Loading...
1b Award of Bid, Lake Ann Park Picnic Shelter & Ball Field Lighting CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us ih ~ MEMORANDUM TO: Todd Gerhardt, City Manager Todd Hoffman, Park & Recreation Director 1/./ July 23, 2007 (J~ . A ward of Bids, Lake Ann Park Picnic Shelter and Ball Field Lighting Projects FROM: DATE: SUBJ: The 2007 Park and Trail Acquisition and Development Capital Improvement Program (CIP) includes two significant projects at Lake Ann Park. Lighting ball fields Nos. 2, 3, 6 and the soccer field, and constructing a second group picnic shelter. Both of these projects are intended to increase the utility of an existing park in order to accommodate increased demands on our recreational amenities. The City retained HTPO to provide engineering, surveyil1gand landscape architecture services for the project. In addition, all city departments participated in the plans and specifications review process in preparation for bidding. This past March, the City Council received a recommendation from Recreation Commission to amend the proposed budgets for these better meet the scope of each project. The lighting project was $400,000 to permit the lighting of four fields inste~<.l()ftwo and budget was increased to $175,000. Park and in order to to r project Upon initiating detailed design work, the engineer's estimate for the lighting project carne in at $403,000 (see bid tabulation). The engineer's estimate for the shelter project came in at $236,602 (see bid tabulation) or 35% over the $17$,.0.00 approved in March. Staff worked with our consultant in an attempt to 10wertl1 foject estimate, but found little margin among the twe nine individual s. In the end, we included one "add alternate" for an upgraded standing seam roof; and two "deduct alternates," one omitting a two-foot section of select graIllilar borrow from underneath the access road and a second deducting the bituminous walk leading to the beach. On Thursday, July 12, 2007, sealed bids for botl1projects were opened at 10 a.m. in the city council chambers. < Pour bids were receivedfor each ofthe:Rrpjects. Bid tabulations and letters of recommendation from our consultant a attached. The qualified low bid for the lighting project was received from Honda Electric of Loretto, Minnesota in the amount of $410,300. The qualified low bid for the shelter project was received from Sunram Construction of Corcoran, Minnesota in the amount of $235,916. The City of Chanhassen · A growing community with clean lakes, qualilyschools, a Charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Mr. Todd Gerhardt July 23, 2007 Page 2 The lighting bid is $7,300 over the engineer's estimate and $10,300 over the estimated budget approved on March 12,2007. The shelter bid is $686.50 under the engineer's estimate, but $60,916 over the estimated budget approved on March 12, 2007. I wish to communicate to the Council that we are disappointed by not being able to meet the targeted budget estimates, but staff remains firmly committed to the projects at Lake Ann Park. In the event the City Council agrees, an additional $71,216 in park dedication funds, above the $575,000 originally budgeted, will be invested in the projects. Other recent park projects awarded by the Council, including tennis court resurfacing and the Power Hill Park trail, came in under budget by a total of $45,704. The current cash balance in the park dedication fund is $3,799,321.43. RECOMMENDA TION It is recommended that the City Council award the Lake Ann Park Ball Field Lighting project to Honda Electric, Inc. in the amount of $410,300 and the Lake Ann Park Shelter project to Sunram Construction, Inc. in the amount of $235,916 and amend the 2007 Park and Trail Acquisition and Development CIP to accommodate these projects. ATTACHMENTS 1. Bid Tabulations 2. Letters of Recommendation from HTPO G:\PARK\TH\Lake Ann Ballfields & Picnic Shelter\award of bid. doc "1-' J I Engineering Surveying --p U Landscape Architecture July 13, 2007 Mr. Todd Hoffman City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 Dear Mr. Hoffman, Bids were received and opened at 10:00 a.m. on Thursday July 12, 2007 for the above referenced project. The bids are shown on the attached bid tabulation. The Engineer's Estimate for this project was $403,000.00. The low bidder, Honda Electric, Inc. came in slightly above the Engineer's Estimate at $410,300.00. Honda Electric Inc. provided favorable references. Therefore, recommendation is made that the City Council award City Project No. RA-100D to Honda Electric, Inc. in the amount of $410,300. This recommendation considers that the City Council reserves the right to waive minor irregularities and further reserves the right to award the contract in the best interests of the City. Respectfully, Hansen Thorp Pellinen Olson, Inc. 7510 Market Place Drive Eden Prairie, MN 55344 952-829-0700 952-829-7806 fax www.htpo.com b~c~. Duncan C. Schwensohn, P.E. DCS:tlb Enclosures . HANSEN THORP PELLlNEN OLSON, INC. "1 . Bid Tabulation Lake Ann Park Field Lighting City of Chanhassen Project No. RA-100U BASE BID (Lake Ann Park Field Lighting) Enltineers Estimate Honda Electric Vinca Inc. Killmer Electric, Co. Ridl1:edale Electric, Inc. ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL No. ITEM QTY UNIT PRICE PRICE PRICE PRICE PiI 1 Soccer Field Lioch 1 LumD Sum $85 000.00 $85 000.00 $101 000.00 $101 000.00 $102750.00 $102 750.00 $87000.00 $87000.00 $123 0 $123 000.00 2 Field 2 Li"htin" 1 Lumo Sum $105 000.00 $105 000.00 $99.300.00 $99300.00 $99850.00 $99850.00 $107000.00 $107000.00 $123 $123 000.00 3 Field 3 Liochtinoc 1 LumD Sum $95 000.00 $95 000.00 $97000.00 $97000.00 $99275.00 $99275.00 $106 000.00 $106 000.00 $123 $123 000.00 4 Field 6 Li<>htin<> 1 Lumo Sum $115 000.00 $115 000.00 $107000.00 $107 000.00 $118775.00 $118 775.00 $118 000.00 $118 000.00 $139 000.00 $139 000.00 5 Site Restoration 1 Lumo Sum $3 000.00 $3 000.00 $6 000.00 $6000.00 $3 000.00 $3 000.00 $8500.00 $8 500.00 $8 000.00 $8 000.00 Bid Total $403 000.00 $410 300.00 $423 650.00 $426.500.00 $516 000.00 HTPO 07-020 7/13/2007 ~1""""" p I Engineering Surveying --p U Landscape Architecture July 12, 2007 Mr. Todd Hoffman City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 Dear Mr. Hoffman, Bids were received and opened at 10:00 a.m. on Thursday July 12, 2007 for the above referenced project. The bids are shown on the attached bid tabulation. The base bid Engineer's Estimate for this project was $236,602.50. The low bidder, Sunram Construction, Inc. came in slightly below the Engineer's Estimate base bid at $235,916.00. The Park and Recreation Department chose to include the base bid and no add alternates or deduct alternates. Therefore, recommendation is made that the City award City Project No. RA-100V to Sumam Construction, Inc. in the amount of $235,916.00. This recommendation considers that the City Council reserves the right to waive minor irregularities and further reserves the right to award the contract in the best interests of the City. Respectfully, Hansen Thorp Pellinen Olson, Inc. 7510 Market Place Drive Eden Prairie, MN 55344 952-829-0700 952-829-7806 fax www.htpo.com ~C~ Duncan C. Schwensohn, P.E. DCS:tlb Enclosures HANSEN THORP PELLlNEN OLSON, INC. Bid Tabulation BASE BID (Lake Ann Park Picnic Shelter) Lake Ann Park Picnic Shelter City of Chanhassen Project No. RA-100V Engineers Estimate Sunram Construction, Inc. Barber Construction, Inc. Prestige Builders of MN, LLC Midwest Asphalt Corporation ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL No. ITEM QTY UNIT PRICE PRICE PRICE PRICE PRICE 1 Mobilization 1 Lumn Sum $2,000.00 $2,000.00 $6,030.10 $6,030.10 $15 000.00 $15,000.00 $6,500.00 $6500.00 $8,800.00 $8,800.00 2 C!earin~ and Grubbin~ 15 Tree $300.00 $4,500.00 $210.00 $3,150.00 $300.00 $4,500.00 $184.80 $2,772.00 $223.00 $3,345.00 3 Remove 1" Conner Water Service Line 200 Un. Fl. $5.00 $1,000.00 $10.50 $2,100.00 $14.00 $2,800.00 $16.50 $3,300.00 $12.30 $2,460.00 4 Site GradirW 1 Lumn Sum $6,000.00 $6,000.00 $20,900.00 $20,900.00 $12,000.00 $12,000.00 $49,500.00 $49,500.00 $34,250.00 $34,250.00 5 Silt Fence 1100 Un. Ft. $2.25 $2,475.00 $2.50 $2,750.00 $4.00 $4,400.00 $2.00 $2,200.00 $2.05 $2,255.00 6 Tree Protection Fence 350 Un. Ft. $4.00 $1,400.00 $3.00 $1 050.00 $4.00 $1,400.00 $2.42 $847.00 $2.50 $875.00 7 Picnic Shelter 1 Lumn Sum $100,000.00 $100,000.00 $90,720.00 $90,720.00 $80,000.00 $80,000.00 $98,302.50 $98,302.50 $94,700.00 $94,700.00 8 Picninc Shelter U~htinQ' and Electrical 1 Lumn Sum $24,000.00 $24,000.00 $19,400.00 $19,400.00 $25,000.00 $25,000.00 $15,400.00 $15,400.00 $21,000.00 $21,000.00 9 4' Stone Surround 4 Each $500.00 $2,000.00 $420.00 $1,680.00 $500.00 $2,000.00 $440.00 $1,760.00 $1,785.00 $7,140.00 10 5" Concrete Sidewalk 5855 So. Fl. $4.50 $26,347.50 $4.30 $25 176.50 $5.00 $29,275.00 $3.80 $22,249.00 $5.00 $29,275.00 11 3" Bituminous Walk 1430 So. Fl. $5.00 $7,150.00 $3.73 $5.333.90 $4.00 $5,720.00 $2.90 $4 147.00 $3.45 $4,933.50 12 A<>O'Te<>ate Base CL V 260 Ton $22.00 $5,720.00 $24.80 $6448.00 $20.00 $5,200.00 $19.80 $5 148.00 $17.20 $4,472.00 13 Tvne LVWE350330B Bituminous Pavement 40 Ton $75.00 $3,000.00 $108.00 $4,320.00 $100.00 $4,000.00 $113.30 $4,532.00 $101.00 $4040.00 14 Tvne LVNW35030B Bituminous Pavement 50 Ton $65.00 $3,250.00 $96.00 $4,800.00 $100.00 $5,000.00 $97.90 $4,895.00 $79.05 $3,952.50 15 Select Granular Borrow for Concrete 960 Ton $18.00 $17,280.00 $16.43 $15 772.80 $12.00 $11,520.00 $16.50 $15.840.00 $10.05 $9,648.00 16 Select Granular Borrow for Bituminous Pavero 640 Ton $18.00 $11,520.00 $16.43 $10,515.20 $12.00 $7,680.00 $16.50 $10,560.00 $10.60 $6,784.00 17 Bituminous Tack Coat 22 Gal. $5.00 $110.00 $5.25 $115.50 $10.00 $220.00 $5.50 $121.00 $5.60 $123.20 18 Pavement Markin~ 1 Lumn Sum $1,250.00 $1,250.00 $1500.00 $1,500.00 $1,500.00 $1,500.00 $550.00 $550.00 $500.00 $500.00 19 Grills 2 Each $1,000.00 $2,000.00 $1,000.00 $2,000.00 $500.00 $1,000.00 $1,100.00 $2,200.00 $445.00 $890.00 20 Seedin<> 3050 Sa. Yd. $0.90 $2,745.00 $0.32 $976.00 $1.00 $3,050.00 $0.34 $1 037.00 $1.95 $5,947.50 21 Erosion Control Blanket Cate~orv 2 1760 Sn. Yd. $2.75 $4,840.00 $1.20 $2,112.00 $3.00 $5,280.00 $1.30 $2,288.00 $1.30 $2,288.00 22 111 Conner Water Service Pine 130 Un. Ft. $15.00 $1,950.00 $22.00 $2,860.00 $50.00 $6,500.00 $19.80 $2,574.00 $48.00 $6,240.00 23 Wheel Stoo 3 Each $150.00 $450.00 $200.00 $600.00 $300.00 $900.00 $165.00 $495.00 $67.00 $201.00 24 Sanita;:;;- Y ard ~drant w /7' Burv Denth 1 Each $1,000.00 $1,000.00 $160.00 $160.00 $3,000.00 $3,000.00 $1,650.00 $1,650.00 $3,200.00 $3,200.00 25 Rock Construction Entrance 1 Each $1,200.00 $1,200.00 $800.00 $800.00 $1000.00 $1,000.00 $550.00 $550.00 $1,100.00 $1,100.00 26 Remove Concrete Pad 1 Lumn Sum $300.00 $300.00 $600.00 $600.00 $1,500.00 $1,500.00 $550.00 $550.00 $315.00 $315.00 27 Remove Concrete Curb and Gutter 30 Un. Fl. $3.00 $90.00 $15.50 $465.00 $5.00 $150.00 $22.00 $660.00 $5.85 $175.50 28 Install Concrete Curb and Gutter 30 Un. Ft. $20.00 $600.00 $23.00 $690.00 $25.00 $750.00 $33.00 $990.00 $21.90 $657.00 29 Sand Beddin" 35 Ton $5.00 $175.00 $28.60 $1,001.00 $20.00 $700.00 $16.50 $577.50 $35.00 $1,225.00 30 Install 4" PVC Drain Tile 150 Feet $15.00 $2,250.00 $12.60 $1,890.00 $30.00 $4,500.00 $18.70 $2,805.00 $29.00 $4,350.00 Base Bid Total $236,602.50 $235,916.00 $245,545.00 $265,000.00 $265,142.20 I Add Alternate 1 I I I I I I Add Alternate Total I $22,000.00 I $18,720.45 I $20,000.00 I $18,000.00 I $20,000.00 I Deduct Alternate 2 Deduct Alternate Total I -$13,520.00 I $3,500.00 I -$7,680.00 I $0.00 I -$9,034.00 I Deduct Alternate 3 I Deduct Alternate Total I -$7,150.00 I -$3,700.00 I -$5,720.00 I -$4,147.00 I -$4,933.50 HTPO 07-020 7/12/2007