Loading...
82-62 . e . CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA RESOLUTION DATE: October 7, 1982 RESOLUTION NO. 82-62 MOTION BY COUNCILMEMBER: Neveaux SECONDED BY COUNCILMEMBER: Horn RESOLUTION PERTAINING TO CITY REVIEW OF THE "REVISED TRANSPORTATION DEVELOPMENT GUIDE/POLICY PLAN FOR THE YEAR 2000" PREPARED BY METROPOLITAN COUNCIL. WHEREAS, the Metropolitan Council has prepared a revised Transportation Development Guide/Policy Plan for the Year 2000 (hereinafter referred to as the "Transportation Plan") which is a state- ment of the direction that major transportation investments are to take between now and the Year 2000 in the Twin Cities Metropolitan Area~ and WHEREAS, said Transportation Plan designates certain highways which are planned to comprise the Metropolitan Highway System in the Year 2000 ~ and WHEREAS, said Metropolitan Highway System Plan includes the Construction of a new TH 212 from Chaska to Eden prairie as a Metropolitan Transportation priority; and WHEREAS, said Plan does not include TH 5 in the Year 2000 Metropolitan Highway System, and therefore, does not recognize the need for substantial upgrading of TH 5 as a Metropolitan Transportation priority; and WHEREAS, the Metropolitan Council has requested comments con- cerning said Transportation Plan from the City of Chanhassen prior to November 15, 1982~ and WHEREAS, the Transportation Subcommittee of the Metropolitan Council has scheduled a Public Hearing for October 12, 1982 in order to take testimony concerning the revised Transportation Plan; and WHEREAS, the City council of the City of Chanhassen has reviewed said Transportation Plan, especially insofar as it impacts the citizens of Chanhassen. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chanhassen offers the following comments for consideration by the Metropolitan Council during their deliberations on the proposed Revised Transportation Plan: 1. The Plan for Right-of-Way acquisition and construction of new TH 212 is supported by the City of Chanhassen, with the need for new TH 212 identified in the Chanhassen Comprehensive Plan. ~ Resolution #82-62 2. e The City of Chanhassen believes that TH 5 serves as a Regional Transportation route, not as a local road. Highway 5 provides the primary regional access to Downtown Chanhassen, therefore, we recommend that TH 5 also be included in the year 2000 Metropolitan Highway System Plan. 3. According to a Traffic Analysis Report prepared for the City of Chanhassen in March, 1982, TH 5 is in need of immediate upgra- ding to four-lane divided arterial standards from 1-494 west to Carver County Road 17. Such improvements will relieve the severe congestion and very long traffic delays presently experienced during peak hours along this segment of TH 5. This traffic study also recommends that TH 5 be upgraded to four- lanes west of Carver County Road 17 to TH 41 by 1985 in order to adequately handle forecasted traffic volumes. e . 4. Due primarily to capacity limitations and traffic operations problems which exist at uncontrolled intersections on TH 5, the average accident rate along TH 5 within the City of Chanhassen was 15 percent higher than the average rate for similar roads in the Western Suburban Area during the period of 1976-1980. 5 . Redevelopment activities designed to induce development in the City of Chahassen are presently underway. These activities are consistent with the City's Comprehensive Plan and with the goals and policies of the Metropolitan Council. However, in order to be successful in promoting the orderly economic deve- lopment of the City and the Region, adequate Regional Transportation facilities must be developed. In keeping with the goals contained in the revised Transportation plan, the City of Chanhassen believes that upgrading TH 5 will "produce positive impacts upon the social, economic and physical environment, and conserve the supply of Metropolitan energy resources". 6. The Transportation Plan emphasizes the need to make maximum use of existing Transportation facilities before resources are com- mitted to major new investments, and that all Transportation investments, should be made on the basis of need. The city of Chanhassen supports this general policy. We believe that the most cost-effective approach towards improving the regional transportation system which serves Transportation Subregion 3 would be to upgrade TH 5 to four-lane arterial standards. Under this policy, improvements to TH 5 should receive a higher priority than the construction of new TH 212. Right-of-Way acquisition and grading costs will be substantially higher for a new TH 212 corridor than they would be to upgrade the existing TH 5 corridor. The upgrading of existing transpor- tation systems makes more sense than does the construction of new systems, expecially when highway construction funds are scarce. -2- , Resolution #82-62 . 7. The City of Chanhassen urges the Metropolitan Council to re- evaluate the Regional significance of the TH 5 corridor in light of these comments, and pledges the full support and cooperation of the City in any efforts to provide the residents of Chanhassen (and of the Metropolitan area in general> with good accessibility to subregional and regional opportunities. . Passed and Adopted by the City Council of the City of Chanhassen this 7th day of october, 1982. //,1 /~ , .-" I . '..,' I ATTESU. ~ Ll; ~ Don Ashworth, c~ty Manage e Yes No Absent Hand 1 ton Horn Neveaux Swenson Geving None None . -3-