88-25
e
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE:
March 28, 1988
RESOLUTION NO:
88-25
MOTION BY:
Hamilton
SECONDED BY:
Geving
A RESOLUTION ACCEPTING THE TETON LANE FEASIBILITY STUDY
(ALTERNATE NO.4) AND AUTHORIZING PREPARATION OF PLANS
AND SPECIFICATIONS, PROJECT FILE 87-16
WHEREAS, on March 14, 1988, the City Council considered the
Teton Lane Feasibility Study. Staff was directed to prepare a
new alternate which would evaluate the feasibility of upgrading
Teton Lane with an intermediate roadway section that would be
physically separated from Phase II of the Curry Farms subdivision
with some form of breakaway structure that could be surmounted by
emergency vehicles in time of emergency.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF CHANHASSEN THAT:
1. The Council accepts Alternate No.4 as the preferred
alternate for the Teton Lane Feasibility Study and that
the expense for implementation of this alternate shall be
borne solely by Centex Homes.
e
2. That the developer be responsible for reimbursing the
City for its consultant's expenses in preparation of this
study ($3,700).
3. That the firm of William R. Engelhardt and Associates is
authorized to prepare plans and specifications for the
project. Further, that design details for the upgrade of
Teton Lane in accordance with the criteria laid out in
Alternate 4 shall be submitted for approval to the City
Engineer and the City Council as a part of the plans and
specification approval process for Curry Farms 2nd
Addition.
Passed and adopted by the Chanhassen City Council this
28th day of March , 1988.
ATTEST:
Don A&h. ~
Yk~Li":Mi(
YES
NO
ABSENT
-
Hamilton
Boyt
Johnson
Horn
Geving
None
None