Loading...
1b. Lift Station No. 3 Modifications: Approve Natural Gas Generator Quote CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us ib ------ MEMORANDUM Paul Oehme, City Engineer/Dir. of Public Works '\ ,::';:0 TO: FROM: Joseph Shamla, Project Engineer DATE: January 14,2008 t)~ SUBJ: Lift Station No.3 Modifications Project No. 07-03: Approve Natural Gas Generator Quote. REQUEST (Simple Majority Vote Required) Staff requests the City Council approve a quote for the generator to Quality Control & Integration, Inc. in the amount of $39,005.63. BACKGROUND On August 27,2007, Council awarded the construction contract to Parrott Contracting, Inc. for the Lift Station No.3 Modifications Project. Included in the construction contract is the installation of the generator supplied by the City. Lift Station No.3 is located on the north side of Trunk Highway7justwest of Church Road. The station is currently being rebuilt and is the Il1aincollection point for wastewater in the western portion of the city. Four smaller lift stations flow into Lift Station No.3. A standby generator is needed at Lift Station No.3. Thereasonf()Fthisneeclisthat the power supply regularly is interrupted. During a power interrupti()ll,theutility department needs to tend to this lift station first. . With the amount off1ow/etityrill~ this station and the distance from the public works facility, anypowerinterrugtiprLat this station causes and immediate emergency. During peak traffictimes,the~e\V'er could back up because of the extra time it takes to reach this sta.tion.Apptherre<i1>()J1 to have a standby generator at this location is because during citywide power failures, the utility department can barely keep up with the mobilegelleratoFoftl1e other 30 lift stations plus the wells. Having a standby generatoratthislocati()llwill help prevent sewer backups during power interruptions. The generator staff proposes to purchase for Lift Station No. 3is a natural gas unit. This site is a good location for using natural gas versus diesel because Minnegasco has a trunk gas line in'the Highway 7 right-of-way next to the lift station..Staff anticipates future maintenance of the generator will be less then a diesel unit because of diesel fuel related maintenance requirements. An environmental reason for going with the natural gas is the proximity to the wetland. Using natural gas at this site eliminates the chance of a diesel spill into the wetland. The City of Chanhassen . A growing community with clean lakes, quality schools,a charming downtown, thriving businesses, winding trails, and beautifui parks. A great place to live, work, and play. Lift Station No.3 Modifications January 14,2008 Page 2 In order to save on contractor mark-ups, the generator was quoted out separate from the project. The quotes received are as follows: Quality Control & Integration Inc. Cummins NPower, LLC $39,005.63 $40,070.63 FUNDING This project was programmed in the 2008 CIP Project SS-021. Funding for the project is proposed from the sanitary sewer utility fund. RECOMMENDA TION Staff recommends that the City Council adopt the following motion: "The Chanhassen City Council approves a generator quote to Quality Control & Integration in the amount of $39,005.63." Attachment: 1. CIP Page 2. Service Area Map 3. Location Map G:\ENG\PUBLIC'L2007 Projects\07-03 Lift Station No. 3\01-14-08 - Approve Quote.doc ..., '~ Capital Improvement Program City of Chanhassen, MN 2008 thru 2012 Contact '....,.. f t Account # 3 Department Sanitary Sewer Improvements Type Unassigned Useful Life Category Utilities Priority nJa 1.'11.. t Project # SS-021 Project Name Lift Station #3 Standby Generator Account # 1 Account #2 II Total Project Cost $80,000 11 Description I Lift station #3 had improvements made to the station in 2007. These improvements inc1udedincreasing the size of the wet well and a new pump. This lift station picks up 4 other smaller lift stations before discharging into the Metropolitan Council line. It is critical this lift station be in operation even if power is interupted. A standby generator is recommended for this lift station for reliability. The City has other standby generators. The City has 30 lift stations and it is difficult to operate all the lift stations with the City's few portable generators. 1,1 Justification Increase reliability oflift station during power outages. il \1 I Expenditures Construction 2008 80,000 80,000 2009 2010 2011 .2012 Total 80,000 80,000 I Total I Funding .Sources Sewer Utility Fund 2008 80,000 80,000 2009 2010 2011 2012 Total 80,000 80,000 I Total I I Operational Impact/Other I I I I I I 90 I ~ Lift Station 3 Service Area SC)~~' -fii:"ci! ~ .;,l E ........._,~--;;/ ~' "",,'J 1~!"' '-..'~;:/ '" 0t7 " ...~- '::.';( ~,.;]] i"";:"::'~"" ri.~ I ...~~-- ~""- . Lift Stations ~I _ Sewer Main [=:-J Service Area for Lift Station 3 G: IENGVo/eenIEngProjecl"IPau/\153 Janumy 30, 2007