Loading...
02-05-2024 City Council Special Meeting Agenda and PacketA.7:00 P.M. - CALL TO ORDER B.WORK SESSION B.1 Civic Campus Discussion C.8:30 P.M. - ADJOURNMENT AGENDA CHANHASSEN CITY COUNCIL MONDAY, FEBRUARY 5, 2024 FOUNTAIN CONFERENCE ROOM, 7700 MARKET BOULEVARD SPECIAL MEETING 1 City Council Item February 5, 2024 Item Civic Campus Discussion File No.Item No: B.1 Agenda Section WORK SESSION Prepared By Laurie Hokkanen, City Manager Reviewed By SUGGESTED ACTION Discussion Motion Type N/A Strategic Priority Development & Redevelopment SUMMARY The City Council will meet in work session in the Fountain Conference Room from 7 p.m. to 8:30 p.m. The Civic Campus Design team will attend to walk the City Council through the attached presentation. The goal of the meeting is to work through the following questions: 1. What Scenario should Staff and the Design Team follow? 2. What is the Council’s comfort level for the base bid relative to the budget? 3. What are the desired add alternates for the project? 4. What is the size and number of restrooms in the Park Pavilion Building? 5. What is the desired direction for the Stage cover? Also attached are renderings of the City Hall/Senior Center clad in brick rather than stone. This is one of the cost-saving measures that the City Council will consider. 2 BACKGROUND DISCUSSION BUDGET RECOMMENDATION ATTACHMENTS Chan Civic Campus - Council Work Session Presentation 02-05-2024 City Hall Brick Alternative Rendering - Northeast Corner City Hall Brick Alternative Rendering - Northwest Corner City Hall Brick Alternative Rendering - Southwest Corner City Hall Brick Alternative Rendering - Southeast Corner City Hall Brick Alternative Rendering - North Side City Hall Brick Alternative Rendering - South Side Aerial 3 Chanhassen Civic Campus City Council Work Session 2/5/2024 4 Agenda 1.Summary of Project Needs and Goals 2.Current Project -Plans and Renderings 3.Budget Comparison Summary –Concept to DD Estimate 4.Overview of Current Budget at DD 5.Scenarios for Council Consideration/Discussion •1-1B Current Design + Alternates •2-2B Current Design + Expanded Alternates / Lower Base Bid •3 Match Concept Budget, Significant Scope Reduction 6.Council Direction for Staff & Design Team 5 Summary of Project Needs & Goals 6 7 Cost to Renovate vs. Cost to Build New 8 9 10 Project Goals 1.Create a Destination Civic & Park Space 2.Support a Vibrant Downtown 3.Provide Year Round Activities •Multi-use space for summer concerts, farmer’s market, winter activities 4.Multi-generational •Sr. Center, Library, Veteran’s Memorial, splash feature, playground, performance space, pickleball, skate park,, outdoor living room, etc. 11 Current Project - Plans / Renderings 12 13 OFF-SITE INFRASTRUCTURE IMPROVEMENTS 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Updated Park Pavilion Rendering 28 Budget Comparison – Concept to Current DD 29 Major Differences Between the Concept Plan and the Current Design •Price per square foot assumptions on buildings/increased square footage •City Hall/SR Center: 38,000sf @ $425/sf vs $496sf (+ $2.7mil) •City Hall/SR Center: 685sf increase from Concept (+ $340K) •Park Pavilion Building: $350/sf vs $774sf (+ $350,000) •Park Pavilion Building: 1,500sf decrease from Concept •No building programming was completed, assumed sq. ft. off of facilities study •Utilities and site infrastructure •Phasing of utilities, relocation of sanitary sewer, storm sewer, water main, electrical services (More than assumptions made at concept level) Budget Comparison – Concept Plan to Current DD Plans 30 Major Differences Between the Concept Plan and the Current Design •Soils / geotechnical evaluation •Clay soils, additional correction/ base material •Completed during SD/DD Phase post Concept •Grading and earthwork •No grading plan completed at Concept •Added scope items not previously in concept: •Off-site Infrastructure Improvements (Additional Funds Allocated + $225K) •Stage Structure (Additional Funds Allocated + $300K) •Fireman’s Monument Relocation + $90K •Digital Display Sign + $60K Budget Comparison – Concept Plan to Current DD Plans 31 Overview of Current Project Budget at DD 32 Current Project Revenue (Sources) Description Design Development Estimate Notes Bonds $33,000,000 $35mil. less $2mil. for Bond Issuance Interest Earnings on Bonds $700,000 Conservative Estimate Tax Savings $800,000 Owner Estimated Park Dedication Funds $300,000 Dedicated to Stage Structure PMP Funds $225,000 Dedicated to Off-Site Infrastructure Misc. (Generator, Cable TV, Rebates)$175,000 Total Project Revenue $35,200,000 Potential Additional Revenue Sources: •Fund Balance = +/- $2mil. •Utility Funds = +/- $200K •Potential Future Park Dedication Funds = +/- $1mil. Total for Potential Additional Revenue Sources = $0 - $3,200,000 33 Current Construction Costs (Uses) Description DD Estimate Notes New Construction –City Hall/Sr. Center $19,200,000 DD Estimate New Construction –UG Parking $2,175,000 DD Estimate New Construction –Park Pavilion ($1.75mil.) + Outdoor Living Room Cover ($295K) $2,040,000 DD Estimate Site Improvements (incl. $300K Stage Structure)$5,750,000 DD Estimate Park Elements (Splash $345K, Playground $625K, Skate Park $130K, Ice $50K) $1,145,000 DD Estimate Off-Site Infrastructure Improvements $300,000 Implemented Value Management By Design Team/Staff ($2,815,000)Value Management (next 2 slides) Design Contingency $695,000 Approx 2.5% Escalation $710,000 2.5% Total Bid Day $29,200,000 Remaining Contingency $1,460,000 5% General Conditions $400,000 Estimated at 20 Months Total Project Construction Costs $31,060,000 34 City Hall / Senior Center DD Estimate Notes Interior glass walls to Dorma System $700,000 SD was 350sf, DD is 3,500sf (Offices and Conf. Rooms) Reduce wood veneer wall paneling $150,000 Common spaces ACT in offices (wood look)$166,000 For open office ACT Clock tower to one side $45,000 DD Estimate Remove Ceiling Insulation and ACT in parking garage $200,000 At underside of precast Remove 90LF of glazed interior railings $90,000 Drywall assembly and wood cap Reduce slat -1 ceiling finish in council chambers and lobby $60,000 Add four gas fired unit heaters in garage $30,000 Remove dry sprinkler from lower level $33,000 Tile at wet walls only in restrooms, base remains $35,000 Remove interior stone wall finish on west corridor $30,000 Remove canopy at north side of City Hall/ Senior Center $27,000 Value Management Items Already Included 35 Site DD Estimate Notes Reduction in site furnishings $95,000 CIP Seat walls $75,000 Central seat walls removed Custom leaf fountain & trellis at splash feature $130,000 Library trash enclosure $23,000 Stone veneer at CH/Sr. Center trash enclosure $36,000 Remove one fire pit $10,000 Park Pavilion Building DD Estimate Notes Roof system from standing seam to ballasted $80,000 Reduced square footage $247,000 Reduce western covered canopy $110,000 Remove window treatments $23,000 Current Total VM = $2,815,000 (Site $440K, Park Pavilion $460K CH/Sr. Center $1,915,000) Value Management Items Already Included 36 Current Soft Costs (Uses) Description Design Development Estimate Notes Design Fees $2,290,000 Construction Management $1,460,000 Permits, Plan Reviews & Fees $50,000 Utility Connections $40,000 Xcel, Centerpoint, CarverLink Pre-Construction Surveys + Studies $60,000 Testing & Inspections $195,000 Bidding, Legal, Finance & Misc.$30,000 City Purchase Orders / Soft Cost Contingency $250,000 Furniture, Fixtures, & Equipment (FF&E)$800,000 Soft Costs Subtotal $5,175,000 37 Current Project Budget Summary Description Design Development Estimate Notes Total Project Revenue $35,200,000 Total Project Construction Costs -$31,060,000 Soft Costs Subtotal -$5,175,000 Variance (OVER / UNDER)($1,035,000) *Does not include select Tentative Add Alternates ($894,000) – See next slide *Does not included on-site stormwater treatment ($800,000) Current Conversations with Watershed District are leaning toward a larger stormwater solution for Downtown that includes Civic Campus stormwater treatment requirements 38 Tentative Project Add Alternates #Add Alternates DD Estimate Base Bid Item 1.Terrazzo Floor Finish in Lobby $36,000 Tile floor as scheduled 2.Operable Partition in Classroom 146 $32,000 Full ht. metal stud wall 3.CH Energy Recovery Unit $176,000 No energy recovery unit 4.White Noise System in CH Offices $40,000 No white noise system 5.Room Scheduling System $40,000 No room scheduling system 6.Site Speaker Notification System $25,000 No site speaker/notification system 7.Site-wide City provided Wi-Fi $65,000 No exterior, site-wide Wi-Fi System 8.Site snow-melt between CH/Sr-Lib $255,000 No site snow melt in the base bid 9.Relocate Fireman’s monument $90,000 Provide landscape/site work as indicated 10.Cast-in-place concrete seat walls $75,000 Provide conc. seat walls as indicated (edges) 11.Digital monument sign $60,000 Provide landscape/site work as indicated Add Alternate Totals $894,000 39 Current Project Budget Summary with Alternates Description DD Estimate Notes Total Project Revenue $35,200,000 Total Project Construction Costs -$31,060,000 Soft Costs Subtotal -$5,175,000 Variance (OVER / UNDER)($1,035,000) Add Alternates -$894,000 Total w/ Alternates ($1,929,000) 40 Current Costs in the Project to Help Manage Budget PRE-BID Design Contingency = $695K •Would be reduced to $0 at bid day, reducing the overall project cost •To cover possible bid day overages or add alternates Escalation = $710K •2.5% of budget anticipating staggered construction 2024–2025 •To cover possible bid day overages or add alternates Total Pre-Bid Contingency and Escalation = $1,405,000 POST-BID Construction Contingency = $1,470,000 •Would hold for additional project unknowns throughout construction •Potential for add backs to project 41 Scenarios for Council Consideration/Discussion 42 Scenarios for Council Consideration/Discussion Scenario 1 or 1B –Current Design Track with or without Add Alternates •Base Bid = $1,035,000 over budget; w/ Add Alternates range = $0 to $894,000 •Likely must utilize additional funding sources •Deliverers complete project scope •No impacts to current schedule Scenario 2 or 2B –Reduced Base Bid + Expanded Add Alternates or Park Pavilion Building as Add Alternate •Base Bid = +/-$310,000 over budget to +/--$1,005,000 under budget; Add Alternates range = $0 to $2,934,000 •May require additional funding sources dependent on alternates selected, Risk associated with numerous, complex alternates •Project likely would lack key features (exterior snow melt system, stone on City Hall/Sr. Center exterior, etc.) (Specific el ements TBD) •Potential for schedule impacts Scenario 3 –Match Concept Budget •Base Bid = $0 over budget •Likely no additional funding needed •Strategies would range from significant redesign of City Hall/ Sr. Center building, no Park Pavilion building, remove pickleb all, keep skatepark and hockey with no upper parking lot, etc. •Would increase costs due to redesign and significant schedule impacts (6-12 months)43 Project Scope: •Delivers Complete Scope Identified in the Design Process •Includes the Park Pavilion Building + Outdoor Living Room Area Budget: •Base Bid = $1,035,000 over budget •Add Alternates Range = $0 -$894,000 •Total Estimate with all Add Alternates = $1,035,000 -$1,929,000 over budget Need for Additional Funding: •Likely would require additional revenue (Amount & Source TBD) •Pre-Bid Contingency and Escalation total of $1,405,000 Schedule Impacts: •Maintains Completion Schedule target of July 4th 2026 Scenario 1 – Current Design + Current Add Alternates 44 Project Scope: •Delivers Near Complete Scope Identified in the Design Process •Includes the Park Pavilion Building + Outdoor Living Room Area Budget: •Base Bid = $1,035,000 over budget •No Add Alternates •Total Estimate = $1,035,000 over budget Need for Additional Funding: •May require some additional funds (Amount & Source TBD) •Pre-Bid Contingency and Escalation total of $1,405,000 Schedule Impacts: •Maintains Completion Schedule target of July 4th 2026 Scenario 1B – Current Design & No Alternates 45 Project Scope: •Potential Exists to Deliver Near Complete Scope Identified in the Design Process •Includes the Park Pavilion Building + Outdoor Living Room Area in Base Bid Budget: •Base Bid = $310,000 over budget (reduced base bid due to expanded alternates below) •Expanded Add Alternates (Enact Level 3 on Value Management in addition to Alternates from Scenario 1) •Stone to Brick Exterior ($300K) •Glass to Metal Interior & Exterior Railings ($200K) •Reduce private office fronts ($75K) •Eliminate Pickle Ball Courts ($150K) •Budget risks associated with a significant number of Add Alternates (15 total, targeting 5 max) Need for Additional Funding: •May not require additional funds depending on alternates selection (Amount & Source TBD) •Pre-Bid Contingency and Escalation total of $1,405,000 Schedule Impacts: •Maintains Completion Schedule target of July 4th 2026 Scenario 2 – Current Design & Expanded Alternates 46 Project Scope: •Potential Exists to Deliver Near Complete Scope Identified in the Design Process •Shifts the Park Pavilion Building + Outdoor Living Room Area to an Add Alternate Budget: •Base Bid = -$1,005,000 under budget •Maintain Scenario 1 Add Alternates + Park Pavilion Building as Add Alternate = $0 -$2,934,000 •Budget risks associated with a significant number and complexity of Add Alternates Need for Additional Funding: •May not require additional funds depending on alternates selection (Amount & Source TBD) •Pre-Bid Contingency and Escalation total of $1,405,000 Schedule Impacts: •Maintains Completion Schedule target of July 4th 2026 Scenario 2B – Current Design, Park Pavilion Building as Add Alternate, Plus Scenario 1 Alts. 47 Project Scope: •Likely significant portions of project scope removed •Various strategies could include: •Significant reductions to City Hall/ Sr. Center building square footage •Remove training room, relocate Council Chambers to first floor; Remove clock tower; Revisit W 78 th Façade and covered entrance area; Remove underground parking •Remove Park Pavilion Building •Stub Utilities for Future, Portable Restrooms, Trailer for Warming House, No Splash Pad –Turf in lieu, Reduce associated site furnishings, •Leave Hockey and Skate Park, Resurface Skate Park, reinstall ex. Features, No New Upper Parking Lot Budget: •Base Bid = $0 over budget with no Alternates •Additional costs for redesign, schedule delays (amount and duration TBD) Need for Additional Funding: •Would likely not require additional funding •Pre-Bid Contingency and Escalation total of $1,405,000 Schedule Impacts: •Schedule impacted by minimum of 6-12 months Scenario 3 – Match Budget & No Add Alternates 48 Council Consideration/Discussion 49 1.What Scenario should Staff and the Design Team follow? 2.What is the Council’s comfort level for the base bid relative to budget? 3.What are the desired add alternates for the project? 4.What is the size and number of restrooms in the Park Pavilion Building? 5.What is the desired direction for the Stage cover? Considerations for Council 50 51 52 53 54 55 56