90-53
e
e
e
City of Chanhassen
Carver and Hennepin Counties, Minnesota
DATE:
May 14. 1990
RESOLUTION NO:
90-53
MOTION BY:
Johnson
Dimler
SECONDED BY:
A RESOLUTION ACCEPTING THE FEASIBILITY STUDY. WAIVING A
PUBLIC HEARING. AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS
AND ADOPTING A CONNECTION CHARGE POLICY FOR THE
HARVEY/O'BRIEN SEWER EXTENSION PROJECT 90-5
WHEREAS, on March 12, 1990 the City Council directed the firm
of Engelhardt and Associates to prepare a feasibility study for the
Harvey/O'Brien Sewer Extension Project 90-5.
NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council
as follows:
1. That the feasibility study as prepared by William R.
Engelhardt and Associates dated April 17, 1990 is hereby
accepted;
2. That a public hearing is hereby waived;
3.
That a connection policy is hereby adopted that is
similar to the Lake Lucy Road Trunk Watermain connection
charge policy; and
4. That firm of William R. Engelhardt and Associates is
hereby authorized to prepare detailed plans and
specifications for this project.
Passed and adopted by the Chanhassen City Council this 14th
day of May, 1990.
ATTEST:
JU (Ja,Jj1
Don Ashworth, ity Clerk/Manager
~~~~/-
0- nald J. hmiel, Mayor
YES
NO
ABSENT
Chmiel
Johnson
Dimler
Workman
None
Boyt