Loading...
C. Public Works Facility Expansion CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us ~ ~ JP' l'v1EMORANDUM TO: Todd Gerhardt, City Manager Paul Oehme, P.E., Dir. of Public Works/City Enginee~1' O. August 13, 2005 O~ · FROM: DATE: SUBJ: Public Works Facility Program Study Discussion Project No. 08-03 DISCUSSION Staff is planning to give a PowerPoint presentation on the study staff has completed for the Public Works Facility. Several City departments are based at the Public Works Facility and all the departments are in need of additional space. The last addition to the facility was completed in 1987 and since then the City's population, households and City service responsibilities have more then doubled. The city population is projected to grow by more then 60% before fully developed. Staff will present several options as outlined in the study to address the current and future needs of the Public Works Facility. Attachments: Study Plan Sheets g:\eng\publicL2008 projects\08-03 chanhassen maintenance (pw) facility\bkgd 081307 pw wkshp present.doc The City of Chanhassen · A growing community with clean lakes, quality schools, a Charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. CITY OF CHANIlASSEN PUBLIC WORKS FACILITY PROGRAM STUDY City Project No. 08-03 Chanhassen, Minnesota PREPARED BY: CITY OF CHANHASSEN ENGINEERING DEPARTMENT . CITY OF CHANHASSEN PUBLIC WORKS FACILITY PROGRAM STUDY TABLE OF CONTENTS Introduction.................................................................................... ..3 Review of Existing Facilities and Operations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 4 Future Needs.................................................................................... 8 Possible Solutions........................................................................ ......9 Problem Statement.............................. ............................................ ..14 Major Planning Issues................. ....................... ............................. ....14 Project Schedule............................................................................. .16 Summary and Recommendations....................................................... ....16 - 2 - g:\eng\public\_2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study. doc . CITY OF CIlANIlASSEN PUBLIC WORKS FACILITY PROGRAM STUDY INTRODUCTION This study was drafted by City staff to look at the long-term needs of public works. During the 2007 budget discussion, the Council directed staff to complete the background study "in house" for public works needs assessment. This study looks at current staffing levels, equipment usage and the public works building size necessary to have an efficient, safe and good working environment. The study also looks at the future needs of the public works building and the size needed to efficiently provide a good level of service to the community. Staff has discussed this project with other communities that have recently completed a similar needs assessment, obtained feasibility reports from other governmental agencies as a guide, and discussed the study with architects. The information contained in this study is staff's best efforts to quantify the current and future needs of public works. A good public works infrastructure is essential to the health, safety, and well-being of any community. The City of Chanhassen public works covers the broad spectrum of activities needed for our community to function. Improved social well-being and economic expansion will be severely hampered without a properly functioning public works. The City of Chanhassen public works and parks staff, housed at the public works building, in general covers the following key services and responsibilities: . Maintenance of roads, bridges and related infrastructure . Maintenance and replacement of street striping and signs . Maintenance of street lights and signals . Maintenance of storm water ponds and collection system . Emergency response . Snow plowing and ice control operations . Maintain over $8 million dollars worth of vehicles and equipment . Maintain potable water system . Maintain collect, and disposal system for sanitary sewage . Maintaining parks, trails and recreation facilities . Help organize, plan for and work at City special events . Weed Control A good public works operation is centrally located in the community and has equipment and materials stored at one main location. By having equipment and materials stored at one central location, the public works operation is significantly more efficient in day to day operations and during emergency operations such as snow plowing, power outages or sanitary sewer backups. The purpose of this study is to evaluate the existing public works space needs, estimate future space needs upon full build out of the community, and evaluate potential site - 3 - g:\eng\public'L2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study. doc . CITY OF CIlANIlASSEN PUBLIC WORKS FACILITY PROGRAM STUDY options. The current public works building is over capacity, has numerous code violations and is in need of major repair. Since the City is over two-thirds developed, it is recommended that whatever improvements are made, they are for the final build out of the community. In this report, staff has evaluated four options to address long-term needs of the public works operation. REVIEW OF EXISTING FACILITY AND OPERATIONS The City of Chanhassen public works building is located at 1591 Park Road. The building is home to the Streets, Parks, Utility, and Fleet Maintenance departments. The building is 24,100 square feet and is situated on a 5.3 acre site. In the summer time, the facility is home to 26 full-time employees and 20 part-time employees. The original facility was built in 1980 and had additions made in 1987 and 1990. Below is a table showing how the building size has increased since being built in 1980. 1980 % Increase 88% % Increase 24% The main building houses office space, a vehicle maintenance garage, equipment storage, and shop spaces. On the south side of the site is TC& W railroad line and on the east is a commercial business. The property is zoned officelindustrial. The west access drive to the back yard is fenced to restrict vehicles during non-business hours. The back yard does not have a security fence around the perimeter. The backyard has a salt/sand storage building, fuel island, a secondary equipment storage facility, parking and staging areas. The front of the facility has parking for employees and visitors. No screening is provided at the back of the building to Audubon Road. The last time the public works building had a major addition was in 1987. Below is a table showing the amount of growth the City as had in the last 20 years. 1987 2007 % Increase Population 11,732 23,900 104% Households 3,900 8,671 122% Miles of City streets 86 103 20% Parks (acres) 279 824 195% Trails (miles) 4 54 1,250% The public works building has numerous deficiencies. The major problem is that it is too small for current operations. Many city vehicles and equipment are being stored in unprotected areas because of the lack of space. Vehicles stored outside typically wear out sooner, are less reliable and are susceptible to vandalism. The Parks Department utilizes the parks storage facility at Lake Ann Park as much as possible but much of this department's equipment is stored at the public works building. The Utility Department - 4 - g:\eng\public\_2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study.doc . CITY OF CIlANHASSEN PUBLIC WORKS FACILITY PROGRAM STUDY utilizes Lift Station No. 24's three parking garage stalls but most of their equipment is stored at the public works facility. During the summer months, the parking lot does not have sufficient capacity for all full-time and part-time employees. Locker rooms are inadequate and do not provide enough locker space for full-time employees. The office space and lunch room are too small to effectively hold interdepartmental meetings and training seminars, not to mention being overcrowded during lunch time. The Chanhassen building department recently conducted an inspection of the existing facility. Currently, this building does not meet building code in several areas. Accessibility violations and improper office/shop separation are two of the main reasons the facility doesn't meet building code. None of the restrooms meet accessibility standards. Additionally, a minimum of twelve doors have non-complying hardware. The building code requires two hour separation (walls) between the office and the shop with 90 minute doors. Only one of the doors was legibly labeled for 90 minutes. Emergency lighting and exiting is insufficient and material and vehicles stored outside are not screened to meet City ordinance. The evaluation of the facility did not include the building's plumbing or mechanical systems. Also, the roof over the administration portion of the building is old, leaks regularly and is in need of major repair. Street Department Currently, vehicles are double parked in the storage garage drive lanes to have as many vehicles protected in a secure location during non-business hours. Typically, 14-16 vehicles are stored in this manner. During summer regular business hours, it takes approximately 30 minutes to move vehicles around before daily operations can begin. During the winter months, it takes approximately 45 minutes to move vehicles around prior to snow plowing operations begin. A typical snow plow operation begins at 2:30 a.m. The tight parking conditions are a safety issue especially in the early morning hours. Double parked vehicles in the winter months are typically the pickups with snow plows and other snow moving equipment. These vehicles need to be stored in the storage garage for better reliability. Snow moving equipment is stored outside when not used because of lack of storage space. This equipment includes truck sanders, snow plows, and other miscellaneous equipment. The hydraulic pumps, hoses and other moving parts on this equipment rust and wear out quicker when stored outside. The salt/sand cold storage is undersized for the current City operation. The City currently stockpiles two types of salts and sand in the cold storage. One type of salt is for snow/ice events that are above 10 degrees and another for ice events that are under 10 degrees. Sand is mixed with the higher temperature salt to increase vehicle traction and as a cost-effective ice melter. Keeping the three products separated in the storage area is difficult. Typically, after eight average snow/ice events, the storage shed has to be - 5 - g:\eng\public\_2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study.doc . CITY OF CHANHAllSEN PUBLIC WORKS FACILITY PROGRAM STUDY restocked. Staff is not recommending replacing the salt/sand cold storage at this time, but a larger salt/sand cold storage facility should be considered in the future when the current facility needs to be replaced. Fleet Maintenance Department The Fleet Department has two vehicle maintenance bays with lifts and a vehicle wash stall. This area is undersized for the current fleet size. The Fleet Department consists of two mechanics and a supervisor who also is a mechanic. The City has 174 vehicles of which 92 are licensed. These vehicles include park mowers and off-terrain vehicles that need regular maintenance. This number does not include small equipment like chain saws, push mowers or trimmers. As a reference, in 1987 when the last major addition to the garage area was constructed, the fleet size was 55 vehicles. The growth in vehicles is mainly from the Parks, Fire and Street Departments. The Park department has added numerous responsibilities to its work load in the last 20 years including increased mowing of parks and trails, ball field maintenance, weed spraying, beach grooming, ice rink construction and maintenance and snow removal. The Fire department has added vehicles to keep up with the growth of the City. The Street department has added additional equipment to keep up with the aging streets. This equipment includes a small paver, rollers, crack sealer machine, and line striper. The Fire department is expected to add an additional satellite fire station in the near future which will add to the vehicle fleet. Most vehicles have routine scheduled maintenance that needs to be completed several times a year. When vehicles break down, these vehicles are given precedence. Typically, when a vehicle breaks down it is unknown exactly what the problem is. The vehicle has to be taken apart to diagnose the problem and thel) parts can be ordered. Depending on the problem, it can take between 3 hours to 2 days to get parts. For less standard parts it can take several weeks to be delivered. These delays can result in disruptions in the Fleet department because the vehicle being serviced takes one bay out of service. Currently, the options the Fleet department has is to put the vehicle back together and remove it from the bay or work on another vehicle in the wash bay. The vehicle maintenance bays are not deep or wide enough for the size of vehicles being serviced today. A single-axle plow with a plow wing can only be serviced effectively in one bay because the other bay is too narrow and not deep enough. This causes problems and service backups when several plow trucks need to be serviced at once. When servicing the larger vehicles, it is difficult to move around the front of the vehicle due to cramped conditions. The lifts in the mechanics bays are old and too small for the current size fleet. Today's new larger trucks, loaders and fire trucks cannot be adequately serviced in the existing bays. Some service needs are out-sourced to other because the lifts and bays are too small. The hydraulic system is failing and at times the safety locks are required to keep the vehicles from slowly coming down. - 6 - g:\eng\public'--2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study.doc . CITY OF CHANHASSEN PUBLIC WORKS FACILITY PROGRAM STUDY Welding of parts and fabrication of equipment is currently worked on in one of the maintenance bays, the floor of the vehicle storage building or wash bay. Welding gives off fumes that are hazardous and can make people sick. Welding should be performed in a designated, well ventilated area away from other employees. The mechanical bay is poorly ventilated for welding. Welding in the mechanical bay or on the storage building floor is inefficient because it takes a bay away from vehicle service or it gets in the way of employees or other operations. Most of the welding supplies and material are stored in an unprotected area of the vehicle storage area which is away from the maintenance bays. This equipment and material can easily be damaged by vehicles that park to close. The size of the vehicle parts room is inadequate for the size of the city fleet. Some ordinary parts that are used frequently are not stocked because of lack of storage space. Vehicle spare parts are stored throughout the public works building including the vehicle storage area, wood shop room, in temporary structures or outside because of lack of space in the parts room. Also, some parts and equipment are stored in the wash bay which leads to corrosion problems. The vehicle maintenance area does not have a tool storage area. Without a designated tool storage area, tools are easily misplaced and are unorganized. The oil/hydraulic fluid room is too small for the amount and variety of oils and hydraulic fluids the City stocks. The wash bay is under sized and only one vehicle can be washed at a time. The bay is too narrow for a plow truck or loader to open up a plow wing and clean effectively. The ceiling is not high enough for a plow truck box to tip up. Because of the size of the wash bay, plow trucks have to be washed outside or in the storage garage. Washing the trucks outside or in the vehicle storage garage is time consuming and inefficient. Also, washing plow trucks outside is not recommended because of salt and oil run off. Parks Department The Park department employees report to the main public works building to begin their work day. During the summer months, this includes seven full-time employees and up to thirteen seasonal employees. This is the location where employees receive their daily work assignments after which they depart in a work vehicle. The only dedicated park space within the main building is a small office. The Park department utilizes an auxiliary maintenance building at Lake Ann Park as a workshop and storage location for vehicles, equipment and supplies. This building does include a screened outside storage yard. Due to the inadequate size of this area, outside storage spills over into an unscreened site. The Lake Ann Park building also houses an ambulance bay that is home to one of the Ridgeview Hospital emergency response vehicles. Construction of this facility was necessary to relieve the tremendous space constraints being experienced at the main Public Works facility in the late 1990's. Further expansion of the Lake Ann Park facility is not possible. - 7 - g:\eng\public\_2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study.doc . CITY OF ClL\NlIASSEN PUBLIC WORKS FACILITY PROGRAM STUDY The following equipment is currently housed at the Lake Ann Park maintenance building: trucks, deck mowers, flail mower, sprayers, tractors, caterpillar dozer, sweeper, snow blowers, bobcat skid steers, stump grinder, field stripers, water trucks, aera-vator, shop equipment and small tools. Utility Department The Utility Department has two rooms at the Public Works building for repairs of water meters, testing meters and for storage of meters and spare parts for water distribution pipes, sanitary sewers and lift stations. These rooms should have more space for storage and maintenance operations. When emergencies arrive, having a part in stock and finding a critical replacement piece is essential. FUTURE NEEDS Staff has reviewed the current and projected staffing and equipment needs of each department. The projected needs are estimates based on providing the current service levels to the community at the time the City is fully developed. Staff did not assume taking on any more responsibilities for the departments. If minor increases in service levels are realized in the future, the impact could be offset with operational size efficiencies and advanced technology. Below is a table showing the current and future growth of the City and each department anticipated growth based at the public works facility. Anticipated City Growth 2007 2030 % Increase Population 23,900 38,000 59% Household 8,671 14,800 71% Streets 103 130 26% Trails (miles) 54 90 67% Parks (acreage) 824 1,100 33% - 8 - g:\eng\public\_2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study.doc . CITY OF CIlANIlASSEN PUBLIC WORKS FACILITY PROGRAM STUDY Pro'ected Public Works Staffin Needs Estimated Increase 8 3 7 8 10 4 9 12 25% 33% 29% 50% Vehicles * 174 185 6% *Total includes all City departments not just Public Works. POSSIBLE SOLUTIONS In order to determine the best solution to provide adequate space in a public works facility now and into the future, four options were considered. The first option was to expand the building space on the existing site, the second option was to build on the City owned property on Park Place and sell the existing public works building site, the third option was to lease an existing site on Powers Boulevard and sell the other two public works properties and the fourth option was to buy a site along Powers Boulevard and sell the existing two City owned public works properties. Existing Site Expansion Option The first option staff looked at was to expand the existing facility on the 5.3 acres site. Since the public works facility is currently undersized, staff decided to try to maximize the capacity of the existing site to see if it would fit the needs of the departments. The following is a summary of how much space is available if this site was maximized. EXISTING ESTIMATED EXISTING P.W. SITE MAX. SPACE NEEDS BUILDING CAPACITY AT TIME OF SITE W/ADDTION CITY BUILD OUT OFFICE (SF) (Includes locker, lunch, 2,350 3,600 7,740 reception area and offices) DEPARTMENT SHOPS (SF) 2,050 2,750 6,550 EQUIPMENT STORAGE (SF) 16,650 46,250 56,000 VEHICLE MAINT. (SF) 2,300 4,450 7,700 WASH BAY (SF) 750 1,500 2,900 WELDING BAY (SF) 0 2,500 2,580 BUILDING TOTAL (SF) 24,100 58,550 83,470 SALT/SAND STORAGE (SF) 3,450 3,450 9,600 - 9 - g:\eng\public\_2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study. doc PARKING LOT STALLS 41 66 57 (outside) HEAVY EQUIP. STALLS 12 26 31 PICK-UPS/OTHER EQUIP. 14 43 45 Looking at the information above, one can see that the existing site addition will not meet the needs of public works now or into the future. In the near future, the limited space will cause similar problems that we are having now. Also, with more limited space in the back of the building, staging and working on equipment will become problematic. Expansion of the Public Works building also presents a problem for City operations when the expansion work is taking place. The fleet maintenance garage would most likely need to be completely demolished to make the necessary improvements. Fleet maintenance would most likely need to be contracted out to a garage during the time the maintenance garage was being constructed. Also, adding onto the site would be problematic for other departments during this time because of construction conflicts. Staff has estimated how much it will cost to renovate the building to the best of our ability. Staff looked at other similar projects that have been built recently and talked to architects and other cities to find out costs per construction addition type. The following is an estimated cost to expand the exiting site to maximum site capacity. These costs are in 200712008 dollars. If the project is bid later than February 2008, include another 2%- 4% for each of these costs. BUILDING EXPANSION $ 2,900,000 BUILDING RENOVATION, DEMOLITION $ 1,300,000 SITE IMPROVEMENTS (Parking lot, restoration, etc.) $ 180,000 FUEL ISLAND/UPGRADE $ 40,000 TELECOMMUNICATIONS / SECURITY $ 25,000 FURNISHINGS $ 40,000 CONTINGENCY $ 70,000 ESTIMA TED PROJECT COST* $4,555,000* *The estimate was based on the total building area of 58,500 sf and includes indirect costs. Costs for renovation and expansion on a square foot basis will be proportionately higher for a renovation. Also, one must consider that more unknown items can arise in a renovation which could increase the cost after construction start. The 2007 Capital Improvement Program had programmed $3,920,000 for construction in 2008. Since the estimated project is over the amount budgeted, part of the project would need to be cut to make budget if the current programmed funds needs to be maintained. Below is a summary of the project staying within the 2008 budget. . CITY OF CIlANIWlSEN PUBLIC WORKS FACILITY PROGRAM STUDY BUILDING EXPANSION $ 2,900,000 SITE IMPROVEMENTS (Parking lot, restoration, etc.) $ 180,000 FUEL ISLAND/UPGRADE $ 40,000 TELECOMMUNICATIONS / SECURITY $ 25,000 CONTINGENCY $ 50,000 TOTAL PROJECT COST $ 3,195,000 This option only addresses the short term needs of the vehicle storage portion of the facility. A larger vehicle storage area would be needed for the final build out of the community. Also, this option does not address any needs of the office, vehicle maintenance, or wash bay. This option is not recommended because it only resolves the vehicle storage need in the short term. The city would be investing a large sum of money into a site that doesn't meet the current or future needs of the community. Park Place Option The second option considered was to construct a new Public Works building at the end of Park Place. This land was tax forfeited in 1992 and acquired by the City around 1998. The City owns three parcels that total 18 acres. The site is encumbered with some steep slopes, wetlands, and a Metropolitan Council sanitary sewer easement. Approximately 10 acres of the property appears to be buildable. Currently, the property is used for storing topsoil, street sweepings, woodchips and backfill. The property also is used temporarily as a stockpile area for trees that have been cut down and brush. Below is a summary of a public works building that could be built on the Park Place property. EXISTING PARK PLACE ESTIMATED SPACE P.W. BUILDING PROPOSED NEEDS AT TIME OF SITE FACILITY CITY BUILD OUT BUILDING OFFICE (SF) (Includes locker, lunch, 2,350 7,740 7,740 reception area and offices) DEPARTMENT SHOPS 2,050 6,550 6,550 (SF) EQUIPMENT STORAGE 16,650 56,000 56,000 (SF) VEHICLE MAINT. (SF) 2,300 7,700 7,700 WASH BAY (SF) 750 2,900 2,900 WELDING BAY (SF) -- 2,580 2,580 BUILDING TOTAL (SF) 24,100 83,470 83,470 - 11 - g:\eng\public\_2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study.doc . CITY OF CHANHASSEN PUBLIC WORKS FACILITY PROGRAM STUDY SITE FEATURES SALT/SAND STORAGE (SF) 3,450 9,600 9,600 PARKING LOT STALLS 41 60 57 HEAVY EQUIP. STALLS 12 31 31 PICK-UPS/OTHER EQUIP. 14 46 45 The proposed facility on Park Place enables the City to provide enough capacity for the current and future growth of the community. However, the site is tight for cold storage material. The site would have to be raised a few feet, and wetlands may need to be mitigated. Soils in this area may be poor and corrections may need to be made. The existing cul-de-sac and a portion of the road would need to be removed and utilities relocated. Mature trees would need to be removed for the site for it to develop. Staff completed a cost estimate to build a new facility on this site. The estimate is in 2007/2008 dollars and would need to be revised if this were to bid after February of 2008. MAIN BUILDING $ 7,380,000 SITE IMPROVEMENTS $ 350,000 FUEL ISLAND $ 140,000 TELECOMMUNICATIONS / SECURITY $ 45,000 FURNISHINGS $ 40,000 Other Costs and expenses $ 20,000 Contingency $ 85,000 ESTIMA TED PROJECT COST** $8,060,000 **The estimate was based on the total building area of 83,470 sJ. building and includes indirect costs. The estimated does not include a new salt/sand storage facility. Staff also examined the result of building a new facility within the 2007 Capital Improvement Program budget of $3,920,000. This facility would be the construction of 48,000 SF of the proposed 56,000 SF vehicle storage area. No offices, shops, maintenance areas, or wash bay would be included in this facility. Below is an estimate of the cost to build a 48,000 SF vehicle storage area on the Park Place site. 48,000 SF VEHICLE STORAGE AREA $ 3,600,000 SITE IMPROVEMENTS $ 250,000 SECURITY $ 25,000 Other Costs and expenses $ 20,000 Contingency $ 25,000 ESTIMA TED PROJECT COST** $3,920,000 Building this facility would not alleviate the shortage of office space, vehicle maintenance, or wash bay. Staff does not recommend building a portion of the building because it would cost more in the long run and it does not satisfy the short or long term needs of a public works facility. - 12 - g:\eng\public'-Z008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study.doc . CITY OF CIlANIlASSEN PUBLIC WORKS FACILITY PROGRAM STUDY Lease Option The third option considered was to lease space from the former Emplast facility at 950 Lake Drive. This 192,000 SF building is located on a 12.6 acre site; 78,000 s.f of warehouse space is currently available. The building was built as a warehouse and would need to be modified to meet the needs of a public works facility. Drains would be needed in the warehouse to accommodate the water from snow melt. Some structural modifications would be necessary to store heavy vehicles in the warehouse. A maintenance garage facility and salt/sand building would need to be constructed along with a fuel island and material storage areas. The back of the building does not have very much space for the cold storage material and a fuel island. Staff has estimated a rough cost to have this facility function as a public works building is $2,500,000. An architect would need to evaluate the site further to obtain a better estimate. Leasing the space per year would cost $428,712.00/year. The sale of the existing public works building and the Park Place properties is estimated at $4.425 million. This option would mean the City would have to start budgeting about $500,000 a year in 2 years to make the lease payments indefinitely. This option does not appear to be a good long-term financial decision for the City. Powers Boulevard Option The last option considered was buying the land and constructing a new facility in Chanhassen Lakes Business Park, Outlot F. This site is 17 acres parcel and is located on the west side of Powers Boulevard at the intersection of Lake Drive. The reason for considering this land is it is centrally located in the City provides the necessary site space for a public works building and could be utilized as a future water tower site. The 2007 water comprehensive plan identified this site as a good location for a future water tower, based on the hydraulic analysis and future growth areas of the City. The proposed facility on Powers Boulevard option enables the City to provide enough capacity for the future growth of the community. The site would have to be lowered to provide access to Powers Boulevard and would encroach into bluff areas. Retaining walls would need to be constructed for the access road. Site improvements are anticipated to be more expensive then the Park Place option. The site would provide a home for a future water tower. However, the sale price of the property is estimated to make this option unfeasible. Staff completed a cost estimate to build a new facility on this site. The estimate is in 2007/2008 dollars and would need to be revised if this were to bid after February of 2008. - 13 - g:\eng\puplic\_2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study. doc . CITY OF CIlANHASSEN PUBLIC WORKS FACILITY PROGRAM STUDY MAIN BUILDING $ 7,380,000 SITE IMPROVEMENTS $ 850,000 FUEL ISLAND $ 140,000 TELECOMMUNICATIONS / SECURITY $ 45,000 FURNISHINGS $ 40,000 Other Costs and expenses $ 20,000 Contingency $ 85,000 ESTIMA TED PROJECT COST* $8,560,000** **The estimate was based on the total building area of 83,470 s.f. building and includes indirect costs. The estimated does not include a new salt/sand storage facility. * Does not include land purchase cost. PROBLEM STATEMENT Since the remodeling of the existing facility does not meet the needs of the City, construction of a new facility is proposed. A new facility will provide key attributes including: . Long-range multi-use space to accommodate growth . Provide enclosed storage for vehicles and equipment to protect them from vandalism and environmental deterioration . Reduction of overcrowding, and contiguous space for department staff. . Prolong equipment life . Provides a safer work environment for staff Based on the 3 new facility options the Park Place Option is the most cost effective option that meets the current and future needs of the City. MAJOR PLANNING ISSUES Architectural Image The facility should be attractive but cost conscience. Also, the facility should be visually obscure from the surrounding area. A quality, functional, nice building will enhance productivity since the workers will feel their work is a valued public service. The facility should provide a quality workplace that is compatible with the surrounding area. Landscape buffers should provide a visual separation between the facility and the neighboring properties. It is equally important to create a quality interior work environment for long life expectancy. Abundant natural light should be provided in the lunch room, conference room, and offices to reduce energy costs and provide a natural light source. Security Protection from loss, theft, or vandalism is an issue because of the expense of the equipment. Controlled access should be required after normal business hours at all entries. During normal business, the public access should be controlled by the main - 14- g:\eng\public\_2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study.doc . CITY OF CHANIlASSEN PUBLIC WORKS FACILITY PROGRAM STUDY office and an entry card or push button entry system should be used at employee entrances. A security fence should be installed around the back area of the facility. The high security areas will be the server room and the fueling stations. These areas should be limited to only essential employees. Tool storage and parts area should be secured and access limited. Funding If the Park Place Option were to be funded the proposed funding for the project would come from several sources. The 2007 Capital Improvement Program has budgeted $3,920,000 for construction in 2008. The programmed cost currently includes $3,020,000 from GO Bonds. The CIP estimate was only an estimate since a study had not been completed prior to this year. Staff would anticipate using the sale proceeds from the existing facility to help offset the cost of the new facility. The estimated sale price of the existing public works facility is $1,700,000. The proposed funding for the Park Place Option is as follows: Funding GO Bonds Sanitary Sewer Utility Fund Storm Water Utility Fund Existing Public Works Facility Sale Current Funding New Building Estimate Funding Deficit $3,020,000 $700,000 $200,000 $1,700,000 $5,620,000 $8,060,000 $2,440,000 Other Outside Potential Funding Sources Other possible funding sources include co-housing and leasing space to other another agencies. Staff has discussed the possibility of having MnDot or Carver County co-house some equipment at the future public works facility. MnDot was receptive to the idea since the planned west maintenance garage, to be built in Chaska at the intersection of CSAH 147 and TH 212 was not included in last years state bonding bill. The project was to have started construction in 2007. MnDot needs this maintenance facility to adequately maintain TH 212 when it opens in 2008. MnDot anticipates needing at least 3 truck stalls for winter snow plowing along the 212 corridor since the Eden Prairie and the Shakopee facilities are at capacity. By having MnDot co-housed at the Chanhassen Public Works facility the residents should see better responsive plow operations on 212, TH 5 and TH 101. One of the main concerns of MnDot is timing. MnDot needs to secure space soon so that they know how they will service the area. Another possible option is co-housing with Carver County. The county may be interested in some short term use of stalls since they had planned to co-house some of their resources out of the MnDot maintenance facility. Since a new facility would have a few vacant stalls planned - 15 - g:\eng\public\_2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study.doc . CITY OF CHANHASSEN PUBLIC WORKS FACILITY PROGRAM STUDY for future growth, co-housing in the short term would be beneficial for the community. Staff will continue to work these other agencies if a new facility is planned. PROJECT SCHEDULE If the City Council was to budget funds and proceeds with this project, the following schedule is proposed: Solicited bids for Architectural Services for design services Obtain soil borings and soil borings report Review preliminary design with Council Planning Commission Review City Council Plan Review and Approval of Plans and Specifications Bid Opening Facility Opens SUMMARY AND RECOMMENDATIONS August/Sept. 2007 September 2007 December 2007 January 2008 January 2008 March 2008 January 2009 Based upon the analysis completed as part of this report, the Public Works Facility Program Study, City Project 08-03, the proposed improvements are feasible, necessary and cost effective. We recommend the following: The City Council authorizes staff to solicit bids for architectural services for final design of the Public Works facility at the Park Place site. - 16 - g:\eng\public\_2008 projects\08-03 chanhassen maintenance (pw) facility\pw feasibility study.doc City of Chanhassen Public Works Facility Site Options ;Jt ~ July, 2007 G:IEngIJoleenIEngProjectsIPauIlPublicWorks\Option Sites.mxd .. J CJ PARK ROAD ~ d ~ < a ~ S ~ 02040 80 , , HORIZONTAL SCALE IN FEET BUILDING LOCATION OFFI CE DEPARTMENT SHOPS EQUIPMENT STORAGE VEHICLE MAINTENANCE WASH BAY WELDING BAY SALT SAND STORAGE SQ.FT. 2,350 2,050 16,650 2,300 750 o 3,450 INTERIOR ROOM DESCRIPTION 103 WASH BAY 104 MAINTENANCE BAY 105 P ARTS ROOM 106 RECEPTIONIST 107 FLEET SUPERINTENDANT 108 PARK SUPERINTENDANT 109 UTILITY SUPERINTENDANT 110 CHEMICAL ROOM 111 LADIES BATHROOM 112 JANITOR CLOSET 113 MENS BATHROOM 114 LOCKER ROOM 115 METER REPAIR 116 METER ROOM 117 LUNCH ROOM 118 ELECTRICAL ROOM 119 STREET SUPERINTENDANT 120 LOCKER RESTROOM 121 SIGN ROOM PARKING EXISTING 41 10 11 NEEDS 60 31 45 PARKING STALLS PARKING LOT HEAVY EQUIPMENT VEHICLE STALLS PARKING STALLS PARKING LOT HEAVY EQUIPMENT VEHICLE STALLS c >- ~ .2 '5 ~~~5 .g ~ ~~ tt15- 5 ~E~~~ 0 0.>, t:op Z ~~5g~ <J :J ~ ~:i~~ ~ ~~;~~ u~lIl"'G u_.....D....::5 f~~~o IIP- 5j.r;o x i'! :: ~ E~~ ~ "' ., Ii!!; LL 1;1 i 0=1 ~=I 0-=1 = ~ . z>- w!::: (/)::::! (/)U <(<(~ :r: lL. F! Z(/)CIl <(~~ :r: C:::::J UOiii lL. 3: lii OU~ >-:J I-CD o=> a... (/) z o F cs z o U '-' z F (/) X w >-x lD~ Vl Z o Vi 5' w a:: I!! < o Of:SJCNEO DRAWN PO JS PRo..ECT, 08-03 SHEET' 1 '" 4 ~ PARK ROAD ~ ~ ~ ~ c ~ ~ ~ o 20 40 , 80 , HORIZONTAL SCALE IN FEET BUILDING LOCATION OFFICE DEPARTMENT SHOPS EQUIPMENT STORAGE VEHICLE MAINTENANCE WASH BAY WELDING BAY SALT/SAND STORAGE SQ. FT. 3,600 2,750 46,250 3,300 1,500 1,150 3,450 ROOM 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 INTERIOR DESCRIPTION WASH BAY WELDING BAY MAINTENANCE BAY MAINTENANCE BAY PARTS CHEMICAL ROOM FLEET SUPERINTENDANT UTILITY SUPERINTENDANT METER ROOM RECEPTIONIST STREET SUPERINTENDANT STORAGE ELECTRICAL ROOM METER REPAIR LADIES LOCKER REST. MENS LOCKER REST. LUNCH ROOM SIGN ROOM PARKING PROVIDED 66 24 40 PARKING STALLS PARKING LOT HEAVY EQUIPMENT VEHICLE STALLS SITE DESCRIPTION APPROX. AREA AC SITE 5.27 IMPERVIOUS 3.65 69% IMPERVIOUS c ,., ~ h~~ . O~ g-~- 5 ~e~~~ 0 iiggl z u ::; ~ ~.~lo ~ ~:I]~ a;~ieal ;~~~: ~~:c ~ ~ x I!! ~ 5 E~~ ~ ;3 .. u..~1 O=~ ~=I 0< = ~ . Z~ w- (/)::::! (/) u >- <( <( Cl IlL.~ Z(/)<11 <(~~ Ia:::~ ()OiD LL3:!;2 Oulf >-:J I-(D ():::> a.. ~ U; " z i= ......(/) ZX OW -lL. ~O Oz o U; z <( a.. X W )-X lD~ Vl Z o in 5 UJ "" I!! < o DESIGNED PO JS PRO.ECT , 08-03 SHEET , 2 ~ 4 " ~ /______J ., ~. c- 05 \., 4) E" o~ -, . tE~~i g .!!~-g'g.~ U ~"'3ow~ ::J ~ l~]~ ~ €;~~~ ~"......u ~-u~:S 0 'tl t~::o 25 50 100 ~~~8; x ~ , x , _15E~.2 x HORIZONTAL SCALE IN FEET /----_...,./------ / -----" ~ d ~ ~ a ~, ~ ....,-'" ' ~ \\ :::i ~ .---_./'..._..--~ -------~ ( - u.=~ 0=1 ~=I 0-=1 == ~ BUILDING LOCA llON SQ.FT. OFFI CE 8,150 OEPARTMENT SHOPS 6,550 EQUIPMENT STORAGE 56.000 VEHICLE MAINTENANCE 7.700 WASH BAY 2,900 WELDING BAY 2,900 SALT/SAND STORAGE 9,600 . PARKING PROVIDED PARKING STALLS 60 PARKING LOT 31 HEAVY EQUIPMENT 45 VEHICLE STALLS Z~ ~;! (l)U>- <(<(0 :r:u..F Z(/)Ul <(~~ :r:a::::J UOffi u..3=<ii OU~ >-1- :J _CD U:::> a.. ~ u; C'olw zU 0<( F...J a.. a.. o~ a::: <( a.. >-ll "'x III Z o i7i :> '" 0:: ~ < c PO JS PROJECT, 08-03 SHEET' 3 4 Ji>. m_..'."____.~.. ... .. -~1 i'\ f"l...-.-~--,,, ,//~:::-~.:-.~\...l v-~ ~-J(O!i ~-,) f\ '\:) I i' ~-~-----;.~--... ,f---~ \ ;'--'V g ~.. ~ ~{! g;S 'u ~ E ~ . Q-~~~ . HHi g ti :5~Ol..U~ :J o &.~go ~ ;~:~1i ~ i i~: i~gJi~ ~ ~~~j x Io! 0 30 60 120 ~ , , HORIZONTAl SCALE IN FEET BUILDING LOCATION SQ.FT. OFFI CE 5,622 DEPARTMENT SHOPS 6,200 VEHICLE STORAGE 56,000 VEHICLE MAINTENANCE 7,550 WASH BAY 2750 WELDING BAY 2750 PARKING PROVIDED PARKING STALLS 64 PARKING LOT 31 HEAVY EQUIPMENT 48 V1EHICLE STALLS :a:; u..=1 O:!~ ~=I 0-=1 == ~ . z~ LaJ- (/):::! (/) U >- <(<(0 :::c Ii.. i2 z (/) UJ <(~~ :::Ca::- Uoiil 1i..3=<:l OU~ ~~ -::> Ua.. W I- 'Viii Z~ 0- j::a:: a..Cl OW ~ <( -l >-ll lOx III Z o lii 5 w a: I':! < o PO JS PRo.ECTI 08-03 SHEET, 4 4 Recent Public Works Buildings Built in the Metro Area Shakopee 29,335 2006 38,310 $4,600,000 $120.07 New Facility only needed 18,000 s.f. of vehicle storage Osseo 2,459 2006 18,680 $2,200,000 $11777 Expansion to existing facility- includes 7,200 s.f. . salt! sand building Rockford 3,500 2007 24,140 $2,328,400 $96.45 New Facility Maplewood 36,279 2006 24,300 $2,000,000 $82 30 Additon to existing PW facility included 20,200 . s.f. of vehicle storage space. St. Anthony 8,200 2004 27,465 $2,200,000 $80.10 New Facility Otsego 7,000 2006 32,750 $3,900,000 $119.08 New Facility Woodbury 57,000 2004 34,265 $4,810,000 $140.38 Addition to existing facility Waconia 9,250 2007 44,928 $4,500,000 $100.16 New Facility Hopkins 17,263 2003 45,326 $3,100,000 $68.39 V~hi?le sto~~ge & department storage addition to eXlstmg facIlity Faribault 20,818 2007 82,550 $7,675,000 $92.97 New Facility Minnetonka 51,657 2003 82,881 $6,500,000 $78.43 Addition to existing facility Lakeville 51,722 2006 110,000 $11,000,000 $100.00 New Facility Dakota County Many 2002 84,000 $7,300,000 $86.90 New Facility .PAf<.I< .pL.Ac.e s.lrE taxparc_cc.shp x 212row.shp C8l 212line.shp chan_05_cc_gen2.si Image Right of Way o 300 600 900 1200 1500 t Scale (Feet) = ~ --- -" -., . - - - - --- I r- Ex,.s+,. nj P!'{ b 1/,-, W Oi'L;c..s SirE Scale (Feet) ,---------,----..,....-------,'------------'- -,--------,~ ~ 800 n_ - 1000 o 400 600 taxparc_cc.shp x 212row.shp !:8:i 212line.shp chan_05_cc_gen2.si Image Right of Way t