Loading...
1a Change Order TH 101 ProjectC1TYOF CHA SEN 7700 Mark~ Boulevard ~ Box 147 Chanl'~sen. MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspe~lons Phone: 952.227.1180 Fax: 952227.1190 Engineering Phone: 952.227.1160 Fax: 952227.1170 Flflnfl~ Phone: 952.227.1140 Fax: 952227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952227.1110 Pabllc Works 1591 Pat Road Phone: 952227.1300 Fax: 952227.1310 Senior Center Phone: 952.227.1125 Fax: 952227.1110 Web Site vmtci.chanhass~.mn.us TO: Todd Gerhardt, City Manager FROM: DATE: SUBJ: Teresa J. Burgess, Public Works. Director/City May 20, 2003 Future Change Order for Additional work on TH 101, City Project 97-12-3 REQUESTED ACTION Authorize work to be done. A formal change order will be processed at a later DISCUSSION On Monday, May 12th, representatives of the Engineering, Street, and Parks Departments along with the design consultant and contractor for the Highway 101 Trail (North) walked the entire length of the trail. While the trail has been visited and inspected during construction, this was the first time all of these representatives had walked the entire trail together. As a result of that walk, several items were identified to improve safety, drainage, and facilitate trail maintenance. A copy of the field notes are attached. It is staff's opinion that all of these items are necessary in order for the trail to function as intended, however, it would be costly and cause time delays to have the design consultant prepare plans and quantities for the work. Staff is requesting that Council approve the tasks with the formal change order to be prepared after completion based on actual costs. FUNDING The project has a 50% matching grant up to a maximum of $500,000 from the Mn/DNR. The total project budget is $1,300,000 with the rem~ning $800,000 coming from the City's Park and Trail Dedication Pund. The City has spent $942,884.35 to date. Leaving $357,115.65 to complete the project. The change order is expected to be below $50,000, but may exceed $15,000. The following table summarizes the outstanding project costs. Remaining Construction Contract $171,893.72 Remaining En~neering Contract $7,162.75 1 parcel in condemnation proc~xlings Unk'nown Payment for Roger Bongard parcel $2,500.00 Change Order No. 2 (attached task list) Unknown Fox Hollow curb/guard rail Unknown c: Ted Anderson, HTPO The City of Chanha#en · A grov,,lnl~~~aSl::~l~l;~own, U'lrivlng businesses, winding balls, and beautiful parks. A gmat place to IIv~, work, and play. Date: 05/19/03 ~fi_ms: 11:15-= City of ?9~.h..se~ Pa~s: 1 For ~ ~i~: 01/01/02 ~ 12/31/02 ~i~ ~_~t ~ ~t ~ ~ ~ ~ ~ ~ ~. ~1~ % ~ l~ncl: 410 P~l~ AC~SI~IO~ & D~gfBLO~$~ Dept: 4~3 ~r~ ~ 101 ~ail ~t~ S~ic~ 0.00 0.00 105,~97.58 86,913.63 0.00 -105,497.58 0.0 ~i~l ~t~y 0.00 0.00 750,736.61 179,819.19 0.00 -750,736.61 0.0 C~t~l S~lces 0.00 0.00 26,506.75 26,506.75 0.00. -26,506.75 0.0 ~m~l~ ~m 0.00 0.00 ~, 159.0& 40.00 0.00 -~, 159.04 0.0 ........................................................................................... No~ ~ 101 ~ail 0.00 0.00 89~,899.98 293,279.57 0.00 -89~,899.98 0.0 Ex~euditures Net Effect for PA~ ALg~ISITI(~ & 0.00 0.00 896,899.98 293,279.57 0.00 -eg&,e99.98 0.0 0.00 0.00 -894,899.98 -293,279.57 0.00 894,899.98 0.0 -981,183.08 Grand Total Net Zffect: 0.00 0.00 -094,899.98 -293,279.57 0.00 894,899.98 0.0 B. gv~i~ / ~I=miDI'I'URS ~ Dst, e: 05/19/03 ~: 11:1&am ¢iL-'y o~ ~--~-e~ ~: 1 Eot ~ ~t~: 01/01/03 ~ 12/31/03 ~t~1 ~t ~ ~t ~ ~ ~ ~ ~ ~ ~. ~l,~e i ~ ~: ~1o P~ ~sI~ & ~ ~ ~es ~: A~3 ~ ~ 101 ~z~ S~ices North ~ 101 Trail 0.00 0.00 3,3&9.75 0.00 0.00 -3,3&9.75 0.0 0.00 0.00 39,0&9.93 0.00 0.00 -39,0&9.93 0.0 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.00 0.00 5,58&.69 0.00 0.00 -5,58&.69 0.0 0.00 0.00 &7,98&.37 0.00 0.00 -47,984.37 0.0 0.00 0.00 &7,98&.37 0.00 0.00 -&7,98&.37 0.0 Eet Effect for PARK AC~ISITI0ii & DEVE[&) 0.00 0.00 -47,98&.37 0.00 0.00 47,984.37 0.0 Cha.~'e in FuDd ~alance: -17,A20.&2 Total Eet Effect: 0.00 0.00 -AT,98&.37 0.00 0.00 &7,98&.37 0.0 From:t-ITl:~,II~. 952. 8L;x3 7a~ I:~FI3/"ZO03 07:37 tlr/04 P.001/ali Engineering · Survq4ng Land.cape Amhltscture FAX LEAD SHEET Date: 5/13/2003 lob No: 00-071 To; Cotrles: Jeff tmtth, Rosti Constmctia~ g52-4614~Y7 D~I~ Gms.V, Oty P~zk., gS2-22743t ¢ M~ke We~, Cit~ Stme~ ~2-2~-t3t0 Thank You, Ted ~ H~nsen Thorp Pelllnen Oloorl, Inc. 7510 Mazket ~ Drlve~ ]idsn lat~tz~, ~ 56344, phom~ 952--829-0'700 ~ 952-82%7806 - From:'HTPO,INO, ~ 829 ~ [:5/18/'2f~ 07::87 ~ P.~ INSPECTION REPORT Wozk l~orce ViMtor~ Corot. F_Xl.uiP. HTPO ' 7510 Market ~ace Dd~ · ~ I:~ ~ 55344 · 95'2-829d3700, 0524211.-7806 fax From;HTPO,INC. 952 829 ~ (:~¢'1~ 07:87 ,V/04 P.(:X::8/(~ :...~"::??}' ']P En;inHdnil -$urwylng ~...~0 Land,cape .A. mhlteckum .-.~ INSP]~CTION REPOKT ?=~J ~ ~ ~ //~ lot T,,~ ; ( , , · ~x:mh'a~crr - WoTk ]~o~rce Visitors ~e~o~ HTPO ' 7510 Market Prate Dr',m · F_.d~n Pmlde, MN 55344 · e5'2-828-0700, 95Z-829-7808 fax . Fro~;HTPO,[NC. 952 829 7806 1~]~ 07:97 ,C/04 P.[I:~~ Work Visitors Cor~ .l .. DAy: S M T W Th ]~ -_ ! HTPO · 7610 Market Place Dflve · Eden Prm~, MN 55344 · 95~~, 952829.-1806 fax , Fran:HTPO,[l~. 952 829 7a~ ff:v'l~ 07:38 ~704 P.~ '.:?ii': ' · ' Engineering · Surveying ~:.;~ Lands0ape Art. bit.re ..'~ INSPECTION KEPORT PzoJ~ No. D&te Work Force Const. Equip. Da?. S M T W Th F , Materials ~_~ HTPO 7510 Market ~ Drive · Eden Prairie, MN 55344 · 95'24294Yf00, 952-829.7~06 f,x Fro~HTPO,]NO, ~ 829 7836 IT:gl~ 07:38 l? ' ' Engineering · Surveying ~; :0 Landscape Architecture ]I~TSPt~C'TION R~PORT ! ! Contracto~ - Work Force Visitors Const. r~ztp. Materials HTPO