: $116,547.12
The $926,587.06 in assessments and interest will be apportioned to the lots and blocks within the
Pioneer Pass 2nd final plat. Staff proposes to reapportion this assessment as follows:
$926,587.06 _ 53 units = $17,482.78/unit
These assessments are for 7 years at 6% interest. Reapportionment of the assessment requires a
City Council resolution. The letter of credit will include $926,587.06 for the assessments within
the Pioneer Pass 2"d Addition plat.
COMPLIANCE TABLE
Areas . ft.)
Width ft.
Depth(ft.)
Notes
Code
(RLM
District)
9,000
50
110
Setbacks: Front-25% side-5' (garage
side), 10' (house side); rear-25', Bluff
Creek Prima -40' ; Coverage: 35%
Ll Bl
18,504
90
206
Comer lot, Bluff Creek Primary Zone
L2 B 1
13,460
80
185
Bluff Creek Primary Zone
L3 B 1
12,242
71
166
Bluff Creek Primary Zone
L4 B1
11,710
70
155
Bluff Creek Primary Zone
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 5 of 20
Areas . ft.
Width ft.
Depth (ft.)
Notes
Code
(RLM
District
9,000
50
110
Setbacks: Front-25'; side-5' (garage
side), 10' (house side); rear-25', Bluff
Creek Prima -40' ; Coverage: 35%
L5 Bl
13,355
71
158
Bluff Creek Primary Zone
L6 Bl
16,619
68
178
Bluff Creek Primary Zone
L7 B 1
20,252
68
210
Bluff Creek Primary Zone
L8 B1
18,753
68
197
Bluff Creek Primary Zone
L9 Bl
12,167
71
163
Bluff Creek Primary Zone
L10B1
11,605
86
158 1
Bluff Creek Primary Zone
1-11 Bl
11,359
85
156
Bluff Creek Primary Zone
L12 Bl
11,326
86
153
Bluff Creek Primary Zone
L13B1
11,501
86
160
Bluff Creek Primary Zone
L14B1
13,791
70
181
Bluff Creek Primary Zone
L 15 B 1
16,668
67
191
Bluff Creek Primary Zone
L16 BI
13,728
67
173
Bluff Creek Primary Zone
L17 Bl
12,517
67
159
Bluff Creek Primary Zone
L18 Bl
12,976
67
164
Bluff Creek Primary Zone
L19B1
13,297
67
162
Bluff Creek Primary Zone
L20 B 1
11,685
67
150
Bluff Creek Primary Zone
Ll B2
13,449
90
149
Corner lot
L2 B2
11,018
69
145
L3 B2
10,613
80
144
L4 B2
10,670
79
142
L5 B2
16,950
201
116
L6 B2
10,773
83
120
L7 B2
10,178
97
128
L8 B2
10,225
77
139
L9 B2
10,946
93
136
L10 B2
11,714
53
139
LI1 B2
17,483
46
142
L12 B2
13,391
46 @
146
L13 B2
18,974
46 @
166
L14 B2
19,240
46
161
L15 B2
11,493
102
145
L16 B2
9,912
71
135
L 17 B2
9,426
68
125
L18 B2
9,275
68
123
L19 B2
13,223
80
138
1 Comer lot
L20 B2
12,877
122
102 #
Corner lot
L21 B2
10,652
90
142
L22 B2
10,570
74
146
L23 B2
10,109
79
138
L24 B2
1 13,665
50
146
L25 B2
1 20,740
46 @
152
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 6 of 20
Areas . ft.
Width(ft.)
Depth ft.
Notes
Code
(RLM
District)
9,000
50
110
Setbacks: Front-25'; side-5' (garage
side),10' (house side); rear-25', Bluff
Creek Prima -40' ; Coverage: 35%
L26 132
14,233
46 @
149
L27 B2
13,246
46 @
142
L28 B2
9,840
72
134
L29 B2
10,723
73
147
L30 B2
10,614
72
146
L31 B2
9,906
72
137
L32 B2
10,617
64
131
L33 B2
13,200
77
145
Corner Lot
Right -of-
Way
135,540
3.116 acres
TOTAL
823,000
53 Lots and public streets on 18.89
acres
@ Meets the minimum 50 width at the building setback line.
# Westerly lot line must be adjusted to create the lot front on the cul-de-sac street. By definition
on a comer lot, the lot line that is shortest (121.69' vs. 121.95') is classified as the front. (Note:
This revision may slightly alter the lot areas for lots 20 and 21.)
REVIEW CONDITIONS OF APPROVAL
The preliminary plat for Pioneer Pass creating 94 lots, 4 outlots and right-of-way for public streets,
plans prepared by James R. Hill dated June 4, 2010, was approved subject to the following
conditions:
1. Building Official:
a. The developer must submit a list of proposed street names for review and approval prior
to final plat of the property.
*This condition shall be modified as follows: The developer must provide street
names for the two cul-de-sacs and revise the plat and plans accordingly.
b. Developer to provide 1:200 scale plat drawing (with lot numbers, block numbers and
street names only) for addressing purposes.
*This condition still applies.
c. Demolition permits must be obtained before demolishing any existing structures.
*This condition does not apply.
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 7 of 20
d. A final grading plan and soils investigation/correction report must be submitted to the
Building Inspections Division before permits can be issued.
*This condition still applies.
e. Retaining walls over four feet high require a building permit and must be designed by a
Structural Engineer registered in the State of Minnesota.
*This condition still applies.
f. Each lot must be provided with separate sewer and water services.
*This condition still applies.
g. The developer and/or their agent shall meet with the Inspections Division as early as
possible to discuss plan review and permit procedures.
*This condition still applies.
2. Engineer:
a. The developer must coordinate the proposed grading within the Liberty on Bluff Creek
property and the restoration with the homeowners association.
*This condition no longer applies.
b. The developer must obtain approval to complete the off -site grading required to construct
a collector road - Bluff Creek Drive - to Pioneer Trail.
*This condition has been met.
c. If importing or exporting material for development of the site is necessary, the applicant
will be required to supply the City with detailed haul routes.
*This condition shall be modified as follows: The developer must continue to work
with staff to resolve the grading issue in the city park.
d. Additional catch basins will be required along Street A. The number and location will be
determined with the final plat submittal.
*This condition has been met.
e. The developer's engineer must work with City staff to improve the proposed drainage
patterns at the back of Lots 11 through 14, Block 2.
*This condition has been met.
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 8 of 20
A drain tile service stub must be provided for any lot that drains from the back to the
front.
*This condition does not apply to this addition.
g. The low floor elevations of Lots 33 to 35, Block 1 must be adjusted so that they are a
minimum of three feet above the high water level of the adjacent pond.
*This condition has been met.
h. Verify the first floor elevation of Lots 1 through 3, Block 1.
*This condition no longer applies.
i. Retaining walls over four feet high require a building permit and must be designed by a
Structural Engineer registered in the State of Minnesota.
*This condition still applies.
j. Retaining walls constructed with the development will be the responsibility of the
homeowners association.
*This condition still applies.
k. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep
must be SDR 18.
*This condition still applies.
The sanitary sewer between Lots 5 and 6, Block 1 must be installed within a steel casing
pipe.
*This condition still applies.
in. The developer will install 12-inch trunk watermain within Bluff Creek Drive. The City
will reimburse the developer the cost difference between 8-inch lateral and 12-inch trunk
watermain.
*This condition has been met.
n. A water service stub must be installed for the park area at a location acceptable to the
Parks and Recreation Director.
*This condition has been met.
Todd Gerhardt
Pioneer Pass 2nd Addition Final Plat
March 12, 2012
Page 9 of 20
o. A pressure reducing valve is required within the homes with a low floor elevation of 935
feet or lower.
*This condition still applies.
p. The developer shall install a pressure reducing valve vault in the southern portion of
Bluff Creek Drive. The City will determine the location and design of the vault in
conjunction with the final plat design. The developer will be reimbursed for the cost of
the vault.
*This condition has been met.
q. The property is subject to sanitary sewer and water hookup charges for all of the lots.
The 2010 Met Council SAC charge is $2,175 per unit. The City's 2010 trunk utility
hookup fees are $2,026 per unit for sanitary sewer and $5,393 per unit for water. A
portion of the trunk utility hookup fees will be collected with the final plat: For 2010, the
portion collected with the development contract is $1,418/unit of the sanitary sewer
hookup fee and $3,775/unit of the water hookup fee.
*The condition shall be revised as follows:
The property is subject to sanitary sewer and water hookup charges for all of the
lots. A portion of these fees will be collected with the final plat and is calculated as
follows:
Partial Payment of Sanitary Sewer Hookup: 53 units x $632/unit = $33,496.00
Partial Payment of Watermain Hookup: 53 units x $1,715/unit = $90,895.00
The remainder of these hookup fees will be collected with the building permit at the
rate in effect at that time. The Met Council SAC charge will also be collected with
the building permit.
r. All of the utility improvements are required to be constructed in accordance with the
City's latest edition of Standard Specifications and Detail Plates.
*This condition still applies.
s. Permits from the appropriate regulatory agencies will be required, including the MPCA,
NPDES, Dept. of Health, Carver County, MnDOT and Watershed District.
*This condition still applies.
t. Prior to final plat approval, the City and the developer must work with MnDOT to obtain
the necessary approvals and/or agreements necessary to construct the portion of Bluff
Creek Drive that will lie within the MnDOT right of way.
*This condition has been met.
Todd Gerhardt
Pioneer Pass 2nd Addition Final Plat
March 12, 2012
Page 10 of 20
u. The grade of the public streets must be adjusted so that they do not exceed 8%.
*This condition has been met.
v. The owner of the exception parcels should work with MnDOT, the County and the City
to determine future access to these areas.
*This condition still applies.
w. The assessments shall be reapportioned according to the City Council resolution. Each
lot within the Pioneer Pass final plat will be subject to a $16,313.55assessment over 7
years at 6% interest for the 2005 MUSA improvements and Highways 101/212 and
Lyman Boulevard improvements.
*This condition shall be revised as follows: The letter of credit shall include
$926,587.06 for the assessments plus interest accrued until March 12, 2012.
x. Outlot C will be subject to a $864,617.90 assessment for the 2005 MUSA improvements
and Highways 101/212 and Lyman Boulevard improvements.
*This condition no longer applies.
Based on review of the construction plans for the second phase of the development, staff is
recommending that the following conditions be added:
The developer must include sump storm sewer manholes and SAFL baffles at Manholes
102, 107 and 114.
The developer must work with the City on redesign of the pond outlet.
3. Environmental Resource Specialist:
a. The applicant shall plant 343 trees within the development. Each lot shall have a
minimum of two overstory, deciduous trees planted in the front yard.
*This condition shall be modified as follows: The applicant shall plant 343 trees
within the development. Each lot shall have a minimum of two overstory, deciduous
trees planted in the yard.
b. The applicant shall install the total required bufferyard along Bluff Creek Boulevard and
Outlot C.
*This condition has been met.
c. The applicant shall develop a restoration plan including native plants for the Bluff Creek
Overlay district north of Block 1. The plant species shall be selected from the Bluff
Todd Gerhardt
Pioneer Pass 2Id Addition Final Plat
March 12, 2012
Page 11 of 20
Creek Management Plan Appendix C. The final plan must be reviewed and approved by
the City before installation.
*This condition shall be modified as follows: The applicant shall be responsible for
native plant restoration within the Bluff Creek Overlay District as per the approved
landscape plan. Native seed mix shall be used on all disturbed areas within Outlots
A and B. The applicant shall fully establish and maintain the restoration area until
accepted by the city.
d. Lots 13, 14,25 and 26, Block 2 shall receive an increased number of evergreen plantings
to shield the properties from oncoming traffic headlights.
*This condition has been met.
e. The applicant shall revise the landscape plan to show more variation in boulevard
plantings. No more than 10 trees of a species may be grouped together.
*This condition has been met.
f. Tree protection fencing shall be installed prior to construction around all areas designated
for preservation and/or at the edge of proposed grading limits.
*This condition has been met.
g. No burning permits shall be issued for tree removal. All trees removed on site shall be
chipped and used on site or hauled off.
*This condition has been met.
Based on review of the plans, staff is recommending that the following condition be added:
The applicant shall establish a native seed mix in the area below the retaining wall on lots
8-17, Block 1. Native seed mix is not required above the retaining wall on lots in Block
1.
4. Fire Marshal:
a. Additional fire hydrants will be required and some will need to be relocated. Contact the
Fire Marshal for which hydrants are in question.
*This condition shall be modified as follows: Add/relocate fire hydrants.
Additional fire hydrants are required in the following locations:
• Between Lots 4 and 5 on Hemlock Way.
• At the northeast quadrant of the intersection of Bluff Creek Blvd. and
Hemlock Way.
• Remove the hydrant between Lots 2 and 3 on Hemlock Way.
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 12 of 20
b. Water main and fire hydrants shall be installed and made serviceable prior to combustible
construction (2007 MSFC Sec. 503.1.1.).
*This condition still applies.
c. A three-foot clear space shall be maintained around fire hydrants (2007 MSFC Sec.
508.5.4.).
*This condition still applies.
d. Temporary street signs shall be installed as soon as construction begins. Signs shall be of
an approved size, weather resistant, and maintained until replaced by permanent signs
(2007 MSFC Sec. 505.2.).
*This condition still applies.
e. Fire apparatus access roads and water supply for fire protection is required to be
installed. Such protection shall be installed and made serviceable prior to and during
time of construction except when approved alternate methods of protection are provided
(2007 MSFC Sec. 501.4.).
*This condition still applies.
5. Park Director:
a. Successful transfer of Outlot C (8.7+ acres) to the City of Chanhassen through a
combination of dedication and fee purchase for development and use as a neighborhood
park.
*This condition has been met.
b. Extension of trail (west side of road) and sidewalk (east side of road) paralleling the
planned connector street south to their respective connection points at the intersection of
Pioneer Trail and Bluff Creek Drive.
*This condition has been met.
c. Install a sidewalk on Street D from Street A to Bluff Creek Drive.
*This condition has been met.
6. Planner:
a. Lot 20, Block 2, shall be adjusted to meet minimum 110 feet of lot depth.
Todd Gerhardt
Pioneer Pass 2W Addition Final Plat
March 12, 2012
Page 13 of 20
*This condition shall be modified as follows: The westerly lot line of Lot 20, Block
2, shall be adjusted to create the lot front on the cul-de-sac street (Street B).
b. A 30 dBA attenuation shall be provided by the building design and construction along
with year-round climate control for the homes adjacent to the TH 212/Pioneer Trail right-
of-way.
*This condition still applies.
c. The developer shall pay $23,649.00 as their portion of the 2005 AUAR.
*This condition shall be modified as follows since 43.6 percent (41 lots/94 lots) of the
project were developed with the first phase and the proportionate amount of fee
paid ($10,315.00) and the balance of the project is included in this phase: The
developer shall pay $13,334.00 as their portion of the 2005 AUAR for this phase of
the project.
d. The property owner may donate Outlots A and B to the City, or if retained under private
ownership, dedicate a roadway/trail easement and drainage and utility easement over
Oudot A, and conservation easement, trail easement and a drainage and utility easement
over Outlot B.
*This condition has been met.
Based on review of the construction plans, staff is recommending the following condition be
added:
Revise the construction plan title sheet Minimum City Setbacks notes as follows: Side
(House) 10 feet, delete Side (Street) 20 Feet, add Minimum House Separation 15 Feet.
7. Water Resources Coordinator:
a. The HydroCAD model shall be revised to accurately reflect the post -development soil
conditions or evidence shall be provided that soils post development will have a water
transmission rate between 0.15 and 0.30 in/hr.
*This condition has been met.
b. All conditions for the wetland alteration permit must be met (Chapter 20 Article VI).
*This condition still applies.
c. Wetland I, as delineated by Graham Environmental Services, Inc., needs to be shown on
Sheet 1.2 and other applicable plan sheets.
*This condition has been met.
Todd Gerhardt
Pioneer Pass 2nd Addition Final Plat
March 12, 2012
Page 14 of 20
d. Wetland buffers and setbacks shall be shown around all wetland features on or adjacent
to the subject property on the plat and grading plans (20-412).
*This condition still applies.
e. Where, if at all, the buffer encroaches onto a private lot, a drainage and utility easement
is required (20-412).
*This condition has been met.
f. Wetland buffers must be planted with native vegetation per Section 20-412.
*This condition still applies.
g. Make the Soil Boring report available to the City (18-40).
*This condition has been met.
h. SWMP fees, estimated at $119,830.52, will be due to the City at final plat (4-30).
*This condition shall be modified as follows: SWMP fees of $67,102.62 shall be paid
for this phase of the development prior to the recording of the final plat.
i. The applicant or their agent must secure permissions from the Minnesota Department of
Transportation to discharge subcatchment area 8S to MnDOT right-of-way.
*This condition still applies.
As stated in Section 18-40(4)2v, Drain tile service must be provided to any lots where
drainage is directed from back to front. This condition exists along Street B between lots
16 & 17 as well as lots 18 & 19. Because of the presence of Hamel loam, a soil with a
known seasonally high water table less than one foot below the surface, drain tile shall be
extended from Lot 12 to the CBMH in front of Lot 19 of Block 2. Drain tile is also
encouraged in front of lots 1, 2, 3, 41 and 42 of Block 3, and Lots 1, 2 and 3 of Block 2.
The soil boring report will be beneficial in making this determination (18-40).
*This condition has been met.
k. The swale between Street B and Street C must be within a drainage and utility easement.
Care should be taken to design the grading so that surface drainage from Street C isn't
directed into the residences along Street B (18-76).
*This condition has been met.
1. The outlet for Pond 2 is to be moved as far west as is practical (19-144).
*This condition still applies.
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 15 of 20
m. Applicant must demonstrate how the City can access Pond 2 for future maintenance.
*This condition still applies.
n. The outlet for Pond 6 is to be moved so that the discharge point is approximately 75 feet
from the proposed location. Energy dissipation and soil stabilization best management
practices such as ScourStopTrm, Erosion Control Blanket P42TM or similar shall be used in
addition to rip -rap (18-62).
*This condition shall be modified as follows: Energy dissipation and soil
stabilization best management practices such as ScourStolirm, Erosion Control
Blanket P42Tm or similar shall be used in addition to rip -rap (18-62).
o. A SWPPP specific to this site shall be prepared and submitted to the City and Carver
SWCD (18-40).
*This condition shall be modified as follows: A SWPPP specific to this site shall be
prepared and submitted to the City and Carver SWCD (18-40).
1) The SWPPP must incorporate the requirements of Part III (Stormwater
Discharge Design Requirements), Part IV (Construction Activity Requirements)
and Appendix A for the project. A narrative describing the timing for
installation of all erosion prevention and sediment control BMPs required in
Part III, Part IV and Appendix A must also be included in the SWPPP.
p. Areas where proposed and existing grades are to be matched shall be done so that no
concentrated flow conditions are created. These areas include, but are not necessarily
limited to, the backyard of Lot 7, Block 1, the backyards of Lots 1 and 2 of Block 1 and
adjacent to the extension of Bluff Creek Boulevard at the intersection with Pioneer Trail
(I8-62).
*This condition has been met.
q. Type 3, weed -free mulch shall be used in outlot B.
*This condition is still applicable.
r. Inlet protection will be required on the existing CBMH at the northerly intersection of
Bluff Creek Boulevard and proposed Street A (18-62/63).
*This condition still applies.
s. A note shall be included on sheets 3.2, 3.3 and 3.4 indicating that inlet protection will be
required on all backyard CB until final stabilization is achieved.
*This condition has been met.
Todd Gerhardt
Pioneer Pass 2nd Addition Final Plat
March 12, 2012
Page 16 of 20
t. After the slopes are graded but before the erosion control blanket and seed is placed, the
use of silt fence with J-hooks, straw wattles, rock logs, bioroll or other BMP will be
required to break up any run 75 feet or longer (18-62).
*This condition still applies.
u. Bluff Creek needs to be identified on the plan set and the S WPPP and erosion plans must
clearly indicate that it is an impaired water for turbidity and that no discharge of
untreated water will be allowed to the creek or to the fringe wetland (19-145).
*This condition has been met.
v. A detailed turf establishment plan shall be provided (19-145).
*This condition still applies.
w. A note needs to be included on the plan set that top soils are to be scraped and stockpiled
and the soil stockpile area(s) need to be shown on the plan (19-145).
*This condition still applies.
x. Signage for the Bluff Creek Overlay District must be posted on every other property
corner and at major lot angle changes where residential yards meet the primary zone.
*This condition shall be amended as follows: Signage for the Bluff Creek Overlay
District must be posted on every other property corner and at major lot angle
changes where residential yards meet the primary zone before final Letter Of Credit
reduction.
RECOMMENDATION
Staff recommends that the City Council approve the final plat for Pioneer Pass 2"d Addition,
plans prepared by James R. Hill, Inc., dated 11/2/11, subject to the following conditions:
1. Building Official:
a. The developer must provide street names for the two cul-de-sacs and revise the plat and
plans accordingly.
b. Developer to provide 1:200 scale plat drawing (with lot numbers, block numbers and
street names only) for addressing purposes.
c. A final grading plan and soils investigation/correction report must be submitted to the
Building Inspections Division before permits can be issued.
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 17 of 20
d. Retaining walls over four feet high require a building permit and must be designed by a
Structural Engineer registered in the State of Minnesota.
e. Each lot must be provided with separate sewer and water services.
f. The developer and/or their agent shall meet with the Inspections Division as early as
possible to discuss plan review and permit procedures.
2. Engineer:
a. The developer must continue to work with staff to resolve the grading issue in the city
park.
b. Retaining walls over four feet high require a building permit and must be designed by a
Structural Engineer registered in the State of Minnesota.
c. Retaining walls constructed with the development will be the responsibility of the
homeowners association.
d. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep
must be SDR 18.
e. The sanitary sewer between Lots 5 and 6, Block 1 must be installed within a steel casing
pipe.
f. A pressure -reducing valve is required within the homes with a low floor elevation of 935
feet or lower.
b. The property is subject to sanitary sewer and water hookup charges for all of the lots. A
portion of these fees will be collected with the final plat and is calculated as follows:
Partial Payment of Sanitary Sewer Hookup: 53 units x $632/unit = $33,496.00
Partial Payment of Watermain Hookup: 53 units x $1,715/unit = $90,895.00
The remainder of these hookup fees will be collected with the building permit at the rate
in effect at that time. The Met Council SAC charge will also be collected with the
building permit.
h. All of the utility improvements are required to be constructed in accordance with the
City's latest edition of Standard Specifications and Detail Plates.
i. Permits from the appropriate regulatory agencies will be required, including the MPCA,
NPDES, Dept. of Health, Carver County, MnDOT and Watershed District.
j. The owner of the exception parcels should work with MnDOT, the County and the City
to determine future access to these areas.
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 18 of 20
k. The letter of credit shall include $926,587.06 for the assessments plus interest accrued
until March 12, 2012.
1. The developer must include sump storm sewer manholes and SAFL baffles at Manholes
102, 107 and 114.
m. The developer must work with the City on redesign of the pond outlet.
3. Environmental Resource Specialist:
a. The applicant shall plant 343 trees within the development. Each lot shall have a
minimum of two overstory, deciduous trees planted in the yard.
b. The applicant shall be responsible for native plant restoration within the Bluff Creek
Overlay District as per the approved landscape plan. Native seed mix shall be used on all
disturbed areas within Outlots A and B. The applicant shall fully establish and maintain
the restoration area until accepted by the city.
c. The applicant shall establish a native seed mix in the area below the retaining wall on lots
8-17, Blockk 1. Native seed mix is not required above the retaining wall on lots in Block
1.
4. Fire Marshal:
a. Add/relocate fire hydrants. Additional fire hydrants required in the following locations:
■ Between Lots 4 and 5 on Hemlock Way.
• At the northeast quadrant of the intersection of Bluff Boulevard and Hemlock
Way.
■ Remove the hydrant between Lots 2 and 3 on Hemlock Way.
b. Water main and fire hydrants shall be installed and made serviceable prior to combustible
construction (2007 MSFC Sec. 503.1.1.).
c. A three-foot clear space shall be maintained around fire hydrants (2007 MSFC Sec.
508.5.4.).
d. Temporary street signs shall be installed as soon as construction begins. Signs shall be of
an approved size, weather resistant, and maintained until replaced by permanent signs
(2007 MSFC Sec. 505.2.).
e. Fire apparatus access roads and water supply for fire protection is required to be
installed. Such protection shall be installed and made serviceable prior to and during
time of construction except when approved alternate methods of protection are provided
(2007 MSFC Sec. 501.4.).
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 19 of 20
5. Planner:
a. The westerly lot line of Lot 20, Block 2, shall be adjusted to create the lot front on the
cul-de-sac street (Street B).
b. A 30 dBA attenuation shall be provided by the building design and construction along
with year-round climate control for the homes adjacent to the TH 212/Pioneer Trail right-
of-way.
c. The developer shall pay $13,334.00 as their portion of the 2005 AUAR for this phase of
the project.
d. Revise the construction plan title sheet Minimum City Setbacks notes as follows: Side
(House) 10 feet, delete Side (Street) 20 Feet, add Minimum House Separation 15 Feet.
6. Water Resources Coordinator:
a. All conditions for the wetland alteration permit must be met (Chapter 20 Article VI).
b. Wetland buffers and setbacks shall be shown around all wetland features on or adjacent
to the subject property on the plat and grading plans (20-412).
c. Wetland buffers must be planted with native vegetation per Section 20-412.
d. SWMP fees of $67,102.62 shall be paid for this phase of the development prior to the
recording of the final plat.
e. The applicant or their agent must secure permissions from the Minnesota Department of
Transportation to discharge subcatchment area 8S to MnDOT right-of-way.
f. The outlet for Pond 2 is to be moved as far west as is practical (19-144).
g. Applicant must demonstrate how the City can access Pond 2 for future maintenance.
h. Energy dissipation and soil stabilization best management practices such as ScourStoprm,
Erosion Control Blanket P42TM or similar shall be used in addition to rip -rap (18-62).
i. A SWPPP specific to this site shall be prepared and submitted to the City and Carver
SWCD (1840).
1) The SWPPP must incorporate the requirements of Part III (Stormwater Discharge
Design Requirements), Part IV (Construction Activity Requirements) and Appendix
A for the project. A narrative describing the timing for installation of all erosion
prevention and sediment control BMPs required in Part III, Part IV and Appendix A
must also be included in the SWPPP.
Todd Gerhardt
Pioneer Pass 2"d Addition Final Plat
March 12, 2012
Page 20 of 20
j. Type 3, weed -free mulch shall be used in outlot B.
k. Inlet protection will be required on the existing CBMH at the northerly intersection of
Bluff Creek Boulevard and proposed Street A (18-62/63).
1. After the slopes are graded but before the erosion control blanket and seed is placed, the
use of silt fence with J-hooks, straw wattles, rock logs, bioroll or other BMP will be
required to break up any run 75 feet or longer (18-62).
m. A detailed turf establishment plan shall be provided (19-145).
n. A note needs to be included on the plan set that top soils are to be scraped and stockpiled
and the soil stockpile area(s) need to be shown on the plan (19-145).
o. Signage for the Bluff Creek Overlay District must be posted on every other property
corner and at major lot angle changes where residential yards meet the primary zone
before final Letter Of Credit reduction.
ATTACHMENTS
1. Development Review Application,
2. Reduced Copy Pioneer Pass 2"d Addition Plat.
3. Reduced Copy Pioneer Pass 2"d Addition Final Sanitary Sewer, Watermain, Storm Sewer,
Street Construction & Erosion & Sediment Control Plan (14 pages).
g:\plan\2010 planning cases\10-09 pioneer pass\pioneer pass 2nd addition\final plat 2nd add staff report.doc
MIN I
CITY OF CHANHASSEN41
7700 Market Boulevard - P.O. Box 147
Chanhassen, MN 55317 - (952) 227-1100
DEVELOPMENT REVIEW APPLICATION
and Address:
P tin, R2-Al ter c , ..•r.J 5S . •14
Contact: 444y__ so m,rsz.Atd
Phone: 9S2•Zzf.Goo7 Fax: fSL.2Z9.Ga
Email: MsonsFe����t�•�-I
Planning Case No. I (� - G ` i
Property Owner Name and Address:
PGTB.esotif Mtn e,%ob La.-pa,pg,,
12 M+V
a= 7
Contact: �rwr P
Phone: 6tz.Vo. ovf Fax:
Email: fi k �leA a5ur10ra4/d.y(Csr+P
NOTE: Consultation with City staff is required prior to submittal, including review of development
plans
Comprehensive Plan Amendment
Conditional Use Permit (CUP)
Interim Use Permit (IUP)
Non -conforming Use Permit
Planned Unit Development*
Rezoning
Sign Permits
Sign Plan Review
Site Plan Review (SPR)*
_ Subdivision* - FiN44- k f--
Temporary Sales Permit
Vacation of Right-of-Way/Easements (VAC)
(Additional recording fees may apply(
Variance (VAR)
Wetland Alteration Permit (WAP)
Zoning Appeal
Zoning Ordinance Amendment
Notification Sign - $200
(City to install and remove)
x Escrow for Filing Fees/Attomey Cost*
- $50 CUP/SPRNACNAR/WAP/Metes & Bounds
- $450 Minor SUB
TOTAL FEE $,CSC)`
An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant
prior to the public hearing.
a
*Five (5) full-size folded copies of the plans must be submitted, 'including an 8%" X 11" reduced
copy for each plan sheet along with a digital copy in TIFF -Group 4 (*.tif) format.
**Escrow will be required for other applications through the development contract.
Building material samples must be submitted with site plan reviews.
NOTE: When multiple applications are processed, the appropriate fee shall be charged for
each application.
SCANNED
PROJECT NAME: PIOVE&-L PA-.s Z' AbDrTlON
LOCATION: KLAJFF C 9 IUC- fAltyAfP ir
/�F•kss
LEGAL DESCRIPTION ANDPID: A` i/ u'-fl ?4-cT—
p/
�u^lilt
TOTALACREAGE: I8'• �9
WETLANDS PRESENT: X YES NO
PRESENTZONING:
REQUESTED ZONING: -
PRESENT LAND USE DESIGNATION:
REQUESTED LAND USE DESIGNATION:
REASON FOR REQUEST: t nJAJ RAT AM-fGyo-.J
FOR SITE PLAN REVIEW Include number of wasting employees: and new employees:
This application must be completed in full and be typewritten or deady'prii ted and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application.
A determinaticn of completeness of the application shall be made within 15 business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within 15 business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owner's Duplicate Certificate of Title. Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies. etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and cored to the best of
my knowledge.
,-
Signs Z
Dat
1� _ 1/
i ature er' "Date
K. ylan'.tortreLln'elopmem revi.w applkution.doc
SCANNED
�:w„I;rA�xw�.,x xnwt.wl
w',x,xnlgl . xML t,r Fvwn 9 i
_ _ .,':'Y:' �,. .`.SVNIJoN 9rotlLxv.xa rwtl ww N{vtm • Laxrna
wxAxxn�x tlAmVS •BLtr OA LVO dNWJW ]LOx _ /' xf••
o noN
03AI3038
'CC rir i:n ilrr"wax"wr alL xo usr �iiw'sv vi[ \ >
IN
wrwnvRrya _�mmn,ww � sX �.+'+ I r // \•\\ n�>, n
Ati—.PIRN ILIxN(WLii tll®9tIOIAW MIMIMNM//Vr91 VY` w�'�L�/ \ \ I %� I
vawaxxw'uxnoaxanxrarauxtrvn uxmJ I �/ / �yN� dY �a 1 I �+ �Si3 I �t
wa.ypmwrRvn va. W�0.ry1 _ I / /// �,.'P t� I I .E•`Ar" I I I �
.' t-
-aJ =�
r•w�l-rwno.lww+w.+v.�t,.vev.'—aww.tl..r.nmr.nA..ryr :^�.:'1, 'p�I C F,sta S( , .X/
r10aaYYM'AtxI,OJtliW iLatlOaratlAWWIMrAtxnw dm...xnrAln /T� ILL=%ij/��,JPyN L/al\ ii
H •a °'Lh tea' m/.r—�_�rv�n�.wnrnv+w. .....w�.xteet..e.0 r, u.A riw._
Yamxmw WNYrrWNJtl9urJnpaoTUxnOJ wa v.xtnxwwneavu pC591"q�---I. 1 _ ap?ip.� t�y+b „� I v tl��
r.nnxA �'M m •I�.nwmwwnn.Ygryrmx.W.p. m.m w kp
rvlry Trn.wIP6 To{nqr.a,rw.IR.u.nlRPmpyntl.ppMmlllm
Pa— �in.wlmw...v�lre®-..o
Ie An NIAII>•^^JRII,I.4�NpN". M.x^Mr WNtr(Yn Mi RVLY4AY.liA.q TLL
v.rmnxxrw xamnxxmJm AnJwuamuxnatuu
N.,n6IWJ.'+V'wx.r.V 8TY A0
]. (q- ..plwnuN.prypl Ml'I[61Nw .m.N'H[✓.IN09PW
'r1WaNNW'ALIINtlaMYJYOAiM(la LLVrrW
1 �'IfAn.nl WwN�e�T��AX
m rlgyAwoH
a[ A/T .M...4FpMFq.r V�W4Wt
V1C69XWwAL 3F
............. MJ.nr.... PAxa�Wn�
atW gAppxlLlrpm.Fwot MrV.�.,n�l Nn�nuyr"nl�WiwW Natlww'prryx.xY9
t R.isr NPJ..Ipxo+JAW
aw�'nv'AwnJ
exvlaAWx
vRNn,nxex.rymm.d- wmt w
.'ry umn WNapti^ n__
M �ce A.9e—x•ragpar9'x..ry.VW.xvxvn4igp[
ma]ttmJ
ruvwtlwnuvu
n atl
x9 tl.gNNtl.ILL
n+W.+dtln yyW
h pm S.I.n.n,...IIv..+wwWen:nmAnw.',n �q NNx.LLxPY+"ry"W"n n
,mm1V AW ,iuoa 6Vxx3 mpW p/lvAx.w.r „.Axwa .xm.vww.e
An runwin.L�'p.�A.ry:�'.m Niny,vwlArny.y ,tN.nlx.l a�''exy eGwRYdtl,lr MNl
All
y yob
9F pp 4 M : �i xwrA 8 'ggI nv
_ hsl \
nR
\\ 9� �Qv�OLLG;.Lg �vvA' `r� t; 'III ts�o]t
- - �\ tj> A
leerie�,v a",a3s3aa Sic ,�
01 N33N^
3;k3"3Yd 3H:
N011laa`d dNZ SSdd HERNOld
PIONEER PASS 2ND ADDITION
INSET A
%Mope . !IT[� W 0 xPX eY
LI, AT 11.1 x. �)xa AV.
amxALL
o Dort «six" .+e
•+p. a +/� xw . is »kr+aa o +°al
rzM.eo m vs. w. me..
• axertf +n �xw nw www+rexo
SITE
0
mn
MINIW IN flit/ VT MS
T RI
soE [xAEW) S,vN
SOL (ANSI NE LLI
FI
4[ ISA[LT IN 1.
5LM ]5 iR,
Sl .1 ANY DA TRY AI wREw=
� 1. AND. S
Lai. I IN .11AN V. DE
rw nM ulhllax, b smnl
iuv:xi LINE xw[wrM sDI/x EWE.
Fmm E,urrrAW .
y PRT.Ecr mr]ucn
A DSSVR..r - w[n n TELL. wo. Lvl-Ao—.o., NET
N,N-w-Sw lq
[.1 IN FEET EFFET �A x - RFE-AAA_Ax, 151
OMO.O=� - urc.�wAxp wwANnAro xowwuwAAux teal-A,r-,Iw (el
EYE LIE LINES
IxDuu . FEET owwA Inq v IA IN
wNERIATED [A STREET
L DES AND TN I R& . ISM ENTRIE TS yNWx.xNN,. 1. tlE MrzFFIRD I.rvl-AAA AAAA
PIONEER PASS 2ND ADDITION
CHANHASSEN, MINNESOTA
FINAL SANITARY SEWER, WATERMAIN, STORM
SEWER, STREET CONSTRUCTION & EROSION &
SEDIMENT CONTROL PLAN
FORYLAND .HOMES
7599 ANAGRAM DRIVE, EDEN PRAIRIE, MN 55344
PHONE: (952) 229-6000 FAX: (952) 229-6024
IVOV J S LOi1
TITLE SHEET
SITE INFORMATCN
EROSION EI SEDIMENT CONTROL. DETAILS
FINK ERGS M M SEDIMENT CONTROL PLAN
SANITARY SEWER R WATERUAIN CONSTRUCDON
SANITARY SEWER (STERN TON
HEMLOCK WAY
STREET A k STREET B
STORM SEWER CONSTRUCTION
STREET CCNSTRUCT001
HEMLOCK WAY
STREET A k STREET S
DETAILS
,.1
[.2-I.J
2.1
2.2
J.[
3.2
3.3
.1-a.2
S[
9.2
e.l—ez
,..
Pf3{MMC N41W1 ANN.
. wxEA«
ASTRAD w[ATED W..No
.
0 = =ILR11.
EIn/P[[9
[0M0 -,..A.
x-y�
[MMC ST. 4Mx
—'�7
EFFEENTRAD M ASSET'n
ahTS
x...............
..... n..n.....::.....:..
EFE.PDrtv
111 xEYE INTS"AL
I�1[I
.......................................
[YSIWO xGw-WT SIT [[x[[
...
[g51Ht 9L, RXR
ED.. FREE vlwrtnwx I
TS
ENINAANDE
R
x.EM
SEWxE". GSw
1. Id ALLAIIC/ZV[IY
IRI uu =1
EAI[mE YEALAIIRMWTWnNt
<:J
TEIT�w„DA
PADDED STDINNER,
FERRA btl bOx
—.—.—».—.—.— ANNI :w ANY SN
r..A,ED.
nxnWl,E] [MNNII -.• E[EM.W VSC
...............
cnarOYn p,wN,EE R[x[[_.. AND YP ,S
ARAw.w
g:bRxl>,NND�W
--------------
W N DAAAS NA,ER .R.IAE-T .Rrw 11 x
0
xx.AbA DETEST. AI
FREASSE. FLAY.
-
p1OS. Dogma aATTDATE. RN.'.
Ar.x I.E. ar LINEN cax5m .)
®
(E. BEgwo,':mE. 1DRaEnw rc
AFTER
nool Ire[ ,
V
YITTER
(,o x°SST .LIEN-uOFEARNED.
LEAFY
`,
mreoyo wwa (m [[ xelw[A AIR[
coRnnl. n INNS, WxSFREDDw)
w-WISE b1, 11.
ILA % IINSTALLED NRn c.NEn. V
OD
ENGINEENGINE
Nl AW DTT
TN."NATcrrw)[wwi[
IN
ENury
Rxun3S v' w.. [w[[n
Mfio¢o wnwD. wa[A
T—,
u
wmwm ANY.
�R
rn
if
Ole
1
v
a
`"ai _. f...
``
i
.:
to
�i
r
USGS MAP
1 I. • .OW feet
BENCHMARK
11 x
n n.. .. « W...lo yp��wau NIL.
SOIL GROUP MAP
1 mcn ^ aoo feet
r—
„,cIs so. r..wua
m[A Ice. lover-1. ac �ovn
a �c coon yl coon
C aav imm Q,y
o aor coon. •ub aor ioo...aar aor. wry clay. m clay
I I SNO Ku
2xn x/n u
• 2xem�wx�//u vi 2 '2/ m
nn�v0 x3em �s� w Lvl w .i/ n M 2xK WHOM
Loel COZ . 4oµ L
30VNIVdG 03SOdONd
1✓wsPm All.... .A
iwl OOL . wul L
30VNIVNG ONIISIX3
r �1 ,w LW
—RAR,
°;--- -=-
a
-�=ter_ �._ � _ r.. _. _ _ •- _
"�r'70.MCt'mYPAR, .P.
a ...r. _:.lair PAR
w
PA —PAR
=zZomma
r _"� _•y z= _ �
.r.�
.cam_'--_-�
-'r_�.
�•� _
��� c:..._�_—_.==_;mot
_=•_=_r
FT� •_r
-'---_---�_-_-• _ _____
-
__�.--�_*•T_.�.__.__.
_ _.ram_
________
arLorun
ail
mmm®mmmm.®-.ar°.®
W.
=lama=—r A.
..-.rr rr.................,..,............_
w,.rru—`rR�M INLr
IPAPE
-�s
PY
CROW MOTOR VRMRC NLN
dTM MIM _ YMM iYO[
YVW..r a.MMENT.R.0
I_
xA=
Rosh MnR Ri.YRrr-c.Rrcrar ""
Il0 z NnuYO nR Y.WrACTNxY mCnuttN51 MdREME'V R. f1°r IR�(.:
___
cc
0
.
T.
Co
o
a.
nr.rme.m nl
nml-=>a-mm ml
.io-3�-. • mi
I®
!Ail m
MI
(VESTMENTS LLL
35.0321300 "4
,
NU KS5i 2'11
35 a23t:
� 7
NOTES
. •rnw P.ml w1...1. ..1.-11 �..a �.wx. w m.u� a ..m.w•xw
n.no...,x no x..... wv..m .x unnx
ca.TxxD � w....o.o w wam woxu.. x.a QD uI � v x.x n.w.. um .v.—
t
Eyl I M1R A 45MENLLC
C P
25.033130300
` Jae
- BRLPDRTRIGHTRA1' OF/ JC
� \ L P 10-0-2 30 � ID
JOHN RLINGELHUT3' \..�
PIO NO. 25.0330406 1
I
m. n
.x l.: % L3
w IZ .w..x...a SS o.vx
roovx`nw.xxe',a.a vv i i.vT L;
xa' eco, wn.o
aurr anx
. 5
/ na °Nmx rti¢oi
W\`
P
KAI\(lrV WAY
925
925
920
x.e r�ae.,.e
a .ra,
920
910
910
reo
.xaosso m.�x,.e
905
I
,
905
xox
900
wl
',
•
900
895
895
890
890
885
a -a rc •
xo - e .K mx ,a
$ i..
885
880
�... .fin
e..
,�E
_.. ......... -_, _...
880
875
875
c�
r
PEN40m I I
ICO RNw. B]0.0 V VTL VT Li �� 6 `.
fL�R.�p uw i Lu[ 6
\ f &d debxq . ♦ 1
1 �� !� Ri NfXV 1RX
1 vLi ♦.2^' f' bif
. Ztu .M
. rHIro n
14I 15 t
16 / •.17
' 21
1l�
` 22
17
HFMI CK WAY
.4'4J •�� �Y�'I � Y. IA
S
OC�x�
19 \' N cc
X
i 2U\\
33,
32
n
3
F
my-m..ee
sc-Ro. '
Ft
unn_sn sx
925
.,
k .y�
y% ,,
{�y
`yg
-�
925
%.
915
C - -
�I Ay9r'
915
a..e .k son n • R.ow
' `
910
0�•�=
\
.I'P'. w.fn
910
wmwoso cxwR
ww ea.
905
p�
905
900
'16"°#"YS ,w.
Oa
,.I"R:'
Ma m�rtw,wc�''
�.•
900
895
I�w
�d
tt
,yw
.F R
895
9a
890
N
s c
'
l I
e.
fr-e• w.x
•r
.a. e �
� lu.e
C
!
�j
a
F
�
890
885
p
w'n w.mY�
wwn ww.mtPwr Xwo
i ow.
sow u • o.we
885
� Rewslws � 1
4 14
_ 15
n 3
L __
221
6 a
f 1,l 1 ', 19 '' \ fee /
.� �' • 70 ll1 \\ �I\...1fl \] 20 rJ3/ ° 16 C'
10 - 9 8 �\ d`1• i' 1 1Z 21 ,\ L 1 <, —
1523
24 11\ 1� \�\\ 4"(d _ •�s'l� < � i n y` d
ik •.. .t d1 \ \ r
n1.6" \\Jy�r tom! 3IXy y
k16 ��, •: �. 3 7 � � F
12. x'1.1 ) _ 11 1\ `r' \\ 19 25. -.�' \\ 1��\4 32 .,..
�\
21„
IN
A� V 30
.41'ai. �� l0N"'66r'°'1 VA 16 _� 23 22 V�. In....dl `L \\ \ 29 ]
24 \\\ \ \ \o '-St1` �p'1\` ul'„'7u7.1
14 \ 2z
FT A
970
'�N
a.,ElYw
9
�� �a9
;8
Hai
3':
930
925`(
/(`N]Iwo
'�..
°M
925
920
920
915
915
910
905
905
900
900
• k
L885
ago
885
e
RENSIIXIS I I
a
910
910
905
M
R
905
900
900
895
895
890
K1...
_ ELL,. On
w
890
Vie•
O
885
zz a9
885
880
R ®$s
a aka
��
kk§y
� _ 4
a
880
875
g®g
i
K
s i .
6
875
rz
N
qF 8651 \ \ ^*
\ \ ♦
e
u
5
o-
S4n•vroe'e
�p•„\\ \\•\
w
10915-
915910
«e
.MD]
MA m..
iaom.n5a evo.o
�`xJmrwIXe"0r
m \•,
�
m
0� 93
905 910
910
=__V '
y
\xD•
_\
AE sueurzn
° a
°sin
�
8i
• \ YiC[a[id.
900 - S. s
I 1
900 905
�
r
905
8
i
S e""
gg
0.5. °x".Lw m o.rux
895
895.900
4 $
900
y //
Iv95Y{'\ WP. rmrx iA<atn rrt
\ \••\•�,
K —
•••
C\
7
'\••\
ws.crtn • rziim it
^
5
9 • \�
^
�
VX'S-,-11____
_VMS,�
15
10
/'1"
14
16 17
11
12 13
l
�;. ��4'
i
i
III cDSie•
iHROM
r�[.�n.e n
18
a�ia
alJ
/ !!
I HE xSwe .N ,e M N,°. Y we, w,LP Tn:<.e�w[x.m. .5.°Sn�O. TMrtmrt5. �.NSY
a.H. °n a mm
> ALL urn rr° °.,w eu.e wn x.x xYr rem[rnw .norm w mw W[o.rt.r NRe xnuunw.
1
y' \ •
/• •� \
5I
6 R.Y'wY
'.
6 iv
t /
1 .",:��'L nww� wn x u55nuo w HE mKn u,w FYw u.w EOLYL' � a Sum
1 �` \`
•..J
a_r�
W
X
o-w ti mrzrm.SS.w w�. nw,K u, m
4
d
5'9M"5':8o
i LJ
o
I=
.•\,`
R'�"-'�dt,
.a..rt.rt°u�i`L0°w5uw,e.
nS..P
3 2
`f'
7 i;
19 ;n
20u5 �; y
33
2 5..,.
u:rcx w�eS SSmS°.wx°,«°.uE..°".".rvww
5^/
0
a
°�-°5
goo
_ $a�
900
895
x
895
890
890
885
i
/.
885
°
880
a r w,
880
a°.•�Dn
n ae wm`
875
nrt •°° r°aii
'�
875
870
2
B70
865
_
865
860
x ° ° S
860
, L
920
6�e
Eai
�.
iaS
�_
6=
Hai
a
i
Y
9
9
�a9
�a�
�a§
-k;
920
y
� 6
0
a9
a
915
915
910
.;a*
x.,
1
910
O
nxmus°
a
`° y5
DRAM BY
19051_..
."
�
'
axRxw:[
'o �
905
cD5
nDAN
900
aaNWaS]s
• e
I ea;.
895
v
`
890
HE
•
a
as
�q aA
^^
"a agsy
^
8
�� 8Y6
a
aSi
' "s.
B
y��
SS
H
]IOOF-]t
-�
li-I B ' I I.
_I
1 1 I I I I �- ' 19
;
m
I�UF
CREEK�'
_ 14�
20
22 ✓ ,,
`\
rn \
23 ` `�\ %''/�.... per <
� e
E
33
6
32
'
1 ,
1
u; mX]w
2 '
3 11
4
5 ;
\ BX ,]:1 A
Xno.ono in .,c 25
913a)..w wow
1
'
E
nev.
re
0
61 1.10-
-
29
2+EMXu
7 >
, 28
10
1' 28
1
,
11
Q a
12 '`
18 .....X. C• .n, X•H w�M,.�m—..,wWoo« �,„<r�r.X...,u. ,X... •M ..Xm..w sm X...vX.m. wan gym,., m.s,.,X.�.
yy
La 9
.-
17
a.,....a.
Z 9G o
�Y"�
,norzcm .m. X:,.,,,o..,,,1.,,..,v. D—SL" —F
m,a o-m,v�. Xa�a,�a . ,Nova c,,,�a_ .L.-IT r ..X.rt,r..rtX U-1tom.]
Z
15
.,,wa o. o,,.a w.., I— mry e1 unu,r coni,.v', ru. W .,.....,<,..l.
,. wm wrsmXoo..
�
920
ao eiio"-nvm
uv cw,w„XsAa
li ✓
925
885
-
...........
885
925
_'. _ _
�a7
880
Ili
880
920
920
'.
`r.
915
875
875
915
x �
ao
sX.rzX
a.0
x.wwa1s.1tl,
870
_
BXs
870
910
mE0
._
885
,...w.
885
905
"°"r,
905
Mao"m:`w,:ro�iE'usi]B
880
900
900
I.., C': n ns n°in°wi
n e ,Bs.
ai.BwX
>nv
a vux
RI 9A
855
yA
-.w.s iff
Y M
yAy
L
A
a
BSS
895
A 21;
k i W i
``pp3
_f
r,
i�
895
56'Fg6
5R
850
850
890
'...�. '... i
890
K.Wa s II
YflO.ECT N0.
v.Ae-a
a.A
h::T1 h_
VV1l.Vl
4 �\ 5
/
1 �
'
\ /
a:w.marep
�`\., fi b'•
`
NQM
x:e �o xn eru w or wuo
/
1
\
ux[ (ee°ol
• \ ;. %I , ur
�'`
aas bm. ww
1
j
Y
,
:Y1'n�n:�j`
",",°"" ;.G"daa.:..w..n,w ..a
C�
\
,`.o-•4'�
6 7
81:
sl`:'of�.'"'":
cli
-�
•'���
12
13
111
yam/
aw.orru
l,rol.rt
F
'w'i%°v)an melwclwl
CD�tl�
•f
'
11
' roONwx°r
r1�
�x�rt/ r urwry vFC Yfu.�wa
rc amarz
E'�' E
______
• Isno.E ams
• p Y�T➢N1F�
5
4 r. a iiici •--wexi. la.oel ...
20 0
e`` "
18 �' `�`7�,1 ^�^ ;'^,,.^y%I` _'•- __ �/,m n ___ _� \ \9E9L1WEB8 i��1$a °
�f >- `r 32 2 / F a wu wx1. r.cr w neww..� m t rr4 (; 9 '\!''� / ^!'• 21 ` . 1 6 FaF w'mW °iu� ,Ni....ouo.wx 6g0�0
a E s�e
/"1Y wu .ry uwxxr.xwm
NFAAI r) ' WAY`
^
s'
935
,- ___,_,
935
I
K-po° ',
930
925
_
925
^920
Y
915
eG
CK
8 a
aq�
.n .n..:.
e 5
/
915
910
W
§�
910
905
^m
_
=
905
900
B95
p
nxc xrz�xr i
895
6
890
F
890
2B
8
_ ;fie
8
885
k'
m
'
%
x
b
_
BBS
�00
REMVMS I I
PPWFCi NO.
]1996-]I
]1
2
3 '
4
"
_
II
_ ,� ,1
S
12
1
__
18
I
17
16
�" _Ugp
10 ;1 r
i6 L.
mw 0 15
...1 1
1622
21
ice g a
23\R'
,
24
; ,�--�
33
6f a
3029
1
13 ;1'1 - 21 28 28 x T
J%!r 14 :�`2-23\` 22 27 STREET
24
STREET A 9
�1
935 ', _ 935
930 V 930
925, 925
920 q�`. F9 920
915 n.w.Q. a.muwe 915
910 p 910
B
905 905
900 esao° 900
a
895 895
890 g 890
a za
885 R 885
55
Mug 3.1
1 REN50N5 11
t ."
r Sk'I"::r:t:..
a�lr
vc.K•.
1 mfiy
irq
,� 1
CP^Tt C �C
r
r
n
,I e45
i +run—
M NYC. '
S FF �YI%F
MKir I
■
0 --iu,-
YEA9 YI9D D9#11'7� TFT41L
CITY OF
CBANNA3SEN
7700 Market Booked
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax:952.227.1110
BdftInspections
Phone: 952,227.1180
Fax:952.227.1190
Phone:952.227.1160
Fax:952.227.1170
F mice
Pfpne:952.227.1140
Fax: 952.227,1110
Park & Recreation
Phu:952.227.1120
Fax:952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952,227,1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior cerrfer
Phone: 952.227.1125
Fax:952.227.1110
Web Site
wmci.chanhassen.mn.us
July 13, 2010
Mr. Mark Sonstegard
Ryland Homes
7599 Anagram Drive
Eden Prairie, MN 55344
Re: Pioneer Pass Preliminary Plat — Planning Case #10-09
Dear Mr. Sonstegard:
This letter is to confirm that on July 12, 2010, the Chanhassen City Council
approved the following:
A. Preliminary Plat creating 94 lots, 4 outlots and right-of-way for public
streets, plans prepared by James R. Hill dated June 4, 2010, subject to the
following conditions:
1. Building Official:
a. The developer must submit a list of proposed street names for review and
approval prior to final plat of the property.
b. Developer to provide 1:200 scale plat drawing (with lot numbers, block
numbers and street names only) for addressing purposes.
c. Demolition permits must be obtained before demolishing any existing
structures.
d. A final grading plan and soils investigation/correction report must be
submitted to the Building Inspections Division before permits can be
issued.
e. Retaining walls over four feet high require a building permit and must be
designed by a Structural Engineer registered in the State of Minnesota.
f. Each lot must be provided with separate sewer and water services.
g. The developer and/or their agent shall meet with the Inspections Division
as early as possible to discuss plan review and permit procedures.
2. Engineer.
a. The developer must coordinate the proposed grading within the Liberty on
Bluff Creek property and the restoration with the homeowners association.
Chanhassen is a Community for Life - Providing forToday and Planning for Tamo m
$CANNED
Mr. Mark Sonstegard
Pioneer Pass
July 13, 2010
Page 2 of 10
b. The developer must obtain approval to complete the off -site grading required to construct
a collector road- Bluff Creek Drive- to Pioneer Trail.
c. If importing or exporting material for development of the site is necessary, the applicant
will be required to supply the City with detailed haul routes.
d. Additional catch basins will be required along Street A. The number and location will be
determined with the final plat submittal.
e. The developer's engineer must work with City staff to improve the proposed drainage
patterns at the back of Lots 11 through 14, Block 2.
f. A drain tile service stub must be provided for any lot that drains from the back to the
front.
g. The low floor elevations of Lots 33 to 35, Block I must be adjusted so that they are
minimum three feet above the high water level of the adjacent pond.
h. Verify the first floor elevation of Lots I through 3, Block 1.
Retaining walls constructed with the development will be the responsibility of the
homeowners association.
j. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep
must be SDR 18.
k. The sanitary sewer between Lots 5 and 6, Block 1 must be installed within a steel casing
pipe.
The developer will install 12-inch trunk watermain within Bluff Creek Drive. The City
will reimburse the developer the cost difference between 8-inch lateral and 12-inch trunk
watermain.
in. A water service stub must be installed for the park area at a location acceptable to the
Parks and Recreation Director.
n. A pressure -reducing valve is required within the homes with a low floor elevation of 935
feet or lower.
o. The developer shall install a pressure -reducing valve vault in the southern portion of
Bluff Creek Drive. The City will determine the location and design of the vault in
conjunction with the final plat design. The developer will be reimbursed for the cost of
the vault.
_,a
r Mr. Mark Sonstegard
Pioneer Pass
July 13, 2010
Page 3 of 10
p. The property is subject to sanitary sewer and water hookup charges for all of the lots.
The 2010 Met Council SAC charge is $2,175 per unit_ The City's 2010 trunk utility
hookup fees are $2,026 per unit for sanitary sewer and $5,393 per unit for water. A
portion of the trunk utility hookup fees will be collected with the final plat: for 2010 the
portion collected with the development contract is $608.00/unit of the sanitary sewer
hookup fee and $1,618.00/unit of the water hookup fee.
q. All of the utility improvements are required to be constructed in accordance with the
City's latest edition of Standard Specifications and Detail Plates.
r. Permits from the appropriate regulatory agencies will be required, including the MPCA,
NPDES, Dept. of Health, Carver County, MnDOT and Watershed District.
s. Prior to final plat approval, the City and the developer must work with MnDOT to obtain
the necessary approvals and/or agreements necessary to construct the portion of Bluff
Creek Drive that will lie within the MnDOT right-of-way.
t. The grade of the public streets must be adjusted so that they do not exceed 8%.
U. The owner of the exception parcels shall work with MnDOT, the County and the City to
determine future access to these areas.
v. The outstanding assessments, plus accrued interest must be paid with the final plat or
reapportioned to the lots within the final plat.
3. Environmental Resource Specialist:
a. The applicant shall plant 343 trees within the development. Each lot shall have a
minimum of two overstory, deciduous trees planted in the front yard.
b. The applicant shall install the total required bufferyard along Bluff Creek Boulevard and
Outlot C.
The applicant shall develop a restoration plan including native plants for the Bluff Creek
Overlay district north of Block 1. The plant species shall be selected from the Bluff
Creek Management Plan Appendix C. The final plan must be reviewed and approved by
the City before installation.
d. Lots 13, 14, 25 and 26, Block 2 shall receive an increased number of evergreen plantings
to shield the properties from oncoming traffic headlights.
e. The applicant shall revise the landscape plan to show more variation in boulevard
plantings. No more than 10 trees of a species may be grouped together.
Mr. Mark Sonstegard
Pioneer Pass
July 13, 2010
Page 4 of 10
I. Tree protection fencing shall be installed prior to construction around all areas designated
for preservation and/or at the edge of proposed grading limits.
g. No burning permits shall be issued for tree removal. All trees removed on site shall be
chipped and used on site or hauled off.
4. Fire Marshal:
a. Additional fire hydrants will be required and some will need to be relocated. Contact the
Fire Marshal for which hydrants are in question.
b. Water main and fire hydrants shall be installed and made serviceable prior to combustible
construction (2007 MSFC Sec. 503.1.1.).
c. A three-foot clear space shall be maintained around fire hydrants (2007 MSFC Sec.
508.5.4.).
d. Temporary street signs shall be installed as soon as construction begins. Signs shall be of
an approved size, weather resistant, and maintained until replaced by permanent signs
(2007 MSFC Sec. 505.2.).
e. Fire apparatus access roads and water supply for fire protection is required to be
installed. Such protection shall be installed and made serviceable prior to and during
time of construction except when approved alternate methods of protection are provided
(2007 MSFC Sec. 501.4.).
5. Park Director:
a. Successful transfer of Outlot C (8.7± acres) to the City of Chanhassen through a
combination of dedication and fee purchase for development and use as a neighborhood
park.
b. Extension of trail (west side of road) and sidewalk (east side of road) paralleling the
planned connector street south to their respective connection points at the intersection of
Pioneer Trail and Bluff Creek Drive.
c. Install a sidewalk on Street D from Street A to Bluff Creek Drive.
6. Planner:
a. Lot 20, Block 2, shall be adjusted to meet minimum 110 feet of lot depth.
b. A 30 dBA attenuation shall be provided by the building design and construction along
with year-round climate control for the homes adjacent to the T.H. 212/Pioneer Trail
right-of-way.
Mr. Mark Sonstegard
Pioneer Pass
July 13,2010
Page 5 of 10
c. The developer shall pay $23,649.00 as their portion of the 2005 AUAR.
d. The property owner may donate Outlots A and B to the City, or if retained under private
ownership, dedicate a roadway/trail easement and drainage and utility easement over
Outlot A, and conservation easement, trail easement and a drainage and utility easement
over Outlot B.
7. Water Resources Coordinator:
a. The HydroCAD model shall be revised to accurately reflect the post -development soil
conditions or evidence shall be provided that soils post development will have a water
transmission rate between 0.15 and 0.30 in/hr.
b. All conditions for the wetland alteration permit must be met (Chapter 20 Article VI).
c. Wetland I, as delineated by Graham Environmental Services, Inc., needs to be shown on
Sheet 1.2 and other applicable plan sheets.
d. Wetland buffers and setbacks shall be shown around all wetland features on or adjacent
to the subject property on the plat and grading plans (20-412).
e. Where, if at all, the buffer encroaches onto a private lot, a drainage and utility easement
is required (20-412).
f. Wetland buffers must be planted with native vegetation per Section 20-412.
g. Make the Soil Boring report available to the City (18-40).
h. SWMP fees, estimated at $119,830.52, will be due to the City at final plat (4-30).
i. The applicant or their agent must secure permissions from the Minnesota Department of
Transportation to discharge subeatchment area 8S to MnDOT right-of-way.
j. As stated in Section 18-40(4)2v. Drain tile service must be provided to any lots where
drainage is directed from back to front. This condition exists along Street B between lots
16 & 17 as well as lots 18 & 19. Because of the presence of Hamel loam, a soil with a
known seasonally high water table less than one foot below the surface, drain tile shall be
extended from Lot 12 to the CBMH in front of Lot 19 of Block 2. Drain tile is also
encouraged in front of lots 1, 2, 3, 41 and 42 of Block 3, and Lots 1, 2 and 3 of Block 2.
The soil boring report will be beneficial in making this determination (18-40).
k. The swale between Street B and Street C must be within a drainage and utility easement.
Care should be taken to design the grading so that surface drainage from Street C isn't
directed into the residences along Street B (18-76).
Mr. Mark Sonstegard
Pioneer Pass
July 13, 2010
Page 6 of 10
1. The outlet for Pond 2 is to be moved as far west as is practical (19-144).
in. Applicant must demonstrate how the City can access Pond 2 for future maintenance.
n. The outlet for Pond 6 is to be moved so that the discharge point is approximately 75 feet
from the proposed location. Energy dissipation and soil stabilization best management
practices such as ScourStopTM, Erosion Control Blanket P42TM or similar shall be used in
addition to rip -rap (18-62).
o. A SWPPP specific to this site shall be prepared and submitted to the City and Carver
SWCD (18-40).
p. Areas where proposed and existing grades are to be matched shall be done so that no
concentrated flow conditions are created. These areas include, but are not necessarily
limited to, the backyard of Lot 7, Block 1, the backyards of Lots 1 and 2 of Block 1 and
adjacent to the extension of Bluff Creek Boulevard at the intersection with Pioneer Trail
(18-62).
q. Type 3, weed -free mulch shall be used in outlot B.
r. Inlet protection will be required on the existing CBMH at the northerly intersection of
Bluff Creek Boulevard and proposed Street A (18-62163).
s. A note shall be included on sheets 3.2, 3.3 and 3.4 indicating that inlet protection will be
required on all backyard CB until final stabilization is achieved.
t. After the slopes are graded but before the erosion control blanket and seed is placed, the
use of silt fence with J-hooks, straw wattles, rock logs, bioroll or other BMP will be
required to break up any run 75 feet or longer (18-62).
u. Bluff Creek needs to be identified on the plan set and the SWPPP and erosion plans must
clearly indicate that it is an impaired water for turbidity and that no discharge of
untreated water will be allowed to the creek or to the fringe wetland (19-145).
v. A detailed turf establishment plan shall be provided (19-145).
w. A note needs to be included on the plan set that top soils are to be scraped and stockpiled
and the soil stockpile area(s) need to be shown on the plan (19-145).
x. Signage for the Bluff Creek Overlay District must be posted on every other property
corner and at major lot angle changes where residential yards meet the primary zone.
Mr. Mark Sonstegard
Pioneer Pass
July 13, 2010
Page 7 of 10
B. Conditional Use Permit for development within the Bluff Creek Overlay District with a
Variance for encroachment into the Primary Zone for the construction of a stormwater pond
subject to the following conditions:
1. Wetland must be protected at all times from impact.
2. Every reasonable effort must be made to avoid impacting more area than need be. Where
desirable native vegetation is present, avoidance should occur unless to do so would
prevent the applicant or their agent from fulfilling the intent of the encroachment.
3. Signage shall be posted at the property corners indicating the Bluff Creek Overlay
District boundaries. The applicant and City shall work together to best determine
location, aesthetic and message.
4. Bluff Creek shall be shown and identified on the plan set.
5. Vegetative enhancement will be needed within the Bluff Creek Overlay District in
addition to the mitigation area. This area shall be planted with a native seed mix
appropriate to the area. Trees shall be planted on the south side of the pond for
temperature control as well as screening from the residences.
6. The SWPPP, erosion control and grading plans shall be revised to include all erosion and
sediment best management practices.
7. The outlet for Pond 6 is to be moved so that the discharge point is approximately 75 feet
from the proposed location. The FES can then be pulled back so it remains outside of the
BCOD. Energy dissipation and soil stabilization best management practices such as
ScourStopTM, Erosion Control Blanket P42TM or similar shall be used in addition to rip -
rap (18-62).
8. The applicant shall develop a restoration plan including native plants for the Bluff Creek
Overlay district north of Block 1. The plant species shall be selected from the Bluff
Creek Management Plan Appendix C. The final plan must be reviewed and approved by
the city before installation.
9. Signage for the Bluff Creek Overlay District must be posted on every other property
corner and at major lot angle changes where residential yards meet the primary zone.
C. Interim Use Permit to allow site grading prior to final plat approval subject to the following
conditions:
1. A SWPPP specific to this site shall be prepared and submitted to the City and Carver
SWCD (18-40).
Mr. Mark Sonstegard
Pioneer Pass
July 13, 2010
Page 8 of 10
2. The erosion control and grading plan must be amended per Preliminary Plat comments.
3. The Wetland Alteration Permit conditions must be met.
4. A phasing and sequence plan must be prepared and submitted.
5. The grading operations must follow the preliminary grading plan as approved by City
Council.
6. The applicant must submit a $36,500 erosion control security before grading can
commence.
7. The applicant must obtain permission for any off -site grading.
8. Tree protection fencing shall be installed prior to construction around all areas designated
for preservation and/or at the edge of proposed grading limit.
9. Permits from the appropriate regulatory agencies will be required, including the MPCA,
NPDES, Dept. of Health, Carver County, MnDOT and Watershed District.
10. If importing or exporting material for development of the site is necessary, the applicant
will be required to supply the City with detailed haul routes.
11. Erosion control measures must be installed and inspected prior to grading.
And,
Wetland Alteration Permit for the grading and filling of wetlands on site subject to the
following conditions:
1. Wetland I must be shown on the plans (18-40).
2. Mitigation Area #1 must be revised to equal the 20,909 square feet of new wetland credit
approved in the 2006 wetland replacement plan.
3. Wetland buffer must be extended around the mitigation area to achieve no less than
20,473 square feet and cannot include any portion of the pond.
4. A detailed wetland alteration and replacement plan needs to be developed that meets the
requirements of Minnesota Rules Chapter 8420.0528. this should include, at a minimum:
a. Two cross -sectional views and a plan view;
b. A detailed planting schedule;
Mr. Mark Sonstegard
Pioneer Pass
July 13, 2010
Page 9 of 10
c. A detailed vegetation management schedule including any mowing, herbicide
application, and performance goals (note: this should include the buffer area as
well as the created wetland);
d. A discussion of the soils as it pertains to their adequacy in wetland creation; and
e. A discussion of hydrology as it is not conclusive that there will be adequate
hydrology to take on wetland characteristics.
5. A five-year monitoring plan must be developed and submitted to the City for review and
comment per Minnesota Rules 8420.0810. This monitoring plan will require the
placement of shallow water monitoring wells as the intent is to create a type I wetland.
6. A letter of credit or other surety equal to 110% of the construction cost will be required.
This can be released upon the issuance of a Certificate of Compliance with Wetland
Replacement Plan.
7. The wetland area should use BWSR seed mix WTI for any temporary seeding.
8. An as -built survey must be provided to the City for review and approval prior to final
seeding of the area.
9. Yellow tags shall be provided to the City after the area has been seeded.
10. The planting schedule and vegetation management plan shall incorporate the buffer area
as well.
I I. The selected contractor and applicant must also provide the City with a signed Board of
Soil and Water Resources "Contractors Responsibility and Landowner Statement Form.
Final plat documents must be submitted to the City 30 days prior to the City Council meeting in
which you wish to have your final plat approved. Conditions of the preliminary plat approval
must be addressed for final plat approval. Enclosed is the list of items required for submittal for
final plat approval.
A revised grading plan for the Interim Use Permit must be submitted to the City for review and
approval. A security in the amount of $36,500 for erosion control must be submitted before site
grading can commence. Additionally, all erosion control measures and tree protection fencing
must be installed and inspected prior to the City authorizing grading operations.
A revised wetland mitigation plan must be submitted and approved by the City prior to any
wetland alterations occurring. Additional security based on the construction cost for the
mitigation shall be required. Contact Terry Jeffery at (952) 227-1168 or
tieffery@ci.chanhassen.mn.us if you have any questions.
Mr. Mark Sonstegard
Pioneer Pass
July 13, 2010
Page 10 of 10
Should you have additional questions or need more information, please feel free to contact me at
(952) 227-1131 or benerous@ci.chanhassen.mn.us.
Sincerely,
Robert Generous, AICP
Senior Planner
c: Peterson -Jacques Farm Land Co., LLC
15900 Flying Cloud Drive
Eden Prairie, MN 55347
ec: Kate Aanenson, Community Development Director
Alyson Fauske, Assistant City Engineer
Todd Gerhardt, City Manager
Terry Jeffery, Water Resources Coordinator
Enclosure
g:Xplan\2010 planning cases\10-09 pioneer pmstappmval letter prelim plat cup variup wapAcc
ITEMS REQUIRED FOR FINAL PLAT CONSIDERATION
The following items are required to be submitted a minimum of 30 days prior to
City Council meeting and payment of a $250.00 final plat review fee:
Submit three (3) sets of full size, 50 scale construction plans and
specifications for staff review and redline.
• Utility plans shall show both plan view and profiles of all utilities
(sanitary sewer, water and storm sewer lines). The plan view must
show all drainage and utility easements.
• Grading and drainage plans shall show dwelling type and elevations,
wetlands and wetland buffer areas, stormwater pond NWL and HWL,
EOF and catch basin and storm manhole numbers.
• The construction plans and specifications shall be in accordance to the
City's latest edition of Standard Specifications & Detail Plates.
• The plans shall include traffic signage and street light placement.
2. Drainage calculations for water quantity and quality ponding with maps
showing drainage areas for pre -and post -development conditions and
contributing areas to catch basins.
3. Hydraulic calculations and drainage map for the storm sewer design
4. Tree Preservation Easements (if applicable).
5. Trail Easements (if applicable).
6. Engineer's Cost Estimate of Improvements:
a. Sanitary sewer system.
b. Water system.
c. Storm sewer drainage system including cleaning and
maintenance.
d. Streets, sidewalk and trails.
e. Erosion control.
f. Site restoration (seeding, sodding, etc.).
g. Site grading
h. Street lights & signs
i. Engineering, surveying & inspection
j. Landscaping
7. Five (5) sets (folded) of final plat, one (1) set of reductions (81/2" x 11 "), and
a digital copy in .tit format.
8. Digital copy of the legal description of the property in a .doc format.
9. Lot tabulations
Failure to provide any of the above items by the required deadline will
result in delaying consideration of final plat before the City Council.
Updated 11-29-06
gAeng\torms\tinal plat submittal-doc
lJ - I
CITY OF
C9ANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.11 BO
Fax: 952.227.1190
Engineering
Phone: 952.227,1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952227,1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952227.1404
Manning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.achanhawn.mn.as
MEMORANDUM
TO: Todd Gerhardt, City Manager
FROM: Bob Generous, Senior Planner
DATE: September 13, 2010 04f
SUBJ: Final Plat for Pioneer Pass, Planning Case #10-09
PROPOSED MOTION
"The Chanhassen City Council approves the final plat for Pioneer Pass creating
41 lots, 5 outlots and right-of-way for public streets, plans prepared by James
R. Hill, Inc., date stamped received August 20, 2010, subject to the conditions
of the staff report ,
City Council approval requires a majority vote of City Council present.
PROPOSAUSUMMARY
The applicant is requesting final plat approval
for the first phase of Pioneer Pass, which
includes 41 single-family lots, a neighborhood
park, right-of-way for public streets including
the extension of Bluff Creek Drive from Bluff
Creek Boulevard to Pioneer Trail, an outlot for
access to the property to the east, and outlots for
stormwater ponds and the Bluff Creek primary
corridor. The entire development will
eventually include 94 single-family lots (see
preliminary plat below).
Staff is recommending approval of the final plat
for Pioneer Pass subject to the conditions of the
staff report.
BACKGROUND
On July 12, 2010, the Chanhassen City Council approved
the Preliminary Plat creating 94 lots, 4 outlots and right-
of-way for public streets; a Conditional Use Permit for
development within the Bluff Creek Overlay District with
a Variance for encroachment into the Primary Zone for the
construction of a stormwater pond; an Interim Use Permit
to allow site grading prior to final plat approval; and a
Wetland Alteration Permit for the grading and filling of
wetlands on site.
N
3fi
i3
Chanhassen is a Community for life - Providing for Today and Planning for Tomorrow
SCANNED
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 2 of 27
SUBDIVISION REVIEW
The developer is requesting final plat approval to create 41 single-family lots as part of the
Pioneer Pass development. In this phase, the city park will be graded, Bluff Creek Drive will be
extended to Pioneer Trail, the stormwater ponds will be installed, the wetland mitigation will be
created and the southern half of the development will have City streets, sewer and water
constructed.
PIONEER PASS
IN�A
e
L�' wire
i
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 3 of 27
COMPLIANCE TABLE
Area (sq. ft.)
Width (ft.)
Depth (ft.)
Notes
Code
(RLM
District)
9,000
50
110
Setbacks: Front-25'; side-5' (garage
side),10' (house side); rear-25', Bluff
Creek Primar -40' ; Covera e: 35%
Ll BI
12,600
102
137
Comer lot
L2 B I
9,618
83
127
L3 B1
9,310
78
124
L4 BI
9,498
72
131
L5 BI
10,701
86
1 137
L6 BI
10,703
90
265
L7 BI
9,745
67
128
L 8 B 1
11,074
67
142
L9 B 1
14,685
90
175
Comer Lot
Ll B2
12,600
83
138
Corner Lot
L2 B2
9,643
70
133
L3 B2
10,633
72
129
LA B2
9,327
72
129
L5 B2
9,324
72
129
L6 B2
10,625
71
130
L7 132
10,660
72
128
L8 B2
11,462
106
145
L9 B2
15,043
121
170
Comer Lot
L10 B2
13,772
164
119
Lll B2
10,646
102
131
L12 B2
10,625
88
130
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 4 of 27
Area (sq. ft.)
Width (ft.)
Depth (ft.)
Notes
Code
(RLM
District)
9,000
50
110
Setbacks: Front-25% side-5'(garage
side),10' (house side); rear-25', Bluff
Creek Prima -40' ; Coverage: 35%
L13 B2
10,625
82
130
L14 B2
10,625
86
130
L15 B2
10,624
81
130
L16 B2
9,909
77
130
L17 B2
11,723
86
142
Comer Lot
Ll B3
13,756
67
165
Bluff Creek Primary
L2 B3
14,285
70
187
Bluff Creek Primary
L3 B3
14,901
70
195
L.4 B3
15,523
70
192
L 5 B3
11,799
67
159
L6 B3
12,497
64
153
L7 B3
15,288
64
165
L8 B3
11,716
67
150
L9 B3
10,876
68
139
L10 B3
9,972
72
139
Lll B3
9,972
72
138
L12 B3
10,651
75
137
L13 B3
10,726
71
135
L14 B3
10,764
83
136
L15B3
12,039
95
134
Corner Lot
Outlot A
38,344
Road Access for property to east, 0.88 ac.
Outlot B
747,538
Bluff Creek Primary zone, wetland
mitigation, storm water pond, 17.161 ac.
Outlot C
823,000
Phase 2 development area, 18.893 ac.
Outlot D
18,232
Storm water pond, 0.419 ac.
Outlot E
379,345
City Park, 8.709 ac.
ROW
284,201
6.524 ac.
TOTAL
2,761,224
63.389 ac.
Avg. Lot
size this
base
11,477
GRADING
The current high point of the property is generally located east of the Bluff Creek Boulevard
roundabout. The site is currently being graded according to the Interim Use Permit granted on July
12, 2010.
The grading plan shows that a small area within K. Hovnanian's Liberty on Bluff Creek
development will be graded with the project. The developer is in the process of obtaining an
easement from the homeowners association to complete grading and restoration in this area.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 5 of 27
MnDOT has approved the off -site grading required to construct a collector road (Bluff Creek Drive)
to Pioneer Trail. If importing or exporting material for development of the site is necessary, the
applicant will be required to supply the City with detailed haul routes.
The low floor elevation of Lot 15, Block 3 must be minimum three feet above the 100-year
elevation of the adjacent pond. This may result in changing the house style from a lookout to a
walkout.
The grading plan must be revised to show that the high water level for Pond 7 (Outlot D) does not
extend into the MnDOT right-of-way.
The grading within the park must be revised to eliminate the channelized flow to the creek.
Drainage and utility easements are required over all of the outlots.
RETAINING WALLS
The grading plan identifies a retaining wall on the northwest portion of the plat, about 100 feet east
of the temporary terminus of Hemlock Way. The maximum height of this retaining wall is four
feet; therefore, the wall must be designed by a Structural Engineer registered in the State of
Minnesota and a building permit is required.
Retaining walls constructed with the development will be the responsibility of the homeowners
association.
UTILITIES
Trunk sanitary sewer and watermain to serve the proposed development were constructed with the
2005 MUSA Expansion Improvements, City Project 04-05. Lateral sanitary sewer and watermain
within the development will extend from the existing trunk facilities within Bluff Creek Boulevard.
An additional lateral sanitary sewer connection is proposed from the existing 8-inch stub at
Freedom Lane, within the Liberty on Bluff Creek development to the west.
Due to the grade variation within the site, some segments of the sanitary sewer will exceed 16 feet
in depth. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep
must be SDR 18.
The developer will install 12-inch trunk watermain within Bluff Creek Drive. The City will
reimburse the developer the cost difference between 8-inch lateral and 12-inch trunk watermain.
A water service stub must be installed for the park area at a location acceptable to the Parks and
Recreation Director.
The developer shall install a pressure reducing valve vault in the southern portion of Bluff Creek
Drive. The City will determine the location and design of the vault in conjunction with the final plat
design. The developer will be reimbursed for the cost of the vault.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 6 of 27
The property is subject to sanitary sewer and water hookup charges for all of the lots. A portion of
these fees will be collected with the final plat and is calculated as follows:
Partial Payment of Sanitary Sewer Hookup: 41 units x $608/unit = $24,928.00
Partial Payment of Watermain Hookup: 41 units x $1,618/unit = $66,338.00
The remainder of these hookup fees will be collected with the building permit at the rate in effect at
that time. The Met Council SAC charge will also be collected with the building permit.
The developer will be responsible for extending lateral sewer and water service to the lots;
therefore, the sanitary sewer and water connection charges do not apply.
All of the utility improvements are required to be constructed in accordance with the City's latest
edition of Standard Specifications and Detail Plates. Permits from the appropriate regulatory
agencies will be required, including the MPCA, NPDES, Dept. of Health, Carver County, MnDOT
and Watershed District.
STREETS
The developer will construct Bluff Creek Drive from the existing roundabout to Pioneer Trail. The
southern 400 feet of this street lies outside of the plat and within Minnesota Department of
Transportation (MnDOT) right-of-way for Highway 212. Based on the final alignment of Highway
212, MnDOT has indicated that this right-of-way will likely be turned back in the future. Prior to
final plat approval, the City and the developer must work with MnDOT to obtain the necessary
approvals and/or agreements necessary to construct this street.
The developer proposes to construct two public streets within this phase of the development. All
public streets shall be 31 feet wide within a 60-foot wide right-of-way.
The owner of the exception parcels should work with MnDOT, the County and the City to
determine future access to these areas.
The Arterial Collector Roadway Fee will be waived since the developer will be constructing Bluff
Creek Drive (a collector road).
The10-foot wide bituminous trail shall be constructed on the west side of Bluff Creek Drive;
sidewalk shall be constructed on the east side. Both the sidewalk and trail shall extend to Pioneer
Trail.
ASSESSMENTS
There are three deferred assessments (with interest) on the parent property:
1. 2005 MUSA Area Expansion: $301,044.41(principal amount)
2. Bluff Creek Boulevard Improvements: $1,017,682.41(principal amount)
3. Highways 101 and 212/Lyman Blvd. improvements: $188,659.46 (principal amount)
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 7 of 27
The September 13, 2010 City Council consent agenda includes the proposed reapportionment of
these assessments. If the consent agenda is approved, $546,582.48 (plus $122,272.88 interest as of
September 13, 2010) will be apportioned to the lots and blocks within the Pioneer Pass final plat
and $706,557.84 (plus $158,060.06 interest as of September 13, 2010) apportioned to Outlot C of
the Pioneer Pass plat. Staff proposes to reapportion this assessment as follows:
$668,855.36 =41 units = $16,313.55/unit
Outlot C: $864,617.90
These assessments are for 7 years at 6% interest. The letter of credit will include $1,253,140.32 for
the assessments within the Pioneer Pass plat.
GRADING, DRAINAGE AND EROSION CONTROL
Wetlands
In October of 2005, Graham Environmental Services delineated seven wetlands on the property
identified as the Peterson property. Of these wetlands, three are located on the subject property to
be platted as Pioneer Pass. Wetlands A, B, I and F were found to be jurisdictional wetlands in the
Graham report. Wetland A was mitigated for by the City of Chanhassen for the construction of
Bluff Creek Drive. Wetland I will be mitigated for as part of this project.
The mitigation area is to be located northerly on the property in that area which will be developed in
Phase II. Because this area is not to be disturbed at this time and insufficient hydrology will be
available until then, the applicant is not planning on creating the mitigation area at this time. Under
the rules in effect at the time the wetland alteration was approved, the applicant can, at the discretion
of the LGU, delay mitigation provided that a letter of credit or other surety is secured equal to at
least 110% of the construction cost of the mitigation. The applicant has provided this in an
amendment to their letter of credit.
The current plan shows a buffer area around the Mitigation Area only, not the remaining wetlands
on the property. Chanhassen City Code requires that a buffer be preserved or created around all
wetlands on a property. Because this area was in agricultural production and is not likely to support
a community of native vegetation, the applicant will need to establish a native buffer. This will
need to be shown on the plans and buffer signs will need to be placed. The applicant will need to
work with City Staff concerning the purchase and placement of the signs.
Retaining Walls
The grading plan identifies a retaining wall as shown in red on the diagram below. The maximum
height of this retaining wall is 15 feet; therefore, the wall must be designed by a Structural Engineer
registered in the State of Minnesota and a building permit is required. The wall must be located
entirely on the private lots and not within the drainage and utility easement or the outlot.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 8 of 27
Surface Water Management Connection Charges
The applicant is proposing to develop this piece in two phases. The currently proposed phase has
13.545 acres of assessable area. Further, the applicant will receive credit for that area which is to be
treated by the proposed NURP basins — Pond 6 and Pond 7. This area is equal to 11.76 acres and
will have one outlet from the site. Total credit is $17,435.20 for the phase.
Water Quality Fees
Because of the impervious surface associated with this development, the water quality fees for this
proposed development are based on single-family residential development rates of $2,540 per acre.
Assessable area is equal to the area of Blocks 1, 2 and 3 and the right-of-way less the public right-
of-way for Bluff Creek Boulevard. This net equals 13.545 acres. Therefore, the gross water quality
fees associated with this project are 13.545 acres multiplied by $2,540/acre or $34,404.30.
Water Quantity Fees
The SWMP has established a connection charge for the different land uses based on an average
citywide rate for the installation of water quantity systems. This cost includes land acquisition,
proposed SWMP culverts, open channels, and storm water ponding areas for runoff storage in
addition to mitigation for flood damage. Single-family residential developments have a connection
charge of $2,640 per developable acre. This results in a water quantity fee of $35,758.80 for the
proposed development.
SWMP Credits
This project proposes the construction of three NURP basins. The applicant will be credited for
50% of the water quality charge for each acre draining to a NURP basin on site. Sub -catchment
areas 2, 6,7 and 9 are all treated in the three NURP basins. Credit for this treatment will be
$14,935.2 or [$2540(0.5)* 11.76ac]. There will be one outlet structure with BMPs for rate control
and the removal of floatables. This structure wan -ants a $2,500 credit.
At this time, the total net SWMP fee, due payable to the City at the time of final plat recording, is
$52,727.90.
Drainage
The applicant provided a summary of the HydroCAD model. While there is some change to the
watershed boundaries, approximately the same areas are draining to the same receiving waters post -
development as pre -development. They have reduced the 100-year runoff rates in post -
development conditions. There are two exceptions to this. Subcatchment area 3S now runs west to
Bluff Creek Drive where the existing infrastructure appears adequate to handle this relatively minor
increase in discharge rate. The other exception is subcatchment 8S in the southeast comer. This
area will now discharge to MnDOT right-of-way. The applicant has received approval from the
Department of Transportation to redirect runoff to this area. The model has been revised to reflect
the post -development conditions which will be more similar to C hydrologic group soils.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 9 of 27
To avoid further degradation to the existing gully due to erosion the applicant has moved the outlet
for pond 6 per the direction of City staff. This new outlet also avoids additional encroachment into
the Bluff Creek Overlay District. Energy dissipation and soil stabilization best management
practices need to be employed so that new gullies, rills or escarpments do not form. Materials such
as Scour StopTM, Erosion Control Blanket P42TM, or other similar turf reinforcement mat products
shall be installed in conjunction with traditional rip -rap and this design must be provided to the City
for their review and approval. The establishment of woody vegetation in the form of dense shrubs,
such as sandbar willow, beyond the outlet would be strongly encouraged as well.
Bluff Creek Overlay District
The subject property is encumbered by the Bluff Creek Overlay District to the north, northeast and
southwest. While the mitigation area and stormwater pond will encroach into the Bluff Creek
Overlay District, this will not occur with this phase but rather upon development of the northern
portion of the property. By moving the outlet for Pond 6, encroachments into the Bluff Creek
Overlay District have all been avoided for this phase of development. The future proposed
encroachments will require a conditional use permit and a variance.
Other Agencies
The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g.,
Minnesota Pollution Control Agency, Minnesota Department of Natural Resources (for
dewatering), Carver SWCD, Minnesota Department of Transportation, et al) and comply with their
conditions of approval.
BLUFF CREEK OVERLAY DISTRICT
The City of Chanhassen established the Bluff Creek Overlay District (BCOD) by ordinance in 1998
to protect the Bluff Creek Corridor, wetlands, bluffs and significant stands of mature trees through
the use of careful site design and other low -impact practices. This parcel is partially encumbered by
the Bluff Creek Overlay District. No alterations are allowed within the primary corridor or within
the first 20 feet of the setback from the primary corridor. All structures must meet the 40-foot
setback from the primary corridor. If any alterations are proposed on property within the Bluff
Creek Overlay District, a conditional use permit must be obtained prior to alterations occurring.
All structures must meet a 40-foot structural setback from the Primary Corridor boundary as
required by Chanhassen City Code. In addition, no grading is allowed within the first 20 feet of the
Primary Corridor. The applicant is proposing to construct a stormwater pond, a wetland mitigation
area and approximately 160 feet of sanitary sewer within the Bluff Creek Overlay District (BCOD).
No roads, lots or other infrastructure are to be placed within the BCOD. Because of the need to
mitigate, there is no reasonable alternative to creating on -site mitigation without encroaching into
the Primary Zone of the Bluff Creek Overlay District. This area is most likely to have suitable soils,
hydrology and vegetation for a successful mitigation area. At this time, there will be no
encroachment into the primary zone as this will happen with the subsequent phase. When this does
occur, as a condition of approval, the applicant will be required to develop a revegetation plan for
the Primary Corridor.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 10 of 27
WETLAND ALTERATION PERMIT
In May of 2006, the City as the LGU
responsible for the administration of the
Wetland Conservation Act, approved
the permanent impact of 0.47 acres of
Type 1, (PEMAf) Palustrine Emergent
Vegetation Seasonally Flooded, farmed
wetland. These wetlands were
identified as A and I in the Graham
Environmental Services (GES) report
and is shown to the left.
The originally approved development
plan and Wetland Alteration Permit
called for these impacts to be mitigated
on -site through the creation of 0.48
acres (20,909 ST) of new wetland credit
and 1.22 acres of public value credit in
the form of NURP ponds and wetland
buffer. The approved plan called for
10,190 square feet of wetland buffer and 43,124 square feet of ponding. Even though the MN Rules
changes in 2007 and much of this mitigation would not be eligible for credit, the Wetland Alteration
Permit was approved under the 2002 rules. However, Chanhassen Code, Section 20-419, states that
"the permittee shall begin and complete the development authorized by the wetland alteration
permit within one year after the date the council approves the permit application." It has been four
(4) years since approval was granted.
The current plan proposes to create 18,464 square feet of new wetland credit. This is 2,445 square
feet short of the 20,909 square feet required by the approved replacement plan. The approved
replacement plan called for 10,190 square feet of buffer. The proposed plan shows 15,303 square
feet of buffer. In 2006, the Wetland Conservation Act required that at least the first 1:1 replacement
is new wetland credit. Mitigation Area #1 must be revised to provide no less than 20,909 square
feet of new wetland credit. This will meet WCA requirements. Under new State rules, stormwatcr
ponding would not be allowed for use as public value credits. Since a portion of the impacts have
already occurred prior to mitigation, the City may increase the replacement ratio. To mitigate for
these wetland losses, the applicant must create the 20,909 square feet of new wetland credit and
20,473 square feet of public value credit in the form of wetland buffer. This buffer area cannot
count the stormwater pond.
Wetland Impact
New Wetland Credit
Public Value Credit
A 527 SF
Not Applicable — mitigated for under previous plan
I 20,473 SF
20,909 SF
120,473 SF
Z 4,206 SF
Not Applicable — mitigated for under ous plan
TOTAL
20,909 SF
20,473 SF
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 11 of 27
This mitigation area must have its own detailed plan including two cross -sectional views, a
description of the soils and how they will be suitable to wetland characteristics, a detailed planting
schedule and vegetation management plan including annual benchmarks for plant establishment, a
discussion of the hydrology and supporting documentation that it will be adequate to support the
intended wetland conditions, a five-year monitoring plan consistent with the MN Wetland
Conservation Act, and surety money equal to 110% of the cost of the wetland and buffer creation.
Based upon preliminary review of the plan, it is unclear that there will be adequate hydrology
directed to the mitigation area to assure success.
The selected contractor and applicant must also provide the City with a signed Board of Soil and
Water Resources "Contractors Responsibility and Landowner Statement" form and a "Deed
Restrictions and Covenants" form.
Because of phasing the site development, the applicant is proposing to postpone the creation of the
wetland mitigation until Phase 2 of the project. In lieu of this, the applicant has amended the letter
of credit to include the estimated cost of wetland construction as provided by James R. Hill, Inc.
REVIEW CONDITIONS OF APPROVAL
The preliminary plat for Pioneer Pass creating 94 lots, 4 outlots and right-of-way for public streets,
plans prepared by James R. Hill dated June 4, 2010, was approved subject to the following
conditions:
1. Building Official:
a. The developer must submit a list of proposed street names for review and approval prior
to final plat of the property.
*This condition shall be modified as follows: The north -south collector street shall be
shown as Bluff Creek Drive.
b. Developer to provide 1:200 scale plat drawing (with lot numbers, block numbers and
street names only) for addressing purposes.
*This condition still applies.
c. Demolition permits must be obtained before demolishing any existing structures.
*This condition still applies.
d. A final grading plan and soils investigation/correction report must be submitted to the
Building Inspections Division before permits can be issued.
*This condition still applies.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 12 of 27
e. Retaining walls over four feet high require a building permit and must be designed by a
Structural Engineer registered in the State of Minnesota.
*This condition still applies.
f. Each lot must be provided with separate sewer and water services.
*This condition still applies.
g. The developer and/or their agent shall meet with the Inspections Division as early as
possible to discuss plan review and permit procedures.
*This condition still applies.
2. Engineer:
a. The developer must coordinate the proposed grading within the Liberty on Bluff Creek
property and the restoration with the homeowners association.
*This condition still applies.
b. The developer must obtain approval to complete the off -site grading required to construct
a collector road (Bluff Creek Drive) to Pioneer Trail.
*This condition has been met.
c. If importing or exporting material for development of the site is necessary, the applicant
will be required to supply the City with detailed haul routes.
*This condition still applies.
d. Additional catch basins will be required along Street A. The number and location will be
determined with the final plat submittal.
*This condition does not apply to this addition.
e. The developer's engineer must work with City staff to improve the proposed drainage
patterns at the back of Lots 11 through 14, Block 2.
*This condition does not apply to this addition.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 13 of 27
f. A drain tile service stub must be provided for any lot that drains from the back to the
front.
*This condition does not apply to this addition.
g. The low floor elevations of lots 33 to 35, Block 1 must be adjusted so that they are
minimum three feet above the high water level of the adjacent pond.
*This condition shall be revised as follows: The low floor elevation of Lot 15, Block 3
must be minimum three feet above the 100-year elevation of the adjacent pond.
h. Verify the first floor elevation of Lots 1 through 3, Block 1.
*This condition does not apply to this addition.
i. Retaining walls constructed with the development will be the responsibility of the
homeowners association.
*This condition still applies.
j. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep
must be SDR 18.
*This condition still applies.
k. The sanitary sewer between Lots 5 and 6, Block 1 must be installed within a steel casing
pipe -
*This condition does not apply to this addition.
1. The developer will install 12-inch trunk watermain within Bluff Creek Drive. The City
will reimburse the developer the cost difference between 8-inch lateral and 12-inch trunk
watermain.
*This condition still applies.
in. A water service stub must be installed for the park area at a location acceptable to the
Parks and Recreation Director.
*This condition still applies.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 14 of 27
n. A pressure -reducing valve is required within the homes with a low floor elevation of 935
feet or lower.
*This condition no longer applies.
o. The developer shall install a pressure -reducing valve vault in the southern portion of
Bluff Creek Drive. The City will determine the location and design of the vault in
conjunction with the final plat design. The developer will be reimbursed for the cost of
the vault.
*This condition still applies.
p. The property is subject to sanitary sewer and water hookup charges for all of the lots.
The 2010 Met Council SAC charge is $2,175 per unit. The City's 2010 trunk utility
hookup fees are $2,026 per unit for sanitary sewer and $5,393 per unit for water. A
portion of the trunk utility hookup fees will be collected with the final plat: for 2010 the
portion collected with the development contract is $608.00/unit of the sanitary sewer
hookup fee and $1,618.00/unit of the water hookup fee.
*This condition shall be revised as follows: The property is subject to sanitary sewer
and water hookup charges for all of the lots. A portion of these fees will be collected
with the final plat and is calculated as follows:
Partial Payment of Sanitary Sewer Hookup: 41 units x $608/unit = $24,928.00
Partial Payment of Watermain Hookup: 41 units x $1,618/unit = $66,338.00
The remainder of these hookup fees will be collected with the building permit at the
rate in effect at that time. The Met Council SAC charge will also be collected with
the building permit.
q. All of the utility improvements are required to be constructed in accordance with the
City's latest edition of Standard Specifications and Detail Plates.
*This condition still applies.
r. Permits from the appropriate regulatory agencies will be required, including the MPCA,
NPDES, Dept. of Health, Carver County, MnDOT and Watershed District.
*This condition still applies.
s. Prior to final plat approval, the City and the developer must work with MnDOT to obtain
the necessary approvals and/or agreements necessary to construct the portion of Bluff
Creek Drive that will lie within the MnDOT right-of-way.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 15 of 27
*This condition still applies.
t. The grade of the public streets must be adjusted so that they do not exceed 8%.
*This condition has been met.
u. The owner of the exception parcels shall work with MnDOT, the County and the City to
determine future access to these areas.
*This condition still applies.
v. The outstanding assessments, plus accrued interest must be paid with the final plat or
reapportioned to the lots within the final plat.
This condition shall be modified as follows: Each lot within the Pioneer Pass final plat
will be subject to a $16,313.55 assessment over 7 years at 6% interest for the 2005
MUSA improvements and Highways 101/212 and Lyman Boulevard improvements.
Outlot C will be subject to a $864,617.90 assessment for the 2005 MUSA
improvements and Highways 101/212 and Lyman Boulevard improvements.
Based on review of the construction plans for the development, staff is recommending that the
following conditions be added:
a. The grading plan must be revised to show that the high water level for Pond 7
(Outlot D) does not extend into the MnDOT right-of-way.
b. The grading within the park must be revised to eliminate the channelized flow to the
creek.
c. Drainage and utility easements are required over all of Outlots A, B, C and D,
Pioneer Pass.
d. The 10-foot wide bituminous trail shall be constructed on the west side of Bluff
Creek Drive; sidewalk shall be constructed on the east side.
e. Both the sidewalk and trail shall extend to Pioneer Trail.
3. Environmental Resource Specialist:
a. The applicant shall plant 343 trees within the development. Each lot shall have a
minimum of two overstory, deciduous trees planted in the front yard.
*This condition still applies.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 16 of 27
b. The applicant shall install the total required bufferyard along Bluff Creek Boulevard and
Outlot C.
*This condition has been met.
c. The applicant shall develop a restoration plan including native plants for the Bluff Creek
Overlay district north of Block 1. The plant species shall be selected from the Bluff
Creek Management Plan Appendix C. The final plan must be reviewed and approved by
the City before installation.
*This condition still applies.
d. Lots 13, 14, 25 and 26, Block 2 shall receive an increased number of evergreen plantings
to shield the properties from oncoming traffic headlights.
*This condition has been met.
e. The applicant shall revise the landscape plan to show more variation in boulevard
plantings. No more than 10 trees of a species may be grouped together.
*This condition has been met.
f. Tree protection fencing shall be installed prior to construction around all areas designated
for preservation and/or at the edge of proposed grading limits.
*This condition still applies.
g. No burning permits shall be issued for tree removal. All trees removed on site shall be
chipped and used on site or hauled off.
*This condition still applies.
4. Fire Marshal:
a. Additional fire hydrants will be required and some will need to be relocated. Contact the
Fire Marshal for which hydrants are in question.
*This condition has been met.
b. Water main and fire hydrants shall be installed and made serviceable prior to combustible
construction (2007 MSFC Sec. 503.1.1.).
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 17 of 27
*This condition still applies.
c. A three-foot clear space shall be maintained around fire hydrants (2007 MSFC Sec.
508.5.4.).
*This condition still applies.
d. Temporary street signs shall be installed as soon as construction begins. Signs shall be of
an approved size, weather resistant, and maintained until replaced by permanent signs
(2007 MSFC Sec. 505.2.).
*This condition still applies.
e. Fire apparatus access roads and water supply for fire protection is required to be
installed. Such protection shall be installed and made serviceable prior to and during
time of construction except when approved alternate methods of protection are provided
(2007 MSFC Sec. 501.4.).
*This condition still applies.
5. Park Director:
a. Successful transfer of Outlot C (8.7± acres) to the City of Chanhassen through a
combination of dedication and fee purchase for development and use as a neighborhood
park.
*This condition still applies.
b. Extension of trail (west side of road) and sidewalk (east side of road) paralleling the
planned connector street south to their respective connection points at the intersection of
Pioneer Trail and Bluff Creek Drive.
*This condition still applies.
c. Install a sidewalk on Street D from Street A to Bluff Creek Drive.
*This condition has been partially met and shall be modified as follows: Install a
sidewalk on Mayapple Pass.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 18 of 27
6. Planner:
a. Lot 20, Block 2, shall be adjusted to meet minimum 110 feet of lot depth.
*This condition is not applicable in this phase.
b. A 30 dBA attenuation shall be provided by the building design and construction along
with year-round climate control for the homes adjacent to the TH 212/Pioneer Trail right-
of-way.
*This condition still applies.
c. The developer shall pay $23,649.00 as their portion of the 2005 AUAR.
*This condition shall be modified as follows since only 43.6 percent (41 lots/94 lots) of
the project is being developed at this time: The developer shall pay $10,315.00 as their
portion of the 2005 AUAR for this phase of the project.
d. The property owner may donate Outlots A and B to the City, or if retained under private
ownership, dedicate a roadway/trail easement and drainage and utility easement over
Outlot A, and conservation easement, trail easement and a drainage and utility easement
over Outlot B.
*This condition still applies.
7. Water Resources Coordinator:
a. The HydroCAD model shall be revised to accurately reflect the post -development soil
conditions or evidence shall be provided that soils post development will have a water
transmission rate between 0.15 and 0.30 in/hr.
*This condition has been met.
b. All conditions for the wetland alteration permit must be met (Chapter 20 Article VI).
*This condition still applies.
c. Wetland I, as delineated by Graham Environmental Services, Inc., needs to be shown on
Sheet 1.2 and other applicable plan sheets.
*This condition has been met.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 19 of 27
d. Wetland buffers and setbacks shall be shown around all wetland features on or adjacent
to the subject property on the plat and grading plans (20-412).
*This condition does not apply to this phase.
e. Where, if at all, the buffer encroaches onto a private lot, a drainage and utility easement
is required (20-412).
*This condition does not apply to this phase.
f. Wetland buffers must be planted with native vegetation per Section 20-412.
*This condition does not apply to this phase.
g. Make the Soil Boring report available to the City (18-40).
*This condition has been met.
h. SWMP fees, estimated at $119,830.52, will be due to the City at final plat (4-30).
*This condition shall be modified as follows: SWMP fees of $52,727.90 shall be paid
for this phase of the development prior to the recording of the final plat.
i. The applicant or their agent must secure permissions from the Minnesota Department of
Transportation to discharge subcatchment area 8S to MnDOT right-of-way.
*This condition has been met.
j. As stated in Section 18-40(4)2v, Drain tile service must be provided to any lots where
drainage is directed from back to front. This condition exists along Street B between lots
16 & 17 as well as lots 18 & 19. Because of the presence of Hamel loam, a soil with a
known seasonally high water table less than one foot below the surface, drain tile shall be
extended from Lot 12 to the CBMH in front of Lot 19 of Block 2. Drain tile is also
encouraged in front of lots 1, 2, 3, 41 and 42 of Block 3, and Lots 1, 2 and 3 of Block 2.
The soil boring report will be beneficial in making this determination (18-40).
*This condition still applies.
k. The swale between Street B and Street C must be within a drainage and utility easement.
Care should be taken to design the grading so that surface drainage from Street C isn't
directed into the residences along Street B (18-76).
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 20 of 27
*This condition does not apply to this phase.
1. The outlet for Pond 2 is to be moved as far west as is practical (19-144).
*This condition does not apply to this phase.
in. Applicant must demonstrate how the City can access Pond 2 for future maintenance.
*This condition does not apply to this phase.
n. The outlet for Pond 6 is to be moved so that the discharge point is approximately 75 feet
from the proposed location. Energy dissipation and soil stabilization best management
practices such as ScourStopTM, Erosion Control Blanket P42Tm or similar shall be used in
addition to rip -rap (18-62).
*This condition shall be modified as follows: The developer needs to show detail
drawing of discharge point and how energy dissipation will be achieved.
o. A SWPPP specific to this site shall be prepared and submitted to the City and Carver
SWCD (18-40).
*This condition shall be modified as follows: A SWPPP specific to this site shall be
prepared and submitted to the City and Carver SWCD (18-40).
1) All surface waters and existing wetlands, which can be identified on maps
such as United States Geological Survey 7.5 minute quadrangle maps or
equivalent maps within one mile from the project boundaries, which will receive
stormwater runoff from the construction site, during or after construction.
Where surface waters receiving runoff associated with construction activity will
not fit on the plan sheet, they must be identified with an arrow, indicating both
direction and distance to the surface water. The SWPPP must identify if the
surface water is a special or impaired water.
2) The SWPPP must incorporate the requirements of Part III (Stormwater
Discharge Design Requirements), Part IV (Construction Activity Requirements)
and Appendix A for the project. A narrative describing the timing for
installation of all erosion prevention and sediment control BMPs required in
Part III, Part IV and Appendix A must also be included in the SWPPP.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 21 of 27
p. Areas where proposed and existing grades are to be matched shall be done so that no
concentrated flow conditions are created. These areas include, but are not necessarily
limited to, the backyard of Lot 7, Block 1, the backyards of Lots 1 and 2 of Block 1 and
adjacent to the extension of Bluff Creek Boulevard at the intersection with Pioneer Trail
(18-62).
*This condition is still applicable.
q. Type 3, weed -free mulch shall be used in outlot B.
*This condition is still applicable.
r. Inlet protection will be required on the existing CBMH at the northerly intersection of
Bluff Creek Boulevard and proposed Street A (18-62/63).
*This condition does not apply to this phase.
s. A note shall be included on sheets 3.2, 3.3 and 3.4 indicating that inlet protection will be
required on all backyard CB until final stabilization is achieved.
*This condition is still applicable.
t. After the slopes are graded but before the erosion control blanket and seed is placed, the
use of silt fence with J-hooks, straw wattles, rock logs, bioroll or other BMP will be
required to break up any run 75 feet or longer (18-62).
*This condition is still applicable.
u. Bluff Creek needs to be identified on the plan set and the SWPPP and erosion plans must
clearly indicate that it is an impaired water for turbidity and that no discharge of
untreated water will be allowed to the creek or to the fringe wetland (19-145).
*This condition is still applicable
v. A detailed turf establishment plan shall be provided (19-145).
*This condition is still applicable
w. A note needs to be included on the plan set that top soils are to be scraped and stockpiled
and the soil stockpile area(s) need to be shown on the plan (19-145).
*This condition is still applicable
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 22 of 27
x. Signage for the Bluff Creek Overlay District must be posted on every other property
comer and at major lot angle changes where residential yards meet the primary zone.
*This condition is still applicable
y. Based on review of the construction plans, staff recommends the inclusion of the following
condition: Seed mixes shall be consistent with current MnDOTBWSR cooperative
mixes. See MnDOT publication Native Seed Mix Design for Roadsides and BWSR
State Seed Mixes: http://www.bwsr.state.mn.us/native vegetation/state seed mixes.pdf .
RECOMMENDATION
Staff recommends that the City Council approve the final plat for Pioneer Pass, plans prepared
by James R. Hill, Inc., dated 7/16/10 revised through 8/18/10, and dated 8/20/10, subject to the
following conditions:
1. Building Official:
a. The north -south collector street shall be shown as Bluff Creek Drive.
b. Developer to provide 1:200 scale plat drawing (with lot numbers, block numbers and
street names only) for addressing purposes.
c. Demolition permits must be obtained before demolishing any existing structures.
d. A final grading plan and soils investigation/correction report must be submitted to the
Building Inspections Division before permits can be issued.
e. Retaining walls over four feet high require a building permit and must be designed by a
Structural Engineer registered in the State of Minnesota.
f. Each lot must be provided with separate sewer and water services.
g. The developer and/or their agent shall meet with the Inspections Division as early as
possible to discuss plan review and permit procedures.
2. Engineer:
a. The developer must coordinate the proposed grading within the Liberty on Bluff Creek
property and the restoration with the homeowners association.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 23 of 27
b. If importing or exporting material for development of the site is necessary, the applicant
will be required to supply the City with detailed haul routes.
c. The low floor elevation of Lot 15, Block 3 must be minimum three feet above the 100-
year elevation of the adjacent pond.
d. Retaining walls constructed with the development will be the responsibility of the
homeowners association.
e. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep
must be SDR 18.
f. The developer will install 12-inch trunk watermain within Bluff Creek Drive. The City
will reimburse the developer the cost difference between 8-inch lateral and 12-inch trunk
watermain.
g. A water service stub must be installed for the park area at a location acceptable to the
Parks and Recreation Director.
h. The developer shall install a pressure -reducing valve vault in the southern portion of
Bluff Creek Drive. The City will determine the location and design of the vault in
conjunction with the final plat design. The developer will be reimbursed for the cost of
the vault.
i. The property is subject to sanitary sewer and water hookup charges for all of the lots. A
portion of these fees will be collected with the final plat and is calculated as follows:
Partial Payment of Sanitary Sewer Hookup: 41 units x $608/unit = $24,928.00
Partial Payment of Watermain Hookup: 41 units x $1,618/unit = $66,338.00
The remainder of these hookup fees will be collected with the building permit at the rate
in effect at that time. The Met Council SAC charge will also be collected with the
building permit.
j. All of the utility improvements are required to be constructed in accordance with the
City's latest edition of Standard Specifications and Detail Plates.
k. Permits from the appropriate regulatory agencies will be required, including the MPCA,
NPDES, Dept. of Health, Carver County, MnDOT and Watershed District.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 24 of 27
1. Prior to final plat approval, the City and the developer must work with MnDOT to obtain
the necessary approvals and/or agreements necessary to construct the portion of Bluff
Creek Drive that will lie within the MnDOT right-of-way.
m. The owner of the exception parcels shall work with MnDOT, the County and the City to
determine future access to these areas.
n. Each lot within the Pioneer Pass final plat will be subject to a $16,313.55 assessment
over 7 years at 6% interest for the 2005 MUSA improvements and Highways 101/212
and Lyman Boulevard improvements.
Outlot C will be subject to a $864,617.90 assessment for the 2005 MUSA improvements
and Highways 101/212 and Lyman Boulevard improvements.
o. The grading plan must be revised to show that the high water level for Pond 7 (Outlot D)
does not extend into the MnDOT right-of-way.
p. The grading within the park must be revised to eliminate the channelized flow to the
creek.
q. Drainage and utility easements are required over all of Outlots A, B, C and D, Pioneer
Pass.
r. Thel0-foot wide bituminous trail shall be constructed on the west side of Bluff Creek
Drive; sidewalk shall be constructed on the east side.
s. Both the sidewalk and trail shall extend to Pioneer Trail.
3. Environmental Resource Specialist:
a. The applicant shall plant 343 trees within the development. Each lot shall have a
minimum of two overstory, deciduous trees planted in the front yard.
b. The applicant shall develop a restoration plan including native plants for the Bluff Creek
Overlay district north of Block 1. The plant species shall be selected from the Bluff
Creek Management Plan Appendix C. The final plan must be reviewed and approved by
the City before installation.
c. Tree protection fencing shall be installed prior to construction around all areas designated
for preservation and/or at the edge of proposed grading limits.
d. No burning permits shall be issued for tree removal. All trees removed on site shall be
chipped and used on site or hauled off.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 25 of 27
4. Fire Marshal:
a. Water main and fire hydrants shall be installed and made serviceable prior to combustible
construction (2007 MSFC Sec. 503.1.1.).
b. A three-foot clear space shall be maintained around fire hydrants (2007 MSFC Sec.
508.5.4.).
c. Temporary street signs shall be installed as soon as construction begins. Signs shall be of
an approved size, weather resistant, and maintained until replaced by permanent signs
(2007 MSFC Sec. 505.2.).
d. Fire apparatus access roads and water supply for fire protection is required to be
installed. Such protection shall be installed and made serviceable prior to and during
time of construction except when approved alternate methods of protection are provided
(2007 MSFC Sec. 501.4.).
5. Park Director:
a. Successful transfer of Outlot C (8.7± acres) to the City of Chanhassen through a
combination of dedication and fee purchase for development and use as a neighborhood
park.
b. Extension of trail (west side of road) and sidewalk (east side of road) paralleling the
planned connector street south to their respective connection points at the intersection of
Pioneer Trail and Bluff Creek Drive.
c. Install a sidewalk on Mayapple Pass.
6. Planner:
a. A 30 dBA attenuation shall be provided by the building design and construction along
with year-round climate control for the homes adjacent to the TH 212/Pioneer Trail right-
of-way.
b. The developer shall pay $10,315.00 as their portion of the 2005 AUAR for this phase of
the project.
c. The property owner may donate Outlots A and B to the City, or if retained under private
ownership, dedicate a roadway/trail easement and drainage and utility easement over
Outlot A, and conservation easement, trail easement and a drainage and utility easement
over Outlot B.
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 26 of 27
7. Water Resources Coordinator:
a. All conditions for the wetland alteration permit must be met (Chapter 20 Article VI).
b. SWMP fees of $52,727.90 shall be paid for this phase of the development prior to the
recording of the final plat.
c. As stated in Section 18-40(4)2v. Drain tile service must be provided to any lots where
drainage is directed from back to front. This condition exists along Street B between lots
16 & 17 as well as lots 18 & 19. Because of the presence of Hamel loam, a soil with a
known seasonally high water table less than one foot below the surface, drain tile shall be
extended from Lot 12 to the CBMH in front of Lot 19 of Block 2. Drain tile is also
encouraged in front of lots 1, 2, 3, 41 and 42 of Block 3, and Lots 1, 2 and 3 of Block 2.
The soil boring report will be beneficial in making this determination (18-40).
d. The developer needs to show detail drawing of discharge point and how energy
dissipation will be achieved.
e. A SWPPP specific to this site shall be prepared and submitted to the City and Carver
SWCD (18-40).
1) All surface waters and existing wetlands, which can be identified on maps such as
United States Geological Survey 7.5 minute quadrangle maps or equivalent maps within
one mile from the project boundaries, which will receive stormwater runoff from the
construction site, during or after construction. Where surface waters receiving runoff
associated with construction activity will not fit on the plan sheet, they must be
identified with an arrow, indicating both direction and distance to the surface water.
The SWPPP must identify if the surface water is a special or impaired water.
2) The SWPPP must incorporate the requirements of Part III (Stormwater Discharge
Design Requirements), Part IV (Construction Activity Requirements) and Appendix A
for the project. A narrative describing the timing for installation of all erosion
prevention and sediment control BMPs required in Part III, Part IV and Appendix A
must also be included in the SWPPP.
f. Areas where proposed and existing grades are to be matched shall be done so that no
concentrated flow conditions are created. These areas include, but are not necessarily
limited to, the backyard of Lot 7, Block 1, the backyards of Lots I and 2 of Block 1 and
adjacent to the extension of Bluff Creek Boulevard at the intersection with Pioneer Trail
(18-62).
Todd Gerhardt
Pioneer Pass Final Plat
September 13, 2010
Page 27 of 27
g. Type 3, weed -free mulch shall be used in outlot B.
h. A note shall be included on sheets 3.2, 3.3 and 3.4 indicating that inlet protection will be
required on all backyard CB until final stabilization is achieved.
i. After the slopes are graded but before the erosion control blanket and seed is placed, the
use of silt fence with J-hooks, straw wattles, rock logs, bioroll or other BMP will be
required to break up any run 75 feet or longer (18-62).
j. Bluff Creek needs to be identified on the plan set and the SWPPP and erosion plans must
clearly indicate that it is an impaired water for turbidity and that no discharge of
untreated water will be allowed to the creek or to the fringe wetland (19-145).
k. A detailed turf establishment plan shall be provided (19-145).
1. A note needs to be included on the plan set that top soils are to be scraped and stockpiled
and the soil stockpile area(s) need to be shown on the plan (19-145).
m. Signage for the Bluff Creek Overlay District must be posted on every other property
corner and at major lot angle changes where residential yards meet the primary zone.
n. Seed mixes shall be consistent with current MNDOT/BWSR cooperative mixes. See
MNDOT publication Native Seed Mix Design for Roadsides and BWSR State Seed Mixes:
http://www.bwsr.state.mn.us/native vegetation/state seed mixes.pdf .
ATTACHMENTS
1. Development Review Application.
2. Letter from Mark Sonstegard to Kate Aanenson dated August 18, 2010.
3. Reduced Copy Pioneer Pass Final Plat.
4. Reduced Copy Pioneer Pass lst (sic) Addition Final Grading, Drainage & Erosion Control
Plan.
5. Reduced Copy Pioneer Pass lst (sic) Addition Final Sanitary Sewer, Watermain, Storm
Sewer, Street Construction & Erosion & Sediment Control Plan.
g9plan\2010 planning casmU 0-09 pioneer pass0inal plaAfinal plat staff report.doc
CITY OF CHANHASSEN
7700 Market Boulevard — P.O. Box 147
Chanhassen, MN 55317 — (952) 227-1100
DEVELOPMENT REVIEW APPLICATION
PLEASE PRINT
Planning Case No.ZG 10 —0
CITY OF CHANHASSEN
RECEIVED
AUG 202010
CHANHASSEN PLANNING DEPT
AppliV,nt N me and Address: • Orner Name andAddress:
Phone:/ ..•• •/ ( bali Phone:.1,Pi
A
NOTE: Consultation with City staff is required prior to submittal, including review of development
plans
Comprehensive Plan Amendment
Conditional Use Permit (CUP)
Interim Use Permit (IUP)
Non -conforming Use Permit
Planned Unit Development'
Rezoning
Sign Permits
Sign Plan Review
Site Plan Review (SPR)*
LSubdivision* — Yirol P16L+
Temporary Sales Permit
Vacation of Right-of-Way/Easements (VAC)
(Additional recording fees may apply)
Variance (VAR)
Wetland Alteration Permit (WAP)
Zoning Appeal
Zoning Ordinance Amendment
Notification Sign — $200
(City to install and remove)
X Escrow for Filing Fees/Attomey Cost**
- $50 CUP/SPRA/ACA/ARANAP/Metes & Bounds
- $450 Minor SUB
TOTAL FEE $ Z500 GCS L4L Z$
An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant
prior to the public hearing.
*Five (5) full-size folded copies of the plans must be submitted, including an 8%" X 11" reduced
copy for each plan sheet along with a digital copy in TIFF -Group 4 (*.tif) format.
**Escrow will be required for other applications through the development contract.
Building material samples must be submitted with site plan reviews.
NOTE: When multiple applications are processed, the appropriate fee shall be charged for
each application.
SCANNED
PROJECT N
LOCATION:
LEGAL DESi
it J- n % e25 - 0a62 DLb
TOTAL ACREAGE: �</g. -795
WETLANDS PRESENT: D : YES NO
PRESENT ZONING: RnL/"1
REQUESTED ZONING: R`M
PRESENT LAND USE DESIGNATION: ciflla/t VIt/►1� /Y
REQUESTED LAND USE DESIGNATION:
REASON FOR REQUEST:
�M�ia f-inn JQC
FOR SITE PLAN REVIEW: Include number of existing employees: and new employees:
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within 15 business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within 15 business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owners Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my knowledge.
Signature of Applicant
Signature of Fee Owner
Date
Date
g:\plwUor \developm t review application.doc SCANNED
August 18, 2010
Ms. Kate Aanenson
Community Development Director
City of Chanhassen
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Re: Pioneer Pass -Final Plat Application
Dear Ms. Aanenson:
RYLAND
HOMES'
TWIN CITIES DIVISION
7599 Anagram Drive
Eden Prairie, MN 553"
952-229-6000 Office
952-229-6024 Fax
www.ryland.com
Ryland Homes is pleased to submit to the City of Chanhassen a final plat application for Pioneer
Pass. This phase of the development includes forty one (41) single-family lots, the completion of
a collector street from Bluff Creek Boulevard to Pioneer Trial and the creation of the 8.7 acre city
park. Included with this letter please find the Final Plat Application Form, along with all of the
necessary plans and items required for final plat consideration.
Phase two development is scheduled to start in 2012 with the completion of the remaining fifty
three (53) lots.
If you have any questions with this application, please call me at (952) 229-6007.
Sincerely,
Mark Sonstegard
Land Development Manager
Twin Cities
CITY OF CHANHASSEN
RECEIVED
AUG 2 0 2010
CHANHASSEN PLWNING DEPT
SCANNED
(�1rIS�r;15
.d34 °JNNrWId N3SSVHNVHD
OW o z one
03AI3098
N3SSVHNVHO 30 Allo
h
'N MroWtU W' pyY
I.,--wM—IMrw aw{pwv®xJxw„Idyw Iw141p4w91
.LINAM1MIW'A IYIfCItlMY]1YIYM1WY.V.VIIUI
PYAwq,.,PJ'.N�IYW
h
4
pn4'YrYrwrr.w,YI.IN W.wf.,Y.�µPrlp N N9MM,.s,rvl4ws (yWl
'Y111YAMYYY'AI.WIµI pAYY.I'NI,LNYIV A3NM.1
h h
ow+u N ^I I ypsu'MJ M,. M.a
.w 41)w irwYa,w. mll�urvivul r't wry �r'N'4n VrrW wWWP
,v.ulry,ww+vna.w.lvlu.--Y;' , WYw4wNw.r
rvnrvlW ,a�urvco.r, n...p4n wpnm,n•ru w++J.a.YYru YeaMNaYaM•IW
Axiw]wu9'w/e.y9 W
ry ua-41Pu,May.q MN'IYIPuw.wwnlN'W rLLpw,..4
'vtlW WIW'.LLµIY]YfAYYI VIlinYI1tlAY'IM,.1
a.�M'4w
41P.MN
—p�rA.MI,Mw.I„I�a1M
xPNAaPN
YYle1 wlwwye x..l.., <xiq rTr nu.uw.
y-y M�4P wM—wewaNvww+,ux..wwlw+l.w.0
rN 'Atl
MOn]T1wnJ,.Nwrwq.tl
rh,l w14TYIIw9w...1wroM.w..Yx.J.nTlawJ...wf�. W T')`W��+uPY
-�vsJroMw.YI.IM�ovtn
Nxw]
YNva.N
r �,�T4 YP PM—N..wwlpww.nawrv.l4YY...IY
rvlawnwg4v ml
' Ie1V— TN+tl.NY
4 nM.9.1,v.wJ aw w..•,nl'�. V ww� �; I•m.m �' wn wax PwY a TTP.M... W a
Y.ul w.�n+W..smn'wW4-arlNl w w.l
re' wM—N+wwyr,ww..q...wrv..w M•Iwa MA hIPT+.T•r.w.rvw'•-w-+-++..M.. Yx'... Am.o,nma
roY+.w.Tw..w 4Wa Tsev..NYxua.,wwwlmlw..wyP,y... ro,»..�•MI
rmwxxlw r,urii ....a�ww lw•.�w„r.ln,..«sol oxtrx ArP
n.wwYxauvtyailYiru i wxwiY.Jal vuew.xl,.,,..a.r.y..w'w.alW,.•w
rain.N .......n'.,.N']apx .,.]a W.Y'Nlmwa'can.w�.wn�..n.,x.rl,...,o,-ywall.ya w4
.µ,..W'Arm].ror�',Yx.v,ll+w.wt'.r w.•.s' "M.�nl�.a.�x..m..roP.w.x
... w.. •'w.r .<wanrowwwPhM.0
i r w rl avve lx•.wuN MJypw py.V l..uwa P.w , +uY luM,4Vw/wW p'mWm T4N.' 'trMIpNY YAMI 51wH A µBYYTr IYINY
SSdd d�I�NOld
w.u,w.Vn 1p lG ra. Na lE/,imYipl O
W9\YNPM MII xw✓Imam •
.�...
ve, w sew Ae mw.Y
tl1'
s,xx,wn:�"ao.e w sw n niu�rv'voo;omn
r
,:v .. sv.wY w.an Yrrow
' u .°i .xr ,. Wxlxfi oe.As ,remWow mr vxx
I
N
,.vac.%..;_J' .,.ww....-•....�t <9'
I \
wt
I
I / /
i
PIONEER PASS
LE� NO
CRATDOC NO.
INSET A
i
a
R.540P �.
�55a.
-`
NOM NOc�,o",:1u•e. •wrt
�2110
inri%TAWTEN,
Ar1�1.. rt a w mwr nw m[
'na
yM
• room in xlx,xn wuwn rww
100�•�j•
Rf Rn
,Wj
0 xur,ola�u. 'n nu. vwwil
_ 245.59 N00.290VW '
.- -�
� _ 111.0
BLUFF CREEK BOULEVARD
ad �
'1
a
20
e
y^,
/
41)
af9'l0'S5 W `
H .
1221.57 5001905E
eiTv OF SSEn
RECEIVED
AUG 202010
CHANHASSEN PLAWNWG DEPT
JAMES R. HILL INC.
PIONEER PASS PLR DOC O
c .THL No.
INSET B
�y5. t�.tW-)'JN'A:a"l.ePo'1JL'�i111'N�1�ide.Y t,j� ��� 8 eF£� 3
YY+,,},•ee s--" _ .•e r _'_'�!iN-u_ _ _` x` au+:t'i .%. 7
)b
� � S• 1 y'� Web sK .. i i 10 > �`F. �d � ` — 1 J L �.
7 2 \`
,AQ� `,' `':.�(x"T. YOP.owMm
naa
�xiolc.rte i 0.ii NCNVMEMi
d9-:- .89 •� era rt"n Yr re
`` l v 1 �I comaro>ert
wmn rur. e u
13 !1 \ '� 12 s :YNcu it vii`eo. Ilia n°+°.+Ep1yx�r
\ � ( ''1 5 �� •�L ! '! ^ ` �yP� -' `` r `� �„wd�,ta. � _.`p • mwm yv nor � xowxr mw
13
`` I �s� �•,'..� "-;��� `r '�� 14 "1 .8-�� )'��;i°���.-!iF 14 ° v°°"am1Oe�om�reremruY wruY.ri si r.,r
• 9.. �..N-"t r� 11 15 ` A. 'a..w
CITY Of CHANHASSEN � i. � �
RECEIVED 3 � `� 3 � I-a,.,,�- ,,..I..w.. {� 14 � �r
2 �p 2 I
j17
^HANHASSEN PLANNING DEP7 -'"__,aa-" � �---ma"--'�! �= ` 1`x,..-' _ e,54o.aa
r'
yowW
I it I • �'1, ! � 5
245.59 NO 9 W -' e^20•°5'W
y19V a 11 p.42o.
,.Mo.99
JAMES R. HILL INC.
SCANNED
PIONEER PASS 1ST ADDITION
CHANHASSEN, MINNESOTA
FINAL GRADING, DRAINAGE & EROSION INDEX
CONTROL PLAN STE SHEET " n: wronunna [.x-I.a
FOR En°9a • KWIN [r cams ° TAU x.+
N&
""" �"°'"`' °""""� RYLAND HOMES `
coma vu>r
7599 ANAGRAM DRIVE, EDEN PRAIRIE, MN 55344 %mm 4.1-4.2
PHONE: (952) 229-6000 FAX: (952) 229-6024 n"ni u"°%°APE
°ET"Ea a.t
Aa w[r`.1 A. 10 nn .."
•wn.veww[.s wuu "pvnxi.°.[
i v[:no a m[ "I
, n nlv
u Clf Y U•ruu
Y It w /tl l M IA
"llf. t, Al . M
rc
Ma CT cMT.
MINIMUM c
r
]! T[r
.l,T1..xG.,n.
m v .-I I. - ,AA— w.. A.
nn-X„�.v. Im
1 1 .Ix)
N'ttwM
01
.IT.1.)
CIX IWG[)
>IUr
CNINnINtltt[xTMGn
( !
i
sa lamt[2
x rtnTlIlTl
tlapw
11 I
!
[wr
brt[r
W xtl
mr6xr
Ins .p IAw A-1
�e a{.Aro
i TW
IEGEtl4
evmxe r, I.v
3
[mr ae se'mux
ry
[vsn v tt w a[
tmp1. UIIIx[A7E.0 .11 A.
x[n.wo MUNIANv
TIll 11.[/m[[5
x—
�—
ttx
[urI/Pori
f-1
an �
ATILIT
vi XG MU
xux[ um[au
................[vs�w
.....................
............... ..
v.N.
B..
vet
w\'
•
•.yn p,[[er pen4cr w.
v ownA
rnpnoFn nnuxK xu1
—Ic°o—..vowo
u«mn
•
cnn
.M., ncnur.[
-.-. mA•
rll
lt ..
1wm
nnnrowv wr usvAnw
A. 1aw2 vmnv
.nwvazv .sp.v..r aA,nu
enn xce-rtswA10
o rYw
All luxr-an wr rcxa
. ... .....
.. rnW)[IA elr IN.
b„rt
w ww
x°uw'vi uu All'. 11.
r ...Bnr
. vv rwwvriina
'AT
S1
"v c AFxn vn
NN,N , rev'Al
seoixnrxnw wap ancr .p[
mNAl ltrcx
xsa [ [ u
�n
�!"Alm�r
p n[/[M[n
AlIP %n)
up
.[ .. .
��'��JI.�U
[..acmctnv �f°xoxaax cwnv
.Alto v rnp2crw
Prcx ewvixvwavr
rn[ i m a xerAuv rAren
CMrL[nW tt U9ApK)
\
I.A
MWOe(G xO,W
r,IhM[ <plCn[2 lNN'.
USGS MAP
arNCHUM¢
•�asee ma . an- nos...w ee o..w
e. u.::mury iw w u ir%urt.
eur•• eo,w ..w ee onuu
SOIL GROUP MAP
In11 . PO;, lea
x.e.a SyLTyy�a m�^o s d. lw y w d a .n.ar iwm
B Srl a lown
c :lm .gym
o C.r Tw,
a., nH my mnm..wuy nnr..oq anv. o. aav
CI
IE�NGIL
'OH LO]fOYtl
61L—NlIS ♦ •NIS
TI! OYJ xl Nn b arcomYe xo b� ubwba
tt. r lxMnWn Ntl n!T' pL RS M
nruro eo iuil �H Y�l9e
WOe LLi pa)J�i�yxLi MpiSYI 6 Ye J X6
INI NZ • VaW I iNl 001
39VNIV8(l 43SOd08d 30VNIV80 ONUSIX3
SMi6NJY ((( ✓ w ��77 _ 1
�j
• r A
Ro1g,
AM
If
wy z `O yi iJo
CCU —
I HOW
it i �` a � i L �%;'. Y III �'.'. ie• /. �.,':_:.:.�I
r I I
e� l
i
m 5,
P \ N UY
r�
A
n m.,maR[R
.: A.� 'i:=� '___ Wiz_—_�_—,_r:=-__•�_c.:=—.—_—n_�r__ _ =a..—.=_—_— r—.
Y mmm�v. l.euxun v�mvlvrl. R .2=�1_ 9 .f--.• __ _ _. __—__
.TS=— Af
... .............. _,_._.— _,..� ®�.y._�-ter
i— -- '— r• -vim ram- YVpplRY eenluFNiATOx BOeIN CAS R.ex 'Rp(Im�T"� ron^' �wnM IUMT M
Iv} TF[TW _ _f01YM} FR1FR exd
_—�—_
R[MRYAQ—Y[1�T� RN� c*�R�ROF[TOx
___-Nl
---�i�r��ifi.iri •�W�•�
�.oR rt�. mn
•si.A �••:'"�rx'_.rr,.r.._..
use^rtuz—_--__
"dS.Si'- ,r
nnW lul cT RR
••3�L'isS.nLi'^':'u$�n:SY.V'i.i�n,•w•r
iRFR'Rom=MN
r.s
c"ss SEVON [ROF1a MM
dRY _ MM TIRI .1
[pOaW WTRM �N[R—!1[fY1RYT
IA R [mwm rw YwlRcnwR sfWUTMRI
u
wwsF.
,mm�umwm r mw eo a.m x�. , �n• aw m
t'An RAIN INIfT VRb=c — nLM Nc QAF
��tTx
it
AMCHMm
.rvnn ua .eo.oso .n u+c
-(gD0
1\
P C ON 1TRACTOR SHALL PROVIDE
EROSION CONTROL PROTECTION
FOR ALL TEMPORARY TOPSOIL ,
STOCKPILES LOCATED ON —SITE. ,;
,
2. BLUFF CREEK IS AN IMPAIRED `
�WATER FOR TURBIDITY AND NO
DISCHARGE WATER WALL BE ALLOWED
"TO THE CREEK OR TO THE FRINGE
WETLAND
5 111 `
.<N,i�s- 11
NOTES:
5 1` 11+` 1. CONTRACTOR SHALL PROVIDE
12 ^„ �, EROSION CONTROL PROTECTION C
• `,� FOR ALL TEMPORARY TOPSOIL
STOCKPILES LOCATED ON —SITE. Gf sm }/ 3 '
2. BLUFF CREEK IS AN IMPAIRED �"` _
• \, 6� O Y',3 ^.,1 �` + Y. WATER FOR TURBIDITY AND NO \ �,g i /
\,� 4a i R • n 4 \ -I DISCHARGE WATER \ BE ALLOWED TO 70 THE CREEK OR TO THE FRINGE G
e ,3 � TLAND
Ecc
yy
,, :� �• �� "` • \ ��i
PoNo
r..
n E
N +S]
I
E V
iqi
6
�• I I , . rr a
_ I ' In
• ff
i
`f � yy
` `` ne �
1I I ' Q � Njgg,��pp� P�3
OUTLOT u I� As
n ,
on a av
o•rz
r/s/,o
• e
-
•
as vu,ry
mr u.w
/A rAl
vll
T
h I v
l' ..,.,:.1.. U Rfc INVESTMENTS TLC F— K eA• <e<na
P D 0 23.0221 ;CC w.
n 1R<r 1O.
omNim
NOTES: 1TRACTOR SHALL PROVIDE
EROSION CONTROL PROTECTION
FOR ALL TEMPORARY TOPSOIL \ y
STOCKPILES LOCATED ON —SITE.
2. BLUFF CREEK IS AN IMPAIRED
WATER FOR TURBIDITY AND NO
DISCHARGE WATER WLL BE ALLOWED
TO THE CREEK OR TO THE FRINGE r °
WETLAND
OUTLOT E
7 �
oe I 12
I _ _
I 4 r1
1 d
YYY[[[ C
4 I
.S 14 null 7�s
If,15 \
o ° }�UTLOTQ
9
p pa
Ey�F OE
ZZZ s$
V
Q3z
S.n' $
I
pa�
°Re. ev
'x/Ia/+o
REHvws
mi
CREEK B
• F
LVO
u. i d n rtn
ex P: nxp
AU: RA INVESTMENTS LLC
1 ^ [ 5p1 - [[ ff S Y4MLR CAD iRE
i p 310b-IIE
• M I .... n .. w o.mx PRQIEOT N0.
I, D U 25.U2273f1RENCHMARK
I _
A r
»ZiYbH',E4) TJ MOf'R4jR� MY �
w y1nW rVL J'.YO mgrw b%!
SiROH�4NY77.N
j
sao.�nans /swab / saaarma
'3ul qpHssva
st'uaoaa 13axtis-
a��xoia
n
n
�
N
o
n
O
n
W
m
P
$
W
a
a
m
m
m
:2
Ss -a I
w zcc.
w mm rr
ac.
wmx.m
s3
sg
c. Ri8e m�
w mu«
E
E
xow asv«.
wx.
R^g.
' E$y�.
wcrw
Y
ms
Nvwax,
w mx»
i ',vv '.
z� umsroi asp'
c zR I 11O.�mD.p
-
i:Y
�av w us.
S s3
« J
I
» uryp.S9 .M mm
N
S
n
O
N
O
P
P
P
P
W
P
N
P
P
h
N
N
N
O
O
O
N
O
W
W
P
�
m
P
OW
q
m
mnm ,
SiRB
1
`\
lZ'
m
O
✓1
N
N
NOT
N
O
N
O
O
.-I
N
P
O
W
W
W
P
P
P
P
OJ
p
, AEI ,�,
aa� sar�s / samxa / sa�+rmw
�
'3uI 'a
.,♦ _ �, P, �.. �...
moll axrua 6>
axa. s
savtoaa aa3e
II!N
-
_ - ssva aaaHoia
o
m
o
m
o
N
o
n
o
N
o
n
o
n
N
N
a
a
n
n
ry
ry
P
P
P
P
i I
_
I
I
L I
_F I
[
'
$ wmmw
(
\I
I\
y
P. I ♦
I ♦
6�1
mM.L
Liw
w I'
♦N �-
u 8 � 8.^.
i I B:Yi
w maws
♦ aml( SYn�
o
N
o
n
o
N
o
n
o
m
n
n
♦
v
n
n
ry
ry
P
P
P
P
P
P
P
P
P
• A
J
\ w Y. y
11 slao a �" D
Mil
i
'
/
Fla
a a
� r�• o
an.
_•ems a. —T,
�a=rates:
_•ems a. —T,
�a=rates:
'MII' �Y OtSONW �MNSN1 Yi1gb0
MnMn WY Nrn YD< t/ rvY
Mm.a coe •nm-un mwa
°°n zi n rwo a Lsr+ / m
LLM01 l6, ry bYI W M4 1MER I n9
30
0~ (13NSiNlf— 1
a�F
fMneA ]t6
NW.153a0�—y� �yYtl�
v DmW��iYi
�t r
N�.NP
r
v..N.NNW.W eN.
i
dS SPI2k�'�YL"b�"X..
S3d 35WN 030N3MA003H
1I9I;G9PIP'JH362Ei
jfP11NT4'�U:•Y..1'/�!I•Ily.tN:l
GT
fin'
R �Lw;w
n��riiW wi� T
.un u,nnol� aY ti n�ii
fuPwn�Nl Ntiti wh w.�iW.j9eF��p
9TE
'1
SITE MAP
.D IDAIc
n II .. ..D
o PPl
AND oIo :c I i Ii�v .o
.o1urto -1IN, ..n.rtAM
PIONEER PASS 1ST ADDITION
CHANHASSEN, MINNESOTA
FINAL SANITARY SEWER, WATERMAIN, STORM
SEWER, STREET CONSTRUCTION & EROSION &
SEDIMENT CONTROL PLAN
FOR
RYLAND HOMES
7599 ANAGRAM DRIVE, EDEN PRAIRIE, MN 55344
PHONE: (952) 229-6000 FAX: (952) 229-6024
I
MIILNLM CITY EFIMI RFNMMMK
N fl:
ni XYM /Att p ,i! rDlq,
Ra jxwp) i rm ettf .isar aiwwAr - x. sm[ p
yp (mm i rm rICMEu LANE . nn- i�O.N IMw a oATY
ax m[i% "PAY,u.IN lN'IDD
as m rt[r",.,.A. a'. R♦w we
FMv • ` a ouD.
N. nwwN.N� .,.Aw . I,., -III Nla
F, 'Al NNAN
w..9 n.croYpn VD.[nA"p,vp darWYx frY.l>}�.::a 10)
•LLpMp.. u Na l . to)
uAN.N-re DNA.R ....w.. itsm'rz� °e I.�oiA.-.A.n..
MRE M4MT
97 INFC III
ER090N k 4 MENT CONTROL DETALS
FINK OMM k 4DIMENT C MM PW
SANITARY SEWER k WATERMAIN CMSMiUCnp
9LFF CREEK mw
BLUFF mm sLw
NEMLOCIt WAY
HEMLOCI( WAY
MAYAPPLE PASS
STORM sE CONsTRUCNON
STREET =4MUnM
BUIPF CREEK mw
BWFF Mm Kw
HEMLOCK WAY
MAYAPPLE PAZ
OETALs
LEGEtl4
9i
t
f i..i Do-.NE,I SURIwE
D,NAIAX�.ztt.w
O cx.Aw n.ai
11
12
}J
3{
zB
ti,—{ {
B.,
6.2
M1J
B{
sd-52
�-
9u9nxG v.,RRp ix
•LL!
{ifTnl rzIE.Nn„ , .IDE.,A,
`i1
xp -Y" P" r9x
A., DRApx4 a! IWC[
:..I
- mints P. NPPrz' N rzxC[
msow TF.VMARr xa,.
�y
EwMIW£
pARY
IW AeuuA®P�TY
I....
.I, ENa ro ,.DI
DILIDND ..ro
A. D]M,D! 1.
—.NPIN.NA. NAIL. DAAANDLD
®—
pDMD.
- •
RaAmosfD vw�.nr sfvRn
"r
• _____�ANAPI
xanlvasrm�IE CONA. Tmf36
11110415V./ACC
A.. AY.A.T PI
A,DIP.. DID m"PP9ADC1Ilp)
®
nnmaFn n1H. DID nWrtCM.iro
A`DIRCWVMTW pvDuly
CM9`AUAt
RV
11. &E.NNNADAJI ID A�iPAWC "n°,r"'M PDA
e
DID T DPAN)
NDANAI • �"'Au. ArrzN
IPI
♦
., p 51R9f! cD .DD )
nI
N D AD Y"R'Ta.111..p�ro
Mi
�:u�m"cs CD a wvAN
.rrzR c p DT.,rz <wsnvcnar
i
j� -
.um.l. DDII IIII
-
t
USGS MAP
1 Inc9 . IWO I..l
ou n. Al 1 mum K. a n*.aY.A
I [ K91 V IM.A, - X... Y
nipK(I A.R -.11V. n0N A. Y WNY
M N: AAcA VN W OIL.YCIO&D
[t[X� .1>.i A. M O.NY
SOIL GROUP MAP
Sol TC.,—
m ne Sma Immy —d. V Mner lmm
B 91Iwn V l.V
c smey ear IesY
0 1'Jor IYVM1 Ntr <mr loom..wdy clay, .nay duy, o, a0y
F'I
IL-1.1le
'ON 1'J3MN<
052-OIOiL niLLva n avx axle �Nel
'ny 0�0 WIrJY f M YN: nuldJYa
M6 Y ]pnNgn NY NIIM1 Ma EI �
mLLVO X qYF K'OIe �N1A - WY11fMkJ
YnO�i air nav�N9pN[ ]Yetii J X
C
F
n•� nn2 � m.�. I nn ooz - rw I
30`dNIV80 03SOdO8d 30VNIV80 0NUSIX3
SNJISN3tl
]LYO
MJ
AG NNYUO
! Si
art
_-9
o f/,rEpzi
t14
t
i Mnl '-
AMRCD '
4 N MIKE
r y'
t a q'�
Mill
.
La
\l
c�
_S�
. T :Lt=��T1:2�R�� : •:1G22...
2• Wiz_ n_ z_av__.__�.__.
..�..,.--
-
9SMf.ICPial'ffi.R',OC.��
"%a>C.L'C4"N.VGr ""r"'� rvRmr e�rtL,n
CRm SCLneu w.MRL r[w
ava arnv _ wmv vvn e
tTi10.'aR" ��y_
Rr.R rR� fir. Y.g�rr�Ren'cnax
IJ
rT CRM1AfIIm
... r
o n s.w+v_n>Enry v
m r[ xmrum ra RxurvmrR R�IGMIIR)
Z•.t�_`AL � �L�S.tY _L_
M I!! y
.I
ollC
__ T��'ir•�=s�lL'
r
rr w ay
umadwr®uti, .• .o,.. � � .,. , yr Ru.....
•.va R.mu xl.. vRennn _ m AR �eryrneA
a
R'2�upY�:
7Y'1`t
M.(01
-uw. vvn oven-O.rtlO
:w'n..ion vnxwr,wnu o s xrta...n 1::�-m-vvn
1'
o� o
� 4,s
urtn�
�
ILI
N.ILL�
d
cwn[mx um.ry �iw
=nv.,x
n
cc
BEOCHMARK
L w
DPPF yNE d, CPMDYD e/w lwL
euv.. naa ..w P Dnnu
'
,4 '++
4 13
1 14
ounor L � O� � �._`J^,
7 L.
_ tic
OUTLOT C
E-
x e
h
h. oe� er
oArz
enanD
N[NLIMl9
3 3
OUTLOT D O
16
J ''SEE SNEEt 32:.,
Ind
($lEEK W
OUTLOT E
r nro. 1
rWM �
I i
OUTLOT C
1 RI I IFF CRFFK RI VD X
" " v� -.. I 9EtlGfltld6K a ..0 �
.,J 1 I ice' ° �ea'"v�:�•,oi."+w' o.,�. q
°""' °°""" �� ' �w
{fix
ppp�
�
955
955
rnroo� axmnx
q
_.
...; ..,
•`
,
940
940
..
935
��
935
e.
925
_
wwa.y,n...
•;
925
r.
-________
920
E _
% v. v: vw�mv
920
p4
915
915
I
th
ZIR+T
C
4ca
". -- -
OUTLOT 0
�. �
N
xyp
pE
vys
�F yRMK
R-....
unewrss,
RMCHMARK
!Jt
aIj.1"
me
1."i97NA
�
BLUFF CREEK
BLVD
° Ai
zg
E 3
940
_ i �.
I ......
940
935
maau a.mu'z
;: _.
935
vY
ti St3
RS 9
Cn
2 '1
930
....
930
925
-
/..
'..
925
W ai
920',.______
zr svl
_ .
' ..i
- it
_. _
__'.
T —y ._ _. _:
920
P.
DRAM BY
915
w•NRA
915
DAYE
RENSIORS
910
'.
�, I
...
_...: J
910
905
905
900
i
-� __•.
_ .__. a
.1
i
900
I
�
I
'��
�, ,
v z.. ur
.890
J
� .__.,
B95
m
,.,890
e+
+
C
I
A
_ 5 - 1,
,
MM
OUTLOT C10
11!
12AL ]
f aR
„„ 1\
BENG6Y1BK
IA-.aawa°P�
o
--------
OT P
R
a
HEMLOCKMIA
G
945
ar
-
t
i
A gg
.!
a3
A
Y
d
�
..
945
940
�.._
..
940
W
935mr—
a
R]]xa Ca]m
ti
IIDI
T
930
DRAM or
930
�<'-
'
ma n•�uM �anw
^ I
Ci y �h
_B�
I 'R
9=.. aFl
I
I'
CA,
925
925
oAre
RENL015
920
220
915
]. ]
•
915
CAD MU
•
is1 S
'
g
910
905
4
C
F
-
f
905
>RMCT .0.
]ISYe-n
ya
+
+ +
r--------, ; -----, — —
__- c ____ ,'11 j 2 I I 3 4`
OUTI,OT E 8 y-? j/"�.- •` 11 w� wR+
7'.. •`°`y_ _ PKx61,
rc ixY[ w rrxaa[o n/✓ uv[.
HEMLOCK WAY R._°
-'y . YB c 91 � usaN Cpl[gxR I
`1
1 Rm
,
r a i7 �•
an i i
i ,q rrw ®.wawa
F
u
III
RE.$'p . I 1
E
\�`
\� �l_.___
_
OUTLOT •,%5
xtd,
51
N
AAAVAPPI F PACQ
5
2
v.n wwo
N
9FNCNYMN
np6R Aul - ON._ R�Y.N x.W Y O.Nx
ice:• enn wi a :weexo iMTMi+rt.
�
955
-B -.g
1 II
AAtl rnoeum mlm+r
6
�"-� .�..II
955
e
950
____'�
'r
_,_
i. ...
950
945
',.
..,.
-
_.
_._�,__`
.. ..
945
r
�
I
940
arms
_
940
�r1m
930
930
r ,Re_"epr+r�
WN .,eM
-
'.
925
925
- -.
920
920
_
_.
F -
1 .
915
915
i
i''
i
wwno-nrzx x
OUTLOT C
A
e� non anu sw>» ..a a or .o,sn
iw:.nsr a omwo. - ,as a
nen mm - nnv.. r�av ww w o.n,+
w w 1.1s i w�we M vr`"iaa.
ee M.
9!
953
6
Mt aT9{{ o
..IFS
a f`w°:u
.,
H _ed�
-
t' s �3
�i
;.:
J�yg
��pt..
°�g __!
_
a�{B :3;
a�g
955
!2
IFS
950
1
950
0
945
x
��
.,
.,rcosm w.n Pe1
�'
o
as,oe
945
anKK
940
940
935
s ."- -i
a,
__
-
935
"
a.
we
Uas a1
-
e�-n no
930
930
Pros
r o1r
"�°i
-72
rl K
a-x eE a •Dean
925
925
a PW
°
920
x
ry
s
4'4
kpp*
x
920
e
p p
gg
gg
i£
gg pp
'�i4
pp
p
z
pp 4g
pa
5c5
i i i
g4
£
915
915
£
iii
Sn�
£
f
'
13
Z\
NOM?•„,e„..«.
C
s
W,Y B.aKWw w.n ems...
"w`eiaMwc
"
ir.Hii.Bi
i umimim"in
; i
A. uRumu
14 �,
Y.. rn:�wm'�".'.r .:ray..
`
eT
5NE
oo r'"b'.x8xi�wo.�G'°."'...u°Ln
""
OUTLOT D
—"'l�."`..
5& �
_
.R
3BRAA4. 1-1ML `.,,.".o°a `,::1"
to y
�
15
Y ,,..c.•K»..L a
m
N s
RY mi . �i
,-
,w�
. L0 ALL coeG[rt Me .
C
.
t'S'
wr�n/Rar.L[ uO.LL w M1IRVRO n uiury
G � '
p�
Lp1WCKx ws K mdK u0 vuR, w"WieLr v�u
P.fanmrnw
(Q
�
pRcxeio
1COlAExNL BSo.B
i
I E
4
-
\
RNYucx ^1RY
p z
iw R0 ei.ARDae
\
1:
Voµiu[ m'nMTMw+[.
Y Bl: Vt
a ,Jy�
B J e x.w Ku.vx
N�F
em-
YRBi930
ay�
W S
O
Fr
DRAM er
M
e%zo Eo
PEN50 9
i
oRF
vBBe-ms*
CROJCCT NO.
BBB-xl
2
925
+u�z°J�ezPm Y,IR
OOF K ry] PWY Y
r°'nR RYu¢rnRs
-
_
i�PaY`iwino
SEE
ir{r°oL'Rwai:"."in' I
925
920=.:a
920
n Y
ReR
91r.r
a
•�
B.'�
915
e� w
I
e c' �cLi ur°0nw i
910
Y
i,
kuw }..Ynou
g1p
905om.i
I
M.
903
900
RA
ep
I.
Q
900
895
I
�I
e
5{5
895
890
bb gcc
F E
55p
�'. a°
g
i
aa
F
gg
'. i•
i
890
920
-�tB
ea
�9
a3
920
915
_
915
910
910
MOMb
as
905
rwx° - I
905
R ,.W.11
900
WPYKY
evi.Y°� rR.
900
893
8B5
E. x
B90
er-n+Pv
m • 0.vR
i
890
885
555
880
i R
880
..RR
.• f
}11•, OIY
10
CIE
a n
12
`
,\;
,1
•
8 f
to 3�g
R
^•
,frt.-W"'w
, -1
d
F
"'-
1
}`,
J
'�
•}�} 13 �1 F.;B;b i�
�,`
Opp •.
f
;�
,} 10
`-
.. �-
Aww11
OUTLO7 0
--_,
1,12
11 ;113_
M
1LOT
G �
D
945945
all
940
940
935
935
o m •.°w
930dr0
0�:�'e°�R
930
925
u.w
925
920
920
915
915
910
Rsiq
x
-
910
905
Yf�Z
i
i
905
ORA" BY
cR
OAIB
B/10/10
RCNBICNB
`
,
dx
Nwi
• ..w w. •l K ,rRCM�e ulID
4, M'Kw.vp x"9tt O
ttY'INY
__ _ _ - - /
--
�I II
. v 44xwa
III I�,�`.ewe4[mno AwL M�!,W nu.mxw. xlgl G,G4W ��rt+e"�lV. i�YNx.W µO.IYx\
,
P
i iaim.x ex p. uux Via, [x, • eoum
`
,,•,_--_______
S
1I
�' 11
%'OyTLOT E A
4 .�xk, ,..G oe.: e. �wrt
:xn�ax''eo
�, �,
a Y
.
/ 6 1
I i
wa+.c°G
i w �...x..,. N� m�
5,.
�
%��/
4.:1»e,l I
11
m,', :,".'rMr �...Y .F,�..,.,N�;>rx,.,;,m•"°
�'" B•
Nt lOr LNA�,'
\
d) tl
I
OUTL\
/
J
Y
�
1 •
7
`•+:
lex
• ._ ,�
10
1 4
3
Wr e,�,
Z
OUTLOT E ••
�• \ I 1 1,'1 �11 ;•�' a
`•
••�\�.
1
f d
/
7 2 1 { j�� /
_
-
;_
950��
sB
aa�8 s�
s�k
li _
:..��. aa?
a:u"cgd�
------
950
Q
945
945
one
�.
940
wi
w g
940
rw
935
_
v,+a
urr
•
_
935
I
Ei
930
N war le•..
rts npu» m
_.
,NGaav
a
i;ex"
/,
x
, xu
a.x.
e' ix
\
BSO
0.
fro
ic..xS fi .NN
.G:
u
,on
DRAM BY
925
°n-m wr'xn
. ,ca
e owl
°ei°
a.xroe.zor
xe .<
925
AM
c�rz
/xo/,o
920
�
a
e.,. " Nk. �
920
NeGSIaNs
910
905
910
905
•
�
?
,
�
.
xuwiier
�1108CT N0.
900
900
e.a
16
.maew 17 BLU K 9L70— . _ _ -SHEET 5.2 R Y
cp
OUTLO7 E
OUTLOT C N Y
i
M...
yr«• q P e a mw :.:.mi wi�O 1 �
i d
- �' 0 r�sTMY,, emcie¢ ene eartx.rz 1 / '
wee .x wr�wl (mI. revcsneW an Y wrml Im),
I 1�
f6g• � °"' w.' .. NOM,"
°_•
uY.a.Nni. iF�
"'
oP 10°'= ^.
sru.r i. rl.n
_��rt M1:e1M
re aweWi i,"ip uMCu o xort""C.YW[ F eC M
�,�
w:•
.,
�^
Ey.
OUTLOT C
°.err10 r."w Im.I A .. Pw �`
E.
,Yr 4w
Pei°
M � vmv, wr.�I
9meeueen
ruv.�wsMirvwxw. -
Y CONCRIM
n v [w nunKx
'[' •um:
SIUM&K LOCATION
IFFI�FFK
�O' RITLMINOUI ATON
ei �' nip%,vrw wram• �+.r®uv
uW• .: N x.[w a wv.
qRa{ euKi
RI1Nv Y MPd
w +u+w cwu.m ar
rnv[ IOrtI Yw'I:m'ertnw,x}em
wni Timm
B 9I VC
B IFF RFFK R M
W P:
eLw Ot �I�VM I4
RI IIFF CRFFK
RI Vn
� CR«>�xnwvN OxNM� ""C•
it
t si
�If'
si
ax
955
950
950
=
945
x
f
ii
/
945
940
gg
Yggq
l
s
.
w!i¢.
940
g
'.
_-•__y^••_"_pa
935
g
k x
x�. j
woa..
_J.
m emi..
"_
935
�.
930
..
_.
b!
+�
930
925
-
pipgII
gar:
i e
3' i
925
920
94
920
8
9
8
915
9
_
x
ti
_
915
� PFNSI(N19 � I
rat
t
N0II5
1, IL. DWEHNNAS RAW ,.i
IN
3
.wxvmAoxmIX0
NINR
1
wrxoxxuwinr Ei3nRrxis n
wx
rmn.w
r
..
14
I;r;
IXnulwwa
gx
INA.
'3•°x
ao a »arm
au
3. DUTLDT DA.
RTF
5 -pN FRIpFW41y p AnW
FI LIFF CRFF 9LVp
x
E
INA
co g yq
15
I
'rt it
ioz-
•
�
.Y
r h mxvwO°i rt
wa�ae
G
uul x rzll
(
•
11
OUTLOT C
ox
BRARAN
10• Plllli�py� SALL_L4GA➢@L
ewFF
BENCHMARK
BLUFF
CREEK
BLVD
NIL
r�
z
n
_
I
940
940
o O
935
935
_3 xw�ni..
_... ,..
: _.
_:. .._. ..
E-11
930
I
'i
I
930
uu
a��9
925
;..
is,wi uKmwi
O,
920
�. e
_
ill
,-
�' " -_
l _. -.
r -
920
0..
Q
yy �
r
DRAW BY
915
_�•$
k
p
l .�.
..
915
ux
v¢o/D
910
F
r y
sill
... _._.
910
BENz1an
905
�
'.i ax io
905
900
°f900
595
cno R¢
21ay.-'1 N
y
B
�
PRO CT NO.
mvv
890
i ^
890
e.2.x
+ + +
+ +
8
,
S
10
412
N
m
�f
OUTLOT C
'
',dwimliov t, q.
9
0
= -, �� - 11 `•' - OUTLOT E 6
/ 13 12 tlIlgS
'4 ,,-,l•" mm.[riy no
e.w,s '[a�RXM1WCY Ti•f rcoux sd.ci u,a � ��-Z$•�~ BGNfXY1RK Ifl
LOT D
HFMI (�CK WAY€skr€€..,l
5' CONCRETE CIOFW' >rL orI QQAOON
945
e
awr 2 �e. a 8 .,aoso rnrznw •
«
945
940
..m
v»u„ 10 M -
v..jr :u� a -940
7�i
935-___-__
________
�9y
935
930
$ g
g � $
B$R 29 vmnx rou
```
930
4s'
R
925
.
925
920
4 ... .. - _.._ .....
920
915
is
`�
915
e
Ra
._
I
Far3
910
._ .gj
_
910
/ REMSONS I
9
i ;
1
B
A
J ,
`
W
--e"I�
•
II
�
- - _ __
_
8
.�
5
- aw arm pn) ,) i 10
13
MAYAPPI F PA4S
NOMS
nzxs urm i�uno o' amF ncaA, W'ntw w f,4+uRr
N
RI
MTwrc a n�xa"osso x v �w.
emw
960
900
«,
K=<oa.w
955
�a
�
Yu
rn:ma raml,.
_
955
945
,n ao.,
e�
__•
e
_
945
�9g
�
940
_.
,I
935
Ilil
835
'
waoo
930
_.
_
...(
. I. ...._...
.�_ .......I
...
930
�
�
925
p��
925
920
i
920
NENSCNS A I
=.Nluv�..- = =.-w
. .[—e�Fa=
prg
Oak I
I * dwo I .. -1
I I r
T700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone:952.227.1100
Fax: 952.227.1110
Building Inspections
Phone:952.227.1180
Fax:952.227.1190
Engineering
Phone: 952.227.1160
Fax:952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone:952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax:952.227.1404
Planning &
Natural Resources
Phone:952.227.1130
Fax: 952.227.1110
Public Works
7901 Park Place
Phone: 952.227.1300
Fax: 952.227-1310
Senior Center
Phone:952.227.1125
Fax: 952.227.1110
web Site
www.ci.chanhassen.mn.us
10-(icy
September 27, 2011
Mr. Mark Sonstegard
Ryland Homes
7599 Anagram Drive
Eden Prairie, MN 55344
Re: Pioneer Pass — Approve Addendum A to the Development Contract;
Approve Plans & Specifications for Mass Grading (Outlots B, C & E)
Planning Case #2010-09
Dear Mr. Sonstegard:
This letter is to confirm that on September 26, 2011, the Chanhassen City Council
approved Addendum A to the Development Contract; and approved Plans &
Specifications for mass grading for Pioneer Pass Phase II, plans prepared by James R.
Hill, Inc., dated September 9, 2011, subject to the following conditions:
A pond as -built will be required when the storm sewer is connected to the
pond. This will ensure the pond is constructed according to the approved
plans.
2. The applicant shall have a soils engineer monitor the construction to ensure
proper placement and compaction of material.
3. The storm water pollution prevention plan shall he updated per the current
plan.
4. Proposed driveway grades must be between 2% and 10%.
5. Conditions referring to grading on the approved preliminary plat must be
addressed.
6. The date and duration of the Bluff Creek Drive closure for grading purposes
must be approved by the City Engineer.
7. The security posted for Pioneer Pass will also be used for any issues relating
to the grading of Phase II.
8. The retaining wall must be designed by an engineer licensed in the State of
Minnesota. A soils engineer must be present during construction to ensure
that the wall is constructed properly. A registered engineer must certify upon
completion that it was built according to the approved plan.
SCANNED
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Mr. Mark Sonstegard
September 27, 2011
Page 2
9. The plans must be revised to provide a connection to a drainage system for the roof down
spouts and sump pumps to prevent the discharge from these items from going over the
proposed wall.
10. The applicant shall choose either wet or dry cast block approved by MnDOT
specifications for the wall material.
11. Due to the height of the wall, a fence shall be constructed above the wall for safety
reasons. Any area in which the wall height is greater than four feet shall have a fence
installed.
12. The retaining walls constructed under this Addendum to the Development Contract shall
be maintained by the Homeowners Association.
13. The applicant shall revise the grading plan per the comments provided by staff (redlines).
14. This phase will result in the approved wetland impact. Because of this it will be
necessary to construct the mitigation area at this time. The applicant must provide a
detailed site specific restoration plan which includes, at a minimum, items 22 — 37 from
the Minnesota Wetland Conservation Act Replacement Plan: Complete Application
Checklist available on the Minnesota Board of Soil and Water Resources.
a. Wetlands are in profile and plan view;
b. Detailed planting schedule;
c. A detailed vegetation management plan including intermediate goals;
d. Other elements consistent with the Minnesota Wetland Restoration Guide
available from the MN Board of Soil and Water Resources.
15. All other conditions of the wetland alteration permit must be met. (Chapter 20, Article
VI).
16. A Landowner Statement and Contractor Responsibilityfor Work in Wetland and Public
Waters must be provided prior to any grading in Phase 2.
17. The SWPPP needs to be modified to be specific to this site.
a. The SWPPP must incorporate the requirements of Part III (Stormwater Discharge
Design Requirements), Part IV (Construction Activity Requirements) and
Appendix A for the project. A narrative describing the timing for the installation
of all erosion prevention and sediment control BMPs required in Part III, Part IV
and Appendix A must also be included in the SWPPP.
18. After grading, the use of silt fence with j-hooks, staggered biorolls, straw wattles, rock
logs or other appropriate BMP shall be installed to break up any run 75 feet or longer.
This is to be shown on the grading and erosion control plan and indicated in the SWPPP.
Mr_ Mark Sonstegard
September 27, 2011
Page 3
19_ The plans must show the soils correction area or "temporary blister" area and include
additional BMPs necessary to prevent erosion and sediment deposition from this area.
Signage for the Bluff Creek Overlay District Primary zone shall be installed after area is
graded as well as in those areas where no grading is needed.
20. The SWPPP, all modifications and all inspection reports shall be maintained on site.
21. All stockpile areas shall be indicated on the plan set.
22. All exposed soil areas must be stabilized as soon as possible to limit soil erosion but in no
case later than seven (7) days after the construction activity in that portion of the site
tributary to Bluff Creek has temporarily or permanently ceased and no later than fourteen
(14) days elsewhere.
You are also reminded that you must comply with all the conditions of approval for the wetland
alteration permit and conditional use permit which were granted as part of the preliminary plat
approval. Please execute the enclosed Addendum A to the Pioneer Pass Development Contract
and return for City execution and recording at Carver County. A signed copy will be returned to
you for your files.
A separate building permit application is required for the construction of the retaining wall. The
retaining wall must be designed by an engineer licensed in the State of Minnesota.
Once everything is submitted, please contact Gordy Stauff at 952-227-1166 to coordinate the
preconstruction meeting. Should you have any questions, please feel free to contact me at
(952) 227-1165 or by email at ish�ci.chanhassen.mn.us.
Sincerely,
Joseph Sh /laP.E.
Project Engineer
ec: Kate Aanenson, Community Development Director
Alyson Fauske, Assistant City Engineer
Bob Generous, Senior Planner
Todd Gerhardt, City Manager
Todd Hoffman, Parks & Recreation Director
Terry Jeffery, Water Resources Coordinator
Jerry Mohn, Building Official
Paul Oehme, City Engineer
Gordy Stauff, Construction Manager
Enclosures
g:\eng\prcjects\p-s\pioneer pass (fka peterson property)\approval letter addendum a phase ii gradingAm
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
ADDENDUM "A"
TO PIONEER PASS
DEVELOPMENT CONTRACT
SPECIAL PROVISIONS
AGREEMENTS dated September 26, 2011, by and between the CITY OF
CHANHASSEN, a Minnesota municipal corporation ("City), and THE RYLAND GROUP,
INC., a corporation under the laws of the State of Maryland (the "Developer").
1. BACKGROUND. The parties have previously entered into a development contract
for Pioneer Pass dated September 13, 2010 (the "Development Contract'). The Development
Contract was recorded on December 1, 2010 as Carver County Abstract Document No. A529909.
The developer is now requesting amendments to the grading plan and conditions of approvals.
2. EXTENSION OF DEVELOPMENT CONTRACT. The Development Contract
shall remain in full force and effect with the modifications listed in the special conditions below.
3. SPECIAL CONDITIONS. In addition to the terms and conditions outlined in the
development contract, the following amendments shall apply:
a) Plan `B" Grading, Drainage and Erosion Control Plan dated September 13, 2010,
prepared by JR Hill and Associates shall also include Phase 2 Grading, Drainage and Erosion
Control plans dated September 9, 2011, prepared by J.K Hill and Associates.
b) Paragraph C on Page SP-5 shall be revised to add:
21. A pond as -built will be required when the storm sewer is connected to the
pond. This will ensure the pond is constructed according to the approved plans.
22. The applicant shall have a soils engineer monitor the construction to
ensure proper placement and compaction of material.
plan.
addressed.
23. The storm water pollution prevention plan shall be updated per the current
24. Proposed driveway grades must be between 2% and 10%.
25. Conditions referring to grading on the approved preliminary plat must be
26. The date and duration of the Bluff Creek Drive closure for grading
purposes must be approved by the City Engineer.
27. The security posted for Pioneer Pass can also be used for any issues
relating to the grading of Phase 2.
28. The applicant shall revise the grading plan per the comments provided by
staff (redlines).
29. The retaining wall must be designed by an engineer licensed in the State
of Minnesota. A soils engineer must be present during construction to ensure that the wall is
constructed properly. A registered engineer must certify upon completion that it was built
according to the approved plan.
30. The plans must be revised to provide a connection to a drainage system for
the roof down spouts and sump pumps to prevent the discharge from these items from going over
the proposed wall.
31. The applicant shall choose either wet or dry cast block approved by
MnDOT specifications for the wall material.
2
32. Due to the height of the wall, a fence shall be constructed above the wall
for safety reasons. Any area in which the wall height is greater than four feet shall have a fence
installed.
33. The retaining walls constructed under this Addendum to the Development
Contract shall be maintained by the Homeowners Association.
c) Paragraph D on Page SP-7 shall be revised to add:
15. Phase 2 grading will result in the approved wetland impact. Because of
this, it will be necessary to construct the mitigation area at this time. The applicant must provide
a detailed site specific restoration plan which includes, at a minimum, Items 22 — 37 from the
Minnesota Wetland Conservation Act Replacement Plan: Complete Application Checklist
available on the Minnesota Board of Soil and Water Resources.
goals;
a. Wetlands are in profile and plan view;
b. A detailed planting schedule;
C. A detailed vegetation management plan including intermediate
d. Other elements consistent with the Minnesota Wetland Restoration
Guide available from the MN Board of Soil and Water Resources.
20, Article VI)
16. All other conditions of the wetland alteration permit must be met. (Chapter
17. ALandowner Statement and Contractor Responsibility for Work in
Wetland and Public Waters must be provided prior to any grading in Phase 2_
18. After grading, the use of silt fence with j-hooks, staggered biorolls, straw
wattles, rock logs or other appropriate BMP shall be installed to break up any run 75 feet or
longer. This is to be shown on the grading and erosion control plan and indicated in the SWPPP.
19. The plans must show the soils correction area or "temporary blister" area
and include additional BMPs necessary to prevent erosion and sediment deposition from this
efrM I
20. Signage for Bluff Creek Overlay District Primary zone shall be installed
after area is graded as well as in those areas where no grading is needed.
21. The SWPPP, all modifications and all inspection reports shall be
maintained on site.
22. All stockpile areas shall be indicated on the plan set.
23. All exposed soil areas must be stabilized as soon as possible to limit soil
erosion but in no case later than seven (7) days after the construction activity in that portion of
the site tributary to Bluff Creek has temporarily or permanently ceased and no later than fourteen
(14) days elsewhere.
4. RECORDING. The Development Contract and this Addendum "A" shall be
recorded against Outlots B, C and E in Pioneer Pass.
IN WITNESS WHEREOF this Addendum "A" was executed by the parties the day and
year first above written.
(SEAL)
CITY OF CHANHASSEN
114%
0
4
Thomas A. Furlong, Mayor
Todd Gerhardt, City Manager
DEVELOPER:
THE RYLAND GROUP, INC.
Printed Name:
Title:
STATE OF MINNESOTA )
) ss.
COUNTY OF CARVER )
The foregoing instrument was acknowledged before me this day of ,
2011, by Thomas A. Furlong and by Todd Gerhardt, respectively the Mayor and City Manager of
the City of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and
pursuant to the authority granted by its City Council.
Notary Public
STATE OF MINNESOTA )
) ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of
2011,by ,the
Of The Ryland Group, Inc., a Corporation under the laws of the State of Maryland,
on behalf of the corporation.
Drafted by:
City of Chanhassen
7700 Market Boulevard
P. O. Box 147
Chanhassen, MN 55317
(952)227-1100
MORTGAGE HOLDER CONSENT
TO
DEVELOPMENT CONTRACT
which holds a mortgage on the subject property, the development of which is governed by the
foregoing Development Contract, agrees that the Development Contract shall remain in full force
and effect even if it forecloses on its mortgage.
Dated this _ day of 20_
STATE OF MINNESOTA )
(ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this
20_, by
ri
day of
NOTARY PUBLIC
FEE OWNER CONSENT
TO
DEVELOPMENT CONTRACT
fee owners of all or part of the subject property, the development of which is governed by the
foregoing Development Contract, affirm and consent to the provisions thereof and agree to be
bound by the provisions as the same may apply to that portion of the subject property owned by
them.
Dated this day of 20_
STATE OF MINNESOTA )
(ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of
20_, by
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
(952)227-1100
gAeng\dc\p-s\pimm pass addendum a.dm
7
NOTARY PUBLIC
September 15, 2010
CITY OF
CHANHASSEN
Mr. Mark Sonstegard
Ryland Homes
7700 Market Boulevard
7599 Anagram Drive
PO Box 147
Eden Prairie, MN 55344
Chanhassen, MN 55317
Re: Pioneer Pass Final Plat — Planning Case #10-09
Administration
Dear Mr. Sonstegard:
Phone: 952.227.1100
Fax: 952.227.1110
This letter is to confirm that on September 13, 2010, the Chanhassen City Council
Building Inspedo ns
approved the final plat for Pioneer Pass, plans prepared by James R. all, Inc.,
Phone:952.227.1180
dated 7/16/10 revised through 8/18/10, and dated 8/20/10, subject to the following
Fax:952.227.1190
conditions:
Engineering
1. Building Official:
Phone: 952.227,1160
Fax:952.227.1170
a.
The north -south collector street shall be shown as Bluff Creek Drive.
Finance
Phone:952,227.1140
b.
Developer to provide 1:200 scale plat drawing (with lot numbers, block
Fax:952.227.1110
numbers and street names only) for addressing purposes.
Park 8 Bemeafian
c.
Demolition permits must be obtained before demolishing any existing
Phone:952.227.1120
structures.
Fax: 952.227.1110
Remotion Cep
d.
A final grading plan and soils investigation/correction report must be
2310CoulterBodevard
submitted to the Building Inspections Division before permits can be
Phone:952.227.1400
issued.
Fax: 952.227.1404
e.
Retaining walls over four feet high require a building permit and must be
Planning &
designed by a Structural Engineer registered in the State of Minnesota.
Natural Resources
Phone: 952,227.1130
Fax 952,227.1110
f.
Each lot must be provided with separate sewer and water services.
Nk works
g. The developer and/or their agent shall meet with the Inspections Division
1591 Park Road
as early as possible to discuss plan review and permit procedures.
Plane: 952.227.1300
Fax:952.227.1310
2, Engineer:
Senior Denier
Pha e:952.227.1125
a. The developer must coordinate the proposed grading within the Liberty on
Fax:952.227.1110
Bluff Creek property and the restoration with the homeowners association.
Web Site b. If importing or exporting material for development of the site is necessary,
www.d.chanhassen.mn.us the applicant will be required to supply the City with detailed haul routes.
SCANNED
Chanhassen is a Community for Life -Providing for Today and Planning forTworow
Mr. Mark Sonstegard
September 15, 2010
Page 2
c. The low floor elevation of Lot 15, Block 3 must be minimum three feet above the 100-
year elevation of the adjacent pond.
d. Retaining walls constructed with the development will be the responsibility of the
homeowners association.
e. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep
must be SDR 18.
The developer will install 12-inch trunk watermain within Bluff Creek Drive. The City
will reimburse the developer $13,174.40 which is the cost difference between 8-inch
lateral and 12-inch trunk watermain.
g. A water service stub must be installed for the park area at a location acceptable to the
Parks and Recreation Director.
h. The developer shall install a pressure -reducing valve vault in the southern portion of
Bluff Creek Drive. The City will determine the location and design of the vault in
conjunction with the final plat design. The developer will be reimbursed up to
$51,000.00 for the cost of the vault and valves.
i. The property is subject to sanitary sewer and water hookup charges for all of the lots. A
portion of these fees will be collected with the final plat and is calculated as follows:
Partial Payment of Sanitary Sewer Hookup: 41 units x $608/unit = $24,928.00
Partial Payment of Watermain Hookup: 41 units x $1,618/unit = $66,338.00
The remainder of these hookup fees will be collected with the building permit at the rate
in effect at that time. The Met Council SAC charge will also be collected with the
building permit.
j. All of the utility improvements are required to be constructed in accordance with the
City's latest edition of Standard Specifications and Detail Plates.
k. Permits from the appropriate regulatory agencies will be required, including the MPCA,
NPDES, Dept. of Health, Carver County, MnDOT and Watershed District.
1. Prior to final plat approval, the City and the developer must work with MnDOT to obtain
the necessary approvals and/or agreements necessary to construct the portion of Bluff
Creek Drive that will lie within the MnDOT right-of-way.
in. The owner of the exception parcels shall work with MnDOT, the County and the City to
determine future access to these areas.
n. Each lot within the Pioneer Pass final plat will be subject to a $16,313.55 assessment
over 7 years at 6% interest for the 2005 MUSA improvements and Highways 101/212
and Lyman Boulevard improvements.
02:ru LJa
Mr. Mark Sonstegard
September 15, 2010
Page 3
o. Outlot C will be subject to a $864,617.90 assessment for the 2005 MUSA improvements
and Highways 101/212 and Lyman Boulevard improvements.
p. The grading plan must be revised to show that the high water level for Pond 7 (Outlot D)
does not extend into the MnDOT right-of-way.
q. The grading within the park must be revised to eliminate the channelized flow to the
creek.
r. Drainage and utility easements are required overall of Outlots A, B, C and D, Pioneer
Pass.
s. The10-foot wide bituminous trail shall be constructed on the west side of Bluff Creek
Drive; sidewalk shall be constructed on the east side.
t. Both the sidewalk and trail shall extend to Pioneer Trail.
3. Environmental Resource Specialist:
a. The applicant shall plant 343 trees within the development. Each lot shall have a
minimum of two overstory, deciduous trees planted in the front yard.
b. The applicant shall develop a restoration plan including native plants for the Bluff Creek
Overlay district north of Block 1. The plant species shall be selected from the Bluff
Creek Management Plan Appendix C. The final plan must be reviewed and approved by
the City before installation.
c. Tree protection fencing shall be installed prior to construction around all areas designated
for preservation and/or at the edge of proposed grading limits.
d. No burning permits shall be issued for tree removal. All trees removed on site shall be
chipped and used on site or hauled off.
4. Fire Marshal:
a. Water main and fire hydrants shall be installed and made serviceable prior to combustible
construction (2007 MSFC Sec. 503.1.1.).
b. A three-foot clear space shall be maintained around fire hydrants (2007 MSFC Sec.
508.5.4.).
c. Temporary street signs shall be installed as soon as construction begins. Signs shall be of
an approved size, weather resistant, and maintained until replaced by permanent signs
(2007 MSFC Sec. 505.2.).
d. Fire apparatus access roads and water supply for fire protection is required to be
installed. Such protection shall be installed and made serviceable prior to and during
Mr. Mark Sonstegard
September 15, 2010
Page 4
time of construction except when approved alternate methods of protection are provided
(2007 MSFC Sec. 501.4.).
S. Park Director:
a. Successful transfer of Outlot C (8.7± acres) to the City of Chanhassen through a
combination of dedication and fee purchase for development and use as a neighborhood
park.
b. Extension of trail (west side of road) and sidewalk (east side of road) paralleling the
planned connector street south to their respective connection points at the intersection of
Pioneer Trail and Bluff Creek Drive.
c. Install a sidewalk on Mayapple Pass.
6. Planner:
a. A 30 dBA attenuation shall be provided by the building design and construction along
with year-round climate control for the homes adjacent to the TH 212/Pioneer Trail right-
of-way.
b. The developer shall pay $10,315.00 as their portion of the 2005 AUAR for this phase of
the project.
c. The property owner may donate Outlots A and B to the City, or if retained under private
ownership, dedicate a roadway/trail easement and drainage and utility easement over
Outlot A, and conservation easement, trail easement and a drainage and utility easement
over Outlot B.
7. Water Resources Coordinator:
a. All conditions for the wetland alteration permit must be met (Chapter 20 Article VI).
b. SWMP fees of $52,727.90 shall be paid for this phase of the development prior to the
recording of the final plat.
c. As stated in Section 18-40(4)2v. Drain tile service must be provided to any lots where
drainage is directed from back to front. This condition exists along Street B between lots
16 & 17 as well as lots 18 & 19. Because of the presence of Hamel loam, a soil with a
known seasonally high water table less than one foot below the surface, drain tile shall be
extended from Lot 12 to the CBMH in front of Lot 19 of Block 2. Drain tile is also
encouraged in front of lots 1, 2, 3, 41 and 42 of Block 3, and Lots 1, 2 and 3 of Block 2.
The soil boring report will be beneficial in making this determination (18-40).
d. The developer needs to show detail drawing of discharge point and how energy
dissipation will be achieved.
Mr. Mark Sonstegard
September 15, 2010
Page 5
e. A SWPPP specific to this site shall be prepared and submitted to the City and Carver
SWCD (18-40).
1) All surface waters and existing wetlands, which can be identified on maps such as
United States Geological Survey 7.5 minute quadrangle maps or equivalent maps within
one mile from the project boundaries, which will receive stormwater runoff from the
construction site, during or after construction. Where surface waters receiving runoff
associated with construction activity will not fit on the plan sheet, they must be
identified with an arrow, indicating both direction and distance to the surface water.
The SWPPP must identify if the surface water is a special or impaired water.
2) The SWPPP must incorporate the requirements of Part III (Stormwater Discharge
Design Requirements), Part IV (Construction Activity Requirements) and Appendix A
for the project. A narrative describing the timing for installation of all erosion
prevention and sediment control BMPs required in Part III, Part IV and Appendix A
must also be included in the SWPPP.
f. Areas where proposed and existing grades are to be matched shall be done so that no
concentrated flow conditions are created. These areas include, but are not necessarily
limited to, the backyard of Lot 7, Block 1, the backyards of Lots 1 and 2 of Block 1 and
adjacent to the extension of Bluff Creek Boulevard at the intersection with Pioneer Trail
(18-62).
g. Type 3, weed -free mulch shall be used in outlot B.
h. A note shall be included on sheets 32, 3.3 and 3.4 indicating that inlet protection will be
required on all backyard CB until final stabilization is achieved.
i. After the slopes are graded but before the erosion control blanket and seed is placed, the
use of silt fence with J-hooks, straw wattles, rock logs, bioroll or other BMP will be
required to break up any run 75 feet or longer (18-62).
j. Bluff Creek needs to be identified on the plan set and the SWPPP and erosion plans must
clearly indicate that it is an impaired water for turbidity and that no discharge of
untreated water will be allowed to the creek or to the fringe wetland (19-145).
k. A detailed turf establishment plan shall be provided (19-145).
1. A note needs to be included on the plan set that top soils are to be scraped and stockpiled
and the soil stockpile area(s) need to be shown on the plan (19-145).
in. Signage for the Bluff Creek Overlay District must be posted on every other property
corner and at major lot angle changes where residential yards meet the primary zone.
n. Seed mixes shall be consistent with current MNDOTBWSR cooperative mixes. See
MNDOT publication Native Seed Mix Design for Roadsides and BWSR State Seed Mixes:
http://www.bwsr.state.mn.ustnative vegetation/state seed mixes.ndf.
Mr. Mark Sonstegard
September 15, 2010
Page 6
Two signed mylar copies of the final plat shall be submitted to our office for signatures. One
1 "=200' scale mylar reduction of the final plat and one 1 "=200' scale paper reduction of the final
plat with just street names and lot and block numbers shall be submitted. The executed
development contract and the required fees ($174,896.90 plus$10,315.00 as their portion of the
2005 AUAR for a total fee of $185,211.90) and security ($2,878,643.46) specified therein shall
be submitted to the City. In addition, a digital copy in .dxf format and a digital copy in .tif
format (pdf compatible) in Carver County coordinates of the final plat shall be submitted_ The
City will submit all the necessary documents to Carver County for recording.
The property owner will need to make a determination of the disposition of Outlots A & B prior
to the recording of the final plat documents. If the property is to be retained by the owner, then
the appropriate easement documents must be submitted for recording.
A warranty deed for Outlot E shall be prepared and executed for recording with the final plat
documents.
You are also reminded that you must comply with all the conditions of approval for the wetland
alteration permit and conditional use permit which were granted as part of the preliminary plat
approval. Additionally, all current year taxes must be paid in full and any delinquent property
taxes or green acres taxes must also be paid.
Once everything is submitted, please contact Gordy Stauff at 952-227-1166 to coordinate the
preconstruction meeting. Should you have any questions, please feel free to contact me at
(952) 227-1131 or beenerous@ci.chanhassen.mn.us_
Robert Generous, AICP
Senior Planner
ec: Kate Aanenson, Community Development Director
Alyson Fauske, Assistant City Engineer
Todd Gerhardt, City Manager
Todd Hoffman, Parks & Recreation Director
Terry Jeffery, Water Resources Coordinator
Jerry Mohn, Building Official
Paul Oehme, City Engineer
c: Peterson -Jacques Farm Land Co., LLC
Enclosures
gAplan\2010 planning cases\10-09 pioneer pass\fiml plat\appmval letterdoc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
PIONEER PASS 1ST ADDITION
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
TABLE OF CONTENTS
SPECIAL PROVISIONS
PAGE
1.
REQUEST FOR PLAT APPROVAL............................................................................SP-1
2.
CONDITIONS OF PLAT APPROVAL........................................................................SP-1
3.
DEVELOPMENT PLANS ....... .....................................................................................
SP-1
4.
IMPROVEMENTS........................................................................................................SP-2
5.
TIME OF PERFORMANCE.........................................................................................SP-2
6.
SECURITY....................................................................................................................SP-2
7.
NOTICE.........................................................................................................................SP-3
8.
OTHER SPECIAL CONDITIONS................................................................................SP-3
9.
GENERAL CONDITIONS...........................................................................................SP-9
GENERAL CONDITIONS
1.
RIGHT TO PROCEED.................................................................................................GC-1
2.
PHASED DEVELOPMENT........................................................................................GC-1
3.
PRELIMINARY PLAT STATUS................................................................................GC-I
4.
CHANGES IN OFFICIAL CONTROLS ...................... ................... .......................... ..GC-1
5.
IMPROVEMENTS........................................................................................................GC-1
6.
IRON MONUMENTS..................................................................................................GC-2
7.
LICENSE......................................................................................................................GC-2
8.
SITE EROSION AND SEDIMENT CONTROL.........................................................GC-2
8A. EROSION CONTROL DURING CONSTRUCTION OF A DWELLING
OR OTHER BUILDING..................................................................................GC-2
9.
CLEAN UP...................................................................................................................GC-3
10.
ACCEPTANCE AND OWNERSHIP OFIMPROVEMENTS....................................GC-3
11.
CLAIMS.......................................................................................................................GC-3
12.
PARK DEDICATION..................................................................................................GC-3
13.
LANDSCAPING..........................................................................................................GC-3
14.
WARRANTY...............................................................................................................GC-4
15.
LOTPLANS.................................................................................................................GC-4
16.
EXISTING ASSESSMENTS.......................................................................................GC-4
17.
HOOK-UP CHARGES.................................................................................................GC-4
18.
PUBLIC STREET LIGHTING.....................................................................................GC-4
19.
SIGNAGE.....................................................................................................................GC-5
20.
HOUSEPADS..............................................................................................................GC-5
21.
RESPONSIBILITY FOR COSTS ........ ........................................................................
GC-5
22.
DEVELOPER'S DEFAULT.........................................................................................GC-6
22.
MISCELLANEOUS
A_ Construction Trailers........................................................................................GC-6
B. Postal Service....................................................................................................GC-7
C. Third Parties......................................................................................................GC-7
D. Breach of Contract............................................................................................GC-7
E. Severability ............................................................................_.........................GC-7
i
F.
Building Permits...............................................................................................GC-7
G.
Waivers/Amendments.......................................................................................GC-7
H.
Release..............................................................................................................GC-7
I.
Insurance...........................................................................................................
GC-7
J.
Remedies...........................................................................................................GC-8
K.
Assignability.....................................................................................................GC-8
L.
Construction Hours...........................................................................................GC-8
M.
Noise Amplification..........................................................................................GC-8
N.
Access...............................................................................................................GC-8
O.
Street Maintenance............................................................................................GC-8
P.
Storm Sewer Maintenance................................................................................GC-9
Q.
Soil Treatment Systems....................................................................._.............GC-9
R.
Variances...........................................................................................................GC-9
S.
Compliance with Laws, Ordinances, and Regulations.....................................GC-9
T.
Proof of Title.....................................................................................................GC-9
U.
Soil Conditions................................................................................................GC-10
V.
Soil Correction........................................:.......................................................GC-10
W.
Haul Routes.........................................................................................................GC-10
X.
Development Signs..............................................................................................GC-10
Y.
Construction Plans...............................................................................................GC-10
Z.
As -Built Lot Surveys...........................................................................................GC-11
ii
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
PIONEER PASS 1sr ADDITION
SPECIAL PROVISIONS
AGREEMENT dated September 13, 2010 by and between the CITY OF CHANHASSEN,
a Minnesota municipal corporation (the "City"), and, The Ryland Group, Inc., a corporation under
the laws of the State of Maryland (the 'Developer")_
1. Request for Plat Approval. The Developer has asked the City to approve a plat for
PIONEER PASS 1sr ADDITION (referred to in this Contract as the "plat'). The land is legally
described on the attached Exhibit "A".
2. Conditions of Plat Approval. The City hereby approves the plat on condition that
the Developer enter into this Contract, furnish the security required by it, and record the plat with
the County Recorder or Registrar of Titles within 30 days after the City Council approves the plat.
3. Development Plans. The plat shall be developed in accordance with the following
plans. The plans shall not be attached to this Contract. With the exception of Plan A, the plans may
be prepared, subject to City approval, after entering the Contract, but before commencement of any
work in the plat. If the plans vary from the written terms of this Contract, the written terms shall
control. The plans are:
Plan A: Final plat approved September 13, 2010, prepared by JR Hill and Associates.
Plan B: Grading, Drainage and Erosion Control Plan dated September 13, 2010, prepared by
JR Hill and Associates.
Plan C: Plans and Specifications for Improvements dated September 13, 2010, prepared by
JR Hill and Associates.
Plan D: Landscape Plan dated September 13, 2010, prepared by JR Hill and Associates.
Sp -I
4. Improvements. The Developer shall install and pay for the following:
A. Sanitary Sewer System
B. Water System
C. Storm Water Drainage System
D. Streets
E. Concrete Curb and Gutter
F. Street Lights
G. Site Grading/Restoration
H. Underground Utilities (e.g. gas, electric, telephone, CATV)
I. Setting of Lot and Block Monuments
J. Surveying and Staking
K. Landscaping
L. Erosion Control
5. Time of Performance. The Developer shall install all required improvements
except for the wear course on public streets by November 15, 2010. The Developer may, however,
request an extension of time from the City Engineer. If an extension is granted, it shall be
conditioned upon updating the security posted by the Developer to reflect cost increases and the
extended completion date.
6. Security. To guarantee compliance with the terms of this Contract, payment of
special assessments, payment of the costs of all public improvements, and construction of all public
improvements, the Developer shall furnish the City with a letter of credit in the form attached
hereto, from a bank acceptable to the City, or cash escrow ("security") for $2,878,643.46. The
amount of the security was calculated as 110% of the following:
Sanitary Sewer $ 199,634.00
Watermain $ 187,360.25
Storm Sewer, Drainage System, including cleaning and maintenance $ 165,738.00
Streets $ 692,468.00
Street lights and signs $ 6,000.00
Sub -total, Construction Costs $ 1,2.51,200.25
Engineering, surveying, and inspection (7% of construction costs) $ 87,584.02
Landscaping (2% of construction costs) $ 25,024.01
Special assessments (to be re -assessed to the lots and outlots in the final plat) $ 1,253,140.32
Sub -total, Other Costs $ 1,365,74835
TOTAL COST OF PUBLIC IMPROVEMENTS $ 2,616,948.60
SECURITY AMOUNT (110% of $2,616,948.60) $ 2,878,643.46
SP-2
This breakdown is for historical reference; it is not a restriction on the use of the security. The
security shall be subject to the approval of the City. The City may draw down the security, without
notice, for any violation of the terms of this Contract. If the required public improvements are not
completed at least thirty (30) days prior to the expiration of the security, the City may also draw it
down. If the security is drawn down, the draw shall be used to cure the default. With City approval,
the security may be reduced from time to time as financial obligations are paid, but in no case shall
the security be reduced to a point less than 10% of the original amount until (1) all improvements
have been completed, (2) iron monuments for lot corners have been installed, (3) all financial
obligations to the City satisfied, (4) the required "record" plans have been received by the City, (5) a
warranty security is provided, and (6) the public improvements are accepted by the City.
7. Notice. Required notices to the Developer shall be in writing, and shall be either
hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered
mail at the following address:
Mark Sonstegard
The Ryland Group
7599 Anagram Drive
Eden Prairie MN 55344
Phone: 952-229-6000
Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or
mailed to the City by certified mail in care of the City Manager at the following address:
Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, Minnesota 55317,
Telephone (952) 227-1100.
8. Other Special Conditions.
A. SECURITIES AND FEES
A $2,878,643.46 letter of credit or escrow for the developer -installed improvements, the
$174,896.90 cash administration fee and the fully -executed development contract must
be submitted and shall be submitted prior to scheduling a pre -construction meeting.
2. The $174,896.90 cash fee was calculated as follows:
Administration Fee
$
28,768.00
Street Lighting Charge (for electricity), 4 lights at $300.00
$
1,200.00
Final Plat Process (attorney and recording fees)
$
450.00
GIS fee, $25 (plat) +46 parcels x $10/parcel
$
485.00
Surface Water Management Fee
$
52,727.90
Partial Sewer Hookup Fee, 41 units x $608/unit
$
24,928.00
Partial Water Hookup Fee, 41 units x $1,618/unit
$
66,338.00
$ 174,896.90
SP-3
B. PLANNING DEPARTMENT CONDITIONS OF APPROVAL
1. A 30 dBA attenuation shall be provided by the building design and construction along
with year-round climate control for the homes adjacent to the T.H. 212/Pioneer Trail
right-of-way.
2. The developer shall pay $10,315.00 as their portion of the 2005 AUAR for this phase of
the project.
3. The property owner may donate Outlots A and B to the City, or if retained under private
ownership, dedicate a roadway/trail easement and drainage and utility easement over
Oudot A, and conservation easement, trail easement and a drainage and utility easement
over Outlot B.
C. ENGINEERING DEPARTMENT CONDITIONS OF APPROVAL
1. The developer must coordinate the proposed grading within the Liberty on Bluff Creek
property and the restoration with the homeowners association.
2. If importing or exporting material for development of the site is necessary, the applicant
will be required to supply the City with detailed haul routes.
3. The low floor elevation of Lot 15, Block 3 must be minimum three feet above the 100-
year elevation of the adjacent pond.
4. Retaining walls constructed with the development will be the responsibility of the
homeowners association.
5. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep
must be SDR 18.
6. The developer will install 12-inch trunk watermain within Bluff Creek Drive. The City
will reimburse the developer $13,174.40 which is the cost difference between 8-inch
lateral and 12-inch trunk watermain.
A water service stub must be installed for the park area at a location acceptable to the
Parks and Recreation Director.
8. The developer shall install a pressure -reducing valve vault in the southern portion of
Bluff Creek Drive. The City will determine the location and design of the vault in
conjunction with the final plat design. The developer will be reimbursed up to $51,000
for the cost of the vault and valves.
SP-4
9. The property is subject to sanitary sewer and water hookup charges for all of the lots. A
portion of these fees will be collected with the final plat and is calculated as follows:
a. Partial Payment of Sanitary Sewer Hookup: 41 units x $608/unit = $24,928.00
b. Partial Payment of Watermain Hookup: 41 units x $1,618/unit = $66,338.00
The remainder of these hookup fees will be collected with the building permit at the rate
in effect at that time. The Met Council SAC charge will also be collected with the
building permit.
10. All of the utility improvements are required to be constructed in accordance with the
City's latest edition of Standard Specifications and Detail Plates.
11. Permits from the appropriate regulatory agencies will be required, including the MPCA,
NPDES, Dept. of Health, Carver County, MnDOT and Watershed District.
12. Prior to final plat approval, the City and the developer must work with MnDOT to obtain
the necessary approvals and/or agreements necessary to construct the portion of Bluff
Creek Drive that will lie within the MnDOT right-of-way.
13. The owner of the exception parcels shall work with MnDOT, the County and the City to
determine future access to these areas.
14. Each lot within the Pioneer Pass final plat will be subject to a $16,313.55 assessment
over 7 years at 6% interest for the 2005 MUSA improvements and Highways 101/212
and Lyman Boulevard improvements.
15.Outlot C will be subject to a $864,617.90 assessment for the 2005 MUSA improvements
and Highways 101/212 and Lyman Boulevard improvements.
16. The grading plan must be revised to show that the high water level for Pond 7 (Outlot D)
does not extend into the MNDOT right-of-way.
17. The grading within the park must be revised to eliminate the channelized flow to the
creek.
18. Drainage and utility easements are required over all of Outlots A, B, C and D, Pioneer
Pass.
19. The 10-foot wide bituminous trail shall be constructed on the west side of Bluff Creek
Drive; sidewalk shall be constructed on the east side.
20. Both the sidewalk and trail shall extend to Pioneer Trail.
SP-5
D. WATER RESOURCES COORDINATOR CONDITIONS OF APPROVAL
1. All conditions for the wetland alteration permit must be met (Chapter 20 Article VI).
2. SWMP fees of $52,727.90 shall be paid for this phase of the development prior to the
recording of the final plat.
3. As stated in Section 18-40(4)2v. Drain tile service must be provided to any lots where
drainage is directed from back to front. This condition exists along Street B between lots
16 & 17 as well as lots 18 & 19. Because of the presence of Hamel loam, a soil with a
known seasonally high water table less than one foot below the surface, drain the shall be
extended from Lot 12 to the CBMH in front of Lot 19 of Block 2. Drain tile is also
encouraged in front of lots 1, 2, 3, 41 and 42 of Block 3, and Lots 1, 2 and 3 of Block 2.
The soil boring report will be beneficial in making this determination (18-40).
4. The developer needs to show detail drawing of discharge point and how energy
dissipation will be achieved.
5. A SWPPP specific to this site shall be prepared and submitted to the City and Carver
SWCD (18-40).
1) All surface waters and existing wetlands, which can be identified on maps such as
United States Geological Survey 7.5 minute quadrangle maps or equivalent maps
within one mile from the project boundaries, which will receive stormwater runoff
from the construction site, during or after construction. Where surface waters
receiving runoff associated with construction activity will not fit on the plan sheet,
they must be identified with an arrow, indicating both direction and distance to the
surface water. The SWPPP must identify if the surface water is a special or impaired
water.
2) The SWPPP must incorporate the requirements of Part III (Stormwater Discharge
Design Requirements), Part IV (Construction Activity Requirements) and Appendix
A for the project. A narrative describing the timing for installation of all erosion
prevention and sediment control BMPs required in Part III, Part IV and Appendix A
must also be included in the SWPPP.
6. Areas where proposed and existing grades are to be matched shall be done so that no
concentrated flow conditions are created. These areas include, but are not necessarily
limited to, the backyard of Lot 7, Block 1, the backyards of Lots 1 and 2 of Block 1 and
adjacent to the extension of Bluff Creek Boulevard at the intersection with Pioneer Trail
(18-62).
SP-6
7. Type 3, weed -free mulch shall be used in outlot B.
8. A note shall be included on sheets 3.2, 3.3 and 3.4 indicating that inlet protection will be
required on all backyard CB until final stabilization is achieved.
9. After the slopes are graded but before the erosion control blanket and seed is placed, the
use of silt fence with ]-hooks, straw wattles, rock logs, bioroll or other BMP will be
required to break up any run 75 feet or longer (18-62).
10. Bluff Creek needs to be identified on the plan set and the SWPPP and erosion plans must
clearly indicate that it is an impaired water for turbidity and that no discharge of
untreated water will be allowed to the creek or to the fringe wetland (19-145).
11. A detailed turf establishment plan shall be provided (19-145).
12. A note needs to be included on the plan set that top soils are to be scraped and stockpiled
and the soil stockpile area(s) need to be shown on the plan (19-145).
13. Signage for the Bluff Creek Overlay District must be posted on every other property
corner and at major lot angle changes where residential yards meet the primary zone.
14. Seed mixes shall be consistent with current MNDOTBWSR cooperative mixes. See
MNDOT publication Native Seed Mix Design for Roadsides and BWSR State Seed
Mixes: http://www.bwsr.state.nm.ustnative vegetation/state seed mixes.pdf.
E. ENVIRONMENTAL RESOURCES COORDINATOR CONDMONS OF APPROVAL
1. The applicant shall plant 343 trees within the development. Each lot shall have a
minimum of two overstory, deciduous trees planted in the front yard.
2. The applicant shall develop a restoration plan including native plants for the Bluff Creek
Overlay district north of Block 1. The plant species shall be selected from the Bluff
Creek Management Plan Appendix C. The final plan must be reviewed and approved by
the City before installation.
3. Tree protection fencing shall be installed prior to construction around all areas designated
for preservation and/or at the edge of proposed grading limits.
4. No burning permits shall be issued for tree removal. All trees removed on site shall be
chipped and used on site or hauled off.
SP-7
F. PARKS AND RECREATION DEPARTMENT CONDITIONS OF APPROVAL
1. Successful transfer of Outlot C (8.7± acres) to the City of Chanhassen through a
combination of dedication and fee purchase for development and use as a neighborhood
park.
2. Extension of trail (west side of road) and sidewalk (east side of road) paralleling the
planned connector street south to their respective connection points at the intersection of
Pioneer Trail and Bluff Creek Drive.
3. Install a sidewalk on Mayapple Pass.
G. BUILDING OFFICIAL CONDITIONS OF APPROVAL
1. The north -south collector street shall be shown as Bluff Creek Drive.
2. Developer to provide 1:200 scale plat drawing (with lot numbers, block numbers and
street names only) for addressing purposes.
3. Demolition permits must be obtained before demolishing any existing structures.
4. A final grading plan and soils investigation/correction report must be submitted to the
Building Inspections Division before permits can be issued.
5. Retaining walls over four feet high require a building pemut and must be designed by a
Structural Engineer registered in the State of Minnesota.
6. Each lot must be provided with separate sewer and water services.
7. The developer and/or their agent shall meet with the Inspections Division as early as
possible to discuss plan review and permit procedures.
H. FIRE MARSHAL CONDITIONS OF APPROVAL
1. Water main and fire hydrants shall be installed and made serviceable prior to combustible
construction (2007 MSFC Sec_ 503.1.1.).
2. A three-foot clear space shall be maintained around fire hydrants (2007 MSFC Sec.
508.5.4.).
3. Temporary street signs shall be installed as soon as construction begins. Signs shall be of
an approved size, weather resistant, and maintained until replaced by permanent signs
(2007 MSFC Sec. 505.2.).
SP-8
4. Fire apparatus access roads and water supply for fire protection is required to be
installed. Such protection shall be installed and made serviceable prior to and during
time of construction except when approved alternate methods of protection are provided
(2007 MSFC Sec. 501.4.).
9. General Conditions. The general conditions of this Contract are attached as
Exhibit "B" and incorporated herein.
SP-9
(SEAL)
STATE OF MINNESOTA )
(ss.
COUNTY OF CARVER )
. Y11 • �_�U�: U
13'E
Thomas A. Furlong, Mayor
AND:
Todd Gerhardt, City Manager
THE RYLAND GROUP, INC:
BY:
(Signature)
Printed Name:
Tide:
The foregoing instrument was acknowledged before me this day of
2005, by Thomas A. Furlong, Mayor, and by Todd Gerhardt, City Manager, of the City of
Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the
authority granted by its City Council.
NOTARY PUBLIC
STATE OF )
(ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of
2010, by , the of The Ryland Group, Inc., a
Corporation under the laws of the State of Maryland, on behalf of the corporation.
NOTARY PUBLIC
SP-10
DRAFPED BY:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
(952)227-1100
SPAT
EXHIBIT "A"
TO
DEVELOPMENT CONTRACT
LEGAL DESCRIPTION OF SUBJECT PROPERTY:
Northeast Quarter of the Northeast Quarter, Section 27, Township 116, Range 23, Carver County,
Minnesota,
AND
That part of the Southeast Quarter of the Northeast Quarter, Section 27, Township 116, Range 23,
Carver County, Minnesota, lying northeasterly of MINNFSOTA DEPARTMENT OF
TRANSPORTATION RIGHT OF WAY PLAY NO.10-43, according to the recorded plat thereof,
Carver County, Minnesota.
MORTGAGE HOLDER CONSENT
TO
DEVELOPMENT CONTRACT
which holds a mortgage on the subject property, the development of which is governed by the
foregoing Development Contract, agrees that the Development Contract shall remain in full force
and effect even if it forecloses on its mortgage.
Dated this day of 20
STATE OF MINNESOTA )
(ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of
20_, by
NOTARY PUBLIC
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
(952)227-1100
FEE OWNER CONSENT
TO
DEVELOPMENT CONTRACT
fee owners of all or part of the subject property, the development of which is governed by the
foregoing Development Contract, affirm and consent to the provisions thereof and agree to be
bound by the provisions as the same may apply to that portion of the subject property owned by
them.
Dated this day of 20_
STATE OF MINNESOTA )
(ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this day of
20_, by
NOTARY PUBLIC
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
(952)227-1100
IRREVOCABLE LETTER OF CREDIT
No. _
Date:
TO: City of Chanhassen
7700 Market Boulevard, Box 147
Chanhassen, Minnesota 55317
Dear Sir or Madam:
We hereby issue, for the account of (Name of Developer) and in your favor, our
Irrevocable Letter of Credit in the amount of $ . available to you by your draft drawn on sight
on the undersigned bank.
The draft must:
a) Bear the clause, "Drawn under Letter of Credit No. , dated
2 . of (Name of Bank)
b) Be signed by the Mayor or City Manager of the City of Chanhassen.
c) Be presented for payment at (Address of Bank) on or before 4:00 p.m. on November 30,
2
This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty-
five (45) days prior to the next annual renewal date (which shall be November 30 of each year), the Bank
delivers written notice to the Chanhassen City Manager that it intends to modify the terms of, or cancel, this
Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the
U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed as follows:
Chanhassen City Manager, Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, MN
55317, and is actually received by the City Manager at least thirty (30) days prior to the renewal date.
This Letter of Credit sets forth in full our understanding which shall not in any way be modified,
amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not
referred to herein.
This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw
may be made under this Letter of Credit.
This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and
Practice for Documentary Credits, International Chamber of Commerce Publication No. 500.
We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly
honored upon presentation.
Its
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
IW:411130 lilla
►I Do : _•_ 1 ► i 1 ►
1. Right to Proceed. Within the plat or land to be platted, the Developer may not
grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets,
utilities, public or private improvements, or any buildings until all the following conditions have
been satisfied: 1) this agreement has been fully executed by both parties and filed with the City
Clerk, 2) the necessary security and fees have been received by the City, 3) the plat has been
recorded with the County Recorder's Office or Registrar of Title's Office of the County where the
plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been
satisfied and then the Developer may proceed.
2. Phased Development. If the plat is a phase of a multiphased preliminary plat, the
City may refuse to approve final plats of subsequent phases if the Developer has breached this
Contract and the breach has not been remedied. Development of subsequent phases may not
proceed until Development Contracts for such phases are approved by the City. Park charges and
area charges for sewer and water referred to in this Contract are not being imposed on oudots, if
any, in the plat that are designated in an approved preliminary plat for future subdivision into lots
and blocks. Such charges will be calculated and imposed when the outlots are final platted into lots
and blocks.
3. Preliminary Plat Status. If the plat is a phase of a multi -phased preliminary plat,
the preliminary plat approval for all phases not final platted shall lapse and be void unless final
platted into lots and blocks, not outlots, within two (2) years after preliminary plat approval.
4. Changes in Official Controls. For two (2) years from the date of this Contract, no
amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current
urban service area, or official controls shall apply to or affect the use, development density, lot size,
lot layout or dedications of the approved plat unless required by state or federal law or agreed to in
writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the
contrary, to the full extent permitted by state law the City may require compliance with any
amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements
enacted after the date of this Contract.
5. Improvements. The improvements specified in the Special Provisions of this
Contract shall be installed in accordance with City standards, ordinances, and plans and
specifications which have been prepared and signed by a competent registered professional engineer
furnished to the City and approved by the City Engineer. The Developer shall obtain all necessary
GC-1
permits from the Metropolitan Council Environmental Services and other pertinent agencies before
proceeding with construction. The City will, at the Developer's expense, have one or more
construction inspectors and a soil engineer inspect the work on a full or part-time basis. The
Developer shall also provide a qualified inspector to perform site inspections on a daily basis.
Inspector qualifications shall be submitted in writing to the City Engineer. The Developer shall
instruct its project engineer/inspector to respond to questions from the City Inspector(s) and to make
periodic site visits to satisfy that the construction is being performed to an acceptable level of
quality in accordance with the engineers design. The Developer or his engineer shall schedule a
preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties
concerned, including the City staff, to review the program for the construction work.
6. Iron Monuments. Before the security for the completion of utilities is released, all
monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.02, Subd.
1. The Developers surveyor shall submit a written notice to the City certifying that the monuments
have been installed.
7. License. The Developer hereby grants the City, its agents, employees, officers and
contractors a license to enter the plat to perform all work and inspections deemed appropriate by the
City in conjunction with plat development.
8. Site Erosion and Sediment Control. Before the site is rough graded, and before
any utility construction is commenced or building permits are issued, the erosion and sediment
control plan, Plan B, shall be implemented, inspected, and approved by the City. The City may
impose additional erosion and sediment control requirements if they would be beneficial. All areas
disturbed by the excavation and backfilling operations shall be reseeded forthwith after the
completion of the work in that area. Except as otherwise provided in the erosion and sediment
control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as possible.
All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The
parties recognize that time is of the essence in controlling erosion and sediment transport. If the
Developer does not comply with the erosion and sediment control plan and schedule of
supplementary instructions received from the City, the City may take such action as it deems
appropriate to control erosion and sediment transport at the Developers expense. The City will
endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so
will not affect the Developer's and City's rights or obligations hereunder. No development will be
allowed and no building permits will be issued unless the plat is in full compliance with the erosion
and sediment control requirements. Erosion and sediment control needs to be maintained until
vegetative cover has been restored, even if construction has been completed and accepted. After the
site has been stabilized to where, in the opinion of the City, there is no longer a need for erosion and
sediment control, the City will authorize the removal of the erosion and sediment control, i.e. hay
bales and silt fence. The Developer shall remove and dispose of the erosion and sediment control
measures.
8a. Erosion Control During Construction of a Dwelling or Other Building. Before
a building permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash
GC-2
escrow or letter of credit per lot shall also be furnished to the City to guarantee compliance with
City Code § 7-22.
9. Clean up. The Developer shall maintain a neat and orderly work site and shall daily
clean, on and off site, dirt and debris, including blowables, from streets and the surrounding area
that has resulted from construction work by the Developer, its agents or assigns.
10. Acceptance and Ownership of Improvements. Upon completion and acceptance
by the City of the work and construction required by this Contract, the improvements lying within
public easements shall become City property. After completion of the improvements, a
representative of the contractor, and a representative of the Developers engineer will make a final
inspection of the work with the City Engineer. Before the City accepts the improvements, the City
Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved
plans and specifications and the Developer and his engineer shall submit a written statement to the
City Engineer certifying that the project has been completed in accordance with the approved plans
and specifications. The appropriate contractor waivers shall also be provided. Final acceptance of
the public improvements shall be by City Council resolution.
11. Claims. In the event that the City receives claims from laborers, materialmen, or
others that work required by this Contract has been performed, the sums due them have not been
paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees
posted with the City, and if the claims are not resolved at least ninety (90) days before the security
required by this Contract will expire, the Developer hereby authorizes the City to commence an
Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts,
to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in
compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and
dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the
District Court, except that the Court shall retain jurisdiction to determine attomeys' fees.
12. Park Dedication. The Developer shall pay full park dedication fees in conjunction
with the installation of the plat improvements. The park dedication fees shall be the current amount
in force at the time of final platting pursuant to Chanhassen City Ordinances and City Council
resolutions.
13. Landscaping. Landscaping shall be installed in accordance with Plan D. Unless
otherwise approved by the City, trees not listed in the City's approved tree list are prohibited. The
minimum tree size shall be two and one-half (2'h) inches caliper, either bare root in season, or
balled and burlapped. The trees may not be planted in the boulevard (area between curb and
property line). In addition to any sod required as a part of the erosion and sediment control plan,
Plan B, the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each
lot utilizing a minimum of four (4) inches of topsoil as a base. Seed or sod shall also be placed on
all disturbed areas of the lot. If these improvements are not in place at the time a certificate of
occupancy is requested, a financial guarantee of $750.00 in the form of cash or letter of credit shall
be provided to the City. These conditions must then be complied with within two (2) months after
the certificate of occupancy issued, except that if the certificate of occupancy is issued between
GC-3
October 1 through May 1 these conditions must be complied with by the following July 1st. Upon
expiration of the time period, inspections will be conducted by City staff to verify satisfactory
completion of all conditions. City staff will conduct inspections of incomplete items with a $50.00
inspection fee deducted from the escrow fund for each inspection. After satisfactory inspection, the
financial guarantee shall be returned. If the requirements are not satisfied, the City may use the
security to satisfy the requirements. The City may also use the escrowed funds for maintenance of
erosion control pursuant to City Code Section 7-22 or to satisfy any other requirements of this
Contract or of City ordinances. These requirements supplement, but do not replace, specific
landscaping conditions that may have been required by the City Council for project approval.
14. Warranty. The Developer warrants all improvements required to be constructed by
it pursuant to this Contract against poor material and faulty workmanship. The Developer shall
submit either 1) a warranty/maintenance bond for 100% of the cost of the improvement, or 2) a
letter of credit for twenty-five percent (25%) of the amount of the original cost of the improvements.
A. The required warranty period for materials and workmanship for the utility
contractor installing public sewer and water mains shall be two (2) years from the date of final
written City acceptance of the work.
B. The required warranty period for all work relating to street construction, including
concrete curb and gutter, sidewalks and trails, materials and equipment shall be subject to two (2)
years from the date of final written acceptance.
C. The required warranty period for sod, trees, and landscaping is one full growing
season following acceptance by the City.
15. Lot Plans. Prior to the issuance of building permits, an acceptable Grading,
Drainage, Erosion Control including silt fences, and Tree Removal Plan shall be submitted for each
lot for review and approval by the City Engineer. Each plan shall assure that drainage is maintained
away from buildings and that tree removal is consistent with development plans and City
Ordinance.
16. Existing Assessments. Any existing assessments against the plat will be re -spread
against the plat in accordance with City standards.
17. Hook-up Charges.. At the time of final plat approval the Developer shall pay
30% of the City Sewer Hook-up charge and 30% of the City Water hook up charge for each lot
in the plat in the amount specified in Special Provision, Paragraph 8, of this Development
Contract. The balance of the hook-up charges is collected at the time building permits are issued
are based on 70% of the rates then in effect, unless a written request is made to assess the costs
over a four year term at the rates in effect at time of application.
18. Public Street Lighting. The Developer shall have installed and pay for public street
lights in accordance with City standards. The public street lights shall be accepted for City
GC-4
ownership and maintenance at the same time that the public street is accepted for ownership and
maintenance. A plan shall be submitted for the City Engineer's approval prior to the installation.
Before the City signs the final plat, the Developer shall pay the City a fee of $300.00 for each street
light installed in the plat. The fee shall be used by the City for furnishing electricity and
maintaining each public street light for twenty (20) months.
19. Signage. All street signs, traffic signs, and wetland monumentation required by the
City as a part of the plat shall be furnished and installed by the City at the sole expense of the
Developer.
20. House Pads. The Developer shall promptly furnish the City "as -built" plans
indicating the amount, type and limits of fill on any house pad location.
21. Responsibility for Costs.
A. The Developer shall pay an administrative fee in conjunction with the
installation of the plat improvements. This fee is to cover the cost of City Staff time and overhead
for items such as review of construction documents, preparation of the Development Contract,
monitoring construction progress, processing pay requests, processing security reductions, and final
acceptance of improvements. This fee does not cover the City's cost for construction inspections.
The fee shall be calculated as follows:
i) if the cost of the construction of public improvements is less than $500,000,
three percent (3%) of construction costs;
ii) if the cost of the construction of public improvements is between $500,000
and $1,000,000, three percent (3%) of construction costs for the first
$500,000 and two percent (2%) of construction costs over $500,000;
iii) if the cost of the construction of public improvements is over $1,000,000, two
and one-half percent (2rh%) of construction costs for the first $1,000,000 and
one and one-half percent (1'h%) of construction costs over $1,000,000.
Before the City signs the final plat, the Developer shall deposit with the City a fee based upon
construction estimates. After construction is completed, the final fee shall be determined based
upon actual construction costs. The cost of public improvements is defined in paragraph 6 of the
Special Provisions.
B. In addition to the administrative fee, the Developer shall reimburse the City for
all costs incurred by the City for providing construction and erosion and sediment control
inspections. This cost will be periodically billed directly to the Developer based on the actual
progress of the construction. Payment shall be due in accordance with Article 21E of this
Agreement.
GC-5
C. The Developer shall hold the City and its officers and employees harmless from
claims made by itself and third parties for damages sustained or costs incurred resulting from plat
approval and development. The Developer shall indemnify the City and its officers and employees
for all costs, damages, or expenses which the City may pay or incur in consequence of such claims,
including attomeys' fees.
D. hi addition to the administrative fee, the Developer shall reimburse the City for
costs incurred in the enforcement of this Contract, including engineering and attorneys' fees.
E. The Developer shall pay in full all bills submitted to it by the City for obligations
incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time,
the City may halt all plat development work and construction, including but not limited to the
issuance of building permits for lots which the Developer may or may not have sold, until the bills
are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of 8% per year-
F. In addition to the charges and special assessments referred to herein, other
charges and special assessments may be imposed such as, but not limited to, sewer availability
charges ("SAC"), City water connection charges, City sewer connection charges, and building
permit fees.
G. Private Utilities. The Developer shall have installed and pay for the installation
of electrical, natural gas, telephone, and cable television service in conjunction with the overall
development improvements. These services shall be provided in accordance with each of the
respective franchise agreements held with the City.
H. The developer shall pay the City a fee established by City Council resolution,
to reimburse the City for the cost of updating the City's base maps, GIS data base files, and
converting the plat and record drawings into an electronic format. Record drawings must be
submitted within four months of final acceptance of public utilities. All digital information
submitted to the City shall be in the Carver County Coordinate system.
22. Developer's Default In the event of default by the Developer as to any of the work
to be performed by it hereunder, the City may, at its option, perform the work and the Developer
shall promptly reimburse the City for any expense incurred by the City, provided the Developer is
fast given notice of the work in default, not less than four (4) days in advance. This Contract is a
license for the City to act, and it shall not be necessary for the City to seek a Court order for
permission to enter the land. When the City does any such work, the City may, in addition to its
other remedies, assess the cost in whole or in part.
23. Miscellaneous.
A. Construction Trailers. Placement of on -site construction trailers and temporary
job site offices shall be approved by the City Engineer as a part of the pre -construction meeting for
installation of public improvements. Trailers shall be removed from the subject property within
GC-6
thirty (30) days following the acceptance of the public improvements unless otherwise approved by
the City Engineer.
B. Postal Service. The Developer shall provide for the maintenance of postal
service in accordance with the local Postmasters request.
C. Third Parties. Third parties shall have no recourse against the City under this
Contract. The City is not a guarantor of the Developer's obligations under this Contract. The City
shall have no responsibility or liability to lot purchasers or others for the City's failure to enforce
this Contract or for allowing deviations from it.
D. Breach of Contract. Breach of the terms of this Contract by the Developer shall
be grounds for denial of building permits, including lots sold to third parties. The City may also
issue a stop work order halting all plat development until the breach has been cured and the City has
received satisfactory assurance that the breach will not reoccur.
E. Severability. If any portion, section, subsection, sentence, clause, paragraph, or
phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of
the remaining portion of this Contract.
F. Building Permits. Building permits will not be issued in the plat until sanitary
sewer, watermain, and storm sewer have been installed, tested, and accepted by the City, and the
streets needed for access have been paved with a bituminous surface and the site graded and
revegetated in accordance with Plan B of the development plans.
G. Waivers/Amendments. The action or inaction of the City shall not constitute a
waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers
shall be in writing, signed by the parties and approved by written resolution of the City Council.
The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or
release.
H. Release. This Contract shall run with the land and may be recorded against the
title to the property . After the Developer has completed the work required of it under this Contract,
at the Developers request the City Manager will issue a Certificate of Compliance. Prior to the
issuance of such a certificate, individual lot owners may make as written request for a certificate
applicable to an individual lot allowing a minimum of ten (10) days for processing.
I. Insurance. Developer shall take out and maintain until six (6) months after the
City has accepted the public improvements, public liability and property damage insurance covering
personal injury, including death, and claims for property damage which may arise out of
Developer's work or the work of its subcontractors or by one directly or indirectly employed by any
of them. Limits for bodily injury and death shall be not less than $500,000 for one person and
$1,000,000 for each occurrence; limits for property damage shall be not less than $500,000 for each
occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as
an additional insured on the policy, and the Developer shall file with the City a certificate
evidencing coverage prior to the City signing the plat. The certificate shall provide that the City
GC-7
must be given ten (10) days advance written notice of the cancellation of the insurance. The
certificate may not contain any disclaimer for failure to give the required notice.
I Remedies. Each right, power or remedy herein conferred upon the City is
cumulative and in addition to every other right, power or remedy, expressed or implied, now or
hereafter arising, available to City, at law or in equity, or under any other agreement, and each and
every right, power and remedy herein set forth or otherwise so existing may be exercised from time
to time as often and in such order as may be deemed expedient by -the City and shall not be a waiver
of the right to exercise at any time thereafter any other right, power or remedy.
K. Assignability. The Developer may not assign this Contract without the written
permission of the City Council. The Developer's obligation hereunder shall continue in full force
and effect even if the Developer sells one or more lots, the entire plat, or any part of it.
L. Construction Hours. Construction hours, including pick-up and deliveries of
material and equipment and the operation of any internal combustion engine, may only occur from
7:00 a.m. to 6:00 p.m. on weekdays, from 9:00 a.m. to 5:00 p.m. on Saturdays with no such activity
allowed on Sundays or on legal holidays. Contractors must require their subcontractors, agents
and supplies to comply with these requirements and the Contractor is responsible for their failure to
do so. Under emergency conditions, this limitation may be waived by the written consent of the City
Engineer. If construction occurs outside of the permitted construction hours, the Contractor shall
pay the following administrative penalties:
First violation $ 500.00
Second violation $ 1,000.00
Third & subsequent violations All site development and construction must
cease for seven (7) calendar days
M_ Noise Amolifrcation. The use of outdoor loudspeakers, bullhorns, intercoms,
and similar devices is prohibited in conjunction with the construction of homes, buildings, and the
improvements required under this contract The administrative penalty for violation of construction
hours shall also apply to violation of the provisions in this paragraph.
N. Access. All access to the plat prior to the City accepting the roadway
improvements shall be the responsibility of the Developer regardless if the City has issued building
permits or occupancy permits for lots within the plat.
O. Street Maintenance. The Developer shall be responsible for all street
maintenance until streets within the plat are accepted by the City. Warning signs shall be placed by
the Developer when hazards develop in streets to prevent the public from traveling on same and
directing attention to detours. If streets become impassable, the City may order that such streets
shall be barricaded and closed. The Developer shall maintain a smooth roadway surface and
provide proper surface drainage. The Developer may request, in writing, that the City plow snow
on the streets prior to final acceptance of the streets. The City shall have complete discretion to
approve or reject the request. The City shall not be responsible for reshaping or damage to the street
W-
base or utilities because of snow plowing operations. The provision of City snow plowing service
does not constitute final acceptance of the streets by the City.
P. Storm Sewer Maintenance. The Developer shall be responsible for cleaning and
maintenance of the storm sewer system (including ponds, pipes, catch basins, culverts and swales)
within the plat and the adjacent off -site storm sewer system that receives storm water from the plat.
The Developer shall follow all instructions it receives from the City concerning the cleaning and
maintenance of the storm sewer system. The Developers obligations under this paragraph shall end
two (2) years after the public street and storm drainage improvements in the plat have been accepted
by the City. Twenty percent (20%) of the storm sewer costs, shown under section 6 of the special
provisions of this contract, will be held by the City for the duration of the 2-year maintenance
period.
Q. Soil Treatment Systems. If soil treatment systems are required, the Developer
shall clearly identify in the field and protect from alteration, unless suitable alternative sites are first
provided, the two soil treatment sites identified during the platting process for each lot. This shall
be done prior to the issuance of a Grading Permit. Any violation/disturbance of these sites shall
render them as unacceptable and replacement sites will need to be located for each violated site in
order to obtain a building permit.
R. Variances. By approving the plat, the Developer represents that all lots in the
plat are buildable without the need for variances from the City's ordinances.
S. Compliance with Laws. Ordinances, and Regulations. In the development of the
plat the Developer shall comply with all laws, ordinances, and regulations of the following
authorities:
1. City of Chanhassen;
2. State of Minnesota, its agencies, departments and commissions;
3. United States Army Corps of Engineers;
4. Watershed District(s);
5. Metropolitan Government, its agencies, departments and commissions.
T. Proof of Title. Upon request, the Developer shall furnish the City with evidence
satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to
enter into this Development Contract.
U. Soil Conditions. The Developer acknowledges that the City makes no
representations or warranties as to the condition of the soils on the property or its fitness for
construction of the improvements or any other purpose for which the Developer may make use of
such property. The Developer further agrees that it will indemnify, defend, and hold harmless the
City, its governing body members, officers, and employees from any claims or actions arising out of
the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or
pollutants were caused to be there by the City.
GC-9
V. Soil Correction. The Developer shall be responsible for soil correction work on
the property. The City makes no representation to the Developer concerning the nature of
suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots
which have no fill material a soils report from a qualified soils engineer is not required unless the
City's building inspection department determines from observation that there may be a soils
problem. On lots with fill material that have been mass graded as part of a multi -lot grading project,
a satisfactory soils report from a qualified soils engineer shall be provided before the City issues a
building permit for the lot. On lots with fill material that have been custom graded, a satisfactory
soils report from a qualified soils engineer shall be provided before the City inspects the foundation
for a building on the lot.
W. Haul Routes. The Developer, the Developer's contractors or subcontractors
must submit proposed haul routes for the import or export of soil, construction material,
construction equipment or construction debris, or any other purpose. All haul routes must be
approved by the City Engineer
X. Development Sins. The Developer shall post a six foot by eight foot
development sign in accordance with City Detail Plate No. 5313 at each entrance to the project.
The sign shall be in place before construction of the required improvements commences and
shall be removed when the required improvements are completed, except for the final lift of
asphalt on streets. The signs shall contain the following information: project name, name of
developer, developer's telephone number and designated contact person, allowed construction
hours.
Y. Construction Plans. Upon final plat approval, the developer shall provide the
City with two complete sets of full-size construction plans and four sets of 11"x17" reduced
construction plan sets and three sets of specifications. Within four months after the completion of
the utility improvements and base course pavement and before the security is released, the
Developer shall supply the City with the following: (1) a complete set of reproducible Mylar
as -built plans, (2) two complete full-size sets of blue linelpaper as -built plans, (3) two complete sets
of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) location stationing
and swing ties of all utility stubs including draintile cleanouts, (6) bench mark network, (7) digital
file of as -built plans in both Axf & .tif format (the Axf file must be tied to the current county
coordinate system), (8) digital file of utility tie sheets in either Aoc or .tif format, and (9) a
breakdown of lineal footage of all utilities installed, including the per lineal foot bid price. The
Developer is required to submit the final plat in electronic format.
Z. As -Built Lot Surveys. An as -built lot survey will be required on all lots prior to
the Certificate of Occupancy being issued. The as -built lot survey must be prepared, signed, and
dated by a Registered Land Surveyor. Sod and the bituminous driveways must be installed before
the as -built survey is completed If the weather conditions at the time of the as -built are not
conducive to paving the driveway and/or installing sod, a temporary Certificate of Occupancy may
be issued and the as -built escrow withheld until all work is complete.
Rev. 3/31/06
GC-10
PIONEER PASS 1ST ADDITION
CHANHASSEN, MINNESOTA
FINAL SANITARY SEWER, WATERMAIN, STORM
SEWER, STREET CONSTRUCTION & EROSION &
SEDIMENT CONTROL PLAN
FOR
RYLAND HOMES
7599 ANAGRAM DRIVE, EDEN PRAIRIE, MN 55344
PHONE: (952) 229-6000 FAX: (952) 229-6024
I
51E
i
SITE MAP
e w� um.n uIIUMn
, IT., Lu Ln
1I'll =
zY rm
LV N IU. 9M[
SOJ" r•¢ CIF "IBt—
^Uxr
Ixwsl
a r¢•
raL x[fr a DxWa.•r - x.
ILY[I
G[ (W W
J r61
rpLLR rxWL - [ILV- LION W.W w 0•iW
:cnu ix "I:
gIALlsmL[ry
m ru•
Lx P' rpr w n/x xOWxw• = Lwr+
n �1 500 .fa
®
Jf
IT ]`"i Ax WrxMagDAL(N Ix[
....}..._ 1.....} _
GOPHER STA ONE CALL
INRAITCTCfTNTACM
i
O
¢xc a MD O✓O wAMK
LqL rRQ LpJiLL I�Ifi6
•
ry ry p,pr[rx p s aixn.rax i l )
I'ry
Nit'w Kn
c :xD •Mn LNIAML
L )
xonn.N
xox.rzD w"'E'x[ nAl.r.
sw•+K�m x.r.,=w'+.
D. dnxxm
I n .........
TITS SHEET
9TE INFDRNAnON
FR M W M)IMENT CONTROL DUALS
FINAL SM(N WY MOMENT CWTRM PLAN
SANITARY SEWER a WATERMAIN C STRUCTIDN
BLUFF CREEK SLw
SLUFF CREEK SLw
HENLDCK WAY
HEMLOCK WAY
MAYAPPIS PASS
Zlil !EWER CCNSTRUCTQN
STREET CONSTNUCTM
BLUFF mm SLw
SWFF CREEK SLw
HEMLOCK WAY
MAYAPPLE PAW
DETNL
EG=
C
3.1
3.2
13
3.4
D.!
4. 4
0.,
!.3
!.
!.4
B.,-B.2
[asnxc Mu
[atnxn mnxwY rtocarA.
ITTrnrt� wr rexc[.
mxi id• •exwc[n
N iosnxc
xosi nx.D'xc.Lr
ICY
[=snxc •TEE vxll rtxa
• -
-'- eiLi"LurtIT.11 vnw[x•..nwv
^�
snxMO rnxxcnyrnr NOcx
m. ¢
IDMIN_.
uLL �Dp" nUur
vtOUEiw00twEmrt
<xpnxn LrvwcD
yIT
IT uv[x[er wsrvxr uW
w
®-•
mWuy[0 WVMo
—�.—MMOSLD
wnlPuux
.�
D SAx rnxv Y[K9
nL
MY%o e•wrur
=MCnnK4 i:vm[x imk'. n
T
MWUILU [WCxE•ETlY.UXI.v'[
nxVMEO • -ILr LWeAa
xdOY[0 wY[mo L wnUO• C1n4dr J
Ol M.4W'[•Ii0 8[ MfiAIIEO
Cp•,n(nM M n,, WwSAUGnw)
®
o>osm xru 11,T cn xxorzcxc,x•o
LiW�s"'nwwax rrzn roxxunw or xnu•+
)x
y
xLaxixw.roDL wx
i io0°wE9Wn�LLEo •rnv w.xurKx`
p' nUn tGxsrwcnwl
IIICPOYn W[VIN D[ wnµL[U Arnx
..
LWn.[ngI V YALS• cMcrnucnp)
•x xvouv • nwx ro
m�w,n[nnx
N N Expn ai
Y 1
xw•DxLD Ja ra .Tuo
cMY nw)
-
uv+e JAITAL. uM.
..
L "....'
lv n`r cwurw ww•u
OY /� PoIl WS R bN Mv.vV +Lif W. .T
nitll[P A.r. - R[Y• f+O.N N.w M O.NY
W II'. MT[I11Y VN q!+'NE^o�1 p •M YN[.
nE¢- von N.w w o.Nu
SOIL GROUP MAP
N Mtlmle SeA boos �jy�dLL
1 Sm6 1-1 wnd. w wM, Iwm
B M ,
" a lean
c 1der im++
0 oer lawn. 01, aor Iwm..wer aer..mr der. o. dor
L,
-Y66,E
'ON 1'JYOtltl
nal"Be1L MiYV N Mm u'ue •nm
TIl UYO �x/tl mNeaa N Exn ue,Aea
fpi a lfglxOn n/n xnM ha iI wn
nNYO N MYM1 µ"n,n • n7O - Yt YIMFu
A YX! "x AYMNIW A a]YA ITY
xMOe 111 tl lna IYM 'II iK S )xM. YM
IM w .4 I INI mt VVuI I
30VNI(I` 80 43SOdO8d 3!DVNid80 ONIISIX3
]1Y0
� � � o ® sir \\ ••� .xl� � I e 4tr
IN
K
e
• 1{{! � `. ,. ; 6 mac' � ' ... .. '!�. s.�
f ��T
t
y�rg% j
ca i/, __ r
�y
...................._-...flu..-
L � r=
A
m Y. �1. Z TS3 • ••w•
m u mmmnv.lemuru n mw[wgl 2'?tiYt�1 —'
�. r�.nin-un.li ai�S�
�glp�W�PY
a Re°.".�..�
NO Iir
••`rjn�vT.y ^mw
....m....n--v.r.. n`n'"'m MCF PR01EClIW fFHff
CROSS AcnON crto[l[ v[w
t3`LR. 3=T
-
-
meOF,y' �YY� �wR mrvu M «.iMOM1Ii ur mmS. i.M M N[dt
RF.R Ym YfQh C DA II,XLFi P gROIECiId!
I \nip m Xeas� I
.� nm
SSM re
frogin .a uX.vucv�Fsxrnuna�il
T1PpR.oY WQIMFNT MkR RE.P T.Pp C. i[N R^O�N WIFL PROIFCT
M��
non wm
is . X i - ni eFP .aRm.ir
P�LJ'm•v.
Ci.fY�.
x .+mprvx[xi.WM. nOnrs nivo-.gd
NOWS
••� P �I .,,R.o a m�....� c
/ --------
----- A 11 J 4 16' °m°.R.., .,,.
oa adcr rt -n:�.. �°w . cp
33
9----- ' ' 10X�. BEtlGtlYdB�K`..m"o
zo
7 ` C 3 '� 13 72
0 4 Ex}
�- 13 OaCa
MI I
P. Y@gg@
ou Teo, E `` �, `�y'. !� 04 a&
16 r
2 2 13 7
77 1'-�, pRANN BV
AM
{ e/za/,v
— I
1511
I L
I OUILOT O Ylft. 1\1 ,`� `•'i G� eAo nm
iti1:.1,i1 1v ` �� I m s a ti
3 �
I
--------------
OUTLOT E
OUTLOT C
BLUFF CREEK BLVD
OUTLOT 0 C
SHEET 3.2 _
Ind
E
CREEK
N e
5�
OU{LOi C`,
N
o
I
I
\ 5q 3t�3t
\ ® 1
\J °Y�`sonwew�� a E 9
A
R
955
" ,.
955
950
-----------
950
945
j �
'
_ • •`
_. __ _
945
nw
--------------
I
940
'••. a xoK
: ^
_
940
935
_�•______'�_
_, .. !
935
925
oy cmxa�..na_
925
920w,w
..r..
920
915
REN9d14 I I
Ro.
13
w j
,..;,:,,....
,,r,o..
BLUFF CREEK BLVD
N
RGNCHMMK 1 x.n W rxt
s. n: v .u•, urt a: oawoii :i.M ,�
940
940
935
..nuu a.vw�
_
935
930
030
w mux.
s
925.
I.
925
920
___ er eaI'
920
,
915
915
_. _.. __.
`
910
910
, _. _
905
903
._.__
900
900
wm0
895
895
BBO
890
REMMp S
`1 '-' Pam'• \
p• �jN YI \\ ___y t,�
a
C
1\ \ _
_
10.
� '
III
....,. o... k
• ....^' � ,
it , \ \ ,, , . \ • P .�" 5
a
2 4'�t \�,
,\\`\
7
Y gyp.
Y
� 1 � _ .2 , 4 �1 "4 - .C. y; x°C'7� 6
� �
_
'tea \ `` \ \\ f e \ a 7
• tF�°i \� 1�'�„' o \ �\ yam•} \d UL 6 �,,,` J
/
��" .n
....-r-•»^•+ .
OUTLOT C
i1,\ N
w
0112
`s
14 73
oeiIri.: ego.. x.w'm u.vx
`•j�
OT D eNWm^o
ow.R,.n.n .n Yx[
WAY
Q 8�,
6
HEMLOCK
sn'
�i
945
�q
-9�".
{5.
o.0sm mnuu. "^g
945
940
940
935
935
- -
WO
.
mva �nuelxc
��
Rn
_
..
T
s..l
930
oeec++ By
cx
925
iII
I.T.
T .. •i
' I' ' f 09.1
tl> 7 itl 1 III
- I•
1
1� ttll. �d _ B' A"
y s�
I bpi _
925
812GI10
ncHmans
I`
i
_
I
Im
920
920
.
�.- a
� e
vI mR¢ •
w-e� .w
vev ow
,
915
.w .
m •c. .
,
m-e v a
910
aa
5
t
£
910
c.o na
RRoxct xo.
905
gtg
i
gg
i
pp
i
gg
i
905
since-ci
yl
F
} i F
------
OUi OT E_ A
a _Y
i
, i
m]az uovM
�+ R y
y b
10
e
OUTIOT E .�
BQ,GtlYlBK
�
3
ORh�V�.
7 ♦
♦'
nvP4S�eAd
D0.JYu�MM WNY
z
]w,Ddre°R Rn,w°.
O
HEMLOCK WAY
REr.pjp1N"M
55
pop
_
r11] mn fnmuw
945
E"&ggg
i7
I]� W
iy
---
94003
i r
I
935
W
930
'
O
oRAYM 9r
925
'
s nn.
tD.a
i�tl of
IXs ia'.
7; Y
;
925
uY
e%]o a
920
920
RENSICNS
915
.______
i gyp•
eb
'
915
910
910
905
_I
c
:.
e
0
0
905
CAD RLE
nacre -ass
Rnaccl Ro.
6
6
g
900
6
900
aw
I
IN 4
� ,
3
r
0
IN /10
IL
X \ 4 , r--12IN
\ ` 5
II I 1 3 \+ t 13 ,�`�IN
UAVADci ;7 pecc
soma amn L'.a.r..'"9a4•o
N
eM i, v omix:n+`N, IS,
vu IF
MOV..1 u 1 W nu+w.1 M/ti u2.
a
a
'
.�
� noroem m.meev
i7 ner»o rsx,wx1e
I
9545
I
950
[950
9-
940
935
ii nc
935
a
a
I
930
r.e_
925
925
il.
_
w_.
920
�.
a
a
I
920
915
915
°
wwea-m;w•
ii
Rc,As,.s
OUTLOT C
ao Twi+u ut v'mn6'rt �v
crta�gKwv�u .w .0 ♦urox
CYMro.' u rq+.rt uti�'1 rtl vwnucMn
4
qq�� zue �. rznnn
YBRLd�
wr-wri
.wren nn - nev.- a�c.a x.w r onrvu
e v n wrvu
a
Y
3
5
T
= =
'4
qq
yy
ill
®a5
950
1
950
945
wcvc a.0 gKKuo
emmm
945
r rzs �w wi
"rv:ww'�uo.
^05m
940
940
ci �..a�
935-
.
- ••
r,o
_ -
935
`qr^^
` c
930
930
a
.=L`••'°•
°
r '.m• w
ui r ooe
925
925
920
'gn'�
a
920
F �gFg
n
•
Y
y g
6 6¢
gg
fi^fi
pnp
i
gg
gg gg
� i£f
gg
S
915
915
S�
i
a
Z�
S ig
13
w.w .NFEA
14
_ aww]ua �,`
-SE SH Z m�v�.�aw. 1 �`� w.,,.
OUTLOT D,»w _ N tl
15
`\
N
la]M.NYA oxo.v
I � � � rte ]°° 11✓j��i
oUtLO4 b ' .w r
�
qq� Ru,�u xiuzx iuz i
1 ,ca'evv ea . ]v nN
1 gEy0yN�g1{ o z
0
0.
U
ap
W 7�f
920 920 a
DRAM er10
CO
oAr
ana/i°
REN91pN5905
3900
uo mE
vve-vsr
WRo]car Wo.
vvvs-v
..x
as +
930
930
olR�tiv°.'n ww
R,01 WUWE] •] rta -
i
:iw. v rc ]0u°er i '
� v c a cu WMY W
�m
r,axvwv
..wWa n]Ra
915
I
zRww.aa ne us�
av c a
41��Y R9 t%W
R
915
Rl[I10.V�.xi Ra�
W
WMO M4f�¢
RRII <YW]r �ns
m W -u]a
910
900
895
995
B90
890
920
'i.. d�
a1
dq{
di
920
v
10 � S�
I 3 is
12
14
712
10
„
,
14 i
955
'➢
'� c:k
'2j
g
96S
950
------- ------------
. _— .....
_
930
945
945
940
- n
940
935
935
930
YR
R4
930
925
925
920
�
� x T
a Y,
_
920
wy
f
55
i
xZ
915
915
945
-}%
- R
R�7^7
rw.oe u.oe
A
•t9}
945
p40
840
935
935
930
_
n.e
ne :.aw
_...
930
925
1 �...
ee.w
925
920
S
xsiY
a6
Y
920
915
915
910
910
90S
rat
gA
k
6
905
O
0.
pun+' ev
cr
eiio�a
NEMMMS
_ 04ffi :x ru,
-
=
.x
w:_.a, A
,-
_
'_e�o'�e.ee
I 3
r'iw[
M.P.[u e`e �.��
A
4 a�ea�..:.ea.'
/ 8
Sm.:+xw�PenwmNen.o�nncPoXpro:":Y°°:e®:e'�`"""wem°•w
,= / in":01"i.n'�
I how .m 9
77" OU rvc w BoeMn�`i,
TLO� E
N�d[f
d E
�
l l
'
�sa
r
,
OUTLOT E
z
N f.
950
§9�g
'r�8
g��
-�`�8al..
Ba�
msKK.c .4
a�
�a3
�a9 -,
950
945
i
_.................`,,
945
E�xo
940
any
aw°[ °
y a
i
935
\
935
W930
930
x
/
� ear
a:t"�
6"fRdxe"KtW
`
925
Dena» er
925"
LI
a/ocvnwosvo
,x
nNe/s
920
",n
920
o
915
915
910
910
vweirsr
905
§
9
e
4
-
A
k
_
S _. s
905
xieve-a
6
g
"n
900
£
Y
i
i
(
900
IN
1T -'Z'. OUTLOT D
r-" J
_2 m' 2' L 16 \ �np1%•1
5
.,eaarrzr MAITI
AN
�1 lrmnrz WAND,awxx _� BLU Bl ilf� •�- SEE 9NEET 5.2
0
OUTLOT E A I
OUTLOT C
i
iw a DI — \\
DUAB DATA
;« Wxsrzcc, jaw III DAM
.xu`"° 1
Toro Y (r..l w "�w•N '�"�R 'aie 4 arm (ro) I
I T4� mm
( •(y m �A .o .a e.w a e n raYa
mR DATA.. ... . J�,e1.
r ee a MueTW own 'r`°xb�.•u xm4Tax x.0 �4 n^ y vay. x r r(
AID
wev Tow sr w i i arvrtxx`n ona,r.: xorzws.uw m c w /--.��'"J, x--
ea OUTLOT C Rn+c�w, xw. re r..vs (rn(w 4e e.a 7j \'• �4• ( _ e .a _ _1
II (, v w°rz`"' %W d �s�' ^aty , x14rr mw 70<4 s�eL .rrco'w a rti l isrt'iE"f.':u'44iA ocr.�u BENCtlNeBK
mwo w n: T DDI A. rs IT,NPoNllI
7 uwu m rows r 4' ON RE 4 �0 WA K LOCATION ]O' RINNINONR TRAIL LOCA ON °� ALL, D u.wu
MIOq Moose a'I uW±rt n®u4 ALI ."LAMA ,.or BLUFF CREEK B VT) BLUFF C9FFK RLW
m•
miv A. A. WNr .rr. (ortl MurAx w. w Yu /w •
MI0( lq .... rxtl6.TIN MWM
4 n lAf 7 MITry PYIR.
BLUFF CREEK BLVD " "°x "eOA1x'""r'
g
9
955
y ppL
�a pEd
E�
8
M. r
�.. _
� ;.
_ ''.
�ewvnw cgnww:
.,,. _.
955
a
NI m
950
-
W'
a
950
a945
945
w4
LE
940
_
n
nT
940
f
ap
F
____
Wa;
'•v..�
935
R �
x
ki..
� �
•. a
..
.III
m o, w(v'.
rt'
935
930
t '�
•', >
930
a
925
asp
r ,aa3j>.
3.A
3
925
920
915
a
a
a
915
I REN910N9 a
a-+
13 �Pj eu wuR nrtn xw ,� n+umx .u. xR ro • ,,.
c.awui .nt �+II�— ..own».i ro ro. eK.
_ - ". ���e,."i.e aoRwn. �ef I��ti x,..
•o. 1 x xwun xs+mm ooxn
r fT jiiw�ol f.x(�ewsn '2iKw' iav�v<r..x,�T moo" av`ax¢ a onn. .. f iTJ m%ww°n
• wm..nN. f— <L•
14DATA
r s5' CONCR= R`OFWA R LWABQM
Z 1 OUTLOT D RLUff CRFc BLw N
15
n'
BLUGF =.vim �_
• ¢�xn
�t 6 iu..vw v
UMMUUMMtt..µ)
N0 OUTLOT C f •"•'
\ axae 10' BITUMINOUS TRAIL IOCATION
\ C1�55.0 BB �PFI tw S rNEAi M Mi'A'l Of x1RO[ V
AN AL14W MOI�
BLUFF CREEK BLVD "" """""&"'"`
nEx-
x
c
$
p
940
940
935
n�iv' .�.
w.mm
-
935
930
930
925
g
.,'.''
'
•-�..
_�
�°+y
�.x rtR
s '
F
f kid
_.
925
920
920
915
915
910
..cow axmxu»<J
a f
i�
970
905
N'
ao», OUT905
e iN:�s
900
All A._
___
e�
900
4
§�
#
895
BBO
rag
890
m
RENVONS
PRO CT NO.
move-m
z:
1
�
; 6 9
----
- ___:_;'_----
'
-3 --- --
III•._,
7
_ _
_
4
',\``
------
�__ii
2
_.__._•,
•
'
5 \� >` . 10�9UTL0T
E
1
I
i 1
�a
,
./,i
ulm
_
��
5
i
� w1. x•xaar wr
9 o:.sa. wrwwE R.n
aul•au]
r wortrt�
y 8 �
y�
„
I
_ 12
1,
I,
- -
•
_
I1P (M'
'
�y�
f�IP
17
16
'
"` •
`
:ewe ]m n,.x
Ij
1,
m.xa
N
�"
fl
•1''
OUTLOT E
i
-
NOTES
12
7
13
�``
i c^q x•�
erc
,ar .
]cu] •,ar'
0
•vwu15
14
,�;`
' ,Ia,.]m,.[w
�rt
sa'-
ah^�
W
Q/},�•\
r"
J
a,rt.Fe[�o.µ0[fiwVua. ors,uwe .reran [va,nx+vw
�iN..._ H'
�TZ
9fMCM 1YN
n ��ct> syw n'ee
r1.
:\
om
rt•j>"
O'[
OUTLOT C�
_.
b'. �w' �
LOT D
.rt unu,., v..nxKrn.
vu�
� �.y
HFMI nr.11 WAY
nFW
S.IMl R RIO W4t v LOCATION
O
945
mow_..6
i
..doso;w,nnco,e
_. �.
945
K 10'v,
" •______
940
i
=
,'-
I.
, °im:
940
935
] .aeee .w .-'
rr euv. - -
..,
_:"� g
a e
935
A8
930
930
925
I
\`
925
920
9
...
.I.
L . __":...
.�. —.
......
—_
..�
. .....
...
920
8159115
�
j
�•
��
�91
910
a=
REMIg S I 1
a.aa0
\ i
9
II
7
OUTLOT E
_
5
bAU
.E
�
--
g� g
I
3-
-- ```-------
>o•..a
7
N
r -- -
= 'nu1 anw w�
10
- '--
12
614
MAYAPPI F PAC'
NOMS
N
RiNfXY1P®vi
miter m"[N.¢awrt�IX.
I s�ccmc n..-�v=nay..wme.w
a
BBO
w-mnm
� i
955955
-_aeo
E
�
�
950
-
rw
..
_
_
940
f
940
> cu
---�
''�
f
=.x
R 2
6.t.
�
__..i
.... ...
94
935
________
_
. ._.'.
........
.. ..__I
mm'
930
s
u->.m
:
. i... .._1
930
925
p6rg7
yg9
9R
g
gg
E
920
920
=
� 1;1
PEmw"s I 1
H'is'R'ae7:'�'. F❖s.:
9Y1
4 ^1•w'X1.. •n.
F' a'
a.M1L
e rv-
inn pS
wia
�-Ti 3Y•":
JM FCN.•
'gypRa.r.•
1 w 4a 1
G �- ^
4 r' k'kw?':AC.
�¢_
� . ,:
�AUR.
�, R' _
t Y .
k 1e_
�^�
�- ��..
w sss� - .
i
S_:S
T
YCNM••
s
�:."Y.:'C:.......
eia F1�:C.:FYitSvisn ••
'.::::: �'� 4:.dy.....�.... �....
w as
4
�.
� �: .;,
"a
T's n
—_J
C
i i.�v:...�.. �...
i:.'�:.2::.�...
.tx:C'G:: �,:,. �:� �......,
ems. '� �,
w a:
Disclaimer
This map is neither a legally recorded map nor a survey and is not intended to be used
as one. This map is a compilation of records, information and data located in various
city, county, state and federal offices and other sources regarding the area shown, and
is to be used for reference purposes only. The City does not warrant that the
Geographic Information System (GIS) Data used to prepare this map are error free, and
the City does not represent that the GIS Data can be used for navigational, tracking or
any other purpose requiring exacting measurement of distance or direction or precision
in the depiction of geographic features. N erors or discrepancies are found please
contact 952-227-1107. The preceding disclaimer is provided ursuant to Minnesota
Statutes §466.03, Subd. 21 (2000), and the ygpr,Qf this o�iQif �� the City
shall not be liable for anv damages. and DIY vRQe&3NSdAbms<-@i,�E,ictees to
` 049J820366F"
$ 00.44
n a v
i- �, 06/24/201 LV a
CITY OF Mailed From 55 10 °w
CHANIIASSEN US POSTA O W
molt
7700 Market Boulevard oaq n
P.O. Box 147 z It a
Chanhassen, Minnesota55317 woo 1A
NQ4 0
SLOCS,Zg* gay3 9C 1 N C 06 p6126J 10 OJQ
UNABLE TO FDRWAROZFOR REVIEW UTP
t E5` $1?46364fl PMD97B—p28@B—s^4-42JNOFORWAROING ORDER E004** SaYGARNIL
BQOF OR DESSEAR:)We n
LADREFORREVI£F>4W It WN2 H
�\ RW) '4
p *4'
z !3
jULIEL SLOCUM FWD
1829 FREEDOM LN
CHANHASSEN, MN 55317-4556 I
(1
SCANNED
irlrlrrlrlrtriltrrrllllidlirriririllilirrli,r,ririlrirrirlilt
Notice of Public Hearing
Chanhassen Planning Commission Meeting
Date & Time:
Tuesday, July 6, 2010 at 7:00 p.m. This hearing may not start until
later in the evening,depending on the order of the agenda.
Location:
City Hall Council Chambers, 7700 Market Blvd.
PIONEER PASS: Request for a Preliminary Plat creating 94 lots, 4
outlots and right-of-way for public streets (approximately 45 acres);
Conditional Use Permit for development within the Bluff Creek
Proposal:
Overlay District with a Variance for encroachment into the Primary
Zone; an Interim Use Permit to allow site grading prior to final plat
approval; and a Wetland Alteration Permit for the grading and filling of
wetlands on property zoned Residential Low and Medium Density
RLM and A riculturaI Estate A2
Applicant:
Ryland Homes
Property
North Of Plorteer Trail (1600 Pioneer Trail) at @I ff Creek Drive
Location:
location map is on the reverse side of this notice.
T e bUrpose of this public hearing is to inform you about the
applicant's request and to obtain input from the neighborhood about
this project. During the meeting, the Chair will lead the public
What Happens
hearing through the following steps:
at the Meeting:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses the
project.
If you want to see the plans before the meeting, please visit the City's
projects web page at:
www.ci.chanhassen.mn.us/sery/plan/10-09.html. if you wish to talk to
someone about this project, please contact Robert Generous by
Questions &
email at boenerous®ci.chanhassen.mn.us or by phone at 952-227-
Comments:
1131. If you choose to submit written comments, it is helpful to have
one copy to the department in advance of the meeting. Staff will
provide copies to the Commission. The staff report for this Item
will be available online on the project web site listed above the
Thursday prior to the Planning Commission meeting.
City Review Procedure:
•. Subdivisions, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses, Wetland Alterations,
Rezonings, Comprehensive Plan Amendments and Code Amendments require a public hearing before the
Planning Commission. City ordinances require all property within 500 feet of the subject site to be notified of the
application in writing. Any interested party Is invited to attend the meeting.
• Staff prepares a report on the subject application that includes all pertinent intonation and a recommendation.
These reports are available by request. At the Planning Commission meeting, staff will give a verbal overview of
the report and a recommendation. The item will be opened for the public to speak about the proposal as a part of
the heading process. The Commission will close the public hearing and discuss the item and make a
recommendation to the City Council. The City Council may reverse, affirm or modify wholly or partly the Planning
Commission's recommendation. Rezonings, land use and code amendments take a simple majority vote of the
City Council except rezonings and land use amendments from residential to commercialfndusmal.
• Minnesota State Statute 519.99 requires all applications to be processed within 60 days unless the applicant
waives this standard. Some applications due to their complexity may take several months to complete. Any
person wishing to follow an item through the process should check with the Planning Department regarding its
status and scheduling for the City Council meeting,
• A neighborhood spokespersondrepresentative is encouraged to provide a contact for the city. Often developers
are encouraged to meet with the neighborhood regarding their proposal. Staff is also available to review the
project with any interested person(s).
• Because the Planning Commission holds the public hearing, the City Council does not. Minutes are taken and
any correspondence regarding the application will be Included in the report to the City Council. If you wish to have
something to be included in the report, lease contact the Planning Staff person named on the notification.
SCANNED