Loading...
1b. Goers Culvert Project CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us .ti - MEMORANDUM TO: Paul Oehme, City EngineerlDir. of Public Works~O FROM: Joseph Shamla, Project Eng)ner ~. DATE: September 24, 2007 SUBJECT: Goers Culvert Drainage Improvements Project No. 07-13: Approve Quote and A ward Construction Contract REQUEST (Simple Majority Vote Required) Staff requests the City Council to approve a construction contract and quote in the amount of $29,384.70 to GL Contracting, Inc. for workto be performed on the . above-referenced project. DISCUSSION In 2006, a drainage plan was completed by Hansen Thorpe Pellinen Olson (HTPO) Inc. for the regional ponding in Power Hill Park. The purpose of this plan was to create more ponding volume to help alleviate downstream erosion issues and to increase water quality. Power Hill Park Pond is connected via a drainage ditch through Goers property to Bluff Creek. This ditcBisvery steep having an approximate elevation difference of 26' in 800' of leng~~~~tyveen the outlet of t~~ pond and the Goers culvert. Over the years andpriogto the regionalpo?d~~ Power Hill Park being completed, this culvert had filled up with sedimentan.d most recently the culvert was washed out because of the large volume of runoff. The City of Chanhassen Street Department temporarily fixed the culvert to get the Goers access to their property. Since the culvert was only temporarily fixed by the City a plan was developed to attempttopermanently solve the problems with the Ggers Culvert. The pl~?isW install a 48" reinforced concrete pipe to replace the 48"corrugated metalp,pyLthat is currently in place. Erosion protection measures areincluded to the downstream portion of the culvert to help prevent sediment frornentering Bluff Creek. In exchange for the project, the City has obtained a no cost permanent drainage and utility easement to this section of the ditch on the Goers property. The drainage ditch through the Goers property is a regional ditch and should be maintained by the City of Chanhassen. Four quotes for the work were submitted to the Cityforthis work. The engineer's project estimate was $33,15Q..QO....The.bids received are as follows: The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Paul Oehme Goers Culvert Drainage Improvements Project September 24, 2007 Page 2 GL Contractin Kusske Construction Minger Construction Parrott Contracting $29,384.70 $29,619.50 $31,864.40 $37,663.90 GL Contracting is the low bidder for the project. GL has worked for the City in the past and most recently completed the sanitary sewer improvements on Lyman Blvd. and storm sewer pond outlet project in Longacres in 2006. Their work was acceptable. Funding for this project was budgeted in the 2007 CIP, Project SWMP-012. The anticipated schedule of the project is as follows: Award Contract Start Construction Final Completion September 24, 2007 September 26, 2007 November 2, 2007 RECOMMENDA TION Staff recommends that the City Council adopt the following motion: "The Chanhassen City Council approve quote and award a construction contract for the Goers Culvert Drainage Improvements Project 07-13 to GL Contracting in the amount of $29,384.70." Attachment: 1. CIP Page 2. Project Map G:\ENG\PUBLIC\2007Projects\07 -13 GoerCu1vert09-24-07 ACC.doc Capital Improvement Program City of Chanhassen, MN 2007 thru 2011 Contact Unassigned Department Surface Water Mana~ent Type Improvement Useful Life Unassigned Category SWMP Priority nJa Project # SWMP;,,012 Project Name SWMP Implementation Account # 1 720-0000-4300 Account # 3 Account #2 Total Project Cost $1,650,000 Description I This project implements projects identified as high priority by the City's Surface Water Management Plan, the National Pollutant Discharge . Elimination System (NPDES) Phase II permit, City Council and/or City staff. Justification I These projects are necessary to meet state and federal government requirements for storm drainage; address storm water issues in existing developments; maintain existing infrastructure; and construct the infrastructure recommended by the City's Surface Water Management Plan. Expenditures Construction 2007 450,000 Total 450,000 2008 300,000 300,000 2009 300,000 300,000 2010 300,000 300,000 2011 300,000 300,000 Total 1,650,000 1,650,000 ! Funding Sources 2007 2008 2009 2010 2011 Total Surface Water Utility Fund 450,000 300,000 300,000 300,000 300,000 1,650,000 Total 450,000 300,000 300,000 300,000 300,000 1,650,000 ~, ~,,: Ii t :::::UOthOI I ~, (" '1 . ~ ~}:; 'i:?' ~' ~~ ;;' f.:.' ~;:' 103 '.\0;, GOERS CULVERT ~... . ' ; ~.'. , f r~ ;,. --:-;-.. _.... -.. ~-.;. :...=.---- 8~"-;- - -.. --.. --.. """"':.-... -- -- ---=.... --=.::-- --:~.... r-"" -"'-~",..,..~-:"- --i - U _.. ---;;.... -~.,"':":"':'...- --:"-.... _.... - ~~.. "M ,.:::,;-".... ;;;.:.;;;-.;- -=.;- -..::.=.:.:::-::.-::",__~_.._.... __.. t. - ~---".-;;_n:::'.:"=."~.._..Z;'=-___.__.______,;'_ _ ; ",Lxmal.1 Blvd -..-.....-....-..--..--...-- ---..-----------..-....---~-----.-.;,;-------.--,.;.--;-.:.....-~.;..._....._......:..:....;;;;..::~~-~..2.'_=...._ h .- ;d.._~..::W~"'*n'~'...o.,lii;,':&,,,,"'i'lW. ~'" , ,ifiAl ~'.Jt~1 , ' ~..;;;,. < ;;x..