Loading...
1i Lake Riley Woods: Approve Quote for Rain Gardens CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us i.~ .---- MEMORANDUM TO: Paul Oehme, City Engineer/Dir. of Public W orkS-0- c? FROM: Krista Torgerson, Natural Resources Technician~-r October 10, 2007 O~. DATE: SUBJECT: Lake Riley Woods Raingardens, SWMP12-035A: Authorize Expenditure of Funds for Installation of the Lake Riley Woods Raingardens BACKGROUND On June 23, 2007, the Carver Soil & Water Conservation District Board of Supervisors approved the State cost-share application for the City of Chanhassen, as part of the Metro Environment Partnership grant, for the Foxford Road Stormwater Retrofit Project. The amount approved for these raingarden project is $12,000. DISCUSSION The City is experiencing problems with drainage in the Lake Riley Woods development, which largely drains to the drainage channel on the Deal property. In the past erosion that has occurred along this drainage channel is currently being addressed with a rip stabilization project, SWMP12-035B. The Lake Riley Woods raingardens would reduce the volume of stormwater that passes through this channel, and therefore reduce the potential for future erosion of the channel. The development is large lot with no City services. The streets are rural section and storm water is not treated in ponds before discharging into wetlands and eventually into Lake Riley. The Lake Riley Woods raingardens would also provide some treatment for stormwater by reducing sediment and nutrient loading in Lake Riley. Lake Riley is currently listed as impaired water for excess nutrients. Plans and specifications for the Lake Riley Woods raingardens have been completed by the Association of Metropolitan Soil & Water Conservation Districts. These plans include over-excavation of current clay and compacted soils to a depth of 30". The soil would then be replaced with a 75% sand/25% compost mixture in order to increase infiltration and volume storage. A depression of 6"-9" would remain for holding capacity during rain events. A total of nine raingardens are planned for construction. Every rain garden would include an overflow that would outlet to the existing culvert. The raingardens would then be covered with 6" of mulch and planted with shrubs. All raingardens are to be constructed within the City's right-of-way and the City of Chanhassen will continue to maintain any drainage within the City's right-of-way. Private utilities will be avoided or moved. The homeowners have/will sign a maintenance The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Paul Oehme Lake Riley Woods Raingardens October 22, 1007 Page 2 agreement with the City of Chanhassen before installation of the raingarden, stating that they are responsible for maintenance of the plantings within the raingarden. An example of the plans and specifications is attached to this background. Funding for this project has been budgeted III the 2007 Surface Water Management Fund. Three quotes have been obtained from the following contractors: Kusske Construction Company, Inc. Earth Wizards, Inc. Sunram Construction, Inc. $44,865.00 $33,756.00 $25,000.00 Staff has checked Sunram Construction, Inc. references and they have experience with raingarden construction. Their past work and scheduling has been acceptable. The City's share of the project is $13,000. The anticipated schedule of the project is as follows: Award Contract Start Construction Substantial Completion October 23,2007 October 24,2007 May, 2008 RECOMMENDA TION Staff recommends that City Council approve expenditure of funds and award a contract to Sunram Construction in the amount of $25,000 for the Lake Riley Woods Raingardens Project, SWMPI2-035A. Attachments g:\eng\swmp files\lake riley woods\! 02207 approve funds Irw raingardens.doc Lake Riley Woods Rain Gardens i \ i *' Rain Garden Locations r ?f GlAUI~ ] ';7 c:z p 1 cqY 11 J C- ~~~ If/ 1.1>') . ( ~ SlO~E- P\l...lM (~~-,; C~, V\N ) /:. ~CJ(... D~ /: f""""""e:. \~~~! M c;v1.S . - ~ (:~~,'l><\>w~) I02,D -----:... '------ . i I /' ~CI.~____ ~ _____ ---- f.\ 2 l(~:j'j r-\.~. '--) ~~!7- / ) (~'-- d'.--' ~ _____ ~ \- ,O\?~ /' rJ~ .~ E / ~\O ---- 1171..." ----- . ~ I I f) ~ . . \~~. ., , . . Gi~f4.--' " . .. , . I . ... . ... ',' . ~.. ~ ""'C".."~,~"".".,,,,..,->.!:!~<~~.... /f)'L Cf~~~~"""r::::-- \ ---" I \01 tot> 'fi j" ~t) 41 ~~"'lt-tGi CoNl>lTI~5 S~ \ of 1{- i r~ d. p t . J I 10' ~' . ~ ~\ ,0 ,~ '~~. 11:. ~6UlU/' 'ROC\'. ~ 1.0 ENSUIl€- lAAJl~~ ~~\lP'rJ P\f Tot' OF lOl.?' + · QOIJ ~."'-6f ~1l{~c0 ~/RJ.~ 0!uJ",~ ... cqLi 11 ~~~ ~, p\.J ~\ I I {) fi \ ~ , ~ '. . -l.4f'\t~ ef cA~~ . . SOIL bS....Q<.~..nttJ.+ ~1- fS\A~T ~ '''':C:,':"':;;'::;::::::'''"":::.t:";Ji~,~~"""""".,~""",,,,,,,,,,,",'C.".."',............"..." . . /fJl. f)'II~ f?J.o;,~.. ~~. . ........"..,.....,........,......"............ ......~~~.....~"'U'W\... ec:.\'ITl~E:t~ ---. :--- ~. OV~ r WAn? oF ~I~ lot> 1'1 b\"U--~CAcv^1fl),J ~t; 41 ~l~ p~ ~-r 1- of' 4- 1 :; ~ ~ ;1. p t I I=- 10' - 1-0' . ~ """~'\ -.0 . 'cq Y 1 I \ :r;~~ ~I . r\tJ f'ca@ I~;: OF """":f7 MULCl\ / ~ \ ('t-AJJ~) , _' JOi. . ,.--- ~ · z-I \ ~\/:fJ""'Cbts'tFOL. ~~~ (c.\Z?) ~ _ ~\ I I D ~ C'J~ iZ--lc;.~-, ".~_,,,,,~.~~--___,1?b~~.~~-nw\ ~ ec.\t;T'~ E:t.~ '---'~ ...-:-- - OV~ _ 10(- lot> ~ l)f> 11 W~et.j, ~L- ~l.-AN ~ Sef~ I ~~ ~ . -:rr' ~j ~ r- ~ , .{i;' r- ~ ~. ~ ~ ,J ~~ - ~.~ \J\Z ~(j) F~ ~ ::s . . , ( , c C . . , . . c ! ~ (- r[SJ lU: , , ~1f~~...... ,. . . ' ~ ,. ,'z).1' I ~~ Capital Improvement Program City of Chanhassen, MN 2007 thru 2011 Project # SWMP-012 Project Name SWMP Implementation Aeeount # 1 720-0000-4300 Aeeount #2 Aeeount # 3 Contact Unassigned Department Surface Water Management Type Improvement Useful Life Unassigned Category SWMP Priority nla Total Project Cost $1,650,000 Description I This project implements projects identified as high priority by the City's Surface Water Management Plan, the National Pollutant Discharge _ Elimination System (NPDES) Phase II permit, City Council and/or City staff. Justification I These projects are necessary to meet state and federal government requirements for storm drainage; address storm water issues in existing developments; maintain existing infrastructure; and construct the infrastructure recommended by the City's Surface Water Management Plan. Expenditures Construction 2007 450,000 Total 450,000 2008 300,000 300,000 2009 300.000 300,000 2010 300.000 300,000 _ Funding Sources Surface Water Utility Fund Total 2007 450,000 450,000 2008 300.000 300,000 2009 300,000 300,000 2010 300,000 300,000 Operational Impact/Other I Citywide. No map. 2011 300,000 300,000 Total 1,650,000 1,650,000 2011 300.000 300,000 Total 1,650,000 1,650,000 103