Loading...
6 Vengra Design Arboretum Busin6 CITYOF CHANHA EN PO I~x 147 C~ha.~, MN 55317 Administration Phone:. 952.227.1100 Fax: 9,52.221.1110 Building Inspections Phone: 9,.52.227.1180 Fax: 952.227.1190 Engineering Phone: 962.227.1160 Fax: 9,52.227.1170 Finance Phone: 952227.1140 Fax: 952227.1110 Park & Recreation P'nor~ 952.227.1120 Fax: 952.227.1110 Recreation CenW 2310 C~lter Boulevard Fax: 952227.1404 Planning & Natural Flenourc~e Phone: 952221.1130 Fax: 9~2227.1110 Public Works 1591 Pad(Road Phone: 952227.1300 Fax: 952.221.1310 Senior Center Phone: 952.227.1125 Fax: 9,52227.1110 Web Site www. ci.chanhass~.mn.us TO: FROM: DATE: Todd Gcrhmxit, City Manager Bob Generous, Senior Planner May 27, 2003 SUB J: Vcngra De. sign and Arboretum Business Park 5th Addition EXECUTIVE SUMMARY The applicant is proposing thc preliminary and final plat approval of one lot into two lots, one lot of 2.69 acres and thc other 1.76 acres, and development of one of the lots with a 20,000 square foot, on~-story building. The proposed subdivision complies with thc req~ts of thc subdivision ordinaucc. Th~m arc no public improvements reqLd_t~ with the subdivision. The applicant is ~xiuesfing site plan review approval for a 20,000 sq. ~ office warehouse building. Thc applicant has revised thc entry area to meet thc fenestration requirement by adding 205 square feet of window area. Additionally, they have added vertical relief to the east elevations to provide some shadowing and break up thc facade. Staff and the Planning Commission arc n~:mm~-n~ approval of thc development. PLANNING COMMI.qSION UPDATE Thc Planning Commission voted to mcorn~d approval of thc subdivi~on and site plan. CONSm~.R ~ R~QUF~T FOR SUBDI3qSION APPROVAL TO CREATE TWO LOTS ON LQT 1~ B~ 1~ ARBORETUM BUSINESS PARK 2~ ADDITION AND SITE PLAN REVlEVF FOR A 20~000 SQUARE FOOT (EXPANDABLE TO 28,000 ~QUARE FOOT) OFFICE WAl nOU$ . 0N ACR OF PROP] TY ZON] UNIT DEVELOPMENT~ LOCATED AT 2932 WATER TOWER PLACE~ POD RC I$ AND INC., DESIGN. Public Present: Name Address Peter Kordonowy 810 Ramsey Avenue, Carver The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thfl',dno businesses, winding trails, and beautiful parks. A gmat pl~ to live, work, and play. Todd Gerhardt May 27, 2003 Page 2 Jeff Berends Bonnie Huller 3610 County Road 101, Wayzata 2965 Water Tower Place Bob Generous presented the staff report on this item. The commission had concerns about the grade change from the project to Highway 41, sufficient parking and ff there was enough room for the required landscaping. Their biggest eoneem was with the truck traffic ei_mulafion and turnaround on the site. Jeff Berends from Steiner Development stated he believed they had addressed staff's conm about additional articulation on the northern elevation and would address the cast elevation. No one spoke at the public hearing. Feik moved, Slagle seconded that the Planning Commla$4_ on regommend$ approval of the preliminary plat for Arboretum Business Park 5~ Addition creating two lots, as shown on plans prepared by Schoell & Madsen, Inc., dated April 4, 2003, subject to the conditions of AIl voted in favor and the motion carried unanimously with a vote of 4 to O. Feik moved, Slagle seconded that the Planning Comminnion recommend8 approval of Site Plan/f2003~ as shown on plans prepared by Steiner Construction Services dated April 4, 2003, for a 20,000 square foot, one story office warehouse building on Lot 2, Block 1, Arboretum Business Park 5th Addition, subject to the conditions of the staff report with the addition of the following condition: 19. Future expansion of Lot 2 ts contingent upon proof of adequate tm~ ch-cula~n on the site. All voted in favor and the motion carried unanimously with a vote of 4 to O. RECQMMENDATIQN Staff recommends that thc City Council adopt thc following two motions: The Chanha~en City Council approves the preliminary and final plat for Arboretum Business Park 5th Addition creating two lots, as shown on plans prepared by Schoell & Madsen, Inc., dated April 4, 2003, subject to the following conditions: The development of the lots must comply with the Arboretum Business Park Development Design Standards. o Prior to final plat recording, a professional civil en~neer registea~ in the State of Minnesota must sign all plans. Todd Gerhardt May 27, 2003 Page 3 The applicant will be required to submit storm sewer sizing design data for a 10 year, 24 hour storm event with a drainage area map. The interior lot sWrm sewer will require private easements to be dedicated where the sewer crosses from one lot to another. 1 Staff recommends that Type II silt fence be used. The applicant should be aware that any off-site grading will require an easement from the appropriate ~ owner. Silt fence shall be removed upon completion of consmmtion and re-vegetation of the site. , Installation of the private utilities for the site will require permits and inspections through the City's Building Department. 7. Add City Detail Plate Nos. 1006, 2101, 3101, 5201, 5300 and 5214. e The underlying ~ has been previously as~ for sewer, water and street improvements. The remaining assessment due payable to the City is $47,616.22. This remaining balance may be m-spread against the newly platted lots on a per area basis or paid at the time of final platting. In addition, the sanitary sewer and water hookup charge is $1,400 per unit for sanitary sewer and $1,876 per unit for the watermain. The hookup charges are based on the number of SAC units assigned by the Met Council for the new lots. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. J Permits from the appropriate regulatory agencies must be obtained, including but not limited to the Watershed District. 10. On the plan sheets show the 20 foot private drainage and utility easement for the storm seWer. 11. On the utility plan: a) b) Add note "Any connection to existing utility suuctum must be core dfille&" Revise CB 1 to CBMH 1. 12. On the grading plan: a) b) c) d) Revise MG1 to CBMH 1 Show the benchmark used for the site survey. Revise construction entrance note from 35 feet to 75 feet minimum. Revise the berm side slope to 3:1 maximum. 13. Cross-access easements for the shared driveway access must be obtained and recorded against the lots. Todd Gerh~t May 27, 20O3 Page 4 14. Full trail fees shall be collected per city ordinance for all lots in the Arboretum Business Park 5t~ Addition at the time of final plat recording. The Chanhas~a City Council approves Site Plan #200~, as shown on plans prepared by Steiner Construction Services dated April 4, 2003, for a 20,000 square foot, one story office warehouse building on Lot 2, Block 1, Arboretum Business Park Sa Addition, subject to the following conditions: The developer shall enter into a site plan agreement with the city and supply the security required by it . The applicant shall work with the city to revise the landscape plan so that it meets minimum requirements prior to final approval. e A 10 foot clear space must be main~ around fire hydrants, i.e. street lamps, trees, shrubs, bushes, Qwest, Xcel Energy, Cable TV and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pursuant to Chanhassen City Ordinance #9-1. e The builder must comply with water service installation policy for commercial and industrial buildings. Pursuant to Inspection Division Water Service Installation Policy ff34-1993. . The building must comply with the Chanhassen Fire Deparmmnt/Fire Prevention Division regarding maximum allowable size of domestic water on a combination water/sprinkler supply line. Pmrsuant to Chanhassen Fire Depamnent/F~ Prevention Division Policy g36-1994. 1 The builder must comply with the Chanhassen Fire Department/F'tre Prevention Division regarding premise identification. Pursuant to Chanhassen Fac Depaxtment/Fire Prevention Division Policy g29-1992. 1 The building must comply with Chanhas~ Fire Deparmaent/Fixe Prevention Division regarding notes to be included on all site plans. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy ~1-1991. . The hydrants as shown on the plan are acceptable. However, if building is expanded in the future an additional fire hydrant may be required. The owner may want to consider adding the additional hydrant at this time. Please contact the Chanhassen Fire Marshal for exact location. 1 Submit to Fire Marshal type of business that will be moving into the building, i.e. office/ warehouse, storage and other information necessary. Todd Gerhardt May 27, 2003 Page 5 10. Mechanical equipment, satellite dishes, other utility hardware and trash enclosures, whether located on the roof or exterior of the building or on the ground adjacent to it, shall be screened from the public view and with materials identical to or strongly similar to building material or by heavy landscaping that will be effective in winter. 11. The building is required to have an automatic fire extinguishing system. 12. The building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 13. Three (3) accessible parking spaces must be provided. 14. Detailed occupancy requirements cannot be reviewed until complete building plans are submitted. 15. The owner and/or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. 16. Type H silt fence shall be used. The applicant should be aware that any off-site grading will require an easement from the appropriate ~ owner. Silt fence shall be removed upon completion of construction and re-vegetation of the site. 17. Future expansion of Lot 2 is contingent upon proof of adequate truck circulation on the site. ATTACHMENTS lo Resolution Approving Arboretum Business Park 5~ Addition Planning Commission Staff Repo~ Plans dated April 4, 2003 CITY OF CHANHASSEN CARVER AND HE~IN COUNTIES, MINNESOTA DATE: RESOLUTION NO: MOTION BY: SECONDED BY: A RESOL~ON APPROVING A SUBDIVISION OF LOT 1, BLOCK 1, ARBORETUM BUSINESS PARK 2ND ADDmON CREATING LOTS ! AND 2, BLOCK 1, ARBORETUM BUSINESS PARK FII?rH ADDmON WHEREAS, left Podergois and Steiner Development Inc. have requested a subdivision of Lot 1, Block 1, Aflx~mm Business Park 2"a Addition located at the north~ corner of Water Tower Place and Trunk Highway 41 into two lots of 2.69 acres and 1.76 acres; and WHE~~, the proposed subdivision complies with all requirements of the Chanhassen City Code. NOW, THF. REFORE, BE IT RF~OLVFJ} that the Chanhassen City Council hereby approves the preliminary and final plat for Arbom~m Business Park 5~ Addition, creating two lots subject to the following conditions: 1. The development of the lots must comply with the ~mm Business Park Development Design Standards. 2. Prior to final plat approval, a professional civil en~neer registered in the State of Minnesota must sign all plans. 3. The applicant will be required to submit storm sewer sizing design data for a 10 year, 24 hour storm event with a drainage area map. 4. The interior lot storm sewer will require private easements to be dedicated where the sewer crosses from one lot to another. 5. Staff recommends that Type 1I silt fence be used. The applicant should be aware that any off-site grading will require an easement from the appropri~ ~ owner. Silt fence shall be removed upon completion of construction and re-vegetation of the site. 6. Installation of the private utilities for the site will require permits and inspections through the City's Building Department. 7. Add City Detail Plate Nos. 1006, 2101, 3101, 5201, 5300 and 5214. 8. The underlying property has been previously assessed for sewer, water and street improvements. The remaining assessment due payable to the City is $47,616.22. This remaining balance may be re-spread against the newly platted lots on a per area basis or paid at the time of final platting. In addition, the sanitary sewer and water hookup charge is $1,400 per unit for sanitary sewer and $1,876 per unit for the watermain. The hookup charges are based on the number of SAC units assigned by the Met Council for the new lots. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. 9. Permits from the appropriate regulatory agencies must be obtained, including but not limited to the Watershed District. 10. On the plan sheets show the 20 foot t~ivate drainage and utility easement for the storm sewer. 11. On the utility plan: a) b) Add note "Any connection to existing utility smacmm must be core drilled." Revise CB 1 to CBMH 1. 12. On the grading plan: a) b) c) d) Revise MG1 to CBMH 1 Show the benchmark used for the site survey. Revise construction entrance note from 35 feet to 75 feet minimum. Revise the berm side slope to 3:1 maximum. 13. Cross-access easements for the shared driveway access must be obtained and record~ against the lots. 14. Full trail fees shall be collected per city ordinance for all lots in the Arboretum Business Park 5th Addition at the time of final plat recording. Passed and adopted by the Chanhassen City Council this 27tu day May of 2003. ATTEST: Todd Gerhardt, City cierk/Manager Thomas A. Furlong, Mayor gAplan~bl~Villages~solution Arboretum Busine~ Park 5th CiTY OF PC DATE: May 6, 2003 REVIEW DEADLINE: 6/3/03 STA REPORT Z 0 Request for subdivision approval to create two lots, Arbcaetum Business Park 5~ A .ddition, and site plan review for a 20,000 sq..ft. (expandable to 28,000 sq. ft.) office wareho ~use, one-story building, Vengra Design. - LOCATION: 2932 Water Tower Place-l~t 1, Block 1; Arboretum Business Park 2"a Addition APPLICANT: Jeff Podergois 1450 Park Court, g4 Chanhassen, MN 55317 (952) 470-6111 Steiner Development Inc., 3610 South County Road 101 Wayzata, MN 55391 (952) 473-5650 .W PRESENT ZONING: Planned Unit Development, PUD (office-industrial park with support commercial) 2020 LAND USE PLAN: OfficeJindustrial SUBDIVISION ACREAGE: 4.45 acres DENSITY: F.A~R. 02.6 SITE ~ ACRFAGE: 1.76 SUMMARY OF REQUEST: The applicant is requesting pre~ plat approval to subdivide one lot in to two and site plan approval for one of the resulting lots for a one-story, 20,000 square foot office- warehouse building. Notice Of this public hearing has been mailed to all property owners within 500 feet. LEVEL OF CITY DISCRETION IN DECISION-MAK1NC~. The City's discretion in approving or denying a preliminary plat is limited to wheth~ or not the proposed plat meets the standmxts outlined in the Subdivision Regulati.. 'ons and Zoning Ordinance. If it meets these standards, the City must approve the preliminary plat. This is a quasi judicial decision. The City's discretion in approving or denying a site plan is limited to whether or not the ~ project complies with Zoning Ordinance requirements. If it meets those standards, the City must then approve the site plan. This is a quasi-judicial decision. 1 Coach Court 2 Coach Lane 3 Coach Place 4 Coach Dr 5 Village Street 6 Village Place 7 Century Cimle 8 Arboretum Village Trl W 82nd St. 5 6 Arboretum Business Park 5"' Addition Vengra Design May 6, 2003 Page 2 PROPOSAI~UMMARY The applicant is proposing the subdivision of one lot in to two lots, one lot of 2.69 acres and the other 1.76 acres, and development of one of the lots with a 20,000 square foot, one-story building. The proposed subdivision complies with the requirements of the stflxlivision ordinance. There are no public improvements required with the subdivision. The applicant is requesting site plan review approval for a 20,000 sq. ft. office warehouse building. The PUD permits up to 30 percent of floor area ratio and 58,166 square foot office warehouse building, on these two sites. The building is a maximum of 24 feet high at the top of the pamper. The building material is preclominanfly dark brown, broken face, concrete block_ A tan Exterior Finish & Insulating System (EFIS) is proposed around the windows abutting the office area of the building. The we, stem side of the proposed building has loading docks that will face the loading docks for the future, a neighboring use. The entrance area faces Water Tower Place ami is projected appro~ly five feet out from the building, with the roof an additional four feet out from there. Walled mounted lights are located above the overhe~ doors. The development design standards state that all walls shall be given added architecunal interest through building design or appropriate landscaping. The buildings shall have varied and interesting detailing. Staff is recommending that the developer incorporate additional architectural details on north 146 feet of the eastern elevation of the building and the easterly 70 feet of the north elevation of the building to provide visual relief in views from public streets. While the developer has continued the banding on the building, there is little articulaI/on in these areas. Such details may include the addition of overhead windows, the provision of vertical elements, such as columns or vertical lines of material, the stepping out or recessing of the wall, or the inclusion of material changes including colored tiles or architectural concrete ornaments/figures. Additionally, the south elevation of the building is required to incorpoole an additional 176 square feet on fenestration. The only other significant change would be that the applicant work with staff to mallocate landscaping around the building and revise the landscaping plan to meet ordinance req~ts. Staff is recommending approval of Subdivision g2003-5, Arbore~ Business Park 5"' Addition, and site plan W20034 for Vengra Design subject to the conditions of the staff report. APPLICABLE REGULATIONS Arboretum Business Park Development Standards Site Plan Review, Chapter 20, Article H, Division 6 Design Standards for Commercial, Industrial and Office-Institutional Development, Chapter 20, Article XXIII, Division 7 Subdivisions, Chapter 18 Arboretum Business Park 5t~ Addition Vengra Design May 6, 2003 Page 3 BACKGROUND December 10, 2001, the city approved an amendment to the Planned Unit Development (PUD g92- 6) Development Contract/PUD Agreement for Arboretum Business Park incorporating printing as a light industrial use; permitting indoor recreafi~th clubs and recording stmtios in the existing office-industrial buildings in the project; and prohibiting vocational schools, public buildings (except in Outlots A and B), screened outdoor storage, and food processing. On June 22, 1998, the city approved a site plan for a 55,911 square foot building (All About Lights) on Lot 1, Block 2, Arboretum Business Park 3rd Addition and a 52,956 square foot building (On The Level) on Lot 1, Block 1, Arboretum Business Park 2nd Addition. (The On The Level building was not consmmted.) on May 11, 1998, the City Council approved ~ Business Park 2nd Addition consisting of six lots and the right-of-way for Water Tower Place, formerly known as Coulter Boulevard, and a site plan for a 113,600 square feet office-industrial-warehouse buildings (Steiner Building 2). on July 28, 1997, the City Council approved the following: the ordinance for PUD g924 rezoning approximately 154 acres from Agricultural Estate, A2, to Planned Unit Devel~t, PUD, and the PUD g92-6 granting final plat approval for Arbor~a.un Business Park. on June 23, 1997, the City Council aPl:n'oved a Resolution that the AUAR be revised to incorporate the summary of issues and mitigation plan contained in this staff report, that the revisions to the Traffic Study prepared by SRF outlined in the staff relx~ be incorporated into the ~tty, and that the revised AUAR be adopted by the City. On May 27, 1997, the City Council approved the following: · Approved the first reading for rezoning the property from Agricultural Estate, A2, to Planned Unit Development, PUD. Approved the preliminary PUD g92-6 for an office/industrial business park and preliminary plat approval for 12 lots, two outlots and associated right-of-way subject to the plans dated April 4, 1997, revised May 23, 1997,with conditions. · The City Council approved Wetland Alteration Permit for Gateway Business Park subject to the conditions of prelimin~ PUD g92-6 approval. · The City Council approved Interim Use Permit g97-1 for Gateway West Planned Unit Development site subject to conditions. Arboretum Business Park 5t~ Addition Vengra Design May 6, 2003 Page 4 SUBDIVISION REVIEW Public improvements and rough site grading were previously done to the site with the Second Addition. The ~ subdivision ~ two lots where one was previously loeateck Both lots meet the minimum requirements of the subdivision ordinance. The development of the individual lots must comply with the Arboretum Business Park Development Design Standards. GRADING, DRAINAGE & EROSION CONTROL The applicant is proposing to fine grade about 50% of the site for the two new lots. The plans propose to grade the site for the new building pad of 1004 in elevation and proposed parking lots. At this elevation, stormwater from the building and parking lot will drain toward the proposed catch basins and be conveyed via storm sewer to the existing Water Tower Place storm sewer. Prior to final platting, storm sewer design data for a 10-year, 24-hour storm event will need to be submitted for staff review2 The interior lot storm sewer will require private easements to be dedicated where the sewer crosses from one lot to another. Staff recommends that Type II silt fence be used along the grading areas. No erosion control is needed on the west side of the site. The applicant should be aware that any off-site grading will require an easement from the appropriate property owner. A maximum slope of 3:1 is allowed on the berms along the south side of the easterly proposed lot. Municipal sewer and water service are available to the site from the south side of the lot on Water Tower Place. The applicant is proposing to connect to the existing water and sanitary sewer lines and extend them to serve each of the lots. The watermain and municipal sewer lines will be considered private utility lines since they will serve only one lot~ The site has previously been assessed for utility and street improvements. The remaining assessment due payable to the City is $47,616.22. The remaining balance may be re-spread against the newly platted lots on a per-area basis or paid at the time of final platting. Sanitary sewer and water hookup charges will also be applicable for the new lots. The 2003 trunk hookup charge is $1,440 per unit for sanitary sewer and $1,876 per unit for watermain. The hookup charges are based on the number of SAC units assigned by the Met Council for the new lots. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at the time of building permit issuance. All of the utility improvements are required to be cons~ in acc~ce with the City's latest edition of Standard Specifications and Detail Plates. Permits from the appropriate regulatory agencies will have to be obtained, including but not limited to the Watershed District. Arboretum Business Park 5th Addition Vengra Design May 6, 2003 Page 5 STREETS No public streets are proposed as part of this project. The applicant is proposing full access to the site from Water Tower Place. As the access will service the two lots, cross-access easements will need to be obtained and recorded against the lots. PARK & RECREATION As agreed to by Steiner Development, Steiner Development and its representatives and the City of Chanhassen and its representaaves, the following conditions of approval regarding parks and trails in the Arboretum Business Park were approved by the City Council: Steiner Development dedicated Outlots A & B (48.38 acres), comprised of 26.13 acres of wetland and ponds and 22.23 acres of upland, and all required connecting trail easements, to the City of Chanhassen. Compensation for the 22.23 acres of upland shall include a park dedication credit of 11.73 acres and cash payment of $200,000. Said cash payment being derived from tax increment proceeds and paid on a no interest schedule of $40,lXX) per year for five years. The year of commencement being the year of initial tax increment proceeds. Trails Steiner Development shall be responsible for planning, engineering, and consmacfing the "wetland trail." This trail follows an alignment generally des~bed as the western edge of Ouflots A & B. Connection points for this new trail consmmtion shall be the terminus of the Trotter's Ridge trail and Autumn Ridge trail. Portions of said consmmfion will occur off-site of the Arboretum plat within land owned by the City of Chanhassen. Trail construction shall be completed in two phases: one north of Coulter Boulevard and the other south of Coulter Boulevard. Each phase shall be completed contemporaneously with adjoining improvements. In consideration for this trail consmaction, the city shall compensate Steiner Development full costs of trail consmaction plus a 10% design and construction management fee. Bid documents, including plans and specifications, shall be approved by the Park & Recreation Director and City Engineer prior to soliciting bids. Project bidding shall occur in a competitive environment with a minimum of three bids being received. The results of the bidding procx~s shall be reviewed with the Park & Recreation Director and City Engineer prior to award. Cash payment for trail consmmfion shall be made from the City of Chanhassen to the developer upon completion, inspection, and acceptance of the trail. In lieu of crediting trail fees against said trail conslxuction, full trail fees shall be collected per city ordinance for all lots in the Arboretum Business Park. Said fees shall be deposited into the Arboretum Business Park 5t~ Addition Vengra Design May 6, 2003 Page 6 city's park dedication account the same account that will fund the cash payment being made to Steiner Development for trail construction. COMPLIANCE TABLE Area (square feet} 43,560 Frontage (feet) 150 Code Lot 1 117,300 268 433 Lot 2 76.587 174 ~.44 Total 193,887 Vepth (feet) GENERAL SITE PIAN/ARCmT~CrURE ARCmTECTURAL COMPLIANCE Size Portion Placement The entrance to the building faces Water Tower Place and is loeat~ in the center of the building. The entrance is covered with a canopy style projection, asphalt shingled roof. Staff believes that additional windows on the side of the entrance ckxyrs could provide much of required additional fenestration necessary to meet the requirement and accentuate the entrance. The applicant is protx~ng a dark brown rock face block as the primary building material (70 percent of the wall area). The office area will be highlighted with a tan exterior and finiah insulating system (EFIS) in the window areas (7 pewent of the wail area). Windows and roof flashing for the parapet wall cap are bronze anodized. The southern end of the building is accented by a '~veathered green" asphalt shingled (9 percent of the wall area) roof smacmre and planter box extensions at the east and west ends. A burnished, double scored, tan block band (4 percent of the wall area) extends around the building. As an alta'native, the plans spell out that the burnished band and the roof cornice may be replaced with EFIS. Overall, the design inc/xpora~ high quality materials - accent material occupy less than 15 percent of the buildings fagade. To avoid long unbroken expanses, buildings of more than 40 feet in width shall be divided into smaller increments (between 20 and 40 feet) through articulation of the faceade. Staff is concerned with the north 146 feet of the eastern elevation of the building and the ~ly 70 feet of the north elevation of the building. While the developer has continued the banding on the building, there is little articulation in these areas. One option would be to incorporate overh~ windows. A second option would be to incorporate column elements projected out from the building. A third option Arboretum Business Park 5th Addition Vengra Design May 6, 2003 Page 7 would be to incorporate of vertical elements, such as vertical lines of material with the rock face block to help articulate this area or mal_erial changes including colored tiles or architectural concrete ornaments/figures. A fourth option would include the stepping out or recessing of the wall. Color The building colors include dark brown, tan and 'hveathered green". These earth tone colors should blend well with the other buildings within Arboretum Business Park. Height and Roof Design The building height is 19' -4" at the south end of the building and 23' -4" at the noFda end of the building. This is within the height limit of 3 stories or 40 feet in the Overlay. The building has a pitched roof element. Mechanical equipment, satellite dishes, other utility hardware, and trash enclosures, whether located on the roof or exterior of the building or on the ground adjacent to it, shall be screened from the public view and with materials identical to or strongly similar to building materials or by heavy landscaping that will be effective in winter or they shall be located so as not to be visible from any public way. Use of parapet walls or pitched roof elements to screen rooftop equipment is encouragetL In no case shall wooden fencing be used as a rooftop equipment screen. Facade Transparency The south elevation of the building is required to incorporate an additional 176 square feet on fenestration. Fifty percent of the first floor elevation that is viewed by the public shall include transparent windows and or doors. All other areas shall include landscaping mAterrial and architectural detailing and articulation. Site Furnishing The plans include an area for a bicycle rack on the west side of the building as well as landscape planters on the east and west ends of the south side of the building. The applicant is also providing for pedestrian access from the site to the sidewalk on the south side of Water Tower Place. The truck loading docks are located on the west side of the building, angled to the northwest Eventually, when the building to the west develops, this area will be an enclosed truck loading area. No exterior trash enclosures have been shown on the plans. An exterior trash enclosure, if consUucted, must be consmwted of the same material as the building. Staff recommends that if an Arboretum Business Park 5th Addition Vengra Design May 6, 2003 Page 8 exterior trash enclosure is installed, then it should be located on the west aide of the building between the loading dock and the parking stall. If no exterior tmah encloaure ia provided, then tmah and recyclables must be kept indoors until the day of pickup. Landscaping Minimum requirements for landscaping include 3,874 sq. ft. of landscaped area around the parking lot, 16 trees for the parking lot, and buffet yard plantings along the ~ lines. The applicant's proposed as compared to the requirements for landscape area and parking lot trees is shown in the following table. Vehicular use landscape area Trees/parking lot North prop. line - buffer yard B, 160' South prop. Line East prop. line - buffer yard B, 450' Total 2,504 sq. ft. 10 overstory 2 islands/peninsulas 3 overstory 6 undemtory 10 shrubs understory shrubs 5 overstory trees 9 shrubs 21 overstory trees 15 understory trees 19 shrubs >2,5O4 sq. ft. 3 overstory 2 islands/peninaulas 2 overstory 0 understory 16 shrubs 3 overstory (also counted as parking lot trees) 7 understory 12 shrubs 12 overstory 27 understory 5 shrubs 17 overstory 34 understory 28 shrubs Proposed landscaping does not meet minimum ordinance requirements in each category. Space constraints on the site has mused some areas to exceed requirements and others to have less than required. The proposed mechanical pad on the west side of the building must be screened with either a wall or with heavy landscaping. Staff would like to work with the applicant to relocate plant materials to ensure areas such as parking lots and views of the building arc sufficiently screened. Staff recommends that the applicant work with the city to revise the landscape plan so that it meets minimum requirements prior to final approval. Lot Frontage and Parking location The building is designed to front on Water Tower Place. Access to the site is via Water Tower Place. Parking is dis~buted around the building. Approximately 50 percent (28 of 57) of the parking is between the front factade and the street. Arboretum Business Park 5th Addition Vengra Design May 6, 2003 Page 9 Lighting/Si~ The developer is proposing 20 foot tall, 400 watt, metal halide, shoebox style light fixtures. Such lighting is consistent with the development design standards for the project. The applicant is also proposing %vail pak" lighting units above the loading dock area. Such units shall be shieldecC Area lighting shall have a 90 degree cut-off angle. Lighting shall be shielded from direct off-site view. The developer is not showing monument signage on the street frontages. However, the design standards would permit one monument sign. Monument signage may not exceed eight feet in height nor have a sign area greater than 80 square feet in sign area. Monuments must be set back a minimum of V~ the required building setback (15 feet) from Water Tower Place. Any monument sign would need to be cons~t~ of material similar to the principal building. Wall signage shall be permitted per city ordinance for industrial office park site. The building elevations show wall signage on the south side. Signage would be permitted in this area. Staff is not currently reviewing the signage for compliance with the sign ordinance, nor is there sufficient detail to perform this type of review. A separate sign permit will need to be applied for prior to the installation of any signage. COMPLIANCE TABI~E PUD Vengra Design Building Height 3 stories 1 story Building Setback N-0'E=0' W - 0' S = 30' N - 133'E - 20' W- 53'S - 100' Parking stalls 44 stalls 57 stalls Parking Setback N - 0'E- 0' W - 0' S - 20' N-8'E-8' W-0'S-20' Hard surface 70%* 68% coverage Lot Area 1 acre 1.8 acres * The development may average 70% impervious surface over the entire project. Individual lots may exceed the 70% coverage. Arboretum Business Park 5t~ Addition Vengra Design May 6, 2003 Page 10 Parking Standards: office, 4.5 per 1,000 sq. ft., or 32 spaces; warehouse, 1 per 1,000 sq. ft. for the first 10,000 sq. ft., then 1 per 2,000 sq. ft., or 12 spaces. The applicant has provided 57 spaces. SUBDIVISION FINDINGS 1. The proposed subdivision is consistent with the zoning ordinance; Finding: The subdivision meets all the requirements of the Industrial Office Park District for which the Arboretum Business Park standards are based. , The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; Finding: The proposed subdivision is consist with applicable plans. w The physical characteristics of the site, including but not limited to topo~hy, mils, vegetation, susceptibility to erosion and siltation, suscepti~ty to flooding, and storm water drainage are suitable for the proposed development; Finding: The proposed site is suitable for development subject to the conditions stmeified in this report. o The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other i .mpmv~ts required by this chapter; Finding: The proposed subdivision is served by adequate uffoan infras~. 5. The proposed subdivision will not cause environmental damage; Finding: The proposed subdivision will not cause additional environmental damage. 6. The proposed subdivision will not conflict with easements of ~ Finding: The proposed subdivision will not conflict with existing easements, but rather will expand and provide all necessary easements. 7~ The proposed subdivision is not prexnature. A subdivision is premature if any of the following exists: a, Lack of ad~t, storm water drainage. lack of adequate roads. Arboretum Business Park 5t~ Addition Vengra Design May 6, 2003 Page 11 C, Lack of adequate sanitary sewer systems. Lack of adequate, off-site public im.m'ovements or support systems. Finding: The proposed subdivision is provided with adequate urban infiasmmmm. SITE PLAN FINDINGS In evaluating a site plan and building plan, the city shall consid~ the d~velopment's compliance with the following: Consistency with the elements and objectives of the city's development guides, including the comprehensive plan, official mad mapping, and other plans that may be adopted; (2) Consistency with this division; (3) Preservation of the site in its natural stat~ to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general appearance of the neighboring developed or developing or developing areas; (4) Creation of a harmonious relationship of building and open space with rumtml site features and with existing and future buildings having a visual relationship to the development; (5) Creation of functional and harmonious design for slxucmres and site features, with special attention to the following: ao An internal sense of order for the buildings and use on the sit~ and provision of a desirable environment for occupants, visitors and general community; b. The amount and location of open space and landscaping; Co Materials, textures, colors and details of conslxu~on as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and d, Vehicular and pedestrian circulation, including walkways, interior drives and parking in terms of location and number of access points to the public streets, width of interior drives and access points, general interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. (6) Protection of adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and Arboretum Business Park 5t~ Addition Vengra Design May 6, 2003 Page 12 those aspects of design not adequately covered by other regulations which may have substantial effects on neighboring land uses. Finding: Subject to the revisions contained in the staff report, the proposed site plan is consistent with all plans and specifications, Deign Standards for Commemial, Industrial and Office-Institutional Developments and development design standmxts for the Arboretum Business Park Planned Unit Development. RECOMMENDATION Staff recommends that the Planning Commission adopt the following motions: A) le e 'Whe Planning Commission recommends approval of the preliminary plat for ~ Business Park 5t~ Addition creating two lots, plans prepared by Schoell & Madson, Inc., dated April 4, 2003, subject to the following conditions: The development of the lots must comply with the Arboretum Business Park Development Design Standards. Prior to final plat approval, a professional civil en~neer registered in the State of Minnesota must sign all plans. , The applicant will be required to submit storm sewer sizing design data for a 10-year, 24- hour storm event with a drainage area map. . The interior lot storm sewer will require private easements to be dedicat~ where the sewer crosses from one lot to another. e Staff recommends that Type II silt fence be used. The applicant should be aware that any off-site grading will require an easement from the appropriate ~ owner. Silt fence shall be removed upon completion of construction and re-vegetation of the site. . Installation of the private utilities for the site will require permits and inspections through the City's Building DepOt. . . Add City Detail Plate Nos. 1006, 2101, 3101, 5201, 5300 and 5214. The underlying property has been previously assessed for sewer, water and ~ improvements. The remaining assessment due payable to the City is $47, 616.22. This remaining balance may be m-spread against the newly platted lots on a per-area basis or paid at the time of final platting. In addition, the sanitary sewer and water hookup charge is $1,400 per unit for sanitary sewer and $1,876 per unit for the watermain. The hookup Arboretum Business Park 5th Addition Vengra Design May 6, 2003 Page 13 charges are based on the number of SAC units assigned by the Met Council for the new lots. Sanitary sewer and watermain hookup fees may be specially assessed against the parcel at/he time of building permit issuance. e Permits from the appropriate regulatory agencies must be obtained, including but not limited to the Watershed District. 10. On the plan sheets show the 20-foot private drainage and utility easement for the storm sewer. 11. On the utility plan: i) Add note "Any connection to existing utility smmUae must be core drilled." ii) Revise CB 1 to CBMI-I 1. 12. On the grading plan: i) Revise MI1 1 to CBMI-I 1. ii) Show the benchmark used for the site survey. iii) Revise construction entrance note from 35 feet to 75 feet minimum. iv) Revise the berm side slope to 3:1 maximum. 13. Cross-ms easements for the shared driveway ms must be obtained and tecarrded against the lots. 14. Full trail fees shall be collected per city ordinance for all lots in the Arboretum Business Park 5th Addition at the time of final plat ~g." B) 'Whe Planning Commission recommends approval of Site Plan 820034, plans pmpm~ by Steiner Consmmtion Services, dated April 4, 2003, for a 20,000 square foot, one story office warehouse building, on Lot 2, Block 1, Arboretum Business Park 5m Addition, subject to the following conditions: lw The developer shall enter into a site plan agn~xmnt with the city and supply the security required by it. The developer shall work with staff to provide additional articulation to the eastern and northern building elevations. 1 The south elevation of the building is n~quired to incorparate an additional 176 square feet on fenestration. The applicant shall work with the city to revise the landscape plan so that it meets minimum requirements prior to final approval. Arboretum Business Park 5th Addition Vengra Design May 6, 2003 Page 14 St . 1 , 10. 11. 12. 13. 14. A 10-foot clear space must be maintained around fire hydrants, i.e., street lamps~, trees, shrubs, bushes, Qwest, Xcel Energy, Cable TV and transf~ boxes. This is to ensure that fire hydrants can be quickly locatext and safely operated by firefighters. Pursuant to Chanhassen City Ordinance ~)-1. The builder must comply with water service installation policy for commercial and industrial buildings. Pursuant to In.on Division Water Service Installation Policy g34- 1993. The builder must comply with the Chanhaeaen Fire Department/Fire Prevention Division regarding maximum allowable size of domestic water on a combination water/sprinkler supply line. Pursuant to Chanhassen Fi_re DepamnenffFire Prevention Division Policy g36- 1994. The builder must comply with the Chanhasaen lZxre DepartmentJPire Prevention Division regarding premise identification. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy g29-1992. The builder must comply with the Clmnhassen Fire Depmtment/Fa~ Prevention Division regarding notes to be included on all site plans. Pttrsuant to Chanha~en Fire Department/Fac Prevention Division Policy geb1991. The hydrants as shown on plan are acceptable. However, if building is expanded in the future an additional fire hydnmt may be required. The owner may want to consider adding the additional hydrant at this time. Please contact the ~ F~re ~ for exact location. Submit to fire marshal type of business that will be moving into the building, i.e. office/warehouse, storage and other information necessary. Mechanical equipment, satellite dishes, other utility hardware, and trash enclosures, whether located on the roof or exterior of the building or on the ground adjacent to it, shall be screened from the public view and with materials identical to or strongly similar to building materials or by heavy landscaping that will be effective in winter. The building is required to have an automatic fire extinguishing system. The building plans must be prepared and signed by design professionals licensed in the State of Minnesota. 15. Three (3) accessible parking spaces must be provided. Arboretum Business Park 5t~ Addition Vengra Design May 6, 2003 Page 15 16. Detailed occupancy retailed requirements cannot be reviewed until complete plans are submitted. 17. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit proced~. 18. Type li silt fence shall be used. Thc applicant should be aware that any off-site grading will require an easement from the appropriate property owner. Silt fence shall be removed upon completion of construction and re-vegetation of the site." ATrACHMgNTS: . 2. 3. 4. 5. 6. 7. 8. 9. Hndings of Fact and Recommendation Development Review Application ReduceA Copy of Site Han Reduced Copy of Landscape Plan Reduced Copy of Exterior Elevations Recluc~ Copy of Preliminary Plat Arboretum Business Park Development Design Standards Memo from Mark Littfin to Robert Genertms dated 4/18/03 Public I-Ie~ng Notice and Mailing List Arboretum Business Park 5~ Addition Vengra Design May 6, 2003 Page 16 CITY OF CHANHASS~ CARVER AND HENNEPIN COUNTIF_S, MINNES~A FINDINGS OF FACT AND RECOMMENDATION Application of Jeff Podergois and Steiner Development, Inc. for Subdivision and Site Plan approval. On May 6, 2003, the Chanhassen Planning Commission met at its regularly schedule meeting to consider the application of Jeff Podergois and Steiner Development, Inc. for preliminary plat approval of property and site plan approval. The Planning Commission gonducted a public. hearing on the proposed subdivision preceded by published and mailed notice. The Planning Commission heard testimony from all interested persons wiahing to speak and now make~ the following: FINDINGS OF FACT Ii 1 The property is currently zoned Planned Unit Development, PUD. The property is guided in the Land Use Plan for OfficeJIndustrial uses. The legal description of the ~ is: Lot 1, Block 1, Aflx~tum Business Park 2~ Addition. The Subdivision Ordinance directs the Planning Commission to consider seven possible adverse affects of the proposed subdivision. The seven (7) affects and our findings regarding them are: (1) The proposed subdivision is consistent with the zoning ordinan~; (2) The proposed subdivision is coo~i~ with all applicable city, county and regional plans including but not limited to tile city's com.m'ehensive plan; Arboretum Business Park 5t~ Addition Vengra Design May 6, 2003 Page 17 (3) The physical characteristics of the site, including but not limited to topography, mils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; (4) The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; (5) The proposed subdivision will not cause environmental damage; (6) The proposed subdivision will not conflict with easements of record; and (7) The proposed subdivision is not premature. A subdivision is premature if any of the following exists: Lack of adequate storm water drainage. Lack of adequate roads. Lack of adequate sanitary sewer systems. Lack of adequate off-site public im.m'ov~ts or support systems. 5. Section 20-110, Site Plan: (1) (2) (3) (4) (5) Is consistent with the elements and objectives of the city's development guides, including the comprehensive plan, official road mapping, and other plans that may Is consistent with this division; Preserves the site in its natural state to the extent practicable by minimizing tree and soil removal and designing grade changes to be in keeping with the general a~ce of the neighboring developed or developing or developing areas; Creates a harmonious relationship of building and open space with natural site features and with existing and future buildings having a visual relationship to the development; Creates a functional and harmonious design for stnmmres and site features, with special attention to the following: An internal sense of order for the buildings and use on the site and provision of a desirable environment for occupants, visitors and general community; Arboretum Business Park 5th Addition Vengra Design May 6, 2003 Page 18 , b. The amount and location of open space and landscaping; Materials, textures, colors and details of consmacfion as an expression of the design concept and the compatibility of the same with adjacent and neighboring structures and uses; and d. Vehicular and pedestrian circulation, including walkway, interior drives and parking in termg of location and number of access points to the public streets, width of interior drives and access points, gen~ interior circulation, separation of pedestrian and vehicular traffic and arrangement and amount of parking. (6) Protects adjacent and neighboring properties through reasonable provision for surface water drainage, sound and sight buffers, preservation of views, light and air and those aspects of &sign not adequately covered by other regulations which may have substantial effects on neighboring land uses. The planning report g2003-4 Sub and g2003-5 Site Plan, dated May 6t~, 2003, prepared by Robert Generous, et al, is incorporated herein. RECOMMENDATION The Planning Commission recommends that the City Council approve the Preliminary Plat and Site Plan. ADOPTED by the Chanhassen Planning Commission this 6"' day of May, 2003. CHANHASSEN PLANNING COMMISSION ATTEST: BY: Secretary 04/09/02 08:35 F~ 612 937 5739' CITY OF CEAH]~SS]gN ~002 CITY OF CHANHASSEN 69O COULTER DRIVE CHANHASSEN,. MN 55317 374soo TR r:PHONE (Day time)_ DEVELOPMENT REWIEW APPLICATION _-.._ Comprehensive Plan Amendmem ConditionaJ Use Permit · , In'torito Use Permit Non-conforming Use Permit Planned Ur~t Development' . Sign Permits SePlan Review' , , , _~Subdivision* Temporary Sales Pen'n/t Vacation of ROW/Easements . Wetland Alteration Permit X ($50 CUP/SPRNAC,/V~AP/Metes ,.~"',~, ~ and Bounds, ¢~,00 Minor SUB) TOTAL FEE $. ,/~~ A ~ of all property owners within 500 fee~ of the bounda~ of the property must be Included with the appUcation. l~al]d]ng material sampb=s must be ~u~ with alia plan. reviews. 'Twenty-six full size folded copies of the plans must be submitted, includin~ an 8W' X 11" reduced copy el, -~ ..... ~Z for each plan sheet. '* ESCTr~ will be required far other appUcatlorm through the development contract NOTE - When multiple applications are processed, the appropriate.fee shal be charged for each appllcatJorc 04/09/02 08'35 F,~ 812 937 5739 CZ'I~ OF' ~SS]~ l~003 PROJECT NAME ~.DCATI~I ~ DESCRIPTION TOTE ,~.,REAGE PRESENI' ZONING REQ~ ZONING PI:~c. SENT LAND USE DESIGNATION REQU~ LAND USE DESIGNATION REASON FOR THIS REQUEST' -i'his appr~-~tion must be completed in full and be typewrlt~n or clearly printed and must be acc~ m~ied by all Information and plans required by applicable City Ordinance provisions. Before fling this appllcetion, you should confer with the Planning Depam'nent to determine the specific ordinance and pmceduraJ requim~ applicable tc~ your application. A determ~on of completeness of the application shall be made within ten business days of applV, ation submittaJ. A written r~tice of appllr.,;Ibn deficiencies shall be maJled to the a;)pllcant within ten ~ days of application. 'i'hi~; is to cortl~y that ! am making application for the described action by the City and that I am re~po~l~e for complying with ail City requirements with naga~ to this request. This applca~ should be processed in my name and I am the party whom the City should contact regarding sny matter pertalrdng to l~is application. I have aItached a copy of proof of ownership (either copy of Owner's Duplicate Cerffflcate of. T'(de, Abstract of Titte or purchase, agreement), or ! am the authorized pemon to make 1his appiicaIion and the fee owner has also sigrted this appitcatlom 1 will keep myself informed ot the deadlines for submission of material and the progress of this applicatl0n. I further understand that adc~onai fees may be charged for consulting fees, feasibility studles~ etc. with an estimate prior' to any authorization to proceed with the stUdy. The docum~ and Information I have submitted am true and correct to the best of rny knowledge. · 'The city hereby rtmtfles the applicant that development review can]lot be completed within 60 days due to public hearing requirements and agency review. Therefore, the city Is notlfyl~ the applicant that the city requires an automac 60 day extension for development review. Devel~ment review shall be completed within 120 days unless additionaJ review extensions are approvad by the applicant. ~[~:l~re of Fee Owner 'The applicant should contact staff for a copy of the staff repot/whlc:h will be avel]able on Friday pri0r to the meeting. If nut contacted, a copy of the report will be mailed to the applicant's adl:h'es~. ,- o. I. I I I i .. i i i I ' I . . I Construction Scrvio~__ '--- ... m ..- ,~.-.. ,.,~ ,m-,m,~.,.--, ,,,-,~ .- -- kk k~M.M.k. MIm~l~M~-~-~ ' '- ' ! · ii ii ! Steiner Construction I · I i HIGHII/AY NO. 41 · ...... -._.. ~-~::~ ...... .it4_._ -------~__~<.-"~...-.. - ..... -'~. '.-:'~.- '"~-'. '-.._ -'"' '--... .IL_ .. .....' -~.,,.',.. %,,.~ '-. .... -r .... ..:, .... .?..-.~._. . .~ ~- .... · :.? ..¢.:'-%.-~:-'3-:~H- ..... .:?.i' ~ ~'~.~1~.-'-_' (%.:... .". 1 VENGRA DESIGN · PREUMINARY PLAT Ill lit I EXIti UlT C Adopted 7/28/98 Amended 7~26~99 Amended 8/13/01 Amended 12/10101 ARBORETUM BUSINF3S PARK DEVELOPMENT DESIGN STANDARDS Development Standards Intent The purpose of this zone is to create a PUD light industrial/office park. The use of the PUD zone is to allow for more flexible design standards while creating a higher quality and more sensitive proposal. All utilities are required to be placed underground. Each lot proposed for development shall proceed through site plan review based on the development standards outlined below. Photo- composite images of proposed development adjacent to Highways 5 and 41 shall be submitted as part of the review process. The PUD requires that the development demonstrate a higher quality of architectural standards and site design. Ancillary uses may be permi~ as listed below ff they are ancillary to a principal use on the individual lot. Commercial/retail uses are prohibited except those uses specifically noted below. b. Permitted Uses The permitted uses in this zone should be limited to light industrial, warehousing, office and other uses as defined below. The uses shall be limited to those as defined herein. If there is a question as to whether or not a use meets the definition, the City Council shall make that interpretation. Permitted use~ shall be allowed on the different Blocks and Lots for which they are specifi~ below. The Blocks and Lots specified below are those designated on the attached PUD plan_ The Block and Lot designations in final plats approved for phases of development may differ from those specified below. However, the permitted uses shall continue to be those specified below for the Lots identified in the PUD plan. L/ght Industr/a/- The manufacturing, compounding, proc:easing, assembling, packaging, printing, or testing of goods or equipment or reseamh activities entirely within an enclosed smacmre, with no outside storage. There shall be negligible impact upon the surrounding environment by noise, vibration, smoke, dust or pollutants. (Lots 3, 4, and 5, Block 1; Lot 1, Block 2; Lots 1, 2, 3, and 5 (Ouflot A, Arboretum Business Park 4t~ Addition), Block 4; and the Wrase ~) (Amen~ 12/10/01) Warehousing - Means the commercial storage of merchandise and personal ~. (Lots 3, 4, and 5, Block 1; and Lots 1, 2, 3, and 5 (Outlot A, Arboretum Business Park 4~ Addition), Block 4) O~ewe. Professional and business office. (Lots 1, 2, 3, 4, and 5, Block1; Lot 1, Block 2; Lot 1, Block 3; Lotsl, 2, 3, 4 (Lots 1, 2 and 3, Block 1, Afooretum Business Park 4t~ Addition), and 5 (Outlot A, Arboretum Business Park 4t~ Addition), Block 4; and the Wrase ~) Health Services- establishments primarily engaged in furnishing medical, surgical and other health services to persons. (Lots 1 and 2, Block 1; Lot 1, Block 3; and Lot 4 (Lots 1, 2 and 3, Block 1, Arboretum Business Park 4th Addition), Block 4) Conferences/Convention Center - establishments designed to accommodate people in assembly, providing conference and meeting services to individuals, groups, and organizations. (Lot 5 (Outlot A, Arboretum Business Park 4th Addition), Block 4) Indoor Recreation/Health Club - establishments engaged in operating reducing and other health clubs, spas, and similar facilities featuring exercise and other physical fimess conditioning. (Lots 3, 4 and 5, Block 1; Lot 1, Block 3; and Lots 2, 3 and 4 ('Lots 1, 2 and 3, Block 1, Arboretum Business Park 4th Addition), Block 4) (Amended 12/10/01) Hotel/Motel-establishments engaged in furnishing lodging, or lodging and meals, to the general public. (Lot 1, Block 3; and LOt 4 (Lots 1, 2 and 3, Block 1, Arboretum Business Park 4th Addition), Block 4) Utility Services - Water towers and reservoir. (Lots 3, 4, and 5, Block 1; LOts 1, 2, and 3, Block 4; and the Wrase property) Recording Studio - LOts 3, 4 and 5, Block 1; Lots 2 and 3, Block 4. (Amended 12/10101) Commercial uses (permitted on lots specified as commercial in development standards tabulation box) 1. Restaurant, permitted on Lot 1, Block 3 or Lot 4 (Lots 1, 2 and 3, Block 1, Arbo~ Business Park 4t~ Addition), Block 4. (One stand alone restaunmt.) 2. Convenience store with or without gas pumps, not to exceed 12,000 square feet, on LOt 1 or 2, Block 1, only. (One convenience store.) 3. Banks, with or without drive up windows ~ 1 and 2, Block 1; LOt 1, Block 3; and LOt 4 (Lots 1, 2 and 3, Block 1, Aflxn~tum Business Park 4t~ Addition), Block 4) 4. Day Care - establishments providing for the care and supervision of infants and children on a daily basis. (Lots 1 and 2, Block 1; LOt 1, Block 3; and Lot 4 (Lots 1, 2 and 3, Block 1, Arboretum Business Park 4t~ Addition), Block 4) 5. Auto service center, auto body repair is prohibited (Wrase) (amended 8/13/01) Ancillary Uses (in conjunction with and integral to a primary use) 1. Fast Food (no drive-through and only in conjtmction with and integral to a convenience store). 2. Restaurant (only in conjunction with hotel/motel or convention/conference center). 3. Showroom - showroom type display area for products stored or manufactured on-site provided that no more than 20 percent of the floor space is used for such display and sales.[for entire development]. (Amended 8/25/97) 4. Telecommunication Towers and Antennas by conditional use permit only. 5. Car wash, in conjunction with convenience store. 6. Day Care Interim Uses (Amended 7126/99) Church facilities, i.e., assembly or worship halls and associated office, meeting, and other required spaces, subject to the following criteria: 1. The church shall not occupy more than six ~percent (6%) of the one building on Lots 3 and 4, Block 2, Arboretum Business Park 2 Addition. 2. The church congregation may not exceed 200 adult me~. 3. Shall be reviewed and approved in accordance with the same procedures specified in the city code for conditional use permits. Prohibited uses (Amended 12/10101) · Contractors Yard · Lumber Yard · Home Improvement/Building Supply · Garden Center · Auto related including sales and repair, except on the Wrase property (amended 8/13101) · Home furnishings and equipment stores · General Merchandise Store · Vocational School · Public buildings, except on Outlots A and B, which are public park land · Screened outdoor storage · Food processing The development is regulated by the Highway 5 and the PUD Standards. There are no minimum requirements for setbacks on interior lot lines in the PUD zone. The following setbacks shall apply: I Street Fronta~ I I I Hwys. 5 &41 Coulter & Century Boulevards 70/50 50/20 30/20 150 * 100 NA *Lot 5 (Outlot A, Arbo~ Business Park 4t~ Addition), Block 4, must only meet the maximum setback on one Highway frontage. The average hard surface coverage does not include Outlots A and B. The PUD standard for hard surface coverage is 70% for office and industrial uses. Any one site/lot can exceed the 70 percent requirement but in no case can the entire finished development exceed 70 percent. d. Development Standards Tabulation Box 1. Building Area LOT/USE ACRES Building Size/FAR PARKING Street Dedication 1.80 Interior 16.6 30 28.7 3.01 Lot 3, Block 1 10.02 131,006 262 Lot 4, Block I 5.45 71,218 142 Lot 5, Block 1 4.41 57,688 115 Lot 1, Block 4 4.38 57,199 114 Lot 2, Block 4 5.40 70, 597 141 Lot 3, Block 4 8.98 117,371 235 Lot 1, Block 2 12.23 159,822 320 23.20 (3/1000) 1,213 Lot 5, Block 4 (Outlot A, Arborelxnn Business Park 4th (.4 FAR) 404,279 Lot 1, Block I 1.80 11,746 / 23,520 Lot 2, Blockl 2.32 15,180 / 30,320 61 Lot 4, Block 4 (Lots 1, 2 and 3, Block 1, At'bore~ Business Park 4m Addition), Office/Hotel Lotl, Block 3 Restaurant/Office 6.41 26,536 / 53,060 (.10FAR) 27937 / 83,770 (5/1000) 133 (16/1000)447 Commercial sites may develop as office-industrial uses. Square footage for individual lots may be ~aflocated within the development, by type, provided the maxinmm square footage is not exceeded. Building Square Footage Breakdown . Office 31% 368,000 / (432,000) Light Industrial 31% 368,000 / (432,000) Warehouse 31% 368,000 / (432,000) Commercial 7% 81,000 / (0) Total *includes the Wrase property. industrial uses 100% 1,186,000 / (1,295,000) ( ) represents conversion of commercial uses to OffiCe- More than one (1) principal structure may be placed on one (1) platted lot. 3. Building height shall be limited to 3 stories or 40 feet. , Lot 5, Block 4, (Outlot A, Arboretum Busine~ Park 4~ Addition), is intended to accommodate a major coqxgate headquarters or office, ~h, high end manff~ with limited warehousing type user. While the majority of the developmeat is baaed on 30 percent office space, Lot 5 must have a minimum of 40 percent office uae and include multi-story building(s). Building Materials and Design The PUD requires that the development demonstrate a higher quality of architectural standards and site design. All mechanical equipment shall be screened with material compatible to the building. . . . , . . 10. 11 12. L All materials shall be of high quality and durable. Masonry material shall be used. Color shall be introduced through colored block or panels and not painted cinder block. Brick may be used and must be approved to assure uniformity. Block shall have a weathered face or be polished, fluted, or broken face. Concrete may be poured in place, tilt-up or pm-east, and shall be finished in stone, textumd~ coated, or painted. Metal siding will not be approved except as suptx~ material to one of the above material.~ or curtain wall on office components or, as trim or as HVAC screen. All accessory smlcmms shall be designed to be compatible with the primary s~. All roof mounted equipment shall be screened by walls of compatible appea~g material or camouflaged to blend into the building or bac~unck Wood screen fences are prohibited. All exterior process machinery, tanks, etc., are to be fully screened by compatible materials. The use of large unadorned, pre-stressed concrete panels and concrete block shall be prohibited. Acceptable materials will incorporate textured surfaces, exposed aggregate and/or other patterning. All walls shall be given ~_d~d amhitecmral intern, st through building design or appropriate landscaping. The buildings shall have varied and in~g detailing. The use of large unadorned, concrete panels and concrete block, or a solid wall unrelieved by architectural detailing, such as change in materials, change in color, fenestrations, or other si~ifieant visual relief provided in a manner or at intervals in keeping with the size, mass, and scale of the wall and its views from public ways shall be prohibited. Acceptable materials will incorporate textured surfaces, exposed aggregate and/or other patterning. All walls shall be given added architectural interest through building design or appropriate landscaping. Space for recycling shall be provided in the interior of all principal stnmtnms or within an enclosure for each lot developed in the Business Center. Each buildings shall contain one or more pitched roof elements depending on scale and type of building, or other architectural ~ts such as towers, arches, vaults, entryway projections, canopies and detailing to add additional interest and articulation to ~. There shall be no underdeveloped sides of buildings visible from public right-of-ways. All elevations visible from the slxeet shall receive nearly equal treatment and visual qualifies. Site Lands~ping and Screening 1 lo 2~ 3~ 1 m o e Landscaping along Highways 41 and 5 shall comply with Buffer yard standard C. Coulter Boulevard, Century Boulevard, and West 82"a Street shall comply with Buffer yard standard B. The master landscape plan for the Arboretum Business Park (formerly Gateway) PUD shall be the design guide for all of the specific site landscape developments. Each lot must present a landscape plan for approval with the site plan nview process. Storage of material outdoors is prohibited tmless it has been approved under site plan review. All approved outdoor storage must be screened with masonry fences and/or landscaping. Undulating or angular berms or elevation changes of 3' in height shall be placed along Coulter Boulevard, and Century Boulevard. The berms shall be sodded or see. xted at the conclusion of each project Phase grading and utility consm~on. The required buffer landscaping may be installed incrementally, but it shall be required where it is deemed necessary to screen any proposed development. All required boulevard landscaping shall be sodded. Loading areas shall be screened 100 percent year round from public fight-of-ways. Wing walls may be required where deemed appropriate. Signage All freestanding signs be limited to monument signs. The sign shall not exceed eighty (80) square feet in sign display area nor be greater than eight (8) feet in height. The sign treaunent is an element of the architecture and thus should reflect the quality of the development. The signs should be consistent in color, size, and matea'ial throughout the development. The applicant should submit a sign package for staff review. Each property shall be allowed one monument sign per street frontage. The signage will have consistency throughom the development A common theme will be introduc~ at the development's entrance monument and will be used throughout Consistency in signage shall relate to color, size, materials, and heights. The Arboretum Business Park PUD shall be permi~ two A_rbore~ Business Park identification signs. One sign per project entrance, at West 82"d and Century Boulevard and at Highway 41 and the westerly roadway, shall be permitted. Said sign shall not exceed 80 square feet in sign axe. a nor be greater than eight feet in height. Wall sign shall be permitted per city ordinance for industrial office park site. All signs shall require a separate sign txa'mit. 8. In addition to the two signs identified in g. 5. above, signage for the main entrance on Highway 5 and Century Boulevard shall be reviewed and approved by the Planning Commission and City Council. 1. Lighting for the interior of the business center should be consistent throughout the development. The street lights should be designed consistent with thc exis~ng lighting along the existing Coulter Boulevard. 2. A decorative, shoe box fixture (high presst~ sodium vapor lamps or metal halide lights) with a square ornamental pole shall be used throughout the development area for area lighting. 3 Lighting equipment similar to what is mounted in the public street right-of-ways shall be used in the private areas. 4. All light fixtures shall be shielded. Light level for site lighting shall be no more than 1/2 candle at the property line. This does not apply to street lighting. i. Alternative Access 1. Each site shall ac~omrnodate txansit service within the individual development whenever possible. 2. Pedestrian ac, ce, ss shall be provided from each site to the public sidewalk and trail system. 3. The developer and site users shall promote and encourage Traffic Demand Management Strategies. 4. Each site shall provide areas for bicycle parking and storage. CITYOF CHANHASSEN PO 8ox147 Chanha~,n, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fa~ 952.227.1190 Engineering P'nooe: 952.227.1160 Fax: 9,.52.227.1170 Finance Phone: 952.227.1140 Fax: 952227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952227.1110 Recreation Centre' 2310 C~lter Boulevard Phone: 952.227.1400 Fax:. 952227.1404 Planning & Natural Resoarce~ Phone: 952227.1130 Fac 952227.1110 Public Wofim 1591 Park Road Phone: 952.227.1300 Fax: 952227.1310 Senior Center F'hone: 952.227.1125 Fac 952227.1110 Web SHe www. ci.chanhassen.mn.us TO: Robert Generous, Senior Planner FROM: Mark Littfin~ Fire Marshal DATE: April 18, 2003 Request for subdivision approval to create two lots on Lot 1, Block 1 Arboretum Business Park 2aa Addition and site plan review for a 20,000 square foot (expandable to 28,000 square feet) offi~house on 4.45 acres of property zoned planned trait development, located at 2932 Watertower Place, Jeff Podergois and Steiner Development, Inc, Vengra Design. Planning Case: 2003-5 SUB and 2003-4 SPR I have reviewed the site plan for the above project. In order to comply with the Chanhassen Fire Department/Fire Prevention Division, I have the following fire code or city ordinance/policy requirements. The site plan is based on the available information submitted at this time. If additional plans or changes are submitted the appropriate code or policy items will be addressed . A 1 O-foot clear space must be maintained around fire hydrants, i.e., ~ lamps, trees, shrubs, bushes, Qwest, Xcel g. nergy, Cable TV and transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated by firefighters. Pmmmm to Chanhass~ City Ordinance g9-1. . The builder must comply with water service installation policy for commercial and industrial buildings. Pttrsuant to Tn.qpection Division Water Service Installation Policy #34-1993. Copy enclosed. 1 The builder must comply with the Chanhassen Fire Department/Fire Prevention Division regarding maximum allowable size of domestic water on a combination water/sprinkler supply line. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy #36-1994. Copy enclosed. . The builder must comply with the Chanhassen Fire Department/Fire Prevention Division regarding premise identification. ~t to Chanhassen Fire Department/Fire Prevention Division Policy #29-1992. Copy enclosed. The City of Chanha#en · A growing community with clean lakes, quality schools, a charming downtown, l~riving busine~mes, winding trails, and beauUful parks. A gmat place to live, work, and play. Mr. Robert Generous April 18, 2O03 Page 2 o . The builder must comply with the Chanhassen Fire Department/Fire Prevention Division regarding notes to be included on all site plans. Pursuant to Chanhassen Fire Department/Fire Prevention Division Policy ~4-1991. Copy enclosed. The hydrants as shown on plan are acceptable. However, if building is expanded in the fumm an additional fire hydrant may be required. The owner may want to consider adding the additional hydrant at this time. Please contact the Chanhassen Fire Marshal for exact location. Submit to fire marshal type of business that will be moving into the building, i.e. office/warehouse, storage and other information necessary. G:~affi~y~nl~plrev2003 -$ sub Ii e . Si , e e 1 10. 11. CHANHASSEN FIRE DEPARTMENT FIRE PREVENTION BUREAU 7700 MARK~ BLVD. PO BOX 147 CHANHASSEN, MN 55317 (952) 227-1150 FAX: (952) 227-1190 CT-TANT-TA.~i~'.N ~'TR~ TIlq'.PAl~TNgI~.NT NTfYT~.~ TI'I Rlq'. IN'CT ,l T111~'.11 t'iN A T.T, ~T'I~. PT.A N~ Revised 6/12/02 Fire Marshal must witness the flushing of underground sprinkler service line, per NFPA 13-8-2.1. A final inspection by the Fire Marshal before a Certificate of Occupancy is issued. rim ~ acc, e, aa ma&q shall be provided on site during all phases of construction. The construction of these temporary roads will conform with the Chanhassen Fire Department requirements for temporary acx~s roads at construction sites. Details are available. On.qite fire h_ydraI~ shall be provided and in operating condition during all phases of construction. The uae af liquefied W,,tmlaum gaa shall be in conformance with NFPA Standard 58 and the Minnesota Uniform Fire Code. A list of these requirements is available. (See policy #33-1993) All fire ~t~tian and fire alLlx~..5,sifl~ rqLqigma shall be monitored by an approved UL central station with a UL 72 Certificate issued on these systems before final occupancy is issued. An 11" x 14" Ag Ruilt shall be provided to the Fire Department. The'As Built shall be reproducible and acceptable to the Fire Marshal. (See policy g07-1991). An applxlltp~ I~k }mx shall be provided on the building for fire department use. The lock box should be located by the Fire Department connection or as located by the Fire Marshal. High41ilad flflmhuafibla aglmga shall camglg with the re~?imment.q nf ~ af the Mizme.,mla l lniform Fire ~ High-piled combustible storage is combustible materials on closely packed piles more than 15' in height or combustible materials on pallets or in racks more than 12' in height. For certain special-hazard commodities such as mbber tires, plastics, some flammable liquids, idle pallets, etc. the critical pile height may be as low as 6 feet. Fire lane aignage shall be provided as required by the Fire Marshal. (See policy g06-1991). Maximum allowed size of domestic water service on a combination domestic/fire sprinkler supply line policy must be followed. (See policy #36-1994). Notes For Site Plan 04-1991 Page 1 of 1 CHANHASSEN FIRE DEPARTMENT FIRE PREVENTION BUREAU 7700 Market Blvd BOX 147 CHANHASSEN. MN 55317 (952) 227-1150 FAX: (952) 227-1190 PREMI'~I~.q Reused 6/10/02 Numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall contrast with their baek~und. Size and location of numbers shall be approved by one of the following - Fire Marshal, Fire Inspector, Building Official, Building Inspector. Requirements are for new construction and existing buildings where no ad_dress numbers are posted. 4. ~T-mhet8 0]] rrmll be=; at dl't1~='w~y ~ ma7 be a ndntmnm O~ 4". 1. ~linlrmm~ heh,hf ~dmll be ~ t~ f'.mnmerel~l Remdl-emml~ ]. :M~nbn, nn ~ ~h~n be :12". 2. Mu]tI-Temu~ ~SEN FIRE DEPARTMENT POLICY MAXIMUM ALLOWED SIZ'P~ OF DOMESTIC WATER SERVICE ON A COMBINATION DOMESTI~ SPRINKLER SUPPLY LINE 1. Domestic water line shall not be greater than ¼ pipe size of the combination sea'vice watex supply line. 2. 1 ½" domestic off 6" line. 3. 2" domestic off 8" line. .. .~ ~.~ 4. 2 ½ domestic off 10" line. :.~-;;. ..,:~,,- ~::7~-:-~ : .::- -4. :: Option 1' ..~:~¢.,..,,~. ,~'::- :'..: Domestic sizes be .mased if it '0.al. .hy caUy the demahd by ail domestic ~ ,Wi!!.. ~..t: ' ' '.dmp.th,e..~?;. "'~,~kler watea' . ;--.._. ,.. below'its minimum g~.'.O~~~:' ' ":'; ' :( :~i :. ".!' ~-:.:';'¢i'.7 ~ · .~ . . - . . : . . 2,' '-'-' ': ' ~- .... : t'~:: - .-' --:~: -:.' ,"r' ' .... '- -- i · .' ' ''" '; : '"" "'~'~" .... ::~"'" '~-' ~'"'~-';'- '-"~'': :~'i':¢"~:~-''i7';' · ..- . 2--,..':.'...~-:' :,.'..: .::.".?* ;' : .-;--,%': -. ..... :, :-...- .:.- -~ ,:;~ .......... ..-.,.- · .~;..,,~-.,~,' -: .... :-.i {.,:; ~ :'-::::7--';;' ,'~: ;.-L.;;2':.-.'~-'-;;~.'."&.'.,'''.'-:.-'.-..''~'2~:}. ':':, · -.. .:~,:-~-- --.-,-.~ : i~ . ¢-,-.--:,,.,~ ~'..~ .... ~, .-..2-.: -~-:,}.;.. ,_.:-~ ~2.--~.....: · .., '-.:..~ Option :2: ...... '"': :::'? "' .... · .......... ~·' .... ': '""': ........ "'::~" ~ ........ ' ...... '":' ":~ -- : ':-- -:-7:-'Y'--.":' .:~.":.-- .~';g,~:."~.'.'Y .'-~ .'-'"',-.- ::'- "-?'--".':'.-'.: :'"' '~'~ -' :' ~-;,' ::'-"':-' ":' ' "7,. Combinatioii dom,,tic and fire llne ~ce ~ have '.~ e.'iectrie"}.. ;.. solenoid valve install~ on the domestic side oftbe service: ' % . '- .' : :!. .., - 2"- .' . ,':':,-'~'. .[ -~, .5::~T,; ~.-.'--'27--i "".'' ~:'}':' ":-"~'.'i"-!-.'-' :'..'~ (~-~-f.:!).'.':,'....:..: ';::.-'-'-.':? ~!F.'~".i:.~ !,.'.;!'i~/':~'Y.:'.i'S:~: Must be approved by the '~ Fire Marshal and c~'s~'';~'~ · ..: : '; ~ .'-.." Mechani~ .... r, " "- ,:..- .... · ..'-." .;.,_.'~:-.'"-':"- ;: . ; - . - . ; ~ Y. .;. - 1- .-. ,. . : ........ . . , .... -- , - 'i ·- . - : ~ - . - -, . ' - '- · :: - · . · . . -. .- .,. . :.~.,. :.- ...: ..... ..,. .-,~. .' . . ' : .... '-'-" /! . 'i¢.!" i-'. ~Fire~en.~.!.;~..~' ' Appr0veal-.l~llllOlZlg UrnOlltl -~.:.-:-~: ;;',:.'-' ;:--' .*.-. l-'011gy~..50-lyyq.;- - '" ' ' ' "'*'~ "':'~'"'~';-::': ;"'"'"'~'"' 4'" '-.:;...:~-~;i}:,..:; --..~;'~::~i;.-'~{i.-:ii, !5~;}~Date: 06/10/9 ~-. ".':':-' ~ ';' '.' ,.'--' :.', ~.--;': .-.' ~?.'..,?..~- 4;: ~.'-.'..'~%', :!~.r,' ;.:' D,,,-,,~ .'l ,,;,e t ~.~,~ox-:.C;~-L~ c:.-"-~ .~.-'::.:~ _ -'::.:¢.;..:.;.'..,%...~-;:~..:~:..:~}o:q ..... ~ .... ~.--~-, ~: .t ~'- i~ ".lq4'. ""-" ~ ~ · ....... -'-,-e .... ~ >I.- ~t-'-,.~--' ,';' ->.::'~";,- ~,~,,e-t ..- -,-O4~ : .= -.. ;~1, ....... -. ........ :-:'-:~' i.~.~...._...? ~ .-.....>.+~. ,~.:.e..~...,.. -,-',1 ,.,,~..-4 -"a--.~.-a.. ,.~o..¢....~- -/_ -·.- i-*-%'~ .-: i.: '-,--:-: ,,---,', --~:. ..... ;~.c- ..--,.~.- ~, .-:-¢--,-.- ..... ~., I.%2 -:-,.~ :--,- , -q ,..-4 {.~. ,-.0 ,. r...,. I: ,..x ..,;,-·,:...Iv: ~.. i::,,-> · ..,i~ ~,~'; · ~a lVlarsh~ ~'~ ~ - -;;'-";':"':': -"::""~'--':~"~"'".¢'"'"' :'i _ .., -..~:.~.~,-.,z-=_~,.,~.:~ -....¢.-.. ->., ,, -'....7.'.:,%'~.'," ~:~--:; -~: .'-L.:-"-~'~ £.% -' ' '.':- ' -. ,..r :. '.,..~ ..'.;..-':. ~ $:¢~:~.-',- .... CHANHASSEN FIRE DEPARTMEI~ FIRE PREVENTION BUREAU 7700 MARKET BLVD. PO BOX 147 CHANHASSEN, MN 55317 (952) 227-1150 FAX: (952) 227-1190 WATER SERVICE INSTALLATION POLICY FOR COMMERCIAL AND INDUSTRIAL BUILD~ Revised 6/12/02 1) The Inspections Division shall be respons~le for issuance of permits No permit shall be issued until approval of plans have been obtained from the following: a) Engineering Department b) Fire Mamhal c) Minnesota Department of Health d) Plumbing Inspector Mechanical impectors will do all installation inspections and witness the hydrostatic and conductivity tests. Call (952) 227- 1180 to schedule an inspection. lrtqpection and Test Requiremenls a) All pipes shall be inspected before being covered. Phone (952) 227- 1180, to schedule inspections. A 24 hour notice is rmui d. b) Conductivity test is required. The pipe shall be subjected to minimum 350 amp test for a period of not less than 5 minutes. c) Hydrostatic test required. All pipe shall be subjected to a hydrostatic pressure of 150 PSI for 2 hours. Allowable pressure drop shall not exceed 1 PSI. d) Pipe shall not be nm under buildings - NFPA 24, 8-3.1. 3) Upon approval of the hydro test, the plumbing impector shall submit a copy of the inspection report to the utility superintendent. The inspection report shall note whether the system is ready for main flush and drawing of water sample for the bug test. Water Service Installation 34-1993 Page 1 of 2 Water main flushing shall be wimessed by the utility superintendS. a) Watermain flushing may be scheduled by contacting the utility superintendent at 474-2086. A 24 hour notice is required. b) The utility superintendent shall obtain a water .sample for a bacteria test after the main flush and deliver to a testing company. The contractor shall be responsible for testing costs. Allow two weeks for testing results to be returned to the City. c) Upon receiving approval of the water sample test, the utility superintendent shall submit a copy to each plumbing inspector and turn water on to the tested and approved sections of the piping. 5) An additional supervised flush and flow test will be required and witnessed by the Fire Marshal for services supplying fire suppression systems. The flush and flow test shall be performed in accordance with 1991 edition of NFPA 13, Sec. 8-2.1. Contact the Chanhassen Fire Marshal at (952) 227-1150. 6) Watermain installations shall comply with: a) Minnesota Plumbing Code, Chapter 4715 b) Chantmssen Engin~ Department, Watermain Specifications c) National Fire Protection Association, Chapter 24 7) Only authorized city employees are permitted to operate city water control valves. For water mm on or off contact the utility superintendent by phone (952) 227-1308. A 24 hour notice is required. Water Service Installation 34-1993 Page 2 of 2 NOTICE OF PUBLIC HEARING CHANHASSEN PLANNING COMMISSION MEETING TUESDAY, MAY 6, 2003 AT 7:00 P.M. CITY HALL COUNCIL CHAMBERS 7700 MARKET BLVD. PROPOSAL: Subdivision and Site Plan Review APPLICANT: Jeff Podergois LOCATION: 2932 Water Tower Place NOTICE: You am invited to attend a public hearing about a proposal in your area. The applicant, Jeff Podergois request for subdivision appmvai to create two lots on Lot 1, Block 1, Arboretum Business Park 2nd Addition and site plan review for a 20,000 sq. f. (expandable to 28,000 sq. ff.) office warehouse on 4.45 acres of property zoned Planned Unit Development, located at 2932 Water Tower Place, and Stelner Development Inc., Vengm Design. What Happens at the Meeting: The purpose of this public hearing is to Inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the public hearing through the following steps: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses the project. Questions and Comments: If you want to sea the plans before the meeting, please stop by City Hail during office houm, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project, please contact Bob at 952-227-1131. If you choose to submit written comments, it is helpful to have one copy to the department In advance of the meeting. Staff will provide copies to the Commission. Notice of this hearing was published in the Chanhessen Villager on April 24, 2003. Smooth Feed SheetsTM Use template for 5160® ::{EGENTS OF UNIV OF MINNESOTA 3/0 REAL ESTATE OFFICE .. )19 15TH AVE SE 424 DON HOWE BLDG ~IlNNEAPOLIS MN 55455 ~F_GENTS OF UNIV OF MINNESOTA 3/0 REAL ESTATE OFFICE )19 15TH AVE SE 424 DON HOWE BLDG VIINNEAPOLIS MN 55455 Tom Chrietenaen All Abou~ L±ghl;s' 2965 Nater Tower Place Chanhasaen, MN 55317 MN Landscape /~bo=etum 3675 /L~bo=etum Blvd. Chanhassen, MN 55317 ~3EURTERRA LLP- 3610 SOUTH HWY 101 /VAYZATA MN 55391 3HASKA GATEWAY PARTNERS 3610 CO RD 101 WAYZATA MN 55391 3HANHASSEN ACQUISITIONS LLC 2036 WASHINGTON ST HANOVER MA 02339 3ENTURY 2000 PARTNERS LLP 3610 SOUTH HWY 101 ~AYZATA MN 55391 /VATERTOWER PARTNERS LLC PO BOX 265 ~ACON~ MN 55387 ~RBORETUM III REALTY PTRS LLP )610 CO RD 101 /VAYZATA MN 55391 31-1ASKA GATEWAY PARTNERS )610 CO RD 101 NAYZATA MN 55391 Laser 5260®