1f. Bluff Creek Ravine 2: Approve Quote
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax 952.227.1404
Planning &
Natural Resources
Phone 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone 952.227.1125
Fax 952.227.1110
Web Site
VfflW.ci .chanhassen. mn. us
~
MEMORANDUM
TO:
~:;::> 0
Paul Oehme, Director of Public Works/City Engineer \,
Terry Jeffery, Water Resources COOrdjn~ W'
March 24, 2008
FROM:
DATE:
SUBJECT:
Bluff Creek Ravine #2 Stabilization Project No. SWMPI2-22A:
Approve Contract Quote for Installation of Drop Structures
REQUESTED ACTION (Simple Majority Vote Required)
City Council is recommended to authorize the quote and approve the construction
contract in the amount of $28,770.00 with Parrott Contracting Inc. for the above
referenced project.
BACKGROUND
Bluff Creek is listed as a stream which is impaired for turbidity and fish biological
indices. The Minnesota Pollution Control Agency has recently begun the Total
Maximum Daily Load study and implementation plan for Bluff Creek. This will
build upon the past research which has been performed on Bluff Creek. In
particular, Barr Engineering assessed the gullies and escarpments along the Bluff
Creek Corridor which are depositing sediment within Bluff Creek.
This study identified twenty two (22) occurrences of ravine or bank erosion along
the corridor. This particular area is
identified as Ravine #2 and is
classified as severely eroded. Staff
has discussed with the owner of the
property that contains the majority
of the ravine and the Minnesota
Department of Transportation
(MnDot) about stabilizing the
ravine. Staff met on-site with the
owner and MnDot to discuss the
issue in greater detail.
: -.-... !
.--..-_. :
'::::= =:=-- :
-- ---.:
e>.. _._- :
---~.. :
<;}
II~
MnDot is planning to stabilizing the eastern fork of Ravine #2 in conjunction or
before the scheduled mill and overlay for Highway 101. The mill and overlay
project is scheduled to occur in 2009. It would be beneficial to coordinate the
work of stabilizing the west ravine, which is the City's responsibly, with the work
MnDot plans to complete on the east branch. This coordination will allow for
access to the site as well as an area from which construction can be staged. Space
is otherwise limited due to steep slopes and heavy forest cover.
The City of Chanhassen · A growingdRIffiI<.l(~wJlitPIfR~IS\VIJI~\i~YA~9~~.tf~rmlQQc9~'!I~Wl%JQhif'jRQ:Rb\%(8mo~'a~~mljQ~~[ij~~oend beautiful parks. A great place to live, work, and play.
Paul Oehme
March 24, 2008
SWMPI2-22A, Ravine #2
Page 2
In addition to stabilizing the ravine, it will be necessary to address the current
condition of the outlet from Mandan Circle. Currently, water is directed to a
catch basin which discharges through an above-ground, 12-inch corrugated metal
pipe (CMP) into the ravine. The outlet for the CMP is elevated approximately ten
feet above the bottom of the ravine t / * .... . "'.r it
thereby increasing the force of the \- ~.
water as it enters the channel and
eroding the ravine more. In an effort to
address this issue now, staff is
proposing to install a drop structure on
Mandan Circle and directionally bore a
high density polyethylene pipe (HDPE)
to a second drop structure prior to
discharging into the ravine. This will
act to dissipate the energy at the outfall
and minimize the erosive force of the runoff into the channel. Rip rap will be
placed at the outlet to further dissipate energy. In the future, the pipe should be
extended down the bluff to further minimize erosion of the ravine and bluff.
On March I, 2008, quotes for this cleanout were requested from Kusske
Construction Company and Parrott Contracting. The two quotes were received
and are summarized as follows:
Parrott GM
Submitted Prior To The Deadline ./ ./
V olume of Cleanout ./ ./
Offsite Disposal of Materials ./ ./
Site Restoration ./ ./
Base Fee $28,770 $43,335.64
Based upon the two quotes received, staff is recommending approving the lesser
quote submitted by Parrott Contracting Inc. and authorizing the structure
installation by Parrott Contracting for $28,770. Parrott Contracting has completed
numerous projects for the City. Their work has been acceptable.
Detailed Work Plan
The scope of the project includes:
Task 1: Remove the existing pipe and catch basin manhole structure
Task 2: Install new drop structure
Task 3: Directionally bore 125 feet of HDPE
G:IENGISWMP PROJECTSISWMPI2.22A. BlutTCrk Channel Ravine 2-Mandan Cirelel032408 approve-quote. doe
Paul Oehme
March 24, 2008
SWMPI2-22A, Ravine #2
Page 3
Task 4: Apply erosion control blanket over disturbed areas.
Task 5: Replace geotextile fabric and rip rap at outlet
SCHEDULE
If this project moves forward, staff anticipates the following; project schedule:
Award Consultant Contract March 24, 2008
Send Letters to Neighbors March 25,2008
Start Construction After road restrictions are
lifted
Construction Complete Late May, 2008
FUNDING
Funding for this project is anticipated to come from the CIP SWMP-024. A total
of $150,000 has been budgeted to address construction and restoration as
recommended within the Bluff Creek Natural Resources ManagementPlan for the
2008 fiscal year. This project is the first phase of the Bluff Creek Management
Plan for 2008. Staff is planning to make improvements to the rest of the ravine #2
in late 2008 or early 2009.
RECOMMENDATION
Move to approve the quote submitted by Parrott Contracting in the amount of
$28,770.00 and authorize the improvements as discussed in this background.
Attachment:
CIP Page
G:\ENG\SWMP PROJECTS\SWMP12-22A - BluffCrk Channel Ravine 2-Mandan Circle\032408 approve-quotc.doc
Capital Improvement Program
City of Chanhassen, MN
2008 thru 2012
Contact Unassigned
Department Surface Water Management
Project #
SWMP-024
ProjectName Bluff Cr. Nat. Resources Mgmt Plan Implementation
Account # 1 720-0000-4751
Account #2
Account # 3
Type hnprovement
Useful Life Unassigned
Category SWMP
Priority nla
Total Project Cost $900,000
Description
Construction and restoration as recommended in the Bluff Creek Natural Resource Management Plan. It is unknown how much funding the Riley-
Purgatory-Bluff Creek Watershed District wiIl contribute to this project. Will assist in achieving compliance with NPDES Phase II MS4 Permit.
Justification
Implementation of recommendations in 1996 Bluff Creek Natural Resource Management Plan in cooperation with the Riley-Purgatory-BluffCreek
Watershed District. These projects will improve habitat and aesthetics in the Bluff Creek Watershed.
Prior
150,000 I
Total
Expenditures
Construction
Total
Prior
150,000 I
Total
Funding Sources
Surface Water Utility Fund
Total
2008
150,000
150,000
2009
150,000
150,000
2010
150,000
150,000
2008
150,000
150,000
2009
150,000
150,000
2010
150,000
150,000
Operational Impact/Other
The restored areas wiIl require regular maintenance to sustain the native plant communities.
109
2011
150,000
150,000
2011
150,000
150,000
2012
150,000
150,000
2012
150,000
150,000
Total
750,000
750,000
Total
750,000
750,000
;-
I
I
I
ii'
:'1"
~
I
J
I ~
1:1
I!