Loading...
1c. Award Contract for Infiltration-Inflow Project CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us .1~ MEMORANDUM TO: Paul Oehme, Dir. of Public Works/City Engineer FROM: tWO Joseph Shamla, Project Engineer DA TE: March 10, 2008 SUBJ: 2008 Sanitary Sewer Rehabilitation Project No. 08-07 & PW254B: Award Construction Contract for Infiltration/Inflow (III) Project REQUESTED ACTION Award Construction Contract for Infiltration/Inflow Project. BACKGROUND On November 13,2007, staff reviewed with the Council the Metropolitan Council III (Infiltration and Inflow) surcharge program and discussed the recently completed 2007 (III) project. Staff also discussed the 2008 proposed project with the Council. DISCUSSION The 2008 III project is designed to identify and eliminate areas in the sanitary sewer system that allows groundwater or surface water to enter. These improvements include lining sewer pipes, pipe joint sealing, grouting manholes and pipe joints. Repairs to the sewer pipes are scheduled to take place near the downtown area. The sewer pipes in this project are some of the older sewers in the City. Staff feels these areas contribute some of the highest levels of III to the system. Two alternate bids were included in the project. Attached is a map showing the repair areas proposed for 2008. Alternate A is for lining a trunk 33-inch diameter, 220-ft. long, corrugated metal pipe that was constructed under Powers Blvd. This section of pipe was installed in 1979. Typically in today's industry corrugated metal pipe is used in storm water systems, not sanitary sewers. The reason for lining this pipe is because the metal has deteriorated due to the sewer gases. Lining is a good alternative to replacing the pipe in this application because the street does not have to be open cut. The liner is made of fiberglass fabric material with resin which gives the pipe structural strength. This section of corrugated metal pipe is the only known section of corrugated metal pipe left in the City. The other sections of corrugated metal pipe have already been lined. It is recommended to line this pipe at this time based on the condition of the pipe from the 2006 televising investigation report. The City of Chanhassen · A growing community with clean lakes, quality schools, a Channing downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Mr. Paul Oehme March 10, 2008 Page 2 Alternate B is for repairing the sanitary sewer line along the north and west sides of Lake Susan. This area is known to have some II I problems due to the high groundwater table from the proximity to the Lake. This area was chosen as an alternate area to repair depending on the bid prices. Staff feels this area can wait to be included in a future sewer repair project. On February 28, 2008 at 2:00 p.m., bids were received. The bids and engineer estimate is shown below: Bidder Base Bid Alternate A Alternate B Totals Infrastructure Technologies Inc. $163,361.00* $39,250.00* $10,592.00 $213,203.00 Visu-Sewer Clean and Seal Inc. $171,552.00 $36,250.00 $12,790.00 $220,592.00 Engineer Estimate $209,640.00 $37,500.00 $12,365.00 $259,505.00 * Notes recommended items to be awarded. The low bidder for the project was Infrastructure Technologies Inc. Infrastructure Technologies Inc. has worked on other City sewer projects. Their work has been acceptable. Funding for this project has been budgeted for in the 2008 CIF, Project SS-012, and will be paid for by the Sewer Utility fund. The amount budgeted for 2008 is $200,000. Staff fells that Alternate bid A, lining of the corrugated metal pipe be included in the project at this time because of the condition of the pipe. Due to the amount of funding allocated for the 2008 project, staff feels that Alternate B can be removed from the project for this year. The total price for the Base Bid and Alternate A is $202,611.00. All the work associated with this project is eligible for offsetting the MCES surcharge. RECOMMENDA TION Staff recommends that the City Council adopt the following motion: "The Chanhassen City Council awards a construction contract for the 2008 Sanitary Sewer Rehabilitation Project to Infrastructure Technologies Inc. in the amount of $202,611.00. " ATTACHMENT 1. 2008 Sanitary Sewer Rehabilitation Project Location Map. G:\ENGIPUBLJO_200S PrujectslOS-07 I-I PrujectlAward Const. Comract.doc I Capital Improvement Program City ofChanhassen, MN 88-012 2008 thro 2012 Contact Unassigned Department Sanitary Sewer hnprovements I Account # 1 701-0000-4509 Account # 3 Type Improvement Useful Life Unassigned Category Utilities Priority n/a Project # I Project Name Inflow and Infiltration Abatement I Account #2 Total Project Cost $800,000 Description I This annual project includes televising, repairs and rehabilitation of existing sanitary sewer. The program also detects and eliminates points of entry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration Report. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees. I I Justification I City staff has identified numerous older sewer lines that are in need of repair. The City ofChanhassen pays the Metropolitan Council for sewage treatment. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its way into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to the City for sewage disposal and increasing the load on the City's lift stations. Also, MCES may place a surcharge on cities that are not trying to improve the inflow and infiltration problem. I I I Expenditures Maintenance 2008 200,000 200,000 2009 200,000 200,000 2010 200,000 200,000 2011 200,000 200,000 2012 Total 800,000 800,000 Total I I Funding Sources Sewer Utility Fund 2008 200,000 200,000 2009 200,000 200,000 . 2010 200,000 200,000 2011 200,000 200,000 2012 Total 800,000 800,000 I Total I I Operational Impact/Other I The efforts may decrease operational costs, emergency call outs and maintenance costs. It is also the city's intent to use connection charges to help fund for those costs. It is the city's belief that as new customers come on line those connection fees should help fund future infiltration problems. I I I I I 85 12~~~~101;;l~~~?=df\~~~ ~~~~IPT=f~~~'\ '~ \ \~~\ "V"~~~ ,,~\ i~<J::{ ~~"-,, ..I-L-,,~~~ ~-t=rHIlli~~.-I'~~ I~ I \ \ \ \ ~" I L ~\ \ " "I .. .. , \ \ ,,/ l::-i"A'0:" " ~ ~ I " I I I I I I I I \ \ /"~~f6 ; !11' \I '\,~ 9~ \ \" ,,7' _'-..:/ <'.:.>y/ \11; ~ \ \~ 1 i I I I 11 l- "-,, -qtr--fl'~//" "~/'~ /~ 1= \' ;,;/ ~ I ~" ~tl III I~ \ \ ::I..---.---.f--~ · ;;0:_. 1_ "- ~ L/~+ t~ \ ~ }:)~~ 1== ,~/f/ I "- "-,, ~~ ~""-.= 1" \ lir-r-- f-I- - - - h 7;0--W /I/~ \ \ ~'?: !" r---- /~V ~ ~~mmmm~~,,~ 1-- --" =-1- -l_.~-. .:-.-.r \~\%>) .~ ~\11 ~ .// II -\'0- IOJ ,,-- .-- -- I ~ ~./' \.,~;~, \ I ~ l~.~ I~.~ ~ .-. = s..'Yh", ~ t~3 !~.!' ~ I~s " r.=:r j Ii." I ~\ l_.._._._.~ ee I I ~"''f~ I. .-. I ~ ~ "______. (.-.l .-.-. . ..,,, ~~~ t7KW! rJ ~ jI!J~ ~I~ 11 t / /~ i( y ~ ,~ ~ /~ ~ \ (!..--=.) (, I /~ F .-.-.....-.-il wJi1 ~~, ~ .~ ~~ J~~ ,_ U ~ CUI i\l \~-~I ~4~~r~LAKED.-.-F .. ~--=.. .i i ~ ~~sneit~J~V9"~~S~ ~{fE~0i\ : --- ~ir~\ I. ~:ETUM:~~I;;;' (~\ ');::i:-,~~t~ .s-'------- ~I \.~.-.-. LAKEDR~ . t#~ ~o==I~~~~k ~~~/E ~~:n\ l\\o-j" r ~ ~\ ~~J=-~dI-~ !ff#NY- '. " / - \ \ ~L\,) ~~ ~ {E= 0\ \ vi' \~/ I I\.' ~ -< ~~;:: ~ \ ! ,,\ (; If\- '~I< 'Ir& .r:::Rl' ShE!et 7; r=;:j t<r<:: ~ ,,/ / /I-r- -,,~--~ \ \ f!l-r-1 J~' I ~.-_.'!l__-.~~~ ~ Ii ');JJ \ I I \, '#J /) /. /\ \ \J I jJJ 1l~. , ~"~~ . II.. \ \ '0 \~..=~y~( \ \ I / 1.\ \ llL/ i I \f-~ . ~~-=-" III ~ _ I,~.m.-. LL \~ \, 1'.0 "I I \~(j I 1~~~J L'~:""" ~.~~ ~~~ff1v ,/ --J ~ I~ ~ ~ I 'Y \ " r- c,.."yI/ /A ~ I .\\1 f .~.~~~\ ~~,,~ Y/~. I~~""J I / \~\/# ;! 1J LlJ i r0-),lk';' \"-,,.;;-'\~ \ )(/ r- I ~\ i. ,..t~u~MH\CC~~\ ./. "-"""""'1"\'\\ \ \ y" ^^~~ \' ("-f"r--- ./A.Z~ g \\X""----"-,,-,,.-"": , ~~ ' 'I \ \' , " ;;:;lV ,\ \.... W · .. 15 " 3 ~ --\~ f8.. / . ~I" "C:J<Q" ~L" @ljEBil. t ~~~. \j)~// f~..\.\.',,___. .. j~.. r~1.j)~./>!/.... l~ I rl' ~~.. Sh~et 9 !I~I, " \ / ~ I"-~!"l / I:::J~'I \. !J1 ~~ ~"a 3 EaB./"",~\ ~ I~ \ \ \ / t / {--::j.' I ",: U""0'/~ ~ b I ~ '1\ ~~\ ~ I IJ ________ l~ /\ \_~~ ( ~ -"~, / / /,,,------J/L::::; .-1" . /" I I & I 'Y ~ I I ______,,::-------- :i~ ~ ~ /~ /'Z~~~ " . "f .I ~~ . 2008 Sanitary Sewer Rehabilitation Project City of Chanhassen Project Location Sheet 1 of 11 N W~E s o 375 750 1,500 Feet Legend .. ~ 2008 Repair Area Alternate Area 1\ c: : ---, Alternate Area ':.8 200S SANITARY SEWER REHABILITATION CITY OF CHANHASSEN PROJECT NO, OS.{)7 WSB PROJECT NO, 1694.{)7 FOR THE CITY OF CHANHASSEN. MINNESOTA Prepared by: WSB & Associates, Inc, 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 (763 541-4800 (763) 541-1700 (Fax) I hereby certify that thiS plan, specification. or report was prepared by me or under my direct supervision and that t am a duty licensed professional engineer under the laws ollhe Slate of Minnesota. /...41 /~ Todd E. Hubmer Date: January 28, 2008 Lit. No. 24043 . CITY OF CK4N HAS SEN ~ WSB & Associales IIIC,