88-13
-
e
e
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE:
February 22, 1988
RESOLUTION NO:
88-13
MOTION BY:
Geving
SECONDED BY:
Hamilton
A RESOLUTION ACCEPTING THE UTILITIES IN HIDDEN VALLEY PHASE 1 AND 2
PROJECT 85-12
WHEREAS, construction plans and specifications for utility
improvements were approved by the Council on September 23, 1985,
for the above mentioned developments; and
WHEREAS, said improvements were installed consistent with the
executed development contract; and
WHEREAS, the developer's engineer, McCombs-Frank-Roos, Inc.,
has certified that all construction is in compliance with City
standards and conditions; and
WHEREAS, the City Engineer has inspected said improvements
and concurs with that certification.
NOW, THEREFORE, BE IT RESOLVED That the Chanhassen City
Council hereby accepts all public improvements for municipal
maintenance in Hidden Valley Phase 1 and 2 with the following
conditions:
1. The one (1) year warranty period shall expire on February
22, 1989.
2. The gate valve located in the driveway to the shopping
mart be repaired as soon as weather permits this spring.
3. Manhole 14 on Marsh Drive be reinstalled at grade using a
maximum of two (2) spacer rings.
4. Sanitary Sewer between manholes 12 and 13 be re-mandrel
tested in the spring of 1988 and corrections made if warranted.
Passed and adopted by the Chanhassen City Council this
22nd
day of
February
A{~/ (4rCJfD-
Don wort, City Manager
L
YES
NO
ABSENT
Hamilton
Boyt
Horn
Geving
None
Johnson