2. 2008 Proposed Budget and CIP
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
~
MEMORANDUM
TO:
Mayor
City Council
FROM:
&,7.
c-,~.
Greg Sticha, Finance Director
DA TE:
December 10, 2007
SUBJ:
Adoption of the Proposed 2008 Budget and CIF
The City of Chanhassen has gone through an extensive process in evaluating its
budgets and capital improvement plans (CIF) for 2008 through 2012. This
process was finalized with the Truth-in-Taxation hearing last Monday. Staff is
recommending that the 2008 Budget and the CIP be adopted as presented.
BACKGROUND
The final 2008 Budget being adopted is for a total levy of $9,834,965, which is
$259,187 or 2.7% more than the 2007 levy. The final levy is $20,000 less than
the preliminary levy of $9,854,965 and includes $250,000 for roads in 2008.
Total spending before transfers in the General Fund only increased $105,900 or
1.17% from the previous year's general fund expenses. This include~ a new
public safety position and wage increases for all general fund employees. The
total levies for bonding of debt/streets and expenses for streets increased
$116,262 (6% more than 2007). This amount includes $250,000 for streets in
2008 that was not included in 2007. The average homeowner should see no
increase in the city portion of their property tax bill, and in most cases, residents
will see a slight decrease.
CIP
The CIF funds larger construction and building projects such as a public works
facility, a fire station, and the eventual construction of a second water treatment
plant. The CIF also accounts for other infrastructure purchases such as streets,
water lines and wells, storm water construction and upgrades, and sanitary sewer
lines. In addition, the CIP funds our capital replacement fund with a levy of
$824,000 on an annual basis, to fund ongoing equipment replacements and
purchases.
The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play.
Adoption of the Proposed 2008 Budget and CIP
December 10, 2007
Page 2 of2
RECOMMENDA TION
Staff recommends that the City Council adopt the 2008 Budget and CIP as
presented on December 10, 2007. Approval of the budget requires a simple
majority vote of those present.
ATTACHMENTS:
1. Proposed Resolution Adopting the 2008 Budget & CIF
2. PowerPoint Presentation: 2008 Budget & CIF Adoption
3. 2008 Budget
4. 2008-12 CIF
5. 2008 Final Levy Impact Spreadsheet
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE:
December 10. 2007
RESOLUTION NO:
2007 -
MOTION BY:
SECONDED BY:
A RESOLUTION ADOPTING THE 2008 BUDGET AND
ESTABLISHING TAX LEVIES FOR 2007, COLLECTIBLE IN 2008
WHEREAS, the City Council has examined the budgetary and tax levy needs for
Chanhassen for the calendar year 2008 through detailed public budget meetings; and
WHEREAS, the Truth in Taxation meeting was held to receive public input into the budget
and tax levy for 2008;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Chanhassen that the 2008 Budget for the City of Chanhassen is adopted with revenue and
expenditure amounts for the General Fund of $9,318,300, Special Revenue Funds of $19,500, and
$154,500 respectively which are detailed in the 2008 Budget which is made part of this motion by
reference; and
BE IT FURTHER RESOLVED that the City Council of the City of Chanhassen adopts a
tax levy of $824,000 for the purpose of equipment upgrades and purchases for 2008; and
BE IT FURTHER RESOLVED that the City Council of the City of Chanhassen adopts a
CIP for years 2008-2012 in the total amount of $85,536,300; and
BE IT FURTHER RESOLVED that the City Council of the City of Chanhassen
determines that certain bonded indebtedness levies are hereby adopted to meet statutory
requirements and bond covenants and that the County Auditor is hereby authorized to spread the
adopted bonded debt levies as shown on the attached Tax Levy Certification document; and
BE IT FURTHER RESOLVED that the City of Chanhassen authorizes the County
Auditor to levy the amounts shown on the attached Tax Levy Certification document upon taxable
property in the City of Chanhassen in 2007 for collection in 2008, as set forth in the attached Tax
Levy Certification document.
Passed and adopted by the Chanhassen City Council this 10th day of December, 2007.
AITEST:
Todd Gerhardt, City Manager
Thomas A. Furlong, Mayor
YES
NO
ABSENT
GENERAL GOVERNMENT
1110 Legislative
1120 Administration
1130 Finance
1140 Legal
1150 Assessing
1160 MIS
1170 City Hall
1180 Elections
1190 Library Building
TOTAL
LAW ENFORCEMENT
1210 Law Enforcement
1220 Fire
1250 Building Inspection
1260 CSO
TOTAL
PUBLIC WORKS
1310 Engineering
1320 Street Maintenance
1350 Street Lighting
1370 Vehicle Maintenance
TOTAL
COMMUNITY DEVELOPMENT
1410 Planning Commission
1420 Planning Administration
1430 Senior Commission
* TOTAL
PARKS & RECREATION
1510 Park & Rec. Commission
1520 Park Administration
1530 Recreation Center
1540 Lake Ann
1550 Park Maintenance
1560 Senior Center
1600 Recreation Programs
1700 Self-Supporting Programs
TOTAL
Total Operational Expenditures
Transfer for Roads
** TOTAL GENERAL FUND
CITY OF CHANHASSEN
2008 BUDGET
Expenditures
Personal Materials & Contractual Capital 2007 %
Services Supplies Services Outlay Total Total Change
34,200 200 100,500 - 134,900 123,400 9.32%
374,500 500 59,900 - 434,900 438,000 -0.71%
210,600 300 91,500 200 302,600 318,000 -4.84%
- - 168,000 - 168,000 168,000 0.00%
- - 101,600 - 101,600 100,100 1.50%
163,600 2,400 119,300 - 285,300 281 ,200 1.46%
68,400 42,300 282,100 - 392,800 428,600 -8.35%
21,500 - 6,400 - 27,900 19,700 41.62%
- 3,000 107,200 - 110,200 102,200 7.83%
872,800 48,700 1,036,500 200 1,958,200 1,979,200 -1.06%
75,100 - 1,427,000 - 1,502,100 1,333,700 12.63%
510,600 47,000 116,000 - 673,600 678,600 -0.74%
658,800 8,700 23,400 - 690,900 756,100 -8.62%
55,300 4,000 13,700 - 73,000 69,200 5.49%
1,299,800 59,700 1,580,100 - 2,939,600 2,837,600 3.59%
506,500 900 29,900 300 537,600 528,400 1.74%
599,700 133,500 33,000 1,300 767,500 786,500 -2.42%
- 4,500 315,400 - 319,900 314,900 1.59%
241,700 150,400 46,500 6,000 444,600 459,600 -3.26%
1,347,900 289,300 424,800 7,600 2,069,600 2,089,400 -0.95%
- 200 4,000 - 4,200 4,200 0.00%
367,800 700 14,100 - 382,600 377,600 1.32%
20,100 - 15,200 - 35,300 30,100 17.28%
387,900 900 33,300 - 422,100 411,900 2.48%
- 200 2,000 - 2,200 2,200 0.00%
118,500 1,000 9,600 - 129,100 123,500 4.53%
212,700 11,500 77,000 - 301,200 269,100 11.93%
13,800 9,100 51,400 - 74,300 71,800 3.48%
661,300 81,300 88,200 4,000 834,800 819,600 1.85%
36,900 4,300 19,500 - 60,700 52,400 15.84%
165,800 17,100 93,500 - 276,400 274,200 0.80%
26,900 5,200 68,000 - 100,100 131,500 -23.88%
1,235,900 129,700 409,200 4,000 1,778,800 1,744,300 1.98%
5,144,300 528,300 3,483,900 11,800 9,168,300 9,062,400 1.17%
150,000
9,318,300 9,062,400 2.82%
CITY OF CHANHASSEN
2008 BUDGET
REVENUE
101 General Fund
2006 2007 2007 2008 Inc Over
ACCOUNT DESCRIPTION ACTUAL BUDGET PROJECTED BUDGET PY Budget
GENERAL PROPERTY TAX
3010 Current Property Tax 6,121,408 6,558,100 6,558,100 6,833,900 4.2%
3002 Allowance for Delinquent Taxes (320,000) (320,000) (320,000)
3011 Delinquent Property Tax 63,896 50,000 50,000 50,000
3041 Homestead & Ag Credit
3090 Other Property Taxes 8
3500 Local Government Aid
TOTAL GENERAL PROPERTY TAX 6,185,312 6,288,100 6,288,100 6,563,900 4.4%
LICENSES
3203 Dog Kennel 900 500 500 500
3205 Dog or Cat 5,257 4,500 4,500 5,000
3213 Solicitor 300 500 500 500
3223 3.2 Off and On Sale 2,225
3226 Liquor On and Off Sale 79,977 84,000 84,000 84,000
3227 Club and Sunday 1,600
3230 Rental Housing Licenses 5,950 15,000 15,000 15,000
3284 Rubbish 3,600 3,000 3,000 3,000
* TOTAL LICENSES 99,809 107,500 107,500 108,000 0.5%
PERMITS
3301 Building 700,450 825,000 725,000 725,000
3302 Plan Check 365,892 330,000 330,000 330,000
3305 Heating & NC 119,392 120,000 120,000 120,000
3306 Plumbing 94,641 85,000 85,000 95,000
3307 Trenching 42,707 35,000 35,000 35,000
3308 Gun 700 1,000 1,000 1,000
3309 Sprinkler 11,448 14,000 14,000 14,000
3311 Sign 7,255 6,500 6,500 7,500
3320 Stable 220 300 300 300
3330 Elec Permit App Forms 104
3331 Firework's Application Fee 400
3390 Misc. Permits 2,945 1,000 1,000 2,000
* TOTAL PERMITS 1,346,155 1,417 ,800 1,317,800 1,329,800 -5.7%
FINES & PENALTIES
3401 Traffic & Ordinance Violation 152,365 130,000 140,000 150,000
3402 Vehicle Lockouts 2,450 2,500 2,500 2,500
3404 Dog/Cat Impound 6,583 4,000 4,000 5,000
3405 Other Fines and Penalties 1,548
* TOTAL FINES & PENALTIES 162,946 136,500 146,500 157,500 15.4%
INTERGOVERNMENTAL REVENUE
3509 Other Shared Taxes 175,685 165,000 165,000 175,000
3510 Grants-State 61,424 40,000 40,000 50,000
* TOTAL INTERGOVERNMENTAL REV 237,109 205,000 205,000 225,000 9.8%
CITY OF CHANHASSEN
2008 BUDGET
REVENUE
101 General Fund
2006 2007 2007 2008 Inc Over
ACCOUNT DESCRIPTION ACTUAL BUDGET PROJECTED BUDGET PY Budget
CHARGES FOR CURRENT SERVICES
3601 Sale of Documents 979 4,000 1,000 1,000
3602 Use & Variance Permits 52,360 45,000 35,000 40,000
3603 Rezoning Fees 2,500 2,000 2,000 2,000
3604 Assessment Searches 720 500 500 500
3605 Plat Recording Fees 15,288 10,000 7,000 7,000
3607 Election Filing Fees 30
3613 Misc.-General Government 8,026 10,000 10,000 10,000
3614 Admin. Charge-2% Constr. 146,687 120,000 50,000 50,000
3615 Admin. Charge-5% Street Re-Constr. 32,000
3617 Engineering General 1,336 1,000 1,000 1,000
3619 Investment Management Fee 75,000 75,000 75,000 75,000
3629 Misc.-Public Safety 6,138 4,000 4,000 5,000
3630 Recreation Program Fees 24,813 30,000 30,000 38,100
3631 Recreation Center 121,671 135,000 125,000 114,000
3633 Park Equipment Rental 222 200 200 200
3634 Park Facility Usage Fee 9,747 12,000 12,000 12,000
3635 Watercraft Rental 4,466 4,000 4,000 4,000
3636 Self-Supporting Programs 172,924 160,000 175,000 180,000
3637 Senior Programs 27,078 30,000 30,000 30,000
3638 Food Concessions 11,971 12,000 12,000 12,000
3639 MiSC.-Park & Rec. 765 800 800 800
3641 Youth Sport Donation 32
3649 MiSC.-Public Works 14,400 5,000 5,000 5,000
3651 Merchandise Sales 1,886 1,500
3670 Internment Fee 250
* TOTAL CURRENT SERVICES 699,290 660,500 579,500 621,100 -6.0%
OTHER REVENUE
3801 Interest Earnings 133,405 70,000 110,000 125,000
3802 Equipment Rental & Sale 107,384 110,000 110,000 125,000
3803 Building Rental 1,613
3804 Land Sale 1,600
3807 Donations 26,122 20,000 20,000 20,000
3808 Ins. Recoveries & Reimburse 10,024 5,000 5,000 5,000
3816 SAC Retainer 70,169 5,000 155,000 5,000
3818 Sur-Tax Retainer 954 1,500 1,500 1,500
3820 Misc. Other Revenue 110 5,000 1,000 1,000
3829 Interest/Penalties-Other 500 500 500
3903 Refunds/Reim bu rsements 34,546 30,000 30,000 30,000
3910 Misc. Revenue 323
* TOTAL OTHER REVENUE 386,249 247,000 433,000 313,000 26.7%
** TOTAL GENERAL FUND REVENUE 9,116,869 9,062,400 9,077,400 9,318,300 2.8%
TOTAL GENERAL FUND EXPENDITURES 9,318,300
NET LEVY REMAINING (Use of Gen Fund Reserves)
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1110 Legislative
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4020 Salaries & Wages-Temp 27,100 31,600 31,600 0.0%
4030 Contributions-Retirement 2,083 2,500 2,500 0.0%
4050 Workers Compensation 72 100 100 0.0%
* TOTAL PERSONAL SERVICES 29,256 34,200 34,200 0.0%
4210 Books & Periodicals 200 200 0.0%
TOTAL MATERIALS & SUPPLIES 200 200 0.0%
4300 Fees, Services 7,381 13,000 8,000 (38.5%)
4330 Postage 5,831 6,000 6,500 8.3%
4340 Printing & Publishing 44,631 37,000 47,000 27.0%
4360 Subscriptions & Memberships 27,730 28,000 29,000 3.6%
4370 Travel & Training 6,545 3,000 8,000 166.7%
4375 Promotional Expense 999 2,000 2,000 0.0%
* TOTAL CONTRACTUAL SERVICES 93,118 89,000 100,500 12.9%
** TOTAL LEGISLATIVE 122,373 123,400 134,900 9.3%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1120 Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 282,694 295,000 294,000 (0.3%)
4020 Salaries & Wages-Temp 6,000 6,000 0.0%
4030 Contributions-Retirement 35,453 41 ,1 00 37,800 (8.0%)
4040 Contributions-I nsurance 34,725 42,300 35,500 (16.1%)
4050 Workers Compensation 1,001 1,100 1,200 9.1%
* TOTAL PERSONAL SERVICES 353,872 385,500 374,500 (2.9%)
4120 Supplies-Equipment 901 200 200 0.0%
4130 Supplies-Program 100 100 0.0%
4210 Books & Periodicals 100 200 200 0.0%
TOTAL MATERIALS & SUPPLIES 1,001 500 500 0.0%
4300 Fees, Services 770 2,000 2,000 0.0%
4310 Telephone 1,566 1,500 2,400 60.0%
4330 Postage 20,716 13,000 16,000 23.1%
4340 Printing & Publishing 4,169 1,500 1,500 0.0%
4360 Subscriptions & Memberships 3,987 2,500 4,000 60.0%
4370 Travel & Training 6,833 5,500 8,000 45.5%
4380 Mileage 7,239 7,200 7,200 0.0%
4410 Rental-Equipment 18,778 18,500 18,500 0.0%
4530 Repair & Maintenance-Equip 172 300 300 0.0%
4807 Property Tax Expense 2,916 0.0%
4933 Sales Tax 0.0%
* TOTAL CONTRACTUAL SERVICES 67,146 52,000 59,900 15.2%
4703 Office Equipment 0.0%
* TOTAL CAPITAL OUTLAY 0.0%
** TOTAL ADMINISTRATION 422,020 438,000 434,900 (0.7%)
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1130 Finance
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 172,006 177,900 168,000 (5.6%)
4011 Overtime 541 200 200 0.0%
4030 Contributions-Reti rement 22,191 24,700 24,000 (2.8%)
4040 Contributions-I nsurance 21,807 22,200 17,400 (21.6%)
4050 Workers Compensation 641 1,000 1,000 0.0%
* TOTAL PERSONAL SERVICES 217,186 226,000 210,600 (6.8%)
4120 Supplies-Equipment 50 200 200 0.0%
4210 Books & Periodicals 100 100 0.0%
* TOTAL MATERIALS & SUPPLIES 50 300 300 0.0%
4300 Fees, Services 52,373 42,000 55,000 31.0%
4301 Fees, Financial/Audit 20,362 38,000 25,000 (34.2%)
4310 Telephone and Communications 283 300 300 0.0%
4330 Postage 200 200 0.0%
4340 Printing & Publishing 1,426 1,500 1,500 0.0%
4360 Subscriptions & Memberships 285 400 400 0.0%
4370 Travel & Training 4,202 9,000 9,000 0.0%
4530 Repair & Maintenance-Equip 100 100 0.0%
* TOTAL CONTRACTUAL SERVICES 78,931 91,500 91,500 0.0%
4703 Office Equipment 200 200 0.0%
* TOTAL CAPITAL OUTLAY 200 200 0.0%
** TOTAL FINANCE 296,167 318,000 302,600 (4.8%)
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1140 Legal
2007 to
2006 2007 2008 2008 _
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4302 Fees, Legal 158,768 168,000 168,000 0.0%
* TOTAL CONTRACTUAL SERVICES 158,768 168,000 168,000 0.0%
**
TOTAL LEGAL
158,768
168,000
168,000
0.0%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1150 Property Assessment
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4300 Fees, Services 94,264 100,000 101,500 1.5%
4340 Printing & Publishing 100 100 0.0%
* TOTAL CONTRACTUAL SERVICES 94,264 100,100 101,600 1.5%
**
TOTAL PROPERTY ASSESSMENT
94,264
100,100
101,600
1.5%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1160 M.I.S.
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 119,360 124,300 129,500 4.2%
4030 Contributions-Retirement 15,959 17,300 18,300 5.8%
4040 Contributions-I nsurance 16,250 17,900 15,300 (14.5%)
4050 Workers Compensation 427 500 500 0.0%
* TOTAL PERSONAL SERVICES 151,996 160,000 163,600 2.3%
4150 Maintenance Materials 743 1,300 1,300 0.0%
4210 Books & Periodicals 128 600 600 0.0%
4220 Software Licenses 8,908 0.0%
4260 Small Tools & Equipment 248 500 500 0.0%
* TOTAL MATERIALS & SUPPLIES 10,027 2,400 2,400 0.0%
4300 Fees, Services 57,370 78,100 86,100 10.2%
4310 Telephone 981 1 ,400 1 ,400 0.0%
4320 Utilities 11 ,160 12,600 12,600 0.0%
4350 Cleaning and Waste Removal 53 0.0%
4370 Travel & Training 23,351 21,700 14,200 (34.6%)
4530 Repair & Maintenance-Equip 3,820 5,000 5,000 0.0%
4933 Sales Tax 216 0.0%
* TOTAL CONTRACTUAL SERVICES 96,951 118,800 119,300 0.4%
** TOTAL M.tS. 258,974 281,200 285,300 1.5%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1170 City Hall
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 48,316 49,600 50,300 1.4%
4011 Overtime-Reg 3,780 2,000 3,500 75.0%
4030 Contributions-Reti rement 7,005 6,900 7,100 2.9%
4040 Contributions-I nsu rance 6,206 6,600 5,900 (10.6%)
4050 Workers Compensation 1,536 1,500 1,600 6.7%
- TOTAL PERSONAL SERVICES 66,844 66,600 68,400 2.7%
4110 Supplies-Office 37,793 37,000 37,000 0.0%
4120 Supplies-Equipment 193 1,000 1,000 0.0%
4140 Supplies-Vehicles 329 1,000 1,000 0.0%
4150 Maintenance Materials 4,077 3,000 3,000 0.0%
4260 Small Tools & Equipment 68 500 300 (40.0%)
TOTAL MATERIALS & SUPPLIES 42,460 42,500 42,300 (0.5%)
4300 Fees, Services 3,176 6,000 6,000 0.0%
4310 Telephone 14,189 16,000 16,000 0.0%
4320 Utilities 49,885 52,000 54,600 5.0%
4350 Cleaning & Waste Removal 34,108 33,000 35,000 6.1%
4440 License & Registration 15 100 100 0.0%
4483 Insurance-General Liability 133,119 205,500 163,000 (20.7%)
4510 Repair & Maintenance-Building 5,609 5,000 5,000 0.0%
4520 Repair & Maintenance-Vehicles 99 400 400 0.0%
4530 Repair & Maintenance-Equip 2,441 1,500 2,000 33.3%
4933 Sales Tax 44 0.0%
- TOTAL CONTRACTUAL SERVICES 242,684 319,500 282,100 (11.7%)
-- TOTAL CITY HALL 351,988 428,600 392,800 (8.4%)
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1180 Elections
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4020 Salaries & Wages-Temp 30.958 12.500 20.500 64.0%
4030 Contributions-Reti rement 217 1.000 1.000 0.0%
* TOTAL PERSONAL SERVICES 31.175 13.500 21.500 59.3%
4110 Office Supplies 372 200 200 0.0%
4300 Fees. Services 2.674 3,000 3,000 0.0%
4340 Printing & Publishing 4.057 2,000 2,000 0.0%
4370 Travel & Training 2,577 1,000 1,200 20.0%
* TOTAL CONTRACTUAL SERVICES 9.679 6,200 6,400 3.2%
** TOTAL ELECTIONS 40,854 19,700 27,900 41.6%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1190 Library Building
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4150 Maintenance Materials 3,545 2,000 3,000 50.0%
4260 Small Tools & Equipment 19 0.0%
* TOTAL MATERIALS & SUPPLIES 3,564 2,000 3,000 50.0%
4300 Fees, Services 559 1,000 1,000 0.0%
4310 Telephone 2,040 2,200 2,200 0.0%
4320 Utilities 67,872 63,000 67,000 6.3%
4350 Cleaning & Waste Removal 32,169 30,000 33,000 10.0%
4510 Repair & Maintenance-Building 5,942 2,000 2,000 0.0%
4530 Repair & Maintenance-Equip 1,772 2,000 2,000 0.0%
* TOTAL CONTRACTUAL SERVICES 110,354 100,200 107,200 7.0%
** TOTAL LIBRARY 113,918 102,200 110,200 7.8%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1210 Police Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 55,983 58,800 60,200 2.4%
4030 Contributions-Retirement 7,570 8,200 8,500 3.7%
4040 Contributions-I nsurance 6,164 6,700 5,900 (11.9%)
4050 Workers Compensation 382 500 500 0.0%
* TOTAL PERSONAL SERVICES 70,099 74,200 75,100 1.2%
4130 Program Supplies 3,973 5,000 5,000 0.0%
4300 Fees, Services 1,236,172 1,250,000 1 ,417 ,500 13.4%
4375 Promotional Expense 613 4,500 4,500 0.0%
* TOTAL CONTRACTUAL SERVICES 1,240,758 1,259,500 1,427,000 13.3%
** TOTAL POLICE ADMINISTRATION 1,310,857 1,333,700 1,502,100 12.6%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1220 Fire Prevention Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 128,215 133,500 132,000 (1.1%)
4011 Overtime 218 1,000 1,000 0.0%
4020 Salaries & Wages-Temp 135,284 160,000 160,000 0.0%
4030 Contributions-Reti rement 178,853 187,000 187,000 0.0%
4040 Contributions-I nsurance 18,089 19,600 16,100 (17.9%)
4050 Workers Compensation 12,762 14,500 14,500 0.0%
* TOTAL PERSONAL SERVICES 473,421 515,600 510,600 (1.0%)
4120 Supplies-Equipment 9,862 11 ,000 11 ,000 0.0%
4130 Supplies-Program 5,808 5,000 5,000 0.0%
4140 Supplies-Vehicles 4,216 7,000 7,000 0.0%
4150 Maintenance Materials 484 1,000 1,000 0.0%
4170 Motor Fuels and Lubrication 292 0.0%
4210 Books & Periodicals 1,230 1,000 1,000 0.0%
4240 Uniforms & Clothing 12,940 13,500 13,500 0.0%
4260 Small Tools & Equipment 4,467 5,000 5,000 0.0%
4290 Misc. Materials & Supplies 3,820 3,500 3,500 0.0%
* TOTAL MATERIALS & SUPPLIES 43,118 47,000 47,000 0.0%
4300 Fees, Services 11 ,369 16,500 16,500 0.0%
4310 Telephone 9,087 6,000 6,000 0.0%
4320 Utilities 24,462 23,000 23,000 0.0%
4330 Postage 76 0.0%
4350 Cleaning & Waste Removal 5,339 7,000 7,000 0.0%
4360 Subscriptions & Memberships 1,533 3,000 3,000 0.0%
4370 Travel & Training 19,012 10,000 10,000 0.0%
4375 Promotional Expense 8,483 9,000 9,000 0.0%
4440 License & Registration 18 0.0%
4483 Insurance-General Liability 1 ,405 1,000 1,000 0.0%
4510 Repair & Maintenance-Building 4,567 7,000 7,000 0.0%
4520 Repair & Maintenance-Vehicles 4,165 7,000 7,000 0.0%
4530 Repair & Maintenance-Equip 11 ,150 5,000 5,000 0.0%
4531 Repair & Maintenance-Radios 6,966 9,000 9,000 0.0%
4901 Refunds/Reim bu rsements 819 0.0%
Contribution for Performance 12,500 12,500 100.0%
4933 Sales Tax 389 0.0%
* TOTAL CONTRACTUAL SERVICES 108,840 116,000 116,000 0.0%
** TOTAL FIRE PREVENTION ADMIN 625,379 678,600 673,600 (0.7%)
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1250 Code Enforcement
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 458,938 524,000 484,400 (7.6%)
4011 Overtime-Reg 4,106 2,000 4,000 100.0%
4020 Salaries & Wages-Temp 30,000 30,000 0.0%
4030 Contributions-Reti rement 60,022 72,900 72,900 0.0%
4040 Contributions-I nsurance 69,566 91 ,700 64,100 (30.1%)
4050 Workers Compensation 2,843 3,400 3,400 0.0%
* TOTAL PERSONAL SERVICES 595,475 724,000 658,800 (9.0%)
4120 Supplies-Equipment 35 1,000 1,000 0.0%
4130 Supplies-Program 127 800 800 0.0%
4140 Supplies-Vehicles 1,487 1,500 1,500 0.0%
4210 Books & Periodicals 889 3,500 3,500 0.0%
4240 Uniforms & Clothing 891 1,500 1,500 0.0%
4260 Small Tools & Equipment 73 400 400 0.0%
* TOTAL MATERIALS & SUPPLIES 3,501 8,700 8,700 0.0%
4300 Fees, Services 83 1,000 1,000 0.0%
4310 Telephone 2,858 4,000 4,000 0.0%
4340 Printing & Publishing 1,017 2,000 2,000 0.0%
4360 Subscriptions & Memberships 520 1,000 1,000 0.0%
4370 Travel & Training 5,561 11,000 11,000 0.0%
4375 Promotional Expense 200 200 0.0%
4440 License & Registration 371 200 200 0.0%
4520 Repair & Maintenance-Vehicles 639 1,500 1,500 0.0%
4530 Repair & Maintenance-Equip 1 ,488 2,500 2,500 0.0%
4901 Refunds/Rei mbursements 550 0.0%
4933 Sales Tax 7 0.0%
* TOTAL CONTRACTUAL SERVICES 13,093 23,400 23,400 0.0%
** TOTAL CODE ENFORCEMENT 612,069 756,100 690,900 (8.6%)
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1260 Community Service
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4020 Salaries & Wages-Temp 37,013 47,000 47,000 0.0%
4021 Overtime-Temp 1,370 1,000 1 ,400 40.0%
4030 Contributions-Retirement 5,312 4,900 5,500 12.2%
4040 Contributions-I nsurance 568 600 600 0.0%
4050 Workers Compensation 794 700 800 14.3%
* TOTAL PERSONAL SERVICES 45,056 54,200 55,300 2.0%
4120 Supplies-Equipment 903 500 1,000 100.0%
4130 Supplies-Program 83 700 500 (28.6%)
4140 Supplies-Vehicles 1,235 700 700 0.0%
4210 Books & Periodicals 200 200 0.0%
4240 Uniforms & Clothing 2,032 1,800 1,600 (11.1%)
* TOTAL MATERIALS & SUPPLIES 4,252 3,900 4,000 2.6%
4300 Fees, Services 14,271 7,000 9,600 37.1%
4310 Telephone 896 1,000 1,000 0.0%
4340 Printing & Publishing 316 500 500 0.0%
4360 Subscriptions & Memberships 105 300 300 0.0%
4370 Travel & Training 644 700 700 0.0%
4440 License & Registration 15 0.0%
4520 Repair & Maintenance-Vehicles 170 1,000 1,000 0.0%
4530 Repair & Maintenance-Equip 99 300 300 0.0%
4531 Repair & Maintenance-Radios 303 300 300 0.0%
* TOTAL CONTRACTUAL SERVICES 16,819 11 ,100 13,700 23.4%
** TOTAL COMMUNITY SERVICE 66,127 69,200 73,000 5.5%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1310 Engineering
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 342,989 383,900 395,800 3.1%
4011 Overtime-Reg 1,595 1,000 1,500 50.0%
4020 Salaries & Wages-Temp 10,980 10,000 12,000 20.0%
4021 Temp/Seasonal Overtime 8 0.0%
4030 Contributions-Retirement 46,412 53,400 56,900 6.6%
4040 Contributions-I nsurance 35,977 46,300 37,700 (18.6%)
4050 Workers Compensation 2,178 2,800 2,600 (7.1 %)
4060 Unemployment 11,845 0.0%
* TOTAL PERSONAL SERVICES 451,984 497,400 506,500 1.8%
4120 Supplies-Equipment 32 200 200 0.0%
4140 Supplies-Vehicles 264 300 300 0.0%
4210 Books & Periodicals 335 400 400 0.0%
* TOTAL MATERIALS & SUPPLIES 631 900 900 0.0%
4300 Fees, Services 58,815 18,000 18,000 0.0%
4303 Engineering Consulting 2,008 0.0%
4310 Telephone 1,845 2,000 2,000 0.0%
4330 Postage 400 400 0.0%
4340 Printing & Publishing 1,297 1,100 1,100 0.0%
4360 Subscriptions & Memberships 1 ,405 1,200 1,200 0.0%
4370 Travel & Training 1 ,485 3,000 3,000 0.0%
4380 Mileage 200 300 50.0%
4440 License & Registration 29 300 300 0.0%
4520 Repair & Maintenance-Vehicles 500 500 0.0%
4530 Repair & Maintenance-Equip 1,879 3,000 3,000 0.0%
4531 Repair & Maintenance-Radios 100 100 0.0%
4933 Sales Tax 22 0.0%
* TOTAL CONTRACTUAL SERVICES 68,784 29,800 29,900 0.3%
4705 Other Equipment 300 300 0.0%
* TOTAL CAPITAL OUTLAY 300 300 0.0%
** TOTAL ENGINEERING 521,399 528,400 537,600 1.7%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1320 Street Maintenance
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INCIlDEC)
4010 Salaries & Wages-Reg 415,251 436,400 446,000 2.2%
4011 Overtime-Reg 5,104 10,000 5,500 (45.0%)
4020 Salaries & Wages-Temp 8,748 17,800 10,000 (43.8%)
4030 Contributions-Retirement 58,904 60,700 63,100 4.0%
4040 Contributions-I nsurance 59,172 72,900 55,000 (24.6%)
4050 Workers Compensation 18,960 17,500 20,100 14.9%
* TOTAL PERSONAL SERVICES 566,140 615,300 599,700 (2.5%)
4120 Supplies-Equipment 35,253 47,000 44,000 (6.4%)
4140 Supplies-Vehicles 24,623 28,000 28,000 0.0%
4150 Maintenance Materials 53,319 55,000 55,000 0.0%
4160 Chemicals 67 0.0%
4170 Motor Fuels & Lubricants 2,574 0.0%
4210 Books & Periodicals 100 100 0.0%
4240 Uniforms & Clothing 3,603 3,700 3,700 0.0%
4260 Small Tools & Equipment 392 2,700 2,700 0.0%
* TOTAL MATERIALS & SUPPLIES 119,830 136,500 133,500 (2.2%)
4300 Fees, Services 179 1,000 1,000 0.0%
4310 Telephone 3,292 3,500 3,500 0.0%
4340 Printing & Publishing 59 300 300 0.0%
4350 Cleaning & Waste Removal 19 300 300 0.0%
4360 Subscriptions & Memberships 1,118 100 100 0.0%
4370 Travel & Training 769 1,500 1,500 0.0%
4410 Rental-Equipment 1,500 1,500 0.0%
4440 License & Registration 571 600 600 0.0%
4510 Repair & Maintenance-Building 500 500 0.0%
4520 Repair & Maintenance-Vehicles 5,905 2,400 3,500 45.8%
4530 Repair & Maintenance-Equip 1,020 5,500 5,500 0.0%
4531 Repair & Maintenance-Radios 2,000 500 (75.0%)
4540 Repair & Maintenance-Streets 17,650 500 500 0.0%
4560 Repair & Maintenance-Signs 12,455 13,700 13,700 0.0%
4933 Sales Tax 1,493 0.0%
* TOTAL CONTRACTUAL SERVICES 44,530 33,400 33,000 (1.2%)
4703 Office Equipment 300 300 0.0%
4705 Other Equipment 700 1,000 1,000 0.0%
* TOTAL CAPITAL OUTLAY 700 1,300 1,300 0.0%
** TOTAL STREET MAINTENANCE 731,200 786,500 767,500 (2.4%)
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1350 Street Lighting & Signals
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DECl
4120 Supplies-Equipment 4,445 4,500 4,500 0.0%
* TOTAL MATERIALS & SUPPLIES 4,445 4,500 4,500 0.0%
4300 Fees, Services 300 300 0.0%
4310 Telephone 499 600 600 0.0%
4320 Utilities 282,764 290,000 295,000 1.7%
4530 Repair & Maintenance-Equip 1,678 2,500 2,500 0.0%
4565 Repair & Maintenance-Lights&Signals 11 ,499 17,000 17,000 0.0%
* TOTAL CONTRACTUAL SERVICES 296,440 310,400 315,400 1.6%
** TOTAL STREET LIGHT & SIGNALS 300,885 314,900 319,900 1.6%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1370 City Garage
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 202,322 187,400 177,700 (5.2%)
4011 Overtime-Reg 4,307 6,500 6,500 0.0%
4030 Contributions-Retirement 23,196 26,100 25,100 (3.8%)
4040 Contri butions-I nsu rance 28,738 32,000 26,600 (16.9%)
4050 Workers Compensation 5,584 6,000 5,800 (3.3%)
* TOTAL PERSONAL SERVICES 264,146 258,000 241,700 (6.3%)
4120 Supplies-Equipment 1,392 3,300 3,300 0.0%
4140 Supplies-Vehicles 371 500 500 0.0%
4150 Maintenance Materials 1,530 1,000 1,000 0.0%
4170 Motor Fuels & Lubricants 95,799 140,000 140,000 0.0%
4240 Uniforms & Clothing 1,586 1,200 1,200 0.0%
4260 Small Tools & Equipment 3,062 4,400 4,400 0.0%
* TOTAL MATERIALS & SUPPLIES 103,739 150,400 150,400 0.0%
4300 Fees, Services 1 ,425 1,300 1,300 0.0%
4310 Telephone 2,991 3,800 3,800 0.0%
4320 Utilities 19,200 23,000 23,000 0.0%
4340 Printing & Publishing 59 100 100 0.0%
4350 Cleaning & Waste Removal 9,186 6,100 7,400 21.3%
4360 Subscriptions & Memberships 200 200 0.0%
4370 Travel & Training 170 1,500 1,500 0.0%
4410 Rental-Equipment 349 500 500 0.0%
4440 License & Registration 65 500 500 0.0%
4510 Repair & Maintenance-Building 6,269 4,000 4,000 0.0%
4520 Repair & Maintenance-Vehicles 37 300 300 0.0%
4530 Repair & Maintenance-Equip 1,586 3,800 3,800 0.0%
4531 Repair & Maintenance-Radios 100 100 0.0%
4933 Sales Tax 32 0.0%
* TOTAL CONTRACTUAL SERVICES 41,368 45,200 46,500 2.9%
4703 Office Equipment 292 500 500 0.0%
4705 Other Equipment 4,773 5,500 5,500 0.0%
* TOTAL CAPITAL OUTLAY 5,065 6,000 6,000 0.0%
** TOTAL CITY GARAGE 414,318 459,600 444,600 (3.3%)
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1410 Planning Commission
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4210 Books & Periodicals 200 200 0.0%
TOTAL MATERIALS & SUPPLIES 200 200 0.0%
4340 Printing & Publishing 4,600 3,000 3,000 0.0%
4360 Subscriptions & Memberships 200 200 0.0%
4370 Travel & Training 601 800 800 0.0%
TOTAL CONTRACTUAL SERVICES 5,201 4,000 4,000 0.0%
** TOTAL PLANNING COMMISSION 5,201 4,200 4,200 0.0%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1420 Planning Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 271,977 283,200 289,700 2.3%
4030 Contributions-Retirement 35,822 39,400 41,000 4.1%
4040 Contributions-I nsurance 38,246 39,200 35,900 (8.4%)
4050 Workers Compensation 965 1,000 1,200 20.0%
TOTAL PERSONAL SERVICES 347,011 362,800 367,800 1.4%
4120 Supplies-Equipment 77 300 300 0.0%
4130 Supplies-Program 7 100 100 0.0%
4140 Supplies-Vehicles 81 100 100 0.0%
4210 Books & Periodicals 200 200 0.0%
TOTAL MATERIALS & SUPPLIES 165 700 700 0.0%
4300 Fees, Services 45 5,000 5,000 0.0%
4310 Telephone 77 200 200 0.0%
4340 Printing & Publishing 200 200 0.0%
4360 Subscriptions & Memberships 1,150 1,500 1,500 0.0%
4370 Travel & Training 2,885 7,000 6,400 (8.6%)
4440 License & Registration 15 600 0.0%
4520 Repair & Maintenance-Vehicles 200 200 0.0%
TOTAL CONTRACTUAL SERVICES 4,172 14,100 14,100 0.0%
** TOTAL PLANNING ADMINISTRATION 351,347 377,600 382,600 1.3%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1430 Senior Commission
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 15,290 15,900 16,200 1.9%
4030 Contributions-Reti rement 2,049 2,200 2,300 4.5%
4040 Contributions-) nsurance 1,572 1,700 1,500 (11.8%)
4050 Workers Compensation 54 100 100 0.0%
TOTAL PERSONAL SERVICES 18,965 19,900 20,100 1.0%
4300 Fees, Services 8,416 9,500 14,500 52.6%
4370 Travel & Training 18 200 200 0.0%
4375 Promotional Expense 32 500 500 0.0%
TOTAL CONTRACTUAL SERVICES 8,466 10,200 15,200 49.0%
** TOTAL SENIOR COMMISSION 27,431 30,100 35,300 17.3%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1510 Park & Ree Commission
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4130 Supplies-Program 100 100 0.0%
4210 Books & Periodicals 100 100 0.0%
TOTAL MATERIALS & SUPPLIES 200 200 0.0%
4340 Printing & Publishing 1,138 900 900 0.0%
4360 Subscriptions & Memberships 700 700 0.0%
4370 Travel & Training 380 400 400 0.0%
TOTAL CONTRACTUAL SERVICES 1,517 2,000 2,000 0.0%
** TOTAL PARK & REC COMMISSION 1,517 2,200 2,200 0.0%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1520 Park & Rec Administration
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 86,525 89,200 95,200 6.7%
4030 Contributions-Retirement 11,229 12,400 13,400 8.1%
4040 Contributions-I nsurance 10,143 11,400 9,500 (16.7%)
4050 Workers Compensation 307 400 400 0.0%
TOTAL PERSONAL SERVICES 108,205 113,400 118,500 4.5%
4120 Supplies-Equipment 106 500 500 0.0%
4130 Supplies-Program 200 200 0.0%
4210 Books & Periodicals 100 100 0.0%
4240 Uniforms & Clothing 200 200 0.0%
TOTAL MATERIALS & SUPPLIES 106 1,000 1,000 0.0%
4300 Fees, Services 1,100 1,100 0.0%
4310 Telephone 587 900 900 0.0%
4330 Postage 1,307 400 400 0.0%
4340 Printing & Publishing 14,166 1,500 1,500 0.0%
4360 Subscriptions & Memberships 1,962 1,200 1,600 33.3%
4370 Travel & Training 1,802 3,800 3,800 0.0%
4380 Mileage 27 200 300 50.0%
4807 Property Tax Expense 12 0.0%
TOTAL CONTRACTUAL SERVICES 19,863 9,100 9,600 5.5%
** TOTAL PARK & REC ADMINISTRATION 128,174 123,500 129,100 4.5%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1530 Recreation Center
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INCICDEC)
4010 Salaries & Wages-Reg 41 ,200 43,300 43,700 0.9%
4020 Salaries & Wages-Temp 123,342 132,000 132,000 0.0%
4030 Contributions-Retirement 21,617 28,000 28,000 0.0%
4040 Contributions-Insurance 6,063 6,600 5,800 (12.1%)
4050 Workers Compensation 3,049 4,200 3,200 (23.8%)
4060 Unemployment 82 0.0%
TOTAL PERSONAL SERVICES 195,354 214,100 212,700 (0.7%)
4120 Supplies-Equipment 672 8,000 8,000 0.0%
4130 Supplies-Program 12,334 3,000 3,000 0.0%
4150 Maintenance Materials 500 500 0.0%
TOTAL MATERIALS & SUPPLIES 13,006 11,500 11,500 0.0%
4300 Fees, Services 284 500 29,700 5840.0%
4310 Telephone 3,137 1,500 2,500 66.7%
4320 Utilities 36,382 36,500 37,500 2.7%
4340 Printing and Publishing 524 0.0%
4360 Subscriptions & Memberships 253 300 300 0.0%
4370 Travel & Training 164 400 400 0.0%
4375 Promotional Expense 1,598 300 1,600 433.3%
4510 Repair & Maintenance-Building 2,904 2,500 3,000 20.0%
4530 Repair & Maintenance-Equip 439 1,000 1,000 0.0%
4590 Misc. Contractual Services 2,622 500 1,000 100.0%
TOTAL CONTRACTUAL SERVICES 48,307 43,500 77,000 77.0%
** TOTAL RECREATION CENTER 256,666 269,100 301,200 11.9%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1540 Lake Ann Park Operations
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INCUDEC)
4020 Salaries & Wages-Temp 9,130 12,800 12,200 (4.7%)
4021 Overtime-Temp 60 500 500 0.0%
4030 Contributions-Retirement 703 800 800 0.0%
4050 Workers Compensation 215 300 300 0.0%
TOTAL PERSONAL SERVICES 10,108 14,400 13,800 (4.2%)
4120 Supplies-Equipment 3,349 3,800 (100.0%)
4130 Supplies-Program 10,654 9,100 8,600 (5.5%)
4240 Uniforms & Clothing 500 500 500 0.0%
TOTAL MATERIALS & SUPPLIES 14,503 13,400 9,100 (32.1%)
4300 Fees, Services 26,759 31,800 31,800 0.0%
4310 Telephone 3,069 3,600 3,600 0.0%
4320 Utilities 9,171 8,300 15,000 80.7%
4340 Printing & Publishing 133 300 1,000 233.3%
TOTAL CONTRACTUAL SERVICES 39,132 44,000 51,400 16.8%
** TOTAL LAKE ANN PARK OPERATIONS 63,743 71,800 74,300 3.5%
CITY OF CHANHA55EN
2008 BUDGET
101 General Fund
1550 Park Maintenance
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 409,215 422,800 435,400 3.0%
4011 Overtime-Reg 6,600 8,000 8,000 0.0%
4020 Salaries & Wages-Temp 79,339 79,000 82,000 3.8%
4021 Overtime-Temp 1,094 3,000 3,000 0.0%
4030 Contributions-Retirement 60,628 58,800 61,700 4.9%
4040 Contributions-I nsurance 64,125 71,000 59,700 (15.9%)
4050 Workers Compensation 11 ,460 9,500 11,500 21.1%
TOTAL PERSONAL SERVICES 632,460 652,100 661,300 1.4%
4120 Supplies-Equipment 32,762 32,000 32,000 0.0%
4140 Supplies-Vehicles 6,237 8,000 8,000 0.0%
4150 Maintenance Materials 35,976 33,000 33,000 0.0%
4151 Irrigation Materials 2,604 3,000 3,000 0.0%
4240 Uniforms & Clothing 1,344 2,800 2,800 0.0%
4260 Small Tools & Equipment 804 2,500 2,500 0.0%
TOTAL MATERIALS & SUPPLIES 79,727 81,300 81,300 0.0%
4300 Fees, Services 20,455 18,000 22,000 22.2%
4310 Telephone 3,604 3,700 3,700 0.0%
4320 Utilities 6,952 6,000 6,000 0.0%
4340 Printing & Publishing 203 400 400 0.0%
4350 Cleaning & Waste Removal 5,382 9,000 6,000 (33.3%)
4360 Subscriptions & Memberships 588 400 400 0.0%
4370 Travel & Training 563 2,000 2,000 0.0%
4400 Rental-Land & Buildings 26,068 23,500 28,500 21.3%
4410 Rental-Equipment 4,643 2,000 2,000 0.0%
4440 License & Registration 450 700 700 0.0%
4510 Repair & Maintenance-Building 2,191 3,000 3,000 0.0%
4520 Repair & Maintenance-Vehicles 372 2,500 2,500 0.0%
4530 Repair & Maintenance-Equip 17,016 6,500 6,500 0.0%
4531 Repair & Maintenance-Radios 500 500 0.0%
4560 Repair & Maintenance-Signs 3,795 4,000 4,000 0.0%
4933 Sales Tax 83 0.0%
TOTAL CONTRACTUAL SERVICES 92,364 82,200 88,200 7.3%
4705 Other Equipment 3,956 4,000 4,000 0.0%
TOTAL CAPITAL OUTLAY 3,956 4,000 4,000 0.0%
** TOTAL PARK MAINTENANCE 808,507 819,600 834,800 1.9%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1560 Senior Citizens Center
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INCt(DEC)
4010 Salaries & Wages-Reg 25,652 26,900 32,200 19.7%
4030 Contributions-Retirement 3,503 3,700 4,500 21.6%
4040 Contributions-I nsurance 300 (100.0%)
4050 Workers Compensation 90 200 200 0.0%
TOTAL PERSONAL SERVICES 29,246 31,100 36,900 18.6%
4120 Supplies-Equipment 410 300 300 0.0%
4130 Supplies-Program 3,143 3,500 4,000 14.3%
TOTAL MATERIALS & SUPPLIES 3,553 3,800 4,300 13.2%
4300 Fees, Services 17,570 16,500 18,500 12.1%
4340 Printing & Publishing 100 100 0.0%
4350 Cleaning & Waste Removal 200 200 0.0%
4360 Subscriptions & Memberships 20 100 100 0.0%
4370 Travel & Training 139 300 300 0.0%
4375 Promotional Expense 164 200 200 0.0%
4380 Mileage 95 100 100 0.0%
TOTAL CONTRACTUAL SERVICES 17,988 17,500 19,500 11.4%
** TOTAL SENIOR CITIZENS CENTER 50,787 52,400 60,700 15.8%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1600 Recreation Programs
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 81,009 84,600 85,200 0.7%
4020 Salaries & Wages-Temp 35,813 64,300 57,100 (11.2%)
4021 Overtime-Temp 354 200 400 100.0%
4030 Contributions-Retirement 13,635 14,900 12,500 (16.1%)
4040 Contributions-I nsurance 9,906 10,600 9,400 (11.3%)
4050 Workers Compensation 1,157 1,000 1,200 20.0%
* TOTAL PERSONAL SERVICES 141,875 175,600 165,800 (5.6%)
4120 Supplies-Equipment 2,000 2,000 0.0%
4130 Supplies-Program 13,555 13,100 13,600 3.8%
4240 Uniforms & Clothing 555 1,500 1,500 0.0%
TOTAL MATERIALS & SUPPLIES 14,110 16,600 17,100 3.0%
4300 Fees, Services 45,019 47,400 57,200 20.7%
4310 Telephone 1,252 3,300 3,200 (3.0%)
4320 Utilities 2,596 2,500 2,800 12.0%
4330 Postage 200 200 0.0%
4340 Printing & Publishing 3,587 4,400 4,400 0.0%
4360 Subscriptions & Memberships 280 0.0%
4370 Travel & Training 220 500 500 0.0%
4380 Mileage 75 500 500 0.0%
4400 Rental-Land & Buildings 4,096 5,500 6,500 18.2%
4410 Rental-Equipment 11,291 17,700 18,200 2.8%
TOTAL CONTRACTUAL SERVICES 68,415 82,000 93,500 14.0%
** TOTAL RECREATION PROGRAMS 224,400 274,200 276,400 0.8%
CITY OF CHANHASSEN
2008 BUDGET
101 General Fund
1700 Self-Supporting Programs
2007 to
2006 2007 2008 2008
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010 Salaries & Wages-Reg 20,252 21,200 21,300 0.5%
4020 Salaries & Wages-Temp 2,882 13,600 (100.0%)
4030 Contributions-Retirement 3,021 3,300 3,100 (6.1%)
4040 Contributions-Insurance 2,476 2,600 2,400 (7.7%)
4050 Workers Compensation 106 100 100 0.0%
TOTAL PERSONAL SERVICES 28,738 40,800 26,900 (34.1%)
4120 Supplies-Equipment 277 600 400 (33.3%)
4130 Supplies-Program 7,432 8,000 4,800 (40.0%)
TOTAL MATERIALS & SUPPLIES 7,709 8,600 5,200 (39.5%)
4300 Fees, Services 100,377 82,100 68,000 (17.2%)
TOTAL CONTRACTUAL SERVICES 100,377 82,100 68,000 (17.2%)
** TOTAL SELF-SUPPORTING PROGRAMS 136,823 131,500 100,100 (23.9%)
City of Chanhassen, MN
Capital Improvement Program
2008 thru 2012
DEPARTMENT SUMMARY
Department 2008 2009 2010
Major Equipment 849,100 686,600 1,531 ,600
Municipal Buildings 8,070,000 300,000 2,000,000
Park & Trail Improvements 669,800 1,285,000 216,000
Planning 30,000 75,000
Sanitary Sewer Improvements 670,000 401,000 2,910,000
Street Improvements 11,170,000 3,895,000 8,185,000
Surface Water Management 1,760,000 1,170,000 1,110,000
Water System Improvements 3,930,000 770,000 3,515,000
GRAND TOTAL 27, 148,900 8,682,600 19,467,600
2011 2012
876,700 463,500
125,000
771,000 696,000
305,000 100,000
1,585,000 7,785,000
670,000 970,000
3,745,000 12,245,000
7,952,700 22,384,500
Total
4,407,500
10,495,000
3,637,800
105,000
4,386,000
32,620,000
5,680,000
24,205,000
85,538,300
City of Chanhassen, MN
Capital Improvement Program
2008 thru 2012
PROJECTS BY DEPARTMENT
Department Project# Priority 2008 2009 2010 2011 2012 Total
IMajor E9ui~ment ~
Fire Dept.: SCBA Equipment EO-D04 n/a 5,000 5,000 5,000 5,000 20,000
Laptop Computers EO-D09 n/a 50,000 50,000
PPE: Turnout/Helmets EO-D10 n/a 15,000 15,000 15,000 15,000 60,000
Computer/Network Equipment PurchaseS/Upgrades EO-D13 nla 97,700 104,500 116,800 90,900 93,200 503,100
Telecommunication Purchases/Upgrades EO-D14 nla 6,200 50,000 20,000 6,000 6,000 88,200
Community Dev.: Light Duty Trucks EO-D15 n/a 54,000 30,000 28,000 29,000 141,000
Dump/Plow Truck Replacements/Additions EO-D16 n/a 161,000 371,800 169,000 701,800
Vibratory Roll Packer EO-D 19 n/a 45,000 45,000
Equipment Trailers EO-D21 n/a 25,000 25,000
Tar Kettle EO-D22 nla 30,000 30,000
Ford 555C Backhoe EO-D23 n/a 80,000 80,000
Line Striper EO-D25 n/a 9,000 9,000
AudioNisual Equipment EO-D26 nla 10,000 10,000 10,000 10,000 10,000 50,000
Groundsmaster 580 Mower Replacement EO-D28 nla 82,000 82,000
Light Duty Trucks: Public Works EO-D29 nla 32,000 32,000 64,000
Sewer Bobcat Snow Accessories EO-D31 nla 7,000 7,000
Grounds Mower Replacement EO-D34 n/a 37,000 37,000
Mailing Folder/Inserter EO-D41 n/a 20,000 20,000
Software Purchases EO-D48 nla 30,500 42,000 37,000 22,000 22,000 153,500
Computerized Records Retention System EO-D49 n/a 12,700 31 ,300 8,000 9,000 61,000
Light Duty Trucks: Parks EO-D52 n/a 98,000 33,000 65,000 196,000
Fire Vehicles EO-D54 n/a 40,000 40,000 40,000 120,000
Aerial Photography for City GIS Datasets EO-D55 nla 32,000 43,000 44,500 119,500
Front-End Loaders EO-D56 n/a 175,000 175,000
Skid loader Planer EO-D61 nla 15,000 15,000
Light Duty Trucks: Utilities EO-D62 nla 54,000 70,000 55,000 179,000
Administration Vehicle EO-D63 n/a 25,000 25,000
Engineering Vehicles EO-D65 nla 58,000 58,000
Storage Area Network EO-D81 n/a 45,000 20,800 20,800 20,800 107,400
CSO Truck EO-D83 nla 30,000 30,000
Office EO-D84 nla 5,000 5,000 5,000 5,000 5,000 25,000
Standby Generator - City Hall EO-D85 n/a 130,000 130,000
Equipment for New Fire Station EO-D86 n/a 1 ,000,000 1,000,000
Major Equipment Total 849,100 686,600 1,531,600 876,700 463,500 4,407,500
IMunicipal Buildings I
Public Works Facility Improvements MB-003 n/a 8,060,000 8,060,000
Siding and Backing Replacement MB-008 n/a 20,000 20,000
Fire Station 3 MB-009 nla 2,000,000 2,000,000
City Hall Remodel MB-010 n/a 125,000 125,000
Pioneer Cemetery Fencing and Landscaping MB-013 n/a 10,000 10,000
City Hall North Parking Lot MB-014 n/a 280,000 280,000
Department Project# Priority 2008 2009 2010 2011 2012 Total
Mllllicipal Buildings Total 8,070,000 300,000 2,000,000 125,000 10,495,000
IPark & Trail Im~rovements I
Hwy 101 North Trail Connection PK& T .029 nla 114,000 114,000
Picnic Tables/Park Benches PK& T .042 nla 6,000 6,000 6,000 6,000 6,000 30,000
Trees PK& T -D43 n/a 5,000 5,000 5,000 5,000 5,000 25,000
Arboretum Business Park Lot 12 Trail PK&T.o47 n/a 317,000 317,000
Hwy 41 Pedestrian UnderpasslTrail Grant Match PK& T .069 n/a 125,000 125,000
Tennis Court Repair PK& T .072 nla 50,000 50,000
Liberty at Creekside Trail PK& T -D75 n/a 275,000 275,000
The Preserve Trail and Bridge PK& T .076 n/a 250,000 250,000
Lakeside Trail (Lyman Boulevard) PK& T .077 n/a 60,000 60,000
2005 MUSA Park Acquisition and Development PK& T .078 n/a 400,000 400,000
Recreation Center fitness Equipment PK& T -D79 n/a 10,000 10,000 10,000 10,000 10,000 50,000
Recreation Center Lobby Furniture PK& T .080 n/a 18,800 18,800
Lyman Blvd Trail Improvements PK&T .081 n/a 500,000 500,000
Carver Beach Park Fishing Dock Extension PK& T -D82 n/a 3,000 3,000
Bluff Creek Drive Gap Trail PK& T -D83 n/a 350,000 350,000
Pioneer Boulevard Gap Trail PK& T .084 nla 300,000 300,000
Disc Golf Course Contribution PK& T .085 nla 20,000 20,000
Lake Ann Park Ballfield Shelter/Restrooms PK& T -D86 nla 750,000 750,000
Park & TrailImprovements Total 669,800 1,285,000 216,000 n1,000 696,000 3,637,800
IPlanning ~
Update of Comprehensive Plan PL -001 n/a 30,000 30,000
County Rd 61 (old 212) Corridor Study PL -002 n/a 75,000 75,000
PllllUling Total 30,000 75,000 105,000
ISanitary Sewer Improvements I
Inflow and Infiltration Abatement 55-012 nla 200,000 200,000 200,000 200,000 800,000
Sanitary Sewer Replacement 55-014 nla 250,000 250,000 500,000
Sanitary Lift Station Rehabilitation Program 55-017 n/a 140,000 76,000 260,000 105,000 100,000 681,000
Dell Road/77th Street Forcemain Replacement 55-018 n/a 125,000 125,000
2010 MUSA Sanitary Lift Station 55-020 n/a 2,200,000 2,200,000
Lift Station #3 Standby Generator 55-021 n/a 80,000 80,000
SlIIIitlll'Y Sewer Improvements Total 670,000 401,000 2,910,000 305,000 100,000 4,386,000
IStreet Imfrovements I
West 78th St Streetlights 5T-001 nla 300,000 300,000
Lyman Boulevard Improvements 5T-003 n/a 8,950,000 5,300,000 5,600,000 19,850,000
Annual Street Improvement Program 5T-012 nla 1 ,600,000 3,500,000 2,200,000 1,200,000 1,500,000 10,000,000
TH 101 Corridor Preservation Planning 5T-0 17 nla 200,000 300,000 500,000
Pavement Management 5T-0 18 n/a 385,000 385,000 385,000 385,000 385,000 1,925,000
TH 5 Corridor Study - TH 41 to TH 212 5T-0 19 n/a 10,000 10,000
Downtown-Decorative Streetlights/Signal Enhancemnt 5T-020 n/a 35,000 35,000
Street Improvements Total 11,170,000 3,895,000 8,185,000 1,585,000 7,785,000 32,620,000
ISurface Water Management I
SWMP Implementation 5WMP-012 n/a 350,000 300,000 300,000 300,000 300,000 1,550,000
Department Project# Priority 2008 2009 2010 2011 2012 Total
Property Acquisition 5WMP-014 n/a 250,000 100,000 200,000 200,000 100,000 850,000
Street Improvement Projects - Storm Water Mgmt 5WMP-019 n/a 400,000 300,000 400,000 1,100,000
Leaf Vacuum 5WMP-021 nla 40,000 40,000
Excavator 5WMP-022 nla 70,000 70,000
Vactor, Used 5WMP-023 nla 200,000 200,000
Bluff Cr. Nat. Resources Mgmt Plan Implementation 5WMP-D24 n/a 150,000 150,000 150,000 150,000 150,000 750,000
Lake Minnewashta Outlet 5WMP-026 nla 30,000 30,000
Natural Resources Stewardship Plan 5WMP-027 n/a 50,000 20,000 20,000 20,000 20,000 130,000
Landings Court Storm Water Pond Imp 5WMP-029 n/a 70,000 70,000
Lake Susan Shoreline Restoration Improvements 5WMP-030 n/a 90,000 90,000
West Lotus Lake Drainage Improvements 5WMP-031 n/a 400,000 400,000 800,000
Surfaee Wtlter MlllUlgement Total 1,760,000 1,170,000 1,110,000 670,000 970,000 5,680,000
IWater System Improvements I
Repainting: West 76th St. Water Tower W-015 n/a 80,000 80,000
Arboretum Water Main W-020 n/a 220,000 220,000
Watermain Replacement W-024 nla 660,000 700,000 700,000 2,060,000
Well #4 Improvements W-025 nla 350,000 350,000
Pressure Reducing Station 8 W-027 n/a 65,000 150,000 215,000
Raw Well Water Collection System W-030 nla 500,000 500,000
Well Rehabilitation Program W-032 n/a 80,000 40,000 45,000 45,000 45,000 255,000
West Water Treatment Plant W-037 n/a 11 ,000,000 11,000,000
Stand by Generator for wells W-038 n/a 120,000 120,000
Audubon South Watermain Loop W-039 n/a 150,000 150,000
Repaint Melody Hills Water Tower W-040 n/a 300,000 300,000
Repaint Lake Lucy Water Stand Pipe W-041 nla 550,000 550,000
High Zone Elevated Storage Tank W-042 n/a 1 ,850,000 1,850,000
Well #14 Improvements W-043 n/a 1,200,000 1,200,000
Well #13 W-044 n/a 1,200,000 1,200,000
West Junior High School Well W-045 n/a 715,000 715,000
Low Zone 1 million gallon Elevated Storage Tank W-046 n/a 2,500,000 2,500,000
Well #12 Improvements W-047 n/a 940,000 940,000
W titer System Improvements Total 3,930,000 no,ooo 3,515,000 3,745,000 12,245,000 24,205,000
GRAND TOTAL 27,148,900 8,582,600 19,467,600 7,952,700 22,384,500 85,536,300
City of Chanhassen, MN
Capital Improvement Program
2008 thru 2012
FUNDING SOURCE SUMMARY
Source 2008 2009 2010 2011 2012 Total
Arterial Collector Dvlpmnt Fee 250,000 1,000,000 1,250,000
Assessment/Revolving Assess Fund 2,055,000 1,140,000 1,900,000 1,200,000 1,500,000 7,795,000
Cable TV Fund 10,000 10,000 10,000 10,000 10,000 50,000
Capital Replacement Fund 877,900 645,600 1,031,600 806,700 533,500 3,895,300
General Fund 30,000 75,000 105,000
GO Bonds 7,000,000 2,500,000 9,500,000
MSA 1,410,125 2,627,125 957,125 117,125 2,261 ,125 7,372,625
Other Agency Contribution 5,846,000 340,000 2,960,000 3,506,000 12,652,000
Park Dedication Fund 1,141,000 1,275,000 556,000 761,000 686,000 4,419,000
Reforestation 50,000 20,000 20,000 20,000 20,000 130,000
Revenue Bonds 11 ,000,000 11,000,000
Sewer Utility Fund 1 ,420,000 455,000 2,960,000 375,000 155,000 5,365,000
Surface Water Utility Fund 2,631,000 950,000 1,540,000 650,000 1 ,200,000 6,971,000
Tax Levy 267,875 267,875 267,875 267,875 267,875 1,339,375
Water Utility Fund 4,160,000 777,000 3,765,000 3,745,000 1,245,000 13,692,000
GRAND TOTAL 27,148,900 8,582,600 19,467,600 7,952,700 22,384,500 85,538,300
City of Chanhassen, MN
Capital Improvement Program
2008 thru 2012
PROJECTS BY FUNDING SOURCE
Source Pro.ject# Priority 2008 2009 2010 2011 2012 Total
IArterial Collector Dvlpmnt Fee I
Lyman Boulevard Improvements 5T-003 nla 250,000 1 ,000,000 1,250,000
Arterial Collector Dvlpmnt Fee Total 250,000 1,000,000 1,250,000
IAssessmentIRevolving Assess Fund I
City Hall North Parking Lot MB-014 nla 140,000 140,000
Lyman Boulevard Improvements 5T-003 n/a 400,000 400,000
Annual Street Improvement Program 5T-012 nla 1,600,000 1,000,000 1 ,900,000 1,200,000 1,500,000 7,200,000
Downtown-Decorative Streetlights/Signal Enhancemnt 5T-020 nla 35,000 35,000
Audubon South Watermain Loop W-039 nla 20,000 20,000
Assessment/Revolving Assess Fund Total 2,055,000 1,140,000 1,900,000 1,200,000 1,500,000 7, 795,000
ICable TV Fund ,
AudioNisual Equipment EO-D26 n/a 10,000 10,000 10,000 10,000 10,000 50,000
Cable TV Fund Total 10,000 10,000 10,000 10,000 10,000 50,000
ICapital Replacement Fund I
Fire Dept.: SCBA Equipment EO-D04 n/a 5,000 5,000 5,000 5,000 20,000
Laptop Computers EO-D09 n/a 50,000 50,000
PPE: Turnout/Helmets EO.o10 nla 15,000 15,000 15,000 15,000 60,000
Computer/Network Equipment Purchases/Upgrades EO-D 13 n/a 97,700 104,500 116,800 90,900 93,200 503, 100
Telecommunication PurchaseslUpgrades EO-D14 nla 6,200 50,000 20,000 6,000 6,000 88,200
Community Dev.: Light Duty Trucks EO-D15 n/a 54,000 30,000 28,000 29,000 141,000
Dump/Plow Truck Replacements/Additions EO.o16 n/a 161,000 371,800 169,000 701,800
Vibratory Roll Packer EO-D 19 nla 45,000 45,000
Equipment Trailers EO-D21 nla 25,000 25,000
Tar Kettle EO-D22 n/a 30,000 30,000
Ford 555C Backhoe EO-D23 nla 80,000 80,000
Line Striper EO-D25 n/a 9,000 9,000
Groundsmaster 580 Mower Replacement EO.o28 n/a 82,000 82,000
Light Duty Trucks: Public Works EO.o29 nla 32,000 32,000 64,000
Grounds Mower Replacement EO-D34 n/a 37,000 37,000
Mailing Folderllnserter EO.o41 n/a 20,000 20,000
Software Purchases EO.o48 nla 30,500 42,000 37,000 22,000 22,000 153,500
Computerized Records Retention System EO-D49 n/a 12,700 31,300 8,000 9,000 61,000
Light Duty Trucks: Parks EO-D52 n/a 98,000 33,000 65,000 196,000
Fire Vehicles EO-D54 nla 40,000 40,000 40,000 120,000
Aerial Photography for City GIS Datasets EO-D55 nla 32,000 43,000 44,500 119,500
Front-End Loaders EO-D56 n/a 175,000 175,000
Skid loader Planer EO.o61 n/a 15,000 15,000
Source Pro.iect# Priority 2008 2009 2010 2011 2012 Total
Administration Vehicle EO.o63 nla 25,000 25,000
Engineering Vehicles EO.o65 n/a 58,000 58,000
Storage Area Network EO.o81 n/a 45,000 20,800 20,800 20,800 107,400
CSO Truck EO.o83 nla 30,000 30,000
Office EO.o84 n/a 5,000 5,000 5,000 5,000 5,000 25,000
Standby Generator - City Hall EO.o85 n/a 130,000 130,000
Equipment for New Fire Station EO.o86 nla 500,000 500,000
Siding and Backing Replacement MB-008 n/a 20,000 20,000
City Hall Remodel MB-O 10 n/a 125,000 125,000
Pioneer Cemetery Fencing and Landscaping MB-013 nla 10,000 10,000
Recreation Center fitness Equipment PK& T .079 n/a 10,000 10,000 10,000 10,000 10,000 50,000
Recreation Center Lobby Furniture PK& T .080 n/a 18,800 18,800
Capital Replacement Fund Total an,900 645,600 1,031,600 a06,700 533,500 3,895,300
IGeneral Fund I
Update of Comprehensive Plan PL-001 n/a 30,000 30,000
County Rd 61 (old 212) Corridor Study PL -002 nla 75,000 75,000
General Fund Total 30,000 75,000 105,000
IGO Bonds I
Equipment for New Fire Station EO.o86 n/a 500,000 500,000
Public Works Facility Improvements MB-003 n/a 7,000,000 7,000,000
Fire Station 3 MB-009 n/a 2,000,000 2,000,000
GO Bonds Total 7,000,000 2,500,000 9,500,000
IMSA I
West 78th St Streetlights 5T-001 nla 300,000 300,000
Lyman Boulevard Improvements 5T-003 nla 1 ,243,000 490,000 1 ,844,000 3,577,000
Annual Street Improvement Program 5T-0 12 n/a 2,500,000 300,000 2,800,000
TH 101 Corridor Preservation Planning 5T-017 nla 50,000 50,000 100,000
Pavement Management 5T-0 18 nla 117,125 117,125 117,125 117,125 117,125 585,625
TH 5 Corridor Study - TH 41 to TH 212 5T-019 n/a 10,000 10,000
MSA Total 1,410,125 2,627,125 957,125 117,125 2,261 ,125 7,372,625
IOther Agency Contribution I
City Hall North Parking Lot MB-O 14 n/a 140,000 140,000
Lyman Boulevard Improvements 5T-003 nla 5,457,000 2,710,000 3,506,000 11,673,000
TH 101 Corridor Preservation Planning 5T-0 17 nla 150,000 250,000 400,000
Lake Susan Shoreline Restoration Improvements 5WMP-030 n/a 39,000 39,000
West Lotus Lake Drainage Improvements 5WMP-031 nla 200,000 200,000 400,000
Other Agency Contribution Total 5,846,000 340,000 2,960,000 3,506,000 12,652,000
IPark Dedication Fund I
Hwy 101 North Trail Connection PK& T .029 n/a 114,000 114,000
Picnic Tables/Park Benches PK& T .042 n/a 6,000 6,000 6,000 6,000 6,000 30,000
Trees PK& T-043 n/a 5,000 5,000 5,000 5,000 5,000 25,000
Arboretum Business Park Lot 12 Trail PK&T.o47 n/a 317,000 317,000
Source Pro.i ect# Priority 2008 2009 2010 2011 2012 Total
Hwy 41 Pedestrian UnderpasslTrail Grant Match PK& T .069 nla 125,000 125,000
Tennis Court Repair PK& T .072 n/a 50,000 50,000
Liberty at Creekside Trail PK& T .075 nla 275,000 275,000
The Preserve Trail and Bridge PK& T .076 n/a 250,000 250,000
Lakeside Trail (Lyman Boulevard) PK& T .077 n/a 60,000 60,000
2005 MUSA Park Acquisition and Development PK& T .078 n/a 400,000 400,000
Lyman Blvd Trail Improvements PK&T-D81 n/a 500,000 500,000
Carver Beach Park Fishing Dock Extension PK& T .082 n/a 3,000 3,000
Bluff Creek Drive Gap Trail PK& T .083 n/a 350,000 350,000
Pioneer Boulevard Gap Trail PK& T .084 n/a 300,000 300,000
Disc Golf Course Contribution PK& T .085 nla 20,000 20,000
Lake Ann Park Ballfield Shelter/Restrooms PK& T .086 n/a 750,000 750,000
Lyman Boulevard Improvements 5T-003 n/a 500,000 350,000 850,000
Park Dedication Fund Total 1,141,000 1,275,000 556,000 761,000 686,000 4,419,000
I Reforestation I
Natural Resources Stewardship Plan 5WMP-027 nla 50,000 20,000 20,000 20,000 20,000 130,000
Reforestation Total 50,000 20,000 20,000 20,000 20,000 130,000
IRevenue Bonds I
West Water Treatment Plant W-037 n/a 11 ,000,000 11,000,000
Revenue Bonds Total 11 ,000,000 11,000,000
ISewer Utility Fund I
Light Duty Trucks: Utilities EO.o62 n/a 54,000 70,000 55,000 179,000
Public Works Facility Improvements MB-003 nla 700,000 700,000
Inflow and Infiltration Abatement 55-012 n/a 200,000 200,000 200,000 200,000 800,000
Sanitary Sewer Replacement 55-014 nla 250,000 250,000 500,000
Sanitary Lift Station Rehabilitation Program 55-017 n/a 140,000 76,000 260,000 105,000 100,000 681,000
Dell Road/77th Street Forcemain Replacement 55-018 n/a 125,000 125,000
2010 MUSA Sanitary Lift Station 55-020 nla 2,200,000 2,200,000
Lift Station #3 Standby Generator 55-021 n/a 80,000 80,000
Lyman Boulevard Improvements 5T-003 n/a 50,000 50,000 100,000
Sewer Utility Fund Total 1,420,000 455,000 2,960,000 375,000 155,000 5,365,000
ISurface Water Utility Fund I
Public Works Facility Improvements MB-003 n/a 360,000 360,000
Lyman Boulevard Improvements 5T-003 n/a 800,000 450,000 250,000 1,500,000
SWMP Implementation 5WMP-012 n/a 350,000 300,000 300,000 300,000 300,000 1,550,000
Property Acquisition 5WMP-014 n/a 250,000 100,000 200,000 200,000 100,000 850,000
Street Improvement Projects - Storm Water Mgmt 5WMP-019 n/a 400,000 300,000 400,000 1,100,000
Leaf Vacuum 5WMP-021 n/a 40,000 40,000
Excavator 5WMP-022 n/a 70,000 70,000
Vactor, Used 5WMP-023 n/a 200,000 200,000
Bluff Cr. Nat. Resources Mgmt Plan Implementation 5WMP-024 n/a 150,000 150,000 150,000 150,000 150,000 750,000
Lake Minnewashta Outlet 5WMP-026 n/a 30,000 30,000
Landings Court Storm Water Pond Imp 5WMP-029 n/a 70,000 70,000
Lake Susan Shoreline Restoration Improvements 5WMP-030 n/a 51,000 51,000
West Lotus Lake Drainage Improvements 5WMP-031 nla 200,000 200,000 400,000
Capital Improvement Program
City 0.( Chanhassen, MN
Project # EQ-004
Project Name Fire Dept.: SCBA Equipment
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life 20 years
Category Fire
Priority n/a
Total Project Cost $95,000
Account # 1 400-4115-4705
Accou nt # 3
Account #2
Description I
This program is to provide additional SCBA bottles and upgrade air packs as needed.
Justification I
SCBA packs will be 20 years old in 20 II. Replacement will bring packs to new standards. Bottles replaced in 2007 due to DOTINFP A expiration
will be traded in or used with new packs if the same brand is purchased.
Prior
I 75,000 I
'rotal
Expenditures
Equipment
2008
5,000
5,000
2009
5,000
5,000
2010
5,000
5,000
2011
5,000
5,000
2012
Total
20,000
20,000
Total
Prior
I 75,000 I
'1' 0 t al
Funding Sources
Capital Replacement Fund
Total
2008
5,000
5,000
2009
5,000
5,000
2010
5,000
5,000
2011
5,000
5,000
2012
Total
20,000
20,000
Operational Impact/Other I
This assists the department on emergency scenes and helps reduce on-scene times by eliminating the need to shuttle bottles from the scene to the
fire station for re-filling.
Capital Improvement Program
City o.f Chanhassen, MN
Project # EQ-009
Project Name Laptop Computers
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life 7-10 years
Category Fire
Pdority n/a
Total Project Cost $50,000
Account # 1 400-4127-4703
Account # 3
Account #2
Description I
Involves installing laptops in all front-line vehicles to enable responding personnel to access building pre-plans, hazardous materials data, hydrant
and other utility maps, address locations, etc.
Justification I
The project will enhance Fire Department operations, allowing for increased safety as a result of easy access to important information. It will also
make it easier to find best routes and/or alternative routes when responding to emergencies.
Expenditures
Office Equipment
2008
2009
2010
50,000
50,000
2011
2012
Total
50,000
50,000
Total
Funding Sources
Capital Replacement Fund
2008
2009
2010
50,000
50,000
2011
2012
Total
50,000
50,000
Total
OperatiolUll Impact/Other I
There should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program 2008 thru 2012
Contact
City o.f Chanhassen, MN Department Major Equipment
Project # EQ-OIO Type Unassigned
Useful Life 20 years
Project Name PPE: Turnout/Helmets
Category Fire
Accou nt # 1 400-4105-4705 Accou nt # 3 Priority n/a
Account #2
Total Project Cost $75,000
Description I
Replacement of 3-5 sets per year as a result of damage received from firefighting activities. The city will also provide new members with new gear
after they complete their probationary period.
Justification I
i Turnout gear lasts approximately 5-7 years on average.
Prior Expenditures 2008 2009 2010 2011 2012 Total
I 15,000 I Maintenance 15,000 15,000 15,000 15,000 60,000
'I'ohlI Total 15,000 15,000 15,000 15,000 60,000
Prior Funding Sources 2008 2009 2010 2011 2012 Total
I 15,000 I Capital Replacement Fund 15,000 15,000 15,000 15,000 60,000
'rotal Total 15,000 15,000 15,000 15,000 60,000
Operational Impact/Other I
There should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program
City o.f Chanhassen, MN
2008 thnl2012
Project # EQ-013
Project NanlC Computer/Network Equipment PurchaseslUpgrades
Account # 1 400-4126-4703
Accou nt # 3
Accou nt #2
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Administration
Priority n/a
Total Project Cost $503,100
Description I
Funds the purchase of replacement user and network computers, printers, peripherals, and networking hardware. The replacement schedule was
adopted in 1999 and is subject to modifications by the MIS Coordinator with approval from the City Manager and department heads.
Justification I
Budgeting and purchasing computer equipment through this project allows the city greater flexibility to direct equipment to where it is needed the
most, rather than in individual budgets. The replacement schedule was developed in 1999 by the MIS Coordinator and was approved by the 1999
council appointed IT task force. Expenditures in the 2008 budget request are for the replacement of core and departmental switches, 4 network
servers, 4 workstations, 8 desktop pes, and one notebook PC. Replaced equipment will be recycled if possible for use by other users or will be
sold on the city public surplus auction site.
Expenditures
Office Equipment
2008
97,700
97,700
2009
104,500
104,500
2010
116,800
116,800
2011
90,900
90,900
Total
Funding Sources
Capital Replacement Fund
Total
2008
97,700
97,700
2009
104,500
104,500
2010
116,800
116,800
2011
90,900
90,900
Operational Impact/Other I
2012
93,200
93,200
Total
503,100
503,100
2012
93,200
93,200
Total
503,100
503,100
Capital Improvement Program
City 0.( Chanhassen, MN
Project # EQ-O 14
Project NanlC Telecommunication PurchaseslUpgrades
2008 thru 2012
Account # 1 400-4101-4703
Accou nt # 3
Account #2
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life 5-7 years
Category Administration
Priority n/a
Total Project Cost $88,200
Description I
This project funds the expansion and upgrades to the city telephone systems excluding cellular equipment which remains an individual department
budget item. The current system is an Intertel Axxess PBX which serves City Hall, Public Works, the main fire ~tation, the Recreation Center and
the Water Treatment Plant. A new call accounting software package was added in 2007. The system is planned to be replaced in 2009 at which
time it will be 10 years old.
Justification I
A central PBX system simplifies the management of phone services and for the integration with other city applications such as unified messaging.
The city PBX server hardware and software will continue to be upgraded as necessary until its scheduled replacement in 2009. Two new facilities,
a new Public Works building and a third Fire Station are projected to be constructed in 2009-1010. The new system would be sized to
accommodate additional services. Any new phone equipment for the new buildings would be funded out of the construction projects. A redundant
PBX switch is proposed for the year following the replacement of the Axxess system. Only upgrades to individual telephones are proposed in
2008.
Expenditures
Office Equipment
2008
6,200
6,200
2009
50,000
50,000
2010
20,000
20,000
2011
6,000
6,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
6,200
6,200
2009
50,000
50,000
2010
20,000
20,000
2011
6,000
6,000
2012
6,000
6,000
Total
88,200
88,200
2012
6,000
6,000
Total
88,200
88,200
Operational Impact/Other I
A new maintenance aggreement was established with Eschelon Telecom following the expiration of the 5 year warranty from Interte!. The MIS
operating budget includes annual maintenance charges for this service.
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Major Equipment
Account # 1 400-4107-4704
Account # 3
Type Vehicles
Useful Life Unassigned
Category Community Development
Priority n/a
Project #
EQ-015
Project NanlC Community Dev.: Light Duty Trucks
Account #2
Total Project Cost $141,000
Description I
These purchases are consistent with the Vehicle Replacement Schedule. Replacement units are generally purchased early in the year to
accommodate the time frames established by Hennepin County and the State of Minnesota Cooperative Purchasing Program.
2008 - #605 1996 Ford Ranger Pickup
2008 - #606 1998 Ford Ranger Pickup
2009 - #801 1996 Chevrolet Astro Van
2010 - #606 1999 Ford Ranger Pickup
2012 - #603 2001 Ford Ranger Pickup
Justification I
These vehicles are used to provide building inspection services throughout the community. The average replacement age is over 10 years.
Expenditures
Vehicles
2008
54,000
54,000
2009
30,000
30,000
2010
28,000
28,000
2011
2012
29,000
29,000
Total
141,000
141,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
54,000
54,000
2009
30,000
30,000
2010
28,000
28,000
2011
2012
29,000
29,000
Total
141,000
141,000
Operational Impact/Other I
These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced.
Capital Improvement Program
City o.f Chanhassen, MN
Project # EQ-016
Project Name Dump/Plow Truck Replacements/Additions
2008 thru 2012
Account # 1 400-4108-4704
Account # 3
Account #2
Contact Unassigned
Department Major Equipment
Type Vehicles
Useful Life Unassigned
Category Street Equipment
Priority n/a
Total Project Cost $701,800
Description I
These purchases are required to maintain a reliable truck fleet. Costs include truck chassis, dump box, hydraulic system, snow wing, snow plow
and sander. Truck chassis costs are higher due to new federal mandated anti-lock braking requirements effective since 2000. These vehicles are
purchased using either the Hennepin County or State of MN cooperative bid systems. Orders for truck chassis are typically required to be placed
up to one year in advance of del ivery.
2008 - # 117 1994 Ford L8000 Dump Truck
2010 - # 118 1994 Ford L8000 Dump Truck
2011 - # 115 1991 Ford F800 Dump Truck
201 ] - # 116 1992 Ford L8000 Dump Truck
Justification I
These vehicles are used to provide a variety of maintenance services throughout the community including winter response for plowing and hauling
snow. The average replacement age is 16.5 years. Winter emergency service necessitates these vehicles be reliable and dependable. Growth in the
community creates additional work for these trucks. These vehicle purchases are consistent with the Vehicle Replacement Schedule.
Expenditures
Vehicles
2008
161,000
161,000
2009
2010
2011
371,800
371,800
Total
Funding Sources
Capital Replacement Fund
2008
161,000
161,000
2009
2010
2011
371 ,800
371,800
Total
2012
169,000
169,000
Total
701 ,800
701,800
2012
169,000
169,000
Total
701,800
701,800
Operational Impact/Other I
These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced.
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
P.-iority n/a
Total Project Cost $45,000
Project #
EQ-019
Project NanlC Vibratory Roll Packer
Account # 1 400-0000-4704
Account # 3
Accou ot #2
Description I
Purchase is scheduled to replace the 1987 Rosco Vibratory Roll Packer. The purchase is consistent with the Vehicle Replacement Schedule.
2008 - # 133 1987 Rosco Vibratory Roll Packer
Justification I
This machine is used extensively in the patching and overlaying of City streets. The unit will be 21 years old at the time of replacement.
Expenditures
Vehicles
2008
2009
45,000
45,000
2010
2011
2012
Total
45,000
45,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
2009
45,000
45,000
2010
2011
2012
Total
45,000
45,000
Operational Impact/Other I
This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the machine replaced.
Capital Improvement Program
City o.f Chanhassen, MN
EQ-021
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
Priority n/a
Total Project Cost $25,000
Project #
Project Nanle Equipment Trailers
Account # 1 400-0000-4705
Account # 3
Accou nt #2
Description I
Provides for replacement of an existing and the addition of a 20,000 lb (] 0 ton) capacity tandem axle trailer.
2008 - # 138 Hi Ibros 20,000 Ib tandem axle trai ler
Justification I
These trailers are used extensively in the paving operation to transport the paver machine, roll packer, skidloader and other equipment to and from
the job sites. The utility and parks departments also utilize this trailer for their work. The existing trailer is 20 years old.
Expenditures
Equipment
2008
25,000
25,000
2009
2010
2011
2012
Total
25,000
25,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
25,000
25,000
2009
2010
2011
2012
Total
25,000
25,000
Operational Impact/Other I
80th purchases include a limited warranty.
Capita/Improvement Program 2008 thru 2012 Contact Unassigned
City o.f Chanhassen, MN Department Major Equipment
Project # EQ-022 Type Equipment
Useful Life Unassigned
Project Name Tar Kettle
Category Street Equipment
Accou nt # 1 400-0000-4705 Account # 3 Priority n/a
Accou nt #2
Total Project Cost $30,000
Description I
Provides for replacement of the existing tar kettle.
2008 - #134 1997 Stepp SBF-300 Tar Kettle
Justification I
The existing tar kettle is used extensively in the pavement maintenance operations. Due to the nature of its use, the life expectancy of this unit is
limited. The kettle was purchased in 1997 and will be 11 years old at the time of trade-in.
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 30,000 30,000
Total 30,000 30,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 30,000 30,000
Total 30,000 30,000
Operational Impact/Other I
This purchase will include a limited warranty and will eliminate an expensive overhaul on the existing unit.
I
I
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Major Equipment
Account # 1 400-4111-4705
Account # 3
Type Equipment
Useful Life Unassigned
Category Street Equipment
Pdority n/a
Project # EQ-023
Project Name Ford 555C Backhoe
Accou I1t #2
Total Project Cost $80,000
Description I
Provides for the replacement of an eXlsting 1989 Tractor Backhoe.
2009 - # 143 1989 Ford 555C Backhoe
Justification I
The tractor backhoe is used extensively in malntenance operations. The backhoe is sometimes used by the Utility Department for waterrnain
breaks and uti lity replacement projects. The Parks Department also uses the backhoe for their projects. This purchase is consistent with the
Equipment Replacement Schedule.
Expenditures
Equipment
2008
2009
80,000
80,000
2010
2011
2012
Total
80,000
80,000
Total
Funding Sources
Capital Replacement Fund
2008
2009
80,000
80,000
2010
2011
2012
Total
80,000
80,000
Total
Operational Impact/Other I
This purchase will1nclude a I1mited warranty and wlll reduce the annual maintenance and repair costs as compared to the machine replaced.
Capital Improvement Program 2008 thru 2012 Unassigned
Contact
City o.f Chanhassen, MN Department Major Equipment
Project # EQ-025 Type Equipment
Useful Life Unassigned
Project Name Line Striper
Category Street Equipment
Account # 1 400-0000-4705 Accou nt # 3 Priority n/a
Account #2
Total Project Cost $9,000
Description I
Provides for the replacement of an existing line-striping machine.
2010 - #NA 1994 Graco GM5000 Line Striper 5 hp
Justification I
This machine is used to paint pavement markings and stripe lanes on roads. This purchase will ensure timely and reliable pavement marking
operations. The purchase is consistent with the Equipment Replacement Schedule.
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 9,000 9,000
Total 9,000 9,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 9,000 9,000
Total 9,000 9,000
Operational Impact/Other I
This purchase will include a limited warranty.
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City o.f Chanhassen, MN Department Major Equipment
Project # EQ-026 Type Equipment
Useful Life Unassigned
Project Name AudioNisual Equipment
Category Administration
Accou nt # 1 210-0000-4705 Account # 3 Priority n/a
Account #2
Total Project Cost $50,000
Description I
Provides for the systematic maintenance and upgrading of audio/visual equipment.
Justification I
The original A/V equipment was purchased in 1989, with the upgrades in 1994.
Expenditures 2008 2009 2010 2011 2012 Total
Maintenance 1 0,000 10 I 000 10,000 10,000 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000
Funding Sources 2008 2009 2010 2011 2012 Total
Cable TV Fund 10,000 10,000 10,000 10,000 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000
Operational Impact/Other I
This purchase will include a limited warranty. In 2007, a major remodeling including camreas, display screens, AlV control systems, and Ch 8
management was undertaken. Future upgrades include expanding access to programming to those without access to cable, and continued
enhancement of the live and broadcast experience.
Capital Improvement Program
City o.f Chanhassen, MN
Project # EQ-028
Project Name Groundsmaster 580 Mower Replacement
2008 thru 2012
Contact Unassigned
DepartJnent Major Equipment
Type Equipment
Useful Life Unassigned
Category Park
Priority n/a
Total Project Cost $82,000
Account # 1 400-0000-4705
Account # 3
Account #2
Description I
Provides for the replacement of an existing Toro 580, 15 foot, high volume grounds mower.
Justification I
The City currently has 3 high-production grounds mowers that cut a 15' pass. Each machine is used daily during the growing season and takes the
place of 2 1/2 smaller machines used by the City. Due to additional park development, an additional high-capacity machine is needed.
Expenditures
Equipment
2008
2009
82,000
82,000
2010
2011
2012
Total
82,000
82,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
2009
82,000
82,000
2010
2011
2012
Total
82,000
82,000
Operational Impact/Other I
This purchase will include a limited warranty and reduce maintenance and repair expenses as compared to the unit replaced. Also, each of these
machines takes the place of 2 1/2 smaller machines and makes the mowing operation 150% more efficient.
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Vehicles
Useful Life Unassigned
Category Street Equipment
Priority n/a
Total Project Cost $64,000
Project # EQ-029
Project Name Light Duty Trucks: Public Works
Account # 1 400-4120-4704
Account # 3
Accou nt #2
Description I
Provides for scheduled replacement of light duty trucks in the street and garage departments. Replacement units are generally purchased early in
the year in order to accommodate the time frames established by Hennepin County and the State ofMN Cooperative Purchasing Program.
2009 - # 109 1995 Chevrolet 3/4 ton 4x4
2010 - # 110 1996 Chevrolet 3/4 ton 4x4
Justification I
These vehicles are used for a variety of services throughout the community. The average replacement age is 13 years. These purchases are
consistent with the Vehicle Replacement Program.
Expenditures
Vehicles
2008
2009
32,000
32,000
2010
2011
32,000
32,000
2012
Total
64,000
64,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
2009
32,000
32,000
2010
2011
32,000
32,000
2012
Total
64,000
64,000
Operational Impact/Other I
These purchases will include a limited warranty and will reduce annual maintenance and repair costs as compared to the vehicles replaced.
Capital Improvement Program 2008 thru 2012 Unassigned
Contact
City o.f Chanhassen, MN DepartJnent Major Equipment
Project # EQ-031 Type Improvemen t
Useful Life 10-15 years
Project Name Sewer Bobcat Snow Accessories
Category Utilities
Accou nt # 1 700-0000-4705 Accou nt # 3 P,'iority n/a
Account #2 701-0000-4705
Total Project Cost $7,000
Description I
The snowblower attachment is nearing its useful life and needs replacement.
2009 - #NA 2007 Loftness Snow Blower
Justification I
This equipment is necessary for cleaning snow from water and sewer locations.
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 7,000 7,000
Total 7,000 7,000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 7,000 7,000
Total 7,000 7,000
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhassen, MN
Project # EQ-034
Project Name Grounds Mower Replacement
2008 thru 2012
Contact Unassigned
Department Major Equipment
Account # 1 400-0000-4705
Accou nt # 3
Type Equipment
Useful Life Unassigned
Category Park
Pdority n/a
Accou nt #2
Total Project Cost $37,000
Description I
Provides for replacement of lawn mowers.
Justification I
With the amount of parkland consistently growing, there is increased wear and tear on the City's lawn mowers. They are 12-16 years old and are
not dependable. Rebuilding is not cost effective. This is consistent with the Equipment Replacement Program.
Expenditures
Equipment
2008
37,000
37,000
2009
2010
2011
2012
Total
37,000
37,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
37,000
37,000
2009
2010
2011
2012
Total
37,000
37,000
Operational Impact/Other I
This purchase will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the existing unit.
Capital Improvement Program
City o.f Chanhassen, MN
Project # EQ-041
Project Name Mailing Folder/Inserter
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Administration
Priority n/a
Account # 1 400-4114-4703
Account # 3
Account #2
Total Project Cost $20,000
l>escription I
This is a replacement for the existing Folder/Inserter in the Administration Department. It is used for folding and mailing all city-wide and smaller
bulk mailings. It will be used more after the utility bill format is changed.
Justification I
We are leasing the current machine with no option to purchase. The cost is higher than the cost to lease a new machine with a purchase option for
a do liar at the end of the I ease at a fi nanci ng rate of 180/0. It makes more economic sense for us to purchase the machine at the city's cost of capital
of 6% and finance it over four or five years through the issuance of equipment certificates.
Expenditures
Office Equipment
2008
2009
2010
20,000
20,000
2011
2012
Total
20,000
20,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
2009
2010
20,000
20,000
2011
2012
Total
20,000
20,000
Operational Impact/Other I
Capital Improvement Program
City o.f Chanhassen, MN
EQ-048
2008 thru 2012
Contact Unassigned
Department Major Equipment
Account # 1 400-4117-4707
Accou Ilt # 3
Type Equipment
Useful Life 5-7 years
Category Administration
P."iority n/a
Project #
Project Name Software Purchases
Accou nt #2
Total Project Cost $153,500
Description I
This project funds the purchase of new software for alJ city departments that is not associated with a specific, individual project. Annual support
and license fees for existing software applications are funded out of account 1160-4300.
Justification I
The major portion of funds requested for this project are for Microsoft software purchases. In 2007, the city joined the Microsoft Office Enterprise
Aggreement for the State of Minnesota. Microsoft Office is the standard desktop software application for all city users. Participating in the state
aggreement al lows the city to spread the cost of the product over a period of six years in which there are no additional fees for product upgrades.
An add on module for the city's Springbook Software is proposed in 2008 to allow residents to check on their utility accounts and make electonic
payments. Other software purchase requests in 2008 are for client access licenses for the new version of Windows server, and for a mobile security
product for desktop pes.
Expenditures
Office Equipment
2008
30,500
30,500
2009
42,000
42,000
2010
37,000
37,000
2011
22,000
22,000
2012
22,000
22,000
Total
153,500
153,500
Total
Funding Sources
Capital Replacement Fund
Total
2008
30,500
30,500
2009
42,000
42,000
2010
37,000
37,000
2011
22,000
22,000
2012
22,000
22,000
Total
153,500
153,500
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhassen, MN
Project # EQ-049
Project Name Computerized Records Retention System
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Administration
P.'iority n/a
Total Project Cost $61,000
Account # 1 400-4124-4703
Accou nt # 3
Account #2
Description I
This project originally funded the purchase of an electronic records retention system. The project is now used to fund its expansion and the
replacement of scanning equipment, which has a useful life expectancy of 3 to 5 years. A large format color copier, scanner, printer is proposed to
replace the Ricoh 240W in 2009.
Justification I
This system allows for quick and sinlultaneous retrieval of documents from any computer on the city network. Both physical document storage
space and the occurrence of lost or misfiled documents will be significantly reduced. In addition, documents specified for public access can be
easily made available to residents and constituents from any internet capable computer. Web Access, a web based full scanning client engine is
proposed for 2008. This would replace the full clients which require a local client to be loaded on the end user workstation. This would become
the standard user interface for both staff and public access. This client will greatly enhance our ability to integrate documents in Laserfiche to
other application software. It is anticipated that this will replace the Weblink product in use for staff and public read only access.
Expenditures
Office Equipment
2008
12,700
12,700
2009
31 ,300
31,300
2010
8,000
8,000
2011
9,000
9,000
2012
Total
61 ,000
61,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
12,700
12,700
2009
31 ,300
31,300
2010
8,000
8,000
2011
9,000
9,000
2012
Total
61 ,000
61 ,000
Operational ImpacVOther I
There is an annual license fee of $1,600 for the Laserfiche Web Access server which would be funded from the 116-4300 account.
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City 0.( Chanhassen, MN Department Major Equipment
EQ-052 Type Vehicles
Project #
Useful Life Unassigned
Project N ~l Ole Light Duty Trucks: Parks
Category Park
Accou nt # 1 400-0000-4704 Account # 3 Priority n/a
Accou nt #2
Total Project Cost $196,000
Description I
Provides for scheduled replacement of light duty trucks in the Park Maintenance Department.
Justification I
These vehicles are used for multiple park maintenancer operations including towing mowers, bobcat, snowplowing, sanding, etc. The average
replacement age of these vehicles is 13.5 yrs.
Expenditures 2008 2009 2010 2011 2012 Total
Vehicles 98,000 33,000 65,000 196.000
Total 98,000 33,000 65,000 196,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 98,000 33,000 65,000 196.000
Total 98,000 33,000 65,000 196,000
Operational Impact/Other I
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Major Equipment
Type Vehicles
Useful Life 10-1 5 years
Category Fire
Priority n/a
Total Project Cost $205,000
Project # EQ-054
Project Name Fire Vehicles
Accou nt # 1 400-4135-4704
Accou nt # 3
Account #2
Description I
This item allows for the replacement of existing equipment. Vehicles are purchased off either the Hennepin County or State of Minnesota
cooperative bid. Orders are typically required to be placed up to one (1) year in advance of delivery.
Justification I
As vehicles age they become less reliable. Also, they require more costly maintenance. Vehicles proposed for replacement are:
Unit 219 - 1988 chev 1 ton (2007) $85,000
Unit 703 - 1999 Explorer (2008) $40,000
Unit 207 - 1995 Astro Van (2009) $40,000
Unit 706 - 1997 Expedition (2010) $40,000
Prior
f 85,000 I
'rot,ll
Expenditures
Vehicles
2008
40,000
40,000
2009
40,000
40,000
2010
40,000
40,000
2011
2012
Total
120,000
120,000
Total
Prior
I 85,000 I
'1' 0 t nl
Funding Sources
Capital Replacement Fund
Total
2008
40,000
40,000
2009
40,000
40,000
2010
40.000
40,000
2011
2012
Total
120,000
120,000
Operational Impact/Other I
These purchases wil1 include a limited warranty and wil1 reduce the annual maintenance and repair costs. The electrical work on the Aerial Truck
will correct an existing problem that has been a concern of the mechanics for some time.
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Account # 1 400-0000-4752
Accou nt # 3
Contact Unassigned
DepartJnent Major Equipment
Type Improve men t
Useful Life 5-7 years
Category Administration
Priority n/a
Total Project Cost $119,500
Project # EQ-055
Project Name Aerial Photography for City GIS Datasets
Accou nt #2
Description I
This project funds the aerial photography for the integration with the city's existing GIS datasets. This project is dependent upon the cooperation
of the Carver County GIS department. This initial joint aerial flyover was conducted in April of 2005 and is scheduled to be re-flown every three
years. In 2008, the County will be purchasing an enterprise license for Pictometry, a mapping product which provides three dimensional and
orthographic views, along with a full featured mapping client. By participating in the project, the city will have unlimited access to the client and
dataset. Additional funds are being requested to assist with integrating the client to other existing city applications, such as Laserfiche.
Justification I
City Planners, Engineers and Util ity staff use this data in conjunction with other GIS datasets to help resolve geographical issues with residents
and contractors without repeated site visits. It is used in nearly every scheduled staff meeting and has proven useful to the Sheriffs Office, and fire
department when conducting area searches. The Pictometry solution will also provide the ability for staff to view each side of buildings, and
includes a toolset which allows for the accurate measurement of areas and lines.
Expenditures
Maintenance
2008
32,000
32,000
2009
2010
43,000
43,000
2011
2012
44,500
44,500
Total
119,500
119,500
Total
Funding Sources
Capital Replacement Fund
Total
2008
32,000
32,000
2009
2010
43,000
43,000
2011
2012
44,500
44,500
Total
119,500
119,500
Operational Impact/Other I
Capital Improvement Program
City o.f Chanhassen, MN
ProJect # EQ-056
Project Name Front-End Loaders
2008 thru 2012
Accou nt # 1 400.0000-4705
Account # 3
Contact Unassigned
Department Major Equipment
Type Equipment
Useful Life Unassigned
Category Street Equipment
Priority n/a
Total Project Cost $175,000
Accou nt #2
Description I
This item replaces the front-end loaders used in street maintenance. This loader is used very frequently at the shop. The loader was purchased in
1971 and wi J] be 36 years old at the time of trade-in. The loader is also used for plowing residential streets.
2010 - # 132 1971 920 Cat. Loader
Justification I
The loader requires more frequent and expensive repairs. Replacement parts are hard to find.
Expenditures
Equipment
2008
2009
2010
2011
175,000
175,000
2012
Total
175,000
175,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
2009
2010
2011
175,000
175,000
2012
Total
175,000
175,000
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City o.f Chanhassen, MN Department Major Equipment
ProJect # EQ-061 Type Equipment
Useful Life Unassigned
Project Name Skidloader Planer
Category Street Equipment
Account # 1 400-0000-4705 Account # 3 Priority n/a
Accou nt #2
Total Project Cost $15,000
Description I
This bobcat attachment is to be used for grinding out distressed pavement areas for patching. This attachment is used extensively during the
summer to remove distressed pavement areas for patching.
2008 - #NA 1996 Bobcat planer mill
Justification I
This is necessary for effective pavement patching.
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 15,000 15,000
Total 15,000 15,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 15,000 15,000
Total 15,000 15,000
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012 Unassigned
Contact
City 0.( Chanhassen, MN Department Major Equipment
Pro.;ect # EQ-062 Type Vehicles
Useful Life Unassigned
Project Name Light Duty Trucks: Utilities
Category U tit Hi es
Accou nt # 1 700-0000-4704 2007 Accou nt # 3 701-0000-4704 2011 Priority n/a
Accou nt #2 701-0000-4704 2009
Total Project Cost $179,000
Description I
This allows for replacement of existing vehicles in the Water and Sewer department.
2009 - #3 19 1999 Dodge 3/4 ton 4x4
2009 - #309 1973 Ford P500 Watermain break van
2011 - #302 1999 Ford F-450 3/4 ton pickup
2012 - #317 1997 Chevrolet 3/4 ton pickup
Justification I
This replaces pickups in accordance with the vehicle replacement plan.
Expenditures 2008 2009 2010 2011 2012 Total
Vehicles 54,000 70,000 55,000 179,000
Total 54,000 70,000 55,000 179,000
Funding Sources 2008 2009 2010 2011 2012 Total
Sewer Utility Fund 54,000 70,000 55,000 179,000
Total 54,000 70,000 55,000 179,000
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012 Unassigned
Contact
City 0.( Chanhassen, MN Department Major Equipment
EQ-063 Type Vehicles
Project #
Useful Life Unassigned
Project Name Administration Vehicle
Category Administration
Accou nt # 1 400-0000-4704 Accou nt # 3 Priority n/a
Account #2
Total Project Cost $25,000
Description I
This allows for replacement of an existing vehicle for City Hall.
2010 - #2 1993 Ford Taurus
Justification I
This replaces a vehicle in accordance with the vehicle replacement plan.
Expenditures 2008 2009 2010 2011 2012 Total
Vehicles 25,000 25,000
Total 25,000 25,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 25,000 25,000
Total 25,000 25,000
Operational Impact/Other I
-- -~-~--~~
Capital Improvement Program 2008 thru 2012 Unassigned
Contact
City o.f Chanhassen, MN DepartJnent Major Equipment
EQ-065 Type Vehicles
Project # Useful Life Unassigned
Project N anlC Engineering Vehicles Street Equipment
Category
Accou nt # 1 400-0000 -4704 Accou nt # 3 Priority n/a
Accou nt #2 Total Project Cost $58,000
Description I
The engineering van was purchased in 1995 and is used for engineering fieldwork and job site inspections.
The Crown Victoria was purchased in 1993 and is used for general transportation for City Hall employees and site inspections.
Justification I
These replacements are in accordance with the vehicle replacement plan.
Expenditures 2008 2009 2010 2011 2012 Total
Vehicles 58,000 58,000
Total 58,000 58,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 58,000 58,000
Total 58,000 58,000
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhassen, MN
Project # EQ-081
Project Name Storage Area Network
2008 thru 2012
Contact
Department Major Equipment
Account # 1 400-4126-4703
Accou nt # 3
Type Improvement
Useful Life 5-7 years
Category Administration
Priority n/a
Accou nt #2
Total Project Cost $107,400
Description I
This project funds the purchase of a storage area network, (SAN) which will gradually replace all internal disk drives in existing network servers.
The storage area network is a central storage device made up of individual storage modules, and managed from a single console. The SAN allows
disk storage to be modified as storage needs change, without any downtime for city users.
Justification I
The need for digital storage space for city documentation and applications is growing at a rate of 50GB to 100GB per year. Existing storage space
is becoming difficult to manage on individual network servers. Internal storage utilization is inefficient, and requires system downtime to
reconfigure. SAN storage allows for real time reconfiguation as well as the ability to make real time copies for redundancy and for daytime backup
processes. The initial San installation would reside in the server room at city hall. Additional storage units would be added in later years at other
city buildings to facilitate disaster recovery. A 1.8 Terabyte redundant SAN is proposed to be implemented in year one, with a second single unit
added in years 2 and 3. As each unit is added, the overall performance of the SAN as a whole is greatly increased.
Expenditures
Equipment
2008
45,000
45,000
2009
20,800
20,800
2010
20,800
20,800
2011
2012
20,800
20,800
Total
1 07,400
107,400
Total
Funding Sources
Capital Replacement Fund
Total
2008
45,000
45,000
2009
20,800
20,800
2010
20,800
20,800
2011
2012
20,800
20,800
Total
107,400
107,400
Operational Impact/Other I
Software support is included for the first year. Software support for the following years would be funded out of 116-4300. The hardware proposed
is covered under a three year, next day warranty. Hardware repairs would be done by MIS staff using a spare kit and replenished by the warranty.
Spare parts required after the warranty expiration would be funded out of 116-4530.
-
Capital Improvement Program 2008 thru 2012
Contact
City o.f Chanhassen, MN Department Major Equipment
EQ-083 Type V chicles
Project #
Useful Life
Project Name CSO Truck
Category Administration
Accou nt # 1 400~4l29~4 704 Account # 3 Priority n/a
Accou I1t #2
Total Project Cost $30,000
Description I
This allows for replacement of an existing CSO truck.
Justification I
This replaces a vehicle in accordance with the vehicle replacement plan.
Expenditures 2008 2009 2010 2011 2012 Total
Vehicles 30,000 30,000
Total 30,000 30,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 30,000 30,000
Total 30,000 30,000
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012
Contact
City 0.( Chanhassen, MN Department Major Equipment
I Project # EQ-084 I Type Unassigned
Useful Life
Project NanlC Office Category Administration
Accou nt # 1 Account # 3 Priority n/a
Account #2
Total Project Cost $25,000
Description I
Provide for office furniture and chair replacements.
Justification I
This item will allow items to be replaced as they wear out or needs change.
Expenditures 2008 2009 2010 2011 2012 Total
Office Equipment 5,000 5,000 5,000 5,000 5,000 25,000
Total 5,000 5,000 5,000 5,000 5,000 25,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 5,000 5,000 5,000 5,000 5,000 25,000
Total 5,000 5,000 5,000 5,000 5,000 25,000
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhassen, MN
Project # EQ-085
Project NanlC Standby Generator - City Hall
2008 thru 2012
Contact
Department Major Equipment
Accou nt # 1 Accou nt # 3
Type Equipment
Useful Life 7-10 years
Category Administration
Priority n/a
Account #2
Total Project Cost $130,000
Description I
This project funds the purchase of a standby generator for powering all of city Hall in emergency situations.
Justification I
The current 5Kw standby generator which supplied power to the telephone system and the network server room is no longer functional. Due to
both upgrades to the telephone system and network hardware, it did not have the capacity to fully power these systems in full when functional. A
150K w standby generator is being requested in order to supply power to all of City Hall in emergency situations. City Hall has been designated as
the Emergency Operation Center for emergency events. Standby power is neccessary to ensure this can be maintained in the event that outside
power is not available.
Expenditures
Equipment
2008
130,000
130,000
2009
2010
2011
2012
Total
130,000
130,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
130,000
130,000
2009
2010
2011
2012
Total
130,000
130,000
OperationoJ Impact/Other I
Annual maintenance to be done by city utility/shop staff.
Capita/Improvement Program 2008 thru 2012
Contact
City o.f Chanhassen, MN Department Major Equipment
Pro,ject # EQ-086 Type Unassigned
Useful Life
Project N~lnlC Equipment for New Fire Station
Category Fire
Account # 1 Accou nt # 3 Priority n/a
Account #2
Total Project Cost $1,000,000
Description I
Equipment for new satellite fire station to be built in 2010.
Justification I
Response time from the other two stations will be unacceptable after Highway 212 is completed.
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 1,000,000 1,000,000
Total 1,000,000 1,000,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 500,000 500,000
GO Bonds 500,000 500,000
Total 1,000,000 1,000,000
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhossen, MN
2008 thru 2012
Contact Unassigned
Department Municipal Buildings
Account # t
Account #2
Account # 3
Type Improvement
Useful Life Unassigned
Category Street Equipment
Priority n/a
Project #
MB-003
Project Name Public Works Facility Improvements
Total Project Cost $8,060,000
Description I
The existing Public Works facility is over capacity and is in need of major repairs. The City is expected to grow an additional 30% before ultimate
build out. The existing facility is located on a 5 acre site which is already cramped for storage and operation space. The City completed a facility
needs study that recommended moving the Public Works building because the existing site is too small for expansion.
Justification I
The Operations and Maintenance Department needs additional space for repairs, meeting facilities, files, storage, supervisory offices and proper
equipment storage. In addition, the current facility does not meet many City building codes.
Expenditures
Planning/Design
2008
8,060,000
8,060,000
2009
2010
2011
2012
Total
8,060,000
8,060,000
T otlll
Funding Sources 2008 2009 2010 2011 2012 Total
GO Bonds 7,000,000 7,000,000
Sewer Utility Fund 700,000 700,000
Surface Water Utility Fund 360,000 360,000
T otlll 8,060,000 8,060,000
Operatio1llllImpIICt/Other I
This project would increase operational costs based on the percentage of the footprint expansion.
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Municipal Buildings
Account # 1 400-4003-4702
Account # 3
Type Improvement
Useful Life 20 years
Category Fire
Priority n/a
Project # MB-008
Project Name Siding and Backing Replacement
Account #2
Total Project Cost $20,000
Description I
This project would be to replace the epoxy sealant on the bay floors at Station 2.
Justification I
The West satellite station was originally built in 1980. Siding and roofing will be 30 years old. The current siding is original. It has some holes in
it and had some rotten spots replaced. Currently we have a problem with bug infestation. Replacement would also bring it up to the current code.
Expenditures
Maintenance
2008
2009
20,000
20,000
2010
2011
2012
Total
20,000
20,000
Total
Funding Sources
Capital Replacement Fund
Total
2008
2009
20,000
20,000
2010
2011
2012
Total
20,000
20,000
Operational Impact/Other I
There should be no operational impact to this project.
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City 0.( Chanhassen, MN Department Municipal Buildings
Project # MB-009 Type Improvemen t
Useful Life 20 years
Project NanlC Fire Station 3
Category Fire
Account # 1 400-4143- Accou I1t # 3 Priority n/a
Account #2
Total Project Cost $2,000,000
Description -I
This is for a possible fire station in the southern part of the city which will be developed after 2005.
Justification I
Response time from the other two stations will be unacceptable after Highway 212 is completed.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 2,000,000 2,000,000
Total 2,000,000 2,000,000
Funding Sources 2008 2009 2010 2011 2012 Total
GO Bonds 2,000,000 2,000,000
Total 2,000,000 2,000,000
Operational Impact/Other I
The operational impact will be for the staffing and maintenance of personnel and equipment for the station once in place.
Capital Improvement Program 2008 thru 2012
Contact
City o.f Chanhassen, MN Department Municipal Buildings
Project # MB-O 10 Type Improvement
Useful Life
Project NanlC City Hall Remodel Category Administration
Accou nt # 1 Accou I1t # 3 Priority n/a
Account #2 Total Project Cost $125,000
Description I
Remodel and refurbish areas of City Hall that need paint, carpet or storage areas added.
Justification I
Certain areas of City Hall wi II be in need of some small repair and maintenance needs in 2010.
Expenditures 2008 2009 2010 2011 2012 Total
Maintenance 125,000 125,000
Total 125,000 125,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 125,000 125,000
Total 125,000 125,000
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012
Contact
City 0.( Chanhassen, MN Department Municipal Buildings
Pro,ject # MB-O 13 Type Improvement
Useful Life
Project NanlC Pioneer Cemetery Fencing and Landscaping Category Administration
Accou nt # 1 Accou nt # 3 Priority n/a
Accou ot #2 Total Project Cost $10,000
Description I
Construction of fencing and landscaping for the Pioneer Cemetery.
Justification I
Expenditures 2008 2009 2010 2011 2012 Total
Construction 10,000 10,000
Total 10,000 10,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 10,000 10,000
Total 10,000 10,000
Operational Impact/Other I
Capital Improvement Program
City of Chanhassen, MN
Project # MB-014
Project Name City Hall North Parking Lot
2008 thru 2012
Contact
Department Municipal Buildings
Account # 1 Account # 3
Account #2
Type Improvement
Useful Life
Category Streets/Highways
Priority nla
Total Project Cost $280,000
Expenditures
Construction
2008
2009
280,000
280,000
2010
2011
2012
Total
280,000
280,000
Total
Funding Sources
AssessmenVRevolving Assess
Other Agency Contribution
Total
2008
2009
140,000
140,000
280,000
2010
2011
2012
Total
140,000
140,000
280,000
Capital Improvement Program 2008 thru 2012 Contact
City o.fChanhassen, MN Department Park & Trail Improvements
Projcct # PK&T -029 Type Improvemen t
Useful Life 30 Years
Project N anlC Hwy 101 North Trail Connection Park
Category
Accou nt # 1 410-0000-4710 Account # 3 Priority n/a
Accou nt #2 $114,000
Total Project Cost
Description I
Construction of a 1 O-foot wide pedestrian trail along the west side of Highway 101 from Pleasant View Road to Townline Road.
Justification I
The last segment of a trai I that was originaly constructed in 2001.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 114,000 114,000
Total 114,000 114,000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 114,000 114,000
Total 114,000 114,000
Operational Impact/Other I
Overlay every 10-12 years.
Capital Improvement Program 2008 thru 2012 Unassigned
Contact
City o.f Chanhassen, MN Department Park & Trail Improvements
Project # PK&T -042 Type Improvemen t
Useful Life 10-15 years
Project Name Picnic Tables/Park Benches
Category Park
Account # 1 410-000-4705 Accou nt # 3 Priority n/a
I
Account #2
Total Project Cost $60,000
Description I
Purchase of picnic tables and park benches.
Justification I
New tables and benches are needed to replace old stock and meet new needs.
Expenditures 2008 2009 2010 2011 2012 Total Future
Equipment 6,000 6,000 6,000 6,000 6,000 30,000 1 30,000 I
Total 6,000 6,000 6,000 6,000 6,000 30,000 l'ohll
Funding Sources 2008 2009 2010 2011 2012 Total Future
Park Dedication Fund 6,000 6,000 6,000 6,000 6,000 30,000 I 30,000 I
Total 6,000 6,000 6,000 6,000 6,000 30,000 l'otal
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012
Contact Unassigned
City o.f Chanhassen, MN Department Park & Trail Improvements
Project # PK&T -043 Type Improvemen t
Useful Life 50 Years
Project NanlC Trees Category Park
Accou nt # 1 410-0000-4701 Accou nt # 3 Priority n/a
Account #2 Total Project Cost $50,000
Description I
Annual tree planting program.
Justification I
Planting trees is one of the best investments we can make in our future.
Expenditures 2008 2009 2010 2011 2012 Total Future
Land Improvement 5,000 5,000 5,000 5,000 5,000 25,000 I 25,000 I
Total 5,000 5,000 5,000 5,000 5,000 25,000 Totul
Funding Sources 2008 2009 2010 2011 2012 Total I~'luture
Park Dedication Fund 5,000 5,000 5,000 5,000 5,000 25,000 I 25,000 I
Total 5,000 5,000 5,000 5,000 5,000 25,000 l'otal
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012 Unassigned
Contact
City 0.( Chanhassen, MN Department Park & Trail Improvements
Project # PK&T-047 Type Improvement
Useful Life 30 Years
Project Name Arboretum Business Park Lot 12 Trail Category Park
Accou nt # 1 410-0000-4710 Account # 3 Priority n/a
Accou nt #2 Total Project Cost $317,000
Description I
Construction of an 8-foot wide asphalt trail in the Chanhassen nature preserve.
Justification I
Represents the final phase in a four part trail construction initiative.
Expenditures 2008 2009 2010 2011 2012 Total
Land Improvement 317,000 317,000
Total 317,000 317,000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 317,000 317,000
Total 317,000 317,000
OperatiolUll Impact/Other I
Maintenance and operations costs.
Capital Improvement Program 2008 thru 2012 Contact
City o.f Chanhassen, MN Department Park & Trail Improvements
Project # PK&T -069 Type Improvemen t
Useful Life 50 Years
Project Name Hwy 41 Pedestrian Underpass/Trail Grant Match
Category Park
Accou nt # 1 410-0000-4706 Accou nt # 3 Priority n/a
Accou ot #2
Total Project Cost $125,000
Description I
Carver County has applied for a federal grant to provide these improvements. The city has supported the application pledging a $115,000
contribution if the full grant is received.
Justification I
A pedestrian underpass to M innewashta Regional Park is a highly sought after improvement.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 125,000 125,000
Total 125,000 125,000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 125,000 125,000
Total 125,000 125,000
Operational Impact/Other I
Maintenance and operations costs.
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact
Account # 1 410-000-4706
Account # 3
Department Park & Trail Improvements
Type Unassigned
Useful Life 25 years
Category Park
Priority n/a
Project #
PK&T -072
Project Name Tennis Court Repair
Accou nt #2
Total Project Cost $50,000
Description I
Patch and resurface courts.
Justification I
We have deliberately limited the number of courts constructed within our system to lower overall maintenance costs associated with tennis courts.
The courts we do offer are kept in playable condition through patching and resurfacing on a six to ten year cycle.
Expenditures
Maintenance
2008
2009
2010
50,000
50,000
2011
2012
Total
50,000
50,000
Total
Funding Sources
Park Dedication Fund
2008
2009
2010
50,000
50,000
2011
2012
Total
50,000
50,000
Total
Operational Impact/Other I
Maintenance and operations costs.
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact
Department Park & Trail Improvements
Account # 1 Account # 3
Type Unassigned
Useful Life
Category Park
Priority n/a
Project # PK&T -075
Project N~lmc Liberty at Creekside Trail
Accou ot #2
Total Project Cost $275,000
Descriptionl
The Liberty at Creek side trail is a 2600 foot pedestrian trail improvement tied to the development of Liberty at Creek side. This trail will be
situated in the Bluff Creek preservation corridor traveling from the "east/west collector" south to new Highway 212.
Town and Country Homes is responsible for construction of this trail as a condition of their development contract with the city. Upon completion
of the trail we will reimburse Town and Country Homes for the cost of the project materials.
Justification I
This section of trail is identified on the Cities comprehensive trail plan. The City has an obligation to construct it concurrent with development of
the surrounding properties.
Expenditures
Construction
2008
2009
2010
2011
2012
275,000
275,000
Total
275,000
275,000
Total
Funding Sources
Park Dedication Fund
2008
2009
2010
2011
2012
275,000
275,000
Total
275,000
275,000
Total
Operational Impact/Other)
Maintenance and operations costs.
Capital Improvement Program
City o.fChanhassen, MN
2008 thru 2012
Contact
Department Park & Trail Improvements
Type Unassigned
Useful Life 50 Years
Category Park
Priority n/a
Pro,ject #
PK&T-076
Project Name The Preserve Trail and Bridge
Accou nt # 1
Account # 3
Accou nt #2
Total Project Cost $250,000
Description I
The Preserve trai 1 is a 2800 foot pedestrian trai I improvement tied to the development of the Preserve. This trail will be situated in the Bluff Creek
preservation corridor travel ing from the "east/west collector" road north to Lyman Boulevard. A large bridge crossing of Bluff Creek wil I be the
signature component of this project. Rottlund Homes is responsible for the construction of the trail and bridge as a condition of their development
contract with the City. Upon completion of the trail we will reimburse Rottlund Homes for the cost of the project materials.
Justification I
This section of trail is identified on the Cities comprehensive trail plan. The City has an obligation to construct it concurrent with development of
the surrounding properties.
Expenditures
Construction
2008
250,000
250,000
2009
2010
2011
2012
Total
250,000
250,000
Total
Funding Sources
Park Dedication Fund
2008
250,000
250,000
2009
2010
2011
2012
Total
250,000
250,000
Total
Operational Impact/Other I
Maintenance and operations costs.
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact
Department Park & Trail Improvements
Project #
PK&T -077
Type Unassigned
Useful Life 50 Years
Project NanlC Lakeside Trail (Lyman Boulevard)
Account # 1
Account # 3
Category Park
Priority n/a
Accou ot #2
Total Project Cost $60,000
Description I
The Lakeside Trail is a foot extension of a trail already in place along Lyman Boulevard. This section will connect with a future trail in Eden
Prairie. Sienna Corporation is responsible for the construction of the trail as a condition of their development contract with the City. Upon
completion of the trail we will reimburse Sienna Corporation for the cost of the project materials.
Justification I
This section of trail is identified on the Cities comprehensive trail plan. The City has an obligation to construct it concurrent with development of
the surrounding properties.
Expenditures
Construction
2008
60,000
60,000
2009
2010
2011
2012
Total
60,000
60,000
Total
Funding Sources
Park Dedication Fund
2008
60,000
60,000
2009
2010
2011
2012
Total
60,000
60,000
Total
Operational Impact/Other I
Maintenance and operations costs.
Capital Improvement Program 2008 thru 2012 Contact
City o.fChanhassen, MN Department Park & Trail Improvements
PK&T -078 Type Unassigned
Project # Useful Life 50 Years
Project Name 2005 MUSA Park Acquisition and Development Category Park
Accou nt # 1 Account # 3 Priority n/a
Account #2 Total Project Cost $400,000
Description I
Acquisition and development of a neighborhood park in the 2005 MUSA area.
Justification I
This acquisition satisfies a significant void in the Cities comprehensive park plan. It will serve neighborhood park needs for over 500 homes
located with 1/2 mile of its location.
Expenditures 2008 2009 2010 2011 2012 Total
Land Acquisition 400,000 400,000
Total 400,000 400,000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 400,000 400,000
Total 400,000 400,000
Operational Impact/Other I
Maintenance and operations costs.
Capital Improvement Program 2008 thru 2012
Contact
City 0.( Chanhassen, MN Department Park & Trail Improvements
Project # PK&T -079 Type Unassigned
Useful Life
Project Name Recreation Center fitness Equipment
Category Park
Account # 1 Accou nt # 3 Priority n/a
Account #2
Total Project Cost $50,000
Description I
Purchase of new fitness room equipment for the recreation center over the next five years.
Justification I
The fitness room equipment has not been replaced since the opening of the center in 1995. The equipment is now 12 years old with many pieces
nearing or past their useful life expectancy.
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 10,000 10,000 10,000 10,000 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 10,000 1 0,000 10,000 10,000 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000
Operational Impact/Other I
Maintenance costs will be reduced.
Capital Improvement Program 2008 thru 2012
Contact
City 0.( Chanhassen, MN Department Park & Trail Improvements
Project # PK&T -080 Type Unassigned
Useful Life
Project Name Recreation Center Lobby Furniture
Category Park
Accou nt # 1 Account # 3 Priority n/a
Account #2 $18,800
Total Project Cost
Description I
Purchase of new lobby furniture for the recreation center.
Justification I
The existing furniture is original to the building's construction in 1995. After 12 years of use in a public recreation setting the existing furniture is
less than aesthetically pleasing.
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 18,800 18,800
Total 18,800 18,800
Funding Sources 2008 2009 2010 2011 2012 Total
Capital Replacement Fund 18,800 18,800
Total 18,800 18,800
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012 Contact
City 0.( Chanhassen, MN Department Park & Trail Improvements
Project # PK&T -081 Type Improvement
Useful Life 30 Years
Project Name Lyman Blvd Trail Improvements
Category Park
Accou nt # 1 Account # 3 Priority n/a
Accou nt #2
Total Project Cost $500,000
Description 1
Pedestrain trail and underpass improvements along Lyman Boulevard from Powers Boulevard to Highway 41.
Justification I
Lyman Boulevard is scheduled for reconstruction. The best time to construct trail improvements is concurrent with theroad project.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 500,000 500,000
Total 500,000 500,000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 500,000 500,000
Total 500,000 500,000
I Operational Impact/Other I
Maintenance and operations costs.
Capital Improvement Program 2008 thru 2012 Contact
City o.f Chanhassen, MN Department Park & Trail Improvements
Projcct # PK&T -082 Type Improvemen t
Useful Life 20 years
Project Nanlc Carver Beach Park Fishing Dock Extension Category Park
Account # 1 Accou nt # 3 Priority n/a
Accou nt #2 Total Project Cost $3,000
Description I
Extension of existing dock at Carver Beach Park.
Justification I
The current dock section is too short and does not allow for fishing.
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 3,000 3,000
Total 3,000 3,000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 3,000 3,000
Total 3,000 3,000
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012
Contact
City o.f Chanhassen, MN Department Park & Trail Improvements
Project # PK&T -083 Type Improvement
Useful Life 30 Years
Project Name Bluff Creek Drive Gap Trail Category Park
Accou nt # 1 Account # 3 Priority n/a
Accou nt #2 Total Project Cost $350,000
Description I
Construction of a 10 foot wide pedestrian trail from south of Pioneer Trail to the southwest LRT trail head.
Justification I
The Highway 212 improvement project included a pedestrain trail along the first 2000 feet of Bluff Creek Drive. The resulting trail "gap" or
missing link should be completed.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 350,000 350,000
Total 350,000 350,000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 350,000 350,000
Total 350,000 350,000
Operational Impact/Other I
Maintenance and operations costs.
Capital Improvement Program 2008 thru 2012 Contact
City 0.( Chanhassen, MN DepartJnent Park & Trail Improvements
Project # PK&T -084 Type Improvement
Useful Life 30 Years
Project NanlC Pioneer Boulevard Gap Trail Category Park
Accou nt # 1 Account # 3 Priority n/a
Accou nt #2 Total Project Cost $300,000
Description I
Construction of a 10 foot wide pedestrian trail from Highway 101 to Powers Boulevard.
Justification I
The Highway 212 improvement project included construction of a pedestrain trail along the majority of Pioneer Trail. The remaining missing link
or "gap" between Powers Boulevard and Highway 101 should be completed.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 300,000 300,000
Total 300,000 300,000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 300,000 300,000
Total 300,000 300,000
Operational Impact/Other I
Maintenance and operations costs.
Capital Improvement Program 2008 thru 2012 Contact
City o.f Chanhassen, MN Department Park & Trail Improvements
Project # PK&T -085 Type Equipment
Useful Life 30 Years
Project Name Disc Golf Course Contribution
Category Park
Account # 1 Account # 3 Priority n/a
Account #2
Total Project Cost $20,000
Description 1
The city is seeking a partner to construct a disc golf course. The city wil1 provide the investment required to purchase equipment in the event that a
partnering entity has the land on which to build a course.
Justification I
Disc golf is a very popular activity with many teenage participants.
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 20,000 20,000
Total 20,000 20,000
Funding Sources 2008 2009 2010 2011 2012 Total
Park Dedication Fund 20,000 20,000
Total 20,000 20,000
Operational Impact/Other I
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact
Department Park & Trail Improvements
Account # 1 Account # 3
Type Improvement
Useful Life 50 Years
Category Park
Priority n/a
Project # PK&T -086
Project Name Lake Ann Park Ballfield SbelterlRestrooms
Accou nt #2
Total Project Cost $750,000
Description I
Construction of a permanent ballfield shelter at Lake Ann Park. The building will include a concessions room, seating area, storage, utility room,
viewing balcony and modern restrooms.
Justification I
Lake Ann Park is one of two remaining community parks without a full service park building. Activity levels at the park justify this capital
investment.
Expenditures
Construction
2008
2009
2010
2011
750,000
750,000
2012
Total
750,000
750,000
Total
Funding Sources
Park Dedication Fund
2008
2009
2010
2011
750,000
750,000
2012
Total
750,000
750,000
Total
Operational Impact/Other I
Maintenance and operations costs.
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Planning
Type Improvement
Useful Life 1 0-1 5 years
Category Planning
Priority n/a
Total Project Cost $30,000
Project # PL-OOl
Project N~lmc Update of Comprehensive Plan
Account # 1 Account # 3
Accou ot #2
Description I
Update to city's 2020 Comprehensive Plan. Start the process in 2007 and complete in 2008.
Justification I
Mandated by State Statute that the comprehensive plan be updated every 10 years. This is an opportunity to evaluate and re-evaluate the city's land
use designation and MUSA staging, infrastructure plan (roads, sewer, storm wter, water) and parks and open space.
Expenditures
Camp Plan Update
2008
30,000
30,000
2009
2010
2011
2012
Total
30,000
30,000
Total
Funding Sources
General Fund
2008
30,000
30,000
2009
2010
2011
2012
Total
30,000
30,000
Total
Operatio"al Impact/Other -I
The update of the comprehensive provides additional information for capital improvements that may be needed to accommodate growth of the city.
Capita/Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact
Department Planning
Accou nt # 1
Account # 3
Type Improvement
Useful Life 10-15 years
Category Planning
Priority n/a
Project # PL-002
Project Name County Rd 61 (old 212) Corridor Study
Account #2
Total Project Cost $75,000
Description I
Corridor design along new County Road 61 and old State Highway 212.
Justification I
The speci fic corridor study is an extension of the comprehensive plan identifing necessary improvements and developing configurements for
parcels along the right of way.
Expenditures
Planning/Design
2008
2009
75,000
75,000
2010
2011
2012
Total
75,000
75,000
Total
Funding Sources
General Fund
2008
2009
75,000
75,000
2010
2011
2012
Total
75,000
75,000
Total
Operational Impact/Other I
The corridor study will identify development potential and specific infrastructure improvements needed for development.
Capital Improvement Program
City o.f Chanhassen, MN
88-012
2008 thru 2012
Contact Unassigned
Department Sanitary Sewer Improvements
Accou nt # 1 701-0000-4509
Account # 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n/a
Project #
Project NanlC Inflow and Infiltration Abatement
Account #2
Total Project Cost $800,000
Description I
This annual project includes televising, repairs and rehabilitation of existing sanitary sewer. The program also detects and eliminates points of
entry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration
Report. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees.
Justification I
City staff has identified numerous older sewer lines that are in need of repair. The City of Chanhassen pays the Metropolitan Council for sewage
treatment. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its
way into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to
the City for sewage disposal and increasing the load on the City's lift stations. Also, MCES may place a surcharge on cities that are not trying to
improve the inflow and infiltration problem.
Expenditures
Maintenance
2008
200,000
200,000
2009
200,000
200,000
2010
200,000
200,000
2011
200,000
200,000
2012
Total
800,000
800,000
Total
Funding Sources
Sewer Utility Fund
2008
200,000
200,000
2009
200,000
200,000
2010
200,000
200,000
2011
200,000
200,000
2012
Total
800,000
800,000
Total
Operational Impact/Other I
The efforts may decrease operational costs, emergency cal1 outs and maintenance costs. It is also the city's intent to use connection charges to help
fund for those costs. It is the city's bel ief that as new customers come on line those connection fees should help fund future infiltration problems.
Capital Improvement Program 2008 thru 2012 Contact Unassigned
City o.f Chanhassen, MN Departlnent Sanitary Sewer Improvements
SS-O 14 Type Improvement
Project # Useful Life Unassigned
Project Name Sanitary Sewer Replacement Category Utilities
Accou nt # 1 701-0000-4751 Account # 3 Priority n/a
Account #2 Total Project Cost $500,000
Description 1
Replacement or rehabi I itation of existing sanitary sewer lines in conjunction with the reconstruction of the City street.
Justification -I
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 250,000 250,000 500,000
Total 250,000 250,000 500,000
Funding Sources 2008 2009 2010 2011 2012 Total
Sewer Utility Fund 250,000 250,000 500,000
Total 250,000 250,000 500,000
Operational Impact/Other I
Th is project wi II decrease maintenance costs.
Capital Improvement Program
City o.f Chanhassen, MN
Project # SS-017
Project Name Sanitary Lift Station Rehabilitation Program
Account # 1 701-0000-4751
Accou nt #2
Accou nt # 3
2008 thru 2012
Contact Unassigned
Department Sanitary Sewer Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n/a
Total Project Cost $681,000
Description I
The sanitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment.
The City currently maintains 3 1 I ift stations. Many of these lift stations are high service pumps and need frequent servicing. The program will
service or replace pumps, pipe gallery, and electrical components as needed. The proposed lift stations for improvements are as follows:
2008 . #4, #5, #6 and #2 2009 . #7, #9 and #12 2010 - #8 and #24
2011 - # 10 and # 11 2012 - # 16 and #21
Justificatio n I
Reduce emergency calls and potential sewer backups.
Expenditures
Maintenance
Total
Funding Sources
Sewer Utility Fund
Total
Operational Impact/Other I
2008
140,000
140,000
2008
140,000
140,000
2009
76,000
76,000
2009
76,000
76,000
2010
260,000
260,000
2010
260,000
260,000
2011
105,000
105,000
2011
105,000
105,000
2012
100,000
100,000
Total
681,000
681,000
2012
100,000
100,000
Total
681,000
681,000
Capital Improvement Program 2008 thru 2012 Contact Unassigned
City o.f Chanhassen, MN Department Sanitary Sewer Improvements
Project # 88-018 Type Improvement
Useful Life Unassigned
Project Name Dell Road/77th Street Forcemain Replacement Category Utilities
Account # 1 701-0000-4751 Account # 3 Priority n/a
Account #2
Total Project Cost $ t 25,000
Description I
The forcel11ain on Dell Road and 77th Street that pumps the sewage from the industrial park has had several breaks in the past few years and needs
to be replaced. This project will be included with the street improvements in 2009.
Justification I
Eliminate emergency calls and sewer spills.
Expenditures 2008 2009 2010 2011 2012 Total
Maintenance 125,000 125,000
Total 125,000 125,000
Funding Sources 2008 2009 2010 2011 2012 Total
Sewer Utility Fund 125,000 125,000
Total 125,000 125,000
Operational Impact/Other I
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact
Department Sanitary Sewer Improvements
Account # 1 701-0000-4702
Account # 3
Type Unassigned
Useful Life
Category Unassigned
P,'iority n/a
Project # 88-020
Project Name 2010 MUSA Sanitary Lift Station
Account #2
Total Project Cost $2,200,000
Description I
This lift station will be located on Powers Boulevard south ofTH 212 to service the future 2010 MUSA area and will also be used by future
MUSA areas.
Justification I
Required for future developJllent of the 2010 MUSA area. The cost will be assessed to future MUSA areas using connection fees.
Expenditures
Construction
2008
2009
2010
2,200,000
2,200,000
2011
2012
Total
2,200,000
2,200,000
Total
Funding Sources
Sewer Utility Fund
2008
2009
2010
2,200,000
2,200,000
2011
2012
Total
2,200,000
2,200,000
Total
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact
Department Sanitary Sewer Improvements
Project # 88-021
Project Name Lift Station #3 Standby Generator
Type Unassigned
Useful Life
Accou nt # 1 Accou nt # 3
Category Utilities
Priority n/a
Account #2
Total Project Cost $80,000
Description I
Lift station #3 had improvements made to the station in 2007. These improvements included increasing the size of the wet well and a new pump.
This lift station picks up 4 other sma))er lift stations before discharging into the Metropolitan Council line. It is critical this lift station be in
operation even if power is interupted. A standby generator is recommended for this lift station for reliability. The City has other standby
generators. The City has 30 lift stations and it is difficult to operate all the lift stations with the City's few portable generators.
Justification I
Increase reliability of lift station during power outages.
Expenditures
Construction
2008
80,000
80,000
2009
2010
2011
2012
Total
80,000
80,000
Total
Funding Sources
Sewer Utility Fund
2008
80,000
80,000
2009
2010
2011
2012
Total
80,000
80,000
Total
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012 Contact Unassigned
City 0.( Chanhassen, MN Department Street Improvemen ts
Project # ST -001 Type Improvement
Useful Life Unassigned
Project Name West 78th St Streetlights
Category S treets/H i gh wa ys
Account # 1 Accou nt # 3 Priority n/a
Account #2
Total Project Cost $300,000
Description I
Install street lights on West 78th Street from the Western edge of Lake Ann Park to Century Blvd. Street lights already exist on the section of
West 78th Street east of this section of road.
Justification I
V isibi I ity wi 11 be improved with the installation of street lights.
Expenditures 2008 2009 2010 2011 2012 Total
Equipment 300,000 300,000
Total 300,000 300,000
Funding Sources 2008 2009 2010 2011 2012 Total
MSA 300,000 300,000
Total 300,000 300,000
Operational Impact/Other 1
This project will increase maintenance and electrical usage costs.
Capital Improvement Program
City 0.( Chanhassen, MN
Project #
ST -003
Project Name Lyman Boulevard Improvements
Account # 3
Total Project Cost $19,850,000
Accou nt # 1
Accou nt #2
2008 thru 2012
Contact Unassigned
Department Street Improvements
Type Improvement
Useful Life Unassigned
Category
Priority n/a
Description I
The city will need to participate in the reconstruction of Lyman Boulevard between Powers Boulevard and TH 41. The street segment is proposed
to be widened and urbanized to accommodate increased traffic volume from TH 212, new developments in the area and the new Chanhassen high
school. Improvements include roadway widening, signals, stormsewer improvements, trail improvement and trunk watermain improvement.
Phase I - 2008 - Improvements include the roadway section from Galpin Blvd to Audubon south
Phase II - 2010 - Improvements are from Audubon south to Powers Blvd
Phase III - 2012 - Improvements are from Galpin Blvd to TH 41
Justification I
To improve safety and mobility along the corridor.
Expenditures
Construction
Total
Funding Sources
Arterial Collector Dvlpmnt Fee
Assessment/Revolving Assess
MSA
Other Agency Contribution
Park Dedication Fund
Sewer Utility Fund
Surface Water Utility Fund
Water Utility Fund
2008
8,950,000
8,950,000
2009
2010
5,300,000
5,300,000
2011
2012
5,600,000
5,600,000
Total
19,850,000
19,850,000
Total
1,250,000
400,000
3,577,000
11 ,673,000
850,000
100,000
1,500,000
500,000
19,850,000
Total
Operational Impact/Other I
This project will increase maintenance costs in relation to the increase in City Utilities and Trails constructed with the project.
2008 2009 2010 2011
250,000 1,000,000
400,000
1,243,000 490,000
5,457,000 2,710,000
500,000 350,000
50,000 50,000
800,000 450,000
250,000 250,000
8,950,000 5,300,000
2012
1,844,000
3,506,000
250,000
5,600,000
Capital Improvement Program
City 0.( Chanhassen, MN
ST-012
2008 thru 2012
Contact Unassigned
Department Street Improvements
Type Improvemen t
Useful Life Unassigned
Category Streets/Hi gh ways
Priority n/a
Total Project Cost $14,436,000
Project #
Project NanlC Annual Street Improvement Program
Account # 1 601-0000-4751
Accou nt # 3
Account #2
Description I
Annual project to rehabilitate and reconstruct streets in the City. Current 5-year plan shows the following neighborhood areas:
Residential 2008 - Laredo Dr/Ln, Longview Dr, Cimarron Circle, and Highland Drive
2009 - Chaparral and Saratoga Dr/Cir
2010 - Erie Ave area and Red Cedar Pt
2011 - Carver Beach Rd area, Sandy Hook Rd area, Holly Ln, Royal Oak Estates, Crimson Bay, Ches Mar and Timberwood
2012 - Greenbriar, Fir Tree, Elm Tree, Dogwood and Shore Drive
MSA 2009 - Audubon Road Lyman Blvd, to Lake Drive West
2010- West 78th Street
Justification I
The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the
life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective.
Rehabilitation projects extend the life of the street. In cases with utility or poor subgrade needs to be replaced or where streets have deteriorated to
a point where rehabilitation will no longer be practical reconstruction of the street is necessary. A feasibility study is written to consider the merits
of the project and scope of work.
'Prior
I 4,436,000 I
'1' 0 t nI
Expenditures
Construction
2008
1,600,000
1,600,000
2009
3,500,000
3,500,000
2010
2,200,000
2,200,000
2011
1,200,000
1,200,000
2012
1 ,500,000
1,500,000
Total
10,000,000
10,000,000
Total
Prior Funding Sources 2008 2009 2010 2011 2012 Total
I 4,436,000 I Assessment/Revolving Assess 1,600,000 1,000,000 1,900,000 1,200,000 1,500,000 7,200,000
T'otaJ MSA 2,500,000 300,000 2,800,000
Total 1,600,000 3,500,000 2,200,000 1,200,000 1,500,000 10,000,000
Operational Impact/Other)
This project nlay decrease maintenance costs.
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Street Improvements
Project #
ST-017
Type Improvement
Useful Life Unassigned
Category Streets/Highways
Project Name TH 101 Corridor Preservation Planning
Account # 1 415-0000-4300
Account # 3
Priority n/a
Accou nt #2
Total Project Cost $500,000
Description I
A preliminary design, environmental scoping study was completed in 2007. A study to complete the environmental assessment review for the
segment from Lyman Blvd to Pioneer Trail is scheduled for 2008. In 2010, a study to complete the environmental review is planned. No funding
for improvenlcnts have been identified at this time.
Justification I
To improve safety and mobility along the corridor and plan for future growth.
Expenditures
Planning/Design
2008
200,000
200,000
2009
2010
300,000
300,000
2011
2012
Total
500,000
500,000
Total
Funding Sources 2008 2009 2010 2011 2012 Total
MSA 50,000 50,000 100,000
Other Agency Contribution 150,000 250,000 400,000
Total 200,000 300,000 500,000
Operational Impact/Other I
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact Paul Oehme
Departrnent Street Improvements
Type Maintenance
Useful Life 7-10 years
Category S treets/H i gh wa ys
Priority n/a
Total Project Cost $2,310,000
Project #
ST-018
Project Name Pavement Management
Account # 1 420-0000-4751
Accou nt # 3
Account #2
Description I
This project will provide maintenance such as crack sealing, seal-coating, pothole patching for city streets. The projects will be determined
annually based on the pavement condition index as generated by the pavement management program.
Justification I
This will provide a centralized funding mechanism that will help reduce the effect on General Fund operating expenditures.
Prior
[ - 385,000 J
l'ot~ll
Expenditures
Maintenance
2008
385,000
385,000
2009
385,000
385,000
2010
385,000
385,000
2011
385,000
385,000
2012
385,000
385,000
Total
1,925,000
1,925,000
Total
Prior Funding Sources 2008 2009 2010 2011 2012 Total
I 385,000 I MSA 117,125 117,125 117,125 117,125 117,125 585,625
rrot~ll T ax Levy 267,875 267,875 267,875 267,875 267,875 1 ,339,375
Total 385,000 385,000 385,000 385,000 385,000 1,925,000
Operational Impact/Other 1
This will reduce the need to reconstruct streets and will allow us to more closely match the life of streets to the utility lines that lie underneath
them. This will allow better coordination when we need to replace water and sewer lines with replacing roads.
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact
Department Street Improvements
Project #
ST-019
Type Unassigned
Useful Life
Project Name TH 5 Corridor Study - TH 41 to TH 212
Accou nt # 1 415-0000-4300
Account # 3
Category Unassigned
Priority n/a
Account #2
Total Project Cost $10,000
Description -I
This is a joint project between Carver County, MnDot and the cities along the corridor to plan for future improvements and complete the
environmental and preliminary design. The first phase of the environmental review is anticipated to be completed in 2008. The project
programmed for 2009 is anticipated to complete the environmental assessment.
Justification I
This study is the first step in preliminary design and scoping to plan for improvements to the corridor. The city's portion of the project will be used
for the seglllent between TH 41 and the west city limits.
Expenditures
Planning/Design
2008
2009
10,000
10,000
2010
2011
2012
Total
1 0,000
10,000
Total
Funding Sources
MSA
2008
2009
10,000
10,000
2010
2011
2012
Total
10,000
10,000
Total
Operational Impact/Other -I
Capital Improvement Program 2008 thru 2012
Contact
City o.f Chanhassen, MN Department Street Improvemen ts
Project # ST -020 Type Improvemen t
Useful Life 7 -1 0 years
Project N anlC Downtown- Decorative Streetlights/Signal Enhancemnt Category S treets/H i gh wa ys
Accou nt # 1 Account # 3 Priority n/a
Accou ot #2
Total Project Cost $35,000
Description I
Most of the downtown decorative streetlights are not turned on because the bulbs are to bright and use too much power. The decorative
streetlights and three signals west of Kerber Boulevard need painting. The project is to paint all of the decorative downtown streetlights and three
signals and replace the bulbs in the streetlights to accent lighting.
Justification I
To enhance the look of the downtown area.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 35,000 35,000
Total 35,000 35,000
Funding Sources 2008 2009 2010 2011 2012 Total
AssessmenURevolving Assess 35,000 35,000
Total 35,000 35,000
I
Operational Impact/Other I
Capita/Improvement Program 2008 thru 2012 Contact Unassigned
City o.fChanhassen, MN Department Surface Water Management
J> roj eet # SWMP-012 Type Improvement
Useful Life Unassigned
Project Name SWMP Implementation Category SWMP
Accou nt # 1 720-0000-4300 Accou nt # 3 Pdority n/a
Accou nt #2 Total Project Cost $2,000,000
Description I
This project implements projects identified as high priority by the City's Surface Water Management Plan, the National Pollutant Discharge
Elimination System (NPDES) Phase II permit, City Council and/or City staff.
Justification I
These projects are necessary to meet state and federal government requirements for storm drainage; address storm water issues in existing
developments; maintain existing infrastructure; and construct the infrastructure recommended by the City's Surface Water Management Plan.
Prior Expenditures 2008 2009 2010 2011 2012 Total
[ 450,000 J Construction 350,000 300,000 300,000 300,000 300,000 1,550,000
'rot'll Total 350,000 300,000 300,000 300,000 300,000 1,550,000
I)rior Funding Sources 2008 2009 2010 2011 2012 Total
I 450,000 I Surface Water Utility Fund 350,000 300,000 300,000 300,000 300,000 1,550,000
'1' 0 t al Total 350,000 300,000 300,000 300,000 300,000 1,550,000
Operational Impact/Other I
Citywide. No map.
Capital Improvement Program 2008 thru 2012 Unassigned
Contact
City 0.( Chanhassen, MN Department Surface Water Management
Project # SWMP-014 Type Improvement
Useful Life Unassigned
Project N anlC Property Acquisition
Category SWMP
Accou nt # 1 720-0000-4701 Accou nt # 3 P.'jority n/a
Account #2 410-0000-4701
Total Project Cost $850,000
Description I
The City will acquire property in accordance with its Comprehensive and Surface Water Management Plans.
Justification I
Properties within the City must be acquired in order to achieve the goals set forth in the Comprehensive and Surface Water Management Plans.
Expenditures 2008 2009 2010 2011 2012 Total
Land Acquisition 250,000 100,000 200,000 200,000 100,000 850,000
Total 250,000 100,000 200,000 200,000 100,000 850,000
Funding Sources 2008 2009 2010 2011 2012 Total
Surface Water Utility Fund 250,000 100,000 200,000 200,000 100,000 850,000
Total 250,000 100,000 200,000 200,000 100,000 850,000
Operational Impact/Other 1
Citywide. No map.
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Account # 1 720-0000-4702
Account # 3
Type Improvement
Useful Life Unassigned
Category SWMP
Priority n/a
Project # SWMP-019
Project Name Street Improvement Projects - Storm Water Mgmt
Accou I1t #2
Total Project Cost $1,100,000
Description I
An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects
undertaken by the engineering and public works departments.
Justification I
Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with
federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects.
Expenditures
Construction
2008
400,000
400,000
2009
2010
300,000
300,000
2011
2012
400,000
400,000
Total
1,100,000
1,100,000
Total
Funding Sources
Surface Water Utility Fund
Total
2008
400,000
400,000
2009
2010
300,000
300,000
2011
2012
400,000
400,000
Total
1,100,000
1,100,000
Operational Impact/Other I
Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Account # 1 720-0000-4705
Account # 3
Type Equipment
Useful Life 10-15 years
Category SWMP
Priority n/a
Project #
SWMP-021
Project Name Leaf Vacuum
Account #2
Total Project Cost $40,000
Description I
Purchase of a leaf vacuum trailer to address street sweeping requirements ofNPDES Phase II MS4 permit.
Justification I
A leaf vacuum wi II be more effective at picking up leaves, wet and dry, from streets than a street sweeper. This will prolong the life of the street
sweeper, which is a more expensive piece of equipment. The leaf vacuum also shreds leaves to increase productivity between dumping.
Expenditures
Equipment
2008
2009
2010
40,000
40,000
2011
2012
Total
40,000
40,000
Total
Funding Sources
Surface Water Utility Fund
2008
2009
2010
40,000
40,000
2011
2012
Total
40,000
40,000
Total
Operational Impact/Other I
The collected material wi II have to be disposed of properly.
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Project #
SWMP-022
Type Equipment
Useful Life 10-15 years
Category SWMP
Project Nnmc Excavator
Account # 1 720-0000-4705
Accou nt # 3
P.'iority n/a
Aceou ot #2
Total Project Cost $70,000
Description I
Purchase of a small excavator designed with rubber tracks to access storm water infrastructure for maintenance purposes. Equipment will have a
boom capable of revolving 360 degrees.
Justification I
The small size of th is excavator wi 11 allow street crews to maintain infrastructure in small easements or in areas with limited access potential. Light
weight minimizes damage to properties. Revolving boom minimizes site disturbance. Once inventory and inspection of stormwater infrastructure
has taken place, it is anticipated that many ponds and drainageways will require maintenance to comply with NPDES Phase II.
Expenditures
Equipment
2008
2009
2010
70,000
70,000
2011
2012
Total
70,000
70,000
Total
Funding Sources
Surface Water Utility Fund
Total
2008
2009
2010
70,000
70,000
2011
2012
Total
70,000
70,000
Operational Impact/Other I
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Project #
SWMP-023
Type Equipment
Useful Life Unassigned
Category SWMP
Project Name Vactor, Used
Account # 1 720-0000-4705
Accou nt # 3
Priority n/a
Actou nt #2
Total Project Cost $200,000
Description I
Purchase of a small vactor truck for maintenance of storm water infrastructure.
Justification I
Development adds stormwater infrastrucure. Currently, street department shares equipment with utility department. Utility department has
increased use of current vactor and streets department has increased need for additional vactor. The small vactor will be used off road in easements
where the larger vactor cannot maneuver. Also, the small vactor will be used on trails where the larger vactor should not go do due to damage it
caused to the bituminous trail due to its weight. Will increase efficiency of SWMP cleanouts and other maintenance. Will also serve as a backup
to current vactor in an emergency. Will assist in achieving compliance with NPDES Phase II MS4 permit.
Expenditures
Equipment
2008
2009
200,000
200,000
2010
2011
2012
Total
200,000
200,000
Total
Funding Sources
Surface Water Utility Fund
Total
2008
2009
200,000
200,000
2010
2011
2012
Total
200,000
200,000
Operational Impact/Other I
The co Ilected material wi II have to be disposed of properly.
Capital Improvement Program 2008 thru 2012 Contact Unassigned
City o.f Chanhassen, MN Department Surface Water Management
Project # SWMP-024 Type Improvemen t
Useful Life Unassigned
Project Name Bluff Cr. Nat. Resources Mgmt Plan Implementation SWMP
Category
Accou nt # 1 720-0000-4751 Account # 3 Priority n/a
Accou nt #2 Total Project Cost $900,000
Description I
Construction and restoration as recommended in the Bluff Creek Natural Resource Management Plan. It is unknown how much funding the Riley-
Purgatory-Bluff Creek Watershed District will contribute to this project. Will assist in achieving compliance with NPDES Phase II MS4 Permit.
Justification I
Implementation of recommendations in 1996 Bluff Creek Natural Resource Management Plan in cooperation with the Riley-Purgatory-Bluff Creek
Watershed District. These projects will improve habitat and aesthetics in the Bluff Creek Watershed.
p ri 0 r Expenditures 2008 2009 2010 2011 2012 Total
[ 150,000 I Construction 150,000 150,000 150,000 150,000 150,000 750,000
'rot". Total 150,000 150,000 150,000 150,000 150,000 750,000
Prior Funding Sources 2008 2009 2010 2011 2012 Total
I 150,000 J Surface Water Utility Fund 150,000 150,000 150,000 150,000 150,000 750,000
'rot~ll Total 150,000 150,000 150,000 150,000 150,000 750,000
Operational Impact/Other I
I The restored areas will require regular maintenance to sustain the native plant communities.
Capital Improvement Program 2008 thru 2012 Contact
City 0.( Chanhassen, MN Department Surface Water Management
Project # SWMP-026 Type Improvement
Useful Life
Project Name Lake Minnewashta Outlet SWMP
Category
Accou nt # 1 720-0000-4751 Accou nt # 3 PI.iority n/a
Accou nt #2 Total Project Cost $30,000
Description I
lnstall a permanent outlet structure at the outlet for Lake Minnewashta.
Justification I
The current outlet is sand and is therefore easily altered. Alterations to the outlet can cause the entire lake to drain down to the outlet elevation.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 30,000 30,000
Total 30,000 30,000
Funding Sources 2008 2009 2010 2011 2012 Total
Surface Water Utility Fund 30,000 30,000
Total 30,000 30,000
Operational Impact/Other I
None
Capital Improvement Program 2008 thru 2012 Contact
City o.f Chanhassen, MN Department Surface Water Management
I Pro.i ect # SWMP-027 Type Improvemen t
Useful Life
Project N a Ole Natural Resources Stewardship Plan
Category SWMP
Account # 1 720-7202-4300 Account # 3 Priority n/a
Account #2
Total Project Cost $180,000
Description I
This project would develop and implement over time a stewardship plan for all public natural resources.
Justification I
The plan is necessary to enhance and protect the city's public natural resource investments in land and vegetation. The plan could prioritize
strategies, sites and processes as well as inventory the existing conditions of publically held properties.
Prior Expenditures 2008 2009 2010 2011 2012 Total
I 50,000 I Planning/Design 50,000 20,000 20,000 20,000 20,000 130,000
'rot~ll Total 50,000 20,000 20,000 20,000 20,000 130,000
Prior Funding Sources 2008 2009 2010 2011 2012 Total
I 50,000 I Reforestation 50,000 20,000 20,000 20,000 20,000 130,000
'1' 0 t nl Total 50,000 20,000 20,000 20,000 20,000 130,000
Operational Impact/Other I
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact
Department Surface Water Management
Project #
SWMP-029
Type Improvement
Useful Life
Project NanlC Landings Court Storm Water Pond Imp
Category SWMP
Accou nt # 1
Account # 3
Priority n/a
Account #2
Total Project Cost $70,000
Description I
This project addresses storm water quantity issues entering Lake Minnewashta. This project was discussed with the City Council during the
Boulder Cove development application. The improvements include ponding and additional storm water piping to the lake.
Justification I
To help address erosion and reduce storm water discharge rates into Lake Minnewashta.
Expenditures
Construction
2008
70,000
70,000
2009
2010
2011
2012
Total
70,000
70,000
Total
Funding Sources
Surface Water Utility Fund
Total
2008
70,000
70,000
2009
2010
2011
2012
Total
70,000
70,000
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact
Department Surface Water Management
Project #
SWMP-030
Type Improvement
Useful Life
Project Nnmc Lake Susan Shoreline Restoration Improvements
Accou nt # 1
Account # 3
Category SWMP
Priority n/a
Aceou nt #2
Total Project Cost $90,000
Descriptionl
Residents around Lake Susan have requested the City of Chanhassen to repair shoreline erosion problems. Restoration of the shoreline took place
at Lake Susan Park in 2006. The restoration under this project is similar in nature to the 2006 project. The funding from Other Agency
Contributions will come from Water Shed District funds.
Justification I
To reduce shoreline erosion.
Expenditures
Construction
2008
90,000
90,000
2009
2010
2011
2012
Total
90,000
90,000
Total
Funding Sources
Other Agency Contribution
Surface Water Utility Fund
Total
2008
39,000
51,000
90,000
2009
2010
2011
2012
Total
39,000
51 ,000
90,000
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012 Contact
City 0.( Chanhassen, MN Department Surface Water Management
Project # SWMP-031 Type Improvement
Useful Life
Project Name West Lotus Lake Drainage Improvements
Category SWMP
Account # 1 Account # 3 Priority n/a
Accou nt #2
Total Project Cost $800,000
Description I
This improvement project addressess storm water quality and quantity issues in the Lotus Lake water shed. In 2005, the regional pond over topped
causing significant damage down stream. The storm water ponding in this area was discussed with the City Council during the review of the Lotus
Woods development. The Water Shed District has made Lotus Lake a high priority in their capital improvement plan. It is proposed the City work
jointly with the Water Shed District on this project. The funding from Other Agency Contributions will come from Water Shed District funds.
Justification I
To improve water quality and quantity in the Lotus Lake water shed.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 400,000 400,000 800,000
Total 400,000 400,000 800,000
Funding Sources 2008 2009 2010 2011 2012 Total
Other Agency Contribution 200,000 200,000 400,000
Surface Water Utility Fund 200,000 200,000 400,000
Total 400,000 400,000 800,000
i
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012 Contact Unassigned
City o.f Chanhassen, MN Department Water System Improvements
Project # W-015 Type Improvemen t
Useful Life Unassigned
Project Name Repainting: West 76th St. Water Tower Category Utilities
Account # 1 700-0000-4751 Account # 3 P..iority n/a
Account #2 Total Project Cost $80,000
Description I
Provides for the recoating of the interior and exterior surfaces of the W. 76th St. Water Tower. The water tower is currently not used for water
storage because of the hydraulic changes that were made when the Lake Lucy Road/Powers Boulevard tower was made.
Justification I
This type of infrastructure requires repainting to protect the metal structure so more costly repairs can be avoided.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 80,000 80,000
Total 80,000 80,000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 80,000 80,000
Total 80,000 80,000
i Operational Impact/Other I
This project does not increase operational costs.
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Water System Improvements
Accou nt # 1
Account # 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n/a
Project #
W-020
Project Nume Arboretum Water Main
Accou nt #2
Total Project Cost $220,000
Description I
Installation of a missing piece of water main to provide better looping and system reliability between the Arboretum Water Tower and W 78th
Street.
Justification I
Completing this section of water main will complete a missing loop in the system providing improved water quality and pressure as well as
increasing operational reliability. This project was identified in the 2003 Master Water Study.
Expenditures 2008 2009 2010 2011 2012 Total
Planning/Design 20,000 20,000
Construction 200,000 200,000
Total 220,000 220,000
Funding Sources
Water Utility Fund
2008
2009
2010
220,000
220,000
2011
2012
Total
220,000
220,000
Total
Operational Impact/Other I
This project will increase maintenance costs.
Capital Improvement Program
City o.f Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Water System Improvements
Account # 1 700-0000-4751
Account # 3
Type Improvement
Useful Life Unassigned
Category Utilities
P'4iority n/a
Project # W -024
Project Name Watermain Replacement
Account #2
Total Project Cost $2,060,000
Description I
Replacement of existing water main lines in coordination with the reconstruction of the City street.
Justification I
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water
main, replacement may be the Inost cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing
project in the City.
Expenditures
Construction
2008
660,000
660,000
2009
2010
700,000
700,000
2011
2012
700,000
700,000
Total
2,060,000
2,060,000
Total
Funding Sources
Water Utility Fund
2008
660,000
660,000
2009
2010
700,000
700,000
2011
2012
700,000
700,000
Total
2,060,000
2,060,000
Total
Operational Impact/Other I
These projects will decrease maintenance costs.
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Water System Improvements
Account # 1 700-0000-4751
Account # 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority n/a
Pro,iect # W -025
Project Name Well #4 Improvements
Account #2
Total Project Cost $350,000
Description I
Engineering has reviewed the test data of the water from Well #4 and currently, the radium levels are at the upper end of the MDH guidelines. In
2004, staff reviewed the radium problems with the Minnesota Dept of Health (MDH). The well is currently used as a peak well during high
demand periods which blends the Well #4 water with the other well water in the system. If the radium levels continue to rise, the City may have to
enter into a monitoring program with the MDH on a temporary basis. The MDH at that time will determine the acceptable amount of water that
can be pumped into the City system from Well #4. If an agreement with the MDH cannot be reached, the well may have to be redeveloped, capped
or have a small treatment plant built for this well. Well #4 is also a high producer of iron and manganese. Redevelopment of the well is budgeted
for 2009.
Justification I
Well #4 continues to test high for RADIUM and is a high producer of iron and manganese which creates "rusty" water.
Expenditures
Construction
2008
2009
350,000
350,000
2010
2011
2012
Total
350,000
350,000
Total
Funding Sources
Water Utility Fund
2008
2009
350,000
350,000
2010
2011
2012
Total
350,000
350,000
Total
Operational Impact/Other I
This project will not increase operations cost.
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Water System Improvements
Account # 1 700-0000-4751
Account # 3
Type Improvement
Useful Life Unassigned
Category
Priority n/a
Project #
W-027
Project Name Pressure Reducing Station 8
Accou nt #2
Total Project Cost $215,000
Description -I
Construction of a pressure reducing valve station in the 2005 MUSA area by Pioneer Trail is programmed for 2008 if the development along
Pioneer Trail is constructed. Two pressure reducing stations are programmed for the 2010 MUS A area.
Justification I
Identified in the 2010 Comprehensive Water Supply Plan. Needed to control watermain pressure due to elevation changes.
Expenditures
Construction
2008
65,000
65,000
2009
2010
150,000
150,000
2011
2012
Total
215,000
215,000
Total
Funding Sources
Water Utility Fund
2008
65,000
65,000
2009
2010
150,000
150,000
2011
2012
Total
215,000
215,000
Total
Operational Impact/Other I
This project will increase maintenance costs.
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact Unassigned
Departrnent Water System Improvements
Account # 1 700-0000-4751
Account # 3
Type Improvement
Useful Life Unassigned
Category
Priority n/a
Project # W -030
Project Name Raw Well Water Collection System
Accou nt #2
Total Project Cost $500,000
Description I
This project includes designing and installing watermain from new and existing well sites to the phase II treatment plant at the west end of the city.
Justification I
Raw water lines are required to feed the water directly from the wells to the treatment plant prior to distribution to the water system. These
imporvements were identified in the 2003 Master Water Plan.
Expenditures
Construction
2008
2009
2010
2011
2012
500,000
500,000
Total
500,000
500,000
Total
Funding Sources
Water Utility Fund
2008
2009
2010
2011
2012
500,000
500,000
Total
500,000
500,000
Total
Operat;onallmpact/Other I
This project will increase maintenance costs.
Capital Improvement Program 2008 thru 2012 Contact Unassigned
City 0.( Chanhassen, MN Department Water System Improvements
I W-032 Type Improvemen t
I ProJect # Useful Life Unassigned
Project Name Well Rehabilitation Program
Category Uti 1i ti es
Accou nt # 1 700-0000-4530 Account # 3 PI.iority n/a
Accou nt #2
Total Project Cost $255,000
Description I
This program annually inspects and performs regular maintenance of the City's wells. Well pumps are recommended to be serviced every 8 years.
In 2008, it is recommended that the pumps in wells #2 and #3 be lowered because of the drop in the aquifer levels.
Justification I
To extend the life and ensure reliability of the City's well fields. Performing regular maintenance will extend the life of well components, reduce
emergency calls and have a more reliable water supply system.
Expenditures 2008 2009 2010 2011 2012 Total
Maintenance 80,000 40,000 45,000 45,000 45,000 255,000
Total 80,000 40,000 45,000 45,000 45,000 255,000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 80,000 40,000 45,000 45,000 45,000 255,000
Total 80,000 40,000 45,000 45,000 45,000 255,000
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact
Department Water System Improvements
Project #
W-037
Type Improvement
Useful Life
Project Name West Water Treatment Plant
Account # 1 Account # 3
Category Utilities
Priority n/a
Accou nt #2
Total Project Cost $11,000,000
Description I
The treatment of potab Ie water for the high zone area and the west side of town is planned for construction in 2012. This treatment plant, along
with the east treatment plant, wi II treat the city's potable water for an average day's usage.
Justification I
To remove iron and l11anganese from the water prior to distributing.
Expenditures
Construction
2008
2009
2010
2011
2012
11,000,000
11,000,000
Total
11,000,000
11,000,000
Total
Funding Sources
Revenue Bonds
2008
2009
2010
2011
2012
11,000,000
11,000,000
Total
11,000,000
11,000,000
Total
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact
Department Water System Improvements
Project # W -038
Project Name Stand by Generator for wells
Type Unassigned
Useful Life
Account # 1 700-0000-4705
Accou nt # 3
Category Unassigned
Priority n/a
Account #2
Total Project Cost $120,000
Description I
With the addition of the water treatment plant standby generation for wells is needed to keep water supplied to the treatment plant. The treatment
plant has a standby generator for the plant but only one well. The requested standby generator will be able to run an additional two wells. This
wi II allow the plant to treat water to meet an average day demand.
Justification I
To meet average day water demand for the city if power is disrupted for an extended period of time.
Expenditures
Equipment
2008
120,000
120,000
2009
2010
2011
2012
Total
120,000
120,000
Total
Funding Sources
Water Utility Fund
2008
120,000
120,000
2009
2010
2011
2012
Total
120,000
120,000
Total
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact
Department Water System Improvements
Accou nt # 1
Accou nt # 3
Type Unassigned
Useful Life
Category Utilities
Priority n/a
Project #
W-039
Project Name Audubon South Watermain Loop
Accou nt #2
Total Project Cost $150,000
Description .1
This watermain project will extend watermain from the intersection of Lyman Blvd and Audubon south along Audubon to connect to the Liberty
on Bluff Creek development. Service will be provided to the existing homes along Audubon.
Justification I
To service existing homes along Audubon and profice a watermain loop for properties in the area. To provide a loop watermain system for the area
Expenditures
Construction
2008
150,000
150,000
2009
2010
2011
2012
Total
150,000
150,000
Total
Funding Sources
AssessmenURevolving Assess
Water Utility Fund
2008
20,000
130,000
150,000
2009
2010
2011
2012
Total
20,000
130,000
150,000
Total
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012 Contact
City 0.( Chanhassen, MN Department Water System Improvements
Pro.iect # W -040 Type Unassigned
Useful Life
Project N anle Repaint Melody Hills Water Tower
Category Utilities
Accou nt # 1 Account # 3 Priority n/a
Accou nt #2
Total Project Cost $300,000
Description I
Provides for the recoating of the interior and exterior surfaces of the Melody Hills water tower.
Justification I
Steel water towers require recoating to protect the metal and to prevent more costly repairs.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 300,000 300,000
Total 300,000 300,000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 300,000 300,000
Total 300,000 300,000
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012
Contact
City o.(Chanhassen, MN Department Water System Improvements
Project # W-041 Type Unassigned
Useful Life
Project Name Repaint Lake Lucy Water Stand Pipe
Category Uti 1 i ti es
Accou nt # 1 Accou nt # 3 Priority n/a
Account #2
Total Project Cost $550,000
Description I
This project will repaint the interior and exterior surfaces of the Lake Lucy stand pipe.
Justification I
Steel tanks require recoating to protect the metal to prevent more costly repairs.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 550,000 550,000
Total 550,000 550,000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 550,000 550,000
Total 550,000 550,000
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact
Department Water System Improvements
Project # W -042
Project Name High Zone Elevated Storage Tank
Type Unassigned
Useful Life
Account # 1 Account # 3
Category Utilities
PI.iority n/a
Accou nt #2
Total Project Cost $1,850,000
Description I
Based on current and projected system demands, the high zone should have additional storage capacity. The 2008 water comprehensive plan
recommends a total of 750,000 gallons for storage. Currently, the high zone only has 200,000 gallons of storage.
Justification I
To meet current and future water demands for the high zone area and to meet recommended fire flow storage requirements.
Expenditures
Construction
2008
2009
2010
1,850,000
1,850,000
2011
2012
Total
1,850,000
1,850,000
Total
Funding Sources
Water Utility Fund
2008
2009
2010
1,850,000
1,850,000
2011
2012
Total
1,850,000
1,850,000
Total
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012 Contact
City 0.( Chanhassen, MN Department Water System Improvements
Project # W-043 Type Improvement
Useful Life
Project Nanle Well #14 Improvements Utilities
Category
Accou nt # 1 Account # 3 Priority n/a
Account #2 Total Project Cost $1,200,000
Description I
This well is proposed to meet the water needs of the growing community.
Justification I
To meet the growing water needs of the city.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 1,200,000 1,200,000
Total 1,200,000 1,200,000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 1,200,000 1,200,000
Total 1,200,000 1,200,000
I
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012 Contact
City 0.( Chanhassen, MN Department Water System Improvements
I Pro,iee! # W-044 I Type Unassigned
Useful Life
ProJcct Nanle Well #13 Category Utilities
Accou nt # 1 Account # 3 Priority n/a
Accou ot #2 Total Project Cost $1,200,000
Description I
This well is proposed to replace the lost capacity of well #6.
Justification I
To meet the peak summer irrigation demands of the city.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 1,200,000 1,200,000
Total 1,200,000 1,200,000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 1,200,000 1,200,000
Total 1,200,000 1,200,000
Operational Impact/Other I
Capital Improvement Program
City 0.( Chanhassen, MN
2008 thru 2012
Contact
Account # 1
Account # 3
Departlnent Water System Improvements
Type Unassigned
Useful Life
Category Utilities
Priority n/a
Project #
W -045
Projcct Name West Junior High School Well
Account #2
Total Project Cost $715,000
Description I
This improvement will convert the school well from a stand by well into a regular producing municipal well. Currently, the well can only produce
250 gpm. It is anticipated the well could produce as much as 800 gpm. The project consists of a new submersible pump and using some electrical
components from well #5 that are anticipated to be decommissioned. A new water main is necessary to be extended to well #7 well house for
chel111cal treatment. Valve improvements are also anticipated to have the ability to bleed this water out of the high zone pressure area.
Justification I
To meet the current water demand of the city.
Expenditures
Construction
2008
715,000
715,000
2009
2010
2011
2012
Total
715,000
715,000
Total
Funding Sources
Water Utility Fund
2008
715,000
715,000
2009
2010
2011
2012
Total
715,000
715,000
Total
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012
Contact
City 0.( Chanhassen, MN Department Water System Improvements
Project # W -046 Type Unassigned
Useful Life
Project N~lme Low Zone 1 million gallon Elevated Storage Tank
Category Utilities
Accou nt # 1 Account # 3 PI.iority n/a
Account #2
Total Project Cost $2,500,000
Description I
This tank is needed to l11eet the peak day and potential emergency demand for the growth of the community.
Justification I
To meet peak demand and emergency water demand for the growing community.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 2,500,000 2,500,000
Total 2,500,000 2,500,000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 2,500,000 2,500,000
Total 2,500,000 2,500,000
Operational Impact/Other I
Capital Improvement Program 2008 thru 2012
Contact
City 0.( Chanhassen, MN Department Water System Improvements
Project # W-047 Type Unassigned
Useful Life
Project Name Well #12 Improvements
Category Utilities
Accou nt # 1 Account # 3 Priority n/a
Account #2
Total Project Cost $940,000
Description I
This well is proposed to replace the lost capacity of Well #5.
Justification I
To meet the peak summer irrigation demands of the city.
Expenditures 2008 2009 2010 2011 2012 Total
Construction 940,000 940,000
Total 940,000 940,000
Funding Sources 2008 2009 2010 2011 2012 Total
Water Utility Fund 940,000 940,000
Total 940,000 940,000
Operational Impact/Other I
...
CITY OF CHANHASSEN (DECEMBER)
TAX LEVY
2008 Budget
2007 2008 Percent
TAX CAPACITY BASED TAX LEVY Levy Levy Increase
General Fund $6,558,100 $6,833,900 4.21% 275,800
Capital Replacement Fund (for equipment) 824,000 824,000 0.00%
Pavement Mgmt Fund (Sealcoating) 250,750 267,875 6.83%
Special Assessment Debt 129,500 -100.00%
General Obligation Debt 488,280 484,873 -0.70%
General Obligation Debt (212 Bonds) 80,000 285,000 256.25%
Local Street Improvements 100,000 100.00%
Debt of Other Agencies (EDA) 122,548 122,703 0.13%
TOTAL TAX CAPACITY BASED TAX LEVIES $8,453,178 8,918,351 5.50%
MARKET VALUE TAX LEVY
Park Referendum 696,500 695,900 -0.09%
Library Referendum 489,100 490,700 0.33%
TOTAL MARKET VALUE TAX LEVY $1,185,600 $1,186,600 0.08%
Use of cash reserves ($63,000) ($269,986)
TOTAL TAX LEVY $9,575,778 $9,834,965 2.71%
Dollar Increase $259,187
Scenario 1
Taxes applied to: General Fund
Capital Replacement
Pavement Mgmt
Total Levy subject to levy limits
Bond Funds
Local Street Improvements
Reduction in OS Levy
Total
$ 6,833,900
824,000
267,875
$7,925,775
2,079,176
100,000
(269,986)
$9,834,965
Tax Generation Capacity
Prior Year
New Construction
Exsiting MV Inc
TIF Oist 1
Eden Trace TIF
Gateway TIF
$9,575,616
$172,361
$0
$0
$0
$0
Total Capacity
$9,747,977