CAS-17_CHANHASSEN SPECIALTY RETAIL (TOTAL WINE) FILE 1 OF 2VILLAGES ON THE PONDS 7/9/2015
DEVELOPMENT
g:\plan\bg\Villages building area
Presbyterian Home
--_--
St. Hubed Expansion
Pond Promenade E
g:\plan\bg\Villages building area
VILLAGES ON THE PONDS
DEVELOPMENT
g:\plan\bg\Villages building area
7/9/2015
L�
g:\plan\bg\Villages building area
VILLAGES ON THE PONDS
DEVELOPMENT
0
7/9/2015
L7
• ►5-17
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
Application of Venture Pass Partners, LLC and Northcott Company for Subdivision, Site Plan
and Planned Unit Development Amendment approval.
On July 7, 2015, the Chanhassen Planning Commission met at its regularly scheduled meeting to
consider the application of Venture Pass Partners, LLC and Northcott Company for preliminary
plat, Planned Unit Development Amendment and site plan approval for the construction of a
19,909 square -foot specialty retail building. The Planning Commission conducted a public
hearing on the proposed subdivision preceded by published and mailed notice. The Planning
Commission heard testimony from all interested persons wishing to speak and now makes the
following:
FINDINGS OF FACT
1. The property is currently zoned Planned Unit Development, PUD.
2. The property is guided in the Land Use Plan as Mixed Use.
3. The legal description of the property is: Outlot B, Villages on the Ponds Fourth Addition.
4. The Subdivision Ordinance directs the Planning Commission to consider seven possible
adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding
them are:
a. The proposed subdivision is consistent with the zoning ordinance and meets the standards
of the Village on the Ponds Planned Unit Development;
b. The proposed subdivision is consistent with all applicable city, county and regional plans
including but not limited to the city's comprehensive plan since the site is guided for mixed
use development which includes commercial or multi -family residential;
c. The physical characteristics of the site, including but not limited to topography, soils,
vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water
drainage are suitable for the proposed development;
d. The proposed subdivision makes adequate provision for water supply, storm drainage,
sewage disposal, streets, erosion control and all other improvements required by this
chapter,
e. The proposed subdivision will not cause environmental damage;
SCANNED
0
f. The proposed subdivision will not conflict with easements of record; and
g. The proposed subdivision is not premature since adequate infrastructure is available. A
subdivision is premature if any of the following exists:
1) Lack of adequate storm water drainage.
2) Lack of adequate roads.
3) Lack of adequate sanitary sewer systems.
4) Lack of adequate off-site public improvements or support systems.
5. Site Plan. In evaluating a site plan and building plan, the city shall consider the
development's compliance with the following:
a) The proposed project is consistent with the elements and objectives of the city's
development guides, including the comprehensive plan, official road mapping, and other
plans that may be adopted;
b) The proposed project is consistent with the Site Plan Review requirements of City Code;
c) The proposed project preserves the site in its natural state to the extent practicable by
minimizing tree and soil removal and designing grade changes to be in keeping with the
general appearance of the neighboring developed or developing areas;
d) The proposed project creates a harmonious relationship of building and open space with
natural site features and with existing and future buildings having a visual relationship to
the development;
e) The proposed project creates a functional and harmonious design for structures and site
features, with special attention to the following:
1. An internal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants, visitors and general community,
2. The amount and location of open space and landscaping;
3. Materials, textures, colors and details of construction as an expression of the design
concept and the compatibility of the same with adjacent and neighboring structures
and uses; and
4. Vehicular and pedestrian circulation, including walkways, interior drives and parking
in terms of location and number of access points to the public streets, width of interior
drives and access points, general interior circulation, separation of pedestrian and
vehicular traffic and arrangement and amount of parking.
f) The proposed project protects adjacent and neighboring properties through reasonable
provision for surface water drainage, sound and sight buffers, preservation of views, light
0 0
and air and those aspects of design not adequately covered by other regulations which
may have substantial effects on neighboring land uses.
6. The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse
effects of the proposed amendment. The six (6) effects and our findings regarding them are:
a) The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City Comprehensive
Plan.
FindinE: The site is guided mixed use (residential and neighborhood commercial). A
retail building is a reasonable use in that location.
b) The proposed use is or will be compatible with the present and future land uses of the
area.
Find: The proposed use is and will be compatible with the present and future land
uses of the area through the implementation of the design standards, landscaping,
architecture, etc.
c) The proposed use conforms with all performance standards contained in the Zoning
Ordinance.
Findin : The proposed use will conform with all performance standards contained in the
Zoning Ordinance such as design standards, signage, durable materials, uses, etc.
d) The proposed use will not tend to or actually depreciate the area in which it is proposed.
FindinE: The proposed use is intended to meet the daily needs of the area. It could
potentially add convenience to the homeowners in the area.
e) The proposed use can be accommodated with existing public services and will not
overburden the city s service capacity.
Fes: The site is located within the Municipal Urban Service Area. The proposed use
can be accommodated with existing public services and will not overburden the city's
service capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving the
property.
FindinE: Based upon traffic studies conducted by the applicant's traffic engineer, traffic
generation by the proposed use is within capabilities of streets serving the property.
6. The planning report 42015-17 dated July 7, 2015, prepared by Sharmeen Al-Jaff, eta], is
incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council approve the Preliminary
Plat (Villages on the Ponds I I' Addition) and site plan with a variance for Chanhassen Specialty
Retail (Total Wine & More).
ADOPTED by the Chanhassen Planning Commission this 7t" day of July, 2015.
CHANHASSEN PLANNING COMMISSION
Its Chairman
Cf
0 0
CHANHASSEN PLANNING COMMISSION
REGULAR MEETING
JULY 7, 2015
Chairman Aller called the meeting to order at 7:00 p.m.
MEMBERS PRESENT: Andrew Aller, Mark Undestad, John Tietz, Nancy Madsen, Steve
Weick, and Lisa Hokkanen
MEMBERS ABSENT: Maryam Yusuf
STAFF PRESENT: Kate Aanenson, Community Development Director; Bob Generous, Senior
Planner, Sharmeen AI-Jaff, Senior Planner, and Alyson Fauske, Assistant City Engineer
PUBLIC PRESENT:
Ray Schenk
1130 Dove Court
Mike Glaccum
1510 Lake Lucy Road
Jim Slattery
1990 West 7801 Street
Michael Graenez
7600 West 7801 Street
Jay Kronick
78 West 7816 Street
Brian H. Burdick
600 Market Street
Judy Anderson
8584 Flamingo
Steve Friedrichs
8955 Southwest Village
Peter Adolphson
8980 Reflections Road
Matt Hanna
8863 Lake Riley Drive
Craig Claybaugh
1630 Lake Lucy Road
PUBLIC HEARING:
CHANHASSEN SPECIALTY RETAIL, PLANNING CASE 2015-17: REOUEST FOR
AMENDMENT TO PLANNED UNIT DEVELOPMENT: SUBDIVISION OF
APPROXIMATELY THREE ACRES INTO ONE LOT AND ONE OUTLOT
(VILLAGES ON THE PONDS 11TH ADDITION) AND SITE PLAN REVIEW TO
CONSTRUCT A 19.909 SQUARE FOOT SPECIALTY RETAIL BUILDING (TOTAL
APPLICANT/OWNER: VENTURE PASS PARTNERS, LLC/NORTHCOTT
COMPANY.
Aanenson: Before you begin Chairman and members of the Planning Commission, again I
would remind you within your purview is what we're to do with the application is the site plan
review. There's actually 3 actions with that for the specialty retail, site plan review, PUD
amendment and a subdivision so again any comments on merits of the liquor license is outside of
your purview. Again we ask that anybody that has comments on that. Some people have
submitted things in writing which we forwarded to you but we're, it's also out of your
jurisdiction or purview to comment on that so we would be forwarding those to the City Council
SCANNED
0 0
Chanhassen Planning Commission — July 7, 2015
so anybody that wants to speak on that we would certainly recommend that you attend the City
Council meeting on the 27th and with that I'll turn it over to Sharmeen to make a presentation.
A] -Jaffa Chairman Aller, members of the Planning Commission. The site that we are looking at
today is located at the northwest corner of Lake Drive and Main Street. It is within the
development of Villages on the Ponds which is a mixed use development encompassing
residential, institutional, as well as commercial developments. At this point I will turn it over to
Kate Aanenson, the Community Development Director to provide background and history on
this development and when she's done with that part of it we will look specifically at the
specialty retail development proposal.
Aanenson: Thank you. Because there's some new planning commissioners I thought I'd just
give a brief background of Villages on the Ponds because this is a unique sitting. So in 1995 we
started the process of putting together Villages on the Pond. At that time St. Hubert's Church
was looking for some property to provide for an institutional use and they were looking across
the street, that 66 acres and so the City had some goals. The developer at that time had some
goals and we ventured forth on working together to do a new urbanism project which at the time
was pretty unique. We were one of the fust communities to go through the Livable
Communities at the time through the Met Council. We actually did a horizontal/vertical mix and
there's shared parking throughout this whole project so that's one of the things that I wanted to
explain to you. And also we have private streets in this development. One of the unique
attributes of this is that there's parking on street which we don't have in other developments and
you'll see this with this application too, there's opportunities for shared parking and on street
parking so in order to do that the engineering department recommended that they be private
streets so they maintain internally their own streets except there's a public loop that goes through
that the City does maintain so we've looked at institutional uses. Retail uses as a core
component and then residential and one of the first ones to go in was the apartments across 101.
The Powers Ridge Apartments and then kind of the core was St. Hubert's Church so we've been
adding to that. We've actually made very few amendments to this which is kind of hard to
believe when we put this together in 1995 kind of looking for, we certainly saw there was
components that were important. We always saw something unique of kind of a boutique
grocery store which is something that came in and then some of the other supporting things such
as Presbyterian Homes and opportunities for residents that live within there also to take
advantage of you know shopping within and walking so there's only one fast food drive thru in
that which the staff recommended but the council recommended approval for that but there's
only one drive thru restaurant in there. Otherwise it is a unique development so again going back
from 1985 to '96 this also had an Environmental Assessment document on it so when we go
through each project we measure to make sure that we're staying within the industrial
commercial institutional quadrants and then checking for the parking and as you see in the staff
report tonight we'll also share with you kind of that tabulation of parking. Those are all the
things that we look at with each project that goes forward. So again we created this master PUD
which was a couple, a year, year and a half worth of work. Again the design standards the uses,
those are all part of the PUD so this use in itself, the 20,000 square foot was one of the things
that we said was the maximum to meet within this PUD because we wanted these to be kind of
more smaller and not big box type uses so that was the goal on this. And that they also be more
2
0 0
Chanhassen Planning Commission — July 7, 2015
highly articulated for this district so with that just wanted to give you that background and how
that all works and I'll tum it back over to Sharmeen.
Aller: Thank you.
Al-Jaff: Thank you Kate. Briefly so the application before you today is consists of three
components. The first one is a subdivision to replat an outlot into a lot and an outlot, there is a
site plan for a 19,909 square foot retail building and then a planned unit development amendment
to the sign criteria as far as the location of the individual letters as well as the height of each
individual letter. This application is going to follow the exact same process that we have gone
through in the past since 1995 as each building comes in. So far we've had 12 buildings built
within Villages on the Pond. Those include retail, residential as well as institutional buildings.
So again this application before you is going to follow that exact same process. One of the
components of the overall development was, and I apologize if I repeat a few things that Kate
already went through. One of the components that was studied with the overall development and
through the environmental assessment worksheet for this development was parking. It was
intended to always have shared parking and anything that you see on this overall plan for
Villages on the Ponds that is highlighted in yellow is shared parking. I need to point out that
there are a few buildings, specifically the residential as well as the community bank that has
underground parking. Staff has not included those numbers with the overall calculations. The
overall development is required to provide 1,631 parking spaces. They have provided 1,712. So
the site plan that is before you, and that's, that will be the first item that we will cover is for a
19,909 square foot retail building. As part of looking at this development and because this is a
planned unit development, this site has to comply with the ordinance requirements for Villages
on the Ponds. One of the things that they are required to do is not to exceed 70 percent hard
surface coverage. Again this is a planned unit development. Whenever we have this type of
development, hard surface coverage is calculated over the entire development of Villages on the
Pond rather than on each individual site and when this development was approved the City
ensured that there was a permanent open space that exceeded 30 percent. The reality is the open
space for this overall development exceeds 45 percent. The majority of the parking is located
west of the building. The architecture of the building and the design is attractive. It is proposed
to be constructed of high quality materials that are complimentary to the surrounding buildings.
They include rock face block. Accent block. Concrete utility. There are awnings above all of
the, all of the windows with the exception of specifically the ones that are located next to the
loading dock and the only reason for that is to ensure this is the elevation where the loading dock
is going to be located and it is to avoid any accidents as pick up trucks are backing up. All
elevations that can be viewed by the public on all four sides have received equal level of
attention. We need to point out that we worked with the applicant for a long time and they have
truly cooperated with the City. They have revised the design and basically met the direction that
staff asked them to. One of the things that we needed to show you is there is a green wall that is
being introduced along the south elevation of the site. All of the, there are areas where they
could not put in windows so they put spanrow windows on the building. The roof line there is
enough movement and there are pitched elements. It's a building that meets all of the design
criteria. The lights that are proposed on the building are shielded. They meet ordinance
requirements. Shoe boxes will be used in the parking lot and again shielded fixtures in, on the
building itself. One of the things that the PUD recommended was the use of light fixtures on the
0
Chanhassen Planning Commission — July 7, 2015
building to minimize the number of parking lot lights and that's exactly what they are doing.
The second item that we need to address is signage on the building. The applicant is requesting
signage on all four sides of the building which is permitted under the planned unit development.
They are also requesting the signage to be located higher than 20 feet above the ground elevation
and this is what staff will explain in a moment. Also the signage facing the north and the west
elevation, they are requesting that the letters be larger than 30 inches. The limit by ordinance in
this planned unit development is 30 inches. So the one thing that we need to also talk about as
far as background on this area is the fact that this development when it was first looked at and
studied it was divided into four sectors and the ordinances that govern this development were
written around those four sectors. They took those sectors into consideration. So Sector 1 which
is where this development is located is a mixed use of commercial and residential. Sector 2,
which abuts Highway 101 as well as Highway 5 is highway exposure type of development. And
then Sector 3 is institutional, which is where you see St. Hubert's and 4 is strictly residential
which is the Lake Susan Apartments. So as I mentioned we've got the 4 sectors. When the sign
criteria for Sector 2 was written it allowed them to put up signage that was higher, taller than 20
feet and the individual signs, the individual letters within Sector 2 could exceed 30 inches. As
staff started looking at Sector 1 and how it compares to Sector 2, specifically when it came to the
signage, and looking at previous requests that have come before the City on previous
applications on that specific site requesting the exact same variance. Requesting letters that were
planed higher than 20 feet above the ground and the size of the letter being taller, we started
asking why is this happening and what was it that happened before when we first looked at this
development that we didn't maybe notice at the time. So what we found they did have in
common is this site did have exposure to Highway 101. There's nothing blocking that exposure
to Highway 101 or Highway 5. You've got that view that continues to those two elevations. In
those two directions. The distance is 550 feet from Highway 5. It is 620 from Highway 101. As
mentioned earlier, oh initially they came in. They requested a variance and we said rather than
applying for a variance, which the City has granted in the past on previous applications, let's fix
the planned unit development and amend it so that anything that we do is going to apply to
everyone within this development rather than one individual building. And based on that staff is
recommending only the north and west elevations within Sector 1 to be allowed to go above the
20 feet. But in addition to that rather than just saying let them go higher as well as larger letters
those, we also added a line that ensures the signage is actually complimenting the architecture of
the building. The intent is not to have a specific portion of an architectural feature of the
building extending higher than the rest of the building just to advertise the signage. The intent is
to have the signage compliment the architecture of the building. And if you look at this building,
if you look at this building there is an EIFS band around the entire upper level of the building.
The top of the building. It's framing it and in all honesty this is where the signage belongs.
They can meet ordinance requirements. The design of the building will be compromised if you
lower the signage. It is staff's opinion that the location of the proposed signage will compliment
the design.
Aanenson: And I just want to add a couple more things to that. So they came in with the
variance application as Ms. Al-Jaff has stated that in the previous application for specialty
grocery the Planning Commission, as did the City Council approved that variance so in that
variance situation you're approving just that one use so instead of doing that we said let's put
everybody in that sector and treat them equally so anybody else in that same situation. What we
4
0 0
Chanhassen Planning Commission — July 7, 2015
learned from our previous experience with the Children's Learning Adventure, when you
sometimes have exaggerated architectural elements to accomplish your sign so in this
circumstance we put language in this PUD that you wouldn't have that so it's really more
integral to it. So what we're doing is instead of just treating this with a variance we're saying
everybody in this same sector would get that same treatment.
Al-Jaff: And staff is recommending approval of this planned unit development amendment. The
ordinance that would allow this change. The final request is for replat of an outlot into a lot and
an outlot. The lot is going to house the building. The retail building and the outlot will contain
some parking as well as private streets. Staff is recommending approval of this application
including the preliminary plat, planned unit development and site plan request and I'll be happy
to answer any questions the Planning Commission may have.
Aller: Any questions at this time? Commissioner Weick.
Weick: Yeah, just a point of clarification moving backwards. Why create the Outlot A and not
just have one lot? Is there a reason for that?
Al-Jaff: The outlot, whenever you have private streets, there is an option of either having them
within an easement or on, within an outlot. In this case we...
Aanenson: They're common to the rest of the HOA. There's a HOA that governs everything in
that association so we've kept that all, except for the public streets that we manage.
Weick: Thank you.
Aller: Commissioner Madsen.
Madsen: I have a question about traffic flow and what affect would this anticipated traffic
increase have on busy intersections nearby. For example the Lake Drive and 101 intersection on
the west side and then the Lake Drive intersection on the east side near by the Marathon gas
station.
Fauske: If I may answer that question. A detailed traffic analysis was not completed with this
development because the use was compatible with what the planned unit development had
envisioned for the area. Certainly I think the applicant might be able to speak in greater detail as
far as what kind of traffic they anticipate they would capture. Are they getting folks that are
already on the roadway and just will stop in on their way to pick up something from their stores
or is it a destination? We don't feel that there's any, that there would be any negative impacts to
those intersections but we will monitor that and you know residents are good about letting us
know if there's an issue and we can address that at the time if need be.
Madsen: Okay, thank you.
Aller: Commissioner Tietz.
0 0
Chanhassen Planning Commission — July 7, 2015
Tietz: Yeah, question regarding the parking that would be on Outlot A across from Houlihan's.
South of Houlihan's and east of Bookoo. Is that then the responsibility of the developer to build
and construct because that's in that private road zone?
A]-Jaff: It is intended to be built as part of this.
Tietz: Of the development.
A]-Jaff: Development, correct.
Aller: Would the HOA maintain?
Aanenson: Correct. The private streets, that's correct.
Aller: With the lighting, has there been any indication that there would be an impact to safety at
all? Is there any concern from the sheriff's department?
Fauske: Not that we've been made aware of Chairman Aller.
Aller: Otherwise the lighting meets our codes. 90 degree shielded. The amount of parking that
was provided has always been the intent so we're exceeding that right now with the shared
parking.
Al-Jaff: That's correct.
Aller: The impact on grading and drainage, do we have a SWPPP plan?
Aanenson: Yes, we had that in the staff report. The grading and drainage. It's relatively flat.
Did you want to comment on the drainage? How they're managing that.
Fauske: Just an additional comment to add to that Kate. Originally the site, the proposed site
development included some underground parking so if you look on the aerial on page 4 of the
staff report. Or actually on page 2 as well, it appears as though there's a pond on the site and
that's simply rain water that went into the excavated area. The area that was excavated for
underground parking. It's not a jurisdictional wetland. It wasn't intended to be, it was not
intended to be a stormwater management pond. It was simply the low area that they had graded
in anticipation of the site development that never came to fruition.
Aller: And it's my understanding from the report that the proposed maximum rate of runoff will
actually decrease for the entire area as a result of what has been proposed.
Fauske: Yes. From the original PUD approval the rules for stormwater management have
changed significantly in 20 years and as a development comes through site plan approval and
subdivision they are required to meet the current standards for stormwater management and on
this site what the applicant has proposed is some pervious pavement within the parking area and
then an underground system in order to meet the requirements of the City. And then they will
0 0
Chanhassen Planning Commission — July 7, 2015
also work with the watershed district to ensure that they meet the watershed district requirements
as well.
Tietz: Alyson are there examples here in the city where pervious paving has been used and the
systems have been effective?
Fauske: Yes, actually the public works site has some porous pavement in the parking area just to
the south of the building. And then in the 2014 street project we also had a porous pavement
parking lot next to Bandimere Park. The west, pardon me. The east side of Bandimere Park.
It's not a fully functional area at this time but we do have some examples where.
Tietz: So we have standards that will be enforced and applied to this project?
Fauske: Yes. There's an industry standard within the surface water management community
with, as far as void space and it has to infiltrate at a certain rate and there's, we do have
equipment that can measure those quantities.
Aller: Then with the modification of the PUD what we're doing is leveling the playing field
basically for anyone else that's in that fust phase or phase 1.
Aanenson: That's correct.
Aller: So anyone that wants to modify, as long as it doesn't, it meets all the criteria of the new
PUD requirements can do so at this time without coming in and asking for a variance.
Aanenson: That's correct.
Aller: Any additional questions at this time? Hearing none we'll ask the applicant to come
forward if they desire to do so and make a presentation. Welcome sir. State your name and
address and representational capacity please.
David Carland: Good evening commissioners. My name is David Carland. I'm President of
Venture Pass Partners. Our corporate address is 19620 Waterford Court in Shorewood and with
me tonight I have Jim Ottenstein and Randy Rauwerdink, also of Venture Pass Partners. This is
a re -tooled version of the Traders Joe specialty grocer site plan that the Planning Commission
and City Council approved last October. If you recall that was 14,000 square foot grocery
building along with 8,000 square feet of associated strip so in terms of overall square footage it's
very close to what was approved previously. You know unfortunately and you know for some
complex reasons we weren't able to put that together and this is kind of the reincarnation for lack
of a better term of that. Of that project which we're of course excited about. We worked long
and hard with staff and we're happy with the finished product and I guess we thank them for the
inspiration they gave us. At the end of the day you know for not a whole lot of cost the client
thinks the building, it's an improved building. We think it's an improved building and city staff
does as well so we were happy to go through that process with the City. We believe that the
project meets all the zoning ordinances. We believe we meet all the design guidelines. We've,
you know we've submitted this application as a specialty retail building and the building could
0
Chanhassen Planning Commission — July 7, 2015
be a clothing store. Could be a pet supply store. Could be sporting goods or anything that's a
permitted use within the zoning district including a liquor store because there's a simultaneous
application for the same property address for Total Wine we thought that it would be forth
coming and above board at least in our planning application to identify that as our contemplated
tenant which it is indeed Total Wine and More is the contemplated tenant for the project. In
terms of parking they generally, for this size of a store, which is significantly smaller than other
stores that they've done in the Twin Cities. This is the first store that's a new construction
ground up. The other stores have been you know ones that they've inherited from existing
shopping centers and previous users. They feel like 80 parking spots would be adequate. By
code we're providing 100 but we're also, if you count the additional stalls that we're providing
on the outlot we're providing 158 so we're actually adding 58 overall parking spots for use
within the overall development. I think that's a good overview. I was going to have Randy who
handles our architecture just give you a, maybe just some brief bullet points on some of the
architectural enhancements we've made to the project if that's appropriate.
Aller: Thank you.
Randy Rauwerdink: Thank you Dave. Randy Rauwerdink with Venture Pass Partners. I'll
reiterate what Dave said. We worked very closely with Sbarmeen and with our design team
from Tushie Montgomery Architects and Sambatek Engineering and it kind of turned into a bit
of a design sharret but a very successful one and product that we're very pleased with. Keeping
in mind all of the articulation requirements and sloped roof and glass requirements I think we've
put together a very attractive building and a very pronounced protruding brick entrance element.
Arched, transom glass over the entrance. Featured towers on the comers. EIFS insets and arch
work. Multiple different details of protruding awnings both in fabric and standing seam metal.
Metal hipped roofs. A lot of architectural interest in terms of texture through pigmented burnish
block. Rock faced block. Full brick. EIFS. The metal awnings we discussed. Store front and
windows on all four elevations. Details in the cornice work. I think just a lot of very nice
detailing that's consistent on four sides of the building. We also enhance that with vertical
landscaping and strategic screening areas, be the loading docks. The trash areas. Trellis roofs
over the trash area. Sharmeen mentioned a little bit our, kind of that eco mesh growing or living
wall. Just a large curved element on Main Street that's covered with clematis, flowering vines
and just adds additional articulation. And along with bike parking and benches and then back to
the watershed issue, that whole parking lot. Following up on the engineer comments here.
Really all of the parking stall bays within the interior parking field are all pervious pavers.
Contemplated as pavers as opposed to pavement and that's kind of a direct result of our
coordination with Riley -Purgatory watershed district. Very stringent requirements that are really
new to 2015 kind of that haven't been, haven't been felt by probably any other parcel in this
development today. What's unique about this parking lot is that entire structure underneath our
parking field is about a 3 foot deep section of, it's a heavy rock. Basically 40 percent void space
that's providing a lot of the capacity given soils that aren't really conducive to infiltration within
this development. That's all laden with a serpentine of perforated drain tile and some kind of
proprietary contact type filter structures so there's a lot of effort. Unfortunately a lot of expense
and money into that parking field but that's what it took to comply with the Riley -Purgatory
requirements. And then just following up on the parking again. You know obviously the outlot
is Pond Promenade. A road to the north and to the west with extensions of the private road
0 0
Chanhassen Planning Commission — July 7, 2015
which are bearing almost 70 new improved parking stalls in addition to the 80 plus that we have
interior to the parking field so those are really I would say to the benefit of all of those parcels
around us and far exceeding what had to be there so yeah Pond Promenade is fully improved
surface. Curb and gutter. All new parking in addition to all the improvements to the interior of
our lot. I think that's probably the best highlight. I just want to again thank Sharmeen for her
help and for the cooperation that we had with her and our architects on pulling this together.
Aller: Great, thank you sir.
Aanenson: I just want to add one comment just for some of the new Planning Commissioners
that the use of sparrow glass. I just want to, because sometimes people don't always see where
we have a lot of it around town. It's actually quite a bit of it's on Houlihan's. We have it in
Target. Office Max on West 7e Street. There's quite a bit there and I would say probably
another user that has a security issue would be the two more recent Walgreen's also has quite a
bit. The one up on Highway 7 and the one right downtown also has quite a bit of use of the
spanrow glass too so it's an opportunity to get the fenestration that we required and then also
adapt to a user that has, whether it's freezer space or an example of the restaurants where they
have cold storage or Walgreen's that has pharmaceutical areas that they want secure, it is an
opportunity to meet our ordinance and still get an attractive building so. We've also learned that
sparrow glass is different qualities and grades and we've got ten really good at making sure we
see samples of those before they go on too.
Aller: Any additional questions at this time? Okay, hearing none we'll open the public hearing
portion of this matter so anyone wishing to come forward can do so at this time. You can step
forward to the podium and state your name and address sir and your position either for or against
the item or a comment.
Ray Schenk: Thank you. My name's Ray Schenk. I live at 1130 Dove Court.
Aller: Welcome Mr. Schenk.
Ray Schenk: I'm a resident of Chanhassen for 22 years and I'd like to thank staff. They seem to
represented real well what this development was originally intended to do. Some of the things I
remember back when it was first up is that it was going to have this old time feeling like you
were in a downtown area. Kind of small town where you'd have apartments upstairs and a shop
down below and I don't think we've fulfilled any of those dreams yet. We have some big nice
apartments. Some senior living which is really nice. You know I think those are some nice
things there but one of my least favorite places to go is over in that area because it's hard to park.
The traffic is not so good. The radiuses on all the comers are much too small. The roads are
very narrow. I feel like it will be the same of situation that the Cub Foods where the loading
dock has this huge, big concrete post so that the trucks don't hit it but the radius was never big
enough for them to make the turn so you put a post and rocks and they get pushed out of the way
by the semi's and there's just not good access and then if you're coming down the main part and
you make your right hand tum to get out, you always wind up hitting the curb. You just see, it's
always covered with people's tire marks because the radiuses aren't right. This development has
many, many features just like that. The on street parking is very difficult when it's parallel and
0
0 0
Chanhassen Planning Commission — July 7, 2015
very tight together and I don't think that was the original intent when we went through and did
the planning years ago. I think you know with some different buildings that got put in I think
some of that intent has gone away and I think for people that have been in town a long time,
we've had a lot of arguments about signage and unfairness about signage so I'm a member of
Family of Christ and when they asked for a signage variance they were denied. I know other
businesses have asked for signs on multiple sides of the building and have been denied. I would
encourage not to have multiple sides on buildings of signage and tall signs and big lights. I don't
like that look. I don't think it's fitting of our community. I don't think it fits what we try to
portray and why we're picked as a great place to live every, you know many times in magazines
and things. I mean we've done a really good job of planning. I don't think we should change
that. I don't think we should go for bigger signs and more lights. Less lights. Smaller signs.
Smaller buildings. More parking. Bigger radiuses on comers and wider streets so it's easier to
go. If you look at the way this is built, as you drive through all the sight lines changed. It's
made so that you'd park your car and you'd walk through this area and people don't do that.
This isn't a big store like this won't make that happen. It's, I just don't see that it is what the
vision was. I know it fits the numbers and I know they're being good about that and they're
really watching careful and doing a good accurate job but it wasn't the original intent and I don't
think that it should continue on and I definitely don't want any changes on the signage. I just
think that's just totally wrong and unfair to any other business in this town that's wanted that
request. Parking. Added parking spots that you're talking about right now are gravel by
Houlihan's and they're full. I drove there before I came here tonight and they're all full. We're
not adding extra parking. We're improving it. It's already very, very busy over there. There's
one spot by Bookoo Bikes that was open. There were 4 spots in that same area and Houlihan's
parking lot was pretty full. Very full actually and then you know down the sides and we don't
have these other new buildings that are going to have people and traffic to even gauge how much
that is. It may be meeting our numbers but it isn't really meeting the use and the intent of what's
happening. We're overwhelmed already. I just, that's kind of the way I see it and it's not my
favorite place to go. Thank you.
Aller: Thank you. Any additional individuals wishing to come forward. Please state your name
and address for the record.
Brian Burdick: Good evening everyone. Brian Burdick, Burdick Properties, 600 Market Street,
Chanhassen. Glad to be here this evening. I have to say I think the gentleman that just spoke did
a really excellent job. I hope that all of you will really think about that. He raised some many
very valid concerns. I'm sure Total Wine runs a very good operation. I do believe that city staff
has gone to a lot of detail and done a nice job with the planning. I don't doubt that. That's fine
but this is not a good location for a huge 20,000 square foot, big box liquor store. It's not a good
use. It's not what was originally intended there and I did hear that from staff clearly this evening
too going through the proposal, which they seem to be in favor of. That's fine but I heard also in
there that as the gentleman just said, this doesn't fit the PUD and what was really planned and
proposed for this area and I hope all of you will really think about that too. Is this what you want
in Chanhassen? Big box liquor store close to a church and school. Making an area that's already
congested more congested. It's just not a good location. I think some of the, I definitely agree
on the signs so I'll keep it short for all of you. I certainly hope you wouldn't approve the
additional sign. That generally doesn't happen in Chanhassen from what I know in being a long
U
Chanhassen Planning Commission — July 7, 2015
time building owner and property owner in Chanhassen. And I don't believe it was, it was
pointed out what the current requirements are. I did not hear what the applicant is proposing for
the signage which is obviously going to be proposed larger letters than 30 inches in height and
higher than 20 feet but it didn't say how much higher than 20 feet. How much higher than the 30
inches but it doesn't matter because that should not be compromised. It's just not fair. Couple
other things I heard just maybe for your interest is talking about hard cover. I'm not going to go
into details. You are very well versed. I think you should look at that closer. I heard the words
of pervious pavement. I don't know what pervious pavement is. If someone can enlighten me
but I've never heard of pervious pavement. I've heard of pervious surfaces sometimes permitted
in cities. I don't pretend to know the City of Chanhassen's fill ordinance on that. Often times
you see pavers or some other permitted pervious surfaces and situations. I don't know if you do
in the commercial district but I'm not sure what pervious pavement is. I already spoke about the
clarification for the signage. I think a traffic study would clearly be warranted. My recollection
is this kind of brings back some old memories being here this evening from many, many
meetings in front of the Planning Commission and council years ago but a traffic analysis should
be required period. It would be crazy not to. You've heard from people and I'm sure you are all
well aware of the area. It is very congested It's very awkward. It's very awkward. This is just
going to make that a whole lot worst. There are uses for that site that I think would be very nice
for the city. Fit what the city originally intended there. A couple of them were mentioned by the
applicant themselves for a clothing store was one. A pet store. Something that could fit in a
large building if that should be your decision. Those could be nice but guess what, they don't
have liquor. And this is not the place for a liquor store but for all the other reasons, and I
understand too. This is just not a good location for this proposed development. Thank you very
much.
Aller: Thank you, and for the record we did receive your letter. It will be attached and attached
to the package that goes to the City Council regarding other issues.
Brian Burdick: Thank you very much for mentioning that. Appreciate it.
Aller: Any additional individuals wishing to come forward can do so at this time. Please state
your name and address for the record.
Jay Kronick: Thank you. My name is Jay Kronick. I own property on 78's Street. 78 West 7P
Street and 19900 West 78"' Street.
Aller: Welcome Mr. Kronick.
Jay Kronick: Those parcels. I've been in the business community here in Chanhassen since
before Village on the Ponds and I remember when that went in, most of what I feel has been said
by the two gentlemen before me and so there's nothing new but I just need to stand up here and
tell you that I agree with what has been forth here. This is big box retailing. Make no mistake
about it and yes it fits the numbers as Mr. Burdick said but it's going to change that planned unit
development away from the original intent and if that's where you want to go with it, that's
where it's going to go but if you want to get back to a livable, walkable, bike friendly shopping
area, it's not the right use there. The parking thing just blows me away that you haven't looked
11
0 0
Chanhassen Planning Commission—July 7, 2015
at that and the traffic with enough scrutiny. My site, which has a building half the size of it
which services wines and spirits right now. We have 70 parking spaces there and there are times
where it's not adequate and you already have a parking problem there. It's just, I can't see that
you just give that. It deserves more scrutiny. The issue with the signage, the gentlemen before
me have spoke. I can't help but agree. The City sets rules up. All the businesses play by those
rules. To start changing the rules seems unfair. Many of us have worked diligently within the
confines and guidelines of the city for our professional and business careers here and to change
the rules because someone feels like they don't have the visibility they want. We all would like
better visibility from our signs and gosh, why don't we do it everywhere if that's the case.
Everyone should be seen better from the highway than they are. Thanks.
Aller: Thank you sir. Any additional comments? Please come forward. State your name and
address for the record.
Steve Friedrichs: Good evening. My name is Steve Friedrichs. I'm at 8955 Southwest Village
Loop. New townhomes right there by Southwest Transit. Actually I was here for, so I'm a new
resident of Chan. I was here for the Arbor Glen planning but stayed to listen. So just a couple of
things. I'm the president of the homeowners association and traffic flow would be a concern of
mine. One of the reasons I moved where I did is I love to bike into downtown and I bike and I
go over the bridge to get into downtown. And to get back across I have to go, I think it's where
the Marathon is or whatever and that street, I know we have a bicycle path for us to go through
there but it's very, very congested. Very dangerous and I just think we should do a traffic study.
A traffic flow so we can keep Chanhassen what it was designed for and I really do appreciate the
opportunity to address the group. Thank you.
Aller: Thank you sir and welcome.
Peter Adolphson: Good evening Chairman. My name's Peter Adolphson, 8980 Reflections
Road. Having been in the public eye before I find it amazing that staff, while they've done their
job on the stuff that looks good. Haven't done their job where they need to and just some rough
figuring. For Total Wine to make the kind of volume they want you're talking about 3,000 cars a
day to get in there and as these previous gentlemen have said, it's already a lousy traffic situation
there. I think although you have letters of support in your packet from Houlihan's and the bike
shop. St. Hubert's I'm sure would not be very happy about this at all, especially when they've
got Saturday mass going on. The senior center, those people have to walk to where they want to
get. If there's 3,000 extra cars a day in there, they're going to be looking out for their lives. You
only got one traffic light and that's Highway 7. All the rest are stop signs and it's hard enough to
get onto Market sometimes with the traffic flow we currently have. Other guys both have said,
we don't need another big box store. I agree totally. What are we trying to do to our downtown
right now? If we start putting these big box stores around. I know Chanhassen has a history of
turning down box stores. You've got Fleet Farm. You've got Walmart. You guys need to think
about that. This is not the image we need for Chanhassen. Thank you.
Aller: Thank you sir. Any additional comments? Please state your name and address for the
record.
IK
0 0
Chanhassen Planning Commission — July 7, 2015
Kate McGuire: I'm Kate McGuire and I live at 773 Autumn Ridge Lane, Chanhassen and I
guess I just want to reiterate a lot of the items that have been brought to your attention. I
definitely think that a traffic study should be done. It is a very congested area, especially at that
west entrance which is just controlled by a stop sign. There's a lot of traffic there during rush
hour. You've got the big business across the road from there with people coming and going. Of
course traffic coming up from 212. School starting. School ending. My daughter works at the
salon in there so she's traveling in there too so that's a concern as a mother. I know this isn't
really your area to decide on but we already have 7 liquor stores in a town that covers almost 25
miles. I think we have maxed out on our liquor licenses and I know that's not your area but I just
wanted to bring that up too.
Aller: Thank you very much. Any additional comments? Questions. Oh, one other individual
coming forward. Please state your name and address for the record sir.
Craig Claybaugh: My name's Craig Claybaugh, 1630 Lake Lucy Road in Chanhassen.
Aller: Welcome.
Craig Claybaugb: It may be in there in looking over the documents but what was the identified
hardship for the signage that warranted the variance?
Aanenson: What we did is we gave a variance to the previous application and nobody objected
to that so instead of saying we're going to give them a variance we wanted to treat everybody in
that same sector equal. Nobody objected to the previous variance on the specialty grocery. The
14,000 plus the additional, and then we have additional square footage with that so.
Craig Claybaugh: So what was the hardship on that? Because is that hardship being
grandfathered forward?
Aanenson: No. No, no, we're amending the PUD which is a different application and the fact
that it applies to everybody in that same sector.
Craig Claybaugh: Okay. Am I wrong in assuming there needs to be a hardship for a variance?
Aanenson: For a PUD amendment, that's correct.
Aller: For the PUD so.
Craig Claybaugh: Alright, thank you for that clarification.
Aller: But that's what we look for in variances so it's a good question. Thank you sir. Any
additional comments? Seeing no one come forward I'll close the public hearing at this time.
Open it up for discussion or questions based on the comments made.
Undestad: Alyson, clarify some of the.
13
0 0
Chanhassen Planning Commission — July 7, 2015
Aller: Yeah, can you address some of the issues that were brought forward. I guess the first and
foremost would be parking and traffic.
Fauske: I'll let the planning department refer to, response to the parking concerns as they've
done the analysis for the parking on the site. With regards to the traffic, when we look at this site
the public infrastructure that serves the entire Villages development is County Road 101 to the
west and then Great Plains Boulevard which is, I think there were a couple members of the
audience that had spoke to the Marathon station. That's where Great Plains Boulevard extends
to. At this point to be honest I haven't heard a lot of, this is good information to get from the
residents as far as their concerns with traffic. We can take a look at what the traffic counts are
doing on some of these roads. Certainly County Road 101 was designed, given the zoning in
mind, in place at this development and tum lanes installed both for southbound left tum and
northbound right tum. So we can certainly take a look at you know the existing intersection and
see if there's any queuing back into the, into the through lanes. If the level of service is
deteriorating at that intersection. That's certainly something that we can talk to Carver County
with regards to on 101 because it is a county road. And you know with regards to the trip
generation for this site, I really couldn't speak to what the trip generation is for this. That wasn't
something that I have in the back of my head to be able to tell you. We can certainly provide
that information for the council based on the square footage of the building and what the Institute
of Traffic Engineers would anticipate would be a trip generation for that size building. And then
with regards to the interior site, you know some of the concerns with regards to the tight radius
and the traffic, I know that the City Engineer/Public Works Director has been in contact with the
property manager on several occasions throughout the years to discuss some of the concerns that
have been brought forward from the residents to the City so he's been communicating with the
property manager on those issues you know hoping to get some resolve with that and being able
to make the area a little better drivability for the residents but it's ultimately an interior non-
public system.
Aanenson: I guess I would just add to that too. If you go back to the specialty grocery store, if
you look at the types of uses and where they would draw from they would be similar types of
draw. Probably a little bit larger trade area so you look at the traffic patterns. While that one
didn't have the same visceral feelings about the type of use, it also did have a larger trade area so
that one seemed to work so I think to going back and looking at, as the Assistant City Engineer
mentioned, looking at kind of the trade draw area tum movements. Peak hours. Those sort of
things and quantifying those but certainly we believe that one met the standards there. Again
you have access onto the state highway. Highway 5 and coming off of 101 there which would be
the public street that we also maintain. Getting access off to that but we certainly can,
comparing those two numbers to show you what we had approved previously based on those
assumptions and moving forward with that to the City Council.
Aller: When the PUD was originally developed the number of parking spots, if you know was
that based on the, the intended square footage that was going to be for the entire PUD?
Al -Jaffa Yes it was and one of the things that we need to point out as far as the residential
portion, it assumed that all of those units were going to be independent living and that's how the
parking was calculated for the overall PUD development. The reality is we do have a large
14
0 0
Chanhassen Planning Commission — July 7, 2015
number of senior living within the development and some of those senior living apartments are
not just, they're actually assisted living which means those are individuals that actually don't
have vehicles with them. Yet the number of parking spaces have, that are provided with this
development exceeds what was anticipated and what was required by ordinance. The other thing
that we need to point out is the highest square footage and the highest user that requires parking
would be the office and commercial use and the reality is we are far below what was anticipated
for this development and again.
Aanenson: Let me just say that a little bit differently. So the original plans anticipated more
retail than we have there today so it's under retailed. And then so we do have some vertical/
horizontal. That would be Presbyterian Homes which has commercial. Yes, is it exactly how we
envisioned it? No. I mean when this thing went through a sag big time and without throwing the
baby out with the bath we kind of had to retool. Just like people challenge us, why doesn't
Chanhassen's downtown look like Excelsior? Wayzata Because it's built at a different
timeframe but I think for the most part we've stayed within that framework of what our original
envision was. Again we had St. Hubert's Church which also has a lot of parking. They can
provide cross parking in some of those peak times when there's additional activities so the
challenge there is while there might not be parking right in front of where you want to go, you
may have to walk. Whether that's the Legion, walking across maybe from St. Hubert's or
something like that. That's the envision is that you're sharing parking in that situation so we
believe it does meet those standards and again to be clear, there is plenty of impervious surface.
It does meet the hard surface parking. With that PUD they've got a lot of open space so it does
meet those standards so the challenge there is to make sure that we've given you the information
and the council regarding again, we believe it met the traffic warrants with the specialty grocery
but make sure we've quantified that when we move forward to the City Council based on the
liquor use. But would it be any different if it was you know a larger trade area or something so
we can maybe put a couple different options in there too showing what those different traffic
patterns would be. Again we're under retailed from the original vision that we put in place in the
environment assessment document.
Aller: With impervious surfaces we exceed what our PUD requirements are?
Aanenson: That's correct. We're at about 45 percent.
Aller: By a good 10 percent.
Aanenson: Yes and that's part of the PUD. We had that with the National Weather Service site
too where you have some properties that have more green space and others less but you average
it over the entire property so this entire 66 acres has 45 percent.
Aller: So regardless of the pervious nature of a material that's placed and being used for this
project, it would still fit the requirements of the PUD?
Aanenson: That's correct. Again that's part of that you know what we show you the
compilation of all the parking, of the hard cover. So we match that up against the original, where
we are. Kind of a balance sheet.
15
0 0
Chanhassen Planning Commission — July 7, 2015
Aller: Question, Commissioner Undestad.
Undestad: The balance sheet. I just, I was going to ask the question earlier about you know a lot
of the areas when we go through these we kind of keep tabs on what we thought would go in
there when we started and where we're at mid -stream and where we're at now. Have you gone
through that? Again initially we were going to have a lot of residential above a lot of retail and
things are changed. Have you gone through so you can kind of look and say well actually we're
under here. We're over there.
Aanenson: Yep. Yeah we still anticipated two significant office buildings to go on the site and
those are still vacant and we also anticipated a lot more institutional type uses so there are other
uses that came under what we anticipated. You know we anticipated a lot more vertical. I think
the challenge out there is you know the condominium market right now is in the last 10 years has
been very challenging. That's really what we anticipated. They took a long time and the City
had provided, you know with the TIF to get the Presbyterian Homes in there and that's been very
successful and it's a nice anchor. Again the City wanted to have additional property for some
retail and that was really one of the drivers we were running on kind of the score here and
providing that retail across the street.
Undestad: So if we assume that that lot down by St. Hubert's, the office building goes in there.
I think the building that's under construction now next to Community Bank is a little bit smaller
than what was originally, could have been put on there.
Aanenson: Right, correct.
Undestad: So I guess that's what I'm trying to just get a feel for is that really we're probably less
than where we thought we would have been.
Aanenson: Absolutely. Absolutely.
Undestad: In this whole project didn't we.
Aanenson: Yeah.
Aller: Additional questions, comments.
Undestad: Just following up part to Alyson there too was, again on the traffic piece of it. You
know if we looked at this originally and we've done some traffic work back when the original
project came in, or no?
Aller: Let me piggy back on that. Was there an AUAR in the area?
Aanenson: Yes there was an original, yeah. For the project. We have an approved
Environmental Assessment Worksheet and it looked at all the trip generation and where it was
coming from, that's correct.
16
Chanhassen Planning Commission — July 7, 2015
Undestad: So again we've had traffic work done based on.
Aanenson: Yes. And again because we're under that threshold looking at that.
Undestad: Okay.
Madsen: Does that trip generation worksheet look at all the different access points of the ways
that you can tum and when you have to tum left and cross a 4 lane road? All those sorts of
intersections.
Aanenson: Yes. It looked at directional traffic.
Madsen: Okay, thank you.
Weick: Regarding the sign amendment. The amendment matches Sector 2, correct?
Al -Jaffa Yes.
Weick: So Sector 1 would match Sector 2 when it comes to sign requirements, correct?
Aanenson: That's our recommendation.
Weick: Okay. I mean I would note, you know Houlihan's which sits in Sector 2 I believe is
right off the comer of this building. I mean the proximity of those buildings and their subsequent
proximity to 5 is very similar I will note.
Aller: Which goes to my questions earlier that because they would be treated equally even if he
was in Section 1. Houlihan's could then change or modify their signage.
Weick: Correct.
Aanenson: So if you looked at what American Inn has. AmericInn. That's a taller sign on there.
They have kind of a cupola that.
Aller: Any additional comments, questions at this time? Then I'll entertain a motion if someone
wishes to make one.
Weick: Actually can I go back? I do. You know at the beginning we said we were looking at
three things. One was plat approval. Two was site plan approval and three was the PUD
amendment for the signage. Is there any in the first two items, so plat approval and site plan
approval, there's no amendments or variances or anything in those correct?
Aanenson: That's correct.
Weick: So everything that's presented falls within the zoning ordinances.
IN
0 0
Chanhassen Planning Commission — July 7, 2015
A] -Jaffa Exceeds the requirements.
Weick: Or exceeds the requirements and so the real question for us is item number 3, is that a
fair statement?
Aanenson: Yes you have discretion on, you have discretion on the amendment, that's correct.
Weick: Thank you.
Aller: Because in denying or approving items 1 and 2, which are the plats and the site plan
review, if a property, a request is made and it meets the requirements we must approve so that
boils down the reason we ask questions. The reason we want the information and staff does it's
report is so that we can decide whether or not that, those requirements are met. Once a
determination is that we feel as though they are met then we must approve. If we feel that they
are not met, then you have the ability to deny. So with that any additional questions?
Weick: Sorry.
Aller: No, that's fine. Then I'1] entertain a motion. Educated decision.
Weick: I'll make a motion.
Aller: Commissioner Weick.
Weick: The Chanhassen Planning Commission recommends that City Council approve the
preliminary plat for Villages on the Ponds I I'h Addition, site plan for Chanhassen specialty
retail, and planned unit development amendment to the sign criteria subject to the conditions of
the staff report and adopts the Findings of Fact and Recommendation.
Aller: For discussion purposes do I have a second?
Undestad: Second.
Aller: Having a motion by Commissioner Weick and a second by Commissioner Undestad, do
we have any finther discussion or comment?
Weick moved, Undestad seconded that the Chanhassen Planning Commission recommends
the City Council approve the preliminary plat for Villages on the Ponds 11th Addition
subject to the following conditions and adopts the Findings of Fact and Recommendation:
Park
1. Full park fees in lieu of additional parkland dedication and/or trail construction shall be
collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on the
Ponds 11'" Addition. The park fees will be collected in full at the rate in force upon final plat
In
• •
Chanhassen Planning Commission — July 7, 2015
submission and approval. Based upon the current commercial park fee rate of $12,500 per acre,
the total park fees would be $33,875.
Enizineerin
1. The plat must be revised to include a 10 -foot wide perimeter drainage and utility easement on
Lot 1, Block 1.
2. The fees collected with the final plat are: Surface Water Management fee, Park Dedication
fee, and GIS fee ($25 for the plat + $10/parcel).
3. City water (WAC), city sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will
be collected with the building permit and will be calculated based on the uses within the
building.
Water Resources
1. An estimated $54,610.02 in storm water utility connection charges shall be due at final plat.
2. The property owner shall execute and record against the property a maintenance agreement
in a format provided by the city for the pervious pavement, underground filtration, sump
manholes and Contech JellyfishTM Filter.
3. The applicant shall apply for and procure all other necessary permits.
All voted in favor and the motion carried unanimously with a vote of 6 to 0.
Weick moved, Undestad seconded that the Chanhassen Planning Commission recommends
the City Council approve the site plan to construct a 19,909 square foot specialty retail
building on property zoned Planned Unit Development subject to the following conditions
and adoption of the attached Findings of Fact and Recommendation:
Engineering
1. Based on the proposed grading on the north side of site the grading plan may require some
revisions in order to maintain drainage from the existing improvements to the north.
Building
1. The buildings are required to have automatic fire extinguishing systems.
2. Building plans must be prepared and signed by design professionals licensed in the State of
Minnesota.
3. Detailed occupancy -related requirements will be addressed when complete building plans are
submitted.
4. Provide a 1:200 scale drawing of subdivision.
19
0 0
Chanhassen Planning Commission — July 7, 2015
5. The owner and/or their representative shall meet with the Inspections Division as soon as
possible to discuss plan review and permit procedures.
Fire Marshal
1. Provide a three-foot clear space around fire hydrants.
2. Yellow -painted curb and "No Parking Fire Lane" signs will be required. Applicant shall
contact Fire Marshal for specific locations.
3. No P.I.V. (post indicator valve) will be required.
Natural Resource Specialist
1. The interior width of all islands must be a minimum of 10 feet.
2. A total of 13 trees must be planted within the vehicular use area.
Planning:
The applicant shall enter into a site plan agreement with the City and provide the necessary
security to guarantee erosion control, site restoration and landscaping.
1. The street/sidewalk lights along Main Street have to be preserved and operational when the
site construction is completed.
2. Approval of the site plan is contingent upon withdrawal of Planning Case 2014-29, approval
of the Planned Unit Development amendment and Subdivision.
3. The light poles may not exceed 20 feet in height
4. All Wall Packs (WPO shall be replaced with Wall Packs (WP2).
Water Resources
1. The Surface Water Pollution Prevention Plan with all elements required by the NPDES
Construction Permit shall be prepared and supplied to the city for approval prior to any earth -
disturbing activities.
2. Proof of the NPDES Construction Permit having been procured by the applicant shall be
supplied to the city prior to any earth -disturbing activities.
3. A dewatering plan, specific to the existing pond, shall be prepared and submitted to the city
for review and approval prior to any earth -disturbing activities.
20
Chanhassen Planning Commission — July 7, 2015
4. Areas immediately tributary to the pervious pavement, including disturbed areas behind the
back of curb, must be stabilized within 24 hours of construction of the pervious pavement
areas.
All voted in favor and the motion carried unanimously with a vote of 6 to 0.
Weick moved, Undestad seconded that the Planning Commission recommends the City
Council approve the Planned Unit Development amendment in the attached ordinance for
Villages on the Ponds to allow signs to be placed higher than 20 feet within Sector I, and for
the size of letters to be increased to 48 inches along the west and north elevations as shown
below (amendments are shown in bold and highlighted in yellow), and including the
attached Findings of Fact and Recommendation:
Wall Signs
The location of letters and logos shall be restricted to the approved building sign bands, the
tops of which shall not extend greater than 20 feet above the ground. In Sectors I and II,
sign height may be increase based on the criteria that the signage is compatible with and
complementary to the building architecture and design. The letters and logos shall be
restricted to a maximum of 30 inches in height except along the north and west elevations for
buildings within sectors I and IL These letters may be increased to 48 inches. All
individual letters and logos comprising each sign shall be constructed of wood, metal, or
translucent facing.
2. If illuminated, individual dimensional letters and logos comprising each sign may be any of
the following:
a. Exposed neon/fiber optic,
b. Open channel with exposed neon,
c. Channel Letters with acrylic facing,
d. Reverse channel letters (halo lighted), or
e. Externally illuminated by separate lighting source.
3. Tenant signage shall consist of store identification only. Copy is restricted to the tenant's
proper name and major product or service offered. Corporate logos, emblems and similar
identifying devices are permitted provided they are confined within the signage band and do
not occupy more than 15% of the sign area unless the logo is the sign.
4. Within Sectors I and II, architecturally, building -integrated panel tenant/logo sign may be
permitted based on criteria that the signage is compatible with and complementary to the
building design and architecture. Architectural elements specifically created to increase
signage height are prohibited.
5. Backlit awnings are prohibited.
21
Chanhassen Planning Co• ssion—July 7, 2015 •
All voted in favor and the motion carried unanimously with a vote of 6 to 0.
Aller: The matter is moved to the City Council. Those individuals wishing to discuss other items
with regards to the City Council or follow this item to the City Council for it's final
determination is presently set for July 27, 2015. Thank you all for participating. We're going to
take a minute recess here to allow the room to clear and those individuals that might have been
here for item number 3 that was presently on the calendar. Arbor Glen planning case, that matter
has been removed from the calendar at their request and that will be extended and heard by this
commission on the 21'.
The Planning Commission took a short recess at this point in the meeting.
PUBLIC HEARING:
GLACCUM SUBDIVISION. PLANNING CASE 2015-18: REOUEST FOR REZONING
OF PROPERTY FROM RURAL RESIDENTIAL DISTRICT (RR) TO SINGLE FAMILY
RESIDENTIAL DISTRICT (RSF): AND SUBDIVISION WITH VARIANCES OF
APPROXIMATELY THREE ACRES INTO FOUR LOTS ON PROPERTY LOCATED
AT 1510 LAKE LUCY ROAD. APPLICANT/OWNER: ESTATE DEVELOPMENT
CORPORATION/MICHAEL & LEAH GLACCUM.
Generous: Thank you Chairman Aller, commissioners. As you stated Planning Case 2015-18 is
Glaccum Subdivision. Glaccum's are the property owners for this site and so that's where the
name comes from. Tonight we're holding the public hearing and this goes to City Council on
July 27's. The applicant is Estate Development Corporation and Michael and Leah Glaccum.
Again it's a rezoning of the property from it's currently zoned rural residential to residential
single family or RSF. The property is guided in the Comprehensive Plan for residential low
density uses and this means density of 1.2 to 4 units per acre. This development will come in
within that range and it complies with all the requirements of the RSF district. The property is
located at the northeast comer of Lake Lucy Road and Yosemite. Property address is 1510 Lake
Lucy Road. There is an existing single family home on this site as well as a couple out buildings
and a little garden. The northwest comer of their property consists of a wetland complex and the
one issue we had in here is there's a small portion of the site meets the city criteria for a bluff
and the City defines a bluff as having an elevation change of 25 feet or more and a slope of 30
percent or greater so when it has both those criteria then we consider it a bluff. However this
entire ridge area, there's only a small percentage of this. The development to the east Shadow
Ridge has the same slope configuration. However none of that met the bluff criteria so
everything around this bluff area could develop except for that specific area behind the existing
house. That house does not meet the City's requirements for setback from a bluff. It's
approximately 10 feet from the top of the bluff. Bluff setbacks are 30 feet. So the applicant, as
part of this development with the subdivision is requesting a variance from the bluff setback
requirement and in this instance to go to zero setback they want to take out the top of that hill
and make the residential area developable. What staff worked with the developer on was trying
to preserve the wetland area and the wooded area on the northern, on the north side of this
project. Down in the bottom of the bowl if you will. Again this is a rezoning from rural
residential to single family residential district and a subdivision of the property into 4 single
family lots. As part of the development they would outlot the wetland and they would also
22
PROPOSED MOTION:
"The Chanhassen Planning Commission recommends that City Council approve the preliminary
plat for Villages on the Ponds 11 m Addition; site plan for Chanhassen Specialty Retail, and
Planned Unit Development Amendment to the sign criteria subject to the conditions of the staff
report, and adopts the Findings of Fact and Recommendation."
SUMMARY OF REQUEST: The developer is requesting preliminary plat approval to create
one lot and one outlot (Villages on the Ponds l ls' Addition), and Site Plan Review for a 19,909
square -foot, one-story specialty liquor store (Total Wine & More), and Planned Unit Development
Amendment to the sign criteria. Notice of this public hearing has been mailed to all property
owners within the required 500 feet. Staff is recommending approval of the request with
conditions.
LOCATION: Northwest Comer of Lake Drive and Main Street
Outlot B, Villages on the Ponds 4te Addition
(PID 25-8460030)
APPLICANT: Venture Pass Partners, LLC Owner: Northcott Company
19620 Waterford Court 250 Lake Drive East
Shorewood, MN 55331 Chanhassen, MN 55317
(612)801-4313 (952)294-5215
rrauwerdinkAa ventureoass net bschwen(a)northcotthospitalitycom
PRESENT ZONING: Planned Unit Development (PUD) — Villages on the Ponds
2020 LAND USE PLAN: Mixed Use
ACREAGE: 2.71 acres DENSITY: NA
LEVEL OF CITY DISCRETION IN DECISION-MAKING:
The City's discretion in approving or denying a preliminary plat is limited to whether or not the
proposed plat meets the standards outlined in the Subdivision Regulations and Zoning
Ordinance. If it meets these standards, the City must approve the preliminary plat. This is a
quasi-judicial decision.
The City's discretion in approving or denying a site plan is limited to whether or not the
proposed project complies with Zoning Ordinance requirements. If it meets these standards, the
City must then approve the site plan. This is a quasi-judicial decision.
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 2 of 23
The City has a relatively high level of discretion in approving amendments to PUDs because the
City is acting in its legislative or policy-making capacity. A PUD amendment must be consistent
with the City's Comprehensive Plan.
PROPOSAUSUMMARY
The site is located at the northwest comer of Lake Drive and Main Street, within Villages on the
Ponds, a mixed-use development. The site was rough graded as part of the overall development.
The property is located within Sector I of the Villages on the Ponds development (there are four
sectors within the development which will be discussed in further detail later in the report).
The following is a summary of the proposal:
1. Subdivision: Replat an outlot into one lot and one outlot to house a specialty retail building.
2. Site Plan: Construction of a 19,909 square -foot retail building (Total Wine & More).
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 3 of 23
3. Planned Unit Development Amendment: Changing the Signage Criteria to allow wall
signs to be placed higher than 20 feet from floor elevation along the north and west building
facades, and increase the height of the individual letters not to exceed 48 inches.
The primary parking for the project is located within the westerly portion of the site. Some on -
street parking is also available along Lake Drive, Main Street and Pond Promenade, which are all
private streets. Within Villages on the Ponds there are existing cross -access and cross -parking
agreements that permit a portion of the parking to be located off site. Parking requirements in
excess of those specifically provided on site are through shared parking.
The building materials consist of rock face block, accent block and concrete utility brick. Black
awnings are proposed over individual windows. An E.I.F.S. band is incorporated at the top of
the walls and is used as a sign band. Staff has been working with the applicant for several
months to improve the design and layout of the site and building. The applicant has
implemented all staff's recommendations into the design. The product is attractive and will
complement the design of surrounding buildings.
The proposed development is consistent with the comprehensive plan and the project's
development design standards. Staff is recommending approval of the project subject to the
conditions of this report.
APPLICABLE REGULATIONS
Chapter 18, Subdivision
Chapter 20, Article II, Division 6, Site Plan
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 4 of 23
Chapter 20, Article XXIII, Division 7, Design Standards for Commercial, Industrial and Office -
Institutional Development
Villages on the Ponds Development Design Standards
BACKGROUND
On September 23, 1996, the City Council approved PUD 95-2, Villages on the Ponds, including a
Comprehensive Land Use Plan amendment from Office/Industrial, Institutional, Residential
Medium Density, Residential Low Density to Mixed Use -Commercial, High Density Residential,
Institutional and Office; Preliminary Planned Unit Development for up to 291,000 square feet of
commercial/office buildings, 100,000 square feet of institutional buildings, and 322 dwelling units;
Rezoning from IOP and RSF to PUD, Planned Unit Development (final reading); and final plat
dated "Received September 19, 1996" for two lots and ten outlots and public right-of-way.
On June 28, 1999, the City Council
approved PUD 95-2 granting Final Plat
approval for Villages on the Ponds Fourth
Addition, creating one lot and two outlots.
The lot is for the Peddler Cyclery, a.k.a.,
Bokoo Bikes.
On December 9, 2002 the Chanhassen
City Council approved Site Plan #2002-9,
plans prepared by Truman Howell
Architects and Associates, Inc., dated
October 18, 2002, for a 70,873 square -
foot, three-story building consisting of
street level commercial and upper level
hotel rooms (not constructed); and
A variance for the use of more than 15
percent EIFS on the building based upon
the finding that it is consistent with other
buildings approved in the area (void since
not used); and
A variance for signage in excess of 20 feet in height on the building based on the fact that it is
consistent with the approval given to the Community Bank of Chanhassen building (void since
not used).
On October 27, 2014, the Chanhassen City Council approved the Preliminary and Final Plat for
Villages on the Ponds 11' Addition; Site Plan for Chanhassen Specialty Grocery with a Variance
to the sign letter size on the north and west building elevations subject to the modified conditions
of the Planning Commission staff report, and the Development Contract for Villages on the
Ponds l lm Addition.
Planning Commission •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 5 of 23
On February 9, 2015, the Chanhassen City Council approved the extension of the time to record
the site plan agreement for Chanhassen Specialty Grocery and the final plat for Villages on the
Ponds 116' Addition to May 31, 2015. (Not constructed and plat not recorded).
SITE PLAN
In order to provide a better understanding of the overall development, staff will first review the
site plan component, which in turn leads to the Planned Unit Development Amendment and the
Replat of the outlot. The building must comply with the Design Standards for Villages on the
Ponds design criteria. The ordinance governing this site requires the development to have an
attractive design and use durable materials. Site coverage may not exceed 70 percent. This is a
Planned Unit Development and hard surface coverage can be averaged over the entire
development including the permanent open space. When the city approved the initial
development for Villages on the Ponds, it insured an open space that exceeds 30%. The actual
open space exceeds 45%.
The design of the building is attractive and is proposed to be constructed of high-quality
materials that are complementary to surrounding buildings. They include rock face block, accent
block and concrete utility brick. Black awnings are proposed over individual windows. An
E.I.F.S. band is incorporated at the top of the walls and is used as a sign band. The architectural
design of the building lends itself to place wall signage over the E.I.F.S. band shown in the
elevations below. Staff is recommending approval of a PUD amendment to allow the requested
signage if it meets the architectural integrity of the overall development.
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 6 of 23
All elevations can be viewed by the public on all four sides. Staff commends the applicant on
the level of detail that has been introduced to the building through the use of spandrel windows,
different building materials, a green wall along the east elevation, projecting entrance and
articulation along the roof line. The loading dock is buffered from views by landscaping.
The majority of the parking
is located along the western
portion of the site.
Sidewalks are extended
between the subject site and
the surrounding area and
separates pedestrian from
vehicular traffic. The trash
enclosure for the building is
located along the southeast
comer of the building and is
proposed to utilize the some
materials as the building.
The added landscaping and
boulevard trees will provide
a calming effect to a busy
area.
The building has a
pronounced entrance,
utilizes durable exterior
materials, and exhibits
articulation. There are no
required setbacks from any
of the private streets within
this development.
Staff regards the project as
a well-designed
development. The overall
design is sensitive to the
surrounding area. Based
upon the foregoing, staff is
recommending approval of
the site plan with
conditions as outlined in
the staff report.
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 7 of 23
LIGHTING/SIGNAGE
The applicant has submitted a lighting plan and a photometrics plan has been prepared for the
site. Light levels for site lighting shall be no more than one-half foot candle at the project
perimeter property line. This does not apply to street lighting. All fixtures must be shielded.
The proposed parking lot lights are a shoebox design which is permitted in this development.
The light poles may not exceed 20 feet in height.
The PUD standards encourage the use of lights on the building to minimize the number of
parking lot lights. The applicant is proposing to use downcast shielded fixtures.
Wall signage is proposed along four sides of the building which is permitted under the Planned
Unit Development ordinance governing this development. However, there is a limit on the size
of the individual letters and height of the wall sign. Staff will address this issue in detail under
the PUD amendment section of the report.
PARKING
The ordinance requires one parking space per 200 square feet of retail building, which translates
to 100 spaces for this application. The applicant is providing 84 spaces on site and 74 on -street
parking spaces. The entire development was created based on a shared parking concept. An
overall parking study noted that the cross -parking arrangement would provide sufficient parking
to accommodate users throughout the development. The parking study and the Alternative
Urban Areawide Review (AUAR) anticipated a greater density and intensity of use. It was
anticipated that there would be a total of 291,000 square feet of office/commercial space,
100,000 square feet of institutional space, and 322 dwelling units in the overall development.
Actual development resulted in the following:
Planning Commission • •
Chanhassen Specialty Retail — Plannin Case 2015-17
July 7, 2015
Page 8 of 23
Aa L
Use
Anticipated
Actual
Net Change
Institutional
100,000 square feet
134,000 square feet
-34,000 square feet
Residential
322 units*
323 units**
-1 unit
Office/Commercial
291,000 square feet
198,500 square feet
+92,500 s uare feet
*Parking study assumed independent living apartment units requiring more parking
** 160 of the 323 units are senior -only apartments which required substantially less parking
The overall Villages on the Ponds development provides ample parking and remains consistent
with the approved plan.
ARCHITECTURAL COMPLIANCE
Size, Portion and Placement
Entries: The building has pronounced entrances.
Articulation: The buildings incorporate adequate detail and has been tastefully designed to
complement the surrounding area. The architectural style is unique to the buildings but will fit in
with the surrounding area. The building utilizes exterior materials that are durable and of high
quality.
Site Furnishing
The applicant is providing bicycle racks in the northwest corner of the building and an eco -mesh
green wall on the east side of the building.
Material and Detail
High quality materials are being used on the building.
Color
The colors chosen for the buildings are earth tones. The selection is unique, but blends in with
the surrounding buildings.
Height and Roof Design
The building is a one-story building. The roofline is staggered and contains pitched elements
which adds articulation to the design of the buildings. All rooftop equipment must be screened
from views.
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 9 of 23
Facade Transparency
All facades viewed by the public contain more than 50 percent windows and/or doors. Some
walls are further broken by the use of landscaping.
Loading Areas, Refuse Areas etc
The trash enclosure and loading dock are located along the southeast corner of the building.
They will be screened by landscaping and a trash enclosure.
SITE PLAN FINDINGS
In evaluating a site plan and building plan, the City shall consider the development's compliance
with the following:
(1) Consistency with the elements and objectives of the city's development guides, including the
comprehensive plan, official road mapping, and other plans that may be adopted;
(2) Consistency with this division;
(3) Preservation of the site in its natural state to the extent practicable by minimizing tree and
soil removal and designing grade changes to be in keeping with the general appearance of the
neighboring developed or developing areas;
(4) Creation of a harmonious relationship of building and open space with natural site features
and with existing and future buildings having a visual relationship to the development;
(5) Creation of functional and harmonious design for structures and site features, with special
attention to the following:
a. An internal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants, visitors and general community;
b. The amount and location of open space and landscaping;
c. Materials, textures, colors and details of construction as an expression of the design
concept and the compatibility of the same with adjacent and neighboring structures and
uses; and
d. Vehicular and pedestrian circulation, including walkways, interior drives and parking in
terms of location and number of access points to the public streets, width of interior
drives and access points, general interior circulation, separation of pedestrian and
vehicular traffic and arrangement and amount of parking.
(6) Protection of adjacent and neighboring properties through reasonable provision for surface
water drainage, sound and sight buffers, preservation of views, light and air and those aspects
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 10 of 23
of design not adequately covered by other regulations which may have substantial effects on
neighboring land uses.
Finding: The proposed development is consistent with the city's design requirements, the
comprehensive plan, the zoning ordinance, the design standards, and the site plan review
requirements. Staff is recommending approval of the request with conditions. The site design is
compatible with the surrounding developments. It is functional and harmonious with the area.
Staff regards the project as a reasonable use of the land. The overall design is sensitive to the
city's image. Based upon the foregoing, staff is recommending approval of the site plan with
conditions outlined in the staff report.
PLANNED UNIT DEVELOPMENT AMENDMENT
The current language pertaining to wall signage that address the subject building limits the height of
the wall sign to 20 feet and the size of the individual letters to 30 inches. The proposed building as
well as some of the other buildings that were approved before this one have received variances.
When the applicant submitted the proposal for this request, they also requested a variance from
this criteria. Staff evaluated the request and recommended a minor PUD amendment that would
accommodate all users within this sector of the development to allow the same treatment.
Approval of the building signage will be contingent upon approval of the PUD amendment.
When Villages on the Ponds was being studied,
discussed and analyzed, it was divided into four
sectors:
• Sector I: Mixed use of commercial and
residential
• Sector II: Highway exposure
• Sector III: Institutional
• Sector IV: Residential
Within Sector I, the ordinance limited the wall
signage to be placed no higher than 20 feet above
the ground elevation, and limited the height of the
individual letters to 30 inches. Sector R permits the
placement of wall signs to be extended above 20
feet. This was permitted because Sector 11 was
viewed as a highway -oriented development as it is
bordered by Highay 5 to the north and Highway
101 to the west.
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 11 of 23
As staff began evaluating the subject
site and how it fits into the sector
scenario described above, it was
concluded that the north and west
elevations for buildings in Sector I fall
under that same rule. Based on this
conclusion, staff directed the applicant
to apply for a Planned Unit
Development amendment rather than a
variance. The amendment is simple and
will involve two sections of the Wall
Signs Criteria, as shown below in bold
type and highlighted in yellow:
Wall Signs
1. The location of letters and logos shall be restricted to the approved building sign bands, the
tops of which shall not extend greater than 20 feet above the ground. In Sectors I and 11,
sign height may be increase based on the criteria that the signage is compatible with and
complementary to the building architecture and design. The letters and logos shall be
restricted to a maximum of 30 inches in height except along the north and west elevations for
buildings within sectors I and H. These letters may be increased to 48 inches. All
individual letters and logos comprising each sign shall be constructed of wood, metal, or
translucent facing.
2. If illuminated, individual dimensional letters and logos comprising each sign may be any of
the following:
a. Exposed neon/fiber optic,
b. Open channel with exposed neon,
c. Channel Letters with acrylic facing,
d. Reverse channel letters (halo lighted), or
e. Externally illuminated by separate lighting source.
3. Tenant signage shall consist of store identification only. Copy is restricted to the tenant's
proper name and major product or service offered. Corporate logos, emblems and similar
identifying devices are permitted provided they are confined within the signage band and do
not occupy more than 15% of the sign area unless the logo is the sign.
4. Within Sectors I and II, architecturally, building -integrated panel tenant/logo sign may be
permitted based on criteria that the signage is compatible with and complementary to the
building design and architecture. Architectural elements specifically created to increase
signage height are prohibited.
5. Backlit awnings are prohibited.
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 12 of 23
As stated earlier, this is a mior amendment and staff is recommending approval of the request.
PLANNED UNIT DEVELOPMENT AMENDMENT FINDINGS
The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse
effects of the proposed amendment. The six (6) effects and our findings regarding them are:
a) The proposed action has been considered in relation to the specific policies and provisions of
and has been found to be consistent with the official City Comprehensive Plan.
Findine: The site is guided mixed use. A retail building with an area of less than 20,000
square feet is a reasonable size building in that location.
b) The proposed use is or will be compatible with the present and future land uses of the area.
Fes: The proposed use is and will be compatible with the present and future land uses
of the area through the implementation of the design standards, landscaping, architecture, etc.
c) The proposed use conforms with all performance standards contained in the Zoning
Ordinance.
FIn in: The proposed use will conform with all performance standards contained in the
Zoning Ordinance such as design standards, signage, durable materials, uses, etc.
d) The proposed use will not tend to or actually depreciate the area in which it is proposed.
FSndin : The proposed use is intended to meet the daily needs of the area. It could
potentially add convenience to the homeowners in the area.
e) The proposed use can be accommodated with existing public services and will not
overburden the city's service capacity.
Finding: The site is located within the Municipal Urban Service Area. The proposed use
can be accommodated with existing public services and will not overburden the city s service
capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving the property.
Finding: Traffic generation by the proposed use is within capabilities of streets serving the
property.
Planning Commission * •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 13 of 23
The developer is proposing to replat the
property into one lot and one outlot. The lot
will house the specialty liquor store building.
Outlot A is for Pond Promenade.
The ordinance states, "All lots shall abut for
their full required minimum frontage on a
public street as required by the zoning
ordinance; or be accessed by a private
street; or a flag lot which shall have a
minimum of thirty feet of frontage on a
public street"
The lot has street frontage on all four sides.
Out�Ot
s
d
Lot 1, Block 1
,y
The subdivision request is a relatively straightforward action and staff is recommending approval
with conditions.
The plat includes one lot (Lot 1, Block 1) and one outlot (Outlot A). The plat must be revised to
include a 10 -foot wide perimeter drainage and utility easement on Lot 1, Block 1.
The fees to be collected with the final plat are as follows:
Surface Water Management fee
Park Dedication fee
• GIS fee: $25 (plat) + ($10/parcel x 3 parcels) = $55
City water (WAC), city sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will be
collected with the building permit and will be calculated based on the uses within the building.
Staff notes that the proposal is consistent with the Comprehensive Plan and the Zoning Ordinance.
SUBDIVISION FINDINGS
1. The proposed subdivision is consistent with the zoning ordinance.
Fes: The subdivision meets the intent of the city code subject to the conditions of the staff
report.
2. The proposed subdivision is consistent with all applicable city, county and regional plans
including but not limited to the city's comprehensive plan;
Fin in: The proposed subdivision is consistent with applicable plans.
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 14 of 23
3. The physical characteristics of the site, including but not limited to topography, soils,
vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water
drainage are suitable for the proposed development;
FindinE: The proposed site is suitable for development subject to the conditions specified in
this report.
4. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage
disposal, streets, erosion control and all other improvements required by this chapter;
Finding: The proposed subdivision will be served by adequate urban infrastructure.
5. The proposed subdivision will not cause environmental damage;
Finding: The proposed subdivision will not cause environmental damage subject to conditions
of approval.
6. The proposed subdivision will not conflict with easements of record.
FSndIn : The proposed subdivision will not conflict with existing easements, but rather will
expand and provide all necessary easements.
7. The proposed subdivision is not premature. A subdivision is premature if any of the following
exists:
a. Lack of adequate storm water drainage.
b. Lack of adequate roads.
c. Lack of adequate sanitary sewer systems.
d. Lack of adequate off-site public improvements or support systems.
Finding: The proposed subdivision is provided with adequate urban infrastructure.
PARKS
This property is located within the community park service area for Lake Susan Community Park
and the neighborhood park service area for Rice Marsh Lake Neighborhood Park. Employees and
visitors to the specialty retail store will have convenient access to these publicly -maintained park
and recreation facilities. Lake Susan Park is 33 acres in size and features large playgrounds,
basketball court, picnic shelter, tennis courts, archery range, public water access, fishing pier and a
ball field. Ample off-street parking is available at the park.
Rice Marsh Lake Neighborhood Park is four acres in size and features a playground, ball field,
basketball court, volleyball court and a small picnic shelter. Off-street parking is available. No
additional parkland acquisition is being recommended as a condition of this subdivision.
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 15 of 23
TRAILS
The subject site has convenient access to the public trails along Great Plains Boulevard, the three-
mile Rice Marsh Lake trail loop, and the lakeside trail route to Lake Susan Park. No additional trail
construction is being recommended as a condition of this subdivision.
STREETS AND ACCESS
The site lies within the Villages on the Pond Planned Unit Development located south of Trunk
Highway 5 between County Road 101 and Great Plains Boulevard. The streets within the
Villages development — Pond Promenade, Lake Drive and Main Street — are privately owned and
maintained. The site is on the northwest corner of Lake Drive and Main Street and will be
accessed from the north and west via Pond Promenade.
The developer proposes improvements along the private streets north and west of the site,
specifically installation of 90 -degree parking stalls that will be paved and will have curb and
gutter.
The developer has submitted turning movement templates illustrating how tractor -trailer units
will access the site from Lake Drive and back into the loading dock on the south side of the
building.
UTILITIES
Public sanitary sewer and water main are within the streets surrounding the proposed
development. A drainage and utility easement is proposed over these utilities.
The developer proposes to wet tap a six-inch diameter water service to the existing water main
and extend a sanitary sewer service from an existing sanitary sewer manhole northwest of the
building on Lot 1. These service connections will be inspected by the Building Department in
conjunction with the budding/plumbing permit.
GRADING AND DRAINAGE
The site was mass graded when the surrounding area was developed. The original plans for the
site included underground parking within the southern portion of proposed Lot 1. The
underground parking was sub cut with the original site grading and has since filled with surface
water runoff. The developer proposes to raise the grade of Lot 1, including filling the
aforementioned sub -cut area. Porous pavement is proposed to be installed, draining to an
underground system comprised of sand and a drain tile outlet that connects to the existing storm
sewer system. This connection will be inspected by the Building Department in conjunction
with the building/plumbing permit.
Based on the proposed grading on the north side of site the grading plan may require some
revisions in order to maintain drainage from the existing improvements to the north.
Planning Commission • •
Chanhassen Specialty Retail - Planning Case 2015-17
July 7, 2015
Page 16 of 23
The entire site drains to Rice Marsh Lake. The majority of the site reaches Rice Marsh Lake
through a conveyance that follows the 101 corridor. A small portion of the site drains to the
wetland located along Highway 5 before heading south through the Hidden Valley neighborhood
and then on to Rice Marsh Lake.
Within the two largest drainage areas and overall drainage on the site the discharge rates are
decreased under the developed conditions from existing conditions.
Stam Event
SW CB
Existing Maximum Rah of Runoff (cfs)
Area 3S Area 48 Area 5S
Total Existing
2-yow
7.22
0.01
0.50
0.06
7.72
10-rar
13.32
0.02
0.80
009
14.13
f"ar
2521
O.D4
1.32
0.16
26.59
10 -day Snow
1.39
0.00
0.06
001
1.45
Proposed Maximum Rate of Runoff (cfs)
Storm Event
SW CB
Area 3S
Area 4S
Area 5S
Total Proposed
2 -ear
3.14
029
0.50
0.14
3.94
101var
5.82
0.49
0.80
0.25
7.14
f"ar
9-56
0187
1.32
0.47
12A0
f048y Snow
1.02
0.04
0.06
0.02
1.12
Figure 1 Pre- and post -development runoff rates
Given the existing capacity within the system and the modest rate increases proposed for areas
3S (Main Street east side of building) and 5s (southeast corner of the building), staff agrees with
the consulting engineer that there is little likelihood of downstream deleterious effects.
SITE GRADING: EROSION PREVENTION AND SEDIMENT CONTROL
The proposed development will exceed one (1) acre of disturbance and will, therefore, be subject
to the General Permit Authorization to Discharge Stormwater Associated with Construction
Activity Under the National Pollution Discharge Elimination/State Disposal System (NPDES
Construction Permit). The applicant has prepared a Surface Water Pollution Prevention Plan
(SWPPP) and submitted to the city. This SWPPP must contain all required elements as listed in
Parts III and IV of the permit. The City has a checklist of required elements that can be made
available to the applicant's engineer. The PCA also has a checklist available on their website.
It is known that dewatering must take place on the site. A dewatering plan shall be included as
part of the SWPPP and submitted to the city for review. The pervious pavement must be
protected at all times throughout construction. The SWPPP and erosion plan shall indicate how
stabilization of tributary disturbed areas is to occur and that it must occur such that no sediment
is introduced to the areas once they have been installed, but in no case any longer than 24 hours.
Staff has firsthand knowledge that failure to stabilize these areas can result in an ineffective
practice.
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 17 of 23
SITE CONSTRAINTS
Wetland Protection
There is no indication that any wetlands are present on the property. The existing pond was
created incidentally when the area was excavated in anticipation of constructing an underground
parking facility.
BluffProtection
There are no bluffs or steep slopes on the site.
Shoreland Management
The property does not lie within any Shoreland district.
Floodplain overlay
This property does not he with a floodplain.
STORM WATER MANAGEMENT
Article VII, Chapter 19 of City Code describes the required storm water management
development standards. Section 19-141 states that "these development standards shall be
reflected in plans prepared by developers and/or project proposers in the design and layout of site
plans, subdivisions and water management features." This site lies within the boundaries of the
Riley -Purgatory -Bluff Creek Watershed District and is subject to their stormwater management
requirements. These requirements are similar to Minimal Impact Design Standards and have the
same required removals of total phosphorus and total suspended solids as does Chanhassen's
code. Further, they are similar to Chanhassen's requirements as stipulated in our MS4 permit.
To meet these requirements, the applicant is proposing to install pervious pavement in the
interior parking stalls as well as three structural devices. The proposed plan appears to meet the
volume control, rate control and water quality standards requirements. The applicant will need
to get the approval of the Riley -Purgatory -Bluff Creek Watershed District.
The following table has been extracted from the stormwater management report and shows the
anticipated removals based upon the BMPs installed.
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 18 of 23
Required Removal
Nub*d Anvlysis
("Year) Provided Removal (lbslyear)
Annual TP Load
4.39
6051c Annual TP Load
2.63 Annual TP Removal 3.06
Annual TSS Load
798
90% Annual TSS Load
718 Annual TSS Removal 739
Figure 1. Annual reduction in Total Phosphorus and Total Suspended Solid loads
Operations and Maintenance
Part III.D.5.a(5) of the GENERAL PERMIT AUTHORIZATION TO DISCHARGE
STORMWATER ASSOCIATED WITH SMALL MUNICIPAL SEPARATE STORM
SEWER SYSTEMS UNDER THE NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM (NPDES/SDS) PERMIT
PROGRAM requires that "The permittee's Regulatory Mechanism(s) shall provide for the
establishment of legal mechanism(s) between the permittee and owners or operators responsible
for the long-term maintenance of structural stormwater BMPs not owned or operated by the
permittee, that have been implemented to meet the conditions for post -construction stormwater
management in Part III.D.5.a(2)." The permit continues on to discuss minimum provisions to
allow for inspection of and preservation of function of the facility as well as transfer of
responsibilities in the event the facility is sold.
The city has developed a maintenance agreement and this shall be revised accordingly, executed
and recorded against the property. in addition, the developer or their representative shall develop
an operations and maintenance manual which shall specify anticipated inspection and
maintenance, as well as schedule, necessary in order to ensure there is not significant decreases
in the practices' efficacies. This operations and maintenance manual shall be referenced in the
maintenance agreement.
Storm Water Utility Connection Charges
Section 4-30 of city code sets out the fees associated with surface water management. A water
quality and water quantity fee are collected with a subdivision. These fees are based on land use
type and are intended to reflect the fact that more intense the development type, the greater the
degradation of surface water.
This fee will be applied to the new lot of record being created. It is calculated as shown in the
table below:
Planning Commission • •
Chanhassen Specialty Retail — Planning Case 2015-17
July 7, 2015
Page 19 of 23
Per acre rate
TSize of new lot in acres
Totals
Water Quality $22,940.00 1
2.71
$62,236.22
Water Quantity $8,900.00 1
2.71
$24,145.70
Credit $11 70-001
2.77 acres treated
$31771.90
Total due at final plat
0 Overstory trees
$54,610.02
LANDSCAPING
Minimum requirements for landscaping at the proposed development include 3,436 square feet
of landscaped area around the parking lot, landscape islands or peninsulas, and 13 trees for the
parking lot. The applicant's proposed as compared to the requirements for landscape area and
parking lot trees is shown in the following table.
Required
Proposed
Vehicular use landscape area 3,436 sq. ft.
>3,436 sq. ft.
Trees/parking lot 13 trees
12 trees
Islands or peninsulas/parking lot 7 islands/ as
8 islands/peninsulas
The applicant needs to locate one additional overstory tree on the site to meet minimum
requirements for trees and landscaping in the parking lot area.
Bufferyard requirements:
All bufferyard requirements have been met.
Required plantings
Proposed plandngs
Bufferyard A — north prop. line, Pond
0 overstory trees
2 overstory
Promenade., 330'
2 Understory trees
0 Understory trees
2 Shrubs
12 Shrubs
Bufferyard B — south prop. line, Lake
0 Overstory trees
4 Overstory trees
Drive, 230'
1 Understory trees
0 Understory trees
1 Shrubs
29 Shrubs
Bufferyard B — east prop. line, Main
0 overstory trees
1 Overstory trees
Street, 210'
1 Understory trees
0 Understory trees
1 Shrubs
40 Shrubs
Bufferyard A — west prop. line, Pond
0 overstory trees
2 Overstory trees
Promenade, 210'
1 Understory trees
0 Understory trees
I Shrubs 13
Shrubs
All bufferyard requirements have been met.
Planning Commission • •
Villages on the Ponds I lb Addition/Chanhassen Specialty Grocery
Planning Case 2015-17
July 7, 2015
Page 20 of 23
COMPLIANCE TABLE
(Retail 1/200 square feet — 19,909/200 =100 spaces (# 70 spaces on-site, 88 spaces on Main
Street, Lake Drive, and Pond Promenade.
Parking Setback N - 0' E - 0' N - 0' E - 142'
W -0'S-0' W -0'S-0'
RECOMMENDATION
Staff recommends that the Planning Commission approve Villages on the Ponds 11'b Addition
and Chanhassen Specialty Retail Store as shown in Plans dated received June 18, 2015 and
subject to the following conditions and adoption of the attached Findings of Fact and
Recommendation:
SUBDIVISION
Park
Full park fees in lieu of additional parkland dedication and/or trail construction shall be
collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on the
Ponds 11's Addition. The park fees will be collected in fiill at the rate in force upon final plat
submission and approval. Based upon the current commercial park fee rate of $12,500 per acre,
the total park fees would be $33,875.
Enizineering
1. The plat must be revised to include a 10 -foot wide perimeter drainage and utility easement on
Lot 1, Block 1.
2. The fees collected with the final plat are: Surface Water Management fee, Park Dedication
fee, and GIS fee ($25 for the plat + $10/parcel).
PUD
Chanhassen Specialty Retail (19,909 sf)
Lot Area
15,000
77,657
Building Height
3 stories
1 story
40 feet
29.5 feet
Building Setback
N - 0' E-01
N - 70' E - 13
W-0' S-0'
W-218' S-90'
Parking Stalls
100 stalls
158 stalls #
(Retail 1/200 square feet — 19,909/200 =100 spaces (# 70 spaces on-site, 88 spaces on Main
Street, Lake Drive, and Pond Promenade.
Parking Setback N - 0' E - 0' N - 0' E - 142'
W -0'S-0' W -0'S-0'
RECOMMENDATION
Staff recommends that the Planning Commission approve Villages on the Ponds 11'b Addition
and Chanhassen Specialty Retail Store as shown in Plans dated received June 18, 2015 and
subject to the following conditions and adoption of the attached Findings of Fact and
Recommendation:
SUBDIVISION
Park
Full park fees in lieu of additional parkland dedication and/or trail construction shall be
collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on the
Ponds 11's Addition. The park fees will be collected in fiill at the rate in force upon final plat
submission and approval. Based upon the current commercial park fee rate of $12,500 per acre,
the total park fees would be $33,875.
Enizineering
1. The plat must be revised to include a 10 -foot wide perimeter drainage and utility easement on
Lot 1, Block 1.
2. The fees collected with the final plat are: Surface Water Management fee, Park Dedication
fee, and GIS fee ($25 for the plat + $10/parcel).
Planning Commission • •
Villages on the Ponds I I' Addition/Chanhassen Specialty Grocery
Planning Case 2015-17
July 7, 2015
Page 21 of 23
3. City water (WAC), city sewer (SAC) and Metropolitan Council sewer (Metro SAC) fees will
be collected with the building permit and will be calculated based on the uses within the
building.
Water Resources
1. An estimated $54,610.02 in storm water utility connection charges shall be due at final plat.
2. The property owner shall execute and record against the property a maintenance agreement
in a format provided by the city for the pervious pavement, underground filtration, sump
manholes and Contech JellyfishTm Filter.
3. The applicant shall apply for and procure all other necessary permits.
SITE PLAN
Engineering
1. Based on the proposed grading on the north side of site the grading plan may require some
revisions in order to maintain drainage from the existing improvements to the north.
Buildine
1. The buildings are required to have automatic fire extinguishing systems.
2. Building plans must be prepared and signed by design professionals licensed in the State of
Minnesota.
3. Detailed occupancy -related requirements will be addressed when complete building plans are
submitted.
4. Provide a 1:200 scale drawing of subdivision.
5. The owner and/or their representative shall meet with the Inspections Division as soon as
possible to discuss plan review and permit procedures.
Fire Marshal
1. Provide a three-foot clear space around fire hydrants.
2. Yellow -painted curb and "No Parking Fire Lane" signs will be required. Applicant shall
contact Fire Marshal for specific locations.
3. No P.I.V. (post indicator valve) will be required.
Planning Commission •
Villages on the Ponds 11`s Addition/Chanhassen Specialty Grocery
Planning Case 2015-17
July 7, 2015
Page 22 of 23
Natural Resource Specialist
1. The interior width of all islands must be a minimum of 10 feet.
2. A total of 13 trees must be planted within the vehicular use area
Plannine:
1. The applicant shall enter into a site plan agreement with the City and provide the necessary
security to guarantee erosion control, site restoration and landscaping.
2. The street/sidewalk lights along Main Street have to be preserved and operational when the
site construction is completed.
3. Approval of the site plan is contingent upon withdrawal of Planning Case 2014-29, approval
of the Planned Unit Development amendment and Subdivision.
4. The light poles may not exceed 20 feet in height.
5. All Wall Packs (WPI) shall be replaced with Wall Packs (WP2).
Water Resources
1. The Surface Water Pollution Prevention Plan with all elements required by the NPDES
Construction Permit shall be prepared and supplied to the city for approval prior to any earth -
disturbing activities.
2. Proof of the NPDES Construction Permit having been procured by the applicant shall be
supplied to the city prior to any earth -disturbing activities.
3. A dewatering plan, specific to the existing pond, shall be prepared and submitted to the city
for review and approval prior to any earth -disturbing activities.
4. Areas immediately tributary to the pervious pavement, including disturbed areas behind the
back of curb, must be stabilized within 24 hours of construction of the pervious pavement
areas.
PLANNED UNIT DEVELOPMENT AMENDMENT
"The Planning Commission recommends the City Council approve the Planned Unit
Development amendment in the attached ordinance for Villages on the Ponds to allow signs to
be placed higher than 20 feet within Sector I, and for the size of letters to be increased to 48
inches along the west and north elevations as shown below (amendments are shown in bold
and highlighted inyellow), and including the attached Findings of Fact and Recommendation:
0 0
Planning Commission
Villages on the Ponds 11's Addition/Chanhassen Specialty Grocery
Planning Case 2015-17
July 7, 2015
Page 26 of 26
Wall Signs
The location of letters and logos shall be restricted to the approved building sign bands, the
tops of which shall not extend greater than 20 feet above the ground. In Sectors I and II,
sign height may be increase based on the criteria that the signage is compatible with and
complementary to the building architecture and design. The letters and logos shall be
restricted to a maximum of 30 inches in height except along the north and west elevations for
buildings within sectors I and H. These letters may be increased to 48 inches. All
individual letters and logos comprising each sign shall be constructed of wood, metal, or
translucent facing.
2. If illuminated, individual dimensional letters and logos comprising each sign may be any of
the following:
a. Exposed neon/fiber optic,
b. Open channel with exposed neon,
c. Channel Letters with acrylic facing,
d. Reverse channel letters (halo lighted), or
e. Externally illuminated by separate lighting source.
3. Tenant signage shall consist of store identification only. Copy is restricted to the tenant's
proper name and major product or service offered. Corporate logos, emblems and similar
identifying devices are permitted provided they are confined within the signage band and do
not occupy more than 15% of the sign area unless the logo is the sign.
4. Within Sectors I and II, architecturally, building -integrated panel tenanvlogo sign may be
permitted based on criteria that the signage is compatible with and complementary to the
building design and architecture. Architectural elements specifically created to increase
signage height are prohibited.
5. Backlit awnings are prohibited.,'
ATTACHMENTS
1. Findings of Fact and Recommendation.
2. PUD Ordinance Amendment.
3. Development Review Application.
4. Project Narrative dated Received June 18, 2015.
5. Reduced copies of Final Plat, Civil and Architectural plans dated Received June 18, 2015.
6. Letter from Soloman Real Estate Group dated June 29, 2015.
7. Email from Ed Vigil dated July 1, 2015.
8. Email from Mika Milovancev dated June 26, 2015
9. Email from Randy Rauwerdink dated July 1, 2015.
10. Letter from Julie Roettger, Houlihan's Restaurant dated July 2, 2015
11. Email from Matt Mayben, General Manager, Americlnn Hotel & Suites
12. Public Hearing Notice and Affidavit of Mailing List.
Wplao\2015 planning cases\2015-17 Chanhassen specialty retail/staff report specialty retail.doc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
FINDINGS OF FACT
AND RECOMMENDATION
IN RE:
Application of Venture Pass Partners, LLC and Northcott Company for Subdivision, Site Plan
and Planned Unit Development Amendment approval.
On July 7, 2015, the Chanhassen Planning Commission met at its regularly scheduled meeting to
consider the application of Venture Pass Partners, LLC and Northcott Company for preliminary
plat, Planned Unit Development Amendment and site plan approval for the construction of a
19,909 square -foot specialty retail building. The Planning Commission conducted a public
hearing on the proposed subdivision preceded by published and mailed notice. The Planning
Commission heard testimony from all interested persons wishing to speak and now makes the
following:
FINDINGS OF FACT
1. The property is currently zoned Planned Unit Development, PUD.
2. The property is guided in the Land Use Plan as Mixed Use.
3. The legal description of the property is: Outlot B, Villages on the Ponds Fourth Addition.
4. The Subdivision Ordinance directs the Planning Commission to consider seven possible
adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding
them are:
a. The proposed subdivision is consistent with the zoning ordinance and meets the standards
of the Village on the Ponds Planned Unit Development;
b. The proposed subdivision is consistent with all applicable city, county and regional plans
including but not limited to the city's comprehensive plan since the site is guided for mixed
use development which includes commercial or multi -family residential;
c. The physical characteristics of the site, including but not limited to topography, soils,
vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water
drainage are suitable for the proposed development;
d. The proposed subdivision makes adequate provision for water supply, storm drainage,
sewage disposal, streets, erosion control and all other improvements required by this
chapter;
e. The proposed subdivision will not cause environmental damage;
0
f. The proposed subdivision will not conflict with easements of mord; and
g. The proposed subdivision is not premature since adequate infrastructure is available. A
subdivision is premature if any of the following exists:
1) Lack of adequate storm water drainage.
2) Lack of adequate roads.
3) Lack of adequate sanitary sewer systems.
4) Lack of adequate off-site public improvements or support systems.
5. Site Plan. In evaluating a site plan and building plan, the city shall consider the
development's compliance with the following:
a) The proposed project is consistent with the elements and objectives of the city's
development guides, including the comprehensive plan, official road mapping, and other
plans that may be adopted;
b) The proposed project is consistent with the Site Plan Review requirements of City Code;
C) The proposed project preserves the site in its natural state to the extent practicable by
minimizing tree and soil removal and designing grade changes to be in keeping with the
general appearance of the neighboring developed or developing areas;
d) The proposed project creates a harmonious relationship of building and open space with
natural site features and with existing and future buildings having a visual relationship to
the development;
e) The proposed project creates a functional and harmonious design for structures and site
features, with special attention to the following:
1. An internal sense of order for the buildings and use on the site and provision of a
desirable environment for occupants, visitors and general community,
2. The amount and location of open space and landscaping;
Materials, textures, colors and details of construction as an expression of the design
concept and the compatibility of the same with adjacent and neighboring structures
and uses; and
4. Vehicular and pedestrian circulation, including walkways, interior drives and parking
in terms of location and number of access points to the public streets, width of interior
drives and access points, general interior circulation, separation of pedestrian and
vehicular traffic and arrangement and amount of parking.
f) The proposed project protects adjacent and neighboring properties through reasonable
provision for surface water drainage, sound and sight buffers, preservation of views, light
2
0 0
and air and those aspects of design not adequately covered by other regulations which
may have substantial effects on neighboring land uses.
6. The Zoning Ordinance directs the Planning Commission to consider six (6) possible adverse
effects of the proposed amendment. The six (6) effects and our findings regarding them are:
a) The proposed action has been considered in relation to the specific policies and
provisions of and has been found to be consistent with the official City Comprehensive
Plan.
Fines: The site is guided mixed use (residential and neighborhood commercial). A
retail building is a reasonable use in that location.
b) The proposed use is or will be compatible with the present and future land uses of the
area.
FindlnP: The proposed use is and will be compatible with the present and future land
uses of the area through the implementation of the design standards, landscaping,
architecture, etc.
c) The proposed use conforms with all performance standards contained in the Zoning
Ordinance.
Finding: The proposed use will conform with all performance standards contained in the
Zoning Ordinance such as design standards, signage, durable materials, uses, etc.
d) The proposed use will not tend to or actually depreciate the area in which it is proposed.
Finding: The proposed use is intended to meet the daily needs of the area. It could
potentially add convenience to the homeowners in the area.
e) The proposed use can be accommodated with existing public services and will not
overburden the city's service capacity.
Finding: The site is located within the Municipal Urban Service Area. The proposed use
can be accommodated with existing public services and will not overburden the city's
service capacity.
f) Traffic generation by the proposed use is within capabilities of streets serving the
property.
FIndin : Based upon traffic studies conducted by the applicant's traffic engineer, traffic
generation by the proposed use is within capabilities of streets serving the property.
6. The planning report #2015-17 dated July 7, 2015, prepared by Sharmeen A]-Jaff, et al, is
incorporated herein.
RECOMMENDATION
The Planning Commission recommends that the City Council approve the Preliminary
Plat (Villages on the Ponds 111 Addition) and site plan with a variance for Chanhassen Specialty
Retail (Total Wine & More).
ADOPTED by the Chanhassen Planning Commission this 7'" day of July, 2015.
CHANHASSEN PLANNING COMMISSION
DIV
Its Chairman
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
ORDINANCE NO.
AN ORDINANCE AMENDING CHAPTER 20 OF THE
CHANHASSEN CITY CODE, THE CITY'S ZONING ORDINANCE,
BY AMENDING A PLANNED UNIT DEVELOPMENT
THE CITY COUNCIL OF THE CITY OF CHANHASSEN ORDAINS:
Section 1. Chapter 20 of the Chanhassen City Code, the City's zoning ordinance, is hereby
amended by amending the Villages on the Ponds Planned Unit Development Design Standards in
its entirety as follows:
VILLAGES ON THE PONDS
DEVELOPMENT DESIGN STANDARDS
a. Intent
The purpose of this zone is to create a mixed use PUD consisting of commercial, institutional,
office, and residential uses. The use of the PUD zone is to allow for more flexible design
standards while creating a higher quality and more sensitive proposal. All utilities are required to
be placed underground. Each lot proposed for development shall proceed through site plan
review based on the development standards outlined below. The Central Business District
regulations shall apply except as modified by this ordinance.
b. Permitted Uses
The permitted uses in this zone should be limited to uses as defined below or similar uses to
those as listed in the Standard Industrial Classification. If there is a question as to the whether or
not a use meets the definition, the Planning Director shall make that interpretation. No single
retail user shall exceed 20,000 square feet on a single level of a building. A maximum of thirty-
three (33) percent of the square footage of the retail users within the development may be of a
"big box" category. The intent of this requirement is to provide a variety of users, including
small retail shops, service providers, coffee shops, cabarets, etc., for residents of the Villages as
well as the community as a whole, rather than typical suburban type large, individual users
dominating the development and detracting from the "village" character. Retail users should be
those that support and compliment the residential development located within the development,
providing goods and services which enhance residents of the village and the community.
Office. Professional and business office, non -retail activity except for showroom type
display area for products stored or manufactured on-site provided that no more than 20
percent of the floor space is used for such display and sales.
bank/credit union
0
0
finance, insurance and real estate
health services - except nursing homes and hospitals
engineering, accounting, research management and related services
legal services
Personal Services. Establishments primarily engaged in providing services involving the
care of a person or his or her personal goods or apparel.
dry cleaning
beauty or barbershop
shoe repair
photographic studio
tax return preparation
laundromat
health club
optical goods
computer services
day care center
copying
mail stores
Institutional. Establishments that are public/semi-public in nature.
church
library
education services
day care
art gallery
dance studio
cultural facility
Commercial/Retail. Establishments engaged in commercial operations including retail sales
and services and hospitality industries.
Apparel and Accessory Stores
shoe stores
electronic and music store and musical instruments
restaurant — no drive through, except on Lot 1, Block 1, Villages on the Ponds 2' Addition
through a conditional use permit and compliance with the following standards - the drive
through shall provide sufficient stacking to assure that traffic is not backed into the
parking lot drive aisles; loud speakers used for ordering shall be shielded so that noise is
not heard off-site, and the drive through shall be screened from off-site views. (amended
8/13/01)
restaurant - fast food only if integrated into a building
no freestanding fast food and no drive through
drug store/pharmacy
PA
r
book/stationary
jewelry store
hobby/toy game
gift novelty and souvenir
sewing, needlework and piece good
florist
camera and photographic supply
art and art supplies, gallery
sporting goods
video rental
food stores including bakery and confectionery
hardware store
computer store
hotel/motel
entertainment
liquor store
pets and pet supplies
home furnishings
0
Residential. Residential units shall be provided as upper level units above the
commercial/office uses within the village core and as stand alone units. A minimum of 50
percent of the residential units shall be rental units. Of the rental units, the city has adopted
a goal of 35 percent of the units meeting the Metropolitan Council's affordable criteria. Foi
the ownership housing, the city has adopted the goal of 50 percent of the units meeting the
Metropolitan Council's affordable criteria
Prohibited Uses:
Auto related including auto sales, auto repair, gas stations
c. Setbacks
In the PUD standards, there is the requirement for landscape buffering in addition to building and
parking setbacks.
The following setbacks shall apply:
0
0
Buffer yards are as specified in the City of Chanhassen Landscaping and Tree Removal
Ordinance, Article XXV.
No fences shall be permitted between the required landscape buffer and arterial and collector
roads.
d. Development Site Coverage and Building Height
The PUD standard for hard surface coverage is 70% for the overall development.
Individual lots may exceed this threshold, but in no case shall the average exceed 70
percent.
2. More than one (1) principal structure may be placed on one (1) platted lot.
The maximum building height shall be Sector I - four
stories (residential with street level commercial or
office)/50 ft. (retail and office buildings without
residences above shall be limited to three stories/40 ft.)
except for the lot on the comer of Promenade Pond and
Great Plains Boulevard shall be limited to two stories and
30 feet, Sector H - three stories/40 ft., Sector III - three
stories/40 ft., and Sector IV - four stories/50 feet.
Building height limitations are exclusive of steeples,
towers, and other architectural and roof accents.
(Amended 11/26/01)
4. The maximum building footprint for any one building
shall be limited to 20,000 square feet without a street
level break in the continuity of the building, e.g.,
pedestrian passageways, except for the church and
residential only buildings.
4
VILLAGES ON THE PONDS
Sectors
Building
Parking
Great Plains Blvd.: Buffer yard & Setback
C, 0'
0'
Market Blvd.: Buffer yard & Setback
C, 50'
20'
Highway 5: Buffer yard & Setback
B, 50'
20'
Interior Side Lot Line: Buffer yard & setback
NA, 0'
0'
East Perimeter Side Lot Line (adjacent to residential): Buffer yard &
setback
D, 50'
S0'
West Perimeter Side Lot Line (adjacent to industrial): Buffer yard &
setback
B, 50
20
Buffer yards are as specified in the City of Chanhassen Landscaping and Tree Removal
Ordinance, Article XXV.
No fences shall be permitted between the required landscape buffer and arterial and collector
roads.
d. Development Site Coverage and Building Height
The PUD standard for hard surface coverage is 70% for the overall development.
Individual lots may exceed this threshold, but in no case shall the average exceed 70
percent.
2. More than one (1) principal structure may be placed on one (1) platted lot.
The maximum building height shall be Sector I - four
stories (residential with street level commercial or
office)/50 ft. (retail and office buildings without
residences above shall be limited to three stories/40 ft.)
except for the lot on the comer of Promenade Pond and
Great Plains Boulevard shall be limited to two stories and
30 feet, Sector H - three stories/40 ft., Sector III - three
stories/40 ft., and Sector IV - four stories/50 feet.
Building height limitations are exclusive of steeples,
towers, and other architectural and roof accents.
(Amended 11/26/01)
4. The maximum building footprint for any one building
shall be limited to 20,000 square feet without a street
level break in the continuity of the building, e.g.,
pedestrian passageways, except for the church and
residential only buildings.
4
VILLAGES ON THE PONDS
Sectors
0
E
5. The following table shall govern the amount of building area for the different uses:
Commercial/
Retails
Office/Service
s
Institutional
s
Dwelling
Units
TOTAL sf
Sector I 114,500
83,500
0
160
198,000
Sector II *60,000
14,000
0
0
74,000
Sector III 0
0
100,000
0
100,000
Sector IV 0
0
0
162
0
TOTAL 174,500
97,500
100,000
322
372,000
(amended 11/26/01)
* Includes 47,200square-foot, 106 -unit motel
Building square footages may be reallocated between sectors and between uses subject to
approval by the Planning Director. The following factors shall be used in calculating the
reallocation of building square footages between uses:
1 Residential apartment unit = 3 congregate care (assisted living or dementia) unit.
1 Residential apartment unit = 2 elderly (independent) unit.
1 Residential apartment unit = 360 square feet of office/service.
1 Residential apartment unit = 90 square feet of retail.
1 Residential apartment unit = 440 square feet of institutional.
950 square feet of office/service = 1,000 square feet of institutional.
300 square feet of retail = 1,000 square feet of office/service.
290 square feet of retail = 1,000 square feet of institutional. (amended 11/26/01)
In no instance shall addition institutional building square footage be reallocated without
an amendment to the PUD.
6. Buildings adjacent to pedestrian sidewalks must have commercial/office on the majority
of the street frontage. (amended 11/26/01)
e. Building Materials and Design
The PUD requires that the development demonstrate a higher quality of architectural
standards and site design. The intent is to create a pedestrian friendly, "traditional'
village character consistent with the European heritage of the upper midwest and the
atmosphere within this development, yet with the amenities and technological tools of
modern times. The village elevations shown on the PUD drawings are to be used only as
a general guideline and the reflection of the overall village image including the north -
midwestern architectural vocabulary, village like human scale and flavor, and variety in
design and facade treatment.
2. All materials shall be of high quality and durable. Major exterior surfaces of all walls shall
be face brick, stone, glass, stucco, architecturally treated concrete, cast in place panels,
decorative block, cedar siding, vinyl siding in residential with support materials, or
approved equivalent as determined by the city. Color shall be introduced through colored
block or panels and not painted block or brick. Bright, long, continuous bands are
5
0 0
prohibited. Bright or brilliant colors and sharply contrasting colors may be used only for
accent purposes and shall not exceed 10 percent of a wall area.
3. Block shall have a weathered face or be polished, fluted, or broken face. Exposed cement
("cinder") blocks shall be prohibited.
4. Metal siding, gray concrete, curtain walls and similar materials will not be approved except
as support material to one of the above materials, or as trim or as HVAC screen, and may
not exceed more than 25 percent of a wall area.
5. All accessory structures shall be designed to be compatible with the primary structure.
6. All roof mounted equipment shall be screened by walls of compatible appearing material.
Wood screen fences are prohibited. All exterior process machinery, tanks, etc., are to be
fully screened by compatible materials. All mechanical equipment shall be screened with
material compatible to the building.
The buildings shall have varied and interesting detailing. The use of large unadorned,
concrete panels and concrete block, or a solid wall unrelieved by architectural detailing,
such as change in materials, change in color, fenestrations, or other significant visual
relief provided in a manner or at intervals in keeping with the size, mass, and scale of the
wall and its views from public ways shall be prohibited. Acceptable materials will
incorporate textured surfaces, exposed aggregate and/or other patterning. All walls shall
be given added architectural interest through building design or appropriate landscaping.
8. Space for recycling shall be provided in the interior of all principal or accessory
structures.
9. There shall not be underdeveloped backsides of buildings. All elevations shall receive
nearly equal treatment and visual qualities.
10. The materials and colors used for each building shall be selected in context with the
adjacent building and provide for a harmonious integration with them. Extreme
variations between buildings on the same street in terms of overall appearance, bulk and
height, setbacks and colors shall be prohibited.
11. Slope roof elements shall be incorporated in all structures: Sector I - minimum 70
percent of roof area shall be sloped, Sector H - minimum of 70 percent of the roof area
shall be sloped, Sector III - minimum of 30 percent of the roof area shall be sloped, and
Sector IV - minimum of 70 percent of the roof area shall be sloped. An exception to this
requirement are roof areas designed for human use such as decks, garden areas, patios,
etc., which will not be counted towards flat roof area
12. The following design elements should be incorporated into individual structures:
R
0
Building Accents
Towers, silos, arches, columns, bosses, tiling, cloisters, colonnades, buttresses, loggias,
marquees, minarets, portals, reveals, quoins, clerestories, pilasters.
Barrow, dome, gable, hip, flat.
Roof Accents
Cupolas, cornices, belfries, turrets, pinnacles, look -outs, gargoyles, parapets, lanterns.
Accent elements such as towers, turrets, spires, etc., shall be excluded from the sector
building height limitation.
Window Tvoes
Bay, single paned, multi -paned, angular, square, rectangular, half -round, round, italianate.
Window Accents
Plant boxes, shutters, balconies, decks, grates, canopies, awnings, recesses, embrasures,
arches, lunettes.
Street level windows shall be provided for a minimum of 50 percent of the ground level
wall area.
f. Site Landscaping and Screening
1. All buffer landscaping, including boulevard landscaping, included in Phase I shall be
installed when the grading of the phase is completed. This may well result in landscaping
being required ahead of individual site plan approvals, but we believe the buffer yard and
boulevard plantings, in particular, need to be established immediately. In addition, to
adhere to the higher quality of development as spelled out in the PUD zone, all loading
areas shall be screened. Each lot for development shall submit a separate landscaping
plan as a part of the site plan review process.
2. All open spaces and non -parking lot surfaces, except for plaza areas, shall be landscaped,
rockscaped, or covered with plantings and/or lawn material. Tree wells shall be included
in pedestrian areas and plazas.
3. Storage of material outdoors is prohibited.
4. Undulating or angular berms 3' to Tin height, south of Highway 5 and along Market
Boulevard shall be sodded or seeded at the conclusion of grading and utility construction.
The required buffer landscaping may be installed where it is deemed necessary to screen any
proposed development. All required boulevard landscaping shall be sodded.
0
0
5. Loading areas shall be screened from public right-of-ways. Wing walls may be required
where deemed appropriate.
6. Native species shall be incorporated into site landscaping, whenever possible.
g. Signage
One project identification sign shall be permitted for the development at each end of Lake
Drive and at the south end of Main Street. Project identification sign(s) may also be
located at the entrances to the development(s) in Sector IV. Project identification signs
shall not exceed 24 square feet in sign display area nor be greater than five feet in height.
One project identification sign, with a maximum height of 20 feet, which may be
increased in height subject to city approval based on the design and scale of the sign,
designed as a gateway to the project shall be located at the north end of Main Street.
Individual lots are not permitted low profile ground business sign. Within Sector III, one
sign for the church and one sign for the school may be placed on streetscape walls. The
top of the signs shall not extend more than eight feet above the ground and the total sign
area for the signs shall not exceed 64 square feet. Pylon signs are prohibited. The sign
treatment is an element of the architecture and thus should reflect the quality of the
development. The signs should be consistent in color, size, and material and height
throughout the development. A common theme will be introduced at the development's
entrance monument and will be used throughout.
2. All signs require a separate sign permit.
Wall business signs shall comply with the city's sign ordinance for the central business
district for determination of maximum sign area. Wall signs may be permitted on the
"street" front and primary parking lot front of each building.
4. Projecting signs are permitted along Main Street and Lake Drive and along pedestrian
passageways subject to the conditions below.
Signage Plan and Restrictions
Wall Sims
The location of letters and logos shall be restricted to the approved building sign bands, the
tops of which shall not extend greater than 20 feet above the ground. In Sector I and II, sign
height may be increase based on the criteria that the signage is compatible with and
complementary to the building architecture and design. The letters and logos shall be
restricted to a maximum of 30 inches in height except along the north and west elevations for
buildings within sectors I and H. These letters may be increased to 48 inches. All
individual letters and logos comprising each sign shall be constructed of wood, metal, or
translucent facing.
0 0
2. If illuminated, individual dimensional letters and logos comprising each sign may be any of
the following:
a. Exposed neon/fiber optic,
b. Open channel with exposed neon,
c. Channel Letters with acrylic facing,
d. Reverse channel letters (halo lighted), or
e. Externally illuminated by separate lighting source.
Tenant signage shall consist of store identification only. Copy is restricted to the tenant's
proper name and major product or service offered. Corporate logos, emblems and similar
identifying devices are permitted provided they are confined within the signage band and do
not occupy more than 15% of the sign area unless the logo is the sign.
4. Within Sectors I and II, architecturally, building -integrated panel tenant/logo sign may be
permitted based on criteria that the signage is compatible with and complementary to the
building design and architecture. Architectural elements specifically created to increase
signage height are prohibited.
5. Backlit awnings are prohibited.
Proiectin Sims
isms
1. The letters and logos shall be restricted to the approved building sign area.
2. All wooden signs shall be sandblasted and letters shall be an integral part of the building's
architecture.
Signage shall consist of store identification only. Copy is restricted to the tenant's proper
name and major product or service offered and such minimal messages such as date of
establishment of business. Corporate logos, emblems and similar identifying devices are
permitted provided they are confined within the signage band or within the projecting sign
and do not occupy more than fifteen (15) percent of the sign display area.
4. Projecting signs shall be stationary, may not be self -illuminated but maybe lighted by surface
mounted fixtures located on the sign or the adjacent facade.
5. Projecting signs shall be limited to one per tenant on street frontage and pedestrian
Passageway and my not exceed six square feet. Letters shall have a maximum height of 12
inches.
6. Projecting signs shall be a minimum of eight feet above the sidewalk and shall not project
more than six feet from the building facade.
7. Plastic, plexi -glass, clear plex, or similar material projecting signs are prohibited unless used
in conjunction with other decorative materials.
0 0
8. Projecting signs may be painted, prefinished, or utilize exposed metal. Any exposed metal
shall be anodized aluminum, stainless steel, titanium, bronze, or other similar non -corrosive
or ono -oxidizing materials.
Window Signs
Window signs shall not cover more than 25 percent of the window area in which they are
located.
2. Window signs shall not use bright, garish, or neon paint, tape, chalk, or paper.
Menu Signs
1. Shall be located at eye level adjacent to tenant entries and shall not exceed 4 feet in height.
2. Shall be used only to convey daily specials, menus and offerings and shall be wood framed
chalkboard and/or electronic board with temporary handwritten lettering. No paper
construction or messages will be permitted.
3. Menu signs shall be limited to one per tenant and may not exceed 8 square feet.
Festive Flags/Banners
1. Flags and banners shall be permitted on approved standards attached to the building facade
and on standards attached to pedestrian area lighting.
2. Plastic flags and banners are prohibited.
3. Flags and banners shall be constructed of fabric.
4. Banners shall not contain advertising for individual users, businesses, services, or products.
5. Flags and banners shall project from buildings a maximum of two feet.
6. Flags and banners shall have a maximum area of 10 square feet.
Flags and banners which are torn or excessively worn shall be removed at the request of the
city.
Building Directo
In multi -tenant buildings, one building directory sign may be permitted. The directory sign
shall not exceed eight square feet.
10
Pole Directory Sign
1. Pole directory signs consisting of single poles with individual nameplate type directional
arrows may be located within the development.
2. Pole directory sign shall not exceed 15 feet in height.
3. Directory signs shall be a minimum of eight feet above the sidewalk.
4. A maximum of eight directory signs may be provided per pole.
5. The maximum size of an individual sign shall be 18 inches long by four inches wide.
6. Poles shall be a minimum of 10 feet behind the curb.
h. Lighting
Lighting for the interior of the business center should be consistent throughout the
development. The plans do not provide for street lighting. As with previous
developments, the City has required the developer to install street lights throughout the
street system.
2. A shoe box fixture (as specified by City Code) with decorative natural colored pole shall
be used throughout the development parking lot area for lighting. Decorative, pedestrian
scale lighting shall be used in plaza and sidewalk areas and may be used in parking lot
areas.
3. Lighting equipment similar to what is mounted in the public street right-of-ways shall be
used in the private areas.
4. All light fixtures shall be shielded. Light level for site lighting shall be no more than 1/2
candle at the project perimeter property line. This does not apply to street lighting.
5. Light poles shall be limited to a height of 20 feet.
6. Lighting for parking areas shall minimize the use of lights on pole standards in the parking
area. Rather, emphasis should be placed on building lights and poles located in close
proximity to buildings.
i. Parking
1. Parking shall be provided based on the shared use of surface parking areas whenever
possible. Cross access easements and the joint use of parking facilities shall be protected
by a recorded instrument acceptable to the city.
2. A minimum of 75 percent of a building's parking shall be located to the "rear" of the
structure and in underground garages.
11
11
0
The development shall be treated as a integrated shopping center and provide a minimum
of one space per 200 square feet of commercial/retail area. The office/personal service
component shall be treated as an integrated office building and provide 4.5 space per
1,000 square feet for the first 49,999 square feet, four per thousand square feet for the
second 50,000 square feet, and 3.5 per thousand square feet thereafter. Residential uses
shall provide 1.5 spaces per unit as underground parking with visitor spaces provided as
part of the commercial/office uses. Within sector IV, visitor parking shall be provided at
a rate of 0.5 stalls per unit. Hotel/motels shall comply with city ordinance.
Churches/schools shall comply with city ordinance, however, a minimum of 50 percent of
the parking shall be shared.
12
COMMUNITY DEVELOPMENT DEMIRTMENT
Planning Division — 7700 Market Boulevard
Mailing Address — P.O. Box 147, Chanhassen, MN 55317
Phone: (952) 227-1300 / Fax: (952) 227-1110
0 CITY OF CHANgASSEN
APPLICATION FOR DEVELOPMENT REVIEW
Date Filec! � J — L � 60 -Day Review Deadline:4— _ Planner: S A Case #:cal rj _ l�%
Section 1: Application Typeapply)
❑ Comprehensive Plan Amendment ......................... $600
❑ Minor MUSA line for failing on-site sewers..... $100
❑ Conditional Use Permit
❑ Single -Family Residence ................................ $325
❑ All Others......................................................... $425
❑ Interim Use Permit
❑ In conjunction with Single -Family Residence.. $325
❑ All Others......................................................... $425
❑ Rezoning
❑ Planned Unit Development (PUD) .................. $750
❑ Minor Amendment to existing PUD ................. $100
❑ All Others......................................................... $500
❑ Sign Plan Review ................................................... $150
[D $ite Plan Review
❑ Administrative.................................................. $100
❑� Commercial/Industrial Districts*....................g
Plus $10 per 1,000 square feet of building ar
Include number of existing employees:
and number of new employees:
❑ Residential Districts ......................................... $500
Plus $5 per dwelling unit
❑
Subdivision
❑v Create 3 lots or less ..........................
3
❑ Create over 3 lots.......................$600 + $15
per lot
❑ Metes & Bounds .........................$300 + $50
per lot
❑ Consolidate Lots..............................................$150
❑ Lot Line Adjustment........................................$15
❑� Final Plat* ........... ....
EO
'Requires add@iona 0 crow for attorney costs.
(2
Escrow will be requir r other applications through the
development contract.
❑
Vacation of Easements/Right-of-way...................
$300
(Additional recording fees may apply)
Variance.............................................................
_
$200
❑
Wetland Alteration Permit
❑ Single -Family Residence... ............................
$150
❑ All Others .......................................................
$275
❑
Zoning Appeal ......................................................
$100
❑
Zoning Ordinance Amendment ............................
$500
NOTE: When multiple applications are processed concurrently,
the
appropriate fee shall be charged for each application.
(Refer to the appropriate Application Checklist for required submittal
information that must accompany this application)
ADDITIONAL REQUIRED FEES:
❑v Notification Sign .................. TOTAL FEES: $ b�3 a 3• ��
........................
(city to install and remove)
❑ Property Owners' List within 500' ........ $3 per address Received from\� Y "f[iLlvvrll�
(City to generate — fee determined at pre -application meeting)
❑✓ Escrow for Recording Documents.. $50 per documen Date Received: % 15 Check Number: 819c)
(CUP/SPRNACNAR/WAP/Metes & Bounds Subdivision) ,.
Project Name: Chanhassen Specialty Retail
Property Address or Location: Outlot B, VILLAGES ON THE PONDS, 4th ADDITION
Parcel #: 258460030
Total Acreage: 2.71
Present Zoning: PUD
Legal Description: Outlot B, VILLAGES ON THE PONDS, 4TH ADDITION
Wetlands Present?
Present Land Use Designation: PUD/Retail
Existing Use of Property: Vacant Land
❑ Yes ® No
Requested Zoning: Existing, PUD
Requested Land Use Designation. Retail
Description of Proposal: 19,909 sf specialty retail.
Platting outlot underlying the Pond Promenade private road areas.
0 Check box if separate narrative is attached
SCANNED
Section 3: Property Owner and Applicant Information
APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained
authorization from the property owner to file this application. I agree to be bound by conditions of approval, subject only to
the right to object at the hearings on the application or during the appeal period. If this application has not been signed by
the property owner, I have attached separate documentation of full legal capacity to file the application. This application
should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this
application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I
further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to
any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct.
Name: Venture Pass Partners, LLC (or assigns) Contact: Randy Rauwerdink
Address: 19620 Waterford Court Phone: (612) 801-4313
City/State/Zip: Shorewood, MN 55331 Cell: (612) 801-4313
Email: rrauwerdink@venturepass.net Fax:
Signature: Date: 6/5/15
PROPERTY OWNER: In signing this application, I, as property owner, have full legal capacity to, and hereby do,
authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those
conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of
the deadlines for submission of material and the progress of this application. I further understand that additional fees may
be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the
study. I certify that the information and exhibits submitted are true and correct.
Name: Northcott Company Contact: Brian Schwen
Address: 250 Lake Drive East Phone: (952) 294-5215
City/State/Zip: Chanhassen, M"317,, Cell:
Email: bschwnorthcotth ital' om Fax:
Signature: t- Date: 6/5/15
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all
information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the
appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and
applicable procedural requirements.
A determination of completeness of the application shall be made within 15 business days of application submittal. A
written notice of application deficiencies shall be mailed to the applicant within 15 business days of application.
PROJECT ENGINEER (if applicable)
Name: Sambatek
Address: 12800 Whitewater Drive Suite 300
City/State/Zip: Minnetonka, MN 55343
Email: MBultman@sambatek.com
Contact: Mike Bultman
Phone: (763) 398-0867
Cell:
Fax :(763)476-8532
SCANNED
Section 4 Notification
Information
Who should receive copies
of staff reports?
'Other Contact Information:
❑
❑�
Z
Z
Property Owner
Applicant
Engineer
Other'
Via:
Via:
Via:
Via:
❑�
0
El
❑
Email
Email
Email
Email
❑ Mailed Paper Copy
❑ Mailed Paper Copy
❑ Mailed Paper Copy
❑ Mailed Paper Copy
Name: Andy Kmnik-Tushle Montgomery ArcMreots
Address:
City/State/Zip:
Email: AndyK@b armdR s.=n
SCANNED
PROPOSED DEVELOPMENT-OUTLOT B VILLAGES ON THE PONDS 4 ADDN
PROJECT SUMMARY NARRATIVE
Introduction
Venture Pass Partners, LLC is pleased to submit for consideration and approval, the attached
applications for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B, VILLAGES ON THE
PONDS 4TMADDITION. We are proposing to subdivide and plat this parcel into Lot 1 retail development
consisting of a 19,909 sf specialty retail store, as well as Outlot A which will contain the Pond
Promenade Road improvements. Sidewalk construction and improvements are proposed along the full
perimeter extents of Pond Promenade Road and Main Street as part of the improvements, enhancing
the pedestrian friendly character of the project. Benches and bike racks are also being incorporated to
further promote the pedestrian character.
Architecture and Design
The 19,909 sf single story building will be detailed with a varied pallet of warm toned materials for the
building exterior. Materials consist of pigmented rock face and burnished masonry, brick, EIFS cornices,
standing seam metal roofing, aluminum windows, and fabric awnings.
Accommodation for the 70% sloped roof coverage requirement is accomplished through the use of
sloped metal roofing at portions of all four elevations and feature corner towers rising above the sloped
areas to provide a visual break in the sloped areas. The main entrance on the west elevation projects
out to form a covered area over the entry and also provides a sloped metal hip roof. Additional use of
projecting fabric awnings and metal awnings and sculpted EIFS cornices provide increased relief within
the building facade.
The 50% building fenestration requirement is accomplished with an interplay of massing, color, and
material detailing at each elevation. The use of large windows, sloped metal roofing, sculpted EIFS
cornices, and fabric awnings provide a pedestrian scale and architectural detailing to each elevation.
Windows at some locations, as governed by the Tenant's store layout, may be spandrel or translucent
glass highlighted with awnings. The exterior of the building is further enhanced with an emphasis to
natural plant materials using a green screen climbing landscape element at the east elevation (Main
Street) and extensive use of plantings varied in height along the north, east, and south elevations. The
outdoor trash storage and loading area is also screened by use of plant materials. Articulation of the
south wall elevation is also accomplished with the natural building steps resulting from the receiving
appendage and with the added layering and screening provided by the freestanding trash enclosure
with an architectural trellis detail.
Tenant signage will be integrally lit channel letters and will occur on all four building elevations as
allowed by city ordinance, and will be compliant with all allowable area requirements.
Stormwater Design
One of the unique challenges of this project is meeting the stringent requirements of Riley -Purgatory
Bluff -Creek Watershed District (RPBCWD), and specifically the standards which just became effective
January 1, 2015. This is further complicated by the existence of primarily group type D soils that are
pervasive across this site. Stormwater rate, water quality and abstraction requirements are being
satisfied via the construction of an underground stormwater infiltration system. Extensive areas of the
parking lot are to be surfaced with pervious pavers over a draintile and rock infiltration basin system.
CITY OF CHANHASSEV
RECEIVED
JUN -I n 2015
CHANHASSEN PLANNING DEPT
SCANNED
CHANHASSEN SPECIALTY
RETAIL
VILLAGE ON THE PONDS
LAKE DRIVE & MAIN STREET
CHANHASSEN, MINNESOTA
�won'�.ovor
.awarvw,..smw
.Ic.,rm rKm.,x.e,
:rwcer"ora`
a.Knna
m .iarK
M &rYrlrM
mou �
gun
r vl»�ienirrcw
.00K.a.
PROJECT TEAM
ON[tORR
�HITUR[ IAb �MRNW. LLC.
ARCM"=,
!W"IIA Kr9KI.Kfs
uM4Ml. WIeb,� . IK KId KI.K.Y
v,Npsnre uvalrtea,
iV WNIONiCO ARCNTEM
ONL NO
Cf
.0T I..
a e
_
sareme.ueoru+u+r
mV
mnKi
�"`
� KRMI
muc
+Ivi.Kruerllur�r„
wMA,�r
„KM
rLLrr
:,vrarolrr
w
.Karoo
:ee�rc Kpu"`
w
.mlcv
u
uPR
�won'�.ovor
.awarvw,..smw
.Ic.,rm rKm.,x.e,
:rwcer"ora`
a.Knna
m .iarK
M &rYrlrM
mou �
gun
r vl»�ienirrcw
.00K.a.
PROJECT TEAM
ON[tORR
�HITUR[ IAb �MRNW. LLC.
ARCM"=,
!W"IIA Kr9KI.Kfs
uM4Ml. WIeb,� . IK KId KI.K.Y
v,Npsnre uvalrtea,
iV WNIONiCO ARCNTEM
ONL NO
N[OUNN t 9e0rRIGt MONM
wu rrbNva wxaam
SIyT�pNE LOCATION
Ito
GENERAL NOTES
PROJECT INFO.
�Oz[LLWLLwC. nu,w
» ...... ....
ftTT—
,.�..
mrA .AKa.
rlwron urr`.:O1xoa
_ KKKaIKrIra,IK"r
C=INNpM710N
wK RNRFrevl'M W L C�v.Rv wm YINM.I'A
M,NCU[l. Alf
mr a�n;m"."wrA .ov
Ire,Ara,..................., Kia..,... Krerwmm
Iv.Kew
Ar.. K,o-»u.w�"KKww ryiaAo.r
.............AK a� AAe
K»wenu�e'e'rm.ron..o-AAu..r Ir.Av..
.Aawr
a""erlm+.l.r I.,AKA..urranAl•..
mr KfY]�NAIAIMY
;eme:�.Au
o„r,..ArK.m
DRAWING INDEX
m
01TY 0FCHANHAS-Er I
RECEIVE')
JUN 18 2015
.., AWMEN PIAN.MNS DFPT
SCANNED
VILLAGES ON THE PONDS 11TH ADDITION
owlx.vNub.MMgbl.ra.amcNvai.ugrvreseNun.u. [vv.rtv.x...r..vw..
uFwwMrregn.evv.WbblMwxm.nxxarur. Nuv...MybaY1l.x.YpWNIV IYx, urriv
an.y N w.ry mnw x exN Ivr.xn
LL[.. r.M.x Y4. W..w.,ry, s.. ximw,vlvnun w <.vw imv pn.m. io s
.YNn...rxvusuw_Nx x�
munr'w
n...sar.�...r�w..xr..�..M_.w. •_.x
wn, n.xN.wxm.xF.xx,.....niN.x.Nw......lw•a
•,uxx,.a,..
.~�.n.x•N.M1 ee
vx.gsMxumiM1�nrywx a..ey..Y:mw nmwvexpw.�n N•.ernviNr,vrtm.an.um.v. uvw.
w. x..urt uemx w f w�.. x.rm u.w r. x.b
nvs�or.
mwna
M r.wa.r.�.�r...w.xr...a...w._•rw.
.N rxur.xrx
•.,�..,. brxx.®. x�..x
�. xxb,.,...1.. mbr.......x.
... x.N.....,,N.x,,.
I....rw"'"'rw�M+4Nw.a.xNN...x�.�.•...e........xl....e..Ne..a...wr. N..a u.—a...
µ..+.. .RR p.. nluua. m. w...rx.. ........
x.NN......rxw.e«
VILLAGES
ON THE:
VILLA.OES ON THE 'r:ihiCci
3RD ADOITiOEd
i VILLAGES
Ohl THE:
VILLAOEEi Oh! T..EE P^fdDS
W ^—
NORTH
i
FILE NO.
PONDS010
_
I
E;i
•x
I
n.
'•• a I
I
ti. I
�
I
I
I
Nl
Ill
/-
T I
`n
t-) I
I
I
In
I
r
I
•x
I
J
111 I
a I
}� I
I
SAMBATEIC INC.
XEFNHIx4. ar.xNING
PNO 0511PVFYING
Z
N
j
!tl
i
-ZO
bd
O0u+
x2
'• Ea77[[ a
aNZ
uN i
NaawDEMOLMONNOTEs
RRA LEGEND
♦ W n r� u .. „uuu
. r Yra_r„anm
EEO DEMOUTM LEGEND
Z7 -7-
2D
MIK
.,.�,...,,.»...,,o... L
e ,e x
v NNARDOUS BUILDING MATERIAL NOTES aa�
IL1
D1�unTREE PROTECiNN WARtl�'�r�
®YrrM.Erx
IR,.�NY,YM
1R6TYW
Y�r,MIR..BIb�
Client
VENTURE PASS
PARTNERS, LLC
�tNj11[,PISS P/IIRBk
Project
CHANH
SPECIALTW
RETAIL
Location
CHANHASSEN,
MN
Certification
n..
Summary
Revision
y� m
Sheet Title I
DEMOLITION
PLAN
Sheet No. Revislol
C2.02
1
Pr0 'ecl N09EN30145
o
I
I
I
I
I
I
I
VILLAGES I
ON THE
PONDS
[n.GCK , I
I
VILLAGES ON THE PONDS
ROTM
LOT t 3RD ADDITION
BLOCK , `r .c_-
VILLAGES
ON THE
PONDS
OUTLOT a
__ i�i�.i
—ocuRlmloN
—T
ce
/h•+
��3
In
[
��1
=CONTACT INFORMATION
_ -PROMENADE------
�•�`.:,.�..
LIE NOTES
,\ - ,T.,W�./r) 1.
v `````\1 / /'J ' wa.••Iw'�,W _ —ill//��/r r\\\ 1
WE DRIVE OUn0EA 8
VJt_.AGes
O`
11 s ON THE PONOS 7TH ADDITION I
,�P, I `
VILLAGES .weir LOT 1
C,BLOCK I
I
mLeOENo _
4M awniH�� Non
VENTURE PASS
PARTNERS, LLC
Project
CHANHA�
RETAIL
CHANHASSEN,
MN
Certification
5^ummary
!eVIElon HI
Sheet Title
PRELIMINARY
PLAT - VILLAGES
ON THE PONDS
11TH ADDITION
CZ_n_,A
IIFDFMD
wum n
n ® �w.v
� ere�n
mmu Q
�DEv�LWMFNT MOIFF
®GMOING NOTES
Sad mei'
Client
VENTURE PASS
PARTNERS, LLC
SMTEW�MM, MX 65111E
&MQF PISS PMIjeR
Project
CHANHA
SPECIAL
RETAIL
Eocauon
CHANHASSEN,
MN
Unification �onp�A
Summary
Revision HiUM
Sheet Title
GRADING PLAN
Sheet No. Revisior
C4.01
Project NO.VF WO 145 0
f\ a
,I
i
" PROMENADE � r
pONO
I
1 \ 1
ST Rip /f/(I
y \�
LAKI DRIW
e IEGEND
�Ny �
nwu.x.n.w..uw
n.wur a.a.e.u.a..0
SB
TS
NERE SEOIENCF W CONSTRICTION
IRR41'xe.iru.wxn[mY.m[n,un
.NOTETOC MaOflx rmxnaarxrarnrmon
EROSION CONTROE MATERIRl50VANNTIES
Y1M Ouxxlin
0�
I
I
I
I
I
I
II,
N111§-
ii+°:
YIANE DRIVE
v� 5
SIT
d r
IT
,
l9
IT
o —2srs Qf rnao
.-III-,_WEw a
TS
�SEQUENCEO CONSTRUCTION
=NOTE To CONTMCrON
ME
Snbafek
mwNEMENEMEN
ME.
Client
VENTURE PASS
PARTNERS, LLC
Project
CHANW
SPECIAL
RETAIL
Location
CHANHASSEN,
NIN
Certification
�e
umma�
Revision HISIM
.
allllllpm
Sheet Title
EROSION
CONTROL PLAN
- PHASE 11
Sheet No, R-Islor
C5.02
Project No.VEN20145.0'
Il r EROSION! SEDIMENTATION CONTROL NOTES& DETAILS/'SITE MAP'
�NIF IOGTION MAP
t
nnery Mxu�x1� ,4
r1nRe.n!e:r..-RE e..nne..w^1Y_Cly
4
�4.
111\
t„� .WnWli4z
�USGS MAP—
r1nRe.n!e:r..-RE e..nne..w^1Y_Cly
BROAD ORMN INLET PROTEMON (10.11
mwmt WASNOUTAR[
NPNw
OGENERAL EROSION NOTES:
eMMNTENANCE
111\
t„� .WnWli4z
BROAD ORMN INLET PROTEMON (10.11
mwmt WASNOUTAR[
NPNw
OGENERAL EROSION NOTES:
eMMNTENANCE
.I � �IFGfNO
s -IJ
PROMENADEIIIIIIIIIIII�
UnUrn CONWRUCTIONNOIFS�._.........r.n.rr.r�
.w.a y m d� arwnu rnnm, � .am�w�
��• vau vrv�n
.... .1—
LAKE DRIVE
.... ...J
al I.
.WORM SEWER WRUI SCHEDULE
}:Sambatek
reWrex [a
.�w..ev�uxaw
Client
VENTURE PASS
PARTNERS, LLC
Project
CHANHA_
SPECIAL
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision HI
Sheet Title
UTILITY PLAN
C6.0.1.,�..,..,.
Project NO.VEN)0I450
T —
mlf TWN:AL IY CIAYEIfit
CATCH BASIN
EIMMELwo mMnur JIOS
. Xu drP1 N yam PuwnnN
B rvn.-e.m
x� u..rn
M1
IT
M /
1�
A9 1.k
UNION
HARED ENO SEC110N
u.pNEEmNO oPMTYENi r"N'N' SI08
QAC +miGAL C NAMEMR
IATON BASH MANNGLF
xlxC IXIAK I T F,7ti 11!11
B rvn.-e.m
x� u..rn
M1
IT
M /
1�
A9 1.k
r
QAR
TYPICAL GATE VALYL
AND BOX INSTAWMM
QAC +miGAL C NAMEMR
IATON BASH MANNGLF
xlxC IXIAK I T F,7ti 11!11
� �rl
Q�IOP iYPIDAI CURB
AND W70
DNXNDIIIq omrmu011 �" 910.1
B rvn.-e.m
x� u..rn
M1
IT
M /
r
QAR
TYPICAL GATE VALYL
AND BOX INSTAWMM
fxWKKENINf: —I.- !DDB
� �rl
Q�IOP iYPIDAI CURB
AND W70
DNXNDIIIq omrmu011 �" 910.1
ie br.wain
Y
,p
MTN PIPL BEDDING
IN POOR SOLS
O GREENNG OE9MIYENI ~c, 2201
Olv GCOESSIBLL PARKING SIGN
Pali PBEDDIFPE
�avxwsrvsi. ENxc IIEP.wINExI — 2203
RlV,,11kX1 [«b1N1
YCM1M � t..T.mun.ue«rrr". M �1'��manw
O' M ..�o.,1.1-.-.T. «�..,...,.....,,.���..«.«�.. ..d..
�QNOCUT 03« IYPIGLCLEANOUt ' �PlelSTllue Nils aa3EP
YnIw A+
Client
VENTURE PASS
PARTNERS, LLC
Project
CHANHA
SPECIAL
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision RI
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revisiol
C/.02
OSx BITUMINOUS PAVEMENT SECTIONS
SIM
e6x CONCRETE PAVEMENT SECTIONS
aN pal NN NNc d41 W
r 7 B.Taa.•.�
avtiT, : M,T'
Mdf MN
SAFL BAFFLE PRNCL TOP VIEW OF SUMP
V.
Y..
.T doEou
rP@!B nV:-
y..
... yll WAp4%
OET/JL FI W4PlA ' Wn[ SIUf VIEW (1f q.I,I�, i �KKET '.
upstream♦
TeCthnol0 les
WINs�EFaeaEnReTwacnRx suFl
�,tt...T....`i� nNaNuerNNBRRcwIwFLB
�'.^'^` — eMSIMINW1FOMaaeeiNC IaPPLL
B)xss CONCRETE ISOM"
L.
x::1a
L. ,V
�__ fib^ vawnmx.
(g�.7,PERVNRIS PAVEMENT SECTION
..e,..� /
w m. no.nwo0 wr_....'� � witx"w` `n a v, ,•
ROC, INFIUTRATION BASIN
.N9SM9Ns11S Pe.a RS.TdwnN
P7pRMIW....
AL I'R
aTNavnnnuL
�Samsb3Uek
RTW W
Client
VENTURE PASS
PARTNERS, LLC
sxoiwwauo"�0ss1Osuis
&IWN [allo
Project
CHANHAIR
SPECIAL?
RETAIL
Location
CHANHASSEN,
MN
Certification
14
Summary
RevisionHI�
M�—
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revision
C7.03
Project NONENIBSASID
�b
e b
1
oa roxam rossouuro�
Olent
VENTURE PASS
PARTNERS, LLC
&Mw.iiMN"d'
Project
CHANHA
SPECIAL
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Reviion Hl
i
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revisior
C7.04
ommaYmarmYo-�.w�zsw®
�m®mmasrmY ww®
!�®®®mYlmYim®
aatam®®momY um,s+ao
vao�®mmasrmY NUs4gma#a! V
�b
e b
1
oa roxam rossouuro�
Olent
VENTURE PASS
PARTNERS, LLC
&Mw.iiMN"d'
Project
CHANHA
SPECIAL
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Reviion Hl
i
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revisior
C7.04
-� ||!| •| •!�`
.�!
� . -- � . , � r, § ..,, I
9| , � . .;, ¥ .
` e � ( ; Q!|�!)�| �
Q\ / /� � ,� !| \ � ƒ
� , | ;� r � j
\ |%w$ �a •
� | /| ; � $,¢/||.
i�� � ƒ� � �� §� (� § t
/ ■� |� /) � � � �� �� § -
! !| . [ H ... _m ,,, !
�IA .111 11
A"I '�'l I'l'
e _
~ *3
/ � k\
fAilv03 AN3 AVHNVH
/ : ~
a mai n irerru. w mr �moiM
eanrr m �`m: inwmr wr'"..
.°rt...�mu°r°m w� rues.m wn
•• rokown...m.m—
,r..wnnwa�werom
n B45TRft RANTING
1� �.ue�.e.o. m.
,
nw���,"i+7TT�P
ar�.eenxeeoao. �Tt JT P -.r
n SOD INSTALLATION
�usn.Nnea � T I�
n DOWNSPOUT DRAINAGE BTRIP IN MULCH BED
2 IXISTING 7EV5HRU13 PROTECTION
.0 +e uae rnnu rrwm..o..w. —
w�awe
uoema.o.�. -
rw..�aucw.w��.
.uxr®in'ro". .a.eoomwmr w.zw 1-1��rr7lF_
xrmr
.wo wmn u un u wwm ae. m rnew eo. ru...cnou wm owns
ww uos ro near mw ne ernv m ue.. x..r n. wine . our we a'xm uww.
u.are mxauwveuoevcmwwumr..n vx.
>ooneieaemuowr w.er nu rourrw..owo-oaouwncmuw..e..nw"
e.krro m+eex�rum w �wrwm ar wwr..n ew.
uae.owu a>rtme nm r.... umr uew m.:r. u„+ouuoe ww n.
r neummowwrwna.waruerm ra wrrow..rwa.mwrunwuwnQ.uorn..r+.rx+,
4 BHRUB PLANTING
�zu
0O
s�•
t
s aj5
aaa a �
aaaaa a]
a aaa r
a a a l a
a aaaaa a
a ] a a a
as a]a 'yy
as aaad
aaaaa a
i 1 a
1 l a a a a 2 a
a a a 2 2 a a s
aaaa a a
i nasi ags
ra racer
aaa , x a
aaaaa a ]
aaaaaai�a
elosau asseyueyo
10
hllt/1O3dS N3SSbHNVHc)
�s�"6fis
11
' a
,2
a ,
MAIN 5TREEf
iaaaaaaal_a �
d
} N
u_
1
vlmmmmmmm=ie _j 0
d
3
MY
FIRST FLOOR
0
SIR
U TRA9n GNCL09URC - EAST CIGVATON
I
I
IB.9M 5.F.
Q
TOTAL
J----------T-------
-----
i
HIM
I®
Q5 AM
TRA.9n cNCMURL - 5MTn MEVATION
TRAbn GNCLOSURE - WEST O.GVATION
U TRA9n GNCL09URC - EAST CIGVATON
S 9(�RASH -
ii i�llinmuuu�nuuuunnm�mwuuuuwuinmuu�yuuun
I RooFNVn o
O
a
A urrur� I
I n 9gMLne Dugram
EMI
— U
n Roof Dram Detnl
�rTa
40
4 Roof Cgmpment Support Curb Detail
n Roof flakch Detail
/� Roof Vent DebA
m
.PREl�M1NPRY
�g��WN
s.weee..�
aaoiam �
ii i�llinmuuu�nuuuunnm�mwuuuuwuinmuu�yuuun
I RooFNVn o
O
a
A urrur� I
I n 9gMLne Dugram
EMI
— U
n Roof Dram Detnl
�rTa
40
4 Roof Cgmpment Support Curb Detail
n Roof flakch Detail
/� Roof Vent DebA
m
.PREl�M1NPRY
�g��WN
DRCRIOR PINISN SCHEDULE
mr....u.m�m
u�'wn�crev��
rawrmcc re
�•'•.
aeoruw
UMN
fueCw
c(NM
MfY WCt
aue..w
ii
)
( E]s
v aue i8•,
I
WA—
RRNO VCAA
C�Sj{tU�
I A2.0 1
/1 North Elevation
2 5axn �avaaon
8 Ent Oevadon
r, r, n n n
4 WeeC Elevation
}
F
J
Q
U 0
W °
a
z
z
WW
U)
a
= U
z
Q
U
\/_nlnm rest I'wwns
�StFti�t101'I
IXfDIOR �LVATON!
INnfn LWDlGnN6)
A2. I
FI -41 Mri
EY(NNl�ill�
i aae.
also
�1l1oil
-� A 111 �n
0 0
SOLOMON
REAL ESTATE
GROUP
"Where Wisdom and Opportunity Meet"
June 29, 2015
Mr. Bob Generous
City of Chanhassen
7700 Market Boulevard
Chanhassen, MN 55317
RE: Planned Unit Development for Chanhassen Specialty Retail
Venture Pass Partners, LLC as Applicant
Dear Bob,
I am writing this letter in support of the application made by Venture Pass Partners, LLC
for the development of the property located at Outlot B, Villages on the Ponds
Addition.
As a neighboring property owner, we believe it is important for the promotion of success
of the retail businesses located within the Village on the Ponds to have the strong support
and positive traffic generation that this proposed retail use will bring to the area. This
area has lagged behind many of the businesses located across Highway 5 and needs the
support of sizable, strong retailers in order to generate sufficient traffic to support strong
sales volumes.
In addition, this project will finally complete the Village on the Ponds development
which will result in a healthy and vibrant look, feel and shopping experience. Last, the
quality of the proposed architecture is strong and consistent with the other properties in
the area and once completed all common areas will finally be installed in a manner
consistent with the original vision for the Village on the Ponds project.
We support the proposed project and hope that the City of Chanhassen will do the same.
Sincerely,
6'.), -0-t jod�w
Jay Scott
President
12300 $ingletree Lane
Suite 200
Eden Prairie, MN 55344
Phone: 952.974.9200 Fax: 952.974.9300
M�monre ou xom
AI-Jaff, Sharmeen
From:
Ed Vigil <ekvigil@usinternet.com>
Sent:
Wednesday, July 01, 2015 11:24 AM
To:
AI-Jaff, Sharmeen
Cc:
Generous, Bob
Subject:
FW: TWM
Hi Sharmeen,
I will be traveling for the next 2 weeks and I will not be able to attend the meeting on Tuesday the 7th. However, I
wanted to send you an email regarding the approval process of TWM in front of my property on Village on the Ponds.
To the members of the City Council,
My name is Ed Vigil, I am the owner of Bokoo Bikes and Paddlesports located at 550 Lake Dr in Chanhassen. Our
building is situated directly adjacent to the proposed location of the new Total Wine and More retail store.
I have been waiting for 15 years for this land to be developed and a business to open. Making use of this valuable
location has been a long time coming and it is important that all potential businesses are given serious consideration.
The recent recession did not help the prospects of this land being developed. There has been very little interest in this
parcel over the years but there have been a few deals that fell through. Many of our customers have commented that
we have a very nice pond in front of us and have been shocked to learn that the 'pond' is actually a hole that was dug in
preparation for underground parking for Extended Stay Suites proposed to develop in 2001. The most recent activity
was the fiasco of having another national retailer, Trader Joe's, abandon their plans to move to Chanhassen because of
a clause within Lakewind's Co-op and the property owners agreement.
We now have a golden opportunity for another nationally recognized retailer open up shop in our city. I would like to
ask the City Council to do whatever is necessary to not lose this chance and welcome a retailer of TWM's caliber. Out
of all the retailers I could imagine, this is a business with a very successful business model that will draw their customer
base from outside Chanhassen because of competition generated by municipalities.
Based upon the experiences of other cities, TWM will likely greatly increase consumer traffic for Chanhassen as a
whole. Chanhassen is very fortunate to have been chosen as a site for expansion.
I fully endorse the approval to welcome TWM to Village on the Ponds in Chanhassen.
Respectfully,
Ed Vigil
0
AI-Jaff, Sharmeen
0
Subject: FW: VOP Association, Architectural Review Committee's Comments for "Chanhassen
Specialty Retail ", Outlot B, Village on the Ponds 4th Addition.
From: Mika Milovancev rmailto:mmilo(almagarch.coml
Sent: Friday, June 26, 2015 1:15 PM
To: Vernelle Clayton
Subject: FW: VOP Association, Architectural Review Committee's Comments for "Chanhassen Specialty Retail ", Outlot B,
Village on the Ponds 4th Addition.
To: Village on the Ponds Association
c/o Vernelle Clayton, the Manager of the Association.
Re. VOP- Architectural Review Committee's Comments for:
" Chanhassen Specialty Retail", Outlot B, VOP 4te Addition, Proposed Development Plans.
Developer: Venture Pass
Date issued: 6/26/2015
Dear Vernelle,
It is our understanding that the proposed Chanhassen Specialty Retail will be a welcome addition both to the City, as
well as for the business environment of the VOP community area. And that was always the goal for our Village: a wide
range of uses that together create pedestrian oriented streets and a vibrant urban setting.
Keeping that in mind, we look favorably at the proposed development, even though it is not providing the desirable mix
of uses (retail, residential, office...) within this specific site area. Also, the VOP Guidelines called for the main entry to be
facing the Main Street, at least for the assumed office or residential uses Guidelines envisioned on the upper floors.
However, we recognize that in this case of a large, single level retail store, in order to be successful in operation, the
main entry needs to be as close as possible to the parking area. Especially in case of very cold winters we have in our
Minnesota.
In regard to some other specifics:
--- Sheet L4.0- Lighting Plan:
The existing Main Street lights are neither referred to, nor reflected on the plan, but those are to remain as part of
VOP's overall streetscape. Also consider:
- replacing "modern", powerful Gardco wall lights along the Main Street with Longman fixtures.
Gardco would interfere/"diminish" the existing traditional lights on the street, as opposed to softer Lingman lights
that would blend better with the overall character of this street.
- providing a special lighting effect (landscape up lights?)for the curved "green wall" facing the Main Street.
--- Sheet L2.0- Landscape plan:
-It calls for the existing 5 street treeRso remain. This is of essence due to a very tight space between the building wall
and the street sidewalk/parking, which allows only for a rather minimal new landscaping to be planted along the wall.
-Also, aside of the two linden trees called for in the plan, there is not any other ground cover/landscape indicated at the
NW corner of the parking lot; that needs to be corrected and properly landscaped and irrigated.
--- Sheet A2.0 -Architectural Elevations:
-Overall, and as well described in the "Project Summary Narrative" part of the submittal package to the City, the
proposed building massing, "warm toned" facade materials, colors and various articulations, provide for desired
varieties and good integration within the existing VOP community.
- However, in regard to facade segments covered with the utility brick #2 at the East end North elevations, with their
face flush with the adjacent wall areas, consider to change them to be either somewhat recessed, or projected out from
the rest of the walls around them. That would give them a pronounced appearance and create more variety and
interest on these elevations.
- Specifically, at the Main Street, that wall segment could nicely follow the curved shape of the "green wall", thus
breaking the monotony of the long and high flat building wall along the street. In absence of the building entry from the
street, that, along with some possibly expended seating area there, would grant some interest and more of a
"pedestrian oriented" feel to the street.
In Conclusion:
The above comments were based on our review of the set of preliminary plans (with a focus on architectural and
landscape plans) as provided to us on 6/22/2015. We hope the above comments would help, along with further City's
reviews and hearings, towards a successful completion and integration of this development into the VOP and City of
Chanhassen urban core.
Please let us know if we can be of any further assistance. Thank you,
Mika Milo, r. architect
For VOP Association, Architectural Review Committee.
This email has been checked for viruses by Avast antivirus software.
www.avast.com
3vastr This email has been checked for viruses by Avast antivirus software.
a'.- www.avast.com
• 0
AI-Jaff, Sharmeen
From: Randy Rauwerdink <RRauwerdink@VENTUREPASS. NET>
Sent: Wednesday, July 01, 2015 11:18 AM
To: AI-Jaff, Sharmeen
Cc: Dave Carland; Andy Krenik
Subject: VOP review comments
Sharmeen, as follow up to a voice message that I just left for you, I wanted to discuss how or if we were to react to the
plan review comments that Mika provided last Friday (through Vernelle). We generally found his comments to be very
favorable, but did have some clarification or concern with some of the comments.
We want to understand if any of this becomes a part of staff report or conditions, and if so we want to provide some
input. Below is an initial response from our architect that addresses Mika's comments:
L4.0: Lighting Plan
• Main Street lights will remain and are so noted on 1-1.0 (removed and reinstalled)
• The lighting plan will need to be redone as there was not enough time to redo the plan per the 19,909 sf
building revision
• 1 have a call in to the lighting designer to see if/how changing to the Ligman fixture will alter the lighting levels
• Uplights at the green wall are not allowed per my understanding as fixtures need to have a 90 degree cutoff
L2.0: Landscape Plan
• Sod/irrigatation noted for the NW corner but plants can be placed there instead if so desired
A2.0: Architectural Elevations
Brick #2 projects out 4" at East and North Elevations. Not in favor of projecting brick #2 out any further but we
can at an added cost to footings and foundation. Corner brick #1 elements are already projecting out 8" to
provide varying depths for facade along with projecting canopies and varying roof lines.
Curving the brick wall on the east elevation will add substantial cost for additional footings and foundation
work, will come very close to Utility Easement (but technically not over), and will reduce depth of planting
area. The green wall is curved for that specific reason to break up the length of the elevation without adding
costs and reducing planting area.
Randy Rauwerdink
Venture Pass Partners, LLC
19620 Waterford Court
Shorewood, MN 55331
612.801.4313
rr uwerdinkCo)ventureoass.net
/VMM PASS PARnWs
7/2/2015
Roettger, Julie
Houlihan Restaurant
530 Pond Promenade
Chanhassen, MN 55317
Sharmeen A]-Jaff
Senior Planner
City of Chanhassen
7700 Market Boulevard
Chanhassen, MN 55317
Dear City Planner,
I have reviewed the request for amendment to Villages on the Ponds Planned Unit
Development, Subdivision of approximately three acres into one lot and one outlot (Villages on
the Ponds 11th Addition), and Site Plan Review to construct a 19,909 square -foot liquor store on
property zoned Planned Unit Development (PUD) and located on Outlot B, Villages on the
Ponds 4th Addition and the development application. I do support this project because I believe
the customer traffic generated by the proposed high volume retailer will benefit our business
while not adding additional direct competition. I also believe the architecture and design are
excellent and are cohesive to the high standards that have been achieved with previous building
within the development.
Regards,
Roettger, Julie
Vice President of Operations
Houlihan Restaurant
• 0
AI-Jaff, Sharmeen
From: Ameridnn Chanhassen, MN <Chanhassen.MN@americinn.com>
Sent: Thursday, July 02, 2015 9:32 AM
To: AI-Jaff, Sharmeen
Subject: Our support behind the Villages on the Pond development
Dear Ms. AI-Jaff -
As the General Manager of the Americlnn Hotel & Suites of Chanhassen, I want to pass along my support for a new
development of the vacant land located near our hotel in the Villages on the Pond area.
We understand there is a possibility of a large retailer being located in a new building on that vacant land. We would be
in support of the additional retailer being located there. Any retailer who can generate additional foot traffic and
exposure to our businesses — as well as be an amenity for our guests — is a welcome addition to the area.
We were looking at the Chanhassen Planning web site and feel the design and size of the building is complimentary to all
of the neighbors.
We fully support this recent development application.
Thanks,
Matt
Matt Mayben I General Manager
Americinn Hotel & Suites — Chanhassen
570 Pond Promenade i Chanhassen, MN 55317
Phone: (952) 934-3888 1 Fax: (952) 974-9394 I
Northcott Hospitality I vle4ea&v# SO grana 4 ha&AUR14
ANN19ll i WMAR ! FBI*$ lnTAKAUSIA" InM[InlNSOUR IIY
•
CITY OF CHANHASSEN
0
AFFIDAVIT OF MAILING NOTICE
STATE OF MINNESOTA)
) ss.
COUNTY OF CARVER )
I, Karen J. Engelhardt, being first duly sworn, on oath deposes that she is and was on
June 25, 2015, the duly qualified and acting Deputy Clerk of the City of Chanhassen, Minnesota;
that on said date she caused to be mailed a copy of the attached notice of Public Hearing for
Chanhassen Specialty Retail — Planning Case 2015-17 to the persons named on attached
Exhibit "A", by enclosing a copy of said notice in an envelope addressed to such owner, and
depositing the envelopes addressed to all such owners in the United States mail with postage
fully prepaid thereon; that the names and addresses of such owners were those appearing as such
by the records of the County Treasurer, Carver County, Minnesota, and by other appropriate
records.
Subs b-4 and sworn to before me
ti Vay of,tl n -e— 12015.
Notary Publi
*0 ' WIN" /
Notice of Public Hearing
Chanhassen Planning Commission Meeting
Date & Time:
Tuesday, July 7, 2015 at 7:00 p.m. This hearing may not start until
later in the evening, depending on the order of theagenda.
Location:
City Hall Council Chambers, 7700 Market Blvd.
Request for Amendment to Planned Unit Development;
Subdivision of approximately three acres into one lot and one
Proposal:
outlot (Villages on the Ponds 11th Addition), and Site Plan
Review with Variances to construct a 19,909 square -foot
specialty retail building on property zoned Planned Unit
Development PUD — Chanhassen Specialty Retail
Applicant:
Venture Pass Partners, LLC
Property
Outlot B, Villages on the Ponds 4th Addition
Location:
A location map is on the reverse side of this notice.
The purpose of this public hearing is to inform you about the
applicant's request and to obtain input from the neighborhood
about this project. During the meeting, the Chair will lead the
What Happens
public hearing through the following steps:
at the Meeting:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses
the project.
If you want to see the plans before the meeting, please visit
the City's projects web page at:
www.c!.chanhassen.mn.us/2015-17. If you wish to talk to
someone about this project, please contact Sharmeen AI-Jaff
Questions &
by email at saliaff(d)ci.chanhassen.mn.us or by phone at 952 -
Comments:
227-1134. If you choose to submit written comments, it is
helpful to have one copy to the department in advance of the
meeting. Staff will provide copies to the Commission. The
staff report for this item will be available online on the
project web site listed above the Thursday prior to the
Planning Commission meeting.
NEWT Sign up to receive email and/or text notifications when meeting agendas,
packets, minutes and videos are uploaded to the city's website. Go to
www.ci.chanhassen.mn.us/notifyme to sign up!
City Revlew Procedure:
• Subdivisions, Planned Unit Developments, Site Ran Reviews, Conditional and IMedm Uses, Wetland Alterations. Rezonings,
Comprehensive Plan Amendments and Code Amendments require a pudic hearing before the Planning Commission. City
ordinances require all properly within 500 feel of the subject site to be notified of the application In writing. Any Interested path Is
invited to attend the meeting.
• Staff prepares a report on the subject application that includes all pertinent Information and a recommendation. These reports are
available by request. At the Planning Commission meeting, staff will give a verbal overview of the report and a recommendation.
The Item will be opened for the public to speak about the proposal as a pad of the heading process. The Commission will dose the
public hearing and discuss the Item and make a recommendation to the City Council. The City Council may reverse, affirm or modify
wholly or partly the Planning Commission's recommendation. Remnings, land use and code amendments take a simple majority
vote of the City Council except rezonings and land use amendments from residential ki mmmerclelllndustdal.
• vinnesota Stale Statute 519.99 requires all applications to be processed within 60 days unless the applicant walves this standard.
Some applications due to their complexity may take several months to complete. Any parson wishing to follow an Item through the
process should check with the Planning Department regarding Its status and scheduling for the City Council meeting.
• A neighborhood spokespersonmepesentative Is encouraged to provide a contact for the city. Often developers are encouraged to
meet with the neighborhood regarding their proposal. Staff is also available M review the project with any Interested person(s).
• Because the Planning Commission hods the public heading, the City Council does not. Minutes are taken and any corrWpOndence
regarding the application will be included In the report to the City Council. If you wish to have something to be included in the report.
lease contact the Mannino Stale person named on the notification.
Notice of Public Hearing
Chanhassen Planning Commission Meeting
Date & Time:
Tuesday, July 7, 2015 at 7:00 P.M. This hearing may not start until
later In the e,,enin , depending on the order of theagenda.
Location:
City Hall Council Chambers 7700 Market Blvd.
Request for Amendment to Planned Unit Development;
Subdivision of approximately three acres into one lot and one
Proposal:
outlot (Villages on the Ponds 11'^ Addition), and Site Plan
Review with Variances to construct a 19,909 square -foot
specialty retail building on property zoned Planned Unit
Development PUD — ChanhassenS eclat Retail
Applicant:
Venture Pass Partners, LLC
Property
Outlot B, Villages on the Ponds 4th Addition
Location:
A location map Is on the reverse side of this notice.
The purpose of this public hearing is to inform you about
applicant's request and to obtain input from the neighbor
about this project. During the meeting, the Chair will lead the
What Happens
public hearing through the following steps:
at the Meeting:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses
the project.
If you want to see the plans before the meeting, please visit
the City's projects web page at:
www.ci.chanhassen.mn.us/2015-17. If you wish to talk to
someone about this project, please contact Sharmeen AI-Jaff
Questions &
by email at sal!aff(cDci.chanhassen.mn.us or by phone at 952 -
Comments:
227-1134. If you choose to submit written comments, it is
helpful to have one copy to the department in advance of the
meeting. Staff will provide copies to the Commission. The
staff report for this item will be available online on th
project web site listed above the Thursday prior to the
Planning Commission meeting.
NEWI Sign up to receive email and/or text notifications when meeting agendas,
packets, minutes and videos are uploaded to the city's website. Go to
www.ci.chanhassen.mn.us/notifyme to sign up!
City Review Procallues:
• Subdivisions, planned Unit Developments. Site Plan Reviews, Conditional and Interim Uses, Welland Alterations, Recordings.
Comprehensive Plan Amendments and Code Amendments require a public hearing before the Planning Commission. City
ordinances require all property within 500 feet of the subject site to be notified of the application In writing. Any Interested party is
invited to attend the meeting.
• Staff prepares a resod an the subject application that Includes all pelt nent information and a recommendation. These reports are
available by request. At the Planning Commission meeting, staff will give a verbal overview of the resod and a recommendation.
The Item will be opened for the pudic to speak about the proposal as a pert of the hearing process. The Commission will dose the
public hearing and discuss the item and make a recommendation to the City Council. The City Council may reverse, Sam or modify
wholly or partly the Planning Commission's recommendation. Rezonings, land use and code amendments take a simple majority
We of the City Council except moorings and land use amendments from residential to commemlalAndustdal.
• Minnesota Slate Statute 519.99 requires all applications to be processed MMin 00 days unless the applicant wolves this standard.
Some applications due to their complexity may take several months to complete. Any person wishing to follow an item through the
process should check Win the Planning Department regarding IU status and scheduling for Me City Count masking.
• A neighborhood spokesperson/representhfive Is encouraged to provide a contact for the city. Often developers are encouraged to
meet with the neighborhood regarding their proposal. Staff is also available to review the project with any Interested person(s).
• Because the Planning Commission holds the public hearing, the City Council does not. Minutes are taken and any mnespondenca
regarding the application will be Induced In Me report to the City Council. 9 you wish to have something to be induced in the report,
lease contact the Manning Stall person named on the notificedM.
AUSMAR DEVELOPMENT CO LLC
5916 HANSEN RD
MINNEAPOLIS, MN 55436-2513
CHURCH OF ST HUBERT
8201 MAIN ST
CHANHASSEN, MN 55317-9647
LAKE SUSAN APARTMENT HOMES
LLC
11455 VIKING DR # 350
EDEN PRAIRIE, MN 55344-7206
ROSEMOUNT INC
12001 TECHNOLOGY DR
EDEN PRAIRIE, MN 55344-3695
VIGIL COMPANIES LLC
550 LAKE DR
CHANHASSEN, MN 55317-9378
WHEATSTONE RESTAURANT
GROUP
250 EAST LAKE DR
CHANHASSEN, MN 55317-9364
0 0
CHANHASSEN RETAIL LLC
9478 RILEY LAKE RD
EDEN PRAIRIE, MN 55347-3490
COMMUNITY BANK CORPORATION
PO BOX 177
CHANHASSEN, MN 55317-1177
NORTHCOTT COMPANY
250 EAST LAKE DR
CHANHASSEN, MN 55317-9364
SILO BUILDING LLC
3561 44TH ST W
MINNEAPOLIS, MN 55410-1359
VILLAGES ON THE PONDS ASSN INC
PO BOX 404
CHANHASSEN. MN 55317-0404
CHCR LLC
PO BOX 1038
MASON CITY, IA 50402-1038
KINSALE OF CHANHASSEN LLC
PO BOX 404
CHANHASSEN, MN 55317-0404
PHM/CHANHASSEN INC
2845 HAMLINE AVE N
ROSEVILLE, MN 55113-7127
STORE MASTER FUNDING VI LLC
8501 E PRINCESS DR STE 190
SCOTTSDALE, AZ 85255-5494
VOP I LLC
PO BOX 404
CHANHASSEN, MN 55317-0404
0 0
AI-Jaff, Sharmeen
From: Dave Carland <DCarland@VENTUREPASS.NET>
Sent: Tuesday, July 07, 2015 10:30 AM
To: AI-Jaff, Sharmeen
Subject: FW: Chanhassen Villages on the Ponds Declaration and PUD review with respect to St
Hubert's
Sharmeen, per the e-mail below from my partner, I think the Church agreed to a liquor store prior to constructing their
facilities in 1997. 1 want to be polite and respectful of their concerns but I think this may need to be pointed out if they
object to the basic concept of a liquor store.
David Carland
Venture Pass Partners, LLC
19620 Waterford Court
Shorewood, MN 55331
(o) 952.473.1210
(c) 612.963.9107
dca rlan d(d)ventu repass.net
/VENTURE PASS ,PARTNERS
From: Jim Ottenstein
Sent: Tuesday, July 07, 2015 10:17 AM
To: Dave Carland
Subject: Chanhassen Villages on the Ponds Declaration and PUD review with respect to St Huberts
Dave, in anticipation of the planning commission meeting tonight, I reviewed the Declaration and the PUD Agreements
with respect to the Church of St Hubert.
The PUD was entered into in November, 1996 and the Declaration was entered into in March 1997. It appears that The
Church of St Hubert was a land owner prior to the execution of the PUD and that with the execution of the PUD, their
property was replatted as Lot 1, Block 2, Villages on the Ponds.
The PUD established the zoning of the property as a PUD and memorialized development requirements. Among other
things, the PUD also established permitted uses in exhibit C. Exhibit C lists a church as a permitted use and a liquor store
as a permitted use (so long as the retail use (ie liquor store) does not exceed 20,000 square feet on one level). The
Church of St Hubert was a party to the agreement and executed a "Fee Owner Consent to Development Agreement". In
essence, the use of a liquor store is on equal footing as the use as a Church.
The Declaration was also executed by the Church. The Declaration established, among other things, protective
covenants regarding the development. Protective covenants included establishment of Prohibited Business or Activities.
This Section of the Declaration prohibits the operation of any business or activity offering the sale of sexually explicit or
"X-rated" materials. This is the only use that is specifically prohibited and no change was made that limited or prohibited
the use as a liquor store.
In summary, the PUD approves liquor stores as a permitted use and the Declaration, which followed the execution of the
PUD, established prohibited uses but did not take exception to a liquor store use.
11
Jim Ottenstein
Venture Pass Partners, LLC
19620 Waterford Court
Shorewood, MN 55331
612-849-2324
Lttenstei n Ccilventu repass. net
/VENTURE PASS PARTNERS
Notice of Public Hearing
lanhassen Planning Commission Mesti
Date & Time:
Tuesday, July 7, 2015 at 7:00 p.m. This hearing may not start until
later in the evening, depending on the order of the agenda.
Location:
City Hall Council Chambers, 7700 Market Blvd.
Request for Amendment to Planned Unit Development;
Subdivision of approximately three acres into one lot and one
Proposal:
outlot (Villages on the Ponds 111h Addition), and Site Plan
Review with Variances to construct a 19,909 square -foot
specialty retail building on property zoned Planned Unit
Development PUD — Chanhassen Specialty Retail
Applicant:
Venture Pass Partners, LLC
Property
Ou".lot B, Villages on the Ponds 4th Addition
Location:
A Iccatic c map is , . :he reverse side of this n6tice.
The purpose of chis public hearing is to inform you about the
applicant's request and to obtain input from the neighborhood
about this project. During the meeting, the Chair will lead the
What Happens
public hearing through the following steps:
at the Meeting:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses
the project.
If you want to see the plans before the meeting, please visit
the City's projects web page at:
www.ci.chanhassen.mn.us/2015-17. If you wish to talk to
someone about this project, please contact Sharmeen AI-Jaff
Questions &
by email at saliatf( ci.chanhassen.mn.us or by phone at 952 -
Comments:
227-1134. if you choose to submit written comments, it is
helpful to have one copy to the department in advance of the
meeting. Staff will provide copies to the Commission. The
staff report for this item will be available online on the
project web site listed above the Thursday prior to the
Planning Commission meeting.
NEWI Sign up to receive email and/or text notifications when meeting agendas,
packets, minutes and videos are uploaded to the city's website. Go to
www.ci.chanhassen.mn.us/notifyme to sign up!
City Revive Procedure:
• Sundivisians, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses. Wetland Alterations. Rezonings.
Comprehensive Plan Amendments and Code Amendments require a pudic heanng before the Planning Commission. City
ordinances require all property within 500 feel of Me subject site to be notified of the application m whang. Any interested party is
invited to attend the meeting.
• Staff prepares a report ante subject application Nat induces all pertinent informationanda recommendaborn These reports are
available by request At the Planning Commission meting, staff will give a verbal overvew of the report and a recommendation.
The item will be opened for the public to speak about the proposal as a part of Me hearing process. The Commission will dose the
public hearing and discuss the item snd make a recommendation to the City Council. The City Council may reverse, affirm or modify
wholly or partly the Planning Commission's recommendation. Rezonings, land use and code amendments take a simple majority
vote of the City Coundl except rezonings and land use amendments from residential to commerciaviindustnal.
• Minnesota State Statute 519 99 requires all applications to be processed within 60 days unless the applicant waives this standard
Some applications due to their complexity may take several months to complete. Any person wishing to follow an item through the
process should check with the Planning Department regarding its status and scheduling for the City Council meting.
• A neighborraod apokesparsonlneprasantative is encouraged to provide a contact for the city. Often developers are encouraged to
Meet with the neighborhood regarding their proposal. Staff is also available to review the project with any interested person(s).
• Because Me Planning Commission holds the Public hearing, the City Council does not Minutes are taken and any correspondence
regarding the application will be Included In the report to the City CiWMI, i you wish to have something to be Included in the report,
lease contact the Planning Stag pension named on the notification.
SCANNtL
fCf+¢{fL,AFx+�l.l[yr 4s N .55� �"'"
_ try+'MFRC)MZ(P
�Mw���`d9''
f e`��iwp.�...,M .
' t" �F725 2015
SUBJECT
CITY OF
in
.�DE 553
PROPERTY 1 PIT 171ASSEN
�!? ` Boulevard
\r'Innesota55317
�E SENA it N $ en.mn.us �r
��
to
Disclaimer 55'\\���\r`\ \ rSF
This map is neith, .5 C. - ���\�� , and is not intended to be used
as one. This map i.-,matlon and data located in various city,
county, state and It sources regarding the area shown, and is to
be used for referenr manly. The City does not warrant that the Geographic �+'. v
Information System (l aata used to prepare this map are error free, and the City does A N
not represent that the GIS Data can be used for navigational, tracking or any other \.y\ VILLAGES ON THE PONDS ASSN INC
purpose requiring exacting measurement of distance or direction or precision in the
depiction of geographic features. If errors or discrepancies are found please contact 952- PO BOX 404
227-1107. The preceding disclaimer is provided pursuant to Minnesota Statutes §466 03, CHANHASSEN, MN 55317-0404
Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable
for any damages, and expressly waives all claims, and agrees to defend, indemnity, and
hold harmless the City from any and all claims brought by User, its employees or agents,
_. --e (ItWd parties whmi aft lbotaf the users access orna VOz*,r�Y ,;,47 I�`tjllllt lit 1l r�r`rt r�ll�llrtnlllllllll ljli 11lril'Irllllrf 11111
^4
zee'
cI
Disclaimer
This map is neither a let ,r nor a survey and is not intended to be used
as one. This map is a con . records, information and data located in various city,
county, state and fede(.H ..es and other sources regarding the area shown, and is to
be used for reference purposes only. The City does not warrant that the Geographic
Information System (GIS) Data used to prepare this map are error free, and the City does
not represent that the GIS Data can be used for navigational, tracking or any other
purpose requiring exacting measurement of distance or direction or precision in the
depiction of geographic features. If errors or discrepancies are found please contact 952-
227-1107. The preceding disclaimer is provided pursuant to Minnesota Statutes §466.03,
Subd, 21 (2000), and the user of this map acknowledges that the City shall not be liable
for any damages, and expressly waives all claims, and agrees to defend, indemnify, and
hold harmless the City frootfJJ�� any and all claims brought by User, its employees or agents,
or third parties which an fro of the user's access or r t
'SEN
ward
g� JES POST.
�L.d v�
PITNEY 00 Re
021 P $ 000.485
0003195036 JUN 25 20�
MAILED FROM ZIP CODE 553
It
6' „ Inesota uja it
,\\V\�\ — lanhassen.miI C� e ��
9�ti is
VOP ILLC �ANK •
PO BOX 404
CHANHASSEN, MN 55317-0404 �_
J
Jlr�r�In1111L��uI�I11LL11��III11rr�J��II11r11rL1��ILrr11
Notice of Public Hearing
• I
hanhassen Planning Commission Meeting
Date & Time:
Tuesday, July 7, 2015 at 7:00 p.m. This hearing may not start until
later in the evening, depending on the order of theagenda.
Location:
City Hall Council Chambers, 7700 Market Blvd.
Request for Amendment to Planned Unit Development;
Subdivision of approximately three acres into one lot and one
Proposal:
outlot (Villages on the Ponds 111' Addition), and Site Plan
Review with Variances to construct a 19,909 square -foot
specialty retail building on property zoned Planned Unit
Development PUD — ChanhassenS cial Retail
A licant:Venture
Pass Partners, LLC
Property
utlot B, Villages on the Ponds 41h Addition
LOCatIOn:
A location map is on the reverse side of this notice.
The purpose of this public hearing is to inform you about the
applicant's request and to obtain input from the neighborhood
about this project. During the meeting, the Chair will lead the
What Happens
public hearing through the following steps:
at the Meeting:
1. Staff will give an overview of the proposed project.
2. The applicant will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses
the project.
If you want to see the plans before the meeting, please visit
the City's projects web page at:
www.ci.chanhassen.mn.us/2015-17. If you wish to talk to
someone about this project, please contact Sharmeen AI-Jaff
Questions &
by email at saliaff(cDci.chanhassen.mn.us or by phone at 952 -
Comments:
227-1134. If you choose to submit written comments, it is
helpful to have one copy to the department in advance of the
meeting. Staff will provide copies to the Commission. The
staff report for this item will be available online on the
project web site listed above the Thursday prior to the
Planning Commission meeting.
NEW! Sign up to receive email and/or text notifications when meeting agendas,
packets, minutes and videos are uploaded to the city's website. Go to
www.ci.chanhassen.mn.us/notifyme to sign up!
City Review Procedure:
• Subdivisions, Planned Unit Developments, Site Plan Reviews, Conditional and Interim Uses. lNeteW Alterations, RamNngs,
Comprenensive Plan Amendments and Code Amendments require a Now hearing before the Planting Commission. City
ordinances require all property within 500 feet of the subject site to be notified of the application in writing. Arty interested party is
invited to attend the meeting.
• Staff prepares a report on the subject application that includes all pertinent information and a recommendation. These reports are
available by request. At the Planning Commission meeting, staff will give a verbal overview of the repon and a recommendation.
The item will be opened for the public to speak about the proposal as a part of the treating process. The Commission will close the
public heamhg and discuss the item aW make is recommendation to the City Council. The City Council may reverse, affirm or modify
wholly or portly the Planning Commission's recommendation. Rezonings, land use and code amendments take a simple maprity
vote of the City Council except rezonings and land use amendments from residential to dxnmerclagindusdal.
• Minnesota State Statute 519.99 requires all applications to be processed within 60 clays unless the applicant waives this standard
Some applications due to their complexity may take several months to complete. Any person wishing to follow an item through the
process shoud check with the Planning Department regarding its status and scheduling for the City Council meeting.
• A neighbortwod spokespersaJrepmsenWb" is encouraged to provide a contacl for the aty Often developers are encouraged M
meet with the neighbodreod regarding thew proposal. Staff is also available d review the projectwith any interested penson(a).
• Because the Planning Commission holds the public hearing, the City Count does not. Minutes are taken and any correspondence
regarding the application will be included in "report to" City Coundlff you w O to haves ing to ba included in me repon,
lease contect the Planning Stag person named on the notification.
SCANNED
rn, I „ moi•
r CITY ITY OF
a PROPERTY r CHAN"' "SEN
6 `
` y5 ward
a
to 55317
us
"3
f',kpSiS P0.Sr'M
S v
Z —'W PITNEY BOWEB
02 1P $ 000.485
0003195036 JUN 252015
MAILED FROM ZIP CODE 5531
4,W ct%%
AP�o Ali\.\\\\\\
A,\5
Disclaimer
This map is neither a le; '( p7 \\\\\ oe used
as one. This map is a con C%� �D Y \\\\`\\ .,i various city,
county, slate and federal c .,e shown, and is to •
be used for reference pure 5'� \\\\\\\\ .dirt that the Geographic
Information System (GIS) Da, L. ertor free, and the City does T =
not represent that the GIS G b \ „avigational, tracking or any other KINSALE OF CHANHASSEN LLC
purpose requiring exacting m6 .,stance or direction or precision in the
depiction of geographic features. or discrepancies are found please contact 952- PO BOX 404
227-1107. The preceding disclaim...s provided pursuant to Minnesota Statutes §466.03, CHANHASSEN, MN 55317-0404
Subd. 21 (2000), and the user of this map acknowledges that the City shall not be liable
for any damages, and expressly waives all claims, and agrees to defend, indemnity, and �..
hold harmless the City from any and all claims Linc�bLb4. Usz.,.js,��_'aplQgpA or agents,
171or third parties which arse out of the user's accesk9egfaS®4 11,111 rrl IIltt!I 1111111111111 , ,I,tI) ,I II! fill l tIII II r
I II !
0
AI-Jaff, Sharmeen
0
From:
Dave Carland <DCarland@VENTUREPASS.NET>
Sent:
Wednesday, July 01, 2015 3:08 PM
To:
AI-Jaff, Sharmeen
Cc:
Jim Ottenstein; Randy Rauwerdink
Subject:
Chanhassen Specialty Grocer/ Villages on the Pond 11th Addition Planning Case #
2014-29
Sharmeen, this e-mail should be considered our formal request to the City of Chanhassen by Venture Pass Partners that
we wish to withdraw our previously approved application for the 14,000 square foot specialty grocery store and future
small shop retail which was previously approved for the property. That submission is no longer being considered for
development and is replaced by the current application for a 20,000 square foot specialty retail store.
David Carland
Venture Pass Partners, LLC
19620 Waterford Court
Shorewood, MN 55331
(o) 952.473.1210
(c) 612.963.9107
dcarland(a)ventureoass net
MENTURE PASS PARTNERS
0
Affidavit of Publication
Southwest Newspapers
CITY OF CHANHASSEN
CARVER & HENNEPIN
State of Minnesota
COUNTIES
NOTICE OF PUBLIC
)SS.
HEARING
PLANNING CASE NO. 2015-17
County of Carver )
NOTICE IS HEREBY GIVEN
that the Chanhassen Planning
Commission will hold a public
hearing on Tuesday July 7, 2015, at
7:00p.m. in the Council Chambers
Laurie A. Hartmann, being duly sworn, on oath says that she is the publisher or the authorized
in Chanhassen City Hall, 7700
agent of the publisher of the newspapers known as the Chaska Herald and the Chanhassen Vil-
Market Blvd. The purpose of
lager and has full knowledge of the facts herein stated as follows:
this hearing is to consider a
request for an amendment to the
(A) These newspapers have complied with the requirements constituting qualification as a legal
Villages on the Ponds Planned
Unit Development; Subdivision
newspaper, as provided by Minnesota Statute 331A.02, 331A.07, and other applicable laws, as
of approximately three acres into
amended.
one lot and one outlot (Villages
on the Ponds 11th Addition), and
(B) The printed public notice that is attached to this Affidavit and identified as No.
Site Plan Review with Variances
was published on the date or dates and in the newspaper stated in the attached Notice and said
to construct a 19,909 square-
Notice is hereby incorporated as part of this Affidavit. Said notice was cut from the columns of
foot specialty retail building on
the newspaper specified. Printed below is a copy of the lower case alphabet from A to Z, both
property zoned Planned Unit
inclusive, and is hereby acknowledged as being the kind and size of type used in the composition
Development (PUD) and located
and publication of the Notice:
on OutlotB, Villages on the Ponds
9th Addition. Applicant. Venture
Pass Partners, LLC. Owner:
abcdefghijkbnnopgtstuvwxyz
Northcott Company.
A plan showing the location
U
/,�
of the proposal is available
By:
Hartm�
for public review on the City'sw.
web site at wwci.chanhassen.
Laurie A.
mn.us/2015-17 or at City Hall
during regular business hours.
All interested persons are invited
to attend this public hearing
Subscribed and sworn before me on
and express their opinions with
respect to this proposal.
Sharmeen A1Jaff, Senior
�/C
Planner
this day of2015
Email: saljaff(sn ci.chanhassen.
mn.us
Phone: 952-227-1139
tL,
(Published in the Chanhassen
AliNiF JhETEK
Villager on Thursday, June 25,
2015: No. 4151)
NTWY PtB'JC MASESC?A
,
N Public WYCOMMSS1014D'':RESO'..rli.,a
RATE INFORMATION
Lowest classified rate paid by commercial users for comparable space.... $31.20 per column inch
Maximum rate allowed by law for the above matter ................................. $31.20 per column inch
Rate actually charged for the above matter .............................................. $12.59 per column inch
SCANNED
0 0
CITY OF CHANHASSEN
CARVER & HENNEPIN COUNTIES
NOTICE OF PUBLIC HEARING
PLANNING CASE NO. 2015-17
NOTICE IS HEREBY GIVEN that the Chanhassen Planning Commission will hold a
public hearing on Tuesday, July 7, 2015, at 7:00 p.m. in the Council Chambers in Chanhassen
City Hall, 7700 Market Blvd. The purpose of this hearing is to consider a request for Subdivision
of approximately three acres into one lot and one outlot (Villages on the Ponds I Id Addition), and
Site Plan Review with Variances to construct a 23,520 square -foot specialty retail building on
property zoned Planned Unit Development (PUD) and located on Oudot B, Villages on the Ponds
4a' Addition. Applicant: Venture Pass Partners, LLC. Owner: Northcott Company.
A plan showing the location of the proposal is available for public review on the City's web
site at www.ci.chanhassen.mn.us/2015-17 or at City Hall during regular business hours. All
interested persons are invited to attend this public hearing and express their opinions with respect to
this proposal.
Sharmeen Al-Jaff, Senior Planner
Email: saliaMci.chanhassen.mn.us
Phone: 952-227-1134
(Publish in the Chanhassen Villager on June 25, 2015)
SCANNED
0
arr RECEI EDEt
7645 Lyndale Avenue South, Suite 100
Minneapolis, Minnesota 55423-4084 JUN 18 2015
612.861.9636 Fax: 612.861.9632
www.tmiarchitects.com ()NAPWA%ENPLAN'MNG0P1
TRANSMITTAL
5�4r*wzn AL ;1R(P
To: n l..n /'i_- L --
170b M 44Q -t blvd
CA4'^4m551p\. MM 95-:k-7
u
T U S H I E
MONTGOMERY
ARCHITECTS
Date: (0 -it .15
Project Number: 241502.1A
Project Name:
WE ARE SENDING YOU VIA:
❑ Fax — Total Pages: ❑ Picked Up ❑ U.S. Mail [Messenger
❑ Hand Delivery ❑ Overnight Delivery
THE FOLLOWING ITEMS:
❑ PRINTS ❑ SPECIFICATIONS ❑ SHOP DRAWINGS ❑ OTHER
"I
19 YOUR USE OqSAS REQUESTED
❑ APPROVAL ❑ BIDS DUE
❑ REVIEW AND COMMENT
❑ DISTRIBUTION TO OTHERS
COPY TO: File FROM: At Kra k,
Please notify us if you have any questions or concerns regarding this transmittal.
CHANHASSEN SPECIALTY RETAIL-Outl*ILLAGES ON THE PONDS 4m ADDN •
REQUEST FOR VARIANCE TO PERMIT 42" WALL SIGNAGE LETTER HEIGHT ON NORTH AND WEST ELEVATIONS
Venture Pass Partners, LLC has submitted for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B VILLAGES ON THE
PONDS 4ni ADDN, including the development of a 19,909 SF specialty retail store. The architectural design and exterior building
elevations as submitted incorporate wall signage on four allowable building elevations, as follow:
North -Fronting Pond Promenade and visible to Hwy 5 to the north. ;n OFCHANHASSEf l
RECEIVED
West -Over main entrance and fronting the parking lot, also visible to Market Blvd.
East -Fronting Main Street JUN 18 2015
South -Fronting Lake Drive
CHANHASSEN PtANNIN60F.PT
Signage on each elevation is proposed as individual internally illuminated channel letters, 42" in height on the North and West
elevations and 30" in height on the East and south elevations, and placed in a consistent fashion/signage band detail. The total
area of each sign as proposed is well below the allowable signage area as per City ordinance, as illustrated and enumerated on the
attached exterior elevation drawings.
A variance is required due to a clause in the VOP Development Design Standards, restricting wall letters to a maximum of 30" in
height. While this standard maybe suitable for small shop space or for visibility and legibility from directly abutting streets or at
pedestrian scale, this is far too limiting and ineffective for our proposed use. We also feel that it is not of a scale consistent with
the massing and dimensions of our proposed building. It should also be noted that when the Pond Promenade PUD was approved
in 1996 it was one of the pioneering new urbanism projects in the Metropolitan area. During this period communities and planners
had a general attitude that merchant signs should be minimal and generic. The current trend as evidenced by the relaxing of most
municipal sign codes is that adequate signage is not only critical to a merchants success but can add vibrant and creative design
elements to a project while adding distinction and variety to a neighborhood. Highly visible and legible signage is critical to the
success and viability of a grocery operation with a regional draw. This parcel as situated has critical sightlines to Hwy 5 and to
Market Blvd, however it is set back from Hwy 5 by approximately 550, and from Market Blvd by approximately 620'. Providing
effective identification and signage to passing motorists is essential. Signage, if restricted to 30" letter height, will prove ineffective
and unacceptable to the user.
SCANNED
Research as compiled by the United Statn Council, studying legibility of signage para+o roadways from moving vehicles is
summarized in the table below. This tab a only calculates recommended letter heights up to a distance of 400' from the roadway,
however even at 400' (highlighted in yellow) the recommended legible sizes exceed 80" in height. The 42" height that we are
requesting is obviously well below this recommendation, but it will provide some level of effectiveness that could not be achieved with
the 30" restriction. The 42" height is also consistent with other locations of our tenant, and in keeping with their minimum standards.
For additional reference I also highlighted in red the effective distance for viewing signage with 30" letters. This approximate 100'
distance is consistent with my comments above, suggesting this sizing is suitable for pedestrian scale or viewing from directly abutting
roadways.
Parallel Signs
TYPICAL PAR, Lu Sans-MWLARWM
ROADWAY
sign letter height lookup table.
Offset from Curb (R)
Letter Height in Inches
Number of Lanes
1 2 3 4 5
4 6 8 10 12
20
6
8
10
12
14 -
40
10
12
14
16
18
_
60
80
100
14
18
22
16
---- 20.. _
24
18
- - 22. _.. ..
26
_
20
-- 24
28
22
26 _
30
_ 125
150
27 _
32
29
34
31
36
33
38
35
40
_
175
37
39
41
43
45
200
42
44
46
48
50
225 _
250
47
52
49
54
51
56
53
58
55
60
275
57
59
61
63
65
300
62
64
66
68
70
325
67
69
71
73
75
350
72
74
76
78
80
82 84 86 88 90
Additional research into the effective sizisignage letters, from the basis of static strain viewing also supports the 42" sizing of
the sign letters. Note on this table that from the distances we are offset from the major roadways, signage with the best impact is 42"
to 60" high. This does not take into account the limited viewing time that is possible when in a moving vehicle, or when concentrating
on driving the vehicle, as is accounted for in table above.
40000
LETTER VISIBILITY CHART
STATIC PERPENDICULAR VIEWING
-----------------------
3"
30'
M
Letter Height
Distance for Best
Max. Readable
(Inches)
Impact rfeet;
Distance Ifeetl
3"
30'
100'
4"
40'
150'
6"
60'
200'
8"
80'
350'
9"
90'
400'
10"
100'
450'
12"
120'
525'
15"
150'
630'
18"
180'
750'
24"
240'
1000'
30"
300'
1250'
36"
360'
1500'
42"
420'
1750'
48"
480'
2000'
54"
540'
2250'
60"
600'
2500'
0
0
-.•
� ....._-���
m�iitttt_
/
0
0 •
MEMORANDUM
CITYOF TO: Sharmeen Al-Jaff, Senior Planner
CHMNSEN FROM: Todd Hoffman, Park & Recreation Director
7700 Market Boulevard
PO Box 147 DATE: June 10, 2015
Chanhassen, MN 55317
Senior Center Full park fees in lieu of additional parkland dedication and/or trail construction shall be
Phone: 952.227.1125 collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on
Fax: 952.2271110 the Ponds I Vh Addition. The park fees will be collected in full at the rate in force upon
final plat submission and approval. Based upon the current commercial park fee rate of
Website $12,500 per acre, the total park fees would be $33,875.
www.ci.chanhassen.mir us
SCANNED
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
SUBJ: Request for Subdivision of approximately three acres into one lot and one
Administration
outlot (Villages on the Ponds 11th Addition), and Site Plan Review with
Phone: 952.227.1100
Variances to construct a 23,520 square -foot specialty retail building on
Fax: 952.227.1110
property zoned Planned Unit Development (PUD) and located on Outlot B,
Building Inspections
Villages on the Ponds 4th Addition. Applicant: Venture Pass Partners,
Phone: 952.227.1180
LLC/Owner: Northcott Company
Fax: 952.2271190
subdivision.
7901 Park Place
PARKS
Engineering
PARK AND TRAIL CONDITIONS OF APPROVAL
Phone: 952.227.1160
This property is located within the community park service area for Lake Susan
Fax: 952.227.1170
Community Park and the neighborhood park service area for Rice Marsh Lake
Finance
Neighborhood Park. Employees and visitors to the specialty retail store will have
Phone: 952.227.1140
convenient access to these publicly -maintained park and recreation facilities. Lake
Fax: 952.227.1110
Susan Park is 33 acres in size and features large playgrounds, basketball court, picnic
shelter, tennis courts, archery range, public water access, fishing pier and a ballfield.
Park & Recreation
Ample off-street parking is available at the park.
Phone: 952.227.1120
Fax: 952.227.1110
Rice Marsh Lake Neighborhood Park is four acres in size and features a playground,
Recreation Center
ballfield, basketball court, volleyball court and a small picnic shelter. Off-street parking
2310 Coulter Boulevard
is available. No additional parkland acquisition is being recommended as a condition of
Phone: 952.2271400
this subdivision.
Fax: 952.227.1404
Senior Center Full park fees in lieu of additional parkland dedication and/or trail construction shall be
Phone: 952.227.1125 collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on
Fax: 952.2271110 the Ponds I Vh Addition. The park fees will be collected in full at the rate in force upon
final plat submission and approval. Based upon the current commercial park fee rate of
Website $12,500 per acre, the total park fees would be $33,875.
www.ci.chanhassen.mir us
SCANNED
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
TRAILS
Planning &
Natural Resources
Pnone: 952.2271130
The subject site has convenient access to the public trails along Great Plains Boulevard,
Fax: 952.2271110
the three-mile Rice Marsh Lake trail loop, and the lakeside trail route to Lake Susan
Park. No additional trail construction is being recommended as a condition of this
Public Works
subdivision.
7901 Park Place
Phone: 952.227.1300
PARK AND TRAIL CONDITIONS OF APPROVAL
Fax: 952.227.1310
Senior Center Full park fees in lieu of additional parkland dedication and/or trail construction shall be
Phone: 952.227.1125 collected as a condition of approval for the proposed plat of Lot 1, Block 1, Villages on
Fax: 952.2271110 the Ponds I Vh Addition. The park fees will be collected in full at the rate in force upon
final plat submission and approval. Based upon the current commercial park fee rate of
Website $12,500 per acre, the total park fees would be $33,875.
www.ci.chanhassen.mir us
SCANNED
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division — 7700 Market Boulevard
Mailing Address — P.O. Box 147, Chanhassen, MN 55317
Phone: (952) 227-1130 I Fax: (952) 227-1110
*CITY OF CNANHASSEN
AGENCY REVIEW REQUEST
LAND DEVELOPMENT PROPOSAL
Please review and respond no later than the review response deadline
Agency Review Request Date:
June 9, 2015
Agency Review Response Deadline:
June 25, 2015
Date Application Filed:
June 5, 2015
Contact:
Contact Phone:
Contact Email:
Sharmeen AI-Jaff
952-227-1134
saljaff@ci.chanhassen.mn.us
Senior Planner
®
Park Director
Planning Commission Date:
City Council Date:
60 -Day Review Period Deadline:
July 7, 2015 at 7:00 p.m.
July 27, 2015 at 7:00 p.m.
August 4, 2015
Application:
Request for Subdivision of approximately three acres into one lot and one outlot (Villages on the Ponds 11th Addition), and
Site Plan Review with Variances to construct a 23,520 square -foot specialty retail building on property zoned Planned Unit
Development (PUD) and located on Outlot B, Villages on the Ponds 41^ Addition. Applicant: Venture Pass Partners, LLC
Owner: Northcott Companv
In order for staff to provide a complete analysis of issues for Planning Commission and City Council review, we would
appreciate your comments and recommendations concerning the impact of this proposal on traffic circulation, existing and
proposed future utility services, storm water drainage, and the need for acquiring public lands or easements for park sites,
street extensions or improvements, and utilities. Where specific needs or problems exist, we would like to have a written
report to this effect from the agency concerned so that we can make a recommendation to the Planning Commission and
City Council. Your cooperation and assistance is greatly appreciated.
City Departments:
LJ
Attorney
®
Building Official
®
Engineer
®
Fire Marshal
®
Forester
®
Park Director
®
Water Resources
Carver County Agencies:
❑ Community Development
❑ Engineer
❑ Environmental Services
❑ Historical Society
❑ Parks
® Soil & Water Conservation District
State Agencies:
❑ Board of Water & Soil Resources
❑ Health
❑ Historical Society
❑ Natural Resources -Forestry
❑ Natural Resources -Hydrology
❑ Pollution Control
❑ Transportation
Federal Agencies:
❑ Army Corps of Engineers
❑ US Fish & Wildlife
Watershed Districts:
❑
Carver County WMO
❑
Lower MN River
❑
Minnehaha Creek
®
Riley -Purgatory -Bluff Creek
Utilities:
Cable TV — Mediacom
Electric — Minnesota Valley
Electric — Xcel Energy
Magellan Pipeline
Natural Gas — CenterPoint Energy
Phone — CenturyLink
Adjacent Cities:
❑
Chaska
❑
Eden Prairie
❑
Jackson Township
❑
Minnetonka
❑
Shorewood
❑
Victoria
Adjacent Counties:
❑ Hennepin
❑ Scott
School Districts:
❑ Eastern Carver County 112
❑ Minnetonka 276
Other Agencies:
❑ Hennepin County Regional Railroad
Authodty
❑ MN Landscape Arboretum
❑ SouthWest Transit
❑ TC&W Railroad
® Villages on the Ponds Association
El
El
El
❑ SCANNED
CITY, OF .OHANHASSEN
P O'BOX 147
CHANHASSEN MN 55317
06/09/2015 1:53 PM
Receipt No. 00285844
CLERK: ashleym
PAYEE: Venture Pass Partners LLC
19620 Waterford Court
Shorewood MN 55331 -
Planning Case 2015-17
-------------------------------------------------------
Site Plan Review
740.00
Sign Rent
200.00
Recording Fees
600.00
Subdivision
300.00
Variance
200.00
Final Plat
250.00
GIS List
33.00
Total
Cash
Check 8190
Change
2,323.00
0.00
2,323.00
0.00
SCANNED
Venture Pass Partners, LLC
City of Chanhassen
Spate Type Reference
6/8/2015 Bill TW application
6/8/2015
Original Amt. Balance Due Discount
2,323.00 2,323.00
Check Amount
Payment
2,323.00
2,323.00
Bremer Bank Checkin 2,323.00
e
0
CHANHASSEN SPECIALTY RETAIL - PLANNING CASE 2015-17
$200.00 Notification Sign
$740.00 Site Plan Review
$300.00 Subdivision (3 lots or less)
$200.00 Variance
$250.00 Final Plat
$450.00 Final Plat Escrow for Attorney's Costs
$33.00 Property Owners List
$150.00 Escrow for recording documents
$2,323.00 TOTAL
$2,323.00 Check 8190 from Venture Pass Partners, LLC
0
CITY
COMMUNITY DEVELOPMENT DEPARTMENT JUN 0 5 2015 CITY OF CHANHASSEN
Planning Division — 7700 Market Boulevard
Mailing Address — P.O. Box 147, Chanhassen, MN 55317
Phone: (952) 227-1300 / Fax: (952) 227-1110 'WHA99ENR+MWk0n;
APPLICATION FOR DEVELOPMENT REVIEW
Date Filed: (,; (� 60 -Day Review Deadline: 'J — �l —� `�
Planner r7�
Case
Section••
• •-apply)
❑
Comprehensive Plan Amendment
$600 Q
Subdivision
��**�`�
.........................
El Minor MUSA line for failing on-site sewers .....
$100
❑
Create 3 lots or less ......................................399
❑
Create over 3 lots .......................$600
+ $15 per lot
❑
Conditional Use Permit
❑
Metes & Bounds.. . ......................
$300 + $50 per lot
❑ Single -Family Residence ................................
$325
❑
Consolidate Lots..............................................
$150
❑ All Others.........................................................
$425
❑
Q
Lot Line Adjustment.........................................
Final Plat*
$150
250
... .... ..�.pp��
'Requires
..
for
El
Interim Use Permit
addition ity 50� scrow attorney costs.
❑ In
Escrow will be require or
other applications through the
conjunction with Single -Family Residence..
$325
development contract.
❑ All Others.........................................................
$425
❑ Rezoning
❑ Planned Unit Development (PUD)..................$750
❑ Minor Amendment to existing PUD ................. $100
❑ All Others.......................................................:i(!I�
❑ Sign Plan Review...................................................$150
❑ Vacation of Easements/Right-of-way................... $300
(Additional recording fees may apply)
QVariance ...................................................
❑ Wetland Alteration Permit
❑ Single -Family Residence ............................... $150
❑ All Others ....................................................... $275
Q Site Plan Review ❑ Zoning Appeal ...................................................... $100
❑ Administrative ..................................................$100
❑ Commercial/Industrial Districts' ...................... i! d ❑ Zoning Ordinance Amendment............................ $500
Plus $10 per 1,000 square feet of building area Lap NOTE: When multiple applications are processed concurrently,
'Include number of existing employees: the appropriate fee shall be charged for each application.
and number of new employees:
❑ Residential Districts ......................................... $500 (Refer to the appropriate Application Checklist for required submittal
Plus $5 per dwelling unit information that must accompany this application)
ADDITIONAL REQUIRED FEES: Z Z VO /
❑Q Notification Sign.. ................................. .
(City to install and remove) j (yr Zi 3
❑� Property Owners' List within 500' ........ $3 per a s
(City to generate - fee determined at pre -application meeting)
Q Escrow for Recording Documents.. $50 per documen
(CUP/SPRNACNAR/WAP/Metes & Bounds Subdivision)` --T
TOTAL FEES:$ 3
Received from: e)pwfe
Date Received: to-6—l'j Check Number: Sly
Project Name: Chanhassen Specialty Retail
Property Address or Location: Outlot B, VILLAGES ON THE PONDS, 4th ADDITION
Parcel #: 258460030 Legal Description: Outlot B, VILLAGES ON THE PONDS, 4TH ADDITION
Total Acreage: 2.71
Present Zoning: PUD
Wetlands Present?
Present Land Use Designation: PUD/Retail
Existing Use of Property: Vacant Land
❑ Yes ® No
Requested Zoning: Existing, PUD
Requested Land Use Designation: Retail
Description of Proposal: 23,520 sf specialty retail. .
Platting outlot underlyinq the Pond Promenade private road areas.
21 Check box if separate narrative is attached
WE
APPLICANT OTHER THAN PROPERTY OWNER: In signing this application, I, as applicant, represent to have obtained
authorization from the property owner to file this application. 1 agree to be bound by conditions of approval, subject only to
the right to object at the hearings on the application or during the appeal period. If this application has not been signed by
the property owner, I have attached separate documentation of full legal capacity to file the application. This application
should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this
application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I
further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to
any authorization to proceed with the study. I certify that the information and exhibits submitted are true and correct.
Name: Venture Pass Partners, LLC (or assigns) Contact: Randy Rauwerdink
Address: 19620 Waterford Court Phone: (612) 801-4313
City/State/Zip: Shorewood, MN 55331 Cell: (612) 801-4313
Email: rrauwerdink@venturepass.net Fax:
Signature: Date: 6/5/15
PROPERTY OWNER: In signing this application, I, as property owner, have full legal capacity to, and hereby do,
authorize the filing of this application. I understand that conditions of approval are binding and agree to be bound by those
conditions, subject only to the right to object at the hearings or during the appeal periods. I will keep myself informed of
the deadlines for submission of material and the progress of this application. I further understand that additional fees may
be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the
study. I certify that the information and exhibits submitted are true and correct.
Name: Northcott Company Contact: Brian Schwen
Address: 250 Lake Drive East Phone: (952) 294-5215
City/State/Zip: Chanhassen, MN 55317
Cell:
Email: bschwen@northcotthospitality.com Fax:
Signature: Date: 6/5/15
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all
information and plans required by applicable City Ordinance provisions. Before filing this application, refer to the
appropriate Application Checklist and confer with the Planning Department to determine the specific ordinance and
applicable procedural requirements.
A determination of completeness of the application shall be made within 15 business days of application submittal. A
written notice of application deficiencies shall be mailed to the applicant within 15 business days of application.
PROJECT ENGINEER (if applicable)
Name: Sambatek
Address: 12800 Whitewater Drive Suite 300
City/State/Zip: Minnetonka, MN 55343
Email: MBultman@sambatek.com
Contact: Mike Bultman
Phone: (763) 398-0867
Cell:
Fax: (763) 476-8532
Who should receive copies of staff reports? 'Other Contact Information:
0
Property Owner
Via:
❑v
Email
❑ Mailed Paper Copy
Name: kWy Kwlik-Tushie Montgomery Architects
❑�
Applicant
Via:
❑�
Email
❑ Mailed Paper Copy
Address:
❑Q
Engineer
Via:
❑
Email
❑ Mailed Paper Copy
City/State/Zip:
❑
Other'
Via:
❑�
Email
❑ Mailed Paper Copy
Email: Anayl<@ namhdeas.com
0 1 0
C ITY OF CHANHASSEN
RECEIVED
PROPOSED DEVELOPMENT-OUTLOT B VILLAGES ON THE PONDS 4T" ADDN JUN (� 2015
PROJECT SUMMARY NARRATIVE
'HANHASSEN PLANNING DEPT
Introduction
Venture Pass Partners, LLC is pleased to submit for consideration and approval, the attached
applications for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B, VILLAGES ON THE
PONDS 4' ADDITION. We are proposing to subdivide and plat this parcel into Lot 1 retail development
consisting of a 23,520 sf specialty retail store, as well as Outlot A which will contain the Pond
Promenade Road improvements. Sidewalk construction and improvements are proposed along the full
perimeter extents of Pond Promenade Road and Main Street as part of the improvements, enhancing
the pedestrian friendly character of the project. Benches and bike racks are also being incorporated to
further promote the pedestrian character.
Architecture and Design
The 23,520 sf single story building will be detailed with a varied pallet of warm toned materials for the
building exterior. Materials consist of pigmented rock face and burnished masonry, brick, EIFS cornices,
standing seam metal roofing, aluminum windows, and fabric awnings.
Accommodation for the 70% sloped roof coverage requirement is accomplished through the use of a
feature corner tower with a hip roof and wrap around sloped metal roofing at portions of all four
elevations. Additional use of projecting fabric awnings and sculpted EIFS cornices provide increased
relief within the building facade.
The 50% building fenestration requirement is accomplished with an interplay of massing, color, and
material detailing at each elevation. The use of large windows, sloped metal roofing, sculpted EIFS
cornices, brick piers, and fabric awnings provide a pedestrian scale and architectural detailing to each
elevation. Windows at some locations, as governed by the Tenant's store layout, may be spandrel or
translucent glass highlighted with awnings. The exterior of the building is further enhanced with an
emphasis to natural plant materials using a green screen climbing landscape element at the east
elevation (Main Street) and extensive use of plantings varied in height along the north, east, and south
elevations. The outdoor trash storage and loading area is also screened by use of plant materials.
Articulation of the south wall elevation is also accomplished with the natural building steps resulting
from the receiving appendage and with the added layering and screening provided by the freestanding
trash enclosure with an architectural trellis detail.
Tenant signage will be integrally lit channel letters and will occur on all four building elevations as
allowed by city ordinance, and will be compliant with all allowable area. requirements.
Stormwater Design
One of the unique challenges of this project is meeting the stringent requirements of Riley -Purgatory
Bluff -Creek Watershed District (RPBCWD), and specifically the standards which just became effective
January 1, 2015. This is further complicated by the existence of primarily group type D soils that are
Pervasive across this site. Stormwater rate, water quality and abstraction requirements are being
satisfied via the construction of an underground stormwater infiltration system. Extensive areas of the
parking lot are to be surfaced with pervious pavers over a draintile and rock infiltration basin system.
SCANNED
CHANHASSEN SPECIALTY RETAIL-Outlot B VILLAGES ON THE PONDS 4'" ADDN
REQUEST FOR VARIANCE TO EXCEED 20,000 SF RETAIL USER ON SINGLE LEVEL OF A BUILDING. (PROPOSE 23,520 SF)
Venture Pass Partners, LLC has submitted for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B VILLAGES ON THE
PONDS 47" ADDN, including the development of a 23,520 sf specialty retail store. The proposed retail use is specifically listed as a
Permitted Use in the Villages on the Ponds PUD zoning. The Villages on the Ponds Development Design Standards as adopted in
1996 and amended in 2001, under Article (b.) Permitted Uses, states that No single retail user shall exceed 20,000 squarefeet on a
single level of a building.
Within the Villages OnThe Ponds development, as well as in the surrounding downtown area and neighborhood, there are multiple
offerings and opportunities for small shop space and uses. What is limited is the availability of larger parcels that can support a
medium size retail box; a use that can serve as a critical draw in support of the neighboring small shop space. The 2.71 acre Outlot B
parcel, less the approximately one acre that is to be platted as Outlot underlying Pond Promenade, is well suited to fill this void.
Since its conception in 1996, the Villages On The Ponds development has struggled to reach full build -out, being limited by the small
shop village character limitations that exist. Our proposed project can help achieve the goal of a full build -out, essentially becoming
the final anchor to this development.
The proposed 23,520 square foot building footprint, while smaller than the typical or desired footprint for this retail user, does
represent the maximum development potential on this parcel. The site is extremely limited by the existence of deep, poor
unsuitable soils over much of the site; with the Northeast corner being the only real suitable placement for building foundation.
Creating multiple smaller footprints across other areas of the site would prove unfeasible and cost prohibitive due to extreme soil
correction and deep foundation system requirements. These conditions are even further exacerbated by the new more stringent
Riley -Purgatory Bluff -Creek Watershed District design standards as were made effective January 1, 2015. You will note in the storm
water design documents that were engineered for this project, that we are incorporating significant areas of pervious pavers
throughout the entire interior parking field to help comply with these new standards.
We believe that this modest increase in proposed maximum building footprint size is merited and beneficial to the development as a
whole. We will be introducing a significant, high quality national retailer to the development, enabling full build -out of the
development, and at the same time maintaining high standards of architectural character and amenities.
r1 NORTHWEST PERSPECTIVE
.CHANHASSEN SPECIALTY RETAIL-Outlot B VILLAGES ON THE PONDS 4T" ADDN
REQUEST FOR VARIANCE TO PERMIT 42" WALL SIGNAGE LETTER HEIGHT ON NORTH AND WEST ELEVATIONS
Venture Pass Partners, LLC has submitted for Site Plan Approval and Subdivision (Plat) for the 2.71 acre Outlot B VILLAGES ON THE
PONDS a ADDN, including the development of a 23,520 sf specialty retail store. The architectural design and exterior building
elevations as submitted incorporate wall signage on four allowable building elevations, as follow:
North -Fronting Pond Promenade and visible to Hwy 5 to the north.
West -Over main entrance and fronting the parking lot, also visible to Market Blvd.
East -Fronting Main Street
South -Fronting Lake Drive
Signage on each elevation is proposed as individual internally illuminated channel letters, 42" in height on the North and West
elevations and 30" in height on the East and south elevations, and placed in a consistent fashion/signage band detail. The total area
of each sign as proposed is well below the allowable signage area as per City ordinance, as illustrated and enumerated on the
attached exterior elevation drawings.
A variance is required due to a clause in the VOP Development Design Standards, restricting wall letters to a maximum of 30" in
height. While this standard may be suitable for small shop space or for visibility and legibility from directly abutting streets or at
pedestrian scale, this is far too limiting and ineffective for our proposed use. We also feel that it is not of a scale consistent with the
massing and dimensions of our proposed building. It should also be noted that when the Pond Promenade PUD was approved in
1996 it was one of the pioneering new urbanism projects in the Metropolitan area. During this period communities and planners
had a general attitude that merchant signs should be minimal and generic. The current trend as evidenced by the relaxing of most
municipal sign codes is that adequate signage is not only critical to a merchants success but can add vibrant and creative design
elements to a project while adding distinction and variety to a neighborhood. Highly visible and legible signage is critical to the
success and viability of a grocery operation with a regional draw. This parcel as situated has critical sightlines to Hwy 5 and to
Market Blvd, however it is set back from Hwy 5 by approximately 550', and from Market Blvd by approximately 620'. Providing
effective identification and signage to passing motorists is essential. Signage, if restricted to 30" letter height, will prove ineffective
0 0
.Research as compiled by the United States Sign Council, studying legibility of signage parallel to roadways from moving vehicles is
summarized in the table below. This table only calculates recommended letter heights up to a distance of 400' from the roadway,
however even at 400' (highlighted in yellow) the recommended legible sizes exceed 80" in height. The 42" height that we are
requesting is obviously well below this recommendation, but it will provide some level of effectiveness that could not be achieved
with the 30" restriction. The 42" height is also consistent with other locations of our tenant, and in keeping with their minimum
standards. For additional reference I also highlighted in red the effective distance for viewing signage with 30" letters. This
approximate 100' distance is consistent with my comments above, suggesting this sizing is suitable for pedestrian scale or viewing
from directly abutting roadways.
Parallel Signs
TYPICAL PARALLEL SIGNS - ANGULAR VIEWS
'IcN
ROADWAY
Table 3. Parallel sign letter height lookup table.
200
42
Letter Height in Inches
46
48
50
Number of Lanes
47
Offset from Curb (ft)
1
2 3 4
5
10
4
6 8 10
12
20
6
— _
8 10 12
_
14
40
10
12 14 16
18
60
14
16 18 20
22
80
18
20 22 24
26
100
22
24 26 28
30
125
27
29 31 33
35
150
32
34 36 38
40
175
37
39 41 43
45
200
42
44
46
48
50
225
47
49
51
53
55
250
52
54
56
58
60
275
57
59
61
63
65
300
62
64
66_
68
70
_ 325
67
69
71
73
75
350
72
74
76
78
80
375
77
79
81
83
85
400
62
84
86
88
90
SCANNED
• Additional research into the effective sizing of signage letters, from the basis of static straight on viewing also supports the 42"
sizing of the sign letters. Note on this table that from the distances we are offset from the major roadways, signage with the best
impact is 42" to 60' high. This does not take into account the limited viewing time that is possible when in a moving vehicle, or
when concentrating on driving the vehicle, as is accounted for in table above.
n
�. LETTER VISIBILITY CHART
STATIC PERPENDICULAR VIEWING
T +
3"
I 30t
Letter Height Distance for Best Max. Readable
(inches) Impact (feet, Distance (feet)
3" 30' 100'
4" 40' 150'
6" 60' 200'
8" 80' 350'
9" 90' 400'
10" 100' 450'
12" 120' 525'
15" 150' 630'
18" 180' 750'
24" 240' 1000'
30" 300' 1250'
36" 360' 1500'
42" 420' 1750'
48" 480' 2000'
54" 540' 2250'
60" 600' 2500'
SCANNED
• 0
1
16
a�� SIGNAGE
axe,/—'-- -------------------------- - ��
n NORTFI T MP5MCII
SCANNED
CHANHASSEN SPECIALTY
RETAIL
VILLAGE ON THE PONDS
LAKE DRIVE & MAIN STREET
CHANHASSEN, MINNESOTA
ABBREVIATIONS
awr,�i.�uu
m wa
In
IA
wimrasam
PROJECT TEAM
M:NiURi FA" MRI M. IlG
6"ro a
n»nrzaMorrtcoMea uxnlren•.
LMlD9CI.R I.RCNR[R,
N lr MWGOMEW NLCNN[GTS
CML NGINM
MMMRR v
M[CMNIGL 1 [LCLTRKIl CNGIN[!R
cux rlwMw� wroxwiu
SITE LOCATION _
(I['.A'l'.RAI, NO I.ti
PROJECT INFO.
cox wrow.wnox
,. orcww. rea.»nw
uNe I,.—
..wa,arrcwaoua�
.boc�r..vw,oi bxu¢rnoree.,wr
.wwr
mt�
M mw mem S��mp�c
DRAWING INDEX
rm w,+m.nw i
`�"wzim�mx�
mbiN::rw mue
muu
9
iff
R
T
sir
K 13
�,y
w•' a
I
------------
Zi ----------
—• Nm94aP111M.00 ;
GF-
-----------------�
\
\
a
, f
1 :C.
a
I t
I
3
I
I
i ApF _
I
p s
I€RZa
I
gig 3
a
Ir
a
it
pp 9
a
x=
g
a
L
S•g3�
�
y
3
Y
sir
K 13
�,y
w•' a
I
------------
Zi ----------
—• Nm94aP111M.00 ;
GF-
-----------------�
\
\
a
, f
1 :C.
a
I t
I
3
I
I
i ApF _
I
p s
I€RZa
I
gig 3
sir
K 13
�,y
w•' a
I
------------
Zi ----------
—• Nm94aP111M.00 ;
GF-
-----------------�
7
•
Site Development Plans
for
Chanhassen Specialty
Retail
Chanhassen, Minnesota
mmmmwSm CONSULTANT COMACT UST
ax[[tl
o(vflON.(OMw sav rL
SHUT.�a p uc w eE,=U E.EEL I0ll.[.xnn lm
COHiST 55351 1[.^ I,M[SSIT
ca.,.cr. X.Xx� tl.vwz.ox.. 1 XnrN.X
YIlfI1RSAM00hNX([r M[mm[[n
I. W� I.rt.1 SYn[][4
V[5wM.5VlfF soo SI [ANXsssxs
X.D.U.Mx5Ll3 TI.I.ID
wMxcS.w tlxnx awr.5n. nia xax
c[m[NI
i UUEDIOS,H-
w1 1ISET UnSIT,1. xMx.UI �hE`.�
Presented by:
Venture Pass Partners, LLC
f
4
`k
Ci
1 n
cu C
1 Pt Y x.x 1: F&
h HCR
9. q
+
1[M r
0.roO^4j �� wxnn si.
lelVy Sl
— '
d
JL -
f
Ig
ITE"`Q,Y�
`"Y
p
•�' SITE
SITE"
9 ENw, suM„
`
F•
I c
x`I
Ilw
IS
is R.
Mnr,hl
TIS
VICINITY MAP
NO SCALE
e BENCNMARBB
ESE NO I
NMH 01�
F..5tl SOUTH SIDEOF FIEND MoX[x,N
n[SE)I . muENowaravuxotl.xorwxsr.
DSnbatek
USED
ITS I
VENTURE PASS
PARTNERS, LLC
;,ST. STEEIDSTESTEDUSE,
�VT.NMS Puss P.wnaas
.................
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision ^Hlstory�
Shee[ Title
TITLE SHEET
Sheet No. Revision
C1.01
Project No.V[N30145.01
VILL.ASiEES
ON THE
P011IM;
•
\
i
VILLAGES ON THE PONDS
ME) ADDITION
DN tN5 PONDS
0
7�
i
7TH AEii)1T:III
i� �✓•y� -- :ES I I
i
Sambatek
Client
VENTURE PASS
PARTNERS, LLC
WnII:t,PxcS i#RPaRS
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
A
�`�PQ
QZII
Summary
Revision HistoryVp
rui vi w.wwn..Pe
Sheet Title
EXISTING
CONDITIONS
Sheet No. Revision
C2.01
Project No.VENI0145.01
LEGENO
1
eOESCRIMION
1/1
CI
=PROPERTYSUMMARY
II/
IIIIIIIIIsSENCHMARRS"
It�
r
..r.w�wr w... nuvne.nemm�.wwrwwrcmwn
wwlp:wwrr..ww.s
[S�j
rwnwrr
U 1
�SURVEYNOTES
;!
J
�wv'wrmwrmsvrvw.
Sambatek
Client
VENTURE PASS
PARTNERS, LLC
WnII:t,PxcS i#RPaRS
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
A
�`�PQ
QZII
Summary
Revision HistoryVp
rui vi w.wwn..Pe
Sheet Title
EXISTING
CONDITIONS
Sheet No. Revision
C2.01
Project No.VENI0145.01
9
0
sDEMONTIDNNOTES
A�wa.awnn.wnvewaNwaw
n u.mw�waw,v�.cm.nn
OEMOLmON LEGEND
—LEGEND
OEMOLmON LEGEND
-tri-rnr�
wA amoie.I.wB ..wING MATERIAL NOTES
I
1
Dl w� TREE PROTECTION DETAILwwun�mmmuu.
Samb&k
"w Nww.°1L.mw
Client
VENTURE PASS
PARTNERS, LLC
SNDAFWOD��MN))))IT
F# I
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision Nlstory
Sheet Title
DEMOLITION
PLAN
Sheet No. Revision
C2.02
Project NO.VEN20145.01
VILLAGES
ON THE:
I.aT ,
PONDS
0M
E
VILLAGES ON' THE PONOS ...;.^"
LOT, 3RU AOUiTiOFi 4 mom°`*/. _
VILLAGE:S ON THE
PiiNDEi
DUTLOT fl
i
—LEGEND
s0 -- NORTH
R -.-....s
/PA`.e'sT —YE
/���•• 1-W SSM'
0
Client
VENTURE PASS
PARTNERS, LLC
�HOREW0001 MN 55 -
Project
CHANHASSEN
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
.n+w.. rv. uulu wuw
Revlslon History
Sheet Title
PRELIMINARY
PLAT - VILLAGES
ON THE PONDS
11TH ADDITION
Sheet No. Revision
C2.03 A
Project NoXENMMS.01
—PROPERTY SUMMARY
y
ra
Cy
_CONTAINFORMATION
R�
.1
SITE NOTES
/PA`.e'sT —YE
/���•• 1-W SSM'
0
Client
VENTURE PASS
PARTNERS, LLC
�HOREW0001 MN 55 -
Project
CHANHASSEN
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
.n+w.. rv. uulu wuw
Revlslon History
Sheet Title
PRELIMINARY
PLAT - VILLAGES
ON THE PONDS
11TH ADDITION
Sheet No. Revision
C2.03 A
Project NoXENMMS.01
•
•
4W � 4 l i J O KE DeIVE
.LEGEND
-� o
F-
0
ODENELOPMENTNOTES
KEY NOTES
Al k?alBk
.webkx
Client
VENTURE PASS
PARTNERS, LLC
,suowniewonocwnr
sxo.sw000,ux ssm
PAss ............
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
41
Summary
Rev tion History ..
Sheet Tltle
CIVIL SITE PLAN
Sheet No. Revision
C3.01
Project NO.VEN30145.01
•
0
V
q l \\O
at R
n
OMENAGE
e-
Nu,x,
V wr..rembrleM.sem
IpAYY �nF� `Ph�aaeaav
xE�TxaYx :vka en:.nnve
Client
VENTURE PASS
PARTNERS, LLC
znmwRo MDWURT
zMIILWu'Oo MN.11
P,IiS Md
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision Hiztory .�
Sheet Title
GRADING PLAN
Sheet No. Revision
C4.01
Projed No.VENla145.e1
RI
long
r
,
1
t
V
q l \\O
at R
n
OMENAGE
e-
Nu,x,
V wr..rembrleM.sem
IpAYY �nF� `Ph�aaeaav
xE�TxaYx :vka en:.nnve
Client
VENTURE PASS
PARTNERS, LLC
znmwRo MDWURT
zMIILWu'Oo MN.11
P,IiS Md
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision Hiztory .�
Sheet Title
GRADING PLAN
Sheet No. Revision
C4.01
Projed No.VENla145.e1
0
mrxw
_ runr
i
f - PROMENADE \
POND — <. .� _ l SB
TS
u
- I �'_ � ' V ! � � ^�I �1A �v 11 MIL � � �°.".•<,". r"�"u.::""., SM
\ 111j 1.,. men SEQUENCE OF CONSTRURION
inl'i
r, s `SCJ
®xon:rocoNTRAcroR
' _
W(E DRIVE ( f \ tlAR"WMM "INACR6 rm
i t�-� ,S c ..'.n a{�!m ') ,F^•dam .�;` .. __
•NmroweRom rtRaxeMtxoRRMuxlex•xn
✓u 1 Ir a 5 _ wns.muntxwn.wxsrawetxruu
EROSION CONTROL MATERIALS QUANTDES
I�
IRM umn _OUPXniv-��-
IFU
e,vnMN
i Samb&k
w.•em0eleh.tom
neap �xtx e'°1Yes'p0u
�iTMeeev�ux
Client
VENTURE PASS
PARTNERS, LLC
IIIIT�VJIITIII—D IT
nunaa Pus eoi
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certiflcatl-n�_
Summary
Revslon— HIstor
Sheet Title
EROSION
CONTROL PLAN
-PHASEI
Sheet No. Revision
C5.01
Project NO.VEN00145.01
3
A
•
eTt^
�. FIAT
ax■�a 1e
�* �� •Y• • I KL OWL
I
Q4TY Q, u�10
O..
rt,nau.a an,wnrnnro.u. TS
SEQUENCE OF CONSTRUMON ^
—NOTETOCONTRAROR
AREASUMMA"INACRES
•Nrs. �osx� omroxaoiiu xons,uuxrexxxrR
NJIN.,Mn. ox,nllyµ OxxO MMf
EROSION CONTROL MATERUUS QUAMmES
nMu.
[lvCPnl
CMN
EBE
�R1��R1a1������������
`Sambatek
Client
VENTURE PASS
PARTNERS, LLC
sw wunMoxomuxr
xR:ew000 Nx snv
&�s MARS AwRau
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
A
Summary
ReNlslon Historywxx
o.�rer
Sheet Title
EROSION
CONTROL PLAN
-PHASE II
Sheet No. Revision
C5.02
Project No.VEN1014501
ax■�a 1e
P
SRFRw..
���
•
.
R
�* �� •Y• • I KL OWL
I
Q4TY Q, u�10
O..
rt,nau.a an,wnrnnro.u. TS
SEQUENCE OF CONSTRUMON ^
—NOTETOCONTRAROR
AREASUMMA"INACRES
•Nrs. �osx� omroxaoiiu xons,uuxrexxxrR
NJIN.,Mn. ox,nllyµ OxxO MMf
EROSION CONTROL MATERUUS QUAMmES
nMu.
[lvCPnl
CMN
EBE
�R1��R1a1������������
`Sambatek
Client
VENTURE PASS
PARTNERS, LLC
sw wunMoxomuxr
xR:ew000 Nx snv
&�s MARS AwRau
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
A
Summary
ReNlslon Historywxx
o.�rer
Sheet Title
EROSION
CONTROL PLAN
-PHASE II
Sheet No. Revision
C5.02
Project No.VEN1014501
11
SEDIMENTATION CONTROL MOTES O DETAILS / "SITE MAP"
.SM LOGTION MAP eev Usw MAP
� TS
tl:lCllnre4..eYllB T'•!MI:O M'.tR
,.•..... �.!... "iii`:?\
�C
]]N
� TS
—ROAD own INW PROTEMON IIP -1i
CONCRETE WASNOSIT AREAAry"•..r..unrvn,u
—GENNEERALLROVONNOTES
—MA1NTENANCENOTES:
k
SEb&k
IMW1�61LfNY
Client
VENTURE PASS
PARTNERS, LLC
SMORFWOOX,MX]]I13r
&M Pits PmTNms
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
RevlsionT
nN Llmiptll
Sheet Title
EROSION
CONTROL
DETAILS
Sheet No. Revision
C5.03
Project NO.NEW145.05
tl:lCllnre4..eYllB T'•!MI:O M'.tR
�?�Lamsr rig•., iJl,`.
me
m r 316
—ROAD own INW PROTEMON IIP -1i
CONCRETE WASNOSIT AREAAry"•..r..unrvn,u
—GENNEERALLROVONNOTES
—MA1NTENANCENOTES:
k
SEb&k
IMW1�61LfNY
Client
VENTURE PASS
PARTNERS, LLC
SMORFWOOX,MX]]I13r
&M Pits PmTNms
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
RevlsionT
nN Llmiptll
Sheet Title
EROSION
CONTROL
DETAILS
Sheet No. Revision
C5.03
Project NO.NEW145.05
9
•
�.ars PONOI`.L�C
�■mout
INCE DRIVE
mwUiI Ln CONSTRUCTION NOTTS
T.
.STORM SEWER STRUCTURE SCNEOOEE
Sambatek
wwwalak.<ON
��wvtl+Riw YW
AR b�M,
nIwR14AYR11MRI.
Client
VENTURE PASS
PARTNERS, LLC
sxonswaoo u�xss�f
�RINIIC PACS PuiI1D�5
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
PyON.
Summary
Revision History
Ne.O rN R�E�IYR ^agy w
Sheet Title
UTILITY PLAN
Sheet No. Revision
C6.01
Protect NO.VEN101E5,01
nrx
'
1.
�k
1
G
E
mwUiI Ln CONSTRUCTION NOTTS
T.
.STORM SEWER STRUCTURE SCNEOOEE
Sambatek
wwwalak.<ON
��wvtl+Riw YW
AR b�M,
nIwR14AYR11MRI.
Client
VENTURE PASS
PARTNERS, LLC
sxonswaoo u�xss�f
�RINIIC PACS PuiI1D�5
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
PyON.
Summary
Revision History
Ne.O rN R�E�IYR ^agy w
Sheet Title
UTILITY PLAN
Sheet No. Revision
C6.01
Protect NO.VEN101E5,01
A
9
my .�\\ iJdV/ /Mr•w4nxw.n. Mi.�
-� grernN
�Q��ANQete R ICAL dr DIAMETER
I� CATCH BASN MANHCLE
dGXEdIxG 4FPAFIMdI rax.0 ]lai
.w Ox M. iY. Nef M N.e. n:xenn.
n rya
ISQ�FIs�`.
...:,, ..,...�, ..... .I:..x.r,.,,.,. ,.:..:.. L. x.
BARED END SECTIDN MMM
dLYXEdxIO GEPAP1NEHi �� }iDB
n
e
LL
InE�wIYn
I/l•'r
WAlfxgl9 M -6>-]'A
9/rr
rfA rp w:w:e Vw
L
my 'oaTi wr"eYv�nYpi�
u
• 1�L
oESICN�sP nnl
rmlcA��U
�Qm
TIPICAI I)• DIAMETEF
x xiomf
1YY�Mfa
CATCH BASN
CNOMCEMN4 OEPMlxdi WW ]1[I]
��'
my .�\\ iJdV/ /Mr•w4nxw.n. Mi.�
-� grernN
�Q��ANQete R ICAL dr DIAMETER
I� CATCH BASN MANHCLE
dGXEdIxG 4FPAFIMdI rax.0 ]lai
.w Ox M. iY. Nef M N.e. n:xenn.
n rya
ISQ�FIs�`.
...:,, ..,...�, ..... .I:..x.r,.,,.,. ,.:..:.. L. x.
BARED END SECTIDN MMM
dLYXEdxIO GEPAP1NEHi �� }iDB
Is
n
e
LL
InE�wIYn
I/l•'r
WAlfxgl9 M -6>-]'A
9/rr
rfA rp w:w:e Vw
el
my 'oaTi wr"eYv�nYpi�
u
QITQ
rmlcA��U
AND
vWxsemEet4x.com
�� YFN YYYW
mmm,oYyw
1WRe1p YiY1
NwrxnW.IIxrYY�e.r�s
Client
VENTURE PASS
PARTNERS, LLC
�ClRAIF�PASR PARR4RS
Sheet
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
CerSLA
tification
Summary
Revision
xn/ .
Sheet 71t1e
CONSTRUCTION
DETAILS
Sheet No. Revision
C7.01
Project No.VEN20105.01
NmNMTs s,aL eL aow ao.w4N ca
WAlfxgl9 M -6>-]'A
.LLL Mi➢PM3 NJSf N[AR�N4yML av qiY
Yxw a Gw :v. Y.
my 'oaTi wr"eYv�nYpi�
'xx,wxi.
ur[F
x xiomf
��'
Menu lux
w.Cx.r:.
p
N`im
ar.4 w.l enro qn part
of I ..:nhc
Nomrx y..C.M
¢ wsMM,
swbemw
QRQ
iWICAL
HYDRANT
rcxrMx.:.x. mx.
INSTALLATIDN
11..
QRQ
TPICAL CAN VALVE
[ACIHLEPIXG Df00M1YFxI .Fl[r 1DD6
QQQ�
AND BOX IHSTALLAIICN
d012aAp CO'MMR ~� 1110!
vWxsemEet4x.com
�� YFN YYYW
mmm,oYyw
1WRe1p YiY1
NwrxnW.IIxrYY�e.r�s
Client
VENTURE PASS
PARTNERS, LLC
�ClRAIF�PASR PARR4RS
Sheet
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
CerSLA
tification
Summary
Revision
xn/ .
Sheet 71t1e
CONSTRUCTION
DETAILS
Sheet No. Revision
C7.01
Project No.VEN20105.01
NmNMTs s,aL eL aow ao.w4N ca
WAlfxgl9 M -6>-]'A
.LLL Mi➢PM3 NJSf N[AR�N4yML av qiY
my 'oaTi wr"eYv�nYpi�
Oe�r
ur[F
vYWpp
N`im
ar.4 w.l enro qn part
ref:"`.,. r...
QRQ
iWICAL
HYDRANT
INSTALLATIDN
[ACIHLEPIXG Df00M1YFxI .Fl[r 1DD6
vWxsemEet4x.com
�� YFN YYYW
mmm,oYyw
1WRe1p YiY1
NwrxnW.IIxrYY�e.r�s
Client
VENTURE PASS
PARTNERS, LLC
�ClRAIF�PASR PARR4RS
Sheet
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
CerSLA
tification
Summary
Revision
xn/ .
Sheet 71t1e
CONSTRUCTION
DETAILS
Sheet No. Revision
C7.01
Project No.VEN20105.01
J
0
oormsernox
,
wvxnoxoruu.
P[wsrelnn coos uuav
01 xrr BC(EfABLEP�EgNONON 01x_ NRB QR 03 x..a TYPII'AlC1ERH0VT ssrnoxx
Sambatek
VENTURE PASS
PARTNERS, LLC
SNwE IAss PARINIII\
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision History_
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revision
C/.02
Project No.VEN20145 01
m .0
I
r�a.Kp i
m w,M LfiW
aNrA.
iwv�s _ a=lu
DING
PIPE BEDDING
IN PDDR SOULS
EA DAN. ovumw 2201
oormsernox
,
wvxnoxoruu.
P[wsrelnn coos uuav
01 xrr BC(EfABLEP�EgNONON 01x_ NRB QR 03 x..a TYPII'AlC1ERH0VT ssrnoxx
Sambatek
VENTURE PASS
PARTNERS, LLC
SNwE IAss PARINIII\
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision History_
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revision
C/.02
Project No.VEN20145 01
I
_Ta`
aNrA.
IABP
PIPE aED01NG
mum
FOR P.V.C. PIPE
ENn. WAUN rt " 2203
oormsernox
,
wvxnoxoruu.
P[wsrelnn coos uuav
01 xrr BC(EfABLEP�EgNONON 01x_ NRB QR 03 x..a TYPII'AlC1ERH0VT ssrnoxx
Sambatek
VENTURE PASS
PARTNERS, LLC
SNwE IAss PARINIII\
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision History_
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revision
C/.02
Project No.VEN20145 01
Wk-0
�] 1
taO9F
aNrA.
RIP RAP
DETAIL
oormsernox
,
wvxnoxoruu.
P[wsrelnn coos uuav
01 xrr BC(EfABLEP�EgNONON 01x_ NRB QR 03 x..a TYPII'AlC1ERH0VT ssrnoxx
Sambatek
VENTURE PASS
PARTNERS, LLC
SNwE IAss PARINIII\
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision History_
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revision
C/.02
Project No.VEN20145 01
•
0
�e��nw" wu vs
.vus Wwe,oW..w m x.W
OSv4 EftiN INOUSPAVEMEMSEMONS=
ty r ti 110�1
r�Ww.
•x"nuNmwmu�w ,ren mnnNm.wus �m
COMM PAVEMENT SECnONS-
r, �
se�ax
umwxomws�wm,.n...e.o..,e.p "
(�CONCRETF nOFWAUt
JCF';MU PW Sea 5S"R MI
n o
ME MEIEF
m.x
i6 m�nw.,
a Novr
on
mart an
EIAFL e4PRe PNEL
�'
TOPNEWQ/pIMP
;,✓�� YAl6Vpf E0.r
GnEN
m ReoEov.
.rte
s
—o-
�eGk1���.'' 9ioEHewa wNp
DRI) les
W
�T•`r�:S
SAPL 9APFLE STM101URE
RAVIWYOY N.WKIL WM1VrLE
ESOL
.= em.wmaPsaxnaaevxc
r, �
se�ax
umwxomws�wm,.n...e.o..,e.p "
(�CONCRETF nOFWAUt
a�Sambatek
neon YmM.P
7aiu.
iW+biti"An oma �'iwm�na
Client
VENTURE PASS
PARTNERS, LLC
&T%NNN PASS P m.4
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
NIN
Certification
,umma� ry
awW m
Revision Hlstory�
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revision
C7.03
Project No.VEN20145.01
ME MEIEF
m.x
i6 m�nw.,
Y
;r
T
O v i ERVIOUS PAVEMEM SEMON
s
PIi
ROOe 1NRLATMnON MSIN
a�Sambatek
neon YmM.P
7aiu.
iW+biti"An oma �'iwm�na
Client
VENTURE PASS
PARTNERS, LLC
&T%NNN PASS P m.4
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
NIN
Certification
,umma� ry
awW m
Revision Hlstory�
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revision
C7.03
Project No.VEN20145.01
•
0
ecoStorm
z
i.
I _
Ole,PP mncnm PIPE DOLMD"�
ftbeatek
�•P.Pxr
win
:lien
VENTURE PASS
aARTNERS, LLC
onorouxr
nrouwmP.un sn>+
A�—DMAC PASS Pum�mS
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision HlstoryM
swe.ii,n,P.N.�
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revision
C7.04
1`101.0 No.Dtrvawas.D1
v®m®m0000®®
�a�umema,moor®®®
aoa mmmoore®o0
om®m�000®oo
a1
11
a Ma_
z
i.
I _
Ole,PP mncnm PIPE DOLMD"�
ftbeatek
�•P.Pxr
win
:lien
VENTURE PASS
aARTNERS, LLC
onorouxr
nrouwmP.un sn>+
A�—DMAC PASS Pum�mS
Project
CHANHASSEN
SPECIALTY
RETAIL
Location
CHANHASSEN,
MN
Certification
Summary
Revision HlstoryM
swe.ii,n,P.N.�
Sheet Title
CONSTRUCTION
DETAILS
Sheet No. Revision
C7.04
1`101.0 No.Dtrvawas.D1
5T[ MVELOPMCNT SUMMARY rc�wai I 1
IDT I
ve'eXi�v tiN \
oam�.aow roleawual .. la.ei
�erK drz •ay.IiA is+M O.AnemV �
s1 wsH
LITnL R—RED 1-1l llaL iwnM ..IAXIM I, ie I—.
�.tt . W M4 ne.url uNTW wNSH
.ubMM1�'.ROM arNrt.
XryNII T FAKIN laasoM[sMl MrlP.
'sNIXs e� v—NI-TICI w+
— ITER eee.nwoeRawMi W aIN rzwl.�.,l e. r.., Dawe, meawle
.PRELIM, OPY
NOt �OT�ON
OONStR
T�
SITE YUN
L�
- Plan mcj Ian - _
ELI
CHANHASSEN SPECIALTY =_n
RETAIL -_-
iChanhassen, Minnesota —
4
4
ELI
CHANHASSEN SPECIALTY =_n
RETAIL -_-
iChanhassen, Minnesota —
2 EXISTING TRE HRUB PROTECTION
11 T
."ce rvw�wc.
1.Kmroo. 1
MIN
—11IIT—
�°
—11. A MIN 11,....N.-1�.,�...
.nure wrua
.mow.— o.
�
5013 TREE PLANTING
2 EXISTING TRE HRUB PROTECTION
3 5T,1N5TALLATION
mu oom TTJ
5 WAMULCH BDP
4 SHRUB PLANTING
w..o,„ ILca...uw
H 1
OMER
TECT
J
Q
U �
W y
m
Z Q 2
Z F c
W W v�
Tn z
Q N
= U
z
Q
S
U
.P0.NOMF0RY
GONSt0.UCt10N
PUNTING DETAILS
.mow.— o.
3 5T,1N5TALLATION
mu oom TTJ
5 WAMULCH BDP
4 SHRUB PLANTING
w..o,„ ILca...uw
H 1
OMER
TECT
J
Q
U �
W y
m
Z Q 2
Z F c
W W v�
Tn z
Q N
= U
z
Q
S
U
.P0.NOMF0RY
GONSt0.UCt10N
PUNTING DETAILS
GARDCO INFINITY H SERMS - PAEM
P4 / P4-2
STONCO WTL SERIES
WPA
GARDCO 101 SERIES
WPI
LIGMAN SERIES
WY2
Luminein ScbMule
Projen: CHANHASSEN RETAIL MAM=
wy
41N, ~
•1
•,� •
Symbol Qty Lebd
ArtenBuuent
MONTCOMERN
Lum. Lumen.
LLE
Deecdprion
Wm. WaN
n RC1111' 11('LS
w w i
1 e Iw •• •
E--�
POND PROMENAD
2060'1
0.)50
PREM-FH4WPSMH
I 452
B2 -UO -03
S WPI
SINGLE
Wv
F •. v q... .y—'
0.750
101-WT-ISOPSMH
IBS
B2•DI GI
2 WP2
SINGLE
6500
2604
0.750
LIGMANN-UAAJ2112-2-2-W40
111
ISEUIGI
WPA
SINGLE
2200D
10599
U.
WTL250FNNFF
291
N.A
7 P42
BACK -BACK
40000
20607
4
PAEM-2-FH•4WPSMH
452
BLI/OG3
U m
w W
N
•N
Za
-
Tr
U
Z
a
.
L
LAKE D
s
BIKE 5110P
+
,NSS PAAIIUE
'
'APARTMENTS'
Luminein ScbMule
Projen: CHANHASSEN RETAIL MAM=
Symbol Qty Lebd
ArtenBuuent
Tobi Letup Lo
Lum. Lumen.
LLE
Deecdprion
Wm. WaN
BUGRaflS
5I P4
SINGLE
40000
2060'1
0.)50
PREM-FH4WPSMH
I 452
B2 -UO -03
S WPI
SINGLE
12500
6S9]
0.750
101-WT-ISOPSMH
IBS
B2•DI GI
2 WP2
SINGLE
6500
2604
0.750
LIGMANN-UAAJ2112-2-2-W40
111
ISEUIGI
WPA
SINGLE
2200D
10599
U.
WTL250FNNFF
291
N.A
7 P42
BACK -BACK
40000
20607
0.750
PAEM-2-FH•4WPSMH
452
BLI/OG3
AIL MOANING HEIGHTS ARE SHOWN ADJACENTTO FDOl1RE LOCATIONS ON PLAN
CabWatlon Summery
Pro1M: CHANHASSRN RET'AILMARIO!T
Lebd CdcType Udb Avg Mex Mn AvVMin Mex n
FCBeyend Prop Line el Gnde Illumi.unu Fc 0.14 2.4 0.0 N.A. N.A.
Paved Arm EC de Illumiwlm Fc 025 I16 OJ 4.64 16.5]
ALL VALUES SHOWN ARE HORIZONTAL MAINTAINED FOOTCANDLES AT GRADE
FIXTURE DISTRIFUTION TEMPLATES ARE SHOWN AT O.SOMFC FOR REFERENCE USE ONLY
VALUES DO NOT INCLUDE CONTRMUTION FROM ADJACENT STREET OR PROPERTY LIGHTING
N
OR
COS�UCTIOM
UGKTING PUN
L440`
FZ>
0
FIR5T FLOOR
a
►5
2 TRASH ENCLOSURE - SOUTH ELEVATION
Q
J
a
U m
W H
d
U :
Z F-
W
c
W//�� WW
U)
LL L
a L
ZU
a
2
U
7RASH ENCLOSURE -EAST ELEVATION (D Se tion @ Trash RDOR em
AI.O
n TR
5t1 ENCLOSURE - WE5T ELEVATION
ua�ia�'Oise
J
C>
we or
m -N,-..-
aau Mu+
Mrmnnasw
V.
1,
„.,, n, —li
p0.EUMF0
Gcos0oGS�OT�
7RASH ENCLOSURE -EAST ELEVATION (D Se tion @ Trash RDOR em
AI.O
T ---
--
q
��1. _—_ �Iluuulnnuullnullu�lnnnllulllununlumul nllu�umnununnl nlun
LJ
I Roof Plan
2 5i Mlme Du ram
n Root Drnn Detail
u
l l Roof gau,Pgent support curb Detail
- — 5 Roof hatch Detad
o Roof Vent Detail
n
i
nwxra v.ay.
I
,
i
��1. _—_ �Iluuulnnuullnullu�lnnnllulllununlumul nllu�umnununnl nlun
LJ
I Roof Plan
2 5i Mlme Du ram
n Root Drnn Detail
u
l l Roof gau,Pgent support curb Detail
- — 5 Roof hatch Detad
o Roof Vent Detail
n
E%TERIOR FIN15N 5CHEDULE
V.
w�
�N.u.x.rux wuem
ruselxWm
��
ewro nwmi
e. rwwcwac.
nwurrcNav
� �
unurmuuxu
r
rvuu
ONTG
RCHI
""m'" RR Pius P
� xw
H�]��
•. i i I. I�e°�a M�tl .uW�m
nEast ._-.... ...e...... ,..a•.4.....
cOH°+TRU� �
I A2.0 11
9 South Elevrtion
D
4 Wcst E I,on
Q
0
r
J
Q
U b
W
d
CQi
ZF�
LL1 W
Cl) t
Q m
= U
z
Q
U
PpEOM1FO�
N ,�yU0T10N
DONS
"110R 11IVATIO0
pMTll UND9OA%NG)
A2.1
I SOUTHWEST PERSPECTIVE
2 NORTHWE5T PERSPECTIVE
NORTHEA.5T PERSPECTIVE
.PRELIM\ OQY.
C�NS�LICSIOR
rcRsrecrivtz
A2.3
[Property CardParcel ID Number 55 460030
Taxpayer Information
Taxpayer Name
NORTHCOTT COMPANY
Mailing Address
250 EAST LAKE DR
CHANHASSEN, MN 55317-9364
Property Address
Address
City
1 Rrlfi7a-� 1
.40
Parcel Information
Uses Commercial GIS Acres 2.71
Deeded Acres
Plat VILLAGES ON THE PONDS 4TH ADDN
Lot
Block
Tax Description OUTLOT B
r
F1
Building Information
Estimated Market Value
Building Style
Above Grade
Finished S Ft
Last Sale
Bedrooms
Year Built
Garage N
Date of Sale 11/30/2001
Bathrooms
$0.00
$0.00
Sale Value $895,774.00
Total
Miscellaneous Information
$871,600.00
:Sc�hoolDistrict
Watershed District
WS 064 RILEY PURG BLUFF
Homestead
N
Green Acres
N
Ag Preserve
N
Assessor Information
Estimated Market Value
2014 Values
(Payable 2015)
2015 Values
(Payable 2016)
Last Sale
Land
$871,600.00
$871,600.00
Date of Sale 11/30/2001
Building
$0.00
$0.00
Sale Value $895,774.00
Total
$871,600.00
$871,600.00
GThecataprovded herewith Is for referencep set only. This data Is rpt sudable for legal, ergineemhg, surveying a other similar puephe oses. Carver County does not guarantee taccuracy of the
information contained herein. This data is furnished on an 'as is basis and Carver County makes no representations or warranties, either expressed or implied, for the merchantabldy or fitness of the
hfonnalionprovided for any purpose. This clectaima is provided pursuant to Minnesota Statutes §466.03 and the user of the data
provided herein acknowledges that Carves County shall hot be liable for any damages, and by using this data in any way expressy waives all claims, and agrees to defend. indemnity, and hold
. harmless Carves County. is oRciala, officers, agents, employees. etc hem any and all claims brought by anyone who uses the intermission provided fa herein, its employees or agams, or
CARVER third parties which arise out of user's access By acceptance of this data, the user agrees not to transmit this data or provide access to it or any part of it to another party unless the user includes
COUNTY with the data a copy of this disclaimer
SCANNEC
Tuesday, June 09, 2015 Carver County, MN
C o n s u l t i n g G r o u p I n c
Transportation - Civil • Structural • Environmental • Planning • Traffic • Landscape Architecture • Parking
SRF No. 0962471
MEMORANDUM
TO: David C. Hempel
Assistant City Engineer
City of Chanhassen
FROM: Dennis R. Eyler, P.E., Principal
Marie K. Cote, P.E., Senior Engineer
DATE: August 9, 1996
SUBJECT: REVIEW OF EAW TRAFFIC IMPACT -VILLAGES ON THE POND
As you requested, we have completed a review of the traffic analysis and
forecast for the Villages on the Pond EAW. This included a review of the trip
generation, traffic forecast and analysis, and mitigation.
Based on our review and analysis, we offer the following comments for your
consideration:
• According to the information in the EAW, we concur with the trip generation,
traffic forecast and capacity analyses for the unsignalized and signalized
intersections. The 10% multi-purpose reduction mentioned on page 22 did
not seem to be applied to the trip generation rates or calculation. However, it
is possible that the reduction was made manually in the trip distribution.
• An analysis of recommended geometrics for the proposed development was
conducted to determine whether the intersections of Market Boulevard and
Lake Drive West, and Great Plains Boulevard and Lake Drive East could
operate as right -in, right -out only.
Shown on the Site Plan, Figure 3, the intersection of Market Boulevard and
Lake Drive West is approximately 400 feet south of TH 5. According to
Table 6, the proposed geometrics for Build conditions are two through lanes
and a right turn lane for the north approach, a left turn lane, two through
SRF Consulting Group, Inc.
One Carlson Parkway North, Suite 150, Minneapolis, Minnesota 55447-4443
Telephone (612) 475-0010 • Fax (612) 475-2429
An Equal Opportunity Employer
SCANNED
0 0
David C. Hempel - 2 - August 9, 1996
lanes and a right turn lane for the south approach, a right turn lane for the
east approach, and a right and left turn lane for the west approach. It is
recommended in the EAW that the east approach operate with right -in, right -
out access.
According to Mn/DOT guidelines, full access intersections should be located
a minimum of 600 feet from a major signalized intersection. Since this
intersection is less than the required 600 foot minimum, we would concur with
Mn/DOT's guidelines and recommend that this intersection operate with right
in/right out access only. In regards to access circulation, Lake Drive West
extends to Power Boulevard to the west. This connection would provide an
alternate access to and from the proposed developments. The full access
intersection on Market Boulevard at Lake Drive to the south would also
provide an alternate route to and from the proposed developments.
The intersection of Great Plains Boulevard and Lake Drive East is
approximately 450 feet south of TH 5. The proposed geometrics for this
intersection are a left turn lane, a through lane and a right turn lane for the
north and south approaches, and a left turn lane and a through/right turn lane
for the east and west approaches. This intersection includes two private
roadways and two public roadways. Great Plains Boulevard provides local
access to the proposed development and through traffic is not the main
issue. Therefore, we would recommend that this intersection remain a full
access intersection.
July 9, 1996
Mr. Dennis Eiler
0 0
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937-1900 0 FAX (612) 937-5739
SRF Consulting Group, Inc.
One Carlson Parkway North
Suite 150
Minneapolis, MN 55447-4443
Re: Review of EAW Traffic Impact - Villages on the Pond
Land Use Review File No. 95-17 14
JAR--
Dear Dennis:
Enclosed please find a copy of an EAW for Villages on the Pond prepared by BRW, Inc. dated July 1,
1996. Would you please review the traffic analysis and forecast within the document and let me know
if there are other traffic concerns that may have been overlooked. We are especially concerned with the
proposed full intersections at Market Boulevard and Lake Drive, as well as Great Plains Boulevard and
Lake Drive. We feel that these intersections may be able to function as right -in, right -out only. I
would appreciate your comments back as soon as possible as this item is going forward for preliminary
plat approval on July 17, 1996 at the Planning Commission level and City Council on the August 12,
1996 Council agenda.{.
Please call me with a cost estimate for the services requested herein. If you have any questions or need
additional materials, please do not hesitate to contact me.
1
1
I
1
fJ
1
1
1
I
1
1
11
1
Sincerely.
CITY OF CHANHASSEN 47 -It F '
yrt
AIF-
- David C. Hempel 1
Assistant City Engineer
DCH:jms 1
Enclosure 1
C Charles Folch, Director of Public Works
Kate Aanenson, Planning Director '
��StJIgW 3VCV[�QS�Y,IIBf,'[SC9W
1
Villages on the Ponds
July 17, 1996, July 24, 1996 and
August 12, 1996
Page 40
' believes that all the sanitary sewer and water lines with the exception of the individual building
services should be owned and maintained by the City upon completion.
The applicant will be required to enter into a development contract with the City and provide
financial security in the form of a letter of credit to guarantee compliance with the terms
stipulated in the development contract. Detailed construction plans and specifications will be
required in conjunction with final platting. The construction plans and specifications shall be
prepared in accordance with the City's latest edition of Standard Specifications and Detail Plates.
' The construction plans and specifications will be subject to staff review and formal approval by
the City Council in conjunction with final plat approval. Fire hydrant placement and revisions to
the utility plan layout will occur during review of the construction plans and specifications.
' During construction of the utilities, the applicant's engineer shall provide on-site inspection
services to certify upon completion that the utilities have been constructed in accordance with the
approved plans. As -built construction plans will also be required before acceptance of the
tutilities by the City.
The site contains an existing home on Lot 1, Block 2 west of Trunk Highway 101. This structure
will eventually be razed in conjunction with the development. The existing residential well will
need to be abandoned per State health codes and sanitary service will also need to be
disconnected at the main.
Drainage and utility easements will need to be dedicated on the final plat over the sanitary sewer
and watermains. The easement width will depend on the depth of the sanitary sewer. At a
minimum, a 20 -foot drainage and utility easement should be dedicated over each line.
STREETS
' Subdivision of this parcel will require the vacation of Great Plains Boulevard (Old Trunk
Highway 101) and portions of Trunk Highway 101 (Market Boulevard). At this time, the City
does not have the authority to vacate the right-of-ways since MnDOT has not formally turned
back the road jurisdiction to the City and/or Carver County. The turnback involves a
conglomerate of agreements that need to occur between MnDOT and Hennepin County, Carver
County, Scott County, and the City of Chanhassen. These agreement are anticipated to be
finalized and signed by MnDOT sometime this fall. Portions of this plat are dependent upon the
' vacation of these right-of-ways before being recorded.
Streets within the subdivision are proposed to be private with the exceptions of TrunLHighway
101 (Market Boulevard) and a small portion of Lake Drive at the easterly end of the plat. During
conceptual review of the development, staff indicated that Lake Drive is designated as a collector
street on the City's Comprehensive Plan as well as listed as a Municipal State Aid Route.
I
0
Villages on the Ponds '
July 17, 1996, July 24, 1996 and
August 12, 1996 '
Page 41
Therefore, the street would have to be built to State Aid standards. Given the issue of on -street
'
parking and some unique aesthetic design elements, staff has re-evaluated its position. With the
current design proposal, Lake Drive will actually function more as a main street for this
development rather then a collector through street for the City. For this reason and given the type
'
of unique pavement design, parking configurations and landscaping improvements, staff has
decided to allow Lake Drive to be built, owned, and maintained as a private street. This will
improve building setback requirements, construction costs for the applicant, and reduce
'
maintenance demands on the City, i.e. snowplowing. As a result of this action, the City will need
to request MnDOT to revoke the MSAS status. A small portion of Lake Drive at the easterly end
of the project will be dedicated and built as a public street which will provide a new street access
,
to Grandview Road. Currently, Grandview Road is a private gravel street serving six homes with
the potential of further subdividing once sewer and water becomes available. A secondary access
t
point is also being provided to Grandview Road through Lot 10, Block 1 (St. Hubert's Church
site).
'
The preliminary plat proposes to dedicate a 25 -foot wide right-of-way along the east portion of
the plat through Lot 8 and 10, Block 1. Upon review of the existing Grandview Road alignment,
it appears the 25 -foot wide right-of-way could be reduced to 17 feet, however, it needs to be
'
extended southerly to parallel Grandview Road until Grandview Road turns easterly. This will
impact the location of the retaining walls and parking as shown on Lot 10, Block 1.
'
The preliminary plat is proposing to dedicate right-of-way for Lake Drive and the new access
street to Grandview Road. Staff believes that the cul-de-sac street for Grandview Road can be
reduced down to a 31 -foot wide street with a temporary turnaround. The street section for the
public portion of Lake Drive shall be constructed to 36 feet wide, face-to-face with concrete curb
and gutter. The street section which access Grandview Road within the plat shall be construction
to 31 feet wide, back-to-back with concrete curb and gutter. A temporary cul-de-sac with a 50-
'
foot radius will also need to be constructed at the end of the public street (Grandview Road).
Private streets shall be constructed in accordance with the City's private street ordinance which
requires a minimum 26 -foot wide drive aisles. The development proposes to meet these drive
'
aisle requirements with the except of the hotel/restaurant site where the narrative on the plans
indicated 22 -foot wide drive aisles in these areas. The drive aisles will need to be increased to
facilitate turning movements, delivery vehicles, and safety apparatuses.
public
The plans are proposing full access points onto Trunk Highway 101 (Market Boulevard) at Lake _
Drive, Great Plains Boulevard (Main Street), and across from Rosemount's driveway.%Staff has
serious safety concerns with the full access across from existing Lake Drive given the_close
proximity to Trunk Highway 5 and existing roadway geometries. Staff believes that a right -in,
right -out only may be permitted after further traffic studies are compiled and reviewed by the
City.
Villages on the Ponds
July 17, 1996, July 24, 1996 and
' August 12, 1996
Page 42
A development of this size will require traffic control improvements along Trunk Highway 101
(Market Boulevard) and Great Plains Boulevard, as well as, Main Street. This includes
constructing all or portions of future Trunk Highway 101 to four lanes with auxiliary tum lanes
and traffic signals at Trunk Highway 101 and proposed Lake Drive. Staff is also concerned that
' eventually a traffic signal will also be warranted at Trunk Highway 101 and Main Street (access
south of Lake Drive). Both traffic signals will require meeting a signal justification report prior
to installation with MnDOT. All Trunk Highway 101 improvements will need to meet State Aid
' standards. MnDOT will also be required to approve all access points on Trunk Highway 101.
A cost-sharing agreement for the installation of any traffic signals will need to be drafted. A
' breakdown of the cost participation would be based on jurisdictional entrance percentage. For
example, a signal on Trunk Highway 101 at Lake Drive would be split 501/6 MnDOT, County or
City, 37% Villages on the Pond, and Rosemount 12%. Depending on phasing of the
development, traffic signals or improvements to Trunk Highway 101 may not immediately be
warranted, therefore, staff recommends that the applicant set up a financial escrow account with
the City to guarantee future modifications along Trunk Highway 101. The financial guarantee
' may be in the form of a letter of credit or certificate of deposit assuming that these improvements
are not installed with Phase I.
Upon review of the interior drive aisles and parking lots, staff has concerns with the northerly
east/west drive aisle west of Main Street. This drive aisle will act as a thoroughfare for traffic.
The proposed parking stalls will create turning movements and pedestrian crossings which could
' lead to a potentially hazardous situation. Staff is recommending that the northerly parking stalls
be eliminated and parking permitted only on the south side of the drive aisle adjacent to retail
shops. These parking lot configurations will be further evaluated with the individual site plan
' submittals. For the most part, the main street drive aisle configurations throughout the
development appears acceptable with the exception of drive aisles at the intersection of Trunk
Highway 101 and Great Plains Boulevard. At these intersections, the streets are narrowed down
' from 44 feet wide to 26 feet wide. Staff believes that an additional right tum lane will need to be
incorporated which will increase the drive aisle width to 38 feet to accommodate the tum lanes.
' A right turn lane should also be constructed on northbound Lake Drive at Great Plains
Boulevard.
t In conjunction with -private streets, cross -access easements and maintenance agreements will
need to be prepared by the applicant. The cross -access easements should also qualify she
secondary access road for public use to Grandview Road.
' Detailed construction plans and specifications will be required for all public streets. The plans
and specifications should be prepared in accordance with the City's latest edition of Standard
1
Villages on the Ponds
July 17, 1996, July 24, 1996 and ,
August 12, 1996
Page 43
Specifications and Detail Plates. The construction plans and specifications will be subject to '
staff review and formal approval by City Council.
Some of the plans indicate Lake Drive being dedicated with an 80 -foot wide right-of-way. '
However, the preliminary plat indicates the street will fall within Outlot A which is proposed at
60 feet wide. The proposed private street segment, 44 feet in width, will fit within the 60 width. ,
However, portions of the sidewalk area will need to be located on the individual lots to facilitate
the pedestrian plaza and wide sidewalks envisioned for Lake Drive.
PLANNING COMMISSION UPDATE '
The Planning Commission held a public hearing on July 17, 1996 to review the proposed
'
development. The Planning Commission tabled the item to permit staff and the applicant the
opportunity to clarify the vision for the Village Pond, to analyze parking, to permit the Park &
Recreation Commission to make a recommendation on the location of the proposed soccer field,
'
to create a written definition of the "village character", and to modify the Development Design
Standards.
'
The Planting Commission held a second hearing on July 24, 1996 to review the development.
The Planning Commission voted four for, zero against, with one abstention to recommend
approval of the development subject to the conditions, as modified, below.
t
The Planning Commission did express some concern regarding the open-ended approval
provided with a PUD, with the potential for portions of the project to remain undeveloped for
'
several years and changing conditions and ordinances taking place that are not applicable to this
development. Staff had proposed language that would require the development be reviewed by
the city five years after final development approval to determine if the design standards and
conditions of approval were still appropriate and permitted the city to revise the conditions then.
However, the applicant and Planning Commission were concerned that the uncertainty contained
in such a condition may financing for the project. The Planning Commission requested
'
preclude
that staff and the city attorney develop some language that addressed this concern.
Staff has discussed this issue with the city attorney. He suggested that the following language be
"For two years following final approval of the development, no changes in official
'
controls of the city shall affect the development."
I
Villages on the Ponds '
July 17, 1996, July 24, 1996 and
August 12,1996 '
Page 5
mitigation is done on site. Based on the city's tree preservation ordinance and without additional
'
tree preservation or loss, the development would be required to provide replacement plantings of
206 trees.
'
Traffic: A traffic operation analysis of the proposed development was completed to document
the intersections affected by the proposed development, to estimate the average daily traffic with
the proposed development, to identify capacity limitations, and to identify potential mitigative
'
measures. Regional access to the site is provided east and west by TH 5 and north and south by
TH 101. Local site access is through TH 101 (Market Boulevard) on the west and Great Plains
Boulevard and Lake Drive East on the east.
'
The analysis demonstrates that the change in operations from the existing conditions at the '
intersection along TH 5 are not solely due to the proposed development. The background traffic
growth in the area accounts for 45 to 65 percent of the traffic forecast at the two TH 5
intersections. Even without the project generated traffic, traffic volumes are expected to be near '
or over capacity due to background traffic growth.
The traffic analysis concluded that the predicted traffic generated by the site does not '
significantly change the level of service that would occur without the project. Mitigation
measures suggested do not alleviate the problem. The source of traffic congestion is beyond the
control of this project. Traffic mitigation would require the provision of an alternate traffic '
system on TH 5 such as proposed on TH 212.
Conclusion: There appear to be no significant environmental issues requiring further '
investigation prior to project commencement. Required on site utility and transportation
improvements will be designed and constructed as part of the project. The wetland loss will be
mitigated in full compliance with city, state, and federal requirements. Tree loss will be replaced '
pursuant to the city tree preservation ordinance and site plan landscaping requirements. The
project has been planned to minimize future environmental impacts and will be constructed with
significant emphasis on control of erosion and sedimentation control. '
Staff believes that there are numerous potential benefits for mixed use projects. A mixed use '
development would be unique to the city and would provide a focal point on the fringe of the
downtown area and additional_ vitality to the community. The village concept provides a
pedestrian fiiendlyenvironmentand th rovisio:oftransit services where people can live, '
work, and play, elements which are found in neotraditional development principals and the
livable communities act.
1 Villages on the Ponds
July 17, 1996, July 24, 1996 and
' August 12, 1996
Page 48
' 29. The applicant shall develop a sediment and erosion control plan in accordance with the City's
Best Management Practice Handbook (BMPH). Type III erosion control fencing will be
' required around the wetlands. The site may also require additional erosion control fence on the
slopes and/or temporary sediment basins. Wood fiber blankets shall be utilized on all slopes in
excess of 3:1.
' 30. Drainage and conservation easements shall be dedicated over all wetland areas within the
subdivision including outlots. Wetland mitigation measures shall be developed and subject to
' approval by the City. The mitigation measures shall be completed in conjunction with the site
grading and restoration.
' 31. The applicant reduce the impacts to Wetland 2000, create a larger on site mitigation area and
present a sequencing plan showing reduced impact to affected wetlands.
' 32. City staff and the applicant shall investigate the origin of Wetland 6000 to determine if this
area can be exempt from the Wetland Conservation Act.
33. Buffer strips shall be provided around Wetland 5000. The buffer strips shall be 10 to 30 feet
in width with an average width of 20 feet
' 34. The street section for the public portion of Lake Drive shall be constructed to 36 -feet wide face-
to-face with concrete curb and gutter. The street section which accesses Grandview Road
within the plat shall be constructed to 31 -feet wide back-to-back with concrete curb and gutter.
A temporary cul-de-sac with a 25 -foot radius shall be constructed at the end of the public street
for Grandview Road. All private streets shall be constructed in accordance with the City's
private street ordinance which requires a minimum 26 -foot wide drive aisles and built to 7 -ton
' design.
35. Depending on the phasing of the project, Trunk Highway 101 may need to be upgraded to four
' lanes, as well as, turn lanes and traffic signals. This will be further evaluated contingent upon
the outcome of the traffic study being reviewed by SRF. The applicant shall incorporate the
' necessary traffic improvements as recommended by SRF accordingly. Should the traffic signals
not be required with the initial phase of development, the applicant will be required to escrow
with the City their fair share of the cost for future installation. Security shall be a means of a
' letter of credit or a certificate of deposit. All Trunk Highway 101 improvements shall meet
State Aid standards. The applicants responsibility for the traffic signals along Tntnkliighway,
101 shall be 37% of the total cost. A cost sharing agreement between the applicant and City
' shall be drafted for the installation of any traffic signals.
January 28, 1997
Ms. Julie Long
BRW
Thresher Square
700 Third Street South
Minneapolis, MN 55415
VIA FACSIMILE
Re: Great Plains Boulevard Street Modification - Villages on the Ponds
Project No. 96-13
Dear Julie:
Upon review of the memo from BRW dated July 29, 1996 regarding development traffic, we are
requesting the following modifications to Great Plains Boulevard to accommodate trip
generations from the Villages on the Ponds development:
Provide a 14 -foot wide right tum on southbound Great Plains Boulevard into the
development at Lake Drive East as shown on the attached drawing.
2. Provide an auxiliary 14 -foot wide tum lane on northbound Great Plains Boulevard at
Lake Drive East as shown on the attached drawing.
3. Restripe painted median and turn lanes as shown on the attached drawing. Redo the
driveway entrance to the development off Lake Drive East for a 28 -foot minimum wide
drive aisle into the site centered upon existing Lake Drive East. Currently, the drive
access is 52 according to MnDOT plans.
4. Provide a raised concrete median on Great Plains Boulevard south of Lake Drive East as
shown.
In the future, as development occurs on the American Legion site, the existing access to Total
Mart may be closed off and traffic routed via the American Legion driveway. The Legion's
driveway will also be restricted to a right -in right -out only in the future. We will require the
developer of that site to extend the median south, thus closing of the access point.
a 0
Ms. Julie Long
January 28, 1997
Page 2
Please incorporate these changes in your street construction plans for the development. The
section of Great Plains Boulevard from Trunk Highway 5 to Grandview Road will be a public
street, therefore, plans should be prepared in accordance with the City's Standard Specifications
and Detail Plates.
If you have any questions in this matter, please feel free to contact me.
Sincerely,
CITY OF CHANHASSEN
David C. Hempel
Assistant City Engineer
DCHJms
Attachment
c: Charles Folch, Director of Public Works
Anita Benson, Project Engineer
Vemelle Clayton, Lotus Realty
g.kng\pmjmts\villagm\str modific fion.doc
p
22. Traffic. Parking spaces added 22192. Existing spaces (if project involves expansion) Q.
Estimated total Average Daily Traffic (ADT) generated 14.800. Estimated maximum
peak hour traffic generated (if known) and its timing: approximately 1.500 for both the
AM peak (7-9:00 AM) and the PM peak (4-6:00 PM). For each affected road indicate the
ADT and the directional distribution of traffic with and without the project. Provide ar
estimate of the impact on traffic congestion on the affected roads and describe any
traffic improvements which will be necessary.
Response: A traffic operations analysis of the proposed development was completed in
order to document the following issues:
• Identification of principal roads, highways, and intersections that will be used by
motor vehicles moving to or from the proposed project.
• Estimates of average daily traffic volumes and peak hour traffic volumes
anticipated to occur one year after the proposed project will be substantially
complete and operational.
• Identification of traffic impacts that would result given the capacity limitations of
the roads, highways, and intersections and the forecast post -development traffic
volumes.
• Identification of mitigation measures that can be implemented to address traffic
impacts.
ACCESS ROADWAYS AND INTERSECTIONS
Access Roadways
Local access to the proposed site is to be provided directly by Great Plains Boulevard
and Trunk Highway (TH) 101/Market Boulevard and indirectly by TH 5/Arboretum
Boulevard. The project location and adjacent roadway system is shown in Figure 1.
Great Plains Boulevard will act as one access to the development. In addition, five
accesses are proposed off of TH 101, three accesses to the east and two accesses to the
west. North of TH 5, Great Plains Boulevard is a north -south, two-lane roadway with
no parking and a posted speed limit of 30 miles per hour (mph). South of TH 5, Great
Plains Boulevard is proposed to be designed as a two-lane roadway with parking bays
on both sides of the street and a maximum posted speed limit of 30 mph. The purpose
of this section of Great Plains Boulevard will be to provide a direct route for the
heaviest movements into and out of the development.
North of TH 5, Market Boulevard is a north -south, two-lane roadway with no parking
and a posted speed limit of 30 mph. For approximately 1,000 feet south of TH 5, TH
101 is a north -south, four -lane divided highway with left- and right -turn lanes before
tapering into a two-lane roadway. TH 101, from TH 5 south to County State Aide
Highway (CSAH) 18/Lyman Boulevard, is planned to be upgraded to a four -lane
divided roadway with left- and right -turn lanes. This section of TH 101 does not allow
parking and the posted speed limit is 40 mph. TH 5 is an east -west, four -lane divided
highway with left- and right -tum lanes at major intersections. Access onto TH 5 near
the proposed development is excluded to major cross -streets with no driveway access.
W
TH 5 does not allow parking and the posted speed limit is 55 mph. The site plan is
shown on Figure 3.
Regional access to the proposed site is provided east and west by TH 5 and north and
south by TH 101. TH 5 provides direct access from the southwest suburbs to I-494 and
the rest of the regional road system. TH 101 provides access to TH 212 and TH 169
approximately 3 miles south of the proposed development.
• TH 101 and Main Street
The two intersections on TH 5 are controlled by traffic signals. The remaining access
intersections are proposed to be unsignalized with no control on TH 101 and Great
Plains Boulevard and stop control on the minor roadways (Lake Drive and Main
Street). The existing road geometrics and traffic control are shown in Figure 10 and
Table 3.
EXISTING TRAFFIC CONDITIONS
Existing traffic data is collected because the information is a key component used in the
analysis of existing conditions and in producing forecast volumes. The existing data
gathered includes:
• The existing two-way Average Daily Traffic (ADT) volumes on TH 5, TH 101/
Market Boulevard and Great Plains Boulevard were recorded by BRW, Inc. on
March 22-24, 1996.
• The existing peak hour turning movement volumes and geometrics were collected
by BRW, Inc. on March 23, 1996 from 6:00 to 9:00 AM and 4:00 to 6:00 PM at the
following locations:
(1) The intersection of TH 5 and TH 101/Market Boulevard
(2) The intersection of TH 5 and Great Plains Boulevard
• The existing traffic signal timing was obtained from Mn/DOT for the AM and
PM peak hours of operation at the following locations:
(1) The intersection of TH 5 and TH 101/Market Boulevard
(2) The intersection of TH 5 and Great Plains Boulevard
•_3585 21
Access Intersections
Six critical intersections were identified for analysis:
TH 5 and TH 101/Market Boulevard
TH 5 and Great Plains Boulevard
Great Plains Boulevard and Lake Drive East
TH 101 and Lake Drive West
• TH 101 and Lake Drive (through development)
• TH 101 and Main Street
The two intersections on TH 5 are controlled by traffic signals. The remaining access
intersections are proposed to be unsignalized with no control on TH 101 and Great
Plains Boulevard and stop control on the minor roadways (Lake Drive and Main
Street). The existing road geometrics and traffic control are shown in Figure 10 and
Table 3.
EXISTING TRAFFIC CONDITIONS
Existing traffic data is collected because the information is a key component used in the
analysis of existing conditions and in producing forecast volumes. The existing data
gathered includes:
• The existing two-way Average Daily Traffic (ADT) volumes on TH 5, TH 101/
Market Boulevard and Great Plains Boulevard were recorded by BRW, Inc. on
March 22-24, 1996.
• The existing peak hour turning movement volumes and geometrics were collected
by BRW, Inc. on March 23, 1996 from 6:00 to 9:00 AM and 4:00 to 6:00 PM at the
following locations:
(1) The intersection of TH 5 and TH 101/Market Boulevard
(2) The intersection of TH 5 and Great Plains Boulevard
• The existing traffic signal timing was obtained from Mn/DOT for the AM and
PM peak hours of operation at the following locations:
(1) The intersection of TH 5 and TH 101/Market Boulevard
(2) The intersection of TH 5 and Great Plains Boulevard
•_3585 21
I
I
I
0
i
I
0 0
The resulting existing ADT volumes are documented in Figure 9 and the AM and PM
peak hour turning movement volumes are illustrated in Figure 11 and documented in
Table 3.
SITE GENERATED TRAFFIC
Trip Generation
The trip generation of the proposed land uses are based on national average trip
generation rates from the Trip Generation Report, Fifth Edition published by the
Institute of Transportation Engineers (ITE) in 1991. The number of daily, AM and PM
peak hour trips expected to be generated by each of the proposed land uses are
shown on Table 4.
The proposed site includes nine areas of development and eight different land uses.
The proposed plan contains 391,000 gross square feet (sf) of mixed use commercial
development and 266 dwelling units. The proposed development includes:
• 16,800 sf for three restaurants
• 47,000 sf church
• 53,000 sf elementary school
• 104,500 sf of office space in six buildings
• 122,500 sf of retail space in four locations
• 106 -room motel
• 154 apartment units in four buildings
• 112 condominium units in two buildings.
The proposed development also includes an alternative land use plan. This
alternative plan involves adding 13,000 sf of office space in Area 6 and replacing the
32,000 sf of office space in Area 7 with 56 condominium units. For purposes of the,
trip generation analysis both the proposed land use and the alternative land use were
analyzed and compared. The proposed land use generated greater AM and PM peak
hour volumes; therefore, the volumes generated by the proposed land use were used
for further analysis in this report.
Because of the mixture of land use types proposed for this development, some of the
trips generated are expected to be internal, multi-purpose trips. The Trip Generation
Manual suggests developments with a mixture of residential and commercial land
uses produce the highest multi-purpose trips. Based on this information, 10 percent
of the trips generated were assumed to be internal, multi-purpose trips. In addition,
number of the trips generated by the site are expected to be vehicles traveling on the
adjacent roadways which utilize the convenience of the direct access to the
development and make an intermediate stop even though the proposed site was not
their primary destination. The Trip Generation Manual refers to these intermediate
stops as "pass -by trips". The pass -by trips were not taken into consideration when
developing the trip generation for the proposed development. Therefore, the site
generated traffic will probably be lower than the trip generation indicates, and the
analysis based on the higher trip generation will produce conservative results.
qT
J�
Nn585 22
TABLE 3
EXISTING CONDITIONS
PEAK HOUR VOLUMES AND GEOMETRICS (t)
Notes:
(1) The carrot symbols > or < identify where a right or left movement shares the same lane with the through movement.
(2) All four unsignalized intersections are controlled with a stop condition on the east/west streets and through conditions on the north/south streets.
(3) The movements to and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount, Inc.
building which will share this access.
Source: BRW, Inc. peak hour turning movement counts recorded on March 23, 1996. UAINTVOL.WK4
(2)
TRAFFIC
NORTH APPROACH
EAST APPROACH
SOUTH APPROACH _
WEST APPROACH
_NO__
INTERSECTION_
CONTROL
PARAMETER
RT_
TH
LT I
TH
LT
_ RT
TH
-LT_
RT
TH
LT
TH 5
26
61
151
_RT
104
_ _ _
1,073
165
77
1,550
54
AM Peak Hour
162 51 12
1
&
Signalized
PM Peak Hour
75
87
136
267
1,786
204
271
122
119
50
1,080
96
TH 101
Geometrics
1
2
1
1
2
2-
1
2__—__1
—1
2 -
1
27
21
158
63
1,283
31
84
39
20
TH 5
AM Peak Hour
24
1,777
49
2
&
Signalized
PM Peak Hour
53
74
171
174
1,915
45
66
87
57
35
1,544
81
Great Plains Blvd.
Geometrics
1
1
1
1
1
2-
1- ---
._- 2
1
65
.__21--
0
40
65
_1.------
78
0
Lake Dr. East
AM Peak Hour
0 36 40
0
0
0
3
&
Thru/Stop
PM Peak Hour
0
114
40
65
0
40
65
145
0
0
0
0
Great Plains Blvd.
Lake Dr. East
Geometrics
AM Peak Hour
0
60
- _. 1
243
1
0
1
_ 0
1
-1-
0
-_ 1
185
0-
40
0
60
0
0
0
40
0 0 0
4
&
Thru/Stop
PM Peak Hour
40
301
0
0
0
0
0
452
60
40
0
60
TH 101
Geometrics
1
2
0
0
0
0
0
2
1
-1------0
1
(3)
Lake Dr. (Site)
AM Peak Hour
0
303
0
0
0
0
0
185
0
0
0
0
5
&
Thru/Stop
PM Peak Hour
0
341
0
0
0
0
0
452
0
0
0
0
TH 101
Geometrics
1
2_
_- 1
0
0
0
1
_ 2
1
1
0
1
Main Street
0
0
0
AM Peak Hour
0 303 0
0
185
0
0
0
0
6
&
Thru/Stop
PM Peak Hour
0
341
0
0
0
0
0
452
0
0
0
0
TH 101
1
1 Geometrics
1 0
1
< 0
1 1
0
1
1
1
0
0
0
0
Notes:
(1) The carrot symbols > or < identify where a right or left movement shares the same lane with the through movement.
(2) All four unsignalized intersections are controlled with a stop condition on the east/west streets and through conditions on the north/south streets.
(3) The movements to and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount, Inc.
building which will share this access.
Source: BRW, Inc. peak hour turning movement counts recorded on March 23, 1996. UAINTVOL.WK4
I
7
v
1
I
I'�
I
m
N
W 2
F p
� H
W
CL �
Lu
�aLL'
MO C9
mIr Qa
0
rI
83EP
�~EE?EE
a
x=`x
� aR�eR$$
E$ � 's
E
gsa$
• c Y R
_
.�
ems.
I
k 8
�
8 8 � �
8
8
� 8
�8e y8�
t8 y8�
X8
y8c ■8
�8e
yip� y8�� y8ee
�8e y8 y��
i=
R�
-
R R G•
• e A R A e_
—
_
....
a a
E
-
i
X
3
X X X
333
X x X X xx x
7:.::Y3
x i
R R
ye
3
f
3
gill
88
X X X X
e
�8Y
SSSSSSe
S R
R
8
SFAS
R. R_
R
E
8
e S
!R
8Si
888888 8 8
8 8 8 8
•�
S
�
���
x i x x x X X �,
— —
R
.�
yy888
S R R R
y
� e R R
':
e-
€GGGG
SSI
GGGGGGG
�S�O
G
t
GGGG
G G G G
�mO
G
EG
BS8
iBnneOS
B
@
O°°S
:
8
I$ $1.
—'
v=R=
$
a
$RR!
S;RS§Rw§
[R
u
�
E
dad
'
83EP
�~EE?EE
I
0 0
The development is expected to generate 14,810 vehicle trips per day, 1,520 AM peak
hour trips and 1,490 PM peak hour trips. Fifty percent of the total daily trips are
expected to be inbound to the development and 50 percent are expected to be
outbound from the development for a total of 7,405 vehicles per day (vpd) both
entering and exiting the development. The distribution of vehicles in the AM peak
hour is expected to be 56 percent inbound and 44 percent outbound or 855 vehicle
„ trips entering and 665 vehicle trips exiting. The distribution of vehicles in the PM
U peak hour is expected to be 48 percent inbound and 52 percent outbound or 715
vehicles entering and 775 vehicles exiting.
Directional Trip Distribution
The directional orientation used to distribute the site -generated trips to/from the
proposed development is based on two sets of information: the existing traffic
demands and the regional traffic model for the twin cities metro area. The directional
trip distribution assumed for the site is shown on Figure 15.
TRAFFIC FORECASTS
In order to analyze the potential traffic impacts that the expected future development
will have on the adjacent roadway system, traffic volumes were prepared for the
forecast Year 2002 background (no -build) and post -development (build) conditions.
The forecast no -build volumes consist of the existing volumes plus a background
traffic growth. The forecast build volumes consist of the background volumes plus
the site -generated trips for the proposed development distributed over the roadway
network.
Background Traffic Growth
The background traffic growth was determined from two sets of information: by
analysis of historical traffic counts for the roadways in the area and from historic land
development patterns in the Chanhassen Central Business District (CB15) provided by
the City staff. The ADT volumes reported on the Mn/DOT Traffic Flow M_ps from
1978 to 1994 were used in combination with the 1996 ADT count conducted by BRW,
Inc., to develop average annual growth rates along TH 5, TH 101/Market Boulevard,
Great Plains Boulevard and Lake Drive. These growth rates were then adjusted based
on the City of Chanhassen's assessment of growth in the area.
An average annual growth rate of three percent was determined for TH 5, TH 101
south of TH 5, and Lake Drive west of TH 101. A growth rate of one-half percent
was used for Market Boulevard and Great Plains Boulevard, both north of TH 5, due
to lack of area remaining for new development in the downtown area. A one-half
percent growth rate was also used for Lake Drive east of Great Plains Boulevard.
Finally, a zero percent growth rate was used for Great Plains Boulevard south of
TH 5. The residential neighborhoods in the area east of Great Plains Boulevard are
mostly built -out and Great Plains Boulevard will be designed to provide direct access
into the proposed development. Any growth in traffic along Great Plains Boulevard
will be accounted for by the site -generated traffic.
. rias 25
I
0 0
These growth rates were applied to the existing daily volumes along TH 5, TH 101 /
Market Boulevard, Great Plains Boulevard and Lake Drive to develop background
growth traffic volumes. These results are shown in Figure 11 and Table 5 for the
intersection turning movement volumes as Year 2002 no -build volumes.
Forecast Traffic Volumes
In order to analyze the potential traffic impacts that the proposed development will
have on the adjacent roadway system, post -development traffic volume forecasts were
prepared for the Year 2002 conditions. The forecast volumes consist of the existing
volumes plus background traffic growth plus the site -generated trips for the proposed
land uses. The resulting forecast Year 2002 build AM and PM peak hour turning
movement volumes for the two intersections along TH 5 are illustrated in Figure 12.
The existing peak hour turning movement counts were not available for the four
unsignalized access intersection; therefore, the following assumptions were made in
developing the AM and PM peak hour turning movement volumes.
• The AM and PM peak hour volumes were assumed to be 10 percent of the ADT
on Lake Drive.
• The directional distribution along Lake Drive was assumed to be a 50/50 split for
both the AM and PM peak hours.
• The directional distribution along TH 101 and Great Plains Boulevard was based
on the peak hour tum movements at the two TH 5 signalized intersections. The
directional distribution along TH 101 was assumed to be a 40/60, northbound/
southbound split in the AM peak hour and a 60/40, northbound/ southbound
split in the PM peak hour. The directional distribution along Great Plains
Boulevard was assumed to be a 60/40, northbound/southbound split for both the
AM and PM peak hours.
• The geometry assumed at each access entrance included a left- ancf right -tum lane
off of the major street (TH 101 or Great Plains Boulevard) and two lanes
outbound from the development (either a left -tum lane and a right -turn lane or,
where appropriate, a left -turn lane and a shared through/right-turn lane).
l.� • For the forecast build conditions at the intersection of TH 101 and Lake Drive
West, the east approach from the development was assumed to provide right -in
and right -out movements only.
• No site generation volumes were available for the Rosemount, Inc. building
which will share the west approach to the intersection of TH 101 and Lake Drive
through the site as one of its accesses. Therefore, only the trip generation from
the proposed development was used for this west approach only.
The Year 2002 forecast build AM and PM peak hour turning movement volumes for
all six intersections are documented in Table 6.
pariiINi
TABLE 5
FORECAST YEAR 2002 NO -BUILD CONDITIONS
PEAK HOUR VOLUMES AND GEOMETRICS (t)
2
3
4
5
0
M &-us ...
INTERSECTION
(2)
TRAFFIC
CONTROL
PARAMETER
RT
NORTH APPROACH
TH LT
RT
120
320
1
EAST APPROACH
TH
1,280
2,130
2
LT
200
240
2
RT
190
320
1
SOUTHAPPROACH
TH
80
150
2
LT
10
140
1
_WEST
RT
90
80
1
30
40
- 1
0
0
0
75
50
0
0
0
0
0
APPROACH
.: 7H
1,850
1,290
2
2,120
1,840
_ 2—
0
0
0-
0
0
0
0
1 0
0
0
0
LT
60
110 I
1
60
100
1
0
0
0
50
75
0
0
1
0
0
0
TH 5
g
TH 101
Signalized
AM Peak Hour
PM Peak Hour
Geometries
30 60 160
80 90 140
1 2 1
80 1,530 40
210 2,290 50
1 2 1
65 0 45
65 0 45
1 0 1
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
80 40 20
70 90 60
1 1- 2
TH 5
8
Great Plains Blvd.
Signalized
AM Peak Hour
PM Peak Hour
Geometries
30 20 160
50 80 180
1 1 1_
85 75 0
65 155 0
1 1 0
Lake Dr. East
8
Great Plains Blvd.
Thru/Stop
AM Peak Hour
PM Peak Hour
Geometries
0 45 45
0 125 45
0 1 1
0 210 50
0 535 75
0 2
0 210 0
0 535 0
1 2 1
Lake Dr. East
g
TH 101
Lake Dr. (Site)
&
TH 101
Thru/Stop
Thru/Stop
AM Peak Hour
PM Peak Hour
Geometries
AM Peak Hour
PM Peak Hour
Geometries
75 275 0
50 340 0
1 2 0
0 350 0
0 390 0
1 2 _ _1
0 350 0
1 0 390 0
0 1 < 0
0 0 0
0 0 0
1 0 1
0 210 0
0 535 0
1 1 1 0
Main Street
g,
TH 101
Thru/Stop
AM Peak Hour
PM Peak Hour
Geometries
Notes:
(1) The carrot symbols > or < identify where a right or left movement shares the same lane with the through movement.
(2) All four unsignalized intersections are controlled with a stop condition on the east/West streets and through conditions on the north/south streets.
(3) The movements to and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount. Inc.
building which will share this access.
m "'—
UANTVOL.WK4
Source: BRW, Inc. peak hour turning movement counts recorded on March 23, 1996.
ID
= a M a i M i = M " YI♦ " iimiiiiiiil i ii
TABLE 6
FORECAST YEAR 2002 BUILD CONDITIONS
PEAK HOUR VOLUMES AND GEOMETRICS 0)
Notes:
(1) The carrot symbols > or < identify where a right or left movement shares the same lane with the through movement.
(2) All four unsignalized intersections are controlled with a stop condition on the easVwest streets and through conditions on the north/south streets.
(3) The movements to and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount, Inc.
building which will share this access.
..,,.�
Source: BRW, Inc. using ITE Trip Generation Manual, Fifth Edition (1991). - U:IINTVOL.WK4
s
•
(2)
TRAFFIC
NORTH APPROACH
EASTAPPROACH
SOUTH APPROACH
WESTAPPROACH
RT
TH
LT
NO.
INTERSECTION
CONTROL
PARAMETER
RT TH LT
RT
TH
LT
RT
TH
LT
TH 5
AM Peak Hour
30
60
160
120
1,280
300
280
60
100
210
1,850
60
1
&
Signalized
PM Peak Hour
80
90
140
320
2,130
330
430
150
250
160
1,290
110
TH 101
Geometrics
1
2
1_
1
2
2
1
2
1
1
2
1
TH 5
AM Peak Hour
40
90
160
80
1,620
300
280
90
20
30
2,200
80
2
&
Signalized
PM Peak Hour
60
140
180
210
2,370
280
300
140
60
40
1,930
120
Great Plains Blvd.
Geometrics
AM Peak Hour
1
1
1
1
2
1
1
65
1
265
2
0
1
0
2 _
0
1
60
Lake Dr. East
75 300 45
65 0 45
3
&
Thru/Stop
PM Peak Hour
65
350
45
65
0
45
65
370
0
0
0
65
Great Plains Blvd.
Geometrics
1
1
1
0
> 1
1
1
1
1
0
> 1
1
Lake Dr. East
75
495
0
100
0
0
AM Peak Hour
25
290
50
75
0
50
4
&
Thru/Stop
PM Peak Hour
50
530
0
95
0
0
25
660
75
50
0
75
TH 101
Geometrics
1
2
0
1
0
0
12
1
1
0
1
Lake Dr. (Site)
25
0
125
115
335
20
(3)
AM Peak Hour
40 400 130
5
0
5
5
&
Thru/Stop
PM Peak Hour
5
445
130
40
0
120
100
680
5
20
0
40
TH 101
Geometrics
1
2
1
0
> 1
1
1
2
1
0
> 1
1
AM Peak Hour
5
490
35
15
0
40
Main Street
65
420
5
15
0
35
6
&
Thru/Stop
PM Peak Hour
35
535
15
20
0
65
50
750
15
5
0
15
TH 101
Geometrics
1 1
1
1
0
> 1
1
1
1
1
0
> 1
1
Notes:
(1) The carrot symbols > or < identify where a right or left movement shares the same lane with the through movement.
(2) All four unsignalized intersections are controlled with a stop condition on the easVwest streets and through conditions on the north/south streets.
(3) The movements to and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount, Inc.
building which will share this access.
..,,.�
Source: BRW, Inc. using ITE Trip Generation Manual, Fifth Edition (1991). - U:IINTVOL.WK4
s
•
Site -generated trips were assigned to the roadway system for the forecast Year 2002
build condition based on two assumptions.
• Vehicles using TH 5 will use the road closest to their land use, either TH 101 or
Great Plains Boulevard, to gain access to TH 5.
(1) The intersection of TH 5 and TH 101/Market Boulevard
(2) The intersection of TH 5 and Great Plains Boulevard
(3) Great Plains Boulevard and Lake Drive East
(4) TH 101 and Lake Drive West
(5) TH 101 and Lake Drive (through development) L{,aowC-1 inch. E&Awsom cow+
(6) TH 101 and Main Street
The capacity analysis of the signalized intersections used the SIGNAL94 software and
the procedures documented in "Chapter 9: Signalized Intersections" of the 1994
Update to the Highway Capacity Manual (HCM).The unsignalized intersections were
analyzed using the procedures of "Chapter 10: Unsignalized Intersections' of the
HCM. The existing traffic signal timings were used for the existing conditions and
forecast no -build analysis and optimized timings were used in analyzing the forecast
build conditions. The existing cycle length during the peak hours is 145 seconds.
This cycle length was maintained for the future conditions analysis. The existing
timing is set to provide as much green time as possible to the heavy east and west
through movements on TH 5. By providing extra time for the major movements, the
cross -street movements and the major street left -tum movements will experience more
delay. A similar timing plan was used for the build conditions where extra green
time was provided for the TH 5 through volumes.
"23W 29
• When the east approach left -turn movement off of TH 5 at the Great Plains
Boulevard intersection exceeds 300 vehicles in the peak hour, vehicles are
expected to by-pass this intersection and tum left at the TH 101 intersection to
access the development.
FORECAST TRAFFIC ANALYSES
iCapacity
Analysis
A capacity analysis is a qualitative measure, of traffic flow through an intersection or
'
along a roadway segment. The basic output from a capacity analysis is a level of
service (LOS) letter grade (A through F) with LOS A representing minimal delays and
no congestion, and LOS F representing substantial delays and congestion. LOS E is
1
considered to be the actual capacity of an intersection or movement. Level of service
D is generally considered to be an acceptable level of traffic operations in urbanized
areas during the peak traffic hours. Level of service E and F are common during
peak hour conditions in urbanized areas for left -tum movements at unsignalized
intersections.
Capacity analyses were conducted using the traffic volumes and geometrics illustrated
previously in Figures 10, 11 and 12 and documented in Tables 3, 4 and 5, at the
following six locations:
(1) The intersection of TH 5 and TH 101/Market Boulevard
(2) The intersection of TH 5 and Great Plains Boulevard
(3) Great Plains Boulevard and Lake Drive East
(4) TH 101 and Lake Drive West
(5) TH 101 and Lake Drive (through development) L{,aowC-1 inch. E&Awsom cow+
(6) TH 101 and Main Street
The capacity analysis of the signalized intersections used the SIGNAL94 software and
the procedures documented in "Chapter 9: Signalized Intersections" of the 1994
Update to the Highway Capacity Manual (HCM).The unsignalized intersections were
analyzed using the procedures of "Chapter 10: Unsignalized Intersections' of the
HCM. The existing traffic signal timings were used for the existing conditions and
forecast no -build analysis and optimized timings were used in analyzing the forecast
build conditions. The existing cycle length during the peak hours is 145 seconds.
This cycle length was maintained for the future conditions analysis. The existing
timing is set to provide as much green time as possible to the heavy east and west
through movements on TH 5. By providing extra time for the major movements, the
cross -street movements and the major street left -tum movements will experience more
delay. A similar timing plan was used for the build conditions where extra green
time was provided for the TH 5 through volumes.
"23W 29
When the volume approaches or exceeds the capacity for a movement the delay
grows at an increased rate. Rather than report an approximation of this increased
delay, the analysis reports the movement(s) which are above capacity and does not
report delay for the intersection. In order to compare the no -build and build
conditions where the intersection level of service is F and no intersection delay is
reported, the planning analysis from the 1985 HCM was used to supplement the
results of the 1994 Update to the HCM analysis. The planning analysis is a method
which provides a basic assessment relative to whether the capacity of an intersection
is expected to be exceeded. The analysis sums the volume for the critical movements
at an intersection. If the sum of the critical volumes is below 1,200 vehicles in the
peak hour, the intersection is expected to be under capacity. If the sum of the critical
volumes is from 1,200 to 1,400 vehicles in the peak hour the intersection is expected to
be near capacity. If the sum of the critical volumes is greater than 1,400 vehicles in
the peak hour, then the volume is expected to exceed the capacity of the intersection.
"585 30
U
The results of the capacity analysis for the existing, Year 2002 no -build, and Year 2002
build conditions are shown in Tables 7 and 8 for the two signalized intersections and
for the four unsignahzed intersections, respectively. The signalized intersections level
of service table provides the intersection level of service and intersection delay results
for the AM and PM peak hours. The unsignalized intersection level of service table
provides the major and minor street level of service and delay by movements and the
Uintersection
delay results for the AM and PM peak hours.
All four of the right -turn movements at the intersection of TH 5 and TH 101/Market
Boulevard have their own lane and a channelization island. There are also right -turn
lanes and channelization islands for the east and west approach right -turn movements
on TH 5 at the Great Plains Boulevard intersection. Therefore, these right -tum
movements were analyzed as free right conditions which means they do not effect the
signal timing operations at the intersections. The remaining two right -tum
movements for the north and south approaches on Great Plains Boulevard have their
own lane but do not have a channelization island. The analysis assumed that for
every two vehicles turning left during the protected left -turn phase on TH 5, one
vehicle would turn right -on -red from the north and south approaches on Great Plains
iBoulevard.
�1
The capacity analysis is an indication of how conditions are likely to be during
weekday peak hours only and not at other times of the day or on weekends. The
results of the signalized intersection analysis are as follows:
• For the existing conditions, both intersections along TH 5 are reported to operate
at LOS C in the AM and PM peak hours.
• For the forecast no -build conditions, both intersections along TH 5 are expected to
operate at LOS C and D in the AM and PM peak hours, respectively.
• For the forecast build conditions, the intersection of TH 5 and TH 101 is expected
to operate at LOS D for both the AM and PM peak hours. The intersection of TH
5 and Great Plains Boulevard is expected to operate at LOS F for both the AM
and PM peak hours.
When the volume approaches or exceeds the capacity for a movement the delay
grows at an increased rate. Rather than report an approximation of this increased
delay, the analysis reports the movement(s) which are above capacity and does not
report delay for the intersection. In order to compare the no -build and build
conditions where the intersection level of service is F and no intersection delay is
reported, the planning analysis from the 1985 HCM was used to supplement the
results of the 1994 Update to the HCM analysis. The planning analysis is a method
which provides a basic assessment relative to whether the capacity of an intersection
is expected to be exceeded. The analysis sums the volume for the critical movements
at an intersection. If the sum of the critical volumes is below 1,200 vehicles in the
peak hour, the intersection is expected to be under capacity. If the sum of the critical
volumes is from 1,200 to 1,400 vehicles in the peak hour the intersection is expected to
be near capacity. If the sum of the critical volumes is greater than 1,400 vehicles in
the peak hour, then the volume is expected to exceed the capacity of the intersection.
"585 30
TABLE 7
SIGNALIZED INTERSECTION LEVEL OF SERVICE
NOTES:
(1) The same cycle length was used (145 seconds) for all conditions.
(2) No intersection delay is reported when a movement volume to capacity ratio exceeds one
over the peak hour factor.
(3) The mitigated build condition included an additional left -turn lane for the east approach and
a free right turn for the south approach.
SOURCE: BRW, Inc. using SIGNAL94, HCS Signalized Intersection Analysis and the Highway Capacity Manual.
HCS ANALYSIS
LOS
_DELAY IS J_,
VOLUME
RELATIONSHIP
B
t)
C
(2)
D
>25 and <=40
E
>40 and <=60
F
>60
PLANNING
SUM
CYCLE
LEVEL
INTERSECTION
ANALYSIS
OF
INTER.
TRAFFIC
TIME OF
LENGTHS
OF
DELAY
LEVEL OF
CRITICAL
NO.
INTERSECTION
CONTROL
CONDITION
DAY
SEC
SERVICE
SEC
CAPACITY
VOLUMES
1
TH 5/Arboretum Blvd.
Signalized
Existing
AM Peak Hour
145
C
17.6
Under
1,034
and
PM Peak Hour
145
C
20.0
Under _
_1,186
Year2002
AM Peak Hour
145
C
21.1
TH 101/Market Blvd
Near
1,215
No -Build
PM Peak Hour
145
D
27.7
Near
1,390
Year 2002
AM Peak Hour
145
D
30.1
Near
1,265
Build
PM Peak Hour
145
D
34.9
Over
1,470
2
TH 5/Arboretum Blvd
Signalized
Existing
AM Peak Hour
145
C
16.3
Under
1,147
and
PM Peak Hour
145
C
_ 19.4
Near
1,297
Year 2002
AM Peak Hour
145
_
C
Great Plains Blvd.
22.6
Near
1,300
No -Build
PM Peak Hour
145
D
31.2
Over
1,515
Year 2002
AM Peak Hour
145
F
NA
Over
1,650
Build
PM Peak Hour
145
F
NA
1,625
Year 2002
AM Peak Hour
145
D
27.6
_Over _
Over
1,500
Mitigated Build
PM Peak Hour
145
F
NA
Over
1,625
(3)
NOTES:
(1) The same cycle length was used (145 seconds) for all conditions.
(2) No intersection delay is reported when a movement volume to capacity ratio exceeds one
over the peak hour factor.
(3) The mitigated build condition included an additional left -turn lane for the east approach and
a free right turn for the south approach.
SOURCE: BRW, Inc. using SIGNAL94, HCS Signalized Intersection Analysis and the Highway Capacity Manual.
HCS ANALYSIS
LOS
_DELAY IS J_,
VOLUME
RELATIONSHIP
B
>5 and <=15
C
>15 and <=25
D
>25 and <=40
E
>40 and <=60
F
>60
PLANNING ANALYSIS
CRITICAL
VOLUME
RELATIONSHIP
FOR INT.
TO PROBABLE
_ (VPH)__
_ CAPACITY
o to 1,200
Under Capacity
1,201 to 1,400
Near Capacity
>= 1,401
Over Capacity
06126196
U:ILOSNEW.WN4
0
r
0
a
a
J
0
TABLE 8 lb
LINSIGNALIZED INTERSECTION LEVEL OF SERVICE
E
INTERSECTION
(1)
WNOR STREET
MAJORSTREET
i2,
INTERSECTION
NORTHISOUTH STREET
i
TRAFFIC
TIME OF
DELAY
- (3)1 LEVEL OF DELAY
(3) LEVEL OF DELAY
NO.
EASTAVEST STREET
CONTROL
CONDITION
MY
MOVEMENT' SERVICE SECNEH
MOVEMENT SERVICE SECNEN
SECIVEN
3
Great Plains Blvd.
ThndSWp
Existing
AM Peak Hour
WB LT
A 4.6
SB LT A 2.6
1.5
6
WB RT
A 30
Lake Dnve East
PM Peak Hour
WS LT
B 5.8
SB LT A _ 2.8
1.M
WORT
A 3.3
Year 2002
AM Paak Hour
WB LT
A
4.7
SB LT A 2.6
1.5
No-Buid
WB RT
A
3.0
PM Peak Hour
WB LT
B
6.6
50 LT
A 3.0
18
WB RT
A
3.4
Year 2002
AM Peak Hour
EB LT
C
12.2
NB LT
A 3.2
1.7
Budd
EB TH/RT
A
3.8
SB LT
A 3.2
WB LT
B
9.4
WB TWRT
A
3.9
PM Peak Hour
EB LT
C
16.7
NO LT
A 3.4
2.0
EB TH/RT
A
4.0
SB LT
A 3.7
WB LT
C
12.2
WB TWRT
A
4.5
4
TH 701
i hru/Stop
Existing
AM Peak Hour
E8 LT
B
8.5
NB LT
A
3.2
Lt
6
EBRT
A
3.2
Lake Omit, West
PM Peak Hour
EB LT
C
17.6
NB LT
A
3.5
1.5
EBRT
A
3.3
Year 2002
AM Peak Hour
EB LT
C
10.1
NB LT
A
3.5
1.3
NOBuild
ES RT
A
3.3
PM Peak Hour
ES LT
D
28.2
NB LT
A
3.8
2.3
EBRT
A
3.4
Year 2002
AM Peak Hour
EB LT
0
21.0
NO LT
A
4.7
1.7
Build
EBRT
A
3.9
WB RT
A
3.4
k Hour
EB LT
F
123.3
NBLT
B
5.0
6.6
roas'
EBRT
A
3.6
WORT
A
4.4
(4)
6
TH 101
Thru/Stop
Existing
AM Peak Hour
EB LT
NA
(5)
NA
NB LT
NA
NA (5I
0.0
EBRT
NA
NA
SB LT
NA
NA
6
PM Peak Hour
EB LT
NA
NA
NB LT
NA
NA
0.0
EB RT
NA
NA
SB LT
NA
NA
Lake Drive (See)
Year 2002
AM Peak Hour
ES LT
NA
NA
NB LT
NA
NA
0.0
No-BWid
EBRT
NA
NA
SB LT
NA
NA
PM Peak Hour
ES LT
NA
NA
NB LT
NA
NA
0.0
EBRT I
NA
NA
SB LT
NA
NA
Year 2002
AM Peak Hour
EB LT
C
16.9
NB LT
A
3.8
5.0
Build
ES THIRT
A
3.3
SB LT
A
4.5
WB LT
E
41.4
WB THIRT
A
3.3
PM Pak Hour
ES LT
F
51.8
NB LT
A
3.6
38.1
EB TH/RT
A
3.5
SB LT
B
7.7
WB LT
F
475.6
Vd8 TH/RT
A
4.2
6
TH 107
ThWStop
Existing
AM Peak Hour
WH LT
NA
(a)
NA
SB LT
NA
(5)
NA
0.0
WB RT
NA
NA
8
PM Peak Hour
Vd3 LT
NA
NA
58 LT
NA
NA
0.0
WB RT
NA
NA
Main Street
Year 2002
AM Peak Hour
WB LT
NA
NA
SB LT
NA
NA
0.0
No -Budd
WB RT
NA
NA
PM Peak Hour
VdB LT
NA
NA
SB LT
NA
NA
0.0
WB RT
NA
NA
Year 2002
AM Peak Hour
EB LT
C
16.5
NB LT
A
3.7
1.4
Budd
EB TWRT
A
4.9
SB LT
A
3.8
WB LT
C
16.8
WS TMIRT
A
4.4
PM Peak Hour
ES LT
D
27.5
NO LT
A
ES THIRT
B
5.1
SB I
B
5.4
WB LT
E
42.4
NB TH/RT
B
6.8
NOTES
(1) All four intersections are controlled with stop conditions on the easMaest streets and free Rowing through conditions on Ne nortNsouth strut.
(2) The direction and movement is reported. For example. VJB LT identlies Ne Westbound IeR-tum movement.
(3) The mterse n delay represents the overall delay in seconds per vehxde entering the intersection.
(4) The movements W and from the west approach of this intersection do not include the volumes for the trips generated by the Rosemount, Inc.
budding which wdl share this access.
(5) The results with "NA" identify the movements which are not present in the existing and no -build conditions.
SOURCE: BRW, Inc. using RCS Unsignalleee Intereechon Analysis And Ne Highway Capacity Manuel.
OaOSlae
U:IUNSIGLOS.WM
u • •
Table 7 shows the AM and PM peak hour results of the planning analysis for the
signalized intersections along TH 5. The results indicate:
I� For the existing conditions, the intersections of TH 5 and TH 101 is reported to
operate under capacity in both the AM and PM peak hours. The intersection of
TH 5 and Great Plains Boulevard is reported to operate under capacity in the AM
peak hour and near capacity in the PM peak hour.
The planning analysis helps demonstrate that the change in operations at the
intersections along TH 5 from the existing conditions are not solely due to the
additional traffic generated by the development. The background traffic growth in
the area accounts for 45 to 65 percent of the traffic forecast at the two intersections
along TH 5, varying by intersection during the peak hours. Even without the
additional site -generated traffic in the forecast year, the volumes are expected to be
near or over capacity due to the background traffic growth.
Table 8 shows the results of the unsignalized intersection analysis. The analysis
indicates that all of the unsignalized intersection movements currently operate at LOS
C or better in both the AM and PM peak hours. For the forecast Year 2002 no -build
condition, the analysis indicates that all of the intersection movements are expected to
operate at LOS D or better in both the AM and PM peak hours. For the forecast Year
2002 build conditions, the analysis indicates all of the intersection movements are
expected to operate at LOS D or better, with the following exceptions:
• The TH 101/Lake Drive West intersection eastbound left -tum movement is
expected to operate at LOS F in the PM peak hour.
J The TH 101/Lake Drive (Site) intersection westbound left -tum movement is
expected to operate at LOS E and F in the AM and PM peak hours, respectively.
'. The TH 101/1-ake Drive (Site) intersection eastbound left -turn movement is
expected to operate at LOS F in the PM peak hour.
•�5" 33
• For the no -build conditions, the intersection of TH 5 and TH 101 is expected to
operate near capacity in both the AM and PM peak hours. The intersection of TH
5 and Great Plains Boulevard is expected to operate near capacity in the AM peak
hour and over capacity in the PM peak hour.
"
• For the build conditions, the intersection of TH 5 and TH 101 is expected to
operate near capacity in the AM peak hour and over capacity in the PM peak
hour. The intersection of TH 5 and Great Plains Boulevard is expected to operate
I�
over capacity in both the AM and PMf peak hours.
• The analysis indicates that in comparing the sum of the critical volumes for the
AM and PM peak hours from the existing conditions to the forecast Year 2002 no -
build conditions there is an increase of 13 to 17 percent.
11
• The analysis indicates that in comparing the critical volumes for the AM and PM
f�
peak hours from the no -build to the forecast Year 2002 build conditions there is
an increase of 4 to 27 percent.
The planning analysis helps demonstrate that the change in operations at the
intersections along TH 5 from the existing conditions are not solely due to the
additional traffic generated by the development. The background traffic growth in
the area accounts for 45 to 65 percent of the traffic forecast at the two intersections
along TH 5, varying by intersection during the peak hours. Even without the
additional site -generated traffic in the forecast year, the volumes are expected to be
near or over capacity due to the background traffic growth.
Table 8 shows the results of the unsignalized intersection analysis. The analysis
indicates that all of the unsignalized intersection movements currently operate at LOS
C or better in both the AM and PM peak hours. For the forecast Year 2002 no -build
condition, the analysis indicates that all of the intersection movements are expected to
operate at LOS D or better in both the AM and PM peak hours. For the forecast Year
2002 build conditions, the analysis indicates all of the intersection movements are
expected to operate at LOS D or better, with the following exceptions:
• The TH 101/Lake Drive West intersection eastbound left -tum movement is
expected to operate at LOS F in the PM peak hour.
J The TH 101/Lake Drive (Site) intersection westbound left -tum movement is
expected to operate at LOS E and F in the AM and PM peak hours, respectively.
'. The TH 101/1-ake Drive (Site) intersection eastbound left -turn movement is
expected to operate at LOS F in the PM peak hour.
•�5" 33
I • •
• The TH 101/Main Street intersection westbound left -tum movement is expected
to operate at LOSE in the PM peak hour.
'
The traffic for the minor street left -turn movements at the unsignalized intersections
are expected to experience some delay during the peak hour conditions. However,
the intersection operations for the majority of the volume entering the unsignalized
intersections are expected to operate at LOS A. This volume includes the through
movement and right -tum movement volumes along the major street which are not
required to stop.
RECOMMENDED MITIGATION
The following traffic mitigation measures are recommended based on the results of
the preceding traffic capacity analysis and planning analysis. Mitigation is
recommended for intersections where the volume approaches or exceeds the capacity
for the current geometrics. The signalized intersections of TH 5 and TH 101/Market
Boulevard is expected to operate at LOS D or better which is a satisfactory condition
for the peak hours of operation. The intersection of TH 5 and Great Plains Boulevard
is expected to have movements which approach or exceed the capacity; therefore,
different forms of mitigation including adding double left -turn lanes, channelizing free
right -tum lanes or a combination of both were considered. Table 7 shows the results
of the most effective and reasonable mitigation at this intersectiones K,�j ovn bras^ak
tlWhen
the volume for a left -turn lane exceeds 300 vehicles, an additional left -tum lam n
should be considered. The volume for the east approach left -tum movement into the
development is expected to be near or over 300 vehicles in the peak hour. The
addition of a second left -turn lane for the east approach on TH 5 is recommended at
the intersection of TH 5 and Great Plains Boulevard. Adding a second left -turn lane
is expected to improve the conditions at the Great Plains Boulevard intersection..
Another form of mitigation which should be considered at the TH 5 and Great Plains
Boulevard intersection is either providing a free right for the south approach or
extending the right -tum lane. This right -turn movement is expected to be heavily
used by vehicles traveling east on TH 5 or north on TH 101. Although the through
and left -tum movements for this south approach are low compared to the right -turn
movement, extending the lane
right -turn could help prevent the right -turn queue from
blocking access to the through and left -turn lanes.
Although these mitigations are expected to improve the intersection operations, they
do not improve the overall intersection level of service. The intersection is expected
to operate near capacity due to the heavy through movement on TH 5. No mitigation
was identified to deal with the high volumes of traffic traveling in the through
movements on TH 5. The through movements on TH 5 already receive the majority
of the green time at the signalized intersections and are expected to continue to do so
in the future. Therefore, the mitigation discussed above is aimed at improving the
conditions for the other movements at the intersections.
A common form of mitigation for unsignalized intersections is to install a traffic
signal. Volumes at the unsignalized intersections were compared to the Peak Hour
Volume Warrant as discussed in the Minnesota Manual on Uniform Traffic Control
.zsses 34
r
Devices (MMUTCD). Neither the AM nor the PM peak hour combination of major
and minor street volumes were found to meet the Peak Hour Volume Warrant
conditions for signalization at any of the four intersections. As stated earlier, level of
service E or even F for left -tum movements from minor streets at unsignalized
intersections during peak hour operations is common in urbanized areas. Gaps in
traffic created by the traffic signals at the two TH 5 intersections will also improve the
conditions for the left -tum movements from the development accesses. Therefore, no
mitigation is recommended at any of the unsignalized intersections.
23. Vehicle -related Air Emissions. Provide an estimate of the effect of the project's traffic
generation on air quality, including carbon monoxide levels. Discuss the effect of
traffic improvements or other mitigation measures on air quality impacts. (If the
project involves 500 or more parking spaces, consult EAW Guidelines about whether a
detailed air quality analysis is needed.)
Response: The proposed project will have 2,192 associated parking spaces.
Minnesota Pollution Control Agency (MPCA) rules require an Indirect Source Permit
(ISP) for new development with over 2,000 parking spaces. The ISP regulates
vehicular emissions of carbon monoxide (CO) from vehicles generated by proposed
developments.
The air quality impacts of the proposed project were addressed by modeling future
traffic flow to predict carbon monoxide (CO) concentrations in the project area. The
microscale air quality analysis was based on the traffic forecasts and operational
analyses documented in Question #22 - Traffic. Total expected CO concentrations are
the sum of local CO (determined through modeling) and background CO (determined
by monitoring in the project area). Impacts were determined by comparing the
forecast CO concentrations to the state ambient air quality standards for CO, shown in
Table 9. These standards were established at levels to protect the most sensitive
segments of the population and are not to be exceeded more than once per year.
TABLE 9
AMBIENT AIR QUALITY STANDARDS FOR CO (PPM)
State
1 -HOUR AVERAGE 8 -HOUR AVERAGE
0
The air quality impacts of the project were addressed by estimating future CO
concentrations at the two busiest intersections in the project area:
• TH 5 and TH 101 (Market Boulevard)
• TH 5 and Great Plains Boulevard
F
423585 35
0 • • •
35,600
1,950
Villages on the Ponds
Environmental Assessment Worksheet
The City of Chanhassen
61
45,800
0
0
ca
44,400
2,100
Figure 9
Existing Average Daily Traffic Volumes
E
54/96
60/110
1,550/1,080
1,850/1,290
77/50
90/60
x
iges on the Ponds
ronmental Assessment Worksheet
City of Chanhassen
0
41 • y
41 + 1*
�o
Ln 00
00�
�r
��
�\
�\
r -
N M
N
H �
41 • y
41 + 1*
104/267 49/81
120/320 60/100
F 11073/1,786 1,777/1,544
1,280/2,130 2,120/1,840
165/204 24/35
200/240 30/40
Legend:
Traffic Signal
XXX/XXX Existing Conditions AM/PM Peak Hour
Turning Movement Volumes
XXX/XXX Year 2002 No -Build AM/PM Peak Hour
Turning Movement Volumes
Source: BRW, Inc. Counted
on March 23, 1996.
0
Om
en c:)
eq U)
��
H
N
N
��
N
1Z�
Ln \.D
-i
104/267 49/81
120/320 60/100
F 11073/1,786 1,777/1,544
1,280/2,130 2,120/1,840
165/204 24/35
200/240 30/40
Legend:
Traffic Signal
XXX/XXX Existing Conditions AM/PM Peak Hour
Turning Movement Volumes
XXX/XXX Year 2002 No -Build AM/PM Peak Hour
Turning Movement Volumes
Source: BRW, Inc. Counted
on March 23, 1996.
0
41
en c:)
�1,
��
Om
N
00o
-4i
N
N
�
41
63/174
80/210
11283/1,915
1,530/2,290
31/45
40/50
Figure 11
Existing and Year 2002 No -Build AM and PM
Peak Hour Miming Movement Volumes
9606 0091
Ln
00O
��
00
o
o
NN
Cf) 1:t
GO 00
63/174
80/210
11283/1,915
1,530/2,290
31/45
40/50
Figure 11
Existing and Year 2002 No -Build AM and PM
Peak Hour Miming Movement Volumes
9606 0091
600
110 (0)
1,850 (0)
1,290(0)
210 (115)
160 (100)
120 (0)
320 (0)
F 11280 (0)
2,130(0)
300 (95)
330 (85)
80 (15)
120 (20)
2,200 (75)
1,930 (85)
30 (0)
40 (0)
Traffic Signal
XXX (XXX) Year 2002 Build AM Peak Hour
Turning Movement Volumes
(Site Generated Volumes)
XXX (XXX) Year 2002 Build PM Peak Hour
Turning Movement Volumes
(Site Generated Volumes)
Source: BRW, Inc. Using ITE Trip
Generated Manual, Fifth
Edition, 1991.
80(o)
210 (0)
1,620 (85)
2,370 (75)
300 (255)
280 (225)
Figure 12
Year 2002 Build and Site Generated AM and PM
Peak Hour Turning Movement Volumes
9606 0061