Loading...
1c. Award of Bid, Power Hill Park Trail CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us lc ~ MEMORANDUM TO: Todd Gerhardt, City Manager Todd Hoffman, Park and Recreation Director -;j(j July 9, 2007 ,,~ Award of Bid, Power Hill Park Trail FROM: DATE: SUBJ: The 2007 Park and Trail Acquisition and Development Fund includes $75,000 for construction of the Power Hill Park neighborhood connector trail. Power Hill Park has been in our park system since 1993, The master plan for the park, developed and adopted in 1997, includes a trail that links the adjoining neighborhoods in the area together, in addition to providing convenient access to park amenities. Two trail access points associated with this improvement have been in place since the adoption of the plan. With the final neighborhood connection in place (Stonefield), we are 'in a position to move forward with the full trail project. The finished trail will be 81/2 feet wide and constructed of bituminous material. The total length is approximately 2,250 feet. Construction is anticipated to be completed in July. A mailing notifying neighboring residents of the upcoming construction work will be sent upon approval of the City Council and execution of a contract agreement. The following bids were received on the project: Plehal Blacktopping GMH Asphalt Czars of Tar $43,570.00 $46,687.50 $59,775.00 RECOMMENDATION It is recommended that the City Council award the bid for the Power Hill Park Trail project to Plehal Blacktopping, Inc. in the amount of $43,570. Approval of this item requires a simple majority vote of those City Council members present. A TT ACHMENTS 1. Bid Forms 2. CIP Budget Sheet 3. Park Master Plan c: Park and Recreation Commission Dale Gregory, Park Superintendent Plehal Blacktopping GMH Asphalt Czars of Tar The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. G:\park\th\award of bid power hill park trail.doc PLEHAL BLACKTOPPING, INC. DRIVEWAY & PARKING AREAS BLACKTOPPED www.plehal.com P.O. BOX 317 -13060 DEM CON DRIVE SHAKOPEE, MN 55379-0317 PH. (952) 445-7676 - FAX (952) 445-7682 ~"\ f"" .'" f1c.Gli'::~V5:ffl Ik,., ~ (; .'", l-,/ JUN 2 0 2007 CITY OF CHANHASSEN Page No. 1 of 1 Pages PROPOSAL SUBMITTED TO CITY OF CHANHASSEN ATTENTION TODD HOFFMAN STREET PO BOX 147 CITY, STATE, AND ZIP CODE CHANHASSEN, MN 55317 MAP LOCATION PHONE # 952-227-1100 FAX # 952-227-1110 19, 2007 ~~~!S~27-1129 JOB NAME POWER HILL PARK JOB LOCATION We hereby submit specifications and estimates for: POWER HILL PARK - NEW TRAILS APPROXIMATELY 2,225 LINEAR FEET SUB-CUT 9 FEET WIDE AND 9 INCHES BELOW FINISHED GRADE. GRADE AND SHAPE SUB BASE. INSTALL 3 INCHES RECLAIMED ASPHALT FOR BASE. GRADE AND COMPACT. INSTALL 3 INCHES CLASS #5 100% CRUSHED LIMESTONE BASE. GRADE AND COMPACT. INSTALL 3 INCHES MN D.O.T. SPEC 41A BITUMINOUS WEARING COURSE. ROLL AND COMPACT. NOTE: NEW BITUMINOUS PATH WILL BE 8' 4" WIDE (WIDTH OF SCREED). We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of; FORTY THREE THOUSAND FIVE HUNDRED SEVENTY dollars($ 43, 570.00 ). Payment to be made as follows; NET DUE UPON COMPLETION Any person or company supply labor or materials for this improvement to your property may file a lien against your property if that person or company is not paid for the contributions. All depths are average and measurements are approximate. All material is guaranteed to be as specified. All work is to be completed in a workmanlike manner according to specifications submitted per standard practices. All agreements contingent upon strikes, accidents, or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman's Compensation Insurance. See Additional Contract Terms On The Back. No FINANCE CHARGE made on accounts paid within 30 days. Past due invoices will be charged 11/2% per month FINANCE CHARGE (18% annual percentage rate). Authorized Signature ~Lfdb RICH PELTIER Note: This proposal may be withdrawn by us if not accepted within days. Acceptance of Proposal- The above prices, specifications and conditions are satisfactory and are hereby accepted. The general provisions on the back of this contract are made a part of this contract and incorporated herein by this reference. You are authorized to do the work as specified. Payment will be made as outlined above. Signature Date of Acceptance: . VISA Signature White Copy (Return to Office) - Yellow Copy (Customer) - Pink Copy (File) GMH ASPHALT ~ I"", p' !',-. I....' I \jg ~U. ~, ,,1' ,... 8 - "",", P Ii"'" ~ ., U"......,lk '''''~~J QUOTE CORPORATION JUN 2 0 Z007 CITY OF CHANHASSEN Date Estimate # I Customer Mr. Todd Hoffman Park & Recreation Director 7700 Market Blvd. P.O. Box 147 Chanhassen, MN 55317 6/18/2007 101 I Phone # Fax# 952-442-5288 952-442-5656 E-mail gmhasphalt@gmail.com Project Stonefield Area Bituminous Trail Item Unit Price Total STONEFIELD AREA BITUMINOUS TRAIL CONSTRUCTION APPROXIMATELY 2250 L.F. IN LENGTH AND 8.5' WIDE WE PROPOSE THE FOLLOWING: (I) STRIP SOD/VEGETATION 12' TO 14' WIDE (2) EXCAVATE 9-1/2' TO 10' IN WIDTH BY 7-1/2" IN DEPTH (3) INSTALL 6" OF CLASS 5 RECYCLED AGGREGATE BASE (4) INSTALL 3" OF 2341a BITUMINOUS WEAR (5) ROUGH IN BACKFILL ADJACENT TO NEW BITUMINOUS TRAIL TOTAL BID PRICE $20.75 PER LINEAR FOOT 46,687.50 46,687.50 NOTE: FINAL RAKING/GRADING AND SEED RESTORATION BY OTHERS FINAL BILLING WILL BE BY ACTUAL LINEAR FOOT OF TRAIL INSTALLED . . . J ~ . ; ,j; ...It _- .,..... . \.~. '~ ' Total $46,687.50 GMH ASPHALT CORP. .. 9180 Laketown Road" Chaska, MN 55318 .. Phone: (952) 442-5288 FAX: (952) 442-5656 .-- ...-.--- -"M_'.__'__ _. ".'- -,. --... 'roposal Page No. of ages PH. 761-421-6417 1309 FAX 763-78]""81 PROPOSAL SUBMITTED TO . Ptl BOX 147 CIlY, STATE: and ZIP CODe C~NHASSEN MN 55317 ARCHITECT DATE OF PLANe TH0MAS STEICHEN 6/18/07 952..227-1129 JOB NAME PATHwAYS JOB LOCATION We hereby sUbmIt Specifications and estimEltes for: PAX: ~52~227~1110 JOB PHONf: . ..........'................................ .........................,.............................. ...................................,..,................ .............. '.. .............................. ................ ..... ... ...................., ..........................................................',..,................... ........................................ ..fL .. ,1.~S.r.A:L1.,fj..!NC.ijR,S..C.LASS.. .7. ..RQ.CK................... . J..!.........r;x.GAy.4..IE.....~.,..?,!5.Q....r.:T...X.....9.:...~r...i''.t.. .,TQ,...,2..."INCUE.5.. ..BELOW....GRADE;,.":...,.............".,,..,...............................,....,....................,..................., ",.......................... ..~~. ....rAY~.....2,..Z.SQ...r.T..,X....,a....5,....~:r....N::t'l'H. .3.....INCH.." C0MP ACTEIt...2.3.41B. HOT....MIX,.. ...........,........................... . .. .........-.................. ................................,. "................................."..............................". ...........................".....................,....,..,."....... ...M..........,.. .4.~. ...m..R.E.$:!.OJ.U~.,P.:t.S.IU.RB.ED..AUAS:...Wf.Tij....D.IRT....AND.....B.ACK:....prLL....NEW..PAV,1Nl!.........."................................. .."................" ,.......................,........"........ " . .?..............Qwm;~....I.S.....R~.Sl:'0N~I:a..L;g....1'.O. .. S~ED.....~R".SOD....S:rDE.S....AND....AD.JACEN:1'.....AREAS...,T.C1....NE.W....rAY-ING................................. ........................".,.. ,...............................,.......,.......,.............................,..,. ............ ......................... . . ......... .... ....... ............ . ............. .............. ... .. ............ ......................,.."..,..........-.....................,."........................ ....,..,.......................... I I ..,......"............. ,...........,. ..,.'.,............... .................'....'...".....,.,........-........."..... ., "......... .... .................... ........'..........,.............,.....,. ...."..................M...............,.,.." ,........................... ......11'.............................. ................,...........................",..,......,..................................." ....."........................... .., '. . "..,. ......... ..........,...,. ........ .,........................""",..., ................................-....."..."."., ....,...................................,.....,..................... ",..........,............,..........,.......,............,..,......,............................,..,.........................."......,...,,, ......................................,..,..,...,...................................."."""',....,............................",,,..,.........................'.............,. .............................. ............................ .... .., ". .. ... ,..... ,"..... ... ..........".........,.,.,. .......... ....,...... ...,."........... .. ... ............,................,...,....,""',..............................,......."'",,,............._................,,...,.,,...,.............................,,.".,......................... ...........................,....,."....................,............... ...'.......u.,.. ...,......................................... .,....................................".... ..... .. . ...... ...... ........................, ..'..'''....................-................'',....".".........._.M...................."",,.......,............................,.....,................ ..............,. ...........,.........,..................,,,,,.....,...................................... ....'..,,,.,.......................................'''..... .. ,. ..................,......... ...... .... .... .....'...................................u ..............:............................. I I ....,.."..................................."...".....",."................""""..1..,,,...... 30% P() BIt prOpOlll hereby to furnish material and labor - complete In aCCordance with above specifications, for the su of; dollars ($ ). N . UNPA:FD BA % Authorized Signature All materiel is guaranteed to bll 9$ specified. AIr WOtk 10 be completed In a workm..nlik. manner aceord'A'1g 10 $landard practices. Arry ~l'lltion or devtatlon !rom above ~cificatlOn8 involving extra COSIa Will be ell'cuted only upon wmten orr.tors, and will become on extra alia'll' over and above the esllm~~. All agreements contlngent upon strikes. accidents or dslays beyond our control. Owner ro carry lire, tornado and Olher necessary insullInc.. Our workers ...'" fully covered by Workm8r'J'S Cornpens!ltlon Insurance. I ys. Atceptanct of proposal_The ..bow price&, &POeific,"tions and conditions are s3tisf~ctory and are hereby accepted. 'lUll are authorized Signature to do the work, as specified. Payment will be made as outlined above. Date of Acceptance: Slgnatum o o I,~ I 'z' o ... = ., o o I I I I ~ o c GJI3 8!D HOI.irlrlol: Kut",Jlf:r Croup 11':(' Master Plan Power Hill Park City of Chanhassen, Minnesota .. r...... 'I..... ....,,~..' .",... r.... l.II",. ~~."'''J''' ...'! t!-..."~.,, "1.., 1~1 "''''~t'' :I,'!! ~',""'.\. Sf.'!" 1M llh"'....l""i., 101I,........'0\. :,>",.Ol~lll\t t!2-'1~-1I"'."' SHEET 1 cd Capital Improvement Program City of Chanhassen, MN 2007 thru 2011 Contact Department Park & Trail Improvements Type Improvement Useful Life 30 Years Category Park Priority nla Project # PK&T-066 Project Name Power Hill Park Trail Account # 1 410-0000-4710 Account # 3 Account #2 Description I Construction of an 8- foot wide pedestrian. trail linking the north and south ends of the park. Total Project Cost $75,000 J 1 j ~j Justification I Accessibility within the park will be greatly improved. Expenditures Construction 2007 2008 75,000 75,000 2009 2010 2011 Total 75,000 75,000 Total Funding Sourc~ . Park Dedication Fund 2007 ..2008 75,000 . 75,000 2009 2010 2011 Total 75,000 75,000 Total I J J Operational Impact/Other I J J. j 71