Loading...
2d Dogwood-Tanadoona Improvement Project : Approve Consultant Contract CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952,227.1190 Engineering Phone: 952.227.1160 Fax: 952.227,1170 Finance Phone: 952.227.1140 Fax: 952.227,1110 Park & Recreation Phone: 952.227.1120 Fax: 952,227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227,1110 Web Site WWVI, ci .chanhassen.mn. us 02-ct, - :MEMORANDUM TO: ?c7( FROM: Paul Oehme, Director of Public Works/City Engineer Alyson Fauske, Assistant City Engineer rt..1->f ~ ~~Y . June 11,2007 ' DATE:' SUBJ: Dogwood/Tanadoona Improvement Project No. 07-01: Approve Consultant Contract for Additional Services REQUESTED ACTION Approve Consultant Contract for additional services with Kimley-Horn & Associates in the amount of $51,200. BACKGROUND As part of the final design for this project, several additional services were necessary to complete the project. The following are additional services that Kimley-Horn provided during final design that were not in the original contract: Dogwood Alternative Alignment Design · Develop preliminary alignment and profile for alternative roadway alignment for Dogwood Road based on property owner feedback. . Cut cross sections and develop construction limits for alternative alignment. · Perform preliminary design on private driveway extensions including alignments, profiles and earthwork calculations. . Determine additional impacts to existing trees. . Determine additional right-of-way required for the alternative alignment. . Calculate earthwork and quantities for alternative alignment. . Prepare preliminary cost estimate for the alternative alignment. · Prepare exhibits for City staff to facilitate discussions with property owners regarding the alternative roadway alignment. Additional Financing Summary Analysis . Prepare four (4) different cost estimates for each of the following improvements to reflect variations in design: Dogwood Road Improvements, Tanadoona Drive Improvements, Sanitary Sewer Improvements, Watermain Improvements, and Storm Sewer Improvements. . Prepare four (4) versions of the assessment roll to reflect different The City of Chanhassen · A growing community with cle~1~~~~ua?rm~g~~a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. DogwoodJTanadoona Improvement Project June 11, 2007 Page 2 · Perform two additional updates to the assessment rolls based on changes to the assessment methodology. Storm Water Pond Design . Explore feasibility of construction of a storm water pond at the northwest corner of Dogwood Road and Tanadoona Drive. . Perform preliminary design of a storm water pond based on GIS contours provided by the City. . Determine easement requirements and prepare exhibit for City staff to facilitate discussions with the property owner. . Prepare legal description for drainage easement. . Perform topographic survey and mapping for storm water pond area. . Perform final design of storm water pond based on survey mapping. · Determine wetland impacts from proposed storm water pond construction. · Coordinate with City staff in preparing wetland banking application for project. Starks Berm Design . Explore feasibility of constructing a berm on the south side of Tanadoona Drive adjacent to the Starks property. . Provide exhibits to City staff to facilitate discussions with property owner regarding berm construction. . Prepare final design of berm including cross sections and earthwork calculations. Additional Final Design Work · Coordinate with City staff and product vendor on the design of an environmental manhole for the project. · Explore option of directional drilling the sanitary sewer and watermain on the project. Meet with contractors to discuss the feasibility of directional drilling sewer. Additional Soil Boring Investigation · Perform deeper soil borings as necessary to accommodate extra depth in sanitary sewer and proposed sanitary sewer lift station. This cost was past through to Kimley- Horn by the soils investigation consultant. Additional Meetings . Attend two (2) additional meetings with City staff and the private developer. Staff has reviewed these costs and finds them acceptable based on the work performed and the time submitted for the service provided. Funding for the additional services were included in the project cost and will be funded through assessments, the revolving assessment fund, and the storm sewer utility fund based on the City's assessment practice. c: Chadd Larson, Kimley-Horn & Associates