Loading...
1c Approve Master Contract for Consulting Services with Barr Eng. CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us 1<?. MEMORANDUM TO: Todd Gerhardt, City Manager FROM: --'\7 () Paul Oehme, Director of Public Works/City Engineer \ ..- DATE: November 26,2007 ~ SUBJ: Approve Master Contract for Consulting Services with Barr Engineering Company - PW009B DISCUSSION Staff is recommending approval of the master contract agreement for consulting services with Barr Engineering Company. Since Barr Engineering Company is working on the proposed Wells 12 & 13 project, it is advisable to have a "master" service agreement with this firm. This agreement is standard for professional service firms who work for the City regularly. The agreement, in general, covers insurance, indemnification, fees, and other basic service requirements. The city attorney has drafted and reviewed the agreement. Attachment The City of Chanhassen · A growinrgc~\lfJMta\'HMI~!l\~ CjllflijM.cil:ehp\lBi@,_P\Y\l6tQ.~yffig-~a~W, winding trails, and beautiful parks. A great place to live, work, and play. AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES ORIGINAL THIS IS AN AGREEMENT made between the CITY OF CHANHASSEN, a municipal corporation in the Counties of Carver and Hennepin, State of Minnesota, hereinafter called the "OWNER", and BARR ENGINEERING COMPANY, hereinafter called the "ENGINEER". The date of this agreement is October 29, 2007. OWNER intends to secure professional ENGINEERING services, subject to and according to the terms of this Agreement. OWNER intends to secure professional consulting engineering, architectural, and/or land survey services on an ongoing basis for multiple projects, subject to and according to the terms of this agreement. OWNER shall issue a project specific supplemental agreement or work order for each project, which may, by mutual agreement between OWNER and ENGINEER, alter the terms of this agreement for a specific project. SECTION 1.BASIC SERVICES OF ENGINEER 1.1. GENERAL 1.1.1. ENGINEER shall provide for OWNER professional engineering services in all phases of the Project to which this Agreement applies as hereinafter provided. These services will include serving as OWNER'S professional engineering representative for the Project, providing engineering consultation and advice and furnishing customary general municipal engineering, land surveying, wetlands and drainage, and traffic and transportation engineering and other customary engineering services and architectural services thereto. ENGINEER is an independent provider of professional engineering and/or land surveying services, responsible for means and methods used in performing ENGINEER'S services pursuant to this Agreement. 1.2. STUDY AND REPORT PHASE After written authorization to proceed, ENGINEER shall, if requested by OWNER in supplemental agreement: 1.2.1. Consult with OWNER to clarify and define OWNER'S requirements for the Project, review available data and attend necessary meetings and be available for general consultation. A Service Planner will be prepared for each project to clarify roles and responsibilities of the OWNER and the ENGINEER. 134745v02 RNK:r 1 0/19/2007 1 1.2.2. Advise OWNER as to the necessity of OWNER'S providing or obtaining from others data or services of the types described in paragraph 3.3, and assist OWNER in obtaining such data and services. 1.2.3. Identify and analyze requirements of governmental authorities having jurisdiction to approve the design of the Project and participate in consultations with such authorities. 1.2.4. Provide analyses of OWNER'S needs, planning surveys, site evaluations and comparative studies of prospective sites and solutions. 1.2.5. Provide a general economic analysis of OWNER'S requirements applicable to various alternatives. 1.2.6. The ENGINEER shall conduct and prepare preliminary studies, layouts, sketches, preliminary field work, preliminary cost estimates, estimates of assessment rates, and shall assist the OWNER in obtaining required subsurface investigations as required for the preparation of the Feasibility Reports. The Feasibility Reports shall conform to the format presented in Appendix "A" of this Agreement. The report shall contain schematic layouts, sketches and conceptual design criteria with appropriate exhibits to indicate clearly the considerations involved (including applicable requirements of governmental authorities having jurisdiction as aforesaid) and the alternative solutions available to OWNER and setting forth ENGINEER'S findings and recommendations. This Report will be accompanied by ENGINEER'S opinion of probable costs for the Project, including the following which will be separately itemized: construction cost and indirect cost consisting of engineering costs and contingencies, and (on the basis of information furnished by OWNER) allowances for such other items as charges of all other professionals and consultants, for the cost of land and rights-of-way, for compensation for or damages to properties, for interest and financing charges and for other services to be provided by others for OWNER pursuant to paragraphs 3.7 through 3.11, inclusive. The total of all construction and indirect costs are hereinafter called "T otal Proj ect Costs". 1.2.7. Furnish fifteen (15) copies of the Study and Report documents and review them in person with OWNER unless otherwise specified in the Supplemental Letter Agreement for the proj ect. 1.2.8. The ENGINEER shall assist with presenting the Feasibility Reports to the proper reviewing agencies and to the City Council. The ENGINEER shall appear at the public hearing to present the information. 1.3. PRELIMINARY DESIGN PHASE 134745v02 RNK:r1 0/19/2007 2 After written authorization to proceed with the Preliminary Design Phase, ENGINEER shall, if requested by OWNER in supplemental agreement: 1.3.1. In consultation with OWNER and on the basis of the accepted Study and Report documents, determine the general scope, extent and character of the Project; attend necessary meetings and be available for general consultation. 1.3.2. Prepare Preliminary Design documents consisting of final design criteria, preliminary drawings, outline specifications and written descriptions of the Project. 1.3.3. Advise OWNER if additional data or services of the types described in paragraph 3.4 are necessary and assist OWNER in obtaining such data and services. 1.3.4. Based on the information contained in the Preliminary Design documents, submit a revised opinion of probable Total Project Costs. 1.3.5. Furnish preliminary legal descriptions and exhibits for all permanent and temporary easements anticipated to construct the Project. 1.3.6. Furnish three (3) copies of the above Preliminary Report documents and present and review them in person with OWNER. 1.4. FINAL DESIGN PHASE After authorization to proceed with the Pinal Design Phase, ENGINEER shall, if requested by OWNER in supplemental agreement: 1.4.1. On the basis of the accepted Preliminary Report documents and the revised opinion of probable Total Project Costs prepare for incorporation in the Bidding Documents final drawings to show the general scope, extent and character of the work to be furnished and performed by Contractor(s) (hereinafter called "Plans") and Specifications. 1.4.2. Provide technical criteria, written descriptions and design data for use in filing applications for permits with or obtaining approvals of such governmental authorities as have jurisdiction to approve the design of the Project, and assist OWNER in consultations with appropriate authorities. The ENGINEER shall submit all applications and easement descriptions to the appropriate agencies and submit copies to the OWNER. 1.4.3. Provide legal descriptions and exhibits for all easements, property surveys or related engineering services needed for the transfer of interests in real property and 134745v02 RNK:rl0/19/2007 3 field surveys for design purposes and engmeenng surveys and staking to enable Contractor( s) to proceed with their work. 1.4.4. Advise OWNER of any adjustments to the latest opinion of probable Total Project Costs caused by changes in general scope, extent or character or design requirements of the Project or Construction Costs. Furnish to OWNER a revised opinion of probable Total Project Costs based on the Plans and Specifications. 1.4.5. Prepare for review and approval by OWNER, its legal counsel and other advisors contract agreement forms, general conditions and supplementary conditions, and (where appropriate) bid forms, invitations to bid and instructions to bidders, and assist in the preparation of other related documents. 1.4.6. Attend necessary meetings and be available for general consultation. 1.4.7. Furnish three (3) copies of the above documents and of the Plans and Specifications and present and review them in person with OWNER. 1.4.8. The ENGINEER shall furnish one copy of all design calculations as requested by OWNER. 1.5. BIDDING OR NEGOTIATING PHASE 1.5.1. The ENGINEER shall prepare and forward the Advertisement for Bids to the designated publications, official newspaper and the OWNER. The ENGINEER shall supply up to thirty (30) sets of full size final Plans and Specifications for use in obtaining bids and submitting for general review unless otherwise specified in the Supplemental Letter Agreement for the project. The ENGINEER shall maintain a record of prospective bidders to whom Bidding Documents have been issued, attend pre-bid meetings and receive and process deposits for Bidding Documents. 1.5.2. Issue addenda as appropriate to interpret, clarify or expand the Bidding Documents. 1.5.3. Consult with and advise OWNER as to the acceptability of subcontractors, suppliers, and other persons and organizations proposed by the prime contractor( s) (herein called "Contractor(s)") for the portions of the work where acceptability is required by the Bidding Documents. 1.5.4. Consult with and advise OWNER concerning and determining the acceptability of substitute materials and equipment proposed by Contractor( s) when substitution prior to the award of contracts is allowed by the Bidding Documents. 134745v02 RNK:rlO/19/2007 4 1.5.5. Attend the bid opening, prepare bid tabulation sheets and assist OWNER in evaluating bids or proposals and in assembling and awarding contracts for construction, materials, equipment and services. 1.6. CONSTRUCTION PHASE During the Construction Phase: 1.6.1. General Administration of Construction Contract. ENGINEER shall consult with and advise OWNER and act as OWNER'S representative. All of OWNER'S instructions to Contractor(s) will be issued through ENGINEER who will have authority to act on behalf of Owner to the extent provided in the General Conditions except as otherwise provided in writing. The General Conditions shall not be modified without the written agreement of the OWNER. 1.6.2. Visits to Site and Observation of Construction. In connection with observations ofthe work ofContractor(s) while it is in progress: 1.6.2.1. 1.6.2.2. 1.6.2.3. 134745v02 RNK:rl0/19/2007 ENGINEER shall make visits to the site at intervals appropriate to the various stages of construction as ENGINEER and OWNER deems necessary in order to observe as an experienced and qualified design professional the progress and quality of the various aspects of Contractor(s) work. In addition, if requested by OWNER, ENGINEER shall provide the services of a Resident Project Representative (and assistants as agreed) at the site to assist ENGINEER and to provide more continuous observation of such work. Based on information obtained during such visits and on such observations, ENGINEER shall endeavor to determine in general if the work is proceeding in accordance with the Contract Documents and ENGINEER shall keep OWNER informed of the progress of the work. The Resident Project Representative (and any assistants) will be ENGINEER'S agent or employee and under ENGINEER'S supervision. The duties and responsibilities of the Resident Project Representative (and assistants) are set forth in Appendix B "Duties, Responsibilities and Limitations of Authority of the Project Representative" . The purpose of the ENGINEER'S visits to and representation by the Resident Project Representative (and assistants, if any) at the site will be to enable ENGINEER to better carry out the duties and responsibilities assigned to and undertaken by ENGINEER during 5 the Construction Phase, and, in addition, by exercise of ENGINEER'S efforts as an experienced and qualified design professional, to provide for OWNER a greater degree of confidence that the completed work of Contractor(s) will conform to the Contract Documents and that the integrity of the design concept as reflected in the Contract Documents has been implemented and preserved by Contractor(s). On the other hand, ENGINEER shall not, during such visits or as a result of such observations of Contractor( s)' work in progress, supervise, direct, or have control over Contractor(s)' work, nor shall ENGINEER have control or charge of and shall not be responsible for the Contractor(s)' means, methods, techniques, sequences, or procedures of construction selected by Contractor( s), for safety precautions and programs incident to the work of Contractor( s) or for any failure of Contractor( s) to comply with laws, rules, regulations, ordinances, codes, or orders applicable to Contractor( s) furnishing and performing their work. Accordingly, ENGINEER can neither guarantee the performance of the construction contracts by Contractor( s) nor assume responsibility for Contractor( s)' failure to furnish and perform their work in accordance with the Contract Documents. 1.6.2.4. If ENGINEER observes or otherwise becomes aware of defects or deficiencies in the work, or nonconformance to the Contract Documents, ENGINEER shall promptly give written notice thereof to OWNER. 1.6.3. Defective Work. During such visits and on the basis of such observation, ENGINEER may disapprove of or reject Contractor(s) work while it is in progress if ENGINEER believes that such work will not produce a completed Project that conforms generally to the Contract Documents or that it will prejudice the integrity of the design concept of the Project as reflected in the Contract Documents. 1.6.4. Interpretations and Clarifications. ENGINEER shall issue necessary interpretations and clarifications of the Contract Documents and in connection therewith prepare work directive changes and change orders as required for OWNER'S approval. 1.6.5. Shop Drawings. ENGINEER shall review and approve (or take other appropriate action in respect of) Shop Drawings, samples and other data which Contractor(s) are required to submit, but only for conformance with the design concept of the Project and compliance with the information given in the Contract Documents. Such reviews and approvals or other action shall not extend to means, methods, techniques, 134745v02 RNK:r 10/19/2007 6 sequences or procedures of construction or to safety precautions and programs incident thereto. 1.6.6. Substitutes. ENGINEER shall evaluate and determine the acceptability of substitute materials and equipment proposed by Contractor(s), but subject to the provision of paragraph 2.2.2. 1.6.7. Inspections and Tests. ENGINEER shall have authority, as OWNER'S representative, to require special inspection or testing of the work, and shall receive and review all certificates of inspections, testings and approvals required by laws, rules, regulations, ordinances, codes, orders or the Contract Documents (but only to determine generally that their content complies with the requirements of, and the results certified indicate compliance with, the Contract Documents). ENGINEER shall be entitled to rely on the results of such tests. 1.6.8. ENGINEER shall respond to all written claims submitted by Contractor in a timely fashion. ENGINEER shall not be liable for the results of any such interpretations or decisions rendered in good faith. 1.6.9. Applications for Payment. Based on ENGINEER'S on-site observations as an experienced and qualified design professional, on information provided by the Resident Project Representative and on review of applications for payment and the accompanying data and schedules: 1.6.9.1. 1.6.9.2. 134745v02 RNK:rl0/19/2007 ENGINEER shall determine the amounts owing to Contractor(s) and recommend in writing payments to Contractor( s) in such amounts. Such recommendations of payment will constitute a representation to OWNER, based on such observations and review, that the work has progressed to the point indicated, and that, to the best of ENGINEER'S knowledge, information and belief, the quality of such work is generally in accordance with the Contract Documents (subject to an evaluation of such work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents and to any other qualifications stated in the recommendation). In the case of unit price work, ENGINEER'S recommendations of payment will include final determinations of quantities and classifications of such work (subject to any subsequent adjustments allowed by the Contract Documents). By recommending any payment ENGINEER will not thereby be deemed to have represented that exhaustive, continuous or detailed reviews or examinations have been made by ENGINEER to check 7 the quality or quantity of Contractor(s)' work as it is furnished and performed beyond the responsibilities specifically assigned to ENGINEER in this Agreement and the Contract Documents. ENGINEER'S review of Contractor(s)' work for the purposes of recommending payment will not impose on ENGINEER responsibility to supervise, direct or control such work or for the means, methods, techniques, sequences or procedures of construction or safety precautions or programs incident thereto or Contractor(s)' compliance with laws, rules, regulations, ordinances, codes or orders applicable to their furnishing and performing the work. It will also not impose on ENGINEER responsibility to make any examination to ascertain how or for what purposes any Contractor has used the money paid on account of the Contract Price, or to determine that title to any of the work, materials or equipment has passed to OWNER free and clear of any lien, claims, security interests or encumbrances, or that there may not be other matters at issue between OWNER and Contractor that might affect the amount that should be paid. 1.6.10.Contractor(s)' Completion Documents. ENGINEER shall receive and review maintenance and operating instructions, schedules, guarantees, bonds and certificates of insurance, tests and approvals which are to be assembled by Contractor(s) in accordance with the Contract Documents (but such review will only be to determine that their content complies with the requirements of, and in the case of certificates on inspection, tests and approvals the results certified indicate compliance with, the Contract Documents); and shall transmit them to OWNER with written comments. 1.6.11.Inspections. ENGINEER shall conduct an inspection to determine if the work is substantially complete and a final inspection to determine if the completed work is acceptable so that ENGINEER may recommend, in writing, final payment to Contractor(s) and any give written notice to OWNER and the Contractor(s) that the work is acceptable (subject to any conditions therein expressed), but any such recommendation and notice will be subject to the limitations expressed in paragraph 1.6.9.2. 1.6.12.Limitation of Responsibilities. ENGINEER shall not be responsible for the acts or omissions of any Contractor, or of any subcontractor or supplier, or any of the Contractor(s)' or subcontractors' or suppliers' agents or employees of any other persons (except ENGINEER'S own employees and agents) at the site or otherwise furnishing or performing any of the Contractor(s)' work; however, nothing contained in paragraphs 1.6.1 through 1.6.11 inclusive, shall be construed to release ENGINEER from liability for failure to properly perform duties and responsibilities assumed by ENGINEER in the Contract Documents. 134745v02 RNK:rl0/19/2007 8 1.7. OPERATIONAL PHASE During Operational Phase, ENGINEER shall, when requested by OWNER: 1.7.1. Provide assistance in the closing of any financial or related transaction for the Proj ect. 1.7.2. Provide assistance in connection with the refining and adjusting of any equipment or system. 1.7.3. Assist OWNER in training OWNER'S staff to operate and maintain the Project. Extensive training shall be mutually agreed upon within the Supplemental Agreement as Additional Services as defined in Section 2 of this agreement. 1.7.4. Assist OWNER in developing systems and procedures for control of the operation and maintenance of and record keeping for the Project. 1.7.5. Within ninety (90) days after completion of a Project, prepare a set of reproducible record prints of Drawings showing those changes made during the construction process, based on the marked-up prints, drawings and other data furnished by Contractor(s) to ENGINEER and which ENGINEER considered significant. ENGINEER will not be responsible for any errors or omissions in the information provided by Contractor that is incorporated in the record drawings and record documents. Final payment will be made only after record drawings are received by the OWNER. 1.7.6. In company with OWNER, visit the Project to observe any apparent defects in the completed construction, assist OWNER in consultations and discussions with Contractor( s) concerning correction of such deficiencies, and make recommendations as to replacement or correction of defective work. 1.7.7. Assist OWNER in preparation of assessment roll for City improvement projects, and attend assessment hearings. SECTION 2.ADDITIONAL SERVICES OF ENGINEER 2.1. SERVICES REQUIRING AUTHORIZATION IN ADVANCE If authorized in writing by OWNER, ENGINEER shall furnish or obtain from others Additional Services of the types listed in paragraphs 2.1.1 through 2.1.14, inclusive. These services are not included as part of Basic Services except to the extent provided otherwise by attached Supplemental Agreement or Work Order and will be paid for by OWNER as indicated in Section 5. 134745v02 RNK:rl0/19/2007 9 2.1.1. Preparation of applications and supporting documents (in addition to those furnished under Basic Services) for private or governmental grants, loans or advances in connection with the Project; preparation or review of environmental assessments and impact statements; review and evaluation of the effect on the design requirements of the Project of any such statements and documents prepared by others; and assistance in obtaining approvals of authorities having jurisdiction over the anticipated environmental impact of the Project. 2.1.2. Review of developer's plats, concept plans and assistance to developer in preparing a plat; contract administration and construction observation of developer installed improvements; review and finalization of developer's construction record drawings, and work performed in acquisition of easements. 2.1.3. Field Services to make measured drawings of or to investigate existing conditions or facilities, or to verify the accuracy of drawings or other information furnished to OWNER by others. 2.1.4. Services resulting from significant changes in the general scope, extent or character of the Project or its design including, but not limited to, changes in size, complexity, OWNER'S schedule, character of construction or method of financing; and revising previously accepted studies, reports, design documents or Contract Documents when such revisions are required by changes in laws, rules, regulations, ordinances, codes or orders enacted subsequent to the preparation of such studies, reports or documents, or are due to any other causes beyond ENGINEER'S control. 2.1.5. Providing renderings or models for OWNER'S use. 2.1.6. Preparing documents for alternate bids requested by OWNER for Contractor( s)' work which is not executed or documents for out-of-sequence work. 2.1.7. Investigations and studies involving, but not limited to, detailed consideration of operations, maintenance and overhead expenses; providing value engineering during the course of design; the preparation of feasibility studies, cash flow and economic evaluations, rate schedules and appraisals; assistance in obtaining financing for the Project; evaluating processes available for licensing; assisting OWNER in obtaining process licensing; detailed quantity surveys of material, equipment and labor; and audits or inventories required in connection with construction performed by OWNER. 2.1.8. Furnishing services of independent professional associates and consultants for other than Basic Services (which include, but are not limited to, customary civil, structural, mechanical and electrical engineering and customary architectural design incidental thereto); and providing data or services of the types described in paragraph 3.4 134745v02 RNK:rl0/19/2007 10 when OWNER employs ENGINEER to provide such data or servIces In lieu of furnishing the same in accordance with paragraph 3.4. 2.1.9. Services during out-of-town travel required of ENGINEER other than visits to the site or OWNER'S office as required by Section 1. 2.1.10.Assistance in connection with bid protests, rebidding or renegotiating contracts for construction, materials, equipment or services, except when such assistance is required to complete services called for in paragraph 6.2.2.5. 2.1.11.Preparation of operating, maintenance and staffing manuals to supplement Basic Services under paragraph 1.7.3. 2.I.l2.Preparing to serve or serving as a consultant or witness for OWNER in any litigation, arbitration or other legal or administrative proceeding involving the Project unless the ENGINEER is a defendant (except for assistance in consultations which is included as part of Basic Services under paragraphs 1.2.3 and 1.4.2). 2. 1. 13.Additional services in connection with the Project, including services which are to be furnished by OWNER in accordance with Article 3, and services not otherwise provided for in this Agreement. 2.2. REQUIRED ADDITIONAL SERVICES When required by the Contract Documents in circumstances beyond ENGINEER'S control, ENGINEER shall furnish or obtain from others, as circumstances require during construction and without waiting for specific authorization from OWNER, Additional Services of the types listed in paragraphs 2.2.1 through 2.2.6, inclusive. These services are not included as part of Basic Services except to the extent provided otherwise by attached Supplemental Agreement or Work Order. ENGINEER shall advise OWNER promptly after starting any such additional services which will be paid for by OWNER as indicated in Section 5. 2.2.1. Services in connection with work directive changes and change orders to reflect changes requested by OWNER if the resulting change in compensation for Basic Services is not commensurate with the additional services rendered. 2.2.2. Services in making revisions to Plans and Specifications occasioned by the acceptance of substitutions proposed by Contractor(s); and services after the award to each contract in evaluating and determining the acceptability of an unreasonable or excessive number of substitutions proposed by Contractor. 134745v02 RNK:r 10/19/2007 11 2.2.3. Services resulting from significant delays, changes or price increases occurring as a direct or indirect result of material, equipment or energy shortages. 2.2.4. Additional or extended services during construction made necessary by (1) work damaged by fire or other cause during construction, (2) a significant amount of defective or neglected work of any Contractor, (3) acceleration of the progress schedule involving services beyond normal working hours, and (4) default by any Contractor. 2.2.5. Services (other than Basic Services during the Operational Phase) in connection with any partial use of any part of the Project by OWNER prior to Substantial Completion. 2.2.6. Evaluating an unreasonable or extensive number of claims submitted by Contractor(s) or others in connection with the work. SECTION 3.0WNER'S RESPONSIBILITIES OWNER shall do the following in a timely manner so as not to delay the services of ENGINEER: 3.1. Designate in writing a person to act as OWNER'S representative with respect to the services to be rendered under this Agreement, such person shall have complete authority to transmit instructions, receive information, interpret and define OWNER'S policies and decisions with respect to ENGINEER'S services for the Project. 3.2. Provide criteria and information as to OWNER'S requirements for the Project, including design objectives and constraints, space, capacity and performance requirements, flexibility and expandability, and any budgetary limitations; and furnish copies of design and construction standards OWNER will require to be included in the Plans and Specifications. 3.3. Assist ENGINEER by placing at ENGINEER'S disposal all available information pertinent to the Project including previous reports and any other data relative to design or construction ofthe Project. 3.4. Furnish to ENGINEER as required for performance of ENGINEER'S Basic Services except to the extent provided otherwise by attached amendment, the following: 3.4.1. Data prepared by or services of others, including without limitation, borings, probings and subsurface explorations, hydrographic surveys, laboratory tests and inspections of samples, materials and equipment; 3.4.2. Appropriate professional interpretations of all the foregoing; 134745v02 RNK:r10/19/2007 12 3.4.3. Environmental assessment and impact statements; 3.4.4. Property, boundary, easement, right-of-way, topographic and utility surveys; 3.4.5. Property descriptions; 3.4.6. Zoning, deed and other land use restrictions; and 3.4.7, Other special data or consultations not covered in Section 2; all of which ENGINEER may use and rely upon in performing services under this Agreement. 3.5. Provide engineering surveys or authorize ENGINEER to establish reference points for construction to enable Contractor( s) to proceed with the layout of the work. 3.6. Arrange for access to and make all provisions for ENGINEER to enter upon public and private property as required for ENGINEER to perform services under this Agreement. 3.7. Examine all studies, reports, sketches, Drawings, Specifications, proposals and other documents presented by ENGINEER. Obtain advice of an attorney, insurance counselor and other consultants as OWNER deems appropriate for such examination and render in writing decisions pertaining thereto within a reasonable time so as not to delay the services of ENGINEER. 3.8. Furnish approvals and permits from all governmental authorities having jurisdiction over the Project and such approvals and consents from others as may be necessary for completion of the Project. 3.9. Provide such accounting, independent cost estimating and insurance counseling services as may be required for the Project, such legal services as OWNER may require or ENGINEER may reasonably request with regard to legal issues pertaining to the Project including any that may be raised by Contractor(s), such auditing service as OWNER may require to ascertain how or for what purpose any Contractor has used the monies paid under the construction contract, and such inspection services as OWNER may require to ascertain that Contractor(s) are complying with any law, rule, regulations, ordinance, code or order applicable to their furnishing and performing the work. 3.10. If OWNER designates a person to represent OWNER at the site who is not ENGINEER or ENGINEER'S agent or employee, the duties, responsibilities and 134745v02 RNK:r10/19/2007 13 limitations of authority of such other person and the affect thereof on the duties and responsibilities of ENGINEER and the Resident Project Representative (and any assistants) will be set forth in an exhibit that is to be identified, attached to and made a part of this Agreement before such services begin. 3.11. If more than one prime contract is to be awarded for construction, materials, equipment and services for the entire Project, designate a person or organization to have authority and responsibility for coordinating the activities among the various prime contractors. 3.12. Furnish to ENGINEER data or estimated figures as to OWNER'S anticipated costs for services to be provided by others for OWNER (such as services pursuant to paragraphs 3.7 through 3.11, inclusive, and other costs of the types referred to in paragraph 1.2.6) so that ENGINEER may make the necessary findings to support opinions of probable Total Project Costs. 3.13. Attend the pre-bid meeting, bid opening, pre-construction meetings, construction progress and other job related meetings and substantial completion inspections and final payment inspections. 3.14. Give prompt written notice to ENGINEER whenever OWNER observes or otherwise becomes aware of any development that affects the scope of timing of ENGINEER'S services, or any defect or nonconformance in the work of any Contractor. 3.15. Furnish, or direct ENGINEER to provide, Additional Services as stipulated in paragraph 2.1 of this Agreement or other services as required. 3.16. Bear all costs incident to compliance with the requirements of this Section 3. SECTION 4.PERIODS OF SERVICE 4.1. The provisions of Section 4 and the various rates of compensation for ENGINEER'S services provided for elsewhere in this Agreement have been agreed to in anticipation of the orderly and continuous progress of the Project through completion of the Construction Phase. ENGINEER'S obligation to render services hereunder will extend for a period which may reasonably be required for the design, award of contracts, construction and initial operation of the Project including extra work and required extensions thereto. 4.2. The services called for in the Study and Report Phase will be completed and the Report submitted within the agreed period after written authorization to proceed with that phase of services which will be given by OWNER. 134745v02 RNK:r1 0/19/2007 14 4.3. After acceptance by OWNER of the Study and Report Phase documents indicating any specific modifications or changes in the general scope, extent or character of the Project desired by OWNER, and upon written authorization from OWNER, ENGINEER shall proceed with the performance of the services called for in the Preliminary Design Phase, and shall submit preliminary design documents and a revised opinion of probable Total Project Costs within the agreed period. 4.4. After acceptance by OWNER of the Preliminary Design Phase documents and revised opinion of probable Total Project Costs, indicating any specific modifications or changes in the general scope, extent or character of the Project desired by OWNER, and upon written authorization from OWNER, ENGINEER shall proceed with the performance of the services called for in the Final Design Phase; and shall deliver Contract Documents and a revised opinion of probable Total Project Costs for all work of Contractor(s) on the Project within the agreed period. 4.5. ENGINEER'S services under the Study and Report Phase, Preliminary Design Phase, and Final Design Phase, shall each be considered complete at the earlier of (1) the date when the submissions for that phase have been accepted by OWNER, or (2) thirty (30) days after the date when such submissions are delivered to OWNER for final acceptance, plus in each case such additional time as may be considered reasonable for obtaining approval of governmental authorities having jurisdiction to approve the design of the Project. 4.6. After acceptance by OWNER of the ENGINEER'S Drawings, Specifications and other Final Design Phase documentation including the most recent opinion of probable Total Project Costs and upon written authorization to proceed, ENGINEER shall proceed with performance of the services called for in the Bidding or Negotiating phase. This Phase shall terminate and the services to be rendered thereunder shall be considered complete upon commencement of the Construction Phase or upon cessation of negotiations with prospective Contractor( s) (except as may otherwise be required to complete the services called for in paragraph 6.2.2.5). 4.7. The Construction Phase will commence with the execution of the first prime contract to be executed for the work of the Project or any part thereof, and will terminate upon written recommendation by ENGINEER of final payment on the last prime contract to be completed. Construction Phase services may be rendered at different times in respect of separate prime contracts if the Proj ect involves more than one prime contract. 4.8. The Operational Phase will commence during the Construction Phase and will terminate one year after the date of Substantial Completion, as defined in the Contract Documents, if the last prime contract for construction, materials and equipment on which substantial completion is achieved. 134745v02 RNK:rI0/19/2007 15 4.9. If OWNER has request for significant modifications or changes in the general scope, extent or character of the Project, the time of performance of ENGINEER'S services shall be adjusted equitably. 4.10. OWNER shall give prompt authorization to proceed or not proceed with any phase of services after completion of the immediately preceding phase. 4.11. If ENGINEER'S services for design or during construction of the Project are delayed or suspended in whole or in part by OWNER for more than three (3) months for reasons beyond ENGINEER'S control, ENGINEER shall on written demand to OWNER (but without termination of this Agreement) be paid as provided in paragraph 5.3.2. If such delay or suspension extends for more than one year for reasons beyond ENGINEER'S control, or if ENGINEER for any reason is required to render Construction Phase services in respect of any prime contract for construction, materials or equipment more than one year after Substantial Completion is achieved under that contract, the various rates of compensation provided for elsewhere in this Agreement shall be subject to equitable adjustment. 4.12. In the event that the work designed or specified by ENGINEER is to be furnished or performed under more than one prime contract, or if ENGINEER'S services are to be separately sequenced with the work of one or more prime contractors (such as in the case of fast-tracking), OWNER and ENGINEER shall, prior to commencement of the Final Design Phase, develop a schedule for performance of ENGINEER'S services during the Final Design, Bidding or Negotiating and Construction Phases in order to sequence and coordinate properly such services as are applicable to the work under such separate contracts. SECTION 5.PAYMENTS TO ENGINEER 5.1. METHODS OF PAYMENT FOR SERVICES AND EXPENSES OF ENGINEER 5.1.1. For Basic Services. OWNER shall pay ENGINEER for Basic Services rendered under Section 1 by one of the following methods, or as specified by Supplemental Agreement or Work Order for each project: 5.1.1.1. The fee for all Basic Services (except services of ENGINEER'S Resident Project Representative and assistants furnished under paragraph 1.6.2.1) shall mean a fee based upon Schedule "A". 5.1.1.2. Upon request of the OWNER, the ENGINEER shall submit a written not to exceed cost for the Study and Report Phase. If the project proceeds, the amount paid for this phase will be deducted from the 134745v02 RNK:r 10/19/2007 16 5.1.1.3. overall fee charged. The maximum amount to be deducted will not exceed twenty percent (20%) of the total possible fee for the project. Resident Project Services. For services of ENGINEER'S Resident Project Representative (and assistants) furnished under paragraph 1.6.2.1 on the basis of Hourly Costs in accordance with Schedule B for services rendered by principals and employees assigned to resident Project representation. 5.1.2. For Additional Services. OWNER shall pay ENGINEER for Additional Services rendered under Section 2 as follows: 5.1.2.1. 5.1.2.2. General. For Additional Services of ENGINEER'S principals and employees engaged directly on the Project and rendered pursuant to paragraph 2.1 or 2.2 on the basis of ENGINEER'S Hourly Costs in accordance with Schedule B. Professional Associates and Consultants. For services and Reimbursable Expenses of independent professional associates and consultants employed by ENGINEER to render Additional Services pursuant to paragraph 2.1 or 2.2, the amount billed to ENGINEER therefor times a factor of 1.0, unless otherwise specified in the Supplemental Agreement. 5.1.3. For Reimbursable Expenses. In addition to payments provided for in paragraphs 5.1.1 and 5.1.2, OWNER shall pay ENGINEER the actual costs of all Reimbursable Expenses incurred in connection with all Basic and Additional Services. 5.1.4. As used in this paragraph 5.1, the terms "Hourly Costs" and "Reimbursable Expenses" have the meanings assigned to them in paragraph 5.4, and the term "Construction Cost" has the meaning assigned to it in paragraph 6.1. When Construction Cost is used as a basis for payment it will be based on one of the following sources with precedence in the order listed for work designed or specified by ENGINEER: 5.1.4.1. 5.1.4.2. 134745v02 RNK:r10/19/2007 For completed construction work, the total construction cost of all work performed as designed or specified by ENGINEER, unless otherwise specified in the Supplemental Agreement to include the mathematical average of the lowest two responsible bids received.. For work designed or specified but not constructed, the lowest bona fide bid received from a qualified bidder for such work; or, if the work is not bid, the lowest bona fide negotiated proposal for such work. 17 5.1.4.3. For work designed or specified but not constructed upon which no such bid or proposal is received, the most recent estimate of Construction Cost, or if none is available, ENGINEER'S most recent opinion of probable Construction Cost. No deduction is to be made from Construction Costs on account of any penalty, liquidated damages, or other amounts withheld from payments to Contractor(s). 5.2. TIMES OF PAYMENTS 5.2.1. ENGINEER shall submit monthly statements for Basic and Additional Services rendered and for Reimbursable Expenses incurred. The statements will be based upon ENGINEER'S estimate of the proportion of the total services actually completed at the time of billing. OWNER shall make prompt monthly payments in response to ENGINEER'S monthly statements. 5.2.2. Upon conclusion of each phase of Basic Services, OWNER shall pay such additional amount, if any, as may be necessary to bring total compensation paid on account of such phase to the following percentages of total compensation payable for all phases of Basic Services: Phase Percentage Study and Report Preliminary Design (inc!. Field Surveys) Final Design Bidding or Negotiating Construction Operational (inc!. Record Drawings) 10% 40% 28% 2% 10% 10% 100% 5.2.3. ENGINEER shall comply with Minnesota Statute ~ 471.425. ENGINEER must pay Subcontractor for all undisputed services provided by Subcontractor within ten days of ENGINEER'S receipt of payment from OWNER. ENGINEER must pay interest of 1.5 percent per month or any part of a month to Subcontractor on any undisputed amount not paid on time to Subcontractor. The minimum monthly interest penalty payment for an unpaid balance of$100 or more is $10. 5.3. OTHER PROVISIONS CONCERNING PAYMENTS 5.3.1. If OWNER fails to make any payment due ENGINEER for services and expenses within thirty (30) days after receipt of ENGINEER'S statement therefor, the 134745v02 RNK:r 10/19/2007 18 amounts due ENGINEER will be increased at the rate of one-half percent (1/2%) per month from said thirtieth day, and in addition, ENGINEER may, after giving seven (7) days' written notice to OWNER, suspend services under this Agreement until ENGINEER has been paid in full all amounts due for services, expenses and charges. 5.3.2. In the event of termination by OWNER under paragraph 7.1 upon the completion of any phase of the Basic Services, progress payments due ENGINEER for services rendered through such phase shall constitute total payment for such services. In the event of such termination by OWNER during any phase of the Basic Services, ENGINEER will be paid for services actually and necessarily rendered during that phase by ENGINEER'S principals and employees engaged directly on the Project, on the basis of ENGINEER'S Hourly Costs on Schedule B to date of termination. In the event of any such termination, ENGINEER also will be reimbursed for the reasonable charges of independent professional associates and consultants employed by ENGINEER to render Basic Services, and paid for all unpaid Additional Services and unpaid reimbursables. 5.3.3. Records of ENGINEER'S Hourly Costs pertinent to ENGINEER'S compensation under this Agreement will be kept in accordance with generally accepted accounting principles. Copies will be made available to OWNER at cost on request prior to final payment for ENGINEER'S services. 5.3.4. Whenever a factor is applied to Hourly Costs in determining compensation payable to ENGINEER that factor will be adjusted periodically and equitably to reflect changes in the various elements that comprise such factor. All such adjustments will be in accordance with generally accepted accounting practices as applied on a consistent basis by ENGINEER and consistent with ENGINEER'S overall compensation practices and procedures. 5.4. DEFINITIONS 5.4.1. The Hourly Costs used as a basis for payment mean salaries and wages (basic and incentive) paid to all ENGINEER'S personnel engaged directly on the Project, including, but not limited to, engineers, architects, surveyors, designers, draftsmen, specification writers, estimators, other technical and business personnel; plus the cost of customary and statutory benefits including, but not limited to, social security contributions, unemployment, excise and payroll taxes, workers' compensation, health and retirement benefits, sick leave, vacation and holiday and other group benefits. For the purposes of this Agreement, the principals of ENGINEER and their Hourly Costs are as shown on Schedule B. The Hourly Costs of principals of ENGINEER will be adjusted equitably to reflect changes in personnel and in ENGINEER'S overall compensation procedures and practices. 134745v02 RNK:r10/19/2007 19 5.4.2. Reimbursable Expenses means the actual reasonable expenses incurred by ENGINEER or ENGINEER'S independent professional associates or consultants, directly or indirectly in connection with the Project, such as expenses for: transportation and subsistence incidental thereto; obtaining bids or proposals from Contractor(s); providing and maintaining field office facilities including furnishings and utilities; subsistence and transportation of Resident Project Representatives and their assistants; toll telephone calls and telegrams; reproduction of reports, Drawings, Specifications, Bidding Documents, and similar Project-related items in addition to those required under Section 1; and, if authorized in advance by OWNER, overtime work requiring higher than regular rates. SECTION 6. CONSTRUCTION COST AND OPINIONS OF COST 6.1. CONSTRUCTION COST The construction cost of the entire Project (herein referred to as "Construction Cost") means the total cost to OWNER of those portions of the entire Project designed and specified by ENGINEER, but it will not include indirect costs such as ENGINEER'S compensation and expenses, the cost of land, rights-of-way, or compensation for or damages to, properties unless this Agreement so specifies, nor will it include OWNER'S legal, accounting, insurance counseling or auditing services, or interest and financing charges incurred in connection with the Project or the cost of other services to be provided by others to OWNER pursuant to paragraphs 3.7 through 3.11, inclusive. (Construction Cost is one of the items comprising Total Project Cost which is defined in paragraph 1.2.6). 6.2. OPINIONS OF COST 6.2.1. Since ENGINEER has no control over the cost of labor, materials, equipment or services furnished by others, or over the Contractor( s) methods of determining prices, or over competitive bidding or market conditions, ENGINEER'S opinions of probable Total Project Costs and Construction Cost provided for herein are to be made on the basis of ENGINEER'S experience and qualifications and represent ENGINEER'S best judgment as an experienced and qualified professional engineer, familiar with the construction industry; but ENGINEER cannot and does not guarantee that proposals, bids or actual Total Project or Construction Costs will not vary from opinions of probable cost prepared by ENGINEER. If prior to the Bidding or Negotiating Phase OWNER wishes greater assurance as to Total Project or Construction Costs, OWNER shall employ an independent cost estimator as provided in paragraph 3.9. 6.2.2. If a Construction Cost limit is established by a written agreement between OWNER and ENGINEER and specifically set forth in this Agreement as a condition thereto, the following will apply: 134745v02 RNK:r 10/19/2007 20 6.2.2.1. 6.2.2.2. 6.2.2.3. 6.2.2.4. 6.2.2.5. 134745v02 RNK:r10/19/2007 The acceptance by OWNER at any time during the Basic Services/Additional Services of a revised opinion of probable Total Project or Construction Costs in excess of the then established cost limit will constitute a corresponding revision in the Construction Cost limit to the extent indicated in such revised opinion. Any Construction Cost so established will include a contingency of ten percent (10%) unless another amount is agreed upon in writing. ENGINEER will be permitted to determine what types of materials, equipment and component systems are to be included in the Plans and Specifications and to make reasonable adjustments in the general scope, extent and character of the Project to bring it within the cost limit. If the Bidding or Negotiating Phase has not commenced within six (6) months after completion of the Final Design Phase, the established Construction Cost limit will not be binding on ENGINEER, and OWNER shall consent to an adjustment in such cost limit commensurate with an applicable change in the general level of prices in the construction industry between the date of completion of the Final Design Phase and the date on which proposals or bids are sought. If the lowest bona fide proposal or bid exceeds the established Construction Cost limit, OWNER shall (1) give written approval to increase cost limit, (2) authorize negotiating or rebidding the Project within a reasonable time, or (3) cooperate in revising the Project's general scope, extent or character to the extent consistent with the Project's requirements and with sound engineering practices. In the case of (3), ENGINEER shall modify the Contract Documents as necessary to bring the Construction Cost within the cost limits. In lieu of other compensation for services in making such modifications, OWNER shall pay ENGINEER, ENGINEER'S Reimbursable Expenses, but without profit to ENGINEER on account of such services. The providing of such service will be the limit of ENGINEER'S responsibility in this regard and, having done so, ENGINEER shall be entitled to payment for services in accordance with this Agreement and will not otherwise be liable for damages attributable to the lowest bona fide proposal or bid exceeding the established Construction Cost. 21 SECTION 7.GENERAL CONSIDERATION 7.1. TERMINATION The obligation to provide further services under this Agreement may be terminated by OWNER upon two (2) days' written notice to the ENGINEER. 7.2. REUSE OF DOCUMENTS All documents including Plans and Specifications prepared or furnished by ENGINEER (and ENGINEER'S independent professional associates and consultants) pursuant to this Agreement are instruments of service in respect of the Project and the OWNER will be provided with original record drawing copies for information and reference in connection with the use and occupancy of the Project by OWNER and others; however, such documents are not intended or represented to be suitable for reuse by OWNER or others on extensions of the Project or on any other project. Any reuse without written verification or adaptation by ENGINEER for the specific purpose intended will be at OWNER'S sole risk. 7.3 MINNESOTA GOVERNMENT DATA PRACTICES ACT. The ENGINEER must comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to (1) all data provided by the City pursuant to this Agreement, and (2) all data, created, collected, received, stored, used, maintained, or disseminated by the ENGINEER pursuant to this Agreement. The ENGINEER is subject to all the provisions of the Minnesota Government Data Practices Act, including but not limited to the civil remedies of Minnesota Statutes Section 13.08, as if it were a government entity. In the event the ENGINEER receives a request to release data, the ENGINEER must immediately notify the OWNER. The OWNER will give the ENGINEER instructions concerning the release of the data to the requesting party before the data is released. ENGINEER agrees to defend, indemnify, and hold the OWNER, its officials, officers, agents, employees, and volunteers harmless from any claims resulting from ENGINEER'S officers', agents', owners', partners', employees', volunteers', assignees' or subcontractors' unlawful disclosure and/or use of protected data. The terms of this paragraph shall survive the cancellation or termination of this Agreement. 7.4. INSURANCE 7.4.1. ENGINEER shall secure and maintain such insurance as will protect ENGINEER from claims under the Worker's Compensation Acts and from claims for bodily injury, death, or property damage which may arise from the performance of services under this Agreement. Such general liability insurance shall be written for amounts not less than the following: 134745v02 RNK:r10/19/2007 22 Bodily Injury General & Automobile General & Automobile $1,000,000 Each Person $1,000,000 Each Occurrence Property Damage General & Automobile General $1,000,000 Each Occurrence $1,000,000 Aggregate The OWNER shall be named as an additional insured on the policy. 7.4.2. Professional Liability Insurance. The ENGINEER shall secure and maintain a professional liability insurance policy. Said policy shall insure payment of damages for legal liability arising out of the performance of professional services for the OWNER, in the insured's capacity as ENGINEER, if such legal liability is caused by an error, omission, or negligent act of the insured or any person or organization for whom the insured is legally liable. Said policy shall provide minimum limits of $1,000,000 with a deductible maximum of $300,000; and shall state that such insurance cannot be cancelled until thirty (30) days after the OWNER has received written notice (upon request) of the insurer's intention to cancel this insurance. The OWNER shall be named as an additional insured on the policy. 7.4.3. Before commencing work the ENGINEER shall provide the OWNER a certificate of insurance evidencing the required insurance coverage in a form acceptable to OWNER. 7.5. INDEMNIFICATION The ENGINEER agrees, to the fullest extent permitted by law, to indemnify and hold OWNER harmless from any damage, liability, or cost (including reasonable attorney's fees and costs of defense) to the extent caused by ENGINEER's negligent acts, errors, or omissions in the performance of professional services under this Agreement and those of his or her subcontractors or anyone for whom the ENGINEER is liable. 7.6. CONTROLLING LAW This Agreement is to be governed by the laws of the State of Minnesota. 7.7. SUCCESSORS AND ASSIGNS 7.7.1. OWNER and ENGINEER each is hereby bound and the partners, successors, executors, administrators and legal representatives of OWNER and ENGINEER (and to the extent permitted by paragraph 7.6.2, the assigns of OWNER and 134745v02 RNK:r 10/19/2007 23 ENGINEER) are hereby bound to the other party, to this Agreement and to the partners, successors, executors, administrators and legal representatives (and said assigns) of such other party, in respect of all covenants, agreements, and obligations of this Agreement. 7.7.2. Neither OWNER nor ENGINEER shall assign, sublet or transfer any rights under or interest in (including, but without limitation, monies that may become due or monies that are due) this Agreement without the written consent of the other, except to the extent that any assignment, subletting or transfer is mandated by law or the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. Nothing contained in this paragraph shall prevent ENGINEER from employing such independent professional associates and consultants as ENGINEER may deem appropriate to assist in the performance of services hereunder. 7.7.3. Nothing under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than OWNER and ENGINEER, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the OWNER and ENGINEER and not for the benefit of any other party. 7.8. COPYRIGHT Copyright or Patent Infringement. ENGINEER shall defend actions or claims charging infringement of any copyright or patent by reason of the use or adoption of any designs, Drawings or Specifications supplied by it, and it shall hold harmless the OWNER from loss or damage resulting therefrom. 7.9. MEDIATION 7.9.1. In an effort to resolve any conflicts that arise during the design or construction of the project or following the completion of the project, the OWNER and ENGINEER agree that all disputes between them arising out of or relating to this Agreement shall be submitted to nonbinding mediation unless the parties agree otherwise. The OWNER and ENGINEER further agree to consider including a similar mediation provision in all agreements with independent contractors and consultants retained for the project and to require all independent contractors and consultants also to include a similar provision in all agreements with subcontractors, subconsultants, suppliers, or fabricators so retained. SECTION 8.SPECIAL PROVISIONS. EXHIBITS AND SCHEDULES 8.1. The following exhibits are attached to and made a part of this Agreement: 134745v02 RNK:r1 0/19/2007 24 8.1.1. Schedule A "Fee Schedule for Basic Services". 8.1.2. Schedule B "Per Diem Hourly Rate Schedule for Additional Services" 8.1.3. Appendix A - Feasibility Report Outline 8.1.4. Appendix B - Duties, Responsibilities and Limitations of Authority of the Resident Project Representative. 8.2. This Agreement together with the Appendix and Schedules identified above constitute the entire agreement between OWNER and ENGINEER and supersede all prior written or oral understandings. This Agreement, Appendix and Schedules may only be amended, supplemented, modified or cancelled by a duly executed written instrument. [The remainder of this page has been intentionally left blank. Signature pages follow.] 134745v02 RNK:rlO/19/2007 25 IN WITNESS WHEREOF, the parties hereto have made and executed this Agreement as of the day and year first above written. Its Mayor ENGINEER: BARR ENGINEERING COMPANY BY: ~ -:J~ Brian LeMon Its Vice President OWNER: CITY OF CHANHASSEN BY: AND Its City Manager/Clerk ADDRESS FOR GIVING NOTICES: ADDRESS FOR GIVING NOTICES: Chanhassen City Hall 7700 Market Boulevard P.O. Box 147 Chanhassen, Minnesota 55317 Attn: Brian LeMon Barr Engineering Company 4700 West 77th Street Minneapolis, Minnesota 55435-4803 Barr file name and path: P:\Mpls\23 MN\1O\2310095 Chanhassen Wens 13 & 13\ProjRiskMgmt\Chanhasses Wens 12 & 13 AGR]ROF_ENGRG_SERVICES.DOC 134745v02 RNK:r10/19/2007 26 SCHEDULE A FEE SCHEDULES FOR BASIC SERVICES The following fee and rate schedule are attached and will be renewed each calander year: 1. Fee Schedule with hourly billing rates (one page) 2. Rental Equipment Rate Schedule (five pages) 3. Copy Production Rate Schedule ( one page) 4. Special Computer Rate Schdule ( one page) 134745v02 RNK:r 10/19/2007 27 BARR Fee Schedule-2007 Rev, 01/01/07 Description Rate4 (dollars) Principal Engineer/Scientist.......... .... ,......... .............................. ... ........... .............. .... ..... .................. $90-190 Senior Consultants 1 .............. .... ............. ........, ...... .......... ...................................... ........................... $90-180 S.....E. . IS. '..t.1 $80120 .. emor .. nglneer C1en 1st .........................................................~.....................~............................... ..... -. . Engineer/SCientist1 ........................................................... .....,.............;. ;.... ..;.;...... ............. ........... ...... $55...90 Co m puter Specialist..... .............. .........................................................................;.. ......... .... ............. . $55~ 120 SeDior Technician2 ... .... ................... .............. ..... .... .... .... ....... ...................~. ...;....... .... .........;........... .... $60-100 . ; Te.chnlcian2 ........; ;.......;....... ............... .....;................ ......................;.......... .;...... .................. ..... ....... ....... $40~75 . Cqmmllnication Specjalist...........;.....~. .............. .................... ...... ';~"'.""""'" ...... .... ............,. .,........,. .$10~120 SUpport Servlcerr echnlcal.Manager ..' ................ .................... .... ............ .............. .... ... .... .... ............ $80-155 SupporfPersonnel3 ....... .......... ...........;.... .... ................. ...... ........ ." ................;. .....;.. ..,........ ......... ~.... ... $3&;85 . Rates for litigation support services will include a 30% surcharge. .. . .. ,. . Aten percent(10%) markup will be adcled to subcontraCts for professioncilsuppc:>rfandconstruclion services tocoveroverheadandil'lslIrance slIrcharge expenses. ... .... ,. ... Invoices are payable within 30 (jays ofthe dateoftheirivoice. ;\nyamOUl1tDot paid within 30 days shall beatiriterest ftom the date 10 days afterthe<date of the involceafa rateequaltothelesser of18 percent per annum or th.e highestrate allowed by applicable law i . R;eimbtirsable expenses including, but not limited to, the actualarid reasonal:llecosts oftransportation, meals;lcidging,long-distanqe telephone ch~rges, parkingcostsi . "ost8ge; . andshippil'lQ. charges will. be billed at actual cost, Mater\als and supplies charges, . printingchargl':ls, and l':lCluipmentrentalcharges ""III br;, binl':ld in accordance with Barr's standard rate schedules. Mileage will be billed atthelRS- all()""ablerate, . .. .. 1 Includes engineers, ec:01ogists,b1ol()gists, chemists, hydrogeologists; .geologistsdhd~strialhygiellists, soU scientiSts, meteorologlstsienvir()nmental sciehtists, information technologyspecll:11ists, ancllaridscapearChitects, . . 2 Includes surveyors, drafters, CADD Operators, designers, cOst estimator$,cc:>nslructionobservers, water, air cmd waste samplers, safety techniCians, interns, and data managementtechl'licisl'ls. 3 Includes word processing, report production, project accounting; information specialist, arid other project support personnel. 4 Rates do not Include sales tax on services that may be required in some states. ::ODMA\PCDOCS\D0CS\247848\1 BARR Rental Equipment Rate Schedule-2007 (Alphabetized) (see general and end notes) Rev. 01/01/07 Sheet 10f 5 Del)cription Daily Rate (dollars) Non~Expendable Equipment Air Quality Air-Cool~d .M5. Prope/Oven .Assembly ............. ............. .......... ....................................... ..... ...................300.00 AmbientSQ:iJ,jI.onitor..................... .......... ..;... ... ..... .................................. ........................... .............. .....1 00.00 AI1i3.lyier Filter: ,.oven............ .;....... ..... ..... ......... .............................. ........... ...........,................ ......................11.00 .Analyzer.StlPP.ort:Kit:{ a.) .... .... .......... ,................... ....... ................. ........, ..... .................;...... .......,.............400;00 Ariemq.meter ';.'" .,...,..................... ........... ................ ...;... ................. ............... .......;................. ................. .50;50 .C.o An.aly.z:i:!r;..."......,............................................ .......... .......................................... ........,...... ............... .16tl.OO C.o. Cal<::;?l:!e$(~et qf:;;!).;............................... ....................,........................ ......... ,.......;...,......,....;.... .........33,50 C.o/.oz/C<):i.RetililafCii$ (set .of 2} ......... ..... ............................. .......... .................... .... ......,.........~..............,17 ~oo Data.. Logger .';.;... ;.., ................. ..... ....................................... .............;..,........ .............. ................ .............. .33.50 DlIlltionCi,ilibtatof. ...,. .;..........;.................................................... ........,..........................;.... ....... ....:,....... ..200.00 Dual :PElt" :$trip: Chart.......................................... ................................... ....~... ...... ..................,............... ...,45.1;10 EPA '26 'J'al1k1Tn;ip:S:et...... ... .....,., ..... ,............................. ................. .............................,. ............;............11.75 EP A 6 S.o; Anaiysis "Kit.. ............. ..................................................... ......................... ......... ......................56.00 EPA Method. Z$(T<3NMO) Sampling Train ............................................................................................252.00 EPA Meth<ld.$:'ORSATTrain ......,...........................,................................................,.......... .....................22.50 EPA.M,eth'od.$:SaJl1Pllng train. ....................... ...................................................................... ,.. ..... .........3El4.00 EPA Method5WettesiMelet Calibrator ...................... ........................................ ............. ..................224.00 ~:!:~!i~~~~t~r.l~~i;i:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::;:::::::::::::::::::::::::~~:g~ Heated Sample Line: (150') . .......................................... ......... ......................;...........,.;;; ..;....... .,..............~1 00.00 HeatellSample:I,ne:{50') ... ............................................. ...... .......... .............."...........,.:'.... ...., ;...,..... ..........q:e,oo HiSh, :Fiow Pump~:{each).~... .........................,................,........ ..................;............... ..;.....,.... ......,...........,.38.00 HiVol :Ambietit.caL .Klt;.......... ....,......................................... .............. ..............,............,......"..........,........,.22.$0 Hydrocarbor{CalibrationGases........................ ................................. .................... ....................................56,00 HYdrocarbon. Regulator Set............................................. ..................... ......... .... ...,.................... ....,.,.... ....28,00 Low Flciw::Pumps. (each) .~...... ........................................................... ........... ......... ;.......... ........................28.00 Met Station Calibration Kit ..... ..................... .................................................. ....................,....................116;50 Midget.lmpinger .Sample'. Une ..................... ........ .........,................................... ............,...... .....................60,00 Midgetlmpi.ngerSampling Train ....................................................................;.... ......;..,................. ..........1.1 ~OO NCASI.S~mple .Train.....................................................................................................................;.... .......35.00 N0x Ahalyter,...;....................................................... ................................... ..........................,.................224.00 NOj( Cal.Gases., (set of . 2) . ............ .... .~. ;............. ............................ ......... .;........... ....;... .;;....... ..;...., ;..;... .,. .;.~a.60. NOxfSO~ Regul.atots.(sei 'of.2} .......................................................;.:.. .............,. ..,....;;.......;...;.;......;...,.....22.50 0:z/C02 Analyter ;.....; .......... .................................................... .................. ............ ...~:..~."...;... ;...... ..,.... ...168;00 021 CO2. Cal.Gase.s. (set of 2) .. ........................;.;................. ..........................;;..........;;.;.............................33;50 Portable oxYgen A.nalyzer ..................... ......................................................,..........;................................28.00 Single Peri Strip. Chart Recorder........................................................................;....;;.......................,......~33,50 ~g~~~~~~rb~.G~$:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~~~:~~ i~~'~i~~~~~~~~~.~~.~.'~~~.::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~~5:g~ TSP Hi':'Vol Sampler;~......... .................................................................. ..................................~................ .2$.00 Universaleontrol Console (Vost Meter) .............. ........... .............. ....................................... ........;....., ...173.50 Volumetric .Air Flow Meesurement Kit........................... ............. ....... ......................,......................,. ..... ...61.00 Field Equipment 1 ~-jnch. SUbmersible. Purge Pump .........,............... ................................... ...,..............,...... ......................35.00 Alpha Water Bottle (each usage )....... ... ..... ... ....... .....................................................................................,3.00 AreaNelocityFlowmeter .......... ..................... ..... ............................... ......... .......... ....................................12.00 Automatic Sampler with Depth Sensor and Flowmeter ...........................................................................18.00 Automatic Sampt er.......... ........ ............ ......................'....... .................................................................... ......9.00 Cleaning & Calibration Certification ............ .... .............. .............. ........................... ...............,................125.00 ::OOMA\PCDOCS\DOCS\247821\1 BARR Rental Equipment Rate Schedule-2007 (Alphabetized) (see general and end notes) Rev. 01/01/07 Sheet 2 of 5 Daily Rate (dollars) Description Conductivity Meter .............. ..... ........................................... ................... .......................................... ...... ..17.50 Current .Meter Suspensiori Kit.............................................. ............. .... ...... .................................. ...........55.00 Data Logger. - Hermit ... ............................................................................................................... ... ...........61.0.0. Data Trarisfer System ,.........,.......................... ...................... ................... ................................................22..0.0. Depth Seihsot/Flowtl'l~ter Orily ............................................ ............................................ .........................1.0..0.0 Dissolved Oxygen: Meter ................ ......................... ........................................................................... .......29..0.0 DissolvedOxygenlCol"ldllctivity Meter ...,.............. ... .....~...................................... ..... ...............................313;25 Dissolved. Oxygen. Sensor/Data. Logger System ......... .............................. ... ........... .................................3();.oO DriilR()d. (foot) .... ...;................ "........... ...... ;................................ .,............................... ..~... ......................;. ....2,5.0 i~]~~!i~~~~~~[~~~f:g~~ii~~:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::}!:~~ Field: Rugged.l.aptopfPockef PC ........... ....... ............... ..... ;.............................................. ...;..... ..... ..........25.00 Auori.meter ........;.;;,~;.,;';..;.;;;........:;....;............................... ...... ............. ............. .......... .................... .,..............17..5.0 GA-90 or c;EM400.o Landfill Gas Analyzer ........................... .................................................... ..............87.00 Gas Centrif1J9ElI. Pump..;.............; .......;. ............. ... .................... .....................,............................. ........... ...26.75 GasGEmer~t()r: "'.' ;;,;'; ..;....................,....... .................. ........ ................. .........,............................ .... ....;;..... .29. O() GroundwatE;lf Hang .Pl,Jmp .............. ...... ...................................................................................... .:............. .14.5.0 . Hand Vaci.Jum.Pi.Jmp:,~.;,......................................... ...........................,............................................., ............,.2,3.0.. ~S;!i~iit.1.~~::::.::::~:::~~:::~:::::~::~::.:.::~~:.::~::.:::~~:~::::::~:::..::.::::~:::::.~::.::~~:::i~;~ KemmererVeitjc~rBottleSampler ......;.............. ,..... ................... .......................,.. .....,.......,...;; ;.............;.3~;5.o . Magnetorrll:~ter......;.; .:..::.. ,;.. :.. L..,..........:;. ..,... ............................. ........................... .............. :..........., .......116;0.0: Multi-param\'iter Sui:face Water Da talogger ....... .............................. ......... .............,......................;..... ...;. .19.75 . Oil, Water.lnfeipllase' Pr()be ..:.....................;.......... ..,................................................................ ...,............ ,87..00. Peristaltic Pump.....".................... ......... .............,........................... ................ ................ .......................... .41;75 . Petite. Ponar Oredge ............................,.................................. ................. ............................... ................. .1.4.50 pH .Meter..............:. ,............ ...........;...................................... ............... ..... ......... ............,..........,............... .27.75. Portable. Colorimeter........,;......... .......... ...... ................ .......... ..........................................;......................... ;34; 7 5 . Portable Doppler. Ultrasonic Flow Meter .......................................................................... ......... ..,...,.........69,0.0 Portable Field Scale.;.....................;.............. ......... ,........................, ............... ........ ............ .................. ...15;00 Pressure Transducer ....................;................... ......,...... ........................................ .......... .....;..................40,50 Sediment Corer (each usage)............ ................ ............. .........;... ......................................... ....."........... ...,5,75. Seisgun...... .... ..:". .;... ;......,.;... .......................,....................... .............................. .............,.... ,.....................60.:0.0 Soil C.ore .Sarnplerlaucket. Auger ................ ............ ...................... .....,....... ...................... ......;. ................ ,29;()0 Soil Gas Recovery .$yste.m ;.;...............;.....................................,............................................................191..0.0. SOil.VaporEXtraction. System ....................:............ .................................................. .................,.......;...133.00. Sontek ADY (Acc()l,Jstic. Doppler Velocimeter) '................,.................................................. ....................128.00 Split lube SoU firobelHand Auger ..................;.:.................;.........................................................;.............8.75 SlElinless. SteeIB'ailer( each. osage );.....:................................................ ........,...................,;.............,.....;18.50 Submers.ibie. Purnp;... .L;........ ...,...... ...... ......... ....... .................. ........................ on......... .......... ................... .60.00 Temperature Dafalogger:.;...;... ............... ................ ......... .............. ..................................... ...... .............. ....1.50 Tent........... ;.;..... ".............,.. .................... .,................ ....... ........... ............................. ..;..... .............;.............1 5.00 Turbidimeter...... '.' .... .:.. ,..... ....................... ...........,.... .......... ........................... .............. ............................ ..14.00 Underwa.terVlewin~i.System .,...;.........................,....................................................... .............. ..,.... ........;60.00 Water Levelftemperafure Probe/Datalogger (MiniTroll or level Troll) ....................................................62.00 water QualitY :Meter.{YSI556. MPS) ............;........................................ .......................................... .........75.00 W ellLevellndiCC1,tor .... .......... .;.............. .;............... .................... ....................... .............. .,...................... ..22.00 Zooplankton Net................................... ......................................................................... ...... ............ ..........7.00 Zooplankton .............;.................... .................... ................. ........................... ........................... ..... .........145.00 Materials and Testing Brass Sieve Set .............................................. ....................................................... ................. ............ .......6.00 Chlorophyll a.................. ................................................... ................................ .................................. .....60.00 ::ODMA\PCDOCS\OOCS\247821\1 - BARR Rental Equipment Rate Schedule-2007 (Alphabetized) (see general and end notes) Rev. 01/01/07 Sheet 3 of 5 Description Daily Rate (dollars) Coarse Sieve Set ............................ ..................... ...... ..........................., ........ ........... .......... ..... ................1 0.00 Concrete Air Meter ........... ............... ................... ........ ................ ........... ...................... ........ ..... .......,........36.00 Concrete Test Hammer....... ........... ...... .............. ................................. .................................. ...................40.50 DL Plus Ultrasonic Kit (37DL, 36DL, 26XTDL) ........................................................................................62~OO Dual-Mass Dynamic Cone Penetrometer ....... ...... ...................... ......................... ... .................................50 .00 Dye Penetrant Kit... ............................ .........;................................ ...... ................... ........ ....................... .....22.,00 Hand. Vane Shear ........................... .......... .......................... ................ ................... .................... ............ .,Q$:;50: Heavy-Duty .Balance ........ ............... ................................................................. ...... ...................................16,QO Horizontal. Sample . Ejector ....... .............................. ................... ............................. ..................................25.$0. Kessl.er Field. Moisture Oven ................,....... ...................................... ........................ ...............................45.00 Laboratory Analysis ..................................... ............... ...................................... ......... ..... .......... ..................7.00 Laboratory ServiCes.. ................... ........:............ .:........... ................................ ............... ............... .... .., ...........2.50. Liquid Limit Set.. .............................;.............................. ......... ...................................................................7.50 Magnetic. Crawler .......................................,............................................. .................... ............................48.00 Magnetic Particle Kit ............. .... ........................... ................ ................. ........ ....... ..... .................... ...... .....38.00 Metal Thickness Gauge ............................ ....... ..... ...... ........................ ........ ... .... ..................... .... ............107.00 Paint Thickness Gauge.. ....... ..... ......... ...:................................................ ..... ............... ............. ...................15.00 Phytoplankton....... ...... ..................................... ............. ......... ............................................................... .145.00 Platform Beam Scale.. .... ........... .................;.;................ ........................ ....... .... ........... .................... ..........14.75 Pneumatic Pressure Indicator.................................... ..........., ..................... ................................... ...... ....11.5Ci ~~~!~t!i~~t~;:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::~~:g~ Sand Cone. Set.;;;. ....... .............................,.............................. '.' '......n ....... ....... ....................... .~........... ;...1 O,(j(). Sinco'lncliriometer Probe;.........................;...........;............................ ...... ............ ......... ..........................200.00 Soluble Reactive. Phosphorus.......;.. ....... .....;........................................................ ............... .............,......213~00 Torvane:Shear Device ...........,....0'...................;....;..................................................... .................................2;50 Total. Dissolved. Phosphorus ....... ;........ ............................................. ......... ............ ..................................30.00: Total Nitrogen (TN) ............. ..... .........;.......................................................... ................................ ........... ...40.00 Total Phosphorus (TP)................... .........;..................................... ........... ........ ............ ......... ........... ........23.;00 Vibrating Wire Logger VW21 04 ..... ....................... ................................... ........ ........................................24.00 Weld .Inspection Equipment.. ... ............. ....... ............,.. ................, .................................................. ......... ..12.00 Safety 5~Minute Escap.e. Pack (ELSA) ...................................,........................................ ......... ............ .................6.00 AerosollDust.Monitor (Mlniram. PDM-3 or PDR-1000) ..,................................ .........,........... .....................67.15 Calibration Gas Kit...... ........... ..... .......... ....:..... .............. ........ ........ .............................. ...........;.......... ...........8.75 CO Monitor. (ISC T82) ...............,.............................................................................. ..................................36,00 Combustible Gas IndiCator (M40 orlS-C. MX251);;..................................~......................................;.......45M Combustible Gas Indicator (MSA 260/360) ........................................................................................,.....58~00 Confined .Space Rescue Retrieval Equipment.................................................................. .....................295.00 Confined . Space Ventilator .............,......................;................................. .................... ..,....... ....... ..............5't7$ DetectorTUbe Pump .......................................................................... ..... .............;...................... ..............15.00 DL-101 11.7. eV 'Conversion .Kit ......... ..........................................;.........,................. ..................... ...........20.00 Drager Chip MeasurElment System .......;......,........................................................................ ...... .................75.00 Dry.Cell Air Flow Calibrator ........................ ..;..........,.........................................................................,..... .50;0.0. Flame Ionization Detector (TV A-1 000) ......... ...........................................................................................13S,00 Flotation Worksuit...... ............................................ .... ................. ................................................. .............19.75 Full~Face Respirator .. ......... ........... ...... ......... .............. ............ ........................................ ................. ..........8. 00 HiS Meter (I.S.C. T40) .............................,......................................... ......................................................27.00 H2S.. O2 and LEL Meter ............................ ;...;............................................ ..... ............ ..............................48.75 Half-Face Respirator. .......................................... ..... ............................................ ......... ............................ .6.00 OVM 580B 11.8eV Lamp Conversion Kit.................................................................................................14.00 Photoionization Detector (OVM 5808).................................................................. ...... ......... ..................11 O.OD Radiation Monitor......... .............. ....... ...... .................... ........ ................. .......................... ............................9.25 Recording Photoionization Detector (Hnu DL-101 or DL-102)...............................................................110.00 ::ODMA\PCDOCS\D0C$\247821\1 SARR Rental Equipment Rate Schedule-2007 (Alphabetized) (see general and end notes) Rev. 01/01/07 Sheet 4 of 5 Description Daily Rate (dollars) Self-Contained . Breathing Apparatus (SCBA) ........... .... ..................... ....................... ..................... ..........63.75 Self-Retracting Lifeline (30') ...................................... ... .......... ...................................... ....... ... .................56.00 Sound LeYel.Meter ............................. .................. .............................................. ..................................;....48.75 Supplied .A\r. Breathing System with SCBA .......... ............................................. ...... .................................75.50 Surv~y 16' Johh.Boat.& Trailer ......... ............ ................ ............ ............... ................................... ......... .............. ..52.00 20:HP Outboard:Molor ............................................................................................;........................... ......48.50 Canoe '" ...;...,;..... ,.......................... ..................... ................. ................... ................ ......... .;.............;..........21.75 Chairt.Saw.;.,..;..........;.............,..........................................................................................;.............,.......23;00 Cornri1unic;atiorl. Radios (set).., ............................................ ............ ... ........................... ......... ........ ..........17.75 DifferentialGPS :Syste.ri1.....,. .......................... ................. ... ........ .................... .... .................... ...... ............90.00 Hand ]ce. Auger.. ...~,.........................,................ .......................................... ...... ..,............................ ........,..7.00 Harid~Held.GPS/Digital Camera Kit .................................... ............... ................................................... ...22.00 Hand~Held laser. Meter ,.......................................................... ................................................ ........... ... ...65.00 Iron .Locator~....."......... .................................................... ......... ....................................... ............ ........... ...17.50 ~~~~~~I~~~it.~~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::.::::::::::::::::::::::::!i:~g Recording..pepth Locator.,....,.......... ...... ....................~.................................... ...... .....................................37.00 Robotic Total:Statioll.(per hour, :4-hour minimum )................................,.................................................A5.00 RTKGPS.SUrveYSystem. (per hour, 4'-hoUrmlnimUni) ............. ..........................,.....~.......................... ...55.00 Spectra. .LaserLever;;.....,......,............~......... ............................... .............;....... ........... ..............................25.;00 SurVey. Notebook.Computer...........;,...,.....,............... .......... .... ...... ......,........... ........... ............:...... ............28.75 Survey. Set (t;e'lel,. Tripod and . Rod)............. ....................... ........ ........... ............ .... ..............,..;,...............20.75 Total. $tatlon.SUrveyS.et... Complete...................................................... ....... ...., ....................................116;50 Total. Station SiJrveySet.......................................,....... ,.............. ....... .......................... ..,... ............ ....... ..65;00. T rolling Motor and. Battery ..... ,.; ,................................. ................. ...... ...... ................ ........ .......................; ..48~00 Vehicles and Trailers. . 4WD AIl~ Tern;ilnVehicle . ................................................................ ................ ......................... ...............,89.50 Air Sampling Trailer ..................................................... .................................... .........,................ ..... ..........38.00 Heavy Trailer Mileage (in addition to vehicle mileage at IRS rate}.~......................,........,.....................,....0.25 Utility Trailer :.;... ................. .......... ........... ......... ............. ...................... ............................. ,. ...,............ ....... .35.00 Vehicle - 2WO Field ............ ................... ..............................,...........................................................,.......45;00 Vehicle - 4WO: Field..............., ..........................................................................,........ ............,..".,............60.00 Vehlt<le -per$()lJal (Q)........................ ............................................. .............................. ,....;,. ....,...............45.00 Vehicle - .CuPe Truck .................................................... ...................... ...................,........................,.........75.00 Vehicle - UImty. (bl).. ..."............;........ ............. .;.......... ... ................... .......... .....,. .:......; ,.,.. ..,~,. ...... ...,.... ..,...35.00 Vehicle Mileage (company and personal)..........................................................,.....,..........;..........,...IRS Rate CommunicationS8ncllmaging 35mrn .Carneras (c:Iay) ......................................................................... .............~.................................,.......3.00 Cellular Telephcmesilncluding Air Time (day) ............................................... ......... .~...............................11.00 Digital.CamerCl.Kit ;;.....;.................................. ..................................... ..... .................... ..,...... ...................1.2.00 Professlonal.Format Still Camera Kit................... ......... ......................;.... ... ........ ...... ...... ........... ..............75.50 Video .Camera .(day).......................................................................... ..........,.......................;..........,........,20.00 Expendai)re Field Supplies 3/8-lnch.J.O: PVC Tubing (per foot) .....................,.....................................................................................0.35 3/8-lnch I.D. Silicone Pump Tubing (per foot)............................................................................................6.15 35mm Print Film -12 Exposure (roU) .........................................................................................................3.95 35mm Print Film - 24 Exposure (roll) .........................................................................................................5.25 35mm Print.Film - 36 Exposure (roll) .........................................................................................................6.85 35mm Slide Film- 24 Exposure (roU).........................................................................................................7.60 35mm Slide Film - 36 Exposure (roll).......................................................................................................10.50 ::ODMAIPCDOCSID0CS\247821\1 BARR Rental Equipment Rate Schedule-2007 (Alphabetized) (see general and end notes) Rev. 01/01/07 Sheet 5 of 5 Description Daily Rate (dollars) 4-mil Quart ReclosableBag.(pack .of 50)...................................................................................................3.25 500 ml Disposable Filtration Apparatus (each) .....;.... ........ .......... ............ ................................................13.00 Acid Suit (ea.ch) ......... ............... ..... ...i....... ................. ................................ .... ,..... ....................................70.00 Bact Covers. {pair).......,..........,.................. ,.............. ..... ........................ ........................... ............ ............. .4.05 Colorimetric Water Analysis Kit (each test) ...............................................................................................1.90 Compressed Air (e~ch'300 '<:t).. .......,... ...... ......... ............................. ...... .................... ....... .......................16.;00 Compressed Air (each 45 cf}..... ......... .......... ...... ,........ ..................... ........ ................................................ ..2.50 Detector Tubes (each) .............. ..,........,.......................... ....... ................. ......... ...........................................7.00 Disposable ?5mm .camera (each) ................................. ............... ...... .............. ............. ..........................13.50 Disposable PanoramIc .camera (each).........,................ ....... ...... .............................................. ...............11;75 Distilled Water (each).............,..........................................................................................................,.........3.:50 D()tGlove {pair)......:.,.;................... ........................... .,........................................... .....................................1..50 Encore Sampler ~..25 Gi'am.......................................................................................................................10.00 Fabric Soil Sample. Bag .(each) .............................................................. ...... .,. ..... .......................................:3.75 Field Book/Construction. Diary ...... .................,............................. ...........,..... .................................... ,......18.00 Five. GalloTl :Pail with. Lid. .....,.. .................................................................... ........ ........ .................................8.00 Ice (per bag)......;...,..........,................................................................... .................. ....... ........ ..................~ ...1.50 In..Line Gr()undwater Filter (each)........,... ...... ................. ............................... ............ ................. ...............1:6.00. Lath, 4' (bundle) ....................,.......................... ........................... ......... ....................... ..... ..........., ..............19;25 Lock (each) ~.... .....,..,."................................................................................................. ..... .......... .......,..... ...13.75 Ne9prene, Glovel:; (p~ir).......:..... ...................,................................ ............................ ............................,....3,75 Nitrile Gloves (pliir)'......... ...~,'.:...... .."..... ... .................................................... ...... ............... ........................2;35.. Paint .Ca.n,A-G~iIlCin i:mpty (e.ach) .................................................. .............................................................1;25. Paper T Clwe.h~(per'roll);;..,'... ;... '" .,., .............. ................. ............ ..................................... ................. ..... ...... ..1.21) Poly-Coated'TyYek :c:overall' (each>. .....;....... ................... ................................. ...................................;.......7;75. Respirator Cartridge.s (each)~. .,.................... .......,............................................. ..................................,.....12.75 Sarl:mex Tyvek .Coverall (each)............................................................................. ............................ ........~ 1.9.00 ~r~~y~~;~\~~:).::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::4t~~ Stakes (bundle)....................., ............................................................................... ............... .......... ........ ..16;00. Surgical. Gloves (pair) . .,. ................................................................................................ ..................... ........ .0..30. Tyvek/Kleenguard Coverall (each)................ ..............;...... .............. .... ................. .................... .................6.75 Viton Gloves (pak) '....................................;................................ ...... ....... .............. ................... ................50.;00 Weighted Disposable Bailer (each) ...............................................................................................,...........4. 75 Winter Glove Liner,(pair).....,.. .......... ........... ...................... ........................ ........................ ................ ...... ...3. 00. Winter Gloves (pair).............."....... ....,................................................................................. ..............~........8.65 General Notes: - Applicable to all Equip/l1Elnt Listedoii this Schedule 1.) Minimumreiital l>filiod is 0;5 days. 2.} Rental chargesbegiii on theftrst day the equipment is used on a projecl 3.} Renta! chargesEmd on thelasi day the equlpinentis used on a project. 4.) . A 25 percent weekly rate. dlsc.ount will applyioe<juipmentrenlill for 5 or more days 5.) A 40 percentmcintfilydlsoountwlllapj:ilytoequlpmerit rental for 20 or more days. G.} EquivalEint equipmeritfmcidels niay be substituted for the items listed. EndNotes - Applicable to Only thegquipment Noted .. .. .. . a.} Analyzer SUPpc1I1Kiljncludes th.efolloWiI19: Airflow KIt, Total Hydrocarbon Analyzer. NOX Analyzer, CO Analyzer, 02 Meier, S02 Analyzer, co2l02 AJ'lalyZer,H.ealedSample Une (50'), HeatedSample UneJ100'}, Gas Conditioner, Heated Filter Box, Single Pen Recorder. Dual Pen Strip Chart; pata logger,C3/C4 Cal Gases (set), NOXlS02CalGases (set). CO Cal Gases (set). C02l02 Cal Gas {set of 2}, S02Cal Gas (set of 2). C3 Regulator Set, NOXlS02 Regulators {set of 2}. and CO/C02l02 Regulators (set of 2) b.} Vehicles older than 1997 c.) Employee personal vehicles subjected to. field. off-site, transport or other severe duty. ::OOMA\PCDOCS\DOCSI247621\1 BARR Copy Production Rate Schedule-2007 Companywide Rev. 01/01/07 Sheet 1 of 1 Description Rate (dollar~) Reproduction Photo Copies (large format): All sIZE:l$ ...................................... ... .... ......................... ........ ............... ........ ............; ...... ............ .... 2.00. Xerox Copier: e~~~~s0;:k)':::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::g:~~. Photocopies (8% x 11, 11 x 17)......:...;.;.........;.."................................................................................oJ)7' Fax ..... ...... ...... .......... ...... ............ ........HO......... ....... .....;. ... .......... ...... ......; ....;..;.. ......... .... .......... ....... ...... 0;75 Color Copies ..................................................................................................................................... .0.80., Plotter: BondN ellum ....................... .........; .,..................... .... ............................... ........................... 2.00/sq. ft Photo Grade .............. ...."... ..... .::.. ...... ..... .;.............. ............. .......... ...... ............... ........ ...... 4.00/sq. ft. Laser (11 x 17) ........................'..........;.....;.;.................;.... ..................... ....................................,.. 0.50 Xeroxrrektronix Color Printers; A;' &a:"SlZe: All sizes.., ..... ......... ........,.....; ..;.. ..... ..:............ ........;................... ................ ;......... ...... ...... .....;..... ,.;, 0;5,0'. Overhead Transparency.'.... ... ..... .... ......; ....,. .... ...,...................................................... ..................;.1 :.00 Binding (eaCh) . . . DE:lpendent on size ............... ..... .......,..,...,.............,......... ..... ................. ........................ ...........2.00-1 0;00' ::ODMA\?CDOCS\DOCS\247824\1 BARR Special Computer RateSchedule-2007 Companywide Rev. 01J01/07 Sheet 1 of 1 Description Rate (dollar!;) IBM - PC A Software......................................................................................:............................................ .$15/hour (ArcCAD; J;quisChertlistr'y,fastTAB.s;Ge()Base,GMS, MLAE.M, MT3D, MYGRT, Risk Asslstant,SEEP; SIGMA,SLAEM,VEXCEL, WSPPO. XP-SWMM) ,8. Software....... ... ..... ...~.......... ... :T. ;'. ..;.. ......... ............ ........ ................... ..'.. .,.... :.... ...,. ............................. $8/hour {ACf\D:-L T,ALGOR; AQTESc>t.V, ArcVi~v.r.BarrAirEirllsslbn~,>bAMI3R~, [)ecartes; Fi;AC.GiNT .(P9riI19 Log),GT:Gs..ljydrqGAP,.HYdro~(). Gliertl.(pipe.r& stiffPI()~s),. . IheXpress, LaheyCornpUer.LlMS,.Lo(iPlot (bOririg.199~),.MocleICAPi'MoDIMIS;,PASGE- pfaht CAb,SESbIL; SLOPE,SbbA,STMt>;StratgraphicS, SQRJ=ER,Systat, TGRAF) D SoftwClre (lVIinneClPolis) .al1d.F. software.(Hibbing) ... .....; ... ......................................... .... ............$6/hour (ACAO, ACAD~Ll,CADOVerlay, Eagle Pqint, MicroStatioi'1 PC, Probelt, Siteworks) . . I Software................... ...;........... .... .... .....' :.................................... .';.............. ..';. .................................. .$20/hour (PASCE-Plant Schema,. PASCE~Plar'ltVie1N) J Software................. :....................:.....:. ..;.... ........ ............ ,;;. ;.; ;;...........;;..;.....~.............................. .$40/hou.r (JK Simnlet) T Software........... ..;.,. .......... ...." ;.~....;..... .;;...................... :...........,.. .;.......... '........................... ........ $25/h6ur (Digiti:iing~ndVideo Equipment) . , General use software isnot$urcharged. ::ODMA\PCOOCS\DOCS\247825\1 APPENDIX "A" FEASIBILITY REPORT OUTLINE I. THE REPORT SHALL CONTAIN ALL THE INFORMATION, OPINIONS, AND CONCLUSIONS REQUIRED BY MINN. STAT. ~ 429.031. II. COVER A. Project Number B. Brief Project Description and Location C. Date D. Engineering Firm Preparing Report E. Professional Engineer's Certification III. REPORT A. Project History 1. Feasibility Report Initiation a. Petitions Received b. Dates of City Council Action 2. Previous Reports with Estimated Costs a. Assessment in Software b. Environmental Issues c. Traffic 3. Previous Action B. Description of Construction Elements 1. Sanitary Sewer 2. Watermain 3. Storm Sewer 4. Streets 5. Street Lighting A-I 6. Other 7. Etc. a. Alternates for Each Element b. Details Unique to the Project I) Constraints 2) Effects on Overall Systems 3) Alternatives C. Maintenance Impact 1. Unusual Maintenance Requirements 2. Operations and Maintenance Cost of Alternates D. General Estimated Costs I. Breakdown of Each Element (project to time of construction) a. Sanitary b. Watermain c. Etc. E. Right-of-Way and Easements 1. General Description of Possible Easements 2. Cost Estimates for Easements F. Financing 1. Special Assessments 2. State Aid 3. County Aid 4. Effects on City Accounts a. Sanitary Sewer Trunk Account b. Water Trunk, Source and Storage Accounts G. Projected Timetable 1. Public Hearing 2. Plans and Specifications A-2 3. Advertising Requirements 4. Bid Receipt Date 5. Anticipated Construction Schedule 6. Anticipated Assessment Date H. Non-Petitioning Properties Affected 1. Estimated Assessments 1. Rates 2. Maps and Drawings Showing Benefited Areas 3. Legal Descriptions of Benefited Area as Required by State Statute for Public Hearing Notice 4. Preparation of "Preliminary Assessment Roll" 5. Assessment Analysis for Typical Property J. Controversial Aspects 1. Unusually High Assessment Rates 2. Buildable/Non-buildable Property Involved 3. Percentage PetitionedINon-petitioned K. Conclusion 1. Statement L. Recommendations A-3 APPENDIX "B" DUTIES, RESPONSIBILITIES AND LIMITATIONS OF AUTHORITY OF THE RESIDENT PROJECT REPRESENTATIVE ENGINEER shall furnish a Resident Project Representative ("RPR"), assistants and other field staff to assist ENGINEER in monitoring performance of the work of Contractor( s). Through more extensive on-site observations of the work in progress and field checks of materials and equipment by the RPR and assistants, ENGINEER shall provide further protection for OWNER against defects and deficiencies in the work of Contractor(s); but, the furnishing of such services will not make ENGINEER responsible for or give ENGINEER control over construction means, methods, techniques, sequences, or procedures, or for safety precautions or programs, or responsibility for Contractor( s)' failure to perform the work in accordance with the Contract Documents and in particular the specific limitations set forth in paragraph 1.6 of the Agreement are applicable. The duties and responsibilities of the RPR are limited to those of ENGINEER in ENGINEER'S agreement with the OWNER and in the construction Contract Documents, and are further limited and described as follows: A. GENERAL RPR is ENGINEER'S agent at the site, will act as directed by and under the supervision of ENGINEER, and will confer with ENGINEER regarding RPR's actions. RPR's dealings in matters pertaining to the on-site work shall in general be with ENGINEER and Contractor(s) keeping OWNER advised as necessary. RPR's dealings with subcontractors shall only be through or with the full knowledge and approval of Contractor(s). RPR shall generally communicate with OWNER with the knowledge of and under the direction of ENGINEER. B. DUTIES AND RESPONSIBILITIES OF RPR 1. Schedules. Review the progress schedule, schedule of Shop Drawing submittals and schedule of values prepared by Contractor( s) and consult with ENGINEER concerning acceptability. B-1 2. Conferences and Meetings. Attend meetings with Contractor(s), such as pre-construction conferences, progress meetings, job conferences and other Project-related meetings, and prepare and circulate copies of minutes thereof. 3. Liaison. a. Serve as ENGINEER'S liaison with Contractor(s), working principally through Contractor( s)' superintendent and assist in understanding the intent of the Contract Documents; and assist ENGINEER in serving as OWNER'S liaison with Contractor(s) when Contractor(s)' operations affect OWNER'S on-site operations. b. Assist in obtaining from OWNER additional details or information, when required for proper execution of the work. 4. Shop Drawings and Samples. a. Record date of receipt of Shop Drawings and samples. b. Receive samples which are furnished at the site by Contractor(s), and notify ENGINEER of availability of samples for examination. c. Advise ENGINEER and Contractor( s) of the commencement of any work requiring a Shop Drawing or sample if the submittal has not been approved by ENGINEER. 5. Review of Work, Rejection of Defective Work, Inspections and Tests. a. Conduct on-site observations of the work in progress to assist ENGINEER in determining if the work is in general proceeding in accordance with the Contract Documents. b. Report to ENGINEER whenever RPR believes that any work is unsatisfactory, faulty or defective or does not conform to the Contract Documents, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made; and advise ENGINEER of work that RPR believes should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection or approval. B-2 c. Verify that tests, equipment and systems start-ups and operating and maintenance training are conducted in the presence of appropriate personnel, and that Contractor( s) maintain adequate records thereof; and observe, record and report to ENGINEER appropriate details relative to the test procedures and start-ups. d. Accompany visiting inspectors representing public or other agencies having jurisdiction over the Project, record the results of these inspections and report to ENGINEER. 6. Interpretation of Contract Documents. Report to ENGINEER when clarifications and interpretations of the Contract Documents are needed and transmit to Contractor( s) clarifications and interpretations as issued by ENGINEER. 7. Modifications. Consider and evaluate Contractor(s), suggestions for modifications in Drawings or Specifications and report with RPR's recommendations to ENGINEER. Transmit to Contractor(s) decisions as issued by ENGINEER. 8. Records. a. Maintain at the job site orderly files for correspondence, reports of job conferences, Shop Drawings and samples, reproductions of original Contract Documents including all Work Directive Changes, Addenda, Change Orders, Field Orders, additional Drawings issued subsequent to the execution of the Contract, ENGINEER'S clarifications and interpretations of the Contract Documents, progress reports, and other Project related documents. b. Keep a diary or log book, recording Contractor(s)' hours on the job site, weather conditions, data relative to questions of Work Directive Changes, Change Orders or changed conditions, list of job site visitors, daily activities, decisions, observations in general, and specific observations in more detail as in the case of observing test procedures; and send copies to ENGINEER. c. Record names, addresses and telephone numbers of all Contractor( s), subcontractors and major suppliers of materials and equipment. 9. Reports. B-3 a. Furnish ENGINEER periodic reports as required of progress of the work and of Contractor( s)' compliance with the progress schedule and schedule of Shop Drawing and sample submittals. b. Consult with ENGINEER in advance of scheduled major tests, inspections or start of important phases of the work. c. Draft proposed Change Orders and Work Directive Changes, obtaining backup material from Contractor(s) and recommend to ENGINEER Change Orders, Work Directive Changes, and Field Orders. d. Report immediately to ENGINEER and OWNER upon the occurrence of any accident. 10. Payment Requests. Review applications for payment with Contractor(s) for compliance with the established procedure for their submission and forward with recommendations to ENGINEER, noting particularly the relationship of the payment requested to the schedule of values, work completed and materials and equipment delivered at the site but not incorporated in the work. 11. Certificates, Maintenance and Operation Manuals. During the course of the work, verify that certificates, maintenance and operation manuals and other data required to be assembled and furnished by Contractor( s) are applicable to the items actually installed and in accordance with the Contract Documents, and have this material delivered to ENGINEER for review and forwarding to OWNER prior to final payment for the work. 12. Completion. a. Before ENGINEER issues a Certificate of Substantial Completion, submit to Contractor( s) a list of items requiring completion or correction. b. Conduct final inspection in the company of ENGINEER, OWNER and Contractor(s) and prepare a final list of items to be completed or corrected. c. Observe that all items on final list have been completed or corrected and make recommendations to ENGINEER concerning acceptance. B-4 C. LIMITATIONS OF AUTHORITY Resident Project Representative: 1. Shall not authorize any deviation from the Contract Documents or substitution of materials or equipment unless authorized by ENGINEER. 2. Shall not exceed limitations of ENGINEER'S authority as set forth in the Agreement or the Contract Documents. 3. Shall not undertake any of the responsibilities of Contractor( s), subcontractors or Contractor( s)' superintendent. 4. Shall not advise on, issue directions relative to or assume control over any aspect of the means, methods, techniques, sequences or procedures of construction unless such advice or directions are specifically required by the Contract Documents. 5. Shall not advise on, issue directions regarding or assume control over safety precautions and programs in connection with the work. 6. Shall not accept Shop Drawing or sample submittals from anyone other than Contractor(s). 7. Shall not authorize OWNER to occupy the Project in whole or in part. 8. Shall not participate in specialized field or laboratory tests or inspections conducted by others except as specifically authorized by ENGINEER. B-5