Loading...
1c. West-Central Lotus Lake Improvement Project CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952,227,1100 Fax: 952,227.1110 Building Inspections Phone: 952,227.1180 Fax: 952,227,1190 Engineering Phone: 952,227,1160 Fax: 952,227.1170 Finance Phone: 952,227.1140 Fax: 952,227,1110 Park & Recreation Phone: 952,227,1120 Fax: 952,227,1110 Recreation Center 2310 Coulter Boulevard Phone: 952,227,1400 Fax: 952,227,1404 Planning & Natural Resources Phone: 952,227,1130 Fax: 952,227,1110 Public Works 1591 Park Road Phone: 952,227,1300 Fax: 952,227.1310 Senior Center Phone: 952.227,1125 Fax: 952,227.1110 Web Site www.ci.chanhassen.mn.us 1-C'-. _A-4 MEMORANDUM Paul Oehme, Directar af Public Warks/City Engineer Vo/O. TO: FROM: ,~. Terry Jeffery, WaterResaurces Caardinatar DATE: February 25,2008 SUBJECT: West-Central Latus Lake Impravement Praject No.. 08-02: Autharize Preparatian af Feasibility Study and Apprave Cansultant Cantract far Meadaw Green Park Pand REQUESTED ACTION (Simple Majarity Vate Required) City Cauncil is recammended to. autharize the preparatian af a feasibility study far the West- Central Latus Lake Impravement Project and apprave a cansultant cantract in the amaunt af $102,000.00 with WSB & Assaciates, Inc. BACKGROUND The Meadaw Green Park pand failed in 2005 during large back-to-back rain events. This resulted in flaading within the area, erasian af the autlet channel with subsequent discharge af sediments into. Latus Lake and the expasure af a sanitary sewer line. The. pand was repaired but the deficiencies were nat addressed. In additian, sanitary sewer lines are knawn to. exist in praximity to. the pand such that inflaw and infiltratian maybeanissue. On July 27,2007, a Request far Propasals (RFPs) far thisprajectwassenttoSEH, Inc., Kimley-Harn and Associates, Inc. and WSB & Associates, Inc. The twoprapasals received are summarized as fallaws: Kimley-Horn and Assaciates, Inc. Submitted rior to. the deadline Proposal farmat Transmittal letter submitted with re uired infarmatian Members of the cansultant team identified Understanding af project Base Fee Revised Fee ./ ./ ./ ./ ./ $127,065 ./, $120;582 ' $102,000 Since July, 2007, this project has been in on-going negotiations with the Riley-Purgatary- Bluff Creek Watershed Districtq)J>I3~\VR}t9Aeyelap apallabarative cos,t share. To. date, no. agreement has been reached. TheR-]i>BCWDhas levied maney far a water ql'lality improvement praject within the Latus Lake watershed. It has yet to. be determined when this project will cammence and haw it will relate to. the propased wark. Initially, the RPBCWD will be building a hydrolagic madel but this madel is nat anticipated to. be finished before The City of Chanhassen · A growing community with clean lakes, quality schools, a Charming downtown, thriving businesses, winding trails, and beautiful parks, A great place to live, work, and play, Paul Oehme February 25, 2008 West-Central Lotus Lake Imp. Project Page 2 2009 and will only address existing conditions and not necessarily identify any potential solutions to the known issues within the West-Central Lotus Lake area. Staff is already aware of the deficiencies associated with the Meadow Green Park pond and feels the project should move forward at this time. City staff will continue negotiating with the Watershed District for some type of cost share. The scope of services has been decreased from the original RFP assuming no matching funds. Detailed Work Plan The scope of the project includes: Task 1: Prepare Feasibility Report Provide a feasibility level analysis and report for the West-Central Lotus Lake Improvement Project. This feasibility study will provide an analysis, recommendation, opinion of cost and financing options to address the following concerns within the West-Central Lotus Lake Study Area: · Reduce stormwater flow rates from subwatersheds tributary to Meadow Green Park · Reduce or eliminate storm sewer surcharge at Kerber Blvd. and Bighorn Drive · Reduce or eliminate stormwater ponding in the Lotus Woods Development · Stabilize berm from stormwater flows in Meadow Green Park · Reduce storm water pond outlets and culvert crossings susceptibility to plugging with debris · Stabilize stream channels to reduce erosion and protect City facilities · Protect or relocate sanitary sewer to prevent damage from erosion and to reduce inflow and infiltration · Determine sources and solutions to inflow and infiltration into the sanitary sewer tributary to Lift Station #10 A neighborhood will be held that the residents can share their concerns before any established ideas for the project. Individual meetings with concerned residents will also be held before completing the feasibility report. A final neighborhood meeting would be held once the feasibility report is drafted, prior to presentation to the City Council. The feasibility study will contain recommendations for improvements to Meadow Green Park that may take place in the winter of 2008/2009. Task 2: Meadow Green Park Pond Improvements The consultant will prepare preliminary and final plans and specifications of the recommended alternatives for Meadow Green Park for construction in the 2008/2009 winter season. Preparation of the plans and specifications are anticipated to include the following: · Coordination to obtain soil work · Field surveying, including site surveys of subwatersheds, including lowest floor elevations for up to 40 homes adjacent to drainageways, wetlands or ponds · Identifying areas where easements are required · Preparation of legal descriptions and exhibits for easement acquisition g:\eng\public\_2008 projects\08-02 west-central lotus lake improvements\022508 meadows green park pond award con cont.doc Paul Oehme February 25,2008 West-Central Lotus Lake Imp. Project Page 3 · Bidding of the project The construction of improvements in the winter of 2008/2009 may be effected by the review time of permitting agencies. Task 3: Meadow Green Park Wetland Services The Consultant will review aerial history and previous plans and permits of Meadow Green Park to determine the regulatory status of wetlands located within the park. They will provide wetland delineation as necessary to facilitate the proposed improvements. Coordination with wetland review agencies will need to be included in the project. These agencies may include: , · City of Chanhassen · Minnesota Department of Natural Resources · Army Corps. of Engineers · Watershed management organizations/districts · Carver County Task 4: Meadow Green Park Pond Improvement Surveying The Consultant will provide survey support, as necessary, to complete the feasibility study, final design, construction documents, and wetland services for this project. Task 5: Coordinate with the Riley-Purgatory-Bluff Creek Watershed District The Consultant will work closely with the Watershed District to gain project support and possible additional funding for the construction of the Meadow Green Park pond and wetland improvements. The Watershed District will be brought into the process at the beginning, to review opportunities for funding and in which elements they may desire to participate, as well as to understand any permitting or other concerns they may have with the analysis and recommended improvements. Task 6: Anticipated Project Meetings Staff anticipates the following meetings: · One Planning Commission meeting · Two City Council meetings · Two neighborhood informational meetings · Six staff meetings with the Consultant · Five individual property owner meetings (during feasibility report preparation) · Two Watershed District meetings Task 7: Construction Observation Services The Consultant will provide part-time construction observation services for the winter 2008/2009 Meadow Green Park pond improvement project. They will provide a qualified construction services representative who will attend necessary meetings with the contractor, utility companies, property owners, and coordinate g:\eng\public\_2008 projects\08-02 west-central lotus lake improvements\022508 meadows green park pond award con cont.doc Paul Oehme February 25, 2008 West-Central Lotus Lake Imp. Project Page 4 material testing services. The construction observer will manage the project and provide direction as necessary during construction. Task 8: Meadow Green Park Pond Improvement Survey/Staking The Consultant will provide construction staking and surveying as necessary to construct improvements located within Meadow Green Park during the winter of 2008/2009. Task 9: As-Built Drawings The Consultant will provide as-built drawings in a timely fashion on the Meadow Green Park Pond Improvements. It is anticipated that survey work will be required in order to provide a good record of these improvements. SCHEDULE If this project moves forward, staff anticipates the following project schedule: Award Consultant Contract February 25, 2008 Neighborhood Meeting Marchi April, 2008 Bid Opening October, 2008 Neighborhood Meeting November, 2008 Start Construction December, 2008 Construction Complete Late May, 2009 FUNDING Funding for the feasibility study is programmed to come from the Surface Water Management Fund 4300 - Fees, Services. Funding for construction of the project is anticipated to come from the CIP SWMP-031. A total of $400,000 has been budgeted for the project with $200,000 each budgeted in 2008 and 2009. City staff will continue to negotiate with RPBCWD to see if a cost-share arrangement can be reached but thus far efforts have not met with any success. The contract will be a time and materials based work not to exceed amount. As with all engineering contracts, the consultant must submit periodic invoices that staff will review before processing. The consultant will be required to submit time sheets verifying the hours worked on the project and expense sheets. Staff will review the invoices and expense sheets for accuracy and conformance to the contract. RECOMMENDATION Move to authorize the preparation of a feasibility study for the West-Central Lotus Lake Improvement Project No. 08-02 and approve a consultant contract with WSB & Associates, Inc. in the amount of $102,000.00 for complete engineering services related to the Meadow Green Park pond project. Attachment: Project Area Map CIP g:\eng\public\_2008 projects\08-02 west-central lotus lake improvements\022508 meadows green park pond award con cont.doc td.b- ~ I t^.I~JI t r~ 1)~~m~F;:ct;;NZ fi[ siif:t~fc \1 Par ~ L . 1. I..I.::N ~~ ~ j ! 0 ~ ,~^e..-'/ ~ r- ~ HI ur, '^ ~---'li? C ~ ~ .1-- ~----- '-l \ ~I I " -'I (/1 (/) arver ~ .s~ , e _ ~arvl r ~ 1 farv.e ~~ ~~\\~_ Beach ~i - 1'-. " I-I "E J _~ 11 ~ e~~ ~ _ 0 -9'~ ~ nH "-, H ~\ \ Park " e Q) H ~. --' "~~' ~~ 1m ~~~ ~ ~~ t ~ . ~n. ~jfhJcjn~~U\~ ~" - ~~_.J~~~~"'~m\ Tntll~ ,==""" : .~~ I-A 5.Z7i Iw~gdl AIIQ~$' ~\U Increase Storage 1 1- \~ ...- '~J~PoJ/ ~ ' ~~ '" \~~~ ~ 0- tf1~. MO'~.~?< '{ % ne~::t..~~ ~ ~~ ~ I- ~~ ,-::\~..\,\1)r "-..A-.I.\ M L+- ~ ~~:C \1'/Bia ,,\ I- ~ ,..fl's - ~ -""~ . '\ ~'( ~ ~ 1--1.. ~ -h:'j.-~ "'-. ..... >-v, ~ I ~\\.."~ (lJ k /" ~ ',-- = ~E~~~. \\1:~~~~~/~, .~~)'vm~-= - ~ ~., -'~. J~\ ~ ~~~rY'1/_~'~/(<~~11 I ~ ~~~ I r~~~.\ ~ Mea.,..~ f\". YO!;,.'?- \~, ~~{Ll~~.~ \~ " . I I V ~ Gre~n ~ Y' -(n'fl\~ ~ 1,.... ~~ 'I Stabilize Channel ~\ ) . - . . L !. t< ~ )~~ t:-v~ (I n. ~ '- 1\\ 1 -J T "'J.J 11..4 /\",'..'...J ),.., ~~ ~:'l\..' a.J.-J,.W"',,~ \., ~, ~\t1~ \d.l;Illt::i~ ~ ~ ~ r~ J~ ? \\\ II ..11JlmJ" ( ~~ s. J I- n~ ,'S.SjJ r{. ." '" ~ '" v\:'llmprove Outlet "' \~ ~~. A.I ~ .:;: ~(t.~~~ :../~ . "",,; lAd br< 0k7\ ~~:: ~ '~~~..'.~':;:-; :~tf'.. ~'I Lake · r ~ ~ d",,.. V, I k\.l{{~))7~/ )::; '" I II -r.:. I .~ U7---/t / ~ I I I~ Address Surcharge Issues ~ ~"""" r,? ! ~..et"~V/~t~ ~ I-tm gnla(1q 4Jr ~l <~~ . I ~o}1.~ _ ts I- ('~ JtJ \J--.-,-e- 1 / ~ ~ I .1 ? nr~~el,1 /,<:I~' ~;::;\:: ~ ~' ~)d. CliOOif!\~-. ~ ~ ~I \ ~. ,....- c~~~ 'at:. -~ P"'i' ~\~ ~ . ~ e r-;; t-... 10 <(~ r ~ /)o)*. / ~~ ~~. hl"bln~l .. .A. ~ i- ;f~ ,( a ---.j-- a. 'If J7/~ T\"'~ ~ .. 0: '- rro. '(, ~ -.j" '" - ~ _ ~J IT rlfii i' i\ \ I ~-......::;pr ~ / ~. ,~ ~ v J't-!' -(",M~ .!o. I -r\ ~~.~ - a ur'~'/ -""T'0.~~" ~tJ J: .-~ 'II \ "l e ~(\\~[\/e --r-h\..\ ...... cOCY" ;-'-ra> l~ CiI ~\. a fNC-.V / ~ I ~"(. _ ~. L-M!...~ I( \.'c f- . ~ ,_::,\)1 ~r 1 'f'1C ~ ~ -'I \ KIMBERIVIANE ~.f:F.I' lR.ii >>6j~ - e ~ "---- ~ 1 WJlVIIJ...... .... l-o _ -n:- ~~IY~~U~ay--, I~. . ... ~~~ @ O~~ I~ II~ ~i ~~ ;{ ~~= :/Ola: \ f m. '...- e 0e1 Cl) I U i X -~ co ..u . CITY OF CIJANHASSEN PROPOSED IMPROVEMENTS 1 inch equals 750 feet West Central Lotus Lake Storm Sewer Features ~ Capital Improvement Program City of Chanhassen, MN 2008 thru 2012 Contact Department Surface Water Management Project # SWMP-031 Type Improvement Useful Life Project Name West Lotus Lake Drainage Improvements Account # 1 Account # 3 Category SWMP Priority nla Account #2 Total Project Cost $800,000 Description I This improvement project addressess storm water quality and quantity issues in the Lotus Lake water shed. In 2005, the regional pond over topped causing significant damage down stream. The storm water ponding in this area was discussed with the City Council during the review of the Lotus Woods development. The Water Shed District has made Lotus Lake a high priority in their capital improvement plan. It is proposed the City work Uointly with the Water Shed District on this project. The funding from Other Agency Contributions will come from Water Shed District funds. Justification I To improve water quality and quantity in the Lotus Lake water shed. c Expenditures Construction 2008 400,000 400,000 2009 400,000 400,000 2010 2011 2012 Total 800,000 800,000 Total Funding Sources 2008 2009 2010 2011 2012 Total Other Agency Contribution 200,000 200,000 400,000 Surface Water Utility Fund 200,000 200,000 400,000 Total 400,000 400,000 800,000 Operational Impaet/Other I 114