Loading...
CAS-17_CHANHASSEN SPECIALTY RETAIL (TOTAL WINE) FILE 1 OF 2VILLAGES ON THE PONDS 7/9/2015 DEVELOPMENT g:\plan\bg\Villages building area Presbyterian Home --_-- St. Hubed Expansion Pond Promenade E g:\plan\bg\Villages building area VILLAGES ON THE PONDS DEVELOPMENT g:\plan\bg\Villages building area 7/9/2015 L� g:\plan\bg\Villages building area VILLAGES ON THE PONDS DEVELOPMENT 0 7/9/2015 L7 • ►5-17 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION Application of Venture Pass Partners, LLC and Northcott Company for Subdivision, Site Plan and Planned Unit Development Amendment approval. On July 7, 2015, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Venture Pass Partners, LLC and Northcott Company for preliminary plat, Planned Unit Development Amendment and site plan approval for the construction of a 19,909 square -foot specialty retail building. The Planning Commission conducted a public hearing on the proposed subdivision preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1. The property is currently zoned Planned Unit Development, PUD. 2. The property is guided in the Land Use Plan as Mixed Use. 3. The legal description of the property is: Outlot B, Villages on the Ponds Fourth Addition. 4. The Subdivision Ordinance directs the Planning Commission to consider seven possible adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding them are: a. The proposed subdivision is consistent with the zoning ordinance and meets the standards of the Village on the Ponds Planned Unit Development; b. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan since the site is guided for mixed use development which includes commercial or multi -family residential; c. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; d. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter, e. The proposed subdivision will not cause environmental damage; SCANNED 0 f. The proposed subdivision will not conflict with easements of record; and g. The proposed subdivision is not premature since adequate infrastructure is available. A subdivision is premature if any of the following exists: 1) Lack of adequate storm water drainage. 2) Lack of adequate roads. 3) Lack of adequate sanitary sewer systems. 4) Lack of adequate off-site public improvements or support systems. 5. Site Plan. In evaluating a site plan and building plan, the city shall consider the development's compliance with the following: a) The proposed project is consistent with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; b) The proposed project is consistent with the Site Plan Review requirements of City Code; c) The proposed project preserves the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing areas; d) The proposed project creates a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; e) The proposed project creates a functional and harmonious design for structures and site features, with special attention to the following: 1. An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community, 2. The amount and location of open space and landscaping; 3. Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and 4. Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. f) The proposed project protects adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light 0 0 and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. 6. The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse effects of the proposed amendment. The six (6) effects and our findings regarding them are: a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. FindinE: The site is guided mixed use (residential and neighborhood commercial). A retail building is a reasonable use in that location. b) The proposed use is or will be compatible with the present and future land uses of the area. Find: The proposed use is and will be compatible with the present and future land uses of the area through the implementation of the design standards, landscaping, architecture, etc. c) The proposed use conforms with all performance standards contained in the Zoning Ordinance. Findin : The proposed use will conform with all performance standards contained in the Zoning Ordinance such as design standards, signage, durable materials, uses, etc. d) The proposed use will not tend to or actually depreciate the area in which it is proposed. FindinE: The proposed use is intended to meet the daily needs of the area. It could potentially add convenience to the homeowners in the area. e) The proposed use can be accommodated with existing public services and will not overburden the city s service capacity. Fes: The site is located within the Municipal Urban Service Area. The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. f) Traffic generation by the proposed use is within capabilities of streets serving the property. FindinE: Based upon traffic studies conducted by the applicant's traffic engineer, traffic generation by the proposed use is within capabilities of streets serving the property. 6. The planning report 42015-17 dated July 7, 2015, prepared by Sharmeen Al-Jaff, eta], is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve the Preliminary Plat (Villages on the Ponds I I' Addition) and site plan with a variance for Chanhassen Specialty Retail (Total Wine & More). ADOPTED by the Chanhassen Planning Commission this 7t" day of July, 2015. CHANHASSEN PLANNING COMMISSION Its Chairman Cf 0 0 CHANHASSEN PLANNING COMMISSION REGULAR MEETING JULY 7, 2015 Chairman Aller called the meeting to order at 7:00 p.m. MEMBERS PRESENT: Andrew Aller, Mark Undestad, John Tietz, Nancy Madsen, Steve Weick, and Lisa Hokkanen MEMBERS ABSENT: Maryam Yusuf STAFF PRESENT: Kate Aanenson, Community Development Director; Bob Generous, Senior Planner, Sharmeen AI-Jaff, Senior Planner, and Alyson Fauske, Assistant City Engineer PUBLIC PRESENT: Ray Schenk 1130 Dove Court Mike Glaccum 1510 Lake Lucy Road Jim Slattery 1990 West 7801 Street Michael Graenez 7600 West 7801 Street Jay Kronick 78 West 7816 Street Brian H. Burdick 600 Market Street Judy Anderson 8584 Flamingo Steve Friedrichs 8955 Southwest Village Peter Adolphson 8980 Reflections Road Matt Hanna 8863 Lake Riley Drive Craig Claybaugh 1630 Lake Lucy Road PUBLIC HEARING: CHANHASSEN SPECIALTY RETAIL, PLANNING CASE 2015-17: REOUEST FOR AMENDMENT TO PLANNED UNIT DEVELOPMENT: SUBDIVISION OF APPROXIMATELY THREE ACRES INTO ONE LOT AND ONE OUTLOT (VILLAGES ON THE PONDS 11TH ADDITION) AND SITE PLAN REVIEW TO CONSTRUCT A 19.909 SQUARE FOOT SPECIALTY RETAIL BUILDING (TOTAL APPLICANT/OWNER: VENTURE PASS PARTNERS, LLC/NORTHCOTT COMPANY. Aanenson: Before you begin Chairman and members of the Planning Commission, again I would remind you within your purview is what we're to do with the application is the site plan review. There's actually 3 actions with that for the specialty retail, site plan review, PUD amendment and a subdivision so again any comments on merits of the liquor license is outside of your purview. Again we ask that anybody that has comments on that. Some people have submitted things in writing which we forwarded to you but we're, it's also out of your jurisdiction or purview to comment on that so we would be forwarding those to the City Council SCANNED 0 0 Chanhassen Planning Commission — July 7, 2015 so anybody that wants to speak on that we would certainly recommend that you attend the City Council meeting on the 27th and with that I'll turn it over to Sharmeen to make a presentation. A] -Jaffa Chairman Aller, members of the Planning Commission. The site that we are looking at today is located at the northwest corner of Lake Drive and Main Street. It is within the development of Villages on the Ponds which is a mixed use development encompassing residential, institutional, as well as commercial developments. At this point I will turn it over to Kate Aanenson, the Community Development Director to provide background and history on this development and when she's done with that part of it we will look specifically at the specialty retail development proposal. Aanenson: Thank you. Because there's some new planning commissioners I thought I'd just give a brief background of Villages on the Ponds because this is a unique sitting. So in 1995 we started the process of putting together Villages on the Pond. At that time St. Hubert's Church was looking for some property to provide for an institutional use and they were looking across the street, that 66 acres and so the City had some goals. The developer at that time had some goals and we ventured forth on working together to do a new urbanism project which at the time was pretty unique. We were one of the fust communities to go through the Livable Communities at the time through the Met Council. We actually did a horizontal/vertical mix and there's shared parking throughout this whole project so that's one of the things that I wanted to explain to you. And also we have private streets in this development. One of the unique attributes of this is that there's parking on street which we don't have in other developments and you'll see this with this application too, there's opportunities for shared parking and on street parking so in order to do that the engineering department recommended that they be private streets so they maintain internally their own streets except there's a public loop that goes through that the City does maintain so we've looked at institutional uses. Retail uses as a core component and then residential and one of the first ones to go in was the apartments across 101. The Powers Ridge Apartments and then kind of the core was St. Hubert's Church so we've been adding to that. We've actually made very few amendments to this which is kind of hard to believe when we put this together in 1995 kind of looking for, we certainly saw there was components that were important. We always saw something unique of kind of a boutique grocery store which is something that came in and then some of the other supporting things such as Presbyterian Homes and opportunities for residents that live within there also to take advantage of you know shopping within and walking so there's only one fast food drive thru in that which the staff recommended but the council recommended approval for that but there's only one drive thru restaurant in there. Otherwise it is a unique development so again going back from 1985 to '96 this also had an Environmental Assessment document on it so when we go through each project we measure to make sure that we're staying within the industrial commercial institutional quadrants and then checking for the parking and as you see in the staff report tonight we'll also share with you kind of that tabulation of parking. Those are all the things that we look at with each project that goes forward. So again we created this master PUD which was a couple, a year, year and a half worth of work. Again the design standards the uses, those are all part of the PUD so this use in itself, the 20,000 square foot was one of the things that we said was the maximum to meet within this PUD because we wanted these to be kind of more smaller and not big box type uses so that was the goal on this. And that they also be more 2 0 0 Chanhassen Planning Commission — July 7, 2015 highly articulated for this district so with that just wanted to give you that background and how that all works and I'll tum it back over to Sharmeen. Aller: Thank you. Al-Jaff: Thank you Kate. Briefly so the application before you today is consists of three components. The first one is a subdivision to replat an outlot into a lot and an outlot, there is a site plan for a 19,909 square foot retail building and then a planned unit development amendment to the sign criteria as far as the location of the individual letters as well as the height of each individual letter. This application is going to follow the exact same process that we have gone through in the past since 1995 as each building comes in. So far we've had 12 buildings built within Villages on the Pond. Those include retail, residential as well as institutional buildings. So again this application before you is going to follow that exact same process. One of the components of the overall development was, and I apologize if I repeat a few things that Kate already went through. One of the components that was studied with the overall development and through the environmental assessment worksheet for this development was parking. It was intended to always have shared parking and anything that you see on this overall plan for Villages on the Ponds that is highlighted in yellow is shared parking. I need to point out that there are a few buildings, specifically the residential as well as the community bank that has underground parking. Staff has not included those numbers with the overall calculations. The overall development is required to provide 1,631 parking spaces. They have provided 1,712. So the site plan that is before you, and that's, that will be the first item that we will cover is for a 19,909 square foot retail building. As part of looking at this development and because this is a planned unit development, this site has to comply with the ordinance requirements for Villages on the Ponds. One of the things that they are required to do is not to exceed 70 percent hard surface coverage. Again this is a planned unit development. Whenever we have this type of development, hard surface coverage is calculated over the entire development of Villages on the Pond rather than on each individual site and when this development was approved the City ensured that there was a permanent open space that exceeded 30 percent. The reality is the open space for this overall development exceeds 45 percent. The majority of the parking is located west of the building. The architecture of the building and the design is attractive. It is proposed to be constructed of high quality materials that are complimentary to the surrounding buildings. They include rock face block. Accent block. Concrete utility. There are awnings above all of the, all of the windows with the exception of specifically the ones that are located next to the loading dock and the only reason for that is to ensure this is the elevation where the loading dock is going to be located and it is to avoid any accidents as pick up trucks are backing up. All elevations that can be viewed by the public on all four sides have received equal level of attention. We need to point out that we worked with the applicant for a long time and they have truly cooperated with the City. They have revised the design and basically met the direction that staff asked them to. One of the things that we needed to show you is there is a green wall that is being introduced along the south elevation of the site. All of the, there are areas where they could not put in windows so they put spanrow windows on the building. The roof line there is enough movement and there are pitched elements. It's a building that meets all of the design criteria. The lights that are proposed on the building are shielded. They meet ordinance requirements. Shoe boxes will be used in the parking lot and again shielded fixtures in, on the building itself. One of the things that the PUD recommended was the use of light fixtures on the 0 Chanhassen Planning Commission — July 7, 2015 building to minimize the number of parking lot lights and that's exactly what they are doing. The second item that we need to address is signage on the building. The applicant is requesting signage on all four sides of the building which is permitted under the planned unit development. They are also requesting the signage to be located higher than 20 feet above the ground elevation and this is what staff will explain in a moment. Also the signage facing the north and the west elevation, they are requesting that the letters be larger than 30 inches. The limit by ordinance in this planned unit development is 30 inches. So the one thing that we need to also talk about as far as background on this area is the fact that this development when it was first looked at and studied it was divided into four sectors and the ordinances that govern this development were written around those four sectors. They took those sectors into consideration. So Sector 1 which is where this development is located is a mixed use of commercial and residential. Sector 2, which abuts Highway 101 as well as Highway 5 is highway exposure type of development. And then Sector 3 is institutional, which is where you see St. Hubert's and 4 is strictly residential which is the Lake Susan Apartments. So as I mentioned we've got the 4 sectors. When the sign criteria for Sector 2 was written it allowed them to put up signage that was higher, taller than 20 feet and the individual signs, the individual letters within Sector 2 could exceed 30 inches. As staff started looking at Sector 1 and how it compares to Sector 2, specifically when it came to the signage, and looking at previous requests that have come before the City on previous applications on that specific site requesting the exact same variance. Requesting letters that were planed higher than 20 feet above the ground and the size of the letter being taller, we started asking why is this happening and what was it that happened before when we first looked at this development that we didn't maybe notice at the time. So what we found they did have in common is this site did have exposure to Highway 101. There's nothing blocking that exposure to Highway 101 or Highway 5. You've got that view that continues to those two elevations. In those two directions. The distance is 550 feet from Highway 5. It is 620 from Highway 101. As mentioned earlier, oh initially they came in. They requested a variance and we said rather than applying for a variance, which the City has granted in the past on previous applications, let's fix the planned unit development and amend it so that anything that we do is going to apply to everyone within this development rather than one individual building. And based on that staff is recommending only the north and west elevations within Sector 1 to be allowed to go above the 20 feet. But in addition to that rather than just saying let them go higher as well as larger letters those, we also added a line that ensures the signage is actually complimenting the architecture of the building. The intent is not to have a specific portion of an architectural feature of the building extending higher than the rest of the building just to advertise the signage. The intent is to have the signage compliment the architecture of the building. And if you look at this building, if you look at this building there is an EIFS band around the entire upper level of the building. The top of the building. It's framing it and in all honesty this is where the signage belongs. They can meet ordinance requirements. The design of the building will be compromised if you lower the signage. It is staff's opinion that the location of the proposed signage will compliment the design. Aanenson: And I just want to add a couple more things to that. So they came in with the variance application as Ms. Al-Jaff has stated that in the previous application for specialty grocery the Planning Commission, as did the City Council approved that variance so in that variance situation you're approving just that one use so instead of doing that we said let's put everybody in that sector and treat them equally so anybody else in that same situation. What we 4 0 0 Chanhassen Planning Commission — July 7, 2015 learned from our previous experience with the Children's Learning Adventure, when you sometimes have exaggerated architectural elements to accomplish your sign so in this circumstance we put language in this PUD that you wouldn't have that so it's really more integral to it. So what we're doing is instead of just treating this with a variance we're saying everybody in this same sector would get that same treatment. Al-Jaff: And staff is recommending approval of this planned unit development amendment. The ordinance that would allow this change. The final request is for replat of an outlot into a lot and an outlot. The lot is going to house the building. The retail building and the outlot will contain some parking as well as private streets. Staff is recommending approval of this application including the preliminary plat, planned unit development and site plan request and I'll be happy to answer any questions the Planning Commission may have. Aller: Any questions at this time? Commissioner Weick. Weick: Yeah, just a point of clarification moving backwards. Why create the Outlot A and not just have one lot? Is there a reason for that? Al-Jaff: The outlot, whenever you have private streets, there is an option of either having them within an easement or on, within an outlot. In this case we... Aanenson: They're common to the rest of the HOA. There's a HOA that governs everything in that association so we've kept that all, except for the public streets that we manage. Weick: Thank you. Aller: Commissioner Madsen. Madsen: I have a question about traffic flow and what affect would this anticipated traffic increase have on busy intersections nearby. For example the Lake Drive and 101 intersection on the west side and then the Lake Drive intersection on the east side near by the Marathon gas station. Fauske: If I may answer that question. A detailed traffic analysis was not completed with this development because the use was compatible with what the planned unit development had envisioned for the area. Certainly I think the applicant might be able to speak in greater detail as far as what kind of traffic they anticipate they would capture. Are they getting folks that are already on the roadway and just will stop in on their way to pick up something from their stores or is it a destination? We don't feel that there's any, that there would be any negative impacts to those intersections but we will monitor that and you know residents are good about letting us know if there's an issue and we can address that at the time if need be. Madsen: Okay, thank you. Aller: Commissioner Tietz. 0 0 Chanhassen Planning Commission — July 7, 2015 Tietz: Yeah, question regarding the parking that would be on Outlot A across from Houlihan's. South of Houlihan's and east of Bookoo. Is that then the responsibility of the developer to build and construct because that's in that private road zone? A]-Jaff: It is intended to be built as part of this. Tietz: Of the development. A]-Jaff: Development, correct. Aller: Would the HOA maintain? Aanenson: Correct. The private streets, that's correct. Aller: With the lighting, has there been any indication that there would be an impact to safety at all? Is there any concern from the sheriff's department? Fauske: Not that we've been made aware of Chairman Aller. Aller: Otherwise the lighting meets our codes. 90 degree shielded. The amount of parking that was provided has always been the intent so we're exceeding that right now with the shared parking. Al-Jaff: That's correct. Aller: The impact on grading and drainage, do we have a SWPPP plan? Aanenson: Yes, we had that in the staff report. The grading and drainage. It's relatively flat. Did you want to comment on the drainage? How they're managing that. Fauske: Just an additional comment to add to that Kate. Originally the site, the proposed site development included some underground parking so if you look on the aerial on page 4 of the staff report. Or actually on page 2 as well, it appears as though there's a pond on the site and that's simply rain water that went into the excavated area. The area that was excavated for underground parking. It's not a jurisdictional wetland. It wasn't intended to be, it was not intended to be a stormwater management pond. It was simply the low area that they had graded in anticipation of the site development that never came to fruition. Aller: And it's my understanding from the report that the proposed maximum rate of runoff will actually decrease for the entire area as a result of what has been proposed. Fauske: Yes. From the original PUD approval the rules for stormwater management have changed significantly in 20 years and as a development comes through site plan approval and subdivision they are required to meet the current standards for stormwater management and on this site what the applicant has proposed is some pervious pavement within the parking area and then an underground system in order to meet the requirements of the City. And then they will 0 0 Chanhassen Planning Commission — July 7, 2015 also work with the watershed district to ensure that they meet the watershed district requirements as well. Tietz: Alyson are there examples here in the city where pervious paving has been used and the systems have been effective? Fauske: Yes, actually the public works site has some porous pavement in the parking area just to the south of the building. And then in the 2014 street project we also had a porous pavement parking lot next to Bandimere Park. The west, pardon me. The east side of Bandimere Park. It's not a fully functional area at this time but we do have some examples where. Tietz: So we have standards that will be enforced and applied to this project? Fauske: Yes. There's an industry standard within the surface water management community with, as far as void space and it has to infiltrate at a certain rate and there's, we do have equipment that can measure those quantities. Aller: Then with the modification of the PUD what we're doing is leveling the playing field basically for anyone else that's in that fust phase or phase 1. Aanenson: That's correct. Aller: So anyone that wants to modify, as long as it doesn't, it meets all the criteria of the new PUD requirements can do so at this time without coming in and asking for a variance. Aanenson: That's correct. Aller: Any additional questions at this time? Hearing none we'll ask the applicant to come forward if they desire to do so and make a presentation. Welcome sir. State your name and address and representational capacity please. David Carland: Good evening commissioners. My name is David Carland. I'm President of Venture Pass Partners. Our corporate address is 19620 Waterford Court in Shorewood and with me tonight I have Jim Ottenstein and Randy Rauwerdink, also of Venture Pass Partners. This is a re -tooled version of the Traders Joe specialty grocer site plan that the Planning Commission and City Council approved last October. If you recall that was 14,000 square foot grocery building along with 8,000 square feet of associated strip so in terms of overall square footage it's very close to what was approved previously. You know unfortunately and you know for some complex reasons we weren't able to put that together and this is kind of the reincarnation for lack of a better term of that. Of that project which we're of course excited about. We worked long and hard with staff and we're happy with the finished product and I guess we thank them for the inspiration they gave us. At the end of the day you know for not a whole lot of cost the client thinks the building, it's an improved building. We think it's an improved building and city staff does as well so we were happy to go through that process with the City. We believe that the project meets all the zoning ordinances. We believe we meet all the design guidelines. We've, you know we've submitted this application as a specialty retail building and the building could 0 Chanhassen Planning Commission — July 7, 2015 be a clothing store. Could be a pet supply store. Could be sporting goods or anything that's a permitted use within the zoning district including a liquor store because there's a simultaneous application for the same property address for Total Wine we thought that it would be forth coming and above board at least in our planning application to identify that as our contemplated tenant which it is indeed Total Wine and More is the contemplated tenant for the project. In terms of parking they generally, for this size of a store, which is significantly smaller than other stores that they've done in the Twin Cities. This is the first store that's a new construction ground up. The other stores have been you know ones that they've inherited from existing shopping centers and previous users. They feel like 80 parking spots would be adequate. By code we're providing 100 but we're also, if you count the additional stalls that we're providing on the outlot we're providing 158 so we're actually adding 58 overall parking spots for use within the overall development. I think that's a good overview. I was going to have Randy who handles our architecture just give you a, maybe just some brief bullet points on some of the architectural enhancements we've made to the project if that's appropriate. Aller: Thank you. Randy Rauwerdink: Thank you Dave. Randy Rauwerdink with Venture Pass Partners. I'll reiterate what Dave said. We worked very closely with Sbarmeen and with our design team from Tushie Montgomery Architects and Sambatek Engineering and it kind of turned into a bit of a design sharret but a very successful one and product that we're very pleased with. Keeping in mind all of the articulation requirements and sloped roof and glass requirements I think we've put together a very attractive building and a very pronounced protruding brick entrance element. Arched, transom glass over the entrance. Featured towers on the comers. EIFS insets and arch work. Multiple different details of protruding awnings both in fabric and standing seam metal. Metal hipped roofs. A lot of architectural interest in terms of texture through pigmented burnish block. Rock faced block. Full brick. EIFS. The metal awnings we discussed. Store front and windows on all four elevations. Details in the cornice work. I think just a lot of very nice detailing that's consistent on four sides of the building. We also enhance that with vertical landscaping and strategic screening areas, be the loading docks. The trash areas. Trellis roofs over the trash area. Sharmeen mentioned a little bit our, kind of that eco mesh growing or living wall. Just a large curved element on Main Street that's covered with clematis, flowering vines and just adds additional articulation. And along with bike parking and benches and then back to the watershed issue, that whole parking lot. Following up on the engineer comments here. Really all of the parking stall bays within the interior parking field are all pervious pavers. Contemplated as pavers as opposed to pavement and that's kind of a direct result of our coordination with Riley -Purgatory watershed district. Very stringent requirements that are really new to 2015 kind of that haven't been, haven't been felt by probably any other parcel in this development today. What's unique about this parking lot is that entire structure underneath our parking field is about a 3 foot deep section of, it's a heavy rock. Basically 40 percent void space that's providing a lot of the capacity given soils that aren't really conducive to infiltration within this development. That's all laden with a serpentine of perforated drain tile and some kind of proprietary contact type filter structures so there's a lot of effort. Unfortunately a lot of expense and money into that parking field but that's what it took to comply with the Riley -Purgatory requirements. And then just following up on the parking again. You know obviously the outlot is Pond Promenade. A road to the north and to the west with extensions of the private road 0 0 Chanhassen Planning Commission — July 7, 2015 which are bearing almost 70 new improved parking stalls in addition to the 80 plus that we have interior to the parking field so those are really I would say to the benefit of all of those parcels around us and far exceeding what had to be there so yeah Pond Promenade is fully improved surface. Curb and gutter. All new parking in addition to all the improvements to the interior of our lot. I think that's probably the best highlight. I just want to again thank Sharmeen for her help and for the cooperation that we had with her and our architects on pulling this together. Aller: Great, thank you sir. Aanenson: I just want to add one comment just for some of the new Planning Commissioners that the use of sparrow glass. I just want to, because sometimes people don't always see where we have a lot of it around town. It's actually quite a bit of it's on Houlihan's. We have it in Target. Office Max on West 7e Street. There's quite a bit there and I would say probably another user that has a security issue would be the two more recent Walgreen's also has quite a bit. The one up on Highway 7 and the one right downtown also has quite a bit of use of the spanrow glass too so it's an opportunity to get the fenestration that we required and then also adapt to a user that has, whether it's freezer space or an example of the restaurants where they have cold storage or Walgreen's that has pharmaceutical areas that they want secure, it is an opportunity to meet our ordinance and still get an attractive building so. We've also learned that sparrow glass is different qualities and grades and we've got ten really good at making sure we see samples of those before they go on too. Aller: Any additional questions at this time? Okay, hearing none we'll open the public hearing portion of this matter so anyone wishing to come forward can do so at this time. You can step forward to the podium and state your name and address sir and your position either for or against the item or a comment. Ray Schenk: Thank you. My name's Ray Schenk. I live at 1130 Dove Court. Aller: Welcome Mr. Schenk. Ray Schenk: I'm a resident of Chanhassen for 22 years and I'd like to thank staff. They seem to represented real well what this development was originally intended to do. Some of the things I remember back when it was first up is that it was going to have this old time feeling like you were in a downtown area. Kind of small town where you'd have apartments upstairs and a shop down below and I don't think we've fulfilled any of those dreams yet. We have some big nice apartments. Some senior living which is really nice. You know I think those are some nice things there but one of my least favorite places to go is over in that area because it's hard to park. The traffic is not so good. The radiuses on all the comers are much too small. The roads are very narrow. I feel like it will be the same of situation that the Cub Foods where the loading dock has this huge, big concrete post so that the trucks don't hit it but the radius was never big enough for them to make the turn so you put a post and rocks and they get pushed out of the way by the semi's and there's just not good access and then if you're coming down the main part and you make your right hand tum to get out, you always wind up hitting the curb. You just see, it's always covered with people's tire marks because the radiuses aren't right. This development has many, many features just like that. The on street parking is very difficult when it's parallel and 0 0 0 Chanhassen Planning Commission — July 7, 2015 very tight together and I don't think that was the original intent when we went through and did the planning years ago. I think you know with some different buildings that got put in I think some of that intent has gone away and I think for people that have been in town a long time, we've had a lot of arguments about signage and unfairness about signage so I'm a member of Family of Christ and when they asked for a signage variance they were denied. I know other businesses have asked for signs on multiple sides of the building and have been denied. I would encourage not to have multiple sides on buildings of signage and tall signs and big lights. I don't like that look. I don't think it's fitting of our community. I don't think it fits what we try to portray and why we're picked as a great place to live every, you know many times in magazines and things. I mean we've done a really good job of planning. I don't think we should change that. I don't think we should go for bigger signs and more lights. Less lights. Smaller signs. Smaller buildings. More parking. Bigger radiuses on comers and wider streets so it's easier to go. If you look at the way this is built, as you drive through all the sight lines changed. It's made so that you'd park your car and you'd walk through this area and people don't do that. This isn't a big store like this won't make that happen. It's, I just don't see that it is what the vision was. I know it fits the numbers and I know they're being good about that and they're really watching careful and doing a good accurate job but it wasn't the original intent and I don't think that it should continue on and I definitely don't want any changes on the signage. I just think that's just totally wrong and unfair to any other business in this town that's wanted that request. Parking. Added parking spots that you're talking about right now are gravel by Houlihan's and they're full. I drove there before I came here tonight and they're all full. We're not adding extra parking. We're improving it. It's already very, very busy over there. There's one spot by Bookoo Bikes that was open. There were 4 spots in that same area and Houlihan's parking lot was pretty full. Very full actually and then you know down the sides and we don't have these other new buildings that are going to have people and traffic to even gauge how much that is. It may be meeting our numbers but it isn't really meeting the use and the intent of what's happening. We're overwhelmed already. I just, that's kind of the way I see it and it's not my favorite place to go. Thank you. Aller: Thank you. Any additional individuals wishing to come forward. Please state your name and address for the record. Brian Burdick: Good evening everyone. Brian Burdick, Burdick Properties, 600 Market Street, Chanhassen. Glad to be here this evening. I have to say I think the gentleman that just spoke did a really excellent job. I hope that all of you will really think about that. He raised some many very valid concerns. I'm sure Total Wine runs a very good operation. I do believe that city staff has gone to a lot of detail and done a nice job with the planning. I don't doubt that. That's fine but this is not a good location for a huge 20,000 square foot, big box liquor store. It's not a good use. It's not what was originally intended there and I did hear that from staff clearly this evening too going through the proposal, which they seem to be in favor of. That's fine but I heard also in there that as the gentleman just said, this doesn't fit the PUD and what was really planned and proposed for this area and I hope all of you will really think about that too. Is this what you want in Chanhassen? Big box liquor store close to a church and school. Making an area that's already congested more congested. It's just not a good location. I think some of the, I definitely agree on the signs so I'll keep it short for all of you. I certainly hope you wouldn't approve the additional sign. That generally doesn't happen in Chanhassen from what I know in being a long U Chanhassen Planning Commission — July 7, 2015 time building owner and property owner in Chanhassen. And I don't believe it was, it was pointed out what the current requirements are. I did not hear what the applicant is proposing for the signage which is obviously going to be proposed larger letters than 30 inches in height and higher than 20 feet but it didn't say how much higher than 20 feet. How much higher than the 30 inches but it doesn't matter because that should not be compromised. It's just not fair. Couple other things I heard just maybe for your interest is talking about hard cover. I'm not going to go into details. You are very well versed. I think you should look at that closer. I heard the words of pervious pavement. I don't know what pervious pavement is. If someone can enlighten me but I've never heard of pervious pavement. I've heard of pervious surfaces sometimes permitted in cities. I don't pretend to know the City of Chanhassen's fill ordinance on that. Often times you see pavers or some other permitted pervious surfaces and situations. I don't know if you do in the commercial district but I'm not sure what pervious pavement is. I already spoke about the clarification for the signage. I think a traffic study would clearly be warranted. My recollection is this kind of brings back some old memories being here this evening from many, many meetings in front of the Planning Commission and council years ago but a traffic analysis should be required period. It would be crazy not to. You've heard from people and I'm sure you are all well aware of the area. It is very congested It's very awkward. It's very awkward. This is just going to make that a whole lot worst. There are uses for that site that I think would be very nice for the city. Fit what the city originally intended there. A couple of them were mentioned by the applicant themselves for a clothing store was one. A pet store. Something that could fit in a large building if that should be your decision. Those could be nice but guess what, they don't have liquor. And this is not the place for a liquor store but for all the other reasons, and I understand too. This is just not a good location for this proposed development. Thank you very much. Aller: Thank you, and for the record we did receive your letter. It will be attached and attached to the package that goes to the City Council regarding other issues. Brian Burdick: Thank you very much for mentioning that. Appreciate it. Aller: Any additional individuals wishing to come forward can do so at this time. Please state your name and address for the record. Jay Kronick: Thank you. My name is Jay Kronick. I own property on 78's Street. 78 West 7P Street and 19900 West 78"' Street. Aller: Welcome Mr. Kronick. Jay Kronick: Those parcels. I've been in the business community here in Chanhassen since before Village on the Ponds and I remember when that went in, most of what I feel has been said by the two gentlemen before me and so there's nothing new but I just need to stand up here and tell you that I agree with what has been forth here. This is big box retailing. Make no mistake about it and yes it fits the numbers as Mr. Burdick said but it's going to change that planned unit development away from the original intent and if that's where you want to go with it, that's where it's going to go but if you want to get back to a livable, walkable, bike friendly shopping area, it's not the right use there. The parking thing just blows me away that you haven't looked 11 0 0 Chanhassen Planning Commission—July 7, 2015 at that and the traffic with enough scrutiny. My site, which has a building half the size of it which services wines and spirits right now. We have 70 parking spaces there and there are times where it's not adequate and you already have a parking problem there. It's just, I can't see that you just give that. It deserves more scrutiny. The issue with the signage, the gentlemen before me have spoke. I can't help but agree. The City sets rules up. All the businesses play by those rules. To start changing the rules seems unfair. Many of us have worked diligently within the confines and guidelines of the city for our professional and business careers here and to change the rules because someone feels like they don't have the visibility they want. We all would like better visibility from our signs and gosh, why don't we do it everywhere if that's the case. Everyone should be seen better from the highway than they are. Thanks. Aller: Thank you sir. Any additional comments? Please come forward. State your name and address for the record. Steve Friedrichs: Good evening. My name is Steve Friedrichs. I'm at 8955 Southwest Village Loop. New townhomes right there by Southwest Transit. Actually I was here for, so I'm a new resident of Chan. I was here for the Arbor Glen planning but stayed to listen. So just a couple of things. I'm the president of the homeowners association and traffic flow would be a concern of mine. One of the reasons I moved where I did is I love to bike into downtown and I bike and I go over the bridge to get into downtown. And to get back across I have to go, I think it's where the Marathon is or whatever and that street, I know we have a bicycle path for us to go through there but it's very, very congested. Very dangerous and I just think we should do a traffic study. A traffic flow so we can keep Chanhassen what it was designed for and I really do appreciate the opportunity to address the group. Thank you. Aller: Thank you sir and welcome. Peter Adolphson: Good evening Chairman. My name's Peter Adolphson, 8980 Reflections Road. Having been in the public eye before I find it amazing that staff, while they've done their job on the stuff that looks good. Haven't done their job where they need to and just some rough figuring. For Total Wine to make the kind of volume they want you're talking about 3,000 cars a day to get in there and as these previous gentlemen have said, it's already a lousy traffic situation there. I think although you have letters of support in your packet from Houlihan's and the bike shop. St. Hubert's I'm sure would not be very happy about this at all, especially when they've got Saturday mass going on. The senior center, those people have to walk to where they want to get. If there's 3,000 extra cars a day in there, they're going to be looking out for their lives. You only got one traffic light and that's Highway 7. All the rest are stop signs and it's hard enough to get onto Market sometimes with the traffic flow we currently have. Other guys both have said, we don't need another big box store. I agree totally. What are we trying to do to our downtown right now? If we start putting these big box stores around. I know Chanhassen has a history of turning down box stores. You've got Fleet Farm. You've got Walmart. You guys need to think about that. This is not the image we need for Chanhassen. Thank you. Aller: Thank you sir. Any additional comments? Please state your name and address for the record. IK 0 0 Chanhassen Planning Commission — July 7, 2015 Kate McGuire: I'm Kate McGuire and I live at 773 Autumn Ridge Lane, Chanhassen and I guess I just want to reiterate a lot of the items that have been brought to your attention. I definitely think that a traffic study should be done. It is a very congested area, especially at that west entrance which is just controlled by a stop sign. There's a lot of traffic there during rush hour. You've got the big business across the road from there with people coming and going. Of course traffic coming up from 212. School starting. School ending. My daughter works at the salon in there so she's traveling in there too so that's a concern as a mother. I know this isn't really your area to decide on but we already have 7 liquor stores in a town that covers almost 25 miles. I think we have maxed out on our liquor licenses and I know that's not your area but I just wanted to bring that up too. Aller: Thank you very much. Any additional comments? Questions. Oh, one other individual coming forward. Please state your name and address for the record sir. Craig Claybaugh: My name's Craig Claybaugh, 1630 Lake Lucy Road in Chanhassen. Aller: Welcome. Craig Claybaugb: It may be in there in looking over the documents but what was the identified hardship for the signage that warranted the variance? Aanenson: What we did is we gave a variance to the previous application and nobody objected to that so instead of saying we're going to give them a variance we wanted to treat everybody in that same sector equal. Nobody objected to the previous variance on the specialty grocery. The 14,000 plus the additional, and then we have additional square footage with that so. Craig Claybaugh: So what was the hardship on that? Because is that hardship being grandfathered forward? Aanenson: No. No, no, we're amending the PUD which is a different application and the fact that it applies to everybody in that same sector. Craig Claybaugh: Okay. Am I wrong in assuming there needs to be a hardship for a variance? Aanenson: For a PUD amendment, that's correct. Aller: For the PUD so. Craig Claybaugh: Alright, thank you for that clarification. Aller: But that's what we look for in variances so it's a good question. Thank you sir. Any additional comments? Seeing no one come forward I'll close the public hearing at this time. Open it up for discussion or questions based on the comments made. Undestad: Alyson, clarify some of the. 13 0 0 Chanhassen Planning Commission — July 7, 2015 Aller: Yeah, can you address some of the issues that were brought forward. I guess the first and foremost would be parking and traffic. Fauske: I'll let the planning department refer to, response to the parking concerns as they've done the analysis for the parking on the site. With regards to the traffic, when we look at this site the public infrastructure that serves the entire Villages development is County Road 101 to the west and then Great Plains Boulevard which is, I think there were a couple members of the audience that had spoke to the Marathon station. That's where Great Plains Boulevard extends to. At this point to be honest I haven't heard a lot of, this is good information to get from the residents as far as their concerns with traffic. We can take a look at what the traffic counts are doing on some of these roads. Certainly County Road 101 was designed, given the zoning in mind, in place at this development and tum lanes installed both for southbound left tum and northbound right tum. So we can certainly take a look at you know the existing intersection and see if there's any queuing back into the, into the through lanes. If the level of service is deteriorating at that intersection. That's certainly something that we can talk to Carver County with regards to on 101 because it is a county road. And you know with regards to the trip generation for this site, I really couldn't speak to what the trip generation is for this. That wasn't something that I have in the back of my head to be able to tell you. We can certainly provide that information for the council based on the square footage of the building and what the Institute of Traffic Engineers would anticipate would be a trip generation for that size building. And then with regards to the interior site, you know some of the concerns with regards to the tight radius and the traffic, I know that the City Engineer/Public Works Director has been in contact with the property manager on several occasions throughout the years to discuss some of the concerns that have been brought forward from the residents to the City so he's been communicating with the property manager on those issues you know hoping to get some resolve with that and being able to make the area a little better drivability for the residents but it's ultimately an interior non- public system. Aanenson: I guess I would just add to that too. If you go back to the specialty grocery store, if you look at the types of uses and where they would draw from they would be similar types of draw. Probably a little bit larger trade area so you look at the traffic patterns. While that one didn't have the same visceral feelings about the type of use, it also did have a larger trade area so that one seemed to work so I think to going back and looking at, as the Assistant City Engineer mentioned, looking at kind of the trade draw area tum movements. Peak hours. Those sort of things and quantifying those but certainly we believe that one met the standards there. Again you have access onto the state highway. Highway 5 and coming off of 101 there which would be the public street that we also maintain. Getting access off to that but we certainly can, comparing those two numbers to show you what we had approved previously based on those assumptions and moving forward with that to the City Council. Aller: When the PUD was originally developed the number of parking spots, if you know was that based on the, the intended square footage that was going to be for the entire PUD? Al -Jaffa Yes it was and one of the things that we need to point out as far as the residential portion, it assumed that all of those units were going to be independent living and that's how the parking was calculated for the overall PUD development. The reality is we do have a large 14 0 0 Chanhassen Planning Commission — July 7, 2015 number of senior living within the development and some of those senior living apartments are not just, they're actually assisted living which means those are individuals that actually don't have vehicles with them. Yet the number of parking spaces have, that are provided with this development exceeds what was anticipated and what was required by ordinance. The other thing that we need to point out is the highest square footage and the highest user that requires parking would be the office and commercial use and the reality is we are far below what was anticipated for this development and again. Aanenson: Let me just say that a little bit differently. So the original plans anticipated more retail than we have there today so it's under retailed. And then so we do have some vertical/ horizontal. That would be Presbyterian Homes which has commercial. Yes, is it exactly how we envisioned it? No. I mean when this thing went through a sag big time and without throwing the baby out with the bath we kind of had to retool. Just like people challenge us, why doesn't Chanhassen's downtown look like Excelsior? Wayzata Because it's built at a different timeframe but I think for the most part we've stayed within that framework of what our original envision was. Again we had St. Hubert's Church which also has a lot of parking. They can provide cross parking in some of those peak times when there's additional activities so the challenge there is while there might not be parking right in front of where you want to go, you may have to walk. Whether that's the Legion, walking across maybe from St. Hubert's or something like that. That's the envision is that you're sharing parking in that situation so we believe it does meet those standards and again to be clear, there is plenty of impervious surface. It does meet the hard surface parking. With that PUD they've got a lot of open space so it does meet those standards so the challenge there is to make sure that we've given you the information and the council regarding again, we believe it met the traffic warrants with the specialty grocery but make sure we've quantified that when we move forward to the City Council based on the liquor use. But would it be any different if it was you know a larger trade area or something so we can maybe put a couple different options in there too showing what those different traffic patterns would be. Again we're under retailed from the original vision that we put in place in the environment assessment document. Aller: With impervious surfaces we exceed what our PUD requirements are? Aanenson: That's correct. We're at about 45 percent. Aller: By a good 10 percent. Aanenson: Yes and that's part of the PUD. We had that with the National Weather Service site too where you have some properties that have more green space and others less but you average it over the entire property so this entire 66 acres has 45 percent. Aller: So regardless of the pervious nature of a material that's placed and being used for this project, it would still fit the requirements of the PUD? Aanenson: That's correct. Again that's part of that you know what we show you the compilation of all the parking, of the hard cover. So we match that up against the original, where we are. Kind of a balance sheet. 15 0 0 Chanhassen Planning Commission — July 7, 2015 Aller: Question, Commissioner Undestad. Undestad: The balance sheet. I just, I was going to ask the question earlier about you know a lot of the areas when we go through these we kind of keep tabs on what we thought would go in there when we started and where we're at mid -stream and where we're at now. Have you gone through that? Again initially we were going to have a lot of residential above a lot of retail and things are changed. Have you gone through so you can kind of look and say well actually we're under here. We're over there. Aanenson: Yep. Yeah we still anticipated two significant office buildings to go on the site and those are still vacant and we also anticipated a lot more institutional type uses so there are other uses that came under what we anticipated. You know we anticipated a lot more vertical. I think the challenge out there is you know the condominium market right now is in the last 10 years has been very challenging. That's really what we anticipated. They took a long time and the City had provided, you know with the TIF to get the Presbyterian Homes in there and that's been very successful and it's a nice anchor. Again the City wanted to have additional property for some retail and that was really one of the drivers we were running on kind of the score here and providing that retail across the street. Undestad: So if we assume that that lot down by St. Hubert's, the office building goes in there. I think the building that's under construction now next to Community Bank is a little bit smaller than what was originally, could have been put on there. Aanenson: Right, correct. Undestad: So I guess that's what I'm trying to just get a feel for is that really we're probably less than where we thought we would have been. Aanenson: Absolutely. Absolutely. Undestad: In this whole project didn't we. Aanenson: Yeah. Aller: Additional questions, comments. Undestad: Just following up part to Alyson there too was, again on the traffic piece of it. You know if we looked at this originally and we've done some traffic work back when the original project came in, or no? Aller: Let me piggy back on that. Was there an AUAR in the area? Aanenson: Yes there was an original, yeah. For the project. We have an approved Environmental Assessment Worksheet and it looked at all the trip generation and where it was coming from, that's correct. 16 Chanhassen Planning Commission — July 7, 2015 Undestad: So again we've had traffic work done based on. Aanenson: Yes. And again because we're under that threshold looking at that. Undestad: Okay. Madsen: Does that trip generation worksheet look at all the different access points of the ways that you can tum and when you have to tum left and cross a 4 lane road? All those sorts of intersections. Aanenson: Yes. It looked at directional traffic. Madsen: Okay, thank you. Weick: Regarding the sign amendment. The amendment matches Sector 2, correct? Al -Jaffa Yes. Weick: So Sector 1 would match Sector 2 when it comes to sign requirements, correct? Aanenson: That's our recommendation. Weick: Okay. I mean I would note, you know Houlihan's which sits in Sector 2 I believe is right off the comer of this building. I mean the proximity of those buildings and their subsequent proximity to 5 is very similar I will note. Aller: Which goes to my questions earlier that because they would be treated equally even if he was in Section 1. Houlihan's could then change or modify their signage. Weick: Correct. Aanenson: So if you looked at what American Inn has. AmericInn. That's a taller sign on there. They have kind of a cupola that. Aller: Any additional comments, questions at this time? Then I'll entertain a motion if someone wishes to make one. Weick: Actually can I go back? I do. You know at the beginning we said we were looking at three things. One was plat approval. Two was site plan approval and three was the PUD amendment for the signage. Is there any in the first two items, so plat approval and site plan approval, there's no amendments or variances or anything in those correct? Aanenson: That's correct. Weick: So everything that's presented falls within the zoning ordinances. IN 0 0 Chanhassen Planning Commission — July 7, 2015 A] -Jaffa Exceeds the requirements. Weick: Or exceeds the requirements and so the real question for us is item number 3, is that a fair statement? Aanenson: Yes you have discretion on, you have discretion on the amendment, that's correct. Weick: Thank you. Aller: Because in denying or approving items 1 and 2, which are the plats and the site plan review, if a property, a request is made and it meets the requirements we must approve so that boils down the reason we ask questions. The reason we want the information and staff does it's report is so that we can decide whether or not that, those requirements are met. Once a determination is that we feel as though they are met then we must approve. If we feel that they are not met, then you have the ability to deny. So with that any additional questions? Weick: Sorry. Aller: No, that's fine. Then I'1] entertain a motion. Educated decision. Weick: I'll make a motion. Aller: Commissioner Weick. Weick: The Chanhassen Planning Commission recommends that City Council approve the preliminary plat for Villages on the Ponds I I'h Addition, site plan for Chanhassen specialty retail, and planned unit development amendment to the sign criteria subject to the conditions of the staff report and adopts the Findings of Fact and Recommendation. Aller: For discussion purposes do I have a second? Undestad: Second. Aller: Having a motion by Commissioner Weick and a second by Commissioner Undestad, do we have any finther discussion or comment? Weick moved, Undestad seconded that the Chanhassen Planning Commission recommends the City Council approve the preliminary plat for Villages on the Ponds 11th Addition subject to the following conditions and adopts the Findings of Fact and Recommendation: Park 1. Full park fees in lieu of additional parkland dedication and/or trail construction shall be collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on the Ponds 11'" Addition. The park fees will be collected in full at the rate in force upon final plat In • • Chanhassen Planning Commission — July 7, 2015 submission and approval. Based upon the current commercial park fee rate of $12,500 per acre, the total park fees would be $33,875. Enizineerin 1. The plat must be revised to include a 10 -foot wide perimeter drainage and utility easement on Lot 1, Block 1. 2. The fees collected with the final plat are: Surface Water Management fee, Park Dedication fee, and GIS fee ($25 for the plat + $10/parcel). 3. City water (WAC), city sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will be collected with the building permit and will be calculated based on the uses within the building. Water Resources 1. An estimated $54,610.02 in storm water utility connection charges shall be due at final plat. 2. The property owner shall execute and record against the property a maintenance agreement in a format provided by the city for the pervious pavement, underground filtration, sump manholes and Contech JellyfishTM Filter. 3. The applicant shall apply for and procure all other necessary permits. All voted in favor and the motion carried unanimously with a vote of 6 to 0. Weick moved, Undestad seconded that the Chanhassen Planning Commission recommends the City Council approve the site plan to construct a 19,909 square foot specialty retail building on property zoned Planned Unit Development subject to the following conditions and adoption of the attached Findings of Fact and Recommendation: Engineering 1. Based on the proposed grading on the north side of site the grading plan may require some revisions in order to maintain drainage from the existing improvements to the north. Building 1. The buildings are required to have automatic fire extinguishing systems. 2. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 3. Detailed occupancy -related requirements will be addressed when complete building plans are submitted. 4. Provide a 1:200 scale drawing of subdivision. 19 0 0 Chanhassen Planning Commission — July 7, 2015 5. The owner and/or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. Fire Marshal 1. Provide a three-foot clear space around fire hydrants. 2. Yellow -painted curb and "No Parking Fire Lane" signs will be required. Applicant shall contact Fire Marshal for specific locations. 3. No P.I.V. (post indicator valve) will be required. Natural Resource Specialist 1. The interior width of all islands must be a minimum of 10 feet. 2. A total of 13 trees must be planted within the vehicular use area. Planning: The applicant shall enter into a site plan agreement with the City and provide the necessary security to guarantee erosion control, site restoration and landscaping. 1. The street/sidewalk lights along Main Street have to be preserved and operational when the site construction is completed. 2. Approval of the site plan is contingent upon withdrawal of Planning Case 2014-29, approval of the Planned Unit Development amendment and Subdivision. 3. The light poles may not exceed 20 feet in height 4. All Wall Packs (WPO shall be replaced with Wall Packs (WP2). Water Resources 1. The Surface Water Pollution Prevention Plan with all elements required by the NPDES Construction Permit shall be prepared and supplied to the city for approval prior to any earth - disturbing activities. 2. Proof of the NPDES Construction Permit having been procured by the applicant shall be supplied to the city prior to any earth -disturbing activities. 3. A dewatering plan, specific to the existing pond, shall be prepared and submitted to the city for review and approval prior to any earth -disturbing activities. 20 Chanhassen Planning Commission — July 7, 2015 4. Areas immediately tributary to the pervious pavement, including disturbed areas behind the back of curb, must be stabilized within 24 hours of construction of the pervious pavement areas. All voted in favor and the motion carried unanimously with a vote of 6 to 0. Weick moved, Undestad seconded that the Planning Commission recommends the City Council approve the Planned Unit Development amendment in the attached ordinance for Villages on the Ponds to allow signs to be placed higher than 20 feet within Sector I, and for the size of letters to be increased to 48 inches along the west and north elevations as shown below (amendments are shown in bold and highlighted in yellow), and including the attached Findings of Fact and Recommendation: Wall Signs The location of letters and logos shall be restricted to the approved building sign bands, the tops of which shall not extend greater than 20 feet above the ground. In Sectors I and II, sign height may be increase based on the criteria that the signage is compatible with and complementary to the building architecture and design. The letters and logos shall be restricted to a maximum of 30 inches in height except along the north and west elevations for buildings within sectors I and IL These letters may be increased to 48 inches. All individual letters and logos comprising each sign shall be constructed of wood, metal, or translucent facing. 2. If illuminated, individual dimensional letters and logos comprising each sign may be any of the following: a. Exposed neon/fiber optic, b. Open channel with exposed neon, c. Channel Letters with acrylic facing, d. Reverse channel letters (halo lighted), or e. Externally illuminated by separate lighting source. 3. Tenant signage shall consist of store identification only. Copy is restricted to the tenant's proper name and major product or service offered. Corporate logos, emblems and similar identifying devices are permitted provided they are confined within the signage band and do not occupy more than 15% of the sign area unless the logo is the sign. 4. Within Sectors I and II, architecturally, building -integrated panel tenant/logo sign may be permitted based on criteria that the signage is compatible with and complementary to the building design and architecture. Architectural elements specifically created to increase signage height are prohibited. 5. Backlit awnings are prohibited. 21 Chanhassen Planning Co• ssion—July 7, 2015 • All voted in favor and the motion carried unanimously with a vote of 6 to 0. Aller: The matter is moved to the City Council. Those individuals wishing to discuss other items with regards to the City Council or follow this item to the City Council for it's final determination is presently set for July 27, 2015. Thank you all for participating. We're going to take a minute recess here to allow the room to clear and those individuals that might have been here for item number 3 that was presently on the calendar. Arbor Glen planning case, that matter has been removed from the calendar at their request and that will be extended and heard by this commission on the 21'. The Planning Commission took a short recess at this point in the meeting. PUBLIC HEARING: GLACCUM SUBDIVISION. PLANNING CASE 2015-18: REOUEST FOR REZONING OF PROPERTY FROM RURAL RESIDENTIAL DISTRICT (RR) TO SINGLE FAMILY RESIDENTIAL DISTRICT (RSF): AND SUBDIVISION WITH VARIANCES OF APPROXIMATELY THREE ACRES INTO FOUR LOTS ON PROPERTY LOCATED AT 1510 LAKE LUCY ROAD. APPLICANT/OWNER: ESTATE DEVELOPMENT CORPORATION/MICHAEL & LEAH GLACCUM. Generous: Thank you Chairman Aller, commissioners. As you stated Planning Case 2015-18 is Glaccum Subdivision. Glaccum's are the property owners for this site and so that's where the name comes from. Tonight we're holding the public hearing and this goes to City Council on July 27's. The applicant is Estate Development Corporation and Michael and Leah Glaccum. Again it's a rezoning of the property from it's currently zoned rural residential to residential single family or RSF. The property is guided in the Comprehensive Plan for residential low density uses and this means density of 1.2 to 4 units per acre. This development will come in within that range and it complies with all the requirements of the RSF district. The property is located at the northeast comer of Lake Lucy Road and Yosemite. Property address is 1510 Lake Lucy Road. There is an existing single family home on this site as well as a couple out buildings and a little garden. The northwest comer of their property consists of a wetland complex and the one issue we had in here is there's a small portion of the site meets the city criteria for a bluff and the City defines a bluff as having an elevation change of 25 feet or more and a slope of 30 percent or greater so when it has both those criteria then we consider it a bluff. However this entire ridge area, there's only a small percentage of this. The development to the east Shadow Ridge has the same slope configuration. However none of that met the bluff criteria so everything around this bluff area could develop except for that specific area behind the existing house. That house does not meet the City's requirements for setback from a bluff. It's approximately 10 feet from the top of the bluff. Bluff setbacks are 30 feet. So the applicant, as part of this development with the subdivision is requesting a variance from the bluff setback requirement and in this instance to go to zero setback they want to take out the top of that hill and make the residential area developable. What staff worked with the developer on was trying to preserve the wetland area and the wooded area on the northern, on the north side of this project. Down in the bottom of the bowl if you will. Again this is a rezoning from rural residential to single family residential district and a subdivision of the property into 4 single family lots. As part of the development they would outlot the wetland and they would also 22 PROPOSED MOTION: "The Chanhassen Planning Commission recommends that City Council approve the preliminary plat for Villages on the Ponds 11 m Addition; site plan for Chanhassen Specialty Retail, and Planned Unit Development Amendment to the sign criteria subject to the conditions of the staff report, and adopts the Findings of Fact and Recommendation." SUMMARY OF REQUEST: The developer is requesting preliminary plat approval to create one lot and one outlot (Villages on the Ponds l ls' Addition), and Site Plan Review for a 19,909 square -foot, one-story specialty liquor store (Total Wine & More), and Planned Unit Development Amendment to the sign criteria. Notice of this public hearing has been mailed to all property owners within the required 500 feet. Staff is recommending approval of the request with conditions. LOCATION: Northwest Comer of Lake Drive and Main Street Outlot B, Villages on the Ponds 4te Addition (PID 25-8460030) APPLICANT: Venture Pass Partners, LLC Owner: Northcott Company 19620 Waterford Court 250 Lake Drive East Shorewood, MN 55331 Chanhassen, MN 55317 (612)801-4313 (952)294-5215 rrauwerdinkAa ventureoass net bschwen(a)northcotthospitalitycom PRESENT ZONING: Planned Unit Development (PUD) — Villages on the Ponds 2020 LAND USE PLAN: Mixed Use ACREAGE: 2.71 acres DENSITY: NA LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City's discretion in approving or denying a preliminary plat is limited to whether or not the proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these standards, the City must approve the preliminary plat. This is a quasi-judicial decision. The City's discretion in approving or denying a site plan is limited to whether or not the proposed project complies with Zoning Ordinance requirements. If it meets these standards, the City must then approve the site plan. This is a quasi-judicial decision. Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 2 of 23 The City has a relatively high level of discretion in approving amendments to PUDs because the City is acting in its legislative or policy-making capacity. A PUD amendment must be consistent with the City's Comprehensive Plan. PROPOSAUSUMMARY The site is located at the northwest comer of Lake Drive and Main Street, within Villages on the Ponds, a mixed-use development. The site was rough graded as part of the overall development. The property is located within Sector I of the Villages on the Ponds development (there are four sectors within the development which will be discussed in further detail later in the report). The following is a summary of the proposal: 1. Subdivision: Replat an outlot into one lot and one outlot to house a specialty retail building. 2. Site Plan: Construction of a 19,909 square -foot retail building (Total Wine & More). Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 3 of 23 3. Planned Unit Development Amendment: Changing the Signage Criteria to allow wall signs to be placed higher than 20 feet from floor elevation along the north and west building facades, and increase the height of the individual letters not to exceed 48 inches. The primary parking for the project is located within the westerly portion of the site. Some on - street parking is also available along Lake Drive, Main Street and Pond Promenade, which are all private streets. Within Villages on the Ponds there are existing cross -access and cross -parking agreements that permit a portion of the parking to be located off site. Parking requirements in excess of those specifically provided on site are through shared parking. The building materials consist of rock face block, accent block and concrete utility brick. Black awnings are proposed over individual windows. An E.I.F.S. band is incorporated at the top of the walls and is used as a sign band. Staff has been working with the applicant for several months to improve the design and layout of the site and building. The applicant has implemented all staff's recommendations into the design. The product is attractive and will complement the design of surrounding buildings. The proposed development is consistent with the comprehensive plan and the project's development design standards. Staff is recommending approval of the project subject to the conditions of this report. APPLICABLE REGULATIONS Chapter 18, Subdivision Chapter 20, Article II, Division 6, Site Plan Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 4 of 23 Chapter 20, Article XXIII, Division 7, Design Standards for Commercial, Industrial and Office - Institutional Development Villages on the Ponds Development Design Standards BACKGROUND On September 23, 1996, the City Council approved PUD 95-2, Villages on the Ponds, including a Comprehensive Land Use Plan amendment from Office/Industrial, Institutional, Residential Medium Density, Residential Low Density to Mixed Use -Commercial, High Density Residential, Institutional and Office; Preliminary Planned Unit Development for up to 291,000 square feet of commercial/office buildings, 100,000 square feet of institutional buildings, and 322 dwelling units; Rezoning from IOP and RSF to PUD, Planned Unit Development (final reading); and final plat dated "Received September 19, 1996" for two lots and ten outlots and public right-of-way. On June 28, 1999, the City Council approved PUD 95-2 granting Final Plat approval for Villages on the Ponds Fourth Addition, creating one lot and two outlots. The lot is for the Peddler Cyclery, a.k.a., Bokoo Bikes. On December 9, 2002 the Chanhassen City Council approved Site Plan #2002-9, plans prepared by Truman Howell Architects and Associates, Inc., dated October 18, 2002, for a 70,873 square - foot, three-story building consisting of street level commercial and upper level hotel rooms (not constructed); and A variance for the use of more than 15 percent EIFS on the building based upon the finding that it is consistent with other buildings approved in the area (void since not used); and A variance for signage in excess of 20 feet in height on the building based on the fact that it is consistent with the approval given to the Community Bank of Chanhassen building (void since not used). On October 27, 2014, the Chanhassen City Council approved the Preliminary and Final Plat for Villages on the Ponds 11' Addition; Site Plan for Chanhassen Specialty Grocery with a Variance to the sign letter size on the north and west building elevations subject to the modified conditions of the Planning Commission staff report, and the Development Contract for Villages on the Ponds l lm Addition. Planning Commission • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 5 of 23 On February 9, 2015, the Chanhassen City Council approved the extension of the time to record the site plan agreement for Chanhassen Specialty Grocery and the final plat for Villages on the Ponds 116' Addition to May 31, 2015. (Not constructed and plat not recorded). SITE PLAN In order to provide a better understanding of the overall development, staff will first review the site plan component, which in turn leads to the Planned Unit Development Amendment and the Replat of the outlot. The building must comply with the Design Standards for Villages on the Ponds design criteria. The ordinance governing this site requires the development to have an attractive design and use durable materials. Site coverage may not exceed 70 percent. This is a Planned Unit Development and hard surface coverage can be averaged over the entire development including the permanent open space. When the city approved the initial development for Villages on the Ponds, it insured an open space that exceeds 30%. The actual open space exceeds 45%. The design of the building is attractive and is proposed to be constructed of high-quality materials that are complementary to surrounding buildings. They include rock face block, accent block and concrete utility brick. Black awnings are proposed over individual windows. An E.I.F.S. band is incorporated at the top of the walls and is used as a sign band. The architectural design of the building lends itself to place wall signage over the E.I.F.S. band shown in the elevations below. Staff is recommending approval of a PUD amendment to allow the requested signage if it meets the architectural integrity of the overall development. Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 6 of 23 All elevations can be viewed by the public on all four sides. Staff commends the applicant on the level of detail that has been introduced to the building through the use of spandrel windows, different building materials, a green wall along the east elevation, projecting entrance and articulation along the roof line. The loading dock is buffered from views by landscaping. The majority of the parking is located along the western portion of the site. Sidewalks are extended between the subject site and the surrounding area and separates pedestrian from vehicular traffic. The trash enclosure for the building is located along the southeast comer of the building and is proposed to utilize the some materials as the building. The added landscaping and boulevard trees will provide a calming effect to a busy area. The building has a pronounced entrance, utilizes durable exterior materials, and exhibits articulation. There are no required setbacks from any of the private streets within this development. Staff regards the project as a well-designed development. The overall design is sensitive to the surrounding area. Based upon the foregoing, staff is recommending approval of the site plan with conditions as outlined in the staff report. Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 7 of 23 LIGHTING/SIGNAGE The applicant has submitted a lighting plan and a photometrics plan has been prepared for the site. Light levels for site lighting shall be no more than one-half foot candle at the project perimeter property line. This does not apply to street lighting. All fixtures must be shielded. The proposed parking lot lights are a shoebox design which is permitted in this development. The light poles may not exceed 20 feet in height. The PUD standards encourage the use of lights on the building to minimize the number of parking lot lights. The applicant is proposing to use downcast shielded fixtures. Wall signage is proposed along four sides of the building which is permitted under the Planned Unit Development ordinance governing this development. However, there is a limit on the size of the individual letters and height of the wall sign. Staff will address this issue in detail under the PUD amendment section of the report. PARKING The ordinance requires one parking space per 200 square feet of retail building, which translates to 100 spaces for this application. The applicant is providing 84 spaces on site and 74 on -street parking spaces. The entire development was created based on a shared parking concept. An overall parking study noted that the cross -parking arrangement would provide sufficient parking to accommodate users throughout the development. The parking study and the Alternative Urban Areawide Review (AUAR) anticipated a greater density and intensity of use. It was anticipated that there would be a total of 291,000 square feet of office/commercial space, 100,000 square feet of institutional space, and 322 dwelling units in the overall development. Actual development resulted in the following: Planning Commission • • Chanhassen Specialty Retail — Plannin Case 2015-17 July 7, 2015 Page 8 of 23 Aa L Use Anticipated Actual Net Change Institutional 100,000 square feet 134,000 square feet -34,000 square feet Residential 322 units* 323 units** -1 unit Office/Commercial 291,000 square feet 198,500 square feet +92,500 s uare feet *Parking study assumed independent living apartment units requiring more parking ** 160 of the 323 units are senior -only apartments which required substantially less parking The overall Villages on the Ponds development provides ample parking and remains consistent with the approved plan. ARCHITECTURAL COMPLIANCE Size, Portion and Placement Entries: The building has pronounced entrances. Articulation: The buildings incorporate adequate detail and has been tastefully designed to complement the surrounding area. The architectural style is unique to the buildings but will fit in with the surrounding area. The building utilizes exterior materials that are durable and of high quality. Site Furnishing The applicant is providing bicycle racks in the northwest corner of the building and an eco -mesh green wall on the east side of the building. Material and Detail High quality materials are being used on the building. Color The colors chosen for the buildings are earth tones. The selection is unique, but blends in with the surrounding buildings. Height and Roof Design The building is a one-story building. The roofline is staggered and contains pitched elements which adds articulation to the design of the buildings. All rooftop equipment must be screened from views. Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 9 of 23 Facade Transparency All facades viewed by the public contain more than 50 percent windows and/or doors. Some walls are further broken by the use of landscaping. Loading Areas, Refuse Areas etc The trash enclosure and loading dock are located along the southeast corner of the building. They will be screened by landscaping and a trash enclosure. SITE PLAN FINDINGS In evaluating a site plan and building plan, the City shall consider the development's compliance with the following: (1) Consistency with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; (2) Consistency with this division; (3) Preservation of the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing areas; (4) Creation of a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; (5) Creation of functional and harmonious design for structures and site features, with special attention to the following: a. An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; b. The amount and location of open space and landscaping; c. Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and d. Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. (6) Protection of adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 10 of 23 of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. Finding: The proposed development is consistent with the city's design requirements, the comprehensive plan, the zoning ordinance, the design standards, and the site plan review requirements. Staff is recommending approval of the request with conditions. The site design is compatible with the surrounding developments. It is functional and harmonious with the area. Staff regards the project as a reasonable use of the land. The overall design is sensitive to the city's image. Based upon the foregoing, staff is recommending approval of the site plan with conditions outlined in the staff report. PLANNED UNIT DEVELOPMENT AMENDMENT The current language pertaining to wall signage that address the subject building limits the height of the wall sign to 20 feet and the size of the individual letters to 30 inches. The proposed building as well as some of the other buildings that were approved before this one have received variances. When the applicant submitted the proposal for this request, they also requested a variance from this criteria. Staff evaluated the request and recommended a minor PUD amendment that would accommodate all users within this sector of the development to allow the same treatment. Approval of the building signage will be contingent upon approval of the PUD amendment. When Villages on the Ponds was being studied, discussed and analyzed, it was divided into four sectors: • Sector I: Mixed use of commercial and residential • Sector II: Highway exposure • Sector III: Institutional • Sector IV: Residential Within Sector I, the ordinance limited the wall signage to be placed no higher than 20 feet above the ground elevation, and limited the height of the individual letters to 30 inches. Sector R permits the placement of wall signs to be extended above 20 feet. This was permitted because Sector 11 was viewed as a highway -oriented development as it is bordered by Highay 5 to the north and Highway 101 to the west. Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 11 of 23 As staff began evaluating the subject site and how it fits into the sector scenario described above, it was concluded that the north and west elevations for buildings in Sector I fall under that same rule. Based on this conclusion, staff directed the applicant to apply for a Planned Unit Development amendment rather than a variance. The amendment is simple and will involve two sections of the Wall Signs Criteria, as shown below in bold type and highlighted in yellow: Wall Signs 1. The location of letters and logos shall be restricted to the approved building sign bands, the tops of which shall not extend greater than 20 feet above the ground. In Sectors I and 11, sign height may be increase based on the criteria that the signage is compatible with and complementary to the building architecture and design. The letters and logos shall be restricted to a maximum of 30 inches in height except along the north and west elevations for buildings within sectors I and H. These letters may be increased to 48 inches. All individual letters and logos comprising each sign shall be constructed of wood, metal, or translucent facing. 2. If illuminated, individual dimensional letters and logos comprising each sign may be any of the following: a. Exposed neon/fiber optic, b. Open channel with exposed neon, c. Channel Letters with acrylic facing, d. Reverse channel letters (halo lighted), or e. Externally illuminated by separate lighting source. 3. Tenant signage shall consist of store identification only. Copy is restricted to the tenant's proper name and major product or service offered. Corporate logos, emblems and similar identifying devices are permitted provided they are confined within the signage band and do not occupy more than 15% of the sign area unless the logo is the sign. 4. Within Sectors I and II, architecturally, building -integrated panel tenant/logo sign may be permitted based on criteria that the signage is compatible with and complementary to the building design and architecture. Architectural elements specifically created to increase signage height are prohibited. 5. Backlit awnings are prohibited. Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 12 of 23 As stated earlier, this is a mior amendment and staff is recommending approval of the request. PLANNED UNIT DEVELOPMENT AMENDMENT FINDINGS The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse effects of the proposed amendment. The six (6) effects and our findings regarding them are: a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Findine: The site is guided mixed use. A retail building with an area of less than 20,000 square feet is a reasonable size building in that location. b) The proposed use is or will be compatible with the present and future land uses of the area. Fes: The proposed use is and will be compatible with the present and future land uses of the area through the implementation of the design standards, landscaping, architecture, etc. c) The proposed use conforms with all performance standards contained in the Zoning Ordinance. FIn in: The proposed use will conform with all performance standards contained in the Zoning Ordinance such as design standards, signage, durable materials, uses, etc. d) The proposed use will not tend to or actually depreciate the area in which it is proposed. FSndin : The proposed use is intended to meet the daily needs of the area. It could potentially add convenience to the homeowners in the area. e) The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. Finding: The site is located within the Municipal Urban Service Area. The proposed use can be accommodated with existing public services and will not overburden the city s service capacity. f) Traffic generation by the proposed use is within capabilities of streets serving the property. Finding: Traffic generation by the proposed use is within capabilities of streets serving the property. Planning Commission * • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 13 of 23 The developer is proposing to replat the property into one lot and one outlot. The lot will house the specialty liquor store building. Outlot A is for Pond Promenade. The ordinance states, "All lots shall abut for their full required minimum frontage on a public street as required by the zoning ordinance; or be accessed by a private street; or a flag lot which shall have a minimum of thirty feet of frontage on a public street" The lot has street frontage on all four sides. Out�Ot s d Lot 1, Block 1 ,y The subdivision request is a relatively straightforward action and staff is recommending approval with conditions. The plat includes one lot (Lot 1, Block 1) and one outlot (Outlot A). The plat must be revised to include a 10 -foot wide perimeter drainage and utility easement on Lot 1, Block 1. The fees to be collected with the final plat are as follows: Surface Water Management fee Park Dedication fee • GIS fee: $25 (plat) + ($10/parcel x 3 parcels) = $55 City water (WAC), city sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will be collected with the building permit and will be calculated based on the uses within the building. Staff notes that the proposal is consistent with the Comprehensive Plan and the Zoning Ordinance. SUBDIVISION FINDINGS 1. The proposed subdivision is consistent with the zoning ordinance. Fes: The subdivision meets the intent of the city code subject to the conditions of the staff report. 2. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; Fin in: The proposed subdivision is consistent with applicable plans. Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 14 of 23 3. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; FindinE: The proposed site is suitable for development subject to the conditions specified in this report. 4. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; Finding: The proposed subdivision will be served by adequate urban infrastructure. 5. The proposed subdivision will not cause environmental damage; Finding: The proposed subdivision will not cause environmental damage subject to conditions of approval. 6. The proposed subdivision will not conflict with easements of record. FSndIn : The proposed subdivision will not conflict with existing easements, but rather will expand and provide all necessary easements. 7. The proposed subdivision is not premature. A subdivision is premature if any of the following exists: a. Lack of adequate storm water drainage. b. Lack of adequate roads. c. Lack of adequate sanitary sewer systems. d. Lack of adequate off-site public improvements or support systems. Finding: The proposed subdivision is provided with adequate urban infrastructure. PARKS This property is located within the community park service area for Lake Susan Community Park and the neighborhood park service area for Rice Marsh Lake Neighborhood Park. Employees and visitors to the specialty retail store will have convenient access to these publicly -maintained park and recreation facilities. Lake Susan Park is 33 acres in size and features large playgrounds, basketball court, picnic shelter, tennis courts, archery range, public water access, fishing pier and a ball field. Ample off-street parking is available at the park. Rice Marsh Lake Neighborhood Park is four acres in size and features a playground, ball field, basketball court, volleyball court and a small picnic shelter. Off-street parking is available. No additional parkland acquisition is being recommended as a condition of this subdivision. Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 15 of 23 TRAILS The subject site has convenient access to the public trails along Great Plains Boulevard, the three- mile Rice Marsh Lake trail loop, and the lakeside trail route to Lake Susan Park. No additional trail construction is being recommended as a condition of this subdivision. STREETS AND ACCESS The site lies within the Villages on the Pond Planned Unit Development located south of Trunk Highway 5 between County Road 101 and Great Plains Boulevard. The streets within the Villages development — Pond Promenade, Lake Drive and Main Street — are privately owned and maintained. The site is on the northwest corner of Lake Drive and Main Street and will be accessed from the north and west via Pond Promenade. The developer proposes improvements along the private streets north and west of the site, specifically installation of 90 -degree parking stalls that will be paved and will have curb and gutter. The developer has submitted turning movement templates illustrating how tractor -trailer units will access the site from Lake Drive and back into the loading dock on the south side of the building. UTILITIES Public sanitary sewer and water main are within the streets surrounding the proposed development. A drainage and utility easement is proposed over these utilities. The developer proposes to wet tap a six-inch diameter water service to the existing water main and extend a sanitary sewer service from an existing sanitary sewer manhole northwest of the building on Lot 1. These service connections will be inspected by the Building Department in conjunction with the budding/plumbing permit. GRADING AND DRAINAGE The site was mass graded when the surrounding area was developed. The original plans for the site included underground parking within the southern portion of proposed Lot 1. The underground parking was sub cut with the original site grading and has since filled with surface water runoff. The developer proposes to raise the grade of Lot 1, including filling the aforementioned sub -cut area. Porous pavement is proposed to be installed, draining to an underground system comprised of sand and a drain tile outlet that connects to the existing storm sewer system. This connection will be inspected by the Building Department in conjunction with the building/plumbing permit. Based on the proposed grading on the north side of site the grading plan may require some revisions in order to maintain drainage from the existing improvements to the north. Planning Commission • • Chanhassen Specialty Retail - Planning Case 2015-17 July 7, 2015 Page 16 of 23 The entire site drains to Rice Marsh Lake. The majority of the site reaches Rice Marsh Lake through a conveyance that follows the 101 corridor. A small portion of the site drains to the wetland located along Highway 5 before heading south through the Hidden Valley neighborhood and then on to Rice Marsh Lake. Within the two largest drainage areas and overall drainage on the site the discharge rates are decreased under the developed conditions from existing conditions. Stam Event SW CB Existing Maximum Rah of Runoff (cfs) Area 3S Area 48 Area 5S Total Existing 2-yow 7.22 0.01 0.50 0.06 7.72 10-rar 13.32 0.02 0.80 009 14.13 f"ar 2521 O.D4 1.32 0.16 26.59 10 -day Snow 1.39 0.00 0.06 001 1.45 Proposed Maximum Rate of Runoff (cfs) Storm Event SW CB Area 3S Area 4S Area 5S Total Proposed 2 -ear 3.14 029 0.50 0.14 3.94 101var 5.82 0.49 0.80 0.25 7.14 f"ar 9-56 0187 1.32 0.47 12A0 f048y Snow 1.02 0.04 0.06 0.02 1.12 Figure 1 Pre- and post -development runoff rates Given the existing capacity within the system and the modest rate increases proposed for areas 3S (Main Street east side of building) and 5s (southeast corner of the building), staff agrees with the consulting engineer that there is little likelihood of downstream deleterious effects. SITE GRADING: EROSION PREVENTION AND SEDIMENT CONTROL The proposed development will exceed one (1) acre of disturbance and will, therefore, be subject to the General Permit Authorization to Discharge Stormwater Associated with Construction Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES Construction Permit). The applicant has prepared a Surface Water Pollution Prevention Plan (SWPPP) and submitted to the city. This SWPPP must contain all required elements as listed in Parts III and IV of the permit. The City has a checklist of required elements that can be made available to the applicant's engineer. The PCA also has a checklist available on their website. It is known that dewatering must take place on the site. A dewatering plan shall be included as part of the SWPPP and submitted to the city for review. The pervious pavement must be protected at all times throughout construction. The SWPPP and erosion plan shall indicate how stabilization of tributary disturbed areas is to occur and that it must occur such that no sediment is introduced to the areas once they have been installed, but in no case any longer than 24 hours. Staff has firsthand knowledge that failure to stabilize these areas can result in an ineffective practice. Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 17 of 23 SITE CONSTRAINTS Wetland Protection There is no indication that any wetlands are present on the property. The existing pond was created incidentally when the area was excavated in anticipation of constructing an underground parking facility. BluffProtection There are no bluffs or steep slopes on the site. Shoreland Management The property does not lie within any Shoreland district. Floodplain overlay This property does not he with a floodplain. STORM WATER MANAGEMENT Article VII, Chapter 19 of City Code describes the required storm water management development standards. Section 19-141 states that "these development standards shall be reflected in plans prepared by developers and/or project proposers in the design and layout of site plans, subdivisions and water management features." This site lies within the boundaries of the Riley -Purgatory -Bluff Creek Watershed District and is subject to their stormwater management requirements. These requirements are similar to Minimal Impact Design Standards and have the same required removals of total phosphorus and total suspended solids as does Chanhassen's code. Further, they are similar to Chanhassen's requirements as stipulated in our MS4 permit. To meet these requirements, the applicant is proposing to install pervious pavement in the interior parking stalls as well as three structural devices. The proposed plan appears to meet the volume control, rate control and water quality standards requirements. The applicant will need to get the approval of the Riley -Purgatory -Bluff Creek Watershed District. The following table has been extracted from the stormwater management report and shows the anticipated removals based upon the BMPs installed. Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 18 of 23 Required Removal Nub*d Anvlysis ("Year) Provided Removal (lbslyear) Annual TP Load 4.39 6051c Annual TP Load 2.63 Annual TP Removal 3.06 Annual TSS Load 798 90% Annual TSS Load 718 Annual TSS Removal 739 Figure 1. Annual reduction in Total Phosphorus and Total Suspended Solid loads Operations and Maintenance Part III.D.5.a(5) of the GENERAL PERMIT AUTHORIZATION TO DISCHARGE STORMWATER ASSOCIATED WITH SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM (NPDES/SDS) PERMIT PROGRAM requires that "The permittee's Regulatory Mechanism(s) shall provide for the establishment of legal mechanism(s) between the permittee and owners or operators responsible for the long-term maintenance of structural stormwater BMPs not owned or operated by the permittee, that have been implemented to meet the conditions for post -construction stormwater management in Part III.D.5.a(2)." The permit continues on to discuss minimum provisions to allow for inspection of and preservation of function of the facility as well as transfer of responsibilities in the event the facility is sold. The city has developed a maintenance agreement and this shall be revised accordingly, executed and recorded against the property. in addition, the developer or their representative shall develop an operations and maintenance manual which shall specify anticipated inspection and maintenance, as well as schedule, necessary in order to ensure there is not significant decreases in the practices' efficacies. This operations and maintenance manual shall be referenced in the maintenance agreement. Storm Water Utility Connection Charges Section 4-30 of city code sets out the fees associated with surface water management. A water quality and water quantity fee are collected with a subdivision. These fees are based on land use type and are intended to reflect the fact that more intense the development type, the greater the degradation of surface water. This fee will be applied to the new lot of record being created. It is calculated as shown in the table below: Planning Commission • • Chanhassen Specialty Retail — Planning Case 2015-17 July 7, 2015 Page 19 of 23 Per acre rate TSize of new lot in acres Totals Water Quality $22,940.00 1 2.71 $62,236.22 Water Quantity $8,900.00 1 2.71 $24,145.70 Credit $11 70-001 2.77 acres treated $31771.90 Total due at final plat 0 Overstory trees $54,610.02 LANDSCAPING Minimum requirements for landscaping at the proposed development include 3,436 square feet of landscaped area around the parking lot, landscape islands or peninsulas, and 13 trees for the parking lot. The applicant's proposed as compared to the requirements for landscape area and parking lot trees is shown in the following table. Required Proposed Vehicular use landscape area 3,436 sq. ft. >3,436 sq. ft. Trees/parking lot 13 trees 12 trees Islands or peninsulas/parking lot 7 islands/ as 8 islands/peninsulas The applicant needs to locate one additional overstory tree on the site to meet minimum requirements for trees and landscaping in the parking lot area. Bufferyard requirements: All bufferyard requirements have been met. Required plantings Proposed plandngs Bufferyard A — north prop. line, Pond 0 overstory trees 2 overstory Promenade., 330' 2 Understory trees 0 Understory trees 2 Shrubs 12 Shrubs Bufferyard B — south prop. line, Lake 0 Overstory trees 4 Overstory trees Drive, 230' 1 Understory trees 0 Understory trees 1 Shrubs 29 Shrubs Bufferyard B — east prop. line, Main 0 overstory trees 1 Overstory trees Street, 210' 1 Understory trees 0 Understory trees 1 Shrubs 40 Shrubs Bufferyard A — west prop. line, Pond 0 overstory trees 2 Overstory trees Promenade, 210' 1 Understory trees 0 Understory trees I Shrubs 13 Shrubs All bufferyard requirements have been met. Planning Commission • • Villages on the Ponds I lb Addition/Chanhassen Specialty Grocery Planning Case 2015-17 July 7, 2015 Page 20 of 23 COMPLIANCE TABLE (Retail 1/200 square feet — 19,909/200 =100 spaces (# 70 spaces on-site, 88 spaces on Main Street, Lake Drive, and Pond Promenade. Parking Setback N - 0' E - 0' N - 0' E - 142' W -0'S-0' W -0'S-0' RECOMMENDATION Staff recommends that the Planning Commission approve Villages on the Ponds 11'b Addition and Chanhassen Specialty Retail Store as shown in Plans dated received June 18, 2015 and subject to the following conditions and adoption of the attached Findings of Fact and Recommendation: SUBDIVISION Park Full park fees in lieu of additional parkland dedication and/or trail construction shall be collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on the Ponds 11's Addition. The park fees will be collected in fiill at the rate in force upon final plat submission and approval. Based upon the current commercial park fee rate of $12,500 per acre, the total park fees would be $33,875. Enizineering 1. The plat must be revised to include a 10 -foot wide perimeter drainage and utility easement on Lot 1, Block 1. 2. The fees collected with the final plat are: Surface Water Management fee, Park Dedication fee, and GIS fee ($25 for the plat + $10/parcel). PUD Chanhassen Specialty Retail (19,909 sf) Lot Area 15,000 77,657 Building Height 3 stories 1 story 40 feet 29.5 feet Building Setback N - 0' E-01 N - 70' E - 13 W-0' S-0' W-218' S-90' Parking Stalls 100 stalls 158 stalls # (Retail 1/200 square feet — 19,909/200 =100 spaces (# 70 spaces on-site, 88 spaces on Main Street, Lake Drive, and Pond Promenade. Parking Setback N - 0' E - 0' N - 0' E - 142' W -0'S-0' W -0'S-0' RECOMMENDATION Staff recommends that the Planning Commission approve Villages on the Ponds 11'b Addition and Chanhassen Specialty Retail Store as shown in Plans dated received June 18, 2015 and subject to the following conditions and adoption of the attached Findings of Fact and Recommendation: SUBDIVISION Park Full park fees in lieu of additional parkland dedication and/or trail construction shall be collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on the Ponds 11's Addition. The park fees will be collected in fiill at the rate in force upon final plat submission and approval. Based upon the current commercial park fee rate of $12,500 per acre, the total park fees would be $33,875. Enizineering 1. The plat must be revised to include a 10 -foot wide perimeter drainage and utility easement on Lot 1, Block 1. 2. The fees collected with the final plat are: Surface Water Management fee, Park Dedication fee, and GIS fee ($25 for the plat + $10/parcel). Planning Commission • • Villages on the Ponds I I' Addition/Chanhassen Specialty Grocery Planning Case 2015-17 July 7, 2015 Page 21 of 23 3. City water (WAC), city sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will be collected with the building permit and will be calculated based on the uses within the building. Water Resources 1. An estimated $54,610.02 in storm water utility connection charges shall be due at final plat. 2. The property owner shall execute and record against the property a maintenance agreement in a format provided by the city for the pervious pavement, underground filtration, sump manholes and Contech JellyfishTm Filter. 3. The applicant shall apply for and procure all other necessary permits. SITE PLAN Engineering 1. Based on the proposed grading on the north side of site the grading plan may require some revisions in order to maintain drainage from the existing improvements to the north. Buildine 1. The buildings are required to have automatic fire extinguishing systems. 2. Building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 3. Detailed occupancy -related requirements will be addressed when complete building plans are submitted. 4. Provide a 1:200 scale drawing of subdivision. 5. The owner and/or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. Fire Marshal 1. Provide a three-foot clear space around fire hydrants. 2. Yellow -painted curb and "No Parking Fire Lane" signs will be required. Applicant shall contact Fire Marshal for specific locations. 3. No P.I.V. (post indicator valve) will be required. Planning Commission • Villages on the Ponds 11`s Addition/Chanhassen Specialty Grocery Planning Case 2015-17 July 7, 2015 Page 22 of 23 Natural Resource Specialist 1. The interior width of all islands must be a minimum of 10 feet. 2. A total of 13 trees must be planted within the vehicular use area Plannine: 1. The applicant shall enter into a site plan agreement with the City and provide the necessary security to guarantee erosion control, site restoration and landscaping. 2. The street/sidewalk lights along Main Street have to be preserved and operational when the site construction is completed. 3. Approval of the site plan is contingent upon withdrawal of Planning Case 2014-29, approval of the Planned Unit Development amendment and Subdivision. 4. The light poles may not exceed 20 feet in height. 5. All Wall Packs (WPI) shall be replaced with Wall Packs (WP2). Water Resources 1. The Surface Water Pollution Prevention Plan with all elements required by the NPDES Construction Permit shall be prepared and supplied to the city for approval prior to any earth - disturbing activities. 2. Proof of the NPDES Construction Permit having been procured by the applicant shall be supplied to the city prior to any earth -disturbing activities. 3. A dewatering plan, specific to the existing pond, shall be prepared and submitted to the city for review and approval prior to any earth -disturbing activities. 4. Areas immediately tributary to the pervious pavement, including disturbed areas behind the back of curb, must be stabilized within 24 hours of construction of the pervious pavement areas. PLANNED UNIT DEVELOPMENT AMENDMENT "The Planning Commission recommends the City Council approve the Planned Unit Development amendment in the attached ordinance for Villages on the Ponds to allow signs to be placed higher than 20 feet within Sector I, and for the size of letters to be increased to 48 inches along the west and north elevations as shown below (amendments are shown in bold and highlighted inyellow), and including the attached Findings of Fact and Recommendation: 0 0 Planning Commission Villages on the Ponds 11's Addition/Chanhassen Specialty Grocery Planning Case 2015-17 July 7, 2015 Page 26 of 26 Wall Signs The location of letters and logos shall be restricted to the approved building sign bands, the tops of which shall not extend greater than 20 feet above the ground. In Sectors I and II, sign height may be increase based on the criteria that the signage is compatible with and complementary to the building architecture and design. The letters and logos shall be restricted to a maximum of 30 inches in height except along the north and west elevations for buildings within sectors I and H. These letters may be increased to 48 inches. All individual letters and logos comprising each sign shall be constructed of wood, metal, or translucent facing. 2. If illuminated, individual dimensional letters and logos comprising each sign may be any of the following: a. Exposed neon/fiber optic, b. Open channel with exposed neon, c. Channel Letters with acrylic facing, d. Reverse channel letters (halo lighted), or e. Externally illuminated by separate lighting source. 3. Tenant signage shall consist of store identification only. Copy is restricted to the tenant's proper name and major product or service offered. Corporate logos, emblems and similar identifying devices are permitted provided they are confined within the signage band and do not occupy more than 15% of the sign area unless the logo is the sign. 4. Within Sectors I and II, architecturally, building -integrated panel tenanvlogo sign may be permitted based on criteria that the signage is compatible with and complementary to the building design and architecture. Architectural elements specifically created to increase signage height are prohibited. 5. Backlit awnings are prohibited.,' ATTACHMENTS 1. Findings of Fact and Recommendation. 2. PUD Ordinance Amendment. 3. Development Review Application. 4. Project Narrative dated Received June 18, 2015. 5. Reduced copies of Final Plat, Civil and Architectural plans dated Received June 18, 2015. 6. Letter from Soloman Real Estate Group dated June 29, 2015. 7. Email from Ed Vigil dated July 1, 2015. 8. Email from Mika Milovancev dated June 26, 2015 9. Email from Randy Rauwerdink dated July 1, 2015. 10. Letter from Julie Roettger, Houlihan's Restaurant dated July 2, 2015 11. Email from Matt Mayben, General Manager, Americlnn Hotel & Suites 12. Public Hearing Notice and Affidavit of Mailing List. Wplao\2015 planning cases\2015-17 Chanhassen specialty retail/staff report specialty retail.doc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA FINDINGS OF FACT AND RECOMMENDATION IN RE: Application of Venture Pass Partners, LLC and Northcott Company for Subdivision, Site Plan and Planned Unit Development Amendment approval. On July 7, 2015, the Chanhassen Planning Commission met at its regularly scheduled meeting to consider the application of Venture Pass Partners, LLC and Northcott Company for preliminary plat, Planned Unit Development Amendment and site plan approval for the construction of a 19,909 square -foot specialty retail building. The Planning Commission conducted a public hearing on the proposed subdivision preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wishing to speak and now makes the following: FINDINGS OF FACT 1. The property is currently zoned Planned Unit Development, PUD. 2. The property is guided in the Land Use Plan as Mixed Use. 3. The legal description of the property is: Outlot B, Villages on the Ponds Fourth Addition. 4. The Subdivision Ordinance directs the Planning Commission to consider seven possible adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding them are: a. The proposed subdivision is consistent with the zoning ordinance and meets the standards of the Village on the Ponds Planned Unit Development; b. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan since the site is guided for mixed use development which includes commercial or multi -family residential; c. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; d. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; e. The proposed subdivision will not cause environmental damage; 0 f. The proposed subdivision will not conflict with easements of mord; and g. The proposed subdivision is not premature since adequate infrastructure is available. A subdivision is premature if any of the following exists: 1) Lack of adequate storm water drainage. 2) Lack of adequate roads. 3) Lack of adequate sanitary sewer systems. 4) Lack of adequate off-site public improvements or support systems. 5. Site Plan. In evaluating a site plan and building plan, the city shall consider the development's compliance with the following: a) The proposed project is consistent with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may be adopted; b) The proposed project is consistent with the Site Plan Review requirements of City Code; C) The proposed project preserves the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing areas; d) The proposed project creates a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; e) The proposed project creates a functional and harmonious design for structures and site features, with special attention to the following: 1. An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community, 2. The amount and location of open space and landscaping; Materials, textures, colors and details of construction as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and 4. Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. f) The proposed project protects adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light 2 0 0 and air and those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. 6. The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse effects of the proposed amendment. The six (6) effects and our findings regarding them are: a) The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Fines: The site is guided mixed use (residential and neighborhood commercial). A retail building is a reasonable use in that location. b) The proposed use is or will be compatible with the present and future land uses of the area. FindlnP: The proposed use is and will be compatible with the present and future land uses of the area through the implementation of the design standards, landscaping, architecture, etc. c) The proposed use conforms with all performance standards contained in the Zoning Ordinance. Finding: The proposed use will conform with all performance standards contained in the Zoning Ordinance such as design standards, signage, durable materials, uses, etc. d) The proposed use will not tend to or actually depreciate the area in which it is proposed. Finding: The proposed use is intended to meet the daily needs of the area. It could potentially add convenience to the homeowners in the area. e) The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. Finding: The site is located within the Municipal Urban Service Area. The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. f) Traffic generation by the proposed use is within capabilities of streets serving the property. FIndin : Based upon traffic studies conducted by the applicant's traffic engineer, traffic generation by the proposed use is within capabilities of streets serving the property. 6. The planning report #2015-17 dated July 7, 2015, prepared by Sharmeen A]-Jaff, et al, is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve the Preliminary Plat (Villages on the Ponds 111 Addition) and site plan with a variance for Chanhassen Specialty Retail (Total Wine & More). ADOPTED by the Chanhassen Planning Commission this 7'" day of July, 2015. CHANHASSEN PLANNING COMMISSION DIV Its Chairman CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA ORDINANCE NO. AN ORDINANCE AMENDING CHAPTER 20 OF THE CHANHASSEN CITY CODE, THE CITY'S ZONING ORDINANCE, BY AMENDING A PLANNED UNIT DEVELOPMENT THE CITY COUNCIL OF THE CITY OF CHANHASSEN ORDAINS: Section 1. Chapter 20 of the Chanhassen City Code, the City's zoning ordinance, is hereby amended by amending the Villages on the Ponds Planned Unit Development Design Standards in its entirety as follows: VILLAGES ON THE PONDS DEVELOPMENT DESIGN STANDARDS a. Intent The purpose of this zone is to create a mixed use PUD consisting of commercial, institutional, office, and residential uses. The use of the PUD zone is to allow for more flexible design standards while creating a higher quality and more sensitive proposal. All utilities are required to be placed underground. Each lot proposed for development shall proceed through site plan review based on the development standards outlined below. The Central Business District regulations shall apply except as modified by this ordinance. b. Permitted Uses The permitted uses in this zone should be limited to uses as defined below or similar uses to those as listed in the Standard Industrial Classification. If there is a question as to the whether or not a use meets the definition, the Planning Director shall make that interpretation. No single retail user shall exceed 20,000 square feet on a single level of a building. A maximum of thirty- three (33) percent of the square footage of the retail users within the development may be of a "big box" category. The intent of this requirement is to provide a variety of users, including small retail shops, service providers, coffee shops, cabarets, etc., for residents of the Villages as well as the community as a whole, rather than typical suburban type large, individual users dominating the development and detracting from the "village" character. Retail users should be those that support and compliment the residential development located within the development, providing goods and services which enhance residents of the village and the community. Office. Professional and business office, non -retail activity except for showroom type display area for products stored or manufactured on-site provided that no more than 20 percent of the floor space is used for such display and sales. bank/credit union 0 0 finance, insurance and real estate health services - except nursing homes and hospitals engineering, accounting, research management and related services legal services Personal Services. Establishments primarily engaged in providing services involving the care of a person or his or her personal goods or apparel. dry cleaning beauty or barbershop shoe repair photographic studio tax return preparation laundromat health club optical goods computer services day care center copying mail stores Institutional. Establishments that are public/semi-public in nature. church library education services day care art gallery dance studio cultural facility Commercial/Retail. Establishments engaged in commercial operations including retail sales and services and hospitality industries. Apparel and Accessory Stores shoe stores electronic and music store and musical instruments restaurant — no drive through, except on Lot 1, Block 1, Villages on the Ponds 2' Addition through a conditional use permit and compliance with the following standards - the drive through shall provide sufficient stacking to assure that traffic is not backed into the parking lot drive aisles; loud speakers used for ordering shall be shielded so that noise is not heard off-site, and the drive through shall be screened from off-site views. (amended 8/13/01) restaurant - fast food only if integrated into a building no freestanding fast food and no drive through drug store/pharmacy PA r book/stationary jewelry store hobby/toy game gift novelty and souvenir sewing, needlework and piece good florist camera and photographic supply art and art supplies, gallery sporting goods video rental food stores including bakery and confectionery hardware store computer store hotel/motel entertainment liquor store pets and pet supplies home furnishings 0 Residential. Residential units shall be provided as upper level units above the commercial/office uses within the village core and as stand alone units. A minimum of 50 percent of the residential units shall be rental units. Of the rental units, the city has adopted a goal of 35 percent of the units meeting the Metropolitan Council's affordable criteria. Foi the ownership housing, the city has adopted the goal of 50 percent of the units meeting the Metropolitan Council's affordable criteria Prohibited Uses: Auto related including auto sales, auto repair, gas stations c. Setbacks In the PUD standards, there is the requirement for landscape buffering in addition to building and parking setbacks. The following setbacks shall apply: 0 0 Buffer yards are as specified in the City of Chanhassen Landscaping and Tree Removal Ordinance, Article XXV. No fences shall be permitted between the required landscape buffer and arterial and collector roads. d. Development Site Coverage and Building Height The PUD standard for hard surface coverage is 70% for the overall development. Individual lots may exceed this threshold, but in no case shall the average exceed 70 percent. 2. More than one (1) principal structure may be placed on one (1) platted lot. The maximum building height shall be Sector I - four stories (residential with street level commercial or office)/50 ft. (retail and office buildings without residences above shall be limited to three stories/40 ft.) except for the lot on the comer of Promenade Pond and Great Plains Boulevard shall be limited to two stories and 30 feet, Sector H - three stories/40 ft., Sector III - three stories/40 ft., and Sector IV - four stories/50 feet. Building height limitations are exclusive of steeples, towers, and other architectural and roof accents. (Amended 11/26/01) 4. The maximum building footprint for any one building shall be limited to 20,000 square feet without a street level break in the continuity of the building, e.g., pedestrian passageways, except for the church and residential only buildings. 4 VILLAGES ON THE PONDS Sectors Building Parking Great Plains Blvd.: Buffer yard & Setback C, 0' 0' Market Blvd.: Buffer yard & Setback C, 50' 20' Highway 5: Buffer yard & Setback B, 50' 20' Interior Side Lot Line: Buffer yard & setback NA, 0' 0' East Perimeter Side Lot Line (adjacent to residential): Buffer yard & setback D, 50' S0' West Perimeter Side Lot Line (adjacent to industrial): Buffer yard & setback B, 50 20 Buffer yards are as specified in the City of Chanhassen Landscaping and Tree Removal Ordinance, Article XXV. No fences shall be permitted between the required landscape buffer and arterial and collector roads. d. Development Site Coverage and Building Height The PUD standard for hard surface coverage is 70% for the overall development. Individual lots may exceed this threshold, but in no case shall the average exceed 70 percent. 2. More than one (1) principal structure may be placed on one (1) platted lot. The maximum building height shall be Sector I - four stories (residential with street level commercial or office)/50 ft. (retail and office buildings without residences above shall be limited to three stories/40 ft.) except for the lot on the comer of Promenade Pond and Great Plains Boulevard shall be limited to two stories and 30 feet, Sector H - three stories/40 ft., Sector III - three stories/40 ft., and Sector IV - four stories/50 feet. Building height limitations are exclusive of steeples, towers, and other architectural and roof accents. (Amended 11/26/01) 4. The maximum building footprint for any one building shall be limited to 20,000 square feet without a street level break in the continuity of the building, e.g., pedestrian passageways, except for the church and residential only buildings. 4 VILLAGES ON THE PONDS Sectors 0 E 5. The following table shall govern the amount of building area for the different uses: Commercial/ Retails Office/Service s Institutional s Dwelling Units TOTAL sf Sector I 114,500 83,500 0 160 198,000 Sector II *60,000 14,000 0 0 74,000 Sector III 0 0 100,000 0 100,000 Sector IV 0 0 0 162 0 TOTAL 174,500 97,500 100,000 322 372,000 (amended 11/26/01) * Includes 47,200square-foot, 106 -unit motel Building square footages may be reallocated between sectors and between uses subject to approval by the Planning Director. The following factors shall be used in calculating the reallocation of building square footages between uses: 1 Residential apartment unit = 3 congregate care (assisted living or dementia) unit. 1 Residential apartment unit = 2 elderly (independent) unit. 1 Residential apartment unit = 360 square feet of office/service. 1 Residential apartment unit = 90 square feet of retail. 1 Residential apartment unit = 440 square feet of institutional. 950 square feet of office/service = 1,000 square feet of institutional. 300 square feet of retail = 1,000 square feet of office/service. 290 square feet of retail = 1,000 square feet of institutional. (amended 11/26/01) In no instance shall addition institutional building square footage be reallocated without an amendment to the PUD. 6. Buildings adjacent to pedestrian sidewalks must have commercial/office on the majority of the street frontage. (amended 11/26/01) e. Building Materials and Design The PUD requires that the development demonstrate a higher quality of architectural standards and site design. The intent is to create a pedestrian friendly, "traditional' village character consistent with the European heritage of the upper midwest and the atmosphere within this development, yet with the amenities and technological tools of modern times. The village elevations shown on the PUD drawings are to be used only as a general guideline and the reflection of the overall village image including the north - midwestern architectural vocabulary, village like human scale and flavor, and variety in design and facade treatment. 2. All materials shall be of high quality and durable. Major exterior surfaces of all walls shall be face brick, stone, glass, stucco, architecturally treated concrete, cast in place panels, decorative block, cedar siding, vinyl siding in residential with support materials, or approved equivalent as determined by the city. Color shall be introduced through colored block or panels and not painted block or brick. Bright, long, continuous bands are 5 0 0 prohibited. Bright or brilliant colors and sharply contrasting colors may be used only for accent purposes and shall not exceed 10 percent of a wall area. 3. Block shall have a weathered face or be polished, fluted, or broken face. Exposed cement ("cinder") blocks shall be prohibited. 4. Metal siding, gray concrete, curtain walls and similar materials will not be approved except as support material to one of the above materials, or as trim or as HVAC screen, and may not exceed more than 25 percent of a wall area. 5. All accessory structures shall be designed to be compatible with the primary structure. 6. All roof mounted equipment shall be screened by walls of compatible appearing material. Wood screen fences are prohibited. All exterior process machinery, tanks, etc., are to be fully screened by compatible materials. All mechanical equipment shall be screened with material compatible to the building. The buildings shall have varied and interesting detailing. The use of large unadorned, concrete panels and concrete block, or a solid wall unrelieved by architectural detailing, such as change in materials, change in color, fenestrations, or other significant visual relief provided in a manner or at intervals in keeping with the size, mass, and scale of the wall and its views from public ways shall be prohibited. Acceptable materials will incorporate textured surfaces, exposed aggregate and/or other patterning. All walls shall be given added architectural interest through building design or appropriate landscaping. 8. Space for recycling shall be provided in the interior of all principal or accessory structures. 9. There shall not be underdeveloped backsides of buildings. All elevations shall receive nearly equal treatment and visual qualities. 10. The materials and colors used for each building shall be selected in context with the adjacent building and provide for a harmonious integration with them. Extreme variations between buildings on the same street in terms of overall appearance, bulk and height, setbacks and colors shall be prohibited. 11. Slope roof elements shall be incorporated in all structures: Sector I - minimum 70 percent of roof area shall be sloped, Sector H - minimum of 70 percent of the roof area shall be sloped, Sector III - minimum of 30 percent of the roof area shall be sloped, and Sector IV - minimum of 70 percent of the roof area shall be sloped. An exception to this requirement are roof areas designed for human use such as decks, garden areas, patios, etc., which will not be counted towards flat roof area 12. The following design elements should be incorporated into individual structures: R 0 Building Accents Towers, silos, arches, columns, bosses, tiling, cloisters, colonnades, buttresses, loggias, marquees, minarets, portals, reveals, quoins, clerestories, pilasters. Barrow, dome, gable, hip, flat. Roof Accents Cupolas, cornices, belfries, turrets, pinnacles, look -outs, gargoyles, parapets, lanterns. Accent elements such as towers, turrets, spires, etc., shall be excluded from the sector building height limitation. Window Tvoes Bay, single paned, multi -paned, angular, square, rectangular, half -round, round, italianate. Window Accents Plant boxes, shutters, balconies, decks, grates, canopies, awnings, recesses, embrasures, arches, lunettes. Street level windows shall be provided for a minimum of 50 percent of the ground level wall area. f. Site Landscaping and Screening 1. All buffer landscaping, including boulevard landscaping, included in Phase I shall be installed when the grading of the phase is completed. This may well result in landscaping being required ahead of individual site plan approvals, but we believe the buffer yard and boulevard plantings, in particular, need to be established immediately. In addition, to adhere to the higher quality of development as spelled out in the PUD zone, all loading areas shall be screened. Each lot for development shall submit a separate landscaping plan as a part of the site plan review process. 2. All open spaces and non -parking lot surfaces, except for plaza areas, shall be landscaped, rockscaped, or covered with plantings and/or lawn material. Tree wells shall be included in pedestrian areas and plazas. 3. Storage of material outdoors is prohibited. 4. Undulating or angular berms 3' to Tin height, south of Highway 5 and along Market Boulevard shall be sodded or seeded at the conclusion of grading and utility construction. The required buffer landscaping may be installed where it is deemed necessary to screen any proposed development. All required boulevard landscaping shall be sodded. 0 0 5. Loading areas shall be screened from public right-of-ways. Wing walls may be required where deemed appropriate. 6. Native species shall be incorporated into site landscaping, whenever possible. g. Signage One project identification sign shall be permitted for the development at each end of Lake Drive and at the south end of Main Street. Project identification sign(s) may also be located at the entrances to the development(s) in Sector IV. Project identification signs shall not exceed 24 square feet in sign display area nor be greater than five feet in height. One project identification sign, with a maximum height of 20 feet, which may be increased in height subject to city approval based on the design and scale of the sign, designed as a gateway to the project shall be located at the north end of Main Street. Individual lots are not permitted low profile ground business sign. Within Sector III, one sign for the church and one sign for the school may be placed on streetscape walls. The top of the signs shall not extend more than eight feet above the ground and the total sign area for the signs shall not exceed 64 square feet. Pylon signs are prohibited. The sign treatment is an element of the architecture and thus should reflect the quality of the development. The signs should be consistent in color, size, and material and height throughout the development. A common theme will be introduced at the development's entrance monument and will be used throughout. 2. All signs require a separate sign permit. Wall business signs shall comply with the city's sign ordinance for the central business district for determination of maximum sign area. Wall signs may be permitted on the "street" front and primary parking lot front of each building. 4. Projecting signs are permitted along Main Street and Lake Drive and along pedestrian passageways subject to the conditions below. Signage Plan and Restrictions Wall Sims The location of letters and logos shall be restricted to the approved building sign bands, the tops of which shall not extend greater than 20 feet above the ground. In Sector I and II, sign height may be increase based on the criteria that the signage is compatible with and complementary to the building architecture and design. The letters and logos shall be restricted to a maximum of 30 inches in height except along the north and west elevations for buildings within sectors I and H. These letters may be increased to 48 inches. All individual letters and logos comprising each sign shall be constructed of wood, metal, or translucent facing. 0 0 2. If illuminated, individual dimensional letters and logos comprising each sign may be any of the following: a. Exposed neon/fiber optic, b. Open channel with exposed neon, c. Channel Letters with acrylic facing, d. Reverse channel letters (halo lighted), or e. Externally illuminated by separate lighting source. Tenant signage shall consist of store identification only. Copy is restricted to the tenant's proper name and major product or service offered. Corporate logos, emblems and similar identifying devices are permitted provided they are confined within the signage band and do not occupy more than 15% of the sign area unless the logo is the sign. 4. Within Sectors I and II, architecturally, building -integrated panel tenant/logo sign may be permitted based on criteria that the signage is compatible with and complementary to the building design and architecture. Architectural elements specifically created to increase signage height are prohibited. 5. Backlit awnings are prohibited. Proiectin Sims isms 1. The letters and logos shall be restricted to the approved building sign area. 2. All wooden signs shall be sandblasted and letters shall be an integral part of the building's architecture. Signage shall consist of store identification only. Copy is restricted to the tenant's proper name and major product or service offered and such minimal messages such as date of establishment of business. Corporate logos, emblems and similar identifying devices are permitted provided they are confined within the signage band or within the projecting sign and do not occupy more than fifteen (15) percent of the sign display area. 4. Projecting signs shall be stationary, may not be self -illuminated but maybe lighted by surface mounted fixtures located on the sign or the adjacent facade. 5. Projecting signs shall be limited to one per tenant on street frontage and pedestrian Passageway and my not exceed six square feet. Letters shall have a maximum height of 12 inches. 6. Projecting signs shall be a minimum of eight feet above the sidewalk and shall not project more than six feet from the building facade. 7. Plastic, plexi -glass, clear plex, or similar material projecting signs are prohibited unless used in conjunction with other decorative materials. 0 0 8. Projecting signs may be painted, prefinished, or utilize exposed metal. Any exposed metal shall be anodized aluminum, stainless steel, titanium, bronze, or other similar non -corrosive or ono -oxidizing materials. Window Signs Window signs shall not cover more than 25 percent of the window area in which they are located. 2. Window signs shall not use bright, garish, or neon paint, tape, chalk, or paper. Menu Signs 1. Shall be located at eye level adjacent to tenant entries and shall not exceed 4 feet in height. 2. Shall be used only to convey daily specials, menus and offerings and shall be wood framed chalkboard and/or electronic board with temporary handwritten lettering. No paper construction or messages will be permitted. 3. Menu signs shall be limited to one per tenant and may not exceed 8 square feet. Festive Flags/Banners 1. Flags and banners shall be permitted on approved standards attached to the building facade and on standards attached to pedestrian area lighting. 2. Plastic flags and banners are prohibited. 3. Flags and banners shall be constructed of fabric. 4. Banners shall not contain advertising for individual users, businesses, services, or products. 5. Flags and banners shall project from buildings a maximum of two feet. 6. Flags and banners shall have a maximum area of 10 square feet. Flags and banners which are torn or excessively worn shall be removed at the request of the city. Building Directo In multi -tenant buildings, one building directory sign may be permitted. The directory sign shall not exceed eight square feet. 10 Pole Directory Sign 1. Pole directory signs consisting of single poles with individual nameplate type directional arrows may be located within the development. 2. Pole directory sign shall not exceed 15 feet in height. 3. Directory signs shall be a minimum of eight feet above the sidewalk. 4. A maximum of eight directory signs may be provided per pole. 5. The maximum size of an individual sign shall be 18 inches long by four inches wide. 6. Poles shall be a minimum of 10 feet behind the curb. h. Lighting Lighting for the interior of the business center should be consistent throughout the development. The plans do not provide for street lighting. As with previous developments, the City has required the developer to install street lights throughout the street system. 2. A shoe box fixture (as specified by City Code) with decorative natural colored pole shall be used throughout the development parking lot area for lighting. Decorative, pedestrian scale lighting shall be used in plaza and sidewalk areas and may be used in parking lot areas. 3. Lighting equipment similar to what is mounted in the public street right-of-ways shall be used in the private areas. 4. All light fixtures shall be shielded. Light level for site lighting shall be no more than 1/2 candle at the project perimeter property line. This does not apply to street lighting. 5. Light poles shall be limited to a height of 20 feet. 6. Lighting for parking areas shall minimize the use of lights on pole standards in the parking area. Rather, emphasis should be placed on building lights and poles located in close proximity to buildings. i. Parking 1. Parking shall be provided based on the shared use of surface parking areas whenever possible. Cross access easements and the joint use of parking facilities shall be protected by a recorded instrument acceptable to the city. 2. A minimum of 75 percent of a building's parking shall be located to the "rear" of the structure and in underground garages. 11 11 0 The development shall be treated as a integrated shopping center and provide a minimum of one space per 200 square feet of commercial/retail area. The office/personal service component shall be treated as an integrated office building and provide 4.5 space per 1,000 square feet for the first 49,999 square feet, four per thousand square feet for the second 50,000 square feet, and 3.5 per thousand square feet thereafter. Residential uses shall provide 1.5 spaces per unit as underground parking with visitor spaces provided as part of the commercial/office uses. Within sector IV, visitor parking shall be provided at a rate of 0.5 stalls per unit. Hotel/motels shall comply with city ordinance. Churches/schools shall comply with city ordinance, however, a minimum of 50 percent of the parking shall be shared. 12 COMMUNITY DEVELOPMENT DEMIRTMENT Planning Division — 7700 Market Boulevard Mailing Address — P.O. Box 147, Chanhassen, MN 55317 Phone: (952) 227-1300 / Fax: (952) 227-1110 0 CITY OF CHANgASSEN APPLICATION FOR DEVELOPMENT REVIEW Date Filec! � J — L � 60 -Day Review Deadline:4— _ Planner: S A Case #:cal rj _ l�% Section 1: Application Typeapply) ❑ Comprehensive Plan Amendment ......................... $600 ❑ Minor MUSA line for failing on-site sewers..... $100 ❑ Conditional Use Permit ❑ Single -Family Residence ................................ $325 ❑ All Others......................................................... $425 ❑ Interim Use Permit ❑ In conjunction with Single -Family Residence.. $325 ❑ All Others......................................................... $425 ❑ Rezoning ❑ Planned Unit Development (PUD) .................. $750 ❑ Minor Amendment to existing PUD ................. $100 ❑ All Others......................................................... $500 ❑ Sign Plan Review ................................................... $150 [D $ite Plan Review ❑ Administrative.................................................. $100 ❑� Commercial/Industrial Districts*....................g Plus $10 per 1,000 square feet of building ar Include number of existing employees: and number of new employees: ❑ Residential Districts ......................................... $500 Plus $5 per dwelling unit ❑ Subdivision ❑v Create 3 lots or less .......................... 3 ❑ Create over 3 lots.......................$600 + $15 per lot ❑ Metes & Bounds .........................$300 + $50 per lot ❑ Consolidate Lots..............................................$150 ❑ Lot Line Adjustment........................................$15 ❑� Final Plat* ........... .... EO 'Requires add@iona 0 crow for attorney costs. (2 Escrow will be requir r other applications through the development contract. ❑ Vacation of Easements/Right-of-way................... $300 (Additional recording fees may apply) Variance............................................................. _ $200 ❑ Wetland Alteration Permit ❑ Single -Family Residence... ............................ $150 ❑ All Others ....................................................... $275 ❑ Zoning Appeal ...................................................... $100 ❑ Zoning Ordinance Amendment ............................ $500 NOTE: When multiple applications are processed concurrently, the appropriate fee shall be charged for each application. (Refer to the appropriate Application Checklist for required submittal information that must accompany this application) ADDITIONAL REQUIRED FEES: ❑v Notification Sign .................. TOTAL FEES: $ b�3 a 3• �� ........................ (city to install and remove) ❑ Property Owners' List within 500' ........ $3 per address Received from\� Y "f[iLlvvrll� (City to generate — fee determined at pre -application meeting) ❑✓ Escrow for Recording Documents.. $50 per documen Date Received: % 15 Check Number: 819c) (CUP/SPRNACNAR/WAP/Metes & Bounds Subdivision) ,. Project Name: Chanhassen Specialty Retail Property Address or Location: Outlot B, VILLAGES ON THE PONDS, 4th ADDITION Parcel #: 258460030 Total Acreage: 2.71 Present Zoning: PUD Legal Description: Outlot B, VILLAGES ON THE PONDS, 4TH ADDITION Wetlands Present? Present Land Use Designation: PUD/Retail Existing Use of Property: Vacant Land ❑ Yes ® No Requested Zoning: Existing, PUD Requested Land Use Designation. Retail Description of Proposal: 19,909 sf specialty retail. Platting outlot underlying the Pond Promenade private road areas. 0 Check box if separate narrative is attached SCANNED Section 3: Property Owner and Applicant Information APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to the right to object at the hearings on the application or during the appeal period. If this application has not been signed by the property owner, I have attached separate documentation of full legal capacity to file the application. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Venture Pass Partners, LLC (or assigns) Contact: Randy Rauwerdink Address: 19620 Waterford Court Phone: (612) 801-4313 City/State/Zip: Shorewood, MN 55331 Cell: (612) 801-4313 Email: rrauwerdink@venturepass.net Fax: Signature: Date: 6/5/15 PROPERTY OWNER: In signing this application, I, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Northcott Company Contact: Brian Schwen Address: 250 Lake Drive East Phone: (952) 294-5215 City/State/Zip: Chanhassen, M"317,, Cell: Email: bschwnorthcotth ital' om Fax: Signature: t- Date: 6/5/15 This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and applicable procedural requirements. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. PROJECT ENGINEER (if applicable) Name: Sambatek Address: 12800 Whitewater Drive Suite 300 City/State/Zip: Minnetonka, MN 55343 Email: MBultman@sambatek.com Contact: Mike Bultman Phone: (763) 398-0867 Cell: Fax :(763)476-8532 SCANNED Section 4 Notification Information Who should receive copies of staff reports? 'Other Contact Information: ❑ ❑� Z Z Property Owner Applicant Engineer Other' Via: Via: Via: Via: ❑� 0 El ❑ Email Email Email Email ❑ Mailed Paper Copy ❑ Mailed Paper Copy ❑ Mailed Paper Copy ❑ Mailed Paper Copy Name: Andy Kmnik-Tushle Montgomery ArcMreots Address: City/State/Zip: Email: AndyK@b armdR s.=n SCANNED PROPOSED DEVELOPMENT-OUTLOT B VILLAGES ON THE PONDS 4 ADDN PROJECT SUMMARY NARRATIVE Introduction Venture Pass Partners, LLC is pleased to submit for consideration and approval, the attached applications for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B, VILLAGES ON THE PONDS 4TMADDITION. We are proposing to subdivide and plat this parcel into Lot 1 retail development consisting of a 19,909 sf specialty retail store, as well as Outlot A which will contain the Pond Promenade Road improvements. Sidewalk construction and improvements are proposed along the full perimeter extents of Pond Promenade Road and Main Street as part of the improvements, enhancing the pedestrian friendly character of the project. Benches and bike racks are also being incorporated to further promote the pedestrian character. Architecture and Design The 19,909 sf single story building will be detailed with a varied pallet of warm toned materials for the building exterior. Materials consist of pigmented rock face and burnished masonry, brick, EIFS cornices, standing seam metal roofing, aluminum windows, and fabric awnings. Accommodation for the 70% sloped roof coverage requirement is accomplished through the use of sloped metal roofing at portions of all four elevations and feature corner towers rising above the sloped areas to provide a visual break in the sloped areas. The main entrance on the west elevation projects out to form a covered area over the entry and also provides a sloped metal hip roof. Additional use of projecting fabric awnings and metal awnings and sculpted EIFS cornices provide increased relief within the building facade. The 50% building fenestration requirement is accomplished with an interplay of massing, color, and material detailing at each elevation. The use of large windows, sloped metal roofing, sculpted EIFS cornices, and fabric awnings provide a pedestrian scale and architectural detailing to each elevation. Windows at some locations, as governed by the Tenant's store layout, may be spandrel or translucent glass highlighted with awnings. The exterior of the building is further enhanced with an emphasis to natural plant materials using a green screen climbing landscape element at the east elevation (Main Street) and extensive use of plantings varied in height along the north, east, and south elevations. The outdoor trash storage and loading area is also screened by use of plant materials. Articulation of the south wall elevation is also accomplished with the natural building steps resulting from the receiving appendage and with the added layering and screening provided by the freestanding trash enclosure with an architectural trellis detail. Tenant signage will be integrally lit channel letters and will occur on all four building elevations as allowed by city ordinance, and will be compliant with all allowable area requirements. Stormwater Design One of the unique challenges of this project is meeting the stringent requirements of Riley -Purgatory Bluff -Creek Watershed District (RPBCWD), and specifically the standards which just became effective January 1, 2015. This is further complicated by the existence of primarily group type D soils that are pervasive across this site. Stormwater rate, water quality and abstraction requirements are being satisfied via the construction of an underground stormwater infiltration system. Extensive areas of the parking lot are to be surfaced with pervious pavers over a draintile and rock infiltration basin system. CITY OF CHANHASSEV RECEIVED JUN -I n 2015 CHANHASSEN PLANNING DEPT SCANNED CHANHASSEN SPECIALTY RETAIL VILLAGE ON THE PONDS LAKE DRIVE & MAIN STREET CHANHASSEN, MINNESOTA �won'�.ovor .awarvw,..smw .Ic.,rm rKm.,x.e, :rwcer"ora` a.Knna m .iarK M &rYrlrM mou � gun r vl»�ienirrcw .00K.a. PROJECT TEAM ON[tORR �HITUR[ IAb �MRNW. LLC. ARCM"=, !W"IIA Kr9KI.Kfs uM4Ml. WIeb,� . IK KId KI.K.Y v,Npsnre uvalrtea, iV WNIONiCO ARCNTEM ONL NO Cf .0T I.. a e _ sareme.ueoru+u+r mV mnKi �"` � KRMI muc +Ivi.Kruerllur�r„ wMA,�r „KM rLLrr :,vrarolrr w .Karoo :ee�rc Kpu"` w .mlcv u uPR �won'�.ovor .awarvw,..smw .Ic.,rm rKm.,x.e, :rwcer"ora` a.Knna m .iarK M &rYrlrM mou � gun r vl»�ienirrcw .00K.a. PROJECT TEAM ON[tORR �HITUR[ IAb �MRNW. LLC. ARCM"=, !W"IIA Kr9KI.Kfs uM4Ml. WIeb,� . IK KId KI.K.Y v,Npsnre uvalrtea, iV WNIONiCO ARCNTEM ONL NO N[OUNN t 9e0rRIGt MONM wu rrbNva wxaam SIyT�pNE LOCATION Ito GENERAL NOTES PROJECT INFO. �Oz[LLWLLwC. nu,w » ...... .... ftTT— ,.�.. mrA .AKa. rlwron urr`.:O1xoa _ KKKaIKrIra,IK"r C=INNpM710N wK RNRFrevl'M W L C�v.Rv wm YINM.I'A M,NCU[l. Alf mr a�n;m"."wrA .ov Ire,Ara,..................., Kia..,... Krerwmm Iv.Kew Ar.. K,o-»u.w�"KKww ryiaAo.r .............AK a� AAe K»wenu�e'e'rm.ron..o-AAu..r Ir.Av.. .Aawr a""erlm+.l.r I.,AKA..urranAl•.. mr KfY]�NAIAIMY ;eme:�.Au o„r,..ArK.m DRAWING INDEX m 01TY 0FCHANHAS-Er I RECEIVE') JUN 18 2015 .., AWMEN PIAN.MNS DFPT SCANNED VILLAGES ON THE PONDS 11TH ADDITION owlx.vNub.MMgbl.ra.amcNvai.ugrvreseNun.u. [vv.rtv.x...r..vw.. uFwwMrregn.evv.WbblMwxm.nxxarur. Nuv...MybaY1l.x.YpWNIV IYx, urriv an.y N w.ry mnw x exN Ivr.xn LL[.. r.M.x Y4. W..w.,ry, s.. ximw,vlvnun w <.vw imv pn.m. io s .YNn...rxvusuw_Nx x� munr'w n...sar.�...r�w..xr..�..M_.w. •_.x wn, n.xN.wxm.xF.xx,.....niN.x.Nw......lw•a •,uxx,.a,.. .~�.n.x•N.M1 ee vx.gsMxumiM1�nrywx a..ey..Y:mw nmwvexpw.�n N•.ernviNr,vrtm.an.um.v. uvw. w. x..urt uemx w f w�.. x.rm u.w r. x.b nvs�or. mwna M r.wa.r.�.�r...w.xr...a...w._•rw. .N rxur.xrx •.,�..,. brxx.®. x�..x �. xxb,.,...1.. mbr.......x. ... x.N.....,,N.x,,. I....rw"'"'rw�M+4Nw.a.xNN...x�.�.•...e........xl....e..Ne..a...wr. N..a u.—a... µ..+.. .RR p.. nluua. m. w...rx.. ........ x.NN......rxw.e« VILLAGES ON THE: VILLA.OES ON THE 'r:ihiCci 3RD ADOITiOEd i VILLAGES Ohl THE: VILLAOEEi Oh! T..EE P^fdDS W ^— NORTH i FILE NO. PONDS010 _ I E;i •x I n. '•• a I I ti. I � I I I Nl Ill /- T I `n t-) I I I In I r I •x I J 111 I a I }� I I SAMBATEIC INC. XEFNHIx4. ar.xNING PNO 0511PVFYING Z N j !tl i -ZO bd O0u+ x2 '• Ea77[[ a aNZ uN i NaawDEMOLMONNOTEs RRA LEGEND ♦ W n r� u .. „uuu . r Yra_r„anm EEO DEMOUTM LEGEND Z7 -7- 2D MIK .,.�,...,,.»...,,o... L e ,e x v NNARDOUS BUILDING MATERIAL NOTES aa� IL1 D1�unTREE PROTECiNN WARtl�'�r� ®YrrM.Erx IR,.�NY,YM 1R6TYW Y�r,MIR..BIb� Client VENTURE PASS PARTNERS, LLC �tNj11[,PISS P/IIRBk Project CHANH SPECIALTW RETAIL Location CHANHASSEN, MN Certification n.. Summary Revision y� m Sheet Title I DEMOLITION PLAN Sheet No. Revislol C2.02 1 Pr0 'ecl N09EN30145 o I I I I I I I VILLAGES I ON THE PONDS [n.GCK , I I VILLAGES ON THE PONDS ROTM LOT t 3RD ADDITION BLOCK , `r .c_- VILLAGES ON THE PONDS OUTLOT a __ i�i�.i —ocuRlmloN —T ce /h•+ ��3 In [ ��1 =CONTACT INFORMATION _ -PROMENADE------ �•�`.:,.�.. LIE NOTES ,\ - ,T.,W�./r) 1. v `````\1 / /'J ' wa.••Iw'�,W _ —ill//��/r r\\\ 1 WE DRIVE OUn0EA 8 VJt_.AGes O` 11 s ON THE PONOS 7TH ADDITION I ,�P, I ` VILLAGES .weir LOT 1 C,BLOCK I I mLeOENo _ 4M awniH�� Non VENTURE PASS PARTNERS, LLC Project CHANHA� RETAIL CHANHASSEN, MN Certification 5^ummary !eVIElon HI Sheet Title PRELIMINARY PLAT - VILLAGES ON THE PONDS 11TH ADDITION CZ_n_,A IIFDFMD wum n n ® �w.v � ere�n mmu Q �DEv�LWMFNT MOIFF ®GMOING NOTES Sad mei' Client VENTURE PASS PARTNERS, LLC SMTEW�MM, MX 65111E &MQF PISS PMIjeR Project CHANHA SPECIAL RETAIL Eocauon CHANHASSEN, MN Unification �onp�A Summary Revision HiUM Sheet Title GRADING PLAN Sheet No. Revisior C4.01 Project NO.VF WO 145 0 f\ a ,I i " PROMENADE � r pONO I 1 \ 1 ST Rip /f/(I y \� LAKI DRIW e IEGEND �Ny � nwu.x.n.w..uw n.wur a.a.e.u.a..0 SB TS NERE SEOIENCF W CONSTRICTION IRR41'xe.iru.wxn[mY.m[n,un .NOTETOC MaOflx rmxnaarxrarnrmon EROSION CONTROE MATERIRl50VANNTIES Y1M Ouxxlin 0� I I I I I I II, N111§- ii+°: YIANE DRIVE v� 5 SIT d r IT , l9 IT o —2srs Qf rnao .-III-,_WEw a TS �SEQUENCEO CONSTRUCTION =NOTE To CONTMCrON ME Snbafek mwNEMENEMEN ME. Client VENTURE PASS PARTNERS, LLC Project CHANW SPECIAL RETAIL Location CHANHASSEN, NIN Certification �e umma� Revision HISIM . allllllpm Sheet Title EROSION CONTROL PLAN - PHASE 11 Sheet No, R-Islor C5.02 Project No.VEN20145.0' Il r EROSION! SEDIMENTATION CONTROL NOTES& DETAILS/'SITE MAP' �NIF IOGTION MAP t nnery Mxu�x1� ,4 r1nRe.n!e:r..-RE e..nne..w^1Y_Cly 4 �4. 111\ t„� .WnWli4z �USGS MAP— r1nRe.n!e:r..-RE e..nne..w^1Y_Cly BROAD ORMN INLET PROTEMON (10.11 mwmt WASNOUTAR[ NPNw OGENERAL EROSION NOTES: eMMNTENANCE 111\ t„� .WnWli4z BROAD ORMN INLET PROTEMON (10.11 mwmt WASNOUTAR[ NPNw OGENERAL EROSION NOTES: eMMNTENANCE .I � �IFGfNO s -IJ PROMENADEIIIIIIIIIIII� UnUrn CONWRUCTIONNOIFS�._.........r.n.rr.r� .w.a y m d� arwnu rnnm, � .am�w� ��• vau vrv�n .... .1— LAKE DRIVE .... ...J al I. .WORM SEWER WRUI SCHEDULE }:Sambatek reWrex [a .�w..ev�uxaw Client VENTURE PASS PARTNERS, LLC Project CHANHA_ SPECIAL RETAIL Location CHANHASSEN, MN Certification Summary Revision HI Sheet Title UTILITY PLAN C6.0.1.,�..,..,. Project NO.VEN)0I450 T — mlf TWN:AL IY CIAYEIfit CATCH BASIN EIMMELwo mMnur JIOS . Xu drP1 N yam PuwnnN B rvn.-e.m x� u..rn M1 IT M / 1� A9 1.k UNION HARED ENO SEC110N u.pNEEmNO oPMTYENi r"N'N' SI08 QAC +miGAL C NAMEMR IATON BASH MANNGLF xlxC IXIAK I T F,7ti 11!11 B rvn.-e.m x� u..rn M1 IT M / 1� A9 1.k r QAR TYPICAL GATE VALYL AND BOX INSTAWMM QAC +miGAL C NAMEMR IATON BASH MANNGLF xlxC IXIAK I T F,7ti 11!11 � �rl Q�IOP iYPIDAI CURB AND W70 DNXNDIIIq omrmu011 �" 910.1 B rvn.-e.m x� u..rn M1 IT M / r QAR TYPICAL GATE VALYL AND BOX INSTAWMM fxWKKENINf: —I.- !DDB � �rl Q�IOP iYPIDAI CURB AND W70 DNXNDIIIq omrmu011 �" 910.1 ie br.wain Y ,p MTN PIPL BEDDING IN POOR SOLS O GREENNG OE9MIYENI ~c, 2201 Olv GCOESSIBLL PARKING SIGN Pali PBEDDIFPE �avxwsrvsi. ENxc IIEP.wINExI — 2203 RlV,,11kX1 [«b1N1 YCM1M � t..T.mun.ue«rrr". M �1'��manw O' M ..�o.,1.1-.-.T. «�..,...,.....,,.���..«.«�.. ..d.. �QNOCUT 03« IYPIGLCLEANOUt ' �PlelSTllue Nils aa3EP YnIw A+ Client VENTURE PASS PARTNERS, LLC Project CHANHA SPECIAL RETAIL Location CHANHASSEN, MN Certification Summary Revision RI Sheet Title CONSTRUCTION DETAILS Sheet No. Revisiol C/.02 OSx BITUMINOUS PAVEMENT SECTIONS SIM e6x CONCRETE PAVEMENT SECTIONS aN pal NN NNc d41 W r 7 B.Taa.•.� avtiT, : M,T' Mdf MN SAFL BAFFLE PRNCL TOP VIEW OF SUMP V. Y.. .T doEou rP@!B nV:- y.. ... yll WAp4% OET/JL FI W4PlA ' Wn[ SIUf VIEW (1f q.I,I�, i �KKET '. upstream♦ TeCthnol0 les WINs�EFaeaEnReTwacnRx suFl �,tt...T....`i� nNaNuerNNBRRcwIwFLB �'.^'^` — eMSIMINW1FOMaaeeiNC IaPPLL B)xss CONCRETE ISOM" L. x::1a L. ,V �__ fib^ vawnmx. (g�.7,PERVNRIS PAVEMENT SECTION ..e,..� / w m. no.nwo0 wr_....'� � witx"w` `n a v, ,• ROC, INFIUTRATION BASIN .N9SM9Ns11S Pe.a RS.TdwnN P7pRMIW.... AL I'R aTNavnnnuL �Samsb3Uek RTW W Client VENTURE PASS PARTNERS, LLC sxoiwwauo"�0ss1Osuis &IWN [allo Project CHANHAIR SPECIAL? RETAIL Location CHANHASSEN, MN Certification 14 Summary RevisionHI� M�— Sheet Title CONSTRUCTION DETAILS Sheet No. Revision C7.03 Project NONENIBSASID �b e b 1 oa roxam rossouuro� Olent VENTURE PASS PARTNERS, LLC &Mw.iiMN"d' Project CHANHA SPECIAL RETAIL Location CHANHASSEN, MN Certification Summary Reviion Hl i Sheet Title CONSTRUCTION DETAILS Sheet No. Revisior C7.04 ommaYmarmYo-�.w�zsw® �m®mmasrmY ww® !�®®®mYlmYim® aatam®®momY um,s+ao vao�®mmasrmY NUs4gma#a! V �b e b 1 oa roxam rossouuro� Olent VENTURE PASS PARTNERS, LLC &Mw.iiMN"d' Project CHANHA SPECIAL RETAIL Location CHANHASSEN, MN Certification Summary Reviion Hl i Sheet Title CONSTRUCTION DETAILS Sheet No. Revisior C7.04 -� ||!| •| •!�` .�! � . -- � . , � r, § ..,, I 9| , � . .;, ¥ . ` e � ( ; Q!|�!)�| � Q\ / /� � ,� !| \ � ƒ � , | ;� r � j \ |%w$ �a • � | /| ; � $,¢/||. i�� � ƒ� � �� §� (� § t / ■� |� /) � � � �� �� § - ! !| . [ H ... _m ,,, ! �IA .111 11 A"I '�'l I'l' e _ ~ *3 / � k\ fAilv03 AN3 AVHNVH / : ~ a mai n irerru. w mr �moiM eanrr m �`m: inwmr wr'".. .°rt...�mu°r°m w� rues.m wn •• rokown...m.m— ,r..wnnwa�werom n B45TRft RANTING 1� �.ue�.e.o. m. , nw���,"i+7TT�P ar�.eenxeeoao. �Tt JT P -.r n SOD INSTALLATION �usn.Nnea � T I� n DOWNSPOUT DRAINAGE BTRIP IN MULCH BED 2 IXISTING 7EV5HRU13 PROTECTION .0 +e uae rnnu rrwm..o..w. — w�awe uoema.o.�. - rw..�aucw.w��. .uxr®in'ro". .a.eoomwmr w.zw 1-1��rr7lF_ xrmr .wo wmn u un u wwm ae. m rnew eo. ru...cnou wm owns ww uos ro near mw ne ernv m ue.. x..r n. wine . our we a'xm uww. u.are mxauwveuoevcmwwumr..n vx. >ooneieaemuowr w.er nu rourrw..owo-oaouwncmuw..e..nw" e.krro m+eex�rum w �wrwm ar wwr..n ew. uae.owu a>rtme nm r.... umr uew m.:r. u„+ouuoe ww n. r neummowwrwna.waruerm ra wrrow..rwa.mwrunwuwnQ.uorn..r+.rx+, 4 BHRUB PLANTING �zu 0O s�• t s aj5 aaa a � aaaaa a] a aaa r a a a l a a aaaaa a a ] a a a as a]a 'yy as aaad aaaaa a i 1 a 1 l a a a a 2 a a a a 2 2 a a s aaaa a a i nasi ags ra racer aaa , x a aaaaa a ] aaaaaai�a elosau asseyueyo 10 hllt/1O3dS N3SSbHNVHc) �s�"6fis 11 ' a ,2 a , MAIN 5TREEf iaaaaaaal_a � d } N u_ 1 vlmmmmmmm=ie _j 0 d 3 MY FIRST FLOOR 0 SIR U TRA9n GNCL09URC - EAST CIGVATON I I IB.9M 5.F. Q TOTAL J----------T------- ----- i HIM I® Q5 AM TRA.9n cNCMURL - 5MTn MEVATION TRAbn GNCLOSURE - WEST O.GVATION U TRA9n GNCL09URC - EAST CIGVATON S 9(�RASH - ii i�llinmuuu�nuuuunnm�mwuuuuwuinmuu�yuuun I RooFNVn o O a A urrur� I I n 9gMLne Dugram EMI — U n Roof Dram Detnl �rTa 40 4 Roof Cgmpment Support Curb Detail n Roof flakch Detail /� Roof Vent DebA m .PREl�M1NPRY �g��WN s.weee..� aaoiam � ii i�llinmuuu�nuuuunnm�mwuuuuwuinmuu�yuuun I RooFNVn o O a A urrur� I I n 9gMLne Dugram EMI — U n Roof Dram Detnl �rTa 40 4 Roof Cgmpment Support Curb Detail n Roof flakch Detail /� Roof Vent DebA m .PREl�M1NPRY �g��WN DRCRIOR PINISN SCHEDULE mr....u.m�m u�'wn�crev�� rawrmcc re �•'•. aeoruw UMN fueCw c(NM MfY WCt aue..w ii ) ( E]s v aue i8•, I WA— RRNO VCAA C�Sj{tU� I A2.0 1 /1 North Elevation 2 5axn �avaaon 8 Ent Oevadon r, r, n n n 4 WeeC Elevation } F J Q U 0 W ° a z z WW U) a = U z Q U \/_nlnm rest I'wwns �StFti�t101'I IXfDIOR �LVATON! INnfn LWDlGnN6) A2. I FI -41 Mri EY(NNl�ill� i aae. also �1l1oil -� A 111 �n 0 0 SOLOMON REAL ESTATE GROUP "Where Wisdom and Opportunity Meet" June 29, 2015 Mr. Bob Generous City of Chanhassen 7700 Market Boulevard Chanhassen, MN 55317 RE: Planned Unit Development for Chanhassen Specialty Retail Venture Pass Partners, LLC as Applicant Dear Bob, I am writing this letter in support of the application made by Venture Pass Partners, LLC for the development of the property located at Outlot B, Villages on the Ponds Addition. As a neighboring property owner, we believe it is important for the promotion of success of the retail businesses located within the Village on the Ponds to have the strong support and positive traffic generation that this proposed retail use will bring to the area. This area has lagged behind many of the businesses located across Highway 5 and needs the support of sizable, strong retailers in order to generate sufficient traffic to support strong sales volumes. In addition, this project will finally complete the Village on the Ponds development which will result in a healthy and vibrant look, feel and shopping experience. Last, the quality of the proposed architecture is strong and consistent with the other properties in the area and once completed all common areas will finally be installed in a manner consistent with the original vision for the Village on the Ponds project. We support the proposed project and hope that the City of Chanhassen will do the same. Sincerely, 6'.), -0-t jod�w Jay Scott President 12300 $ingletree Lane Suite 200 Eden Prairie, MN 55344 Phone: 952.974.9200 Fax: 952.974.9300 M�monre ou xom AI-Jaff, Sharmeen From: Ed Vigil <ekvigil@usinternet.com> Sent: Wednesday, July 01, 2015 11:24 AM To: AI-Jaff, Sharmeen Cc: Generous, Bob Subject: FW: TWM Hi Sharmeen, I will be traveling for the next 2 weeks and I will not be able to attend the meeting on Tuesday the 7th. However, I wanted to send you an email regarding the approval process of TWM in front of my property on Village on the Ponds. To the members of the City Council, My name is Ed Vigil, I am the owner of Bokoo Bikes and Paddlesports located at 550 Lake Dr in Chanhassen. Our building is situated directly adjacent to the proposed location of the new Total Wine and More retail store. I have been waiting for 15 years for this land to be developed and a business to open. Making use of this valuable location has been a long time coming and it is important that all potential businesses are given serious consideration. The recent recession did not help the prospects of this land being developed. There has been very little interest in this parcel over the years but there have been a few deals that fell through. Many of our customers have commented that we have a very nice pond in front of us and have been shocked to learn that the 'pond' is actually a hole that was dug in preparation for underground parking for Extended Stay Suites proposed to develop in 2001. The most recent activity was the fiasco of having another national retailer, Trader Joe's, abandon their plans to move to Chanhassen because of a clause within Lakewind's Co-op and the property owners agreement. We now have a golden opportunity for another nationally recognized retailer open up shop in our city. I would like to ask the City Council to do whatever is necessary to not lose this chance and welcome a retailer of TWM's caliber. Out of all the retailers I could imagine, this is a business with a very successful business model that will draw their customer base from outside Chanhassen because of competition generated by municipalities. Based upon the experiences of other cities, TWM will likely greatly increase consumer traffic for Chanhassen as a whole. Chanhassen is very fortunate to have been chosen as a site for expansion. I fully endorse the approval to welcome TWM to Village on the Ponds in Chanhassen. Respectfully, Ed Vigil 0 AI-Jaff, Sharmeen 0 Subject: FW: VOP Association, Architectural Review Committee's Comments for "Chanhassen Specialty Retail ", Outlot B, Village on the Ponds 4th Addition. From: Mika Milovancev rmailto:mmilo(almagarch.coml Sent: Friday, June 26, 2015 1:15 PM To: Vernelle Clayton Subject: FW: VOP Association, Architectural Review Committee's Comments for "Chanhassen Specialty Retail ", Outlot B, Village on the Ponds 4th Addition. To: Village on the Ponds Association c/o Vernelle Clayton, the Manager of the Association. Re. VOP- Architectural Review Committee's Comments for: " Chanhassen Specialty Retail", Outlot B, VOP 4te Addition, Proposed Development Plans. Developer: Venture Pass Date issued: 6/26/2015 Dear Vernelle, It is our understanding that the proposed Chanhassen Specialty Retail will be a welcome addition both to the City, as well as for the business environment of the VOP community area. And that was always the goal for our Village: a wide range of uses that together create pedestrian oriented streets and a vibrant urban setting. Keeping that in mind, we look favorably at the proposed development, even though it is not providing the desirable mix of uses (retail, residential, office...) within this specific site area. Also, the VOP Guidelines called for the main entry to be facing the Main Street, at least for the assumed office or residential uses Guidelines envisioned on the upper floors. However, we recognize that in this case of a large, single level retail store, in order to be successful in operation, the main entry needs to be as close as possible to the parking area. Especially in case of very cold winters we have in our Minnesota. In regard to some other specifics: --- Sheet L4.0- Lighting Plan: The existing Main Street lights are neither referred to, nor reflected on the plan, but those are to remain as part of VOP's overall streetscape. Also consider: - replacing "modern", powerful Gardco wall lights along the Main Street with Longman fixtures. Gardco would interfere/"diminish" the existing traditional lights on the street, as opposed to softer Lingman lights that would blend better with the overall character of this street. - providing a special lighting effect (landscape up lights?)for the curved "green wall" facing the Main Street. --- Sheet L2.0- Landscape plan: -It calls for the existing 5 street treeRso remain. This is of essence due to a very tight space between the building wall and the street sidewalk/parking, which allows only for a rather minimal new landscaping to be planted along the wall. -Also, aside of the two linden trees called for in the plan, there is not any other ground cover/landscape indicated at the NW corner of the parking lot; that needs to be corrected and properly landscaped and irrigated. --- Sheet A2.0 -Architectural Elevations: -Overall, and as well described in the "Project Summary Narrative" part of the submittal package to the City, the proposed building massing, "warm toned" facade materials, colors and various articulations, provide for desired varieties and good integration within the existing VOP community. - However, in regard to facade segments covered with the utility brick #2 at the East end North elevations, with their face flush with the adjacent wall areas, consider to change them to be either somewhat recessed, or projected out from the rest of the walls around them. That would give them a pronounced appearance and create more variety and interest on these elevations. - Specifically, at the Main Street, that wall segment could nicely follow the curved shape of the "green wall", thus breaking the monotony of the long and high flat building wall along the street. In absence of the building entry from the street, that, along with some possibly expended seating area there, would grant some interest and more of a "pedestrian oriented" feel to the street. In Conclusion: The above comments were based on our review of the set of preliminary plans (with a focus on architectural and landscape plans) as provided to us on 6/22/2015. We hope the above comments would help, along with further City's reviews and hearings, towards a successful completion and integration of this development into the VOP and City of Chanhassen urban core. Please let us know if we can be of any further assistance. Thank you, Mika Milo, r. architect For VOP Association, Architectural Review Committee. This email has been checked for viruses by Avast antivirus software. www.avast.com 3vastr This email has been checked for viruses by Avast antivirus software. a'.- www.avast.com • 0 AI-Jaff, Sharmeen From: Randy Rauwerdink <RRauwerdink@VENTUREPASS. NET> Sent: Wednesday, July 01, 2015 11:18 AM To: AI-Jaff, Sharmeen Cc: Dave Carland; Andy Krenik Subject: VOP review comments Sharmeen, as follow up to a voice message that I just left for you, I wanted to discuss how or if we were to react to the plan review comments that Mika provided last Friday (through Vernelle). We generally found his comments to be very favorable, but did have some clarification or concern with some of the comments. We want to understand if any of this becomes a part of staff report or conditions, and if so we want to provide some input. Below is an initial response from our architect that addresses Mika's comments: L4.0: Lighting Plan • Main Street lights will remain and are so noted on 1-1.0 (removed and reinstalled) • The lighting plan will need to be redone as there was not enough time to redo the plan per the 19,909 sf building revision • 1 have a call in to the lighting designer to see if/how changing to the Ligman fixture will alter the lighting levels • Uplights at the green wall are not allowed per my understanding as fixtures need to have a 90 degree cutoff L2.0: Landscape Plan • Sod/irrigatation noted for the NW corner but plants can be placed there instead if so desired A2.0: Architectural Elevations Brick #2 projects out 4" at East and North Elevations. Not in favor of projecting brick #2 out any further but we can at an added cost to footings and foundation. Corner brick #1 elements are already projecting out 8" to provide varying depths for facade along with projecting canopies and varying roof lines. Curving the brick wall on the east elevation will add substantial cost for additional footings and foundation work, will come very close to Utility Easement (but technically not over), and will reduce depth of planting area. The green wall is curved for that specific reason to break up the length of the elevation without adding costs and reducing planting area. Randy Rauwerdink Venture Pass Partners, LLC 19620 Waterford Court Shorewood, MN 55331 612.801.4313 rr uwerdinkCo)ventureoass.net /VMM PASS PARnWs 7/2/2015 Roettger, Julie Houlihan Restaurant 530 Pond Promenade Chanhassen, MN 55317 Sharmeen A]-Jaff Senior Planner City of Chanhassen 7700 Market Boulevard Chanhassen, MN 55317 Dear City Planner, I have reviewed the request for amendment to Villages on the Ponds Planned Unit Development, Subdivision of approximately three acres into one lot and one outlot (Villages on the Ponds 11th Addition), and Site Plan Review to construct a 19,909 square -foot liquor store on property zoned Planned Unit Development (PUD) and located on Outlot B, Villages on the Ponds 4th Addition and the development application. I do support this project because I believe the customer traffic generated by the proposed high volume retailer will benefit our business while not adding additional direct competition. I also believe the architecture and design are excellent and are cohesive to the high standards that have been achieved with previous building within the development. Regards, Roettger, Julie Vice President of Operations Houlihan Restaurant • 0 AI-Jaff, Sharmeen From: Ameridnn Chanhassen, MN <Chanhassen.MN@americinn.com> Sent: Thursday, July 02, 2015 9:32 AM To: AI-Jaff, Sharmeen Subject: Our support behind the Villages on the Pond development Dear Ms. AI-Jaff - As the General Manager of the Americlnn Hotel & Suites of Chanhassen, I want to pass along my support for a new development of the vacant land located near our hotel in the Villages on the Pond area. We understand there is a possibility of a large retailer being located in a new building on that vacant land. We would be in support of the additional retailer being located there. Any retailer who can generate additional foot traffic and exposure to our businesses — as well as be an amenity for our guests — is a welcome addition to the area. We were looking at the Chanhassen Planning web site and feel the design and size of the building is complimentary to all of the neighbors. We fully support this recent development application. Thanks, Matt Matt Mayben I General Manager Americinn Hotel & Suites — Chanhassen 570 Pond Promenade i Chanhassen, MN 55317 Phone: (952) 934-3888 1 Fax: (952) 974-9394 I Northcott Hospitality I vle4ea&v# SO grana 4 ha&AUR14 ANN19ll i WMAR ! FBI*$ lnTAKAUSIA" InM[InlNSOUR IIY • CITY OF CHANHASSEN 0 AFFIDAVIT OF MAILING NOTICE STATE OF MINNESOTA) ) ss. COUNTY OF CARVER ) I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on June 25, 2015, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota; that on said date she caused to be mailed a copy of the attached notice of Public Hearing for Chanhassen Specialty Retail — Planning Case 2015-17 to the persons named on attached Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and depositing the envelopes addressed to all such owners in the United States mail with postage fully prepaid thereon; that the names and addresses of such owners were those appearing as such by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate records. Subs b-4 and sworn to before me ti Vay of,tl n -e— 12015. Notary Publi *0 ' WIN" / Notice of Public Hearing Chanhassen Planning Commission Meeting Date & Time: Tuesday, July 7, 2015 at 7:00 p.m. This hearing may not start until later in the evening, depending on the order of theagenda. Location: City Hall Council Chambers, 7700 Market Blvd. Request for Amendment to Planned Unit Development; Subdivision of approximately three acres into one lot and one Proposal: outlot (Villages on the Ponds 11th Addition), and Site Plan Review with Variances to construct a 19,909 square -foot specialty retail building on property zoned Planned Unit Development PUD — Chanhassen Specialty Retail Applicant: Venture Pass Partners, LLC Property Outlot B, Villages on the Ponds 4th Addition Location: A location map is on the reverse side of this notice. The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the What Happens public hearing through the following steps: at the Meeting: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. If you want to see the plans before the meeting, please visit the City's projects web page at: www.c!.chanhassen.mn.us/2015-17. If you wish to talk to someone about this project, please contact Sharmeen AI-Jaff Questions & by email at saliaff(d)ci.chanhassen.mn.us or by phone at 952 - Comments: 227-1134. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. The staff report for this item will be available online on the project web site listed above the Thursday prior to the Planning Commission meeting. NEWT Sign up to receive email and/or text notifications when meeting agendas, packets, minutes and videos are uploaded to the city's website. Go to www.ci.chanhassen.mn.us/notifyme to sign up! City Revlew Procedure: • Subdivisions, Planned Unit Developments, Site Ran Reviews, Conditional and IMedm Uses, Wetland Alterations. Rezonings, Comprehensive Plan Amendments and Code Amendments require a pudic hearing before the Planning Commission. City ordinances require all properly within 500 feel of the subject site to be notified of the application In writing. Any Interested path Is invited to attend the meeting. • Staff prepares a report on the subject application that includes all pertinent Information and a recommendation. These reports are available by request. At the Planning Commission meeting, staff will give a verbal overview of the report and a recommendation. The Item will be opened for the public to speak about the proposal as a pad of the heading process. The Commission will dose the public hearing and discuss the Item and make a recommendation to the City Council. The City Council may reverse, affirm or modify wholly or partly the Planning Commission's recommendation. Remnings, land use and code amendments take a simple majority vote of the City Council except rezonings and land use amendments from residential ki mmmerclelllndustdal. • vinnesota Stale Statute 519.99 requires all applications to be processed within 60 days unless the applicant walves this standard. Some applications due to their complexity may take several months to complete. Any parson wishing to follow an Item through the process should check with the Planning Department regarding Its status and scheduling for the City Council meeting. • A neighborhood spokespersonmepesentative Is encouraged to provide a contact for the city. Often developers are encouraged to meet with the neighborhood regarding their proposal. Staff is also available M review the project with any Interested person(s). • Because the Planning Commission hods the public heading, the City Council does not. Minutes are taken and any corrWpOndence regarding the application will be included In the report to the City Council. If you wish to have something to be included in the report. lease contact the Mannino Stale person named on the notification. Notice of Public Hearing Chanhassen Planning Commission Meeting Date & Time: Tuesday, July 7, 2015 at 7:00 P.M. This hearing may not start until later In the e,,enin , depending on the order of theagenda. Location: City Hall Council Chambers 7700 Market Blvd. Request for Amendment to Planned Unit Development; Subdivision of approximately three acres into one lot and one Proposal: outlot (Villages on the Ponds 11'^ Addition), and Site Plan Review with Variances to construct a 19,909 square -foot specialty retail building on property zoned Planned Unit Development PUD — ChanhassenS eclat Retail Applicant: Venture Pass Partners, LLC Property Outlot B, Villages on the Ponds 4th Addition Location: A location map Is on the reverse side of this notice. The purpose of this public hearing is to inform you about applicant's request and to obtain input from the neighbor about this project. During the meeting, the Chair will lead the What Happens public hearing through the following steps: at the Meeting: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. If you want to see the plans before the meeting, please visit the City's projects web page at: www.ci.chanhassen.mn.us/2015-17. If you wish to talk to someone about this project, please contact Sharmeen AI-Jaff Questions & by email at sal!aff(cDci.chanhassen.mn.us or by phone at 952 - Comments: 227-1134. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. The staff report for this item will be available online on th project web site listed above the Thursday prior to the Planning Commission meeting. NEWI Sign up to receive email and/or text notifications when meeting agendas, packets, minutes and videos are uploaded to the city's website. Go to www.ci.chanhassen.mn.us/notifyme to sign up! City Review Procallues: • Subdivisions, planned Unit Developments. Site Plan Reviews, Conditional and Interim Uses, Welland Alterations, Recordings. Comprehensive Plan Amendments and Code Amendments require a public hearing before the Planning Commission. City ordinances require all property within 500 feet of the subject site to be notified of the application In writing. Any Interested party is invited to attend the meeting. • Staff prepares a resod an the subject application that Includes all pelt nent information and a recommendation. These reports are available by request. At the Planning Commission meeting, staff will give a verbal overview of the resod and a recommendation. The Item will be opened for the pudic to speak about the proposal as a pert of the hearing process. The Commission will dose the public hearing and discuss the item and make a recommendation to the City Council. The City Council may reverse, Sam or modify wholly or partly the Planning Commission's recommendation. Rezonings, land use and code amendments take a simple majority We of the City Council except moorings and land use amendments from residential to commemlalAndustdal. • Minnesota Slate Statute 519.99 requires all applications to be processed MMin 00 days unless the applicant wolves this standard. Some applications due to their complexity may take several months to complete. Any person wishing to follow an item through the process should check Win the Planning Department regarding IU status and scheduling for Me City Count masking. • A neighborhood spokesperson/representhfive Is encouraged to provide a contact for the city. Often developers are encouraged to meet with the neighborhood regarding their proposal. Staff is also available to review the project with any Interested person(s). • Because the Planning Commission holds the public hearing, the City Council does not. Minutes are taken and any mnespondenca regarding the application will be Induced In Me report to the City Council. 9 you wish to have something to be induced in the report, lease contact the Manning Stall person named on the notificedM. AUSMAR DEVELOPMENT CO LLC 5916 HANSEN RD MINNEAPOLIS, MN 55436-2513 CHURCH OF ST HUBERT 8201 MAIN ST CHANHASSEN, MN 55317-9647 LAKE SUSAN APARTMENT HOMES LLC 11455 VIKING DR # 350 EDEN PRAIRIE, MN 55344-7206 ROSEMOUNT INC 12001 TECHNOLOGY DR EDEN PRAIRIE, MN 55344-3695 VIGIL COMPANIES LLC 550 LAKE DR CHANHASSEN, MN 55317-9378 WHEATSTONE RESTAURANT GROUP 250 EAST LAKE DR CHANHASSEN, MN 55317-9364 0 0 CHANHASSEN RETAIL LLC 9478 RILEY LAKE RD EDEN PRAIRIE, MN 55347-3490 COMMUNITY BANK CORPORATION PO BOX 177 CHANHASSEN, MN 55317-1177 NORTHCOTT COMPANY 250 EAST LAKE DR CHANHASSEN, MN 55317-9364 SILO BUILDING LLC 3561 44TH ST W MINNEAPOLIS, MN 55410-1359 VILLAGES ON THE PONDS ASSN INC PO BOX 404 CHANHASSEN. MN 55317-0404 CHCR LLC PO BOX 1038 MASON CITY, IA 50402-1038 KINSALE OF CHANHASSEN LLC PO BOX 404 CHANHASSEN, MN 55317-0404 PHM/CHANHASSEN INC 2845 HAMLINE AVE N ROSEVILLE, MN 55113-7127 STORE MASTER FUNDING VI LLC 8501 E PRINCESS DR STE 190 SCOTTSDALE, AZ 85255-5494 VOP I LLC PO BOX 404 CHANHASSEN, MN 55317-0404 0 0 AI-Jaff, Sharmeen From: Dave Carland <DCarland@VENTUREPASS.NET> Sent: Tuesday, July 07, 2015 10:30 AM To: AI-Jaff, Sharmeen Subject: FW: Chanhassen Villages on the Ponds Declaration and PUD review with respect to St Hubert's Sharmeen, per the e-mail below from my partner, I think the Church agreed to a liquor store prior to constructing their facilities in 1997. 1 want to be polite and respectful of their concerns but I think this may need to be pointed out if they object to the basic concept of a liquor store. David Carland Venture Pass Partners, LLC 19620 Waterford Court Shorewood, MN 55331 (o) 952.473.1210 (c) 612.963.9107 dca rlan d(d)ventu repass.net /VENTURE PASS ,PARTNERS From: Jim Ottenstein Sent: Tuesday, July 07, 2015 10:17 AM To: Dave Carland Subject: Chanhassen Villages on the Ponds Declaration and PUD review with respect to St Huberts Dave, in anticipation of the planning commission meeting tonight, I reviewed the Declaration and the PUD Agreements with respect to the Church of St Hubert. The PUD was entered into in November, 1996 and the Declaration was entered into in March 1997. It appears that The Church of St Hubert was a land owner prior to the execution of the PUD and that with the execution of the PUD, their property was replatted as Lot 1, Block 2, Villages on the Ponds. The PUD established the zoning of the property as a PUD and memorialized development requirements. Among other things, the PUD also established permitted uses in exhibit C. Exhibit C lists a church as a permitted use and a liquor store as a permitted use (so long as the retail use (ie liquor store) does not exceed 20,000 square feet on one level). The Church of St Hubert was a party to the agreement and executed a "Fee Owner Consent to Development Agreement". In essence, the use of a liquor store is on equal footing as the use as a Church. The Declaration was also executed by the Church. The Declaration established, among other things, protective covenants regarding the development. Protective covenants included establishment of Prohibited Business or Activities. This Section of the Declaration prohibits the operation of any business or activity offering the sale of sexually explicit or "X-rated" materials. This is the only use that is specifically prohibited and no change was made that limited or prohibited the use as a liquor store. In summary, the PUD approves liquor stores as a permitted use and the Declaration, which followed the execution of the PUD, established prohibited uses but did not take exception to a liquor store use. 11 Jim Ottenstein Venture Pass Partners, LLC 19620 Waterford Court Shorewood, MN 55331 612-849-2324 Lttenstei n Ccilventu repass. net /VENTURE PASS PARTNERS Notice of Public Hearing lanhassen Planning Commission Mesti Date & Time: Tuesday, July 7, 2015 at 7:00 p.m. This hearing may not start until later in the evening, depending on the order of the agenda. Location: City Hall Council Chambers, 7700 Market Blvd. Request for Amendment to Planned Unit Development; Subdivision of approximately three acres into one lot and one Proposal: outlot (Villages on the Ponds 111h Addition), and Site Plan Review with Variances to construct a 19,909 square -foot specialty retail building on property zoned Planned Unit Development PUD — Chanhassen Specialty Retail Applicant: Venture Pass Partners, LLC Property Ou".lot B, Villages on the Ponds 4th Addition Location: A Iccatic c map is , . :he reverse side of this n6tice. The purpose of chis public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the What Happens public hearing through the following steps: at the Meeting: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. If you want to see the plans before the meeting, please visit the City's projects web page at: www.ci.chanhassen.mn.us/2015-17. If you wish to talk to someone about this project, please contact Sharmeen AI-Jaff Questions & by email at saliatf( ci.chanhassen.mn.us or by phone at 952 - Comments: 227-1134. if you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. The staff report for this item will be available online on the project web site listed above the Thursday prior to the Planning Commission meeting. NEWI Sign up to receive email and/or text notifications when meeting agendas, packets, minutes and videos are uploaded to the city's website. Go to www.ci.chanhassen.mn.us/notifyme to sign up! City Revive Procedure: • Sundivisians, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses. Wetland Alterations. Rezonings. Comprehensive Plan Amendments and Code Amendments require a pudic heanng before the Planning Commission. City ordinances require all property within 500 feel of Me subject site to be notified of the application m whang. Any interested party is invited to attend the meeting. • Staff prepares a report ante subject application Nat induces all pertinent informationanda recommendaborn These reports are available by request At the Planning Commission meting, staff will give a verbal overvew of the report and a recommendation. The item will be opened for the public to speak about the proposal as a part of Me hearing process. The Commission will dose the public hearing and discuss the item snd make a recommendation to the City Council. The City Council may reverse, affirm or modify wholly or partly the Planning Commission's recommendation. Rezonings, land use and code amendments take a simple majority vote of the City Coundl except rezonings and land use amendments from residential to commerciaviindustnal. • Minnesota State Statute 519 99 requires all applications to be processed within 60 days unless the applicant waives this standard Some applications due to their complexity may take several months to complete. Any person wishing to follow an item through the process should check with the Planning Department regarding its status and scheduling for the City Council meting. • A neighborraod apokesparsonlneprasantative is encouraged to provide a contact for the city. Often developers are encouraged to Meet with the neighborhood regarding their proposal. Staff is also available to review the project with any interested person(s). • Because Me Planning Commission holds the Public hearing, the City Council does not Minutes are taken and any correspondence regarding the application will be Included In the report to the City CiWMI, i you wish to have something to be Included in the report, lease contact the Planning Stag pension named on the notification. SCANNtL fCf+¢{fL,AFx+�l.l[yr 4s N .55� �"'" _ try+'MFRC)MZ(P �Mw���`d9'' f e`��iwp.�...,M . ' t" �F725 2015 SUBJECT CITY OF in .�DE 553 PROPERTY 1 PIT 171ASSEN �!? ` Boulevard \r'Innesota55317 �E SENA it N $ en.mn.us �r �� to Disclaimer 55'\\���\r`\ \ rSF This map is neith, .5 C. - ���\�� , and is not intended to be used as one. This map i.-,matlon and data located in various city, county, state and It sources regarding the area shown, and is to be used for referenr manly. The City does not warrant that the Geographic �+'. v Information System (l aata used to prepare this map are error free, and the City does A N not represent that the GIS Data can be used for navigational, tracking or any other \.y\ VILLAGES ON THE PONDS ASSN INC purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies are found please contact 952- PO BOX 404 227-1107. The preceding disclaimer is provided pursuant to Minnesota Statutes §466 03, CHANHASSEN, MN 55317-0404 Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnity, and hold harmless the City from any and all claims brought by User, its employees or agents, _. --e (ItWd parties whmi aft lbotaf the users access orna VOz*,r�Y ,;,47 I�`tjllllt lit 1l r�r`rt r�ll�llrtnlllllllll ljli 11lril'Irllllrf 11111 ^4 zee' cI Disclaimer This map is neither a let ,r nor a survey and is not intended to be used as one. This map is a con . records, information and data located in various city, county, state and fede(.H ..es and other sources regarding the area shown, and is to be used for reference purposes only. The City does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and the City does not represent that the GIS Data can be used for navigational, tracking or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. If errors or discrepancies are found please contact 952- 227-1107. The preceding disclaimer is provided pursuant to Minnesota Statutes §466.03, Subd, 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnify, and hold harmless the City frootfJJ�� any and all claims brought by User, its employees or agents, or third parties which an fro of the user's access or r t 'SEN ward g� JES POST. �L.d v� PITNEY 00 Re 021 P $ 000.485 0003195036 JUN 25 20� MAILED FROM ZIP CODE 553 It 6' „ Inesota uja it ,\\V\�\ — lanhassen.miI C� e �� 9�ti is VOP ILLC �ANK • PO BOX 404 CHANHASSEN, MN 55317-0404 �_ J Jlr�r�In1111L��uI�I11LL11��III11rr�J��II11r11rL1��ILrr11 Notice of Public Hearing • I hanhassen Planning Commission Meeting Date & Time: Tuesday, July 7, 2015 at 7:00 p.m. This hearing may not start until later in the evening, depending on the order of theagenda. Location: City Hall Council Chambers, 7700 Market Blvd. Request for Amendment to Planned Unit Development; Subdivision of approximately three acres into one lot and one Proposal: outlot (Villages on the Ponds 111' Addition), and Site Plan Review with Variances to construct a 19,909 square -foot specialty retail building on property zoned Planned Unit Development PUD — ChanhassenS cial Retail A licant:Venture Pass Partners, LLC Property utlot B, Villages on the Ponds 41h Addition LOCatIOn: A location map is on the reverse side of this notice. The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the What Happens public hearing through the following steps: at the Meeting: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. If you want to see the plans before the meeting, please visit the City's projects web page at: www.ci.chanhassen.mn.us/2015-17. If you wish to talk to someone about this project, please contact Sharmeen AI-Jaff Questions & by email at saliaff(cDci.chanhassen.mn.us or by phone at 952 - Comments: 227-1134. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. The staff report for this item will be available online on the project web site listed above the Thursday prior to the Planning Commission meeting. NEW! Sign up to receive email and/or text notifications when meeting agendas, packets, minutes and videos are uploaded to the city's website. Go to www.ci.chanhassen.mn.us/notifyme to sign up! City Review Procedure: • Subdivisions, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses. lNeteW Alterations, RamNngs, Comprenensive Plan Amendments and Code Amendments require a Now hearing before the Planting Commission. City ordinances require all property within 500 feet of the subject site to be notified of the application in writing. Arty interested party is invited to attend the meeting. • Staff prepares a report on the subject application that includes all pertinent information and a recommendation. These reports are available by request. At the Planning Commission meeting, staff will give a verbal overview of the repon and a recommendation. The item will be opened for the public to speak about the proposal as a part of the treating process. The Commission will close the public heamhg and discuss the item aW make is recommendation to the City Council. The City Council may reverse, affirm or modify wholly or portly the Planning Commission's recommendation. Rezonings, land use and code amendments take a simple maprity vote of the City Council except rezonings and land use amendments from residential to dxnmerclagindusdal. • Minnesota State Statute 519.99 requires all applications to be processed within 60 clays unless the applicant waives this standard Some applications due to their complexity may take several months to complete. Any person wishing to follow an item through the process shoud check with the Planning Department regarding its status and scheduling for the City Council meeting. • A neighbortwod spokespersaJrepmsenWb" is encouraged to provide a contacl for the aty Often developers are encouraged M meet with the neighbodreod regarding thew proposal. Staff is also available d review the projectwith any interested penson(a). • Because the Planning Commission holds the public hearing, the City Count does not. Minutes are taken and any correspondence regarding the application will be included in "report to" City Coundlff you w O to haves ing to ba included in me repon, lease contect the Planning Stag person named on the notification. SCANNED rn, I „ moi• r CITY ITY OF a PROPERTY r CHAN"' "SEN 6 ` ` y5 ward a to 55317 us "3 f',kpSiS P0.Sr'M S v Z —'W PITNEY BOWEB 02 1P $ 000.485 0003195036 JUN 252015 MAILED FROM ZIP CODE 5531 4,W ct%% AP�o Ali\.\\\\\\ A,\5 Disclaimer This map is neither a le; '( p7 \\\\\ oe used as one. This map is a con C%� �D Y \\\\`\\ .,i various city, county, slate and federal c .,e shown, and is to • be used for reference pure 5'� \\\\\\\\ .dirt that the Geographic Information System (GIS) Da, L. ertor free, and the City does T = not represent that the GIS G b \ „avigational, tracking or any other KINSALE OF CHANHASSEN LLC purpose requiring exacting m6 .,stance or direction or precision in the depiction of geographic features. or discrepancies are found please contact 952- PO BOX 404 227-1107. The preceding disclaim...s provided pursuant to Minnesota Statutes §466.03, CHANHASSEN, MN 55317-0404 Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable for any damages, and expressly waives all claims, and agrees to defend, indemnity, and �.. hold harmless the City from any and all claims Linc�bLb4. Usz.,.js,��_'aplQgpA or agents, 171or third parties which arse out of the user's accesk9egfaS®4 11,111 rrl IIltt!I 1111111111111 , ,I,tI) ,I II! fill l tIII II r I II ! 0 AI-Jaff, Sharmeen 0 From: Dave Carland <DCarland@VENTUREPASS.NET> Sent: Wednesday, July 01, 2015 3:08 PM To: AI-Jaff, Sharmeen Cc: Jim Ottenstein; Randy Rauwerdink Subject: Chanhassen Specialty Grocer/ Villages on the Pond 11th Addition Planning Case # 2014-29 Sharmeen, this e-mail should be considered our formal request to the City of Chanhassen by Venture Pass Partners that we wish to withdraw our previously approved application for the 14,000 square foot specialty grocery store and future small shop retail which was previously approved for the property. That submission is no longer being considered for development and is replaced by the current application for a 20,000 square foot specialty retail store. David Carland Venture Pass Partners, LLC 19620 Waterford Court Shorewood, MN 55331 (o) 952.473.1210 (c) 612.963.9107 dcarland(a)ventureoass net MENTURE PASS PARTNERS 0 Affidavit of Publication Southwest Newspapers CITY OF CHANHASSEN CARVER & HENNEPIN State of Minnesota COUNTIES NOTICE OF PUBLIC )SS. HEARING PLANNING CASE NO. 2015-17 County of Carver ) NOTICE IS HEREBY GIVEN that the Chanhassen Planning Commission will hold a public hearing on Tuesday July 7, 2015, at 7:00p.m. in the Council Chambers Laurie A. Hartmann, being duly sworn, on oath says that she is the publisher or the authorized in Chanhassen City Hall, 7700 agent of the publisher of the newspapers known as the Chaska Herald and the Chanhassen Vil- Market Blvd. The purpose of lager and has full knowledge of the facts herein stated as follows: this hearing is to consider a request for an amendment to the (A) These newspapers have complied with the requirements constituting qualification as a legal Villages on the Ponds Planned Unit Development; Subdivision newspaper, as provided by Minnesota Statute 331A.02, 331A.07, and other applicable laws, as of approximately three acres into amended. one lot and one outlot (Villages on the Ponds 11th Addition), and (B) The printed public notice that is attached to this Affidavit and identified as No. Site Plan Review with Variances was published on the date or dates and in the newspaper stated in the attached Notice and said to construct a 19,909 square- Notice is hereby incorporated as part of this Affidavit. Said notice was cut from the columns of foot specialty retail building on the newspaper specified. Printed below is a copy of the lower case alphabet from A to Z, both property zoned Planned Unit inclusive, and is hereby acknowledged as being the kind and size of type used in the composition Development (PUD) and located and publication of the Notice: on OutlotB, Villages on the Ponds 9th Addition. Applicant. Venture Pass Partners, LLC. Owner: abcdefghijkbnnopgtstuvwxyz Northcott Company. A plan showing the location U /,� of the proposal is available By: Hartm� for public review on the City'sw. web site at wwci.chanhassen. Laurie A. mn.us/2015-17 or at City Hall during regular business hours. All interested persons are invited to attend this public hearing Subscribed and sworn before me on and express their opinions with respect to this proposal. Sharmeen A1Jaff, Senior �/C Planner this day of2015 Email: saljaff(sn ci.chanhassen. mn.us Phone: 952-227-1139 tL, (Published in the Chanhassen AliNiF JhETEK Villager on Thursday, June 25, 2015: No. 4151) NTWY PtB'JC MASESC?A , N Public WYCOMMSS1014D'':RESO'..rli.,a RATE INFORMATION Lowest classified rate paid by commercial users for comparable space.... $31.20 per column inch Maximum rate allowed by law for the above matter ................................. $31.20 per column inch Rate actually charged for the above matter .............................................. $12.59 per column inch SCANNED 0 0 CITY OF CHANHASSEN CARVER & HENNEPIN COUNTIES NOTICE OF PUBLIC HEARING PLANNING CASE NO. 2015-17 NOTICE IS HEREBY GIVEN that the Chanhassen Planning Commission will hold a public hearing on Tuesday, July 7, 2015, at 7:00 p.m. in the Council Chambers in Chanhassen City Hall, 7700 Market Blvd. The purpose of this hearing is to consider a request for Subdivision of approximately three acres into one lot and one outlot (Villages on the Ponds I Id Addition), and Site Plan Review with Variances to construct a 23,520 square -foot specialty retail building on property zoned Planned Unit Development (PUD) and located on Oudot B, Villages on the Ponds 4a' Addition. Applicant: Venture Pass Partners, LLC. Owner: Northcott Company. A plan showing the location of the proposal is available for public review on the City's web site at www.ci.chanhassen.mn.us/2015-17 or at City Hall during regular business hours. All interested persons are invited to attend this public hearing and express their opinions with respect to this proposal. Sharmeen Al-Jaff, Senior Planner Email: saliaMci.chanhassen.mn.us Phone: 952-227-1134 (Publish in the Chanhassen Villager on June 25, 2015) SCANNED 0 arr RECEI EDEt 7645 Lyndale Avenue South, Suite 100 Minneapolis, Minnesota 55423-4084 JUN 18 2015 612.861.9636 Fax: 612.861.9632 www.tmiarchitects.com ()NAPWA%ENPLAN'MNG0P1 TRANSMITTAL 5�4r*wzn AL ;1R(P To: n l..n /'i_- L -- 170b M 44Q -t blvd CA4'^4m551p\. MM 95-:k-7 u T U S H I E MONTGOMERY ARCHITECTS Date: (0 -it .15 Project Number: 241502.1A Project Name: WE ARE SENDING YOU VIA: ❑ Fax — Total Pages: ❑ Picked Up ❑ U.S. Mail [Messenger ❑ Hand Delivery ❑ Overnight Delivery THE FOLLOWING ITEMS: ❑ PRINTS ❑ SPECIFICATIONS ❑ SHOP DRAWINGS ❑ OTHER "I 19 YOUR USE OqSAS REQUESTED ❑ APPROVAL ❑ BIDS DUE ❑ REVIEW AND COMMENT ❑ DISTRIBUTION TO OTHERS COPY TO: File FROM: At Kra k, Please notify us if you have any questions or concerns regarding this transmittal. CHANHASSEN SPECIALTY RETAIL-Outl*ILLAGES ON THE PONDS 4m ADDN • REQUEST FOR VARIANCE TO PERMIT 42" WALL SIGNAGE LETTER HEIGHT ON NORTH AND WEST ELEVATIONS Venture Pass Partners, LLC has submitted for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B VILLAGES ON THE PONDS 4ni ADDN, including the development of a 19,909 SF specialty retail store. The architectural design and exterior building elevations as submitted incorporate wall signage on four allowable building elevations, as follow: North -Fronting Pond Promenade and visible to Hwy 5 to the north. ;n OFCHANHASSEf l RECEIVED West -Over main entrance and fronting the parking lot, also visible to Market Blvd. East -Fronting Main Street JUN 18 2015 South -Fronting Lake Drive CHANHASSEN PtANNIN60F.PT Signage on each elevation is proposed as individual internally illuminated channel letters, 42" in height on the North and West elevations and 30" in height on the East and south elevations, and placed in a consistent fashion/signage band detail. The total area of each sign as proposed is well below the allowable signage area as per City ordinance, as illustrated and enumerated on the attached exterior elevation drawings. A variance is required due to a clause in the VOP Development Design Standards, restricting wall letters to a maximum of 30" in height. While this standard maybe suitable for small shop space or for visibility and legibility from directly abutting streets or at pedestrian scale, this is far too limiting and ineffective for our proposed use. We also feel that it is not of a scale consistent with the massing and dimensions of our proposed building. It should also be noted that when the Pond Promenade PUD was approved in 1996 it was one of the pioneering new urbanism projects in the Metropolitan area. During this period communities and planners had a general attitude that merchant signs should be minimal and generic. The current trend as evidenced by the relaxing of most municipal sign codes is that adequate signage is not only critical to a merchants success but can add vibrant and creative design elements to a project while adding distinction and variety to a neighborhood. Highly visible and legible signage is critical to the success and viability of a grocery operation with a regional draw. This parcel as situated has critical sightlines to Hwy 5 and to Market Blvd, however it is set back from Hwy 5 by approximately 550, and from Market Blvd by approximately 620'. Providing effective identification and signage to passing motorists is essential. Signage, if restricted to 30" letter height, will prove ineffective and unacceptable to the user. SCANNED Research as compiled by the United Statn Council, studying legibility of signage para+o roadways from moving vehicles is summarized in the table below. This tab a only calculates recommended letter heights up to a distance of 400' from the roadway, however even at 400' (highlighted in yellow) the recommended legible sizes exceed 80" in height. The 42" height that we are requesting is obviously well below this recommendation, but it will provide some level of effectiveness that could not be achieved with the 30" restriction. The 42" height is also consistent with other locations of our tenant, and in keeping with their minimum standards. For additional reference I also highlighted in red the effective distance for viewing signage with 30" letters. This approximate 100' distance is consistent with my comments above, suggesting this sizing is suitable for pedestrian scale or viewing from directly abutting roadways. Parallel Signs TYPICAL PAR, Lu Sans-MWLARWM ROADWAY sign letter height lookup table. Offset from Curb (R) Letter Height in Inches Number of Lanes 1 2 3 4 5 4 6 8 10 12 20 6 8 10 12 14 - 40 10 12 14 16 18 _ 60 80 100 14 18 22 16 ---- 20.. _ 24 18 - - 22. _.. .. 26 _ 20 -- 24 28 22 26 _ 30 _ 125 150 27 _ 32 29 34 31 36 33 38 35 40 _ 175 37 39 41 43 45 200 42 44 46 48 50 225 _ 250 47 52 49 54 51 56 53 58 55 60 275 57 59 61 63 65 300 62 64 66 68 70 325 67 69 71 73 75 350 72 74 76 78 80 82 84 86 88 90 Additional research into the effective sizisignage letters, from the basis of static strain viewing also supports the 42" sizing of the sign letters. Note on this table that from the distances we are offset from the major roadways, signage with the best impact is 42" to 60" high. This does not take into account the limited viewing time that is possible when in a moving vehicle, or when concentrating on driving the vehicle, as is accounted for in table above. 40000 LETTER VISIBILITY CHART STATIC PERPENDICULAR VIEWING ----------------------- 3" 30' M Letter Height Distance for Best Max. Readable (Inches) Impact rfeet; Distance Ifeetl 3" 30' 100' 4" 40' 150' 6" 60' 200' 8" 80' 350' 9" 90' 400' 10" 100' 450' 12" 120' 525' 15" 150' 630' 18" 180' 750' 24" 240' 1000' 30" 300' 1250' 36" 360' 1500' 42" 420' 1750' 48" 480' 2000' 54" 540' 2250' 60" 600' 2500' 0 0 -.• � ....._-��� m�iitttt_ / 0 0 • MEMORANDUM CITYOF TO: Sharmeen Al-Jaff, Senior Planner CHMNSEN FROM: Todd Hoffman, Park & Recreation Director 7700 Market Boulevard PO Box 147 DATE: June 10, 2015 Chanhassen, MN 55317 Senior Center Full park fees in lieu of additional parkland dedication and/or trail construction shall be Phone: 952.227.1125 collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on Fax: 952.2271110 the Ponds I Vh Addition. The park fees will be collected in full at the rate in force upon final plat submission and approval. Based upon the current commercial park fee rate of Website $12,500 per acre, the total park fees would be $33,875. www.ci.chanhassen.mir us SCANNED Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow SUBJ: Request for Subdivision of approximately three acres into one lot and one Administration outlot (Villages on the Ponds 11th Addition), and Site Plan Review with Phone: 952.227.1100 Variances to construct a 23,520 square -foot specialty retail building on Fax: 952.227.1110 property zoned Planned Unit Development (PUD) and located on Outlot B, Building Inspections Villages on the Ponds 4th Addition. Applicant: Venture Pass Partners, Phone: 952.227.1180 LLC/Owner: Northcott Company Fax: 952.2271190 subdivision. 7901 Park Place PARKS Engineering PARK AND TRAIL CONDITIONS OF APPROVAL Phone: 952.227.1160 This property is located within the community park service area for Lake Susan Fax: 952.227.1170 Community Park and the neighborhood park service area for Rice Marsh Lake Finance Neighborhood Park. Employees and visitors to the specialty retail store will have Phone: 952.227.1140 convenient access to these publicly -maintained park and recreation facilities. Lake Fax: 952.227.1110 Susan Park is 33 acres in size and features large playgrounds, basketball court, picnic shelter, tennis courts, archery range, public water access, fishing pier and a ballfield. Park & Recreation Ample off-street parking is available at the park. Phone: 952.227.1120 Fax: 952.227.1110 Rice Marsh Lake Neighborhood Park is four acres in size and features a playground, Recreation Center ballfield, basketball court, volleyball court and a small picnic shelter. Off-street parking 2310 Coulter Boulevard is available. No additional parkland acquisition is being recommended as a condition of Phone: 952.2271400 this subdivision. Fax: 952.227.1404 Senior Center Full park fees in lieu of additional parkland dedication and/or trail construction shall be Phone: 952.227.1125 collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on Fax: 952.2271110 the Ponds I Vh Addition. The park fees will be collected in full at the rate in force upon final plat submission and approval. Based upon the current commercial park fee rate of Website $12,500 per acre, the total park fees would be $33,875. www.ci.chanhassen.mir us SCANNED Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow TRAILS Planning & Natural Resources Pnone: 952.2271130 The subject site has convenient access to the public trails along Great Plains Boulevard, Fax: 952.2271110 the three-mile Rice Marsh Lake trail loop, and the lakeside trail route to Lake Susan Park. No additional trail construction is being recommended as a condition of this Public Works subdivision. 7901 Park Place Phone: 952.227.1300 PARK AND TRAIL CONDITIONS OF APPROVAL Fax: 952.227.1310 Senior Center Full park fees in lieu of additional parkland dedication and/or trail construction shall be Phone: 952.227.1125 collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on Fax: 952.2271110 the Ponds I Vh Addition. The park fees will be collected in full at the rate in force upon final plat submission and approval. Based upon the current commercial park fee rate of Website $12,500 per acre, the total park fees would be $33,875. www.ci.chanhassen.mir us SCANNED Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow COMMUNITY DEVELOPMENT DEPARTMENT Planning Division — 7700 Market Boulevard Mailing Address — P.O. Box 147, Chanhassen, MN 55317 Phone: (952) 227-1130 I Fax: (952) 227-1110 *CITY OF CNANHASSEN AGENCY REVIEW REQUEST LAND DEVELOPMENT PROPOSAL Please review and respond no later than the review response deadline Agency Review Request Date: June 9, 2015 Agency Review Response Deadline: June 25, 2015 Date Application Filed: June 5, 2015 Contact: Contact Phone: Contact Email: Sharmeen AI-Jaff 952-227-1134 saljaff@ci.chanhassen.mn.us Senior Planner ® Park Director Planning Commission Date: City Council Date: 60 -Day Review Period Deadline: July 7, 2015 at 7:00 p.m. July 27, 2015 at 7:00 p.m. August 4, 2015 Application: Request for Subdivision of approximately three acres into one lot and one outlot (Villages on the Ponds 11th Addition), and Site Plan Review with Variances to construct a 23,520 square -foot specialty retail building on property zoned Planned Unit Development (PUD) and located on Outlot B, Villages on the Ponds 41^ Addition. Applicant: Venture Pass Partners, LLC Owner: Northcott Companv In order for staff to provide a complete analysis of issues for Planning Commission and City Council review, we would appreciate your comments and recommendations concerning the impact of this proposal on traffic circulation, existing and proposed future utility services, storm water drainage, and the need for acquiring public lands or easements for park sites, street extensions or improvements, and utilities. Where specific needs or problems exist, we would like to have a written report to this effect from the agency concerned so that we can make a recommendation to the Planning Commission and City Council. Your cooperation and assistance is greatly appreciated. City Departments: LJ Attorney ® Building Official ® Engineer ® Fire Marshal ® Forester ® Park Director ® Water Resources Carver County Agencies: ❑ Community Development ❑ Engineer ❑ Environmental Services ❑ Historical Society ❑ Parks ® Soil & Water Conservation District State Agencies: ❑ Board of Water & Soil Resources ❑ Health ❑ Historical Society ❑ Natural Resources -Forestry ❑ Natural Resources -Hydrology ❑ Pollution Control ❑ Transportation Federal Agencies: ❑ Army Corps of Engineers ❑ US Fish & Wildlife Watershed Districts: ❑ Carver County WMO ❑ Lower MN River ❑ Minnehaha Creek ® Riley -Purgatory -Bluff Creek Utilities: Cable TV — Mediacom Electric — Minnesota Valley Electric — Xcel Energy Magellan Pipeline Natural Gas — CenterPoint Energy Phone — CenturyLink Adjacent Cities: ❑ Chaska ❑ Eden Prairie ❑ Jackson Township ❑ Minnetonka ❑ Shorewood ❑ Victoria Adjacent Counties: ❑ Hennepin ❑ Scott School Districts: ❑ Eastern Carver County 112 ❑ Minnetonka 276 Other Agencies: ❑ Hennepin County Regional Railroad Authodty ❑ MN Landscape Arboretum ❑ SouthWest Transit ❑ TC&W Railroad ® Villages on the Ponds Association El El El ❑ SCANNED CITY, OF .OHANHASSEN P O'BOX 147 CHANHASSEN MN 55317 06/09/2015 1:53 PM Receipt No. 00285844 CLERK: ashleym PAYEE: Venture Pass Partners LLC 19620 Waterford Court Shorewood MN 55331 - Planning Case 2015-17 ------------------------------------------------------- Site Plan Review 740.00 Sign Rent 200.00 Recording Fees 600.00 Subdivision 300.00 Variance 200.00 Final Plat 250.00 GIS List 33.00 Total Cash Check 8190 Change 2,323.00 0.00 2,323.00 0.00 SCANNED Venture Pass Partners, LLC City of Chanhassen Spate Type Reference 6/8/2015 Bill TW application 6/8/2015 Original Amt. Balance Due Discount 2,323.00 2,323.00 Check Amount Payment 2,323.00 2,323.00 Bremer Bank Checkin 2,323.00 e 0 CHANHASSEN SPECIALTY RETAIL - PLANNING CASE 2015-17 $200.00 Notification Sign $740.00 Site Plan Review $300.00 Subdivision (3 lots or less) $200.00 Variance $250.00 Final Plat $450.00 Final Plat Escrow for Attorney's Costs $33.00 Property Owners List $150.00 Escrow for recording documents $2,323.00 TOTAL $2,323.00 Check 8190 from Venture Pass Partners, LLC 0 CITY COMMUNITY DEVELOPMENT DEPARTMENT JUN 0 5 2015 CITY OF CHANHASSEN Planning Division — 7700 Market Boulevard Mailing Address — P.O. Box 147, Chanhassen, MN 55317 Phone: (952) 227-1300 / Fax: (952) 227-1110 'WHA99ENR+MWk0n; APPLICATION FOR DEVELOPMENT REVIEW Date Filed: (,; (� 60 -Day Review Deadline: 'J — �l —� `� Planner r7� Case Section•• • •-apply) ❑ Comprehensive Plan Amendment $600 Q Subdivision ��**�`� ......................... El Minor MUSA line for failing on-site sewers ..... $100 ❑ Create 3 lots or less ......................................399 ❑ Create over 3 lots .......................$600 + $15 per lot ❑ Conditional Use Permit ❑ Metes & Bounds.. . ...................... $300 + $50 per lot ❑ Single -Family Residence ................................ $325 ❑ Consolidate Lots.............................................. $150 ❑ All Others......................................................... $425 ❑ Q Lot Line Adjustment......................................... Final Plat* $150 250 ... .... ..�.pp�� 'Requires .. for El Interim Use Permit addition ity 50� scrow attorney costs. ❑ In Escrow will be require or other applications through the conjunction with Single -Family Residence.. $325 development contract. ❑ All Others......................................................... $425 ❑ Rezoning ❑ Planned Unit Development (PUD)..................$750 ❑ Minor Amendment to existing PUD ................. $100 ❑ All Others.......................................................:i(!I� ❑ Sign Plan Review...................................................$150 ❑ Vacation of Easements/Right-of-way................... $300 (Additional recording fees may apply) QVariance ................................................... ❑ Wetland Alteration Permit ❑ Single -Family Residence ............................... $150 ❑ All Others ....................................................... $275 Q Site Plan Review ❑ Zoning Appeal ...................................................... $100 ❑ Administrative ..................................................$100 ❑ Commercial/Industrial Districts' ...................... i! d ❑ Zoning Ordinance Amendment............................ $500 Plus $10 per 1,000 square feet of building area Lap NOTE: When multiple applications are processed concurrently, 'Include number of existing employees: the appropriate fee shall be charged for each application. and number of new employees: ❑ Residential Districts ......................................... $500 (Refer to the appropriate Application Checklist for required submittal Plus $5 per dwelling unit information that must accompany this application) ADDITIONAL REQUIRED FEES: Z Z VO / ❑Q Notification Sign.. ................................. . (City to install and remove) j (yr Zi 3 ❑� Property Owners' List within 500' ........ $3 per a s (City to generate - fee determined at pre -application meeting) Q Escrow for Recording Documents.. $50 per documen (CUP/SPRNACNAR/WAP/Metes & Bounds Subdivision)` --T TOTAL FEES:$ 3 Received from: e)pwfe Date Received: to-6—l'j Check Number: Sly Project Name: Chanhassen Specialty Retail Property Address or Location: Outlot B, VILLAGES ON THE PONDS, 4th ADDITION Parcel #: 258460030 Legal Description: Outlot B, VILLAGES ON THE PONDS, 4TH ADDITION Total Acreage: 2.71 Present Zoning: PUD Wetlands Present? Present Land Use Designation: PUD/Retail Existing Use of Property: Vacant Land ❑ Yes ® No Requested Zoning: Existing, PUD Requested Land Use Designation: Retail Description of Proposal: 23,520 sf specialty retail. . Platting outlot underlyinq the Pond Promenade private road areas. 21 Check box if separate narrative is attached WE APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained authorization from the property owner to file this application. 1 agree to be bound by conditions of approval, subject only to the right to object at the hearings on the application or during the appeal period. If this application has not been signed by the property owner, I have attached separate documentation of full legal capacity to file the application. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Venture Pass Partners, LLC (or assigns) Contact: Randy Rauwerdink Address: 19620 Waterford Court Phone: (612) 801-4313 City/State/Zip: Shorewood, MN 55331 Cell: (612) 801-4313 Email: rrauwerdink@venturepass.net Fax: Signature: Date: 6/5/15 PROPERTY OWNER: In signing this application, I, as property owner, have full legal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct. Name: Northcott Company Contact: Brian Schwen Address: 250 Lake Drive East Phone: (952) 294-5215 City/State/Zip: Chanhassen, MN 55317 Cell: Email: bschwen@northcotthospitality.com Fax: Signature: Date: 6/5/15 This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and applicable procedural requirements. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. PROJECT ENGINEER (if applicable) Name: Sambatek Address: 12800 Whitewater Drive Suite 300 City/State/Zip: Minnetonka, MN 55343 Email: MBultman@sambatek.com Contact: Mike Bultman Phone: (763) 398-0867 Cell: Fax: (763) 476-8532 Who should receive copies of staff reports? 'Other Contact Information: 0 Property Owner Via: ❑v Email ❑ Mailed Paper Copy Name: kWy Kwlik-Tushie Montgomery Architects ❑� Applicant Via: ❑� Email ❑ Mailed Paper Copy Address: ❑Q Engineer Via: ❑ Email ❑ Mailed Paper Copy City/State/Zip: ❑ Other' Via: ❑� Email ❑ Mailed Paper Copy Email: Anayl<@ namhdeas.com 0 1 0 C ITY OF CHANHASSEN RECEIVED PROPOSED DEVELOPMENT-OUTLOT B VILLAGES ON THE PONDS 4T" ADDN JUN (� 2015 PROJECT SUMMARY NARRATIVE 'HANHASSEN PLANNING DEPT Introduction Venture Pass Partners, LLC is pleased to submit for consideration and approval, the attached applications for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B, VILLAGES ON THE PONDS 4' ADDITION. We are proposing to subdivide and plat this parcel into Lot 1 retail development consisting of a 23,520 sf specialty retail store, as well as Outlot A which will contain the Pond Promenade Road improvements. Sidewalk construction and improvements are proposed along the full perimeter extents of Pond Promenade Road and Main Street as part of the improvements, enhancing the pedestrian friendly character of the project. Benches and bike racks are also being incorporated to further promote the pedestrian character. Architecture and Design The 23,520 sf single story building will be detailed with a varied pallet of warm toned materials for the building exterior. Materials consist of pigmented rock face and burnished masonry, brick, EIFS cornices, standing seam metal roofing, aluminum windows, and fabric awnings. Accommodation for the 70% sloped roof coverage requirement is accomplished through the use of a feature corner tower with a hip roof and wrap around sloped metal roofing at portions of all four elevations. Additional use of projecting fabric awnings and sculpted EIFS cornices provide increased relief within the building facade. The 50% building fenestration requirement is accomplished with an interplay of massing, color, and material detailing at each elevation. The use of large windows, sloped metal roofing, sculpted EIFS cornices, brick piers, and fabric awnings provide a pedestrian scale and architectural detailing to each elevation. Windows at some locations, as governed by the Tenant's store layout, may be spandrel or translucent glass highlighted with awnings. The exterior of the building is further enhanced with an emphasis to natural plant materials using a green screen climbing landscape element at the east elevation (Main Street) and extensive use of plantings varied in height along the north, east, and south elevations. The outdoor trash storage and loading area is also screened by use of plant materials. Articulation of the south wall elevation is also accomplished with the natural building steps resulting from the receiving appendage and with the added layering and screening provided by the freestanding trash enclosure with an architectural trellis detail. Tenant signage will be integrally lit channel letters and will occur on all four building elevations as allowed by city ordinance, and will be compliant with all allowable area. requirements. Stormwater Design One of the unique challenges of this project is meeting the stringent requirements of Riley -Purgatory Bluff -Creek Watershed District (RPBCWD), and specifically the standards which just became effective January 1, 2015. This is further complicated by the existence of primarily group type D soils that are Pervasive across this site. Stormwater rate, water quality and abstraction requirements are being satisfied via the construction of an underground stormwater infiltration system. Extensive areas of the parking lot are to be surfaced with pervious pavers over a draintile and rock infiltration basin system. SCANNED CHANHASSEN SPECIALTY RETAIL-Outlot B VILLAGES ON THE PONDS 4'" ADDN REQUEST FOR VARIANCE TO EXCEED 20,000 SF RETAIL USER ON SINGLE LEVEL OF A BUILDING. (PROPOSE 23,520 SF) Venture Pass Partners, LLC has submitted for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B VILLAGES ON THE PONDS 47" ADDN, including the development of a 23,520 sf specialty retail store. The proposed retail use is specifically listed as a Permitted Use in the Villages on the Ponds PUD zoning. The Villages on the Ponds Development Design Standards as adopted in 1996 and amended in 2001, under Article (b.) Permitted Uses, states that No single retail user shall exceed 20,000 squarefeet on a single level of a building. Within the Villages OnThe Ponds development, as well as in the surrounding downtown area and neighborhood, there are multiple offerings and opportunities for small shop space and uses. What is limited is the availability of larger parcels that can support a medium size retail box; a use that can serve as a critical draw in support of the neighboring small shop space. The 2.71 acre Outlot B parcel, less the approximately one acre that is to be platted as Outlot underlying Pond Promenade, is well suited to fill this void. Since its conception in 1996, the Villages On The Ponds development has struggled to reach full build -out, being limited by the small shop village character limitations that exist. Our proposed project can help achieve the goal of a full build -out, essentially becoming the final anchor to this development. The proposed 23,520 square foot building footprint, while smaller than the typical or desired footprint for this retail user, does represent the maximum development potential on this parcel. The site is extremely limited by the existence of deep, poor unsuitable soils over much of the site; with the Northeast corner being the only real suitable placement for building foundation. Creating multiple smaller footprints across other areas of the site would prove unfeasible and cost prohibitive due to extreme soil correction and deep foundation system requirements. These conditions are even further exacerbated by the new more stringent Riley -Purgatory Bluff -Creek Watershed District design standards as were made effective January 1, 2015. You will note in the storm water design documents that were engineered for this project, that we are incorporating significant areas of pervious pavers throughout the entire interior parking field to help comply with these new standards. We believe that this modest increase in proposed maximum building footprint size is merited and beneficial to the development as a whole. We will be introducing a significant, high quality national retailer to the development, enabling full build -out of the development, and at the same time maintaining high standards of architectural character and amenities. r1 NORTHWEST PERSPECTIVE .CHANHASSEN SPECIALTY RETAIL-Outlot B VILLAGES ON THE PONDS 4T" ADDN REQUEST FOR VARIANCE TO PERMIT 42" WALL SIGNAGE LETTER HEIGHT ON NORTH AND WEST ELEVATIONS Venture Pass Partners, LLC has submitted for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B VILLAGES ON THE PONDS a ADDN, including the development of a 23,520 sf specialty retail store. The architectural design and exterior building elevations as submitted incorporate wall signage on four allowable building elevations, as follow: North -Fronting Pond Promenade and visible to Hwy 5 to the north. West -Over main entrance and fronting the parking lot, also visible to Market Blvd. East -Fronting Main Street South -Fronting Lake Drive Signage on each elevation is proposed as individual internally illuminated channel letters, 42" in height on the North and West elevations and 30" in height on the East and south elevations, and placed in a consistent fashion/signage band detail. The total area of each sign as proposed is well below the allowable signage area as per City ordinance, as illustrated and enumerated on the attached exterior elevation drawings. A variance is required due to a clause in the VOP Development Design Standards, restricting wall letters to a maximum of 30" in height. While this standard may be suitable for small shop space or for visibility and legibility from directly abutting streets or at pedestrian scale, this is far too limiting and ineffective for our proposed use. We also feel that it is not of a scale consistent with the massing and dimensions of our proposed building. It should also be noted that when the Pond Promenade PUD was approved in 1996 it was one of the pioneering new urbanism projects in the Metropolitan area. During this period communities and planners had a general attitude that merchant signs should be minimal and generic. The current trend as evidenced by the relaxing of most municipal sign codes is that adequate signage is not only critical to a merchants success but can add vibrant and creative design elements to a project while adding distinction and variety to a neighborhood. Highly visible and legible signage is critical to the success and viability of a grocery operation with a regional draw. This parcel as situated has critical sightlines to Hwy 5 and to Market Blvd, however it is set back from Hwy 5 by approximately 550', and from Market Blvd by approximately 620'. Providing effective identification and signage to passing motorists is essential. Signage, if restricted to 30" letter height, will prove ineffective 0 0 .Research as compiled by the United States Sign Council, studying legibility of signage parallel to roadways from moving vehicles is summarized in the table below. This table only calculates recommended letter heights up to a distance of 400' from the roadway, however even at 400' (highlighted in yellow) the recommended legible sizes exceed 80" in height. The 42" height that we are requesting is obviously well below this recommendation, but it will provide some level of effectiveness that could not be achieved with the 30" restriction. The 42" height is also consistent with other locations of our tenant, and in keeping with their minimum standards. For additional reference I also highlighted in red the effective distance for viewing signage with 30" letters. This approximate 100' distance is consistent with my comments above, suggesting this sizing is suitable for pedestrian scale or viewing from directly abutting roadways. Parallel Signs TYPICAL PARALLEL SIGNS - ANGULAR VIEWS 'IcN ROADWAY Table 3. Parallel sign letter height lookup table. 200 42 Letter Height in Inches 46 48 50 Number of Lanes 47 Offset from Curb (ft) 1 2 3 4 5 10 4 6 8 10 12 20 6 — _ 8 10 12 _ 14 40 10 12 14 16 18 60 14 16 18 20 22 80 18 20 22 24 26 100 22 24 26 28 30 125 27 29 31 33 35 150 32 34 36 38 40 175 37 39 41 43 45 200 42 44 46 48 50 225 47 49 51 53 55 250 52 54 56 58 60 275 57 59 61 63 65 300 62 64 66_ 68 70 _ 325 67 69 71 73 75 350 72 74 76 78 80 375 77 79 81 83 85 400 62 84 86 88 90 SCANNED • Additional research into the effective sizing of signage letters, from the basis of static straight on viewing also supports the 42" sizing of the sign letters. Note on this table that from the distances we are offset from the major roadways, signage with the best impact is 42" to 60' high. This does not take into account the limited viewing time that is possible when in a moving vehicle, or when concentrating on driving the vehicle, as is accounted for in table above. n �. LETTER VISIBILITY CHART STATIC PERPENDICULAR VIEWING T + 3" I 30t Letter Height Distance for Best Max. Readable (inches) Impact (feet, Distance (feet) 3" 30' 100' 4" 40' 150' 6" 60' 200' 8" 80' 350' 9" 90' 400' 10" 100' 450' 12" 120' 525' 15" 150' 630' 18" 180' 750' 24" 240' 1000' 30" 300' 1250' 36" 360' 1500' 42" 420' 1750' 48" 480' 2000' 54" 540' 2250' 60" 600' 2500' SCANNED • 0 1 16 a�� SIGNAGE axe,/—'-- -------------------------- - �� n NORTFI T MP5MCII SCANNED CHANHASSEN SPECIALTY RETAIL VILLAGE ON THE PONDS LAKE DRIVE & MAIN STREET CHANHASSEN, MINNESOTA ABBREVIATIONS awr,�i.�uu m wa In IA wimrasam PROJECT TEAM M:NiURi FA" MRI M. IlG 6"ro a n»nrzaMorrtcoMea uxnlren•. LMlD9CI.R I.RCNR[R, N lr MWGOMEW NLCNN[GTS CML NGINM MMMRR v M[CMNIGL 1 [LCLTRKIl CNGIN[!R cux rlwMw� wroxwiu SITE LOCATION _ (I['.A'l'.RAI, NO I.ti PROJECT INFO. cox wrow.wnox ,. orcww. rea.»nw uNe I,.— ..wa,arrcwaoua� .boc�r..vw,oi bxu¢rnoree.,wr .wwr mt� M mw mem S��mp�c DRAWING INDEX rm w,+m.nw i `�"wzim�mx� mbiN::rw mue muu 9 iff R T sir K 13 �,y w•' a I ------------ Zi ---------- —• Nm94aP111M.00 ; GF- -----------------� \ \ a , f 1 :C. a I t I 3 I I i ApF _ I p s I€RZa I gig 3 a Ir a it pp 9 a x= g a L S•g3� � y 3 Y sir K 13 �,y w•' a I ------------ Zi ---------- —• Nm94aP111M.00 ; GF- -----------------� \ \ a , f 1 :C. a I t I 3 I I i ApF _ I p s I€RZa I gig 3 sir K 13 �,y w•' a I ------------ Zi ---------- —• Nm94aP111M.00 ; GF- -----------------� 7 • Site Development Plans for Chanhassen Specialty Retail Chanhassen, Minnesota mmmmwSm CONSULTANT COMACT UST ax[[tl o(vflON.(OMw sav rL SHUT.�a p uc w eE,=U E.EEL I0ll.[.xnn lm COHiST 55351 1[.^ I,M[SSIT ca.,.cr. X.Xx� tl.vwz.ox.. 1 XnrN.X YIlfI1RSAM00hNX([r M[mm[[n I. W� I.rt.1 SYn[][4 V[5wM.5VlfF soo SI [ANXsssxs X.D.U.Mx5Ll3 TI.I.ID wMxcS.w tlxnx awr.5n. nia xax c[m[NI i UUEDIOS,H- w1 1ISET UnSIT,1. xMx.UI �hE`.� Presented by: Venture Pass Partners, LLC f 4 `k Ci 1 n cu C 1 Pt Y x.x 1: F& h HCR 9. q + 1[M r 0.roO^4j �� wxnn si. lelVy Sl — ' d JL - f Ig ITE"`Q,Y� `"Y p •�' SITE SITE" 9 ENw, suM„ ` F• I c x`I Ilw IS is R. Mnr,hl TIS VICINITY MAP NO SCALE e BENCNMARBB ESE NO I NMH 01� F..5tl SOUTH SIDEOF FIEND MoX[x,N n[SE)I . muENowaravuxotl.xorwxsr. DSnbatek USED ITS I VENTURE PASS PARTNERS, LLC ;,ST. STEEIDSTESTEDUSE, �VT.NMS Puss P.wnaas ................. Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary Revision ^Hlstory� Shee[ Title TITLE SHEET Sheet No. Revision C1.01 Project No.V[N30145.01 VILL.ASiEES ON THE P011IM; • \ i VILLAGES ON THE PONDS ME) ADDITION DN tN5 PONDS 0 7� i 7TH AEii)1T:III i� �✓•y� -- :ES I I i Sambatek Client VENTURE PASS PARTNERS, LLC WnII:t,PxcS i#RPaRS Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification A �`�PQ QZII Summary Revision HistoryVp rui vi w.wwn..Pe Sheet Title EXISTING CONDITIONS Sheet No. Revision C2.01 Project No.VENI0145.01 LEGENO 1 eOESCRIMION 1/1 CI =PROPERTYSUMMARY II/ IIIIIIIIIsSENCHMARRS" It� r ..r.w�wr w... nuvne.nemm�.wwrwwrcmwn wwlp:wwrr..ww.s [S�j rwnwrr U 1 �SURVEYNOTES ;! J �wv'wrmwrmsvrvw. Sambatek Client VENTURE PASS PARTNERS, LLC WnII:t,PxcS i#RPaRS Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification A �`�PQ QZII Summary Revision HistoryVp rui vi w.wwn..Pe Sheet Title EXISTING CONDITIONS Sheet No. Revision C2.01 Project No.VENI0145.01 9 0 sDEMONTIDNNOTES A�wa.awnn.wnvewaNwaw n u.mw�waw,v�.cm.nn OEMOLmON LEGEND —LEGEND OEMOLmON LEGEND -tri-rnr� wA amoie.I.wB ..wING MATERIAL NOTES I 1 Dl w� TREE PROTECTION DETAILwwun�mmmuu. Samb&k "w Nww.°1L.mw Client VENTURE PASS PARTNERS, LLC SNDAFWOD��MN))))IT F# I Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary Revision Nlstory Sheet Title DEMOLITION PLAN Sheet No. Revision C2.02 Project NO.VEN20145.01 VILLAGES ON THE: I.aT , PONDS 0M E VILLAGES ON' THE PONOS ...;.^" LOT, 3RU AOUiTiOFi 4 mom°`*/. _ VILLAGE:S ON THE PiiNDEi DUTLOT fl i —LEGEND s0 -- NORTH R -.-....s /PA`.e'sT —YE /���•• 1-W SSM' 0 Client VENTURE PASS PARTNERS, LLC �HOREW0001 MN 55 - Project CHANHASSEN RETAIL Location CHANHASSEN, MN Certification Summary .n+w.. rv. uulu wuw Revlslon History Sheet Title PRELIMINARY PLAT - VILLAGES ON THE PONDS 11TH ADDITION Sheet No. Revision C2.03 A Project NoXENMMS.01 —PROPERTY SUMMARY y ra Cy _CONTAINFORMATION R� .1 SITE NOTES /PA`.e'sT —YE /���•• 1-W SSM' 0 Client VENTURE PASS PARTNERS, LLC �HOREW0001 MN 55 - Project CHANHASSEN RETAIL Location CHANHASSEN, MN Certification Summary .n+w.. rv. uulu wuw Revlslon History Sheet Title PRELIMINARY PLAT - VILLAGES ON THE PONDS 11TH ADDITION Sheet No. Revision C2.03 A Project NoXENMMS.01 • • 4W � 4 l i J O KE DeIVE .LEGEND -� o F- 0 ODENELOPMENTNOTES KEY NOTES Al k?alBk .webkx Client VENTURE PASS PARTNERS, LLC ,suowniewonocwnr sxo.sw000,ux ssm PAss ............ Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification 41 Summary Rev tion History .. Sheet Tltle CIVIL SITE PLAN Sheet No. Revision C3.01 Project NO.VEN30145.01 • 0 V q l \\O at R n OMENAGE e- Nu,x, V wr..rembrleM.sem IpAYY �nF� `Ph�aaeaav xE�TxaYx :vka en:.nnve Client VENTURE PASS PARTNERS, LLC znmwRo MDWURT zMIILWu'Oo MN.11 P,IiS Md Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary Revision Hiztory .� Sheet Title GRADING PLAN Sheet No. Revision C4.01 Projed No.VENla145.e1 RI long r , 1 t V q l \\O at R n OMENAGE e- Nu,x, V wr..rembrleM.sem IpAYY �nF� `Ph�aaeaav xE�TxaYx :vka en:.nnve Client VENTURE PASS PARTNERS, LLC znmwRo MDWURT zMIILWu'Oo MN.11 P,IiS Md Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary Revision Hiztory .� Sheet Title GRADING PLAN Sheet No. Revision C4.01 Projed No.VENla145.e1 0 mrxw _ runr i f - PROMENADE \ POND — <. .� _ l SB TS u - I �'_ � ' V ! � � ^�I �1A �v 11 MIL � � �°.".•<,". r"�"u.::""., SM \ 111j 1.,. men SEQUENCE OF CONSTRURION inl'i r, s `SCJ ®xon:rocoNTRAcroR ' _ W(E DRIVE ( f \ tlAR"WMM "INACR6 rm i t�-� ,S c ..'.n a{�!m ') ,F^•dam .�;` .. __ •NmroweRom rtRaxeMtxoRRMuxlex•xn ✓u 1 Ir a 5 _ wns.muntxwn.wxsrawetxruu EROSION CONTROL MATERIALS QUANTDES I� IRM umn _OUPXniv-��- IFU e,vnMN i Samb&k w.•em0eleh.tom neap �xtx e'°1Yes'p0u �iTMeeev�ux Client VENTURE PASS PARTNERS, LLC IIIIT�VJIITIII—D IT nunaa Pus eoi Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certiflcatl-n�_ Summary Revslon— HIstor Sheet Title EROSION CONTROL PLAN -PHASEI Sheet No. Revision C5.01 Project NO.VEN00145.01 3 A • eTt^ �. FIAT ax■�a 1e �* �� •Y• • I KL OWL I Q4TY Q, u�10 O.. rt,nau.a an,wnrnnro.u. TS SEQUENCE OF CONSTRUMON ^ —NOTETOCONTRAROR AREASUMMA"INACRES •Nrs. �osx� omroxaoiiu xons,uuxrexxxrR NJIN.,Mn. ox,nllyµ OxxO MMf EROSION CONTROL MATERUUS QUAMmES nMu. [lvCPnl CMN EBE �R1��R1a1������������ `Sambatek Client VENTURE PASS PARTNERS, LLC sw wunMoxomuxr xR:ew000 Nx snv &�s MARS AwRau Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification A Summary ReNlslon Historywxx o.�rer Sheet Title EROSION CONTROL PLAN -PHASE II Sheet No. Revision C5.02 Project No.VEN1014501 ax■�a 1e P SRFRw.. ��� • . R �* �� •Y• • I KL OWL I Q4TY Q, u�10 O.. rt,nau.a an,wnrnnro.u. TS SEQUENCE OF CONSTRUMON ^ —NOTETOCONTRAROR AREASUMMA"INACRES •Nrs. �osx� omroxaoiiu xons,uuxrexxxrR NJIN.,Mn. ox,nllyµ OxxO MMf EROSION CONTROL MATERUUS QUAMmES nMu. [lvCPnl CMN EBE �R1��R1a1������������ `Sambatek Client VENTURE PASS PARTNERS, LLC sw wunMoxomuxr xR:ew000 Nx snv &�s MARS AwRau Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification A Summary ReNlslon Historywxx o.�rer Sheet Title EROSION CONTROL PLAN -PHASE II Sheet No. Revision C5.02 Project No.VEN1014501 11 SEDIMENTATION CONTROL MOTES O DETAILS / "SITE MAP" .SM LOGTION MAP eev Usw MAP � TS tl:lCllnre4..eYllB T'•!MI:O M'.tR ,.•..... �.!... "iii`:?\ �C ]]N � TS —ROAD own INW PROTEMON IIP -1i CONCRETE WASNOSIT AREAAry"•..r..unrvn,u —GENNEERALLROVONNOTES —MA1NTENANCENOTES: k SEb&k IMW1�61LfNY Client VENTURE PASS PARTNERS, LLC SMORFWOOX,MX]]I13r &M Pits PmTNms Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary RevlsionT nN Llmiptll Sheet Title EROSION CONTROL DETAILS Sheet No. Revision C5.03 Project NO.NEW145.05 tl:lCllnre4..eYllB T'•!MI:O M'.tR �?�Lamsr rig•., iJl,`. me m r 316 —ROAD own INW PROTEMON IIP -1i CONCRETE WASNOSIT AREAAry"•..r..unrvn,u —GENNEERALLROVONNOTES —MA1NTENANCENOTES: k SEb&k IMW1�61LfNY Client VENTURE PASS PARTNERS, LLC SMORFWOOX,MX]]I13r &M Pits PmTNms Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary RevlsionT nN Llmiptll Sheet Title EROSION CONTROL DETAILS Sheet No. Revision C5.03 Project NO.NEW145.05 9 • �.ars PONOI`.L�C �■mout INCE DRIVE mwUiI Ln CONSTRUCTION NOTTS T. .STORM SEWER STRUCTURE SCNEOOEE Sambatek wwwalak.<ON ��wvtl+Riw YW AR b�M, nIwR14AYR11MRI. Client VENTURE PASS PARTNERS, LLC sxonswaoo u�xss�f �RINIIC PACS PuiI1D�5 Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification PyON. Summary Revision History Ne.O rN R�E�IYR ^agy w Sheet Title UTILITY PLAN Sheet No. Revision C6.01 Protect NO.VEN101E5,01 nrx ' 1. �k 1 G E mwUiI Ln CONSTRUCTION NOTTS T. .STORM SEWER STRUCTURE SCNEOOEE Sambatek wwwalak.<ON ��wvtl+Riw YW AR b�M, nIwR14AYR11MRI. Client VENTURE PASS PARTNERS, LLC sxonswaoo u�xss�f �RINIIC PACS PuiI1D�5 Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification PyON. Summary Revision History Ne.O rN R�E�IYR ^agy w Sheet Title UTILITY PLAN Sheet No. Revision C6.01 Protect NO.VEN101E5,01 A 9 my .�\\ iJdV/ /Mr•w4nxw.n. Mi.� -� grernN �Q��ANQete R ICAL dr DIAMETER I� CATCH BASN MANHCLE dGXEdIxG 4FPAFIMdI rax.0 ]lai .w Ox M. iY. Nef M N.e. n:xenn. n rya ISQ�FIs�`. ...:,, ..,...�, ..... .I:..x.r,.,,.,. ,.:..:.. L. x. BARED END SECTIDN MMM dLYXEdxIO GEPAP1NEHi �� }iDB n e LL InE�wIYn I/l•'r WAlfxgl9 M -6>-]'A 9/rr rfA rp w:w:e Vw L my 'oaTi wr"eYv�nYpi� u • 1�L oESICN�sP nnl rmlcA��U �Qm TIPICAI I)• DIAMETEF x xiomf 1YY�Mfa CATCH BASN CNOMCEMN4 OEPMlxdi WW ]1[I] ��' my .�\\ iJdV/ /Mr•w4nxw.n. Mi.� -� grernN �Q��ANQete R ICAL dr DIAMETER I� CATCH BASN MANHCLE dGXEdIxG 4FPAFIMdI rax.0 ]lai .w Ox M. iY. Nef M N.e. n:xenn. n rya ISQ�FIs�`. ...:,, ..,...�, ..... .I:..x.r,.,,.,. ,.:..:.. L. x. BARED END SECTIDN MMM dLYXEdxIO GEPAP1NEHi �� }iDB Is n e LL InE�wIYn I/l•'r WAlfxgl9 M -6>-]'A 9/rr rfA rp w:w:e Vw el my 'oaTi wr"eYv�nYpi� u QITQ rmlcA��U AND vWxsemEet4x.com �� YFN YYYW mmm,oYyw 1WRe1p YiY1 NwrxnW.IIxrYY�e.r�s Client VENTURE PASS PARTNERS, LLC �ClRAIF�PASR PARR4RS Sheet Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN CerSLA tification Summary Revision xn/ . Sheet 71t1e CONSTRUCTION DETAILS Sheet No. Revision C7.01 Project No.VEN20105.01 NmNMTs s,aL eL aow ao.w4N ca WAlfxgl9 M -6>-]'A .LLL Mi➢PM3 NJSf N[AR�N4yML av qiY Yxw a Gw :v. Y. my 'oaTi wr"eYv�nYpi� 'xx,wxi. ur[F x xiomf ��' Menu lux w.Cx.r:. p N`im ar.4 w.l enro qn part of I ..:nhc Nomrx y..C.M ¢ wsMM, swbemw QRQ iWICAL HYDRANT rcxrMx.:.x. mx. INSTALLATIDN 11.. QRQ TPICAL CAN VALVE [ACIHLEPIXG Df00M1YFxI .Fl[r 1DD6 QQQ� AND BOX IHSTALLAIICN d012aAp CO'MMR ~� 1110! vWxsemEet4x.com �� YFN YYYW mmm,oYyw 1WRe1p YiY1 NwrxnW.IIxrYY�e.r�s Client VENTURE PASS PARTNERS, LLC �ClRAIF�PASR PARR4RS Sheet Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN CerSLA tification Summary Revision xn/ . Sheet 71t1e CONSTRUCTION DETAILS Sheet No. Revision C7.01 Project No.VEN20105.01 NmNMTs s,aL eL aow ao.w4N ca WAlfxgl9 M -6>-]'A .LLL Mi➢PM3 NJSf N[AR�N4yML av qiY my 'oaTi wr"eYv�nYpi� Oe�r ur[F vYWpp N`im ar.4 w.l enro qn part ref:"`.,. r... QRQ iWICAL HYDRANT INSTALLATIDN [ACIHLEPIXG Df00M1YFxI .Fl[r 1DD6 vWxsemEet4x.com �� YFN YYYW mmm,oYyw 1WRe1p YiY1 NwrxnW.IIxrYY�e.r�s Client VENTURE PASS PARTNERS, LLC �ClRAIF�PASR PARR4RS Sheet Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN CerSLA tification Summary Revision xn/ . Sheet 71t1e CONSTRUCTION DETAILS Sheet No. Revision C7.01 Project No.VEN20105.01 J 0 oormsernox , wvxnoxoruu. P[wsrelnn coos uuav 01 xrr BC(EfABLEP�EgNONON 01x_ NRB QR 03 x..a TYPII'AlC1ERH0VT ssrnoxx Sambatek VENTURE PASS PARTNERS, LLC SNwE IAss PARINIII\ Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary Revision History_ Sheet Title CONSTRUCTION DETAILS Sheet No. Revision C/.02 Project No.VEN20145 01 m .0 I r�a.Kp i m w,M LfiW aNrA. iwv�s _ a=lu DING PIPE BEDDING IN PDDR SOULS EA DAN. ovumw 2201 oormsernox , wvxnoxoruu. P[wsrelnn coos uuav 01 xrr BC(EfABLEP�EgNONON 01x_ NRB QR 03 x..a TYPII'AlC1ERH0VT ssrnoxx Sambatek VENTURE PASS PARTNERS, LLC SNwE IAss PARINIII\ Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary Revision History_ Sheet Title CONSTRUCTION DETAILS Sheet No. Revision C/.02 Project No.VEN20145 01 I _Ta` aNrA. IABP PIPE aED01NG mum FOR P.V.C. PIPE ENn. WAUN rt " 2203 oormsernox , wvxnoxoruu. P[wsrelnn coos uuav 01 xrr BC(EfABLEP�EgNONON 01x_ NRB QR 03 x..a TYPII'AlC1ERH0VT ssrnoxx Sambatek VENTURE PASS PARTNERS, LLC SNwE IAss PARINIII\ Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary Revision History_ Sheet Title CONSTRUCTION DETAILS Sheet No. Revision C/.02 Project No.VEN20145 01 Wk-0 �] 1 taO9F aNrA. RIP RAP DETAIL oormsernox , wvxnoxoruu. P[wsrelnn coos uuav 01 xrr BC(EfABLEP�EgNONON 01x_ NRB QR 03 x..a TYPII'AlC1ERH0VT ssrnoxx Sambatek VENTURE PASS PARTNERS, LLC SNwE IAss PARINIII\ Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary Revision History_ Sheet Title CONSTRUCTION DETAILS Sheet No. Revision C/.02 Project No.VEN20145 01 • 0 �e��nw" wu vs .vus Wwe,oW..w m x.W OSv4 EftiN INOUSPAVEMEMSEMONS= ty r ti 110�1 r�Ww. •x"nuNmwmu�w ,ren mnnNm.wus �m COMM PAVEMENT SECnONS- r, � se�ax umwxomws�wm,.n...e.o..,e.p " (�CONCRETF nOFWAUt JCF';MU PW Sea 5S"R MI n o ME MEIEF m.x i6 m�nw., a Novr on mart an EIAFL e4PRe PNEL �' TOPNEWQ/pIMP ;,✓�� YAl6Vpf E0.r GnEN m ReoEov. .rte s —o- �eGk1���.'' 9ioEHewa wNp DRI) les W �T•`r�:S SAPL 9APFLE STM101URE RAVIWYOY N.WKIL WM1VrLE ESOL .= em.wmaPsaxnaaevxc r, � se�ax umwxomws�wm,.n...e.o..,e.p " (�CONCRETF nOFWAUt a�Sambatek neon YmM.P 7aiu. iW+biti"An oma �'iwm�na Client VENTURE PASS PARTNERS, LLC &T%NNN PASS P m.4 Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, NIN Certification ,umma� ry awW m Revision Hlstory� Sheet Title CONSTRUCTION DETAILS Sheet No. Revision C7.03 Project No.VEN20145.01 ME MEIEF m.x i6 m�nw., Y ;r T O v i ERVIOUS PAVEMEM SEMON s PIi ROOe 1NRLATMnON MSIN a�Sambatek neon YmM.P 7aiu. iW+biti"An oma �'iwm�na Client VENTURE PASS PARTNERS, LLC &T%NNN PASS P m.4 Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, NIN Certification ,umma� ry awW m Revision Hlstory� Sheet Title CONSTRUCTION DETAILS Sheet No. Revision C7.03 Project No.VEN20145.01 • 0 ecoStorm z i. I _ Ole,PP mncnm PIPE DOLMD"� ftbeatek �•P.Pxr win :lien VENTURE PASS aARTNERS, LLC onorouxr nrouwmP.un sn>+ A�—DMAC PASS Pum�mS Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary Revision HlstoryM swe.ii,n,P.N.� Sheet Title CONSTRUCTION DETAILS Sheet No. Revision C7.04 1`101.0 No.Dtrvawas.D1 v®m®m0000®® �a�umema,moor®®® aoa mmmoore®o0 om®m�000®oo a1 11 a Ma_ z i. I _ Ole,PP mncnm PIPE DOLMD"� ftbeatek �•P.Pxr win :lien VENTURE PASS aARTNERS, LLC onorouxr nrouwmP.un sn>+ A�—DMAC PASS Pum�mS Project CHANHASSEN SPECIALTY RETAIL Location CHANHASSEN, MN Certification Summary Revision HlstoryM swe.ii,n,P.N.� Sheet Title CONSTRUCTION DETAILS Sheet No. Revision C7.04 1`101.0 No.Dtrvawas.D1 5T[ MVELOPMCNT SUMMARY rc�wai I 1 IDT I ve'eXi�v tiN \ oam�.aow roleawual .. la.ei �erK drz •ay.IiA is+M O.AnemV � s1 wsH LITnL R—RED 1-1l llaL iwnM ..IAXIM I, ie I—. �.tt . W M4 ne.url uNTW wNSH .ubMM1�'.ROM arNrt. XryNII T FAKIN laasoM[sMl MrlP. 'sNIXs e� v—NI-TICI w+ — ITER eee.nwoeRawMi W aIN rzwl.�.,l e. r.., Dawe, meawle .PRELIM, OPY NOt �OT�ON OONStR T� SITE YUN L� - Plan mcj Ian - _ ELI CHANHASSEN SPECIALTY =_n RETAIL -_- iChanhassen, Minnesota — 4 4 ELI CHANHASSEN SPECIALTY =_n RETAIL -_- iChanhassen, Minnesota — 2 EXISTING TRE HRUB PROTECTION 11 T ."ce rvw�wc. 1.Kmroo. 1 MIN —11IIT— �° —11. A MIN 11,....N.-1�.,�... .nure wrua .mow.— o. � 5013 TREE PLANTING 2 EXISTING TRE HRUB PROTECTION 3 5T,1N5TALLATION mu oom TTJ 5 WAMULCH BDP 4 SHRUB PLANTING w..o,„ ILca...uw H 1 OMER TECT J Q U � W y m Z Q 2 Z F c W W v� Tn z Q N = U z Q S U .P0.NOMF0RY GONSt0.UCt10N PUNTING DETAILS .mow.— o. 3 5T,1N5TALLATION mu oom TTJ 5 WAMULCH BDP 4 SHRUB PLANTING w..o,„ ILca...uw H 1 OMER TECT J Q U � W y m Z Q 2 Z F c W W v� Tn z Q N = U z Q S U .P0.NOMF0RY GONSt0.UCt10N PUNTING DETAILS GARDCO INFINITY H SERMS - PAEM P4 / P4-2 STONCO WTL SERIES WPA GARDCO 101 SERIES WPI LIGMAN SERIES WY2 Luminein ScbMule Projen: CHANHASSEN RETAIL MAM= wy 41N, ~ •1 •,� • Symbol Qty Lebd ArtenBuuent MONTCOMERN Lum. Lumen. LLE Deecdprion Wm. WaN n RC1111' 11('LS w w i 1 e Iw •• • E--� POND PROMENAD 2060'1 0.)50 PREM-FH4WPSMH I 452 B2 -UO -03 S WPI SINGLE Wv F •. v q... .y—' 0.750 101-WT-ISOPSMH IBS B2•DI GI 2 WP2 SINGLE 6500 2604 0.750 LIGMANN-UAAJ2112-2-2-W40 111 ISEUIGI WPA SINGLE 2200D 10599 U. WTL250FNNFF 291 N.A 7 P42 BACK -BACK 40000 20607 4 PAEM-2-FH•4WPSMH 452 BLI/OG3 U m w W N •N Za - Tr U Z a . L LAKE D s BIKE 5110P + ,NSS PAAIIUE ' 'APARTMENTS' Luminein ScbMule Projen: CHANHASSEN RETAIL MAM= Symbol Qty Lebd ArtenBuuent Tobi Letup Lo Lum. Lumen. LLE Deecdprion Wm. WaN BUGRaflS 5I P4 SINGLE 40000 2060'1 0.)50 PREM-FH4WPSMH I 452 B2 -UO -03 S WPI SINGLE 12500 6S9] 0.750 101-WT-ISOPSMH IBS B2•DI GI 2 WP2 SINGLE 6500 2604 0.750 LIGMANN-UAAJ2112-2-2-W40 111 ISEUIGI WPA SINGLE 2200D 10599 U. WTL250FNNFF 291 N.A 7 P42 BACK -BACK 40000 20607 0.750 PAEM-2-FH•4WPSMH 452 BLI/OG3 AIL MOANING HEIGHTS ARE SHOWN ADJACENTTO FDOl1RE LOCATIONS ON PLAN CabWatlon Summery Pro1M: CHANHASSRN RET'AILMARIO!T Lebd CdcType Udb Avg Mex Mn AvVMin Mex n FCBeyend Prop Line el Gnde Illumi.unu Fc 0.14 2.4 0.0 N.A. N.A. Paved Arm EC de Illumiwlm Fc 025 I16 OJ 4.64 16.5] ALL VALUES SHOWN ARE HORIZONTAL MAINTAINED FOOTCANDLES AT GRADE FIXTURE DISTRIFUTION TEMPLATES ARE SHOWN AT O.SOMFC FOR REFERENCE USE ONLY VALUES DO NOT INCLUDE CONTRMUTION FROM ADJACENT STREET OR PROPERTY LIGHTING N OR COS�UCTIOM UGKTING PUN L440` FZ> 0 FIR5T FLOOR a ►5 2 TRASH ENCLOSURE - SOUTH ELEVATION Q J a U m W H d U : Z F- W c W//�� WW U) LL L a L ZU a 2 U 7RASH ENCLOSURE -EAST ELEVATION (D Se tion @ Trash RDOR em AI.O n TR 5t1 ENCLOSURE - WE5T ELEVATION ua�ia�'Oise J C> we or m -N,-..- aau Mu+ Mrmnnasw V. 1, „.,, n, —li p0.EUMF0 Gcos0oGS�OT� 7RASH ENCLOSURE -EAST ELEVATION (D Se tion @ Trash RDOR em AI.O T --- -- q ��1. _—_ �Iluuulnnuullnullu�lnnnllulllununlumul nllu�umnununnl nlun LJ I Roof Plan 2 5i Mlme Du ram n Root Drnn Detail u l l Roof gau,Pgent support curb Detail - — 5 Roof hatch Detad o Roof Vent Detail n i nwxra v.ay. I , i ��1. _—_ �Iluuulnnuullnullu�lnnnllulllununlumul nllu�umnununnl nlun LJ I Roof Plan 2 5i Mlme Du ram n Root Drnn Detail u l l Roof gau,Pgent support curb Detail - — 5 Roof hatch Detad o Roof Vent Detail n E%TERIOR FIN15N 5CHEDULE V. w� �N.u.x.rux wuem ruselxWm �� ewro nwmi e. rwwcwac. nwurrcNav � � unurmuuxu r rvuu ONTG RCHI ""m'" RR Pius P � xw H�]�� •. i i I. I�e°�a M�tl .uW�m nEast ._-.... ...e...... ,..a•.4..... cOH°+TRU� � I A2.0 11 9 South Elevrtion D 4 Wcst E I,on Q 0 r J Q U b W d CQi ZF� LL1 W Cl) t Q m = U z Q U PpEOM1FO� N ,�yU0T10N DONS "110R 11IVATIO0 pMTll UND9OA%NG) A2.1 I SOUTHWEST PERSPECTIVE 2 NORTHWE5T PERSPECTIVE NORTHEA.5T PERSPECTIVE .PRELIM\ OQY. C�NS�LICSIOR rcRsrecrivtz A2.3 [Property CardParcel ID Number 55 460030 Taxpayer Information Taxpayer Name NORTHCOTT COMPANY Mailing Address 250 EAST LAKE DR CHANHASSEN, MN 55317-9364 Property Address Address City 1 Rrlfi7a-� 1 .40 Parcel Information Uses Commercial GIS Acres 2.71 Deeded Acres Plat VILLAGES ON THE PONDS 4TH ADDN Lot Block Tax Description OUTLOT B r F1 Building Information Estimated Market Value Building Style Above Grade Finished S Ft Last Sale Bedrooms Year Built Garage N Date of Sale 11/30/2001 Bathrooms $0.00 $0.00 Sale Value $895,774.00 Total Miscellaneous Information $871,600.00 :Sc�hoolDistrict Watershed District WS 064 RILEY PURG BLUFF Homestead N Green Acres N Ag Preserve N Assessor Information Estimated Market Value 2014 Values (Payable 2015) 2015 Values (Payable 2016) Last Sale Land $871,600.00 $871,600.00 Date of Sale 11/30/2001 Building $0.00 $0.00 Sale Value $895,774.00 Total $871,600.00 $871,600.00 GThecataprovded herewith Is for referencep set only. This data Is rpt sudable for legal, ergineemhg, surveying a other similar puephe oses. Carver County does not guarantee taccuracy of the information contained herein. This data is furnished on an 'as is basis and Carver County makes no representations or warranties, either expressed or implied, for the merchantabldy or fitness of the hfonnalionprovided for any purpose. This clectaima is provided pursuant to Minnesota Statutes §466.03 and the user of the data provided herein acknowledges that Carves County shall hot be liable for any damages, and by using this data in any way expressy waives all claims, and agrees to defend. indemnity, and hold . harmless Carves County. is oRciala, officers, agents, employees. etc hem any and all claims brought by anyone who uses the intermission provided fa herein, its employees or agams, or CARVER third parties which arise out of user's access By acceptance of this data, the user agrees not to transmit this data or provide access to it or any part of it to another party unless the user includes COUNTY with the data a copy of this disclaimer SCANNEC Tuesday, June 09, 2015 Carver County, MN C o n s u l t i n g G r o u p I n c Transportation - Civil • Structural • Environmental • Planning • Traffic • Landscape Architecture • Parking SRF No. 0962471 MEMORANDUM TO: David C. Hempel Assistant City Engineer City of Chanhassen FROM: Dennis R. Eyler, P.E., Principal Marie K. Cote, P.E., Senior Engineer DATE: August 9, 1996 SUBJECT: REVIEW OF EAW TRAFFIC IMPACT -VILLAGES ON THE POND As you requested, we have completed a review of the traffic analysis and forecast for the Villages on the Pond EAW. This included a review of the trip generation, traffic forecast and analysis, and mitigation. Based on our review and analysis, we offer the following comments for your consideration: • According to the information in the EAW, we concur with the trip generation, traffic forecast and capacity analyses for the unsignalized and signalized intersections. The 10% multi-purpose reduction mentioned on page 22 did not seem to be applied to the trip generation rates or calculation. However, it is possible that the reduction was made manually in the trip distribution. • An analysis of recommended geometrics for the proposed development was conducted to determine whether the intersections of Market Boulevard and Lake Drive West, and Great Plains Boulevard and Lake Drive East could operate as right -in, right -out only. Shown on the Site Plan, Figure 3, the intersection of Market Boulevard and Lake Drive West is approximately 400 feet south of TH 5. According to Table 6, the proposed geometrics for Build conditions are two through lanes and a right turn lane for the north approach, a left turn lane, two through SRF Consulting Group, Inc. One Carlson Parkway North, Suite 150, Minneapolis, Minnesota 55447-4443 Telephone (612) 475-0010 • Fax (612) 475-2429 An Equal Opportunity Employer SCANNED 0 0 David C. Hempel - 2 - August 9, 1996 lanes and a right turn lane for the south approach, a right turn lane for the east approach, and a right and left turn lane for the west approach. It is recommended in the EAW that the east approach operate with right -in, right - out access. According to Mn/DOT guidelines, full access intersections should be located a minimum of 600 feet from a major signalized intersection. Since this intersection is less than the required 600 foot minimum, we would concur with Mn/DOT's guidelines and recommend that this intersection operate with right in/right out access only. In regards to access circulation, Lake Drive West extends to Power Boulevard to the west. This connection would provide an alternate access to and from the proposed developments. The full access intersection on Market Boulevard at Lake Drive to the south would also provide an alternate route to and from the proposed developments. The intersection of Great Plains Boulevard and Lake Drive East is approximately 450 feet south of TH 5. The proposed geometrics for this intersection are a left turn lane, a through lane and a right turn lane for the north and south approaches, and a left turn lane and a through/right turn lane for the east and west approaches. This intersection includes two private roadways and two public roadways. Great Plains Boulevard provides local access to the proposed development and through traffic is not the main issue. Therefore, we would recommend that this intersection remain a full access intersection. July 9, 1996 Mr. Dennis Eiler 0 0 CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937-1900 0 FAX (612) 937-5739 SRF Consulting Group, Inc. One Carlson Parkway North Suite 150 Minneapolis, MN 55447-4443 Re: Review of EAW Traffic Impact - Villages on the Pond Land Use Review File No. 95-17 14 JAR-- Dear Dennis: Enclosed please find a copy of an EAW for Villages on the Pond prepared by BRW, Inc. dated July 1, 1996. Would you please review the traffic analysis and forecast within the document and let me know if there are other traffic concerns that may have been overlooked. We are especially concerned with the proposed full intersections at Market Boulevard and Lake Drive, as well as Great Plains Boulevard and Lake Drive. We feel that these intersections may be able to function as right -in, right -out only. I would appreciate your comments back as soon as possible as this item is going forward for preliminary plat approval on July 17, 1996 at the Planning Commission level and City Council on the August 12, 1996 Council agenda.{. Please call me with a cost estimate for the services requested herein. If you have any questions or need additional materials, please do not hesitate to contact me. 1 1 I 1 fJ 1 1 1 I 1 1 11 1 Sincerely. CITY OF CHANHASSEN 47 -It F ' yrt AIF- - David C. Hempel 1 Assistant City Engineer DCH:jms 1 Enclosure 1 C Charles Folch, Director of Public Works Kate Aanenson, Planning Director ' ��StJIgW 3VCV[�QS�Y,IIBf,'[SC9W 1 Villages on the Ponds July 17, 1996, July 24, 1996 and August 12, 1996 Page 40 ' believes that all the sanitary sewer and water lines with the exception of the individual building services should be owned and maintained by the City upon completion. The applicant will be required to enter into a development contract with the City and provide financial security in the form of a letter of credit to guarantee compliance with the terms stipulated in the development contract. Detailed construction plans and specifications will be required in conjunction with final platting. The construction plans and specifications shall be prepared in accordance with the City's latest edition of Standard Specifications and Detail Plates. ' The construction plans and specifications will be subject to staff review and formal approval by the City Council in conjunction with final plat approval. Fire hydrant placement and revisions to the utility plan layout will occur during review of the construction plans and specifications. ' During construction of the utilities, the applicant's engineer shall provide on-site inspection services to certify upon completion that the utilities have been constructed in accordance with the approved plans. As -built construction plans will also be required before acceptance of the tutilities by the City. The site contains an existing home on Lot 1, Block 2 west of Trunk Highway 101. This structure will eventually be razed in conjunction with the development. The existing residential well will need to be abandoned per State health codes and sanitary service will also need to be disconnected at the main. Drainage and utility easements will need to be dedicated on the final plat over the sanitary sewer and watermains. The easement width will depend on the depth of the sanitary sewer. At a minimum, a 20 -foot drainage and utility easement should be dedicated over each line. STREETS ' Subdivision of this parcel will require the vacation of Great Plains Boulevard (Old Trunk Highway 101) and portions of Trunk Highway 101 (Market Boulevard). At this time, the City does not have the authority to vacate the right-of-ways since MnDOT has not formally turned back the road jurisdiction to the City and/or Carver County. The turnback involves a conglomerate of agreements that need to occur between MnDOT and Hennepin County, Carver County, Scott County, and the City of Chanhassen. These agreement are anticipated to be finalized and signed by MnDOT sometime this fall. Portions of this plat are dependent upon the ' vacation of these right-of-ways before being recorded. Streets within the subdivision are proposed to be private with the exceptions of TrunLHighway 101 (Market Boulevard) and a small portion of Lake Drive at the easterly end of the plat. During conceptual review of the development, staff indicated that Lake Drive is designated as a collector street on the City's Comprehensive Plan as well as listed as a Municipal State Aid Route. I 0 Villages on the Ponds ' July 17, 1996, July 24, 1996 and August 12, 1996 ' Page 41 Therefore, the street would have to be built to State Aid standards. Given the issue of on -street ' parking and some unique aesthetic design elements, staff has re-evaluated its position. With the current design proposal, Lake Drive will actually function more as a main street for this development rather then a collector through street for the City. For this reason and given the type ' of unique pavement design, parking configurations and landscaping improvements, staff has decided to allow Lake Drive to be built, owned, and maintained as a private street. This will improve building setback requirements, construction costs for the applicant, and reduce ' maintenance demands on the City, i.e. snowplowing. As a result of this action, the City will need to request MnDOT to revoke the MSAS status. A small portion of Lake Drive at the easterly end of the project will be dedicated and built as a public street which will provide a new street access , to Grandview Road. Currently, Grandview Road is a private gravel street serving six homes with the potential of further subdividing once sewer and water becomes available. A secondary access t point is also being provided to Grandview Road through Lot 10, Block 1 (St. Hubert's Church site). ' The preliminary plat proposes to dedicate a 25 -foot wide right-of-way along the east portion of the plat through Lot 8 and 10, Block 1. Upon review of the existing Grandview Road alignment, it appears the 25 -foot wide right-of-way could be reduced to 17 feet, however, it needs to be ' extended southerly to parallel Grandview Road until Grandview Road turns easterly. This will impact the location of the retaining walls and parking as shown on Lot 10, Block 1. ' The preliminary plat is proposing to dedicate right-of-way for Lake Drive and the new access street to Grandview Road. Staff believes that the cul-de-sac street for Grandview Road can be reduced down to a 31 -foot wide street with a temporary turnaround. The street section for the public portion of Lake Drive shall be constructed to 36 feet wide, face-to-face with concrete curb and gutter. The street section which access Grandview Road within the plat shall be construction to 31 feet wide, back-to-back with concrete curb and gutter. A temporary cul-de-sac with a 50- ' foot radius will also need to be constructed at the end of the public street (Grandview Road). Private streets shall be constructed in accordance with the City's private street ordinance which requires a minimum 26 -foot wide drive aisles. The development proposes to meet these drive ' aisle requirements with the except of the hotel/restaurant site where the narrative on the plans indicated 22 -foot wide drive aisles in these areas. The drive aisles will need to be increased to facilitate turning movements, delivery vehicles, and safety apparatuses. public The plans are proposing full access points onto Trunk Highway 101 (Market Boulevard) at Lake _ Drive, Great Plains Boulevard (Main Street), and across from Rosemount's driveway.%Staff has serious safety concerns with the full access across from existing Lake Drive given the_close proximity to Trunk Highway 5 and existing roadway geometries. Staff believes that a right -in, right -out only may be permitted after further traffic studies are compiled and reviewed by the City. Villages on the Ponds July 17, 1996, July 24, 1996 and ' August 12, 1996 Page 42 A development of this size will require traffic control improvements along Trunk Highway 101 (Market Boulevard) and Great Plains Boulevard, as well as, Main Street. This includes constructing all or portions of future Trunk Highway 101 to four lanes with auxiliary tum lanes and traffic signals at Trunk Highway 101 and proposed Lake Drive. Staff is also concerned that ' eventually a traffic signal will also be warranted at Trunk Highway 101 and Main Street (access south of Lake Drive). Both traffic signals will require meeting a signal justification report prior to installation with MnDOT. All Trunk Highway 101 improvements will need to meet State Aid ' standards. MnDOT will also be required to approve all access points on Trunk Highway 101. A cost-sharing agreement for the installation of any traffic signals will need to be drafted. A ' breakdown of the cost participation would be based on jurisdictional entrance percentage. For example, a signal on Trunk Highway 101 at Lake Drive would be split 501/6 MnDOT, County or City, 37% Villages on the Pond, and Rosemount 12%. Depending on phasing of the development, traffic signals or improvements to Trunk Highway 101 may not immediately be warranted, therefore, staff recommends that the applicant set up a financial escrow account with the City to guarantee future modifications along Trunk Highway 101. The financial guarantee ' may be in the form of a letter of credit or certificate of deposit assuming that these improvements are not installed with Phase I. Upon review of the interior drive aisles and parking lots, staff has concerns with the northerly east/west drive aisle west of Main Street. This drive aisle will act as a thoroughfare for traffic. The proposed parking stalls will create turning movements and pedestrian crossings which could ' lead to a potentially hazardous situation. Staff is recommending that the northerly parking stalls be eliminated and parking permitted only on the south side of the drive aisle adjacent to retail shops. These parking lot configurations will be further evaluated with the individual site plan ' submittals. For the most part, the main street drive aisle configurations throughout the development appears acceptable with the exception of drive aisles at the intersection of Trunk Highway 101 and Great Plains Boulevard. At these intersections, the streets are narrowed down ' from 44 feet wide to 26 feet wide. Staff believes that an additional right tum lane will need to be incorporated which will increase the drive aisle width to 38 feet to accommodate the tum lanes. ' A right turn lane should also be constructed on northbound Lake Drive at Great Plains Boulevard. t In conjunction with -private streets, cross -access easements and maintenance agreements will need to be prepared by the applicant. The cross -access easements should also qualify she secondary access road for public use to Grandview Road. ' Detailed construction plans and specifications will be required for all public streets. The plans and specifications should be prepared in accordance with the City's latest edition of Standard 1 Villages on the Ponds July 17, 1996, July 24, 1996 and , August 12, 1996 Page 43 Specifications and Detail Plates. The construction plans and specifications will be subject to ' staff review and formal approval by City Council. Some of the plans indicate Lake Drive being dedicated with an 80 -foot wide right-of-way. ' However, the preliminary plat indicates the street will fall within Outlot A which is proposed at 60 feet wide. The proposed private street segment, 44 feet in width, will fit within the 60 width. , However, portions of the sidewalk area will need to be located on the individual lots to facilitate the pedestrian plaza and wide sidewalks envisioned for Lake Drive. PLANNING COMMISSION UPDATE ' The Planning Commission held a public hearing on July 17, 1996 to review the proposed ' development. The Planning Commission tabled the item to permit staff and the applicant the opportunity to clarify the vision for the Village Pond, to analyze parking, to permit the Park & Recreation Commission to make a recommendation on the location of the proposed soccer field, ' to create a written definition of the "village character", and to modify the Development Design Standards. ' The Planting Commission held a second hearing on July 24, 1996 to review the development. The Planning Commission voted four for, zero against, with one abstention to recommend approval of the development subject to the conditions, as modified, below. t The Planning Commission did express some concern regarding the open-ended approval provided with a PUD, with the potential for portions of the project to remain undeveloped for ' several years and changing conditions and ordinances taking place that are not applicable to this development. Staff had proposed language that would require the development be reviewed by the city five years after final development approval to determine if the design standards and conditions of approval were still appropriate and permitted the city to revise the conditions then. However, the applicant and Planning Commission were concerned that the uncertainty contained in such a condition may financing for the project. The Planning Commission requested ' preclude that staff and the city attorney develop some language that addressed this concern. Staff has discussed this issue with the city attorney. He suggested that the following language be "For two years following final approval of the development, no changes in official ' controls of the city shall affect the development." I Villages on the Ponds ' July 17, 1996, July 24, 1996 and August 12,1996 ' Page 5 mitigation is done on site. Based on the city's tree preservation ordinance and without additional ' tree preservation or loss, the development would be required to provide replacement plantings of 206 trees. ' Traffic: A traffic operation analysis of the proposed development was completed to document the intersections affected by the proposed development, to estimate the average daily traffic with the proposed development, to identify capacity limitations, and to identify potential mitigative ' measures. Regional access to the site is provided east and west by TH 5 and north and south by TH 101. Local site access is through TH 101 (Market Boulevard) on the west and Great Plains Boulevard and Lake Drive East on the east. ' The analysis demonstrates that the change in operations from the existing conditions at the ' intersection along TH 5 are not solely due to the proposed development. The background traffic growth in the area accounts for 45 to 65 percent of the traffic forecast at the two TH 5 intersections. Even without the project generated traffic, traffic volumes are expected to be near ' or over capacity due to background traffic growth. The traffic analysis concluded that the predicted traffic generated by the site does not ' significantly change the level of service that would occur without the project. Mitigation measures suggested do not alleviate the problem. The source of traffic congestion is beyond the control of this project. Traffic mitigation would require the provision of an alternate traffic ' system on TH 5 such as proposed on TH 212. Conclusion: There appear to be no significant environmental issues requiring further ' investigation prior to project commencement. Required on site utility and transportation improvements will be designed and constructed as part of the project. The wetland loss will be mitigated in full compliance with city, state, and federal requirements. Tree loss will be replaced ' pursuant to the city tree preservation ordinance and site plan landscaping requirements. The project has been planned to minimize future environmental impacts and will be constructed with significant emphasis on control of erosion and sedimentation control. ' Staff believes that there are numerous potential benefits for mixed use projects. A mixed use ' development would be unique to the city and would provide a focal point on the fringe of the downtown area and additional_ vitality to the community. The village concept provides a pedestrian fiiendlyenvironmentand th rovisio:oftransit services where people can live, ' work, and play, elements which are found in neotraditional development principals and the livable communities act. 1 Villages on the Ponds July 17, 1996, July 24, 1996 and ' August 12, 1996 Page 48 ' 29. The applicant shall develop a sediment and erosion control plan in accordance with the City's Best Management Practice Handbook (BMPH). Type III erosion control fencing will be ' required around the wetlands. The site may also require additional erosion control fence on the slopes and/or temporary sediment basins. Wood fiber blankets shall be utilized on all slopes in excess of 3:1. ' 30. Drainage and conservation easements shall be dedicated over all wetland areas within the subdivision including outlots. Wetland mitigation measures shall be developed and subject to ' approval by the City. The mitigation measures shall be completed in conjunction with the site grading and restoration. ' 31. The applicant reduce the impacts to Wetland 2000, create a larger on site mitigation area and present a sequencing plan showing reduced impact to affected wetlands. ' 32. City staff and the applicant shall investigate the origin of Wetland 6000 to determine if this area can be exempt from the Wetland Conservation Act. 33. Buffer strips shall be provided around Wetland 5000. The buffer strips shall be 10 to 30 feet in width with an average width of 20 feet ' 34. The street section for the public portion of Lake Drive shall be constructed to 36 -feet wide face- to-face with concrete curb and gutter. The street section which accesses Grandview Road within the plat shall be constructed to 31 -feet wide back-to-back with concrete curb and gutter. A temporary cul-de-sac with a 25 -foot radius shall be constructed at the end of the public street for Grandview Road. All private streets shall be constructed in accordance with the City's private street ordinance which requires a minimum 26 -foot wide drive aisles and built to 7 -ton ' design. 35. Depending on the phasing of the project, Trunk Highway 101 may need to be upgraded to four ' lanes, as well as, turn lanes and traffic signals. This will be further evaluated contingent upon the outcome of the traffic study being reviewed by SRF. The applicant shall incorporate the ' necessary traffic improvements as recommended by SRF accordingly. Should the traffic signals not be required with the initial phase of development, the applicant will be required to escrow with the City their fair share of the cost for future installation. Security shall be a means of a ' letter of credit or a certificate of deposit. All Trunk Highway 101 improvements shall meet State Aid standards. The applicants responsibility for the traffic signals along Tntnkliighway, 101 shall be 37% of the total cost. A cost sharing agreement between the applicant and City ' shall be drafted for the installation of any traffic signals. January 28, 1997 Ms. Julie Long BRW Thresher Square 700 Third Street South Minneapolis, MN 55415 VIA FACSIMILE Re: Great Plains Boulevard Street Modification - Villages on the Ponds Project No. 96-13 Dear Julie: Upon review of the memo from BRW dated July 29, 1996 regarding development traffic, we are requesting the following modifications to Great Plains Boulevard to accommodate trip generations from the Villages on the Ponds development: Provide a 14 -foot wide right tum on southbound Great Plains Boulevard into the development at Lake Drive East as shown on the attached drawing. 2. Provide an auxiliary 14 -foot wide tum lane on northbound Great Plains Boulevard at Lake Drive East as shown on the attached drawing. 3. Restripe painted median and turn lanes as shown on the attached drawing. Redo the driveway entrance to the development off Lake Drive East for a 28 -foot minimum wide drive aisle into the site centered upon existing Lake Drive East. Currently, the drive access is 52 according to MnDOT plans. 4. Provide a raised concrete median on Great Plains Boulevard south of Lake Drive East as shown. In the future, as development occurs on the American Legion site, the existing access to Total Mart may be closed off and traffic routed via the American Legion driveway. The Legion's driveway will also be restricted to a right -in right -out only in the future. We will require the developer of that site to extend the median south, thus closing of the access point. a 0 Ms. Julie Long January 28, 1997 Page 2 Please incorporate these changes in your street construction plans for the development. The section of Great Plains Boulevard from Trunk Highway 5 to Grandview Road will be a public street, therefore, plans should be prepared in accordance with the City's Standard Specifications and Detail Plates. If you have any questions in this matter, please feel free to contact me. Sincerely, CITY OF CHANHASSEN David C. Hempel Assistant City Engineer DCHJms Attachment c: Charles Folch, Director of Public Works Anita Benson, Project Engineer Vemelle Clayton, Lotus Realty g.kng\pmjmts\villagm\str modific fion.doc p 22. Traffic. Parking spaces added 22192. Existing spaces (if project involves expansion) Q. Estimated total Average Daily Traffic (ADT) generated 14.800. Estimated maximum peak hour traffic generated (if known) and its timing: approximately 1.500 for both the AM peak (7-9:00 AM) and the PM peak (4-6:00 PM). For each affected road indicate the ADT and the directional distribution of traffic with and without the project. Provide ar estimate of the impact on traffic congestion on the affected roads and describe any traffic improvements which will be necessary. Response: A traffic operations analysis of the proposed development was completed in order to document the following issues: • Identification of principal roads, highways, and intersections that will be used by motor vehicles moving to or from the proposed project. • Estimates of average daily traffic volumes and peak hour traffic volumes anticipated to occur one year after the proposed project will be substantially complete and operational. • Identification of traffic impacts that would result given the capacity limitations of the roads, highways, and intersections and the forecast post -development traffic volumes. • Identification of mitigation measures that can be implemented to address traffic impacts. ACCESS ROADWAYS AND INTERSECTIONS Access Roadways Local access to the proposed site is to be provided directly by Great Plains Boulevard and Trunk Highway (TH) 101/Market Boulevard and indirectly by TH 5/Arboretum Boulevard. The project location and adjacent roadway system is shown in Figure 1. Great Plains Boulevard will act as one access to the development. In addition, five accesses are proposed off of TH 101, three accesses to the east and two accesses to the west. North of TH 5, Great Plains Boulevard is a north -south, two-lane roadway with no parking and a posted speed limit of 30 miles per hour (mph). South of TH 5, Great Plains Boulevard is proposed to be designed as a two-lane roadway with parking bays on both sides of the street and a maximum posted speed limit of 30 mph. The purpose of this section of Great Plains Boulevard will be to provide a direct route for the heaviest movements into and out of the development. North of TH 5, Market Boulevard is a north -south, two-lane roadway with no parking and a posted speed limit of 30 mph. For approximately 1,000 feet south of TH 5, TH 101 is a north -south, four -lane divided highway with left- and right -turn lanes before tapering into a two-lane roadway. TH 101, from TH 5 south to County State Aide Highway (CSAH) 18/Lyman Boulevard, is planned to be upgraded to a four -lane divided roadway with left- and right -turn lanes. This section of TH 101 does not allow parking and the posted speed limit is 40 mph. TH 5 is an east -west, four -lane divided highway with left- and right -tum lanes at major intersections. Access onto TH 5 near the proposed development is excluded to major cross -streets with no driveway access. W TH 5 does not allow parking and the posted speed limit is 55 mph. The site plan is shown on Figure 3. Regional access to the proposed site is provided east and west by TH 5 and north and south by TH 101. TH 5 provides direct access from the southwest suburbs to I-494 and the rest of the regional road system. TH 101 provides access to TH 212 and TH 169 approximately 3 miles south of the proposed development. • TH 101 and Main Street The two intersections on TH 5 are controlled by traffic signals. The remaining access intersections are proposed to be unsignalized with no control on TH 101 and Great Plains Boulevard and stop control on the minor roadways (Lake Drive and Main Street). The existing road geometrics and traffic control are shown in Figure 10 and Table 3. EXISTING TRAFFIC CONDITIONS Existing traffic data is collected because the information is a key component used in the analysis of existing conditions and in producing forecast volumes. The existing data gathered includes: • The existing two-way Average Daily Traffic (ADT) volumes on TH 5, TH 101/ Market Boulevard and Great Plains Boulevard were recorded by BRW, Inc. on March 22-24, 1996. • The existing peak hour turning movement volumes and geometrics were collected by BRW, Inc. on March 23, 1996 from 6:00 to 9:00 AM and 4:00 to 6:00 PM at the following locations: (1) The intersection of TH 5 and TH 101/Market Boulevard (2) The intersection of TH 5 and Great Plains Boulevard • The existing traffic signal timing was obtained from Mn/DOT for the AM and PM peak hours of operation at the following locations: (1) The intersection of TH 5 and TH 101/Market Boulevard (2) The intersection of TH 5 and Great Plains Boulevard •_3585 21 Access Intersections Six critical intersections were identified for analysis: TH 5 and TH 101/Market Boulevard TH 5 and Great Plains Boulevard Great Plains Boulevard and Lake Drive East TH 101 and Lake Drive West • TH 101 and Lake Drive (through development) • TH 101 and Main Street The two intersections on TH 5 are controlled by traffic signals. The remaining access intersections are proposed to be unsignalized with no control on TH 101 and Great Plains Boulevard and stop control on the minor roadways (Lake Drive and Main Street). The existing road geometrics and traffic control are shown in Figure 10 and Table 3. EXISTING TRAFFIC CONDITIONS Existing traffic data is collected because the information is a key component used in the analysis of existing conditions and in producing forecast volumes. The existing data gathered includes: • The existing two-way Average Daily Traffic (ADT) volumes on TH 5, TH 101/ Market Boulevard and Great Plains Boulevard were recorded by BRW, Inc. on March 22-24, 1996. • The existing peak hour turning movement volumes and geometrics were collected by BRW, Inc. on March 23, 1996 from 6:00 to 9:00 AM and 4:00 to 6:00 PM at the following locations: (1) The intersection of TH 5 and TH 101/Market Boulevard (2) The intersection of TH 5 and Great Plains Boulevard • The existing traffic signal timing was obtained from Mn/DOT for the AM and PM peak hours of operation at the following locations: (1) The intersection of TH 5 and TH 101/Market Boulevard (2) The intersection of TH 5 and Great Plains Boulevard •_3585 21 I I I 0 i I 0 0 The resulting existing ADT volumes are documented in Figure 9 and the AM and PM peak hour turning movement volumes are illustrated in Figure 11 and documented in Table 3. SITE GENERATED TRAFFIC Trip Generation The trip generation of the proposed land uses are based on national average trip generation rates from the Trip Generation Report, Fifth Edition published by the Institute of Transportation Engineers (ITE) in 1991. The number of daily, AM and PM peak hour trips expected to be generated by each of the proposed land uses are shown on Table 4. The proposed site includes nine areas of development and eight different land uses. The proposed plan contains 391,000 gross square feet (sf) of mixed use commercial development and 266 dwelling units. The proposed development includes: • 16,800 sf for three restaurants • 47,000 sf church • 53,000 sf elementary school • 104,500 sf of office space in six buildings • 122,500 sf of retail space in four locations • 106 -room motel • 154 apartment units in four buildings • 112 condominium units in two buildings. The proposed development also includes an alternative land use plan. This alternative plan involves adding 13,000 sf of office space in Area 6 and replacing the 32,000 sf of office space in Area 7 with 56 condominium units. For purposes of the, trip generation analysis both the proposed land use and the alternative land use were analyzed and compared. The proposed land use generated greater AM and PM peak hour volumes; therefore, the volumes generated by the proposed land use were used for further analysis in this report. Because of the mixture of land use types proposed for this development, some of the trips generated are expected to be internal, multi-purpose trips. The Trip Generation Manual suggests developments with a mixture of residential and commercial land uses produce the highest multi-purpose trips. Based on this information, 10 percent of the trips generated were assumed to be internal, multi-purpose trips. In addition, number of the trips generated by the site are expected to be vehicles traveling on the adjacent roadways which utilize the convenience of the direct access to the development and make an intermediate stop even though the proposed site was not their primary destination. The Trip Generation Manual refers to these intermediate stops as "pass -by trips". The pass -by trips were not taken into consideration when developing the trip generation for the proposed development. Therefore, the site generated traffic will probably be lower than the trip generation indicates, and the analysis based on the higher trip generation will produce conservative results. qT J� Nn585 22 TABLE 3 EXISTING CONDITIONS PEAK HOUR VOLUMES AND GEOMETRICS (t) Notes: (1) The carrot symbols > or < identify where a right or left movement shares the same lane with the through movement. (2) All four unsignalized intersections are controlled with a stop condition on the east/west streets and through conditions on the north/south streets. (3) The movements to and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount, Inc. building which will share this access. Source: BRW, Inc. peak hour turning movement counts recorded on March 23, 1996. UAINTVOL.WK4 (2) TRAFFIC NORTH APPROACH EAST APPROACH SOUTH APPROACH _ WEST APPROACH _NO__ INTERSECTION_ CONTROL PARAMETER RT_ TH LT I TH LT _ RT TH -LT_ RT TH LT TH 5 26 61 151 _RT 104 _ _ _ 1,073 165 77 1,550 54 AM Peak Hour 162 51 12 1 & Signalized PM Peak Hour 75 87 136 267 1,786 204 271 122 119 50 1,080 96 TH 101 Geometrics 1 2 1 1 2 2- 1 2__—__1 —1 2 - 1 27 21 158 63 1,283 31 84 39 20 TH 5 AM Peak Hour 24 1,777 49 2 & Signalized PM Peak Hour 53 74 171 174 1,915 45 66 87 57 35 1,544 81 Great Plains Blvd. Geometrics 1 1 1 1 1 2- 1- --- ._- 2 1 65 .__21-- 0 40 65 _1.------ 78 0 Lake Dr. East AM Peak Hour 0 36 40 0 0 0 3 & Thru/Stop PM Peak Hour 0 114 40 65 0 40 65 145 0 0 0 0 Great Plains Blvd. Lake Dr. East Geometrics AM Peak Hour 0 60 - _. 1 243 1 0 1 _ 0 1 -1- 0 -_ 1 185 0- 40 0 60 0 0 0 40 0 0 0 4 & Thru/Stop PM Peak Hour 40 301 0 0 0 0 0 452 60 40 0 60 TH 101 Geometrics 1 2 0 0 0 0 0 2 1 -1------0 1 (3) Lake Dr. (Site) AM Peak Hour 0 303 0 0 0 0 0 185 0 0 0 0 5 & Thru/Stop PM Peak Hour 0 341 0 0 0 0 0 452 0 0 0 0 TH 101 Geometrics 1 2_ _- 1 0 0 0 1 _ 2 1 1 0 1 Main Street 0 0 0 AM Peak Hour 0 303 0 0 185 0 0 0 0 6 & Thru/Stop PM Peak Hour 0 341 0 0 0 0 0 452 0 0 0 0 TH 101 1 1 Geometrics 1 0 1 < 0 1 1 0 1 1 1 0 0 0 0 Notes: (1) The carrot symbols > or < identify where a right or left movement shares the same lane with the through movement. (2) All four unsignalized intersections are controlled with a stop condition on the east/west streets and through conditions on the north/south streets. (3) The movements to and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount, Inc. building which will share this access. Source: BRW, Inc. peak hour turning movement counts recorded on March 23, 1996. UAINTVOL.WK4 I 7 v 1 I I'� I m N W 2 F p � H W CL � Lu �aLL' MO C9 mIr Qa 0 rI 83EP �~EE?EE a x=`x � aR�eR$$ E$ � 's E gsa$ • c Y R _ .� ems. I k 8 � 8 8 � � 8 8 � 8 �8e y8� t8 y8� X8 y8c ■8 �8e yip� y8�� y8ee �8e y8 y�� i= R� - R R G• • e A R A e_ — _ .... a a E - i X 3 X X X 333 X x X X xx x 7:.::Y3 x i R R ye 3 f 3 gill 88 X X X X e �8Y SSSSSSe S R R 8 SFAS R. R_ R E 8 e S !R 8Si 888888 8 8 8 8 8 8 •� S � ��� x i x x x X X �, — — R .� yy888 S R R R y � e R R ': e- €GGGG SSI GGGGGGG �S�O G t GGGG G G G G �mO G EG BS8 iBnneOS B @ O°°S : 8 I$ $1. —' v=R= $ a $RR! S;RS§Rw§ [R u � E dad ' 83EP �~EE?EE I 0 0 The development is expected to generate 14,810 vehicle trips per day, 1,520 AM peak hour trips and 1,490 PM peak hour trips. Fifty percent of the total daily trips are expected to be inbound to the development and 50 percent are expected to be outbound from the development for a total of 7,405 vehicles per day (vpd) both entering and exiting the development. The distribution of vehicles in the AM peak hour is expected to be 56 percent inbound and 44 percent outbound or 855 vehicle „ trips entering and 665 vehicle trips exiting. The distribution of vehicles in the PM U peak hour is expected to be 48 percent inbound and 52 percent outbound or 715 vehicles entering and 775 vehicles exiting. Directional Trip Distribution The directional orientation used to distribute the site -generated trips to/from the proposed development is based on two sets of information: the existing traffic demands and the regional traffic model for the twin cities metro area. The directional trip distribution assumed for the site is shown on Figure 15. TRAFFIC FORECASTS In order to analyze the potential traffic impacts that the expected future development will have on the adjacent roadway system, traffic volumes were prepared for the forecast Year 2002 background (no -build) and post -development (build) conditions. The forecast no -build volumes consist of the existing volumes plus a background traffic growth. The forecast build volumes consist of the background volumes plus the site -generated trips for the proposed development distributed over the roadway network. Background Traffic Growth The background traffic growth was determined from two sets of information: by analysis of historical traffic counts for the roadways in the area and from historic land development patterns in the Chanhassen Central Business District (CB15) provided by the City staff. The ADT volumes reported on the Mn/DOT Traffic Flow M_ps from 1978 to 1994 were used in combination with the 1996 ADT count conducted by BRW, Inc., to develop average annual growth rates along TH 5, TH 101/Market Boulevard, Great Plains Boulevard and Lake Drive. These growth rates were then adjusted based on the City of Chanhassen's assessment of growth in the area. An average annual growth rate of three percent was determined for TH 5, TH 101 south of TH 5, and Lake Drive west of TH 101. A growth rate of one-half percent was used for Market Boulevard and Great Plains Boulevard, both north of TH 5, due to lack of area remaining for new development in the downtown area. A one-half percent growth rate was also used for Lake Drive east of Great Plains Boulevard. Finally, a zero percent growth rate was used for Great Plains Boulevard south of TH 5. The residential neighborhoods in the area east of Great Plains Boulevard are mostly built -out and Great Plains Boulevard will be designed to provide direct access into the proposed development. Any growth in traffic along Great Plains Boulevard will be accounted for by the site -generated traffic. . rias 25 I 0 0 These growth rates were applied to the existing daily volumes along TH 5, TH 101 / Market Boulevard, Great Plains Boulevard and Lake Drive to develop background growth traffic volumes. These results are shown in Figure 11 and Table 5 for the intersection turning movement volumes as Year 2002 no -build volumes. Forecast Traffic Volumes In order to analyze the potential traffic impacts that the proposed development will have on the adjacent roadway system, post -development traffic volume forecasts were prepared for the Year 2002 conditions. The forecast volumes consist of the existing volumes plus background traffic growth plus the site -generated trips for the proposed land uses. The resulting forecast Year 2002 build AM and PM peak hour turning movement volumes for the two intersections along TH 5 are illustrated in Figure 12. The existing peak hour turning movement counts were not available for the four unsignalized access intersection; therefore, the following assumptions were made in developing the AM and PM peak hour turning movement volumes. • The AM and PM peak hour volumes were assumed to be 10 percent of the ADT on Lake Drive. • The directional distribution along Lake Drive was assumed to be a 50/50 split for both the AM and PM peak hours. • The directional distribution along TH 101 and Great Plains Boulevard was based on the peak hour tum movements at the two TH 5 signalized intersections. The directional distribution along TH 101 was assumed to be a 40/60, northbound/ southbound split in the AM peak hour and a 60/40, northbound/ southbound split in the PM peak hour. The directional distribution along Great Plains Boulevard was assumed to be a 60/40, northbound/southbound split for both the AM and PM peak hours. • The geometry assumed at each access entrance included a left- ancf right -tum lane off of the major street (TH 101 or Great Plains Boulevard) and two lanes outbound from the development (either a left -tum lane and a right -turn lane or, where appropriate, a left -turn lane and a shared through/right-turn lane). l.� • For the forecast build conditions at the intersection of TH 101 and Lake Drive West, the east approach from the development was assumed to provide right -in and right -out movements only. • No site generation volumes were available for the Rosemount, Inc. building which will share the west approach to the intersection of TH 101 and Lake Drive through the site as one of its accesses. Therefore, only the trip generation from the proposed development was used for this west approach only. The Year 2002 forecast build AM and PM peak hour turning movement volumes for all six intersections are documented in Table 6. pariiINi TABLE 5 FORECAST YEAR 2002 NO -BUILD CONDITIONS PEAK HOUR VOLUMES AND GEOMETRICS (t) 2 3 4 5 0 M &-us ... INTERSECTION (2) TRAFFIC CONTROL PARAMETER RT NORTH APPROACH TH LT RT 120 320 1 EAST APPROACH TH 1,280 2,130 2 LT 200 240 2 RT 190 320 1 SOUTHAPPROACH TH 80 150 2 LT 10 140 1 _WEST RT 90 80 1 30 40 - 1 0 0 0 75 50 0 0 0 0 0 APPROACH .: 7H 1,850 1,290 2 2,120 1,840 _ 2— 0 0 0- 0 0 0 0 1 0 0 0 0 LT 60 110 I 1 60 100 1 0 0 0 50 75 0 0 1 0 0 0 TH 5 g TH 101 Signalized AM Peak Hour PM Peak Hour Geometries 30 60 160 80 90 140 1 2 1 80 1,530 40 210 2,290 50 1 2 1 65 0 45 65 0 45 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 80 40 20 70 90 60 1 1- 2 TH 5 8 Great Plains Blvd. Signalized AM Peak Hour PM Peak Hour Geometries 30 20 160 50 80 180 1 1 1_ 85 75 0 65 155 0 1 1 0 Lake Dr. East 8 Great Plains Blvd. Thru/Stop AM Peak Hour PM Peak Hour Geometries 0 45 45 0 125 45 0 1 1 0 210 50 0 535 75 0 2 0 210 0 0 535 0 1 2 1 Lake Dr. East g TH 101 Lake Dr. (Site) & TH 101 Thru/Stop Thru/Stop AM Peak Hour PM Peak Hour Geometries AM Peak Hour PM Peak Hour Geometries 75 275 0 50 340 0 1 2 0 0 350 0 0 390 0 1 2 _ _1 0 350 0 1 0 390 0 0 1 < 0 0 0 0 0 0 0 1 0 1 0 210 0 0 535 0 1 1 1 0 Main Street g, TH 101 Thru/Stop AM Peak Hour PM Peak Hour Geometries Notes: (1) The carrot symbols > or < identify where a right or left movement shares the same lane with the through movement. (2) All four unsignalized intersections are controlled with a stop condition on the east/West streets and through conditions on the north/south streets. (3) The movements to and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount. Inc. building which will share this access. m "'— UANTVOL.WK4 Source: BRW, Inc. peak hour turning movement counts recorded on March 23, 1996. ID = a M a i M i = M " YI♦ " iimiiiiiiil i ii TABLE 6 FORECAST YEAR 2002 BUILD CONDITIONS PEAK HOUR VOLUMES AND GEOMETRICS 0) Notes: (1) The carrot symbols > or < identify where a right or left movement shares the same lane with the through movement. (2) All four unsignalized intersections are controlled with a stop condition on the easVwest streets and through conditions on the north/south streets. (3) The movements to and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount, Inc. building which will share this access. ..,,.� Source: BRW, Inc. using ITE Trip Generation Manual, Fifth Edition (1991). - U:IINTVOL.WK4 s • (2) TRAFFIC NORTH APPROACH EASTAPPROACH SOUTH APPROACH WESTAPPROACH RT TH LT NO. INTERSECTION CONTROL PARAMETER RT TH LT RT TH LT RT TH LT TH 5 AM Peak Hour 30 60 160 120 1,280 300 280 60 100 210 1,850 60 1 & Signalized PM Peak Hour 80 90 140 320 2,130 330 430 150 250 160 1,290 110 TH 101 Geometrics 1 2 1_ 1 2 2 1 2 1 1 2 1 TH 5 AM Peak Hour 40 90 160 80 1,620 300 280 90 20 30 2,200 80 2 & Signalized PM Peak Hour 60 140 180 210 2,370 280 300 140 60 40 1,930 120 Great Plains Blvd. Geometrics AM Peak Hour 1 1 1 1 2 1 1 65 1 265 2 0 1 0 2 _ 0 1 60 Lake Dr. East 75 300 45 65 0 45 3 & Thru/Stop PM Peak Hour 65 350 45 65 0 45 65 370 0 0 0 65 Great Plains Blvd. Geometrics 1 1 1 0 > 1 1 1 1 1 0 > 1 1 Lake Dr. East 75 495 0 100 0 0 AM Peak Hour 25 290 50 75 0 50 4 & Thru/Stop PM Peak Hour 50 530 0 95 0 0 25 660 75 50 0 75 TH 101 Geometrics 1 2 0 1 0 0 12 1 1 0 1 Lake Dr. (Site) 25 0 125 115 335 20 (3) AM Peak Hour 40 400 130 5 0 5 5 & Thru/Stop PM Peak Hour 5 445 130 40 0 120 100 680 5 20 0 40 TH 101 Geometrics 1 2 1 0 > 1 1 1 2 1 0 > 1 1 AM Peak Hour 5 490 35 15 0 40 Main Street 65 420 5 15 0 35 6 & Thru/Stop PM Peak Hour 35 535 15 20 0 65 50 750 15 5 0 15 TH 101 Geometrics 1 1 1 1 0 > 1 1 1 1 1 0 > 1 1 Notes: (1) The carrot symbols > or < identify where a right or left movement shares the same lane with the through movement. (2) All four unsignalized intersections are controlled with a stop condition on the easVwest streets and through conditions on the north/south streets. (3) The movements to and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount, Inc. building which will share this access. ..,,.� Source: BRW, Inc. using ITE Trip Generation Manual, Fifth Edition (1991). - U:IINTVOL.WK4 s • Site -generated trips were assigned to the roadway system for the forecast Year 2002 build condition based on two assumptions. • Vehicles using TH 5 will use the road closest to their land use, either TH 101 or Great Plains Boulevard, to gain access to TH 5. (1) The intersection of TH 5 and TH 101/Market Boulevard (2) The intersection of TH 5 and Great Plains Boulevard (3) Great Plains Boulevard and Lake Drive East (4) TH 101 and Lake Drive West (5) TH 101 and Lake Drive (through development) L{,aowC-1 inch. E&Awsom cow+ (6) TH 101 and Main Street The capacity analysis of the signalized intersections used the SIGNAL94 software and the procedures documented in "Chapter 9: Signalized Intersections" of the 1994 Update to the Highway Capacity Manual (HCM).The unsignalized intersections were analyzed using the procedures of "Chapter 10: Unsignalized Intersections' of the HCM. The existing traffic signal timings were used for the existing conditions and forecast no -build analysis and optimized timings were used in analyzing the forecast build conditions. The existing cycle length during the peak hours is 145 seconds. This cycle length was maintained for the future conditions analysis. The existing timing is set to provide as much green time as possible to the heavy east and west through movements on TH 5. By providing extra time for the major movements, the cross -street movements and the major street left -tum movements will experience more delay. A similar timing plan was used for the build conditions where extra green time was provided for the TH 5 through volumes. "23W 29 • When the east approach left -turn movement off of TH 5 at the Great Plains Boulevard intersection exceeds 300 vehicles in the peak hour, vehicles are expected to by-pass this intersection and tum left at the TH 101 intersection to access the development. FORECAST TRAFFIC ANALYSES iCapacity Analysis A capacity analysis is a qualitative measure, of traffic flow through an intersection or ' along a roadway segment. The basic output from a capacity analysis is a level of service (LOS) letter grade (A through F) with LOS A representing minimal delays and no congestion, and LOS F representing substantial delays and congestion. LOS E is 1 considered to be the actual capacity of an intersection or movement. Level of service D is generally considered to be an acceptable level of traffic operations in urbanized areas during the peak traffic hours. Level of service E and F are common during peak hour conditions in urbanized areas for left -tum movements at unsignalized intersections. Capacity analyses were conducted using the traffic volumes and geometrics illustrated previously in Figures 10, 11 and 12 and documented in Tables 3, 4 and 5, at the following six locations: (1) The intersection of TH 5 and TH 101/Market Boulevard (2) The intersection of TH 5 and Great Plains Boulevard (3) Great Plains Boulevard and Lake Drive East (4) TH 101 and Lake Drive West (5) TH 101 and Lake Drive (through development) L{,aowC-1 inch. E&Awsom cow+ (6) TH 101 and Main Street The capacity analysis of the signalized intersections used the SIGNAL94 software and the procedures documented in "Chapter 9: Signalized Intersections" of the 1994 Update to the Highway Capacity Manual (HCM).The unsignalized intersections were analyzed using the procedures of "Chapter 10: Unsignalized Intersections' of the HCM. The existing traffic signal timings were used for the existing conditions and forecast no -build analysis and optimized timings were used in analyzing the forecast build conditions. The existing cycle length during the peak hours is 145 seconds. This cycle length was maintained for the future conditions analysis. The existing timing is set to provide as much green time as possible to the heavy east and west through movements on TH 5. By providing extra time for the major movements, the cross -street movements and the major street left -tum movements will experience more delay. A similar timing plan was used for the build conditions where extra green time was provided for the TH 5 through volumes. "23W 29 When the volume approaches or exceeds the capacity for a movement the delay grows at an increased rate. Rather than report an approximation of this increased delay, the analysis reports the movement(s) which are above capacity and does not report delay for the intersection. In order to compare the no -build and build conditions where the intersection level of service is F and no intersection delay is reported, the planning analysis from the 1985 HCM was used to supplement the results of the 1994 Update to the HCM analysis. The planning analysis is a method which provides a basic assessment relative to whether the capacity of an intersection is expected to be exceeded. The analysis sums the volume for the critical movements at an intersection. If the sum of the critical volumes is below 1,200 vehicles in the peak hour, the intersection is expected to be under capacity. If the sum of the critical volumes is from 1,200 to 1,400 vehicles in the peak hour the intersection is expected to be near capacity. If the sum of the critical volumes is greater than 1,400 vehicles in the peak hour, then the volume is expected to exceed the capacity of the intersection. "585 30 U The results of the capacity analysis for the existing, Year 2002 no -build, and Year 2002 build conditions are shown in Tables 7 and 8 for the two signalized intersections and for the four unsignahzed intersections, respectively. The signalized intersections level of service table provides the intersection level of service and intersection delay results for the AM and PM peak hours. The unsignalized intersection level of service table provides the major and minor street level of service and delay by movements and the Uintersection delay results for the AM and PM peak hours. All four of the right -turn movements at the intersection of TH 5 and TH 101/Market Boulevard have their own lane and a channelization island. There are also right -turn lanes and channelization islands for the east and west approach right -turn movements on TH 5 at the Great Plains Boulevard intersection. Therefore, these right -tum movements were analyzed as free right conditions which means they do not effect the signal timing operations at the intersections. The remaining two right -tum movements for the north and south approaches on Great Plains Boulevard have their own lane but do not have a channelization island. The analysis assumed that for every two vehicles turning left during the protected left -turn phase on TH 5, one vehicle would turn right -on -red from the north and south approaches on Great Plains iBoulevard. �1 The capacity analysis is an indication of how conditions are likely to be during weekday peak hours only and not at other times of the day or on weekends. The results of the signalized intersection analysis are as follows: • For the existing conditions, both intersections along TH 5 are reported to operate at LOS C in the AM and PM peak hours. • For the forecast no -build conditions, both intersections along TH 5 are expected to operate at LOS C and D in the AM and PM peak hours, respectively. • For the forecast build conditions, the intersection of TH 5 and TH 101 is expected to operate at LOS D for both the AM and PM peak hours. The intersection of TH 5 and Great Plains Boulevard is expected to operate at LOS F for both the AM and PM peak hours. When the volume approaches or exceeds the capacity for a movement the delay grows at an increased rate. Rather than report an approximation of this increased delay, the analysis reports the movement(s) which are above capacity and does not report delay for the intersection. In order to compare the no -build and build conditions where the intersection level of service is F and no intersection delay is reported, the planning analysis from the 1985 HCM was used to supplement the results of the 1994 Update to the HCM analysis. The planning analysis is a method which provides a basic assessment relative to whether the capacity of an intersection is expected to be exceeded. The analysis sums the volume for the critical movements at an intersection. If the sum of the critical volumes is below 1,200 vehicles in the peak hour, the intersection is expected to be under capacity. If the sum of the critical volumes is from 1,200 to 1,400 vehicles in the peak hour the intersection is expected to be near capacity. If the sum of the critical volumes is greater than 1,400 vehicles in the peak hour, then the volume is expected to exceed the capacity of the intersection. "585 30 TABLE 7 SIGNALIZED INTERSECTION LEVEL OF SERVICE NOTES: (1) The same cycle length was used (145 seconds) for all conditions. (2) No intersection delay is reported when a movement volume to capacity ratio exceeds one over the peak hour factor. (3) The mitigated build condition included an additional left -turn lane for the east approach and a free right turn for the south approach. SOURCE: BRW, Inc. using SIGNAL94, HCS Signalized Intersection Analysis and the Highway Capacity Manual. HCS ANALYSIS LOS _DELAY IS J_, VOLUME RELATIONSHIP B t) C (2) D >25 and <=40 E >40 and <=60 F >60 PLANNING SUM CYCLE LEVEL INTERSECTION ANALYSIS OF INTER. TRAFFIC TIME OF LENGTHS OF DELAY LEVEL OF CRITICAL NO. INTERSECTION CONTROL CONDITION DAY SEC SERVICE SEC CAPACITY VOLUMES 1 TH 5/Arboretum Blvd. Signalized Existing AM Peak Hour 145 C 17.6 Under 1,034 and PM Peak Hour 145 C 20.0 Under _ _1,186 Year2002 AM Peak Hour 145 C 21.1 TH 101/Market Blvd Near 1,215 No -Build PM Peak Hour 145 D 27.7 Near 1,390 Year 2002 AM Peak Hour 145 D 30.1 Near 1,265 Build PM Peak Hour 145 D 34.9 Over 1,470 2 TH 5/Arboretum Blvd Signalized Existing AM Peak Hour 145 C 16.3 Under 1,147 and PM Peak Hour 145 C _ 19.4 Near 1,297 Year 2002 AM Peak Hour 145 _ C Great Plains Blvd. 22.6 Near 1,300 No -Build PM Peak Hour 145 D 31.2 Over 1,515 Year 2002 AM Peak Hour 145 F NA Over 1,650 Build PM Peak Hour 145 F NA 1,625 Year 2002 AM Peak Hour 145 D 27.6 _Over _ Over 1,500 Mitigated Build PM Peak Hour 145 F NA Over 1,625 (3) NOTES: (1) The same cycle length was used (145 seconds) for all conditions. (2) No intersection delay is reported when a movement volume to capacity ratio exceeds one over the peak hour factor. (3) The mitigated build condition included an additional left -turn lane for the east approach and a free right turn for the south approach. SOURCE: BRW, Inc. using SIGNAL94, HCS Signalized Intersection Analysis and the Highway Capacity Manual. HCS ANALYSIS LOS _DELAY IS J_, VOLUME RELATIONSHIP B >5 and <=15 C >15 and <=25 D >25 and <=40 E >40 and <=60 F >60 PLANNING ANALYSIS CRITICAL VOLUME RELATIONSHIP FOR INT. TO PROBABLE _ (VPH)__ _ CAPACITY o to 1,200 Under Capacity 1,201 to 1,400 Near Capacity >= 1,401 Over Capacity 06126196 U:ILOSNEW.WN4 0 r 0 a a J 0 TABLE 8 lb LINSIGNALIZED INTERSECTION LEVEL OF SERVICE E INTERSECTION (1) WNOR STREET MAJORSTREET i2, INTERSECTION NORTHISOUTH STREET i TRAFFIC TIME OF DELAY - (3)1 LEVEL OF DELAY (3) LEVEL OF DELAY NO. EASTAVEST STREET CONTROL CONDITION MY MOVEMENT' SERVICE SECNEH MOVEMENT SERVICE SECNEN SECIVEN 3 Great Plains Blvd. ThndSWp Existing AM Peak Hour WB LT A 4.6 SB LT A 2.6 1.5 6 WB RT A 30 Lake Dnve East PM Peak Hour WS LT B 5.8 SB LT A _ 2.8 1.M WORT A 3.3 Year 2002 AM Paak Hour WB LT A 4.7 SB LT A 2.6 1.5 No-Buid WB RT A 3.0 PM Peak Hour WB LT B 6.6 50 LT A 3.0 18 WB RT A 3.4 Year 2002 AM Peak Hour EB LT C 12.2 NB LT A 3.2 1.7 Budd EB TH/RT A 3.8 SB LT A 3.2 WB LT B 9.4 WB TWRT A 3.9 PM Peak Hour EB LT C 16.7 NO LT A 3.4 2.0 EB TH/RT A 4.0 SB LT A 3.7 WB LT C 12.2 WB TWRT A 4.5 4 TH 701 i hru/Stop Existing AM Peak Hour E8 LT B 8.5 NB LT A 3.2 Lt 6 EBRT A 3.2 Lake Omit, West PM Peak Hour EB LT C 17.6 NB LT A 3.5 1.5 EBRT A 3.3 Year 2002 AM Peak Hour EB LT C 10.1 NB LT A 3.5 1.3 NOBuild ES RT A 3.3 PM Peak Hour ES LT D 28.2 NB LT A 3.8 2.3 EBRT A 3.4 Year 2002 AM Peak Hour EB LT 0 21.0 NO LT A 4.7 1.7 Build EBRT A 3.9 WB RT A 3.4 k Hour EB LT F 123.3 NBLT B 5.0 6.6 roas' EBRT A 3.6 WORT A 4.4 (4) 6 TH 101 Thru/Stop Existing AM Peak Hour EB LT NA (5) NA NB LT NA NA (5I 0.0 EBRT NA NA SB LT NA NA 6 PM Peak Hour EB LT NA NA NB LT NA NA 0.0 EB RT NA NA SB LT NA NA Lake Drive (See) Year 2002 AM Peak Hour ES LT NA NA NB LT NA NA 0.0 No-BWid EBRT NA NA SB LT NA NA PM Peak Hour ES LT NA NA NB LT NA NA 0.0 EBRT I NA NA SB LT NA NA Year 2002 AM Peak Hour EB LT C 16.9 NB LT A 3.8 5.0 Build ES THIRT A 3.3 SB LT A 4.5 WB LT E 41.4 WB THIRT A 3.3 PM Pak Hour ES LT F 51.8 NB LT A 3.6 38.1 EB TH/RT A 3.5 SB LT B 7.7 WB LT F 475.6 Vd8 TH/RT A 4.2 6 TH 107 ThWStop Existing AM Peak Hour WH LT NA (a) NA SB LT NA (5) NA 0.0 WB RT NA NA 8 PM Peak Hour Vd3 LT NA NA 58 LT NA NA 0.0 WB RT NA NA Main Street Year 2002 AM Peak Hour WB LT NA NA SB LT NA NA 0.0 No -Budd WB RT NA NA PM Peak Hour VdB LT NA NA SB LT NA NA 0.0 WB RT NA NA Year 2002 AM Peak Hour EB LT C 16.5 NB LT A 3.7 1.4 Budd EB TWRT A 4.9 SB LT A 3.8 WB LT C 16.8 WS TMIRT A 4.4 PM Peak Hour ES LT D 27.5 NO LT A ES THIRT B 5.1 SB I B 5.4 WB LT E 42.4 NB TH/RT B 6.8 NOTES (1) All four intersections are controlled with stop conditions on the easMaest streets and free Rowing through conditions on Ne nortNsouth strut. (2) The direction and movement is reported. For example. VJB LT identlies Ne Westbound IeR-tum movement. (3) The mterse n delay represents the overall delay in seconds per vehxde entering the intersection. (4) The movements W and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount, Inc. budding which wdl share this access. (5) The results with "NA" identify the movements which are not present in the existing and no -build conditions. SOURCE: BRW, Inc. using RCS Unsignalleee Intereechon Analysis And Ne Highway Capacity Manuel. OaOSlae U:IUNSIGLOS.WM u • • Table 7 shows the AM and PM peak hour results of the planning analysis for the signalized intersections along TH 5. The results indicate: I� For the existing conditions, the intersections of TH 5 and TH 101 is reported to operate under capacity in both the AM and PM peak hours. The intersection of TH 5 and Great Plains Boulevard is reported to operate under capacity in the AM peak hour and near capacity in the PM peak hour. The planning analysis helps demonstrate that the change in operations at the intersections along TH 5 from the existing conditions are not solely due to the additional traffic generated by the development. The background traffic growth in the area accounts for 45 to 65 percent of the traffic forecast at the two intersections along TH 5, varying by intersection during the peak hours. Even without the additional site -generated traffic in the forecast year, the volumes are expected to be near or over capacity due to the background traffic growth. Table 8 shows the results of the unsignalized intersection analysis. The analysis indicates that all of the unsignalized intersection movements currently operate at LOS C or better in both the AM and PM peak hours. For the forecast Year 2002 no -build condition, the analysis indicates that all of the intersection movements are expected to operate at LOS D or better in both the AM and PM peak hours. For the forecast Year 2002 build conditions, the analysis indicates all of the intersection movements are expected to operate at LOS D or better, with the following exceptions: • The TH 101/Lake Drive West intersection eastbound left -tum movement is expected to operate at LOS F in the PM peak hour. J The TH 101/Lake Drive (Site) intersection westbound left -tum movement is expected to operate at LOS E and F in the AM and PM peak hours, respectively. '. The TH 101/1-ake Drive (Site) intersection eastbound left -turn movement is expected to operate at LOS F in the PM peak hour. •�5" 33 • For the no -build conditions, the intersection of TH 5 and TH 101 is expected to operate near capacity in both the AM and PM peak hours. The intersection of TH 5 and Great Plains Boulevard is expected to operate near capacity in the AM peak hour and over capacity in the PM peak hour. " • For the build conditions, the intersection of TH 5 and TH 101 is expected to operate near capacity in the AM peak hour and over capacity in the PM peak hour. The intersection of TH 5 and Great Plains Boulevard is expected to operate I� over capacity in both the AM and PMf peak hours. • The analysis indicates that in comparing the sum of the critical volumes for the AM and PM peak hours from the existing conditions to the forecast Year 2002 no - build conditions there is an increase of 13 to 17 percent. 11 • The analysis indicates that in comparing the critical volumes for the AM and PM f� peak hours from the no -build to the forecast Year 2002 build conditions there is an increase of 4 to 27 percent. The planning analysis helps demonstrate that the change in operations at the intersections along TH 5 from the existing conditions are not solely due to the additional traffic generated by the development. The background traffic growth in the area accounts for 45 to 65 percent of the traffic forecast at the two intersections along TH 5, varying by intersection during the peak hours. Even without the additional site -generated traffic in the forecast year, the volumes are expected to be near or over capacity due to the background traffic growth. Table 8 shows the results of the unsignalized intersection analysis. The analysis indicates that all of the unsignalized intersection movements currently operate at LOS C or better in both the AM and PM peak hours. For the forecast Year 2002 no -build condition, the analysis indicates that all of the intersection movements are expected to operate at LOS D or better in both the AM and PM peak hours. For the forecast Year 2002 build conditions, the analysis indicates all of the intersection movements are expected to operate at LOS D or better, with the following exceptions: • The TH 101/Lake Drive West intersection eastbound left -tum movement is expected to operate at LOS F in the PM peak hour. J The TH 101/Lake Drive (Site) intersection westbound left -tum movement is expected to operate at LOS E and F in the AM and PM peak hours, respectively. '. The TH 101/1-ake Drive (Site) intersection eastbound left -turn movement is expected to operate at LOS F in the PM peak hour. •�5" 33 I • • • The TH 101/Main Street intersection westbound left -tum movement is expected to operate at LOSE in the PM peak hour. ' The traffic for the minor street left -turn movements at the unsignalized intersections are expected to experience some delay during the peak hour conditions. However, the intersection operations for the majority of the volume entering the unsignalized intersections are expected to operate at LOS A. This volume includes the through movement and right -tum movement volumes along the major street which are not required to stop. RECOMMENDED MITIGATION The following traffic mitigation measures are recommended based on the results of the preceding traffic capacity analysis and planning analysis. Mitigation is recommended for intersections where the volume approaches or exceeds the capacity for the current geometrics. The signalized intersections of TH 5 and TH 101/Market Boulevard is expected to operate at LOS D or better which is a satisfactory condition for the peak hours of operation. The intersection of TH 5 and Great Plains Boulevard is expected to have movements which approach or exceed the capacity; therefore, different forms of mitigation including adding double left -turn lanes, channelizing free right -tum lanes or a combination of both were considered. Table 7 shows the results of the most effective and reasonable mitigation at this intersectiones K,�j ovn bras^ak tlWhen the volume for a left -turn lane exceeds 300 vehicles, an additional left -tum lam n should be considered. The volume for the east approach left -tum movement into the development is expected to be near or over 300 vehicles in the peak hour. The addition of a second left -turn lane for the east approach on TH 5 is recommended at the intersection of TH 5 and Great Plains Boulevard. Adding a second left -turn lane is expected to improve the conditions at the Great Plains Boulevard intersection.. Another form of mitigation which should be considered at the TH 5 and Great Plains Boulevard intersection is either providing a free right for the south approach or extending the right -tum lane. This right -turn movement is expected to be heavily used by vehicles traveling east on TH 5 or north on TH 101. Although the through and left -tum movements for this south approach are low compared to the right -turn movement, extending the lane right -turn could help prevent the right -turn queue from blocking access to the through and left -turn lanes. Although these mitigations are expected to improve the intersection operations, they do not improve the overall intersection level of service. The intersection is expected to operate near capacity due to the heavy through movement on TH 5. No mitigation was identified to deal with the high volumes of traffic traveling in the through movements on TH 5. The through movements on TH 5 already receive the majority of the green time at the signalized intersections and are expected to continue to do so in the future. Therefore, the mitigation discussed above is aimed at improving the conditions for the other movements at the intersections. A common form of mitigation for unsignalized intersections is to install a traffic signal. Volumes at the unsignalized intersections were compared to the Peak Hour Volume Warrant as discussed in the Minnesota Manual on Uniform Traffic Control .zsses 34 r Devices (MMUTCD). Neither the AM nor the PM peak hour combination of major and minor street volumes were found to meet the Peak Hour Volume Warrant conditions for signalization at any of the four intersections. As stated earlier, level of service E or even F for left -tum movements from minor streets at unsignalized intersections during peak hour operations is common in urbanized areas. Gaps in traffic created by the traffic signals at the two TH 5 intersections will also improve the conditions for the left -tum movements from the development accesses. Therefore, no mitigation is recommended at any of the unsignalized intersections. 23. Vehicle -related Air Emissions. Provide an estimate of the effect of the project's traffic generation on air quality, including carbon monoxide levels. Discuss the effect of traffic improvements or other mitigation measures on air quality impacts. (If the project involves 500 or more parking spaces, consult EAW Guidelines about whether a detailed air quality analysis is needed.) Response: The proposed project will have 2,192 associated parking spaces. Minnesota Pollution Control Agency (MPCA) rules require an Indirect Source Permit (ISP) for new development with over 2,000 parking spaces. The ISP regulates vehicular emissions of carbon monoxide (CO) from vehicles generated by proposed developments. The air quality impacts of the proposed project were addressed by modeling future traffic flow to predict carbon monoxide (CO) concentrations in the project area. The microscale air quality analysis was based on the traffic forecasts and operational analyses documented in Question #22 - Traffic. Total expected CO concentrations are the sum of local CO (determined through modeling) and background CO (determined by monitoring in the project area). Impacts were determined by comparing the forecast CO concentrations to the state ambient air quality standards for CO, shown in Table 9. These standards were established at levels to protect the most sensitive segments of the population and are not to be exceeded more than once per year. TABLE 9 AMBIENT AIR QUALITY STANDARDS FOR CO (PPM) State 1 -HOUR AVERAGE 8 -HOUR AVERAGE 0 The air quality impacts of the project were addressed by estimating future CO concentrations at the two busiest intersections in the project area: • TH 5 and TH 101 (Market Boulevard) • TH 5 and Great Plains Boulevard F 423585 35 0 • • • 35,600 1,950 Villages on the Ponds Environmental Assessment Worksheet The City of Chanhassen 61 45,800 0 0 ca 44,400 2,100 Figure 9 Existing Average Daily Traffic Volumes E 54/96 60/110 1,550/1,080 1,850/1,290 77/50 90/60 x iges on the Ponds ronmental Assessment Worksheet City of Chanhassen 0 41 • y 41 + 1* �o Ln 00 00� �r �� �\ �\ r - N M N H � 41 • y 41 + 1* 104/267 49/81 120/320 60/100 F 11073/1,786 1,777/1,544 1,280/2,130 2,120/1,840 165/204 24/35 200/240 30/40 Legend: Traffic Signal XXX/XXX Existing Conditions AM/PM Peak Hour Turning Movement Volumes XXX/XXX Year 2002 No -Build AM/PM Peak Hour Turning Movement Volumes Source: BRW, Inc. Counted on March 23, 1996. 0 Om en c:) eq U) �� H N N �� N 1Z� Ln \.D -i 104/267 49/81 120/320 60/100 F 11073/1,786 1,777/1,544 1,280/2,130 2,120/1,840 165/204 24/35 200/240 30/40 Legend: Traffic Signal XXX/XXX Existing Conditions AM/PM Peak Hour Turning Movement Volumes XXX/XXX Year 2002 No -Build AM/PM Peak Hour Turning Movement Volumes Source: BRW, Inc. Counted on March 23, 1996. 0 41 en c:) �1, �� Om N 00o -4i N N � 41 63/174 80/210 11283/1,915 1,530/2,290 31/45 40/50 Figure 11 Existing and Year 2002 No -Build AM and PM Peak Hour Miming Movement Volumes 9606 0091 Ln 00O �� 00 o o NN Cf) 1:t GO 00 63/174 80/210 11283/1,915 1,530/2,290 31/45 40/50 Figure 11 Existing and Year 2002 No -Build AM and PM Peak Hour Miming Movement Volumes 9606 0091 600 110 (0) 1,850 (0) 1,290(0) 210 (115) 160 (100) 120 (0) 320 (0) F 11280 (0) 2,130(0) 300 (95) 330 (85) 80 (15) 120 (20) 2,200 (75) 1,930 (85) 30 (0) 40 (0) Traffic Signal XXX (XXX) Year 2002 Build AM Peak Hour Turning Movement Volumes (Site Generated Volumes) XXX (XXX) Year 2002 Build PM Peak Hour Turning Movement Volumes (Site Generated Volumes) Source: BRW, Inc. Using ITE Trip Generated Manual, Fifth Edition, 1991. 80(o) 210 (0) 1,620 (85) 2,370 (75) 300 (255) 280 (225) Figure 12 Year 2002 Build and Site Generated AM and PM Peak Hour Turning Movement Volumes 9606 0061