Loading...
1e. Koehnen Area Street Improvement Project No. 07-01: Approve Change Order No. 1 for Directional Bore of Storm Sewer CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us .1e MEMORANDUM Paul Oehme, Director of Public Works/City Engineer~~O . Joseph ShamJa, Project Engineer~,_ VA A August 13, 2007 ~ TO: FROM: DATE: SUBJECT: Koehnen/Yosemite Reconstruction, Project No. 07-01: Approve Change Order #1 (Construction of Pond Outlet and EOF) REQUESTED ACTION Approve Change Order #1 provided by the project contractor S.M. Hentges & Sons, Inc. in the amount of $49,680.80 for the KoehnetrL.ArealY osemite A venue storm sewer pond outlet and emergency overflow. BACKGROUND On January 9,2006, the City purchased an easementfoLstonnsewerponding for the Koehnen ArealY osemite Avenue street and utility reconstruction project. On April 3, 2007, Council approved the bids and awarded the contract toS.M. Hentges & Sons, Inc. for the Koehnen ArealYosemiteAvenue street and utility reconstruction project. DISCUSSION The storm water pond along W. 63rd Street was constructed during the Koehnen ArealY osemite A venue Reconstruction Project. This pond is located in the easement purchased from Ann Nye in January of 2006. The pond Was designed to outlet to the nearby wetland. The wetland has an existing storm sewer outlet in the southwest comer of the property. During construction, the outletofthe wetland was determined to have deficiencies. The existing stornioutletconsists of a deteriorated manhole and storm pipe with many sags and does not have the storm water capacity that was originally calculated. Further investigation of the wetland outlet determined that this stOfI11S~~t~p1does not have an adequate emergency over flow (EOF) in this area. EOF'sallowthe stormwater an alternative route in case the primary outlet malfunctions. The primary reason for an EOF is to help prevent flooding. All new developments in the City are required to provide EOF's. The backyards and side yards where the EOF should be has been filled in, a fence has been installed and landscaping constructed. The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Paul Oehme, Dir. Of Public Works/City Engineer Koehnen Area Reconstruction Project - Approve CO #1 August 13, 2007 Page 2 Staff looked at the most cost effective and least disruptive way to complete both objectives. The first objective was to provide a sufficient outlet to the wetland and pond, and the second objective was to provide a better EOF to help prevent backyard flooding. In order to complete the first objective, staff proposes to remove the failing sections of the existing pipe and manhole and replace as necessary. The second objective will be completed by directionally drilling a new 18" HDPE (High Density Poly Ethylene) pipe along the easement between the properties. Open cutting the proposed storm sewer in this area is not recommended. There are many significant trees, a new fence, and a pool along the easement which could be disturbed with the open-cut method. To install the pipe by the open-cut method would require a deep cut through Wood Duck Lane which would require additional disruption to the neighborhood and street restoration costs. Restoration of the trees and fence along with the disruption to these properties prevents using the open-cut method. The improvements are proposed to be constructed during the Koehnen Area Project prior to completion on the storm water pond. Replacement of the failing pipe along with the added flood protection of an EOF is anticipated to complete both objectives. Staff recommends approving Change Order #1 in the amount of $49,680.80 for the Koehnen Area/Yosemite Avenue Reconstruction Project. Staff has compared the unit prices in this change order to other project bids of similar nature and finds the unit prices acceptable. This Change Order is proposed to be funded out of the Storm Sewer Utility Fund. Attachment: 1. Map of area of storm sewer installation. c: Marcus Thomas, Bolton & Menk Inc. g:\eng\public\_2007 projects\07-01 koehnenyosemite road imp\08-13-07 co report.doc Proposed Directional Storm Sewer Pipe ~ [