Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
CAS-10_WALNUT GROVE 2ND ADDITIONcription Parcel 1:
of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
linnesota, described as follows:
ing at the West Quarter corner of said Section 10, thence on an assumed
f South 01 degree 56 minutes 40 seconds East along the West line of
hwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
?0 seconds East, a distance of 1190.41 feet to a point on a 3452.34 foot
-ve, the center of circle of said curve bearing North 79 degrees 30
79 seconds West from said point; thence Southwesterly along said curve,
e of 469.80 feet, central angle 07 degrees 47 minutes 49 seconds; thence
degrees 17 minutes 40 seconds West along tangent, a distance of 64.00
le actual point of beginning of the trust to be described; thence continuing
degrees 17 minutes 40 seconds West, a distance of 282.12 feet; thence
degrees 12 minutes 03 seconds East, a distance of 33.12 feet to a point
?reafter referred to as Point A.
; described as beginning at the point of intersection of the Northerly
way line of Minnesota Trunk Highway No. 5 and a line 33.00 feet
erly of, measured at right angles to and parallel with the centerline of
unty Rood No. 117,• thence on an assumed bearing of North 18 degrees
?s 40 seconds East and parallel with the centerline of said Carver County
117, a distance of 725.00 feet to said Point A.
am said Point A, South 65 degrees 12 minutes 03 Southeast East, a
:of 268.73 feet; thence North 18 degrees 17 minutes 40 seconds East, a
:)f 316.33 feet; thence North 71 degrees 42 minutes 20 seconds West, a
:)f 300.00 feet to the point of beginning.
cription Parcel 2:
MH-Son
of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
linnesota, described as follows:
ing at the West Quarter corner of said Section 10; thence on an assumed
f South 01 degree 56 minutes 40 seconds East along the West line of
hwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
?0 seconds East, a distance of 7190.41 feet; thence Southerly a distance
feet along a curve not tangential with the lost described line, said curve
e to the West, has a radius 3452.34 feet and a central angle of 6 degrees
ss 10 seconds and the chord of said curve bears South 13 degrees 40
i5 second West to the point of beginning of the tract to be described;
)ntinuing Southerly, a distance of 86.07 feet along said curve concave to
having a radius of 3452.34 feet, a central angle of 07 degree 25 minutes
Js; thence South 18 degrees 17 minutes 40 seconds West, tangent to said
listance of 64.00 feet; thence South 71 degrees 42 minutes 20 seconds
istance of 300.00 feet; thence North 18 degrees 17 minutes 40 seconds
istance of 150.00 feet; thence North 71 degrees 42 minutes 20 seconds
'istance of 301.07 feet to the point of beginning.
sblzx6. fo�
A'd
`+oi Qr n
37 VAE al -To 70. 7.. Ile.
? Z
7Hf 3 4
SE•o 70 e
MH-San -
Rlm=960.16
IA/A / All lT
Vy/-IL_/ VV /
�l/ 1�t✓ V C
IFBFRR wq y `el" R
wEs
T
edge of bit. 'DISnNC 9I7.
J-
1 0�'7 qkvia I
tIn
P n.e
TREE LEGEND
AP Apple
B 80"Wood
E t7m
M Maple
0 Oak
P PIne
E24 - 24' Elm
-OHE-
denotes overheod electric Tine
�.
denotes hydr t
DC
denotes gate mtm
O
denotes poro pole
0
denotes telephone box
0 40 80 120
PARCEL 1 =2.06 ACRES
PARCEL 2 =1.03 ACRES
TOTAL AREA = 3.09 ACRES
DEV/EL OPER:
KLINGELHUTZ DEVELOPMENT
ATTN: TOM HEILAND
350 EAST HIGHWAY 212
CHASKA, MN 55318
PH-952-556-6021
FAX 952-448-3496
DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS:
III
BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED,
AND ADJOINING RIGHT-OF-WAYLINES, AND BEING 5 FEET IN
WIDTH, UNLESS OTHERWISE INDICATED, AND ADJOINING LOT
LINES, AS SHOWN ON THE PLAT.
PROPOSED SETBACKS:
FRONT = 30'
SIDE _ 9'
REAR = 30'
PRIMARY OVERLAY ZONE = 40'
EXISTING ZONING = A2
PROPOSED ZONING = RSF
NOTES.-
1) Easement information from Land Title Survey
by Harry S. Johnson Co., Inc. dated
October 23, 2002, file No. 1-3-6202
2) Wetland delineated by Kjolhaug Environmental
Services Companyy,
3) The following Variances will be required:
a. Private Street
b. Lot Width
c. Side Yard Setback
CITY OF CHANHASSEN
RECEIVED
PROPERTY
LOCATION
PROPERTY LOCATION:
PART OF THE SW 114 OF
SEC. 10, T. 116, R. 23
CARVER COUNTY, MINNESOTA
INDEX MAP
W1/4-S112SEC 10, T116,R23
FEB i 2 2004
CHANHASSEN PLANNING DEPT
(
a MA✓ES77C WA Y
o I
� I
I
BRiNKLER STREET
Q�
J weI NOT CURVE ,
ATE HWY NO
E1
O
A's
Official Copy
Community Development Dept.
M.LH.
ADDED TEE TURN AROUND
DESIGNED DRAWN
M.P.C. K.D.K.
CHECKED
M.P.C.
I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I AM A DULY REGISTERED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
Web Site:
www.ottoassoclatea.wm
9 West Division St.
Bufla10,UN55313
Qus Ph:(763)6824717
nPas (763)66sJs1z
EnglneeandLand3urveyonnc. ,I
WALNUT GROVE SECOND ADDITION
KLINGELHUTZ DEVELOPMENT
CHANHASSEN,MN
PRELIMINARY PLAT
PROJECT NO:
2_02_05
M.LH.
REVISED LOT LAYOUT HOUSES & GRADES
BY
DESCRIPTION
Martin P. Campion
DATE: REG. N0. 19901
SHEET N 0. 1 O F 5 SHEETS
DATE. 08/18/C
RENSIONS
DESIGNED DRAWN
M.P.C. K.D.K.
CHECKED
M.P.C.
I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I AM A DULY REGISTERED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
Martin P. Campion
DATE: REG. NO. 19901
Web Slte:
www.o Moaasocla tea, co m
SSTOaO Ision SLToBuffao, MN55313
ATIES Ph., (763)6824727CI
Fac (763)682.3322
and Land Surveyor, Inc.
mnroan
Rim=960.16
WALNUT GROVE SECOND ADDITION
KLINGELHUTZ DEVELOPMENT
CHANHASSEN, MN
aroj
PARCEL 1 =2.06 ACRES
PARCEL 2 =1.03 ACRES
TOTAL AREA = 3.09 ACRES
DEVEL OPER:
KLINGELHUTZ DEVELOPMENT
ATTN: TOM HEILAND
350 EAST HIGHWAY 212
CHASKA, MN 55318
PH-952-555-6021
FAX 952-448-3496
NOTES:
I. EXISTING UTILITY INFORMATION IS FROM THE
CITY AS —BUILT PLANS.
2. SANITARY SERVICES SHALL BE 6' PVC SDR 26.
3. WATER SERVICES SHALL BE 1' COPPER UNLESS
OTHERWISE NOTED.
4. ALL HYDRANT LEADS SHALL BE 6' DIP CLASS 52.
5. NEW SEWER do WATER SERVICES SHALL BE PROVIDED
TO EXISTING HOUSE.
PRELIMINARY UTILITY PLAN
SHEET NO. 2 OF 5 SHEETS
n
NO:
2-02-056f
08/18/03
DESIGNED DRAWN
M.P.C. K.D.K.
CHECKED
M.P.C.
9Y ME OR UNDER MY uKWA Jurnmv"
I AM A DULY ENGINE
UNDER THE LAWS REGISTERED OF THE STATESOFO MINNESOTX
Martin P. Campion DATE: REG. N0. 19901
/ .i3
3, j
Web Site:
www.ottoassociates.Com
TT� 9 West DI S
Buffalo, MNNSt.55
55 313
SSOCIA7ES Ph: (763)6824727
Fam (763)682J522
and Land Surveyors, Inc.
MH—Jan
Rim=960.16
r-
A
`a%Sfto 8/r
SEy�.
I fter R
'NEST
'G 8/T.
WALNUT GROVE SECOND ADDITION
KLINGELHUTZ DEVELOPMENT
CHANHASSEN, MN
'A
40 80 120
PARCEL 1 =2.06 ACRES
PARCEL 2 =1.03 ACRES
TOTAL AREA = 3.09 ACRES
DEVELOPER:
KLINGELHUTZ DEVELOPMENT
ATTN. TOM HEILAND
350 EAST HIGHWAY 212
CHASKA, MN 55318
PH-952-556-6021
FAX 952-448-3496
I I \
4
28
PROJECT NO:
PRELIMINARY STREET & 2_02.05
STORM PLAN
DATE:
SHEET NO. 3 OF 5 SHEETS 08i18A
3,y
MH—Son
Rim=95
'410 �� \
t+ I "IA / All l�
V V/
�A110 98 F
—972Y /
„3-970—
` \ x 959.00
\ \1
_J � —9SB—
��\
�956—
IX
Steel Fence Posts
shall be used to
Support Snow Fence
(Woven Wire may
be Subsituted for
Snow Fence)
Silt Fence ---�
40 0 40 80 120
PARCEL 1 =2.06 ACRES
PARCEL 2 =1.03 ACRES
TOTAL AREA = 3.09 ACRES
DEVELOPER:
KLINGELHUTZ DEVELOPMENT
ATTN: TOM HEILAND
350 EAST HIGHWAY 212
CHASKA, MN 55318
PH-952-556-6021
FAX 952-448-3496
HARI
1
EROSION CONTROL
FENCE — TYPE 3
Hay or Straw Bales
Two rebars driven through bale
1.5' to 2.0' into the ground.
Bales to be recessed 6" below
grade and wired to snow fence.
Bales are to be tied with a
Non —Degradable Material.
NOTES:
1. WETLANDS DELINEATED BY KJOLHAUG ENVIRONMENTAL SERVICES COMPANY.
2. SEDIMENT BASINS SHALL BE CONSTRUCTED PRIOR TO BEGINNING ROAD
CONSTRUCTION.
3. ALL WORK SHALL COMPLY WITH THE MINNESOTA POLLUTION CONTROL'S
(MPCA) GENERAL STORM WATER PERMIT FOR CONSTRUCTION ACTIVITY. BY
BEGINNING THIS WORK, THE CONTRACTOR ACKNOWLEDGES THE TERMS OF
THIS PERMIT AND AGREES TO ABIDE BY THEM.
4. ALL WORK SHALL COMPLY WITH THE GUIDELINES SET FORTH IN THE MPCA'S
PROTECTING WATER QUALITY IN URBAN AREAS: BEST MANAGEMENT PRACTICES
FOR MINNESOTA, AND THE US—EPA'S STORM WATER MANAGEMENT FOR
CONSTRUCTION ACTIVITIES.
5. ALL DISTURBED AREAS SHALL BE SEEDED, MULCHED, AND DISC ANCHORED
WITH MN/DOT SEED MIX 50B WITHIN 48 HOURS AFTER FINAL GRADING IS
COMPLETED OR WITHIN ONE WEEK AFTER ROUGH GRADING IS COMPLETED,
WHICHEVER APPLIES TO PROJECT SCHEDULE.
6. THE CONTRACTOR SHALL ASSUME COMPLETE RESPONSIBILITY FOR CONTROLLING
ALL SILTATION AND EROSION WITHIN AND ADJACENT TO THE PROJECT AREA.
THE CONTRACTOR SHALL USE WHATEVER MEANS NECESSARY TO CONTROL
EROSION AND SILTATION, INCLUDING BUT NOT LIMITED TO EROSION CONTROL
FENCES, BALE CHECKS, DIKES AND ROCK CONSTRUCTION ENTRANCE. CONTROL
SHALL COMMENCE WITH GRADING AND CONTINUE THROUGHOUT THE PROJECT
UNTIL ACCEPTANCE OF THE WORK.
7. ANY DEPOSITING OF SILT OR MUD ON NEW OR EXISTING STORM SEWERS OR
SWALES SHALL BE REMOVED AFTER EACH RAIN AND AFFECTED AREAS CLEANED.
8. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN
APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES
TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE
OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY
AND ALL UNDERGROUND UTILITIES.
ADDED TEE TURN AROUND
DESIGNED DRAWN
M.P.C. K.D.K.
CHECKED
M.P.C.
I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I AM A DULY REGISTERED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA
Web Site:
www.ottoassoclates.com
9 West Dlvislon SL
TT Suftlo,NNSM13
ssccurEs I (' 3)682.352
F�a � �zas�
Engineers and Land Surveyors, Inc.
WALNUT GROVE SECOND ADDITION
KLINGELHUTZ DEVELOPMENT
CHANHASSEN, MN
PRELIMINARY GRADING PLAN2_02_�G
PROJECT N0:
REVISED LOT LAYOUT HOUSES do GRADES
EM.LH.
SHEET N 0 . 4 OF 5 SHEETS
DATE. 08/18/l
DESCRIPTION
Martin P. Campion
p
I DATE: REG. NO. 19901
REVISIONS
EXISTING TREE CANOPY/TREE INVENTORY
SIZE
SPECIES
"CANOPY AREA SF
SA ItE
REMOVE
8"
O1
X
8"
MAPLE
201
X
10"
MAPLE
314
X
10"
MAPLE
314
X
12'
OAK
452
X
8"
PINE
201
X
10"
PINE
314
X
10""
PINE
314
X
10
APPLE
314
X
10
APPLE
314
X
10
APPLE
314
X
10
APPLE
314
X
10
ELM
314
X
10
ELM
314
X
10
ELM
314
X
10
ELM
314
X
10
ELM
314
X
15
PINE
707
X
10
PINE
314
X
24
P1NE
1810
X
24
PINE
1810
X
8
APPLE
201
X
70
PINE
314
X
10
PINE
614
X
"
MAPLE
201
X
10"
PILVE
J14
X
10"
PINF
614
X
24"
MAPLE
1810
X
1 "
MAPLE
1018
X
1 "
MAPLE
452
X
1 "
MAPLE
452
X
10"
ELM
X
10"
ELM
314
X
10"
COTTONWOOD
452
10"
COTTONWOOD
452
12"
COTTONWOOD
452
12"
COTTONWOOD
314
12""
COTTONWOOD
314
"
PINE
201
X
"
PINE
201
X
"
PINE
201
X
8"
PINE
201
X
SUBTOTAL:
8 717 SF
5,765 S
2, 952 SF
CANOPY AREA OF SOU7H0,N WOODED POR77ON OF SITE = 38,768 SF
TOTAL CANOPY AREA (W007ED AREA + INDIWDUAL TREE CANOPY) = 47,485 SF
CANOPY AREA MAINTAINED = 44,533 (94%)
• CANOPY AREA OF INDIWLUAL TREES WAS COMPUTED BY DETERMINING THE CIRCULAR
AREA UNDER THE TREE AS DETERMINED BY ONE FOOT RADIUS FOR EACH ONE
INCH OF DIAMETER.
FA
CB -..._.. 1...
Rim-96 .78
Inv=-96 .18
CB
Rim=96 72
1nr-95� 57
MH-Son /
DESIGNED DRAWN I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED
Es & GRADES BY ME OR UNDER MY DIRECT SUPERVISION AND TR
M.P.C. K.D.K. I AM A DULY REGISTERED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
CHECKED
M.P.C. Martin P. Campion
DATE: REG. NO. 19901
/ 33
33
"fence
10
97 0(?E10 \9e\\ k
/ L loPi Ole
9�
75 \ �Ma 668
l 10 O \ \ OM10 1 \
4/ ' / \s AE10 0 \ 9.0 \9B6\9BB\
Q \ 0\�
E10
\
E10 \ \ o1: �\
�_� 4
oE10 P151 ° �� I Garoge �Pf AP100 '
r V Pi 917 \ \ I P] Shed 1
Ex. House AP8 AP10
I /l P8 I I
968— �pl \ Bor gam\ x 981.31
P10
/ 966B>k..9�3 p P 4
/ C _71
i'° E \ \ - - - Mfg / I /90 /
gibe
x 968.77
Elp 8 \
Q I ll� 956. 2 4 \ / \ 8 en f Q� \ \ Ex. Bld-CIrg.
V / 2 0 \ / T iP ExH
l 1 17\40'RCP \\ El 6 0 1 P8 I
WW��ln v-- 948.198 IN
_
E..ItX--946.7911 A14 1 I edge of bit.
\OEP2 C1 P6 . 1�H�S
E1210'2 x956.78 I 8I Rnt���n e�stn
i 1 I \0&24w'I
\ \P P8 \ BqN� X s 11 9' AfC SqN /%3f
et oll 9r ' E1�2 P� �� FR/��er Fs
\ E7\ \ 1 I I I \� 9Po \ . \ \ \ _edge of bit.
1 1 ' � Pa
63.7 " 1 � \
' E12\ o � x 971A
0I71 E12 \ �0 I �E12�°\ 1 � 1 \ E\ �0\ \ \ � �� \PE106 V I
I10 \ \ \ fence 4.2 �Y6. C16
,r1iF E'!2` \ �IP kARY W. ON
line�96
EJ� �` \ \\ E ° Y \ \ ?
55 �� �E\ \2A,\\�E \ 960 \\\ \ \ \ X959.00
�10 \ \l
E24 \256— —958-�
\9S \``\� \24� 952— \ ' —
\\\ \ ` �94164
95P =12 \ \ i �956
\ 98— �
\\ \\ \ \9S \\\
\E24
\ 60.
Web SFfe:
www.ottoassociates. com
TTo
9 West Division St,
Bu/hlo, MN 55313
5 0CIATES
and Land Surveyors, Inc.
Ph: (763)8824727
Fax: (763)682-3522
WALNUT GROVE SECOND ADDITION
KLINGELHUTZ DEVELOPMENT
CHANHASSEN, MN
PARCEL 1 =2.06 ACRES
PARCEL 2 =1.03 ACRES
TOTAL AREA = 3.09 ACRES
DEVEL OPER:
KLINGELHUTZ DEVELOPMENT
ATTN: TOM HEILAND
350 EAST HIGHWAY 212
CHASKA, MN 55318
PH-952-556-6021
FAX 952-448-3496
P
TREE INVENTORY & CANOPY EXHIBIT
SHEET NO. 5 OF 5 SHEETS D
JECT NO:
2-02-056
N.
WALNUT GROVE 2ND ADDITION
KNOW ALL MEN BY THESE PRESENTS That Klingelhutz Development, Inc., a Minnesota
corporation, fee owner of the "owing described property situated in County of Corvea State of
Minnesota, to wit:
That part of the Southwest Ouartw of Section t0, Township 116, Range 2J Corwr County,
Minnesota, described as follows.'
Commencing at the West Quarter comer of sold Section 10,thence on on assumed bearing
of South Of degree 56 minutes 40 seconds East along the West line of said Southwest
Quarter, a distance o1 121340 feet; thence North 88 degrees 03 minutes 20 seconds East,
a distance of 1190.41 feet to a point on a 3452.34 foot radius curve, the center of circle of
said curve bearing North 79 degrees 30 minutes 09 seconds West from sold point; thence
Southwesterly along said curve, o distance of 469.80 feet, central angle 07 degrees 47
minutes 49 seconds; thence South 18 degrees 17 minutes 40 seconds West along tangent,
a distance of 64.00 feet to the actual point of beginning of the tract to be described, thence
continuing South 18 degrees 17 minutes 40 seconds West, a distance of 282.12 feet;
thence South 65 degrees 12 minutes 03 seconds East, a distance of 3312 feet to a point
that Is hereafter refened to as Point A.
Point A is described as beginning at the point of Intersection of the Northerly right—of—way
line of Minnesota Tmnk Highway No. 5 and a line 3300 feet Southeasterly of, measured
at right angles to and parallel with the centerline of Carver County Road No. 117, thence
on an assumed bearing of North 18 degrees 17 minutes 40 seconds East and parallel with
the centerline of said Carver County Rood Na 117, a distance of 725.00 feet to said Point
A.
Thence from said Point A, South 65 degrees 12 minutes 03 Southeast East, a distance of
26873 feet; thence North 18 degrees 17 minutes 40 seconds East, a distance of 316.33
feet; thence North 71 degrees 42 minutes 20 seconds West, o distance of 300.00 feet to
the point of beginning.
r
That part of the Southwest Ouartar of Section 10, Township 116, Range 23, Carver County,
Minnesota described as follows:
Commencing at the West Quarter comer of sold Section 10; thence on an assumed bearing
of South 01 degree 56 minutes 40 seconds East along the West line of said Southwest
Ouorter, a distance of 121J40 feet; thence North 88 degrees 03 minutes 20 seconds East,
a distance of 1190.41 feet; thence Southerly a distance of JSJ. 79 feet along a curve not
tangential with the last described line, said curve Is concove to the West, has o radius
J452.34 feet and a central angle of 6 degrees 22 minutes 10 seconds and the chord of sold
curve bears South 13 degrees 40 minutes 55 second West to the point of beginning of the
tract to be described; thence continuing Southerly, a distance of 86.01 feet along sold
curve concave to the West, having a radius of J452.34 feet, a central angle of 01 degree
25 minutes 39 seconds; thence South 18 degrees 17 minutes 40 seconds West, tangent to
sold curve, a distance of 64.00 feet thence South 71 degrees 42 minutes 20 seconds East,
a distance of 300.00 feet thence North 18 degrees 17 minutes 40 seconds East, a distance
of 150.00 feet, thence North 71 degrees 42 minutes 20 seconds West, a distance of 301.07
feet to the point of beginning.
Except Parcel 216C of Minnesota Deportment of Transportation Right of Way Plat No 10-04
according to the record plot thereof.
Has caused the same to be surveyed and platted as WALNUT GROVE 2ND ADD1770M and does
hereby donate and dedicate to the public for public use forever the road and also dedicating the
easements us shown on this plat for drainage and utility purposes only.
In witness whereof said Klingethutz Development, Inc., a Minnesota corporation, has caused
these presents to be signed by its proper officer this day of 20
KLINGELHUR DEVELOPMENT, INC.
Thomas R. Holland, Its President �.
ST47E OF MINNESOTA
COUNTY OF � -
omn
The foregoing Instrument was acknowledged before me this _ day of
20 by Thomas R. Holland, President of Klingelhutz Development. Inc, o Minnesota
corporation, on behalf of the corporation.
Notary Public, County, Minnesota
My Commission Expires
I hereby certify that I haw surveyed and platted the property described on this plat as WALNUT
GROVE 2ND ADDIRON; that the plot is a correct representation, of the surety, that all
distances are correctly shown on the plat In feet and hundredths of a foot that all monuments
haw been correctly placed in or will be placed in the ground as shown, in accordance to
Minnesota Statutes, Section 505.02, Subd. 1; that the outside boundary lines are correctly
designated on the plot and that there arc no wet lands as defined in Minnesota Statutes Section
50502, Subd. 1 or public highways to be designated other than as shown.
Edward J. Otto, Land Surveyor
Minnesota License Number 1434J
STATE OF MINNESOTA
COUNTY OF W IGHT
the foregoing Instrument was acknowledged before me this _ day of _
20 by Edward J Otto, Land Surveyor, Minnesota License No. 14343.
Notary Public, Wight County, Minnesota
My Commission Ewkes:
COUNTY SURVEYOR, Carver County Minnesota
Pursuant to Chapter 39A Minnesota Lows of 1971, this plat has been approved this day
of 20.
John E. Freenyer, Carver County Surveyor
CHANHASSEN. MINNESOTA
This plot of WALNUT GROVE 2ND ADD1770N was opproved and accepted by the City Council
of the City of Chanhassen, Minnesota, at a regular meeting held this day of
20_, and is In compliance with the provisions of Minnesota Statutes,
Section 505.03, Subd. 2. All monuments will be set as speclRed by the City Councl and as stated
on this plot, according to Minnesota Statute, 505.02, Subd. 1.
C17Y COUNCIL OF THE CITY OF CHANHASSEN, MINNESOTA
Mayor
Clark
COUNTY AUDITOR, Carve County, Minnesota
I hereby certify that there are no delinquent taxes for all yews prior to
land described on this plat and transfer entered. Dated this day of
Mark Lundgren, Carver County Auditor
By
COUNTY TREASURER, Carver County Minnesota
I hereby certify that the taros payable for the year _ for land described on this plat as
WALNUT GROVE 2ND ADDITION how been paid on this day of
20—
Tom Kerber, Carver County Treasurer
By
COUNTY RECORDER, Carver County, Minnesota
I hereby certify that this plat of WALNUT GROVE 2ND ADD1770N was filed this day
Of 20 at o'clock —M, as Document No.
Carl W. Hanson Jr., County Recorder
for
20 .
CITY OF CHANHASSEN
RECEIVED
MAY 18 2004
CHANHASSEN PLANNING DEPT
By
1 SSOOIATES
and Lend surveyors, Inc.
WALNUT GROVE 2ND ADDITION
n I IT
IYYn L.I �� 1 I�
�Ado,.
do LEA • ` \
/
/
/
/
/
/
/
/8
x;
/
/
/
/
/
/%L/n1C
\71 \ \l y
y ` �W
/
BOCK%
s; /a 6
/
IF
A \,
/ •+ ,
/ p
y
�� 4 / daraAa a1/
lm (Gq<p v Co ,0 6>rb,
,� - ' �"'"• KF Roq QIV7), lyolq
a
/
DRAINAGEAND (RILHYEASEMENTS ARE SHOWNTHUS'
I I
4�3
BEING 10 FEET/N WIDTH, UNLESS OIHFHWISElNOIfATED
WIDTH U0tNiESSLESS
ANDAOROTHERWISERIGHTWIYL/NES.ANOBEING 5FEETIN
INOR:ATEO.ANDADIOINlNG LOT
LINES, AS SHOWN ON THE PUT
3
/
/
/
s I/
/
0
lisil
l /5• ;; / JO 0 30 60 90
'4 Scala M Fnf
/
e /
OUTLOT A
LWrkf A M It's mfhafr he
o Qrokage d uln't, Eaasme+f
roie>r
4
\ � g
a,�``
enarn Imn ,wne
T"N
oN , fn!f
O eafefu 1/p InMW MW
}a{a
Mt+ Cba martaO Mu O
Mat ail, Da xl .,MA on. tP,
Pmee, e.aMv fna dof,
` �
\\,\//.
NaclMe DY the
WRmrMp local W.--p mR
BEARING NOTE
A'Wsaf 1,— e1 Ma S Maaaf Ouartr
/
a, ZIP, f4 T.—No 116, Ror:pa T;
cores count, ux_nafefa h —.e,I
/
to beer 50156',O E.
\/ Epineen and Land 8umyon, Im,
WALNUT GROVE 2ND ADDITION
KNOW ALL MEN BY THESE PRESENTS: That Klingelhutz Development, Inc., a Minnesota
corporation, fee owner of the following described property situated in County of Carver, State of
Minnesota, to wit:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver County,
Minnesota, described as follows:
Commencing at the West Quarter corner of said Section 10; thence on on assumed bearing
of South 01 degree 56 minutes 40 seconds East along the West line of said Southwest
Quarter, a distance of 1213.40 feet; thence North 88 degrees 03 minutes 20 seconds East,
a distance of 1190.41 feet to a point on a 3452.34 foot radius curve, the center of circle of
said curve bearing North 79 degrees 30 minutes 09 seconds West from said point, thence
Southwesterly along said curve, a distance of 469.80 feet, central angle 07 degrees 47
minutes 49 seconds; thence South 18 degrees 17 minutes 40 seconds West along tangent,
a distance of 64.00 feet to the actual point of beginning of the tract to be described; thence
continuing South 18 degrees 17 minutes 40 seconds West, a distance of 282.12 feet;
thence South 65 degrees 12 minutes 03 seconds East, a distance of 33.12 feet to a point
that is hereafter referred to as Point A.
Point A is described as beginning at the point of intersection of the Northerly right—of—way
line of Minnesota Trunk Highway No. 5 and a line 33.00 feet Southeasterly of, measured
at right angles to and parallel with the centerline of Carver County Road No. 117, thence
on on assumed bearing of North 18 degrees 17 minutes 40 seconds East and parallel with
the centerline of said Carver County Road No. 117, a distance of 725.00 feet to said Point
A.
Thence from said Point A, South 65 degrees 12 minutes 03 Southeast East, a distance of
268.73 feet; thence North 18 degrees 17 minutes 40 seconds East, a distance of 316.33
feet, thence North 71 degrees 42 minutes 20 seconds West, a distance of 300.00 feet to
the point of beginning.
AND
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver County,
Minnesota, described as follows:
Commencing at the West Quarter corner of said Section 10; thence on an assumed bearing
of South 01 degree 56 minutes 40 seconds East along the West line of said Southwest
Quarter, a distance of 1213.40 feet; thence North 88 degrees 03 minutes 20 seconds East,
a distance of 1190.41 feet; thence Southerly a distance of 383.79 feet along a curve not
tangential with the lost described line, said curve is concave to the West, has a radius
3452.34 feet and a central angle of 6 degrees 22 minutes 10 seconds and the chord of said
curve bears South 13 degrees 40 minutes 55 second West to the point of beginning of the
tract to be described, thence continuing Southerly, a distance of 86.01 feet along said
curve concave to the West, having a radius of 3452.34 feet, a central angle of 01 degree
25 minutes 39 seconds, thence South 18 degrees 17 minutes 40 seconds West, tangent to
said curve, a distance of 64.00 feet; thence South 71 degrees 42 minutes 20 seconds East,
a distance of 300.00 feet, thence North 18 degrees 17 minutes 40 seconds East, a distance
of 150.00 feet; thence North 71 degrees 42 minutes 20 seconds West, a distance of 301.07
feet to the point of beginning.
Except Parcel 216C of Minnesota Department of Transportation Right of Way Plat No 10-08,
according to the record plat thereof.
Has caused the same to be surveyed and platted as WALNUT GROVE 2ND ADDITION and does
hereby donate and dedicate to the public for public use forever the road and also dedicating the
easements as shown on this plat for drainage and utility purposes only.
In witness whereof said Klingelhutz Development, Inc., a Minnesota corporation, has caused
these presents to be signed by its proper officer this day of 20
KLINGELHUT7 DEVELOPMENT, INC.
Thomas R. Heiland, its President
STATE OF MINNESOTA
COUNTY OF
The foregoing instrument was acknowledged before me this _ day of
20 by Thomas R. Heiland, President of Klingelhutz Development, Inc., a Minnesota
corporation, on behalf of the corporation.
Notary Public, _— County, Minnesota
My Commission Expires:
I hereby certify that I have surveyed and platted the property described on this plat as WALNUT
GROVE 2ND ADDITION; that the plot is a correct representation of the survey, that all
distances are correctly shown on the plat in feet and hundredths of a foot; that all monuments
have been correctly placed in or will be placed in the ground as shown, in accordance to
Minnesota Statutes, Section 505.02, Subd. 1; that the outside boundary lines are correctly
designated on the plat and that there are no wet lands as defined in Minnesota Statutes Section
505.02, Subd. 1 or public highways to be designated other than as shown.
Edward J. Otto, Land Surveyor
Minnesota License Number 14343
STATE OF MINNESOTA
COUNTY OF WRIGHT
The foregoing instrument was acknowledged before me this dory of _
20 , by Edward J. Otto, Land Surveyor, Minnesota License No. 14343.
Notary Public, Wright County, Minnesota
My Commission Expires:
COUNTY SURVEYOR, Carver County, Minnesota
Pursuant to Chapter 395, Minnesota Laws of 1971, this plat has been approved this
of _ 20 .
John E. Freemyer, Carver County Surveyor
CHANHASSEN, MINNESOTA
day
This plat of WALNUT GROVE 2ND ADDITION was approved and accepted by the City Council
of the City of Chanhassen, Minnesota, at a regular meeting held this _ day of
20. and is in compliance with the provisions of Minnesota Statutes,
Section 505.03, Subd. 2. All monuments will be set as specified by the City Council and as stated
on this plat, according to Minnesota Statute, 505.02, Subd. 1.
CITY COUNCIL OF THE CITY OF CHANHASSEN, MINNESOTA
Mayor
Clerk
COUNTY AUDITOR, Carver County, Minnesota
I hereby certify that there are no delinquent taxes for all years prior to
land described on this plat and transfer entered. Dated this day of
Mark Lundgren, Carver County Auditor
om
COUNTY TREASURER, Carver County, Minnesota
I hereby certify that the taxes payable for the year for land described on this plot as
WALNUT GROVE 2ND ADDITION hove been paid on this __ day of
_ 20
Tom Kerber, Carver County Treasurer
50
COUNTY RECORDER, Carver County, Minnesota
I hereby certify that this plat of WALNUT GROVE 2ND ADD1770N was filled this _ day
of _ 20____, at ___ o'clock _.M. as Document No.
Carl W. Hanson Jr, County Recorder
0M
for
20 .
off dial Copy
Community Development DepIL
CITY OF CHANHASSEN
RECEIVED
MAY 18 2004
CHANHASSEN PLANNING DEPT
/--'\ SSOCIATES
Engineers and Land Surveyors, Inc.
SHEET 1 OF 2 SHEETS
J
WALNUT GROVE 2ND ADDITION
IVnV /` � n \l 0 '1
Su?34 FO°T C''AD/ S CURS
l 179 Ro3
CBRC S�3•q� �7?'1','
60
IIYVF�
if
9 of
. E
DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS:
I i
----1----ji
o
L----L----
BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED,
AND ADJOINING RIGHT-OF-WAYLINES, AND BEING 5 FEET IN
WIDTH, UNLESS OTHERWISE INDICATED, AND ADJOINING LOT
LINES, AS SHOWN ON THE PLAT
\ \ �• � \ 1, /�^/A;� v`` � T^ ..,, v _., t .� � �'�/ ' Q j �?
D 0 O fv
v<v A +�,� •� p� / /` �� • denotes iron monument found
.., �'/ ,� �. r� ;?�.• /� •i % �• O denotes 112 inch x 14 inch
/ /�..�•.
^/[7� / /� �A /T k �• Iron pipe marked thus
lJ/•�7^'lam ^^r Q(�/'\" \� ? oTia1�X1
. l J�� i> / � \ (� � '•1 / �•1 rr �� h \ N7B ! 0 orm+mu
that will be set within one year
after recording this plot, or
% �•� sooner, as specifled by the
N...approving local governing unit.
BEARING NOTE.•
The West line of the Southwest Quarter
of Section 10, Township 116, Range 23,
Caner County, Minnesota, is assumed
to bear S0156'40'E.
/---N SSOC►ATES
Engineers and Land Surveyors, Inc.
L
SHEET 2 OF 2 SHEETS
/
Exhiffbist
/
/
\
\
A-
\
\
ti \
S)j4)O8•
f
Sly c ''67.i
k'q/..v/ca.. afLat
.a°°jngv
AREA = 7782.88 S.F.
Nr
Nr� CITY OF CHANHASSEN
_ RECEIVED
MAY 1 8 2004
l /17- A UT Of 4 B\ \ \ \
lJV / L_lJ ltow �zNxk1 \
gment Deft• ° °inoN \
CHANHASSEN PLANNING DEPT
Proposed Easement:
A conservation easement over, under, and across that part of Lots 3 and 4, Block
1, WALNUT GROW 2ND AD01110N, Carver County, Minnesota, according to the record plat
thereof described as follows:
Beginning at the Southwest corner of said Lot 4; thence on an assumed bearing of South 71
degrees 47 minutes 08 seconds East along the South line of said Lot 4, a distance of 116.23 feet;
thence North 43 degrees 47 minutes 36 seconds West a distance of 16.62 feet; thence North 09
degrees 47 minutes 47 seconds East, a distance of 65.15 feet; thence North 07 degrees 12
minutes 49 seconds East, a distance of 2291 feet; thence North 53 degrees 35 minutes 15
seconds West, a distance of 49.43 feet; thence South 30 degrees 03 minutes 48 seconds West, a
distance of 70.42 feet; thence North 73 degrees 07 minutes 39 seconds West, a distance of 26.18
feet to the West line of said Lot 4,- thence South 18 degrees 17 minutes 40 seconds West along
said West line a distance of 40.64 feet to the point of beginning.
•
Requested By: I hereby certify that this survey, Revised: denotes iron monument found plan, or report was prepared by me Web Site:
Klingelhutz Development or under direct supervision and www.ottoassociates.com
a
Q denotes iron pipe Set orro-tasa3 that I am a duly Licensed Land
and marked as shown: Surveyor under the laws of the
oTroaoos2 State Minnesota. 9 West Division St.
Date: Drawn By: Scale: Checked By: /J TTO Buffalo, UN55313 Job No.
denotes soil boring 5/14/04 D.N.A. Ito or E.J.O. Paul E. Otto SSOCIATES Ph:(763)6824727 561
denotes percolation test hole 5-17,0Engineers and Land Surveyors,Inc. 2_ 02-0
Date: _License � 40062
QSTTO
SOCIATES
Engineers and Land Surveyors, Inc.
To: City of Chahassan
Attn: Bob Generous
690 Coulter Drive
P.O. Box 147
Chanhassen, MN 55317
Transmittal
Date: 01/26/04
Project: Walnut Grove Second Addition
Location: Chanhassen, MN
Project No: 2-02-0568
We are sending to you: x Attached _Separately _ By Messenger _ By Fax _ By Mail
Shop Drawings _ Specifications _ Contracts _ Reports
Prints _ Correspondence
Number Documents
Copies Number Date Description:
6 Single Family Concept
1 Single Family Concept (l 1x17)
_ No exceptions taken _ For your use _ For your information _ Rejected
_ For your approval x For your review _Revised and resubmitted _For your distribution
_ As you requested _ Note Markings _ For your processing
Remarks:
Bob,
If you need additional copies of the twin home concept let me know.
If we are to do the single family concept, we will need a variance on the side yard setback.
CC: BY: Marty Campion
marry@ottoassociates.com
Web Site: wtivw.ottoassociates.com
9 WEST DIVISION STREET - BUFFALO, MINN 55313 - (763) 6824727 - FAX (763) 682-3522
rNi
40 0 40 60 120
Scole 1 " = 40'
PROPOSED BUILDING SETBACKS
FRONT= 30'
REAR= 30'
SIDE= 5'
• EXISTING HOUSE= 10'
DES -EJ DRANK
°END
I I NEREW CERT6 THAT 1MS % - —EC,'..; O Dv R"a's
wAS EREPMED W 1.1E OR W.FaR MY �IREC7 9VPER�1510H
AND THAT I M A DVLT OCENSED PROFESSIONAL ENGINEER
UNDER THE IANS OF THE WAR OF WNNESOTA
w.0luc
www.eticn.c<I!I<t<cm
9Wa.t OHl.lon 91.
TTo
YneiJse]<i]i
Qonares easu
-
WALNUT GROVE SECOND ADDITION
KLINGELHUTZ DEVELOPMENT
CHANHA$$EN, MN
SINGLE FAMILY CONCEPT PLAN
I
PRO&CT NO:
2-02-0568
VD DAM RY DESCRIPIIDN
N.nF P. c�Pm��
MTE: LuE 0 199t
SHEE N H
DAM:
1-26-04RENSIWS
/ 33
33
.n—oun
Rim=960.16
8&
sl yF
sere. R
lVFST
40 0 40
Scale 1 "
80 120
= 40'
PROPOSED BUILDING SETBACKS
FRONT= 30'
REAR= 30'
SIDE= 5'
' EXISTING HOUSE= 10'
DESIGNED DRAWN I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WebSite:WALNUT GROVE SECOND ADDITION PROJECT NO:
WAS PREPARED BY ME OR UNDER R DIRECT SUPERVISION www.ottoasaoclates.com SINGLE FAMILY CONCEPT PLAN G O
AND THAT I LA A DULY LICENSED PROFESSIONAL ENGINEER 2-02-056°
UNDER THE LAWS OF THE STATE OF MINNESOTA. TTO 9 Buffalo,
5531t. KLINGELHUTZ DEVELOPMENT
CHECKED Buffalo, MN 55313
N0. DATE I BY I DESCRIPTION Ph: (763)6824727
Martin P. Campion QSOCIATES Fax:(763)682.3522 CHANHASSEN MN C DATE:
REVISIONS DATE: LICENSE # 19901 Engineers and Land Surveyors, Inc. SHEET N 0 . OF SHEETS 1-26-04
QSTTO
SOCIATES
Engineers and Land Surveyors, Inc.
To: City of Chahassan
Attn: Bob Generous
690 Coulter Drive
P.O. Box 147
Chanhassan, MN 55317
RECEIVED
FEB 0 3 2004
CITY OF CHANHASSEN
Transmittal
Date: 01/30/04
Project: Walnut Grove Second Addition
Location: Chanhassen, MN
Project No: 2-02-0468
We are sending to you: x
Attached _ Separately _ By Messenger _ By Fax _ By Mail
Shop Drawings
_ Specifications _ Contracts _ Reports
Prints
_ Correspondence
Number Documents
Copies Number
Date Description:
6
Single Family Concept
1
Single Family Concept (l lxl7)
_ No exceptions taken x
For your use _ For your information _ Rejected
_ For your approval _
For your review _ Revised and resubmitted _ For your distribution
_ As you requested _
Note Markings _ For your processing
Remarks:
Bob,
This revision shows
the actual homes that Klinglebutz would be building on the site.
CC:
Tom Heiland, Klingelhu[z
BY: Marty Campion
Dev.
marty@ottoassociates.com
Web Site: www.ottoassociates.com
9 WEST DIVISION STREET - BUFFALO, MINN 55313 - (763) 682-4727 - FAX (763) 682-3522
N
u
AO 0 40 60 120
IAiAI Alr rT
Scale 1 "' = 40'
AM
O� iTa ss
/e \
Ei Mvrw /
PROPOSED BUILDING SETBACKS
FRONT= 30'
REARING
SIDE= SEE PLAN
•EXISTING HOUSE= 10'
oEsiGNED DRAWN
CHECMED
MR c.
MEREBt ARES' THAT 1Hrs P ' SiECIFlGwOx, oR REGONr
WAS PREPARES RV K OR ENS ER R FESSH 91 ENG.EER
AND R Tr LA N pllY ESTATE0 F MINNESOT& ENGWEER
UNDER
UNDER THE uws or iNE swrE or wmvEsorA.
w•,E;,.:
wxw.etleiYOcylef.com
TT EUNeIo, MN SSJTJ
eSECIArE3 vn:I/sJise:<J:r
usJSJP.Ji
WALNUT GROVE SECOND ADDITION
KLINGELHUIZ DEVELOPMENT
CHANHASSEN, MN
I SINGLE FAMILY CONCEPT PLAN
02_0568
V JVO
ND. DATE
BY
2(SCPoPPDN
Mo
OAL R Ca n EN J,Rvm
1 1
SHEET NO. OF SHEETS
' 1-29-04
;Ks
QsTTO
sOMATEs
Engineers and Land surveyors, Inc.
To: City of Chanhassen
Attn: Bob Generous
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
CITY OF CHANHASSENIVED
RECE
FEB 1 2 2004
CHANHASSEN R A,yNING DEPT
Transmittal
Date: 02/11/04
Project: Walnut Grove Second Addition
Location: Chanhassen, MN
Project No: 2-02-0568
We are sending to you: x Attached _Separately
_ By Messenger _ By Fax _ By Mail
Shop Drawings _ Specifications _ Contracts _ Reports
Prints Correspondence
Number Documents
Copies Number Date
Description:
26 sets 1-5
Preliminary Plat Submittal
1 set 1-5
Preliminary Plat Submittal (8 '/2 x 11 transparency)
_ No exceptions taken x For your use
_ For your information Rejected
_ For your approval _ For your review
_
_ Revised and resubmitted _ For your distribution
As you requested _ Note Markings
_ For your processing
Remarks:
Bob;
I did not resubmit the hydrology report.
The one submitted earlier has not changed.
CC: Tom Heiland, Klingelhutz Dev.
BY: Marty Campion
marty@ottoassociates.com
Web Site: www.ottoassociates.com
9 WEST DIVISION STREET - BUFFALO, MINN 55313 - (763) 682-4727 - FAX (763) 682-3522
C+4-o + toss«.. +
5/201o4- gob con+cLc-led
retu4)*4 c #'z50
TTO
SOCIATES
Engineers and Land Surveyors, Inc.
To: City of Chanhassen
Attn: Bob Generous
7700 Market Boulevard
P.O. Box 147
Chanhassan, MN 55317
CITY OF CHANHASSEN
RECEIVED
MAY 18 2004
CHANHASSEN PLANNING DEPT
Transmittal
Date: 5/17/2004
Project: Walnut Grove 2n' Addition
Location: Chanhassen
Project No: 2-02-0568
We are sending to you: _
Attached _ Separately _ By Messenger _ By Fax _ By Mail
Shop Drawings
_ Specifications _ Contracts _ Reports
Prints
_ Correspondence
Number Documents
Copies Number
Date Description:
10
Final plat— full size
3 sets
Const. plans — full size —
I
Final plat - I lxl7
Iset
Const.plans— ilxl7 — VO ert9
1 set
Stonn sewer talcs +o a nS
1 set
i
Specifications
n v 'o. Ea5 ri Exhibit- - LU
_ No exceptions taken
For your use _ For your information _ Rejected
_ For your approval x
For your review Revised and resubmitted For your distribution
_ As you requested _
_ _
Note Markings _ For your processing
Remarks:
CC: Klingelhutz Development (I plat, 1 set cons[. plans) BY: Cara Schwalm Otto
Attn: Tom Heiland
350 East Hwy 212
6'. Ser VtiA cn
2--c CIZ14- cara@ottoassociates.com
P.O. Box 89
Exh: b:+
Chaska, MN 55318
Web Site: www.ottoassociates.com
v wr.�,l DIVIJION NIXEET - BUFFALO, MINN 55313 - (763) 6824727 - FAX (763) 682-3522
CITY OF CHANHASSEN
7700 MARKET BOULEVARD
CHANHASSEN, MN 55317
(952) 227-1100
DEVELOPMENT REVIEW APPLICATION
APPLICANT: KI I NQ"e1 VwAL
ADDRESS: _ �� O E o� /
l2?N 13 5531 e
7' p
TELEPHONE (Day Time) b o'— J— 3 3 30
OWNER: t-19ed t�QV
ADDRESS:b
0, 4s k^
TELEPHONE: ily- 33 36
Comprehensive Plan Amendment
Temporary Sales Permit
Conditional Use Permit
Vacation of Right-of-Way/Easements
Interim Use Permit
Variance
Non -conforming Use Permit
Wetland Alteration Permit
Planned Unit Development'
Zoning Appeal
Rezoning
Zoning Ordinance Amendment
Sign Permits
Sign Plan Review
Notification Sign
Site Plan Review'
X Escrow for Filing Fees/Attomey Cost"
- $50 CUP/SPR/VACNAR/WAP/Metes & Bounds
- $400 Minor SUB
Subdivision'
TOTAL FEE $
Mailing labels of all property owners within at least 500 feet of the boundaries of the property must be included
with the application -OR- the City can provide this list (Carver County properties only) for an additional fee to be
invoiced to the applicant.
If you would like the City to provide mailing labels, check this box ❑
Building material samples must be submitted with site plan reviews.
'Twenty-six (26) full-size folded copies of the plans must be submitted, including an 8'/2" X 11" reduced copy for
each plan sheet
"Escrow will be required for other applications through the development contract.
NOTE: When multiple applications are processed, the appropriate fee shall be charged for each application.
PROJECT NAME:
LOCATION:
itJ�.l N �� lap -cake 3 `�
LEGAL DESCRIPTION:
TOTAL ACREAGE:
WETLANDS PRESENT:
PRESENT ZONING:
REQUESTED ZONING:
PRESENT LAND USE DESIGNATION:
YES NO
REQUESTED LAND USE DESIGNATION:
REASON FOR REQUEST:
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within ten business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within ten business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my knowledge.
The city hereby notifies the applicant that if development review cannot be completed within 60 days due to public hearing
requirements and agency review, the city requires an automatic 60-day extension for development review. Development
review shall be completed within 120 days unless additional review extensions are approved by the applicant.
iL s,(,7 AZ �-5-/,z Z/ /V e/ —
Sig ture of Ipplicy Date
4-.- zj
d� o
Si ature of e r Date
CID oil.
Application Received on z� 0 Fee Paid Receipt No. �V
The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the
meeting. If not contacted, a copy of the report will be mailed to the applicant's address.
G:\plan\forms\Development Review Application.DOC
CITY OF CHANHASSEN
7700 MARKET BLVD
CHANHASSEN MN 55317
Payee: KLINGELHUTZ DEVELOPMENT
Date: 05/26/2004 Time: 2:50pm
Receipt Number: DW / 5076
Clerk: DANIELLE
FINAL PLAT FEE PROJECT 04-10
WALNUT GROVE 2ND
ITEM REFERENCE AMOUNT
-------------------------------------------
DEVAP FINAL PLAT FEE PROJECT 04-10
USE & VARIANCE 250.00
---------------
Total: 250.00
Check 6367 250.00
---------------
Change: 0.00
THANK YOU FOR YOUR PAYMENT!
DEKLOPEF
xumxirs m¢mnxr
vw
pOp( LYYISAIKTON ENMMCE
I OTA
mi=jrc —=�� WALNUT GROVE SECOND ADDITION �.°
WNOELIM20EVELOPMEM PRELIMINARY GRADING FLAN P-02-0668
°'`' W CHANHASSEN. MN SHEEP N0. < OF 6 SHEETS nel+e�TMi
l�
We
/
'hhgg/R.
�+ �
WALNUT GROVE SECOND ADDITION
.. �. •. -�-� �7T04'w'ii� SLRtiELHUT2 OF.ELO W TREE RlVENTORY SCANOPYE1595R 2-02-OWS
CHANHq$$EN, MN SHEET N0. 5 OF 5 SHEETS aenaw
wwt.r MwP4r DaY..x Nr...w M l+I we.lY-x
W n. tmv .re
..I Mt Y� Yw✓rb 4 xll s�
s.e. w d tix D M.I...r re
W MM+r.rr e..lwr wwu
x .'I�. n rxr P �Y w.t . axnx IMN.4
MI-Y-q�/I � or lY�.lw l s M Dd MYN
� bPr�a v�N�xewIMIMlP4�
M lw ll).. /YSNI.DdM ..x twxrYn..l Yl [.�M6
�l J.Pe.nn Yw u� It.M+d Jwl+l M14
amx wJwW MwrW Me./..II
p .IUr�N WI.t n w..
Yxx.M w n tf.l naw �� w.v aaw M n..r r w �M
r mrt i� .vewm.[w R.O N-r~.ww/M�u
uA.wwF (N • fNs w Ila.l MI YEN rN.b. wis
man.wlYWli.R d�nRb t�iV Mnt..nM wF MII /n...
W w.WwxuMYd
n. pl aN/NOIWy.l rv. l+e N N L+pa
..nIMi1 pwd . aIM NMn M.\rt ..V w ara.. N
xuveM�U xA..I M.-Ipt .I.wp�/.N MI^INW
T .Iry.. tt M.IxA®M.
Is M�T.MUI. DMna
ml... N x0.w M wq. Npx T wln. Y MUM A www
x.4 � hNrr. M.wl.d A.I N p. tMl.l Mlwa/
DI...
aw. Jr
JIPNn,Pwnrmr - a
JiSPM1. d
wm mvs- m
Ir.YimUan een LN IIIM1 MnY
plMryi lwvrr [Y. M^FW
il.e. tJ 0. M Xn -ept
A� Y.MJ er ✓MN PNvninls'
JYw1
I�xIK A/ I/• >
¢Cq[114RtJ
CM1G PINK: YIR)JN
WALNUT GROVE SECOND ADDITION PRELIMINARY PLAT
��y� �YEtio�ttr 2-02-0566
CHANHASSEN, MN ISHEEr NO. 1 OF 5 SHEErS - om m
8.'a I CIS- _ -- I WALNUT GROVE SECOND ADDITION
ME
I
I I `
PREII T PtM ET 8 2ZM69
Z�7 o
IIV i - Z `
iO4
G a-
4
ri�m,w u�iu
(\ aw••w i�wa
WALNUT GROVE SECOND ADDITION [�w`"�a J�%TT� INM3E�Hurz �'IELOP�ENr PRELIMINARY UTILITY PLAN T2-02-0568
"'` .,C..�r.;.•"�' CHANHASSEN, MN I SHEEP NO. 2 OF 5 SHEETS • owim
LNd awajaba, fi.al 1:
TMt Pot a tb. Sw,.wf 0.abr a $ o 14 Tawdyo 114 Ro,,o 24 w.r
C ofx Yhnwo,A AeoEtl w b
ca.a., ,P of t1s l e a a.a. of m s am, la
bwAq of s O Of deyee Se m4w,ee 40 rcv,dr EPn oiov ,e .ba M a
m Sw,.wf Ot , . 6 a 121340 14et ,.xs A1x, M dfa.w 41
o4 a Al eemM. Emt a Asblor a HMO na ,o a point m a J452.H kd
tvAs o/K fM ants a aim. a m Nw bnbq Mo, 7s dq.r JO
mhatw 09 .eur,dl RYst Rvrr m poht fMra Sou,wef.ly dvq m w,w
a haws a 4e0.M lest ovrby aqe OT d1ve.. 4T mlxttw 4P wmMc 0,.xe
Soots IB dyrr I7 wntfw IO wav,dr Rbat yap b.gwt a Mvxe a 6A00
re.t ro Its xbty pahf a 64,Mniq d Its bva ro b. dwa6sd Biwa wnawbq
sat, re any.. n mbNtw 4o rmM Ilbt a Moxe of 2ez Iz r t en..m
so.,
W III GS M1yW . go W m QI A Eqt a RtaC1 0I JS I2 IY( t0 a a011t
Its Jr Ir.vft4r rA.red Pa,rt A
Pant A Is dwoEW m b Aft a Its pMt a ht.axtM a Its Na,vly
Nyrt,F. in a,4b.rwao Ti FRyb.oy N S axl o" JS00 4eef
SwB oly of mes..d a rkht Moog to ob poW a, Bte ovt.Ms a
C C oty Roa1 Ma NT ,4rxs a m owrad baby a Ma, IS dm�w
IT mb 40 ewm6 Eaf axl POW' a, Its c.rt a m W,er Canty
Rood fba 117, a Mvxs a 7.2300 lea to m Pohl A
Tb.,ae Fan m Poht A Sou, R5 o1, 12 mhutw 4T sot t Est a
dbtmm a 2M" fwt ,.nrs lk., 18 ages I] mb.dw 4o wandl Emt a
aT.toxs a Mats fe.t el.rce Nor, Tl d, 42 m Iog 10 raalb R`K o
Moroe a.maw f to , Part a bgwp.
L. d D—*,IJoo Paw 2:
That pot a Ibs soa,.we GtaM a s alvo, 14 To.rdrp Ila Rap. 2; Cv,s
caaltx bo. to dwaMd a fo4a.x
ca,o.aI P a w Ilbof L>,totr a a m 54atbn 14 ,n.lm w a avnsd
beaaq of Soo, m dq 88 m . 40 eepoxY Esf ya, Its ♦ba M d
m Sav,awt Q ,, a A.tora a fraw At bb.xv No, M, 0 OJ
m4Ntw 20 eeoad. Eat a dl a JIM41 Aat , ce Swdmfy a oTaa,o.
a Jez Tv leer da o a.,. oof tore *, atA ,e Nat dwoeed na m oaw
r oaxala fo ,. Ilbt bm o raAv 3452J4 leer and . o.lbd avb a e MW
22 m4x,ew /P wamm aw ,4 mod of m aa,. b.a. sa, IJ dq 40
na.rw ss wand Rn.t to the Pont a bWt"#y of tM boa to a d..vCaq
Ola+e. mnaxrhg Sabl.lx a Maws of Sam feet .bg m v.w o.xvw to
,. ftK Aa,h2 a ro of J4 N wt a mbm olym a OF d15 2J ar.tew
JP won ,.Ia saa, To days Iy mhaw 40 emal rt Its" t to m
a.,. a aerora a "M 4wt tl. sat, 71 of a 42 mhube W wmrd
Eat a og t a 3pR00 h t tAena Mo, 18 cl s IT mhaw 10 Nxvlb
Eat a Arcane a 15aW flat ,.Ia Mo, T dey.w u mhutw 20 wavrdl
Net a Mara a JOIOT 4.ef to its poht a boo-
a --
Aw..qn
w-rnyn
OUT�OTA
\
PARCEL I _24S AffSS
PA 2 -1. ALAS
TOTAL AREA - aW AORS
A/7 I,' iil
q/44u-WTZ QEIELOPEIXT
Ault RV EEXAAV
JW EAST Iid111NY 212
PN-a5z�
FAX 952-44&-34M
I I
F 8--1 0
II
BENG 10 N MViM U(ES OI/ERMEE TEO.
AI�O Ap.CVM'l'RMi/T6AY�YLI6 NO BFIA'SiEETN
N1p11( INESS OIIF/MI�NGra lHl. NOA0.MWX'LOT
ups Assrox++a+>r�nwT
/
SE7BAM
EACMT _ .TtY
_ 1d
TRLXf ELV tTt.FFFR _ ,e
2VAW40 _ AT
RKIN3D Z41IIC - R4
i,7n, Ar
WFESt
I) Eoarrr+t hft a limn Lmd TN. s.,.y
by Nary S .t .. C., fac doted
I .br 2j 2002, flo Na 1-J-152a2
2) WOvld dyisoted by K)r/raty Ery a tof
sor,(w caapm),
xjN11W
EIr
'1.
i5"- _
�. x1Am r4a
Mo =L r Z
�- r.wrrr
US F.-A.
PROPERTY LOG TIM
PART OF 7W SW 114 OF
SEC. 14 T. 114 R 2J
CARWR COEWTY /MKSOTA
#"x MAP
IT 114-S I/2SC 14 T114 R2J
k aiXui# w oar sA�TLioN"Yo"9iw �+'� I
LLP.0 ,L.L,x , n A qav teasTmEn tA,rXEsnuYt, WALNUT GROVE SECOND ADDITION z-oz-o5sa
U�ETI TIE we s TtE soaE v r..sorA T ... PRELIMINARY PLAT
a� 1� 1��x KLINGELHUTZ DEVELOPMENT
rr.. mn
YPC ; e P t'"_"' ts.ln,twtn wCHANHASSEN, MN SHEET N0. OF 5 SH_E_ETS. 0811eros
I
2
l
/ a' � �/- ' u•ti Fie
/ � L
OUTLOT A
/
® _J
5
wa
A /, ,T
rrnt-/v(V/
.� D b 9D ,m
P� 2 -f W �
M7AL AREA - .zas ACRES
DEVELOPER:
Al RY /fLMD
530 FAST /MANY 02
omwA. w 55me
R 952-556'-6
FAX A52-II8-S196
o
�?L
At7VY
zxro � 4
r t.
PRiV ^ c
A� RpgD r',4�
' ' t
I I
/ I
/ I
mar-.;r
a
TAW COMM-TE
OAR mo aLm
'"'""
�v.c u.ax
W d�r'd(so%w"Y'Yiw
, Ar A qir ,ms,[lm FJYEFA
•,•
���-
WALNUT GROVE SECOND ADDITION
PRELIMINARY STREET &
a�
I4i"fE'"&e"Soik
uuvx nc w aF nc mae s rwoc�
TT Q """�'
I
STORM PLAN 2-02-
rov.c
���g+n;
a�
KLINGELHUTZ DEVELOPMENT
CHANHASSEN MN
SHEET NO. 3 OF S SHEETS 08/18/03
P. °ia"
MLM ,�„
�...,.�� .
A
40 ,,yypp�� 0 00gg ��pp�SS5/0 w 120
/PMCEL 2 -f 0T W
,p MrAI NSA - 209 ACRES
DEVELOPER:
/aINm/OTz DETELOPNwr
RH
l 1 4 Art l NEEAD
350 EAST HRINHY 272
1 //A / A it FAX G31-MB-31%
HRID A�
\ cw \ 00 1
Jam/
A i /
A� 7 I /
/ ROCK CaNSTRLICTIM ENTRANCE
F.� m
SW F.
EROSION CONTROL
FENCE - TYPE 3
V- / /''Au \ / Nw 1. WE AIDS DELINEATED BY KJOUTAUG ENVIRONMENTAL SENM(f5 COMPANY.
\ \ \ NA 2SEDIMENT
TIOSHALL9RABE CONSTRUCTED PRIOR TO BEGINNING ROAD
CONSTRUCTION.
S ALL WORK SHALL COMPLY WITH THE MINESOTA POLLUTION CONTRCLS
(MPCA) GENERAL STORY WATER PERMIT FOR CONSTRICTION ACTVITY. BY
/ / / ^ \ \\ ` x n 1 I lss`' �• r M TBEGINNING IM HIS PERMIT ND =(. THE
ABIOS BY T411Ag NOWEDGES I E TERMS OF
AGR• 1 w P '�sp.� 4. ALL WOW SHALL
PROTECTING WAT R QU LAITY N URBAN �S SET FORTH IN THE MPCAS
BEST MANAGEMENT PRACTICES
�A,F RO �'Wlp FOR INESOTA, AND THE US-EPA'S STYN WATER MANAGDA14T FOR
CONSTRUCTION I \ �\ \ 1 xreu .zA. rNe S ALLLL DISSTURBEDAAREAS SHALL BE SEMET. MULCHED. AND DISC ANCHORED
\fI
® / \ I (Jl (TLOY.4 \ \ \ WIN MN/OOT s MD( 50B WITH 48 HODS AFTER FINAL WADING IS
COMPLETED ;"—,7 nit WHICHEVER APPLIES ro PPRROE�CT s�GmULLEE UGH RxrADNc s COMPLETED
\ \ > \ / 8. THE CONTRACTOR SHALL ASSUME COMPLETE RESPOSIEK T FOR CONTROLLING
\ \ \ `� sF ALL SLTA71 N AND EROSION t(M1W AND ADJACENT TO THE PROJECT AREA
THE CONTRACTOR SHALL USE WHATEVER MEANS NECESSARY TO CONTROL
EROSION AND SILTATION, INCLUDING BUT NOT LIMITED TO EROSION CONTROL
` \ FENCES. BALE CHECKS DBMS AID ROCK CONSTRUCIDN ENTRANCE CONTROL
/ ,/ SHALL COMMENCE WITH OtMNG AND CONTINUE TWWO7d1T THE PROJECT
Aop / / \ \\\ t\ \\ \ \ \ \ \\ T. ANY DEPOSIUNTIL TING OF ANCE OF
OR MTHE ELD ON NEW OR EJOSTNG STORY SEWRS OR
`_'�"- \ O���U�AFFLDAREAS CLEANED. B. THE LOCATIONS FUNDERGROUND T SHOW AN
A CATION IE WAY )ONLYMI THE CONTRACTOR SHALL NC04G DETERMINE THE EXACT
//`\ • \ \\ \ _ tiR- TO
FULLY
OF ALL ONSRIC FOR
BEFORE DAMAGES WORK I H AGREES
BE
ro OCCASIONED HOLY R£SPO1 AILU FOR ANY AND ALL TE AND RESE MICR BE
ANDLLUN a DERGROUND UTILITIES.
IXAcnY LOCATE AND PRESERVE ANY
DONNEDWA« UNDER
w D� No r WALNUT GROVE SECOND ADDITION
YP.c ICDx i w A our H1EB6IID® HYtliE�IML DNOFmN 2-02-0568
uoEx TN LA.s Ns THE sDBE a HNMFSOFA �� PRELIMINARY GRADING PLAN
Y°® TTO KLINGELHUTZ DEVELOPMENT
rrrmu
o e " �'0M" Nr Nn ,rm e,�.,�,..o.,...`6'"*"'m CHANHASSEN, MN SHEET N0. 4 OF 5 SHEETS oaneros
GIRCPY AREA OF SOViFEAF WMED PIXib/ � 91E JmmSF
W7AL OAA AREA (Wa)W .YEA + Id1pML TREE NOi0 - T fA47,485 SF
CAWYY AREA Y AIED - KSA (9tV
• GAXO^Y AREA CF M At TREES ms cakvv D BY DGERINANG IW
AREA OVER RE 7REF AS OE/ERIl BY ME FOOT RAaW FOR EAaI ONE
FlCA1 a O6YElER.
OV
OPCLlAR
/
1
/o
lQ r
/ A `
r
1 A,A / A/F /T
rrnc_/ rL, /
IA
rai�n� hsi►
`�8se
Ao 0 a &D ,m
PAR III 2 -1.M ATJdS
1OTAL AREA - SOB ACRES
IIJ'ATI-M'%Li
ATM R HMAAV
" FAST //a AY 212
aug" W s a
F-sss-sozr
FAX 951-+46-.TI96
I AW A ` I I WALNUT GROVE SECOND ADDITION
YP � 1CDJC � F` A °" �� �` BOR3R TREE INVENTORY &CANOPY EXHIBIT 2-02-0568
UDR liE LAR Cf TIE SOOE Of INEIOBL
KLINGELHUTZ DEVELOPMENT
rrrmu
P.
°�'� ,.,, F� �"'> art@ CHANHASSEN, MN SHEET N0. s OF_ s SHEETS oa Faros
QSTTO
SOC►ATES
Engineers and Land Surveyors, Inc.
To: City of Chahassan
Attn: Bob Generous
690 Coulter Drive
P.O. Box 147
Chanhassan, MN 55317
Transmittal
Date: 10/28/03
Project: Walnut Grove Second Addition
Location: Chanhassen, MN
Project No: 2-02-0568
We are sending to you: x
Attached _ Separately _ By Messenger By Fax _ By Mail
Shop Drawings
_ Specifications
_ Contracts Reports
Prints
_ Correspondence
Number Documents
Copies Number
Date
Description:
-1-6sets 1-5
Preliminary Plat Submittal (revised)
1 set 1-5
Preliminary Plat Submittal (revised) 1lx17
_ No exceptions taken
x For your use
For your information Rejected
_ For your approval
_
_ For your review _
_
Revised and resubmitted _ For your distribution
_ As you requested
_ Note Markings _
For your processing
Remarks:
CC:
Tom Heiland, Klingelhutz Dev. 1 set
BY: Marty Campion
many@ottoassociates.com
Web Site: Aww.ottoassociates.com
V wtM UIV151UN S1KLEf - BUFFALO, MINN 55313 - (763) 682-4727 - FAX (763) 682-3522
Legal Description Parcel 1:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows:
Commencing at the West Quarter corner of said Section 10; thence on an assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, a distance of 1213.40 feet, thence North 88 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet to a point on a 3452.34 foot
radius curve, the center of circle of said curve bearing North 79 degrees 30
minutes 09 seconds West from said point; thence Southwesterly along said curve,
a distance of 469.80 feet, central angle 07 degrees 47 minutes 49 seconds; thence
South 18 degrees 17 minutes 40 seconds West along tangent, a distance of 64.00
feet to the actual point of beginning of the tract to be described; thence continuing
South 18 degrees 17 minutes 40 seconds West, a distance of 282.12 feet; thence
South 65 degrees 12 minutes 03 seconds East, a distance of 33.12 feet to a point
that is hereafter referred to as Point A.
Point A is described as beginning at the point of intersection of the Northerly
right-of-way line of Minnesota Trunk Highway No. 5 and a line 33.00 feet
Southeasterly of, measured at right angles to and parallel with the centerline of
Carver County Road No. 117; thence on on assumed bearing of North 18 degrees
17 minutes 40 seconds East and parallel with the centerline of said Carver County
Road No. 117, a distance of 725.00 feet to said Point A.
Thence from said Point A, South 65 degrees 12 minutes 03 Southeast East, a
distance of 268.73 feet, thence North 18 degrees 17 minutes 40 seconds East, a
distance of 316.33 feet; thence North 71 degrees 42 minutes 20 seconds West, a
distance of 300.00 feet to the point of beginning.
Legal Description Parcel 2.-
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows:
Commencing at the West Quarter corner of said Section 10; thence on an assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet; thence Southerly a distance
of 383.79 feet along a curve not tangential with the last described line, said curve
is concave to the West, has a radius 3452.34 feet and a central angle of 6 degrees
22 minutes 10 seconds and the chord of said curve bears South 13 degrees 40
minutes 55 second West to the point of beginning of the tract to be described;
thence continuing Southerly, a distance of 86.01 feet along said curve concave to
the West, having c radius of 3452.34 feet, a central angle of 01 degree 25 minutes
39 seconds; thence South 18 degrees 17 minutes 40 seconds West, tangent to said
curve, a distance of 64.00 feet, thence South 71 degrees 42 minutes 20 seconds
East, a distance of 300.00 feet; thence North 18 degrees 17 minutes 40 seconds
East, a distance of 150.00 feet, thence North 71 degrees 42 minutes 20 seconds
West, a distance of 301.07 feet to the point of beginning.
TOWNI-IOME DETAILS
II
CB -..._.. / ...
Rim=96 78
lnv-96 .18
CB —
Rim=96,172
Inv=959. 67
MH—Son l
DESIGNED DRAWN I HEREBY ERTIFY THAT THIS PLAN WAS PREPARED
BY ME ORCUNDER MY DIRECT SUPERVISION AND THAT
M.P.C. K.D.K. I AM A DULY REGISTERED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
CHECKED
M.P.C. Martin P. Campion
DATE: REG. NO. 19901
A0, V& 40
,�A O
kE$T rj4wFR
Sr b�NE C' >HE sKy O ),o
OF CC la �
3,I
+'
8t
ro\
.—fence
I lA7A / A
x j vv7-IL_I v U f
x�
xK /x�
3.3t
\3pr0
l r Garage \
ad
SIF
Ex. House
x981.31
/ \
fence�--- ---- 3t
/ SO 1. IZ40 SF
•0 � 2 0 / 1
/\
ly
�a-ev,,1j'
J a`
P.,V s o � / .7� / to a
Sol
,� ✓ y
x sss. s
/ ro I 11.7I
pRIM1PV,Y ZY X,Uff
�J 1 40 RCA aO r
aso
5
W.Inv=948.08 \
s f L Elnv=946.79
x 95 78 6
Utility Easement \
6
et�woi4 .�.
OUTLOTA\�@
/l81`
1 C 1\ 37,196 SF \°�•°
L CB
Rim 91 CH U
~ J G
/ 1 •qc� ��Y za+E
R1m 6,3.155.. �
In .15 ^•�
JJ \\
Drainage & '10,j.,F2 8
t
Utility Easement F26
' NaR
ac�N��r
�GNx ky`s�
Web Site:
www.ottoassociates.com
9 West Division St.
TT®
8ullafo, MN 55313
SSOCIATES
Ph: (763)682.4727
Fax: (763)682.3522
Engineers and Land Surveyors, Inc.
X
IZ87J SF
C fence 4.21-
\_...i'
� .o line
III
\ \ ,yY
/
o'
e
Wf line
I ,a
/
'a
j
0 \
x 968.95
X 970.11
x 968.77
16
l7/1L/VL_
Ex. Bldg.
edge of bit,
s ng °vLC S4, SF
TF RojD 94tte,
..._edge of bit.
Ex. :81dg.
TRFF /FnFNb
AP Apple
8osswaod
E Elm
M Maple
0 Oak
P Pine
EXAMPLE
E24 — 24' Elm
—OHE—
denotes overhead electric line
-&
denotes hydrant
D7
denotes gate valve
O
denotes power pole
LLJ
denotes telephone box
WALNUT GROVE SECOND ADDITION
KLINGELHUTZ DEVELOPMENT
CHANHASSEN, MN
PROFE
LOCH Ti
PARCEL 1 =2.06 ACRES
PARCEL 2 =1.03 ACRES
TOTAL AREA = 3.09 ACRES
DEVEL OPER.•
KLINGELHUTZ DEVELOPMENT
ATTN: TOM HEILAND
350 EAST HIGHWAY 212
CHASKA, MN 55318
PH-952-556-6021
FAX 952-448-3496
DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS:
I I
�-®-5
I I
o
{o
BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED,
AND ADJOINING RIGHT-OF-WAY L INES, AND BEING 5 FEET IN
WIDTH, UNLESS OTHERWISE INDICATED, AND ADJOINING LOT
LINES, AS SHOWN ON THE PLAT.
SETBACKS:
FRONT = 30'
SIDE = 10'
REAR = 30'
FROM CUP BUFFER = 40'
EXISTING ZONING = A2
PROPOSED ZONING = R4
NOTES:
1) Easement information from Land Title Survey
by Harry S. Johnson Co., Inc. dated
October 23, 2002, file No. 1-3-6202
2) Wetland delineated by Kjolhaug Environmental
Services Company.
PROPERTY LOCATION:
PART OF THE SW 114 OF
SEC. 10, T. 116, R. 23
CARVER COUNTY, MINNESOTA
INDEX A4AP
W 114 — S 112 SEC 10, T 115, R 23
STATE HWY NO 5 _1
PRELIMINARY PLAT
SHEET NO. 1 OF 5 SHEETS
N
fo9, ill ?�B
V
CITY OF RIVED
SEP 1 1 2003
CHANHASSEN PLANNING DBPi
PROJECT NO:
2-02-0568
DATE: 08/18/03
CK
Rim=96,172
Inv=959. 67
MH-San l
DESIGNED DRAWN BY ME OR UNDER MY DIRECT SUPERVISION AND ETR
M.P.C. K.D.K. I AM A DULY REGISTERED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
CHECKED
M.P.C. Martin P. Campion
DATE: REG. NO. 19901
/78
18
}
1
3,g
3,f
PI E10� \\ +-fence I A / /1 / A
0
�. P10 E1p �f\9�\� + l
d10
r41f10 \
J 7 84
o/d \\
P1 � touna
at, o� ... \ 98cc
6 M8 \
\ 66
10 ( ,\oM10 10' o
\.9 E10 0
�E1OO����/ n�,�� I
\ \
9j �E10 \ P15 `' 1p �� I Goroge P100 APiO0
\}� II � i� Shed
1 \ \' 10\ \ E. House OAPfi Ap
\ y \ x981.31 P1 I 198 /
6 1� 1 P10 . Bar hB r�y�3o P 4
a � �Q 1 fence �...�...��::�3I t
976.0 S/p�
(:1-
to, BIN \
9 9 \\ kbJ, ` 72 —97r /
4.31 970�
� /f
X 956. \ , \ W.
/ -9F yei.Uf
ZONE \ B P8 /
o \ % G° 9 o
/li
/
�A
�o
/
~
i
In
4 nvB Sf 0
.� W.=948.08\ B10
Inv-- � �y�p�g63•
x .95 78 I I I
ICJt1/lky Ease?oent \ p8
�CbYTLOY,
\ oy
fence 4.2t _.
W. o line \
1956—
\ 9 \\ \ ` `954—
_ ino & \ S� �952—
\ util\\etnenf \ 9srr\\� \\�\� �950—
_ �948—
\\ �-946----
Web Site:
www.ottoassocisfes.com
9 West Division St.
TTTO
Buffalo, MN 5531313
SSOCIATES
Ph: (763)682-4727
Fax: (763)682J522
Engineers and Land Surveyors, Inc.
x 968.77
\ Ex. Bldg.
tz!cAgVV ._ �- edge of bit.
�/Vz
R�qO 9UtfB�R
x968.95 \...—edge of bit.
x 97 1.11 / Ex. Bldg.
' arnia
N rn
WALNUT GROVE SECOND ADDITION
KLINGELHUTZ DEVELOPMENT
CHANHASSEN, MN
Steel Fence Posts
shall be used to
Support Snow Fence
(Woven Wire may
be Subsituted for
Snow Fence)
Silt Fence —�
40 0 40
PARCEL 1 =2.06 ACRES
PARCEL 2 =1.03 ACRES
TOTAL AREA = 3.09 ACRES
DEVELOPER:
KLINGELHUTZ DEVELOPMENT
A TTN: TOM HEILAND
350 EAST HIGHWAY 212
CHASKA, MN 55318
PH-952-556-6021
FAX 952-448-3496
HAR
1
EROSION CONTROL
FENCE - TYPE 3
1
-Hay or Straw Bales
Two rebars driven through bale
1.5' to 2.0' into the ground.
Bales to be recessed 6" below
grade and wired to snow fence.
Bales are to be tied with a
Non -Degradable Material.
NOTES:
1. WETLANDS DELINEATED BY KJOLHAUG ENVIRONMENTAL SERVICES COMPANY.
2. SEDIMENT BASINS SHALL BE CONSTRUCTED PRIOR TO BEGINNING ROAD
CONSTRUCTION.
3. ALL WORK SHALL COMPLY WITH THE MINNESOTA POLLUTION CONTROL'S
(MPCA) GENERAL STORM WATER PERMIT FOR CONSTRUCTION ACTIVITY. BY
BEGINNING THIS WORK, THE CONTRACTOR ACKNOWLEDGES THE TERMS OF
THIS PERMIT AND AGREES TO ABIDE BY THEM.
4. ALL WORK SHALL COMPLY WITH THE GUIDELINES SET FORTH IN THE MPCA'S
PROTECTING WATER QUALITY IN URBAN AREAS: BEST MANAGEMENT PRACTICES
FOR MINNESOTA, AND THE US—EPA'S STORM WATER MANAGEMENT FOR
CONSTRUCTION ACTIVITIES.
5. ALL DISTURBED AREAS SHALL BE SEEDED, MULCHED, AND DISC ANCHORED
WITH MN/DOT SEED MIX 50B WITHIN 48 HOURS AFTER FINAL GRADING IS
COMPLETED OR WITHIN ONE WEEK AFTER ROUGH GRADING IS COMPLETED,
WHICHEVER APPLIES TO PROJECT SCHEDULE.
6. THE CONTRACTOR SHALL ASSUME COMPLETE RESPONSIBILITY FOR CONTROLLING
ALL SILTATION AND EROSION WITHIN AND ADJACENT TO THE PROJECT AREA.
THE CONTRACTOR SHALL USE WHATEVER MEANS NECESSARY TO CONTROL
EROSION AND SILTATION, INCLUDING BUT NOT LIMITED TO EROSION CONTROL
FENCES, BALE CHECKS, DIKES AND ROCK CONSTRUCTION ENTRANCE. CONTROL
SHALL COMMENCE WITH GRADING AND CONTINUE THROUGHOUT THE PROJECT
UNTIL ACCEPTANCE OF THE WORK.
7. ANY DEPOSITING OF SILT OR MUD ON NEW OR EXISTING STORM SEWERS OR
SWALES SHALL BE REMOVED AFTER EACH RAIN AND AFFECTED AREAS CLEANED.
8. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN
APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES
TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE
OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY
AND ALL UNDERGROUND UTILITIES.
PRELIMINARY GRADING PLAN
SHEET NO. 4 OF 5 SHEETS
IECT NO:
2-02-0565
08/ 18/03
I
4
Legal Description Parcel 1: a;
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows.,
Commencing at the West Quarter corner of said Section 10; thence on an assumed
bearing of South Ol degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet to a point on a 3452.34 foot
radius curve, the center of circle of said curve bearing North 79 degrees 30
minutes 09 seconds West from said point; thence Southwesterly along said curve,
a distance of 469.80 feet, central angle 07 degrees 47 minutes 49 seconds; thence
South 18 degrees 17 minutes 40 seconds West along tangent, a distance of 64.00
feet to the actual point of beginning of the tract to be described; thence continuing
South 18 degrees 17 minutes 40 seconds West, a distance of 282.12 feet; thence
South 65 degrees 12 minutes 03 seconds East, a distance of 33.12 feet to a point
that is hereafter referred to as Point A.
Point A is described as beginning at the point of intersection of the Northerly
right-of-way line of Minnesota Trunk Highway No. 5 and a line 33.00 feet
Southeasterly of, measured at right angles to and parallel with the centerline of
Carver County Road No. 117; thence on an assumed bearing of North 18 degrees
17 minutes 40 seconds East and parallel with the centerline of said Carver County
Road No. 117, a distance of 725.00 feet to said Point A.
Thence from said Point A, South 65 degrees 12 minutes 03 Southeast East, a
distance of 268.73 feet, thence North 18 degrees 17 minutes 40 seconds East, a
distance of 316.33 feet; thence North 71 degrees 42 minutes 20 seconds West, a
distance of 300.00 feet to the point of beginning.
Legal Description Parcel 2.-
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows.
Commencing at the West Quarter corner of said Section 10; thence on an assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, c distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet, thence Southerly a distance
of 383.79 feet along a curve not tangential with the last described line, said curve
is concave to the West, has a radius 345234 feet and a central angle of 6 degrees
22 minutes 10 seconds and the chord of said curve bears South 13 degrees 40
minutes 55 second West to the point of beginning of the tract to be described;
thence continuing Southerly, a distance of 86.01 feet along said curve concave to
the West, having a radius of 3452.34 feet, a central angle of 01 degree 25 minutes
39 seconds; thence South 18 degrees 17 minutes 40 seconds West, tangent to said
curve, a distance of 64.00 feet; thence South 71 degrees 42 minutes 20 seconds
East, a distance of 300.00 feet; thence North 18 degrees 17 minutes 40 seconds
East, a distance of 150.00 feet; thence North 71 degrees 42 minutes 20 seconds
West, a distance of 301.07 feet to the point of beginning.
TOWNHOME DETAILS
R'lous W
Ryli-
fence
l A/ vi I A/ l f -7-
YYy-I L_/ V LJ I
r
8t
/ p� ��a � ���`` � 4?�aF3a•O
I \ \ \ r 1
tv \
Gorage
Q \
r� 25i985 SF
\ Ex. House
h I \ \ \ \ x 981.151
v\
` sa L 12,495 SF \ \ \
0
Q
J� 2 0�)
ti / vl SPfe
x 956.6
VQ/ _ pSIMAR Y81awl
l 401RCP 0w
w
h
C8 -..._.�-...�. m}
lnv=96 .18
R1m=96.1.72
inv=959. 67
MH-San I
In v*1150.15
'NqP
Q",4,vFq�Y
� TRJ''I'Y �43F
/ W.Inv=948.08
`Elnv-946.79 \ 3
x
1`'..-Drainage & \
Utility Easement
Drainage &
Utility Ease
' I1,d27 =F 11 A
13�
\ \
OUTLOT A\� \o
37,198 SF \ IN-
s
1380 c6
1Z750 SF
W. offline to
;t
fence 4.2t _...�
line ll
/
x 968.77
16
CITY OF.,
RF.
cc.-, 4. 5 Z13133
CHANHASSEN PLANNING DEFT
'1 /C )V V L-
Ex. Bldg.
L edge of bit.
�S (V5
% ncv�C
F Ro,10
got f� R
40 80
PARCEL 1 =2.06 ACRES
:PARCEL 2 =1.03 ACRES
TOTAL AREA = 3.09 ACRES
DEVELOPER:
:.'LiNGELHUTZ DEVELOPMENT
ATTN. TOM HEILAND
J50 EAST HIGHWAY 212
CHASKA, MN 55318
PH-952-556-6021
FAX 952-448-3496
DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS:
�-5
BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED,
AND ADJOINING RIGHT-OF-WAY LINES, AND BEING 5 FEET IN
W,OTH, UNLESS OTHERWISE INDICATED, AND ADJOINING LOT
LINES, AS SHOWN ON THE PLAT.
SETBACKS
FRONT = 30'
SIDE = 10'
RL AR = 30
Fr.JM CUP BUFFER = 40'
E.' !STING ZONING = A2
PROPOSED ZONING = R4
NOTES.-
1) Easement information from Land Title Survey
by Harry S. Johnson Co., Inc. dated
October ?3, 2002, file No. 1-3-6202
2) Wetiond delineated by Kjolhoug Environmental
Services Company.
PROPERTY LOCATION:
PART OF THE SW 114 OF
SEC. 10, T. 116, R. 23
CARVER COUNTY, MINNESOTA
x968.95 N-••-edge of bit.
x 970.11 Ex. Bldg.
mFF �
AP
FrFNo
Apple
Basswood
Mae PROPERTY
M
0
oak LOCATION
P
Pine
FXA
E24 - 24' Elm
-OHE-
denotes overhead electric line
-6.
denotes hydrant
N
denotes gate wive
O
denotes power pole
denotes telephone box
)&' e -0
INDEX MAP
Wi/4-S112SEC 10, T116,R23
STATE HWY NO 5 _1
120
1
10 2a o M.L.H.
ADDED TEE TURN AROUND
DESIGNED DRAWN
M.P.C. K.D.K.
CHECKED
M.P.C.
I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT
I AM A DULY REGISTERED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA
Web Site:
www.ottoassociates.com
9 West Division St.
TTO Buffalo, MN55313
ssocfarEs Ph:(763)682.4727
Fax:(783)682J522
Engineers and Land Surveyors, Inc.
WALNUT GROVE SECOND ADDITION
KLINGELHUTZ DEVELOPMENT
CHANHASSEN � MN
PRELIMINARY PLAT
PROJECT NO:
2-02-0568
EDAMtB=Y
N0.
DESCRIPTION
Martin P. Campion
DATE: REG. N0. 19901
SHEET NO. 1 OF 5 SHEETS
DATT. 08/18/03
REVISIONS
DESIGNED DRAWN
M.P.C. K.D.K.
CHECKED
M.P.C.
BY ME OR UNDER MY DIR
I AM A DULY REGISTERED
UNDER THE LAWS OF THE
Martin P. Campion
DATE: REG. NO. 19901
� /
V�l l .j 40 RCP
W.inv=948.08
E.Inv-946.79
i•
/
l`••—Drainage &
l Utility Easement
r-
C8—..._..—..._.... m
Rim-96.78 /
Inv=96.18 \.
CB—..._..r.
Rim-96472
Inv=95 9.67
MH—San I
3,3
\ 2
3
(
a
r
o
71 ).
1.71
15
Utility
Web Site:
www.otfoassociates.com
West Division St.
TTo
B 55313
Buffalo,
SSOCIATES
68 4727
Fa ; (763)88.352
Fax;(7631882�3522
Engineers and Land Surveyors, Inc.
0
o04
OUTLOTA
3.3t
101
W. of
11 1T
/ V V /
Garage
fence
a'�'
/n v=955.16
5 I
\.._edge of bit.
k
lEx. Bldg.
} �NEaT
fence 4.2.E _...i' (6�T IfQ nwo yy
W. of line
V L
Ex. Bldg.
edge of b t 'IV 7B�
d"�
ny oar `sqN SF
TE ,q�qD 9�ffe�R
WALNUT GROVE SECOND ADDITION
KLINGELHUTZ DEVELOPMENT
CHANHASSEN, MN
40 0 40 80 120
PARCEL 1 =2.06 ACRES
PARCEL 2 =1.03 ACRES
TOTAL AREA = 3.09 ACRES
DEVEL OPER:
KLINGELHUTZ DEVELOPMENT
ATTN. TOM HEILAND
350 EAST HIGHWAY 212
CHASKA, MN 55378
PH-952-556-6021
FAX 952-448-3496
NOTES:
1. EXISTING UTILITY INFORMATION IS FROM THE
CITY AS —BUILT PLANS.
2. SANITARY SERVICES SHALL BE 6" PVC SDR 26.
3. WATER SERVICES SHALL BE 1" COPPER UNLESS
OTHERWISE NOTED.
4. ALL HYDRANT LEADS SHALL BE 6" DIP CLASS 52.
5. NEW SEWER & WATER SERVICES SHALL BE PROVIDED
TO EXISTING HOUSE.
PRELIMINARY UTILITY PLAN
SHEET NO. 2 OF 5 SHEETS
NO:
2-02-0568
08/18/03
DESIGNED DRAWN
M.P.C. K.D.K.
CHECKED
M.P.C.
Rim-96 78
Inv=96.18 \ ••
CB —..._.. .......�...
Rim=96.772
Inv-959. 67 /
MH—Son
Rim=964�53
-tip//
\ IU
I
I HEREBY CERTIFY THAT THIS PLAN WAS PREPAR
BY ME OR UNDER MY DIRECT SUPERVISION AND
I AM A DULY REGISTERED PROFESSIONAL ENGINE
UNDER THE LAWS OF THE STATE OF MINNESOTA.
Martin P. Campion
DATE: REG. NO. 19901
3,j
/o
0
C #
r \ \ k +'—fence
/ 15i (110 \\ \�k\ I A / / 1 7—
P
09
10 9�
�o/d
(� 6
10 �tf8 \
iM1
c10
\E10
10 \PfS ,0 P1� API
`� �� _ I Garage �1
II P1 Shed i 1
\\ \�i\ \ Ex. House OAP8 \ AP100
\ x 981.31 P
B Ni P101, / I
\ Pf ^8 97�� P 4
\ A N #i2# fence"". :n3.3t
0
\ 760.
\
\ o J \ \ \ °a �97L/ V
10' 9EN _
2 \ I Y \ 970--
� t
S\ B x 968.77
PI—
a� ��r� / W. \ _
� x 95 9 � � P8
VQ I l l l RCP FA AR Y ZpNfE \ B
0
4 RO \ 6,+1�gr.o
/il v=948.08 � 81 \ 8 , �g63 o
W.
In v=*6.79
x 95 78
roinage ,�
rXV EaselK ent \ P8
n j \
ICEl�(TLOY A ° \4 \�1VT\
\
j3p �CB I \tip\ 1 \ \ \ \
Ri .9� \ \ �
In 071 ��FF \ fence 4. .
/ oRIMO,y ZaNE�" W. of�line
\
nm 6j+. \ EK \\ \� \� \ \ \ 9
�958-
\ !nog� & \ \9 S �952—
\ =Vy E\a�eQ�ent
sas—
Web Site:
www.atfoassociates.com
West Division St.
TTo
B 55
Buffalo, MN 531J
SSOCIATES
Ph: (763)6624727
Fax: (763)662.3522
Engineers and land Surveyors, Inc.
/,
edge of b1t.
R�g4) 9 to R
x968.95 \•••—edge of bit.
x 97q.11 / Ex. Bldg.
omo
4+ m ca
N rn
WALNUT GROVE SECOND ADDITION
KLINGELHUTZ DEVELOPMENT
CHANHASSEN, MN
0
0 40
PARCEL 1 =2.06 ACRES
PARCEL 2 =1.03 ACRES
TOTAL AREA = 3.09 ACRES
DEVEL OPER:
KLINGELHUTZ DEVELOPMENT
ATTN. TOM HEILAND
350 EAST HIGHWAY 212
CHASKA, MN 55318
PH-952-556-6021
FAX 952-448-3496
HARI
ROCK CONSTRUCTION ENTRANCE
Steel Fence Posts
shall be used to
Support Snow Fence —�
(Woven Wire may \
be Subsituted for
Snow Fence)
Silt Fence —�
EROSION CONTROL
FENCE — TYPE 3
Hoy or Straw Bales
Two rebars driven through bale
1.5' to 2.0' into the ground.
Bales to be recessed 6" below
grade and wired to snow fence.
Bales are to be tied with a
Non —Degradable Material.
NOTES:
1. WETLANDS DELINEATED BY KJOLHAUG ENVIRONMENTAL SERVICES COMPANY.
2. SEDIMENT BASINS SHALL. BE CONSTRUCTED PRIOR TO BEGINNING ROAD
CONSTRUCTION.
3. ALL WORK SHALL COMPLY WITH THE MINNESOTA POLLUTION CONTROL'S
(MPCA) GENERAL STORM WATER PERMIT FOR CONSTRUCTION ACTIVITY. BY
BEGINNING THIS WORK, THE CONTRACTOR ACKNOWLEDGES THE TERMS OF
THIS PERMIT AND AGREES TO ABIDE BY THEM.
4. ALL WORK SHALL COMPLY WITH THE GUIDELINES SET FORTH IN THE MPCA'S
PROTECTING WATER QUALITY IN URBAN AREAS: BEST MANAGEMENT PRACTICES
FOR MINNESOTA, AND THE US—EPA'S STORM WATER MANAGEMENT FOR
CONSTRUCTION ACTIVITIES.
5. ALL DISTURBED AREAS SHALL BE SEEDED, MULCHED, AND DISC ANCHORED
WITH MN/DOT SEED MIX 508 WITHIN 48 HOURS AFTER FINAL GRADING IS
COMPLETED OR WITHIN ONE WEEK AFTER ROUGH GRADING IS COMPLETED,
WHICHEVER APPLIES TO PROJECT SCHEDULE.
6. THE CONTRACTOR SHALL ASSUME COMPLETE RESPONSIBILITY FOR CONTROLLING
ALL SILTATION AND EROSION WITHIN AND ADJACENT TO THE PROJECT AREA.
THE CONTRACTOR SHALL USE WHATEVER MEANS NECESSARY TO CONTROL
EROSION AND SILTATION, INCLUDING BUT NOT LIMITED TO EROSION CONTROL
FENCES, BALE CHECKS, DIKES AND ROCK CONSTRUCTION ENTRANCE. CONTROL
SHALL COMMENCE WITH GRADING AND CONTINUE THROUGHOUT THE PROJECT
UNTIL ACCEPTANCE OF THE WORK.
7. ANY DEPOSITING OF SILT OR MUD ON NEW OR EXISTING STORM SEWERS OR
SWALES SHALL BE REMOVED AFTER EACH RAIN AND AFFECTED AREAS CLEANED.
8. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN
APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT
LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE AGREES
TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE
OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY
AND ALL UNDERGROUND UTILITIES.
PROJECT NO:
PRELIMINARY GRADING PLAN 2-02-0568
SHEET NO. 4 OF 5 SHEETS DATE: 08/18/03
scrv�;r��:e>•�
0 p
O n
iZ�r!':ra•�/7��a�
srrirrrr1
scar11M -F��-:>,��� � o o • � 4 e
• .� ,L7
• oin
a
AO 0 AO a0 12D
PARCa 1 -2-06 AQX3
PA 2 -I.W ALBS
MTAl AREA - am AGES
DELELOPER.,
aNLanvrz cue uanExr
AT M {EL
MO EAST /Rs Y 212
a"wA w ssna
r 952-566-6=
FAX R5?-IIa-.HOB
/ / ^sr.�-Kam\\ •\ � I / Fi \ .•.rre
I
WALNUT GROVE SECOND ADDITIONmm
Y.P.G KZK
i w A aar u®moEt mamu� pp� ^� TREE INVENTORY &CANOPY EXHIBIT 2-02-0568
uoEx nE us or nE soaE or wEsoa,
Y.P.G Ib•, P. Caipm mane IaINGELHurtoEVELoPME,'iT
CHANHASSEN, MN ISHEET NO. 5 OF 5 SHEETS 08n8/08
Lay1 Oal+btA» Pawl is
F Pat d Ma Jw Qya(r a/ Acda 10. roWp 116t Rape 24 fb.�
CwntA ✓ti'rwota aYo6H w Aloac
Ca'^"'a'dq d tlra MYat Qwf� Dana d /afd Sltbr 14 6haw an a oelnW
baby o/ SwM m depla JB mtwfr M /acarde EaN daq ar/ 6bt M d
Idd SwMawt QM� a detmw d 12I1I0 At Mw Foar m dlpwa 0
mbaM1a 10 wavMa Eat o NfaN.r d IID041 Art b a Po a o J45ZJ/ Arf
naAr aara M mta d dda o/ � mw . S.. 1... m depr .W
mYwfw m /Ic MA Wbt Mary Scvararetay dap aaU a/R
a aM 10 d 460.17 Ar, W agora Ol Apr It n.lwtw 4a I+a a w
SwM fa dlpr IT tf b 10 /IPa I lMrt dory tagaC a d taro. d 64m
Ar b Ma Padd 7 at bpfniry d Me of a b a daaAa4 Maw coetlMMq
s w , Iy mbatw 40 � rawt a obtab o/ =, Art Maw
ff a es dq , 12 mrwtw el /Icunb Fast o a6tarw d A/I Art b a pMt
Md Y ArM1r /alarM b w PMt A
P t A A MgEwt w begbJp d M4 Palt d btr.l d MI FatM1y
ripAt�h.oy a. d iA/ee/afa aht IYpn.vy Ma J off a M JJ W leaf
JwMr t d mao•a tl d rlpre al b vb paa/d .FA er w 1tom8 d d
17 County Roll Mn /1T, Ma+c4 a a mnM booby a /IarM le agI/e
IT mbvtw 40 /IvaA East and paa/d w t C1rtIAM d tlf L'orar County
Food Aq 1/7, a abtmw d 7266lKl Ar b Bard Pdrt A
iAw.cr Man /aa palm A SwM 65 Apr 121 W swerawL Ewt• a
Arfaror d MTJ / t Ml.w MwM ie Apr IT mbutr W wcwA EaK a
airtaw d M&M Aat Maw FaM ] dp 42 m/alb/ 10 Imrb Mbt a
astala. d maw Art to er pMt d b""*,
Lqd D..ro fan Paw' 2:
/bat Pat d er swam as d Secf/a IQ Tow * 114 Range ZI Lbr
C fx 1Anrta dwabM w A/o/a
C.r.kp d ar Ibt Q,oYa . d /ob S IQ Maw a a aeanrM
baahy of S M OI depla sa mi.nw q rarda Ead day M4 Mbt M d
W eatMaat Q.a'tr, a dbtao d $PAW TaIE Mau /IaM W dq 0
/rrrnbe 20 IattiI1A East. a Among d IM41 bat Mary SwtAaly a Qkarc
Of J m Aat daq a aIw rot taro w a Ma Avt deaabd M add a/ea
M owrpa.a b t Mbt b o nrdM 3ISZJ4 Art aM a mtrd aq'a d 6 dapr
V m{suM 10 Maaardr a,d Ma aAm/ 01 / cvw boas satM iJ dq M
mbaM % m Mbt b er/ pobt d bybnlry o1 Ms tact b b1 daubs¢
Mlrw —n kv Jw x a aRAaw d mm rlre dap aid aa.a wrrpolr b
tM Mbt hm V a d 3452.N /Ist a oa,bd mot d OF Apse 1J n+artw
N arcoleAt Mary SwM I6 Apr I] mbatw 10 w Mbt taryat to cold
a a d ft. d "W Aat Uraew SwM T dqr 42 rlliMw A M" 1A
Ewt a dMbllw of 31KLm Art Mau MaM TO dq ly me 40 m1de
Ewt a dbMro/ d IMW Ast Macy Abrbl N d p 42 mbAw 20 ecab
Mbt a Artaw d M.OT Are b MI Pab,t d boghihp
FOOOdOla XWS
I a
a a
w
JY
0
0-on
a
aft !y
ems\
\
m
A,
s
bs
Y � � 1//e / n n lr
r�
\
i
,oY ■aaI Avg
r a r�
r
i
OUTLOTA - / y w
L
b AARR�C�yL 0 ppgg 40 e0 120
PARfll 1 �I 0.T
]OTAL AREA am AMS
0 1a [ a:
ATM 6 191"
JJD EAST IMO MY 212
odsK. w 5&WS
PN-052-,'66-6021
EAK 0.52- 3466
pRAYp(.EAND U/ft//YE45EMENt5IRE 5{pNV 111f S
ICI
I I °
I I
..A59/D MTEMI
1
PT74% FRCKT -J%
SCE - ttY
REM � .RY
RM
P1A'M/ EIP 9.iFFR - 10'
E ZIM 201/Y0 _ A2
PIP[iCl4'D 20MM - R4
A.
L
f)Ew t blanwNar iom Lmd 1 9,ey
by Nary S ..b ., Ca. Ma doW
QY 24 2oaz 1/a Am 1-J--e202
2) MMfbrd daAnatd by Kft*" Emiwlratd
saMcw cant,
b. Mw
/ arY. rle
co PRILAIF a.,"tea*
.1mll 4ly
arrA�
%e
r
E
s
•
Y
ar
1
, 2M
pl•Kb
bF rr rr Val•
rr
MCPERTY LCC47XW
PART OF R£ Sly 114 OF
SEC 14 T. II& R 23
OWnER Cd.NIY. Aff*&WTA
#"X MAP
r 114-S 1/2 SEC 10 T114 R2J
W ir°iW
WAw TWALNUT GROVE SECOND ADDITION I PRELIMINARY PLAT EaE
�2-02-05ss
KLINGELHUTZ DEVELOPMENT
o e °' °'""' A In CHANHASSEN, MN ISHEET NO. 1 OF 5 SHEETS r, oanaroa
3
R
OUTLOT A
/
I
I L\ vc
a m*
i
.o G w w 120
PAMZt f =208 AfRET
P 2 -I.eJ MRFS
MM AFEA -sae AOdS
Ault M /EIAlD
. F Nai.Nr V2
ousrA, w ssne
Pr/-ssz--cor
FAX R52-44He-3I86
51
/ a sa s wEora�mi�u E r ne a:
I i .19 � MML E
ALL f 0.19 INFi
I MMN G R VOEr wm
1=n�
_
uP.c u.ox
`N �f °�`
/MAA WYour 1nvmorL Bomt
"'
..=
WALNUT GROVE SECOND ADDITION
um nc of nE mae ar r.00w
Q...
TTo
„„,,,;�„
PRELIMINARY UTILITY PLAN 2 o2-ossa
a®®
W+�m
—
KLINGELHUTZ DEVELOPMENT
CHANHASSEN, MN
SHEET NO. 2 OF 5 SHEETS oan8/03
r ° —0-
E w \ro
e,,..,_„_,.�,,
l
�m
Lu�wan
OUTLOTA
A
40 0 AO !0 170
P�2- N�
MW AREA - AM ACRES
DEVELOPER:
,aPVU / rz tMcw1®vT
AT ICW IElAAD
350 EAST ,ICiOpY III
ams" w 55J18
IA/A / A/,
PF{-952-Sw-602r
FAX RT1-IIB-NdS
/T
a*
.y. r m
r
5
/ I
/ I
/ I �
Y.P., "K
`" �`�'�idn�T"°
I MI A O P®61F1® PAOfESODYL FlIDIFHI
�
WALNUT GROVE SECOND ADDITION
PRELIMINARY STREET&
°®®
N"
DOER 11E IAn Di ME500E 6 YNpOp
QTT07�t
I
I
STORM PLAN 2-02-
YPG
KLINGELHUTZ DEVELOPMENT
CHANHASSEN, MN
NO. 3 OF 5 SHEETS I osne/03
s w 1p
SHEET
AO 0 AO BD 12D
PARCEL 1 -206 ACRES
PAROT. 2 -1.03 ACRES
/ JU TOTAL AREA - JIM ACRES
/ DEVELOPER:
nFIGET/A/n DiETELORMENT
/ l { AM TOM /EILND
/ l / MO EAST HIGHWAY 212
\ \�\ ORAwA w sane
I AMA / AX sw 56 sozl
�.�To \\ rrr v tr
vra ` cf" t_T vV /
M� AQ
rx 1WM"
°F I
/ /� \ g' _
/ _ r _ F.K. P
ROCK C126TRLICTIM ENTRANCE
SF
�a�eo
ito� F.
/ �e ` / � ^ \ \ • \ �^ 1 //..' Vim%
9t Fa. pis rS..o r
r �qLL
/� / � � , \ ��' •-• " Oeb uM ref b v Ys�
EROSION CONTROL xo�„-py�rw w.t�i s
1. 1WE-Iwos DEUMEATm BY KJ"AUG o1%RRONMENTAL SERVICES COMPANY.
zSEDIMENT� SHALL BE CONSTRUCTED PRIOR TO BEGINNING aoAo
CONSTRUC3 u ALL WORK 9,t COMPLY WFTR THE MIN ESOTA POLLUTION CONTROLS
Ar (MICA) GEERAL STORY WATER PERMIT FOR CONSTRUCTON ACIITTTY. BY
\y'�\ m ••• ••• nrs POW THISWORK.� roCONAeR'RACTO ACKNOWLEDGES THE TERMS OF
1
A ALL WOW SHALL THE GUIDELINES SET FORTH IN THEE MPCkS
PROTECTING AW TER QUALM NN URBAN AREAS. BEST MANAGEMENT PRACTICES
FOR MINESOTA. AND THE US-EPAS STORM WATER MANAGEMENT FOR
CONSTRUCTION ACTT`A7IES.
a \ \ \ ALLDISTURBED AREAS SHALL BE SEEDEDHE . MULCHED, NO DISC ANCHORED
®All /1' \ ((bl (TLO'f fi \ \ \ \ 'A°' "'F'E HWTN MR/DOT 9 MIX BOB MINIM AB HOURS MIER FINAL GRADING IS
r 00IMP ETED OR WITHIN ONE WEM AFTER ROUGH GRADING IS COMPLETED,
WHICHIE)" APPLIES ITT PROJECT SCHEMULE-
a CONTRACTOR SHALL ASSUME COMPLETE RES ONSBILM FOR CONTROLLING ALL SILTATION AND EROSION WITAND ADJACENT TO THE PRO ECT AREA
MEANS HE THE GDM,RACMR SHALL USE WHATEVER MEANS TO CONTROL
EROSION AND SILTATION. INCLUDING BUT NOT UNITED TO EROSION CONTROL
FENCES, BATE C EOM DIKES AND ROCK CONSTRUCTION ENTRANCE CONTROL
SHALL COMORLE WITH GRADING AND CONTINUE THROUGHOUT THE PROJECT
UNIT. ACCEPTANCE \ \\ \\ \ \ \ \ \ THE WORK.
7. ANY DE Posnm OF SILTT OR MUD ON NEW OR EmTING smRM SEWERS OR
p
\ \ SWAIFS SHALL BE REMOVED AFTER EACH RAN AND AFFECIED AREAS CLEANED.
a THE APPROXIMATE
W OF ONLY
TEXISTING UNDERGROUND HALLO ARE SHOW N AN
LOCATION
OF WAY OILY. 71U CONTRACTOR SHALL OEIING WO THE FACT
\ • \ _ �\ \ ` �- 10 BE N O' ALL ONSING UNMANS BEFORE COMMENCING UCH HE AGREES
OCAS FULLY RESPONSIBLE FOR ANY AND ALL LOCATE
AND WHICH AN BE
OCCASION BY HISRO ND FAILURE TO EXACTLY LOCATE AND PRE972YE ANY
MD ALL UMEROIOIIO UTILITIES.
Mm
E�Wm aA. WE Olt Y FIE MN '"41 "` WALNUT GROVE SECOND ADDITION E2:(02-0568
MP.G KDx I IM A lllY XTt MY D PWt1HES9OIML FIHOMEDI """ems
UNDER THE UNs OF THE EDGE OF MNEVOV, PRELIMINARY GRADING PLAN
IT N®® ••••
YPG We,P� aacuro ��"'n' IaINGELHUTZ DEVELOPMENT
WWB IEc Nn „WIN T.�.rtrsr..,-.�.. CHANHASSEN, MN _ _SHEET N0. 4 OF 5 SHEETS osns/os
NURN.,
/
/" LLfI
/
2
OUTLOTA s
` � � f�YYTrL07�C
O�JIOJiII�
«.>.. WALNUT GROVE SECOND ADDITION PRELIMINARYSTREET S 2-o2-asee
we KLINGELHUTZME LO%AENT STORM PLAN
CHANHASSEN, MN SHEET NO. 3 OF 5 08/18*3
A
750
a l-MML
/ i ieun xxwru
1 \ \ 4
\ uu.nu it
� ♦ *7 <i
1cf" cr
1
/ • ~ RRNO, YOII[nnO f. MAMMN wMlw10rt4 LfA9 PYYWY.
I ^�% \ ( 2 Rwp! YM N4l R 0.WxVcnO IIYG m RR/xq xup
�\ \ / S CPKv xM M WOlfn xYYTw COITI0.1
/ / '� \�l \ � � ,rW O�1Mlµ11Yx. M WNIIUCIw M09�6'm 1QY8 V
/ 1\ \ 1 y �. ♦ NFL M�G�f fl�Nl fAILY x M,iC1116 Rr RIIM W M VCn'n
� wnu R Rrnm. woa. u uR mw
\gTLO\!'.(1 \\ \ •••• wn Rm �R W. xMi r xxiu; u�a rxu wnvxo n
xM1 we xn uiw xuw RIRx n owwcnv,
�+(!� / / \ i 1 \ \� \ \ \ \ ��9 / 'a • m.x a�w wu n°�`'"� m°�enn Rsw��n ra owiwwa
^,rr , ,. . , . ��� ul RinMr W0a0fw.lMx xo .NWldimMro¢i Wu
'♦-J \(`� � \ \ �a\. 4 M arrnnaw aNi uR wMma Run R®NIY ro awna
Rrn� xnuRw xn wr uwo m aww ownxa
^(' \ rasa ,ru omn. orm nrio roa mxmnuaw anWc coxrnu
/ \ \\\ � \ \ \ \ auu ux�aR xix Rnoxo uo wx� MWRNvr M rRRm
i /�r n � \ \ ♦ r. Wr ovarwo R at a uuo w xa w oRwa siaix Ron w
� '� I \ — \ \ \ y � xWY wul R RUP.a Wla 4w uw uD 4r[Cn0 MnnY CLuld.
/ \\ \ \ \ �\ � WaaMnn rnr aur. M ooxm�na aru R1F1ux[ M a+cr
\\ � � unno� R ui ®nio mum oou m,mlax vaR R •aRs
omuarat m ru ruurc ro ouonr wnn uo rrttaR Wr
WALNUT GROVE SECOND ADDITION PRELIMINARY GRADING PLAN
n0 K INGELHNR DEVELOPMENT 2-02-0568
CHANHASSEN, MN 4 5 oenaroa
a m
r \
rfI� a \\ q/ii.ir�Vl
r aruu vsvnow nmm raawvm. /oo�! _ \\ \ \ — \T
mrr awruu pomv uu �.mau, nc uww) ups P / \ \ \✓G
a,xvruu urrum. Hav MV iQ % / � ��`\ \•�
. wsr uuvwwlu�wmw,mnnioro�avw _ /� // / .\ "C\ \\\ — -•^'�
uu vMm�vv unlwMm.rar moraws,a ua yr /" /
\ \
I IJRTLO'1\4
WALNUT GROVE SECOND ADDITION TREE INVENTORY CANOPY EXHIBIT t�fA 2-02-0568
NLINGELHUTZ DEVELOPMENT
„ r^+y CHANHASSEN, MN 5 5 owm"
Jul 21 03 01:05p
r
OTTO ASSOCIATES
7636823522
p.1
FAX COVER LETTER
'TO
SSOCIATES
Otto Associates, Engineers and Land Surveyors, Inc.
9 West Division Street
Buffalo, MN 55313
(763) 6824727
FAX: (763) 682-3522
To-X NUMBER:
FROM•firdZT
i95n
DATE:
RE
TIM:
NUMBER OF PAGES: COMMENTS:
- L-��
►4; < 1 r ._El (_3� to �Z — 4--1 Z`�
r,jar 4t-
P,-�s
Jul 21 03 01:O5p
OTTO ASSOCIATES
763GS23522
p.2
/
I
$` row
vpr[ I� �.[ \\ \ \\\.JI YYiI / A
_I,rs-
mro
\ \
'~�i,A�1�� 1�
Csu\"n. / lI
\b�o
v, 1-Lf / 1 /
•�/ .� /fit /v6s-- � \ a+��s g 9ari
\-7
9so—
121
r►
1
7700 Market Blvd.
P.O. Box 147
Chanhassen, MN 55317
General Phone: 952-227-1100
Administrative Fax: 952-227-1110
Bldg/Inspections Far: 952-227-1190
Engineering Fax: 952-227-1170
ParklRecreation Far: 952-227-1110
Planning Far: 952-227-1110
Public Works Fax: 952-227-1310
Recreation Center Fax: 952-227-1404
web Address: www.d.ehanhassen.mmus
FAX COVER SHEET
Date: 12.13 .0
Company: C (o ey ez 5 W ( J
Attention: Cf�,
Fax Number: `l 5-2 L4 L f 7 y% 7
Sent By: 40y-; cc: (PIZ .,Sol • 471)
Direct Dial No: V'2- 22 7. Il 5
Sending 1 pages, including cover page.
❑ Please find the information you requested
Rr Please review and call me
❑ Please call to confirm receipt of this fax
Look - - l dQ A Y- &4It,
eAo�qh tasm
If you do not receive all pages, or are experiencin other proble in transmission,
please call the sender at his or her direct dial number. /
W ( i r ►10ol vJ6HiA -
0
The DNR Protected Waters Map, Carver County, Minnesota (Minnesota DNR 1996) showed
one DNR Public Watercourse, Bluff Creek, on the property (Figure 3).
The Soil Survey of Hennepin County, Minnesota (USDA, 1968, Sheet 20) showed Glencoe
silty clay loam (Ge), Lester loam, 6 to 12 percent slopes, eroded (LaC2), and Hayden Loam, 12
to 18 percent slopes, eroded (HaD2) within the project site (Figure 4). Glencoe silty clay loam
was listed by the Natural Resources Conservation Service as an hydric soil.
The City of Chanhassen Wedand Classification Map (City of Chanhassen) showed Bluff Creek
as wetland number A10-13(2)(A) (Figure 5).
Wetland Determinations
The following description reflects field conditions observed at the time of the delineation. At the
time of the delineation, the area had experienced above normal precipitation levels, vegetation
was dormant and temperatures were in the mid 30's.
The northern portion of the project site consisted of a sloped residential housing lot with mowed
lawn and an unmowed area dominated by reed canary grass and occasional box elder, Eastern
cottonwood, Canada thistle, common burdock, honeysuckle and common buckthorn (Figure 6).
Two sample points were completed in this area. Soils at sample point one (Appendix A) were
dark brown to black, silty clay loam to greater than 24 inches. Water was observed at 23 inches
from the soil surface and no other indicators of wetland hydrology were observed Soils at
sample point two (Appendix A) were also dark brown to black clay loam to 36 inches with no
water observed within the soil pit and no other indicators of wetland hydrology found.
Personal communication with the landowner confirmed that there was formerly a field access
road running east off of Galpin Road into this area A 12-inch culvert was found here which
Likely ran under the former access road The landowner further stated that until recently, the
entire area up to the forested slope was mowed lawn
This area was determined to be non -wetland based on the lack of wetland hydrology indicators,
landscape position (sloped, see Figure 6), and presence of obligate upland species scattered
throughout the area such as Canada thistle, common burdock and common buckthorn
The area indicated as PFO1C wetland on both the NWI map and the Chanhassen Wetland
Classification Map was a steep wooded slope associated with Bluff Creek. Dominant vegetation
in the wooded area along the creek included American elm, common buckthorn, box elder, and
burdock, with some bur oak, Virginia water -leaf and garlic mustard.
This area was determined to be non -wetland based on the lack of dominant hydrophytic
vegetation and the lack of wetland hydrology.
2
One portion of the slope contains a deep gully just before it meets Galpin Road to the west. A
small intermittent drainage way (approximately 1 foot wide) drained out of rip -rap and debris at
the base of the gully and into Bluff Creek.
This area was determined to be non -wetland because it was an intermittent stream.
IV. SuAuq RY
There are no areas on the Galpin Road Site meeting wetland criteria as defined by the Corps
of Engineers Wetlands Delineation Manual. If you have any questions regarding my assessment,
please contact me at 952-401-8757.
3
1
1
1
1
1
1
1
1
1
V. CERTIFICATION OF DELINEATION
The procedures utilized in the described delineation are based on the COE 1987 Wetland
Delineation Manual as required by Section 404 of the Clean Water Act and the Minnesota
Wetland Conservation Act. Both the delineation and report were conducted in compliance with
regulatory standards in place at the time the work was completed.
Delineatioi
Reviewed
telly Dlouhy, Wetland Ecologist
Date: 12/03/02
Professional Wetland Scientist No. 000845
4
r Note: Site boundaries on this figure
are approximate and do not constitute
an official survey product.
r
r
r _
r Y
r cJ .
r
117
Site Location
!' . {F JJ
r
r
r
r d
5
r ®zom- rdGcrosoft.. as reserved. _
r
r
r
r
r
r
r
r Figure 1— Site Location Ma
r
r Galpin Road Site (KES No. 2002-191)
r Chanhassen, Minnesota
�- +N No Scale
r KJOLHAUG ENvmoNMENTAI SEMCES COMPANY
•
1
I
1
1
1
1
1
1
1
Figure 2 — NWI Map
Galpin Road Site (KES No. 2002-191)
Chanhassen, Minnesota
KjOLHAUG ENVIRONMENTALSFJMCFS COMPANY +N Scale: l inch —1,150 feet
Vv
s
ev � • �TC1\�� h L _
�
Ge ;
a i LaD2 LaC2 -Lester loam, 6 to 12 percent slopes,
Leroded
aC2 La
Ge
LaD2,
LaD2.'' ag G6 }
LaC HaQ2
y
KJOL, AUG ENVIRONMENTAi- SERVICES C4DMPr111'4-Y
Project/Site: p! v U
Investigator(s):
BasiNArea ID: AX1VA_ / " Sample Pt. ID:
C AUDI F r 1NT_ /
SOILS /
- --'d. NIA Mapped Soil Type: 1 �1J- f ZaIX72
Mottle abund./contrast
Texture, Structure, etc.
Depth (In.)
Matrix Color
Mottle Colors
A,
Field Indicators of Hydric Soils (Midwest Region) USDA, March 1998. (A • ail wits, s • sandy wl)$, F • loamy a elaysy sons)
_ Al. Histasol _ A9,10. 1-2 ®Muck _ S6. Stripped Matrix _ FS.ck Dark Surface
_ A2. Histie Epipedon _ Sl. Sandy Mucky Material _ Fl. loamy Mucky Material ox Dark Surface
A3. Black Histie _ S3. Mucky PeaUPeat _ F2. loamy Gleyed Matrix _ F7. Depleted Dark Surface
A4. Hydrogen Sulfide _ S4. Sandy Gleyed Matrix _ F3. Depleted Marrix _ F8. Redox Depressions
_ A5. Stratified Layers,,-_" S5. Sandy Redox _ F4. Depleted Below Dark Surface
Hydric Soil? es
_No Undetermined
Remarks:
V_ NIA Mapped Soil Type:
Texture, Structure, etc.
Depth (In.)
Matrix Color
Mottle Colors
Mottle abund.lcontrast
D
Field Indicators of Hydric Soils (Midwest Region) USDA, March 1998. (A • all sacs, s • sandy wits,
F • 108bY a elayay wtu)
_ Al. Histosol
_ A9,30. 1-2 on Muck
_ S6. Stripped Matrix c
Fl. Loamy Mucky Material
DarkSurface
F6. Redox Duk Surface
_ A2. Histic Epipedon
A3. Black Histic
_ S 1. Sandy Mucky Material
S3. Mucky PeaUPeat
_ _
_ F2. Loamy Gleyed Matrix _
F7. Depleted Dark Surface -
A4. Hydrogen Sulfide
_
_ S4. Sandy Gleyed Matrix
_ F3. Depleted Matrix _
Fg. Redox Depressions
_
_ A5. Stratified Layers 1.5;_
S5. Sandy Redox
_ FC Depleted Below Dark Surface
Hydric Soil?
No Undetermined
Remarks:
HYDROLOGY
y _ .—
Oxidized Root Channels yes
=Lu�
, Depth Water -Stained Leaves
hole, Depth _13 m Depression _Assumed -Explain
, Height m Czme
Neunal lestUndctermined-Explain:
osits Vegetazion
Other - Explain.
Inundated, Depth in
_ Oxidized Root Channels
Yes
_ Saturated Sort, Depth in.
_ W atcrStaiaed Leaves
1� °
Assumed - Explain:
Water in borehole, Depth in.
_ Mapped Hydric Soil, Depression
_
_
_ Water Marks, Height in.
_ FAC-Neutral Test
Undetermined - Explain:
Drift Lines
_ Topographic Position
_
— Sediment Deposits
Flattened Vegetation:
26105 Wild Row Lam, Shorewood, Mi=m 55331, Phone 952-401.8757, Fax 952-401-8798
�....: •: `—PrgectlSite �/YLl"' /� I Sample Point ID Y � �
VEGETATION
SAMPLE POINT- =====vwrwa% mod• wA
Jnd Status;
S T
20° Q00/o
rR V S T
> 0% QO%
H V S T
>200/- Q0%
H V S T
>20% Q0%
H V S T
>20% QO%
H V S T
>20% Q0%
H V S T
>20% Q0%
H V S T
>20% Q0%
H V S T
>20% Q0%
H V S T
>20% Q0%
Remarks:
Ha inants (>20% Cover) FAC or Watter.
■ SAMPLE POINT- sVp1l& wA
s qa s tt%11F�Y
Speciekk
.,('-c.t�lti:
StatU3
V S T
t
V S T
H V S T
>20% Q0%
H V S T
>200/6 Q00/-
H V S T
7200/, Q0%
H V S T
>200/c QO%
H V S T
>200/0 Q00/0
H V S T
>20% Q00/b
H V S T
>20% QO%
H V S T
>20% Q00%
Remarks:
% Dominants (>20% Cover) FAC or W~
WETLAND DETERMINATION
• CAMPI C PfNWT. I _—1dm_alde ositls '�—'
Does an Atypical Situation Exist? Yes
Does an Atypical Situation Exist? Yes
Does an Atypical Situation Exist? __Yes
Remarks:
CAMPI C PrUNT_ --Y � Me _u°sido .- wr—
1
No Does an Atypical Situation Exist? _Yes
_ ,.G o Does an Atypical Situation Exist? _Yes
No Does an Atypical Situation Exist? _Yes
Remarks:
Page 2
1
e'
KJOu � T r�r
LHA G ENVIRONMENTAL SERVICES COMPANY
RovrYg Soun4 Baked. Cprrpdiensa a Natural Remmoe Sokjbo
Letter of Transmittal
TO:
NAME
COMPANY
Project
Lori Haak
City of Chanhassen
Galpin Road Site
CC:
Tom Heiland
Marty Campion
Klingelhutz Companies
Otto Associates
FROM:
NAME
DATE
Copies
Description
Kelly Dlouhy
12/5/02
1
Wetland Determination Report
RE:
❑ FYI 0 For Your Review ❑ Please Reply ❑ As We
Discussed
• Comments:
Enclosed is a copy of the wetland determination report for the Klingelhutz
Development near Galpin Road. I ask that you review the report as we are seeking a
letter of approval regarding this site. Please inform me of any arrangement for an on -
site review and contact me with any questions.
RECorIVED
DcL; 0 6 Z002
CITY OF CHANHASSEN
26105 Wild Rose Lane, Shorewood, Minnesota 55331, Phone: 952401-8757, Fax: 952401-8798
cc�rrroe
Date: February 20, 2004
To: Development Plan Referral Agencies
From: Planning Department
City of Chanhassen
7700 Market Boulevard
Chanhassen, MN 55317
(952)227-1100
By: Robert Generous, Senior Planner
Subject: Request for rezoning of 3.09 acres from A2, Agricultural Estate District to RSF, Single -Family Residential;
subdivision approval creating four lots with a variance request; and a conditional use permit for development
within the Bluff Creek Corridor, Klingelhutz Development, Walnut Grove 2°d Addition
Planning Case #: 04-10
The above described application for approval of a land development proposal was filed with the Chanhassen Planning
Department on February 12, 2004. The 60day review period ends April 12, 2004.
In order for us to provide a complete analysis of issues for Planning Commission and City Council review, we would
appreciate your comments and recommendations concerning the impact of this proposal on traffic circulation, existing and
proposed future utility services, storm water drainage, and the need for acquiring public lands or easements for park sites,
street extensions or improvements, and utilities. Where specific needs or problems exist, we would like to have a written
report to this effect from the agency concerned so that we can make a recommendation to the Planning Commission and City
Council.
This application is scheduled for consideration by the Chanhassen Planning Commission on March 16, 2004 at 7:00 p.m in
the Council Chambers at Chanhassen City Hall. We would appreciate receiving your comments by no later than March 5.
2004. You may also appear at the Planning Commission meeting if you so desire. Your cooperation and assistance is
greatly appreciated.
City Departments
a. City Engineer
b. City Attorney
c. City Park Director
d. Fire Marshal
e. Building Official
f. Water Resources Coordinator
g. Forester
2. Watershed District Engineer
3. Soil Conservation Service
4. MN Dept. of Transportation
5. U.S. Army Corps of Engineers
6. CenterPoint Energy Minnegasco
7. MN Dept. of Natural Resources
8. Telephone Company
(Qwest or United)
9. Electric Company
(Xcel Energy or MN Valley)
10. Medicom
11. U. S. Fish and Wildlife
12. Carver County
a. Engineer
b. Environmental Services
13. Other-
14.
Date: February 20, 2004
To: Development Plan Referral Agencies
From: Planning Department
cti` zlzoloN
City of Chanhassen
7700 Market Boulevard
Chanhassen, MN 55317
(952)227-1100
By: Robert Generous, Senior Planner
Subject: Request for rezoning of 3.09 acres from A2, Agricultural Estate District to RSF, Single -Family Residential;
subdivision approval creating four lots with a variance request; and a conditional use permit for development
within the Bluff Creek Corridor, Klingelhutz Development, Walnut Grove 2°d Addition
Planning Case #: 04-10
The above described application for approval of a land development proposal was filed with the Chanhassen Planning
Department on February 12, 2004. The 60day review period ends April 12, 2004.
In order for us to provide a complete analysis of issues for Planning Commission and City Council review, we would
appreciate your comments and recommendations concerning the impact of this proposal on traffic circulation, existing and
proposed future utility services, storm water drainage, and the need for acquiring public lands or easements for park sites,
street extensions or improvements, and utilities. Where specific needs or problems exist, we would like to have a written
report to this effect from the agency concerned so that we can make a recommendation to the Planning Commission and City
Council.
This application is scheduled for consideration by the Chanhassen Planning Commission on March 16, 2004 at 7:00 p.m, in
the Council Chambers at Chanhassen City Hall. We would appreciate receiving your comments by no later than March 5,
2004. You may also appear at the Planning Commission meting if you so desire. Your cooperation and assistance is
greatly appreciated.
City Departments
a. City Engineer
b. City Attorney
c. City Park Director
d. Fire Marshal
e. Building Official
f. Water Resources Coordinator
g. Forester
2. Watershed District Engineer
3. Soil Conservation Service
4. MN Dept. of Transportation
5. U.S. Army Corps of Engineers
6. CenterPoint Energy Minnegasco
7. MN Dept of Natural Resources
8. Telephone Company
(Qwest or United)
9. Electric Company
(Xcel Energy or MN Valley)
10. Medicom
11. U. S. Fish and Wildlife
12. Carver County
a. Engineer
b. Environmental Services
13. Other-
14.
F 12
�\ 4 zl I^ 5 ZI I� 6I fo 7 I•a 8 I•o 9 �0 10 �I Io 11 o l0 13 �I l0 14 '
co ^I Iz 11= I I= ^I z IO �I to I ;
Z 11 ! 1 I I :�� r I IZ _I Iz
�\ 11°02'3B• 1 I G.12009'49. 1 1 °� I I I I I 135.n9 Ld'�_1�� 4:�' g8 94� �664.8° I I I ^�y
829 6�7286 J L 80.25 J t3 31 45• •1 pt6°2614 31 /1 5 .Q,. ti k.1 i
0=1^\ �G.12°25'S4' I 41^5� 39: J Ii �� ?4�! 1?34 41.1 I Cf�,6/
IP W A L_ N U T o BD.28 J Lf 1 �U R VE R I N�,o n '� /s
�7.99 G �35°02'41' _ , n / 1 N79° 20•E -118 55 ° R�a00.00 - - SOW R� n `o� *Nti
/ 1265 0 55 - w 1 pr18 58 50' �I 58 '73 00 N73o v
)f' 2 0 24 52'S8' N• D
\j 'q R00.00 173.71 21'u• �/ .48.J3_ W -- 243.88 �0,e • �\
_ _• I 81.35 ��/� 6 21'20 42.7833.88 51.90 /� �'Lry
/9°1905• �14039'29• fIV 1{p.11� 75 / �'`10 2 /� �6°3731.1I
194 �14 Z Iw 4=5°?0' 72.42 72.27 I Oo o n n - �300 0 4.91 43.7 89 p5
O c c,�p 38 p�90 : ° 747- 1\ 9! �� m n 02'14 d18'41• / i Q 58.77�028. 1 a
�) I I� 1L-"� 3900 11 IIG 9 3 1 8 S?•°' I I 10 �I 1^ n �I I� '$ 5 j o 5 \�y 4
I I ° t I I �7 I I [�20 57'27 Dt Aso
M 1; O� °° ; o g ;�l I 41•E - m I
Vp 0 16 �f 15 �I 13 • I IZ mnl IN NI 1 m_I 1 kes 5 \h dco ?,,8� �m 8 �1 3 � , 0 5
11
$. I 14 °D I iN 13 c ^I I� 12 ^I I� c I\ /k 49 33 0 56.28 z SV I'� 7 I �I I� \�
0 I I � \ to �, z M82°25'35•Ell Ic 47 Jz �t 105.61 -z' � � \ �l,b �Y11 p w I 6 `°I 4S•W \
30 p'N 31 o I I 0 11 30- �I z 78• / •V N89°56'39 W N 9 z UH f 056 %
- 72_6� 72 IZ ro z mo -1D4. NO 1151� i w / _ 8go \ f ° 1 1 I I N152 415> _ i` 72.04>, � 72.43 / 78.05 \ 76.05 / 1 ?2- ej z 3 9og3� E
�0 45•E 164.96 \ 72.04- / 78.83 / 1 \'S9 0 /� N8 •i
N83 20 - - \: 84 N87 00'44•W /
\�3.58 17 •�cJ _ 40.13 31.91- N86°41'03•E 330.03 136.36 78.83 I _ - 81.40 _ 6405�,� 9
3p 1 0 y� 38.18 )NO°23'39'E DRAINAGE EASEMENT FOR PONDING � /� N �� $ 59
57'00 °�9/ y/ N89°09'27'E 24.78 N88031'18-E-�N81°33'14` ,y-N75o54,0 i \ .W /
1 132.33},j,i 7 W n\ , \ 0382 < 9 Z 1> 5.59 h �� W o ? 84 3 6
° 20' 45 E .a �o. 120.20 -- '_ J .N6 \ 2 00.13 N20 21.3� �'� m° •
.00.94 - / N83°38239•W SURVEY LINE -'r N83°44'S2'W �8?S k 8O1 j'lp+� '� -
y_ 1� 24- DRAINAGE & UTILITY EASEMENT OVER, - - N87°14'30•E 1 2 35- - 50.37 N)0o 6 •'6 W C6 23 �} 59 W 'E %1/ 4 D° o
.54 •fv 2w UNDER k ACROSS ALL OF LOT 18, �� 62.92 49.92 49.51 5/01.W \?� ~!\ N5L6� 1po28p% 4g Q1, Yr37
w BLOCK 2 ' �53 10j 4 i N/ 6 2 o a O
1 r o(I •% ri. . N33 0�4 Z 3 ci o7 ; . 0�. ^ / 499440• Z � �.36 > U•
18 a,605� 1 + # 25 ° 0 26 ^ 'N 27 2 28 5385- 1 �`� 62 N10 °° 35 UA �• 4 4913�
t Sa 63 y v o m m a ^ n 52.98 Z Sc
ow oti��' 633° a�a 24 ; N• m o Z z m o 29^ g I ;1°39'24• Z 34 U o
0 z z o� 1 a0 �•
c� �w 9 �� 2�, a(� 1 1c 49.24 30 $ 11 °�-33' f 49�` 62
�• 30 �, �° hry s�f /t �i►rP y'o 2 3 Nww O� 49.17 49.91 00 0 " 32 . 261ti� ti
4' \ J d•� Oi►, k0�1�6 8 r?• N83°11.�•E - g9.15 •� �51.39� 5418 Z co o �• = 49 1..Z4 p9� "WO
30 0 •� r i N87 45'29 E N77o y p f op
20 / ? `�. �. O8 48. s�OJ 1 11 N10 Ng9 g? O
1 ♦ po� cP22 1. E & W �• 1. 3.
ry 7' fr 16 • 46 - 68 39 _ R� 190.00 ?J`W 6
`T!a y. 1.►6 Lot g349 - N87 12'S1 E 29 OJ'J N75o N
? s \ o �� 1S o'L N6 1 •E N89°35'32- 83° 51.1?'- }1J88°07'40•W _ / 24 p1' S9
• 'w �`°�• ? ) O� c� �� 10 6Z 00 480°32'28 34'32 �2 W / 16• 0}4
•fc D .T 9 16 GCS• / �' 08. `�9 00' S9.78 y 80.94 °f 48°2�'N y3 N69 S0' a, I
q0S�. 0� p4�1 F. 68.15 55.15 ai? 0'64 N 211.75 a / ° 43
-tp♦ /� s 21 Z w 5 O 02 ° 48 20 \ 16 ti
s O k ► ti Z U \ 2� 2?• 103.88 p.22 Z v ,,6 '
�e% \ _ "8 ° °u �'�° y� a� '� a 53 52 N NBBo 5� S o� N89°04'49-W 96.,0- ye , Z44
Y / 7 0> �5i N J. 1. 6 \ a
•� .�, g $ o Q051 x ?4 ; - - 48.57 47.53
�-` • \ .Q/ H�90 ohry.� id ;�`P {! "!' aw. f Z ane 5 0 ^Lu 1 K w z cn 4 ���ci fc j9
•L �7 \ �? A 2 ,�� o� k JS 4 46.78 Z n o N o, w o ° $� w. / 50.63
i h S• 45.24 C4 N Q U rn Q 4 0 N78o
8 �� /OO\ ?h� S� qo q9. ?0 0 m49 ae4V o �0 7 a� \ 482 ?9�•6 0853'N
>< ` i ro S r 92.02 n o n $ o ° 40
hry 9�t �'Sgo ��J� �_ �T9� 9 k kryA/ N86°t6'it-E N70°31'1 • 54>? Z z # If �'°. N10
p •j� .\`°� t�09• �S \ �'�sj ,e?j?�• 1 Oh '� DRAINAGE 8c unuTY ? W 104 g 54.92 55.14-51.21_ m4 • ,�o�
!a .w� o�' O� �� EASEMENT OVER. UNDER ?' •NAza.s..__
9-i't,,
�(' T u � T Tyr
1 joLl AuG ENVIRONMENTAL SERVICES COMPANY
Prot iding Sound, Balanced Comprehensh c Natural Resouree Solutions
Galpin Road Site
Chanhassen, Minnesota
Wetland Determination Report
Prepared for
Klingelhutz Developments
by
Kjolhaug Environmental Services Company, Inc.
(KES Project No. 2002-191)
December 04, 2002
•
Galpin Road Site
Chanhassen, Minnesota
Wetland Determination Report
I. INTRODUCTION
The Galpin Road Site was examined on November 13th, 2002 for the presence and extent of
areas meeting the jurisdictional definition of wetland. The subject site was located in the
Southwest '%4 of Section 10, Township 116 North, Range 23 West, City of Chanhassen, Carver
County Minnesota.
The site consisted of an approximately 3-acre lot located east of Galpin Lake Road (county Road
No. 117) and South of Walnut Curve (Figure 1). Adjacent land use consisted of single-family
homes to the north and west, town homes to the east, and small businesses to the south. Bluff
Creek bisected the southern portion of the site and is bordered by steep forested slopes. The
northern portion of the site is a combination of mowed residential lawn and unmaintained open
areas with scattered trees.
H. METHODS
The examination was conducted using standard methodology as described in the Corps of
Engineers Wetlands Delineation Manual (Waterways Experiment Station, 1987) as required by
Section 404 of the Clean Water Act and the Minnesota Wetland Conservation Act.
Soils were characterized to a minimum depth of 18-20 inches utilizing Munsell Soil Color Charts
and standard sod texturing methodology.
Plant species dominance was estimated based on the percent aerial or basal coverage within a 30-
foot radius of sample points for the tree and shrub layers and a 5-foot radius for the herbaceous
layer within the community type being sampled. Plants were identified using standard regional
plant keys. Taxonomy was based on the Manual of Vascular Plants of Northeastern United
States and Adjacent Canada, Ed 2 (New York Botanical Garden, 1991). Indicator status of
plant species was taken from the National List of Plant Species That Occur in Wetlands: 1988
Minnesota (U.S. Fish & Wildlife Service, 1988).
M. RESULTS
• _Review of NWI DNR Soils and City of Chanhassen Information
• The National Wetland Inventory Map (NWI) (U.S. Fish & Wildlife Service, 1989, Shakopee
• Quadrangle) showed one PFOIC wetland on the property (Figure 2).
The DNR Protected Waters Map, Carver County, Minnesota (Minnesota DNR, 1996) showed
• one DNR Public Watercourse, Bluff Creek, on the property (Figure 3).
40
• The Soil Survey of Hennepin County, Minnesota (USDA, 1968, Sheet 20) showed Glencoe
• silty clay loam (Ge), Lester loam, 6 to 12 percent slopes, eroded (LaC2), and Hayden Loam, 12
to 18 percent slopes, eroded (HaD2) within the project site (Figure 4). Glencoe silty clay loam
• was listed by the Natural Resources Conservation Service as an hydric soil.
•
• The City of Chanhassen Wetland Classification Map (City of Chanhassen) showed Bluff Creek
• as wetland number Al0-13(2)(A) (Figure 5).
•
• Wetland Determinations
• The following description reflects field conditions observed at the time of the delineation. At the
• time of the delineation, the area had experienced above normal precipitation levels, vegetation
• was dormant and temperatures were in the mid 30's.
• The northern portion of the project site consisted of a sloped residential housing lot with mowed
• lawn and an unmowed area dominated by reed canary grass and occasional box elder. Eastern
• cottonwood, Canada thistle, common burdock, honeysuckle and common buckthorn (Figure 6).
• Two sample points were completed in this area Soils at sample point one (Appendix A) were
• dark brown to black, silty clay loam to greater than 24 inches. Water was observed at 23 inches
• from the soil surface and no other indicators of wetland hydrology were observed. Soils at
• sample point two (Appendix A) were also dark brown to black clay loam to 36 inches with no
• water observed within the soil pit and no other indicators of wetland hydrology found.
• Personal communication with the landowner confirmed that there was formerly a field access
• road running east off of Galpin Road into this area A 12-inch culvert was found here which
• likely ran under the former access road. The landowner further stated that until recently, the
entire area up to the forested slope was mowed lawn.
• This area was determined to be non -wetland based on the lack of wetland hydrology indicators,
• landscape position (sloped, see Figure 6), and presence of obligate upland species scattered
• throughout the area such as Canada thistle, common burdock and common buckthorn.
The area indicated as PFO1C wetland on both the NVA map and the Chanhassen Wetland
• Classification Map was a steep wooded slope associated with Bluff Creek. Dominant vegetation
in the wooded area along the creek included American elm, common buckthorn, box elder, and
• burdock, with some btu oak, Virginia water -leaf and garlic mustard.
• This area was determined to be non -wetland based on the lack of dominant hydrophytic
• vegetation and the lack of wetland hydrology.
•
•
•
•
• 2
0
One portion of the slope contains a deep gully just before it meets Galpin Road to the west. A
small intermittent drainage way (approximately 1 foot wide) drained out of rip -rap and debris at
the base of the gully and into Bluff Creek.
This area was determined to be non -wetland because it was an intermittent stream
IV. SUMMARY
There are no areas on the Galpin Road Site meeting wetland criteria as defined by the Corps
of Engineers Wetlands Delineation Manual. If you have any questions regarding my assessment,
please contact me at 952-401-8757.
3
V. CERTIFICATION OF DELINEATION
The procedures utilized in the described delineation are based on the COE 1987 Wetland
Delineation Manual as required by Section 404 of the Clean Water Act and the Minnesota
Wetland Conservation Act. Both the delineation and report were conducted in compliance with
regulatory standards in place at the time the work was completed.
Delineatioi
Reviewed
telly Dlouhy, Wetland Ecologist
Date: 12/03/02
Professional Wetland Scientist No. 000845
4
Galpin Road Site
Wetland Determination Report
Figures:
• Figure 1 — Site Location Map
• Figure 2 — NWI Map
• Figure 3 — DNR Protected Waters Map
• Figure 4 — Soil Survey Map
• Figure 5 — City of Chanhassen Wetland Classification Map
• Figure 6 — Topographic Area Map
Note: Site boundaries on this figure
are approximate and do not constitute
an official survey product.
Site Location
1— Site Location
KJOLHAUG ENVIRONMENTAL sEMCEs COMPANY
Galpin Road Site (KES No. 2002-191)
Chanhassen, Minnesota
+N No Scale
Note: Site boundaries on this Spare
are approximate and do not constitute
an official survey product
Fyt rt 1RC Lake A
PEM� srss L
� P PfptC '
r'EIW-A M fEMC
PEMA4 Site Location
' M Ti
,C1 OIC pEMC
7
rFrnc ,
PSSIr- ` PFOIC
PEW PF THE
PE�1Aa Peiruu j
MC
PCMU i PE
eM�
PEh1Cd PEM11d
I
., PF04►a y I EEM
Figure 2 — NWI Map
Galpin Road Site (KES No. 2002-191)
Chanhassen, Minnesota
&4 TN Scale: 1 inch � 1,150 feet
IiJOLHAUG ExvmoxMErrrAL SERVICES COMPANY
Note: Site boundaries on this figure
are approximate and do not constitute WOA
an official survey product. 'i zc j
Ha�2Ge
-IAE,1�r>A IdaC NaF LAKE
HaDY Ge eO
HaB Pd VO, G
HaB Sk Sk \ -
Ge mti �a� a ji L HaC
FIaD' HaC2H,, Pd
may �.
= Hc03
HaE
HaE1 `Z'ap'L�;:,' yae ac ,1aC
�a HaF T 0 A
I,aF Pm
Pm .'HaD TeB m
Sk Sk L.1
y� �Q Lar Z HaC2 y ��� HaCZ HaE2
HaC cps Z
s: � HaQ
�aFL Ge Pm HaQ Pd
LaB HaD'1 ,�
6„Ha[3,
e tid 9
y HaC2 HaC2 do Ge
Site Location ae y
a
Ge-Glencoe silty clay loam k
w� ti
Pd Ov, V`L HaD2-Hayden Loam, 12 to 18 percent L.
Ge a a6 �a slopes, eroded H
Ge
LaD2 La Lam -Lester loam, 6 to 12 percent slopes
p
eroded Yll aC
HaD7 LaC2 -
Pd Ge G Ge
p LaD2 <ae N Ge .
`a La C HaD2 ? ydO o ? v �aD� LaB a�
\ La HaD2 Ge.i Lab i nu -- --CIN �a
'H2 !Joins sheet 28)
vigure 3 — Noll M1
Galpin Road Site (KES No. 2002-191)
Chanhassen, Minnesota
KjoLHAuG ENVIRONMENTAL SERVICES COMPANY +N Scale: 1 inch — 880 feet
►w
4 — DNR Protected Waters
Galpin Road Site (KES No. 2002-191)
Chanhassen, Minnesota
i TN Scale: 1 inch — 1950 feet
KjOLHAUG ENVIRONMENTAL SERVICES COMPANY
Note: Site boundaries on this figure
are approximate and do not constitute
an official survey product.
AS-s(tj
` (N) ......
7
A10-120 )—
A10�3(2
Site Location
i A)
0-14(1)
:.......... .... .. N .../
A j'N At)(2)
`A15
.VJ
N
,M
cy; * A15-2(1)
r A
5 — City of Chanhassen Wetland
Galpin Road Site (KES No. 2002-191)
Chanhassen, Minnesota
�(T LTA
HA KjoLuG ENVIRONMENTAL SERVICES COMPANY +N Scale: 1 inch =745 feet
�v
gggq•q
�oo�o
a aia
?quo
:• x
n
�� ao�nma
•
denotes
iron
monument found
p
denotes
iron
pipe set
and marked
orro„au
as shown:
aRa�OW
B
denotes
soil
boring
G
denotes
percolation test hole
i \ FIGURE 6
,-*-60'
Topographic Survey on
parcel in the SW 114 of Klingelhutz Development
Sec. 10, T. 116, R. 23, Date: Drown By: Scale: Checked By:
Carver County, Minnesota 11119102 D.N.A. 1 "=40' AYO
hereby certify that this survey,
on, or report was prepared by me
under my direct supervision and
at I am a duly Licensed Land
irveyor under the laws of the
ate of Minnesota.
Web Site:
wwmattoassociates.com
BWest Division
L/TTO
6uHalo, MNN5313
13
SSOCIATES
Ph: (763)682-4727
Fax: (763)682.3522
and Land 5urvevors. Inc.
Job No.
1—n7—n4i1q)q
n
I
4
Ho go-
00000
'0000'o
$ooYo
g45gCCa
oa �
a
• denotes iron monument
Q denotes iron pipe set
and marked as shown:
denotes soil boring
G denotes percolation test hole
Topographic Survey on
parcel in the SW 114 of
Sec. 10, T. 116, R. 23,
CpUA( i-�'-
96
Rpq�
No
Klingelhutz Development
Dale: I Drawn By:
Carver County, Minnesota 111119102 1 D.N.A
tole: Checked By:
1 "=40' &
c/
Y §
ygb/
J ^i eo / /t
<'
AV
_✓' 00 % T/
\mob \ \ I J
\ FIGURE 6
1 "----60'
hereby certify that this survey,
on, or report was prepared by me
under my direct supervision and
at I am a duty Licensed Land
irveyor under the laws of the
'.ote of Minnesota.
E. Otto
Web Site:
www.ottoassoeiates.com
0
QSsOcIATES
9 West Division St.
TT
Buffalo, MN 55313
Ph:(763)6824727
Fax:(763)682.3522
Engineers and Land Survevors. Inc.
No.
1—n7—nriFR
Galpin Road Site
Wetland Determination Report
Appendix A: Data Forms
H� ���
KJOL- A is ENVIRONMENTAL SERVICES COMPANY
Project/Site: f)lN U Date: /3 0
Investigator(s): VA/t}Vj K%DGOF
BasirVArea ID: '_M / Sample Pt. ID: '1 (ap
SOILS /�/
ceaaoi c Gn[MT- / --`de _NIA Mapped Soil Type: C.7`01A'I2I l!55 r/�Ile
Depth (in.)
Matrix Color Mottle Colors
Mottle abund./conVast
Texture. Structure, etc.
-
G
Field Indicators of Hydric Soils (Midwest Region) USDA, March 1998. (A = all Bolls, 8 a sandy cobs, F e loamy a clayey Soils)
March.
_ Al . Histosol
_ A9,10. 1-2 cm Muck
_ S6. Stripped Matrix _ F5. jck Dark Surface
Dark Surface
FLstic Epipedon
_ Sl. Sandy Mucky Material
_ Loamy Mucky Material ox
F2. Loamy Gleyed Matrix F7. Depleted Dark Surface
_ A3. Black His[ic
_ A4. Hydrogen Sulfide
_ S3. Mucky Peat/Peat
_ S4. Sandy Gleyed Matrix
_ _
_F3. Depleted Mattix _ F8. Redox Depressions
_ A5. Stratified Layers
_ S5. Sandy Redox
_ F4. Depleted Below Dark Surface
Hydric Soil? es
_No Undetermined
Remarks:
n
SAMPLE onlld _ �_ - . - _ NIA Mapped Soil Type: L/-
cy.0 (iat.(
Mottle Colors
SAMPLE POINT- ! _watvca
HYDROLOGY'
�- ✓A
Primary Hydrology Indicators
I seconaary nyuruwyy n,un..-,a t• •--,-,
-------- --
Inundated, Depth in.
Oxidized Root Cbanoels
Yes
_ Satur fed Soil, Depth in.
WaterStamed Leaves
�� -Explain:
7
Ater in borehole, Depth Z2 in
Mapped Hydric Sotl, Depression
_ Water Marks, Height m
_ FAC-Neutral Test
Undetermined - Explain
Drift Lines
_ Topographic Position
Sediment Deposits
_ Flattened Vegetation
-
Dratnaee Panems
Other - Explain
Inundated, Depth _
_ Saturated Soil, Depth _
_ Water in borehole, Depth
_ Water Marks, Height _
_ Drift Lines
_ Sediment Deposits
Dramatic Patterns
M. Oxidized Root Channels
in. W'aterStamed Leaves
m. Mapped Hydric Soil, Depression
in. FAC-Neutral Test
_ Topographic Position
Flattened Vegetation
Yes
-
0
Assumed - Explain
Undetermined - Explain
26105 Wild Rose Lars, Sho wood, M,nnesaa 55331, Ph ne 952-401-8757, Fax. 952-401-8798
ProjecuSite Nlet—:/i' Sample Point ID sy Z—
VEGETATION
SAMPLE POINT- w§rirae —ksP-side NIA
Sopcias Stratum %Cover Ind. Status
c n V
S
T
> 0% <20%
H V
S
T
>200/a Q00/0
H V
S
T
>200/0 Q0%
H V
S
T
>20% <20%
H V
S
T
>200/t <20%
H V
S
T
>20% <20%
H V
S
T
>20% <20%
H V
S
T
>20% <200/0
H V
S
T
>20% <20%
Remarks: % Dominants (>2o% cover) FAG or Wetter:
i
/ NIA
l
H
Stratum
V S
V S
V S
T
T
T
% Coverxx. ;Ind.`Status
200 Q0% `Y' O f—
>20% <200
>20% <20%
S ecies
IlaL11
H
V S
T
>20% <20%
H
V S
T
>200/, <200/0
H
V S
T
>20% <20%
H
V S
T
>20% QO%
H
V S
T
>20% <20%
H
V S
T
>20% <200/0
H
V S
T
>20% <20%
%Dominarts
(>20%
over) FAG or Wetter:
Remarks:
WETLAND DETERMINATION
....iM. .---NIA — — —
Hydrophytic Vegetation Present? as No Does an Atypical Situation ❑yust- _ _s
Wetland Hydrology Present? 1_�.G� Does an Atypical Situation Exist? _Yes
Hydric Soils Present? es �Noo Does an Atypical Situation Exist? _Yes
Is the area a wetland') Yes � o Remarks
Distance from Wetland Edge ft.�
SAMPLE POINT- 7 _ wet3Rle Upside --wr
Hydrophytic Vegetation Present? as No Does an Atypical Situation Exist? _Yes
Wetland Hydrology Present? `Yes —,..�o Does an Atypical Situation Exist? .Yes
Hydnc Soils Present? =/ es .Noo Situation an Atypical Situan Ebst1 Yes
Is the area a wetand7 Yes �—o Remarks:
Distance from Wetland Edge ft. /A
COMMUNITY SUMMARY
Overall Dominant O� erall Dominant
Vegetation: Vegetation: A1-1kAz
I Remarks.
Page 2
July 7, 2004
CITY OF
CI1H1111HJSEN
�' John Klingelhutz
Klingelhutz Development
7700 Market Boulevard
350 East Highway 212
PO Box 147
Chaska, MN 55318
Chanhassen, MN 55317
Administration
Re: Walnut Grove 2nd Addition - Planning Case No. 04-10
Phone: 952.227.1100
Far 952.227.1110
Dear Mr. Klingelhutz:
Building Inspections
Phone:952.227.1180
On June 14, 2004, the Chanhassen City Council approved the final plat for
Fax:952.227.1190
Walnut Grove 2°d Addition creating four lots and one outlot, with lot width
variances for Lots 2, 3 and 4 and a one -foot side yard setback variance for Lots 2,
Engineering
Phone: 952227.1180
3 and 4, subject to the following conditions:
Fax: 952.227.1170
1. The developer shall pay $8,400.00 in park dedication fees at the time of final
Finance
Phone:952,227.1140
plat recording.
Fax: 952.227.1110
2. A final grading plan and soils report must be submitted to the Inspections
Park & Recreation
Phone:952.227.1120
Division before permits will be issued.
Fax: 952.227.1110
Becrealion center
3. The old individual sewage treatment site for the existing home must be
2310 Coulter Boulevard
in accordance with MPCA regulations.
Phone: 952.227.1400
abandoned
Faz:952.227.1404
4. A 10-foot clear space must be maintained around fire hydrants, i.e. street
Planning &
lamps, trees, shrubs, bushes, Qwest, Xcel Energy, Cable TV and transformer
Natural Resources
boxes. This is to insure that fire hydrants can be quickly located and safely
Phone:952.227.1130
Fax: 952.227.1110
operated by firefighters. Pursuant to Chanhassen City Ordinance #9-01.
WOB�
5. "No Parking Fire Lane" signs will be required on the new private street.
15911rP
Phone:952,227.1300
Pursuant to Chanhassen Fire Prevention Policy #06-1991. Copy enclosed.
Fax: 952.227.1310
6. Tree preservation fence shall be installed at the edge of the grading limits prior
Senior center
Phone:952.227.1125
to any construction. Fencing shall protect trees on proposed lots as well as trees
Fax: 952.227.1110
in neighboring properties located next to the grading limits.
Web Site
www.ci.chanhassen.mn.us
7. Any trees lost due to construction that are not shown as such on plans shall be
replaced at a rate of 2:1 diameter inches.
8. A minimum of one overstory tree will be required in the front yard of each lot.
One overstory tree, two understory trees, and four shrubs shall be planted along
Galpin Boulevard on Lots 2 and 3.
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
Mr. John Klingelhutz • •
Walnut Grove 2°d Addition
April 16, 2004
Page 2
9. A final grading plan and soils report must be submitted to the Inspections Division before
permits will be issued.
10. A wetland buffer 0 to 20 feet in width (with a minimum average of 10 feet) shall be maintained
around the wetland. The wetland buffer shall be 0 along the east side of the wetland and 20
feet on the north and west sides. Wetland buffer areas shall be preserved, surveyed and staked
in accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge
signs, under the direction of City staff, before construction begins and shall pay the City $20 per
sign.
11. The grading and erosion control plan shall show the actual wetland buffer widths proposed to
meet the minimum average buffer width requirements as well as the 40-foot wetland buffer
setback. All structures shall maintain at least a 40-foot setback from the edge of the wetland
buffer or, if no buffer is to be preserved, from the delineated wetland edge.
12. The primary zone boundary shall be amended to include the wooded area in the rear
(westernmost) portion of Lot 4.
13. A conservation easement shall be dedicated over the primary zone. All structures shall maintain
at least a 40-foot setback from the primary zone. No disturbance of the site shall occur within
the fast 20 feet of the setback. Open space shall comprise 100% of the primary zone.
14. Riprap and geotextile fabric shall be installed at the flared end sections of the inlet and outlet of
the storm water pond.
15. Type III silt fence shall be provided adjacent to all areas to be preserved as buffer or, if no buffer
is to be preserved, at the delineated wetland edge. Silt fence shall be provided as needed to
prevent sediment from leaving the site.
16. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1.
17. All exposed soil areas shall have temporary erosion protection or permanent cover for the
exposed soil areas year round, according to the following table of slopes and time frames:
Type of Slove
Steeper than 3:1
10:1 to 3:1
Flatter than 10:1
Stabilized within
7 days
14 days
21 days
These areas include any exposed soil areas with a positive slope to a storm water conveyance
system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage
ditch or other natural or man-made systems that discharge to a surface water.
18. Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as needed
Mr. John Klingelhutz • •
Walnut Grove 2°d Addition
April 16, 2004
Page 3
19. Based on the proposed developed area of approximately 1.64 acres, the estimated total SWMP
fee, due payable to the City at the time of final plat recording, is $3,360.00.
20. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g.,
Riley -Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency,
Minnesota Department of Natural Resources (for dewatering), Minnesota Department of Health,
Carver County, Metropolitan Council Environmental Services, etc. and comply with their
conditions of approval.
21. Prior to final plat approval, a professional civil engineer registered in the State of Minnesota
must sign all plans.
22. Sanitary sewer and water hookup charges are applicable for each of the new lots. The 2004
trunk hookup charge is $1,458 for sanitary sewer and $2,814 for watermain. Sanitary sewer
and watermain hookup fees may be specially assessed against the parcel at the time of
building permit issuance. Hook-up charges are based on the number of SAC units assigned
by the Met Council for each lot.
23. The applicant must enter into a development contract with the City and supply the necessary
financial security in the form of a letter of credit or cash escrow to guarantee installation of
the improvements and the conditions of final plat approval.
24. Installation of the private utilities for the site will require permits and inspections through the
City's Building Department.
25. Seed and mulch or sod the site within two weeks of grading. Submit a haul route for City
approval prior to any hauling.
26. The driveway easement must be 30 feet wide with 20 feet of hard -surface pavement and built
to a 7-ton design.
27. Submit an inspection report certifying that the private street is built to a 7-ton design.
28. Elevation of lowest house opening must be two feet above high water level of the proposed
pond.
29. Structure setbacks shall comply with the following table:
Setbacks: front, rear, side, Bluff Creek primary zone, wetland
buffer
Lot 1
30, 30, 10, na, na
Lot 2
30, 30, 9, na na
Lot 3
30, 30, 9, 40, 40
Lot 4
30, na, 9, 40, 40
Mr. John Klingelhutz • •
Walnut Grove 2ud Addition
April 16, 2004
Page 4
30. Show the watermain pipe size and type on the watermain profile sheet.
31. Add the City erosion control fence Detail Plate No. 5300.
Enclosed is the development contract for the project. Please return the executed development
contract with a letter of credit or cash escrow for the public improvements and a check for the
administrative fees.
Two signed mylar copies of the final plat shall be submitted to our office for signatures along
with the signed development contract, the required easements and all required financial security
and fees. Two 1"=200' scale mylar reductions of the final plat and one 1"=200' scale mylar
reductions of the final plat with just street names and lot and block numbers shall be submitted.
In addition, a digital copy in Axf format and a digital copy in .tif format (pdf compatible) of the
final plat shall be submitted.
The city will submit all the necessary documents to Carver County for recording of the
subdivision. Should you have any questions, please feel free to contact me at (952) 227-1131.
Sincerely.
Robert Generous, AICP
Senior Planner
Enclosure
ec: Lod Haak, Water Resource Coordinator
Matt Saam, Assistant City Engineer
Steve Torell, Building Official
gAplan\2004 planning cases\04-10 -walnut grove 2nd addition\ final plat approval letter.doc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
WALNUT GROVE 2' ADDITION
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
TABLE OF CONTENTS
SPECIAL PROVISIONS
PAGE
1.
REQUEST FOR PLAT APPROVAL............................................................................SP-1
2.
CONDITIONS OF PLAT APPROVAL........................................................................SP-1
3.
DEVELOPMENT PLANS............................................................................................SP-1
4.
DdPROVEIVIENTS........................................................................................................SP-2
5.
TIME OF PERFORMANCE.........................................................................................
SP-2
6.
SECURITY....................................................................................................................SP-2
7.
NOTICE.........................................................................................................................SP-3
8.
OTHER SPECIAL CONDITIONS................................................................................SP-3
9.
GENERAL CONDITIONS............................................................................................SP-6
GENERAL CONDITIONS
1. RIGHT TO PROCEED.................................................................................................GC-1
2.
PHASED DEVELOPMENT.........................................................................................GC-1
3.
PRELIMINARY PLAT STATUS................................................................................GC-1
4.
CHANGES IN OFFICIAL CONTROLS......................................................................GC-1
5.
IMPROVEMENTS.............................................................. ................... ......................
GC-1
6.
IRON MONUMENTS..................................................................................................
GC-2
7.
LICENSE......................................................................................................................GC-2
8.
SITE EROSION CONTROL........................................................................................GC-2
8A.
EROSION CONTROL DURING CONSTRUCTION OF A DWELLING OR OTHER
BUILDING....................................................................................................................GC-2
9.
CLEANUP...................................................................................................................GC-3
10.
ACCEPTANCE AND OWNERSHIP OF IMPROVEMENTS....................................GC-3
11.
CLAIMS........................................................................................................................GC-3
12.
PARK DEDICATION..................................................................................................GC-3
13.
LANDSCAPING..........................................................................................................GC-3
14.
WARRANTY...............................................................................................................GC-4
15.
LOT PLANS.................................................................................................................GC-4
16.
EXISTING ASSESSMENTS.......................................................................................GC-4
17.
HOOK-UP CHARGES.................................................................................................GC-4
18.
PUBLIC STREET LIGHTING.....................................................................................GC-4
19.
SIGNAGE.....................................................................................................................GC-5
20.
HOUSE PADS..............................................................................................................GC-5
21.
RESPONSIBILITY FOR COSTS.................................................................................GC-5
22.
DEVELOPER'S DEFAULT.........................................................................................GC-6
22.
MISCELLANEOUS
A. Construction Trailers........................................................................................GC-6
B. Postal Service....................................................................................................GC-6
C. Third Parties......................................................................................................GC-7
D. Breach of Contract............................................................................................GC-7
i
E.
Severability .......................................................................................................GC-7
F.
Building Permits...............................................................................................GC-7
G.
Waivers/Amendments.......................................................................................GC-7
H.
Release..............................................................................................................GC-7
I.
Insurance...........................................................................................................GC-7
J.
Remedies...........................................................................................................GC-7
K.
Assignability .....................................................................................................GC-8
L.
Construction Hours...........................................................................................GC-8
M.
Noise Amplification..........................................................................................GC-8
N.
Access...............................................................................................................GC-8
O.
Street Maintenance............................................................................................GC-8
P.
Storm Sewer Maintenance................................................................................GC-8
Q.
Soil Treatment Systems....................................................................................GC-9
R.
Variances...........................................................................................................GC-9
S.
Compliance with Laws, Ordinances,
and Regulations......................................GC-9
T.
Proof of Title.....................................................................................................GC-9
U.
Soil Conditions.................................................................................................GC-9
V.
Soil Correction..................................................................................................GC-9
W.
Haul Routes.........................................................................................................
GC-10
X.
Development Signs..............................................................................................GC-10
Y.
Construction Plans...............................................................................................GC-10
Z.
As -Built Lot Surveys...........................................................................................GC-10
li
C
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
WALNUT GROVE 2No ADDITION
S CIAi PROVISIONS
AGREEMENT dated June 14, 2004 by and between the CITY OF CHANHASSEN, a
Minnesota municipal corporation (the "City"), and, KLINGELH= DEVELOPMENT, INC., a
Minnesota corporation (the "Developer").
1. Request for Plat Approval. The Developer has asked the City to approve a plat for
Walnut Grove 2nd Addition (referred to in this Contract as the "plat"). The land is legally described
on the attached Exhibit "A".
2. Conditions of Plat Approval. The City hereby approves the plat on condition that
the Developer enter into this Contract, furnish the security required by it, and record the plat with
the County Recorder or Registrar of Titles within 30 days after the City Council approves the plat.
3. Development Plans. The plat shall be developed in accordance with the following
plans. The plans shall not be attached to this Contract. With the exception of Plan A, the plans
may be prepared, subject to City approval, after entering the Contract, but before commencement of
any work in the plat. If the plans vary from the written terms of this Contract, the written terms
shall control. The plans are:
Plan A: Final plat approved June 14, 2004, prepared by Otto Associates.
Plan B: Grading, Drainage and Erosion Control Plan dated May 27, 2004, prepared by Otto
Associates.
Plan C: Plans and Specifications for Improvements dated May 27, 2004, prepared by Otto
Associates.
SP-1
4. Improvements. The Developer shall install and pay for the following:
A. Sanitary Sewer System
B. Water System
C. Storm Water Drainage System
D. Streets
E. Concrete Curb and Gutter
F. Site Grading/Restoration
G. Underground Utilities (e.g. gas, electric, telephone, CATV)
H. Setting of Lot and Block Monuments
I. Surveying and Staking
J. Landscaping
K. Erosion Control
5. Time of Performance. The Developer shall install all required improvements by
November 15, 2004. The Developer may, however, request an extension of time from the City. If
an extension is granted, it shall be conditioned upon updating the security posted by the Developer
to reflect cost increases and the extended completion date.
6. Security. To guarantee compliance with the terms of this Contract, payment of
special assessments, payment of the costs of all public improvements, and construction of all public
improvements, the Developer shall furnish the City with a letter of credit in the form attached
hereto, from a bank acceptable to the City, or cash escrow ("security") for $59,667.00. The amount
of the security was calculated as 110% of the following:
Site Grading/Restoration
Sanitary Sewer
Watermain
Storm Sewer, Drainage System, including cleaning and maintenance
Erosion control
Engineering, surveying, and inspection
Landscaping
TOTAL COST OF PUBLIC IMPROVEMENTS
$ 17,822.00
$ 11,520.00
$ 10,406.00
$ 4,695.00
$ 54.243.00
This breakdown is for historical reference; it is not a restriction on the use of the security. The
security shall be subject to the approval of the City. The City may draw down the security, without
notice, for any violation of the terms of this Contract. If the required public improvements are not
completed at least thirty (30) days prior to the expiration of the security, the City may also draw it
SP-2
down. If the security is drawn down, the draw shall be used to cure the default. With City
approval, the security may be reduced from time to time as financial obligations are paid, but in no
case shall the security be reduced to a point less than 10% of the original amount until (1) all
improvements have been completed, (2) iron monuments for lot comers have been installed, (3) all
financial obligations to the City satisfied, (4) the required "record" plans have been received by the
City, (5) a warranty security is provided, and (6) the public improvements are accepted by the City.
7. Notice. Required notices to the Developer shall be in writing, and shall be either
hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered
mail at the following address:
Thomas R. Heiland
Klingelhutz Development, Inc.
350 East Highway 212
Chaska, MN 55318
952-448-3330
Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or
mailed to the City by registered mail in care of the City Manager at the following address:
Chanhassen City Hall, 7700 Market Boulevard, P.O. Box 147, Chanhassen, Minnesota 55317,
Telephone (952) 227-1100.
8. Other Special Conditions.
A. The applicant shall enter into the development contract and supply the City with a cash
escrow or letter of credit in the amount of $59,667.00 and pay an administration fee of $13,924.00.
B. The developer shall pay $8,400.00 in park dedication fees at the time of final plat
recording.
C. A final grading plan and soils report must be submitted to the Inspections Division before
permits will be issued.
D. The old individual sewage treatment site for the existing home must be abandoned in
accordance with MPCA regulations.
E. A 10-foot clear space must be maintained around fire hydrants, i.e. street lamps, trees,
shrubs, bushes, Qwest, Xcel Energy, Cable TV and transformer boxes. This is to insure that fire
hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City
Ordinance #9-01.
F. "No Parking Fire Lane" signs will be required on the new private street. Pursuant to
Chanhassen Fire Prevention Policy #06-1991. Copy enclosed.
SP-3
F-
L
G. Tree preservation fence shall be installed at the edge of the grading limits prior to any
construction. Fencing shall protect trees on proposed lots as well as trees in neighboring properties
located next to the grading limits.
R Any trees lost due to construction that are not shown as such on plans shall be replaced at a
rate of 2:1 diameter inches.
L A minimum of one overstory tree will be required in the front yard of each lot. One
overstory tree, two understory trees, and four shrubs shall be planted along Galpin Boulevard on
Lots 2 and 3.
J. A final grading plan and soils report must be submitted to the Inspections Division before
permits will be issued.
K. A wetland buffer 0 to 20 feet in width (with a minimum average of 10 feet) shall be
maintained around the wetland. The wetland buffer shall be 0 along the east side of the wetland
and 20 feet on the north and west sides. Wetland buffer areas shall be preserved, surveyed and
staked in accordance with the City's wetland ordinance. The applicant shall install wetland buffer
edge signs, under the direction of City staff, before construction begins and shall pay the City $20
per sign.
L. The grading and erosion control plan shall show the actual wetland buffer widths proposed
to meet the minimum average buffer width requirements as well as the 40-foot wetland buffer
setback. All structures shall maintain at least a 40-foot setback from the edge of the wetland buffer
or, if no buffer is to be preserved, from the delineated wetland edge.
M. The primary zone boundary shall be amended to include the wooded area in the rear
(westernmost) portion of Lot 4.
N. A conservation easement shall be dedicated over the primary zone. All structures shall
maintain at least a 40-foot setback from the primary zone. No disturbance of the site shall occur
within the first 20 feet of the setback. Open space shall comprise 100% of the primary zone.
O. Riprap and geotextile fabric shall be installed at the flared end sections of the inlet and
outlet of the storm water pond.
P. Type III silt fence shall be provided adjacent to all areas to be preserved as buffer or, if no
buffer is to be preserved, at the delineated wetland edge. Silt fence shall be provided as needed to
prevent sediment from leaving the site.
Q. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1.
R. All exposed soil areas shall have temporary erosion protection or permanent cover for the
exposed soil areas year round, according to the following table of slopes and time frames:
SP-4
Type of Slove
Stabilized within
Steeper than 3:1
7 days
10:1 to 3:1
14 days
Flatter than 10:1
21 days
These areas include any exposed soil areas with a positive slope to a storm water
conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or permanent
drainage ditch or other natural or man-made systems that discharge to a surface water.
S. Street cleaning of soil tracked onto public streets shall include daily street scraping and
street sweeping as needed.
T. Based on the proposed developed area of approximately 1.64 acres, the estimated total
SWMP fee, due payable to the City at the time of final plat recording, is $3,360.00.
U. The applicant shall apply for and obtain permits from the appropriate regulatory agencies
(e.g., Riley -Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency,
Minnesota Department of Natural Resources (for dewatering), Minnesota Department of Health,
Carver County, Metropolitan Council Environmental Services, etc. and comply with their
conditions of approval.
V. Prior to final plat approval, a professional civil engineer registered in the State of
Minnesota must sign all plans.
W. Sanitary sewer and water hookup charges are applicable for each of the new lots. The
2004 trunk hookup charge is $1,458 for sanitary sewer and $2,814 for watermain. Sanitary sewer
and watermain hookup fees may be specially assessed against the parcel at the time of building
permit issuance. Hook-up charges are based on the number of SAC units assigned by the Met
Council for each lot.
X. The applicant must enter into a development contract with the City and supply the
necessary financial security in the form of a letter of credit or cash escrow to guarantee
installation of the improvements and the conditions of final plat approval.
Y. Installation of the private utilities for the site will require permits and inspections through
the City's Building Department.
Z. Seed and mulch or sod the site within two weeks of grading. Submit a haul route for City
approval prior to any hauling.
AA. The driveway easement must be 30 feet wide with 20 feet of hard -surface pavement and
built to a 7-ton design.
SP-5
BB. Submit an inspection report certifying that the private street is built to a 7-ton design.
CC. Elevation of lowest house opening must be two feet above high water level of the
proposed pond.
DD. Structure setbacks shall comply with the following table:
Setbacks: front, rear, side, Bluff Creek primary zone, wetland
buffer
Lot 1
30, 30, 10, na, na
Lot 2
30, 30, 9, na, na
Lot 3
30, 30, 9, 40, 40
Lot 4
30, na, 9, 40, 40
EE. Show the watermain pipe size and type on the watermain profile sheet.
FF. Add the City erosion control fence Detail Plate No. 5300.
9. General Conditions. The general conditions of this Contract are attached as
Exhibit "B" and incorporated herein.
SP-6
CITY OF CHANHASSEN
f:3W
(SEAL)
I�
Thomas A. Furlong, Mayor
Todd Gerhardt, City Manager
KLINGELHUTZ DEVELOPMENT, INC.:
4"
STATE OF MINNESOTA )
(ss.
COUNTY OF CARVER )
Thomas R. Heiland, President
The foregoing instrument was acknowledged before me this _ day of ,
20_, by Thomas A. Furlong, Mayor, and by Todd Gerhardt, City Manager, of the City of
Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the
authority granted by its City Council.
NOTARY PUBLIC
STATE OF MINNESOTA )
(ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this _ day of
20_, by Thomas R. Heiland President of Klingelhutz DevelgRment. Inc.. a Minnesota
corporation, on behalf of the corporation.
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147
Chanhassen, MN 55317
(952)227-1100
NOTARY PUBLIC
SP-7
C,
E
EXHIBIT "A"
TO
DEVELOPMENT CONTRACT
LEGAL DESCRIPTION OF SUBJECT PROPERTY:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver County,
Minnesota, described as follows:
Commencing at the West Quarter comer of said Section 10; thence on an assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of said
Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03 minutes 20
seconds East, a distance of 1190.41 feet to a point on a 3452.34 foot radius curve, the
center of circle of said curve bearing North 79 degrees 30 minutes 09 seconds West from
said point; thence Southwesterly along said curve, a distance of 469.80 feet, central angle
07 degrees 47 minutes 49 seconds; thence South 18 degrees 17 minutes 40 seconds West
along tangent, a distance of 64.00 feet to the actual point of beginning of the tract to be
described; thence continuing South 18 degrees 17 minutes 40 seconds West, a distance of
282.12 feet; thence South 65 degrees 12 minutes 03 seconds East, a distance of 33.12 feet
to a point that is hereafter referred to as Point A.
Point A is described as beginning at the point of intersection of the Northerly right-of-
way line of Minnesota Trunk Highway No. 5 and a line 33.00 feet Southeasterly of,
measured at right angles to and parallel with the centerline of Carver County Road No.
117; thence on an assumed bearing of North 18 degrees 17 minutes 40 seconds East and
parallel with the centerline of said Carver County Road No. 117, a distance of 725.00 feet
to said Point A.
Thence from said Point A, South 65 degrees 12 minutes 03 Southeast East, a distance of
268.73 feet; thence North 18 degrees 17 minutes 40 seconds East, a distance of 316.33
feet; thence North 71 degrees 42 minutes 20 seconds West, a distance of 300.00 feet to
the point of beginning.
IMiC
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver County,
Minnesota, described as follows:
Commencing at the West Quarter comer of said Section 10; thence on an assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of said
Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03 minutes 20
seconds East, a distance of 1190.41 feet; thence Southerly a distance of 383.79 feet along
ME
a curve not tangential with the last described line, said curve is concave to the West, has a
radius 3452.34 feet and a central angle of 6 degrees 22 minutes 10 seconds and the chord
of said curve bears South 13 degrees 40 minutes 55 second West to the point of beginning
of the tract to be described; thence continuing Southerly, a distance of 86.01 feet along
said curve concave to the West, having a radius of 3452.34 feet, a central angle of 01
degree 25 minutes 39 seconds; thence South 18 degrees 17 minutes 40 seconds West,
tangent to said curve, a distance of 64.00 feet; thence South 71 degrees 42 minutes 20
seconds East, a distance of 300.00 feet; thence North 18 degrees 17 minutes 40 seconds
East, a distance of 150.00 feet; thence North 71 degrees 42 minutes 20 seconds West, a
distance of 301.07 feet to the point of beginning.
Except Parcel 216C of Minnesota Department of Transportation Right of Way Plat No 10-08,
according to the record plat thereof.
SP-9
ski '•
IRREVOCABLE LETTER OF CREDIT
No. _
Date:
TO: City of Chanhassen
7700 Market Boulevard, Box 147
Chanhassen, Minnesota 55317
Dear Sir or Madam:
We hereby issue, for the account of (Name of Developer) and in your favor, our
Irrevocable Letter of Credit in the amount of $ , available to you by your draft drawn on sight
on the undersigned bank.
The draft must:
a) Bear the clause, "Drawn under Letter of Credit No. , dated
2 , of (Name of Bank)
b) Be signed by the Mayor or City Manager of the City of Chanhassen.
c) Be presented for payment at (Address of Bank) on or before 4:00 p.m on November 30,
2
This Letter of Credit shall automatically renew for successive one-year terms unless, at least forty-
five (45) days prior to the next annual renewal date (which shall be November 30 of each year), the Bank
delivers written notice to the Plymouth City Manager that it intends to modify the terms of, or cancel, this
Letter of Credit. Written notice is effective if sent by certified mail, postage prepaid, and deposited in the
U.S. Mail, at least forty-five (45) days prior to the next annual renewal date addressed as follows:
Chanhassen City Manager, Chanhassen City Hall, 7700 Market Boulevard, Chanhassen, MN 55317, and is
actually received by the City Manager at least thirty (30) days prior to the renewal date.
This Letter of Credit sets forth in full our understanding which shall not in any way be modified,
amended, amplified, or limited by reference to any document, instrument, or agreement, whether or not
referred to herein.
This Letter of Credit is not assignable. This is not a Notation Letter of Credit. More than one draw
may be made under this Letter of Credit.
This Letter of Credit shall be governed by the most recent revision of the Uniform Customs and
Practice for Documentary Credits, International Chamber of Commerce Publication No. 500.
We hereby agree that a draft drawn under and in compliance with this Letter of Credit shall be duly
honored upon presentation.
I
Its
00111
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
EXHHiIT "B"
1. Right to Proceed. Within the plat or land to be platted, the Developer may not
grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets,
utilities, public or private improvements, or any buildings until all the following conditions have
been satisfied: 1) this agreement has been fully executed by both parties and filed with the City
Clerk, 2) the necessary security and fees have been received by the City, 3) the plat has been
recorded with the County Recorder's Office or Registrar of Title's Office of the County where the
plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been
satisfied and then the Developer may proceed.
2. Phased Development. If the plat is a phase of a multiphased preliminary plat, the
City may refuse to approve final plats of subsequent phases if the Developer has breached this
Contract and the breach has not been remedied. Development of subsequent phases may not
proceed until Development Contracts for such phases are approved by the City. Park charges and
area charges for sewer and water referred to in this Contract are not being imposed on outlots, if
any, in the plat that are designated in an approved preliminary plat for future subdivision into lots
and blocks. Such charges will be calculated and imposed when the outlots are final platted into lots
and blocks.
3. Preliminary Plat Status. If the plat is a phase of a multi -phased preliminary plat,
the preliminary plat approval for all phases not final platted shall lapse and be void unless final
platted into lots and blocks, not outlots, within two (2) years after preliminary plat approval.
4. Changes in Official Controls. For two (2) years from the date of this Contract, no
amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current
urban service area, or official controls shall apply to or affect the use, development density, lot size,
lot layout or dedications of the approved plat unless required by state or federal law or agreed to in
writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the
contrary, to the full extent permitted by state law the City may require compliance with any
amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements
enacted after the date of this Contract.
5. Improvements. The improvements specified in the Special Provisions of this
Contract shall be installed in accordance with City standards, ordinances, and plans and
specifications which have been prepared and signed by a competent registered professional
engineer furnished to the City and approved by the City Engineer. The Developer shall obtain all
necessary permits from the Metropolitan Council Environmental Services and other pertinent
GC-1
agencies before proceeding with construction. The City will, at the Developer's expense, have one
or more construction inspectors and a soil engineer inspect the work on a full or part-time basis.
The Developer shall also provide a qualified inspector to perform site inspections on a daily basis.
Inspector qualifications shall be submitted in writing to the City Engineer. The Developer shall
instinct its project engineer/inspector to respond to questions from the City Inspector(s) and to
make periodic site visits to satisfy that the construction is being performed to an acceptable level of
quality in accordance with the engineer's design. The Developer or his engineer shall schedule a
preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties
concerned, including the City staff, to review the program for the construction work.
6. Iron Monuments. Before the security for the completion of utilities is released, all
monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.02, Subd.
1. The Developers surveyor shall submit a written notice to the City certifying that the monuments
have been installed
7. License. The Developer hereby grants the City, its agents, employees, officers and
contractors a license to enter the plat to perform all work and inspections deemed appropriate by the
City in conjunction with plat development.
8. Site Erosion Control. Before the site is rough graded, and before any utility
construction is commenced or building permits are issued, the erosion control plan, Plan B, shall be
implemented, inspected, and approved by the City. The City may impose additional erosion control
requirements if they would be beneficial. All areas disturbed by the excavation and backfilling
operations shall be reseeded forthwith after the completion of the work in that area. Except as
otherwise provided in the erosion control plan, seed shall be certified seed to provide a temporary
ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc
anchored as necessary for seed retention. The parties recognize that time is of the essence in
controlling erosion. If the Developer does not comply with the erosion control plan and schedule of
supplementary instructions received from the City, the City may take such action as it deems
appropriate to control erosion at the Developer's expense. The City will endeavor to notify the
Developer in advance of any proposed action, but failure of the City to do so will not affect the
Developers and City's rights or obligations hereunder. No development will be allowed and no
building permits will be issued unless the plat is in full compliance with the erosion control
requirements. Erosion control needs to be maintained until vegetative cover has been restored,
even if construction has been completed and accepted. After the site has been stabilized to where,
in the opinion of the City, there is no longer a need for erosion control, the City will authorize the
removal of the erosion control, i.e. hay bales and silt fence. The Developer shall remove and
dispose of the erosion control measures.
8a. Erosion Control During Construction of a Dwelling or Other Building. Before
a building permit is issued for construction of a dwelling or other building on a lot, a $500.00 cash
escrow or letter of credit per lot shall also be furnished the City to guarantee compliance with City
Code § 20-94.
KI&A
9. Clean up. The Developer shall maintain a neat and orderly work site and shall daily
clean, on and off site, dirt and debris, including blowables, from streets and the surrounding area
that has resulted from construction work by the Developer, its agents or assigns.
10. Acceptance and Ownership of Improvements. Upon completion and acceptance
by the City of the work and construction required by this Contract, the improvements lying within
public easements shall become City property. After completion of the improvements, a
representative of the contractor, and a representative of the Developer's engineer will make a final
inspection of the work with the City Engineer. Before the City accepts the improvements, the City
Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved
plans and specifications and the Developer and his engineer shall submit a written statement to the
City Engineer certifying that the project has been completed in accordance with the approved plans
and specifications. The appropriate contractor waivers shall also be provided. Final acceptance of
the public improvements shall be by City Council resolution.
11. Claims. In the event that the City receives claims from laborers, materialmen, or
others that work required by this Contract has been performed, the sums due them have not been
paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees
posted with the City, and if the claims are not resolved at least ninety (90) days before the security
required by this Contract will expire, the Developer hereby authorizes the City to commence an
Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts,
to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in
compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and
dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the
District Court, except that the Court shall retain jurisdiction to determine attorneys' fees.
12. Park Dedication. The Developer shall pay full park dedication fees in conjunction
with the installation of the plat improvements. The park dedication fees shall be the current amount
in force at the time of final platting pursuant to Chanhassen City Ordinances and City Council
resolutions.
13. Landscaping. Landscaping shall be installed in accordance with Plan D. Trees
which can cause a public nuisance, such as cotton producing trees, or can be a public hazard, such
as bug infestation or weak bark, are prohibited. The minimum tree size shall be two and one-half
(2rh) inches caliper, either bare root in season, or balled and burlapped. The trees may not be
planted in the boulevard (area between curb and property line). In addition to any sod required as a
part of the erosion control plan, Plan B, the Developer or lot purchaser shall sod the boulevard area
and all drainage ways on each lot utilizing a minimum of four (4) inches of topsoil as a base. Seed
or sod shall also be placed on all disturbed areas of the lot. If these improvements are not in place
at the time a certificate of occupancy is requested, a financial guarantee of $750.00 in the form of
cash or letter of credit shall be provided to the City. These conditions must then be complied with
within two (2) months after the certificate of occupancy issued, except that if the certificate of
occupancy is issued between October I through May 1 these conditions must be complied with by
the following July 1st. Upon expiration of the time period, inspections will be conducted by City
staff to verify satisfactory completion of all conditions. City staff will conduct inspections of
GC-3
incomplete items with a $50.00 inspection fee deducted from the escrow fund for each inspection.
After satisfactory inspection, the financial guarantee shall be returned. If the requirements are not
satisfied, the City may use the security to satisfy the requirements. The City may also use the
escrowed funds for maintenance of erosion control pursuant to City Code Section 20-94 or to
satisfy any other requirements of this Contract or of City ordinances. These requirements
supplement, but do not replace, specific landscaping conditions that may have been required by the
City Council for project approval.
14. Warranty. The Developer wan -ants all improvements required to be constructed by
it pursuant to this Contract against poor material and faulty workmanship. The Developer shall
submit either 1) a warranty/maintenance bond for 100% of the cost of the improvement, or 2) a
letter of credit for twenty-five percent (25%) of the amount of the original cost of the
improvements.
A. The required warranty period for materials and workmanship for the utility
contractor installing public sewer and water mains shall be two (2) years from the date of final
written City acceptance of the work.
B. The required warranty period for all work relating to street construction, including
concrete curb and gutter, sidewalks and trails, materials and equipment shall be subject to two (2)
years from the date of final written acceptance.
C. The required warranty period for sod, trees, and landscaping is eighteen (18) months
following acceptance by the City.
15. Lot Plans. Prior to the issuance of building permits, an acceptable Grading,
Drainage, Erosion Control including silt fences, and Tree Removal Plan shall be submitted for each
lot for review and approval by the City Engineer. Each plan shall assure that drainage is maintained
away from buildings and that tree removal is consistent with development plans and City
Ordinance.
16. Existing Assessments. Any existing assessments against the plat will be re -spread
against the plat in accordance with City standards.
17. Hook-up Charges. The Developer also acknowledges overall sanitary sewer and
water trunk availability to the site and the hook-up charges established by the City as reasonable
compensation for oversizing costs previously incurred, as well as, long-term maintenance. Said
hook-up charges are collectible at time of building permit unless a written request is made to assess
the costs over a four year term at the rates in effect at time of application.
18. Public Street Lighting. The Developer shall have installed and pay for public
street lights in accordance with City standards. The public street lights shall be accepted for City
ownership and maintenance at the same time that the public street is accepted for ownership and
maintenance. A plan shall be submitted for the City Engineers approval prior to the installation.
Before the City signs the final plat, the Developer shall pay the City a fee of $300.00 for each street
GC-4
light installed in the plat. The fee shall be used by the City for furnishing electricity and
maintaining each public street light for twenty (20) months.
19. Signage. All street signs, traffic signs, and wetland monumentation required by the
City as a part of the plat shall be furnished and installed by the City at the sole expense of the
Developer.
20. House Pads. The Developer shall promptly furnish the City "as -built" plans
indicating the amount, type and limits of fill on any house pad location.
21. Responsibility for Costs.
A. The Developer shall pay an administrative fee in conjunction with the
installation of the plat improvements. This fee is to cover the cost of City Staff time and overhead
for items such as review of construction documents, preparation of the Development Contract,
monitoring construction progress, processing pay requests, processing security reductions, and final
acceptance of improvements. This fee does not cover the City's cost for constriction inspections.
The fee shall be calculated as follows:
i) if the cost of the construction of public improvements is less than
$500,000, three percent (3%) of construction costs;
if the cost of the construction of public improvements is between
$500,000 and $1,000,000, three percent (3%) of construction costs
for the fast $500,000 and two percent (2%) of construction costs
over $500,000;
iii) if the cost of the construction of public improvements is over
$1,000,000, two and one-half percent (21h%) of construction costs
for the fast $1,000,000 and one and one-half percent (11h%) of
construction costs over $1,000,000.
Before the City signs the final plat, the Developer shall deposit with the City a fee based upon
construction estimates. After construction is completed, the final fee shall be determined based
upon actual construction costs. The cost of public improvements is defined in paragraph 6 of the
Special Provisions.
B. In addition to the administrative fee, the Developer shall reimburse the City for
all costs incurred by the City for providing construction inspections. This cost will be periodically
billed directly to the Developer based on the actual progress of the construction. Payment shall be
due in accordance with Article 20E of this Agreement.
C. The Developer shall hold the City and its officers and employees harmless from
claims made by itself and third parties for damages sustained or costs incurred resulting from plat
approval and development. The Developer shall indemnify the City and its officers and employees
GC-5
for all costs, damages, or expenses which the City may pay or incur in consequence of such claims,
including attorneys' fees.
D. In addition to the administrative fee, the Developer shall reimburse the City for
costs incurred in the enforcement of this Contract, including engineering and attorneys' fees.
E. The Developer shall pay in full all bills submitted to it by the City for obligations
incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time,
the City may halt all plat development work and construction, including but not limited to the
issuance of building permits for lots which the Developer may or may not have sold, until the bills
are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of 8% per year.
F. In addition to the charges and special assessments referred to herein, other
charges and special assessments may be imposed such as, but not limited to, sewer availability
charges ("SAC"), City water connection charges, City sewer connection charges, and building
permit fees.
G. Private Utilities. The Developer shall have installed and pay for the installation
of electrical, natural gas, telephone, and cable television service in conjunction with the overall
development improvements. These services shall be provided in accordance with each of the
respective franchise agreements held with the City.
H. The developer shall pay the City a fee established by City Council resolution,
to reimburse the City for the cost of updating the City's base maps, GIS data base files, and
converting the plat and record drawings into an electronic format.
22. Developer's Default. In the event of default by the Developer as to any of the work
to be performed by it hereunder, the City may, at its option, perform the work and the Developer
shall promptly reimburse the City for any expense incurred by the City, provided the Developer is
fast given notice of the work in default, not less than four (4) days in advance. This Contract is a
license for the City to act, and it shall not be necessary for the City to seek a Court order for
percussion to enter the land. When the City does any such work, the City may, in addition to its
other remedies, assess the cost in whole or in part.
23. Miscellaneous.
A. Construction Trailers. Placement of on -site construction trailers and temporary
job site offices shall be approved by the City Engineer as a part of the pre -construction meeting for
installation of public improvements. Trailers shall be removed from the subject property within
thirty (30) days following the acceptance of the public improvements unless otherwise approved by
the City Engineer.
B. Postal Service. The Developer shall provide for the maintenance of postal
service in accordance with the local Postmasters request.
MO
9 •
C. Third Parties. Third parties shall have no recourse against the City under this
Contract. The City is not a guarantor of the Developer's obligations under this Contract. The City
shall have no responsibility or liability to lot purchasers or others for the City's failure to enforce
this Contract or for allowing deviations from it.
D. Breach of Contract. Breach of the terms of this Contract by the Developer
shall be grounds for denial of building permits, including lots sold to third parties. The City may
also issue a stop work order halting all plat development until the breach has been cured and the
City has received satisfactory assurance that the breach will not reoccur.
E. Severability. If any portion, section, subsection, sentence, clause, paragraph, or
phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of
the remaining portion of this Contract.
F. Building Permits. Building permits will not be issued in the plat until sanitary
sewer, watermain, and storm sewer have been installed, tested, and accepted by the City, and the
streets needed for access have been paved with a bituminous surface and the site graded and
revegetated in accordance with Plan B of the development plans.
G. Waivers/Amendments. The action or inaction of the City shall not constitute a
waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers
shall be in writing, signed by the parties and approved by written resolution of the City Council.
The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or
release.
H. Release. This Contract shall run with the land and may be recorded against the
title to the property. After the Developer has completed the work required of it under this Contract,
at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the
issuance of such a certificate, individual lot owners may make as written request for a certificate
applicable to an individual lot allowing a minimum of ten (10) days for processing.
L Insurance. Developer shall take out and maintain until six (6) months after the
City has accepted the public improvements, public liability and property damage insurance covering
personal injury, including death, and claims for property damage which may arise out of
Developers work or the work of its subcontractors or by one directly or indirectly employed by any
of them. Limits for bodily injury and death shall be not less than $500,000 for one person and
$1,000,000 for each occurrence; limits for property damage shall be not less than $500,000 for each
occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as
an additional insured on the policy, and the Developer shall file with the City a certificate
evidencing coverage prior to the City signing the plat. The certificate shall provide that the City
must be given ten (10) days advance written notice of the cancellation of the insurance. The
certificate may not contain any disclaimer for failure to give the required notice.
J. Remedies. Each right, power or remedy herein conferred upon the City is
cumulative and in addition to every other right, power or remedy, expressed or implied, now or
GC-7
0 0
hereafter arising, available to City, at law or in equity, or under any other agreement, and each and
every right, power and remedy herein set forth or otherwise so existing may be exercised from time
to time as often and in such order as may be deemed expedient by the City and shall not be a waiver
of the right to exercise at any time thereafter any other right, power or remedy.
K. Assignability. The Developer may not assign this Contract without the written
permission of the City Council. The Developers obligation hereunder shall continue in full force
and effect even if the Developer sells one or more lots, the entire plat, or any part of it.
L. Construction Hours. Construction hours for required improvements under this
contract shall be from 7:00 a.m. to 6:00 p.m. on weekdays, from 9:00 am. to 5:00 p.m. on
Saturdays with no such activity allowed on Sundays or any recognized legal holidays. Under
emergency conditions, this limitation may be waived by the consent of the City Engineer. Any
approved work performed after dark shall be adequately illuminated If construction occurs outside
of the permitted construction hours, the Developer shall pay the following administrative penalties:
First violation
Second violation
Third & subsequent violations
$ 500.00
$ 1,000.00
Nl site development and
construction must cease
for seven (7) calendar days
M. Noise Amplification. The use of outdoor loudspeakers, bullhorns, intercoms,
and similar devices is prohibited in conjunction with the construction of homes, buildings, and the
improvements required under this contract. The administrative penalty for violation of construction
hours shall also apply to violation of the provisions in this paragraph.
N. Access. All access to the plat prior to the City accepting the roadway
improvements shall be the responsibility of the Developer regardless if the City has issued building
permits or occupancy permits for lots within the plat.
O. Street Maintenance. The Developer shall be responsible for all street
maintenance until streets within the plat are accepted by the City. Warning signs shall be placed by
the Developer when hazards develop in streets to prevent the public from traveling on same and
directing attention to detours. If streets become impassable, the City may order that such streets
shall be barricaded and closed. The Developer shall maintain a smooth roadway surface and
provide proper surface drainage. The Developer may request, in writing, that the City plow snow
on the streets prior to final acceptance of the streets. The City shall have complete discretion to
approve or reject the request. The City shall not be responsible for reshaping or damage to the
street base or utilities because of snow plowing operations. The provision of City snow plowing
service does not constitute final acceptance of the streets by the City.
p. Storm Sewer Maintenance. The Developer shall be responsible for cleaning and
maintenance of the storm sewer system (including ponds, pipes, catch basins, culverts and swales)
within the plat and the adjacent off -site storm sewer system that receives storm water from the plat.
The Developer shall follow all instructions it receives from the City concerning the cleaning and
GC-8
maintenance of the storm sewer system. The Developer's obligations under this paragraph shall end
two (2) years after the public street and storm drainage improvements in the plat have been
accepted by the City. Twenty percent (20%) of the storm sewer costs, shown under section 6 of the
special provisions of this contract, will be held by the City for the duration of the 2-year
maintenance period.
Q. Soil Treatment Systems. If soil treatment systems are required, the Developer
shall clearly identify in the field and protect from alteration, unless suitable alternative sites are first
provided, the two soil treatment sites identified during the platting process for each lot. This shall
be done prior to the issuance of a Grading Permit. Any violation/disturbance of these sites shall
render them as unacceptable and replacement sites will need to be located for each violated site in
order to obtain a building permit.
R. Variances. By approving the plat, the Developer represents that all lots in the
plat are buildable without the need for variances from the City's ordinances.
S. Compliance with Laws Ordinances and Regulations. In the development of the
plat the Developer shall comply with all laws, ordinances, and regulations of the following
authorities:
1. City of Chanhassen;
2. State of Minnesota, its agencies, departments and commissions;
3. United States Army Corps of Engineers;
4. WatershedDistrict(s);
5. Metropolitan Government, its agencies, departments and commissions.
T. Proof of Title. Upon request, the Developer shall furnish the City with evidence
satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers to
enter into this Development Contract.
U. Soil Conditions. The Developer acknowledges that the City makes no
representations or warranties as to the condition of the soils on the property or its fitness for
construction of the improvements or any other purpose for which the Developer may make use of
such property. The Developer further agrees that it will indemnify, defend, and hold harmless the
City, its governing body members, officers, and employees from any claims or actions arising out of
the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or
pollutants were caused to be there by the City.
V. Soil Correction. The Developer shall be responsible for soil correction work on
the property. The City makes no representation to the Developer concerning the nature of
suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots
which have no fill material a soils report from a qualified soils engineer is not required unless the
City's building inspection department determines from observation that there may be a soils
problem. On lots with fill material that have been mass graded as part of a multi -lot grading
project, a satisfactory soils report from a qualified soils engineer shall be provided before the City
GC-9
issues a building permit for the lot. On lots with fill material that have been custom graded, a
satisfactory soils report from a qualified soils engineer shall be provided before the City inspects the
foundation for a building on the lot.
W. Haul Routes. Bluff Creek Drive from Trunk Highway 212 to Pioneer Trail
(CSAH 14) may not be used by the Developer, the Developer's contractors or subcontractors as a
haul route for the import or export of soil, construction material, construction equipment or
construction debris, or any other purpose.
X. Development Signs. The Developer shall post a six foot by eight foot
development sign in accordance with City Detail Plate No. 5313 at each entrance to the project.
The sign shall be in place before construction of the required improvements commences and
shall be removed when the required improvements are completed, except for the final lift of
asphalt on streets. The signs shall contain the following information: project name, name of
developer, developer's telephone number and designated contact person, allowed construction
hours.
Y. Construction Plans. Upon final plat approval, the developer shall provide the
City with two complete sets of full-size construction plans and four sets of 11"xl7" reduced
construction plan sets and three sets of specifications. Within sixty (60) days after the completion
of the utility improvements and base course pavement and before the security is released, the
Developer shall supply the City with the following: (1) a complete set of reproducible Mylar
as -built plans, (2) two complete full-size sets of blue linelpaper as -built plans, (3) two complete sets
of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) location stationing
and swing ties of all utility stubs including draintile cleanouts, (6) bench mark network, (7) digital
file of as -built plans in both .dxf & .tif format (the Axf file must be tied to the current county
coordinate system), and (8) digital file of utility tie sheets in either .doc or .tif format. The
Developer is required to submit the final plat in electronic format.
Z. As -Built Lot Surveys. An as -built lot survey will be required on all lots prior to
the Certificate of Occupancy being issued. The as -built lot survey must be prepared, signed, and
dated by a Registered Land Surveyor.
Rev. 3/31/04
MGM
City Council Summary4une 14, 2004 •
g. Walnut Grove 2°d Addition, Klingelhutz Development:*
1) Final Plan Approval
2) Approval of Plans & Specifications and Development Contract
h. Highways of Bluff Creek, Plowshares Development:
1) Final Plat Approval
2) Approval of Plans & Specifications and Development Contract
Stone Creek Town Offices, Eden Trace Corp/Stone Creek Office Group LLC:
1) Final Plat Approval
2) Approval of Plans & Specifications and Development Contract
j. Countryside, Lundgren Bros. Construction:
1) Final Plat Approval
2) Approval of Plans & Specifications and Development Contract
k. Burlwood 2°d Addition Final Plat Approval, McDonald Construction, Inc.
1. Resolution #2004-38: Consider Modification of 2004 CIP for Stormwater
Quality Improvements for the 2004 Residential Street Improvement Project 04-01
n. Resolution #2004-39: Approve Transfers to Close Capital Project Funds and
Debt Service Funds.
o. Resolution #2004-40: Approve Change Order No. 4 for City Hall Lower Level
Remodel, Gen -Con Construction.
*All voted in favor, except Mayor Furlong abstained on item g, and the motion
carried unanimously 4 to 0.
VISITOR PRESENTATIONS:
Tom Devine, 7640 South Shore Drive representing the South Lotus Lake Association,
stated he was not aware of the water treatment program unfolding in their neighborhood
until Friday night, but the association had prepared to do a brief overview of the South
Lotus Lake Association's concerns relative to the park/tennis court and boat landing
areas. He's had conversations with the Carver County Sheriffs Office, specifically Jim
Olson about what can be done with enforcement of parking at the boat ramp. He talked
about the history involved with planning and construction of the boat ramp, park and
neighborhood and the promises that were made at that time. He voiced his
disappointment in learning of the water treatment plant only last Friday night from Mayor
Furlong that there's a decision to build or do something there and the mechanics is really
what's on the table right now without getting the neighborhood involved. The last issue
was the political effort it took from the neighborhood to build the trail along Highway
101 and his hopes that there isn't a political backlash happening from that effort. Staff
2
3,
CITY OF
CHANHASSEN
690 City Center Drive, PO Box 147
Chanhassen, Minnesota 55317
Phone 612.937.1900
General Fax 612.937.5739
Engineering Far 612937..9152
Public Safety Fax 612.934,2524
Web wwwti.chanharsen.mmus
MEMORANDUM
TO: Planning Commission
FROM: Bob Generous, Senior Planner
DATE: May 1, 2001
SUBJ: Rezoning/Land Use Options — Hennessey Property
On March 12, 2001, staff initiated a land use amendment for this property from
Residential — Low Density to Residential - Medium Density. The Planning
Commission tabled the item to have staff review the potential development options
for the property.
As part of the review of the Walnut Grove development, the city stated that the
Hennessey property should be developed as a townhouse project. However, at
that time, the property owner was not a party to the development proposal.
Currently, the extreme southern portion of the site is guided for residential -
medium density (see land use map below). The southern portion of the site is also
encumbered with the Bluff Creek Overlay primary zone (attached is a schematic
of the estimated primary zone boundary). The property is currently zoned
Agricultural Estate District, A2. A portion of the developable upland on the
property is located south of Bluff Creek.
Site Constraints
The site contains approximately three acres of land. Of this amount,
approximately one-third of the site is within the Bluff Creek primary zone,
including the creek and the ravine and woodlands adjacent to it. Access to future
development of the site will be via Baneberry Way West, a private street. Direct
access to the property from Galpin Boulevard will be prohibited. At the time of
platting, a minimum of 17 feet of right-of-way for Galpin Boulevard will be
required.
The City of Chanhassen. A growing community with dean lakes, quality schools, a charming downtown, thriving businesses, and beautiful parks. A great place to live, work, and Play
Planning Commission
May 1, 2001
Page 2
w1 ►m
LAND USE
Staff is looking at alternatives to resolve the potential future development of this parcel. To this
end, we proffer the following alternatives based on an assumption of 2.59 net developable acres.
Land Use Map Amendment from Residential — Low Density to Residential - Medium
Density. The rezoning of the property would be done as part of the future development of
the site.
This option leaves potential development of the parcel undetermined until a future developer
proposes a project. While the intent of the land use amendment was to permit a development that
would be consistent with the Walnut Grove project. There is no certainty of the final development
outcome. With a land use designation of medium density, the property could be developed as any
project that maintains the four to eight units per acre net density.
2. Land Use Map Amendment from Residential — Low Density to Residential - Medium
Density and rezoning of the property to Planned Unit Development — Residential (PUD-R)
and develop design criteria that would permit development of up to 10 "craftman style" or
"detached townhouse" homes similar to those in Walnut Grove or up to 13 single loaded
attached townhouses. Walnut Grove developed at a net density of 5.77 units per acre.
These two proposals have a net density of 3.86 and 5.02 units per acre.
This option would be the most consistent with the surrounding development. It would give the
neighbors the greatest surety of the potential future development of the property. It would also
fulfill an implied consensus that the property should be developed with townhouses.
3. Leave the property guided Residential — Low Density. Development of the property would
then be required to meet criteria for Planned Unit Development (PUD) with a minimum lot
Planning Commission
May 1, 2001
Page 3
size of 11,000 square feet and an average lot size of 15,000 square feet, Single Family
Residential (RSF) with a minimum lot size of 15,000 square feet, or Mixed Low Density
Residential (R4) which permits either single family detached homes on a minimuml5,000
square foot lot or twin homes on a minimum lot of 10,000 square feet per unit. Staff
estimates that between four and six single family detached units would be developed or 10
twin units would be developed.
This option requires no action by the city. Development of the property would be undetermined
until a future developer proposes a project. However, this option does not accommodate the density
transfer/clustering of development required by the Bluff Creek Overlay (BCO) district. It also may
require approval of variances from the BCO standards.
4. Amend the Planned Unit Development (PUD) Ordinance to permit density transfer with
attached and cluster housing within the Residential — Low Density district. Leave the
property guided Residential — Low Density.
This option would resolve the density transfer issue in Residential — Low Density lands. The
ultimate development of the property would be undetermined until a development proposal is
submitted. However, the ultimate density would be between 1.2 and four units per acre.
Staff is requesting that the Planning Commission direct staff as to which option it should pursue.
ATTACHMENT
1. Aerial topography with half section superimposed.
2. 1" =100' aerial topography with half section superimposed
3. Half section of property
4. Half section of property with potential setback delineated
5. Zero lot line potential configuration
6. Townhouse development potential configuration
gAplanft\rnemo hennessey prop options.doc
•k wt---
- r�twK-7EL)Cj— s
-� 7 6 5
rn.13, w
25.0I�J�: IQ M -- 16 1 s o „
r'
�-
- 1 1S S3
Y 13
71
is
3
iT?� Te 29,
13
L � 21
f r n IT K 1 i s SO
Ii II S✓ 3 S SS
10
aUp ar
300 - 1 ,14
_ ��`' �,' r `•ter a. t T " 1 it � 8 2
• i 'r 1 ` x s 12 .1
. � oeb V4,
v
z
e ; 7
C�...13
.\
------------
_�
r
3
4
3p� fl� 6
25.0101600 7
q 8
©0TC
a oT
1
164.63 25.0101300 2
4
1 2 4
1 2.94
25.0101400
N / ,�-
VFW-
O C14
Lk
-?0 72 0
2r
164.6,
1
5 01016
25D.0i0` CC)0
�s
p
m
1
P
0U�
G1`
i D4
r
n` ,f 25.0101400
ell
164.63
3
1
h -Al
25-0101400
CITY OF
7700 Market Boulevard
PO Boa 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227,1160
Fax 952.227,1170
Finance
Phone: 952,227.1140
Fax 952.227.1110
Park d Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 coulter Boulevard
Phone: 952.227.1400
Fax:952.227.1404
Planning 6
Natural Resources
Phone: 952.227.1130
Fax 952.2271110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web She
www.ci.chanhassen.mn.us
MEMORANDUM
TO: Todd Gerhardt, City Manager
FROM: Bob Generous, Senior Planner 0
DATE: June 15, 2004
SUBJ: Walnut Grove 2°a Addition Final Plat, Klingelhutz Development
Planning Case #04-10
PROPOSAL SUMMARY
The developer is requesting final plat approval to subdivide three acres into four
lots and one outlot.
BACKGROUND
On April 12, 2004, the Chanhassen City Council approved the following:
• The rezoning of the property from Agricultural Estate District, A2, to Single
Family Residential District, RSF.
The preliminary plat for Walnut Grove Second Addition with lot width variances
and one (1) foot side yard setback variances and a variance for the use of a
private street.
• Conditional Use Permit #2003-6 for development within the Bluff Creek
Overlay District.
BLUFF CREEK OVERLAY DISTRICT
Bluff Creek flows through the southern portion of this property. The property
also contains a forested riparian corridor and an aglurban wetland. The primary
zone encompasses the forested area, the wetland, and the wetland buffer.
At the time of preliminary plat approval, the developer stated that he was dedicating
Outlot A to the City as permanent open space. Outlot A contains the majority of the
Bluff Creek Primary zone on the property. A conservation easement is being
recorded over those portions of the primary zone located on individual lots.
LANDSCAPING/TREE PRESERVATION
The development shall provide one overstory tree in the front yard of each new
house outside of the drainage and utility easement. One overstory tree, two
understory, trees and four shrubs shall be installed between the storm water pond and
Galpin Boulevard. Tree preservation fencing shall be installed at the limits of tree
removal.
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A gnat place to live, work, and play.
Planning Case No. 04-10
Walnut Grove 2nd Addition
Location Map
Mr. Todd Gerhardt • •
Walnut Grove 2Id Addition
June 14, 2004
Page 2
PARKS AND RECREATION
The developer shall pay park dedication fees for the three new houses at the time of final plat
recording. The 2004 fees are $2,800.00 per unit.
GRADING. DRAINAGE & EROSION CONTROL
The plans propose to grade about 30% of the site for the new house pads, a proposed private
driveway and a stormwater pond. The proposed lots are located in the east central portion of the
site. The proposed grading will prepare the site for look -out and walk -out house pads on Lots 2,
3 and 4, Block 1.
The existing site drainage flows south toward the existing creek. The plans propose to convey
the drainage from the northeast portion of the site to the private street and carry the stormwater
via storm sewer to a proposed NURP pond. The remaining portion of the site will drain overland
to the proposed stormwater pond and/or the creek.
The applicant is proposing to use Type III silt fence along the south side adjacent to the
secondary bluff creek line and type R silt fence along the east and west sides of the grading area.
In addition, staff recommends that tree preservation fencing be installed at the limits of tree
removal. The applicant should be aware that any off -site grading will require an easement from
the appropriate property owner.
UTILITIES
Municipal sewer and water service is available to the site from Baneberry Way. The existing
house on Lot 1 is already connected to municipal sewer and water. The applicant is proposing to
extend sewer and water lines along the private driveway to serve Lots 2, 3 and 4.
According to the City's Finance Department records, the parcel was previously assessed for one
sanitary sewer and water hookup. Since the developer will be responsible for extending lateral
sewer and water service to the lots, the sanitary sewer and water connection charges will be
waived. However, the sanitary sewer and water hookup charges will still be applicable for each
of the new lots. The 2004 trunk hookup charge is $1,458 for sanitary sewer and $2,814 for
watermain. Sanitary sewer and watermain hookup fees may be specially assessed against the
parcel at the time of building permit issuance. Hookup charges are based on the number of SAC
units assigned by the Met Council for each lot.
All of the utility improvements are required to be constructed in accordance with the City's latest
edition of Standard Specifications and Detail Plates. Upon completion of the utility
improvements, the utilities will be turned over to the City for maintenance and ownership. The
applicant is also required to enter into a development contract with the City and supply the
necessary financial security in the form of a letter of credit or cash escrow to guarantee
installation of the improvements and the conditions of final plat approval. Permits from the
appropriate regulatory agencies will have to be obtained, including but not limited to the MPCA,
Department of Health, MCES, Carver County and Watershed District.
Mr. Todd Gerhardt •
Walnut Grove 2Id Addition
June 14, 2004
Page 3
STREETS
The applicant is proposing two accesses to the proposed lots. On the northwest corner of the
parcel, an existing access off Galpin Boulevard will be utilized to serve the existing house on Lot
1. Another proposed new access off Baneberry Way will be servicing Lots 2, 3 and 4 as a
private street. As such, the private street easement must of 30-feet wide with 20 feet of hard -
surface pavement and built to a 7-ton design. The developer must submit an inspection report
certifying that the private street is built to a 7-ton design. The applicant is proposing a
hammerhead turnaround. At this stage, the Engineering Department and the Fire Marshal are
fine with the proposed turnaround and the removal of the existing temporary cul-de-sac at the
end of Baneberry Way.
COMPLIANCE TABLE
Frontage
Depth
Area
Code
90
125
15,000
Lot 1
104
250
26,051
Lot 2
61.01*
250
15,247
Lot 3
60.1*
250
15,019
Lot 4
60.9*
250
15,219
Outlot A
41,198
Gal in Boulevard
21,866
Total
134,600
*A lot width variance is being approved with the plat for Lots 2, 3 and 4.
REVIEW CONDITIONS OF APPROVAL
1. At the time of final plat recording, the developer shall pay full park dedication fees for the three
lots that are subject to park dedication fees.
* This condition shall be modified as follows: The developer shall pay $8,400.00 in park
dedication fees at the time of final plat recording.
2. Adjust the lot line(s) to assure that all lots meet or exceed the 15,000 square -foot minimum lot
area.
* This condition has been met.
3. Individual sewer and water services must be provided for Lots 1-4 and indicated on the plans.
*This condition has been met.
4. A final grading plan and soils report must be submitted to the Inspections Division before
permits will be issued.
* This condition still applies.
Mr. Todd Gerhardt • •
Walnut Grove 2°a Addition
June 14, 2004
Page 4
5. The old individual sewage treatment site for the existing home must be abandoned in
accordance with MPCA regulations.
*This condition still applies.
6. A 10-foot clear space must be maintained around fire hydrants, i.e. street lamps, trees,
shrubs, bushes, Qwest, Xcel Energy, Cable TV and transformer boxes. This is to insure that
fire hydrants can be quickly located and safely operated by firefighters. Pursuant to
Chanhassen City Ordinance #9-01.
* This condition still applies.
7. "No Parking Fire Lane" signs will be required on the new private street. Pursuant to
Chanhassen Fire Prevention Policy #06-1991. Copy enclosed.
* This condition still applies.
8. Conservation easements shall be dedicated overall areas within the Bluff Creek primary
zone.
*This condition is duplicated by conditions 16 and 17 and can be deleted.
9. Tree preservation fence shall be installed at the edge of the grading limits prior to any
construction. Fencing shall protect trees on proposed lots as well as trees in neighboring
properties located next to the grading limits.
* This condition shall be modified as follows: Tree preservation fence shall be installed at the
edge of the grading limits prior to any construction. Fencing shall protect trees on proposed lots
as well as trees in neighboring properties located next to the grading limits.
10. Any trees lost due to construction that are not shown as such on plans shall be replaced at a rate
of 2:1 diameter inches.
* This condition still applies.
11. Applicant shall submit landscape plans for review and approval prior to final plat approval. A
minimum of one overstory tree will be required in the front yard of each lot.
* This condition and condition 12 shall be combined as follows: A minimum of one overstory
tree will be required in the front yard of each lot. One overstory tree, two understory trees, and
four shrubs shall be planted along Galpin Boulevard on Lots 2 and 3.
12. Bufferyard plantings are required along Galpin Boulevard. Planting requirements are: 1
overstory tree, 2 understory trees, and 4 shrubs.
* This condition shall be combined with the previous condition.
Mr. Todd Gerhardt • •
Walnut Grove 2°d Addition
June14,2004
Page 5
13. A final grading plan and soils report must be submitted to the Inspections Division before
permits will be issued.
* This condition still applies.
14. A wetland buffer 0 to 20 feet in width (with a minimum average of 10 feet) shall be maintained
around the wetland. The wetland buffer shall be 0 along the east side of the wetland and 20
feet on the north and west sides. Wetland buffer areas shall be preserved, surveyed and staked
in accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge
signs, under the direction of City staff, before construction begins and shall pay the City $20 per
sign.
* This condition still applies.
15. The grading and erosion control plan shall show the actual wetland buffer widths proposed to
meet the minimum average buffer width requirements as well as the 40-foot wetland buffer
setback. All structures shall maintain at least a 40-foot setback from the edge of the wetland
buffer or, if no buffer is to be preserved, from the delineated wetland edge.
* This condition still applies.
16. The primary zone boundary shall be amended to include the wooded area in the rear
(westernmost) portion of Lot 4.
* This condition still applies.
17. A conservation easement shall be dedicated over the primary zone. All strictures shall maintain
at least a 40-foot setback from the primary zone. No disturbance of the site shall occur within
the first 20 feet of the setback. Open space shall comprise 100% of the primary zone.
* This condition still applies.
18. The proposed development shall maintain existing runoff rates. On -site stormwater ponding
shall be sufficient to meet all City water quality and quantity standards.
* This condition has been met.
19. A manhole with a two -foot sump shall be installed as the last road -accessible structure prior to
discharge into the stormwater pond.
* This condition has been met.
20. Riprap and geotextile fabric shall be installed at the flared end sections of the inlet and outlet of
the storm water pond.
* This condition still applies.
Mr. Todd Gerhardt • •
Walnut Grove 21d Addition
June 14, 2004
Page 6
21. Drainage and utility easements shall be provided over all existing wetlands, wetland buffer
areas and storm water infrastructure.
* This condition has been met.
22. A drainage and utility easement shall be dedicated over the 9 feet either side of the property line
between Lots 2 and 3 in order to accommodate access for future stormwater infrastructure
maintenance. A drainage and utility easement shall be dedicated over the areas in the western
portions of Lots 3 and 4 that are currently not encumbered by drainage and utility easements
since water discharged from the stormwater pond will flow through this area as it moves toward
the wetland.
*This condition has been met.
23. Type III silt fence shall be provided adjacent to all areas to be preserved as buffer or, if no
buffer is to be preserved, at the delineated wetland edge. Silt fence shall be provided as needed
to prevent sediment from leaving the site.
* This condition still applies.
24. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1.
* This condition still applies.
25. All exposed soil areas shall have temporary erosion protection or permanent cover for the
exposed soil areas year round, according to the following table of slopes and time frames:
T)W of Sloe
Steeper than 3:1
10:1 to 3:1
Flatter than 10:1
Stabilized within
7 days
14 days
21 days
These areas include any exposed soil areas with a positive slope to a stormwater conveyance
system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage
ditch or other natural or man-made systems that discharge to a surface water.
* This condition still applies.
26. Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as needed.
* This condition still applies.
27. Based on the proposed developed area of approximately 3.09 acres, the estimated total SWMP
fee, due payable to the City at the time of final plat recording, is $11,041.
Mr. Todd Gerhardt • •
Walnut Grove 2°d Addition
June 14, 2004
Page 7
* This condition shall be modified as follows: Based on the proposed developed area of
approximately 1.64 acres, the estimated total SWMP fee, due payable to the City at the time of
final plat recording, is $3,360.00.
28. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g.,
Riley -Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency,
Minnesota Department of Natural Resources (for dewatering), Minnesota Department of
Health, Carver County, Metropolitan Council Environmental Services, etc. and comply with
their conditions of approval.
* This condition still applies.
29. Prior to final plat approval, a professional civil engineer registered in the State of Minnesota
must sign all plans.
* This condition still applies.
30. Sanitary sewer and water hookup charges are applicable for each of the new lots. The 2004
trunk hookup charge is $1,458 for sanitary sewer and $2,814 for watermain. Sanitary sewer
and watermain hookup fees may be specially assessed against the parcel at the time of
building permit issuance. Hook-up charges are based on the number of SAC units assigned
by the Met Council for each lot.
* This condition still applies.
31. The applicant will be required to meet the existing site runoff rates for the 10-year and 100-
year, 24-hour storm events. The proposed pond must be designed to National Urban Runoff
Program (NURP) standards. The storm sewer must be designed for a 10-year, 24-hour storm
event. Drainage and utility easements shall be dedicated on the final plat over the public
storm drainage system including ponds, drainage swales, and wetlands up to the 100-year
flood level. The minimum easement width shall be 20 feet wide.
* This condition has been met.
32. Tree preservation fencing must be installed at the limits of tree removal. The applicant
should be aware that any off -site grading will require an easement from the appropriate
property owner.
* This condition is a duplicate and can be deleted.
33. The applicant must enter into a development contract with the City and supply the necessary
financial security in the form of a letter of credit or cash escrow to guarantee installation of
the improvements and the conditions of final plat approval.
* This condition still applies.
Mr. Todd Gerhardt • •
Walnut Grove 2°d Addition
June 14, 2004
Page 8
34. Submit detailed construction plans and specifications for the public utility improvements
before final platting.
* This condition has been met.
35. Construct public utility improvements in accordance with the City's latest edition of
Standard Specifications and Detail Plates.
* This condition has been met.
36. Installation of the private utilities for the site will require permits and inspections through the
City's Building Department.
* This condition still applies.
37. Seed and mulch or sod the site within two weeks of grading. Submit a haul route for City
approval prior to any hauling.
* This condition still applies.
38.On the grading plan:
a. Revise the side slopes along the east side of the private drive to be a maximum of 3:1 or
install a retaining wall.
b. Add Type III silt fence along the secondary bluff creek zone line on the south side and
Type II silt fence along the west and east sides of the grading area.
c. Show a minimum 75-foot rock construction entrance.
d. Show all existing and proposed easements.
e. Add a bench mark.
f. Show the storm sewer manhole rim and invert elevations.
* This condition has been met.
39.On the utility plan:
a. Show the proposed utility lines 10 feet inside the property line.
b. Add a note "connection to existing manhole must be core drilled."
c. Show sanitary manhole rim and invert elevations.
d. Show all existing and proposed utility easements.
e. Show the location of existing water and sanitary services to Lot 1.
* This condition has been met.
40.On the street and storm plan:
a. Last storm manhole discharging to the pond must include a 3-foot sump.
b. Show the proposed and existing street easements.
* This condition has been met.
Mr. Todd Gerhardt • •
Walnut Grove 2°d Addition
June 14, 2004
Page 9
41. Add a legend to the plans.
* This condition has been met.
42. The driveway easement must be 30 feet wide with 20 feet of hard -surface pavement and built
to a 7-ton design.
* This condition still applies.
43. Submit an inspection report certifying that the private street is built to a 7-ton design.
* This condition still applies.
44. Elevation of lowest house opening must be three feet above high water level of the proposed
pond.
* This condition shall be revised as follows: Elevation of lowest house opening must be two
feet above high water level of the proposed pond.
45. A 30-foot wide public drainage and utility easement must be dedicated on the final plat over
the public sewer and water lines.
* This condition has been met.
46. Stricture setbacks shall comply with the following table:
Setbacks: front, rear, side, Bluff Creek primary zone, wetland
buffer
Lot 1
30, 30, 10, na, na
Lot 2
30, 30, 9, na, na
Lot 3
30, 30, 9, 40, 40
Lot 4
30, na, 9, 40, 40
* This condition still applies.
In addition, based on review of the development construction plans, the following conditions are
recommended:
• Show the watermain pipe size and type on the watermain profile sheet.
• Add the City erosion control fence detail plate no. 5300.
RECOMMENDATION
Mr. Todd Gerhardt
Walnut Grove 2°d Addition
June 14, 2004
Page 10
Staff recommends that the City Council adopt the following motion:
"Me City Council grants final plat approval of Planning Case #04-10 creating four lots and one
outlot, with lot width variances for Lots 2, 3 and 4 and a one -foot side yard setback variance for
Lots 2, 3 and 4, subject to the following conditions:
1. The developer shall pay $8,400.00 in park dedication fees at the time of final plat recording.
2. A final grading plan and soils report must be submitted to the Inspections Division before
permits will be issued.
3. The old individual sewage treatment site for the existing home must be abandoned in
accordance with MPCA regulations.
4. A 10-foot clear space must be maintained around fire hydrants, i.e. street lamps, trees,
shrubs, bushes, Qwest, Xcel Energy, Cable TV and transformer boxes. This is to insure that
fire hydrants can be quickly located and safely operated by firefighters. Pursuant to
Chanhassen City Ordinance #9-01.
5. "No Parking Fire Lane" signs will be required on the new private street. Pursuant to
Chanhassen Fire Prevention Policy #06-1991. Copy enclosed.
6. Tree preservation fence shall be installed at the edge of the grading limits prior to any
construction. Fencing shall protect trees on proposed lots as well as trees in neighboring
properties located next to the grading limits.
7. Any trees lost due to construction that are not shown as such on plans shall be replaced at a rate
of 2:1 diameter inches.
8. A minimum of one overstory tree will be required in the front yard of each lot. One overstory
tree, two understory trees, and four shrubs shall be planted along Galpin Boulevard on Lots 2
and 3.
9. A final grading plan and soils report must be submitted to the Inspections Division before
permits will be issued.
10. A wetland buffer 0 to 20 feet in width (with a minimum average of 10 feet) shall be maintained
around the wetland. The wetland buffer shall be 0 along the east side of the wetland and 20
feet on the north and west sides. Wetland buffer areas shall be preserved, surveyed and staked
in accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge
signs, under the direction of City staff, before construction begins and shall pay the City $20 per
sign.
11. The grading and erosion control plan shall show the actual wetland buffer widths proposed to
meet the minimum average buffer width requirements as well as the 40-foot wetland buffer
setback. All structures shall maintain at least a 40-foot setback from the edge of the wetland
Mr. Todd Gerhardt •
Walnut Grove 2°d Addition
June 14, 2004
Page 11
buffer or, if no buffer is to be preserved, from the delineated wetland edge.
12. The primary zone boundary shall be amended to include the wooded area in the rear
(westemmost) portion of Lot 4.
13. A conservation easement shall be dedicated over the primary zone. All structures shall maintain
at least a 40-foot setback from the primary zone. No disturbance of the site shall occur within
the fast 20 feet of the setback. Open space shall comprise 100% of the primary zone.
14. Riprap and geotextile fabric shall be installed at the flared end sections of the inlet and outlet of
the storm water pond.
15. Type III silt fence shall be provided adjacent to all areas to be preserved as buffer or, if no buffer
is to be preserved, at the delineated wetland edge. Silt fence shall be provided as needed to
prevent sediment from leaving the site.
16. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1.
17. All exposed soil areas shall have temporary erosion protection or permanent cover for the
exposed soil areas year round, according to the following table of slopes and time frames:
Type of Slope
Steeper than 3:1
10:1 to 3:1
Flatter than 10:1
Stabilized within
7 days
14 days
21 days
These areas include any exposed soil areas with a positive slope to a storm water conveyance
system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage
ditch or other natural or man-made systems that discharge to a surface water.
18. Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as needed.
19. Based on the proposed developed area of approximately 1.64 acres, the estimated total SWMP
fee, due payable to the City at the time of final plat recording, is $3,360.00.
20. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g.,
Riley -Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency,
Minnesota Department of Natural Resources (for dewatering), Minnesota Department of Health,
Carver County, Metropolitan Council Environmental Services, etc. and comply with their
conditions of approval.
21. Prior to final plat approval, a professional civil engineer registered in the State of Minnesota
must sign all plans.
22. Sanitary sewer and water hookup charges are applicable for each of the new lots. The 2004
trunk hookup charge is $1,458 for sanitary sewer and $2,814 for watermain. Sanitary sewer
Mr. Todd Gerhardt
Walnut Grove 21d Addition
June 14, 2004
Page 12
and watermain hookup fees may be specially assessed against the parcel at the time of
building permit issuance. Hook-up charges are based on the number of SAC units assigned
by the Met Council for each lot.
23. The applicant must enter into a development contract with the City and supply the necessary
financial security in the form of a letter of credit or cash escrow to guarantee installation of
the improvements and the conditions of final plat approval.
24. Installation of the private utilities for the site will require permits and inspections through the
City's Building Department.
25. Seed and mulch or sod the site within two weeks of grading. Submit a haul route for City
approval prior to any hauling.
26. The driveway easement must be 30 feet wide with 20 feet of hard -surface pavement and built
to a 7-ton design.
27. Submit an inspection report certifying that the private street is built to a 7-ton design.
28. Elevation of lowest house opening must be two feet above high water level of the proposed
pond.
29. Structure setbacks shall comply with the following table:
Setbacks: front, rear, side, Bluff Creek primary zone, wetland
buffer
Lot 1
30, 30, 10, na, na
Lot 2
30, 30, 9, na, na
Lot 3
30, 30, 9, 40, 40
Lot 4
30, na, 9, 40, 40
30. Show the watermain pipe size and type on the watermain profile sheet.
31. Add the City erosion control fence Detail Plate No. 5300.
ATTACHMENTS
1. Final Plat.
gdplan\2004 planning c \04-10 - walnut grove 2nd addition\walnut grove 2nd fp.doc
WALNUT
GROVE
2ND ADDITION
KNOW 4L NE1V BY MESF pF[YNISI mot ........ OeMlopmenl, In
wfbn. N• ovnn aI ID• IellorHp a„nm•d prep,rtY •Ilua M1e M CvunlY e/ Cer m, stole o/
uMmm, to r/n
nnwy pnn/y meet I now •urwYM we gerr.d m. pwpnb d••vmM m InN plot d• wlLNur
G40K., .IOOl Il0.V; In oI In, N a [vent n of N• r WI
Mot pf. [r m. seven«,I 6ra,M1, o/ s«non ra ra rnNn IrE, amw zx Cm wr cwnlx
o m Amt .?
Mown on me m het me nun beeln. o Mot: not dl mmumwe•
. m 1 m to ed'
MMn«alo. a I1. os n:
w e«o m «Ilr Am
fA. I Ine rui p. ,Mc« m . provne « M . re
It, A I.
Ito.
Commm[Of el !n• Wrt." ron M $«Irm
1 Ih,nu on oo eI
lm sloluhe, A. lobe. I; Mat combo Doundar Y Iq« 1.. fly
meet [en a
e/ SoulM1 01 Mp,•, M m «.0 •• « Co.,loop !M NY,1 Im• eel wld J uMr,rt
.1 -1 ..1 .,
11.1.1
tle,leroNe on Ih• pub me M« Mw do .,..I /we• o. e•M.d H umn.«m same« s«IM
amol o o/ r.1 .lr / m ee mmur11 ). «[we• £e.r.
e e
Jox az, wee I or even[ n/pnwap m D. a npn[lee omv mm o. ,nown.
=
.1 "Iff
rrpo,.r h port! 1. ]. bot 1 and .
. a nroL21. v
.aa .- a n ntaa. .oa
... . o
p,mv N ]Onm .. 0p • or" mm pomc I
swln«ele Men.• floc•
I I t, I
I.d «b a- o dYbn[e [/l.11 Not, cw nnple O
fewom A Otte. Lme s wnpr
toff« .p I es: oo c. Sovlh IL I) .0 .ec.I, W«f oboe loop n1.
1
Nmnnvto Lk n« Nome« n]N
1 1- ...,e
el" /«Into f.. o[lud paml of ,., rc[I to A. Inene.
e^uof
ep .Ado, I 111.4
re ee...n Mph• .a n/ zep.rm r.
e�dnlp�c.
srl lr Of NINNFSOr
M . m al axle her ro a p.mr
m..,« smm eJ d.m..• v mmuN. 03 •.awdncam
rnuNlr w wmwI
Mel M1 hx.nRn nhme to v PeMt I.
l.dl A N Mwane ee Depgngp of .1 .It of I11.1m.l. a/ 11. .,If., Npnl-ol-ro
my
IM. e/ Mmn.wla IrvnY 11',q No. 1 and a dd.. ,1,100 N.I ..'d..... It moo=
of rlpDI -,AA fa e A. mod M. a.e.. el Cam, Lovnfy ..I Na. "' toed .
Oft Ad mod,mol .wqp If No,M la eem«e 11 moo,ter IO «ttnM on Earl e paMhl mod
Me -M,.. ofbA., Cum.cCd,, Roo, Np Ill,o molni« o/..W.1 to wb I.,
mwa. n rob vo.1 A. swlo m ,w,... 11 mMpn. w sop M.orl e«t o dNlance o1
zen n N.L m.n« .1h rJ ammo.. 11 mmvl...O do -do o 11.1- v/ 11e Ja
N.e odwoe N M n Mpm, U mN,f., zO «[wee NYre a di-, of 30000 N.f la
M. pexl o e.o,o,00
ANc
Mot awl o/ M. seumn.e cart.. of s.[IM ra I moodo "A Amp. zJ. coo-
c,mmweowlx
--. a«crm.e a, taro«:
cmp or . w«I Wart.,[am.r Co. sOft, . Men« on m S.dlh .Il
boomop
o/ loam M do,.. xe mural.. .0 r«wd. for olwp M. . Im. o/ role soumrea
I dl.t , a Of 111" of 1. M h.f: m NerM Se .1 . a] m ., o z0 .molt foal,
I dl.ann oI Imar Mh, Men[. a samy v el,1. co a/ ] 1. r➢ h.l oboe o tarn oaf
r d r[,p.d of ram [a w m Me oo n new.
Ju]A ha me o meM ow0 of a dw,•e..o Mulw 1 11,1.., ane m. Mme o/.ole
n Dom spurt IJ Mpr.I..0 minulw JJ .«on, Mr fo I, oof, of e.ff, of M.
mo[r fee b. d rc lo.l. 111 I. [[nfMulnp laufD.rly, o ,blur« oI1601 N.1 alone I.
n la In. "" do-, o m". of le. Jc N."o dom. mpl. o/ 01 ,ern
zd mural., M A*-^ mwn scam 1e eemee8 n mNb mmahe 40 eAce. c tmp.nt to
wld turn, a dNfmcA al oe.00 het: If -loom )I 1,Il mmvhr 20 .nmM East
e dhfmn If
J0000 Net, 1.- Am. IS ce, Il MN.Ns e0 1,. .1, [ ..,.
el mo. mt M Nmm 11 .1.a mmaln e0 .nmee wort a dMmc. of ]ar.01
b.f a M. v.mr el ewmnmp.
emwf P-AA net of Mmnnola aAII-mo t o/ Immwamnm Alpo! DI Ry Plot No lo-0e.
o[caMmp m to. 'mod", .1 .-.
Nor 1..r, If..om. to A..-,mt mo v.fla n .1.1 ONOK .0 A.MMO and dv«
n-od, dmoN me e.ermh m M. p.em /w paem ar. Im.n M. tad and me. do..., me
rc«maN w Morn m MN Prot lee abagap. vnd 0111, papa.« udy
rin.n M..ml am .,ehaN 0.«lopmmt m Il -,. cmaavllm, too I...
porn. a 1. Wed' Al Ih prow olMn mY - evy or 21--
ALMcclylurz OE1¢[WYEN2 mc.
R. N.umd m Pn•le.,l
sIA 1E Lr Nrrweso rA
.1 OE
Me M1v eome m.wmmr r« ocwndrl.dp« 1.1 m. mM1 - oor of
e0- ey Mod. e, N.ymd p .Mml 01 %IMp•Mul• 0.wvpmae In... o N om-1.
cmm-tn m eMo11.1 M. loolllm,
NufvY Publq Lount% YMn.w 10
Yy L.mm.,lm Cwb«'
Me bnpomp Mefrvmwl woowleepM OeMv me me - day of
Dy feword .A 011.. Lone Shc,, MMnnob Lknee Na, 110
Notary lode .10, Ceunl% ..-I.
Ny cnnmN.lm Cwln•:
C., sW K19e. Cam. cowl, Moo..om
A.--, fe C mole, "A odour-1. Lor• o/ 191,, Ih4 plol do. I... omd,O. MN epY
o/ __ zp-
damn c r ^ coffee c.mfy S.,o,
LNANNAssM. MIHNESOM
roh It of .1.1.v . wm M Al .oe moom. end ««vhe At, M. cry coo dd
al Me .1y a1 Monnar«n. MMnerofa, al o to ml m«IMp d. MN My o/
20- and 1. M [o F.O. AIM Ine 1... of MNn«oa slofah;
Loll- SOICJ, subd 1 All M-0119 em b. oef o• w,dMd by Me ply Laum[tl and as ebNe
an MM1 pmf, xmme., fd MHnnvlo SoMI., 3010 .. A. I.
pm COUNCN OE mf 01 Cf CN .ssfN, NrNNfsOrA
Nap, le"
cwmm AYMI.,, Ltlmr C.11, .-0.
I Dever [vllb mot N- an to dYmvaml I... M ou p 1. to/w
fund d Iofr m m, mat me Mmader .ntme W tee mor _ dot o/ e0�
Nary wn,m.>• cmw, cam. AwAof
ax
COON IY AEASWfA, Cww cwnf% Nmnnry
I -, -11, Ine, M. mm papelA M M. pw _ for Lme enamel m mlr A., Is
e•.tf,.. 210 ACOIM%4 non b«n part m 111. - evr u/
zo_
r RMY. L,m v Coanfr r,«•a w
A,
CWMY ercm A, cunw Cvanl, .,-to
h I .Ml lfmof Imo, MN plot .I .1101 G"W 21D AONMW .a Adel Imh Wy
01 Po- of . [loci -N o. Mood-, Np
Lad w Nmem Ah. c do, I..
CY Y OF CHANHASSEN
RECEIVED
MAY 1 6 2004
CHANHASSEN PLANNING OEPT
QTTO
WALNUT GROVE 2ND ADDITION
-� J�,� � <,•,y �,y
I �\
t!r \ KID) ADn'O.
�Q
4.AY.NOL.L'U V�L111'1.4iMNR �YYP4Y.�.',IX9'
I �f
I I
Y a+l
1 I
1 J L
N
g41�,wnN
�lr%nq it
� �v..r
m
u I.n Y'tlYra
Qii?
MY OF
CENSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952,227.1110
Building Inspections
Plane: 952.227,1180
Fax: 952227.1190
Engineering
Phone: 952.227.1160
Fax: 952227.1170
Finance
Phone: 952.227.1140
Fax: 952,227.1110
Park R Recreation
Phone: 952227.1120
Fax: 952 227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning It
Natural Resources
Phone: 952,227.1130
Fax: 952.2271110
Public Works
1591 Park Road
Phone. 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952,227.1110
Web Site
www.ci.chanhassen.mn.us
March 5, 2003
Ms. Kelly Dlouhy
Kjolhaug Environmental Services Co.
26105 Wild Rose Lane
Shorewood, MN 55331
Re: Bluff Creek Primary and Secondary Zone Boundaries between Galpin Boulevard
and Banebeny Way West
Dear Ms. Dlouhy:
City staff visited the above site on November 18, 2002 to establish approximate
boundaries for the Bluff Creek primary and secondary zones. In determining the
boundaries, the city considers vegetation, slope, habitat area, hydrology and contiguous
ecosystems. Since then, you have raised several questions regarding the regulations
pertaining to development on this site.
The regulations goveming the Bluff Creek Overlay District are in Article XXXI of the
Chanhassen City Code (enclosed). Both primary and secondary zone boundaries are
generally delineated in the Bluff Creek Watershed Natural Resources Management Plan
and on City land use maps. An aerial photograph of this property including the
boundaries that appear on City land use maps is enclosed.
The primary zone is the area within the watershed that directly impacts Bluff Creek
and/or its tributaries. The primary zone is intended to be preserved as permanent open
space. In addition, Section 20-164 states: "All structures shall be setback a minimum of
forty (40) feet from the Primary Zone. No disturbance of the site shall occur within the
first twenty (20) feet of such setback."
The secondary zone is the buffer zone that contains habitat areas that are valuable to the
delicate balance of the Bluff Creek ecosystem. The secondary zone is subject to
development limitations (minimization of vegetation removal, impervious surface and
grading, etc.) in order to reduce the impact of new development on the primary zone.
City staff has determined the boundaries of the Bluff Creek Overlay District for the above
property (enclosed). As with all administrative decisions, the applicant may appeal
staffs determination of the watershed zone boundary and type to the city council.
If you have further questions, please contact me at 952.227.1135.
Sincerely,
CITY OF CHANHASSEN
Lori Haak
Water Resources Coordinator
Enclosures
cc: Robert Generous, Senior Planner
Jill Sinclair, Environmental Resource Specialist
The City of Chanhassen • A :vo s%ng community with clean lakes. quality schoolsa charming downtown thriving businesseswinding trails, and beautiful parks_ A great place to livework, and play.
Klingelhutz Development
Galpin Blvd. and Baneberry Way West
&uH Creak COmi r (mwp )
SAg ► uvugi dpi 1IL; Jur VUY
<3 egg
�SoR� i3I
'gIII/ Z
(INry
e7r �
Np
�T-�i ii'\ J \ \� a� aO 3e*• —\��\
�aaoo// / _d /
/ Y % / / Q
oo&ma //I 1 /14
��{J j/////�� �/ •t�// �f m_ / NO m /�//�� %/ / I°#�/Pml'° 1� /
'z
of I 1 m� / / / / / / / / / 4y /
= 1 £
y m Itij
b N / / i
a96 y 6 r
go#- I 1
m x p itr
S voenm� N 'O @ 2 1 eyr I 3 jib
In
°m° ggxx A $ LY v pv I / O
r4
denot,
denote
and rr
A denot
G denot
es iron monument found
s iron pipe set
arked as shown: a m
0
es soil boring
=s percolation test hole
Topographic Survey on
parcel In the SW 1 4 Of
p
Sec. 10, T. 116, R. 23,
Carver County, Minnesota
Requested "y'
Kl i n g e l h u tz Development
I herby certify that tW* survey,
plan, or report was prepared by me
ora� the °` my di supervision and
that I am a duty uaensed Land
SuStale of Minnesota. surveyor under the io.s or the
Web Site:
www.offoassociates.com
9 West Division St.
TT Buffalo, MN 55313
SSOCIATES Ph: (763)682.4727
Far..(763)662J522
Engineers and Land Surveyors, Inc.1-02-0568
Revised:
t/.V w aN.w
.esww
Date:
111119102
Drawn By.
D.N.A.
Scale:
1 " =40
Checked BY
Job No.
�;: E. Otto �119e 4.D62
CHANHASSEN CITY COUNCIL
REGULAR MEETING
SUMMARY MINUTES
APRIL 12, 2004
Mayor Furlong called the meeting to order at 7:32 p.m. The meeting was opened
with the Pledge to the Flag.
COUNCIL MEMBERS PRESENT: Mayor Furlong, Councilman Labatt, Councilman
Ayotte, Councilman Lundquist and Councilman Peterson
STAFF PRESENT: Todd Gerhardt, Justin Miller, Roger Knutson, Bruce DeJong, Paul
Oehme, Matt Saam, Nate Bouvet, Kelley Janes, and Kate Aanenson
PUBLIC PRESENT FOR ALL ITEMS:
Rich Slagle
Debbie Lloyd
Planning Commission
7302 Laredo Drive
PUBLIC ANNOUNCEMENTS: Mayor Furlong announced that item 4, request for
funding streambank stabilization project, Christmas Lake Homeowners Association will
be tabled per staff recommendation.
CONSENT AGENDA: Councilman Peterson moved, Councilman Lundquist
seconded to approve the following consent agenda items pursuant to the City
Manager's recommendations:
a. Approval of Minutes:
-City Council Work Session Minutes dated March 22, 2004
-City Council Summary & Verbatim Minutes dated March 22, 2004
Receive Commission Minutes:
-Planning Commission Summary & Verbatim Minutes dated March 16, 2004
b. Resolution #2004-16: Approve Playground Purchases; Meadow Green Park and
Bandimere Community Park.
C. Resolution #2004-17: Approval of Plans & Specifications; Authorize
Advertising for Bids, 2004 Street Reconstruction Projects, Project 04-01.
d. Resolution #2004-18: Award of Bids, Vehicles & Equipment Included in the
2004 Capital Improvement Program.
(e / e. / Approval of a Request for Rezoning of 3.09 Acres from A2, Agricultural Estate
District to RSF, Single Family Residential; Subdivision Approval Creating Four
City Council Summary gpril 12, 2004
Lots with Variances; and a Conditional Use Permit for Development within the
Bluff Creek Corridor, Klingelhutz Development, Walnut Grove 2od Addition.
f. Resolution #2004-19: Resolution Approving the Limited Use Permit for Non -
Motorized Recreational Trail from CSAH 17 to Carver/Hennepin Line.
All voted in favor, except Mayor Furlong who abstained on item 1(e), and the
motion carried.
VISITOR PRESENTATIONS:
Roger Behrens, 8780 Flamingo Drive brought up the issue of traffic lights on Highway 5,
particularly at the intersections of Powers Boulevard and Market Boulevard. Todd
Gerhardt stated he would notify MnDot of the problem. Greg Swirtz, President of the
Christmas Lake Homeowners Association stated he was present to discuss item 4 which
was tabled. He provided background information on this project.
/;Iq
B. REQUEST FOR PRELDHNARY & FINAL PLAT APPROVAL TO
SUBDIVIDE 2.1 ACRES INTO THREE SINGLE FAMILY LOTS WITH
VARIANCES.
C. APPROVAL OF CONSTRUCTION PLANS & SPECIFICATIONS AND
DEVELOPMENT CONTRACT.
Public Present:
Name Address
Tom Goodrum
Tom Rollings
Maryevelyn Monty
Larry Tivy
Mary Ann McCauley
Darlene & Don Miller
Debra C. Schultz
David Santana
Janice Andrus
Don Sennes
James & Richard Frerich
9841 Xerxes Curve
4550 Weston Lane
370 Pleasant View Road
370 Pleasant View Road
410 Pleasant View Road
396 Pleasant View Road
6614 Horseshoe Curve
6614 Horseshoe Curve
449 Pleasant View Road
6680 Mohawk Drive
651 Broken Arrow Drive
Kate Aanenson presented the staff report and provided the Planning Commission update.
Mayor Furlong asked for clarification on the vacation of the private street. He then
2
City Council Meeting 9pril 12, 2004
•
04- 1 v
e. Approval of a Request for Rezoning of 3.09 Acres from A2, Agricultural Estate
District to RSF, Single Family Residential; Subdivision Approval Creating Four
Lots with Variances; and a Conditional Use Permit for Development within the
Bluff Creek Corridor, Klingelhutz Development, Walnut Grove 2nd Addition.
f. Resolution #2004-19: Resolution Approving the Limited Use Permit for Non -
Motorized Recreational Trail from CSAH 17 to Carver/Hennepin Line.
All voted in favor, except Mayor Furlong who abstained on item 1(e), and the
motion carried.
VISITOR PRESENTATIONS:
Roger Behrens: Sure, good evening everybody. My name is Roger Behrens. B-e-h-r-e-
n-s. I live at 8780 Flamingo Drive. I think you've got quite a number of folks here on a
busy agenda. I want to talk about traffic lights actually. Maybe get some information
and to express some observations that I've noticed. On Highway 5, particularly starting
from Powers Boulevard, where Highway 5 and Powers intersect. Highway 5 and Market,
almost all the way through to Dell but in particular the Market intersection and the
Powers intersection, let's put it this way. It's very difficult to cross over Highway 5,
getting to the other side in the morning and in the evening. There might be some
problems in particular with the Powers one. I've noticed later at night, the left hand turn
signal will skip, or I don't know if it's laser guided but I'll be sitting there. It will go
through the fast one. No left hand turn signal. And then the second time around it will
hit it and you can go and sometimes I was there for 5 minutes trying to make a left onto 5
onto Powers. In the morning the Market Street one, and I use the park and ride. When I
just miss the left hand turn signal, I waited as long as 5 minutes one time. Now in a
vacuum 5 minutes doesn't seem like a long time. When you're trying to catch a bus in
the morning, it can seem like forever. I don't know, I'm sure there's been traffic studies
done. I don't know if this is the fast time you've heard about it. I realize there's a lot of
other important things on the agenda. I just wanted to bring it up as something that's
been kind of bugging me lately. I don't know what can be done. And particularly when
it skips in a cycle too, that can be frustrating. I don't know, that tends to happen, it's
happened more than once. It tends to happen when I'm not up, right up to the line
perhaps. Maybe it's a laser guided thing. I don't know. I'm just here raising the issue so
appreciate the time.
Mayor Furlong: Okay. I guess what we'll do is look into, unless Mr. Gerhardt there's
any comment at this point with regard to those signals.
Todd Gerhardt: We will look into it. MnDot has some control over those but we will be
working with MnDot to make sure that they're operating properly.
Mayor Furlong: Thank you for bringing it to our attention. We're still within visitor
presentations, if there are others? Good evening.
2
0L4-1(�)
Planning Commission Meeting — March 16, 2004
RECONSIDERATION OF SUBDIVISION OF WALNUT GROVE 2Nn
ADDITION. JOHN KLINGELHUTZ, PLANNING CASE #04-10.
Public Present:
Name Address
Susan Remaley 2198 Baneberry Way West
John Klingelhutz 1560 Bluff Creek
Erik Johnson 350 E. Hwy 212, Chaska
Elissa Ellefson 2194 Baneberry Way West.
Bob Generous presented the staff report on this item.
Sacchet: Thank you Bob. Any questions from staff?
Claybaugh: Bob, refresh my memory. Why weren't we using some vehicle to choose
density transfer on this one?
Generous: Under the low density residential land use guiding, the PUD ordinance does
not permit density transfer or cluster development. You would be able to, the minimum
go down to 11,000 square foot lot but you'd have to average 15,000. We weren't really
gaining anything. We can do it via this mechanism through the approval of the variances
to the lot width and the side yard setbacks to make these houses work on the property.
Claybaugh: That's all I had.
Sacchet: Rich.
Slagle: Bob, just a quick question. You mentioned that the applicant in your opinion has
come forward with a better plan. I unfortunately was not here the first time this
application came before us. Is it possible in just a minute or so to tell me what you view
as the improvements.
Generous: Well unfortunately I left the old plan together but previously they had 4 new
units versus the 3 that they're proposing here. They have lot lines that were configured
that made people uncomfortable. They weren't straight and rectangular. It's easier, we
preserved a significant block of the primary zone and an outlot. They provided the turn
around area on their property rather than using the existing turn around. And then of
course they're meeting the lot area requirements for this so the 15,000 square feet has a
big lot. We know these can't be further subdivided because they're at the minimum now.
Outlot A will be at a minimum have a conservation easement and drainage and utility
easements over it. Preferably it will be dedicated to the city, however that's really up to
the developer. Either way it will be protected but we can't take it as an exaction because
we don't need it specifically for park purposes.
20
Planning Commission Meeting — March 16, 2004
Slagle: Okay, fair enough.
Sacchet: Any other questions from staff?
Feik: Just one. Bob, we've seen this a number of times, and I'll ask this to the applicant
as well. There are a whole lot of conditions on this deal, and I understand how we got
there so I'm not griping about that at all. I'm just concerned that we've reviewed or
you've reviewed with the applicant all these conditions and everybody is pretty much
bought off on them.
Generous: The majority of them are fix up for the final plat.
Feik: I know they are so, but there's way too many to go over and I'm just making sure
that those have been adequately reviewed with the applicant.
Generous: Well I haven't discussed it personally with him but they had the documents.
Feik: Okay, thank you. That's it.
Sacchet: Steve.
Lillehaug: I do have some questions. Condition number 3. Sewer and water services up
to, on all four lots. So do we anticipate the sanitary and water main services coming up
from the private drive?
Generous: Yes.
Lillehaug: And then up to the north? To that existing house.
Generous: Correct.
Lillehaug: Okay. And then in the same line, I think it'd be condition 5. I assume that
existing house has an old sewage treatment system.
Generous: That was the building official's assumption, yes.
Lillehaug: Somewhere on site it's buried because it's not hooked up to sanitary and
water main I would assume, right? So in your condition, what does abandonment consist
of? Does it mean totally removing it, because I mean I wouldn't want to just abandon
you know and sitting right behind the proposed house for Lot 2.
Generous: I don't know if they have to fill it and.
Saam: Commissioner Lillehaug I'll just add, if you're talking about the septic tank that
might possibly be in back of the house. Typically they do allow them to fill them with
concrete and leave them in the ground. Or they can take them out. It's up to, you know
21
Planning Commission Meeting — March 16, 2004
if it hinders the construction, typically they'll be taken out, but if not, they may choose to
leave it in the ground.
Lillehaug: And then one other question would be the storm sewer line running between
Lots 2 and 3. One of the conditions indicate to change that, well it's shown as 9 on the
very fast sheet. 9 feet on each side of the property line and one of your conditions say
change it to 10 feet. It's only I foot in each direction but I know that 1 foot is a lot when
we're talking in this area here. Has that fully been looked at? Is that, I mean I would like
to see a 20 foot easement over that storm sewer also. Is that something that the applicant
is aware of and can do in this case?
Saam: Again I have not spoken to the applicant. I know they have received the packet.
I'm not sure if it's a concern of their's or not.
Lillehaug: Okay.
Saam: Something will have to be done to the house though because they are at the side
yard setback of 10 feet.
Lillehaug: That's all I have, thanks.
Sacchet: A quick question. Actually 2 or 3 of them. First of all, the outlot. Who's going
to own the outlot?
Generous: The developer would own it and that'd be dedicated to the city.
Sacchet: The developer would own it but he would sell the other lots to somebody who
lives there and then he would be the owner of the outlot?
Generous: Correct.
Sacchet: Okay, I guess that would be a question for the applicant.
Generous: He did mention to me that he'd probably dedicate it but it's.
Sacchet: Because yeah, I mean it seems kind of an open ended thing. And it says that 2
out of these houses are walkout and I is lookout. Am I correct by assuming that the
middle one is the lookout?
Generous: No, the southerly one.
Sacchet: The southerly one is the lookout. And the middle one is a walkout? Is there
enough elevation for that?
Generous: Yes.
22
Planning Commission Meeting — March 16, 2004
Sacchet: 'There is, okay. Alright, thank you for clarifying that. Then there's a comment
in the grading section on page 4 of the report. It says the proposed slopes along the east
side of the new private driveway are steeper than 3 to 1. And I have a hard time seeing
how that works on the drawings. I was just looking also at the grading thing. Can you
explain that a little bit? And also it seems like that private road is very narrow, if you can
help me out with that one too I'd appreciate it.
Saam: Okay, first the 3 to 1 issue. Zoom in here Nann. Thank you. It's right in this area
Commissioner Sacchet.
Sacchet: Oh, it's not the whole length. It's just a part...
Saam: No, really just at the north end where they're tying in and the street width, I do
believe meets the 20 foot. Yeah, it's 20 foot wide.
Sacchet: Okay. And to mitigate the steepness, they could just do a little different grading
or possibly retaining wall...
Saam: Yeah, small retaining wall.
Sacchet: But it would be minimal? It wouldn't be anything...
Saam: Yes, very minimal.
Sacchet: Okay. Okay, thank you very much for answering that. Yes Craig, do you have
another one?
Claybaugh: Yeah Matt, with respect to the private drive. We've talked in the past about
requiring an independent testing. Did I overlook the condition for that or is that not
included?
Saam: I believe we have it. I thought I caught that. There's a condition for inspection.
If you give me a minute I'll look it up and get back to you.
Claybaugh: Then coming back and dove tailing the chairman's question with respect to
the outlot, potentially if the developer retains ownership of the outlot, and at some future
date they could sell that outlot to an adjacent property owner, who then in turn could
acquire that square footage to make primary changes to, hypothetically if there's an
adjacent property that needed additional square footage to further develop their land, they
could actually be acquiring that square footage from the outlot and we could have a
similar situation of what we're looking at tonight somewhere down the line where
someone could come and say well, we want to do a variance for density transfer because
we have all the square footage but this area is bluff and it's not developable. Is that
plausible?
23
Planning Commission Meeting —March 16, 2004
Sacchet: Hope not.
Saam: I believe we are getting a conservation easement over that entire area.
Claybaugh: I just want to make sure that someone else, the adjacent property doesn't
benefit in the same way that we're looking at this property with a different set of eyes
because it is a challenging property with respect to the bluff area. If you had an adjacent
property to it and acquired that same bluff area, that same scenario could come to pass.
What I'm asking is can you address that and say that no, that cannot happen or do we
need to look at what the possibilities are for the city having that dedicated to them as part
of this process.
Generous: I'm trying to, the city owns the property to the south. The association has the
property to the east and there's conservation easements on that so those are all
encumbered. And I don't know if an encumbered property has the same benefits as an
unencumbered one. You'd have to ask an attorney. I wouldn't think that you could. The
only lot, Lot 4's the only one that conceivably could benefit from acquiring that, but then
they have a wetland in the rear and they don't.
Claybaugh: I'm just posing the question. I don't, I'm not familiar with the perimeter
properties to this. I just want to make sure the scenario that I laid out doesn't apply here.
Generous: No, someone would have to reassemble the whole thing to really make that
work and do a PUD.
Sacchet: It's too small for a PUD.
Generous: Well, yes and no. If you're adjacent to a PUD you can go under the 5 acres.
Sacchet: Okay.
Claybaugh: Is there a reason that the city wouldn't move to have that outlot dedicated
and be done with it?
Generous: Well that would be our preference, yes.
Slagle: Is it related to park and the funds that go to the trail fund?
Generous: Right. We can't take it as an exaction as part of this development. The parks
commission doesn't want it for a public park.
Slagle: Well usually Bob, if I can ask you, we usually have in our conditions or
somewhere in these applications the amount that would be contributed to the city, and I
don't see it in this. I'm probably missing it.
Generous: $8,400.
24
Planning Commission Meeting —March 16, 2004
Slagle: What page are you on?
Generous: Page 4. Well it starts on the bottom of page 3 and goes to 4.
Slagle: Oh there we go, okay. Okay.
Sacchet: Any other questions?
Claybaugh: Yeah Bob, could you just bring that full circle for me? So your comfort
level is high that that's not a concern?
Generous: Right.
Claybaugh: Okay.
Sacchet: Yes Steve.
Lillehaug: I hit on this previously. The high water level is 963.1 and our current
ordinance is either 2 feet or is it 3 feet above? Has that been.
Saam: It's 3.
Lillehaug: It's 3 feet. So the house on Lot 1 would be, and maybe, or Lot 2 and 3 would
be my concern because they're not 3 feet above that high water level. Or is that
something addressed in the report that I'm missing?
Saam: Yes, I believe it is in the report Commissioner Lillehaug, and I'll find the
condition for you.
Lillehaug: Good enough, thanks.
Sacchet: Is that it? With that I'd like to ask the applicant if you want to come forward
and add any other aspects to this. We've looked at this a couple months ago so welcome
back. If you want to state your name and address, and you might want to pull the
microphone over towards you please.
John Klingelhutz: John Klingelhutz, 1560 Bluff Creek. In regards to the outlot, the city
can have it. We don't want it. I mean we don't have to argue much about that one. I'd
sooner have the city own it than me own it and we'll make that part of our end resolution
that the city gets the park, or gets that outlot.
Sacchet: Thank you. Anything else you'd like to?
John Klingelhutz: Not really. I mean I guess we're trying to fit it in within what you
guys want. I mean we did the two quads, two twin homes. There was some problems
25
Planning Commission Meeting — March 16, 2004
with the way maybe the decks could be built in the future, so we came back and re -
looked at it and thought that this kind of housing probably would fit better than anything
and if you really wanted to see what that is, I mean we are doing a similar project to that
in Chaska right now with those same houses being built on them.
Sacchet: Okay, good. Thank you.
Feik: I have a quick question for the applicant. I know you've been through this process
for a while. The conditions are copious. You've reviewed them in their entirety?
John Klingelhutz: Yes.
Feik: And you're okay with them?
John Klingelhutz: There's nothing really in there than what we're used to doing anyway.
Feik: Alright, thank you.
Sacchet: Excellent.
Lillehaug: One question that I hit on this earlier about inbetween Lots 2 and 3. Tweaking
that a little bit and changing it from 9 feet to 10 feet. Is that possible? Because one of the
conditions is to increase that, the setback to 10 feet so it's not encumbered by the D&U
easement.
John Klingelhutz: That's tough to do.
Lillehaug: Yep. That's why I'm asking.
John Klingelhutz: Because we only have this much room to stay out of the Bluff Creek
Overlay.
Lillehaug: I guess that's why I'm asking. Do you plan on doing it? Because it's a
condition.
John Klingelhutz: I don't know how we, I actually cut down the garage some and the
garages are pretty small already. I don't know how we can get a 10 foot setback there.
We're going to have 18 feet between the buildings.
Claybaugh: Commission Lillehaug, what condition number are you on?
Lillehaug: Well it says, I don't remember which one it is. 22. D&U easement needs to
be 10 feet either side of the property line for Lots 2 and 3, so right there it's pretty clear
that the applicant.
Planning Commission Meeting — March 16, 2004
John Klingelhutz: It could be that one of those is 10 feet. We might be able to push Lot
2 over. We have a purchase agreement on the house, the old house, and in that agreement
we have 10 feet in there as being the closest that we would build another structure.
Feik: So you could move that property line northward? You can't?
Saam: Commissioner Lillehaug, if I could add one thing to this. This condition, just so
you're aware, came from the city contracts with Carver County Soil & Water to review
erosion control, grading, that sort of thing. This condition came out of that person's
review. He's not aware, and I'm sorry I didn't mention this earlier but the city doesn't
take easements over storm sewer and private streets. We consider that private drainage,
nmoff. However we will have one over the pond so that is why that condition didn't
come from us. We're not requiring a 20 foot public drainage and utility easement.
Lillehaug: So over the storm sewer between those lots you don't require that either then?
Saam: No. We would require a private easement over that, but that could be 18 feet.
Lillehaug: Sure, okay.
Sacchet: So 18 would be sufficient, is that what you're saying?
Saam: Yes. That'd be fine by us.
Sacchet: Good enough. That's what we need to hear. Any other questions of the
applicant? Okay, thank you very much.
John Klingelhutz: Thank you.
Sacchet: This is a public hearing so if anybody want to come forward, address this item,
this is your chance. Anybody want to address this? Please state your name and address
for the record.
Susan Remaley: I'm Susan Remaley, 2198 Banebeny Way West. This is where I live.
Right at the edge, and.
Sacchet: Could you point again now that we have it on the screen. Okay, thank you.
Susan Remaley: And I'd like to thank the commission and staff and also the builder. I
think this is much better than we first saw. I think everybody will agree that I think this
is a much better solution, but I do have a question regarding the turn around and maybe
Bob you could help me understand where exactly that is in this plan.
Generous: The turn around area is this hammer so that you go forward and back up and
go that way. Or reverse it. Turn...
27
Planning Commission Meeting —March 16, 2004
Susan Remaley: Okay. I'm not really familiar with that kind of a turn around. I do
know that there is a lot of traffic that does come down that street. I think a lot of people
think that they can get to Galpin that way so it is fairly heavy. There's a lot of people
that do use that turn around, and I would just want to make sure that that is pretty clear
that that is what it is, instead of people turning around in either our driveway or our
neighbor to the south. And then just one other comment. The grading. Currently on the,
I guess it would be the west side of my property. The ground is constantly wet now, in
the dead heat of summer and so I just, I don't know what can be done to make sure that
that runoff or drainage doesn't exasperate it any more. And I don't know if that's
something that's been addressed or not.
Sacchet: Can you address that?
Saam: Sure. We could try to make sure that a swale will be put in along that lot line
which would carry the water down to the street, and then there's going to be storm sewer
there which can typically.
Sacchet: So it should actually improve rather than get more aggravated?
Saam: Yes, to me it appears so. It appears that we can get that water going south toward
the street.
Susan Remaley: I just wanted to make sure that everyone understood that there's a
potential problem with the way it is right now and I didn't want anything done that might
add to that, and again just thank the commission and Bob and the builder because I do
think that this is a much better plan that we were first shown. And again my only
concerns would be the drainage and then also making sure that that turn around is a
viable solution and well marked. That's it.
Sacchet: Thank you.
Susan Remaley: Thank you.
Sacchet: Anybody else want to address this item? Yes, please come forward. State your
name and address for the record. Let us know what you have to say.
Elissa Ellefson: Hi, my name is Elissa Ellefson and I live at 2194 Baneberry Way West
and my concern is, has there been any decision as to the construction traffic? Where that
is going to be coming in.
Sacchet: I think we touched on that last time this was in front of us.
Elissa Ellefson: Right, and I don't know if that was completely decided.
Sacchet: Yeah, do we have a plan for that?
NE
Planning Commission Meeting —March 16, 2004
Saam: I guess it's something we should ask the applicant but I did take a look at this to
see if, last time it was brought up possibly routing the traffic off of Galpin. With the
amount of trees on the site, I wouldn't say it can't be done but it'd be pretty tight to have
trucks get around the existing house and garage and still miss some of the significant
trees. So if they can't come off Galpin, then they're going to have to come off Baneberry
Way West, and they do have an easement allowing them access through there so.
Elissa Ellefson: That's our main concern because those roads aren't built really I don't
think to carry heavy construction vehicles and, you know it's our residential area. We
back out onto those streets and we don't wish to have construction workers parking along
there. I mean there just isn't room with the small townhome area so that was my
concern.
Slagle: I have a question. Are you related to Tim?
Elissa Ellefson: No.
Slagle: Okay.
Sacchet: Well would it be appropriate to ask the applicant about that still in terms of
construction traffic? That's one thing we touched on last time and maybe you could give
us an idea of how you would envision that.
John Khngelhutz: I don't know if it's possible. If it is, we would try to route it off of
Galpin because I'd sooner that too but if we have to take down trees, I don't think that's
going to be possible. But if there's a possibility that we can come in and stay on our own
land and not on the existing house land that's there, we would try to do that.
Sacchet: So we could, it would be reasonable to request that there would be no parking
in the neighborhood.
John Klingelhutz: Bob and I can go out there and take a look and if he thinks we can do
it, we will do that.
Sacchet: Okay. Thank you very much. Anybody else wants to address this item? If not,
I will close the public hearing. Seeing nobody, I'll close the public hearing. Bring it
back to commissioners for further discussion. Comments. Or questions. You want to
start Rich?
Slagle: I just have a couple of thoughts and one question if I may for staff that was
thought of after hearing about the turn around from the neighbor. Bob was there any
thought given to having the private drive come in further to the west and having what I
will call a half cul-de-sac put in with the homes going further to the west? I mean in
some respects going away from the existing neighbors. I mean with 250 feet lot lengths,
I mean it seems to me there would be room and then having, like I said, like a half cul-de-
sac sort of each with their own little what I'll call driveway. Was that ever considered?
29
Planning Commission Meeting —March 16, 2004
Generous: Not that I'm aware of, and we relied on their engineer to review that mostly
and then the city approved it. We did look at, suggest one time that the turn around be on
the north end.
Slagle: Okay.
Generous: I don't know that that's how, then you would force the people that are driving
through Baneberry Way West realize it's a dead end, drive all the way up to the end of
this little neighborhood too to make their turn around.
Slagle: Well I'll get to that in my second point but the reason I'm throwing that out is, is
if you had in essence a half cul-de-sac for those folks who go down Baneberry thinking
that it is a through street. If they miss the sign that says not a through street or a dead
end, which is my second question if there is a sign. If there isn't, then maybe there
should be, but my point is if you had a half cul-de-sac, they'd go down there. Realize
oops, I can't get through and it's pretty easy to turn around versus what we're proposing
of they pull into these people's literally 30 feet from their house and back up and go back
out again. It doesn't seem to me to be a wise use of space. And if the applicant, I'd just
be interested in why you didn't push it back towards Galpin a little bit more...
John Klingelhutz: We tried everything here.
Slagle: Okay.
John Klingelhutz: The reason for that is, we still have the Bluff Creek Overlay zone and
then we have the wetland, and we have a 40 foot setback from that. We can't get any
closer with this house here. Now we had a half of cul-de-sac in that. That doesn't work
for the fire department because they can't turn their truck around. I mean we went over
this thing tooth and nail trying to figure out what we can do to make this work.
Slagle: Okay. That makes sense. So the last question then Bob, is there a sign to your
knowledge, or will there be a sign to hopefully try and minimize people heading down
there?
Saam: Like a turn around ahead sign?
Slagle: No, like on our, Vine Hill Road we have not a through street.
Saam: Well we could put one in is what...
Slagle: So you'll put one in?
Saam: Yes, we can require that.
Slagle: Okay.
92
Planning Commission Meeting — March 16, 2004
Sacchet: Actually I have a question too. Along, is there any buffer planting along this
private street? Do we have any requirements for that?
Generous: No buffer yard.
Sacchet: No. No buffer need planting.
Generous: They get one tree per front yard and then there's some buffer planting on
Galpin.
Sacchet: Okay, but not towards the Baneberry side? Okay. Just want to be clear.
Alright, comments. Anybody have comments? No comments?
Claybaugh: Yeah, I have a comment.
Sacchet: Comment Craig?
Claybaugh: Yeah. I'd like to extend my appreciation to the developer. I know we had
some sit down meetings. You've been in front of us discussing this, certainly more than
once and I'm satisfied that you have certainly done due diligence to the best of your
ability and I'm prepared to support it.
Slagle: I would add the same thoughts with one request, and I don't think it needs to be a
condition and that is, the developer and the applicant be open to working with any of the
residents on Baneber y towards the western end of that development, if there is any
thoughts of buffer plantations or something that maybe you guys could work something
out. Help them wholesale something like that.
Sacchet: Thanks Rich. Bruce.
Feik: I'm ready to support it. It's been through here a couple of times and I'm
comfortable with the changes that have been made.
Sacchet: Steve?
Lillehaug: Yeah, I appreciate Mr. Klingelhutz coming back and really refining this.
Getting something that's acceptable. I'm very appreciative of that. I think a couple
things I'd like to change for conditions before we make a motion would be, instead of
abandoning that sewage treatment site, I think it just needs to be removed. And then
condition number 22, we need to change that to 9 feet either side. Other than that, I'm in
support.
Sacchet: Okay. Yeah, I don't have too much to add. I think it certainly makes sense that
the outlot would be owned by the city. I don't know whether we would put that into, I
31
Planning Commission Meeting — March 16, 2004
don't know how we would do... I mean it's not something that we can really make a
condition is it? I mean that's up to the applicant, not to us.
Generous: Verbally you could, the applicant agrees to dedicate Outlot A to the City.
Sacchet: We could just state that? Okay. And if we would ask that the applicant work
with staff to consider if there's a need for a drainage swale on the east side of the private
road and also to look into how best to mitigate the impact of construction traffic.
Whether it's through assuring that if there's construction parking, they will be on the
property itself and not on Baneberry Way. Ultimately I think the possibility of coming
off of Galpin with construction traffic is probably not that big, considering the speed of
the road, of the traffic on Galpin for one thing, and then the impact it would have on the
natural environment there. But with that I'm certainly happy to see this in front of us in
the shape that it is. I want to express my appreciation too to you for doing that, and I'm
willing to take a motion.
Claybaugh: We'll let Bruce do it. Come on Bruce.
Lillehaug: I make the motion the Planning Commission adopt the following three
motions. Rezoning, subdivision.
Feik: I think you need to do them one at a time because we make changes and friendly
amendments.
Sacchet: Make three of them? Okay, one at a time. Alright.
Feik: Want me to do it?
Lillehaug: I got it. I make a motion the Planning Commission recommends approval of
the rezoning of the property from Agricultural Estate District, A2 to Single Family
Residential District, RSF.
Sacchet: I have a motion. Is there a second?
Feik: Second.
Lillehaug moved, Feik seconded that the Planning Commission recommends
approval of the rezoning of the property from Agricultural Estate District, A2 to
Single Family Residential District, RSF. All voted in favor and the motion carried
unanimously with a vote of 5 to 0.
Lillehaug: I also make the motion the Planning Commission recommends approval of
the preliminary plat for Walnut Grove Second Addition with lot width variances and one
(1) foot side yard setback variances and a variance for the use of a private street,
according to the plans prepared by Otto Associates, date stamped Received February 12,
2004, subject to the following conditions 1 through 48 and revise condition number 5.
32
Planning Commission Meeting — March 16, 2004
The old individual sewage treatment site for the existing home must be removed in
accordance with MPCA regulations. And condition number 2, revise from 10 feet to 9
feet.
Sacchet: Number 22 that was right?
Lillehaug: Number 22. From 10 feet to 9 feet, either side of the property line.
Sacchet: We have a motion. Is there a second?
Slagle: Friendly amendment?
Sacchet: Second first.
Feik: Second.
Sacchet: Okay, friendly amendment.
Slagle: You okay with adding something about a sign?
Lillehaug: Sure. No outlet sign posted at the intersection of Baneberry Way.
Sacchet: That's not an applicant thing. That's a city thing. Isn't it?
Slagle: Yeah, but why couldn't we add it as a condition?
Claybaugh: Because it's a city thing, not applicant thing.
Lillehaug: Matt, is that something the city can easily do? Very low cost.
Saam: I'm sorry, can you repeat.
Lillehaug: Adding a no outlet sign.
Saam: Yes. Yes, we can.
Slagle: So no condition needed?
Saam: No, I would recommend that you put a condition.
Sacchet: It makes sense to have a condition there?
Saam: Yep. We typically charge the developer for the signage but we put it in.
Sacchet: Okay. So it makes sense to have a condition then. Alright. Do you have a
friendly amendment?
33
Planning Commission Meeting —March 16, 2004
Feik: Another friendly amendment.
Sacchet: Was that friendly amendment accepted?
Lillehaug: Sure.
Sacchet: Okay.
Feik: All parking related to contractor and contractor's employees shall be
accommodated within the parcel.
Lillehaug: Very good.
Sacchet: That sounds good.
Slagle: Clarification on that. I mean do we really think that that is feasible given Galpin
and?
Feik: Yes. I've been there. You can't turn around on Baneberry as it is. Literally you
can't turn around in Baneberry. If there was a couple of trucks there, people would be
backing out.
Slagle: I'm with you. But then let me ask you this. Are you thinking that the
construction traffic will enter the property via Baneberry versus Galpin? I'm having a
hard time seeing how Galpin's going to be the entrance.
Feik: I'm not worried about necessary where the construction traffic comes in.
Hopefully they'll come in in a safe manner and respect the neighbors but we have to
accommodate access somehow, but as it relates to all day parking of contractors and
stuff, if they're on Baneberry, it's going to be a mess. So I'm thinking of the contractors
and their employees. They've got to be.
Elissa Ellefson: ...construction traffic. Next spring are we going to wake up in the
middle of spring and have big pot holes in front of our driveway?
Saam: Chairman Sacchet, I'll just add private streets in town, we don't allow parking on
because of their narrow width so Baneberry Way already is a no parking street. Also
with all developments we always try to encourage the developer to make sure the
contractor's park within the site, so I feel that's something that we can take care of.
Sacchet: How about that weight of the traffic? Is that a 7 ton road or 5 ton road or what
is it? Do we know?
Saam: Well I'll say, it's supposed to be a 9 ton.
34
Planning Commission Meeting —March 16, 2004
Sacchet: It's supposed to be 9 ton so if it.
Saam: Yes, but this was before the ruling, yes exactly.
Sacchet: Before we made sure they were 9 ton.
Saam: So I can't guarantee that but...
Sacchet: Now assuming it is built to specs, a 9 ton road can handle the type of
construction traffic we would see.
Sawn: Yeah, and this is a 90's development so we're not, I mean it's not like these roads
are 30 years old or anything.
Generous: That's our local street standard.
Slagle: But point of clarification, if I can ask. If they go through this construction period
and there is damage to the private road, is it the developer of this development or the
developer of the, how does the city work that?
Sacchet: How would that be worked?
Saam: Well if this was a public street and we could directly attribute it this development,
then we would try to get some type of compensation but it's not a public street, it's a
private street so.
Slagle: That's why I'm asking. I mean what's going to happen if there's damage to the
road?
Saam: Then the owner should come forward and, it's incumbent upon the private, the
townhome ownership. Maybe their president to come forward and say, you know, I
mean we'll watch them too but if the residents see it, then they should come forward and
then we can get them in contact with the developer.
Lillehaug: Matt is there also an easement agreement between the two owners, since they
are?
Saam: Yeah, that's something I pointed out earlier. This property that's under your
review tonight does have an easement to come off of Baneberry Way to get legal access
to their property, so we really can't deny them that. And keep in mind we're talking 3
additional houses.
Claybaugh: Right. Is it reasonable as a function of condition number, what was it 46
Matt with the independent testing, that part of that independent. 45? As part of that
independent testing we specify that the testing agency go out and do a site observation
and any appropriate measures to basically document condition of the road in advance of
RR
Planning Commission Meeting — March 16, 2004
construction and then as part of their summarization, go back and look at the same
conditions and file a report with the rest of their testing findings?
Saam: That's a great idea, yeah.
Sacchet: So is that a friendly amendment?
Claybaugh: I'll put that in the form of a friendly amendment, yes sir.
Sacchet: Is that acceptable as a friendly amendment?
Lillehaug: I think with the addition of maybe a few pictures.
Claybaugh: Yeah. Whatever appropriate documentation that the independent testing
would, and the city staff and the developer would agree upon. Photos included. You
know written text. Whatever. Just so there's some body of information on what it was
before the construction started.
Sacchet: Let me come back to my question again that wasn't really answered. A 9 ton
road, how does that compare with expected construction traffic? I mean if they come in
with a big bulldozer and stuff like that, I don't know how heavy these things are.
Saam: Yeah, like a bulldozer. The trailer those are carried on. They have more axles to
spread out the weight so they aren't supposed to go over what the legal load limit is of the
roads. But the only way to truly measure that is to have a scale out there. Carver
County's done it before, the deputies to tag off trucks that they feel are over the weight
limit and then actually measure them. That's really the only way to do it.
Lillehaug: They can get to Banebeny because everything going to that is a 9 ton road.
They can get there so, if they get that far they're legal anyway.
Claybaugh: Baneberry's nothing less than the roads that are leading up to it.
Sacchet: Alright. So that should be enough on this topic. Friendly amendment, but any
other friendly amendments? Or discussion actually, yes. I have more friendly
amendments. Did we have a statement that the applicant expressed intent to have the city
own Outlot A? Another friendly amendment that the applicant work with city
engineering in considering if there's a need or how to mitigate drainage or if there's a
need for a swale on the east side of the private road.
Lillehaug: Sure.
Sacchet: To mitigate any drainage issues if there are any. And that's it. Okay. Is that it?
We have a motion. We have a bunch of friendly amendments. We have a second.
Lillehaug: Sounds good
36
Planning Commission Meeting — March 16, 2004
Lillehaug moved, Feik seconded that the Planning Commission recommends
approval of the preliminary plat for Walnut Grove Second Addition with lot width
variances and one (1) foot side yard setback variances and a variance for the use of
a private street, according to the plans prepared by Otto Associates, date stamped
Received February 12, 2004, subject to the following conditions:
1. At the time of final plat recording, the developer shall pay full park dedication fees for
the three lots that are subject to park dedication fees.
2. Adjust the lot line(s) to assure that all lots meet or exceed the 15,000 square -foot
minimum lot area.
3. Individual sewer and water services must be provided and for Lots 1— 4 and indicated
on the plans.
4. A final grading plan and soils report must be submitted to the Inspections Division
before permits will be issued.
5. The old individual sewage treatment site for the existing home must be removed in
accordance with MPCA regulations if encountered during grading procedures.
6. A 10-foot clear space must be maintained around fire hydrants, i.e. street lamps, trees,
shrubs, bushes, Qwest, Xcel Energy, Cable TV and transformer boxes. This is to
insure that fire hydrants can be quickly located and safely operated by firefighters.
Pursuant to Chanhassen City Ordinance #9-01.
7. "No Parking Fire Lane" signs will be required on the new private street. Pursuant to
Chanhassen Fire Prevention Policy #06-1991. Copy enclosed.
8. Conservation easements shall be dedicated over all areas within the Bluff Creek
primary zone.
9. Tree preservation fence shall be installed at the edge of the grading limits prior to any
construction. Fencing shall protect trees on proposed lots as well as trees in neighboring
properties located next to the grading limits.
10. Any trees lost due to construction that are not shown as such on plans shall be replaced
at a rate of 2:1 diameter inches.
11. Applicant shall submit landscape plans for city review and approval prior to final plat
approval. A minimum of one overstory tree will be required in the front yard of each
lot.
12. Buffer yard plantings are required along Galpin Boulevard. Planting requirements are:
1 overstory tree, 2 understory trees, and 4 shrubs.
37
Planning Commission Meeting — March 16, 2004
13. A final grading plan and soils report must be submitted to the Inspections Division
before permits will be issued.
14. A wetland buffer 0 to 20 feet in width (with a minimum average of 10 feet) shall be
maintained around the wetland. The wetland buffer shall be 0 along the east side of
the wetland and 20 ft. on the north and west sides. Wetland buffer areas shall be
preserved, surveyed and staked in accordance with the City's wetland ordinance. The
applicant shall install wetland buffer edge signs, under the direction of City staff, before
construction begins and shall pay the City $20 per sign.
15. The grading and erosion control plan shall show the actual wetland buffer widths
proposed to meet the minimum average buffer width requirements as well as the 40-foot
wetland buffer setback. All structures shall maintain at least a 40-foot setback from the
edge of the wetland buffer or, if no buffer is to be preserved, from the delineated
wetland edge.
16. The primary zone boundary shall be amended to include the wooded area in the rear
(westemmost) portion of Lot 4.
17. A conservation easement shall be dedicated over the primary zone. All structures shall
maintain at least a 40 foot setback from the primary zone. No disturbance of the site
shall occur within the first 20 feet of the setback. Open space shall comprise 100% of
the primary zone.
18. The proposed development shall maintain existing runoff rates. On -site storm water
ponding shall be sufficient to meet all City water quality and quantity standards.
19. A manhole with a two -foot sump shall be installed as the last road accessible structure
prior to discharge into the stone water pond.
20. Riprap and geotextile fabric shall be installed at the flared end sections of the inlet and
outlet of the storm water pond.
21. Drainage and utility easements shall be provided over all existing wetlands, wetland
buffer areas and storm water infrastructure.
22. A drainage and utility easement shall be dedicated over the 9 feet either side of the
property line between Lots 2 and 3 in order to accommodate access for future storm
water infrastructure maintenance. A drainage and utility easement shall be dedicated
over the areas in the western portions of Lots 3 and 4 that are currently not encumbered
by drainage and utility easements since water discharged from the storm water pond will
flow through this area as it moves toward the wetland.
W
Planning Commission Meeting — March 16, 2004
23. Type III silt fence shall be provided adjacent to all areas to be preserved as buffer or, if
no buffer is to be preserved, at the delineated wetland edge. Silt fence shall be provided
as needed to prevent sediment from leaving the site.
24. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1.
25. All exposed soil areas shall have temporary erosion protection or permanent cover for
the exposed soil areas year round, according to the following table of slopes and time
frames:
26. Type of Sloe
Stabilized within
Steeper than 3:1
7 days
10:1 to 3:1
14 days
Flatter than 10:1
21 days
27. These areas include any exposed soil areas with a positive slope to a storm water
conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or
permanent drainage ditch or other natural or man-made systems that discharge to a
surface water.
28. Street cleaning of soil tracked onto public streets shall include daily street scraping and
street sweeping as needed.
29. Based on the proposed developed area of approximately 3.09 acres, the estimated total
SWMP fee, due payable to the City at the time of final plat recording, is $11,041.
30. The applicant shall apply for and obtain permits from the appropriate regulatory
agencies (e.g., Hey -Purgatory -Bluff Creek Watershed District, Minnesota Pollution
Control Agency, Minnesota Department of Natural Resources (for dewatering),
Minnesota Department of Health, Carver County, Metropolitan Council Environmental
Services, etc. and comply with their conditions of approval.
31. Prior to final plat approval, a professional civil engineer registered in the State of
Minnesota must sign all plans.
32. Sanitary sewer and water hookup charges are applicable for each of the new lots. The
2004 trunk hookup charge is $1,458 for sanitary sewer and $2,814 for watermain.
Sanitary sewer and watermain hookup fees may be specially assessed against the
parcel at the time of building permit issuance. Hook-up charges are based on the
number of SAC units assigned by the Met Council for each lot.
33. The applicant will be required to meet the existing site runoff rates for the 10-year
and 100-year, 24-hour storm events. The proposed pond must be designed to
National Urban Runoff Program (NURP) standards. The storm sewer must be
designed for a 10-year, 24-hour storm event. Drainage and utility easements shall be
39
Planning Commission Meeting — March 16, 2004
dedicated on the final plat over the public storm drainage system including ponds,
drainage swales, and wetlands up to the 100-year flood level. The minimum
easement width shall be 20 feet wide.
34. Tree preservation fencing must be installed at the limits of tree removal. The
applicant should be aware that any off -site grading will require an easement from the
appropriate property owner.
35. The applicant must enter into a development contract with the City and supply the
necessary financial security in the form of a letter of credit or cash escrow to
guarantee installation of the improvements and the conditions of final plat approval.
36. Submit detailed construction plans and specifications for the public utility
improvements before final platting.
37. Construct public utility improvements in accordance with the City's latest edition of
Standard Specifications and Detail Plates.
38. Installation of the private utilities for the site will require permits and inspections
through the City's Building Department.
39. Seed and mulch or sod the site within two weeks of grading. Submit a haul route for
City approval prior to any hauling.
40. On the grading plan:
a. Revise the side slopes along the east side of the private drive to be a
maximum of 3:1 or install a retaining wall.
b. Add Type III silt fence along the secondary bluff creek zone line on the
south side and Type II silt fence along the west and east sides of the
grading area.
c. Show a minimum 75-foot rock construction entrance.
d. Show all existing and proposed easements.
e. Add a bench mark.
f. Show the storm sewer manhole rim and invert elevations.
41.On the utility plan:
a. Show the proposed utility lines 10 feet inside the property line.
b. Add a note "connection to existing manhole must be core drilled."
c. Show sanitary manhole rim and invert elevations.
d. Show all existing and proposed utility easements.
e. Show the location of existing water and sanitary services to Lot 1.
42. On the street and storm plan:
a. Last storm manhole discharging to the pond must include a 3-foot sump.
b. Show the proposed and existing street easements.
W,
Planning Commission Meeting — March 16, 2004
43. Add a legend to the plans.
44. The driveway easement must be 30 feet wide with 20 feet of hard -surface pavement
and built to a 7-ton design.
45. Submit an inspection report certifying that the private street is built to a 7-ton design.
Independent testing shall be done on Baneberry Way West to document the
condition of the road in advance of construction and at the completion of
construction to look at the same conditions and file a report with the rest of their
test findings.
46. Elevation of lowest house opening must be three feet above high water level of the
proposed pond.
47. A 30-foot wide public drainage and utility easement must be dedicated on the final
plat over the public sewer and water lines.
48. Structure setbacks shall comply with the following table:
Setbacks: front, rear, side, Bluff Creek primary zone, wetland
buffer
Lot 1
30, 30, 10, na, na
Lot 2
30, 30, 9, na, na
Lot 3
30, 30, 9, 40, 40
Lot 4
30, na, 9, 40, 40
49. No outlet sign posted at the intersection of Baneberry Way.
50. All parking related to the contractor and contractor's employees shall be
accommodated within the parcel.
51. The applicant expressed his intent to have the city own Outlot A.
52. The applicant will work with city engineering to mitigate drainage or the need
for a swale on the east side of the private road.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
Lillehaug: And then I make a motion, the Planning Commission recommends approval
of the conditional use permit #2003-6 for the development within the Bluff Creek
Overlay District subject to following conditions, I through 2.
Sacchet: Do we have a second?
I= 1111MITVI 1 1l
41
Planning Commission Meeting — March 16, 2004
Lillehaug moved, Feik seconded that the Planning Commission recommends
approval of the Conditional Use Permit #2003-6 for development within the Bluff
Creek Overlay District subject to the following conditions:
1. The primary zone boundary shall be amended to include the wooded area in the rear
(westernmost) portion of Lot 4.
2. A conservation easement shall be dedicated over the primary zone. All structures shall
maintain at least a 40 foot setback from the primary zone. No disturbance of the site
shall occur within the first 20 feet of the setback. Open space shall comprise 100% of
the primary zone."
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
Sacchet: We'll take a 5 minute recess. We'll continue at a quarter to 9:00.
PUBLIC HEARING:
REQUEST FOR SUBDIVISION OF 2.1 ACRES INTO 3 SINGLE FAMILY LOTS
WITH VARIANCES; LOTS 1 & 2 PLEASANT VIEW; 400 PLEASANT VIEW
ROAD; KENYON BLUFF, CBR DEVELOPMENT, PLANNING CASE #04-03.
Public Present:
Name Address
Jacie & Max Hurd
Sandy Olson
Maryevelyn Monty
Larry Tivy
Tom Rollings
Don & Darlene Miller
6695 Horseshoe Curve
6696 Horseshoe Curve
370 Pleasant View Road
370 Pleasant View Road
4550 Weston Lane, Plymouth
395 Pleasant View Road
Mary Ann & Gary McCauley 420 Pleasant View
Nick Perkins 339 Pleasant View Road
Katrina Clemens 6691 Horseshoe Curve
Sharmeen Al-Jaff presented the staff report on this item.
Sacchet: Thanks Sharmeen. Questions from staff. Bruce.
Feik: I'll start. The abandonment is really a housekeeping issue. This could go forward
without the abandonment? They don't need the square footage.
Al -Jaffa That's true.
42
MEMORANDUM
TO: Todd Gerhardt, City Manager
CITYOF
CfMWSEN
FROM: Bob Generous, Senior Planner
DATE: September 27, 2004
7700 Market Boulevard
Chanhasssen, MN755317
SUBJ: Certificate of Correction — Walnut Grove 2°d Addition
Planning Case No. 04-10
Administration
Phone. 952.227.1100
Fax: 952.227.1110
EXECUTIVE SUMMARY
Building Inspections
Phone:
The surveyor has requested that City Council approval a correction to the legal
522.27,1190
Fax: 952.227.1190
description of the approved final plat for Walnut Grove 2°d Addition. The legal
Engineering
description and plat show an incorrect dimension of 33.12 feet which should be
Phone:952.227.1160
33.21 feet. The legal description shows a direction of "Southeast East" which
Fax: 952.227.1170
should only be "East".
Finance
Phone: 952.227.1140
ACTION REQUIRED
Fax:952.227.1110
Pork & Recreation
City Council approval requires a majority of City Council present.
Phone: 952.227.1120
Fax: 952.227.1110
BACKGROUND
Recreation Center
2310 Coulter Boulevard
Phone:952.227.1400
City Council approved the final plat for Walnut Grove 2°d Addition on June 14,
Fax:952.227.1404
2W4.
Planning 8
Natural Resources
RECOMMENDATION
Phone: 952.227.1130
Fax: 952.227 1110
Staff recommends adoption of the following:
Public Worlls
1591 Park Road
"The Chanhassen City Council approves the Certificate of Correction dated
Phone: 952.227.1300
September 9, 2004 for the plat of Walnut Grove 2°d Addition."
Fax: 952.227.1310
Senior Center ATTACHMENTS
Phone: 952.227.1125
Fax:952.227.1110 1. Land Surveyor's Certificate of Correction
Web site 2. Reduction of the Approved Final Plat for Walnut Grove 2' Addition
wwwci.chanhassen.mo.us
gAplan\2004 planning cases\04-10 -walnut grove 2nd addition\certificate of cocrection.doc
Lk
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
LAND SURVEYOR'S CERTIFICATE OF CORRECTION
to part of the plat of:
WALNUT GROVE eD ADDITION
Pursuant to the provisions of Chapter 505.174 Laws of Minnesota, 1957, Edward J. Otto, the
undersigned, a Licensed Land Surveyor in and for the State of Minnesota, declares as follows:
That I prepared the plat of WALNUT GROVE eD ADDITION dated , and
filed on , in the Office of the County Recorder, Carver
County, Minnesota in Sleeve No. , Document No.
2. That said plat contains errors, omissions or defects in the following particulars, to wit:
a. On Sheet 1 in the second to last line of the first line of the description, a
dimension of 33.12 is given and on Sheet 2 this same 33.12 dimension is
shown from the centerline of Galpin Lake Road to the previous right-of-way
line on the southerly extension of the east line of the plat.
b. On Sheet 1 in the first line of the third paragraph of the description a call of
"South 65 degrees 12 minutes 03 Southeast East" is given.
3. That said plat is hereby corrected in the following particulars, to -wit:
a. Said 33.12 should be changed to 33.21 in both places.
b. Said call should read "South 65 degrees 12 minutes 03 seconds East".
Dated September 9, 2004
Edward J. Otto, Lapourveyor
Minnesota LicenseNo. 14343
The above Certificate of Correction to the plat of WALNUT GROVE 2NO ADDITION was
approved and accepted by the City Council of the City of Chanhassen, Minnesota, at a meeting held
this day of 20
CITY COUNCIL OF THE CITY OF CHANHASSEN, MINNESOTA
Mayor
Clerk
I hereby certify that this instrument was filed in the Office of the County Recorder of record on this
_ day of 20. at _ o'clock _,M. and was duly recorded in
Cabinet No. , Document No.
Carver County Recorder
WALNUT GROVE 2ND ADDITION
NAG. 41 NEl 91 1HESE xRESEM Met pMp✓Iwli Oewlepmen 1. P
McMod,b .. M -M, Me IWormp does ed propn(y ✓fuoe,e M CwnIY of Comr, Stile of
.1 pnl el Me saumwl picrror of S.Me, la MMMIp "A amw 31 Corer Cwnly
.-b. ee«nd.e or M
Cornmwr[Fv of me Mb.l awls, <wnw Ml.. s.✓w It, mmn M u m.e e,wMp
01 SWM 01 Madre. Jd M.M., a -Mdr Ent alM, ehe .1 IM. or .aa seuln«.e
.1o,' o Mlnn of uueo MI: M.- Nwln M epro., w mFwlee 30 ,nuw Ent.
e MolMn e/ "'del Mt M o,.e, m . Je61. Je bet .. cures Me [nln el [M. 01
eobf nlm eMnv Nu'M l➢ M.pw..10 -Mute. O➢ .,<w' " ..oa pent' mmp.
SwMwuMlY F'np roN cwn. o obMO. 01 ..➢O M!. <n IM on0 0, do,wee, "
mxwln N -,M,l Ixmn SnM IR dop«o Il rt ulw e0... Ml.1 .1 twpnl,
o Mb.be e1 MACO I«I M M. de. pehf <I be ent., of Me Ir«t M be do., MMn
w.lFu.p Sou. IM wpen I> mmufn e0.-. MNt o Wlmn N, Mb
IAnw SouM eS hyooe 13 -Muf. W .nmee .1 o Mo.. o JJ13 1 M a MoMf
.01 4 Mxoekor nbmb le w .1 A,
mA t. 1M.e . of l., m Me 1., .1. bf MewMwl It Mt--wy
IMe e/Mf.rol. -,H,M, . EreedJ, 0oA.,wMuM
el;, NM'". le mb pm.N NIN nM. <I w dMM, II; Mon
do do nmM bodhp e1 NMM 1. M,pe« 11 mmuM e0 n[un .1 me 1. MM
the Ww.. 01 nN Lar Les 1Y MnM AL 11) o Mlla.n e/ ..CO Mt to «p poM,
A.
Mon Rvin nk PON! A SwM Ad bpnn 12 mNuln 0. 1., o MNMnn o/
3➢n7b MI: Mon Nn. 15 do, n mMuln e0 ,.nme Ed.,.. Wemn .1 JN.
MtmMn Nntx n epr.o. IE Me.. 34 ,ne.e, MNt, o Me,- .1 JCOW bee I.
M. poMl 01 MNM.Fp
AAW
Mef pest ./ Me ,buMnof Mu te, o1 SoMM M la Ie,MMoe 110. Roo. ➢A Cww CMmfo
Cw -Mt, of M. .1 awlw <wew .1.. It. la Mon m [. m.M Mew.,
el ➢.u. M de re, ,Y mPutso b o«Dodo Enl .Imp Me We.1 IM. o/ ,dM $W.-I
.d,t,, o .o1.nn or 11U. tier It- Nwex 10 Mrya., 0J M.... 30 n[ma Enl,
e MYtmn ./ II01.1 Mr MoM.. SeuUWy o dblmn .1 J 70 MI ... Dune Mot
.11. .eM Me be, a e<M.e IMF wI. [urn b 1.1d. to Me If Mw a ,.Mlu.
J.#.J, Met ud .Hood mpls oI M e.➢'n, ➢➢ M.W. 10 ommbe M,d the Mwd of wIM
[um be- SmrM IJ sprees .0 M... SS ,wend .1 f. Me poAl eI dWfft o/ Me.1 1. be Mnrlbe4 Me,,. <MfM ., SsuNMN o dhlM<. OI 1tl. 01 MI dmp ,d.
Me .,. A.., o deed o, J,w. M!.. m!M Mph .101 1".
M.b. i ,.uonec mmn snM 11 apnn n Mbd. e0 .. foo," IM11, M
... cum, . el.ldf. oI d. m W bof Mon It-M 11 M,pe .1 ...b. Xf ,ode, Eo.l,
e Mblo<. of JO0.W Mt Mon Nan 1➢ a p'w, Il M... 4O --. Ewt o de? be
of
IS0.M Mt' IM NertM T d,pm, ,➢ mMutn 0 nwtA Wo✓.. INlmn of J01.01
M.,Me le me p, 01 eryMMMv.
Eowpl pwN 21➢C o1 Mb.Mwalo 0«olmo, 011 walOtbn RpMf of Mby pbl Me 10-OA
-.Mi, to Me. pbf Mow,.
<weee the oeme ,o be au,wpM mM plotted w ML T MW 3Ib AW MW Mb Me
e-M, M.MM. M1 dedimfe f. Ina M.. b pobbb un Mew Me . od ce. eoNe.l., Me
,.semenh ee ,MOM m .. pMl M '.Mop, nb wth, Mp. Wy
.I..o, Mnn1 o.V "et odtun 0.wbpm«t M., o MMnewb ..,Mbb T ed. rou,w
m... ornmt. to w .kv,ot M, Ib P, orrtM Mb MY o1 p0�
xuNCELNUIZ WEWLtm✓ENr, lNp
M.mw R .1-4 R. PfmdMwl I �{J3Y
4De
sAR a. NI-b-�/dvEsor �, ,;JE310{�m911♦
.LM, tM WmmU',..Y
Me bn➢bMp Molrtm. , M, .[YnMaeo w be. me Me � MOY of
30_ dy IMonn R, .1m4 pr«Nw1 oI NAMp.Fu„ gr.p«nt
u'wpwtk., m M.0, el Me [npoollom
.Voles, lveM, CwnIR ...b.Mr Can . Ep.
I xveeY melry MOf I now -.l one pbffH ft. pnYmfY e«nroM w Mb ", « .ALw,
C W !No Ap (W that Me plot b < [nr«f rpMeetoMM e/ he «My Mef ed
Mfm<e. ae consul" Mon. m Me pbf M too, Me M. or o Mc ., aV M-,Mt,
Hen x«e -11, plw.e m [r nN d. paced tl IM pwM « Mem. M M.- ro
NMn,«m V...,, snfkn SOx Oz .1 p coot Me wl.. oMM. rm« M aden ov,
,ad'. sea Me pl vt. 110, b be SwIMONO IM., ft., .� soom a«ro ➢Mess« s«tM
EM Med A Mt. LmM a, ld,
."eta Llm« Atmore 11161
STAR O MINNE -
d*w,' CF MMCMI
1M MpoF9 Meflum«l .w Mncbod M be. me Me, - ed, eI
of r. I Olb, 1. Swop: MM.rofo LMnn Ne. IUA).
Nofny NNk, "I Camty MMx«o10
My C-4jobn Efod e
CWNIY SURwE c-eamly NetMoMm
absuml to Cbwfer MA NMM-ta Lon of I'll, fMN petit xw Mew g fodo Mb _ doy
30-
.bMr C ! H,. Carr Cnm1Y Smpr ..._
CHAMIASWo NNNECOIA
IMb of o/ .AUINl OOW 3N0 AOgTCN eve, wpro.M We wopf« OY Me CITY Cwn<p
dl Me v, OI CM do. M.b. of .repute, mot-, x✓d Mb wy dl
M- and N M [wnprbnn . M. 1"'. eI MMnseofo sfofuln.
Swflm J0.S 0.{ LOd. E M mmumenb o01 « mot as pe<IMe 00e Clfy CwM<X old 0, Voted
an IMe pb, Oo.wdol M .1. sbNfa S.= Cudd. I.
9f CM RIPL O! INE 01 C CNANN ... MNNESOIA
Nop,
pet
.O ll A.10.P, CM- Count% NMMoMM
t.y ..xl..nM Man Me no WMpuml Moee M a'I Hen Ml.r
IMe McMl6w m mh plot one ImMefn m1✓,a OOM M, - do, o1 m_
Nmt Lun[gm. Mw Cwnb AUMew
9Y
.1 TREASVRER. Cmw County N/nnwl.
I MVWr w1,n Mof me wn, o.,obl. /w ex. pre _ Iw rme ee,vodol.M cote plol o.
WWVy mw " tMN. Mon bed pout m 111. L.1 of
a0_
b- NevoM C C ly I..-,
Ay
OX,,, oi7 O. Cesar County N.-.
I M., wbNY to Mb R'at OI .. mT CROW 3.. AOM PGi w M.d boY
oI 3 of ..N -N. w ft., Nn
Cpl W. Nw,M J., Cwnly mean,
by
CITY OP CHANHASSEN
RECEIVED
MAY 18 2004
CHANHAEBEN PUNNING OEPT
bsonATEs
WALNUT GROVE 2ND ADDITION
�ih'vw
yr
pp
I
8LOcK
OUTLOTA
(GACPro Ou
P ' \
j
/ �kpmOgO� RO'40iy0 17)
•.,W � R\ ARSE w,fi* a� \ P �{
aw.a"unvrunww"nwswonnrroa R�+i•:! W ••"• w•
I 1 � �w urauwi,er un�
1 1 f wu. "w'6nx
nroM..n.wwL.n"w.. roo
04-1b
Planning Commission Summary — March 16, 2004
7. The material placed underneath the deck shall allow drainage to occur.
8. The applicant will work with the city to inventory the trees and consider the
best location for the driveway in terms of trees and safety.
9. The applicant will work with the engineering staff to address drainage
concerns on the site.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
RECONSIDERATION OF SUBDIVISION OF WALNUT GROVE 2No
ADDITION, JOHN KLINGELHUTZ, PLANNING CASE #04-10.
Public Present:
Name Address
Susan Remaley
2198 Baneberry Way West
John Klingelhutz
1560 Bluff Creek
Erik Johnson
350 E. Hwy 212, Chaska
Elissa Ellefson
2194 Baneberry Way West.
Bob Generous presented the staff report on this item. Commissioner Claybaugh asked
staff to explain why a PUD and density transfer can't be used in this case. Commissioner
Slagle asked for a quick overview of what had improved since the last time the Planning
Commission saw this application. Commissioner Feik asked staff if they had discussed
the conditions with the applicant. Bob Generous stated he had not personally talked with
the applicant but they had the staff report and hadn't called staff. Commissioner
Lillehaug asked for clarification regarding sewer and water service and abandonment of
the existing septic sewer system, and the width of the storm sewer easement running
between Lots 2 and 3. Chairman Sacchet asked for clarification on the ownership of the
outlot, the style of houses proposed for the lots, the proposed grading and slopes, and the
width of the private drive. Commissioner Claybaugh asked about the condition requiring
inspection of the private driveway, and clarification that in the future an adjacent property
owner couldn't acquire the outlot and ask for a variance for density transfer.
The applicant, John Klingelhutz, 1560 Bluff Creek addressed issues brought up by the
commission regarding ownership of the oudot, stating he will give the outlot to the city.
Chairman Sacchet opened the public hearing. Susan Remaley, 2198 Baneberry Way
West thanked the commission, staff and the developer for the new plan. She asked staff
to clarify where the turn around is located and grading in regards to runoff and drainage.
Elissa Ellefson, 2194 Baneberry Way West expressed concern with the construction
traffic. The applicant stated if it is possible to have construction access off of Galpin,
they will do that. Chairman Sacchet closed the public hearing. After discussion the
following motions were made.
Planning Commission Summary —March 16, 2004
Lillehaug moved, Feik seconded that the Planning Commission recommends
approval of the rezoning of the property from Agricultural Estate District, A2 to
Single Family Residential District, RSF. All voted in favor and the motion carried
unanimously with a vote of 5 to 0.
Lillehaug moved, Feik seconded that the Planning Commission recommends
approval of the preliminary plat for Walnut Grove Second Addition with lot width
variances and one (1) foot side yard setback variances and a variance for the use of
a private street, according to the plans prepared by Otto Associates, date stamped
Received February 12, 2004, subject to the following conditions:
At the time of final plat recording, the developer shall pay full park dedication fees for
the three lots that are subject to park dedication fees.
2. Adjust the lot line(s) to assure that all lots meet or exceed the 15,000 square -foot
minimum lot area.
3. Individual sewer and water services must be provided and for Lots 1— 4 and indicated
on the plans.
4. A final grading plan and soils report must be submitted to the Inspections Division
before permits will be issued.
5. The old individual sewage treatment site for the existing home must be removed in
accordance with MPCA regulations if encountered during grading procedures.
6. A 10-foot clear space must be maintained around fire hydrants, i.e. street lamps, trees,
shrubs, bushes, Qwest, Xcel Energy, Cable TV and transformer boxes. This is to
insure that fire hydrants can be quickly located and safely operated by firefighters.
Pursuant to Chanhassen City Ordinance #9-01.
7. "No Parking Fire Lane" signs will be required on the new private street. Pursuant to
Chanhassen Fire Prevention Policy #06-1991. Copy enclosed.
8. Conservation easements shall be dedicated over all areas within the Bluff Creek
primary zone.
9. Tree preservation fence shall be installed at the edge of the grading limits prior to any
construction. Fencing shall protect trees on proposed lots as well as trees in neighboring
properties located next to the grading limits.
10. Any trees lost due to construction that are not shown as such on plans shall be replaced
at a rate of 2:1 diameter inches.
4
Planning Commission Summary — March 16, 2004
11. Applicant shall submit landscape plans for city review and approval prior to final plat
approval. A minimum of one overstory tree will be required in the front yard of each
lot.
12. Buffer yard plantings are required along Galpin Boulevard. Planting requirements are:
1 overstory tree, 2 understory trees, and 4 shrubs.
13. A final grading plan and soils report must be submitted to the Inspections Division
before permits will be issued.
14. A wetland buffer 0 to 20 feet in width (with a minimum average of 10 feet) shall be
maintained around the wetland. The wetland buffer shall be 0 along the east side of
the wetland and 20 ft. on the north and west sides. Wetland buffer areas shall be
preserved, surveyed and staked in accordance with the City's wetland ordinance. The
applicant shall install wetland buffer edge signs, under the direction of City staff, before
construction begins and shall pay the City $20 per sign.
15. The grading and erosion control plan shall show the actual wetland buffer widths
proposed to meet the minimum average buffer width requirements as well as the 40-foot
wetland buffer setback. All structures shall maintain at least a 40-foot setback from the
edge of the wetland buffer or, if no buffer is to be preserved, from the delineated
wetland edge.
16. The primary zone boundary shall be amended to include the wooded area in the rear
(westernmost) portion of Lot 4.
17. A conservation easement shall be dedicated over the primary zone. All structures shall
maintain at least a 40 foot setback from the primary zone. No disturbance of the site
shall occur within the first 20 feet of the setback. Open space shall comprise 100% of
the primary zone.
18. The proposed development shall maintain existing runoff rates. On -site storm water
ponding shall be sufficient to meet all City water quality and quantity standards.
19. A manhole with a two -foot sump shall be installed as the last road accessible structure
prior to discharge into the storm water pond.
20. Riprap and geotextile fabric shall be installed at the flared end sections of the inlet and
outlet of the storm water pond.
21. Drainage and utility easements shall be provided over all existing wetlands, wetland
buffer areas and storm water infrastructure.
22. A drainage and utility easement shall be dedicated over the 9 feet either side of the
property line between Lots 2 and 3 in order to accommodate access for future storm
water infrastructure maintenance. A drainage and utility easement shall be dedicated
5
Planning Commission Summary —March 16, 2004
over the areas in the western portions of Lots 3 and 4 that are currently not encumbered
by drainage and utility easements since water discharged from the storm water pond will
flow through this area as it moves toward the wetland.
23. Type III silt fence shall be provided adjacent to all areas to be preserved as buffer or, if
no buffer is to be preserved, at the delineated wetland edge. Silt fence shall be provided
as needed to prevent sediment from leaving the site.
24. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1.
25. All exposed soil areas shall have temporary erosion protection or permanent cover for
the exposed soil areas year round, according to the following table of slopes and time
frames:
26. Type of Slone
Stabilized within
Steeper than 3:1
7 days
10:1 to 3:1
14 days
Flatter than 10:1
21 days
27. These areas include any exposed soil areas with a positive slope to a storm water
conveyance system, such as a curb and gutter system, storm sewer inlet, temporary or
permanent drainage ditch or other natural or man-made systems that discharge to a
surface water.
28. Street cleaning of soil tracked onto public streets shall include daily street scraping and
street sweeping as needed.
29. Based on the proposed developed area of approximately 3.09 acres, the estimated total
SWMP fee, due payable to the City at the time of final plat recording, is $11,041.
30. The applicant shall apply for and obtain permits from the appropriate regulatory
agencies (e.g., Riley -Purgatory -Bluff Creek Watershed District, Minnesota Pollution
Control Agency, Minnesota Department of Natural Resources (for dewatering),
Minnesota Department of Health, Carver County, Metropolitan Council Environmental
Services, etc. and comply with their conditions of approval.
31. Prior to final plat approval, a professional civil engineer registered in the State of
Minnesota must sign all plans.
32. Sanitary sewer and water hookup charges are applicable for each of the new lots. The
2004 trunk hookup charge is $1,458 for sanitary sewer and $2,814 for watermain.
Sanitary sewer and watermain hookup fees may be specially assessed against the
parcel at the time of building permit issuance. Hook-up charges are based on the
number of SAC units assigned by the Met Council for each lot.
rl
Planning Commission Summary — March 16, 2004
33. The applicant will be required to meet the existing site runoff rates for the 10-year
and 100-year, 24-hour storm events. The proposed pond must be designed to
National Urban Runoff Program (NURP) standards. The storm sewer must be
designed for a 10-year, 24-hour storm event. Drainage and utility easements shall be
dedicated on the final plat over the public storm drainage system including ponds,
drainage swales, and wetlands up to the 100-year flood level. The minimum
easement width shall be 20 feet wide.
34. Tree preservation fencing must be installed at the limits of tree removal. The
applicant should be aware that any off -site grading will require an easement from the
appropriate property owner.
35. The applicant must enter into a development contract with the City and supply the
necessary financial security in the form of a letter of credit or cash escrow to
guarantee installation of the improvements and the conditions of final plat approval.
36. Submit detailed construction plans and specifications for the public utility
improvements before final platting.
37. Construct public utility improvements in accordance with the City's latest edition of
Standard Specifications and Detail Plates.
38. Installation of the private utilities for the site will require permits and inspections
through the City's Building Department.
39. Seed and mulch or sod the site within two weeks of grading. Submit a haul route for
City approval prior to any hauling.
40.On the grading plan:
a. Revise the side slopes along the east side of the private drive to be a
maximum of 3:1 or install a retaining wall.
b. Add Type III silt fence along the secondary bluff creek zone line on the
south side and Type II silt fence along the west and east sides of the
grading area.
c. Show a minimum 75-foot rock construction entrance.
d. Show all existing and proposed easements.
e. Add a bench mark.
f. Show the storm sewer manhole rim and invert elevations.
41. On the utility plan:
a. Show the proposed utility lines 10 feet inside the property line.
b. Add a note "connection to existing manhole must be core drilled."
c. Show sanitary manhole rim and invert elevations.
d. Show all existing and proposed utility easements.
e. Show the location of existing water and sanitary services to Lot 1.
Planning Commission Summary — March 16, 2004
42.On the street and storm plan:
a. Last stone manhole discharging to the pond must include a 3-foot sump.
b. Show the proposed and existing street easements.
43. Add a legend to the plans.
44. The driveway easement must be 30 feet wide with 20 feet of hard -surface pavement
and built to a 7-ton design.
45. Submit an inspection report certifying that the private street is built to a 7-ton design.
Independent testing shall be done on Baneberry Way West to document the
condition of the road in advance of construction and at the completion of
construction to look at the same conditions and file a report with the rest of their
test findings.
46. Elevation of lowest house opening must be three feet above high water level of the
proposed pond.
47. A 30-foot wide public drainage and utility easement must be dedicated on the final
plat over the public sewer and water lines.
48. Structure setbacks shall comply with the following table:
Setbacks: front, rear, side, Bluff Creek primary zone, wetland
buffer
Lot 1
30, 30, 10, na, na
Lot 2
30, 30, 9, na, na
Lot 3
30, 30, 9, 40, 40
Lot 4
30, na, 9, 40, 40
49. No outlet sign posted at the intersection of Baneberry Way.
50. All parking related to the contractor and contractor's employees shall be
accommodated within the parcel.
51. The applicant expressed his intent to have the city own Outlot A.
52. The applicant will work with city engineering to mitigate drainage or the need
for a swale on the east side of the private road.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
Lillebaug moved, Feik seconded that the Planning Commission recommends
approval of the Conditional Use Permit #2003-6 for development within the Bluff
Creek Overlay District subject to the following conditions:
Planning Commission Summary — March 16, 2004
1. The primary zone boundary shall be amended to include the wooded area in the rear
(westernmost) portion of Lot 4.
2. A conservation easement shall be dedicated over the primary zone. All structures shall
maintain at least a 40 foot setback from the primary zone. No disturbance of the site
shall occur within the first 20 feet of the setback. Open space shall comprise 100% of
the primary zone."
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
PUBLIC HEARING:
REQUEST FOR SUBDIVISION OF 2.1 ACRES INTO 3 SINGLE FAMILY LOTS
WITH VARIANCES: LOTS 1 & 2 PLEASANT VIEW: 400 PLEASANT VIEW
ROAD: KENYON BLUFF, CBR DEVELOPMENT, PLANNING CASE #04-03.
Public Present:
Name Address
Jacie & Max Hurd
Sandy Olson
Maryevelyn Monty
Larry Tivy
Tom Rollings
Don & Darlene Miller
Mary Ann & Gary McCauley
Nick Perkins
Katrina Clemens
6695 Horseshoe Curve
6696 Horseshoe Curve
370 Pleasant View Road
370 Pleasant View Road
4550 Wesson Lane
395 Pleasant View Road
420 Pleasant View
339 Pleasant View Road
6691 Horseshoe Curve
Sharmeen Al-Jaff presented the staff report on this item. Commissioner Lillehaug asked
for clarification on curb and gutter requirement and the 10 percent grade of the driveway.
Commissioners Slagle and Claybaugh asked staff about their concern with the location
and grade of the access onto Pleasant View Road. Chairman Sacchet asked staff to
clarify their concerns with the proposed grading in the rear yard areas of Lots 1 and 2,
house pad placement and the use of retaining walls.
The applicant, Tom Rollings, CBR Development, 4550 Weston Lane, Plymouth and Tom
Goodrum with Schoell & Madsen addressed concerns brought up by the Planning
Commission regarding grading and tree preservation, slope and drainage from the
driveway, and the placement of the access onto Pleasant View Road. Chairman Sacchet
opened the public hearing.
Larry Tivy, 370 Pleasant View Road is the adjacent property owner to this site. He
expressed concern with the vacancy of Oak Grove Street and the placement of the home
on Lot 1 in relationship to his home. Gary McCauley, 420 Pleasant View Road stated he
W
0
CITY OF
CIIMSEN
7700 Market Boulevard
PC Box 147
Chanhassen, MN 55317
Administration
Phone:952227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone. 952 227.1160
Fax 952 227.1170
Finance
Phone: 952227.1140
Fax 952.227.1110
Park A Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning 6
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
MEMORANDUM
TO: Todd Gerhardt, City Manager
FROM: Bob Generous, Senior Planner
A
64�
DATE: April 12, 2004 � "
SUBJ: Rezoning from Agricultural Estate District, A2, to Single Family
Residential District, RSF; preliminary plat approval creating four
lots for single-family homes with variances for the use of a private
street, lot width and side yard setbacks; and conditional use permit
approval for development within the Bluff Creek Overlay District,
Walnut Grove 2°d Addition
Planning Case No. 04-10
EXECUTIVE SUMMARY
The development was previously reviewed by City Council and returned to the
Planning Commission for review. Previously, the development consisted of two
twin homes and the existing single-family home. This plan consists of three new
single-family detached houses and the existing single-family home.
ACTION REQUIRED
City Council approval requires a majority of City Council present.
PLANNING COMMISSION SUMMARY
The Planning Commission held a public hearing on March 16, 2004, to review the
proposed development. The Planning Commission voted 5 to 0 to approve the
proposed development. The summary and verbatim minutes are item la in this
packet.
RECOMMENDATION
Senior center
Staff and the Planning Commission recommend adoption of the three motions
Phone:952.227.1125
(rezoning, subdivision with variances and conditional use permit) approving the
Fax: 952.227.1110
development as specified in the staff report dated March 16, 2004.
Web Site
www.ci.chanhassen.mn.us
ATTACHMENTS
Planning Commission Staff Report Dated March 16, 2004.
glplanx2004 planning casesx04-10 -walnut grave 2nd additionxexecutive summary.doc
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
PC DATE: March 16, 2004
CITY OF CHANHASSEN
STAFF REPORT
CC DATE: April 12, 2004
REVIEW DEADLINE: 4/12/04
CASE #: 04-10
BY: Robert Generous, et al.
PROPOSAL: Request for rezoning from Agricultural Estate District, A2, to Single Family
Residential District, RSF; preliminary plat approval creating four lots for
single-family homes with a variance for the use of a private street, lot width and side
yard setbacks; and conditional use permit approval for development within the Bluff
Creek Overlay District.
LOCATION: 7305 Galpin Blvd.
APPLICANT: Klingelhutz Development
350 East Highway 212
Chaska, MN 55318
(952) 448-3330
PRESENT ZONING: Agricultural Estate District, A2, and Bluff Creek Overlay District, BCO
2020 LAND USE PLAN: Residential — Low Density (net density 1.2 — 4.0 units per acre)
ACREAGE: 3.09 DENSITY: 1.62 gross, 2.44 net
SUMMARY OF REQUEST: Rezoning of the property to RSF to permit the existing single-family
home and three detached single-family homes; subdivision approval creating four lots and one outiot
containing Bluff Creek and the majority of the Bluff Creek primary zone with a variance for the use of
a private street for access and one -foot side yard setback and lot width variances for three lots; and a
conditional use permit for development within the Bluff Creek Overlay District.
LEVEL OF CITY DISCRETION IN DECISION -MAKING: The City has a relatively high level
of discretion in approving rezonings because the City is acting in its legislative or policy making
capacity. A rezoning must be consistent with the City's Comprehensive Plan.
The City's discretion in approving or denying a preliminary plat is limited to whether or not the
proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it
meets these standards, the City must approve the preliminary plat. This is a quasi-judicial decision.
The City has limited discretion in approving or denying conditional use permits, based on whether
or not the proposal meets the conditional use permit standards outlined in the Zoning Ordinance.
If the City finds that all the applicable conditional use permit standards are met, the permit
must be approved. This is a quasi-judicial decision.
Planning Case No. 04-10
Walnut Grove 2nd Addition
Location Map
a Z
Ma e5tic `NaY
d
Hill GI,
LL
U c $
'a
F $ 3
J
Brinker Street �
m`
Walnut Curve
Subject Property
A
e
oA
0
n a 3
m
m U' ® y t�ht1-1
c�
W 78I CMaM°'�r axcon Wa„
m h Sireej m H+i4 fl
11�+ LN
wawdw Rxe
ateAear Plata E
Y
®
0
CO 6
m
Walnut Grove 2"d Addition
March 16, 2004
Page 2
1 e JU_lu 1
The developer is proposing an infill development creating three new single-family dwellings. The
surrounding property was developed as part of the Walnut Grove development. The applicant is rezoning the
property to Single Family Residential District, RSF, which permits single-family lots of 15,000 square feet. As
part of the request, the developer is requesting lot width variances and side yard setback variances to permit one
60-foot wide lot and two 61-foot wide lots. In conjunction with the rezoning, the applicant is subdividing the
property to create one lot around the existing single-family house (Lot 1) and three new single-family lots.
Access to the existing home is proposed to remain off Galpin Boulevard. Access to the new homes will be via
a private street which connects to Baneberry Way West, which is a private street. An access easement for this
property was recorded as a condition of the Walnut Grove development. Sewer and water is available through
the Walnut Grove project. Private streets require variance approval as part of a single-family subdivision. A
conditional use permit is required for all development within the Bluff Creek Overlay district.
The subdivision of the property is an attempt to implement the Bluff Creek Overlay District clustering
requirements outside of the Planned Unit Development (PUD) ordinance and provide a housing type that is
comparable to the surrounding development, which leads to the variance requests for lot width and side yard
setbacks. The existing PUD ordinance does not permit density transfer or clustering for properties guided
Residential — Low Density. Instead, the ordinance permits lot sizes down to 11,000 square feet with an
average lot size within the development of 15,000 square feet. However, the single-family PUD requires
minimum lot dimensions of 90 feet by 100 feet. The proposed development could be permitted without
variances with a re -guiding of the property to Residential — Medium Density (net density range 4.0 — 8.0
units per acre), but such an amendment would only be a subterfuge since the intent is to maintain a density
in this development below four units per acre.
The applicant has included the majority of the Bluff Creek Primary Zone in Outiot A. Conservation easements
shall be placed over all areas within the Bluff Creek primary zone. This will allow the City to restore and/or
manage the natural resources in these areas. The developer may dedicate Outlot A to the City.
The townhouse lots on Baneberry Way West leading into this development range in size from 1,473 square feet
to 2,210 square feet with lot widths between 26 and 39 feet. The single-family homes on Walnut Curve are on
lots between 9,912 square feet to 25,337 square feet with lot widths between 70 feet and 111 feet. The
bungalow lots range in size from 3,747 square feet to 4,920 square feet with lot widths between 46.5 feet and
84 feet. The houses proposed with this development would be very similar to the bungalow homes in the
Walnut Grove development. The proposed house sizes have main floor areas of 1,050 to 1,337 square feet
which is comparable and compatible to the bungalow units with main floors of 1,350 to 1,600 square feet. The
proposed houses include two walkout styles and one lookout style home. The proposed houses are on lots with
lot areas consistent with typical single family homes.
The site is heavily wooded in the southern one-third of the site, adjacent to Bluff Creek. The property slopes
from a high point in the northeast comer at elevation 984 down to the creek at an elevation of 944. The
developer is preserving the southern portion of the property as part of Outlot A.
The proposed development is consistent with the comprehensive plan. Approval of the lot width and side yard
setback variance will make the subdivision comply with the zoning ordinance. Staff is recommending approval
of the rezoning, subdivision with lot width and side yard setback variances and a variance for the use of a
Walnut Grove 2"d Addition
March 16, 2004
Page 3
private street, and a conditional use permit for development within the Bluff Creek Overlay District. The
applicant will need to revise the plat slightly to assure that all lots meet the 15,000 square foot minimum lot
area.
BACKGROUND
The house was built in 1908. Development of Walnut Grove, the project to the east, began in 1997. An access
easement, permitting the property to use Baneberry Way West, was recorded as part of the plat for Walnut
Grove.
This project was reviewed by the City Council on November 10, 2003, and remanded to the Planning
Commission for their review. The applicant has revised the plan, eliminating the four twin home units and
prepared a single-family detached plan on lots which meet the lot area and depth requirements, with a minor
adjustment, but do not comply with the lot width requirement for RSF zoned property.
APPLICABLE REGULATIONS
Chapter 18, Subdivisions
Sections 20-41 through 2045, Amendments
Section 20-56 through 20-60, Variances
Sections 20-221 through 20-237, Conditional Use Permits
Sections 20-611 through 20-616, RSF district regulations
Sections 20-1551 through 20-1564, Bluff Creek Overlay District
LANDSCAPWGTREE PRESERVATION
Tree canopy coverage and preservation calculations have been submitted for Walnut Grove 2nd Addition.
They are as follows:
Total upland area (excluding wetlands) 132,200 SF or 3.03 ac.
Baseline canopy coverage 36% or 47,485 SF
Minimum canopy coverage allowed 30% or 39,660 SF
Proposed tree preservation 34% or 44,533 SF
Developer does meet minimum canopy coverage requirements.
Bufferyard plantings are required along Galpin Boulevard for Lots 2-4. Total plantings required are:
1 overstory
2 understory
4 shrubs
PARKS AND OPEN SPACE
The homes being developed in Walnut Grove 2°d Addition lie within the service area of Sugar Bush Park.
The pedestrian trail along Galpin Boulevard borders all of the proposed lots; however, access to the trail will
be through the rear yards. The single condition of approval for this addition regarding parks and trails
Walnut Grove 2"d Addition
March I6, 2004
Page 4
should be the payment of park dedication fees in lieu of land dedication or trail construction. The fee only
applies to the three new lots for a total of $8,400.
WETLANDS
One wetland basin exists on -site. The wetland is an agturban wetland that is a part of the Bluff Creek
corridor. It is dominated by reed canary grass. No wetland impact is proposed.
A wetland buffer of 0 to 20 feet in width (with a minimum average of 10 feet) must be maintained around
the wetland. In order to accommodate the proposed building location on Lot 4, the wetland buffer should be
0 along the east side of the wetland and should be 20 feet on the north and west sides. Wetland buffer areas
should be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must
install wetland buffer edge signs, under the direction of City staff, before construction begins and must pay the
City $20 per sign. The grading and erosion control plan should show the actual wetland buffer widths
proposed to meet the minimum average buffer width requirements as well as the 40-foot wetland buffer
setback. All structures shall maintain at least a
40-foot setback from the edge of the wetland buffer or, if no buffer is to be preserved, from the delineated
wetland edge.
BLUFF CREEK OVERLAY DISTRICT
The Bluff Creek Overlay District was adopted in December 1998 as a tool for the preservation of Bluff
Creek and the natural resources within its corridor. Bluff Creek flows through the southern portion of this
property. The property also contains a forested riparian corridor and an aglurban wetland. The primary
zone encompasses the forested area, the wetland, and the wetland buffer. The secondary zone encompasses
the primary zone and the first 20 feet of the setback. A conservation easement should be dedicated over the
primary zone. All structures must maintain at least a 40 foot setback from the primary zone. No
disturbance of the site may occur within the first 20 feet of the setback. No alterations are proposed within
the overlay district. Open space must comprise 100% of the primary zone.
GRADING, DRAINAGE AND EROSION CONTROL
The plans propose to grade about 25% of the site for the new house pads, a proposed private driveway and a
stormwater pond. The proposed lots are located in the east central portion of the site. The proposed grading
will prepare the site for look -out and walk -out house pads on Lots 2, 3 and 4, Block 1. The proposed slopes
along the east side of the new private driveway are steeper than 3:1. The City allows maximum side slopes
of 3:1; otherwise retaining walls must be used. The applicant must revise the plans to comply.
The existing site drainage flows south toward the existing creek. The plans propose to convey the drainage
from the northeast portion of the site to the private street and carry the stormwater via storm sewer to a
proposed NURP pond. The remaining portion of the site will drain overland to the proposed stormwater
pond and/or the creek. Staff is recommending that the elevation of the lowest opening on the adjacent
homes be three feet above the high water level of the proposed pond.
Drainage calculations have been submitted for the site and some modifications are still needed. The
applicant will be inquired to meet the existing site runoff rates for the 10-year and 100-year, 24-hour storm
events. The proposed pond must be designed to National Urban Runoff Program (NURP) standards. The
Walnut Grove 2"d Addition
March 16, 2004
Page 5
storm sewer must be designed for a 10-year, 24-hour storm event. Drainage and utility easements must be
dedicated on the final plat over the public storm drainage system including ponds, drainage swales, and
wetlands up to the 100-year flood level. The minimum easement width shall be 20 feet wide.
Staff recommends that Type III silt fence be used along the south side adjacent to the secondary Bluff Creek
line and Type II silt fence along the east and west sides of the grading area. In addition, tree preservation
fencing must be installed at the limits of tree removal. A 75-foot minimum rock construction entrance must
be added to the entrance that will be accessed during construction. The applicant should be aware that any
off -site grading will require an easement from the appropriate property owner.
Storm Water Management
The proposed development is required to maintain existing runoff rates. On -site storm water ponding must
be sufficient to meet all City water quality and quantity standards. A manhole with a two -foot sump should
be installed as the last road -accessible structure prior to discharge into the storm water pond. Riprap and
geotextile fabric should be installed at the flared end sections of the inlet and outlet of the storm water pond.
Easements
Drainage and utility easements should be provided over all existing wetlands, wetland buffer areas, and
storm water infrastructure. A drainage and utility easement should be dedicated over the 10 feet either side
of the property line between Lots 3 and 4 in order to accommodate access for future storm water
infrastructure maintenance. A drainage and utility easement should also be dedicated over the area in the
southwestern portion of Lot 3 that is currently not encumbered by a drainage and utility easement since
water discharged from the storm water pond will flow through this area as it moves toward the wetland.
Erosion Control
Type III silt fence should be provided adjacent to all areas to be preserved as buffer or, if no buffer is to be
preserved, at the delineated wetland edge. All upland areas disturbed as a result of construction activities shall
be immediately restored with seed and disc -mulched, covered with a wood -fiber blanket, or sodded within two
weeks of completion of each activity in accordance with the City's Best Management Practice Handbook.
Surface Water Management Fees
Water Quality Fees
Because of the impervious surface associated with this development, the water quality fees for this proposed
development are based on single-family residential development rates of $949/acre. Based on the proposed
developed area of approximately 2.24 acres, the water quality fees associated with this project are $2,126.
Water Quantity Fees
The SWMP has established a connection charge for the different land uses based on an average city-wide rate
for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts,
open channels, and storm water ponding areas for runoff storage. Single-family residential developments have a
Walnut Grove 2"d Addition
March 16, 2004
Page 6
connection charge of $2,348 per developable acre. This results in a water quantity fee of approximately $5,259
for the proposed development.
SWMP Credits
This project proposes the construction of a NURP pond. The applicant will be credited for water quality
where NURP basins are provided to treat runoff from the site. This will be determined upon review of the
ponding and storm sewer calculations. Credits may also be applied to the applicant's SWMP fees for
oversizing in accordance with the SWMP or the provision of outlet structures. The applicant will not be
assessed for areas that are dedicated outlots. No credit will be given for temporary pond areas.
At this time, the estimated total SWMP fee, due and payable to the City at the time of final plat recording, is
$7,385.
Other Agencies
The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley -
Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency) and comply with their
conditions of approval.
Municipal sewer and water service is available to the site from Baneberry Way. The existing house on Lot
1 is already connected to municipal sewer and water. The applicant is proposing to extend sewer and water
lines along the private driveway to serve Lots 2, 3 and 4. The proposed sanitary manholes must be low
enough to serve the basement of Lots 2, 3 and 4, Block 1 and the public utility lines must be 10 feet inside
the property line. In addition, a 30-foot wide public drainage and utility easement must be dedicated on the
final plat over the public sewer and water lines.
According to the City's Finance Department records, the parcel was previously assessed for one sanitary
sewer and water hookup. Since the developer will be responsible for extending lateral sewer and water
service to the lots, the sanitary sewer and water connection charges will be waived. However, the sanitary
sewer and water hookup charges will still be applicable for each of the new lots. The 2004 trunk hookup
charge is $1,458 for sanitary sewer and $2,814 for watermain. Sanitary sewer and watermain hookup fees
may be specially assessed against the parcel at the time of building permit issuance. Hookup charges are
based on the number of SAC units assigned by the Met Council for each lot.
All of the utility improvements are required to be constructed in accordance with the City's latest edition of
Standard Specifications and Detail Plates. Upon completion of the utility improvements, the utilities will be
turned over to the City for maintenance and ownership. The applicant is also required to enter into a
development contract with the City and supply the necessary financial security in the form of a letter of
credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval.
Permits from the appropriate regulatory agencies will have to be obtained, including but not limited to the
MPCA, Department of Health, MCES, Carver County and Watershed District.
Walnut Grove 2"d Addition
March 16, 2004
Page 7
STREETS
The applicant is proposing two accesses to the proposed lots. On the northwest corner of the parcel, an
existing access off Galpin Lake Road will be utilized to serve the existing house on Lot 1. Another
proposed new access off Baneberry Way will be servicing Lots 2, 3 and 4 as a private street. As such, the
private street easement must be 30 feet wide with 20 feet of hard -surface pavement and built to a 7-ton
design. The developer must submit an inspection report certifying that the private street is built to a 7-ton
design. The applicant is proposing a hammerhead turnaround. At this stage, the Engineering Department
and the Fire Marshal are fine with the proposed turnaround and the removal of the existing temporary cul-
de-sac at the end of Baneber y Way.
EASEMENTS
Conservation easements shall be dedicated over all areas within the Bluff Creek primary zone.
REZONING/COMP PLAN
The proposed development is consistent with the Residential — Low Density land use designation which
permits a maximum net density of 1.2 to 4.0 units per acre with a net density of 2.44 units per acre. The
proposed development is preserving the Bluff Creek corridor as permanent open space.
COMPLIANCE TABLE
Area (square feet)
Width (feet)
Depth (feet)
Setbacks: front,
rear, side, Bluff
Creek primary
zone,wetland
Code
15,000
100
125
30, 30,10, 40, 40
Lot 1
26,026
104
250
30, 30,10, na na
Lot 2
15,247
61
250
30, 30, 9, na, na
Lot 3
14,994 #
60
250
30, 30, 9, 40, 40
Lot 4
15,244
61
250
30, na, 9, 40, 40
Outlot A (Bluff
Creek Primary
Zone)
41,246
ROW
21,843
Total
134,600
(Lots 2, 3 and 4 would have 9-foot side yard setbacks)
# The lot lines shall be adjusted to create a 15,000 square foot or larger lot.
PRIVATE STREET FINDINGS
In order to permit private streets, the city finds that the following conditions exist:
1) The prevailing development pattern makes it unfeasible or inappropriate to construct a public street.
The site is being accessed via an existing private street through the Walnut Grove development for
Walnut Grove 2"d Addition
March 16, 2004
Page 8
which an access easement was recorded as part of the Walnut Grove development. The location of
the Bluff Creek Primary zone and the small wetland on site make it unfeasible to construct a public
street. Additional access to Galpin Boulevard is not desirable.
2) After reviewing the surrounding area, it is concluded that an extension of the public street system is
not required to serve other parcels in the area, improve access, or to provide a street system
consistent with the comprehensive plan. No additional access will be permitted to Galpin
Boulevard.
3) The use of the private street will permit enhanced protection of the city's natural resources including
wetlands and forested areas located in the Bluff Creek primary zone.
VARIANCE FINDINGS WITHIN SUBDIVISONS
The city may grant a variance from the regulations of the subdivision ordinance as part of the plat approval
process following a finding that all of the following conditions exist:
1) The hardship is not a mere inconvenience.
Finding: The hardship is not a mere inconvenience. The proposed private street preserves significant
site features and connects to an existing private street. The lot width variance and side yard setback
variance permit the implementation of the Bluff Creek Overlay District.
2) The hardship is caused by the particular physical surroundings, shape or typographical conditions of the
land.
Finding: The hardship is caused by the particular physical surroundings, shape and topographical
conditions of the land, namely the Bluff Creek primary zone and the access via an existing private
street.
3) The conditions upon which the request is based are unique and not generally applicable to other
property.
Finding: The conditions upon which the request is based are unique and not generally applicable to
other properties due to the unique site features.
4) The granting of the variance will not be substantially detrimental to the public welfare and is in accord
with the purpose and intent of this chapter, the zoning ordinance and comprehensive plan.
Finding: The granting of a variance will not be substantially detrimental to the public welfare and is in
accord with the purpose and intent of this chapter, the zoning ordinance, and comprehensive plan.
RECOMMENDATION
Staff recommends that the City Council adopt the following three motions (rezoning,
subdivision with variances and conditional use permit) based on the findings in the staff report:
Walnut Grove 2"d Addition
March 16, 2004
Page 9
A. "The Chanhassen of City Council approves the rezoning of
the property from Agricultural Estate District, A2, to Single Family Residential District, RSF."
B. "The Chanhassen Planning GewArissien feeeffffaends appfaval City Council approves the preliminary
plat for Walnut Grove Second Addition with lot width variances and one (1) foot side yard setback
variances and a variance for the use of a private street, according to the plans prepared by Otto Associates,
date stamped Received February 12, 2004, subject to the following conditions:
1. At the time of final plat recording, the developer shall pay full park dedication fees for the three lots that are
subject to park dedication fees.
2. Adjust the lot line(s) to assure that all lots meet or exceed the 15,000 square -foot minimum lot area.
3. Individual sewer and water services must be provided and for Lots 1— 4 and indicated on the plans.
4. A final grading plan and soils report must be submitted to the Inspections Division before permits will be
issued.
5. The old individual sewage treatment site for the existing home must be abandoned in accordance with
MPCA regulations .
6. A 10-foot clear space must be maintained around fire hydrants, i.e. street lamps, trees, shrubs, bushes,
Qwest, Xcel Energy, Cable TV and transformer boxes. This is to insure that fire hydrants can be
quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-01.
7. "No Parking Fire Lane" signs will be required on the new private street. Pursuant to Chanhassen Fire
Prevention Policy #06-1991. Copy enclosed.
8. Conservation easements shall be dedicated over all areas within the Bluff Creek primary zone.
9. Tree preservation fence shall be installed at the edge of the grading limits prior to any construction.
Fencing shall protect trees on proposed lots as well as trees in neighboring properties located next to the
grading limits.
10. Any trees lost due to construction that are not shown as such on plans shall be replaced at a rate of 2:1
diameter inches.
11. Applicant shall submit landscape plans for ity review and approval prior to final plat approval. A minimum
of one overstory tree will be required in the front yard of each lot.
12. Bufferyard plantings are required along Galpin Boulevard. Planting requirements are: 1 overstory tree, 2
understory trees, and 4 shrubs.
13. A final grading plan and soils report must be submitted to the Inspections Division before permits will be
issued.
Walnut Grove 2"d Addition
March 16, 2004
Page 10
14. A wetland buffer 0 to 20 feet in width (with a minimum average of 10 feet) shall be maintained around the
wetland. The wetland buffer shall be 0 along the east side of the wetland and 20 ft. on the north and
west sides. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's
wetland ordinance. The applicant shall install wetland buffer edge signs, under the direction of City staff,
before construction begins and shall pay the City $20 per sign.
15. The grading and erosion control plan shall show the actual wetland buffer widths proposed to meet the
minimum average buffer width requirements as well as the 40-foot wetland buffer setback. All structures
shall maintain at least a 40-foot setback from the edge of the wetland buffer or, if no buffer is to be
preserved, from the delineated wetland edge.
16. The primary zone boundary shall be amended to include the wooded area in the rear (westernmost) portion
of Lot 4.
17. A conservation easement shall be dedicated over the primary zone. All structures shall maintain at least a
40 foot setback from the primary zone. No disturbance of the site shall occur within the first 20 feet of the
setback. Open space shall comprise 100% of the primary zone.
18. The proposed development shall maintain existing runoff rates. On -site storm water ponding shall be
sufficient to meet all City water quality and quantity standards.
19. A manhole with a two -foot sump shall be installed as the last road accessible structure prior to discharge
into the storm water pond.
20. Riprap and geotextile fabric shall be installed at the flared end sections of the inlet and outlet of the storm
water pond.
21. Drainage and utility easements shall be provided over all existing wetlands, wetland buffer areas and storm
water infrastructure.
22. A drainage and utility easement shall be dedicated over the 48 9 feet either side of the property line between
Lots 2 and 3 in order to accommodate access for future storm water infrastructure maintenance. A drainage
and utility easement shall be dedicated over the areas in the western portions of Lots 3 and 4 that are
currently not encumbered by drainage and utility easements since water discharged from the storm water
pond will flow through this area as it moves toward the wetland.
23. Type III silt fence shall be provided adjacent to all areas to be preserved as buffer or, if no buffer is to be
preserved, at the delineated wetland edge. Silt fence shall be provided as needed to prevent sediment from
leaving the site.
24. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1.
25. All exposed soil areas shall have temporary erosion protection or permanent cover for the exposed soil
areas year round, according to the following table of slopes and time frames:
Walnut Grove 2"d Addition
March 16, 2004
Page 11
26. Type of Slope
Stabilized within
Steeper than 3:1
7 days
10:1 to 3:1
14 days
Flatter than 10:1
21 days
27. These areas include any exposed soil areas with a positive slope to a storm water conveyance system, such
as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or
man-made systems that discharge to a surface water.
28. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as
needed.
29. Based on the proposed developed area of approximately 3.09 acres, the estimated total SWMP fee, due
payable to the City at the time of final plat recording, is $11,041.
30. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley -
Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency, Minnesota Department of
Natural Resources (for dewatering), Minnesota Department of Health, Carver County, Metropolitan
Council Environmental Services, etc. and comply with their conditions of approval.
31. Prior to final plat approval, a professional civil engineer registered in the State of Minnesota must sign
all plans.
32. Sanitary sewer and water hookup charges are applicable for each of the new lots. The 2004 trunk
hookup charge is $1,458 for sanitary sewer and $2,814 for watermain. Sanitary sewer and watermain
hookup fees may be specially assessed against the parcel at the time of building permit issuance. Hook-
up charges are based on the number of SAC units assigned by the Met Council for each lot.
33. The applicant will be required to meet the existing site runoff rates for the 10-year and 100-year, 24-
hour storm events. The proposed pond must be designed to National Urban Runoff Program (NURP)
standards. The storm sewer must be designed for a 10-year, 24-hour storm event. Drainage and utility
easements shall be dedicated on the final plat over the public storm drainage system including ponds,
drainage swales, and wetlands up to the 100-year flood level. The minimum easement width shall be 20
feet wide.
34. Tree preservation fencing must be installed at the limits of tree removal. The applicant should be aware
that any off -site grading will require an easement from the appropriate property owner.
35. The applicant must enter into a development contract with the City and supply the necessary financial
security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and
the conditions of final plat approval.
36. Submit detailed construction plans and specifications for the public utility improvements before final
platting.
Walnut Grove 2"d Addition
March 16, 2004
Page 12
37. Construct public utility improvements in accordance with the City's latest edition of Standard
Specifications and Detail Plates.
38. Installation of the private utilities for the site will require permits and inspections through the City's
Building Department.
39. Seed and mulch or sod the site within two weeks of grading. Submit a haul route for City approval prior
to any hauling.
40.On the grading plan:
a. Revise the side slopes along the east side of the private drive to be a maximum of 3:1 or
install a retaining wall.
b. Add Type III silt fence along the secondary bluff creek zone line on the south side and Type
II silt fence along the west and east sides of the grading area.
c. Show a minimum 75-foot rock construction entrance.
d. Show all existing and proposed easements.
e. Add a bench mark.
f. Show the storm sewer manhole rim and invert elevations.
41.On the utility plan:
a. Show the proposed utility lines 10 feet inside the property line.
b. Add a note "connection to existing manhole must be core drilled."
c. Show sanitary manhole rim and invert elevations.
d. Show all existing and proposed utility easements.
e. Show the location of existing water and sanitary services to Lot 1.
42.On the street and storm plan:
a. Last storm manhole discharging to the pond must include a 3-foot sump.
b. Show the proposed and existing street easements.
43. Add a legend to the plans.
44. The driveway easement must be 30 feet wide with 20 feet of hard -surface pavement and built to a 7-ton
design.
45. Submit an inspection report certifying that the private street is built to a 7-ton design.
46. Elevation of lowest house opening must be three feet above high water level of the proposed pond.
47. A 30-foot wide public drainage and utility easement must be dedicated on the final plat over the public
sewer and water lines.
Walnut Grove 2nd Addition
March 16, 2004
Page 13
48. Structure setbacks shall comply with the following table:
Setbacks: front, rear, side, Bluff Creek primary zone, wetland
buffer
Lot 1
30, 30, 10, na, na
Lot 2
30, 30, 9, na, na
Lot 3
30, 30, 9, 40, 40
Lot 4
30, na, 9, 40, 40
C. "The Chanhassen City Council approves the Conditional
Use Permit #2003-6 for development within the Bluff Creek Overlay District subject to the following
conditions:
1. The primary zone boundary shall be amended to include the wooded area in the rear (westemmost)
portion of Lot 4.
2. A conservation easement shall be dedicated over the primary zone. All structures shall maintain at least
a 40 foot setback from the primary zone. No disturbance of the site shall occur within the first 20 feet
of the setback. Open space shall comprise 100% of the primary zone."
ATTACHMENTS:
1) Findings of Fact and Recommendation.
2) Development Review Application.
3) Reduced Copy of Preliminary Plat Sheets 1-5.
4) Birchwood House Plan.
5) Oakside House Plan.
6) Maple Leaf House Plan.
7) Memo from Steven Torell to Bob Generous dated 3/1/04.
8) Memo from Mark Littfin to Robert Generous dated 2/25/04.
9) Letter from Carver Soil & Water Conservation District to Robert Generous dated 9/23/03.
10) Reduced Copy Walnut Grove Preliminary Plat.
11) Reduced Copy Walnut Grove Site Plan.
12) Portion of Walnut Grove Final Plat (Walnut Curve) — Single -Family Lots.
13) Portion of Walnut Grove Final Plat (Prairie Flower Blvd.) — Bungalow Lots.
14) Portion of Walnut Grove Final Plat (Baneberry Way W.) — Townhouses.
15) Walnut Grove Lot Area Tabulations.
16) Walnut Grove Bungalows, Villas and Villa Townhomes Descriptions.
17) Notice of Public Hearing and Notified Property Owners list.
gAplan12004 pbanning cases\04-10 -walnut grove 2nd addition\walnut gmve 2nd staff tepmt.doc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
IN RE:
Application of Klingelhutz Development for a Rezoning from Agricultural Estate
District, A2, to Single Family Residential District, RSF; preliminary plat approval
creating four lots for single-family homes with a variance for the use of a private
street, lot width and side yard setbacks; and conditional use permit approval for
development within the Bluff Creek Overlay District.
On March 16, 2004, the Chanhassen Planning Commission met at its regularly
schedule meeting to consider the application of Klingelhutz Development for a Rezoning
from Agricultural Estate District, A2, to Single Family Residential District, RSF;
preliminary plat approval creating four lots for single-family homes with a variance for
the use of a private street, lot width and side yard setbacks; and conditional use permit
approval for development within the Bluff Creek Overlay District. The Planning
Commission conducted a public hearing on the proposed Development preceded by
published and mailed notice. The Planning Commission heard testimony from all
interested persons wishing to speak and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned Agricultural Estate District, A2.
2. The property is guided in the Land Use Plan for Residential — Low Density uses.
The legal description of the property is: see exhibit A.
4. The Zoning Ordinance directs the Planning Commission to consider six (6)
possible adverse affects of the proposed amendment. The six (6) affects and our findings
regarding them are:
a) The proposed action has been considered in relation to the specific policies
and provisions of and has been found to be consistent with the official City
Comprehensive Plan. The property is guided for Residential — Low Density
uses. RSF is an appropriate zoning for the property.
b) The proposed use is or will be compatible with the present and future land
uses of the area. This development will develop at a lower density than the
property to the east.
c) The proposed use conforms with all performance standards contained in the
Zoning Ordinance.
d) The proposed use will not tend to or actually depreciate the area in which it is
proposed.
e) The proposed use can be accommodated with existing public services and will
not overburden the city's service capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving
the property. Access to the existing house will be via the existing driveway
on Galpin Boulevard. The additional dwellings will be accessed via
Baneberry Way West, a private street.
Section 18-39 (f) requires the city make the following findings in approving a
Subdivision:
1) The proposed subdivision is consistent with the zoning ordinance;
Findine: The subdivision meets all the requirements of the RSF, Residential Single
Family District with the exception of the lot width and side yard setbacks for which
the applicant is requesting a variance and the Bluff Creek Overlay District.
2) The proposed subdivision is consistent with all applicable city, county and regional
plans including but not limited to the city's comprehensive plan;
Finding: The proposed subdivision is consistent with the Residential — Low Density
land use designation.
3) The physical characteristics of the site, including but not limited to topography,
soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding,
and storm water drainage are suitable for the proposed development;
Finding: The proposed site is suitable for development subject to the conditions
specified in this report.
4) The proposed subdivision makes adequate provision for water supply, storm
drainage, sewage disposal, streets, erosion control and all other improvements
required by this chapter;
Finding: The proposed subdivision is served by adequate urban infrastructure.
2
5) The proposed subdivision will not cause environmental damage;
Finding: The proposed subdivision will not cause excessive environmental damage
subject to conditions of approval.
6) The proposed subdivision will not conflict with easements of record.
Finding: The proposed subdivision will not conflict with existing easements, but
rather will expand and provide all necessary easements.
7) The proposed subdivision is not premature. A subdivision is premature if any of the
following exists:
a) Lack of adequate storm water drainage.
b) Lack of adequate roads.
c) Lack of adequate sanitary sewer systems.
d) Lack of adequate off -site public improvements or support systems.
Finding: The proposed subdivision is provided with adequate urban infrastructure.
6. The Board of Adjustments and Appeals shall not recommend and the City Council shall
not grant a variance unless they find the following facts:
a. That the literal enforcement of this chapter would cause an undue hardship. Undue
hardship means that the property cannot be put to reasonable use because of its size,
physical surroundings, shape or topography. Reasonable use includes a use made by
a majority of comparable property within 500 feet of it. The intent of this provision
is not to allow a proliferation of variances, but to recognize that there are pre-
existing standards in this neighborhood. Variances that blend with these pre-existing
standards without departing downward from them meet this criteria.
Finding: The literal enforcement of this chapter does cause an undue hardship since
the majority of the residential housing within 500 feet of the site consist of
townhouses and zero lot line detached homes.
b. The conditions upon which a petition for a variance is based are not applicable,
generally, to other property within the same zoning classification.
Finding: The conditions upon which a petition for a variance is based are uniques
to this property. Access to the site was previously provided via a private street,
which this development continues. The proposed development attempts to preserve
the Bluff Creek Overlay District within one outlot, as directed by staff, which
constricts the width of the lots. The housing is very compatible with other housing
within the adjacent development.
c. The purpose of the variation is not based upon a desire to increase the value or
income potential of the parcel of land.
Finding: While the subdivision of the property will increase the value of the parcel,
the purpose of the variance is to permit the developer to develop the site and
preserve the Bluff Creek Corridor.
d. The alleged difficulty or hardship is not a self-created hardship.
Finding: The access to the site, via a private street, was provided as part of the
Walnut Grove Development. The applicant is attempting to meet the city's
expectations for preserving the Bluff Creek corridor while developing the site in a
reasonable manner.
e. The granting of the variance will not be detrimental to the public welfare or injurious
to other land or improvements in the neighborhood in which the parcel is located.
Finding: The granting of the variance will not be detrimental to the public welfare
or injurious to other land or improvements in the neighborhood in which the parcel
is located. The proposed development is very compatible with the Walnut Grove
development.
f. The proposed variation will not impair an adequate supply of light and air to
adjacent property or substantially increase the congestion of the public streets or
increase the danger of fire or endanger the public safety or substantially diminish or
impair property values within the neighborhood.
Finding: The proposed variation will not impair an adequate supply of light and air
to adjacent property or substantially increase the congestion of the public streets or
increase the danger of fire or endanger the public safety or substantially diminish or
impair property values within the neighborhood
7. Conditional Use Permit. When approving a conditional use permit, the City must
determine the capability of a proposed development with existing and proposed
uses. The general issuance standards of the conditional use Section 20-232, include
the following 12 items:
a) The proposed development will not be detrimental to or endanger the public
health, safety, comfort, convenience or general welfare of the neighborhood or
the city.
b) The proposed development is consistent with the objectives of the city's
comprehensive plan and this chapter.
c) The proposed development will be designed, constructed, operated and
maintained so to be compatible in appearance with the existing or intended
character of the general vicinity and will not change the essential character of
that area.
0
d) The proposed development will not be hazardous or disturbing to existing or
planned neighboring uses.
e) The proposed development will be served adequately by essential public
facilities and services, including streets, police and fire protection, drainage
structures, refuse disposal, water and sewer systems and schools; or will be
served adequately by such facilities and services provided by the persons or
agencies responsible for the establishment of the proposed use.
f) The proposed development will not create excessive requirements for public
facilities and services and will not be detrimental to the economic welfare of the
community.
g) The proposed development will not involve uses, activities, processes, materials,
equipment and conditions of operation that will be detrimental to any persons,
property or the general welfare because of excessive production of traffic, noise,
smoke, fumes, glare, odors, rodents, or trash.
h) The proposed development will have vehicular approaches to the property which
do not create traffic congestion or interfere with traffic or surrounding public
thoroughfares.
i) The proposed development will not result in the destruction, loss or damage of
solar access, natural, scenic or historic features of major significance.
j) The proposed development will be aesthetically compatible with the area.
k) The proposed development will not depreciate surrounding property values.
1) The proposed development meets standards prescribed for certain uses as
provided in Bluff Creek Overlay District.
8. The planning report #04-10 dated March 16, 2004, prepared by Robert Generous,
et al, is incorporated herein.
5
RECOMMENDATION
The Planning Commission recommends that the City Council approve the
Rezoning from Agricultural Estate District, A2, to Single Family Residential District,
RSF; preliminary plat approval creating four lots for single-family homes with a variance
for the use of a private street, lot width and side yard setbacks; and conditional use permit
approval for development within the Bluff Creek Overlay District subject to the
recommendations contained in the staff report.
10
ADOPTED by the Chanhassen Planning Commission this 16te day of March,
CHANHASSEN PLANNING COMNUSSION
BY:
Uh Sacchet, Chairman
EXHIBIT A
Legal Description Parcel 1:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows:
Commencing at the West Quarter comer of said Section 10, thence on an assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, a distance of 1213.40 feet; thence North 86 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet to a point on a 3452.34 foot
radius curve, the center of circle of said curve bearing North 79 degrees 30
minutes 09 seconds West from said point; thence Southwesterly along said curve,
a distance of 469.80 feet, central angle 07 degrees 47 minutes 49 seconds; thence
South 18 degrees 17 minutes 40 seconds West along tangent, a distance of 64.00
feet to the actual point of beginning of the tract to be described, • thence continuing
South 18 degrees 17 minutes 40 seconds West, a distance of 282.12 feet; thence
South 65 degrees 12 minutes 03 seconds East, a distance of 33.12 feet to a point
that is hereafter referred to as Point A.
Point A is described as beginning at the point of intersection of the Northerly
right—of—way line of Minnesota Trunk Highway No. 5 and a line 33.00 feet
Southeasterly of, measured at right angles to and parallel with the centerline of
Carver County Road No. 117,• thence on an assumed bearing of North 18 degrees
17 minutes 40 seconds East and parallel with the centerline of said Carver County
Road No. 117, a distance of 725.00 feet to said Point A.
Thence from said Point A, South 65 degrees 12 minutes 03 Southeast East, a
distance of 268.73 feet, thence North 18 degrees 17 minutes 40 seconds East, a
distance of 316.33 feet, thence North 71 degrees 42 minutes 20 seconds West, a
distance of 300.00 feet to the point of beginning.
Legal Description Parcel 2•
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows:
Commencing at the West Quarter comer of said Section 10, thence on on assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet; thence Southerly a distance
of 38379 feet along a curve not tangential with the lost described line, said curve
is concave to the West, has a radius 345234 feet and a central angle of 6 degrees
22 minutes 10 seconds and the chord of said curve bears South 13 degrees 40
minutes 55 second West to the point of beginning of the tract to be described;
thence continuing Southerly, a distance of 86.01 feet along said curve concave to
the West, having a radius of 345234 feet, a central angle of 01 degree 25 minutes
39 seconds; thence South 18 degrees 17 minutes 40 seconds West, tangent to said
curve, a distance of 64.00 feet; thence South 71 degrees 42 minutes 20 seconds
East, a distance of 300.00 feet; thence North 18 degrees 17 minutes 40 seconds
East, a distance of 150.00 feet; thence North 71 degrees 42 minutes 20 seconds
West, a distance of 301.07 feet to the point of beginning.
-- ---- - ---- ------_ I I ucaRRY rCC
�pafYOF
CHMSER
IPlannia, 4 -1
(%t merle/ 63 -Ib 5U8/03-14 ea Z/03-ceo1u0)
CII/V F IVEDSSEN
CITY OF CHANHASSEN
7700 MARKET BOULEVARD
CHANHASSEN, MN 55317
(952) 227-1100
DEVELOPMENT REVIEW APPLICATION
APPLICANT: V IIIM
ADDRESS:3sc) 1; V 212
TELEPHONE (Day time) grD2- Liao{ - 333o
FEB 1 2 2004
CHANHASSEN PLANNING DEPT
OWNER: VJ I h 4 1 UAA2 1)i (z(T
ADDRESS: ZI Z
TELEPHONE: q52- "Iy�- 3 330
Comprehensive Plan Amendment
Temporary Sales Permit
Conditional Use Permit
Vacation of ROW/Easements
Interim Use Permit
Variance
Non -conforming Use Permit
_ Wetland Alteration Permit
Planned Unit Development'
_ Zoning Appeal
Rezoning
_ Zoning Ordinance Amendment
Sign Permits
Sign Plan Review
Notification Sign
_ Site Plan Review'
X Escrow for Filing Fees/Attomey Cost"
($50 CUP/SPR/VAC/VARNVAP/Metes
and Bounds, $400 Minor SUB)
Subdivision'
TOTAL FEE $
A list of all property owners within 500 feet of the boundaries of the property must be included with the
application.
Building material samples must be submitted with site plan reviews.
`Twenty-six full size folded copies of the plans must be submitted, including an 8'/:" X 11" reduced copy of
transparency for each plan sheet.
" Escrow will be required for other applications through the development contract
NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application.
PROJECT NAME W( MIA U t VC � ( I.Zd Jkddlfil l()n
LOCATION b,11410a(LI- 1
LEGAL DESCRIPTION ` 6e 0 LC-( hf �L
TOTAL M
ACREAGE 0- P"t-S
WETLANDS PRESENT
^ k YES NO
PRESENTZONING �Z
REQUESTED
ZONING CLS�
PRESENT LAND USE DESIGNATION
REQUESTED LAND USE DESIGNATION
REASON FOR THIS REQUEST P`'1VQk"I_, -SAYeet y 110t IU�y LUnA
SO laws
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning
Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within ten business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within ten business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owners Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my knowledge.
The city hereby notifies the applicant that development review cannot be completed within 60 days due to public hearing
requirements and agency review. Therefore, the city is notifying the applicant that the city requires an automatic 60 day
extension for development review. Development review shall be completed within 120 days unless additional review
extensions are approved by the applicant_
of
Signature
Application Received on Fee Paid
31119--lix-
DaA
Date
Receipt No.
The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the
meeting. If not contacted, a copy of the report will be mailed to the applicant's address.
Legal Description Parcel 1:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows:
Commencing at the West Quarter comer of said Section 10; thence on an assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet to a point on a 3452.34 foot
radius curve, the center of circle of said curve bearing North 79 degrees 30
minutes 09 seconds West from said point, thence Southwesterly along said curve,
a distance of 469.80 feet, central angle 07 degrees 47 minutes 49 seconds; thence
South 18 degrees 17 minutes 40 seconds West along tangent, a distance of 64.00
feet to the actual point of beginning of the tract to be described, • thence continuing
South 18 degrees 17 minutes 40 seconds West, a distance of 282.12 feet; thence
South 65 degrees 12 minutes 03 seconds East, a distance of 3312 feet to a point
that is hereafter referred to as Point A.
Point A is described as beginning at the point of intersection of the Northerly
right—of—way line of Minnesota Trunk Highway No. 5 and a line 33.00 feet
Southeasterly of, measured at right angles to and parallel with the centerline of
Carver County Road No. 117,• thence on an assumed bearing of North 18 degrees
17 minutes 40 seconds East and parallel with the centerline of sold Carver County
Road No. 117, a distance of 725.00 feet to said Point A.
Thence from said Point A, South 65 degrees 12 minutes 03 Southeast East, a
distance of 268.73 feet; thence North 18 degrees 17 minutes 40 seconds East, a
distance of 316.33 feet; thence North 71 degrees 42 minutes 20 seconds West, a
distance of 300.00 feet to the point of beginning.
Legal Description Parcel 2:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows:
Commencing at the West Quarter comer of said Section 10, thence on an assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, a distance of 1213.40 feet; thence North 86 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet; thence Southerly a distance
of 38379 feet along a curve not tangential with the lost described line, said curve
is concave to the West, has a radius 3452.34 feet and a central angle of 6 degrees
22 minutes 10 seconds and the chord of said curve bears South 13 degrees 40
minutes 55 second West to the point of beginning of the tract to be described,•
thence continuing Southerly, a distance of 86.01 feet along said curve concave to
the West, having a radius of 3452.34 feet, a central angle of 01 degree 25 minutes
39 seconds; thence South 18 degrees 17 minutes 40 seconds West, tangent to said
curve, a distance of 64.00 feet; thence South 71 degrees 42 minutes 20 seconds
East, a distance of 300.00 feet; thence North 18 degrees 17 minutes 40 seconds
East, a distance of 150.00 feet, thence North 71 degrees 42 minutes 20 seconds
West, a distance of 301.07 feet to the point of beginning.
I DESIGNED DRAWN I L MtKtUT_lat
....1YMwb'Ii OI IAw mnWM tl✓Is�✓M Atlb MMY
M s.l✓. mr... wrnatlww.. F.n m.tia
.rW M1L.� �INF�..�FI M'nNy�D M
M'Mtr_ Mw�.bM ✓Ilw
�_ N M..nW ryF a 4r� Ynl.r✓ tl �b w.�
.M . �rl m.ba�FYwy wr.✓L. mW✓YNm
MI✓FyrIYW wYw NJry w.�rlFw.
wMil Fmk I� aiwi+rw aM.L��wuuaM b�M.
✓ YM. Y W .Yn wF..�b. ✓ b Irwp
.FY-.I-w�.mirnw w ly..e N J wr.. W am u
�iY nrr.. ✓ ryl wy✓ Y.r1.✓w'r W �Ir. Y
.V .Y IIM1.mYr.. YIam WI b.Y M.w
YYq F� N'Y n..lr Y.r.l✓ D ✓s mR
YI.i..Y mD u Y W Mf ✓J.I.w..
�N .w��b � � �w WrF. a !�� In .✓A JA L�
MM�✓n.w FYwnN�e✓.nbMMMww W�Y
tl Frt w� x.w w bw� N
N wi....✓�w�bywWM b�VM �'wn.
n�bW ro �lr.` W wv ✓'tl".YJ.`....�..�.i: uµimYW! a'
^M.✓I✓.M n.nl MY F W MI ✓ MYN1 ✓ W Mr b Y emNy
Mr�i M1� �JNlY M�rrW wlF ✓n Yt✓N✓WW
Y �m w.� Iww�N N� r1 nW W tl r�Yr 64 W.nl b ✓I/
l..L • mb� ✓JAm Wt P.� Ww F N� Y� m M
wt � 46n Y JOI,OAI M n r I+I ✓MMI Y.M.W A ✓rY
WALNUT GROVE SECOND ADDITION
VN �� IQINGELNURO LO MEM
.Zi '. I C-
1�
w,w�;fffi359�
°��YNbm
a,� ^„J •
oYNw W D.IJ
I `l
II
wrm®
ND.. JV
v. r
mwJ - m
Nwlr olwr Jx. m
tmwJoao-u
�tvae. As
I F4m.tlw Mn L.r11RY 9r.
r L � a LYimr q. W 61Y
diW✓ N Jul3 b IY I-}Iy
L �pp�.�gt ♦aw.m�u
-0 _. _ MF.rF�.rNMwFf
YI. M AMf
lrr[Yanrl( �bij. m
m r6. n4 r.D
urtrvr oinn, Nwnr.
PRELIMINARY PLAT I 2-02-0568
A
� rs Ra[ivoWrr
I
/ b OVF.� W lYb
/u�I]S-WJN
ig "" Z
4 o
a
Orq �
h WALNUT GROVE SECOND ADDITION rr""
TTo` -y NLINOElHURO LWMEN FRELIMINARYU LT PLAN 2-02-0568
bl` w CHANHASSEN, MN SHEET NO. 2 OF 5 SHEETS omiem
WPhONM�HwN,
`S
. z
"7
a
e„
ENZ
I low!
\ I,
"w"" WALNUT GROVE SECOND ADDITION PRELIMINARY STREET&
`!5ci^7 NLINOfLNUR DEVELOPMENT STORM PLAN r 2-02-0588
"wai CHANHASSEN,MN SHEET N0. 3 OF 5 SHEETS wi m
1`•
' . 11 exw waxrrs
/
/ /� / \, • .w. �•'^ww i Aemw1Vgjon ai w urA" �� ° nu Rmmmsurt.
, Ill 1 \ 1 \ m ti a .�u°n w:u rarer wm me wmra wuvi mrxa•s
/ � / � 1 Q�j \ \ \ \ �. °0jJ"M1gr ✓ rna� w. M m1p1x rw°K°'iaWanwowaa[f TM[ r'�"rzdn'a
\ \ Oar rPYr uu WI¢r m uA w r1a11.
n� l.w r.� mm w.0 mn. xa me xaruae v rAa w � wam
. \ rtenn wm� awm x uR.. weam Rer mwuanr w.rnm Tom. \ \ T wl xmYd a4f YWL A gym, x10.0. w9 x]C MAr1Olm
"'// > r so xa sw wAx w xws ulA mu wawo n
, / \ \ `� =' \ �� � \ \ ri mom.90nwi a�ao �•�°w.'VOw w"°'aw�.irasw. m°rtrwiw`"ri`
�C] �Am w aew om wo ew w.znucnw anuia. o>ma
� �� � \ , \ \� � \ \ `— — u i r� a mrO1 w •w axmur iwwawr n4 rwrtc.
\\` —\ r. wr Rlmmlx0 o"ara w.ow R+w smwa ma saASA
\ rz w. W.. nr awiucmi A.0 Alaww nc a.cr
\ \ umv R wa msxa vwrm Rrtw wrdaa �` M —.aae R ML. OOI>d[ Iw w. wa ML PW.1¢f YNi [[
zz
h WALNUT GROVE SECOND ADDITION PRELIMINARY GRADING PIAN w z-0z-osee
ri.c rw uw w a ��Ow� I41NGE MO LOPMEW
CHANHASSEN. MN ISHEET N0. 4 OF 5 SHEETS aarene
uv.�n wrwr ^®a ram. v m -
.� ryasm.w.wwul vrr awa-µwa
pu�srwrtr arm - w Ir^V
WALNUT GROVE SECOND ADDITION TREE INVENTORY 5 CANOPY E%HISIT a7 m
C�7TTo WNGF =DEYELOPMEM 2-02-0$SS
"'-cam CHANHASSEN, MN SHEET N0. 5 OF 6 SHEETS a6MNm
UPPER LEVEL PLAN
1,050 S.f.
MAIN LEVEL PLAN
7.050 s.1.
RIVERWOOD S
952-448-3750 office
WELMAN
81 RCHWOOD SPERI®
TWO STORY
PLAN DATA
MASTER BEDROOM
UPPER
14f x 791
MASTER BATH:
UPPER
7f x 121
BEDROOM 2
UPPER
11 f x 15f
BEDROOM3:
UPPER
77fx 14f
BATHROOM
UPPER
7fx8f
KITCHEN:
MAIN
11fx IN
DINING:
MAIN
71fx 101
GREAT ROOM:
MAIN
11 f x 171
LIVING ROOM:
MAIN
14fx 19f
POWDER:
MAIN
5f x 5f
GARAGE:
MAIN
201 x 24f
BASEMENT (UNFIN.):
LOWER
211 x 50f
Community
Realty
WWWconmealty.net
UPPER LEVEL PLAN
900sc
MAIN LEVEL PLAN
1.100s.f.
952-448-3750 office
WELM"
OAKSIDE s�
TWO STCr, "
PLAN DATA
MASTER SUITE:
UPPER
71 i x 31 f
BEDROOM2:
UPPER
I1fx15f
BEDROOM 3:
UPPER
III 151
BATHROOM:
UPPER
6fx8f
GREATROOM:
MAIN
21fx141
DINING:
MAIN
15f x 9f
KITCHEN:
MAIN
11fx 12f
MUD ROOM.
MAIN
5f x 8f
POWDER:
MAIN
5fx5f
LIVING ROOM:
MAIN
11fx12f
GARAGE:
MAIN
20f x 24f
BASEMENT (UNFIN.):
LOWER
21 f x 50f
0
Community
Realty ww .commrealty.net Q®
UPPER LEVEL PLAN
1,252 s.i.
LOWER LEVEL PLAN
1.337 s.1.
952-448-3750 office
MAPLE LEAF "'"
SPLIT ENTRY
PLAN DATA
KITCHEN:
UPPER
13' x 13'
PANTRY:
UPPER
6' x 6'
DINING:
UPPER
9' x 13'
GREAT ROOM:
UPPER
13' x 19'
POWDER:
UPPER
6' x 5'
MASTER SUITE:
UPPER
13' x 29'
BEDROOM 2:
LOWER
13' x 16'
BEDROOM 3:
LOWER
13' x 17'
BATH:
LOWER
9' x 5'
ENTRY:
SPLIT
6' X 7'
GARAGE:
SPLIT
20' X 24'
40
Community
Realty www.comn i alty.net Q®
CITY OF
CMSEN
T700 Market Boulevard
MEMORANDUM
PC Box 147
Chanhassen, MN 55317
TO: Bob Generous, Senior Planner
on
Rdm952,227.11
Phone:95227.11100
FROM: Steven Torell, Building Official
Fax: 952227.1110
Building Inspections DATE: March 1, 2004
Phone: 952.227.1180
Fax: 952.227.1190
SUBJ: Review of revised plans for proposed subdivision; Walnut Grove
Engineering Second Addition, Klingelhutz Development.
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone:952,227.1140 Planning Case: 04-10
Fax: 952.227.1110
Park a Recreation
I have reviewed the revised plans for the. above project. Following are comments,
Phone: 2 211
which should be included in the conditions of approval.
Fax: 95252.227.17.11100
Recreation Center
2310 Coulter Boulevard
Phone:952.227.1400
1. Individual sewer and water services must be provided and for Lots 1— 4 and
Fax: 952.227.1404
indicated on the plans.
Planning a
2. A final grading plan and soils report must be submitted to the Inspections
Natural Resources
Division before permits will be issued.
Phone: 952.227.1130
3. The old individual sewage treatment site for the existing home must be
Fax: 952.221.1110
abandoned in accordance with MPCA regulations if encountered during
Public work:
grading procedures.
1591 Park Road
4. Meet with the Inspections Division as soon as possible to discuss plan
:
Phone952.227.1300
Fax: 952.227.1310
review and permit procedures
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
G/safety/st/memos/plan/Walnut Grove 2"a Addition-2
Web Site
www.ci.chanhassen.mn.us
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
V
CITY OF
CHA NSEN
7700 Market Boulevard
MEMORANDUM
PO Box 147
Chanhassen, MN 55317
TO: Robert Generous, Senior Planner
Administration
Phone:952.227.1100
FROM: Mark Littfm, Fire Marshal
Fax 952.227.1110
DATE: February 25, 2004
Building Inspections
Phone: 952.227.1180
Fax:952,227.1190
SUBJ: Request for re -zoning of 3.09 acres from A2, Agricultural Estate District
to RSF, Single Family Residential Subdivison approval creating 4 lots
Engineering
Phone:952.227.11W
with a variance request; and a conditional use permit for development
�1 P P
Fax:952.227.1170
within the Bluff Creek Corridor, Klingelhutz Development, Walnut
Grove
Finance
2°d Addition.
Phone:952.227.1140
Fax: 952.227.1110
Planning Case: 04-10
Park 8 Recreation
Phone:952.227.1120
Fax: 952.227.1110
I have reviewed the re -zoning request change for the above project. In order to comply
Recreation Center
with the Chanhassen Fire Department/Fire Prevention division, I have the following fire
2310 Coulter Boulevard
code or city ordinancelpolicy requirements. The plan review was done based on
Phone:952.227.1400
available information submitted at this time. If additional plans or changes are
Fax:952.227.1404
submitted, the appropriate code or policy items will be addressed.
Planning 8
Natural Resources A 10-foot clear space must be maintained around fire hydrants i.e., street lamps, trees,
Phone:952.227.1130 shrubs, bushes, Qwest, Xcel Energy, Cable TV and transformer boxes. This is to insure
Fax: 952 227.1110 that fire hydrants can be quickly located and safely operated by firefighters. Pursuant tc
Public Works Chanhassen City Ordinance #9-01.
1591 Park Road
Phone:
95227132.227.1300 1"No parking fire lane" signs will be required on the new private street. Pursuant to
Chanhassen Fire Prevention Policy #06-1991. Copy enclosed.
Senior Center
Phone:9522271125 gAsdety\mIlp1rev04-10
Fax. 952227.1110
Web Site
www ci.chanhassen.mn.us
The City at Chanhassen - A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
CHANHASSEN FIRE DEPARTMENT
FIRE PREVENTION BUREAU
7700 Market Blvd BOX 147
CHANHASSEN, MN 55317
(952)227-1150
FAX: (952) 227-1190
CHANHASSEN FIRE DEPARTMENT POLICY # 06-1991
REQUIREMENTS FOR FIRE LANE SIGNAGE
Revised 6/10102
1. Signs to be a minimum of 12" x 18".
NO
PARKING 2. Red on white is preferred.
FIIZE
LANE 3. 3M or equal engineer's grade reflective
sheeting on aluminum is preferred.
4. Wording shall be: NO PARKING
FIRE LANE
5. Signs shall be posted at each end of the fire
lane and at least at 75 foot intervals along the
fire lane.
6. All signs shall be double sided facing the
direction of travel.
7. Post shall be set back a minimum of 12" but
not more than 36" from the curb.
(NOT Tom- GRADE 8. A fire lane shall be required in front of fire dept.
SCALE) connections extending 5 feet on each side and
along all areas designated by the Fire Chief.
ANY DEVIATION FROM THE ABOVE PROCEDURES SHALL BE
SUBMITTED IN WRITING, WITH A SITE PLAN, FOR APPROVAL BY THE
FIRE CHIEF. IT IS THE INTENTION OF THE FIRE DEPARTMENT TO
ENSURE CONTINUITY THROUGHOUT THE CITY BY PROVIDING THESE
PROCEDURES FOR MARKING OF FIRE LANES.
Fire Lane Instillation 06-1991
Page 1 of I
4..p9 Cap 219 East Frontage Road
AR VER I A Waconia, MN 55387
h 1946 Phone:952-442-5101
CIO 6 Fax:952-442-5497
r7tt1 Rr 481ty
htta'/lnwa m.carver.mn.us/SWCD/SWCD main.html
Minion StaMnnrt To provide leadership in conservation and teach stewardship of the soil, water, and related resources through a balanced,
coaperattve program that protects, restores, and mproves those resources.
September 23, 2003 RECEIVED
Robert Generous, Senior Planner
SEP 2 4 2003
City of Chanhassen CITY OF CHANHASSEN
7700 Market Boulevard
Chanhassen, MN 55317
Re: Proposed Walnut Grove Second Addition Development
Mr. Generous
Thank you for sending a copy of the 2003-16 Site Plan, Walnut Grove Second Addition development to the SWCD
office. Please review the following storm water, erosion, and sediment control comments and recommendations.
Storm Water
Beginning March 10, 2003 all developments disturbing 1-acre or more or part of a contiguous development which
will disturb more than 1-acre require a National Pollutant Discharge Elimination System (NPDES) permit from the
Pollution Control Agency (PCA). The owner / operator of the proposed development must apply for and receive the
NPDES permit prior to beginning construction activities.
Any development disturbing more than I -acre and creating more than I -acre of impervious surface must also have
permanent storm water treatment It appears this is being done as the Walnut Grove preliminary plan shows the
storm water runoff being managed by a proposed storm water basin.
High water levels / elevations of the pond and wetland and the elevations of the lowest level of the proposed
walkouts should be double checked. It appears the elevations of the dwellings may be too low.
Erosion Control
Riprap and gcotextile fabric needs to be installed at the flared end sections of the inlet and outlet of the storm water
basin
Sediment Control
The proposed silt fence should be extended 40 feet to the east and 20 feet to the west; the ends of the silt fence
should be angled up -slope in a crescent or `smile' formation.
A light duty silt fence should be installed between the duplexes and the storm water pond following the outlet
installation and during home construction.
Inlet control is needed following installation of inlet structures. Inlet control methods will be varied before and after
pavement of the street Before pavement, inlet protection could consist of heavy-duty mono -mono silt fence with 4
foot spacing of metal T-posts and 1" rock around silt fence material. After pavement, mulch socks, sand bags or
rock and wire could be used as temporary inlet control.
If there are any questions regarding this review please contact the SWCD office.
S'
Aaron Mlyn CPESC-IT
Urban Conservation Technician
AN EQUAL OPPORTUNITY EMPLOYER
O
dlp
•xi
i i i I
•
j Ir � I•
Iw.�VI
HOTE4
2 "StYIG - A2
PROPOSED - PW-R
PROPOSED PW BULGING SETBAORS
0 I FANLY
ERORT - 30 F41ii��(E gp0IS5EE SIDE YARD - 18 iEET OMAOE
PEAR YARD - 25 FEET
TOTAL AREA - 2.105.2M WL
I9.80 .
'TNADITI.AL HONE LOTS 3S
BIWGAIDW' HONES: N
'NLLA' HONES
FOIW HONES / BOEDWG: 10
SU HONES / BwL "G: 24
EIWT HONES / WWWG: 33
TY w HONES / BINLDWG "
TOTAL HONES: 20
I.y4 • i ! - �•` . A �_P.rpii�i'� __ VAX
p.u.......nm.ar...0
I.fi{U•.I — �r.n � ��
�� �� IIWrwIV. M1MHN WI,VI.Y �11[OI YIAW
Y6f YP'Y I10IIYr I .W rl N.IOW INO YMA.
I.4P Ilt 1Y.0 Ft lf1{ i Wp.M
lti F i�rw
��WYY
J
fir, ,mob .ONI '1N3Wd( ;30 IVIi N301S38
w. .�t+veYro
1M"YI ISY).16'MII Y3Rtl�•AMPNi 1W440G1 ' Y
� 'CHI iSm 983fi-32iHSVS 3 g ��:`."�`i i of �-'M
� NYId 315 t
g
N,
_L3
A
!
111"
I 111
[�I
\
_�
\ •
n
I Ilr
Il
1
IL
Ir.
e
i It
m
0.
j
q
j
0
R
lii
rn
d 3
•
Ii
Qu
�
S R
%�I I
ll/ I
_ N83°20'45'E 1b4.a� _ _ _ �_
-._.
.F�-40.13- -31.91- Ng6°41'03'E 330.03
30 ° 1 7 y� 38.18 �NO°23'39'E DRAINAGE EASEMENT FOR
I\ Bi.59 00• �ON(b yti� N89°08'27'E 24.78 / N88031'1B'E _ N81
_[ 132.33
:o20'45•E j O N83°3 •20 r N83
00,9� —� SURVEY UNE —
1 . 24•
VO
,y- 3
s�
.3 ok-
'9 i
5 3g IN
DRAINAGE r UTILITY EASEMENT OVER, I, — N87°14.30'E—
Z UNDER do ACROSS ALL OF LOT 18. 62.92
c1.0°
49.92
49.51
BLOCK 2 5.5
0 N55' �k Z
;
:
;
T. 18 �° ° 25 �
N 26'
"27
.� 0,%rbo
65 Z D $
^ m
° m
°
�NiAi!
y�o 23 �. 49.17ltz
49.91
49.2�110
Off/
y
ols — 7Ni0° 32!28•E
e
45'29 E
�4 R_,
St'F 1 C
59.78 l 55
�
tp jZ U 'J
`'rye 1, 53 s 52 N m 51
Lt Z
Sc9• 45.24 46.78
a 9 — 92.02 �20
�k Ik / N860 6'11• E N70031
ph �� DRAINAGE k UTILITY
9� •O EASEMENT OVER, U
o�LO k ACROSS ALL OF I.
i age G BLOCK 2.
o4041E _ N
V •F. N6, •51 S5
)o ol1 •��
59 gAp
!� O O �
p�� /•53•�MF� �,12
�Q
S
�va
\° of
N 4 °I
11°02'38�
•p2 �n�J
r�
I
30
Sc
iLO
pn
n
I^
5
Zd
�P12009'49*
L 80.25 J
WALNUT
3 ho � IY
Fo 8 n o g
b�
b� �I to
=
IZ I IZ I I
35.59
6°26'14 �
45.3 'c
L�,2°25'54' I I .57 n�y9.2J
80.28 J Lt-
%� ,�,7 'E
AA ° � 24052'58' i b4•55
_-40.13- -31• NB6041'030E 330.03
°09'27•E ��NO°23'39'E DRAINAGE EAS
8 N88°31'1
io— 132.3_
N = N83035', ,,.w SURVEY LINE —
DRAINAGE Ic UTILITY EASEMENT OVER, — — N87014'30*E 162
UNDER i ACROSS ALL OF LOT 18. 62.92 49.92
BLOCK 2
�.535 _ Z 3 ;
Ni6ry°�1 \93.49
tipO�O 460032'28ro
c�' •F, 66.15
ar -
2' 51'
I°3E
59.-
5 a°
--w53
5,
\� A; 7L 46.
6'110E
Y Y n
,
ov N62 M A
M T�
o T 8,T0 W SNF
39. pNu7g �SE
.� - 314 23s 39s 86 E
4 W Z 2 i�r J in m ro •4n3g, °p4. 32 5"w 142.
/ 38.00 Z ° Z-Uozh 4 h ^� yo 00� 32.0 •
•W -JS68 11,
N78 04"4 3Z002 39.Op 2 2 m 39 °p \
tl v �93.3 R S6 36' f - 1 y ° p - - 3g 00� 32 °a `20^ ro m v •3
oa7o3g, 70p Op_ 7 N 10S 7�0.w �N73o p02 32p 4 v�o 8� w
�b 4) .W -3gry 80 0�' l 7 0 hf � 1$• 3g m 0 N :
2 1 39.00 41 4 W 1 � r 4 21?1.w 3 12 (1Y 142. 00 2 y'�� � oM
0 0� 32.00 32.00 •00 18-3 i C R_ 700 n o Cho
?�O 16 m 39.[� •� - a-5o3j2po N31o434p-, 4' ^o
88045'00"E CV
n 3 D A m o 39.Op .� 26. ° 35-w / 7e 46 w \ / ^ / Z 4=15047 40" N8
53.84 39.00 a°i `t �O '� af°o v� 28. 1 .00 Nf o - 82.70 -
N7g022 ` N7 32;00 32.Op 38.00z w c 2 6.0 8, 39. �ZQ4 -I1 RO Q=19°3803 =
'39"W - 2 a 3 m m 00� '300.00 N.
1 198,45 39.ppi q 4 cJ 7 _ 89° '49'W 1 .00
8'p0 6 "� l 39cd;.00 28. 26.0 26.0 28.9
° °° 6 00 6 IX W,, W W W W
N N74o ?6. 'n 1 m 1 �'0 � ro
N \ � 37-w • 39.002 ro p tO 0 5
\ 193.Op -- $� 80 z °ov°i z
z z
\ 39.00 6.0 8.0 B.0 6.a
89048 49"W
233.
o^' N89°51'41"E
orn
\ -Z
WETLAND
NssOl
1 406-z,
05/20/97 13:26 N0.229
SV9`e�
,u 0 SATHRE - BERGQUIST, INC.
O w uj 150 SOUTH BROADWAY WAYZATA, MN 55391
(612) 476-6000 FAX 476-0104
�ryFgS P�pa�'
WALNUT GROVE
LOT AREA TABULATIONS
SATHRE-BERGQUIST, INC.
Dated: May 20, 1997
(Page 1 of 3)
BLOCK 1
13
10158
51
4435
BLOCK
5
14
11226
52
4225
LOT AREA
15
10669
53
4471
�
LOT
AREA
Sall
16
13467
S;.
54
4533
SaTFt.
17
10499
55
3980
1
25337
.18
78547_DA14
1
2210
2
19159
19
4059
2
1813
3
16727
20
4920
BLOCK
3
3
1813
4
17678
21
4630
4
2210
5
13814
22
4803
LOT
AREA
6
14577 �Y
23
4375
UEL
7
15382
24
4616
BLOCK
6
8
14872
25
4255
1
31748
9
13660
26
3869
2
14351
LOT
AREA
10
12968
27
4173
3
12297
11
13317
28
4480
4
14048
12
14050
29
4502
5
50110
1
2210
13
15388
30
4489
6
3794
2
1813
14
18431
31
42162
7
4570
3
1813
32
4928
8
4481`'
4
2210
33
4771
9
4015
BLOCK
2
34
4049
Wt
10
3956
35
4030f
11
3933
BLOCK
7
LOT
AREA
36
4051
12
4153
aza
37
4029
13
4372
LOT
AREA
38
4373
14
4465
Sq.Ft.
1
10739
39
4310
15
3981
2
11984
40
42466
1
2210
3
17725
41
4216
2
1473
4
14300
42
5148
X, BLOCK
4
3
1473
5
6
12028 i
�J�
43
4887
4
1473
11828
44
4255
LOT
AREA
5
1473
7
13470
45
3794
\'�
Sq_Ft_
6
2210
8
13025
46
61703
tv"N
9
12194
47
3747
1
2210
10
11601
48
3998
2
1813
11
11003
49
4015
3
1813
12
9912
50
4588
4
2210
P02
►qqi 7
WALNUT GROVE
BUNGALOWS
Rottlund Homes is proposing to replace the Cottages with a new concept called "The Bungalows."
The Bungalows would also be primarily a one level detached townhouse. They are still targeted
toward the same market of empty nesters and retirees with about the same sq. ft. and price range.
There is approximately 1350 - 1600 sq. ft. on the main level with potential expansion with story &
1/2, and walk -out opportunities to bring finished sq. footage up to 2500. The price range would be
approximately $140 - $200,000. The key differences are the shape of the unit, its architectural style,
its orientation to the street and the position of garage. The goal is to create a more traditional feeling
to the detached townhouse site area, in architectural and streetscape. The Bungalows are 36' wide
instead of 32' and approximately 58' deep instead of 72% more square than a long, narrow
rectangle. The lot size would be approximately 50' x 100' instead of 47' x 110'. The garage is inset
into the house. This is to project the front entry and front porch more toward the street than the
garage. The architecture style is that of pre war Midwest and New England which promote front
porches and stoops, stone & brick columns, and 8 1/2 roof pitch.
The Bungalow fits square to the street instead of the 30 degree angle of the Cottages. This allows
more detail and development of the front yard and the front porch instead of the side yard. The
architecture is a more traditional "Bungalow" style to also promote the front entry stoop or porch.
Elevations are still being developed but the concept is to have 3 to 4 floor plans with a minimum of
two elevations each, and to offer side load opportunities whenever possible to create as much variety
as possible. The streetscape will appear more like a small single family lots than narrow lot detached
townhomes. There will also be an opportunity to mix up the garages to alternate two adjacent
garages and adjacent front yards with garages adjacent to front yards to also create more variety in
the streetscape. There is proposed four exterior color palettes to include siding, trim, stone or brick,
roofing and accent colors for the front doors and shutters. As with the exterior elevations, no two
color palettes will be adjacent to each other.
VILLAS AND VILLA TOWNHOMES
Villas
Rottlund Homes is introducing some new unit and building types for both the 2 story Villas and Villa
Townhomes. The Villa 12-unit clusters will still have end units with 2-car garages and single car
garages interior units, but the 8-unit cluster will have all its units with 2-car garages and totally
redesign floor plans and exteriors. In early concept design the 8-unit building end units will have
entry's on the end of the building and side load garages to create more variety in elevations and with
front entry's on all four sides of the building. The exterior of the 8-unit building is to be more
traditional with covered front stoops, shutters and picket fences.
By introducing new floor plans and a new building type into the Villas will assist in creating more
variety and a new look. How the final elevations of the two building types vary in design is still
developing.
Villa Townhomes
We are also introducing a different building type into the Villa Townhomes. The 6-unit "row type"
townhomes has 2-car garage end units, and 1-car garage interior units. The 4-unit buildings that had
the same condition now have all 2-car garages. This will create a different look between the 4 and 6-
unit buildings. Along with the slab on grade and the walk -out opportunities there will be more
variety among these eight buildings. The Villa Townhouse that overlook the central open space will
have the opportunity for covered patio doors, porches and picket fences to create more of a front
door/front porch feel along the open space.
VILLAS AND VILLA TOWNHOMES cont.
Villa & Villa Townhomes
In general with the introduction of the new floor plans, building types, and exterior elevations there is
considerably more variety in the Villa and Villa Townhomes portion of the development then
originally proposed.
The exterior colors in the Villas and Villa Townhomes can be up to four color palettes to include
siding, trim, stone or brick, roofing. How this will ultimately be distributed through out the site has
yet to be determined. Two possibilities are to assign one color palette to each cluster of 4 or 5
buildings of various building types, the other is to assign one palette to each of the 4 building types
(i.e. 8 unit Villa, 12 unit Villa, 4 unit Villa Townhome and 6 unit Villa Townhome.) We recommend
working with the city on the determining colors for each building and final elevations.
It is also intended that all of the 96 Villa units be priced at or below the Livable Communities Act
affordable housing threshold.
CITY OF CHANHASSEN
AFFIDAVIT OF MAILING NOTICE
STATE OF MINNESOTA)
) ss.
COUNTY OF CARVER )
I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on
March 4, 2004, the duly qualified and acting Deputy Clerk of the City of Chanhassen,
Minnesota; that on said date she caused to be mailed a copy of the attached notice of A Public
Hearing to consider a request for rezoning of 3.09 acres from A2, Agricultural Estate
District to RSF, Single -Family Residential; subdivision approval creating four lots with
variances; and a conditional use permit for development within the Bluff Creek Corridor,
Klingelhutz Development, Walnut Grove 2nd Addition. - Planning Case #04-10 to the
persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope
addressed to such owner, and depositing the envelopes addressed to all such owners in the United
States mail with postage fully prepaid thereon; that the names and addresses of such owners were
those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and
by other appropriate records.
i VA„
Subscribed and sworn to before me ^�
this T4` day of (YlarCt\ 12004. N
KIM T. MEUWISSE
�—
Notary Pu is
NOTICE OF PUBLIC HEARING
CHANHASSEN PLANNING COMMISSION MEETING
TUESDAY, MARCH 16, 2004 AT 7:00 P.M.
CITY HALL COUNCIL CHAMBERS
7700 MARKET BLVD.
PROPOSAL: Rezoning from A2 to RSF, APPLICANT: Klingelhutz Development
Subdivision with Variance & a Conditional Use
Permit —Walnut Grove 2"d Addition LOCATION: 7305 Galpin Blvd.
PLANNING CASE #04-10
NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant, Klingelhutz
Development, is requesting rezoning of 3.09 acres from A2, Agricultural Estate District to RSF, Single -Family
Residential; subdivision approval creating four lots with variances; and a conditional use permit for development
within the Bluff Creek Corridor, Klingelhutz Development, Walnut Grove 2"d Addition.
What Happens at the Meeting: The purpose of this public hearing is to inform you about the applicant's
request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead
the public hearing through the following steps:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses the project.
Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during
office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project,
please contact Bob Generous at 952-227-1131 or e-mail bgenerous@ci.chanhassen.mn.us. If you choose to
submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will
provide copies to the Commission.
Notice of this public hearing has been published in the Chanhassen Villager on March 4, 2004
City Review Procedure
Subdivisions, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses, Wetland
Alterations, Rezonings, Comprehensive Plan Amendments, Code Amendments require a public
hearing before the Planning Commission. City ordinances require all property within 500 feet of the
subject site to be notified of the application in writing. Any interested party is invited to attend the
meeting.
Staff prepares a report on the subject application. This report includes all pertinent information and a
recommendation. These reports are available by request. At the Planning Commission meeting,
staff will give a verbal overview of the report and a recommendation. The item will be opened for the
public to speak about the proposal as a part of the hearing process. The Commission will close the
public hearing and discuss the item and make a recommendation to the City Council. The City
Council may reverse, affirm or modify wholly or partly the Planning Commission's recommendation.
Rezonings, land use and code amendments take a simple majority vote of the City Council except
rezonings and land use amendments from residential to commercial/industrial.
Minnesota State Statute 519.99 requires all applications to be processed within 60 days unless the
applicant waives this standard. Some applications due to their complexity may take several months
to complete. Any person wishing to follow an item through the process should check with the
Planning Department regarding its status and scheduling for the City Council meeting.
A neighborhood spokesperson/representative is encouraged to provide a contact for the city. Often
developers are encouraged to meet with the neighborhood regarding their proposal. Staff is also
available to review the project with any interested person(s).
Because the Planning Commission holds the public hearing, the City Council does not. Minutes are
taken and any correspondence regarding the application will be included in the report to the City
Council. If you wish to have something to be included in the report, please contact the Planning Staff
person named on the notification.
Planning Case No. 04-10
Public Hearing Notification Area
(500 Feet)
occas G m
aD c
Nay
Te
LL
U r F
~ U
Brinker Street
m
°,Curve
Subject Property
d,
' I
B o2
® L
N Q e0eny
m U ® y
V w Co %owe��° Cnc. o,y WaY
Q � n
J° faueSa W
WaWeaf
afedeaf Efaee E
W
FFM
B
C0U/rep e
FTI
m
CONVENIENCE STORE CHANHASSEN DEVELOPMENT LLC
INVESTMENTS 1434 SALEM LN SW
LACROSSE
BOXCROSSSEE WI 54602-2107 ROCHESTER MN 55902-6646
L
WALNUT GROVE VILLAS ASSN C/O
GITTLEMAN MGMT CORP NORMA LEE VANHAAFTEN
1801 79TH ST E 2116 CLOVER CT
SUITE 21 CHANHASSEN MN 55317-8353
BLOOMINGTON MN 55425-1230
DOROTHY A GRIESMANN
2127 CLOVER CT
CHANHASSEN MN 55317-8354
JULIE D WAND
2133 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
ANNETTE M CIESZKOWSKI
2141 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
BRADLEY J & JANETTE M WING
2155 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
CHARLES E & JEANNE S BEHRING
2162 BANEBERRY WAY W
CHANHASSEN MN 55317-8338
JEANNE C GILBERTSON
2170 BANEBERRY WAY W
CHANHASSEN MN 55317-8338
DEBRA PHYLLIS KAPLAN
2186 BANEBERRY WAY W
CHANHASSEN MN 55317-8338
HOLLY M RICKERT
2129 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
JUNE M CASEY
2137 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
EDWARD J & SUSAN L ROBBINS
2141 CLOVER CT
CHANHASSEN MN 55317-8354
LIEU NGUYEN & VO THI CHIN
2158 BANEBERRY WAY W
CHANHASSEN MN 55317-8338
LOUIS C ABELA
2163 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
JENNY VAN AALSBURG
2171 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
DORIS FRENCH
2189 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
DAVID WICKSTROM, TRUSTEE &
CAROL KOCH, TRUSTEE
14342 GOLF VIEW DR
EDEN PRAIRIE MN 55346-3306
RICHARD & RHODA M SCHAFFER
2122 CLOVER CT
CHANHASSEN MN 55317-8353
RICHARD H SR & BARBARA KELLER
2130 CLOVER CT
CHANHASSEN MN 55317-8353
ROBERT P & SANDRA L LISTIAK
2138 CLOVER CT
CHANHASSEN MN 55317-8353
KATHLEEN W HOMES
2145 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
MARY LOUISE REITMEIER
2159 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
ERIK J FRITZ & JINA I KUESEL
2167 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
JANETIMARUSKA
2175 BANEBERRY WAY W
CHANHASSEN MN 55317-8340
BRADLEY A & JODENE B THRODAHL
2190 BANEBERRY WAY W
CHANHASSEN MN 55317-8338
NATHAN R JOHNSON & BRANDILYN DENNIS E & ELISSA K ELLEFSON SHAWNA M GRIEP
E BAWEK 2194 BANEBERRY WAY W 2197 BANEBERRY WAY W
CHANHASSEN MN 55317-8340 BANEBERRY WAY W CHANHASSEN MN 55317-8338 CHANHASSEN MN 55317-8340
CHA
SUSAN M ERICKSON HANG CHAN & CHEUKWAI CHONG ROTTLUND COMPANY INC
2198 BANEBERRY WAY W 2201 BANEBERRY WAY W 3065 CENTRE POINTE DR
CHANHASSEN MN 55317-8338 CHANHASSEN MN 55317-8339 ROSEVILLE MN 55113-1130
KLINGELHUTZ DEVELOPMENT CO
350 H W Y 212 E
PO BOX 89
CHASKA MN 55318-0089
RICHARD M & MARY V ERVASTI
643 BAY ST
SANTA MONICA CA 90405-1214
BRIAN & KAREN WALKER
7591 WALNUT CRV
CHANHASSEN MN 55317-9394
BRADLEY J & KATHLEEN
VELDBOOM
7599 WALNUT CRV
CHANHASSEN MN 55317-9394
JONATHAN D & MARCIA L MAPLES
7602 WALNUT CRV
CHANHASSEN MN 55317-9397
THEODORE A & ANGELA M
ELLEFSON
7609 WALNUT CRV
CHANHASSEN MN 55317-9395
ELDEN E & GLORIA A BOTT
7626 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317-8334
DONALD B & JANET L DAHLQUIST
7634 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317-8334
ROBERT R & SALLY J SHULTZ
380 MARGARET CIR
WAYZATA MN 55391-1060
DOUGLAS C & THERESA J BENTZ
7280 GALPIN BLVD
EXCELSIOR MN 55331-8058
LEE A & TAMMY L BERGSTROM
7595 WALNUT CRV
CHANHASSEN MN 55317-9394
SCOTT A & HEATHER D HALLOFF
7600 WALNUT CRV
CHANHASSEN MN 55317-9397
KYLE A & LEAH C PLATH
7604 WALNUT CRV
CHANHASSEN MN 55317-9397
JAMES D & AUDREY C EISENSTEIN
7611 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317-9396
JOANNEIJAMES
7627 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317-9396
PATRICIA K KOHN
7638 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317-8334
J P'S LINKS INC-JOHN PRZYMUS
C/O PAT NEATON
601 CARLSON PKY
#620
MINNETONKA MN 55305-5215
THEODORE F & MARLENE M BENTZ
7300 GALPIN BLVD
EXCELSIOR MN 55331-8011
DAVID K & CHRISTINA J STREETER
7598 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317-9398
STEVEN J & JANICE K VREEMAN
7601 WALNUT CRV
CHANHASSEN MN 55317-9395
ERIC A BAKKEN & JOAN H WADE
7606 WALNUT CRV
CHANHASSEN MN 55317-9397
MARK & CONSTANCE LANTERMAN
7612 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317-8334
MORRIS L & MURIEL N MULLIN
7630 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317-8334
CHARLES B & SHIRLEY A ENGH
TRUSTEE OF TRUST
7642 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317-8334
DAVID W & LINDA J HAGGBLOOM GARY F & JOYCE E ANDERSONGERALD SODERL O & DARLENE A
7646 PRAIRIE FLOWER BLVD 7650 PRAIRIE FLOWER BLVD 7656 PRAIRIE
TRUSTEES OF TRUST
LVD
CHANHASSEN MN 55317-8334 CHANHASSEN MN 55317-8334 CHANHASSEN
PRAIRIE FLOWER -833
CHANHASSEN MN 55317-8334
EARLON L MILBRATH & CAROL ANN STEVEN W & KAREN A BROWN
D MILBRATH 7670 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317-8334 PRAIRIE FLOWER BLVD CHANHASSEN MN 55317-8334
CHA
RICH SLAGLE g:\plan\2004 planning cases\04-10 -
7411 FAWN HILL ROAD walnut grove 2nd addition\ph notice
CHANHASSEN MN 55317 labels.doc
W ILLIAM A & BARBARA E BROWN
7676 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317-8334
PC DATE: March 16, 2004
z
U
a
CITY OF CHANHASSEN
STAFF REPORT
CC DATE: April 12, 2004
REVIEW DEADLINE: 4/12/04
CASE #: 04-10
BY: Robert Generous, et al.
PROPOSAL: Request for rezoning from Agricultural Estate District, A2, to Single Family
Residential District, RSF; preliminary plat approval creating four lots for
single-family homes with a variance for the use of a private street, lot width and side
yard setbacks; and conditional use permit approval for development within the Bluff
Creek Overlay District.
LOCATION: 7305 Galpin Blvd.
APPLICANT: Klingelhutz Development
350 East Highway 212
Chaska, MN 55318 L'
(952)448-3330
PRESENT ZONING: Agricultural Estate District, A2, and Bluff Creek Overlay District, BCO
2020 LAND USE PLAN: Residential — Low Density (net density 1.2 — 4.0 units per acre)
ACREAGE: 3.09 DENSITY: 1.62 gross, 2.44 net
SUMMARY OF REQUEST: Rezoning of the property to RSF to permit the existing single-family
home and three detached single-family homes; subdivision approval creating four lots and one outlot
containing Bluff Creek and the majority of the Bluff Creek primary zone with a variance for the use of
a private street for access and one -foot side yard setback and lot width variances for three lots; and a
conditional use permit for development within the Bluff Creek Overlay District.
LEVEL OF CITY DISCRETION IN DECISION -MAKING: The City has a relatively high level
of discretion in approving rezonings because the City is acting in its legislative or policy making
capacity. A rezoning must be consistent with the City's Comprehensive Plan.
The City's discretion in approving or denying a preliminary plat is limited to whether or not the
proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it
meets these standards, the City must approve the preliminary plat. This is a quasi-judicial decision.
The City has limited discretion in approving or denying conditional use permits, based on whether
or not the proposal meets the conditional use permit standards outlined in the Zoning Ordinance.
If the City finds that all the applicable conditional use permit standards are met, the permit
must be approved. This is a quasi-judicial decision.
Planning Case No. 04-10
Walnut Grove 2nd Addition
Location Map
occ z c m
a c
m Ma esUc Way
o �
LL
L
U � �
a
H o 3
U
Brinker Street
m
W Inet Curve
Subject Property
ED
a�
O
mar AFL a
^ d
3
r �o® m
3
U r
G
Fw
Conetlowac chicory War
m 8th St reej
(�� c f9ue Sa a LN
Walerfeaf
Waterleaf %aceE
Y
r�
m
CCU/ter e o
m
Walnut Grove 2nd Addition
March I6, 2004
Page 2
PROPOSAUSUMMARY
The developer is proposing an infill development creating three new single-family dwellings. The
surrounding property was developed as part of the Walnut Grove development. The applicant is rezoning the
property to Single Family Residential District, RSF, which permits single-family lots of 15,000 square feet. As
part of the request, the developer is requesting lot width variances and side yard setback variances to permit one
60-foot wide lot and two 61-foot wide lots. In conjunction with the rezoning, the applicant is subdividing the
property to create one lot around the existing single-family house (Lot 1) and three new single-family lots.
Access to the existing home is proposed to remain off Galpin Boulevard. Access to the new homes will be via
a private street which connects to Baneberry Way West, which is a private street. An access easement for this
property was recorded as a condition of the Walnut Grove development. Sewer and water is available through
the Walnut Grove project. Private streets require variance approval as part of a single-family subdivision. A
conditional use permit is required for all development within the Bluff Creek Overlay district.
The subdivision of the property is an attempt to implement the Bluff Creek Overlay District clustering
requirements outside of the Planned Unit Development (PUD) ordinance and provide a housing type that is
comparable to the surrounding development, which leads to the variance requests for lot width and side yard
setbacks. The existing PUD ordinance does not permit density transfer or clustering for properties guided
Residential — Low Density. Instead, the ordinance permits lot sizes down to 11,000 square feet with an
average lot size within the development of 15,000 square feet. However, the single-family PUD requires
minimum lot dimensions of 90 feet by 100 feet. The proposed development could be permitted without
variances with a re -guiding of the property to Residential — Medium Density (net density range 4.0 — 8.0
units per acre), but such an amendment would only be a subterfuge since the intent is to maintain a density
in this development below four units per acre.
The applicant has included the majority of the Bluff Creek Primary Zone in Outlot A. Conservation easements
shall be placed over all areas within the Bluff Creek primary zone. This will allow the City to restore and/or
manage the natural resources in these areas. The developer may dedicate Outlot A to the City.
The townhouse lots on Baneberry Way West leading into this development range in size from 1,473 square feet
to 2,210 square feet with lot widths between 26 and 39 feet. The single-family homes on Walnut Curve are on
lots between 9,912 square feet to 25,337 square feet with lot widths between 70 feet and 111 feet. The
bungalow lots range in size from 3,747 square feet to 4,920 square feet with lot widths between 46.5 feet and
84 feet. The houses proposed with this development would be very similar to the bungalow homes in the
Walnut Grove development. The proposed house sizes have main floor areas of 1,050 to 1,337 square feet
which is comparable and compatible to the bungalow units with main floors of 1,350 to 1,600 square feet. The
proposed houses include two walkout styles and one lookout style home. The proposed houses are on lots with
lot areas consistent with typical single family homes.
The site is heavily wooded in the southern one-third of the site, adjacent to Bluff Creek. The property slopes
from a high point in the northeast comer at elevation 984 down to the creek at an elevation of 944. The
developer is preserving the southern portion of the property as part of Outlot A.
The proposed development is consistent with the comprehensive plan. Approval of the lot width and side yard
setback variance will make the subdivision comply with the zoning ordinance. Staff is recommending approval
of the rezoning, subdivision with lot width and side yard setback variances and a variance for the use of a
Walnut Grove 2"d Addition
March 16, 2004
Page 3
private street, and a conditional use permit for development within the Bluff Creek Overlay District. The
applicant will need to revise the plat slightly to assure that all lots meet the 15,000 square foot minimum lot
area.
BACKGROUND
The house was built in 1908. Development of Walnut Grove, the project to the east, began in 1997. An access
easement, permitting the property to use Baneberry Way West, was recorded as part of the plat for Walnut
Grove.
This project was reviewed by the City Council on November 10, 2003, and remanded to the Planning
Commission for their review. The applicant has revised the plan, eliminating the four twin home units and
prepared a single-family detached plan on lots which meet the lot area and depth requirements, with a minor
adjustment, but do not comply with the lot width requirement for RSF zoned property.
APPLICABLE REGULATIONS
Chapter 18, Subdivisions
Sections 20-41 through 20-45, Amendments
Section 20-56 through 20-60, Variances
Sections 20-221 through 20-237, Conditional Use Permits
Sections 20-611 through 20-616, RSF district regulations
Sections 20-1551 through 20-1564, Bluff Creek Overlay District
LANDSCAPING[rREE PRESERVATION
Tree canopy coverage and preservation calculations have been submitted for Walnut Grove 2nd Addition.
They are as follows:
Total upland area (excluding wetlands) 132,200 SF or 3.03 ac.
Baseline canopy coverage 36% or 47,485 SF
Minimum canopy coverage allowed 30% or 39,660 SF
Proposed tree preservation 34% or 44,533 SF
Developer does meet minimum canopy coverage requirements.
Bufferyard plantings are required along Galpin Boulevard for Lots 2-4. Total plantings required are:
1 overstory
2 understory
4 shrubs
PARKS AND OPEN SPACE
The homes being developed in Walnut Grove 2°d Addition lie within the service area of Sugar Bush Park.
The pedestrian trail along Galpin Boulevard borders all of the proposed lots; however, access to the trail will
be through the rear yards. The single condition of approval for this addition regarding parks and trails
Walnut Grove 2"d Addition
March 16, 2004
Page 4
should be the payment of park dedication fees in lieu of land dedication or trail construction. The fee only
applies to the three new lots for a total of $8,400.
WETLANDS
One wetland basin exists on -site. The wetland is an ag/urban wetland that is a part of the Bluff Creek
corridor. It is dominated by reed canary grass. No wetland impact is proposed.
A wetland buffer of 0 to 20 feet in width (with a minimum average of 10 feet) must be maintained around
the wetland. In order to accommodate the proposed building location on Lot 4, the wetland buffer should be
0 along the east side of the wetland and should be 20 feet on the north and west sides. Wetland buffer areas
should be preserved, surveyed and staked in accordance with the City's wetland ordinance. The applicant must
install wetland buffer edge signs, under the direction of City staff, before construction begins and must pay the
City $20 per sign. The grading and erosion control plan should show the actual wetland buffer widths
proposed to meet the minimum average buffer width requirements as well as the 40-foot wetland buffer
setback. All structures shall maintain at least a
40-foot setback from the edge of the wetland buffer or, if no buffer is to be preserved, from the delineated
wetland edge.
BLUFF CREEK OVERLAY DISTRICT
The Bluff Creek Overlay District was adopted in December 1998 as a tool for the preservation of Bluff
Creek and the natural resources within its corridor. Bluff Creek flows through the southern portion of this
property. The property also contains a forested riparian corridor and an ag/urban wetland. The primary
zone encompasses the forested area, the wetland, and the wetland buffer. The secondary zone encompasses
the primary zone and the first 20 feet of the setback. A conservation easement should be dedicated over the
primary zone. All structures must maintain at least a 40 foot setback from the primary zone. No
disturbance of the site may occur within the first 20 feet of the setback. No alterations are proposed within
the overlay district. Open space must comprise 100% of the primary zone.
GRADING, DRAINAGE AND EROSION CONTROL
The plans propose to grade about 25% of the site for the new house pads, a proposed private driveway and a
stormwater pond. The proposed lots are located in the east central portion of the site. The proposed grading
will prepare the site for look -out and walk -out house pads on Lots 2, 3 and 4, Block 1. The proposed slopes
along the east side of the new private driveway are steeper than 3:1. The City allows maximum side slopes
of 3:1; otherwise retaining walls must be used. The applicant must revise the plans to comply.
The existing site drainage flows south toward the existing creek. The plans propose to convey the drainage
from the northeast portion of the site to the private street and carry the stormwater via storm sewer to a
proposed NURP pond. The remaining portion of the site will drain overland to the proposed stormwater
pond and/or the creek. Staff is recommending that the elevation of the lowest opening on the adjacent
homes be three feet above the high water level of the proposed pond.
Drainage calculations have been submitted for the site and some modifications are still needed. The
applicant will be required to meet the existing site runoff rates for the 10-year and 100-year, 24-hour storm
events. The proposed pond must be designed to National Urban Runoff Program (NURP) standards. The
Walnut Grove 2"d Addition
March 16, 2004
Page 5
storm sewer must be designed for a 10-year, 24-hour storm event. Drainage and utility easements must be
dedicated on the final plat over the public storm drainage system including ponds, drainage swales, and
wetlands up to the 100-year flood level. The minimum easement width shall be 20 feet wide.
Staff recommends that Type III silt fence be used along the south side adjacent to the secondary Bluff Creek
line and Type II silt fence along the east and west sides of the grading area. In addition, tree preservation
fencing must be installed at the limits of tree removal. A 75-foot minimum rock construction entrance must
be added to the entrance that will be accessed during construction. The applicant should be aware that any
off -site grading will require an easement from the appropriate property owner.
Storm Water Management
The proposed development is required to maintain existing runoff rates. On -site storm water ponding must
be sufficient to meet all City water quality and quantity standards. A manhole with a two -foot sump should
be installed as the last road -accessible structure prior to discharge into the storm water pond. Riprap and
geotextile fabric should be installed at the flared end sections of the inlet and outlet of the storm water pond.
Easements
Drainage and utility easements should be provided over all existing wetlands, wetland buffer areas, and
storm water infrastructure. A drainage and utility easement should be dedicated over the 10 feet either side
of the property line between Lots 3 and 4 in order to accommodate access for future storm water
infrastructure maintenance. A drainage and utility easement should also be dedicated over the area in the
southwestern portion of Lot 3 that is currently not encumbered by a drainage and utility easement since
water discharged from the storm water pond will flow through this area as it moves toward the wetland.
Erosion Control
Type III silt fence should be provided adjacent to all areas to be preserved as buffer or, if no buffer is to be
preserved, at the delineated wetland edge. All upland areas disturbed as a result of construction activities shall
be immediately restored with seed and disc -mulched, covered with a wood -fiber blanket, or sodded within two
weeks of completion of each activity in accordance with the City's Best Management Practice Handbook.
Surface Water Management Fees
Water Ouality Fees
Because of the impervious surface associated with this development, the water quality fees for this proposed
development are based on single-family residential development rates of $949/acre. Based on the proposed
developed area of approximately 2.24 acres, the water quality fees associated with this project are $2,126.
Water Ouantity Fees
The SWMP has established a connection charge for the different land uses based on an average city-wide rate
for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts,
open channels, and storm water ponding areas for runoff storage. Single-family residential developments have a
Walnut Grove 2"d Addition
March 16, 2004
Page 6
connection charge of $2,348 per developable acre. This results in a water quantity fee of approximately $5,259
for the proposed development.
SWMP Credits
This project proposes the construction of a NURP pond. The applicant will be credited for water quality
where NURP basins are provided to treat runoff from the site. This will be determined upon review of the
ponding and storm sewer calculations. Credits may also be applied to the applicant's SWMP fees for
oversizing in accordance with the SWMP or the provision of outlet structures. The applicant will not be
assessed for areas that are dedicated outlots. No credit will be given for temporary pond areas.
At this time, the estimated total SWMP fee, due and payable to the City at the time of final plat recording, is
$7,385.
Other Agencies
The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley -
Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency) and comply with their
conditions of approval.
Municipal sewer and water service is available to the site from Baneberry Way. The existing house on Lot
1 is already connected to municipal sewer and water. The applicant is proposing to extend sewer and water
lines along the private driveway to serve Lots 2, 3 and 4. The proposed sanitary manholes must be low
enough to serve the basement of Lots 2, 3 and 4, Block 1 and the public utility lines must be 10 feet inside
the property line. In addition, a 30-foot wide public drainage and utility easement must be dedicated on the
final plat over the public sewer and water lines.
According to the City's Finance Department records, the parcel was previously assessed for one sanitary
sewer and water hookup. Since the developer will be responsible for extending lateral sewer and water
service to the lots, the sanitary sewer and water connection charges will be waived. However, the sanitary
sewer and water hookup charges will still be applicable for each of the new lots. The 2004 trunk hookup
charge is $1,458 for sanitary sewer and $2,814 for watermain. Sanitary sewer and watermain hookup fees
may be specially assessed against the parcel at the time of building permit issuance. Hookup charges are
based on the number of SAC units assigned by the Met Council for each lot.
All of the utility improvements are required to be constructed in accordance with the City's latest edition of
Standard Specifications and Detail Plates. Upon completion of the utility improvements, the utilities will be
turned over to the City for maintenance and ownership. The applicant is also required to enter into a
development contract with the City and supply the necessary financial security in the form of a letter of
credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval.
Permits from the appropriate regulatory agencies will have to be obtained, including but not limited to the
MPCA, Department of Health, MCES, Carver County and Watershed District.
Walnut Grove 2"d Addition
March 16, 2004
Page 7
STREETS
The applicant is proposing two accesses to the proposed lots. On the northwest corner of the parcel, an
existing access off Galpin Lake Road will be utilized to serve the existing house on Lot 1. Another
proposed new access off Baneberry Way will be servicing Lots 2, 3 and 4 as a private street. As such, the
private street easement must be 30 feet wide with 20 feet of hard -surface pavement and built to a 7-ton
design. The developer must submit an inspection report certifying that the private street is built to a 7-ton
design. The applicant is proposing a hammerhead turnaround. At this stage, the Engineering Department
and the Fire Marshal are fine with the proposed turnaround and the removal of the existing temporary cul-
de-sac at the end of Baneberry Way.
EASEMENTS
Conservation easements shall be dedicated over all areas within the Bluff Creek primary zone.
REZONING/COMP PLAN
The proposed development is consistent with the Residential — Low Density land use designation which
permits a maximum net density of 1.2 to 4.0 units per acre with a net density of 2.44 units per acre. The
proposed development is preserving the Bluff Creek corridor as permanent open space.
COMPLIANCE TABLE
Area (square feet)
Width (feet)
Depth (feet)
Setbacks: front,
rear, side, Bluff
Creek primary
zone, wetland
Code
15,000
100
125
30, 30, 10, 40, 40
Lot 1
26,026
104
250
30, 30, 10, na, na
Lot 2
15,247
61
250
30, 30, 9, na, na
Lot 3
14,994 #
60
250
30, 30, 9, 40, 40
Lot 4
15,244
61
250
30, na, 9, 40, 40
Outlot A (Bluff
Creek Primary
Zone)
41,246
ROW
21,843
Total
134,6W
(Lots 2, 3 and 4 would have 9-foot side yard setbacks)
# The lot lines shall be adjusted to create a 15,000 square foot or larger lot.
PRIVATE STREET FINDINGS
In order to permit private streets, the city finds that the following conditions exist:
1) The prevailing development pattern makes it unfeasible or inappropriate to construct a public street.
The site is being accessed via an existing private street through the Walnut Grove development for
Walnut Grove 2"d Addition
March 16, 2004
Page 8
which an access easement was recorded as part of the Walnut Grove development. The location of
the Bluff Creek Primary zone and the small wetland on site make it unfeasible to construct a public
street. Additional access to Galpin Boulevard is not desirable.
2) After reviewing the surrounding area, it is concluded that an extension of the public street system is
not required to serve other parcels in the area, improve access, or to provide a street system
consistent with the comprehensive plan. No additional access will be permitted to Galpin
Boulevard.
3) The use of the private street will permit enhanced protection of the city's natural resources including
wetlands and forested areas located in the Bluff Creek primary zone.
VARIANCE FINDINGS WITHIN SUBDIVISONS
The city may grant a variance from the regulations of the subdivision ordinance as part of the plat approval
process following a finding that all of the following conditions exist:
1) The hardship is not a mere inconvenience.
Finding: The hardship is not a mere inconvenience. The proposed private street preserves significant
site features and connects to an existing private street. The lot width variance and side yard setback
variance permit the implementation of the Bluff Creek Overlay District.
2) The hardship is caused by the particular physical surroundings, shape or typographical conditions of the
land.
Finding: The hardship is caused by the particular physical surroundings, shape and topographical
conditions of the land, namely the Bluff Creek primary zone and the access via an existing private
street.
3) The conditions upon which the request is based are unique and not generally applicable to other
property.
Finding: The conditions upon which the request is based are unique and not generally applicable to
other properties due to the unique site features.
4) The granting of the variance will not be substantially detrimental to the public welfare and is in accord
with the purpose and intent of this chapter, the zoning ordinance and comprehensive plan.
Finding: The granting of a variance will not be substantially detrimental to the public welfare and is in
accord with the purpose and intent of this chapter, the zoning ordinance, and comprehensive plan.
RECOMMENDATION
Staff recommends that the Planning Commission adopt the following three motions (rezoning, subdivision
with variances and conditional use permit) based on the findings in the staff report:
Walnut Grove 2"d Addition
March 16, 2004
Page 9
A. "The Chanhassen Planning Commission recommends approval of the rezoning of the property from
Agricultural Estate District, A2, to Single Family Residential District, RSF."
B. "The Chanhassen Planning Commission recommends approval of the preliminary plat for Walnut Grove
Second Addition with lot width variances and one (1) foot side yard setback variances and a variance for
the use of a private street, according to the plans prepared by Otto Associates, date stamped Received
February 12, 2004, subject to the following conditions:
1. At the time of final plat recording, the developer shall pay full park dedication fees for the three lots that are
subject to park dedication fees.
2. Adjust the lot line(s) to assure that all lots meet or exceed the 15,000 square -foot minimum lot area.
3. Individual sewer and water services must be provided and for Lots 1— 4 and indicated on the plans.
4. A final grading plan and soils report must be submitted to the Inspections Division before permits will be
issued.
5. The old individual sewage treatment site for the existing home must be abandoned in accordance with
MPCA regulations if encountered during grading procedures.
6. A 10-foot clear space must be maintained around fire hydrants, i.e. street lamps, trees, shrubs, bushes,
Qwest, Xcel Energy, Cable TV and transformer boxes. This is to insure that fine hydrants can be
quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-01.
7. "No Parking Fire Lane" signs will be required on the new private street. Pursuant to Chanhassen Fire
Prevention Policy #06-1991. Copy enclosed.
8. Conservation easements shall be dedicated over all areas within the Bluff Creek primary zone.
9. Tree preservation fence shall be installed at the edge of the grading limits prior to any construction.
Fencing shall protect trees on proposed lots as well as trees in neighboring properties located next to the
grading limits.
10. Any trees lost due to construction that are not shown as such on plans shall be replaced at a rate of 2:1
diameter inches.
11. Applicant shall submit landscape plans for ity review and approval prior to final plat approval. A minimum
of one overstory tree will be required in the front yard of each lot.
12. Bufferyard plantings are required along Galpin Boulevard. Planting requirements are: 1 overstory tree, 2
understory trees, and 4 shrubs.
13. A final grading plan and soils report must be submitted to the Inspections Division before permits will be
issued.
Walnut Grove 2"d Addition
March 16, 2004
Page 10
14. A wetland buffer 0 to 20 feet in width (with a minimum average of 10 feet) shall be maintained around the
wetland. The wetland buffer shall be 0 along the east side of the wetland and 20 ft. on the north and
west sides. Wetland buffer areas shall be preserved, surveyed and staked in accordance with the City's
wetland ordinance. The applicant shall install wetland buffer edge signs, under the direction of City staff,
before construction begins and shall pay the City $20 per sign.
15. The grading and erosion control plan shall show the actual wetland buffer widths proposed to meet the
minimum average buffer width requirements as well as the 40-foot wetland buffer setback. All structures
shall maintain at least a 40-foot setback from the edge of the wetland buffer or, if no buffer is to be
preserved, from the delineated wetland edge.
16. The primary zone boundary shall be amended to include the wooded area in the rear (westernmost) portion
of Lot 4.
17. A conservation easement shall be dedicated over the primary zone. All structures shall maintain at least a
40 foot setback from the primary zone. No disturbance of the site shall occur within the fast 20 feet of the
setback. Open space shall comprise 100%a of the primary zone.
18. The proposed development shall maintain existing runoff rates. On -site storm water ponding shall be
sufficient to meet all City water quality and quantity standards.
19. A manhole with a two -foot sump shall be installed as the last road accessible structure prior to discharge
into the storm water pond.
20. Riprap and geotextile fabric shall be installed at the flared end sections of the inlet and outlet of the storm
water pond.
21. Drainage and utility easements shall be provided over all existing wetlands, wetland buffer areas and storm
water infrastructure.
22. A drainage and utility easement shall be dedicated over the 10 feet either side of the property line between
Lots 2 and 3 in order to accommodate access for future storm water infrastructure maintenance. A drainage
and utility easement shall be dedicated over the areas in the western portions of Lots 3 and 4 that are
currently not encumbered by drainage and utility easements since water discharged from the storm water
pond will flow through this area as it moves toward the wetland.
23. Type III silt fence shall be provided adjacent to all areas to be preserved as buffer or, if no buffer is to be
preserved, at the delineated wetland edge. Silt fence shall be provided as needed to prevent sediment from
leaving the site.
24. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1.
25. All exposed soil areas shall have temporary erosion protection or permanent cover for the exposed soil
areas year round, according to the following table of slopes and time frames:
Walnut Grove 2id Addition
March 16, 2004
Page 11
26. Type of Slone Stabilized within
Steeper than 3:1 7 days
10:1 to 3:1 14 days
Flatter than 10:1 21 days
27. These areas include any exposed soil areas with a positive slope to a storm water conveyance system, such
as a curb and gutter system, storm sewer inlet, temporary or permanent drainage ditch or other natural or
man-made systems that discharge to a surface water.
28. Street cleaning of soil tracked onto public streets shall include daily street scraping and street sweeping as
needed.
29. Based on the proposed developed area of approximately 3.09 acres, the estimated total SWMP fee, due
payable to the City at the time of final plat recording, is $11,041.
30. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley -
Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency, Minnesota Department of
Natural Resources (for dewatering), Minnesota Department of Health, Carver County, Metropolitan
Council Environmental Services, etc. and comply with their conditions of approval.
31. Prior to final plat approval, a professional civil engineer registered in the State of Minnesota must sign
all plans.
32. Sanitary sewer and water hookup charges are applicable for each of the new lots. The 2004 trunk
hookup charge is $1,458 for sanitary sewer and $2,814 for watermain. Sanitary sewer and watermain
hookup fees may be specially assessed against the parcel at the time of building permit issuance. Hook-
up charges are based on the number of SAC units assigned by the Met Council for each lot.
33. The applicant will be required to meet the existing site runoff rates for the 10-year and 100-year, 24-
hour storm events. The proposed pond must be designed to National Urban Runoff Program (NURP)
standards. The storm sewer must be designed for a 10-year, 24-hour storm event. Drainage and utility
easements shall be dedicated on the final plat over the public storm drainage system including ponds,
drainage swales, and wetlands up to the 100-year flood level. The minimum easement width shall be 20
feet wide.
34. Tree preservation fencing must be installed at the limits of tree removal. The applicant should be aware
that any off -site grading will require an easement from the appropriate property owner.
35. The applicant must enter into a development contract with the City and supply the necessary financial
security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and
the conditions of final plat approval.
36. Submit detailed construction plans and specifications for the public utility improvements before final
platting.
Walnut Grove 2"d Addition
March 16, 2004
Page 12
37. Construct public utility improvements in accordance with the City's latest edition of Standard
Specifications and Detail Plates.
38. Installation of the private utilities for the site will require permits and inspections through the City's
Building Department.
39. Seed and mulch or sod the site within two weeks of grading. Submit a haul route for City approval prior
to any hauling.
40.On the grading plan:
a. Revise the side slopes along the east side of the private drive to be a maximum of 3:1 or
install a retaining wall.
b. Add Type III silt fence along the secondary bluff creek zone line on the south side and Type
II silt fence along the west and east sides of the grading area.
c. Show a minimum 75-foot rock construction entrance.
d. Show all existing and proposed easements.
e. Add a bench mark.
f. Show the storm sewer manhole rim and invert elevations.
41.On the utility plan:
a. Show the proposed utility lines 10 feet inside the property line.
b. Add a note "connection to existing manhole must be core drilled."
c. Show sanitary manhole rim and invert elevations.
d. Show all existing and proposed utility easements.
e. Show the location of existing water and sanitary services to Lot 1.
42.On the street and storm plan:
a. Last storm manhole discharging to the pond must include a 3-foot sump.
b. Show the proposed and existing street easements.
43. Add a legend to the plans.
44. The driveway easement must be 30 feet wide with 20 feet of hard -surface pavement and built to a 7-ton
design.
45. Submit an inspection report certifying that the private street is built to a 7-ton design.
46. Elevation of lowest house opening must be three feet above high water level of the proposed pond.
47. A 30-foot wide public drainage and utility easement must be dedicated on the final plat over the public
sewer and water lines.
Walnut Grove 2"d Addition
March 16, 2004
Page 13
48. Structure setbacks shall comply with the following table:
Setbacks: front, rear, side, Bluff Creek primary zone, wetland
buffer
Lot 1
30, 30, 10, na, na
Lot 2
30, 30, 9, na na
Lot 3
30, 30, 9, 40, 40
Lot 4
30, na, 9, 40, 40
C. "The Chanhassen Planning Commission recommends approval of the Conditional Use Permit #2003-6 for
development within the Bluff Creek Overlay District subject to the following conditions:
1. The primary zone boundary shall be amended to include the wooded area in the rear (westernmost)
portion of Lot 4.
2. A conservation easement shall be dedicated over the primary zone. All structures shall maintain at least
a 40 foot setback from the primary zone. No disturbance of the site shall occur within the first 20 feet
of the setback. Open space shall comprise 100% of the primary zone."
ATTACHMENTS:
1) Findings of Fact and Recommendation.
2) Development Review Application.
3) Reduced Copy of Preliminary Plat Sheets 1-5.
4) Birchwood House Plan.
5) Oakside House Plan.
6) Maple Leaf House Plan.
7) Memo from Steven Torell to Bob Generous dated 3/l/04.
8) Memo from Mark Littfin to Robert Generous dated 2125/04.
9) Letter from Carver Soil & Water Conservation District to Robert Generous dated 9/23/03.
10) Reduced Copy Walnut Grove Preliminary Plat.
11) Reduced Copy Walnut Grove Site Plan.
12) Portion of Walnut Grove Final Plat (Walnut Curve) — Single -Family Lots.
13) Portion of Walnut Grove Final Plat (Prairie Flower Blvd.) — Bungalow Lots.
14) Portion of Walnut Grove Final Plat (Baneberry Way W.) — Townhouses.
15) Walnut Grove Lot Area Tabulations.
16) Walnut Grove Bungalows, Villas and Villa Townhomes Descriptions.
17) Notice of Public Hearing and Notified Property Owners List.
gdplan\2004 planning cases\04-10 -walnut grove 2nd addition\walnut grove 2nd staff report.doc
off._ to
The Planning Commission questioned whether the distance between staged retaining
walls made a difference whether they should be considered one wall as far as height
purposes. They also wanted to clarify that temporary fences would need to meet the
other locational prohibitions.
The Planning Commission directed staff to investigate the issues surrounding the use
EFTS, including proximity to grade, installation, drainage of the system, current
technologies, etc.
Article XXIV. Off-street Parking and Loading
The Planning Commission concurred with the requirement that drive aisles for 45 degree
parking be increased. They also felt that the increase in curb width for 90 degree parking
from 8.5 feet to 9.0 feet was reasonable.
The Planning Commission accepted the idea of making parking requirements for
multifamily developments dependent upon the number of bedrooms in a unit as well as
providing relief for senior housing developments. However, they suggested that the
standards be incorporated in a table.
The Planning Commission agreed with the change in office parking standards, including
the use of net office area, rather than gross building area in determining the parking
requirements. It was pointed out that the divisions based on building square footages be
inclusive, i.e., less than 50,000 sq. ft., between 50,000 and 100,000 sq. ft., and 100,000
sq. ft. and larger.
Article XXV
The Planning Commission recommended that the ordinance use the term "width" rather
than "dimension" is specifying the minimum size of a landscape island or peninsula.
2. Review Comments from Articles II, V, VI and VIE[.
The Planning Commission thanked staff for the additional information and explanation.
3. Review Walnut Grove 2"a Addition Design Alternatives.
The applicant, John Klinglehutz, and Tom Heiland presented a detached housing concept
including three new homes to the Planning Commission on the site. The developer
would bring this option back to the Planning Commission for formal review, if the
Planning Commission felt that this would be a better development option.
Staff provided a copy of the plat for Walnut Grove development for comparison
purposes. The proposed housing would be very similar to the bungalow style home
within the development, but larger in living area. The development would require
variances for lot width and side yard setbacks, but not lot area of lot depth.
The Planning Commission stated that the proposal would probably be a better plan for the
area.
Kate Aanenson went over the agenda for the next Planning Commission meeting on
February 17,2004.
The work session ended at 8:40 p.m.
Submitted by Kate Aanenson
Community Development Director
Prepared by Bob Generous
• 6y-icy 3.
CITY OF
CIUMSEN
7700 Market Boulevard MEMORANDUM
PO Box 147
Chanhassen, MIN55317 TO: Planning Commission
Administration
Phone:952,227.1100 FROM: Bob Generous, Senior Planner
Fax: 952.227.1110
Building Inspections DATE: February 3, 2004
Phone: 952.227.1180
Fax:952.227.1190 SUBJ: Walnut Grove 2nd Addition
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park A Recreation
Phone:952.227.1120
Fax, 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227,1400
Fax: 952.227.1404
Planning A
Natural Resources
Phone: 952,2271130
Fax 952 227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone 952,227.1125
Fax: 952,227.1110
Web Site
www.ci.chanhassen.mn.us
The developer has requested that the Planning Commission review potential
development plans for the development of the property informally prior to
returning to the Planning Commission for formal review. This item was
reviewed by the Planning Commission on October 21, 2003 and by the City
Council on November 10, 2003, who remanded the item to the Planning
Commission for further review.
Attached is the original plan reviewed by the Planning Commission, the
revised plans seen by City Council addressing the turn -around issue, and a
concept plan for detached housing. The third option could only be approved if
the city amends the Planned Unit Development ordinance or if a land use
amendment is approved to residential — medium density.
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A groat place to live, work, and play.
N
scale 7 ° = 40'
PROPOSED BUILDING SETBACKS
FRONT• 90'
REAR•3b
SIDE• 9
' E%ISTINO NOOSE• f0'
J
O••.M�'-. WALNUT GROVE SECOND ADDITION SINGLE FAMILY CONCEPT PLAN
tt KLINGELHUTZ DEVELOPMENT 2-02-0568
o, 'J"m'ww,""' CHANHASSEN, MN SHEET N0. OF SHEETS 1-26-04
CITY OF
MEMORANDUM
TO: Todd Gerhardt, City Manager
7700 Market Boulevard
FROM: Bob Generous, Senior Planner
PO Box 147
Chanhassen, MN 55317
DATE: November 10, 2003
Administration
Phone: 952.227.1100
SUBJ:
Fax: 952.227.1110
Building Inspections
EXECUTIVE SUMMARY
Phone: 952.227.1180
Fax: 952 227.1190
Rezoning of the property to R4 to permit a single-family home and two twin
homes (four units); subdivision approval creating five lots and one outlot with a
Engineering
Phone. 952227.1160
variance for the use of a private street for access; and a conditional use permit
Fax: 952.227.1170
for development within the Bluff Creek Overlay District.
Finance
Phone: 952.227.1140
recommended denaothe rezoning
The Planning Commission recommenddenial
g g and
Fax: 9522271110
consequently denial of the subdivision and conditional use permit due to
inconsistency with the zoning. The primary issues the Planning Commission
Park 8 52.2271120Recreation
Phone: 952.2271120
had were resolving the turnaround and the configuration of Lot 5. "The
g �
Fax:952.227.1110
Planning Commission recommended denial on the basis that the cul-de-sac
Recreation Center
situation has not been addressed by this proposal. It's currently a temporary
2310 Coulter Boulevard
cul-de-sac at the end of that private road. Temporary with the intent that it
Phone:
would go away at some point and there will be a turnaround further down that
,144W
Fax: 952221.1404
road. There is no such provision in this proposal. At least some of the Planning
Planning a
Commission have concerns about the, should I say, intensity of how the current
Natural Resources
proposal places dwellings right on the setback lines, and puts them in a way that
Phone. 952227.1130
Fax 952227.1110
could be termed shoe -horned in. That makes veryfunky lot shapes. That's the
main things. "
Public Works
1ne: Park Road
Phane:952.227.13W
Staff has worked with the applicant to resolve the turnaround issue, creating a
PP � g
Fax:952.227.1310
"hammer -head" on the south end of the private street. As to the lot
configuration, the applicant could have platted a lot that was rectangular in
Senior tamer
Phone:952227.1125
shapethat extended from the east property line to Gal in Boulevard. However,
P Pam' � P
Fax:952.227.1110
staff requested that the majority of the Bluff Creek primary zone be located
within a separate Outlot that could be deeded to the city or be held as an
Web site
www.ci chanhassen.mn.us
undevelo able, association Outlot. The proposed preliminary plat provides that
P P Po P arY P
opportunity. Additionally, the dwelling sizes are very similar to the bungalow
units within the Walnut Grove Development. If the issue is to preclude door
opening for future decks or patios, staff recommends that we prohibit
ingress/egress openings, such as entrance doors or sliding doors on the side of
the structure adjacent to the primary zone setback if there is not at least 12 feet
from the building to the primary zone setback.
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A geat place to live, work, and play.
Mr. Todd Gerhardt, City Manager
November 3, 2003
Page 2
The Planning Commission and the residents on Baneberry Way West have
requested relocating the existing temporary cul-de-sac at the end of Baneberry
Way West further toward the west within the new subdivision. The applicant
has accepted the idea to revise the plans and now proposes a hammer head
turnaround. At this stage, the Engineering Department and the Fire Marshal are
fine with the proposed turnaround.
The Planning Commission questioned whether construction traffic can access
the site from the west side of the property off of Galpin Boulevard. The
Engineering Department has no objection to access off of Galpin Boulevard if
Carver County gives approval, provided that the applicant submits a copy of the
approval to the city.
Staff believes the development is very complementary and compatible with the
Walnut Grove development and is recommending approval of the rezoning to
R4, the preliminary plat creating five lots and one Outlot, and the conditional
use permit.
ACTION REQUIRED
City Council approval requires a majority vote of the entire City Council. City
Council may: 1) grant approval of the preliminary plat, with or without
modification or conditions, 2) refer the preliminary plat to the Planning
Commission or appropriate city staff, or 3) disapprove the preliminary plat. If
the plat is not approved, the City Council shall state the reasons for denial on the
record.
PLANNING COMMISSION SUMMARY
The Planning Commission held a public hearing on October 21, 2003, to review
the proposed development. The Planning Commission voted 4 in favor and 1
abstention to deny the rezoning, preliminary plat and conditional use permit.
The summary and verbatim minutes are item 1 a of the City Council packet for
November 10, 2003.
RECOMMENDATION
Staff recommends that the City Council adopt the following three motions:
• Approval of the rezoning of the property from Agricultural Estate
District (A2) to Mixed Low Density Residential District (R4);
• Approval of preliminary plat for Walnut Grove Second Addition as
shown in plans prepared by Otto Associates dated August 18, 2003
Mr. Todd Gerhardt, City Manager
November 3, 2003
Page 3
and revised October 28, 2003, subject to conditions 1-40 as
contained in the staff report; and
Approval of Conditional Use Permit #2003-6 for development
within the Bluff Creek Overlay District subject to conditions 1-3 in
the staff report.
ATTACHMENTS
1. Planning Commission Staff Report Dated October 21, 2003.
2. Reduced Copy of Walnut Grove Preliminary Plat
3. Reduced Copy of the Walnut Grove Site Plan
4. Section of the Final Plat for Walnut Grove adjacent to Baneberry Way West
5. Sather-Bergquist, Inc. Lot Area Tabulations for Blocks 4, 5, 6 and 7.
6. Walnut Grove Bungalow and Townhomes Description
PC DATE: Oct. 21, 2003
H
z
U
0-I
04
a
a
I
:J
CITY OF CHANHASSEN
STAFF REPORT
CC DATE: Nov. 10, 2003
REVIEW DEADLINE: 11/10/03
CASE #: 03-16 Sub., 03-6 CUP, 03-4 Rez
BY: Robert Generous, et al.
PROPOSAL: Request for rezoning from Agricultural Estate District, A2, to Mixed Low Density
Residential District, R4; preliminary plat approval creating five lots consisting of one
single-family home and four twin home units with a variance for the use of a private
street; and conditional use permit approval for development within the Bluff Creek
Overlay District.
LOCATION: 7305 Galpin Blvd.
APPLICANT: Klingelhutz Development
350 East Highway 212
Chaska, MN 55318
(952) 448-3330
PRESENT ZONING: Agricultural Estate District, A2, and Bluff Creek Overlay District, BCO
2020 LAND USE PLAN: Residential — Low Density (net density 1.2 — 4.0 units per acre)
ACREAGE: 3.09 DENSITY: 1.62 gross, 2.88 net
SUMMARY OF REQUEST: Rezoning of the property to R4 to permit a single-family home and
two twin homes; subdivision approval creating five lots and one outlot containing Bluff Creek and the
majority of the Bluff Creek primary zone with a variance for the use of a private street for access;
and a conditional use permit for development within the Bluff Creek Overlay District.
LEVEL OF CITY DISCRETION IN DECISION -MAKING: The City has a relatively high level
of discretion in approving rezonings, PUD's, and amendments to PUD's because the City is acting
in its legislative or policy making capacity. A rezoning or PUD, and amendment thereto, must be
consistent with the City's Comprehensive Plan.
The City's discretion in approving or denying a preliminary plat is limited to whether or not the proposed
plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these
standards, the City must approve the preliminary plat. This is a quasi-judicial decision.
The City has limited discretion in approving or denying conditional use permits, based on whether
or not the proposal meets the conditional use permit standards outlined in the Zoning Ordinance.
If the City finds that all the applicable conditional use permit standards are met, the permit
must be approved. This is a quasi-judicial decision.
October 21, 2003
Page 2
The developer is proposing an infill development creating two new two-family buildings. The existing
house will remain on one lot within the development. The surrounding property was developed as part of
the Walnut Grove development. This project proposes extending the private street to serve four additional
dwelling units in 2 two-family homes (which was contemplated as part of the Walnut Grove development),
which was required to record an access easement for this property. Sewer and water is available through
the Walnut Grove project.
The site is heavily wooded in the southern one-third of the site, adjacent to Bluff Creek. The property
slopes from a high point in the northeast comer at elevation 984 down to the creek at an elevation of 944.
The developer is preserving the southern portion of the property as part of Outlot A.
APPLICABLE REGULATIONS
Chapter 18, Subdivisions
Sections 20-41 through 20-45, Amendments
Sections 20-221 through 20-237, Conditional Use Permits
Sections 20-631 through 20-637, R4 district regulations
Sections 20-1551 through 20-1564, Bluff Creek Overlay District
PROPOSAUSUNIMARY
The applicant is rezoning the property to Mixed Low Density Residential District, R4, which permits
single-family lots of 15,000 square feet and twin home lots of 10,000 square feet per unit. In conjunction
with the rezoning, the applicant is subdividing the property to create a single-family home lot around the
existing house and four twin home lots. Access to the existing home is proposed to remain off Galpin
Boulevard. Access to the twin homes will be via a private street which will connect to Baneberry Way,
which is also a private street. A conditional use pemut is required for all development within the Bluff
Creek Overlay district.
The subdivision of the property is straightforward with the creation of five lots for development and one
outlot, which will remain natural in appearance and preserved as open space. The applicant has included
the majority of the Bluff Creek Primary Zone in Outlot A. Conservation easements shall be placed over
all areas within the Bluff Creek primary zone. This will allow the City to restore and/or manage the
natural resources in these areas. The developer may dedicate Outlot A to the city.
The proposed development complies with all zoning requirements and is consistent with the comprehensive
plan. Staff is recommending approval of the rezoning, subdivision, and conditional use permit.
BACKGROUND
The house was built in 1908. Development of Walnut Grove, the project to the east, began in 1997. An
access easement, permitting the property to use Baneberry Way West, was recorded as part of the plat for
Walnut Grove.
October 21, 2003
Page 3
LANDSCAPINGlI REE PRESERVATION
Tree canopy coverage and preservation calculations have been submitted for Walnut Grove 2nd
Addition. They are as follows:
Total upland area (excluding wetlands) 132,200 SF or 3.03 ac.
Baseline canopy coverage 36% or 47,485 SF
Minimum canopy coverage allowed 30% or 39,660 SF
Proposed tree preservation 34% or 44,533 SF
Developer does meet minimum canopy coverage requirements.
Bufferyard plantings are required along Galpin Boulevard for Lots 2-4. Total plantings required are:
1 overstory
2 understory
4 shrubs
PARKS AND OPEN SPACE
Walnut Grove Second Addition will have four lots that are subject to a park dedication fee and one lot (the
existing home), which is exempt from park dedication. Prior to recording the final plat, the development is
subject to the payment of $9,600 in park dedication fees ($2,400 per unit) based on 2003 park fees.
WETLANDS
One wetland basin exists on -site. The wetland is an ag/urban wetland that is a part of the Bluff Creek
corridor. It is dominated by reed canary grass. No wetland impact is proposed.
A wetland buffer of 0 to 20 feet in width (with a minimum average of 10 feet) must be maintained
around the wetland. In order to accommodate the proposed building location on Lot 4, the wetland
buffer should be 0 along the east side of the wetland and should be 20 ft. on the north and west sides.
Wetland buffer areas should be preserved, surveyed and staked in accordance with the City's wetland
ordinance. The applicant must install wetland buffer edge signs, under the direction of City staff, before
construction begins and must pay the City $20 per sign. The grading and erosion control plan should
show the actual wetland buffer widths proposed to meet the minimum average buffer width
requirements as well as the 40-foot wetland buffer setback. All structures shall maintain at least a
40-foot setback from the edge of the wetland buffer or, if no buffer is to be preserved, from the
delineated wetland edge.
BLUFF CREEK OVERLAY DISTRICT
The Bluff Creek Overlay District was adopted in December 1998 as a tool for the preservation of Bluff
Creek and the natural resources within its corridor. Bluff Creek flows through the southern portion of
this property. The property also contains a forested riparian corridor and an aglurban wetland. The
primary zone encompasses the forested area, the wetland, and the wetland buffer. The secondary zone
October 21, 2003
Page 4
encompasses the primary zone and the first 20 feet of the setback. A conservation easement should be
dedicated over the primary zone. All structures must maintain at least a 40 foot setback from the
primary zone. No disturbance of the site may occur within the first 20 feet of the setback. No
alterations are proposed within the overlay district. Open space must comprise 100% of the primary
zone.
GRADING, DRAINAGE AND EROSION CONTROL
The plans propose to grade about 25% of the site for the new house pads, a proposed private driveway,
nd a storm water pond. The proposed lots are located in the east central portion of the site. The
proposed grading will prepare the site for full basement house pads on Lots 2, 3, 4 and 5, Block 1.
The existing site drainage flows south toward the existing creek. The plans propose to convey the
northeasterly quadrant drainage to a proposed structure and carry the storm water via storm sewer to a
proposed NURP pond. The remaining portion of the site will drain overland to the proposed storm water
pond and/or the creek. Staff is recommending the creation of two swales between Lots 1 & 2 and
Lots 3 & 4 to minimize neighborhood drainage impact on the houses.
The applicant will be required to meet the existing site runoff rates for the 10-year and 100-year,
24-hour storm events. The proposed pond must be designed to National Urban Runoff Program (NURP)
standards. The stone sewer must be designed for a 10-year, 24-hour storm event. Drainage and utility
easements shall be dedicated on the final plat over the public storm drainage system including ponds,
drainage swales, and wetlands up to the 100-year flood level. The minimum easement width shall be
20 feet wide.
Staff recommends that Type III silt fence be used along the south side adjacent to the secondary bluff
creek line and Type II silt fence along the east and west sides of the grading area. In addition, tree
preservation fencing must be installed at the limits of tree removal. A 75-foot minimum rock
construction entrance must be added to the entrance that will be accessed during construction. The
applicant should be aware that any off -site grading will require an easement from the appropriate
property owner.
Storm Water Management
The proposed development is required to maintain existing runoff rates. On -site storm water ponding
must be sufficient to meet all City water quality and quantity standards. A manhole with a two -foot
sump should be installed as the last road accessible structure prior to discharge into the storm water
pond. Riprap and geotextile fabric should be installed at the flared end sections of the inlet and outlet of
the storm water pond.
Easements
Drainage and utility easements should be provided over all existing wetlands, wetland buffer areas, and
storm water infrastructure. A drainage and utility easement should be dedicated over the 10 feet either
side of the property line between Lots 3 and 4 in order to accommodate access for future storm water
infrastructure maintenance. A drainage and utility easement should also be dedicated over the area in
October 21, 2003
Page 5
the southwestern portion of Lot 3 that is currently not encumbered by a drainage and utility easement
since water discharged from the storm water pond will flow through this area as it moves toward the
wetland.
Erosion Control
Type III silt fence should be provided adjacent to all areas to be preserved as buffer or, if no buffer is to
be preserved, at the delineated wetland edge. All upland areas disturbed as a result of construction
activities shall be immediately restored with seed and disc -mulched, covered with a wood -fiber blanket, or
sodded within two weeks of completion of each activity in accordance with the City's Best Management
Practice Handbook.
Surface Water Management Fees
Water Ouality Fees
Because of the impervious surface associated with this development, the water quality fees for this
proposed development are based on single-family residential development rates of $949/acre. Based on the
proposed developed area of approximately 2.24 acres, the water quality fees associated with this project are
$2,126.
Water Ouantity Fees
The SWMP has established a connection charge for the different land uses based on an average citywide
rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP
culverts, open channels, and storm water ponding areas for runoff storage. Single-family residential
developments have a connection charge of $2,348 per developable acre. This results in a water quantity fee
of approximately $5,259 for the proposed development.
SWMP Credits
This project proposes the construction of a NURP pond. The applicant will be credited for water quality
where NURP basins are provided to treat runoff from the site. This will be determined upon review of
the ponding and storm sewer calculations. Credits may also be applied to the applicant's SWMP fees
for oversizing in accordance with the SWMP or the provision of outlet structures. The applicant will not
be assessed for areas that are dedicated outlots. No credit will be given for temporary pond areas.
At this time, the estimated total SWMP fee, due and payable to the City at the time of final plat recording, is
$7,385.
Other Agencies
The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley -
Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency) and comply with their
conditions of approval.
October 21, 2003
Page 6
Municipal sewer and water service is available to the site from Baneberry Way. The existing house on
Lot 1 is already connected to municipal sewer and water. The applicant is proposing to extend sewer and
water lines along the private driveway to service proposed Lots 2, 3, 4, and 5. The proposed sanitary
manholes must be low enough to serve the basement of Lots 2, 3, 4 and 5, Block 1 and public utility lines
must be 10-feet inside the property line.
According to the City's Finance Department records, the parcel was previously assessed for one sanitary
sewer and water hookup. Since the developer will be responsible for extending lateral sewer and water
service to the lots, the sanitary sewer and water connection charges will be waived. However, the sanitary
sewer and water hookup charges will still be applicable for each of the new lots. The 2003 trunk hookup
charge is $1,440 for sanitary sewer and $1,876 for watermain. Sanitary sewer and watermain hookup fees
may be specially assessed against the parcel at the time of building permit issuance.
All of the utility improvements are required to be constructed in accordance with the City's latest edition of
Standard Specifications and Detail Plates. Upon completion of the utility improvements, the utilities will be
turned over to the City for maintenance and ownership. The applicant is also required to enter into a
development contract with the City and supply the necessary financial security in the form of a letter of
credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval.
Permits from the appropriate regulatory agencies will have to be obtained, including but not limited to the
MPCA, Department of Health, MCES, and Watershed District.
STREETS
The applicant is proposing two accesses to the proposed lots. On the northwest corner of the parcel, an
existing access off Galpin Lake Road will be utilized to serve the existing house on Lot 1. Another
proposed new access off of Baneberry Way turning point will be servicing Lots 2, 3, 4, and 5 as a private
driveway. As such, the driveway easement must be 30 feet wide with 20-feet of hard surface pavement and
built to a 7-ton design. The developer must submit an inspection report certifying that the private street is
built to a 7-ton design prior to certificate of occupancy. There is an existing turnaround at the end of
Baneberry Way; Because of this, the Fire Marshal is not requiring an additional turnaround.
EASEMENTS
Conservation easements shall be dedicated over all areas within the Bluff Creek primary zone.
REZONING/COM PLAN (If required)
The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse affects of
the proposed amendment. The six (6) affects and our findings regarding them are:
a) The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City Comprehensive
October 21, 2003
Page 7
Plan. The property is guided for Residential - Low Density uses. R4 is an appropriate
zoning for the property.
b) The proposed use is or will be compatible with the present and future land uses of the
area. This development will develop at a lower density than the property to the east.
c) The proposed use conforms with all performance standards contained in the Zoning
Ordinance.
d) The proposed use will not tend to or actually depreciate the area in which it is proposed.
e) The proposed use can be accommodated with existing public services and will not
overburden the city's service capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving the
property. Access to the existing house will be via the existing driveway on Galpin
Boulevard. The additional dwellings will be accessed via Baneberry Way West, a private
street.
COMPLIANCE TABLE
Area (square feet)
Width (feet)
Depth (feet)
Setbacks: front,
rear, side, Bluff
Creek primary
zone, wetland
Code -single-family
15,000
80
125
30, 30, 10, 40, 40
Code -two-family
10,000
50
125
30, 30, 10, 40, 40
Lot 1
25,985
104
250
30, 30, 10, na, na
Lot 2
12,495
50
250
30, 30, 10, na, 40
Lot 3
12,495
50
250
30, 30, 10, 40, 40
Lot 4
11,714
50
176
30, na, 10, 40, 40
Lot 5
12,873
125
129
30, na, na, 40, na
Outlot
37,196
ROW
21,842
Total
134,600
PRIVATE STREET FINDINGS
In order to permit private streets, the city must find that the following conditions exist:
1) The prevailing development pattern makes it unfeasible or inappropriate to construct a public
street. The site is being accessed via an existing private street through the Walnut Grove
development for which an access easement was recorded as part of the Walnut Grove
development. The location of the Bluff Creek Primary zone and the small wetland on site make
it unfeasible to construct a public street.
October 21, 2003
Page 8
2) After reviewing the surrounding area, it is concluded that an extension of the public street system
is not required to serve other parcels in the area, improve access, or to provide a street system
consistent with the comprehensive plan. No additional access will be permitted to Galpin
Boulevard.
3) The use of the private street will permit enhanced protection of the city's natural resources
including wetlands and forested areas located in the Bluff Creek primary zone.
VARIANCE FINDINGS WITHIN SUBDIVISONS
The city may grant a variance from the regulations of the subdivision ordinance as part of the plat approval
process following a finding that all of the following conditions exist:
1) The hardship is not a mere inconvenience.
Finding: The hardship is not a mere inconvenience. The proposed private street preserves
significant site features and connects to an existing private street.
2) The hardship is caused by the particular physical surroundings, shape or typographical conditions of
the land.
Finding: The hardship is caused by the particular physical surroundings, shape and topographical
conditions of the land, the Bluff Creek primary zone.
3) The conditions upon which the request is based are unique and not generally applicable to other
property -
Finding: The conditions upon which the request is based are unique and not generally applicable to
other properties due to the unique site features.
4) The granting of the variance will not be substantially detrimental to the public welfare and is in
accord with the purpose and intent of this chapter, the zoning ordinance and comprehensive plan.
Finding: The granting of a variance will not be substantially detrimental to the public welfare and
is in accord with the purpose and intent of this chapter, the zoning ordinance, and comprehensive
plan.
SUBD"ION FINDINGS
1) The proposed subdivision is consistent with the zoning ordinance;
Finding: The subdivision meets all the requirements of the R4, Mixed Low Density Residential
District.
October 21, 2003
Page 9
2) The proposed subdivision is consistent with all applicable city, county and regional plans including
but not limited to the city's comprehensive plan;
Finding: The proposed subdivision is consistent with applicable plans.
3) The physical characteristics of the site, including but not limited to topography, soils, vegetation,
susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are
suitable for the proposed development;
Finding: The proposed site is suitable for development subject to the conditions specified in this
report.
4) The proposed subdivision makes adequate provision for water supply, storm drainage, sewage
disposal, streets, erosion control and all other improvements required by this chapter;
Finding: The proposed subdivision is served by adequate urban infrastructure.
5) The proposed subdivision will not cause environmental damage;
Finding: The proposed subdivision will not cause excessive environmental damage subject to
conditions of approval.
6) The proposed subdivision will not conflict with easements of record.
Finding: The proposed subdivision will not conflict with existing easements, but rather will expand
and provide all necessary easements.
7) The proposed subdivision is not premature. A subdivision is premature if any of the following
exists:
a) Lack of adequate storm water drainage.
b) Lack of adequate roads.
c) Lack of adequate sanitary sewer systems.
d) Lack of adequate off -site public improvements or support systems.
Finding: The proposed subdivision is provided with adequate urban infrastructure.
CONDITIONAL USE PERMIT FINDINGS
When approving a conditional use permit, the City must determine the capability of a proposed
development with existing and proposed uses. The general issuance standards of the conditional use
Section 20-232, include the following 12 items:
1) Will not be detrimental to or endanger the public health, safety, comfort, convenience or general
welfare of the neighborhood or the city.
October 21, 2003
Page 10
Finding: The proposed development, within the BCO, will not be detrimental to or endanger the
public health, safety, comfort, convenience or general welfare of the neighborhood or the city.
2) Will be consistent with the objectives of the city's comprehensive plan and this chapter.
Finding: The proposed development is consistent with the comprehensive plan.
3) Will be designed, constructed, operated and maintained so as to be compatible in appearance with
the existing or intended character of the general vicinity and will not change the essential character
of that area.
Finding: The proposed development of low density housing is compatible with the BCO and
surrounding development.
4) Will not be hazardous or disturbing to existing or planned neighboring uses.
Finding: The proposed development will not be hazardous or disturbing to the existing
neighboring uses. The proposed development will preserve the BCO primary zone in its entirety.
5) Will be served adequately by essential public facilities and services, including streets, police and
fire protection, drainage structures, refuse disposal, water and sewer systems and schools; or will be
served adequately by such facilities and services provided by the persons or agencies responsible
for the establishment of the proposed use.
Finding: The proposed development will be served by adequate public infrastructure.
6) Will not create excessive requirements for public facilities and services and will not be detrimental
to the economic welfare of the community.
Finding: The proposed intensity of development was anticipated as part of the city's
comprehensive plan and will not create excessive requirements for public facilities and services.
7) Will not involve uses, activities, processes, materials, equipment and conditions of operation that
will be detrimental to any persons, property or the general welfare because of excessive production
of traffic, noise, smoke, fumes, glare, odors, rodents, or trash.
Finding: The proposed development will not be detrimental to persons or property or the general
welfare of the area.
8) Will have vehicular approaches to the property which do not create traffic congestion or interfere
with traffic or surrounding public thoroughfares.
Finding: The proposed development will be served via a private street.
October 21, 2003
Page 11
9) Will not result in the destruction, loss or damage of solar access, natural, scenic or historic features
of major significance.
Finding: The proposed development will not result in the destruction, loss or damage of solar
access, natural, scenic or historic features of major significance.
10) Will be aesthetically compatible with the area.
Finding: The proposed development will be aesthetically compatible with the area.
11) Will not depreciate surrounding property values.
Finding: The proposed development will not depreciate surrounding property values.
12) Will meet standards prescribed for certain uses as provided in this article.
Finding: The proposed development will meet standards for the R4 and BCO districts.
RECOMMENDATION
Staff recommends that the Nanning Ceffmiiss City Council adopt the following three motions
(rezoning, subdivision and conditional use permit) based on the findings in the staff report:
A. "The Chanhassen Planning Ceffwpissiea feeemmends approval a City Council approves the rezoning
of the property from Agricultural Estate District, A2, to Mixed Low Density Residential District,
R4."
B. "The Chanhassen City Council approves the
preliminary plat for Walnut Grove Second Addition, plans prepared by Otto Associates, dated 8/18103,
revised 10/28103, subject to the following conditions:
1) At the time of final plat recording, the developer shall pay full park dedication fees for the four lots that
are subject to a park dedication fees.
2) Conservation easements shall be dedicated over all areas within the Bluff Creek primary zone.
3) Tree preservation fence shall be installed at the edge of the grading limits prior to any construction.
Fencing shall protect trees on proposed lots as well as trees in neighboring properties located next to the
grading limits.
4) Any trees lost due to construction that are not shown as such on plans shall be replaced at a rate of 2:1
diameter inches.
5) Applicant shall submit landscape plans for foundation plantings for units. A minimum of one overstory
tree will be required in the front yard of each lot.
October 21, 2003
Page 12
6) Bufferyard plantings are required along Galpin Boulevard. Planting requirements are: 1 overstory tree,
2 understory trees, and 4 shrubs.
7) Any portion of a building within three feet of a property line must be of one -hour fire -resistive
construction and location of openings may be restricted. Consideration must be given to the placement
of property lines prior to platting the property.
8) A final grading plan and soils report must be submitted to the Inspections Division before permits will
beissued.
9) Meet with the Inspections Division as soon as possible to discuss plan review and permit procedures.
10) A wetland buffer of 0 to 20 feet in width (with a minimum average of 10 feet) shall be maintained
around the wetland. In order to accommodate the proposed building location on
Lot 4, the wetland buffer shall be zero (0) feet along the east side of the wetland and shall be
twenty (20) feet on the north and west sides. Wetland buffer areas shall be preserved, surveyed and
staked in accordance with the City's wetland ordinance. The applicant shall install wetland buffer
edge signs, under the direction of City staff, before construction begins and shall pay the City $20 per
sign.
11) The grading and erosion control plan shall show the actual wetland buffer widths proposed to meet
the minimum average buffer width requirements as well as the 40-foot wetland buffer setback. All
structures shall maintain at least a 40-foot setback from the edge of the wetland buffer or, if no
buffer is to be preserved, from the delineated wetland edge.
12) A conservation easement shall be dedicated over the Bluff Creek primary zone. All structures
shall maintain at least a 40 foot setback from the primary zone. No disturbance of the site shall
occur within the first 20 feet of the setback. Open space shall comprise 100% of the primary zone.
13) The proposed development shall maintain existing runoff rates. On -site storm water ponding shall
be sufficient to meet all City water quality and quantity standards.
14) A manhole with a two -foot sump shall be installed as the last road accessible structure prior to
discharge into the storm water pond.
15) Riprap and geotextile fabric shall be installed at the flared end sections of the inlet and outlet of
the storm water pond.
16) A drainage and utility easement must be dedicated over the 10 feet either side of the property line
between Lots 3 and 4 in order to accommodate access for future storm water infrastructure
maintenance. A drainage and utility easement must be dedicated over the area in the southwestern
portion of Lot 3 that is currently not encumbered by a drainage and utility easement since water
discharged from the storm water pond will flow through this area as it moves toward the wetland.
October 21, 2003
Page 13
17) Type III silt fence shall be provided adjacent to all areas to be preserved as buffer or, if no buffer
is to be preserved, at the delineated wetland edge.
18) All upland areas disturbed as a result of construction activities shall be immediately restored with
seed and disc -mulched, covered with a wood -fiber blanket or sodded within two weeks of completion
of each activity in accordance with the City's Best Management Practice Handbook.
19) Based on the proposed developed area of approximately 2.24 acres, the estimated total SWMP fee,
due and payable to the City at the time of final plat recording, is $7,385.
20) The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley -
Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency) and comply with
their conditions of approval.
21) Show the existing street name `Baneberry Way."
22) Prior to final plat approval, a professional civil engineer registered in the State of Minnesota must
sign all plans.
23) Sanitary sewer and water hookup charges are applicable for each of the new lots. The 2003 trunk
hookup charge is $1,440 for sanitary sewer and $1,876 for watermain. Sanitary sewer and
watermain hookup fees may be specially assessed against the parcel at the time of building permit
issuance.
24) The applicant will be required to meet the existing site runoff rates for the 10-year and 100-year,
24-hour storm events. The proposed pond must be designed to National Urban Runoff Program
(NURP) standards. The storm sewer must be designed for a 10-year, 24-hour storm event.
Drainage and utility easements shall be dedicated on the final plat over the public storm drainage
system including ponds, drainage swales, and wetlands up to the 100-year flood level. The
minimum easement width shall be 20 feet wide.
25) Use Type III silt fence along the secondary bluff creek overlay zone line on the south side and use
Type II silt fence along the west and east sides of the grading area. In addition, tree preservation
fencing must be installed at the limits of tree removal. A 75-ft. minimum rock construction
entrance should be added to the entrance that will be accessed during construction. The applicant
should be aware that any off -site grading will require an easement from the appropriate property
owner.
26) Permits from the appropriate regulatory agencies must be obtained, including but not limited to the
MPCA, Department of Health, Watershed District, Carver County, etc.
27) The applicant shall enter into a development contract with the City and supply the necessary
financial security in the form of a letter of credit or cash escrow to guarantee installation of the
improvements and the conditions of final plat approval.
October 21, 2003
Page 14
28) Submit detailed construction plans and specifications for the public utility improvements before
final platting.
29) Construct public utility improvements in accordance with the City's latest edition of Standard
Specifications and Detail Plates.
30) Installation of the private utilities for the site will require permits and inspections through the
City's Building Department.
31) Seed and mulch or sod the site within two weeks of grading. Submit haul route for City approval
prior to any hauling.
32) On the grading plan:
a) Add a storm sewer schedule.
b) Add silt fence Type III along the secondary bluff creek zone line on the south side and
silt fence Type H along the west and east sides of the grading area.
c) Show a minimum 75-foot rock construction entrance.
d) Show all existing and proposed easements.
e) Add a bench mark.
f) Show the storm sewer manholes rim and invert elevations.
33) On the utility plan:
a) Show proposed utility lines 10-feet inside property line.
b) Add a note, "Connection to existing manhole must be core drilled."
c) Show sanitary manhole rim and invert elevations.
d) Show minimum 10-ft. horizontal separation between sanitary and watermain lines.
e) Show all existing and proposed utility easements.
f) Show proposed house lower level elevations.
g) Show sanitary sewer and watermain pipe class and slope.
h) Show a temporary utility easement to work outside property limit.
i) Show the location of proposed and existing water and sanitary services.
j) Show the proposed sanitary and watermain in profile view within the construction area.
k) All public watermain will be PVC, C-900 pipe
1) All public sanitary sewer pipe type will be PVC, SDR35.
34) On the street and storm plan:
a) Last storm manhole discharging to the pond must include a 2-foot sump.
b) Show the proposed and existing street easements.
35) Add a legend to the plans.
36) Add the latest version of City of Chanhassen detail plates# 1002, 1004, 1005, 1006, 2001, 2101,
2109A, 3101, 3102, 3104, 3107, 3108, 3109, 5200, 5203, 5207, 5300, 5301 and 5302.
October 21, 2003
Page 15
37) The driveway easement must be 30 feet wide with 20-feet of hard surface pavement and built to
a 7-ton design. The developer will be required to provide inspection reports verifying the private
street construction complies with this requirement.
38) Construction access may be from the west side of the property off Galpin Lake Road
(Carver County Rd.117.) if Carver County will give approval. The applicant has to
submit to the City a copy of the permit or approval letter from the County to utilize an
access of Galpin Lake Road.
39) Structure setbacks shall comply with the following table:
Setbacks: front, rear, side, Bluff Creek primary zone, wetland
Lot 1
30, 30, 10, na, na
Lot 2
30, 30, 10, na, 40
Lot 3
30, 30, 10, 40, 40
Lot 4
30, na, 10, 40,40
Lot 5
30, na, na, 40, na
39) The current cul-de-sac issue must be addressed relocated as shown on the revised plans dated
10/28/03. The developef: shall eantaot the Chanhassen City Eagine-e-F And- ChanhAsgen Am
Remove the existing cul-de-sac
bituminous in back of the curb and re -sod the area.
40) Ingress/egress openings, such as entrance doors or sliding doors on the side of the structure
adjacent to the primary zone setback, shall be prohibited if there is not at least 12 feet from
the building to the primary zone setback."
C. "The Chanhassen NfflwAng Commission feeeffffnends appfflval e City Council approves the
Conditional Use Permit #2003-6 for development within the Bluff Creek Overlay District subject to the
following conditions:
1) All structures shall maintain at least a 40 foot setback from the primary zone. No disturbance of the
site shall occur within the fast 20 feet of the setback. Open space shall comprise 100% of the
primary zone.
2) The site shall develop substantially in compliance with Subdivision 03-16, Walnut Grove T'
Addition.
3) Ingress/egress openings, such as entrance doors or sliding doors on the side of the structure
adjacent to the primary zone setback, shall be prohibited if there is not at least 12 feet from
the building to the primary zone setback.."
October 21, 2003
Page 16
ATTACHMENTS:
1) Findings of Fact and Recommendation
2) Development Review Application
3) Reduced Copy of Preliminary Plat
4) Letter from Carver Soil & Water Conservation District to Robert Generous dated 9/23/04
5) Notice of Public Hearing and Notified Property Owners List.
October 21, 2003
Page 17
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
Application of Klingelhutz Development for Rezoning, Subdivision and Conditional Use Permit
approval.
On October 21, 2003, the Chanhassen Planning Commission met at its regularly scheduled meeting to
consider the application of Klingelhutz Development for rezoning from Agricultural Estate District, A2,
to Mixed Low Density Residential District, R4; preliminary plat approval creating five lots consisting of
one single-family home and four two-family home units, with a variance for the use of a private street
and a conditional use permit for development within the Bluff Creek Overlay District. The Planning
Commission conducted a public hearing on the proposed development preceded by published and
mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak
and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned Agricultural Estate District and is located within the Bluff
Creek Overlay District.
2. The property is guided in the Land Use Plan for Residential —Low Density use.
3. The legal description of the property is: see Exhibit A
4. The proposed subdivision is inconsistent with the zoning ordinance. The rezoning of the
property to R4 is consistent with the land use designation of the property for Residential —Low
Density use. The proposed development complies with the Bluff Creek Overlay standards.
However, the proposed development does not meet the intent of the Bluff Creek Overlay
district.
5. The proposed development is inconsistent with all applicable city, county and regional plans
including but not limited to the city's comprehensive plan.
6. The physical characteristics of the site, including but not limited to topography, soils,
vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water
drainage are suitable for the proposed development.
October 21, 2003
Page 18
7. The proposed development makes adequate provision for water supply, storm drainage, sewage
disposal, erosion control and all other improvements required by the city. The proposed
development does not adequately address the relocation of the turn -around.
8. The proposed development will not cause significant environmental damage.
9. The proposed subdivision will not conflict with easements of record.
10. The proposed subdivision is not premature. A subdivision is premature if any of the following
exists:
a. Lack of adequate storm water drainage.
b. Lack of adequate roads.
C. Lack of adequate sanitary sewer systems.
d. Lack of adequate off -site public improvements or support systems.
11. The planning report # 03-16 Subdivision, 03-6 CUP, 03-4 Rezoning dated October 21,
2003, prepared by Robert Generous, et al, is incorporated herein.
The Planning Commission recommends that the City Council approve deny the
Rezoning, Preliminary Plat and Conditional Use Permit.
ADOPTED by the Chanhassen Planning Commission this 21st day of October, 2003.
BY:
ATTEST:
Secretary
CHANHASSEN PLANNING CONU&SSION
Its Chairman
EXHIBIT A
Legal Description Parcel 1:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows:
Commencing at the West Quarter corner of said Section 10; thence on an assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, c distance of 1190.41 feet to a point on a 3452.34 foot
radius curve, the center of circle of sold curve bearing North 79 degrees 30
minutes 09 seconds West from sold point, thence Southwesterly along said curve,
a distance of 469.80 feet, central angle 07 degrees 47 minutes 49 seconds; thence
South 18 degrees 17 minutes 40 seconds West along tangent, a distance of 64.00
feet to the actual point of beginning of the tract to be described; thence continuing
South 18 degrees 17 minutes 40 seconds West, a distance of 282.12 feet; thence
South 65 degrees 12 minutes 03 seconds East, a distance of 33.12 feet to a point
that is hereafter referred to as Point A.
Point A is described as beginning at the point of intersection of the Northerly
right—of—way line of Minnesota Trunk Highway No. 5 and a line 33.00 feet
Southeasterly of, measured at right angles to and parallel with the centerline of
Carver County Road No. 117; thence on an assumed bearing of North 18 degrees
17 minutes 40 seconds East and parallel with the centerline of said Carver County
Rood No. 117, a distance of 725.00 feet to said Point A.
Thence from sold Point A, South 65 degrees 12 minutes 03 Southeast East, a
distance of 268.73 feet; thence North 18 degrees 17 minutes 40 seconds East, a
distance of 316.33 feet; thence North 71 degrees 42 minutes 20 seconds West, a
distance of 300.00 feet to the point of beginning.
Legal Description Parcel 2:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows:
Commencing at the West Quarter corner of said Section 10, thence on an assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet; thence Southerly a distance
of 383.79 feet along a curve not tangential with the last described line, said curve
is concave to the West, has a radius 3452.34 feet and a central angle of 6 degrees
22 minutes 10 seconds and the chord of said curve bears South 13 degrees 40
minutes 55 second West to the point of beginning of the tract to be described,
thence continuing Southerly, a distance of 86.01 feet along said curve concave to
the West, having a radius of 3452.34 feet, a central angle of 01 degree 25 minutes
39 seconds; thence South 18 degrees 17 minutes 40 seconds West, tangent to said
curve, a distance of 64.00 feet; thence South 71 degrees 42 minutes 20 seconds
East, a distance of 300.00 feet; thence North 18 degrees 17 minutes 40 seconds
East, a distance of 150.00 feet, thence North 71 degrees 42 minutes 20 seconds
West, a distance of 301.07 feet to the point of beginning.
WYOFCW1' _,I,EN
CITY OF CHANHASSEN
7700 MARKET BOULEVARD .SEP 1 1 2��3
6111 �f CHANHASSEN, MN 55317
(952) 227-1100
CIiNIHASSEN PLANNING DEPi
DEVELOPMENT REVIEW APPLICATION
APPLICANT:
ADDRESS: 3 Sa Ei—
Q\"kv� , MO._
S9 I tC
TELEPHONE (Day time) 4 ,4 _ qY R — 3 33 Q
OWNER: K << N`�vy.t im,
ADDRESS: 35O EF 7l&—'j /
(2kr95NC+4, hlu 5753/�'
,r
TELEPHONE:
Comprehensive Plan Amendment
Temporary Sales Permit
Conditional Use Permit %�M , GIS
Vacation of ROW/Easements
Interim Use Permit
Variance
Non -conforming Use Permit
Wetland Alteration Permit
Planned Unit Development*
Zoning Appeal
Rezoning j 00 .
Zoning Ordinance Amendment
Sign Permits
Sign Plan Review
Notification Sign
Site Plan Review'
X Escrow for Filing Fees/Attomey Cost"
($50 CUP/SPRNACNAR/WAP/Metes
and Bounds, $400 Minor SUB)
Subdivision' 47
5 ifs
TOTAL FEE $ JbI6te— T)S7 i
A list of all property owners within 500 feet of the boundaries of the property must be included with the
application.
Building material samples must be submitted with site plan reviews.
'Twenty-six full size folded copies of the plans must be submitted, including an 81/2' X 11" reduced copy of
transparency for each plan sheet.
" Escrow will be required for other applications through the development contract
NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application.
PROJECT NAME _ V),Pj N V+ 1 U ?2to V e yN D
LOCATION— '1 3Q 5���o� t ��P"" t N
''
LEGAL DESCRIPTION tAt6�►e�r�
TOTAL
ACREAGE 3,0
WETLANDS PRESENT _OYES NO
PRESENT ZONING
REQUESTED
PRESENT LAND USE
REQUESTED LAND USE
REASON FOR THIS REQUEST
LeV, & r,s t4�
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning
Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within ten business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within ten business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my knowledge.
The city hereby notifies the applicant that development review cannot be completed within 60 days due to public hearing
requirements and agency review. Therefore, the city is notifying the applicant that the city requires an automatic 60 day
extension for development review. Development review shall be completed within 120 days unless additional review
extensions are approved by the app)iepnt.
Application Received on 9�i4/c3 Fee Paid
#187s
qA a
D e
9 D-
ate I> W N 29*1
Receipt No. -Dba 40361
The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the
meeting. If not contacted, a copy of the report will be mailed to the applicant's address r
Q, `Pk�� pftoY.c ���3z�s ��tic. WLU44 911114403
Tom Heiland
From:
Kara Knutson [kara@ottoassociates.com]
Sent:
Tuesday, September 09, 2003 9:38 AM
To:
Tom Heiland
Subject:
Legal Description for Walnut Grove second
Legal Description - Parcel 1:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver County,
Minnesota, described as follows: Commencing at the West Quarter corner of said Section 10;
thence on an assumed bearing of South 01 degree 56 minutes 40 seconds East along the West
line of said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet to a point on a 3452.34 foot radius
curve, the center of circle of said curve bearing North 79 degrees 30 minutes 09 seconds
West from said point; thence Southwesterly along said curve, a distance of 469.80 feet,
central angle 07 degrees 47 minutes 49 seconds; thence South 18 degrees 17 minutes 40
seconds West along tangent, a distance of 64.00 feet to the actual point of beginning of
the tract to be described; thence continuing South 18 degrees 17 minutes 40 seconds West,
a distance of 282.12 feet; thence South 65 degrees 12 minutes 03 seconds East, a distance
of 33.12 feet to a point that is hereafter referred to as Point A.
Point A is described as beginning at the point of intersection of the Northerly right-of-
way line of Minnesota Trunk Highway No. 5 and a line 33.00 feet Southeasterly of, measured
at right angles to and parallel with the centerline of Carver County Road No. 117; thence
on an assumed bearing of North 18 degrees 17 minutes 40 seconds East and parallel with the
centerline of said Carver County Road No. 117, a distance of 725.00 feet to said Point A.
Thence from said Point A, South 65 degrees 12 minutes 03 Southeast East, a distance of
268.73 feet; thence North 18 degrees 17 minutes 40 seconds East, a distance of 316.33
feet; thence North 71 degrees 42 minutes 20 seconds West, a distance of 300.00 feet to the
point of beginning.
Legal Description - Parcel 2:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver County,
Minnesota, described as follows: Commencing at the West Quarter corner of said Section 10;
thence on an assumed bearing of South 01 degree 56 minutes 40 seconds East along the West
line of said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet; thence Southerly a distance of 383.79
feet along a curve not tangential with the last described line, said curve is concave to
the West, has a radius 3452.34 feet and a central angle of 6 degrees 22 minutes 10 seconds
and the chord of said curve bears South 13 degrees 40 minutes 55 second West to the point
of beginning of the tract to be described; thence continuing Southerly, a distance of
86.01 feet along said curve concave to the West, having a radius of 3452.34 feet, a
central angle of 01 degree 25 minutes 39 seconds; thence South 18 degrees 17 minutes 40
seconds West, tangent to said curve, a distance of 64.00 feet; thence South 71 degrees 42
minutes 20 seconds East, a distance of 300.00 feet; thence North 18 degrees 17 minutes 40
seconds East, a distance of 150.00 feet; thence North 71 degrees 42 minutes 20 seconds
West, a distance of 301.07 feet to the point of beginning. Sincerely,
Kara Knutson
Otto Associates, Engineers and Land Surveyors, Inc
9 West Division Street
Buffalo, MN 55313
763-682-4727
karaeottoassociates.com
1
M/IIwWYiYwI O.MwIwW IY T.x11N RwpY O.N ` \\ \
oM..Y.wwMm.l. N..tlrrrmN.�.. r.r Q !
.�rw..r wl�"rr.wuiatliwriwd /Ol � •./��/\ ,\� \ \ � �illvv��
ANY rrMM.+r r.Is r. rN�bN.N rl... //"� /� � \
• wKvoM.bw Mm.xr wMYrN�rN� \�• ��.
rN N.N �I) Mw. tl �✓, M Imo. YI.L ..I.. w mm
..M tl MwY. wW IY b Y rY1 w� rINM/ . /
rill w/r NWnl. tl..Vf Y(. Mw. wmSNM Nn. / \\ •rn
xil Y.•�N.MYY�N 64. NI�tlIIN MY./MI / I \\\� �/ I
M.Ix �YI.b MIA Q \ \ V
MI11
nnr..l-..r wlrr mW wwrb a.N.r ssmM I� • �
auM.Ybw .�.rn w.Mi �Yw�rwwxti� V NA ��
rw Wrw_rrwrw_W V 7 CSSR ..r
Nr x. m,. )am Mbrr MrA
dA M M. M1.M N.w� N iM.Y N rY aM • \ Y'
m
YM. w amm M Y W ..Mf wY/.i. � b10 by
• r bx.orxr )--• Y / , t ourLorA�� - .
�Y w W Y.l OYY.wI tl W rtlw N Mw w. rn./ `T / •f
t.b tlrR mw/.I MYI.M�WIM wn/MYfYw J
.Y Yx.M�..r.tl M1NYt Irw. T.YY bI�Y I 1
}6� 'M1
rYrY�.r o,..I.Mwrim«AN N.�rry. Rwx. l �
w LiNM..W •Nrw.IYT�W .m wYI..N.IM .Y/Nn. Mw _ � \ \ �('_
tl �1. 10 sbN W.1.1 w..V .n. M. rN NINON y \
.NYIwbY�.I .I.IYW.MI w..II.MIww MbY r.Y• / .� / _
WTI
KMi�..Y
MMMTI. nN. w.NKN Iw4.�N.MwPIN.M M.Y / �� • l ��li .. a. �.1 M.w NUP N.NMNWYtl��Y iR WI.IY.Y /`\
W.Mw.w MmM Ww rMTNxM Y.rwY�1 'b
p.{ . Mw w Mm Rn Y... M.N II y� N NMw N rw1
I.4. M...w A.m MYw~i 101tlrYwY V.M)�✓r
IIIY O/YM.q
cqr sw-u
YYV� lnM. M
dN+. u sot w R. rJNml
L `�4RFMxPNw.wn
NIVAT'1MIrAYO
RurY ns ar,H o
YC /R 1. IMRD
cwNat aoRne Ixnun
Nsa. wRl I [i]� "" I WALNUT GROVE SECOND ADDITION I PRELIMINARY PLAT I '
s ur x � snR YK Y rsw Lam`/ fTo .__N�.�_ NLINOELHUn DE LO MEM 2-020668
CHANHASSEN MN SHEET NO , OF 6 oenalo3
NOTICE OF PUBLIC HEARING
CHANHASSEN PLANNING COMMISSION MEETING
TUESDAY, OCTOBER 21, 2003 AT 7:00 P.M.
CITY HALL COUNCIL CHAMBERS
7700 MARKET BLVD.
PROPOSAL: Rezoning, Subdivision, and APPLICANT: Klingelhutz Development
Conditional Use Permit for
a Single Family Home and LOCATION: 7305 Galpin Blvd.
Twin Home Units
NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant,
Klingelhutz Development, is requesting rezoning of 3.09 acres from A2, Agricultural Estate District
to R4, Mixed Low Density Residential; subdivision approval creating five lots consisting of one
single family home and four twin home units with a variance request; and a conditional use permit
for development within the Bluff Creek Corridor, located at 7305 Galpin Blvd., Walnut Grove
Second Addition.
What Happens at the Meeting: The purpose of this public hearing is to inform you about the applicant's
request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead
the public hearing through the following steps:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses the project.
Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during
office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project,
please contact Bob at 227 1131 or e-mail bgenerous@ci.chanhassen.mn.us. If you choose to submit written
comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies
to the Commission.
Notice of this public hearing has been published in the Chanhassen Villager on October 9, 2003.
Smooth Feed Sheetsrm
Use template for 51600
)OUGLAS C & THERESA J BENTZ
'280 GALPIN BLVD
EXCELSIOR MN 55331
:RIC A BAKKEN &
IOAN H WADE
'606 WALNUT CRV
;HANHASSEN MN 55317
CYLE A & LEAH C PLATH
'604 WALNUT CRV
;HANHASSEN MN 55317
IONATHAN D & MARCIA L MAPLES
'602 WALNUT CRV
:HANHASSEN MN 55317
3COTT A & HEATHER D HALLOFF
1600 WALNUT CRV
;HANHASSEN MN 55317
NALNUT GROVE VILLAS ASSN
3/0 GITTLEMAN MGMT CORP
1801 EAST 79TH ST SUITE 21
3LOOMINGTON MN 55425
BRIAN & KAREN WALKER
7591 WALNUT CRV
CHANHASSEN MN 55317
DAVID K & CHRISTINA J STREETER
7598 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
THEODORE A & ANGELA M ELLEFSON
7609 WALNUT CRV
CHANHASSEN MN 55317
ROBERT G & MELISSA L REED
7611 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
MARK & CONSTANCE LANTERMAN
7612 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
ROTTLUND COMPANY INC
3065 CENTRE POINTE DR
ROSEVILLE MN 55113
LEROY C & HELEN E WICKSTROM
C/O CAROL KOCH
14342 GOLF VIEW DR
EDEN PRAIRIE MN 5534E
RICHARD H SR & BARBARA KELLER
2130 CLOVER CT
CHANHASSEN MN 55317
WALNUT GROVE HOMEOWNERS ASSN
C/O GITTLEMAN MGMT CORP
1801 E 79TH ST SUITE 21
BLOOMINGTON MN 55425
KLINGELHUTZ DEVELOPMENT CO
350 HWY 212 E PO BOX 89
CHASKA MN 55318
MORRIS L & MURIEL N MULLIN
7630 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
ROBERT P & SANDRA L LISTIAK
2138 CLOVER CT
CHANHASSEN MN 55317
THEODORE F & MARLENE M BENTZ ELDEN E & GLORIA A BOTT WALNLMGROVE HOMEOWNERS ASSN
7300 GALPIN BLVD 7626 PRAIRIE GLOWER BLVD C/O GITTL MGM
EXCELSIOR MN 55331 CHANHASSEN MN 55317 1801 E 79TH S TE 21
BLOOM ON M 55425
3RADLEY J & KATHLEEN VELDBOOM NORMA LEE SCHULLER
7599 WALNUT CRV 2116 CLOVER CT
HANHASSEN MN 55317 CHANHASSEN MN 55317
3TEVEN J & JANICE K VREEMAN JOANNE I JAMES
7601 WALNUT CRV 7627 PRAIRIE FLOWER BLVD
HANHASSEN MN 55317 CHANHASSEN MN 55317
_EE A & TAMMY L BERGSTROM RICHARD & RHODA M SCHAFFER
7595 WALNUT CRV 2122 CLOVER CT
HANHASSEN MN 55317 CHANHASSEN MN 55317
MAVERYO Address Labels
DONALD B & JANET L DAHLQUIST
7634 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
DOROTHY A GRIESMANN
2127 CLOVER CT
CHANHASSEN MN 55317
J P'S LINKS INC-JOHN PRZYMUS
C/O PAT NEATON
601 CARLSON PKY #620
MINNETONKA MN 55305
Laser 51600b
Smooth Feed SheetsTm
Use template for51600
'ATRICIA K KOHN
'638 PRAIRIE FLOWER BLVD
"HANHASSEN MN 55317
=DWARD J & SUSAN L ROBBINS
?141 CLOVER CT
'HANHASSEN MN 55317
"HARLES B & SHIRLEY A ENGH
7642 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
KLINGELHUTZ DEVELOPMENT CO
350 HWY 212 E PO BOX 89
CHASKA MN 55318
DENNIS E & ELISSA K ELLEFSON
2194 BANEBERRY WAY W
CHANHASSEN MN 55317
BRADLEY A & JODENE B THRODAHL
2190 BANEBERRY WAY W
CHANHASSEN MN 55317
AMY DEFIEBRE SUMNER
2186 BANEBERRY WAY W
CHANHASSEN MN 55317
STEVEN W & KAREN A BROWN
7670 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
WALNUT' OVE HOMEOW ASSN JEANNE C GILBERTSON
C/O GITTLEM 2170 BANEBERRY WAY W
1801 E 79TH E 21 CHANHASSEN MN 55317
BLOO N M 55425
DAVID W & LINDA J HAGGBLOOM
7646 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
GARY F & JOYCE E ANDERSON
7650 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
ROBERT R & SALLY J SHULTZ
380 MARGARET CIR
WAYZATA MN 55391
CHARLES E & JEANNE S BEHRING
2162 BANEBERRY WAY W
CHANHASSEN MN 55317
HANG CHAN &
CHEUKWAICHONG
2201 BANEBERRY WAY W.
CHANHASSEN MN 55317
SHAW NA M GRIEP
2197 BANEBERRY WAY W
iCHANHASSEN MN 55317
NATHAN R JOHNSON &
BRANDILYN E BAWEK
2193 BANEBERRY WAY W
CHANHASSEN MN 55317
DORIS FRENCH
2189 BANEBERRY WAY W
CHANHASSEN MN 55317
JANET I MARUSKA
2175 BANEBERRY WAY W
CHANHASSEN MN 55317
JENNY VAN AALSBURG
2171 BANEBERRY WAY W
CHANHASSEN MN 55317
ERIK J FRITZ &
JINA I KUESEL
2167 BANEBERRY WAY W
CHANHASSEN MN 55317
GERALD O & DARLENE A SODERLIND WALNUT GROVE HOMEOWNERS ASSN CITY OF CHANHASSEN
TRUSTEES OF TRUST
C/O GITTLEMAN MGMT CORP
C/O BRUCE DEJONG
7656 PRAIRIE FLOWER BLVD
1801 E 79TH ST SUITE 21
7700 MARKET BLVD PO BOX 147
CHANHASSEN MN 55317
BLOOMINGTON MN 55425
CHANHASSEN MN
55317
EARLON L MILBRATH &
LIEU NGUYEN &
LOUIS C ABELA
CAROL ANN D MILBRATH
VO THI CHIN
2163 BANEBERRY WAY W
7662 PRAIRIE FLOWER BLVD
2158 BANEBERRY WAY W
CHANHASSEN MN
55317
CHANHASSEN MN 55317
CHANHASSEN MN 55317
SUSAN M ERICKSON
WILLIAM A & BARBARA E BROWN
CITY OF CHANHASSEN
2198 BANEBERRY WAY W
7676 PRAIRIE FLOWER BLVD
C/O BRUCE DEJONG
CHANHASSEN MN 55317
CHANHASSEN MN 55317
7700 MARK O BOX 147
CH EN MN
55317
n/%\ Mmi7VW ArlAracc 1 nhalc
1 ncn
riAne
Smooth Feed SheetsTM
Use template for 51600
4ARY LOUISE REITMEIER
159 BANEBERRY WAY W
:HANHASSEN MN 55317
1RADLEY J & JANETTE M WING
!155 BANEBERRY WAY W
;HANHASSEN MN 55317
CATHLEEN W HOMES
?145 BANEBERRY WAY W
:HANHASSEN MN 55317
' NNETTE M CIESZKOWSKI
?141 BANEBERRY WAY W
HANHASSEN MN 55317
JUNE M CASEY
?137 BANEBERRY WAY W
HANHASSEN MN 55317
JULIE D WAND
2133 BANEBERRY WAY W
CHANHASSEN MN 55317
CONVENIENCE STORE INVESTMENTS
PO BOX 2107
LACROSSE WI 54602
CITY OF CHANHASSEN
C/O BRUCE NG
7700 MAYXET BLVDPO BOX 147
CHA ASSEN MN 55317
CHANHASSEN DEVELOPMENT LLC
1434 SALEM LN SW
ROCHESTER MN 55902
n0 AVERY@ Address Labels Laser 51600
\
1
1
\
\\
I
I
I•r%
I%
I/
I
o
\
\'I.` .1 WMH WA Rl9!
1'r�l yIYSV I Ras
\•�
x`
TR.1L r VH WA �m
la ��iwl
RAY 4 WI'.�A (p0
1.�1�i1V1
_ xr'4�H
�M�
IwN WYA W
I J�iW)
rrxY4xY "'"' • --��
.x fir=
N01yM
2pFASTING - A2
PROPOSED - KD-R
Pflw E f" GUIDING SEIB s
S*RIRONY - 30 IFFY
s YARD - MUT MSE
REAR YARD - GS FEET
TOTAL AREA . 2169,2S4 4y1L
49.50 oar
'1RAOITIWAL' NOLK LOS
SS
' BLWDMUM' HONES:
44
'WLA' NOYE@
EODR HONES / B NO:
10
SIX NpIES / BOEfMNO:
24
ERMT NOHES / WWW@
32
I Vf NODES / SMDWG
r
IOTAL NONES: 240
peNi u�nowux uuu urri ie.r rr.mu,e u.....-.u- u� p w
rxrnnrirwnuwwax.Wx.n
I lm. rT Mi M HM W IOHIp Ix 1E r YY1111
srl H.Aa Y w.l w 4 Hll IpW IMR Yvv
IrY r 1/r O 1[ N� e1 wOOM
l�`x l yrYw/x
wx� L MM W by
"ONI '1N3Nd( 30 lVli N3GIS38
Qp-�tl fiu).u[B lw VIYGMI AwOMY Mu6 m ` ,Y � ��M n .
�, m*
� NYId 3115
(Lll ,ow
AV7 ftd'vs
i
i
v "s:'o PJ
0 7-
rkO7' OF&M
O
00
39.7g 42�W 142.
^o W 00 .3
m °10
;' w
m m `
2 : '� m 3Qc
m
39.00 ? 3z 00� �
♦� i J N68o N78 04,4 3200Z 31
4SS61136 F 2•W 142.00
�rw 4m3o R-7 _ N79°21'0
w 7 38.3g�0.00 _ O(/ Try 105.71
� ro 39. N 8°41'4 '�K. r l0 74°:
2 0 0 00 32.00 32 004 00
q b' 39.�
= m 2 OD
m3 m Go
88045'00"E h h 4 �
53.84 39.00
32 00 32.00 39.00Z I � N7go22,3g �
W 198.45 _
N
I
I �
NsSO"?.0` .;p
406.
05/20/97 13:26
PS sjj9DF
z
w � _ v,
SATHRE - BERGQUIST, INC.
150 SOUTH BROADWAY
co (612) 476-6000
CyFAS P�P�2
WALNUT GROVE
LOT AREA TABULATIONS
SATHRE-BERGQUIST, INC.
Dated: May 20, 1997
(Page 1 of 3)
NO.229 D02
WAYZATA, MN 55391
FAX 476-0104
BLOCK
1
13
10158
51 4435
BLOCK
5
14
11226
52 4225
LOT
AREA
15
10669
53 4471
LOT AREA
SoTFt.
16
13467
54 4533
SA. t"
17
10499
55 3980
1
25337
18
78547
1
2210
2
19159
19
4059
2
1813
3
16727
20
4920
BLOCK 3
3
1813
4
17678
21
4630
4
2210
5
13814
22
4803
LOT AREA
6
14577
23
4375
Sq.Ft.
7
15382
24
4616
BLOCK
6
8
14872
25
4255
1 31748
9
13660
26
3869
2 14351
LOT AREA
10
12968
27
4173
3 12297
B Ft.
11
13317
28
4480
4 14048
12
14050
29
4502
5 50110
1
2210
13
15388
30
4489
6 3794
2
1813
14
18431
31
42162
7 4570
3
1813
32
4928
8 4481
4
2210
33
4771
9 4015
BLOCK
2
34
4049
10 3956
35
4030
11 3933
BLOCK
7
LOT
AREA
36
4051
12 4153
Sq.Ft.
37
4029
13 4372
LOT
AREA
38
4373
14 4465
SaE
1
10739
39
4310
15 3981
2
11984
40
42466
1
2210
3
17725
41
4216
2
1473
4
14300
42
5148
BLOCK 4
3
1473
5
12028
43
4887
4
1473
6
11828
44
4255
LOT AREA
5
1473
7
13470
45
3794
Sa -
6
2210
8
13025
46
61703
9
12194
47
3747
1 2210
10
11601
48
3998
2 1813
11
11003
49
4015
3 1813
12
9912
50
4588
4 2210
)qq"?
WALNUT GROVE
BUNGALOWS
Rottlund Homes is proposing to replace the Cottages with a new concept called "The Bungalows."
The Bungalows would also be primarily a one level detached townhouse. They are still targeted
toward the same market of empty nesters and retirees with about the same sq. ft. and price range.
There is approximately 1350 - 1600 sq. ft. on the main level with potential expansion with story &
1/2, and walk -out opportunities to bring finished sq. footage up to 2500. The price range would be
approximately $140 - $200,000. The key differences are the shape of the unit, its architectural style,
its orientation to the street and the position of garage. The goal is to create a more traditional feeling
to the detached townhouse site area, in architectural and streetscape. The Bungalows are 36' wide
instead of 32' and approximately 58' deep instead of 72'; more square than a long, narrow
rectangle. The lot size would be approximately 50' x 100' instead of 47' x 110'. The garage is inset
into the house. This is to project the front entry and front porch more toward the street than the
garage. The architecture style is that of pre war Midwest and New England which promote front
porches and stoops, stone & brick columns, and 8 1/2 roof pitch.
The Bungalow fits square to the street instead of the 30 degree angle of the Cottages. This allows
more detail and development of the front yard and the front porch instead of the side yard. The
architecture is a more traditional "Bungalow" style to also promote the front entry stoop or porch.
Elevations are still being developed but the concept is to have 3 to 4 floor plans with a minimum of
two elevations each, and to offer side load opportunities whenever possible to create as much variety
as possible. The streetscape will appear more like a small single family lots than narrow lot detached
townhomes. There will also be an opportunity to mix up the garages to alternate two adjacent
garages and adjacent front yards with garages adjacent to front yards to also create more variety in
the streetscape. There is proposed four exterior color palettes to include siding, trim, stone or brick,
roofing and accent colors for the front doors and shutters. As with the exterior elevations, no two
color palettes will be adjacent to each other.
VILLAS AND VILLA TOWNHOMES
Villas
Rottlund Homes is introducing some new unit and building types for both the 2 story Villas and Villa
Townhomes. The Villa 12-unit clusters will still have end units with 2-car garages and single car
garages interior units, but the 8-unit cluster will have all its units with 2-car garages and totally
redesign floor plans and exteriors. In early concept design the 8-unit building end units will have
entry's on the end of the building and side load garages to create more variety in elevations and with
front entry's on all four sides of the building. The exterior of the 8-unit building is to be more
traditional with covered front stoops, shutters and picket fences.
By introducing new floor plans and a new building type into the Villas will assist in creating more
variety and a new look. How the final elevations of the two building types vary in design is still
developing.
Villa Townhomes
We are also introducing a different building type into the Villa Townhomes. The 6-unit "row type"
townhomes has 2-car garage end units, and 1-car garage interior units. The 4-unit buildings that had
the same condition now have all 2-car garages. This will create a different look between the 4 and 6-
unit buildings. Along with the slab on grade and the walk -out opportunities there will be more
variety among these eight buildings. The Villa Townhouse that overlook the central open space will
have the opportunity for covered patio doors, porches and picket fences to create more of a front
door/front porch feel along the open space.
VILLAS AND VILLA TOWNHOMES cont
Villa & Villa Townhomes
In general with the introduction of the new floor plans, building types, and exterior elevations there is
considerably more variety in the Villa and Villa Townhomes portion of the development then
originally proposed.
The exterior colors in the Villas and Villa Townhomes can be up to four color palettes to include
siding, trim, stone or brick, roofing. How this will ultimately be distributed through out the site has
yet to be determined. Two possibilities are to assign one color palette to each cluster of 4 or 5
buildings of various building types, the other is to assign one palette to each of the 4 building types
(i.e. 8 unit Villa, 12 unit Villa, 4 unit Villa Townhome and 6 unit Villa Townhome.) We recommend
working with the city on the determining colors for each building and final elevations.
It is also intended that all of the 96 Villa units be priced at or below the Livable Communities Act
affordable housing threshold.
CITY OF CHANHASSEN
STAFF REPORT
PC DATE: Oct. 21, 2003
CC DATE: Nov. 10, 2003
REVIEW DEADLINE: 11/10/03
CASE #: 03-16 Sub., 03-6 CUP, 03-4 Rez
BY: Robert Generous, et al.
PROPOSAL: Request for rezoning from Agricultural Estate District, A2, to Mixed Low Density
Residential District, R4; preliminary plat approval creating five lots consisting of one
single-family home and four twin home units with a variance for the use of a private
street; and conditional use permit approval for development within the Bluff Creek
Overlay District.
LOCATION: 7305 Galpin Blvd.
APPLICANT: Klingelhutz Development
350 East Highway 212
Chaska, MN 55318
(952) 448-3330
PRESENT ZONING: Agricultural Estate District, A2, and Bluff Creek Overlay District, BCO
2020 LAND USE PLAN: Residential — Low Density (net density 1.2 — 4.0 units per acre)
ACREAGE: 3.09 DENSITY: 1.62 gross, 2.88 net
SUMMARY OF REQUEST: Rezoning of the property to R4 to permit a single-family home and
two twin homes; subdivision approval creating five lots and one outlot containing Bluff Creek and the
majority of the Bluff Creek primary zone with a variance for the use of a private street for access;
and a conditional use permit for development within the Bluff Creek Overlay District.
LEVEL OF CITY DISCRETION IN DECISION -MAKING: The City has a relatively high level
of discretion in approving rezonings, PUD's, and amendments to PUD's because the City is acting
in its legislative or policy making capacity. A rezoning or PUD, and amendment thereto, must be
consistent with the City's Comprehensive Plan.
The City's discretion in approving or denying a preliminary plat is limited to whether or not the proposed
plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these
standards, the City must approve the preliminary plat. This is a quasi-judicial decision.
The City has limited discretion in approving or denying conditional use permits, based on whether
or not the proposal meets the conditional use permit standards outlined in the Zoning Ordinance.
If the City finds that all the applicable conditional use permit standards are met, the permit
must be approved. This is a quasi-judicial decision.
October 2, 2003
Page 2
The developer is proposing an infill development creating two new two-family buildings. The existing
house will remain on one lot within the development. The surrounding property was developed as part of
the Walnut Grove development. This project proposes extending the private street to serve four additional
dwelling units in 2 two-family homes (which was contemplated as part of the Walnut Grove development),
which was required to record an access easement for this property. Sewer and water is available through
the Walnut Grove project.
The site is heavily wooded in the southern one-third of the site, adjacent to Bluff Creek. The property
slopes from a high point in the northeast comer at elevation 984 down to the creek at an elevation of 944
The developer is preserving the southern portion of the property as part of Outlot A.
APPLICABLE REGULATIONS
Chapter 18, Subdivisions
Sections 20-41 through 20-45, Amendments
Sections 20-221 through 20-237, Conditional Use Permits
Sections 20-631 through 20-637, R4 district regulations
Sections 20-1551 through 20-1564, Bluff Creek Overlay District
PROPOSALISUMMARY
The applicant is rezoning the property to Mixed Low Density Residential District, R4, which permits
single-family lots of 15,000 square feet and twin home lots of 10,000 square feet per unit. In conjunction
with the rezoning, the applicant is subdividing the property to create a single-family home lot around the
existing house and four twin home lots. Access to the existing home is proposed to remain off Galpin
Boulevard. Access to the twin homes will be via a private street which will connect to Baneberry Way,
which is also a private street. A conditional use permit is required for all development within the Bluff
Creek Overlay district.
The subdivision of the property is straightforward with the creation of five lots for development and one
outlot, which will remain natural in appearance and preserved as open space. The applicant has included
the majority of the Bluff Creek Primary Zone in Outlot A. Conservation easements shall be placed over
all areas within the Bluff Creek primary zone. This will allow the City to restore and/or manage the
natural resources in these areas. The developer may dedicate Outlot A to the city.
The proposed development complies with all zoning requirements and is consistent with the comprehensive
plan. Staff is recommending approval of the rezoning, subdivision, and conditional use permit.
BACKGROUND
The house was built in 1908. Development of Walnut Grove, the project to the east, began in 1997. An
access easement, permitting the property to use Baneberry Way West, was recorded as part of the plat for
Walnut Grove.
October 2, 2003
Page 3
LANDSCAPING/TREE PRESERVATION
Tree canopy coverage and preservation calculations have been submitted for Walnut Grove 2nd
Addition. They are as follows:
Total upland area (excluding wetlands) 132,200 SF or 3.03 ac.
Baseline canopy coverage 36% or 47,485 SF
Minimum canopy coverage allowed 30% or 39,660 SF
Proposed tree preservation 34% or 44,533 SF
Developer does meet minimum canopy coverage requirements.
Bufferyard plantings are required along Galpin Boulevard for Lots 2-4. Total plantings required are:
1 overstory
2 understory
4 shrubs
PARKS AND OPEN SPACE
Walnut Grove Second Addition will have four lots that are subject to a park dedication fee and one lot (the
existing home), which is exempt from park dedication. Prior to recording the final plat, the development is
subject to the payment of $9,600 in park dedication fees ($2,400 per unit) based on 2003 park fees.
WETLANDS
One wetland basin exists on -site. The wetland is an ag/urban wetland that is a part of the Bluff Creek
corridor. It is dominated by reed canary grass. No wetland impact is proposed.
A wetland buffer of 0 to 20 feet in width (with a minimum average of 10 feet) must be maintained
around the wetland. In order to accommodate the proposed building location on Lot 4, the wetland
buffer should be 0 along the east side of the wetland and should be 20 ft. on the north and west sides.
Wetland buffer areas should be preserved, surveyed and staked in accordance with the City's wetland
ordinance. The applicant must install wetland buffer edge signs, under the direction of City staff, before
construction begins and must pay the City $20 per sign. The grading and erosion control plan should
show the actual wetland buffer widths proposed to meet the minimum average buffer width
requirements as well as the 40-foot wetland buffer setback. All structures shall maintain at least a
40-foot setback from the edge of the wetland buffer or, if no buffer is to be preserved, from the
delineated wetland edge.
BLUFF CREEK OVERLAY DISTRICT
The Bluff Creek Overlay District was adopted in December 1998 as a tool for the preservation of Bluff
Creek and the natural resources within its corridor. Bluff Creek flows through the southern portion of
this property. The property also contains a forested riparian corridor and an ag/urban wetland. The
primary zone encompasses the forested area, the wetland,and the wetland buffer. The secondary zone
October 2, 2003
Page 4
encompasses the primary zone and the fast 20 feet of the setback. A conservation easement should be
dedicated over the primary zone. All structures must maintain at least a 40 foot setback from the
primary zone. No disturbance of the site may occur within the first 20 feet of the setback. No
alterations are proposed within the overlay district. Open space must comprise 100% of the primary
zone.
GRADING, DRAINAGE AND EROSION CONTROL
The plans propose to grade about 25% of the site for the new house pads, a proposed private driveway,
nd a storm water pond. The proposed lots are located in the east central portion of the site. The
proposed grading will prepare the site for full basement house pads on Lots 2, 3, 4 and 5, Block 1.
The existing site drainage flows south toward the existing creek. The plans propose to convey the
northeasterly quadrant drainage to a proposed structure and carry the storm water via storm sewer to a
proposed NURP pond. The remaining portion of the site will drain overland to the proposed storm water
pond and/or the creek. Staff is recommending the creation of two swales between Lots 1 & 2 and
Lots 3 & 4 to minimize neighborhood drainage impact on the houses.
The applicant will be required to meet the existing site runoff rates for the 10-year and 100-year,
24-hour storm events. The proposed pond must be designed to National Urban Runoff Program (NURP)
standards. The storm sewer must be designed for a 10-year, 24-hour storm event. Drainage and utility
easements shall be dedicated on the final plat over the public storm drainage system including ponds,
drainage swales, and wetlands up to the 100-year flood level. The minimum easement width shall be
20 feet wide.
Staff recommends that Type III silt fence be used along the south side adjacent to the secondary bluff
creek line and Type D silt fence along the east and west sides of the grading area. In addition, tree
preservation fencing must be installed at the limits of tree removal. A 75-foot minimum rock
construction entrance must be added to the entrance that will be accessed during construction. The
applicant should be aware that any off -site grading will require an easement from the appropriate
property owner.
Storm Water Management
The proposed development is required to maintain existing runoff rates. On -site storm water ponding
must be sufficient to meet all City water quality and quantity standards. A manhole with a two -foot
sump should be installed as the last road accessible structure prior to discharge into the storm water
pond. Riprap and geotextile fabric should be installed at the flared end sections of the inlet and outlet of
the storm water pond.
Easements
Drainage and utility easements should be provided over all existing wetlands, wetland buffer areas, and
storm water infrastructure. A drainage and utility easement should be dedicated over the 10 feet either
side of the property line between Lots 3 and 4 in order to accommodate access for future storm water
infrastructure maintenance. A drainage and utility easement should also be dedicated over the area in
October 2, 2003
Page 5
the southwestern portion of Lot 3 that is currently not encumbered by a drainage and utility easement
since water discharged from the storm water pond will flow through this area as it moves toward the
wetland.
Erosion Control
Type III silt fence should be provided adjacent to all areas to be preserved as buffer or, if no buffer is to
be preserved, at the delineated wetland edge. All upland areas disturbed as a result of construction
activities shall be immediately restored with seed and disc -mulched, covered with a wood -fiber blanket, or
sodded within two weeks of completion of each activity in accordance with the City's Best Management
Practice Handbook.
Surface Water Management Fees
Water Quality Fees
Because of the impervious surface associated with this development, the water quality fees for this
proposed development are based on single-family residential development rates of $949/acre. Based on the
proposed developed area of approximately 2.24 acres, the water quality fees associated with this project are
$2,126.
Water Ouantity Fees
The SWMP has established a connection charge for the different land uses based on an average citywide
rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP
culverts, open channels, and storm water ponding areas for runoff storage. Single-family residential
developments have a connection charge of $2,348 per developable acre. This results in a water quantity fee
of approximately $5,259 for the proposed development.
SWMP Credits
This project proposes the construction of a NURP pond. The applicant will be credited for water quality
where NURP basins are provided to treat runoff from the site. This will be determined upon review of
the ponding and storm sewer calculations. Credits may also be applied to the applicant's SWMP fees
for oversizing in accordance with the SWMP or the provision of outlet structures. The applicant will not
be assessed for areas that are dedicated outlots. No credit will be given for temporary pond areas.
At this time, the estimated total SWMP fee, due and payable to the City at the time of final plat recording, is
$7,385.
Other Agencies
The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley -
Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency) and comply with their
conditions of approval.
October 2, 2003
Page 6
UTILITIES
Municipal sewer and water service is available to the site from Baneberry Way. The existing house on
Lot 1 is already connected to municipal sewer and water. The applicant is proposing to extend sewer and
water lines along the private driveway to service proposed Lots 2, 3, 4, and 5. The proposed sanitary
manholes must be low enough to serve the basement of Lots 2, 3, 4 and 5, Block 1 and public utility lines
must be 10-feet inside the property line.
According to the City's Finance Department records, the parcel was previously assessed for one sanitary
sewer and water hookup. Since the developer will be responsible for extending lateral sewer and water
service to the lots, the sanitary sewer and water connection charges will be waived. However, the sanitary
sewer and water hookup charges will still be applicable for each of the new lots. The 2003 trunk hookup
charge is $1,440 for sanitary sewer and $1,876 for watermain. Sanitary sewer and watermain hookup fees
may be specially assessed against the parcel at the time of building permit issuance.
All of the utility improvements are required to be constructed in accordance with the City's latest edition of
Standard Specifications and Detail Plates. Upon completion of the utility improvements, the utilities will be
turned over to the City for maintenance and ownership. The applicant is also required to enter into a
development contract with the City and supply the necessary financial security in the form of a letter of
credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval.
Permits from the appropriate regulatory agencies will have to be obtained, including but not limited to the
MPCA, Department of Health, MCES, and Watershed District.
STREETS
The applicant is proposing two accesses to the proposed lots. On the northwest comer of the parcel, an
existing access off Galpin Lake Road will be utilized to serve the existing house on Lot 1. Another
proposed new access off of Baneberry Way turning point will be servicing Lots 2, 3, 4, and 5 as a private
driveway. As such, the driveway easement must be 30 feet wide with 20-feet of hard surface pavement and
built to a 7-ton design. The developer must submit an inspection report certifying that the private street is
built to a 7-ton design prior to certificate of occupancy. There is an existing turnaround at the end of
Baneberry Way; Because of this, the Fire Marshal is not requiring an additional turnaround.
Conservation easements shall be dedicated over all areas within the Bluff Creek primary zone.
REZONING/COM PLAN (If required)
The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse affects of
the proposed amendment. The six (6) affects and our findings regarding them are:
a) The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City Comprehensive
October 2, 2003
Page 7
Plan. The property is guided for Residential — Low Density uses. R4 is an appropriate
zoning for the property.
b) The proposed use is or will be compatible with the present and future land uses of the
area. This development will develop at a lower density than the property to the east.
c) The proposed use conforms with all performance standards contained in the Zoning
Ordinance.
d) The proposed use will not tend to or actually depreciate the area in which it is proposed.
e) The proposed use can be accommodated with existing public services and will not
overburden the city's service capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving the
property. Access to the existing house will be via the existing driveway on Galpin
Boulevard. The additional dwellings will be accessed via Baneberry Way West, a private
street.
COMPLIANCE TABLE
Area (square feet)
Width (feet)
Depth (feet)
Setbacks: front,
rear, side, Bluff
Creek primary
zone, wetland
Code —single-family
15,000
80
125
30, 30, 10, 40, 40
Code —two-family
10,000
50
125
30, 30,10, 40, 40
Lot 1
25,985
104
250
30, 30,10, na, na
Lot 2
12,495
50
250
30, 30,10, na, 40
Lot 3
12,495
50
250
30, 30,10, 40, 40
Lot 4
11,714
50
176
30, na, 10, 40, 40
Lot 5
12,873
125
129
30, na, na, 40, na
Outlot
37,196
ROW
21,842
Total
134,600
PRIVATE STREET FINDINGS
In order to permit private streets, the city must find that the following conditions exist:
1) The prevailing development pattern makes it unfeasible or inappropriate to construct a public
street. The site is being accessed via an existing private street through the Walnut Grove
development for which an access easement was recorded as part of the Walnut Grove
development. The location of the Bluff Creek Primary zone and the small wetland on site make
it unfeasible to construct a public street.
October 2, 2003
Page 8
2) After reviewing the surrounding area, it is concluded that an extension of the public street system
is not required to serve other parcels in the area, improve access, or to provide a street system
consistent with the comprehensive plan. No additional access will be permitted to Galpin
Boulevard.
3) The use of the private street will permit enhanced protection of the city's natural resources
including wetlands and forested areas located in the Bluff Creek primary zone.
VARIANCE FINDINGS WITHIN SUBDIVISONS
The city may grant a variance from the regulations of the subdivision ordinance as part of the plat approval
process following a finding that all of the following conditions exist:
1) The hardship is not a mere inconvenience.
Finding: The hardship is not a mere inconvenience. The proposed private street preserves
significant site features and connects to an existing private street.
2) The hardship is caused by the particular physical surroundings, shape or typographical conditions of
the land.
Finding: The hardship is caused by the particular physical surroundings, shape and topographical
conditions of the land, the Bluff Creek primary zone.
3) The conditions upon which the request is based are unique and not generally applicable to other
property.
Finding: The conditions upon which the request is based are unique and not generally applicable to
other properties due to the unique site features.
4) The granting of the variance will not be substantially detrimental to the public welfare and is in
accord with the purpose and intent of this chapter, the zoning ordinance and comprehensive plan.
Finding: The granting of a variance will not be substantially detrimental to the public welfare and
is in accord with the purpose and intent of this chapter, the zoning ordinance, and comprehensive
plan.
SUBD"ION FINDINGS
1) The proposed subdivision is consistent with the zoning ordinance;
Finding: The subdivision meets all the requirements of the R4, Mixed Low Density Residential
District.
October 2, 2003
Page 9
2) The proposed subdivision is consistent with all applicable city, county and regional plans including
but not limited to the city's comprehensive plan;
Finding: The proposed subdivision is consistent with applicable plans.
3) The physical characteristics of the site, including but not limited to topography, soils, vegetation,
susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are
suitable for the proposed development;
Finding: The proposed site is suitable for development subject to the conditions specified in this
report.
4) The proposed subdivision makes adequate provision for water supply, storm drainage, sewage
disposal, streets, erosion control and all other improvements required by this chapter,
Finding: The proposed subdivision is served by adequate urban infrastructure.
5) The proposed subdivision will not cause environmental damage;
Finding: The proposed subdivision will not cause excessive environmental damage subject to
conditions of approval.
6) The proposed subdivision will not conflict with easements of record.
Finding: The proposed subdivision will not conflict with existing easements, but rather will expand
and provide all necessary easements.
7) The proposed subdivision is not premature. A subdivision is premature if any of the following
exists:
a) Lack of adequate storm water drainage.
b) Lack of adequate roads.
c) Lack of adequate sanitary sewer systems.
d) Lack of adequate off -site public improvements or support systems.
Finding: The proposed subdivision is provided with adequate urban infrastructure.
CONDITIONAL USE PERMrr FINDINGS
When approving a conditional use permit, the City must determine the capability of a proposed
development with existing and proposed uses. The general issuance standards of the conditional use
Section 20-232, include the following 12 items:
1) Will not be detrimental to or endanger the public health, safety, comfort, convenience or general
welfare of the neighborhood or the city.
October 2, 2003
Page 10
Finding: The proposed development, within the BCO, will not be detrimental to or endanger the
public health, safety, comfort, convenience or general welfare of the neighborhood or the city.
2) Will be consistent with the objectives of the city's comprehensive plan and this chapter.
Finding: The proposed development is consistent with the comprehensive plan.
3) Will be designed, constructed, operated and maintained so as to be compatible in appearance with
the existing or intended character of the general vicinity and will not change the essential character
of that area.
Finding: The proposed development of low density housing is compatible with the BCO and
surrounding development.
4) Will not be hazardous or disturbing to existing or planned neighboring uses.
Finding: The proposed development will not be hazardous or disturbing to the existing
neighboring uses. The proposed development will preserve the BCO primary zone in its entirety.
5) Will be served adequately by essential public facilities and services, including streets, police and
fire protection, drainage structures, refuse disposal, water and sewer systems and schools; or will be
served adequately by such facilities and services provided by the persons or agencies responsible
for the establishment of the proposed use.
Finding: The proposed development will be served by adequate public infrastructure.
6) Will not create excessive requirements for public facilities and services and will not be detrimental
to the economic welfare of the community.
Finding: The proposed intensity of development was anticipated as part of the city's
comprehensive plan and will not create excessive requirements for public facilities and services.
7) Will not involve uses, activities, processes, materials, equipment and conditions of operation that
will be detrimental to any persons, property or the general welfare because of excessive production
of traffic, noise, smoke, fumes, glare, odors, rodents, or trash.
Finding: The proposed development will not be detrimental to persons or property or the general
welfare of the area.
8) Will have vehicular approaches to the property which do not create traffic congestion or interfere
with traffic or surrounding public thoroughfares.
Finding: The proposed development will be served via a private street.
October 2, 2003
Page 11
9) Will not result in the destruction, loss or damage of solar access, natural, scenic or historic features
of major significance.
Finding: The proposed development will not result in the destruction, loss or damage of solar
access, natural, scenic or historic features of major significance.
10) Will be aesthetically compatible with the area.
Finding: The proposed development will be aesthetically compatible with the area.
11) Will not depreciate surrounding property values.
Finding: The proposed development will not depreciate surrounding property values.
12) Will meet standards prescribed for certain uses as provided in this article.
Finding: The proposed development will meet standards for the R4 and BCO districts.
RECOMMENDATION
Staff recommends that the Planning Commission adopt the following three motions (rezoning, subdivision
and conditional use permit):
A. "Ibe Chanhassen Planning Commission recommends approval of the rezoning of the property from
Agricultural Estate District, A2, to Mixed Low Density Residential District, R4."
B. "The Chanhassen Planning Commission recommends approval of the preliminary plat for Walnut
Grove Second Addition, plans prepared by Otto Associates, dated 8/18/03, subject to the following
conditions:
1) At the time of final plat recording, the developer shall pay full park dedication fees for the four lots that
are subject to a park dedication fees.
2) Conservation easements shall be dedicated over all areas within the Bluff Creek primary zone.
3) Tree preservation fence shall be installed at the edge of the grading limits prior to any construction.
Fencing shall protect trees on proposed lots as well as trees in neighboring properties located next to the
grading limits.
4) Any trees lost due to construction that are not shown as such on plans shall be replaced at a rate of 2:1
diameter inches.
5) Applicant shall submit landscape plans for foundation plantings for units. A minimum of one overstory
tree will be required in the front yard of each lot.
October 2, 2003
Page 12
6) Bufferyard plantings are required along Galpin Boulevard. Planting requirements are: 1 overstory tree,
2 understory trees, and 4 shrubs.
7) Any portion of a building within three feet of a property line must be of one -hour fire -resistive
construction and location of openings may be restricted. Consideration must be given to the placement
of property lines prior to platting the property.
8) A final grading plan and soils report must be submitted to the Inspections Division before permits will
be issued.
9) Meet with the Inspections Division as soon as possible to discuss plan review and permit procedures.
10) A wetland buffer of 0 to 20 feet in width (with a minimum average of 10 feet) shall be maintained
around the wetland. In order to accommodate the proposed building location on
Lot 4, the wetland buffer shall be zero (0) feet along the east side of the wetland and shall be
twenty (20) feet on the north and west sides. Wetland buffer areas shall be preserved, surveyed and
staked in accordance with the City's wetland ordinance. The applicant shall install wetland buffer
edge signs, under the direction of City staff, before construction begins and shall pay the City $20 per
sign.
11) The grading and erosion control plan shall show the actual wetland buffer widths proposed to meet
the minimum average buffer width requirements as well as the 40-foot wetland buffer setback. All
structures shall maintain at least a 40-foot setback from the edge of the wetland buffer or, if no
buffer is to be preserved, from the delineated wetland edge.
12) A conservation easement shall be dedicated over the Bluff Creek primary zone. All structures
shall maintain at least a 40 foot setback from the primary zone. No disturbance of the site shall
occur within the first 20 feet of the setback. Open space shall comprise 100% of the primary zone.
13) The proposed development shall maintain existing runoff rates. On -site storm water ponding shall
be sufficient to meet all City water quality and quantity standards.
14) A manhole with a two -foot sump shall be installed as the last road accessible structure prior to
discharge into the storm water pond.
15) Riprap and geotextile fabric shall be installed at the flared end sections of the inlet and outlet of
the storm water pond.
16) A drainage and utility easement must be dedicated over the 10 feet either side of the property line
between Lots 3 and 4 in order to accommodate access for future storm water infrastructure
maintenance. A drainage and utility easement must be dedicated over the area in the southwestern
portion of Lot 3 that is currently not encumbered by a drainage and utility easement since water
discharged from the storm water pond will flow through this area as it moves toward the wetland.
October 2, 2003
Page 13
17) Type III silt fence shall be provided adjacent to all areas to be preserved as buffer or, if no buffer
is to be preserved, at the delineated wetland edge.
18) All upland areas disturbed as a result of construction activities shall be immediately restored with
seed and disc -mulched, covered with a wood -fiber blanket or sodded within two weeks of completion
of each activity in accordance with the City's Best Management Practice Handbook.
19) Based on the proposed developed area of approximately 2.24 acres, the estimated total SWMP fee,
due and payable to the City at the time of final plat recording, is $7,385.
20) The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley -
Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency) and comply with
their conditions of approval.
21) Show the existing street name `Baneberry Way."
22) Prior to final plat approval, a professional civil engineer registered in the State of Minnesota must
sign all plans.
23) Sanitary sewer and water hookup charges are applicable for each of the new lots. The 2003 trunk
hookup charge is $1,440 for sanitary sewer and $1,876 for watermain. Sanitary sewer and
watermain hookup fees may be specially assessed against the parcel at the time of building permit
issuance.
24) The applicant will be required to meet the existing site runoff rates for the 10-year and 100-year,
24-hour storm events. The proposed pond must be designed to National Urban Runoff Program
(NURP) standards. The storm sewer must be designed for a 10-year, 24-hour storm event.
Drainage and utility easements shall be dedicated on the final plat over the public storm drainage
system including ponds, drainage swales, and wetlands up to the 100-year flood level. The
minimum easement width shall be 20 feet wide.
25) Use Type III silt fence along the secondary bluff creek overlay zone line on the south side and use
Type II silt fence along the west and east sides of the grading area. In addition, tree preservation
fencing must be installed at the limits of tree removal. A 75-ft. minimum rock construction
entrance should be added to the entrance that will be accessed during construction. The applicant
should be aware that any off -site grading will require an easement from the appropriate property
owner.
26) Permits from the appropriate regulatory agencies must be obtained, including but not limited to the
MPCA, Department of Health, Watershed District, Carver County, etc.
27) The applicant shall enter into a development contract with the City and supply the necessary
financial security in the form of a letter of credit or cash escrow to guarantee installation of the
improvements and the conditions of final plat approval.
October 2, 2003
Page 14
28) Submit detailed construction plans and specifications for the public utility improvements before
final platting.
29) Construct public utility improvements in accordance with the City's latest edition of Standard
Specifications and Detail Plates.
30) Installation of the private utilities for the site will require permits and inspections through the
City's Building Department.
31) Seed and mulch or sod the site within two weeks of grading. Submit haul route for City approval
prior to any hauling.
32) On the grading plan:
a) Add a storm sewer schedule.
b) Add silt fence Type III along the secondary bluff creek zone line on the south side and
silt fence Type II along the west and east sides of the grading area.
c) Show a minimum 75-foot rock construction entrance.
d) Show all existing and proposed easements.
e) Add a bench mark.
f) Show the storm sewer manholes rim and invert elevations.
33) On the utility plan:
a) Show proposed utility lines 10-feet inside property line.
b) Add a note, "Connection to existing manhole must be core drilled."
c) Show sanitary manhole rim and invert elevations.
d) Show minimum 10-ft. horizontal separation between sanitary and watermain lines.
e) Show all existing and proposed utility easements.
f) Show proposed house lower level elevations.
g) Show sanitary sewer and watermain pipe class and slope.
h) Show a temporary utility easement to work outside property limit.
i) Show the location of proposed and existing water and sanitary services.
j) Show the proposed sanitary and watermain in profile view within the construction area.
k) All public watermain will be PVC, C-900 pipe
1) All public sanitary sewer pipe type will be PVC, SDR35.
34) On the street and storm plan:
a) Last storm manhole discharging to the pond must include a 2-foot sump.
b) Show the proposed and existing street easements.
35) Add a legend to the plans.
36) Add the latest version of City of Chanhassen detail plates# 1002, 1004, 1005, 1006, 2001, 2101,
2109A, 3101, 3102, 3104, 3107, 3108, 3109, 5200, 5203, 5207, 5300, 5301 and 5302.
October 2, 2003
Page 15
37) The driveway easement must be 30 feet wide with 20-feet of hard surface pavement and built to
a 7-ton design. The developer will be required to provide inspection reports verifying the private
street construction complies with this requirement.
38) Structure setbacks shall comply with the following table:
Setbacks: front, rear, side, Bluff Creek primary zone, wetland
Lot 1
30, 30, 10, na, na
Lot 2
30, 30,10, na, 40
Lot 3
30, 30, 10, 40, 40
Lot 4
30, na, 10, 40,40
Lot 5
30, na, na, 40, na
39) The current cul-de-sac issue must be addressed. The developer shall contact the Chanhassen
City Engineer and Chanhassen Fire Marshal for options in making a permanent turnaround."
C. "The Chanhassen Planning Commission recommends approval of the Conditional Use Permit #2003-6
for development within the Bluff Creek Overlay District subject to the following conditions:
1) All structures shall maintain at least a 40 foot setback from the primary zone. No disturbance of the
site shall occur within the first 20 feet of the setback. Open space shall comprise 100% of the
primary zone.
2) The site shall develop substantially in compliance with Subdivision 03-16, Walnut Grove 2od
Addition."
ATTACHMENTS:
1) Findings of Fact and Recommendation
2) Development Review Application
3) Reduced Copy of Preliminary Plat
4) Letter from Carver Soil & Water Conservation District to Robert Generous dated 9/23/04
5) Notice of Public Hearing and Notified Property Owners List.
October 2, 2003
Page 16
C1TY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMN ENDATION
Application of Klingelhutz Development for Rezoning, Subdivision and Conditional Use Permit
approval.
On October 21, 2003, the Chanhassen Planning Commission met at its regularly scheduled meeting to
consider the application of Klingelhutz Development for rezoning from Agricultural Estate District, A2,
to Mixed Low Density Residential District, R4; preliminary plat approval creating five lots consisting of
one single-family home and four two-family home units, with a variance for the use of a private street
and a conditional use permit for development within the Bluff Creek Overlay District. The Planning
Commission conducted a public hearing on the proposed development preceded by published and
mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak
and now makes the following:
FINDINGS OF FACT
1. The property is currently zoned Agricultural Estate District and is located within the Bluff
Creek Overlay District.
2. The property is guided in the Land Use Plan for Residential — Low Density use.
3. The legal description of the property is: see Exhibit A
4. The proposed subdivision is consistent with the zoning ordinance. The rezoning of the property
to R4 is consistent with the land use designation of the property for Residential — Low Density
use. The proposed development complies with the Bluff Creek Overlay standards.
5. The proposed development is consistent with all applicable city, county and regional plans
including but not limited to the city's comprehensive plan.
6. The physical characteristics of the site, including but not limited to topography, soils,
vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water
drainage are suitable for the proposed development.
7. The proposed development makes adequate provision for water supply, storm drainage, sewage
disposal, streets, erosion control and all other improvements required by the city.
8. The proposed development will not cause significant environmental damage.
October 2, 2003
Page 17
9. The proposed subdivision will not conflict with easements of record.
10. The proposed subdivision is not premature. A subdivision is premature if any of the following
exists:
a. Lack of adequate storm water drainage.
b. Lack of adequate roads.
C. Lack of adequate sanitary sewer systems.
d. Lack of adequate off -site public improvements or support systems.
It. The planning report # 03-16 Subdivision, 03-6 CUP, 03-4 Rezoning dated October 21,
2003, prepared by Robert Generous, et at, is incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council approve the Rezoning,
Preliminary Plat and Conditional Use Permit.
ADOPTED by the Chanhassen Planning Commission this 21st day of October, 2003.
lV
ATTEST:
Secretary
CHANHASSEN PLANNING COMIv1ISSION
Its Chairman
EXHIBIT A
Legal Description Parcel 1:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows:
Commencing at the West Quarter corner of said Section 10; thence on an assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, a distance of 1213.40 feet, thence North 88 degrees 03
minutes 20 seconds East, c distance of 1190.41 feet to a point on a 3452.34 foot
radius curve, the center of circle of said curve bearing North 79 degrees 30
minutes 09 seconds West from sold point; thence Southwesterly along said curve,
a distance of 469.80 feet, central angle 07 degrees 47 minutes 49 seconds; thence
South 18 degrees 17 minutes 40 seconds West along tangent, a distance of 64.00
feet to the actual point of beginning of the tract to be described; thence continuing
South 18 degrees 17 minutes 40 seconds West, a distance of 282.12 feet; thence
South 65 degrees 12 minutes 03 seconds East, a distance of 33.12 feet to a point
that is hereafter referred to as Point A.
Point A is described as beginning at the point of intersection of the Northerly
right—of—way line of Minnesota Trunk Highway No. 5 and a line 3300 feet
Southeasterly of, measured at right angles to and parallel with the centerline of
Carver County Road No. 117,• thence on an assumed bearing of North 18 degrees
17 minutes 40 seconds East and parallel with the centerline of said Carver County
Road No. 117, a distance of 725.00 feet to said Point A.
Thence from said Point A, South 65 degrees 12 minutes 03 Southeast East, a
distance of 268.73 feet; thence North 18 degrees 17 minutes 40 seconds East, a
distance of 316.33 feet; thence North 71 degrees 42 minutes 20 seconds West, a
distance of 300.00 feet to the point of beginning.
Legal Description Parcel 2:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver
County, Minnesota, described as follows:
Commencing at the West Quarter corner of said Section 10; thence on on assumed
bearing of South 01 degree 56 minutes 40 seconds East along the West line of
said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, a distance of 119a41 feet; thence Southerly a distance
of 383.79 feet along a curve not tangential with the last described line, said curve
is concave to the West, has a radius 3452.34 feet and a central angle of 6 degrees
22 minutes 10 seconds and the chord of said curve bears South 13 degrees 40
minutes 55 second West to the point of beginning of the tract to be described,•
thence continuing Southerly, a distance of 86.01 feet along said curve concave to
the West, having a radius of 3452.34 feet, a central angle of 01 degree 25 minutes
39 seconds; thence South 18 degrees 17 minutes 40 seconds West, tangent to said
curve, a distance of 64.00 feet; thence South 71 degrees 42 minutes 20 seconds
East, a distance of 300.00 feet, thence North 18 degrees 17 minutes 40 seconds
East, a distance of 150.00 feet; thence North 71 degrees 42 minutes 20 seconds
West, a distance of 301.07 feet to the point of beginning.
:-
CITY OF CHANHASSEN RECc
�p p 7700 MARKET BOULEVARD SEP i 2QQ3
�4'1$1p1 jOpi� CHANHASSEN, MN 55317
b➢BIIIIB00� (952) 227-1100
AUNHASSEN PLANNING DEPT
DEVELOPMENT REVIEW APPLICATION
APPLICANT:_
ADDRESS: 3 Sa E i�wv� jk I �—
ON A-S K A m 5�5 1 u
TELEPHONE (Daytime) 95a'yyg- 333C
OWNER: K (I
ADDRESS: 3sc, E wt t .9 ! ;L
ChiT
r�N ss3i�
TELEPHONE: q5 3— L 4/ f- 3 3 3 d
Comprehensive Plan Amendment
Temporary Sales Permit
X Conditional Use Permit i 4P
Vacation of ROW/Easements
Interim Use Permit
Variance
Non -conforming Use Permit
Wetland Alteration Permit
Planned Unit Development'
_ Zoning Appeal
Rezoning 7 co . '
_ Zoning Ordinance Amendment
Sign Permits
Sign Plan Review
Notification Sign �cs Ja
Site Plan Review'
X Escrow for Filing Fees/Attomey Cost`
($50 CUP/SPRNACNAR/WAP/Metes
and Bounds, $400 Minor SUB)
X Subdivision' �� ��
J L. J' .a l
TOTAL FEE $
A list of all property owners within 500 feet of the boundaries of the property must be included with the
application.
Building material samples must be submitted with site plan reviews.
'Twenty-six full size folded copies of the plans must be submitted, including an S'/:" X 11" reduced copy of
transparency for each plan sheet.
Escrow will be required for other applications through the development contract
NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application.
PROJECT NAME
LOCATION 1 3d S C-��OtA- t`R t
LEGAL DESCRIPTION {� \ 'D
TOTAL
ACREAGE
WETLANDS PRESENT _YES NO
PRESENT ZONING A 2.
REQUESTED 1
ZONING 1 t
PRESENT LAND USE DESIGNATION RES l
REQUESTED LAND USE
REASON FOR THIS REQUEST
tiD
IAe✓}ta,( Lb� Ozr"S(-)
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning
Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within ten business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within ten business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my knowledge.
The city hereby notifies the applicant that development review cannot be completed within 60 days due to public hearing
requirements and agency review. Therefore, the city is notifying the applicant that the city requires an automatic 60 day
extension for development review. Development review shall be completed within 120 days unless additional review
extensions are approved by the app)icaant.
q A b
At).-
` fAppy nt D e
��i 9 0 Uy�'�f Fe ner /Q ate
Application Received on 9/f&/c3 Fee Paid *197s Receipt No. D14 4#301
The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the
meeting. If not contacted, a copy of the report will be mailed to the applicant's address.
Tom Heiland
From:
Kara Knutson [kara@ottoassociates.com]
Sent:
Tuesday, September 09, 2003 9:38 AM
To:
Tom Heiland
Subject:
Legal Description for Walnut Grove second
Legal Description - Parcel 1
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver County,
Minnesota, described as follows: Commencing at the west Quarter corner of said Section 10;
thence on an assumed bearing of South 01 degree 56 minutes 40 seconds East along the West
line of said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet to a point on a 3452.34 foot radius
curve, the center of circle of said curve bearing North 79 degrees 30 minutes 09 seconds
West from said point; thence Southwesterly along said curve, a distance of 469.80 feet,
central angle 07 degrees 47 minutes 49 seconds; thence South 18 degrees 17 minutes 40
seconds West along tangent, a distance of 64.00 feet to the actual point of beginning of
the tract to be described; thence continuing South 18 degrees 17 minutes 40 seconds West,
a distance of 282.12 feet; thence South 65 degrees 12 minutes 03 seconds East, a distance
of 33.12 feet to a point that is hereafter referred to as Point A.
Point A is described as beginning at the point of intersection of the Northerly right-of-
way line of Minnesota Trunk Highway No. 5 and a line 33.00 feet Southeasterly of, measured
at right angles to and parallel with the centerline of Carver County Road No. 117; thence
on an assumed bearing of North 18 degrees 17 minutes 40 seconds East and parallel with the
centerline of said Carver County Road No. 117, a distance of 725.00 feet to said Point A.
Thence from said Point A, South 65 degrees 12 minutes 03 Southeast East, a distance of
268.73 feet; thence North 18 degrees 17 minutes 40 seconds East, a distance of 316.33
feet; thence North 71 degrees 42 minutes 20 seconds West, a distance of 300.00 feet to the
point of beginning.
Legal Description - Parcel 2:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver County,
Minnesota, described as follows: Commencing at the West Quarter corner of said Section 10;
thence on an assumed bearing of South 01 degree 56 minutes 40 seconds East along the west
line of said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03
minutes 20 seconds East, a distance of 1190.41 feet; thence Southerly a distance of 383.79
feet along a curve not tangential with the last described line, said curve is concave to
the West, has a radius 3452.34 feet and a central angle of 6 degrees 22 minutes 10 seconds
and the chord of said curve bears South 13 degrees 40 minutes 55 second West to the point
of beginning of the tract to be described; thence continuing Southerly, a distance of
86.01 feet along said curve concave to the West, having a radius of 3452.34 feet, a
central angle of 01 degree 25 minutes 39 seconds; thence South 18 degrees 17 minutes 40
seconds West, tangent to said curve, a distance of 64.00 feet; thence South 71 degrees 42
minutes 20 seconds East, a distance of 300.00 feet; thence North 18 degrees 17 minutes 40
seconds East, a distance of 150.00 feet; thence North 71 degrees 42 minutes 20 seconds
West, a distance of 301.07 feet to the point of beginning. Sincerely,
Kara Knutson
Otto Associates, Engineers and Land Surveyors, Inc
9 West Division Street
Buffalo, MN 55313
763-682-4727
kara@ottoassociates.com
1
LD
M /_IJFMp•M MbNAIIb K bMIIK .rIY Y_ I$ ` � �, \\ \�..J /�(• Y4N�DYRq_M
Ly.�lyr N. irl4N Ml»N WI YIW qN�__�M � / v'1VV'� r rNMiWYI MnIM 1R4 .Lry
MM. NfuNNlY_YMUWw�ww lM •Yy Y_•IAr /$ ) N
�rNM Y.•_.rW_rr"agr N.. »Nw»"�m iC % /' `\ \\ / � psi ID4(R.�i,. r��w. WtlW_r. w.weJrrwYMw.•YI_.YMYM
�"Wl.o �' wr.u.•.g.Nr N.an4Ms �• � \ Lrws rn.ggs Yw•n_M
/� mww. r'lr•Y
YW NYttl M s,vl � 41� N •�M�� MN1 Ms / \ \• �'' .YwM
�N IIy�r)nMiW wWwi YN lry lwywt•Yro NYm �. �� I
NI wM'MIJM/VIJWIM bY�YN N•_I�W» /
�r ti�n,•wr wM_r rt. NNwnrsLKM M_ , �\ "�^
Y^� r�N.Wr �r rM.tlrJssreM».Mn I � \\�
M.1N.IyM/J Y/wIJNY�Y,r MAYY•ry I J y, IIC 14 I. 114RD
rWl-J-gAJIMY111tl WngW ONM •b•DmM � ,J �� I � 4YIQ�tNAS41A
r.I.A —A. ..'A
..'A
YW��A�D I•"'eit Yn WN 11N y�YnMW art• �•\ n.✓.t ` �
�wDom M»MrYl r•MnW � � -Fr' \ \ ��. m 'F Rcto"w»"" �I�
_
5`
SNb IwWK N_Y_�J a.sK»wN. IK NNY iIW / j \ I•
�JNriX4aY`aMNMIYYMNw•__�
IYIy Nf»NY _N_Y M•Ww�,b (M ✓.y l»YYI Ynr • _
oo's �[ a -------- ------
MUWtlM.✓. bt•i'ws gllgM Wt NNs f»N/b•YI_" I
J .WY M� •a•nM MAW•YW M.etMM •Y Mw - �� \J\ �_
M MwI_q�NM �J_Ywr••fuN NON_ , �I � \\v
�tlMwrbMAwI J.M.N.wW e.»wwrr , 'O / _
�rWM YMN . Mrm rYm M M.Y W M».�w » 1• »
M Mt MgWy JJYLI•M•�M _/.JN NI_Y M»Y / WW • \ / IL S�M•»•� �Y___» gyMl)iN»•»q�»YJ WI.,Iw_Y /`\ _ J �
tM •YM_rtUm Mt YM_/YNKM.. IIY�•Ww�N a
M
Yt • M»_ J IYm Mt •� /YN N tiM Y.MUW M MwN
1V.4 rax WALNUT GROVE SECOND ADDITION PRELIMINARY PLAT 2-02-0565
40w KLINGELHIJ Z DEVELOPMENT
CHANHASSEN, MN ISHEEF NO, t OF 5 SHaeneroa
CARVER
SOII �} A��I
�4. pg Cap`
A
1946
cO%ty op
219 East Frontage Road
Waconia, NW 55387
Phone:952-442-5101
Fax:952-442-5497
httn,//w carver mISWCD/5wCn maimlitmi
Alissiaa State t To provide leadership in conservation and teach stewardship of the soil, waterand related resources through a halanced.
cooperator program that protects. restores, and unprows�those
reresources.
September 23, 2003 RECE3 V ED
Robert Generous, Senior Planner
SEP 2 4 2003
City of Chanhassen CITY OF CHANHASSEN
7700 Market Boulevard
Chanhassen, MN 55317
Re: Proposed Walnut Grove Second Addition Development
Mr. Generous:
Thank you for sending a copy of the 2003-16 Site Plan, Walnut Grove Second Addition development to the SWCD
office. Please review the following storm water, erosion, and sediment control comments and recommendations.
Storm Water
Beginning March 10, 2003 all developments disturbing 1-acre or more or part of a contiguous development which
will disturb more than 1-acre require a National Pollutant Discharge Elimination System (NPDES) permit from the
Pollution Control Agency (PCA). The owner / operator of the proposed development must apply for and receive the
NPDES permit prior to beginning construction activities.
Any development disturbing more than 1-acre and creating more than 1-acre of impervious surface must also have
permanent storm water treatment It appears this is being done as the Walnut Grove preliminary plan shows the
storm water runoff being managed by a proposed storm water basin.
High water levels / elevations of the pond and wetland and the elevations of the lowest level of the proposed
walkouts should be double checked. It appears the elevations of the dwellings may be too low.
Erosion Control
Riprap and geotextile fabric needs to be installed at the flared end sections of the inlet and outlet of the storm water
basin.
Sediment Control
The proposed silt fence should be extended 40 feet to the east and 20 feet to the west; the ends of the silt fence
should be angled up -slope in a crescent or `smile' formation.
A light duty silt fence should be installed between the duplexes and the storm water pond following the outlet
installation and during home construction.
Inlet control is needed following installation of inlet structures. Inlet control methods will be varied before and after
pavement of the street. Before pavement, inlet protection could consist of heavy-duty mono -mono silt fence with 4
foot spacing of metal T-posts and 1" rock around silt fence material. After pavement mulch socks, sand bags or
rock and wire could be used as temporary inlet control.
If there are any questions regarding this review please contact the SWCD office.
Sin y,
Aaron Mlyne CPESCIT
Urban Conservation Technician
AN EQUAL OPPORTMM EMPLOYER
NOTICE OF PUBLIC HEARING
CHANHASSEN PLANNING COMMISSION MEETING
TUESDAY, OCTOBER 21, 2003 AT 7:00 P.M.
CITY HALL COUNCIL CHAMBERS
rtl1I1lIT, I_\0C =1 a :1 WTI
PROPOSAL: Rezoning, Subdivision, and APPLICANT: Klingelhutz Development
Conditional Use Permit for
a Single Family Home and LOCATION: 7305 Galpin Blvd.
Twin Home Units
NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant,
Klingelhutz Development, is requesting rezoning of 3.09 acres from A2, Agricultural Estate District
to R4, Mixed Low Density Residential; subdivision approval creating five lots consisting of one
single family home and four twin home units with a variance request; and a conditional use permit
for development within the Bluff Creek Corridor, located at 7305 Galpin Blvd., Walnut Grove
Second Addition.
What Happens at the Meeting: The purpose of this public hearing is to inform you about the applicant's
request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead
the public hearing through the following steps:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses the project.
Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during
office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project,
please contact Bob at 227 1131 or email bgenerous@ci.chanhassen.mn.us. If you choose to submit written
comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies
to the Commission.
Notice of this public hearing has been published in the Chanhassen Villager on October 9, 2003.
Prop� vim
Smooth Feed SheetSTM
Use template for 51600
DOUGLAS C & THERESA J BENTZ
7280 GALPIN BLVD
_XCELSIOR MN 55331
=RIC A BAKKEN &
JOAN H WADE
7606 WALNUT CRV
CHANHASSEN MN 55317
KYLE A & LEAH C PLATH
7604 WALNUT CRV
CHANHASSEN MN 55317
JONATHAN D & MARCIA L MAPLES
7602 WALNUT CRV
CHANHASSEN MN 55317
SCOTT A & HEATHER D HALLOFF
7600 WALNUT CRV
CHANHASSEN MN 55317
WALNUT GROVE VILLAS ASSN
C/O GITTLEMAN MGMT CORP
1801 EAST 79TH ST SUITE 21
BLOOMINGTON MN 55425
BRIAN & KAREN WALKER
7591 WALNUT CRV
CHANHASSEN MN 55317
DAVID K & CHRISTINA J STREETER
7598 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
THEODORE A & ANGELA M ELLEFSON
7609 WALNUT CRV
CHANHASSEN MN 55317
ROBERT G & MELISSA L REED
7611 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
MARK & CONSTANCE LANTERMAN
7612 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
ROTTLUND COMPANY INC
3065 CENTRE POINTE DR
ROSEVILLE MN 55113
LEROY C & HELEN E W ICKSTROM
C/O CAROL KOCH
14342 GOLF VIEW DR
EDEN PRAIRIE MN 55346
RICHARD H SR & BARBARA KELLER
2130 CLOVER CT
CHANHASSEN MN 55317
WALNUT GROVE HOMEOWNERS ASSN
C/O GITTLEMAN MGMT CORP
1801 E 79TH ST SUITE 21
BLOOMINGTON MN 55425
KLINGELHUTZ DEVELOPMENT CO
350 HWY 212 E PO BOX 89
CHASKA MN 55318
MORRIS L & MURIEL N MULLIN
7630 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
ROBERT P & SANDRA L LISTIAK
2138 CLOVER CT
CHANHASSEN MN 55317
THEODORE F & MARLENE M BENTZ ELDEN E & GLORIA A BOTT WALNUT,,GROVE HOMEOW NE ASSN
7300 GALPIN BLVD 7626 PRAIRIE GLOWER BLVD C/O GITTL MGM
EXCELSIOR MN 55331 CHANHASSEN MN 55317 1801 E 79TH S TE 21
BLOOM ON M 55425
BRADLEY J & KATHLEEN VELDBOOM
7599 WALNUT CRV
CHANHASSEN MN 55317
STEVEN J & JANICE K VREEMAN
7601 WALNUT CRV
CHANHASSEN MN 55317
NORMA LEE SCHULLER
2116 CLOVER CT
CHANHASSEN MN 55317
JOANNEIJAMES
7627 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
LEE A & TAMMY L BERGSTROM RICHARD & RHODA M SCHAFFER
7595 WALNUT CRV 2122 CLOVER CT
CHANHASSEN MN 55317 CHANHASSEN MN 55317
n4 AVERYO Address Labels
DONALD B & JANET L DAHLQUIST
7634 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
DOROTHY A GRIESMANN
2127 CLOVER CT
CHANHASSEN MN 55317
J P'S LINKS INC-JOHN PRZYMUS
C/O PAT NEATON
601 CARLSON PKY #620
MINNETONKA MN 55305
Laser 51600
Smooth Feed SheetsTM
Use template for 51600
PATRICIA K KOHN
7638 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
EDWARD J & SUSAN L ROBBINS
2141 CLOVER CT
CHANHASSEN MN 55317
CHARLES B & SHIRLEY A ENGH
7642 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
KLINGELHUTZ DEVELOPMENT CO
350 HWY 212 E PO BOX 89
CHASKA MN 55318
DENNIS E & ELISSA K ELLEFSON
2194 BANEBERRY WAY W
CHANHASSEN MN 55317
BRADLEY A & JODENE B THRODAHL
2190 BANEBERRY WAY W
CHANHASSEN MN 55317
AMY DEFIEBRE SUMNER
2186 BANEBERRY WAY W
CHANHASSEN MN 55317
STEVEN W & KAREN A BROWN
7670 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
WALNUT OVE HOMEOW ASSN JEANNE C GILBERTSON
C/O GITTLEM 2170 BANEBERRY WAY W
1801 E 79TH E 21 CHANHASSEN MN 55317
BLOO N M 55425
DAVID W & LINDA J HAGGBLOOM
7646 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
GARY F & JOYCE E ANDERSON
7650 PRAIRIE FLOWER BLVD
CHANHASSEN MN 55317
ROBERT R & SALLY J SHULTZ
380 MARGARET CIR
WAYZATA MN 55391
CHARLES E & JEANNE S BEHRING
2162 BANEBERRY WAY W
CHANHASSEN MN 55317
HANG CHAN &
CHEUKWAI CHONG
2201 BANEBERRY WAY W
CHANHASSEN MN 55317
SHAWNA M GRIEP
2197 BANEBERRY WAY W
CHANHASSEN MN 55317
NATHAN R JOHNSON &
BRANDILYN E BAWEK
2193 BANEBERRY WAY W
CHANHASSEN MN 55317
DORIS FRENCH
2189 BANEBERRY WAY W
CHANHASSEN MN 55317
JANET I MARUSKA
2175 BANEBERRY WAY W
CHANHASSEN MN 55317
JENNY VAN AALSBURG
2171 BANEBERRY WAY W
CHANHASSEN MN 55317
ERIK J FRITZ &
JINA I KUESEL
2167 BANEBERRY WAY W
CHANHASSEN MN 55317
GERALD O & DARLENE A SODERLIND WALNUT GROVE HOMEOWNERS ASSN CITY OF CHANHASSEN
TRUSTEES OF TRUST
C/O GITTLEMAN MGMT CORP
C/O BRUCE DEJONG
7656 PRAIRIE FLOWER BLVD
1801 E 79TH ST SUITE 21
7700 MARKET BLVD PO BOX 147
CHANHASSEN MN 55317
BLOOMINGTON MN 55425
CHANHASSEN MN
55317
EARLON L MILBRATH &
LIEU NGUYEN &
LOUIS C ABELA
CAROL ANN D MILBRATH
VO THI CHIN
2163 BANEBERRY WAY W
7662 PRAIRIE FLOWER BLVD
2158 BANEBERRY WAY W
CHANHASSEN MN
55317
CHANHASSEN MN 55317
CHANHASSEN MN 55317
SUSAN M ERICKSON
WILLIAM A & BARBARA E BROWN
CITY OF CHANHASSEN
2198 BANEBERRY WAY W
7676 PRAIRIE FLOWER BLVD
C/O BRUCE DEJONG
CHANHASSEN MN 55317
CHANHASSEN MN 55317
7700 MARK O BOX147
CHA EN MN
55317
�� AVE We Address Labels
Laser
51600
Smooth Feed SheetsTM Use template for 51600
NARY LOUISE REITMEIER
2159 BANEBERRY WAY W
3HANHASSEN MN 55317
BRADLEY J & JANETTE M WING
2155 BANEBERRY WAY W
CHANHASSEN MN 55317
KATHLEEN W HOMES
2145 BANEBERRY WAY W
CHANHASSEN MN 55317
ANNETTE M CIESZKOWSKI
2141 BANEBERRY WAY W
CHANHASSEN MN 55317
JUNE M CASEY
2137 BANEBERRY WAY W
CHANHASSEN MN 55317
JULIE D WAND
2133 BANEBERRY WAY W
CHANHASSEN MN 55317
CONVENIENCE STORE INVESTMENTS
PO BOX 2107
LACROSSE WI 54602
CITY OF CHANHASSEN
C/O BRUCE NG
7700 MAYXET BLVDPO BOX 147
CHA ASSEN MN 55317
CHANHASSEN DEVELOPMENT LLC
1434 SALEM LN SW
ROCHESTER MN 55902
n0 AVERYO Address Labels Laser 51601D
MEMORANDUM
TO: Bob Generous, Senior Planner
Cp�1 p p
l l l Of
0.0�
FROM: Mak Sweidan, Engineer C�
CgANgASSEN
DATE: Nov. 3, 2003
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
SUBJ: Council Update on Preliminary Plat Review for Walnut Grove 2"a
Addition, Land Use Review File No. 03-11
Administrates
Phone: 952.227.1100
Fax:952.227.1110
At the Oct. 21, 2003 Planning Commission (PC) meeting, there were two main
Building Inspections
issues raised by the Commissioners and the public:
Phone952.227.1180
:
Fax: 952.227,1190
Temporary cul-de-sac
Engineering11
Phone: 952.227.1160
Fax:952.227.1170
The planning commission and the residents on Bareberry Way West have
requested to relocate the existing temporary cul-de-sac at the end of Bareberry
Finance
Way West further toward the west within the new subdivision. The applicant has
Phone: 952.227.1140
Fax:952.227.1110
accepted the idea to revise the plans and now proposes a hammer -head turn
around. At this stage, the Engineering Department and the Fire Marshal are fine
Park & Recreation
with the proposed turn around.
Phone: 952.227,1120
Fax: 952.227.1110
Recreation Center
21 Construction access
2310 Coulter Boulevard
Phone:952.227.14W
The planning commission questioned whether the construction access can be from
Fax:952.227.1404
the west side of the property off Galpin Lake Road (Carver County Rd. 117.) The
Planning &
engineering Department is fine with the access off Galpin Lake Road if Carver
Natural Resources
County will give approval. The applicant has to submit to the City a copy of the
PFax:9522.2v.110
permit or approval letter from the County to utilize an access off Galpin Lake
Fax: 952227.1110
Road.
Public Works
1591 Park Road
Phone: 952.227,1300
Fax: 952.227.1310
RECOMMENDED CONDITIONS OF APPROVAL
Senior Center
PFax:952227.1110
Faz:952.227.1110
1. Show the existing street name `Banebe Way".
g �' )�
Web She 2. Prior to final plat approval, a professional civil engineer registered in the State
winvachanhassen.mn.us of Minnesota must sign all plans.
3. Sanitary sewer and water hookup charges are applicable for each of the new
lots. The 2003 trunk hookup charge is $1,440 for sanitary sewer and $1,876
for water -main. Sanitary sewer and water -main hookup fees may be specially
assessed against the parcel at the time of building permit issuance.
4. The applicant will be required to meet the existing site runoff rates for the 10-
year and 100-year, 24-hour storm events. The proposed pond must be
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
Bob Generous
October 31, 2003
Page 2
designed to National Urban Runoff Program (NURP) standards. The storm
sewer must be designed for a I0-year, 24-hour storm event. Drainage and
utility easements shall be dedicated on the final plat over the public storm
drainage system including ponds, drainage swales, and wetlands up to the
100-year flood level. The minimum easement width shall be 20 feet wide.
5. Use type III silt fence along the secondary bluff creek overlay zone line on
the south side and use type II silt fence along the west and east sides of the
grading area. In addition, tree preservation fencing must be installed at the
limits of tree removal. A 75-feet minimum rock construction entrance
should be added to the entrance that will be accessed during construction.
The applicant should be aware that any off -site grading will require an
easement from the appropriate property owner.
6. Permits from the appropriate regulatory agencies must be obtained, including
but not limited to the MPCA, Department of Health, Watershed District,
Carver County, etc.
7. The applicant shall enter into a development contract with the City and
supply the necessary financial security in the form of a letter of credit or cash
escrow to guarantee installation of the improvements and the conditions of
final plat approval.
8. Submit detailed construction plans and specifications for the public utility
improvements before final platting.
9. Construct public utility improvements in accordance with the City's latest
edition of Standard Specifications and Detail Plates.
10. Installation of the private utilities for the site will require permits and
inspections through the City's Building Department.
11. Seed and mulch or sod the site within two weeks of grading. Submit haul
route for City approval prior to any hauling.
12. On the grading plan:
a. Add a storm sewer Schedule.
b. Add silt fence type III along the secondary bluff creek zone line on
the south side and silt fence type II along the west and east sides of
the grading area.
c. Show a minimum 75-foot rock construction entrance.
d. Show all existing and proposed easements.
e. Add a bench mark.
f. Show the storm sewer manholes rim and invert elevations.
13. On the utility plan:
a. Show proposed utility lines 10-feet inside property line.
b. Add a note "connection to existing manhole must be core drilled."
c. Show sanitary manhole rim and invert elevations.
d. Show minimum 10-feet horizontal separation between sanitary and
water -main lines.
e. Show all existing and proposed utility easements.
f. Show proposed house lower level elevations.
g. Show sanitary sewer and water -main pipe class and slope.
h. Show a temporary utility easement to work out side property limit.
Bob Generous
October 31, 2003
Page 3
i. Show the location of proposed and existing water and sanitary
services.
j. Show the proposed sanitary and water -main in profile view within
the construction area.
k. All public water -main will be PVC,C-900 pipe
1. All public sanitary sewer pipe type will be PVC, SDR35.
14. On the street and storm plan:
a. Last storm manhole discharging to the pond must include a 2-foot
SUMP.
b. Show the proposed and existing street easements.
15. Add a legend to the plans.
16. Add the latest version of City of Chanhassen detail plates# 1002, 1004,
1005, 1006, 2001, 2101, 2109A, 3101, 3102, 3104, 3107, 3108, 3109,
5200, 5203, 5207, 5300, 5301 and 5302.
17. The drive way easement must be a 30 feet wide with 20-feet of hard surface
pavement and built to a 7-ton design.
18 Submit an inspection report certifying that the private street is built to a 7-
ton design prior to certificate of occupancy.
19 Remove the existing cul-di-sac bituminous in back of the curb and re -sod
the area.
c: Matt Saam, Acting Public Works Director/City Engineer
gAeng\pmjecta\walnut gmv 2nd\counctl update preliminary plat m�iew.doc
City of Chanhassen
7700 Market Boulevard
Chanhassen, MN 55317
(952)227-1100
Date: 9/12/2003
To: Development Plan Referral Agencies
From: Planning Department
By: Robert Generous, Senior Planner
Subject: Request for rezoning of 3.09 acres from A2, Agricultural Estate District to R4, Mixed Low Density
Residential; subdivision approval creating five lots consisting of one single-family home and four twin
home units with a variance request; and a conditional use permit for development within the Bluff Creek
Corridor, Klingelhutz Development, Walnut Grove Second Addition.
Planning Case: 2003-16 SUB, 2003-4 Rezoning, and 2003-6 Conditional Use Permit
The above described application for approval of a land development proposal was filed with the Chanhassen Planning
Department on September 11, 2003.
In order for us to provide a complete analysis of issues for Planning Commission and City Council review, we would
appreciate your comments and recommendations concerning the impact of this proposal on traffic circulation, existing and
proposed future utility services, storm water drainage, and the need for acquiring public lands or easements for park sites,
street extensions or improvements, and utilities. Where specific needs or problems exist, we would like to have a written
report to this effect from the agency concerned so that we can make a recommendation to the Planning Commission and City
Council.
This application is scheduled for consideration by the Chanhassen Planning Commission on October 21, at 7:00 p.m. in the
Council Chambers at Chanhassen City Hall. We would appreciate receiving your comments by no later than October 10,
2003. You may also appear at the Planning Commission meeting if you so desire. Your cooperation and assistance is
greatly appreciated.
1. City Depamnents
City Engineer
b. City Attorney
ity Park Director
Marshaladding Official
Pir
ater Resources Coordinator
Forester
(9patershed District Engineer
3O. oil Conservation Service
4. MN Dept. of Transportation
5. U.S. Army Corps of Engineers
QMinnegasco
7. MN Dept. of Natural Resources
IS)relephone Company
(QWest or Sprint)
® Electric Company
(NSP or MN Valley)
(ff)vlediacom Cable System
11. U. S. Fish and Wildlife
12. Carver County
Engineer
Environmental Services
13. Other-
14.
2319
7240
7280
STATE HWY 5
2198 7470 7471 7476 7475 7460
2180
7490 7491 7496
F c~i 7495 7480
U y
7508 7509 7510 7511 7500
'1872173/2159 12145 2131 2117 2103 2091 2075 2059 2043 2027
7604 7602 7600 7596 7592 7588 7584 7580 7576 7572 :t7
7606
a53 / 2310 1
0 v�( 0 \ 0
MEMORANDUM
CITY OF
CHONSEN Date: September 24, 2003
7700 Market Boulevard
To:
Robert Generous, Senior Planner
PO Box 147
Chanhassen, MN 55317
From:
Mark Littfin, Fire Marshal
Administration
Phone:952,227.1100
Subject:
Request for Rezoning of 3.09 acres from A2, Agricultural Estate
Fax.952227.1110
District to Capital R4, Mixed Low Density Residential; Subdivision
Building Inspections
approval creating five lots consisting of one single family home and
Phone:952.227.1180
four twin home units with a variance request, and a conditional use
Fax:952227.1190
permit for development within the Bluff Creek Corridor,
Engineering
Klingelhutz Development, Walnut Grove, Second Edition.
Phone. 952.227,1160
Fax: 952.227,1170
Planning Case #2003-16 SUB, 2003-4 Rezoning, and 2003-6
Finance
Conditional Use Permit.
Phone. 952.227.1140
Fax: 952.227.1110
Park a Recreation
I have reviewed the above request for rezoning for the above project in order to
Phone:952.227,1120
comply with the Chanhassen Fire Department/Fire Prevention Division, I have the
Fax: 952.227.1110
following Fire Code or City Ordinance/Policy requirements. The plan review is
Recreation Center
based on available information submitted at this time. If additional plans or
2310 Coulter Boulevard
changes are submitted, the appropriate code or policy will be addressed.
Phone: 952.227.1400
Fax: 952.2271404
1. The current temporary cul-de-sac issue must be addressed. Contact
Planning &
Chanhassen city engineer and Chanhassen fire marshal for options in
Natural Resources
Phone, 952.227.1130
making this a more permanent turnaround.
Fax: 952.227.1110
The new private street should be a minimum of 20 feet in width. Pursuant
Pub2.
1591 Park Road Works
591 P
to 2000 Minnesota Fire Code, Section 503.2.1.
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227,1125
Fax: 952.227.1110
Web SRO
www.ci.chanhassen.nmus
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A gnat place to live, work, and play.
49
CITY OF
CIIANIIASSEN
7700 Market Boulevard
MEMORANDUM
PO Box 147
Chanhassen, MN 55317
TO:
Bob Generous, Senior Planner
Administration
Phone:952.227.110O
FROM:
Steven Torell, Building Official
Fax: 952.227.1110
Building Inspections
DATE:
September 30, 2003
Phone: 952.227.1180
Fax:952.227.1190
SUBJ:
Review of proposed subdivision; Walnut Grove Second Addition,
Engineering
Klingelhutz Development.
Phone: 952,227.1160
Fax: 952.227.1170
Finance
Phone:952,227.1140
Planning Case: 2003-16 SUB, 2003-4 Rezoning and 2003-6 CUP
Fax: 952.227.1110
Park 6 Recreation
I have reviewed the plans for the above project. Following are comments, which
Phone: 952.227.1120
should be included in the conditions of approval.
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
1. Any portion of a building within three feet of a property line must be of one -
Fax: 952.227.1404
hour fire -resistive construction and location of openings may be restricted.
Planning a
Consideration must be given to the placement of property lines prior to
Natural Resources
platting the property.
Phone. 952.227.1130
2. A final grading plan and soils report must be submitted to the Inspections
Fax: 952.227.1110
Division before permits will be issued.
Public works
3. The individual sewage treatment site for the existing home must be
1591 Park Road
abandoned; a permit must be obtained prior to beginning work.
Phone:
522.27.1.3100
Fax:952.227.1310
4. Meet with the Inspections Division as soon as possible to discuss plan
I� Po
review and permit procedures
Senior center
Phone: 952.227.1125
Fax: 952.227.1110
web site G/safety/sVrnemos/plan7Walnut Grove 2"a Addition
www.ci.chanhasseamn.us
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A gual place to live, work, and play.
CITY OF
CHANHA33EN
690CnyCenterDrive, PO Box 147
Chanhassen, Minnesota 55317
Phone 612.937.1900
General Fax 612 937 5739
Engineering Fax 612.9379152
Public Safety Fax 612.934.2524
Web wwwci.cbanhassen.mn.us
MEMORANDUM
TO: Bob Generous, Senior Planner
FROM: Todd Hoffman, Park and Recreation Director
DATE: September 19, 2003
SUBJ: Walnut Grove Second Addition
Walnut Grove Second Addition will have four lots that are subject to a
park dedication fee and one lot (the existing home), which is exempt
from park dedication. Please ensure that the fmal plat is subject to the
payment of $9,600 in park dedication fees ($2,400 per unit).
Kate Aanenson, Community Development Director
The City of Chanhassen. Agrowing community with clean lakes, quality schoo6, a charming downtown, thriving businesses, and beautiful parks. Agreat place to live, work, and play
CITY OF CHANH
770CLMARIZET B
CHANHASSEN
Payee: KLINGE
Date: 09/16/2
Receipt Numbe
Clerk: DANIEL
WALNUT GROVE
ITEM REFEREN
-------------
DEVAP WALNUT
USE & VARIA
Tot
Check
Cha
THANK Y
KLINGELHUTZ DEVELOPMENT
5790
DATE INVOICE NO. DESCRIPTION
INVOICE AMOUNT
DEDUCTION
BALANCE
9-12-03 7305-A 7035 Galpin-permit
200.00
200.00
gl,fifoHECK 3
CD
9-12-03
5790
TOTALS
200. 00
200.00
TEK
NUMB R
CITY OF CHANHASSEN
7700 MARKET BLVD
CHANHASSEN MN 55317
Payee: KLINGELHUTZ DEVELOPMENT
Date: 09/12/2003 Time: 2:08pm
Receipt Number: DW / 4294
Clerk: DANIELLE
2003-16 SUB
ITEM REFERENCE
-------------------------------------------
AMOUNT
DEVAP 2003-16 SUB
USE & VARIANCE
1,000.00
SIGN RENT
75.00
REZONING
500.00
SIGN ESCROW
100.00
Total:
---------------
1,675.00
Check 5787
1,675.00
---------------
Change:
0.00
THANK YOU FOR YOUR PAYMENT!
Affidavit of Publication
Southwest Suburban Publishing
State of Minnesota)
)SS.
County of Carver )
NOTICE OF PUBLIC HEARING
Laurie A. Hartmann, being duly sworn, on oath says that she is the publisher or the authorized
PLANNING CASE NO. 04-10
agent of the publisher of the newspapers known as the Chaska Herald and the Chanhassen Vil-
CITY OF CHANHASSEN
lager and has full knowledge of the facts herein stated as follows:
NOTICE IS HEREBYGIVENthat
the Chanhassen Planning
(A) These newspapers have complied with the requirements constituting qualification as a legal
Commission will hold a public
newspaper, as provided by Minnesota Statute 331A.02, 331A.07, and other applicable laws, as
hearing on Tuesday, March 16, 2004,
amended.
at 7:00 P.M. in the Council Chambers
in Chanhassen City
U
Hall, 7700Market
(B) The printed public notice that is attached to this Affidavit and identified as No. %��
Blvd. The purpose of this hearing is
consider a request for rezoning of
was published on the date or dates and in the newspaper stated in the attached Notice and said
3. sacres from A2, Agricultural Estate
Notice is hereby incorporated as part of this Affidavit. Said notice was cut from the columns of
District to RSF, Single -Family
the newspaper specified. Printed below is a copy of the lower case alphabet from A to Z, both
Residential; subdivision approval
inclusive, and is hereby acknowledged as being the kind and size of type used in the composition
cieatingfourlots with variances; anda
and publication of the Notice:
conditional use permit for development
within the Bluff Creek Corridor,
Klingelhutz
ywnxyz
abcdefghijkhnno;Ym
Development, Walnut
Grove Addition.
1
t, .+-., 1
plan
A plan showing the location of.
�� A
/ V (�t-x- (� � 7/I / 1 'i✓
the proposal is available for public
J
reviewat City Hall during regular
Laurie A. Hartmann
business hours. All interested
Persons are invited to attend this
public hearing and express their
opfnionswithrespeettothisproposaL
Subscribed and swom before me on
Robert
Generous, Senior Planner
Email:
be nero+ na i h h
//
7 �`'""�'"
n
this day of -2004'�
Phone: 952-227-1131
(Published in the Chanhassen
Villager on Thursday, March 4, 2004;
GWEN M. RADUENZ
tcommY �UOLIC SOTA
No. 4112)%/'��
/
s 12n ..11
Commission Fx9lies Jan. J1.2005
Notary Public
RATE INFORMATION
Lowest classified rate paid by commercial users for comparable space.... $22.00 per column inch
Maximum rate allowed by law for the above matter ................................ $22.00 per column inch
Raze actually charged for the above matter ............................................... $10.85 per column inch
NOTICE OF PUBLIC HEARING
PLANNING CASE NO.04-10
CITY OF CHANHASSEN
NOTICE IS HEREBY GIVEN that the Chanhassen Planning Commission will hold a
public hearing on Tuesday, March 16, 2004, at 7:00 p.m. in the Council Chambers in
Chanhassen City Hall, 7700 Market Blvd. The purpose of this hearing is to consider a request for
rezoning of 3.09 acres from A2, Agricultural Estate District to RSF, Single -Family Residential;
subdivision approval creating four lots with variances; and a conditional use permit for
development within the Bluff Creek Corridor, Klingelhutz Development, Walnut Grove 2na
Addition.
A plan showing the location of the proposal is available for public review at City Hall
during regular business hours. All interested persons are invited to attend this public hearing and
express their opinions with respect to this proposal.
Robert Generous, Senior Planner
Email: bgenerous@ci.chanhassen.mn.us
Phone: 952-227-1131
(Publish in the Chanhassen Villager on March 4, 2004)
NOTICE OF PUBLIC HEARING
REZONING, SUBDMSION AND
CONDITIONAL USE PERMIT
CITY OF CHANHASSEN
NOTICE IS HEREBY GIVEN that the Chanhassen Planning Commission will hold a
public hearing on Tuesday, October 21, 2003, at 7:00 p.m. in the Council Chambers in
Chanhassen City Hall, 7700 Market Blvd. The purpose of this hearing is to consider a
request for rezoning of 3.09 acres from A2, Agricultural Estate District to R4, Mixed Low Density
Residential; subdivision approval creating five lots consisting of one single family home and four
twin home units with a variance request; and a conditional use permit for development within the
Bluff Creek Corridor, Khngelhutz Development, Walnut Grove Second Addition.
A plan showing the location of the proposal is available for public review at City Hall
during regular business hours.
All interested persons are invited to attend this public hearing and express their opinions
with respect to this proposal.
Robert Generous, Senior Planner
Phone: 952-227-1131
(Publish in the Chanhassen Villager on October 9, 2003)
tz Construction
350 East Hwy 212
Phone: 9525566021
Chaska, MN 55318 Fax: 9524483496
PROJECT: Walnut Grove 2nd
TO: City of Chanhassen
ATTN: Bob Generous
DATE: 12/17/2003
REF:
TRANSMITTAL
No. 00001
ARE SENDING:
SUBMITTED FOR;
ACTTON
TAKEN:WE
❑
$hop Drawings
❑ Approval
❑
Approved as Submitted
Letter
Your Use
❑
Approved as Noted
❑
Prints
❑ As Requested
❑
Retumed After Loan
❑
_
Change Order
❑ Review and Comrt=t
❑
Resubmit
❑
Plans
❑
Submit
❑
Samples
VIA:
❑
Retumed
❑
specifications;
rENT
IJ/Attached
❑
Retumed for C.r tions
❑
Other:
I Cl Separate Cover Via:
❑
Due Date:
Remarks: letter of extension
CC:
Signed:
Tom Heiland
Wingelhulz Dev
7700 Market Blvd
PO Box 147
We agree to ex!end review period for Walnut Grove 2nd .Addition until May 1 n 2004.
attention to this matter.
1�vu. lo, �03
ran
$ 4Abf.-I�m-
0
0 3 —Ilo Sub
•o3-a� Rez�-r�
cup
NOTICE OF PUBLIC HEARING
REZONING, SUBDMSION AND
CONDITIONAL USE PERMIT
CITY OF CHANHASSEN
NOTICE IS HEREBY GIVEN that
theC". arthassenPlanningCommissionwill
hold a public hearing on Tuesday, October
21, 2003, at 7:00 p.m. in the Council
Chambers in Chanhassen CityHall, 7700
Market Blvd. The purpose ofthis hearing
is to consider a request forrezoning of3.09
acres from A2, Agricultural Estate District
to R4, Mixed Low Density Residential;
subdivision approval creating five lots
consisting of one single family home and
four twin home units with a variance
request; and a conditional use permit for
development within the Bluff Creek
Corridor, Klingelhutz Development,
Walnut Grove Second Addition.
Affidavit of Publication
Southwest Suburban Publishing
State of Minnesota)
)SS.
County of Carver )
Laurie A. Hartmann, being duly sworn, on oath says that she is the publisher or the authorized
agent of the publisher of the newspapers known as the Chaska Herald and the Chanhassen Vil-
lager and has full knowledge of the facts herein stated as follows:
(A) These newspapers have complied with the requirements constituting qualification as a legal
newspaper, as provided by Minnesota Statute 331 A.02, 331A.07, and other applicable laws, as
amended.
(B) The printed public notice that is attached to this Affidavit and identified as No._y__�
was published on the date or dates and in the newspaper stated in the attached Notice and said
Notice is hereby incorporated as part of this Affidavit. Said notice was cut from the columns of
the newspaper specified. Printed below is a copy of the lower case alphabet from A to Z, both
inclusive, and is hereby acknowledged as being the kind and size of type used in the composition
and publication of the Notice:
abcdefghijkhnnopgrstuvwxyz
Laurie A. Hartmann
Subscribed and sworn before me on
A plan showing the location of the
proposal is available for public review at this 9 �y of 2003
City Hall during regular business hours. =IRADLUIENZAli interested persons are InVlted t0 Ptattendthispubhchearmgandexpresstheir My
opinions with respect to this proposal.
Robert Generous, Senior Planner
Phone: 952-227-1131
(Published in the Chanhassen Villageron Notary Public
Thursday, October 9, 2003; No. 4005)
RATE INFORMATION
Lowest classified rate paid by commercial users for comparable space.... $21.00 per column inch
Maximum rate allowed by law for the above matter ............................... $21.00 per column inch
Rate actually charged for the above matter .............................................. $10.63 per column inch
UPPER LEVEL PLAN
1,252 s.f.
LOWER LEVEL PLAN
1,337 s.f.
RIVERWOOD S
952-448-3750 office
WELMAN
MAPLE
LEAF SPERIDES
SPLIT ENTRY
PLAN DATA
KITCHEN:
UPPER
13' x 13'
PANTRY:
UPPER
6' x 6'
DINING:
UPPER
9' x 13'
GREAT ROOM:
UPPER
13' x 19'
POWDER:
UPPER
6' x 5'
MASTER SUITE:
UPPER
13' x 29'
BEDROOM 2:
LOWER
13' x 16'
BEDROOM 3:
LOWER
13' x 17'
BATH:
LOWER
9' x 5'
ENTRY:
SPLIT
6' X 7'
GARAGE:
SPLIT
20' X 24'
Community
Realty �.con m ealty.net Q®
UPPER LEVEL PLAN
900 s.r.
RIVERWOOD S
OA KSIDE
""R`°"
PLAN DATA
MASTER SUITE:
UPPER
11 i x 311
BEDROOM 2:
UPPER
Ili x 15i
BEDROOM 3:
UPPER
11 i x 751
BATHROOM:
UPPER
6i x 8i
GREAT ROOM:
MAIN
211 x 741
DINING:
MAIN
15i x 9i
KITCHEN:
MAIN
11i x 721
MUD ROOM:
MAIN
5i x 8i
POWDER:
MAIN
5i x 51
LIVING ROOM:
MAIN
111 x 121
GARAGE:
MAIN
20i x 24i
BASEMENT (UNFIN.):
LOWER
2li x 501
�j
MAIN LEVEL PLAN N�—
71D05f Community
952-448-3750 office Realty www.commrmlty.net Q®
CAMPBELL, KNUTSON, SCOTT & FUCHS, P.A.
Attorneys at Law
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, Minnesota 55121
Telephone: (612) 452-5000 FAX: (612) 452-5550
FILING OF DOCUMENTS
TO: XX COUNTY RECORDER REGISTRAR OF TITLES
Please complete, date, and sign this form upon assigning document numbers for the
documents listed below and return completed form to SUE NELSON at the Chanhassen City
Attorney's office at the address shown above. A self-addressed envelope is provided
for your convenience.
CLIENT/MATTER: City of Chanhassen / Walnut- Grove
(Residential Development, Inc. - Rick Murray)
THE FOLLOWING DOCUMENT(S) Abstract
WERE FILED: Document No.
b Plat C�Z/,3 9 9
OS Development contract & Pm c2 /,4/(1 o 3
&� Trail Easement a. /L/0&
Permanent Easement for Access /'Cf(J u S
Torrens
Document No.
at 'S� o'clock A.[�M. on c� / , 19 97 ,wilt, the
County Recorder / Regis of Titles at the Carver County Courthouse, Chaska, MN.
SIGNED:
Thank you!
GRANT OF EASEMENT
THIS GRANT OF EASEMENT is made this ieday of 1997 by
RESIDENTIAL DEVELOPMENT, INC., a Minnesota corporation (Grantor), in favor of
John Hennessey C'Grantee").
RECITALS:
A. Grantor is the fee owner of the property embraced within the Plat of Walnut
Grove in the City of Chanhassen, Minnesota (the "Grantor's Property").
B. Grantee is the fee owner of the real property located at 7305 Galpin Lake Road,
Chanhassen, Minnesota, which property is adjacent to Grantor's Property and legally described
on Exhibit A attached hereto and made a part hereof (the "Grantee's Property").
C. Grantee desires to obtain vehicular access for ingress and egress to and from
Grantee's Property through a portion on the Plat of Walnut Grove to Prairie Flower Boulevard
lying within such plat over a private roadway (the "Roadway") to be constructed within the tract
of land legally described on Exhibit B attached hereto and made a part hereof (the "Easement
Area").
D. Grantor desires to grant such access easement to Grantee for the benefit of
Grantee and the Grantee's Property as set forth herein to accommodate vehicular traffic to and
from Grantee's Property.
NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency
of which is hereby acknowledged, Grantor hereby grants the following easement on the terms
and conditions set forth herein:
9978KMM
1. Grant of Easement. Grantor hereby grants and conveys to Grantee and its
successors and assigns, for the benefit of Grantee and its successors and assigns, a non-exclusive
easement for vehicular ingress and egress to and from Grantee's Property, over the Roadway to
be constructed in the Easement Area, which easement shall commence upon completion of
construction of the Roadway.
2. Construction Maintenance of Roadway. The Roadway shall be constructed in
the Easement Area in compliance with the requirements of the City of Chanhassen applicable to
such Roadway, and shall be maintained by Grantor as Grantor shall deem necessary. Grantee
shall have no right to construct nor to maintain the Roadway on the Easement Area, the only
right granted to Grantee being the right of Grantee to use the Roadway for vehicular access to
and from Grantee's Property after completion of construction of the Roadway.
3. Duration and Limitation. The easement granted to Grantor herein is limited to
use of the Roadway for reasonable vehicular access to the residence located on Grantee's
Property and the easement rights granted therein shall terminate and be of no Rather force and
effect if Grantee's Property is used for business or commercial purposes of any nature.
4. Covenants Running With the Land. Subject to the provisions of Section 3
hereof, the right to use and exercise the easement rights contained herein shall run with Grantor's
Property and Grantee's Property, shall inure to and be for the benefit of Grantee's Property and
Grantee, their heirs, personal representatives, successors and assigns and shall be appurtenances
to the Grantee's Property; none of the easement rights granted hereby may be transferred,
assigned or encumbered except as an appurtenance to Grantee's Property.
IN WITNESS WHEREOF, Grantor has executed this Grant of Easement effective the
day and year first above written.
9978KMM 2
STATE OF MINNESOTA )
)Ss
COUNTY OF V&_(L )
The foregoing instrument was acknowledged before me this r291-Aday of
V L_(( , 1997, by Rick D. Murray the President of RESIDENTIAL
DEVELOPMENT, INC., a Minnesota corporation, on behalf of the corporatioA
Notary
THIS INSTRUMENT WAS DRAFTED BY:
Kathleen M. Martin, Esq.
Malkerson Gilliland Martin LLP
Suite 1500 AT&T Tower
901 Marquette Avenue
Minneapolis, MN 55402
(612)344-1111
M. LEE GLOVER
NOTARY PUBLIC —MINNESOTA
HENNEPIN COUNTY
My Commission expires 1.31.20M
G
07/31/97 THU 09:43 FAX 612344—'14 MALKERSON GILLILAND Z 003
EXIMIT A
(Grantee's Property)
Parcel 1:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver County,
Minnesota, described as follows:
Commencing at the west quarter comer of said Section 10; thence on an assumed bearing of
South 01 degrees 56 minutes 40 seconds East along the west line of said southwest Quarter, a
distance of 1213.40 feet; thence North 88 degrees 03 minutes 20 seconds East, a distance of
1190.41 feet to a point on a 3452.34 foot radius curve, the center circle of said curve hearing
North 79 degrees 30 minutes 09 seconds West 8om said point, thence southwesterly along said
curve, a distance of 469.80 feet central angle 07 degrees 47 minutes 49 seconds; thence South 18
degrees 17 minutes 40 seconds West along tangent, a distance of 64.00 feet to the actual point of
beginning of the tract to be described; thence continuing South 18 degrees 17 minutes 40 seconds
West, a distance of282,12 feet; thence South 65 degrees 12 minutes 03 seconds cast, a distance
of 301.94 feet; thence North 18 degrees 17 minutes 40 seconds East, a distance of 316.33 feet;
thence North 71 degrees 42 minutes 20 seconds West, a distance of 300.00 feet to the point of
beginning. Subject to right-of-way in existing county road subject to any and all easements of
record.
Parcel 2:
That part of the Southwest Quarter of Section 10, Township 116, Range 23, Carver County,
Minnesota described as follows: Commencing at the west quarter corner of said Section 10;
thence on an assumed bearing of South 1 degree 56 minutes 40 seconds East along the west line
of said Southwest Quarter, a distance of 1213.40 feet; thence North 88 degrees 03 minutes 20
seconds East, a distance of 1190.41 feet; thence southerly a distance of 383.79 feet along a curve
not tangential with the last described line, said curve is concave to the west, has a radius of
3452.34 feet and a central angle of 6 degrees 22 minutes 10 seconds and the chord of said curve
bears South 13 degrees 40 minutes 55 seconds West to the point of beginning of the tract to be
described; thence continuing southerly, a distance of 86,01 feet along said curve concave to the
West, having a radius of 3452.34 feet, a central angle of 1 degree 25 minutes 39 seconds; thence
South 18 degrees 17 minutes 40 seconds West, tangent to said curve, a distance of 64.00 feet;
thence South 71 degrees 42 minutes 20 seconds East, a distance of 300.00 feet; thence North 18
degrees 17 minutes 40 seconds East, a distance of 150.00 feet, thence North 71 degrees 42
minutes 20 seconds West, a distance of 301.07 feet to the point of beginning. Subject to right-of-
way in existing County Road and any and all easements of record.
Io907k}
EXIIIBIT B
(Easement Area)
A 30.00 foot Easement for ingress and egress over and across those parts of Lot 5, Block
3 and Outlots B and C, WALNUT GROVE, Carver County, Minnesota according to the
recorded plat thereof, which lies 15.00 feet on each side of the northerly lot line of said
Outlot C.
MU MM 5
CITY OF CHANHASSEN
ENGINEERING DEPARTMENT
7700 Market Boulevard
P.O. Box 147
CHANHASSEN, MN 55317
(952) 227-1160 FAX (952) 227-1170
TO: Campbell Knutson, PA
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, MN 55121
WE ARE SENDING YOU
❑ Shop drawings
❑ Copy of letter
LETTER OF TRANSMITTAL
DATE JOB NO.
8/25/04 04-09
ATTENTION
Sue Nelson
RE:
Walnut Grove 2nd Add.
® Attached ❑ Under separate cover via the following items:
❑ Prints ❑ Plans ❑ Samples ❑ Specifications
❑ Change Order ❑ Pay Request ❑ _
1 1 1 8/11/04 1 1 Executed Conservation Easement I
THESE ARE TRANSMITTED as checked below:
❑
For approval
❑
Approved as submitted
❑
Resubmit
copies for approval
❑
For your use
❑
Approved as noted
❑
Submit
copies for distribution
❑
As requested
❑
Returned for corrections
❑
Return
corrected prints
❑ For review and comment ® For Review & recording
❑ FORBIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS Here is the last easement that needs to be recorded for Walnut Grove 2nd. If you have any questions, feel
free to give me a call.
Thanks.
COPY TO: Bob Generous, Senior Planner
SIGNED: U✓/��/l��
tt Saam, (952) 227-1164
If enclosures are not as noted, kindly notify us at once.
CITY OF CHANHASSEN
ENGINEERING DEPARTMENT
7700 Market Boulevard
P.O. Box 147
CHANHASSEN, MN 55317
(952) 227-1160 FAX (952) 227-1170
TO: Campbell Knutson, PA
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, MN 55121
LETTER OF TRANSMITTAL
DATE JOB NO.
8/24/04 04-09
ATTENTION
Sue Nelson
RE:
Walnut Grove 2nd Add.
WE ARE SENDING YOU
®
Attached ❑
Under separate cover via the following items:
❑ Shop drawings
❑
Prints
❑ Plans ❑ Samples ❑ Specifications
❑ Copy of letter
❑
Change Order
❑ Pay Request ❑
COPIES
DATE
NO.
DESCRIPTION
1
8/20/04
Executed Private Driveway Easement
THESE ARE TRANSMITTED as checked below:
❑
For approval
❑
For your use
❑
As requested
❑
For review and comment
❑ Approved as submitted
❑ Approved as noted
❑ Returned for corrections
® For Review & recording
❑ FORBIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
REMARKS Here is one of the missing easements that need to be recorded for Walnut Grove 2nd. I will be sending you
the remaining easement (conservation) once it is signed by the mayor. The developer is closing on the sale of lot 1 on
Aug. 30th, so they need everything affecting lot 1 recorded by then. If you have any questions, feel free to give me a call.
Thanks.
COPY TO: Bob Generous, Senior Planner
SIGNED: ��" U'
Matt Saarrt 952) 227-1164
It enclosures are not as noted, kindly notify us at once.
CITY OF CHANHASSEN
ENGINEERING DEPARTMENT
7700 Market Boulevard
P.O. Box 147
CHANHASSEN, MN 55317
(952) 227-1160 FAX (952) 227-1170
TO: Campbell Knutson, PA
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, MN 55121
WE ARE SENDING YOU
❑ Shop drawings
❑ Copy of letter
LETTER OF TRANSMITTAL
8/23/04
Sue Nelson
W
® Attached ❑ Under separate cover via the following items:
❑ Prints ❑ Plans ❑ Samples ❑ Specifications
❑ Change Order ❑ Pay Request ❑ _
COPIES
DATE
NO.
DESCRIPTION
1
6/14/04
Executed Development Contract
1
6/14/04
Executed Full Size Final Plat M lar
1
6/2/04
Breakdown of Administration Fees
1
8/13/04
Receipt of Administration Fees
1
8/11/04
Executed Declaration of Covenants
THESE ARE TRANSMITTED as checked below:
❑
For approval
❑
Approved as submitted
❑
For your use
❑
Approved as noted
❑
As requested
❑
Returned for corrections
❑
For review and comment
®
For Review & recording
❑ FORBIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
REMARKS Here are the items that I have to this point which need to be recorded for Walnut Grove 2nd. I will be
sending you two additional easements (conservation & private driveway) once I receive them. The City has received all of
the necessary administration and security fees. The developer is closing on a lot sale on Aug. 30' , so they need the plat
recorded by then. If you have any questions, feel free to give me a call.
Thanks.
COPY TO: Bob Generous, Senior Planner
SIGNED:
l/'/ `�s��--
MW Saam,1(952) 227-1164
If enclosures are not as noted, kindly notify us at once.
April 16, 2004
CITY OF
CAANHASSEN
MrJohn Klingelhutz
Klingelhutz Development
7700 Market Boulevard
350 East Highway 212
PO Box 147
Chanhassen, MN 55317
Chaska, MN 55318
Administration
Re: Walnut Grove 2nd Addition — Planning Case No. 04-10
Phone: 952.227.1100
Fax:952.227.1110
Dear Mr. Klingelhutz:
Building Inspections
Phone:952227.1180
On April 12, 2004, the Chanhassen City Council approved the following:
Fax: 952.227.1190
Engineering
The rezoning of the property from Agricultural Estate District, A2, to Single
Phone:952227.1160
Family Residential District, RSF."
Fax:952.227.1170
Fine=
The preliminary plat for Walnut Grove Second Addition with lot width variances
Phone:952227.1140
and one (1) foot side yard setback variances and a variance for the use of a private
Fax: 952227.1110
street, according to the plans prepared by Otto Associates, date stamped Received
Park & Recreation
February 12, 2004, subject to the following conditions:
Phone: 952.227.1120
Fax:952.227.1110
1. At the time of final plat recording, the developer shall pay full park dedication
enter
13eCoulter
fees for the three lots that are subject to park dedication fees.
Boulevard
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
2. Adjust the lot line(s) to assure that all lots meet or exceed the 15,000 square -foot
minimum lot area.
Planning &
Natural Resources
Phone: 952.227.1130
3. Individual sewer and water services must be provided for Lots 1-4 and indicated
Fax:952227.1110
on the plans.
Public Works
1591 Park Rog
4. A final grading plan and soils report must be submitted to the Inspections
Phone:952227.1300
Division before permits will be issued.
Fax: 952.227.1310
Senior center
5. The old individual sewage treatment site for the existing home must be
Phone: 952.227.1125
abandoned in accordance with MPCA regulations.
Fax: 952.227.1110
Web site
6. A 10-foot clear space must be maintained around fire hydrants, i.e. street
www.ctchanhassen.mn.us
lamps, trees, shrubs, bushes, Qwest, Xcel Energy, Cable TV and transformer
boxes. This is to insure that fire hydrants can be quickly located and safely
operated by firefighters. Pursuant to Chanhassen City Ordinance #9-01.
7. "No Parking Fire Lane" signs will be required on the new private street.
Pursuant to Chanhassen Fire Prevention Policy #06-1991. Copy enclosed.
Conservation easements shall be dedicated over all areas within the Bluff
Creek primary zone.
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding bails, and beautiful parks. A great place to live, work, and play.
Mr. John Klingelhutz
Walnut Grove 2°d Addition
April 16, 2004
Page 2
9. Tree preservation fence shall be installed at the edge of the grading limits prior to any
construction. Fencing shall protect trees on proposed lots as well as trees in neighboring
properties located next to the grading limits.
10. Any trees lost due to construction that are not shown as such on plans shall be replaced at a rate
of 2:1 diameter inches.
11. Applicant shall submit landscape plans for review and approval prior to final plat approval. A
minimum of one overstory tree will be required in the front yard of each lot.
12. Bufferyard plantings are required along Galpin Boulevard. Planting requirements are: 1
overstory tree, 2 understory trees, and 4 shrubs.
13. A final grading plan and soils report must be submitted to the Inspections Division before
permits will be issued.
14. A wetland buffer 0 to 20 feet in width (with a minimum average of 10 feet) shall be maintained
around the wetland. The wetland buffer shall be 0 along the east side of the wetland and 20
ft. on the north and west sides. Wetland buffer areas shall be preserved, surveyed and staked in
accordance with the City's wetland ordinance. The applicant shall install wetland buffer edge
signs, under the direction of City staff, before construction begins and shall pay the City $20 per
sign.
15. The grading and erosion control plan shall show the actual wetland buffer widths proposed to
meet the minimum average buffer width requirements as well as the 40-foot wetland buffer
setback. All structures shall maintain at least a 40-foot setback from the edge of the wetland
buffer or, if no buffer is to be preserved, from the delineated wetland edge.
16. The primary zone boundary shall be amended to include the wooded area in the rear
(westernmost) portion of Lot 4.
17. A conservation easement shall be dedicated over the primary zone. All structures shall maintain
at least a 40-foot setback from the primary zone. No disturbance of the site shall occur within
the first 20 feet of the setback. Open space shall comprise 100% of the primary zone.
18. The proposed development shall maintain existing runoff rates. On -site storm water ponding
shall be sufficient to meet all City water quality and quantity standards.
19. A manhole with a two -foot sump shall be installed as the last road accessible structure prior to
discharge into the storm water pond.
20. Riprap and geotextile fabric shall be installed at the flared end sections of the inlet and outlet of
the storm water pond.
Mr. John Klingelhutz
Walnut Grove 2°d Addition
April 16, 2004
Page 3
21. Drainage and utility easements shall be provided over all existing wetlands, wetland buffer
areas and storm water infrastructure.
22. A drainage and utility easement shall be dedicated over the 9 feet either side of the property line
between Lots 2 and 3 in order to accommodate access for future storm water infrastructure
maintenance. A drainage and utility easement shall be dedicated over the areas in the western
portions of Lots 3 and 4 that are currently not encumbered by drainage and utility easements
since water discharged from the storm water pond will flow through this area as it moves
toward the wetland.
23. Type M silt fence shall be provided adjacent to all areas to be preserved as buffer or, if no
buffer is to be preserved, at the delineated wetland edge. Silt fence shall be provided as needed
to prevent sediment from leaving the site.
24. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1.
25. All exposed soil areas shall have temporary erosion protection or permanent cover for the
exposed soil areas year round, according to the following table of slopes and time frames:
T)W of Slope
Stabilized within
Steeper than 3:1
7 days
10:1 to 3:1
14 days
Flatter than 10:1
21 days
These areas include any exposed soil areas with a positive slope to a storm water conveyance
system, such as a curb and gutter system, storm sewer inlet, temporary or permanent drainage
ditch or other natural or man-made systems that discharge to a surface water.
26. Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as needed.
27. Based on the proposed developed area of approximately 3.09 acres, the estimated total SWMP
fee, due payable to the City at the time of final plat recording, is $11,041.
28. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g.,
Riley -Purgatory -Bluff Creek Watershed District, Minnesota Pollution Control Agency,
Minnesota Department of Natural Resources (for dewatering), Minnesota Department of
Health, Carver County, Metropolitan Council Environmental Services, etc. and comply with
their conditions of approval.
Mr. John Mingelhutz
Walnut Grove rd Addition
April 16, 2004
Page 4
29. Prior to final plat approval, a professional civil engineer registered in the State of Minnesota
must sign all plans.
30. Sanitary sewer and water hookup charges are applicable for each of the new lots. The 2004
trunk hookup charge is $1,458 for sanitary sewer and $2,814 for watermain. Sanitary sewer
and watermain hookup fees may be specially assessed against the parcel at the time of
building permit issuance. Hook-up charges are based on the number of SAC units assigned
by the Met Council for each lot.
31. The applicant will be required to meet the existing site runoff rates for the 10-year and 100-
year, 24-hour storm events. The proposed pond must be designed to National Urban Runoff
Program (NURP) standards. The storm sewer must be designed for a 10-year, 24-hour storm
event. Drainage and utility easements shall be dedicated on the final plat over the public
storm drainage system including ponds, drainage swales, and wetlands up to the 100-year
flood level. The minimum easement width shall be 20 feet wide.
32. Tree preservation fencing must be installed at the limits of tree removal. The applicant
should be aware that any off -site grading will require an easement from the appropriate
property owner.
33. The applicant must enter into a development contract with the City and supply the necessary
financial security in the form of a letter of credit or cash escrow to guarantee installation of
the improvements and the conditions of final plat approval.
34. Submit detailed construction plans and specifications for the public utility improvements
before final platting.
35. Construct public utility improvements in accordance with the City's latest edition of
Standard Specifications and Detail Plates.
36. Installation of the private utilities for the site will require permits and inspections through the
City's Building Department.
37. Seed and mulch or sod the site within two weeks of grading. Submit a haul route for City
approval prior to any hauling.
38.On the grading plan:
a. Revise the side slopes along the east side of the private drive to be a maximum of
3:1 or install a retaining wall.
b. Add Type III silt fence along the secondary bluff creek zone line on the south side
and Type II silt fence along the west and east sides of the grading area.
c. Show a minimum 75-foot rock construction entrance.
d. Show all existing and proposed easements.
Mr. John Klingelhutz
Walnut Grove 2Id Addition
April 16, 2004
Page 5
e. Add a bench mark.
f. Show the storm sewer manhole rim and invert elevations.
39. On the utility plan:
a. Show the proposed utility lines 10 feet inside the property line.
b. Add a note "connection to existing manhole must be core drilled."
c. Show sanitary manhole rim and invert elevations.
d. Show all existing and proposed utility easements.
e. Show the location of existing water and sanitary services to Lot 1.
40. On the street and storm plan:
a. Last storm manhole discharging to the pond must include a 3-foot sump.
b. Show the proposed and existing street easements.
41. Add a legend to the plans.
42. The driveway easement must be 30 feet wide with 20 feet of hard -surface pavement and built
to a 7-ton design.
43. Submit an inspection report certifying that the private street is built to a 7-ton design.
44. Elevation of lowest house opening must be three feet above high water level of the proposed
pond.
45. A 30-foot wide public drainage and utility easement must be dedicated on the final plat over
the public sewer and water lines.
46. Structure setbacks shall comply with the following table:
Setbacks: front, rear, side, Bluff Creek primary zone, wetland
buffer
Lot 1
30, 30, 10, na, na
Lot 2
30, 30, 9, na, na
Lot 3
30, 30, 9, 40, 40
Lot 4
30, na, 9, 40, 40
Conditional Use Permit #2003-6 for development within the Bluff Creek Overlay District subject to
the following conditions:
1. The primary zone boundary shall be amended to include the wooded area in the rear
(westernmost) portion of Lot 4.
Mr. John Klingelhutz
Walnut Grove 2nd Addition
April 16, 2004
Page 6
2. A conservation easement shall be dedicated over the primary zone. All structures shall
maintain at least a 40 foot setback from the primary zone. No disturbance of the site shall
occur within the fast 20 feet of the setback. Open space shall comprise 100% of the
primary zone.
Final plat documents must be submitted to the city three weeks prior to the City Council meeting
in which you wish to have your final plat approved. Enclosed is the list of items required for
submittal for final plat approval. No building permits can be issued until the site plan agreement
is executed and the final plat is approved and submitted for recording.
If you have any questions or need additional information, please contact me at (952) 227-1131.
Sin�cerel,
Robert Generous, AICP
Senior Planner
Enclosure
c: Lori Haak, Water Resource Coordinator
Matt Saam, Assistant City Engineer
Steve Torell, Building Official
g:Nplan\2004 planning c N()4-10 - walnut grove 2nd additioulprefi®oary plat appmval krott.dw
ITEMS REOUHtED FOR FINAL PLAT CONSIDERATION 1/18/02
The following items are required to be submitted a minimum of three (3) weeks prior to City
Council meeting:
1. Submit two (2) sets of construction plans and specifications for staff review and redline.
The construction plans and specifications shall be in accordance to the City's latest edition of
Standard Specifications & Detail Plates. The plans shall include traffic signage and street
light placement. Utility plans shall show both plan view and profiles of all utilities (sanitary
sewer, water and storm sewer lines). Grading and drainage plans shall show dwelling type
and elevations, wetlands and wetland buffer areas, stormwater pond NWLS and HWLS,
catch basin, and storm manhole numbers.
2. Drainage calculations for water quantity and quality pending with maps showing drainage
areas for pre -and post -development conditions and contributing areas to catch basins.
3. Tree Preservation Easements (if applicable).
4. Trail Easements (if applicable).
5. Landscape Plan and Cost Estimates (Woodland Management Plan, if applicable).
6. Engineer's Cost Estimate of Public Improvements:
a. Sanitary sewer system.
b. Water system.
C. Storm sewer drainage system including cleaning and maintenance.
d. Streets, sidewalk and trails.
e. Erosion control.
f. Site restoration (seeding, sodding, etc.).
g. Site grading
7. Ten (10) sets (folded) of final plat, one (1) set of reductions (811V x 11"), a digital copy in
Axf format, and a digital copy in .tif format (pdf compatible) .
8. Legal description of property on an 8W' x I sheet(s) of paper.
9. Lot tabulations
10. 1" = 200' scale mylar reduction of the final plat with just street names and Lot and
Block numbers.
Failure to provide any of the above items by the required deadline will result in delaying
consideration of final plat before the City Council.
CITY OF CHANHA•EN
PLANNING DEPARTMENT
7700 Market Boulevard
P.O. Box 147
CHANHASSEN, MN 55317
(952) 227-1100 FAX (952) 227-1110
TO: Campbell Knutson, PA
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, MN 55121
WE ARE SENDING YOU
❑ Shop drawings
❑ Copy of letter
LETTER O TRANSMITTAL
7/30/04
►C Rorl
Document
® Attached ❑ Under separate cover via the following items:
❑ Prints ❑ Plans ❑ Samples ❑ Specifications
❑ Change Order ❑ Pay Request ❑
COPIES
DATE
NO.
DESCRIPTION
1
7/28/03
03-6
2003-6 Site Plan Permit (Building "B"-Lot 2, Block 1, Arboretum
Sho ping Center
1
7/28/03
03-2
2003-2 Conditional Use Permit (Building "B"-Lot 2, Block 1,
Arboretum Shopping Center
1
4/26/04
04-1
2004-1 Site Plan Permit (Highlands of Bluff Creek
1
1 4/26/04
04-1
1 2004-1 Conditional Use Permit (Highlands of Bluff Creek
1
9/15/03
03-7
2003-7 Site Plan Permit Chanhassen Short Course
1
12/8/03
03-10
2003-10 Site Plan Permit Lot 1, Block 1, Park Nicollet 1 s Addition
1
4/12/04
04-10
2004-10 Conditional Use Permit Walnut Grove 2na Addition
THESE ARE TRANSMITTED as checked below:
❑
For approval
®
For your use
❑
As requested
❑
For review and comment
❑
FOR BIDS DUE
REMARKS
COPY TO:
❑
Approved as submitted
❑
Resubmit
❑
Approved as noted
❑
Submit
❑
Returned for corrections
❑
Return
® For Recording
❑ PRINTS RETURNED AFTER LOAN TO US
SIGN
copies for approval
copies for distribution
corrected prints
Meuwissen, (952T'Z27-1107
If enclosures are not as noted, kindly notify us at once.
CrrY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES
CONDITIONAL USE PERMIT #04-10
1. Permit. Subject to the terms and conditions set forth herein, the City of
Chanhassen hereby grants a conditional use permit for the following use:
Klingelhutz Development Company to develop a three lot single-family residential subdivision
within the Bluff Creek Overlay District known as Walnut Grove 2nd Addition.
2. Property. The permit is for the following described property ("subject property") in
the City of Chanhassen, Carver County, Minnesota:
Walnut Grove 2°d Addition
3. Conditions. The permit is issued subject to the following conditions:
a. The primary zone boundary shall be amended to include the wooded area in the rear
(westernmost) portion of Lot 4.
b. A conservation easement shall be dedicated over the primary zone. All structures
shall maintain at least a 40 foot setback from the primary zone. No disturbance of
the site shall occur within the first 20 feet of the setback. Open space shall comprise
100% of the primary zone."
4. Termination of Permit. The City may revoke the permit following a public hearing
for violation of the terms of this permit.
5. Lapse. If within one year of the issuance of this permit the authorized construction
has not been substantially completed or the use commenced, this permit shall lapse, unless an
extension is granted in accordance with the Chanhassen Zoning Ordinance.
E
6. Criminal Penalty. Violation of the terms of this conditional use permit is a criminal
misdemeanor.
Dated: April 12, 2004
CITY OF CHANHASSEN
By: / -_" Q
Thomas A. Furlong, Ma or
By: A
odd Gerhardt, City Manager
STATE OF MINNESOTA )
(ss
COUNTY OF CARVER )
The foregoing instrument was acknowledged before me this 20-lA day of
2004, by Thomas A. Furlong, Mayor and Todd Gerhardt, City Manager, of the Cityw Ch assen,
a Minnesota municipal corporation, on behalf of the corporation and pursuant to authority granted
by its City Council.
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P. O. Box 147
Chanhassen, MN 55317
(952)227-1100
gAplan\cup iup wap\walnut grove 2nd-cup.doc
2
Not tyublic
LAAAAAAAAM^AAM"I�
KAREN J. FNGELHARDT
Notary public -Minnesota
MbiTV W b on Expiwvvdd tv�'
z
Document No. OFFICE OF THE
A399693 COUNTY RECORDER
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII FeeR$E19 50UN C eMINN 13 TA
25
Certified Recorded an 10-25-2004 at 11:00, IAM ❑ PM
m�mm�mm�son J
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES
CONDITIONAL USE PERMIT #04-10
1. Permit. Subject to the terms and conditions set forth herein, the City of
Chanhassen hereby grants a conditional use permit for the following use:
Klingelhutz Development Company to develop a three lot single-family residential subdivision
within the Bluff Creek Overlay District known as Walnut Grove 2°d Addition.
2. Property. The permit is for the following described property ("subject property") in
the City of Chanhassen, Carver County, Minnesota:
Walnut Grove 2°d Addition
3. Conditions. The permit is issued subject to the following conditions:
a. The primary zone boundary shall be amended to include the wooded area in the rear
(westernmost) portion of Lot 4.
b. A conservation easement shall be dedicated over the primary zone. All structures
shall maintain at least a 40 foot setback from the primary zone. No disturbance of
the site shall occur within the first 20 feet of the setback. Open space shall comprise
100% of the primary zone."
4. Tennination of Permit. The City may revoke the permit following a public hearing
for violation of the terms of this permit.
5. Lapse. If within one year of the issuance of this permit the authorized construction
has not been substantially completed or the use commenced, this permit shall lapse, unless an
extension is granted in accordance with the Chanhassen Zoning Ordinance.
1
6. Criminal Penalty. Violation of the terms of this conditional use permit is a criminal
misdemeanor.
Dated: Anri112.2004
CITY OF CHANHASSEN
A 2LI--
By: / —" "
Thomas A. Furlong, Ma or
By:
� /<'-:7-7- '--
�—odd Gerhardt, City Manager
STATE OF MINNESOTA )
(ss
COUNTY OF CARVER )
The foregoing instrument was acknowledged before me this a6� day of
2004, by Thomas A. Furlong, Mayor and Todd Gerhardt, City Manager, of the City Ch assen,
a Minnesota municipal corporation, on behalf of the corporation and pursuant to authority granted
by its City Council.
DRAFTED BY:
City of Chanhassen
7700 Market Boulevard
P. O. Box 147
Chanhassen, MN 55317
(952)227-1100
g:\plan\Lup iup wap\walnut grove 2ndcup.dm
2
;,�,AA
KAREN J. ENGELHARDT
NolaryPublic-Minnesota
My commission Expims 1131005
Iryy VV"VVNMVVVNdwvv
LAND SURVEYOR'S CERTIFICATE OF CORRECTION
to part of the plat of -
WALNUT GROVE 2No ADDITION
Pursuant to the provisions of Chapter 505.174 Laws of Minnesota, 1957, Edward J. Otto, the
undersigned, a Licensed Land Surveyor in and for the State of Minnesota, declares as follows:
That I prepared the plat of WALNUT GROVE 2ND ADDITION dated and
filed on , in the Office of the County Recorder, Carver
County, Minnesota in Sleeve No. Document No.
2. That said plat contains errors, omissions or defects in the following particulars, to wit:
a. On Sheet 1 in the second to last line of the first line of the description, a
dimension of 33.12 is given and on Sheet 2 this same 33.12 dimension is
shown from the centerline of Galpin Lake Road to the previous right-of-way
line on the southerly extension of the east line of the plat.
b. On Sheet 1 in the first line of the third paragraph of the description a call of
"South 65 degrees 12 minutes 03 Southeast East" is given.
3. That said plat is hereby corrected in the following particulars, to -wit:
a. Said 33.12 should be changed to 33.21 in both places.
b. Said call should read "South 65 degrees 12 minutes 03 seconds East".
Dated September 9, 2004
Edward J. Otto, Lapourveyor
Minnesota LicenseNo. 14343
The above Certificate of Correction to the plat of WALNUT GROVE 2ND ADDITION was
approved and accepted by the City Council of the City of Chanhassen, Minnesota, at a meeting held
this 11th day of October , 2004 .
CITY OUNCIL^OF THE CITY OF CHANHASSEN, MINNE
,7o.
Mayor Clerk
I hereby certify that this instrument was filed in the Office of the County Recorder of record on this
_ day of 120 at _ o'clock M. and was duly recorded in
Cabinet No. , Document No.
Carver County Recorder
SCANm u
PIZ
TITLE MARKa�SSe
co�'ke C�jim(ol o� �xcelle�ece in �rl/e @feruice1
SARAH L, VIZECKY
dosing coordinator �\��iDS hDr�
121 West Mein ilI a t, SuOe 200, ftt jp MN 55387-102T
(952) 442 ]]l) DlrW DISI (952) 442-]]93 FAX (952) N2 g c
EMAIL Wa-ky OtBlemark.com
CA- 10
City Council Summary — November 10, 2003
WALNUT GROVE 2' ADDITION, 7305 GALPIN BOULEVARD,
KLINGELHUTZ DEVELOPMENT:
1) REQUEST FOR REZONING FROM AGRICULTURAL ESTATE
DISTRICT (A2) TO MIXED LOW DENSITY RESIDENTIAL DISTRICT
2) REQUEST FOR PRELIMINARY PLAT APPROVAL TO CREATE 5
LOTS CONSISTING OF ONE SINGLE FAMILY HOME AND FOUR
TWIN HOME UNITS WITH A VARIANCE FOR THE USE OF A
PRIVATE STREET.
3) REQUEST FOR A CONDITIONAL USE PERMIT FOR DEVELOPMENT
WITHIN THE BLUFF CREEK OVERLAY DISTRICT.
Mayor Furlong excused himself from this item due to a conflict of interest with
Klingelhutz Development Company. Councilman Peterson handled this item as Acting
Mayor. Bob Generous presented the staff report and provided the Planning Commission
update. Councilman Labatt asked for clarification on the accesses into this site and the
existing home. Councilman Lundquist asked staff's opinion relating to the Planning
Commission's comments on the development's shape and density. Uli Sacchet provided
input from the Planning Commission and their concerns with the setbacks and the cul-de-
sac. Councilman Ayotte asked what the down side was of sending this application back
through the process. The applicant stated he was willing to work with the city, and
because of the time of year, timing would not be an issue.
Councilman Labatt moved, Councilman Ayotte seconded that the City Council table
the Walnut Grove 2Id Addition request for rezoning, preliminary plat and
conditional use permit and send it back to the Planning Commission with direction
to look at the cul-de-sac or hammer head more closely and on Lots 4 and 5, to look
at the setbacks, building size and location. All voted in favor, except Councilman
Lundquist who opposed, and the motion carried with a vote of 3 to 1.
COUNCIL PRESENTATIONS.
Todd Gerhardt provided an update on the meeting he and Councilman Ayotte attended
with Mike Fahey regarding public safety, specifically CrimNet. Mayor Furlong informed
the council that he has been invited to serve on a mayoral advisory committee for Senator
Norm Coleman's office. The first meeting was last Friday and he will advise the council
of upcoming meetings if they have any issues they want addressed.
ADMINISTRATIVE PRESENTATIONS.
Todd Gerhardt provided an update on the progress of the landscaping in City Center Park
adjacent to the library.
CORRESPONDENCE DISCUSSION. None.
4
SCANNED
City Council Meeting — November 10, 2003
they need to get done on the property without a variance and it's a tough one. I hate to
say no but you know.
Mayor Furlong: Okay. Thank you. Any other comments Councilman Ayotte? No,
okay. My comments are similar. You know if there's some way it can be done without
the variance that would be preferred and it looks like there are some options and I guess I
would encourage those to be pursued but, because you'd like to be able to let people
improve their property to the way they like to. But for a variance there needs to that
compelling reason, as Councilman Peterson and Labatt mentioned and so those are my
concerns here as well. Any other comments or is there a motion?
Councilman Peterson: I'd move that we deny Variance #2003-13 for a 13 foot variance
from the 30 foot front yard setback requirement based upon the findings of the staff
report.
Mayor Furlong: Is there a second?
Councilman Lundquist: Second.
Mayor Furlong: Is there any discussion on the motion? Hearing none we'll proceed with
the vote.
Councilman Peterson moved, Councilman Lundquist seconded to deny Variance
#2003-13 for a 13 foot variance from the 30 foot front yard setback requirement
based upon the rmdings in the staff report. All voted in favor and the motion
carried unanimously with a vote of 5 to 0.
Mayor Furlong: As I mentioned in the beginning of the meeting, item 5 has been
removed from our agenda. Tabled to a future meeting.
WALNUT GROVE 2Nn ADDITION, 7305 GALPIN BOULEVARD,
KLINGELHUTZ DEVELOPMENT:
1) REQUEST FOR REZONING FROM AGRICULTURAL ESTATE
DISTRICT W) TO MIXED LOW DENSITY RESIDENTIAL DISTRICT
2)
3)
TWIN HOME UNITS WITH A VARIANCE FOR THE USE OF A
WITHIN THE BLUFF CREEK OVERLAY DISTRICT.
Mayor Furlong: Before I request a staff report I'd just like to say that the applicant in
this case, Klingelhutz Development Company is a client of my firm. And while we
0
City Council Meeting — November 10, 2003
haven't been involved in any direct, had any direct involvement in this matter or any
financial interests in this matter before the council, I'm going to recuse myself due to the
possible perception that I may have a conflict of interest. With that I'll ask the Deputy
Mayor, Councilman Peterson to lead the council in it's consideration of this matter.
Councilman Peterson.
Councilman Peterson: With that, staff report please.
Bob Generous: Thank you Mr. Mayor, council members. As you stated this is a 3 part
request. The first is to rezone the property from A2 to R4. First, this property is located
on the northeast corner of West 78a' Street and Galpin Boulevard. It's access will be
through Baneberry Way West which is a private street. As part of the subdivision for
Walnut Grove they did receive the required easement for access purposes. Under the
land use designation of residential low density appropriate zonings are RSF, which is
single family residential, R4, which is what the applicant is proposing. Which permits
single family homes or twin homes, or is part of a planned unit development. When we
first looked at this site we thought that there would be more units that would go in there
but due to Bluff Creek corridor, which runs on the south end of this property, it really
constrained the developable area of the site. The applicant did come in with the two new
twin home, or 4 additional units and keeping the existing home. So staff is
recommending approval of the rezoning to R4. The proposed units are very comparable
in size to the bungalow homes which are the detached townhouses within the Walnut
Grove development. They'll be slightly larger than the townhouses that are immediately
to the east of this. So we believe this development is very compatible with that. As part
of the subdivision request they need a variance for a private street. One of the issues at
the Planning Commission was that they were leaving in the existing temporary turn
around. The applicant has revised his plans to provide a hammer head, which is adequate
for the engineering department and our fire marshal both signed off and said this is
adequate for meeting their purposes. The other concern the Planning Commission has
was that configuration of the Lot 5, we would like to see a more rectangular shape to that,
and they feel that this Lot 5 is very constrained by the setback to Bluff Creek. Staff had
encouraged the applicant to plat the Outlot B because that preserves most of the primary
zone of the Bluff Creek corridor. We currently own the property immediately south of
this. We received that as part of the Galpin Business Park. We think this will be a good
addition to that permanent open space in the community and it will help to preserve the
corridor. So while the lot configuration is sort of, not rectangular, it does comply with
ordinances so we are recommending approval of the subdivision subject to the conditions
in the staff report. Finally there is, because it's within the Bluff Creek corridor, there's a
conditional use permit required for any development. We believe by preserving the
corridor they will protect the Bluff Creek and so we're recommending approval of that.
The Planning Commission did vote to recommend denial of the rezoning and
subsequently the subdivision and conditional use permit. Again their condition was that
the turn around hadn't been addressed and they were unsure how this really fit in with the
neighborhood. We provided additional information in the report to show how it would fit
in with the Walnut Grove development. With that I'd be happy to answer any questions.
10
City Council Meeting — November 10, 2003
Councilman Peterson: Any questions of staff?
Councilman Labatt: Bob, is that existing house on the property, will that be accessed off
of Galpin then?
Bob Generous: Yes. It will keep the existing access point that it has.
Councilman Labatt: And can you just give me the rationale for why that, why we
wouldn't want to pull it off of Galpin?
Bob Generous: Well we would if they were making a new house there or new
development. However there is a significant slope up to the back of that site from where
the end of this driveway will be, or this private street. And so to access the garage they'd
have to build, basically build a new garage. As you come to the end of this, this is north
and then it'd go uphill and the garage is already entered that way. They're not going to
change anything on the existing site.
Councilman Labatt: But there's been other times when we've pulled other lot splits like
this off and re-routed the access. Correct?
Bob Generous: That's correct.
Councilman Peterson: Other questions of staff?
Councilman Lundquist: Bob, how do you respond to the Planning Commission's
concerns about that sort of being shoe homed in there and however else they described it
in the lot shapes and things like that.
Bob Generous: Well they're correct. It is a tight site, especially the Lot 5. They could
have shown alternate lot designs in a split building. However these are big twin homes.
They're 1,300 square foot for one floor is big. Big property.
Councilman Lundquist: Sure. And has the applicant made any alternate proposals for
other layouts in there to address the Planning Commission's concerns at all or it's just a,
you know it's a concern and here's the development as it is?
Bob Generous: They've revised the lot lines slightly, but not a lot. It fits their plan I
suppose, and we did have that one condition about no egress opening or door openings on
that site so we wouldn't have people that would have a walkout to the side who want to
expand. Put a patio or something in there. They have accommodated the deck area and
porch area and they do have additional expansion areas towards the sides of the building
and that's how they oriented these structures.
Councilman Lundquist: Okay.
Councilman Peterson: Any other questions?
11
City Council Meeting — November 10, 2003
Councilman Labatt: Bob, I'm still kind of hung up on why we can't make this guy to
access off the private drive. I mean look at the elevation change and from the end of that
hammer head on the north is 974 elevation and his drive's at 981. So you're looking at 7
feet grade change. And so is this guy in the existing home, is he selling and Khngelhutz
is going to do a lot split and develop? Is that what's happening here?
Bob Generous: Yes. The house is being sold to another party is my understanding.
Councilman Labatt: Okay.
Councilman Peterson: Bob the only question that I had is, I don't know whether you
were involved in the meeting two weeks ago where we had a conceptual conversation
about the property across Galpin and ... how do we compare this development in area
obviously and with the presentation, is there, we were kind of negative towards that but
then it was a little bit more intense but how do you compare the two, if you can?
Bob Generous: Well this one would be much less intensive development of a property
compared to the townhouse project. And also it doesn't front onto the main drag. This is
sort of into the neighborhood. The orientation's a lot different.
Councilman Peterson: Alright. The applicant, are you the applicant by chance? Are you
the applicant?
John Klingelhutz: I'm the applicant, yes.
Councilman Peterson: Alright, go ahead. Make a presentation if you'd like, over and
above what we've already heard.
John Klingelhutz: Well, you know one of the things...
Councilman Peterson: Name and address please. Could you state your name and address
please.
John Klingelhutz: John Klingelhutz, 1560 Bluff Creek Drive. If you change the
driveway, the layout for that house doesn't work very well. First of all, grade. Second of
all, the way you enter the garage and third, most of the trees that are on that site you
know, that used to be one of the Lyman residences and a lot of those trees are 100 year
old trees, and most of them would go away. So I mean we believe that leaving that
driveway for that one residence, I mean it's been there all these years and I don't think
it's going to increase or decrease any traffic or be a hazard to anything on that road.
Councilman Peterson: Okay. Any other questions of the applicant? Thank you. Fellow
councilmen, any thoughts on this?
12
City Council Meeting — November 10, 2003
Councilman Ayotte: Any comments from our beloved commissioner from the Planning
Commission?
Uli Sacchet: I'm Uli Sacchet. I live at 7053 Highover Court South. I'm representing the
Planning Commission. We were really struggling with this particular application. I think
it has a lot of merits. It's a good project overall. However, we found that basically the
two things that staff already highlighted, that the cul-de-sac was not addressed, we felt
had a very big impact on the layout of this whole thing. And we had an application just
the same night, the same meeting before this application came up where we had a
development where houses were put not on the setback line but close to setback line and
we face requests for variances. We see encroachments. People are going to go out there.
They're going to have fireplaces. Fire pits in there. They're going to want to have decks.
They're going to want to have pavers and what have you back there, and in this case the
lot, the setback line is pretty much coinciding with the smaller unit of the twin homes.
We felt that it was not, at least some of us felt that that was not in line with the
comprehensive plan's idea of trying to preserve the natural integrity as much as possible,
even though it does meet the letter of the ordinance. We felt that was a reason to oppose
this, and see some additional effort put in in terms of alternatives being explored, which
that hammer head seems like there's a little bit of an alternative but I mean it's up to you
to decide whether that's sufficient. It still seems relatively small effort in terms of
actually looking what the alternate possibilities are. There's a lot of constraint with that
wetland right in the middle of the site so it's definitely a difficult site to balance all the
interests. Basically from a Planning Commission we felt there should be more effort and
it should go back through the system. I don't know whether an option will be for council
to refer it back to the Planning Commission with that consideration to refine those aspects
or, I mean that's in your hands now at this point. Any questions from my end? Thank
you.
Councilman Peterson: Thank you. Any comments gentlemen?
Councilman Ayotte: I'd like to know what the down side would be to bring it back to the
Planning Commission for a little bit of the ... what is the negative to that? Does it bring
adversity to the project?
Councilman Peterson: I think it goes back to timing. I assume it's.
Councilman Ayotte: That's the question. I mean.
Bob Generous: Let's see, Planning Commission meets once in December and then in
January again. Then the council into January.
Councilman Peterson: So we're probably delaying it 45 to 60 days if we do that? Is that
safe to say?
Bob Generous: That would be right near the envelope for city review. Today's actually
the end of the first 60 day period.
13
City Council Meeting — November 10, 2003
Councilman Peterson: I mean we could approve it with a condition that staff continue to
work with the applicant to improve the cul-de-sac area. To continue the process.
Councilman Ayotte: I wouldn't want to put a roadblock in.
Councilman Peterson: Yeah. Other comments to that? Any one else?
Councilman Lundquist: I guess my comments would be, why I asked the question about
the extra effort. That I would tend to agree with the Planning Commission that we're
probably setting ourselves up for variances and other non -conforming type issues to
come. However, they're currently meeting everything that they're required to do by
ordinance and everything else so I guess it's hard to say no, although I would encourage
us, the staff to keep working on that to mitigate some of those future potentials.
Councilman Peterson: Councilman Labatt, anything additional?
Councilman Labatt: Well I think Brian's on, and Uli I thank you for your comments.
The Marsh Glen was, that was proposing to do the same thing. When they came in with
those town homes and we kicked it back and we said no because we're setting ourselves
up here. And Brian, I think you're right on. You hit the nail on the head here or the
noodle is going uphill Bob, is that how you say it? I think we're setting ourselves up for
potential of having variances here by putting these buildings right on the setback lines.
These homeowners are going to buy these properties, it happens in my neighborhood.
Lundgren Brothers has put these buildings right on the property lines and the setback
lines and they can't put a pavers stone deck in. So I'd say we either get the applicant to
give us a written extension or we deny it tonight based upon the findings of fact in the
Planning Commission report.
Councilman Peterson: Okay. I probably feel the same way. I think that we could have a
better project given more time so, although I don't like not making a decision. I don't
like the decision we have to make right here so I'm comfortable in doing it. The only
other alternative would be to send it through with staff working on addressing the issue of
the cul-de-sac, but that doesn't address the setback issue. So I would entertain a motion.
I'll pay somebody a dollar for a motion.
John Klingelhutz: Could I say one thing?
Councilman Peterson: Go ahead.
John Klingelhutz: We're willing to work with the staff to do whatever we need to do to
make the city at ease with this project. Whatever that might be. Does that mean that we
need to take the site that is tight and take a little more off of the part that goes into the
Bluff Creek area to have the lots look like they're bigger or whatever that might be, we're
interested in making this work.
14
City Council Meeting — November 10, 2003
Councilman Peterson: Okay, thank you. I guess with that being said, you know a
possible resolution could be sending this back with specific criteria as it relates to the cul-
de-sac and to increase setbacks by a certain foot percentage or a percentage to address the
concerns that you might have.
Councilman Labatt: So Bob you said we're at the end of our first 60 days.
Bob Generous: Yes. You can take it up to an additional 60 days to review.
Councilman Labatt: So that puts us at January 100, 11a'?
Bob Generous: Somewhere around there.
Councilman Labatt: And when do you have a Planning Commission meeting? It has to
come back to the council in January.
Bob Generous: Yes, and that's where we run into a problem.
Councilman Labatt: Can this get on your December Planning Commission agenda if we
kick it back to the Planning Commission with some direction? Okay.
Bob Generous: Theoretically if they can make revisions.
Councilman Labatt: I think Roger wants to chime in here.
Roger Knutson: The applicant's indication his willingness to work with us, and
considering your difficult time constraints, maybe they would give you an extension until
you can deal with it appropriately in January. I don't know when you meet your first or
second meeting in January. Maybe they could just give you an extension to the end of
January. You could ask if that'd be okay with the applicant.
John Klingelhutz: Like I said before that would be fine. Whatever we need to do. And
it's getting pretty late in the year to do anything so I mean we have to wait til spring. It's
really not the end of the world so let's just figure out what we have to do and make it
work.
Councilman Peterson: Alright, than you.
Councilman Ayotte: Appreciate it.
Councilman Peterson: Alright, that makes the motion a little bit simpler.
Councilman Labatt: So I would move that we table this and kick it back. Table it at the
council level, kick it back to the Planning Commission for their meeting in January with
the direction to look at the cul-de-sac or hammer head more closely and on Lots 4 and 5,
15
City Council Meeting — November 10, 2003
to look at the setbacks and the building size and location. Proximity of the lot. Any more
direction or things you want massaged on it?
Councilman Peterson: Is there a second to that?
Councilman Ayotte: I'll second that.
Councilman Peterson: Any further discussion?
Councilman Labatt moved, Councilman Ayotte seconded that the City Council table
the Walnut Grove 2°d Addition request for rezoning, preliminary plat and
conditional use permit and send it back to the Planning Commission with direction
to look at the cul-de-sac or hammer head more closely and on Lots 4 and 5, to look
at the setbacks, building size and location. All voted in favor, except Councilman
Lundquist who opposed, and the motion carried with a vote of 3 to 1.
Councilman Peterson: The next item on the agenda is a motion to permanently transfer
power to the Deputy Mayor.
Mayor Furlong: You're out of order. I've got it back now. I've got the microphone
back.
COUNCIL PRESENTATIONS.
Mayor Furlong: Any council presentations?
Councilman Ayotte: Provide comments to the city manager regarding our meeting with
public safety.
Todd Gerhardt: Bob Ayotte, Councilmember Bob Ayotte and myself met with Mike
Fahey and discussed some CrimNet data with Mike Fahey and how our deputies can
access that information. Right now that information can only be gained through an e-
mail address and, or calling down to the dispatcher. So right now our deputies haven't
had access to that information. I haven't had a chance to talk with Jim Olson, our
Sergeant, but he is, one of the things we would do is have them directly call the
dispatcher. The CrimNet program that the County is doing, it's a pilot program and it's a
computer system that would allow the deputies to access criminal information from every
county in Minnesota. So if they would pull somebody over, they could call the
dispatcher with that person's driver license and get information that may have court
pending litigation against that individual. Right now the deputies do not have that access
to the computers in their cars so one solution to that is to call into dispatch. Right now
our deputies aren't doing that and I'll be working with Sergeant Olson to ensure that the
deputies do have that option available.
Mayor Furlong: Thank you. Any other council presentations?
16
C�
a3-o �Q
U3-u GU
Affidavit of Publication
Southwest Suburban Publishing
State of Minnesota)
)SS.
County of Carver )
Laurie A. Hartmann, being duly swom, on oath says that she is the publisher or the authorized
agent of the publisher of the newspapers known as the Chaska Herald and the Chanhassen Vil-
lager and has full knowledge of the facts herein stated as follows:
NOTICE OF PUBLIC HEARING (A) These newspapers have complied with the requirements constituting qualification as a legal
REZONING, SUBDIVISION AND newspaper, as provided by Minnesota Statute 331A.02, 33IA.07, and other applicable laws, as
CONDITIONAL USE PERMIT amended.
CITY OF CHANHASSEN
NOTICE IS HEREBY GIVEN that (B) The printed public notice that is attached tothis Affidavit and identified as No.
the Chanhassen PlanningCommissionwill was published on the date or dates and in the newspaper stated in the attached Notice and said
holdapublic bearingon Tuesday, October Notice is hereby incorporated as part of this Affidavit. Said notice was cut from the columns of
21, 2003, at 7:00 p.m. in the Council the newspaper specified. Printed below is a copy of the lower case alphabet from A to Z, both
Chambers in Chanhassen City Hall, 7700 inclusive, and is hereby acknowledged as being the kind and size of type used in the composition
Market Blvd. Thepwpose ofthis hearing and publication of the Notice:
is to consider arequestforrezoningol'109 abcdef klmno rstuvwx z
acres fromA2, Agricultural Estate District gh11 P9 Y
to R4, Mixed Low Density Residential;
subdivision approval creating five lots
consisting of one single family home and B
four twin home units with a variance Laurie A. Hartmann
request; and a conditional use permit for
development within the Bluff Creek
Corridor, Klingelhutz Development, Subscribed and sworn before me on
Walnut Grove Second Addition.
A plan showing the location of the q
proposal is available for public review at this / day of �, 2003 rrNww
City Hall during regular business hours. GWEN M. RADUENZ
All interested persons are invited to NOTARY VUBUC MINtdESOTA
attendthispublichearingandexpress thew OMY OTARY UBILICjw iws NNES, A
opinions with respect to this proposal.
005
Robert Generous, Senior Planner
Phone: 952-227-1131
(Published in the ChanliassenVillageron 4Notaryblic
Thursday, October 9, 2003; No. 4005)
RATE INFORMATION
Lowest classified rate paid by commercial users for comparable space.... $21.00 per column inch
Maximum rate allowed by law for the above matter ................................ $21.00 per column inch
Rate actually charged for the above matter .............................................. $10.63 per column inch
$CANNED
oil-10
City Council Summary — September 27, 2004
g. Approval of Temporary On -Sale Beer & Wine License, Edina Realty Foundation.
h. Approval of Certificate of Correction for Walnut Grove 2Id Addition, Planning
Case No. 04-10.
i. Resolution #2004-70: Award of Bid, 2004 Pedestrian Trail
Reconstruction/Overlay Project.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
VISITOR PRESENTATIONS. None.
LAW ENFORCEMENT & FIRE DEPARTMENT UPDATE.
Sergeant Jim Olson reviewed the sheriff's office area report, citation list, copies of crime
alerts issued by Beth Hoiseth, and the community service officer report for the month of
August. He reminded everyone that school has resumed and deputies are paying extra
close attention to speeds in school zones. They also did special speed patrols on Pleasant
View Road and Frontier Trail during the month of August. Councilman Lundquist asked
about contact being made with the neighbors on Frontier Trail regarding Project
Leadfoot. Mayor Furlong wanted to clarify that the sheriff's office will continue to do
traffic details in problems areas of the city. Chief Gregg Geske provided an update from
the fire department, noting Fire Prevention Week October P through the 9`s with the
open house on October 10`s from 1:00 to 4:00 p.m.
PUBLIC HEARING: REOUEST FOR VACATION OF DRAINAGE AND
UTILITY EASEMENT IN BURLWOOD ADDITION.
Public Present:
Name Address
Michael Falk 1000 Hilloway Circle, Burnsville
Paul Oehme presented the staff report on this item. Councilman Labatt asked staff to
address the issues brought up in the letter from Mr. Martinka regarding the drainage and
utility easement and drainage off the site. Mayor Furlong asked for clarification on the
loss of one lot. He then opened the public hearing. No one spoke and the public hearing
was closed. There was no discussion by council. The following motion was made.
Resolution #2004-71: Councilman Peterson moved, Councilman Lundquist
seconded to approve a resolution vacating the existing public easements as defined
on the attached vacation descriptions, subject to the following condition:
Minimum 5 foot wide public drainage and utility easements must be dedicated
along each side of the new lot lines.
&CANNED
City Council Meeting — September 27, 2004
g. Approval of Temporary On -Sale Beer & Wine License, Edina Realty Foundation.
h. Approval of Certificate of Correction for Walnut Grove 2°d Addition, Planning
Case No. 04-10.
i. Resolution #2004-70: Award of Bid, 2004 Pedestrian Trail
Reconstruction/Overlay Project.
All voted in favor and the motion carried unanimously with a vote of 5 to 0.
VISITOR PRESENTATIONS. None.
LAW ENFORCEMENT & FIRE DEPARTMENT UPDATE.
Sgt. Jim Olson: Thank you. Quite a beautiful evening tonight. I included in my council
packet the sheriffs office area report for the month of August. Copy of crime alerts that
were put out by Beth Hoiseth and also the community service office report. For the
monthly calls for service, our total calls for service were up by 153 for the month. That's
compared to last year and for the year it's up by 412. Criminal calls were up by 17 for
the month and they're down by 52 for the year. A couple things that I just wanted to
point out, as I talked about at the last council meeting that I was at, that's jumped up quite
a bit for the month of August. They're up by 20 for the month from 38 to 58. A large
majority of those are from vehicles, and that's compared to last year and they're up by 21
total for the year. Related theft is down from 6 last year to 2 this year, and then for the
year overall they're down from 37 last year to 13 this year, and theft related, what that
has to do is internet theft, fraud, embezzlement, different things like that. Burglaries
were down from 10 last year to 4 this year and for the year overall they're down from 40
last year to 30 this year, which is a good thing. Suspicious activity was up quite a bit
from 97 to 166. Miscellaneous non -criminal was up quite a bit also from 78 last year to
109 this year, and then for the month citations, for the month of August citations, we're at
158. Any questions at all relating to the monthly numbers? I want to talk about traffic
and school. School's back in session again and I want to remind everyone to drive
carefully before and after school, around bus stops and in school zones especially, and
we're paying extra close attention to school zones right now. Making sure speeds stay
down around those zones and reminding people to watch your speeds around there.
Deputies have done 12 special traffic details this month on Pleasant View Road alone,
and another 10 on Frontier Trail. So we've been hitting those quite a bit. We also had
saturation patrols on both streets involving multiple squads and also the laser that we did.
With Frontier Trail, I think that's a perception problem over there more than anything
else. The top speed that we had on Frontier Trail was 38 miles an hour. That was one
vehicle and that was, we certainly did issue them a citation for that. From there we had
one vehicle at 33 and everything else was down under 30 for Frontier Trail. Cars look
like they're going quite a bit faster along there because of the curves and we're waiting to
hear back from the neighborhood for Project Leadfoot. We have contacted some people
out there but have not heard back from them as of yet. We're trying to institute Project
Leadfoot on Frontier Trail. Any questions in reference to traffic problems? We did have
UPPER LEVEL PLAN
7,050 s./.
MAIN LEVEL PLAN
1,0505.7.
RIVERWOOD S
952-448-3750 office
WELMAN
81 RCHWOOD
$PERT®
PLAN DATA
MASTER BEDROOM
UPPER
14i x 79i
MASTER BATH:
UPPER
7i x 121
BEDROOM 2
UPPER
11 i x 15i
BEDROOM 3:
UPPER
11 i x 14i
BATHROOM
UPPER
71 x 8i
KITCHEN:
MAIN
71/x 12i
DINING:
MAIN
I li x 10i
GREAT ROOM:
MAIN
71 i x 17i
LIVING ROOM:
MAIN
14i x 19i
POWDER:
MAIN
5i x 5i
GARAGE:
MAIN
20i x 24i
BASEMENT (UNFIN.):
LOWER
21i x 50i
Community
Realty W W W.commrealty.net Q®
1'1 i!_ -I
I� �I
3 • e ! 7 B Y 10 btt tD '
£t! 1I z e° a to
1 1 's is u p
t t
o
tQ
t rP
4 am 1
•1RAOInON.LL' HOME LOTS: 35
BUNGALOW - HOMES: 44
*M"- HOMES:
TOUR HOMES / BUILDING: IB
SIX HOMES / BUILDING: 14
EIGHT HOMES / BUILDING: 32
TWELVE HOMES / BUILDING: MG
TOTAL HOMES: 247
I�
.,6verI�
h
a.. �� i Ni■u.r.,■ :tt
IIIYi��iH�l I+i1Yi/Yi �11
hRwR si 4
r
Wtti
Tar'Y►
l
rrm
1�5!AE!7�1
n ■1— 1��
Mm• Trt uv� v T[ 1011]0 1
terra
�i
SWAP FEE WORKSHEET
DATE June 1, 2004
FILE NO. Planning Case 04-10
PROJECT Walnut Grove 2nd Addition
WATER QUALrrY
WATER QUANTITY
Site Area in Acres
ROW (Galpin Blvd.)
Outlot A
Assessable area
ZONING CLASSIFICATION
FEES
Rate per Acre
R-4
3.09
-0.50
-0.95
1.64
Acres Total
$ 1,028.00 1.64 $ 1,685.92
Rate per Acre Acres Total
$ 2,545.00 1.64 $ 4,173.80
CREDITS
ITEM UNIT QUANTITY UNrr TOTAL
PRICE PRICE
Storm water pond
acre
$ 1,028.00
$
Outlet structure
each
1.00
$ 2,500.00
$ 2,500.00
$ 2,500.00
SWMP FEE $ 5,859.72
SWMP CREDITS $ 2,500.00
TOTAL SWMP FEE $ 3,359.72
CITY OF
MEMORANDUM
CIIMNSEN
TO: Bob Generous, Senior Planner
7700 Market Boulevard
FROM: Mak Sweidan, Engineer ©X'A 5
PC Box 147
Chanhassen, MN 55317
DATE: June 1, 2004
Administration
Phone:
SUBJ: Final Plat Review of Walnut Grove 2°d Addition
Fax:
ax:952.227.11.1110
Project No. 04-09
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Upon review of the plans received May 27, 2004, prepared by Otto Associates, I
Engineering
offer the following comments:
Phone: 952.227,1160
Fax: 952.221.1110
GRADING, DRAINAGE & EROSION CONTROL
Finance
Phone: 2227110
The plans propose to grade about 30% of the site for the new house pads, a
Fax
Fax95252.227.111
proposed private driveway and a stormwater pond. The proposed lots are located
Park A Recreation
in the east central portion of the site. The proposed grading will prepare the site
Phone:952.227.1120
for look -out and walk -out house pads on Lots 2, 3 and 4, Block 1.
Fax: 952.227.1110
Recreation Cooler
2310CoulterBoulevard
The existingsite drainage flows south toward the existing creek. The plans
g g
Phone:952.227.1400
propose to convey the drainage from the northeast portion of the site to the private
Fax: 952.227,1404
street and carry the stormwater via storm sewer to a proposed NURP pond. The
remaining portion of the site will drain overland to the proposed stormwater pond
Planning A
Natural Resources
and/or the creek.
Phone: 952.227.1130
Fax:952.227.1110
The applicant is proposing to use Type III silt fence along the south side adjacent
Public works
to the secondary bluff creek line and type 11 silt fence along the east and west
1591 Park Road
sides of the grading area. In addition, staff recommends that tree preservation
PFax:9522.27.13100
fencing be installed at the limits of tree removal. The applicant should be aware
Fax: 952.227.1310
that any off -site grading will require an easement from the appropriate property
Senior Center
owner.
Phone: 952.227.1125
Fax:952227.1110
UTILITIES
Web Site
www.ci.chaohassen.mn.us
Municipal sewer and water service is available to the site from Baneberry Way.
The existing house on Lot 1 is already connected to municipal sewer and water.
The applicant is proposing to extend sewer and water lines along the private drive
way to serve Lots 2, 3 and 4.
According to the City's Finance Department records, the parcel was previously
assessed for one sanitary sewer and water hookup. Since the developer will be
responsible for extending lateral sewer and water service to the lots, the sanitary
sewer and water connection charges will be waived. However, the sanitary sewer
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
Bob Generous
June 1, 2004
Page 2
and water hookup charges will still be applicable for each of the new lots. The
2004 trunk hookup charge is $1,458 for sanitary sewer and $2,814 for watermain.
Sanitary sewer and watermain hookup fees may be specially assessed against the
parcel at the time of building permit issuance. Hook up charges are based on the
number of SAC units assigned by the Met Council for each lot.
All of the utility improvements are required to be constructed in accordance with
the City's latest edition of Standard Specifications and Detail Plates. Upon
completion of the utility improvements, the utilities will be turned over to the City
for maintenance and ownership. The applicant is also required to enter into a
development contract with the City and supply the necessary financial security in
the form of a letter of credit or cash escrow to guarantee installation of the
improvements and the conditions of final plat approval. Permits from the
appropriate regulatory agencies will have to be obtained, including but not limited
to the MPCA, Department of Health, MCES, Carver County and Watershed
District.
STREETS
The applicant is proposing two accesses to the proposed lots. On the northwest
corner of the parcel, an existing access off Galpin Lake Road will be utilized to
serve the existing house on Lot 1. Another proposed new access off Baneberry
Way will be servicing Lots 2, 3 and 4 as a private street. As such, the private
street easement must of 30-feet wide with 20 feet of hard surface pavement and
built to a 7-ton design. The developer must submit an inspection report certifying
that the private street is built to a 7-ton design. The applicant is proposing a
hammerhead turn around. At this stage, the Engineering Department and the Fire
Marshal are fine with the proposed turnaround and the removal of the existing
temporary cul-de-sac at the end of Baneberry Way.
RECOMMENDED CONDITIONS OF APPROVAL
1. Show the watermain pipe size and type on the watermain profile sheet.
2. Add the City erosion control fence detail plate no. 5300.
c: Paul Oehme, Public Works Director/City Engineer
Matt Saam, Assistant City Engineer.
g\eng\prcjects\walnut grove 2nd add\plat review.doc
CITY OF
CIIMESEN
7700 Market Boulevard
PO Box 147
Chanhassen, A 55317
Administration
Phone: 952.227.1100
Fax:952.227.1110
Building Inspections
Phone:952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952,227,1170
Finance
Phone: 952.227,1140
Fax: 952.227.1110
Park 6 Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax:952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.13110
Fax: 952.227,1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web SNe
www.ci.chanhassen.mn.us
MEMORANDUM
TO: Bob Generous, Senior Planner
FROM: Mak Sweidan, Engineer 'q 0(4117
DATE: March 8, 2004
SUBJ: Preliminary Plat Review of Walnut Grove Second Addition
Land Use Review File No. 03-19
Upon review of the plans received Feb. 12, 2004, prepared by Otto Associates, I
offer the following comments:
GRADING, DRAINAGE & EROSION CONTROL
The plans propose to grade about 25% of the site for the new house pads, a
proposed private drive way and a stormwater pond. The proposed lots are located
in the east central portion of the site. The proposed grading will prepare the site
for look -out and walk -out house pads on Lots 2, 3 and 4 Block 1. The proposed
slopes along the east side of the new private driveway are steeper than 3:1. The
City allows maximum side slopes of 3:1 otherwise retaining walls must be used.
The applicant must revise the plans to comply.
The existing site drainage flows south toward the existing creek. The plans
propose to convey the drainage from the northeast portion of the site to the private
street and cant' the stormwater via storm sewer to a proposed NURP pond. The
remaining portion of the site will drain overland to the proposed stormwater pond
and/or the creek. Staff is recommending that the elevation of the lowest opening
on the adjacent homes be three feet above the high -water -level of the proposed
pond.
Drainage calculations have been submitted for the site and some modifications are
still needed. The applicant will be required to meet the existing site runoff rates
for the 10-year and 100-year, 24-hour storm events. The proposed pond must be
designed to National Urban Runoff Program (NURP) standards. The storm sewer
must be designed for a 10-year, 24-hour storm event. Drainage and utility
easements must be dedicated on the final plat over the public storm drainage
system including ponds, drainage swales, and wetlands up to the 100-year flood
level. The minimum easement width shall be 20 feet wide.
Staff recommends that Type III silt fence be used along the south side adjacent to
the secondary bluff creek line and type II silt fence along the east and west sides
of the grading area. In addition, tree preservation fencing must be installed at the
limits of tree removal. A 75-foot minimum rock construction entrance must be
The City of Chanhassen • A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A Beal place to live, work, and play.
Bob Generous
March 8, 2004
Page 2
added to the entrance that will be accessed during construction. The applicant
should be aware that any off -site grading will require an easement from the
appropriate property owner.
UTILITIES
Municipal sewer and water service is available to the site from Baneberry Way.
The existing house on Lot 1 is already connected to municipal sewer and water.
The applicant is proposing to extend sewer and water lines along the private drive
way to serve Lots 2, 3 and 4. The proposed sanitary manholes must be low
enough to serve the basement of Lots 2, 3 and 4, Block 1 and the public utility
lines must be 10-feet inside the property line. In addition, a 30-foot wide public
drainage and utility easement must be dedicated on the final plat over the public
sewer and water lines.
According to the City's Finance Department records, the parcel was previously
assessed for one sanitary sewer and water hookup. Since the developer will be
responsible for extending lateral sewer and water service to the lots, the sanitary
sewer and water connection charges will be waived. However, the sanitary sewer
and water hookup charges will still be applicable for each of the new lots. The
2004 trunk hookup charge is $1,458 for sanitary sewer and $2,814 for watermain.
Sanitary sewer and watermain hookup fees may be specially assessed against the
parcel at the time of building permit issuance. Hook up charges are based on the
number of SAC units assigned by the Met Council for each lot.
All of the utility improvements are required to be constructed in accordance with
the City's latest edition of Standard Specifications and Detail Plates. Upon
completion of the utility improvements, the utilities will be turned over to the City
for maintenance and ownership. The applicant is also required to enter into a
development contract with the City and supply the necessary financial security in
the form of a letter of credit or cash escrow to guarantee installation of the
improvements and the conditions of final plat approval. Permits from the
appropriate regulatory agencies will have to be obtained, including but not limited
to the MPCA, Department of Health, MCES, Carver County and Watershed
District.
STREETS
The applicant is proposing two accesses to the proposed lots. On the northwest
comer of the parcel, an existing access off Galpin Lake Road will be utilized to
serve the existing house on Lot 1. Another proposed new access off Baneberry
Way will be servicing Lots 2, 3 and 4 as a private street. As such, the private
street easement must be 30-feet wide with 20 feet of hard surface pavement and
built to a 7-ton design. The developer must submit an inspection report certifying
that the private street is built to a 7-ton design. The applicant is proposing a
hammerhead turn around. At this stage, the Engineering Department and the Fire
Bob Generous
March 8, 2004
Page 3
Marshal are fine with the proposed turn around and the removal of the existing
temporary cul-de-sac at the end of Baneberry Way.
RECOMMENDED CONDITIONS OF APPROVAL
1. Prior to final plat approval, a professional civil engineer registered in the State
of Minnesota must sign all plans.
2. Sanitary sewer and water hookup charges are applicable for each of the new
lots. The 2004 trunk hookup charge is $1,458 for sanitary sewer and $2,814
for water -main. Sanitary sewer and water -main hookup fees may be specially
assessed against the parcel at the time of building permit issuance. Hook-up
charges are based on the number of SAC units assigned by the Met Council
for each lot.
3. The applicant will be required to meet the existing site runoff rates for the 10-
year and 100-year, 24-hour storm events. The proposed pond must be
designed to National Urban Runoff Program (NURP) standards. The storm
sewer must be designed for a 10-year, 24-hour storm event. Drainage and
utility easements shall be dedicated on the final plat over the public storm
drainage system including ponds, drainage swales, and wetlands up to the
100-year flood level. The minimum easement width shall be 20 feet wide.
4. Tree preservation fencing must be installed at the limits of tree removal. The
applicant should be aware that any off -site grading will require an easement
from the appropriate property owner.
Permits from the appropriate regulatory agencies must be obtained, including
but not limited to the MPCA, Department of Health, Watershed District,
Carver County, etc.
6. The applicant must enter into a development contract with the City and
supply the necessary financial security in the form of a letter of credit or cash
escrow to guarantee installation of the improvements and the conditions of
final plat approval.
7. Submit detailed construction plans and specifications for the public utility
improvements before final platting.
8. Construct public utility improvements in accordance with the City's latest
edition of Standard Specifications and Detail Plates.
9. Installation of the private utilities for the site will require permits and
inspections through the City's Building Department.
Bob Generous
March 8, 2004
Page 4
10. Seed and mulch or sod the site within two weeks of grading. Submit a haul
route for City approval prior to any hauling.
11. On the grading plan:
a. Revise the side slopes along the east side of the private drive to be a
maximum of 3:1 or install a retaining wall.
b. Add silt fence Type III along the secondary bluff creek zone line on the
south side and silt fence Type II along the west and east sides of the
grading area.
c. Show a minimum 75-foot rock construction entrance.
d. Show all existing and proposed easements.
e. Add a bench mark.
f. Show the storm sewer manhole rim and invert elevations.
12. On the utility plan:
a. Show the proposed utility lines 10-feet inside the property line.
b. Add a note "connection to existing manhole must be core drilled."
c. Show sanitary manhole rim and invert elevations.
d. Show all existing and proposed utility easements.
e. Show the location of existing water and sanitary services to Lot 1.
13. On the street and storm plan:
a. Last storm manhole discharging to the pond must include a 3-foot sump.
b. Show the proposed and existing street easements.
14. Add a legend to the plans.
15. The drive way easement must be a 30 feet wide with 20 feet of hard surface
pavement and built to a 7-ton design.
16. Submit an inspection report certifying that the private street is built to a 7-ton
design.
17. Elevation of lowest house opening must be three feet above high -water -level
of the proposed pond.
18. A 30-foot wide public drainage and utility easement must be dedicated on the
final plat over the public sewer and water lines.
c: Paul Oehme, Public Works Director/City Engineer
Matt Saam, Assistant City Engineer.
gieng\projectc\walnut grove 2nd add\prelininwy plat review l.doc
CITY OF
CIIANIIASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952,227.1180
Fax: 952.227.1190
Engineering
Phone 952.227,1160
Fax: 952.227.1170
Finance
Phone: 952,227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952,227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning g
Natural Resources
Phone. 952.227,1130
Fax 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
vewtuchanhassen.mn.us
V/
MEMORANDUM
TO: Bob Generous, Senior Planner
FROM: Todd Hoffman, Planning Director J
DATE: March 2, 2004
SUBJECT: Walnut Grove 2°d Addition; Condition of Approval Concerning
Parks and Trails
The homes being developed in Walnut Grove 2°a Addition lie within the
service area of Sugar Bush Park. The pedestrian trail along Galpin Boulevard
borders all of the proposed lots; however, access to the trail will be through
the rear yards. The single condition of approval for this addition regarding
parks and trails should be the payment of park dedication fees in lieu of land
dedication or trail construction. The fee only applies to the three new lots for
a total of $8,400.
The City of Chanhassen • � e'.m^ _cmmunity with clean lakes. quality schools, a charming dewntavr, I y ,,-e ..--' ng ua S , 2 �eae ,:ul parks. A gieat pla.e:0 1 i aY x 3'z. ;:
City of Chanhassen
7700 Market Boulevard
p Chanhassen, MN 55317 '(1t1ok
,{f'� Of (952)227-1100
MMEN
74,
Date: February 20, 2004 elk ram''
To: Development Plan Referral Agencies
From: Planning Department
By: Robert Generous, Senior Planner
Subject: Request for rezoning of 3.09 acres from A2, Agricultural Estate District to RSF, Single -Family Residential;
subdivision approval creating four lots with a variance request; and a conditional use permit for development
within the Bluff Creek Corridor, Klingelhutz Development, Walnut Grove V' Addition
Planning Case #: 04-10
The above described application for approval of a land development proposal was filed with the Chanhassen Planning
Department on February 12, 2004. The 60day review period ends April 12, 2004.
In order for us to provide a complete analysis of issues for Planning Commission and City Council review, we would
appreciate your comments and recommendations concerning the impact of this proposal on traffic circulation, existing and
proposed future utility services, storm water drainage, and the need for acquiring public lands or easements for park sites,
street extensions or improvements, and utilities. Where specific needs or problems exist, we would like to have a written
report to this effect from the agency concerned so that we can make a recommendation to the Planning Commission and City
Council.
This application is scheduled for consideration by the Chanhassen Planning Commission on March 16, 2004 at 7:00 p.m in
the Council Chambers at Chanhassen City Hall. We would appreciate receiving your comments by no later than March 5.
2004. You may also appear at the Planning Commission meeting if you so desire. Your cooperation and assistance is
greatly appreciated.
1. City Departments
a. City Engineer
b. City Attorney
c. City Park Director
d. Fire Marshal
e. Building Official
f. Water Resources Coordinator
g. Forester
2. Watershed District Engineer
3. Soil Conservation Service
4. MN Dept. of Transportation
5. U.S. Army Corps of Engineers
6. CenterPoint Energy Minnegasco
7. MN Dept. of Natural Resources
8. Telephone Company
(Qwest or United)
9. Electric Company
(Xcel Energy or MN Valley)
10. Medicom
11. U. S. Fish and Wildlife
12. Carver County
a. Engineer
b. Environmental Services
13. Other-
14.
RECEIVE©
FEB 2 0 2003
T u TT TT/�ryUG CITY OF CHANHASSEN
KJOLLmENVIRONMENTAL SERVICES COMPANY
Pmw ing Sound. Balanced. Cornprehensve Nafuraf Resource Solubons
Letter of Transmittal
TO:
NAME
COMPANY
Project
Lori Haak
City of Chanhassen
Galpin Road Site -
Chanhassen
CC:
FROM:
NAME
DATE
Copies
Description
Kelly Dlouhy
2/19/03
1
Revised delineation map
H FYI ❑ For Your Review
e Comments:
❑ Please Reply ❑ As We Discussed
26105 Wild Rose Lane, Shorewood, Minnesota 55331, Phone: 952401-8757, Fax 952401-8798
�Q
► uNuc�, ► d pi ►►L; Our vt� y
RMa
3t3It
W11
1M.
� N
JillitNcl/ / //h Alab.
/
Is
96
x
m x
N
a) m
(� vo;nmt
g
101
�
denotes iron monument
denotes iron pipe set
and marked as shown:
denotes soil boring
denotes percolation test hole
is Survey on
parcel in the SW 114 of l Klingelhutz Development
Sec. 10, T. 116, R. 23,
Carver County, Minnesota 111119102
n By. , Saab: I Checked W.
D.N.A. 1 1 "= 40'
hereby certify that this survey,
on, or report was prepared by me
- under my direct supervision and
tat I am a duty Lkmrmd land
urveyor under the laws of the
Late of Minnesota.
web site.,
WwWAttoassoClate&CM
Division St.Bh
TTowest
MB 55313
SSOCIATES
Ph.)ss24727
(76
Fair (7s(793)682.3522
Engineers and Land Surveyom Ino.
AKA
:nl
1-02-0568
It
o�- WL *?
CARVER �J�ing 219 East Frontage Road
¢t Q N Waconia, N 55387
1946 '� Phone:952-442-5101
n �//�`T�A C% 40 Fax:952-442-5497
lam( � s/�wI /[ %Iy o http,ll we.mcarver.mn.us/SWCD/SWCD maimhtml
Mission Statematc To prov(de leadership in conservation and teach stewardship of the soil, water, and related resources through a halanced,
cooperative program that protects, restores, and unproven those resources.
aw
September 23, 2003 RE��N
Robert Generous, Senior Planner
SEP 2 4 2003
City of Chanhassen CITY OF CHANHASSEN
7700 Market Boulevard
Chanhassen, MN 55317
Re: Proposed Walnut Grove Second Addition Development
Mr. Generous:
Thank you for sending a copy of the 2003-16 Site Plan, Walnut Grove Second Addition development to the SWCD
office. Please review the following storm water, erosion, and sediment control comments and recommendations.
Storm Water
Beginning March 10, 2003 all developments disturbing 1-acre or more or part of a contiguous development which
will disturb more than 1-acre require a National Pollutant Discharge Elimination System (NPDES) permit from the
Pollution Control Agency (PCA). The owner / operator of the proposed development must apply for and receive the
NPDES permit prior to begimung construction activities.
Any development disturbing more than I -acre and creating more than 1-acre of impervious surface must also have
permanent storm water treatment It appears this is being done as the Walnut Grove preliminary plan shows the
storm water runoff being managed by a proposed storm water basin.
High water levels / elevations of the pond and wetland and the elevations of the lowest level of the proposed
walkouts should be double checked. It appears the elevations of the dwellings may be too low.
Erosion Control
Riprap and geotextile fabric needs to be installed at the flared end sections of the inlet and outlet of the storm water
basin.
Sediment Control
The proposed silt fence should be extended 40 feet to the east and 20 feet to the west; the ends of the silt fence
should be angled up -slope in a crescent or `smile' formation.
A light duty silt fence should be installed between the duplexes and the storm water pond following the outlet
installation and during home construction.
Inlet control is needed following installation of inlet structures. Inlet control methods will be varied before and after
pavement of the street Before pavement, inlet protection could consist of heavy-duty mono -mono silt fence with 4
foot spacing of metal T-posts and I" rock around silt fence material. After pavement, mulch socks, sand bags or
rock and wire could be used as temporary inlet control.
If there are any questions regarding this review please contact the SWCD office.
Sin ,
Aaron Mtyn CPESC-rr
Urban Conservation Technician
AN EQUAL OPPORTUNMY EMPLOYER
[Insert List Name and Address of Local Government Unit Here]City of Chanhassen - 7700
Market Boulevard - P.O. Box 147 - Chanhassen. MN 55317
Name of Applicant: Klingelhutz Development - P.O. Box 89 - Chaska, MN 55319
Application Number: n/a
Type of Application (check one):
❑ Exemption Decision
❑ No Loss Decision
❑ Replacement Plan Decision
❑ Banking Plan Decision
® Wetland Type/Boundary Decision
Date of Decision: September 15, 2003
Check One: ®Approved ❑ Approved with conditions
List of Addressees:
[Landowner]
Klingelhutz Development, Attn: Tom Heiland
[Members of Technical Evaluation Panel]
Chip Hentges, Carver SWCD
Lynda Peterson, BWSR
❑ Denied
[Watershed District or Watershed Management Organization (If Applicable)]
Bob Obermeyer, Riley -Purgatory -Bluff Creek Watershed District
[Department of Natural Resources Regional Office]
Julie Ekman, Area Hydrologist
DNR Wetlands Coordinator @
Ecological Services Section
500 Lafayette Road, Box 25
St. Paul, MN 55155
Corp of Engineers Project Manager @
Department of the Army, Corps of Engineers, St. Paul District
ATTN: CO-R, 190 Fifth Street East
St. Paul, MN 55101-1638
[Individual members of the public who requested a copy, summary only]
Kelly Dlouhy, Kjolhaug Environmental
- Page 1 of 2
Klingelhutz Galpin Site Delin Notice (April 2003)
1
'l ftr\M•RGIe'"- L
I��,eUwfz Dak19a+���
Co5ka-
Irk C*"-fAJr
A--Soc. IVit "'iJ
Marty Campion, Otto Associates (via facsimile)
You are hereby notified that the decision of the Local Government Unit on the above -
referenced application was made on the date stated above. A copy of the Local Government Unit's
Findings and Conclusions is attached. Pursuant to Minn. R. 8420.0250 any appeal of the decision
must be commenced by mailing a petition for appeal to the Minnesota Board of Water and Soil
Resources within thirty (30) calendar days of the date of the mailing of this Notice.
[LOCAL DOVE NT UNIT]
Member 15, 2003
t ature Date
Water Resources Coordinator
Title
- Page 2 of 2
Klingelhutz Galpin Site Delin Notice (April 2003)
FINDINGS AND CONCLUSIONS
City of Chanhassen
7700 Market Boulevard a P.O. Box 147 a Chanhassen, MN 55317
Name of Applicant: Ydingelhutz Development
Project Location: SE Comer of Galpin Blvd & Walnut Cv, Chanhassen (T116N R23W S10)
Type of Application (check one):
Date of Decision: September 15, 2003
❑x
Exemption Decision
❑
No Loss Decision
❑
Replacement Plan Decision
❑
Banking Plan Decision
Findings and Conclusions
The applicant submitted a wetland delineation of the above site. The wetland edge was
surveyed by a registered land surveyor. According to the survey received September 12,
2003, the wetland boundary is the same as the one identified on site by City and Carver
Soil and Water Conservation District staff in January/February 2003.
CITY OF CHANHASSEN
Bl�-Y,�
Title: Water Resources Coordinator
Date: September 15, 2003
09/11/2003 08:29 9524018798 KJOLHAUG ENV PAGE 01
•COMTANy
PMWI*V Sam4 OMrx+d Conpeh@IWM NO&MW Rmwm SaJW ns
Fax
TO:
NAME
COMPANY
FAX NUMBER
L 6 Haak
City df CM
(952) 937-5739
tx:
Merry ��
Otto P.•v O=tes
(763
FROM:
NAME
DATE
# of Pages (kK*jdiig this Pagel
Kelly Dlou by
9M IQ=
3
RE: KSngelhutz 1)8 ebpmerd Galpin Road, Chanhassen
❑ FYI Ef For NaarRiviaw 0 Please Repay to As We DivLw
• Comments:
Attached is a memo and figw r: regarding the Galpin Road wetland delineation and request for
approval. I will also be sendi tg the same materials by mail.
28105 VVHd Rose Lena, Sho iwsood, Mkmeeota 55331, Phone: 9624U1a757, Feu 952 401-6798
09/11/2003 08:29
9524018798
KJOLHAUG ENV
PAGE 02
�j(
KJC UMUG ENVIRONMENTAL SERVICES COMPANY
Memorandum
Date: September 11, 2003
To: Lori Hank, Water Res,rurces Coordinator, City of Chanhassen
Cc: Marty Campion, Otto Nssociates
From: Kelly Dlouhy, Kjolhau 2, Environmental Services Company
Re: IGingelhutz Development, Gilpin Road, Chanbassen
This memo is to act as a revision i to the Wetland Determination Report for the Gilpin Road Site
in Chanhassen, Minnesota, dates l Der -ember 4, 2002.
As determined during the on -sit ; review in February, a small area of wetland was identified and
delineated on the site (Figure 1). The location of the boundary was based in part on a monotypic
stand of reed canary that was wi thout interspersed upland species. Scattered upland species were
mixed with reed canary grass in areas excluded from the wetland. Additional determining factors
included slight topographic char ges and observations of free water approximately 20 inches
below the soil surface in a soil p: i dug at the lowest point of the delineated area. Data sheets
reflecting conditions in the delin sated wetland were part of the original determination report.
It is also our understanding that the wetland described above would be part of the Primary
Overlay District within the Bluff Creek Watershed Area (re: your memo dated 3/5/03).
I ask that you review the enclose d materials as we are seeking a letter of concurrence for the
wetland delineation. Please cons act me if you need more information to issue an approval.
26105 Wild Rose Lane, Shor wood, Minnesota 55331, Phone: 052-401-8757, Fax 952-401-8798
--
09/11/2003
08:29 9524018798
N
�f
4LrK(qr--GHurz D�dEcoPnrENf
C-,A4PIA QoAo
CNAN�;Ass��
R1n�99}
Awe7Y /
KJOLHAUG ENV
xu \ \
all" API
to
APIgzz;r Aft
PAGE 03
x 99fl77
H 968.gY L
Y
�r p
wxa9 flb \ 91 l� I -YOU( d
\ N'� P NOW
I I
Ad
+997Y9
A.
\ �� 7Q
\ \ \ \ \ \ CX91/Abe
/
\ \ \ \
L*4
-cY A52 -
-
HC70A € G
RECEIVED
SEP 12 2003
CITY OF CHANHASSEN
KJoLHAUG ENVIRONMENTAL SERVICES COMPANY
Pr wdl?g Sound, Balanced, Compreheraw NaNral Resource Solutions
Letter of Transmittal
TO:
NAME
COMPANY
Project
Lori Haak
City of Chanhassen
KGrgelhutz Development,
Chanhassen
CC:
FROM:
NAME
DATE
Copies
Description
Kelly Dkwhy
91112m
1
Memo, Wetland Detemrnation Report
❑ FYI H For Yew Redew ❑ Plea" Reply ❑ As We Discussed
0 Comments:
Enclosed are the memo, figure and another copy of the determination report for your use.
Please contact me in you require more information for the delineation approval.
26105 Wdd Rose Lane, Sharcwood, Mimesots 55331, Phone: 952-4018757, Fax 952-4018798
� �(' ��Tr/r
�joLHAUG ENVIRONMENTAL SERVICES COMPANY
Re &mSS&wiA Bvlanwd, Gunpreh d Xatmal Rwur Sdwimu
Memorandum
Date: September 11, 2003
To: Lori Haak, Water Resources Coordinator, City of Chanhassen
Cc: Marty Campion, Otto Associates
From: Kelly Dlouhy, Kjolhaug Environmental Services Company
Re: Klingelhutz Development, Galpin Road, Chanhassen
This memo is to act as a revision to the Wetland Determination Report for the Galpin Road Site
in Chanhassen, Minnesota, dated December 4, 2002.
As determined during the on -site review in February, a small area of wetland was identified and
delineated on the site (Figure 1). The location of the boundary was based in part on a monotypic
stand of reed canary that was without interspersed upland species. Scattered upland species were
mixed with reed canary grass in areas excluded from the wetland. Additional determining factors
included slight topographic changes and observations of free water approximately 20 inches
below the soil surface in a soil pit dug at the lowest point of the delineated area. Data sheets
reflecting conditions in the delineated wetland were part of the original determination report.
It is also our understanding that the wetland described above would be part of the Primary
Overlay District within the Bluff Creek Watershed Area (re: your memo dated 3/5/03).
I ask that you review the enclosed materials as we are seeking a letter of concurrence for the
wetland delineation. Please contact me if you need more information to issue an approval.
26105 Wild Rose Lane, Shorewood, Minnesota 55331, Phone: 952401-8757, Fax: 952-401-8798
\
Topographic Survey
bi 3A�
n \ , CgRVFR CO N Z
\ vyfryZ !}'
— °'r
01
xt—
CP
7.4
a xf
/ N
k o +
3ta puu 1 ,;r ,
o a'
°
fix¢ " F
kill
fit
rl� �
0 denotes iron
monument found
Survey on
Requested '
By:Topographic
denotes iron
and marked
pipe set a„p,,,,,
pi shown: a a
ponce/ in the SW 1,4 of
Klingelhutz Development
6 denotes soil
boring
Sec. 10, T. 116, R. 23,
Date:
Drawn B .
scale:
checked By.,
G denotes percolation test hole Carver County, Minnesota 11/19102 1 D. N. A. 1 1 "= 40'
*by certify that this survey,
or report was prepared by me
ider my direct supervision and
I am a duly Licensed Land
ryor under the laws of the
of Minnesota.
E. Otto
All �9
FIGURE 1
web Site: 1/20/03 DAA
ottoassociates.cont •+aaad
S West Division 13
Buffalo, MN 55313 �b No
?MF��Faic. (7533)82LM7
(763)6823522
atd Land Surveyors, foc. 1-02-05E