Loading...
86-34 e e e CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DA'rE: June 2, 1986 RESOLUTION NO: 86-34 Mo'rION BY: Hamilton Horn SECONDED BY: A RESOLUTION ACCEPTING THE FEASIBILITY STUDY A FOR WATER STORAGE FACILITY AND TRUNK LINE EXTENSIONS WHEREAS, the City has documented water system deficiencies and on May 16, 1986 authorized the City Englneer to prepare a teasibility study detailing corrective improvements. NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby accepts the water system feasibility study detaillng a water storage facility and trunk line extensions as prepared by the Engineering Department, dated May 27, 1986. Further, a pUblic hearing be scheduled for July 7, 1986. Passed and adopted by the Chanhassen City Council this 2nd day of June , 1986. AT'rEST: /0, Don Ashworth, (JJg]b City Manager / / / / ./-.e'" .'- Thomas L. Hamilton, Mayor YES NO ABSENT Hamilton Horn Watson Swenson Geving None None