1c. 2008 Sanitary Sewer Rehab Project: Approve Plans and Specs
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
. Fax: 952,227.1190
Engineering
Phone: 952,227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952,227,1400
Fax 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
.1<!.--
-
MEMORANDUM
TO: Paul Oehme, Director of Public Warks/City Engineer ~ 0
lJ~
Joseph Shamla, Project Engineer tf
FROM:
DATE:
t'~
January 28,2008
SUB]:
2008 Sanitary Sewer Rehabilitation Project No. 08-07: Approve
Plans & Specifications; Authorize Ad for Bids
BACKGROUND
o~ November 13, 2007, staff reviewed with the Council the Metropolitan Council
1&1 (Infiltration and Inflow) surcharge program and discussed the recently
completed 2007 (1&1) project. Staff also discussed the 2008 proposed project
with the Council.
DISCUSSION
The 2008 project will fix some of the 1&1 problem areas that were identified in
the 2007 1&1 project. These areas are known to contribute 1&1 to the system.
These improvements include lining sewer pipes, pipe joint sealing,replacing
castings, and grouting manholes and pipe joints. Repairs to the sewer pipes are
scheduled to take place near the downtown area. These sewer pipes are some of
the older sewers in the City. Staff feels these areas contributesomeofthehighest
levels of 1&1 to the system. Attached is a map showing the repair areas for
proposed for 2008.
Funding far this project has been budgeted for in the 2008 CIP, ProjectSS-012,
and will be paid for by the Sewer Utility fund. The currentprojectcostestimate
far the work is $200,000.
The anticipated schedule of the project is as follows:
Bid Opening
Award Contract
Substantial Completion
February 28, 2008
March 10, 2008
June, 2008
RECOMMENDA TION
Staff recommends that the City Council approve the plans and specifications and
authorize the ad for bids for City Project No. 08-07.
Attachments
c: Todd Hubmer, WSB & Associates, Inc.
The City 01 Chanhassen · A growingg;~mwBi%,<<l~t_8aj\~~jQ~fJ:~~r{j~ojSj ~fJJ_~i1J~~Sd8rh~\1Jl:Jwei~~,d\'JHding trails, and beautiful parks. A great place to live, work, and play,
I
I
\
\ \
\ \
\ \
\\
\ \
1\
,
I
,/- -- -, ,~__J
/
(
!
~.~ .:r----.~-=' -,,-Rice,
//, ..1 i
I Lake
!
I
,
---" j
,/ ',/
--_. --- --- ---
Repair Areas 2008
,
,
i
!
!
i
!
!
!
iJ
~ 1
~ i
':
!
!
!
!
i
Legend
~ 2006/07 Televising
_ Repair Area
o
1,250
2,500
,Feet
...
s
.,.
CITY OF
CHANHASSEN
City of Chanhassen
Repair Areas for 2008
City Project 08-07
C: \InI\2008 Repair Area.rnxd
-
,-----
I
I
-
I
-
.
.
b
b
Capital Improvement Program
City of Chanhassen, MN
88-012
2008 thru 2012
Contact Unassigned
Department Sanitary Sewer hnprovements
Account # 1 701-0000-4509
Account # 3
Type Improvement
Useful Life Unassigned
Category Utilities
Priority nla
Project #
Project Name Inflow and Infiltration Abatement
Account #2
Description I
This annual project includes televising, repairs and rehabilitation of existing sanitary sewer. The program also detects and eliminates points of
entry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration
Report. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees.
i
"
..f9stijication I
'~~ltYst#flj~~identified numerous older sewer lines that are in need of repair. The City of Chanhassen pays the Metropolitan Council for sewage
.z' tteatIn~nt. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its
Wi way into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to
.~ the City for sewage disposal and increasing the load on the City's lift stations. Also, MCES may place a surcharge on cities that are not trying to
~improve the inflow and infiltration problem.
~
Total Project Cost $800,000
Expenditures
Maintenance
2008
200,000
200,000
2009
200,000
200,000
2010
200,000
200,000
2011
200,000
200,000
2012
Total
800,000
800,000
Total
u
n
b
n
D
Funding Sources
Sewer Utility Fund
2008
200,000
200,000
2009
200,000
200,000 .
2010
200,000
200,000
2011
200,000
200,000
2012
Total
800,000
800,000
Total
.gpe1:fl/ionallmpact/Other I
:tlie efforts may decrease operational costs, emergency call outs and maintenance costs. It is also the city's intent to use connection charges to help
; fund for those costs. It is the city's belief that as new customers come on line those connection fees should help fund future infiltration problems.