Loading...
1g. Audubon Road Watermain Imp: Approve Plans and Spec - Authorize Ad CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us ~ MEMORANDUM q:O- TO: Paul Oehme, City Engineer/Dir. ()fPublic Works .\' FROM: Joseph Shamla, Project Engineer ;~ DATE: October 27, 2008 o~.f.p. SUBJECT: Audubon Road Watermain Improvement Project No. 08-13: Approve Plans and Specifications; Authorize Ad for Bids PROPOSED MOTION "The City Council approves the plans and specifications and authorizes ordering the ad for bids for the Audubon Road Watermain Improvement Project No. 08-13" City Council approval requires a simple majority vote of the City Council present. DISCUSSION Construction of the 2005 MUSA infrastructure provided one water connection to the City's water system for the K. Hovnanian Homes townhouse development on Bluff Creek Boulevard and future developments in the 2005 MUSA west of Bluff Creek. The reconstruction of Lyman Boulevard this summer extended water south of Lyman Boulevard on Audubon Road to the project construction limits. This project will extend watermain from the Lyman Boulevard watermain improvements to the K. Hovnanian Homes development in Audubon Road right-of-way to provide a secondary water loop for this area. There are many benefits to providing a second water connection to the City's water system infrastructure. If one side of the watermain loop happens to fail, water will still continue in service without disruption to the residents. Looping the watermain also provides safety to the residents in case there was a structure fire because it provides better sustained pressures. Better water quality is also a result of looping the mains instead of having one long deadend line. The AUAR study for this area recommended extending a secondary watermain loop along Audubon Road for this area. Also, the recently completed 2008 Water Comprehensive Plan identified this watermain loop as a necessary improvement for water reliability, pressure and water quality in this area. This project will loop watermain in the 2005 MUSA and consist of directionally drilling approximately 3,000 LF of 8" pipe in the right-of-way of Audubon Road. The watermain loop will connect Lyman Boulevard to the Liberty at Bluff Creek subdivision. The reason for directional drilling this watermain is because it results in less disturbance and restoration work than the open cut method. By direction ally boring the watermain, this improvement can also be completed in winter with less g:\eng\public\_2008 projects\08-13 audubon wm (between Iyman blvd. and lincoln In)\1O-27-08 approve p&s order ad for bid.doc Chanhassen is a Community for Life. Providing for Today and Planning for Tomorrow Paul Oehme Audubon Road Watermain Improvement Project October 27, 2008 Page 2 disruption to the property owners in the area. Staff will notify the property owners in the area when construction will start and the estimated duration of construction. Funding for this project has been budgeted in the 2008 CIF, Project W-039. The anticipated schedule of the project is as follows: Bid Opening Award Contract Start Construction Substantial Completion November 20,2008 December 8,2008 December 10, 2008 May, 2009 Attachments c: Kevin Crooks, Chanhassen Utility Superintendent G:\ENG\PUBLIC\_2008 Projects\08-13 Audubon WM (between Lyman Blvd. and Lincoln Ln)\1O-27-08 approve P&S order ad for bid. doc Project # W-039 Type Unassigned Useful Life I I Capital Improvement Program City of Chanhassen, MN 2008 thru 2012 Contact Department Water System Improvements Project Name Audubon South Watermain Loop Account # 1 Account # 3 Category Utilities P,'iority nla I Account #2 Description This watermain project will extend watermain from the intersection of Lyman Blvd and Audubon south along Audubon to connect to the Liberty on Bluff Creek development. Service will be provided to the existing homes along Audubon. Total Project Cost $150,000 I I Justification To service existing homes along Audubon and profice a watermain loop for properties in the area. To provide a loop watermain system for the area I I I Expenditures Construction 2008 150,000 150,000 2009 2010 2011 2012 Total 150,000 150,000 I Total I Funding Sources Assessment/Revolving Assess Water Utility Fund 2008 20,000 130,000 150,000 2009 2010 2011 2012 Total 20,000 130,000 150,000 I Total I I Operational Impact/Other I I I I I 126 I Proposed Directional Bore Watermain along Audubon Road N Directional bore approx. 3,000 I.f. of 8" watermain Not to scale