Loading...
1i. Well #3 Redevelopment: Approve Quote CITY OF . CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us J..i --- MEMORANDUM TO: Todd Gerhardt, City Manager FROM: ,p. Paul Oehme, Director of Public Works/City Engineer ,,~ DATE: ~~. March 24, 2008 SUBJ: Well #3 - Redevelopment: Approve Quote REQUESTED ACTION (Simple Majority Vote Required) Approve Traut Well Drilling quote for redevelopment of Well #3. BACKGROUND This past summer's high irrigation usage put a lot infrastructure. At Well #3, one problem staff demand and heavy draw-down of the aquifer is becomes displaced and gets drawn into the well the pump, it causes premature wear on the pump distribution system. The sand problem last the well pump yield had to be decreased about 250 on the water utility high water the aquifer drawn into that The proposed project includes redevelopment of the of approximately 50 cubic yards of sand. lowered 40 ft. deeper into the aquifer to well. Also included in the project is shaft for reliability issues. Staff solicited quotes from three qualified received a quote for completing the same scope for the work at Well # 2 came in higher than recommending completing the work at Well Well #2 and may request redevelopment of Quotes received for the work on Well # 3 were The following are the quotes received: for errors. Traut Wells, Inc. Bergerson Case well Inc. E.H. Renner & Sons, Inc. $ 34,175.00 $ 36,550.00 $ 46,280.00 The City of Chanhassen · A growing community with clean lakes, quality schools, a channing downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Mr. Todd Gerhardt March 24, 2008 Page 2 Traut Wells, Inc. is currently drilling new Wells 12 and 13 and their work has been acceptable. Funding for the redevelopment of Well #3 was budgeted in the 2008 CIP (W -032). The budget for rehabilitation of Well # 7 was also budgeted under this project. RECOMMENDA TIONS Staff recommends that the City Council approve the quote from Traut Wells, Inc. in the amount of $34,175.00 for the redevelopment of Well #3. Attachment G:\ENGIPUBLICI_2008 ProjectsI94-3-5 Well #7 Rehabilitationlwell3 rehab.doc Capital Improvement Program City o.fChanhassen, MN 2008 thru 2012 Project # W -032 Project Name Well Rehabilitation Program Aceount # 1 700-0000-4530 Account # 3 Account #2 Contact Unassigned Department Water System hnprovements Type Improvement Useful Li(e ynassigned Category Utilities Priority nla Total Project Cost $255,000 Description I This program annually inspects and performs regular maintenance of the City's wells. Well pumps are recommended to be serviced every 8 years. In 2008, it is recorrunended that the pumps in wells #2 and #3 be lowered because of the drop in the aquifer levels. Justification I To extend the life and ensure reliability of the City's well fields. Performing regular maintenance will extend the life of well components, reduce emergency calls and have a more reliable water supply system. Expenditures Maintenance 2008 80,000 80,000 2009 40,000 40,000 2010 45,000 45,000 2011 45,000 45,000 Total 2012 45,000 45,000 Total 255,000 255,000 Funding Sources Water Utility Fund 2008 80,000 80,000 2009 40,000 40,000 2010 45,000 45,000 2011 45,000 45,000 Total 2012 45,000 45,000 Total 255,000 255,000 Operational ImpacVOther I 123