1g. Chanhassen Nature Preserve Trail
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227,1100
Fax: 952,227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952,227.1190
Engineering
Phone: 952.227.1160
Fax: 952,227,1170
Finance
Phone: 952.227,1140
Fax: 952,227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952,227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227,1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952,227,1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952,227,1300
Fax: 952.227.1310
Senior Center
Phone: 952,227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
~
MEMORANDUM
TO:
Todd Gerhardt, City Manager
Todd Hoffman, Park and Recreation Director 14
FROM:
DA TE:
November 24, 2008
~
SUBJ:
Approve Payment for Chanhassen Nature Preserve Trail
Construction, Steiner Construction Services, Inc.
PROPOSED MOTION
"The City Council approves payment in the amount of $171, 158.38 to
Steiner Construction Services, Inc. for the construction of the
Chanhassen Nature Preserve Trail. Further, staff is directed to send a
letter of appreciation on behalf of the City Council to Steiner
Construction Services, Inc. for their dedicated service in working with
the City to advance our trail system."
Approval of this item requires a simple majority vote of those City
Council members present.
BACKGROUND
On August 11,2008, the City Council approved an agreement with Steiner
Construction Services for construction of the Chanhassen Nature Preserve Trail.
Working with Bituminous Roadways, Inc., this highly anticipated section of trail
was successfully constructed in the months of August, September and October.
The trail opened to the public in mid-October and has been well received.
The 2008 Park and Trail Acquisition and Development Capital Improvement
Plan included $317,000 for construction of this trail. The project was modified
when a proposed bridge crossing was replaced by a concrete culvert,
significantly lowering the overall cost of the project. Our agreement with
Steiner for this work was estimated at $181,046.51. The final project cost is
$171,158.38. Staff is pleased to report that Steiner Construction Services, Inc.
and their representatives have been a pleasure to work with during construction
of all phases of the Nature Preserve Trail.
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Mr. Todd Gerhardt
November 24, 2008
Page 2
RECOMMENDA TION
Staff recommends that the City Council approve payment in the amount of
$171, 158.38 to Steiner Construction Services, Inc. for the construction of the
Chanhassen Nature Preserve Trail. Additionally, staff should be directed to
send a letter of appreciation on behalf of the City Council to Steiner
Construction Services, Inc. for their dedicated service in working with the City
to advance our trail system.
ATTACHMENTS
1. Invoice in the amount of $171,158.38
2. Detailed Cost Description
3. 2008 Capital Improvement Program Project Description
4. Agreement
5. Expense Documentation
. :-..:.;.:;:::::::~~:~~~~f~ '.
. ........... ....
..................
. ....................
.......... ...........
.......... ............
. .......... ..............
: :::::::~~::~:tf~~I~~~I~J!I~~{~~~j~~j~\~I~~j~~~;
Steiner ..t::::::I~~:::~:~:::::~~::::::}':'::::::::::::::::::::::::::::::: .
Construction SerVicest.LLC
... ... ....... ...
...... ........ ............. .......
...... ........ ....... ...... ......
...... .......... ...... ....... .......
... ......... ... ...
... .......... .... ...
... ......... ... ...
... ......... ......
... ......... .......
... ... ...... ... ...
... ... ...... ......
... ......... .......
... ... ..... ......
... ... ..... .....
... ....... .....
... ... .... .....
... ... .... ....
... ... .... ....
3610 County Rd. 101
Wayzata, MN 55391
DATE:
INVOICE #
FOR:
November 12, 2008
91008
ABP 7th Addition
2-Phase Trail
Construction
Chanhassen, MN
Bill To:
City of Chanhassen
7700 Market Blvd PO Box 147
Chanhassen, MN 55317
Attn: Todd Hoffman
Total invoice per attached final construction costs
171,158.38
-.Jrutr04
Scott Anderson, Staff Accountant
TOTAL iii:!:::::::~::::::::::::ii!:i::ii::I:il::;lilllmli:i:
Make all checks payable to Steiner Construction Services
If you have any questions about this invoice contact us at 952-473-5650.
THANK YOU FOR YOUR BUSINESSI
Steiner
OJnsttuc1ion Services, u..c
FINAL CONSTRUCTION COSTS
ASP - 7th Addition
2-PHASE TRAIL CONSTRUCTION
Chanhassen, MN
NOVEMBER 11, 2008
Description
Description
1-000
1-304
1-310
1-311
1-331
1-336
1-451
1-521
1-523
1-722
1-810
of new culvert
reserve 280. = 752.50
5-500
5-520
- AltemateAdds
22-000 CONTRACTOR'S FEE
22-001 Contin enc 5%
o
22-010 Contractors' Fee - Cost Plus 10%
ESTIMATED TOTALS
ALTERNATES
Unit Cost Units Installed
40.00 100.00
17.00 42.00
30.00 66.00
30.00 42.00
49.50
1.00 100.00
2.20
36.30
ACTUAL COSTS OF EXTRA TRAIL INSTALLATION WORK
AIt#1 - Per lin ft MN Dot Railing #8401
4,000.00
AIt#2 - Per cu yd to remove unsuitable material
714.00
AIt#3 - Per yard to replace with Cls-5
As spec'd in field for actual conditions
As needed @ soft subcut areas
1,980.00
1,260.00
AIt#4 - Per cu yd to replace with 2" clear rock
AIt#5 - Per sq yd of geofabric installed
100.00
AIt#6 - Per sq yd of seed blanket installed
AIt#7 - Per sq ft of additional retaining wall.
Total Adds
Deduct for Staking Allowance
Net Add to AsphaltPaving
8,054.00
(3,250.00)
4;804.00
Copital Improvement Program
City ofChanhossen, MN
2008 thru 2012
Contaet Unassigned
Department Park & Trail Improvements
Type Improvement
Useful Life 30 Years
Category Park
Priority nJa
Project # PK&T -047
Project Name Arboretum Business Park Lot 12 Trail
Aecount # 1 410..()()()()-4710
Aecouut # 3
Account #2
Total Project Cost $317,000
Description I
Construction of an 8-foot wide asphalt trail in the Chanhassen nature preserve.
JustificatitJn I
Represents the finaJphase in Ii four part trail construction initiative.
Expenditures
Land Improvement
2008
317,000
317,000
2009
2010
2011
2012
Total
317,000
317,000
Totlll
Funding Sources
. . . Park Dedication Fund
2008
317,000
317,000
2009
2010
2011
2012
Total.
317,000
317,000
Tottil
Opemtionlll Impllel/Other I
Maintenance and operations costs.
64
~~ ~ nv.
R-(3~1
FORM OF AGREEMENT
BETWEEN CITY OF CHANHASSEN AND CONTRACTOR
FOR NON-BID CONSTRUCTION CONTRACT
TIDS AGREEMENT made this .l1:::-. day of AviJ. 'u s {- , 2008, by and between
the CITY OF CHANHASSEN, a Minnesota municipal corp ation ("OWl!er") and STEINER
CONSTRUCTION SERVICES, LLC, a Minnesota limited liability company, ("Contractor").
Owner and Contractor~ in consideration of the mutual covenants set forth herein, agree as
follows:
, 1. CONTRACT DOCUMENTS. The following documents shall be referred to as
the "Contract Documents", all of which shall be taken together as a whole as the contract
between the parties as if they were set verbatim and in full herein:
A. This Agreement.
B. Standard General Conditions of the Construction Contract, EJCDC C-700,
2002, as amended by City of Chanhassen Supplementary Conditions to the
General Conditions.
C. Exhibit "A" - Job Cost Estimate and Schedule of Unit Prices dated July
29,2008 including alternates 1 through 7 inclusive.
D. Specifications, Exhibit "B", dated July 29,2008
E. Drawings and reports:
. Schoell &. Mads()n (West Trail) - Grading & Erosion Control Plan, Sheet C I,
dated 10-8-07
. MFRA Sheet C4.2 (East Trail) - Trail Grading Plan East, Sheet C4.2, dated
2-4-08 and Revision "A" dated July 3, 2008
. Braun Intertec - Shallow Boring Results & Recommendations dated 6-11-08
. .
In the event of a conflict anlong the provisions of the Contract Documents, the order in which
they are listed above shall control in resolving any such conflicts with Contract Document "A"
. having the first priority and Contract Document ~'E" having the last priority.
2. OBLIGATIONS OF THE CONTRACTOR. The contractor shall provide the
goods, services, and perform the work in accordance with the Contract Documents.
3. CONTRACT PRICE. Owner shall pay Contractor for completion of the Work
in accordance with the Contract Documents an amount in current funds equal to the sum of the
amounts determined in accordance with Exhibit "A".'
4. PAYMENT PROCEDURES.
A.
Contractor shall submit Applications for Payment. Applications for
Payment will be processed by Engineer as provided in the General
Conditions.
140400vOl
RNK:08lO612008
1
B. Progress Payments; Retainage. Owner shall make 95% progress payments
on account of the Contract Price on the basis of Contractor's Applications
for Payment during performance of the Work.
C. Payments to Subcontractor.
(1) Prompt Payment to Subcontractors. Pu~suant to Minn. Stat. ~
471.25, Subd. 4a, the Contractor must pay any subcontractor
within ten (10) days of the Contractor's receipt of payment from
the City for undisputed services provided by the subcontractor.
The Contractor must pay interest of I !12 percent per month or any
part of a month to the Subcontractor on any undisputed amount not .
paid on time to the subcontractor. The minimum monthly interest
penalty payment for an unpaid balance of$100.00 or more is
$10.00. For an unpaid balance of less than $100.00, the Contractor
shall pay th~ actual penalty due to the subcontractor.
(2) Form IC~134 (attached) required from general contractor, Minn.
Stat. ~. 290.92 requires that the City of Chanhassen obtain a
Withholding Affidavit for Contractors, FOlm IC-134, before
making final payments to Contractors. This form needs to be
submitted by the Contractor to the Minnesota Department of
Revenue for approval.
. .
The form is used to receive certification from the state that the
vendor has complied with the requirement to withhold and remit
state withholding taxes for employee salaries paid.
D. Final Payment. Upon final completion: of the Work, Owner shall pay the
remainder ofthe Contract Price as recommended by Engineer.
5. COMPLETION DATE. The Work must be completed within sixty (60) days
after the date the Contract Times commence to run, and completed and ready for
final payment in accordance with the General Conditions within sixty (60) . days
after the date when the Contract Times commence to run.
6. CONTRACTOR'S REPRESENTATIONS.
I 40400vO I
RNK:08/06I2008
A.
Contractor has examined and carefully studied the Contract Documents
and other related data identified in the Contract Documents.
B.
Contractor has visited the Site and become familiar with and is satisfied as
to the general, local, an:d Site conditions that may affect cost, progress, and
performance of the Work.
2
140400vO I
RNK:Oll106/20011
C.
Contractor is familiar with and is satisfied as to all federal, state, and local
Laws and Regulations that may affect cost, progress, and perfomlance of
the Work.
D.
Contractor has carefully studied all: (l) reports of explorations and tests
of subsurface conditions at or contiguous to the Site and all drawings of
physical conditions in or relating to existing surface or subsurface
structures at or contiguous to the Site (except Underground Facilities)
which have been identified in the General Conditions and (2) reports and
drawings of a Hazardous Environmental Condition, if any, at the site.
E.
Contractor has obtained and carefully studied (or assumes responsibility
for doing so) all additional or supplementary examinations, investigations,
explorations, tests, studies, and data concerning conditions (surface,
subsurface, and Undergroun~. Facilities) at or contiguous to the Site which
may affect cost, progress, or performance of the Work or which relate to
any aspect of the means, methods, techniques, sequences, and procedures
of construction to be employed by Contractor, including any specific
means, methods, techniques, sequences, and procedures of construction
expressly required by the Bidding Documents, and safety precautions an~
programs incident thereto.
F.
Contractor does not consider that any further examinations, investigations,
explorations, tests, studies, or data are necessary for the performance of
the Work at the Contract Price, within the Contract Times, and in
accordance with the other terms and conditions of the Contract
Documents. .
G.
Contractor is aware of the general nature of work to be performed by
Owner and others at the Site that relates to the Work as indicated in the
Contract Documents.
H.
Contractor has correlated the information'known to Contractor,
information and observations obtained from visits to the Site, reports and
drawings identified in the Contract Documents, and all additional
examinations, investigations, explorations, tests, studies, and data with the
Contract Documents.
I.
The Contract DocUments are generally sufficient to indicate and convey
understanding of all terms and conditions for performance and furnishing
of the Work.
J.
Subcontracts:
3
(1) Unless otherwise specified in the Contract D<?cuments, the
Contractorshatl, upon receipt of the executed Contract Documents,
submit in writing to the Owner the names of the Subcontractors
proposed for the work. Subcontractors may not be changed except
at the request or with the consent of the Owner.
(2) The Contractor is responsible to the Owner for the acts and
omissions of the Contractor's subcontractors, and of their direct
and Indirect employees, to the same extent as the Contractor is
responsible for the acts and omissions ofthe Contractor's
employees.
(3) The Contract Documents shall not be construed as creating any
contractual relation between the Owner, the Engineer, and any
Subcontractor.
(4) The Contractor shall bind every Subcontractor by the terms ofthe
Contract Documents.
7. WORKER'S COMPENSATION. The Contractor shall obtain and maintain for
the duration of this Contract, statutory Worker's Compensation Insurance and Employer's
Liability Insurance as required under the laws of the State of Minnesota.
8. COMPREHENSIVE GENERAL LIABILITY. Contractor shall obtain the
following minimum insurance coverage and maintain it at all times throughout the life of the
Contract, with the City included as an additional name insured. The Contractor shaH furnish the
City a certificate of insurance satisfactory to the City evidencing the required coverage:
Bodily Injury:
$2,000,000 each occurrence
$2,000,000 aggregate products and .
completed operations .
Property Damage:
$2,000,000 each occurrence
$2,000,000 aggregate
Contractual Liability (identifying the contract):
Bodily Injury:
$2,000,000 each occurren((e
Property Damage:
$2,000,000 each occurrence
$2,000,000 aggregate
Comprehensive Automobile Liability (owned, lion-owned, hired):
. Bodily Injury:
$2,000,000 each occurrence
$2,000,000 each accident
140400vOl
RNK:08/06/2008
4
Property Damage:
$2,000,000 each occurrence
9. WARRANTY. The Contractor guarantees that all new equipment warranties as
specified within the quote shall be in full force and transferred to the City upon payment by the
City. The Contractor shall be held responsible for any and all defects in workmanship, materials,
and equipment which may develop in any part of the contracted service, and upon proper
notification by the' City shall immediately replace, without cost to the City, any such faulty part
or parts and damage done by reason of the same in accordance with the bid specifications.
10. INDEMNITY. The Contractor agrees to indemnify and hold the City harmless
from any claim made by third parties as a result of the services performed by it. In addition, the
Contractor shall reimburse the City for any cost of reasonable attorney's fees it may incur as a
result of any such claims. '
11. MISCELLANEOUS.
A. Terms used in this Agreement have the meanings stated in the General
Conditions.
B. Owner and Contractor each binds itself, its partners, successors, assigns
and legal representatives to the other party hereto, its partners, successors,
assigns and legal representatives in respect to all covenants, agreements,
and obligations contained in the Contract Documents.
C. Any provision or part of the Contract Documents held to be void or
unenforceable under any Law or Regulation shall be deemed stricken, and
all remaining provisions shall continue to be valid and binding upon
Owner and Contractor, who agree tbat the Contract Documents shall be
reformed to replace such stricken provision or part thereof with a valid and
enforceable provision that comes as close as possible to expressing the
intenti-on of the stricken provisions.
D. Data Practices/Records.
(1)
All data created, collected, received, maintained or disseminated
for any purpose in the course of this Contract is governed by the
Minnesota Government Data Practices Act, Minn. Stat. Ch. 13, any
other applicable state statute, or any state rules adopted to
implement the act, as well as federal regulations on data privacy.
(2)
All books, records, documents and accounting procedures and
practices to the Contractor and its subcontractors, if any, relative to
this Contract are subject to examination by the City.
I 40400v0 I
RNK:08I06I200B
5
E. Software License. If the equipment provided by the Contractor pursuant
to this Contract contains software, including that which the manufacturer
may have embedded into the hardware as an integral part of the
equipment, the Contractor shall pay all software licensing fees. The
Contractor shall also pay for aU software updating fees for a period of one
year following cutover. The Contractor shall have no obligation to pay for
such fees thereafter. Nothing in the software license or licensing
agreement shall obligate the City to pay any additional fees as a condition
for continuing to use the software.
F. Assignment. Neither party may assign, sublet. or transfer any interest or
obligation in this Contract without the prior written consent of the other
party, and then only upon such terms and conditions as both parties may
agree to and set forth in writing.
G. Waiver. In the particular event that either party shall at any time or times
waive any breach of this Contract by the other, such waiver shan not
constitute a waiver of any other or any succeeding breach of this Contract
by either party, whether of the same or any other covenant, condition or
obligation.
H. Governing LawNenue. The laws of the State of Minnesota govern the
interpretation of this Contract. In the event of litigation, the exclusive
venue shall be in the District Court of the State of Minnesota for Hennepin
County.
I. Severability. If any provision, term or condition of this Contract is found
to be or become unenforceable or invalid. it shall not effect the remaining
provisions, terms and conditions of this C~>ntract, unless such invalid or
. unenforceable provision, term or condition renders this Contract
impossible to perform. Such remaining terms and conditions of the
Contract .shall continue in full torce and effect and shall continue to
operate as the parties' entire contract.
J. Entire Agreement. This Contract represents the entire agreement of the
parties and is a final, complete and all inclusive statement of the terms
.. thereof, and supersedes and terminates any prior agreement(s),
understandings or written or verbal representations made between the
parties with respect thereto. .
K. Permits and Licenses; Rights-of-Way and Easements; The Contractor
shall give all notices necessary and in'cidental to the construction and
completion of the Project. Tb.e City will obtain all necessary rights~of-
way and easements. The ContractorshaU not be entitled to any additional
compensation for any construction delay resulting from the City's not
timely obtaining rights-of-way or easements. .
140400vOI 6
RNK:08l06J2008
L. If the work is delayed.or the sequencing of work is altered because of the
action or inaction of the Owner, the Contractor shall be;allowed a time
extension to complete the work but shall not be entitled to any other
compensation.
OWNER:
CITY CHANHASSEN
CONTRACTOR:
STEINER CONSTRUCTION
SERVICES, LLC
BY:
BY~T~
Address forgiving notices:
City of Chanhassen
7700 Market Boulevard
P.O. Box 147 .
Chanhassen,~ 55317
Address for giving notices:. .
5""~\1.er LrM.t;;Jrvofr~ ~vi'tLJ I LL C
? fq I D CCh"".(..V 1<.",. 10'
~.u~?-A.~ ?vw sS3 c; ,
Llcens 0.: ~ .
. . (wre applicable)
Agent for service or process: .
t 40400vOl
RNK:08lO6l2003
7
I
!
CITY OF CHANHASSEN
SUPPLEMENTARY CONDITIONS TO THE GENERAL CONI>ITIONS
The following supplements shall modify, change, delete from andlor add to the "Standard
General Conditions of the Construction Contract" (No. C-700, 2002 Edition), as prepared by the
Engineers' Joint Contract Documents Committee.
1.00 SECTION 2.7: Delete paragraph 2.01B and insert the following:
Before any work at the site is started, Contractor shall deliver to Owner certificates (and
other evidence of insurance requested by Owner) which Contractor is required to
purchase and maintain in accordance with paragraph 5.03B.
2.00 SECTION 5.0IB: Delete.
3.00 SECTION 5.04: Delete.
6.00 SECTIONS 4.060. 5.05. 5.07. 11.01A5F. 11.030. 12.038. 15.03.A3. 15.03A4:
Delete these eight (8) sections.
7.00 SECTION 5.09:
Delete Section 5.09 and insert the following:
If Owner has any objection to the coverage afforded by or other provisions of the
. insurance required to be purchased and maintained by Contractor on the basis of its not
complying with the Contract Documents, Owner shall notify Contractor in writing
thereof within ten days of the date of delivery of such certificates to Owner in accordance
with paragraph 2.0 I. Contractor shall provide such additional information in respect of
insurance provided as may reasonably be requested.
8.00 SECTION 13.07: One Year Correction Period
Change first sentence of Section 13.07A to read as follows:
If, within one year after the date of final payment and acceptance by the City of
CbanhaSsen, any work is found to be defective, the Contractor should promptly, without
cost to the Owner and in accordance with the City Engineer's written instructions, either
correct such defective work or if it hasbeen rejected by the Engineer, remove it from the
site and replace it with non-'defective work.
9.00 PROMPT fA YMENT TO SUBCONTRACTORS: Pursuant to Minnesota Statute
471.25, Subdivision 4a, the Contractor must pay any subcontractor within ten (10) days
140400vOl
RNK:OIlO6l2OO8
SC-l
of the Contractor's receipt of payment from the City for undisputed services provided by
the subcontractor. The Contractor must pay interest of one and one~half percent (1 Y2 %)
per month or any part of a month to the subcontractor on any ~disputed amount not paid
on time to the subcontractor. The minimum monthty interest penalty payment for an
unpaid balance of $100.00 or more is $10.00. For an unpaid balance ofless than
$100.00, the Contractor shall pay the actual penalty due to the subcontractor. A
subcontractor who prevails in a civil action to collect interest penalties from the
Contractor shall be awarded its costs and disbursements, including attorney's fees,
incurred in bringing the action.
10.00 REOUIREMENTS FOR FINAL PAYMENT: Final payment will not be made until the
Contractor, and all subcontractors, furnish a certificate showing that they have complied
with the provisions ofM.S.A..290.92 and 290.97 concerning the withholding of
Minnesota income tax on wages at the source. Said certificates shall be obtained by the
Commissioner of Taxation. IC-134 forms for certifications may be obtained froin the
Department of Revenue, Centennial Building, 658 Cedar Street, St. Paul, MN 55155.
11.00 DATA PRACTICES ACT: The Contractor must comply with the Minnesota
Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to (I) all
data provided by the Owner pursuant to this Agreement, and (2) all data, created,
collected, received, stored, used, maintained, or disseminated by the Contractor pursuant
to this Agreement. The Contractor is subject to all the provisions of the Minnesota
Government Data Practices Act, including but not limited to the civil remedies of
Minnesota Statutes Section 13.08, as if it were a government entity. In the event the
Contractor receives a request to release data, the Contractor must immediately notify the
Owner. The Owner will give the Contractor instructions concerning the release of the
data to the requesting party before the data is released. Contractor agrees to defend,
indemnify, and hold the Owner, its officials, officers, agents, employees, and volunteers
harmless from any claims resultIng from Contractor's officers', agents', owners', .
partners', employees', volunteers', assignees' or subcontractors' unhlwfhl disclosure
and/or use of protected data. The terms of this paragraph shall survive the cancellation or
termination of this Agreement.
12.00 SECTION 14.02A3: Delete Section 14.02A3 and insert the following:
The amount of retainage with respect to aU progress payments will be as follows:
140400vOl
RNK:08lO6l2008
SC-2
I 404OOvO I
. RNK:08I0612008
Minnesota Contractor's
Exempt Non-Minnesota Contractors
Non-Except Non-Minnesota Contractors
5%
5%
5%+8%= 13%
* State Surety Deposit
Non-Minnesota Contractors are advised to file Form SD-3 with the Minnesota
Department of Revenue to determine their exemption status.
SC-3
Steiner
O:>ns1ruction Services, lLC
EXH1BIT "A"
ABP - 7th AdditJon
2-PHASETRAIL CONSTRUCTlON
Chanhassen, MN
JULY 29. 2008
De$~ on
nch
o
o
o
22-010 Contractors' Fee - Cost Plus 10".4
ESTIMATED TOTALS
SCHEDULE
This scope oi work shaij begin on Of about August 6. 2006 and without weather delays wiii be substantlaliy compieie by August 29. ZOO8.
ALTERNATES
AI'" - UN Dot Railing #8401
AIII2 - Per yard to remove unsuitable material
Altt3 - Per yard to replace with Cl5-5
AIt#4 - Per yard to replace with 2" dear rock
A1tt5 - Per sq yd of geofabric installed
. Alt#6 - Per sq yd of seed blanket Installed
Altt7 - Per sq ft of additional retaining wall.
44.00 ILF
18.70 leu yard
33.00 leu yard
49.56 ku yard
1.10 Isq yd
2.20 isq yd
38.30 Isq ft
Approved and Accepted by:
~b~
OoO<<3~OD
~cf~
?5' /1'2-/0 f(
Date: I I
-..
St' . E~;;t~~}l
. ..eln.er =---'-=="",,,,,-""
Development, lnc~='
3610 County Road 101
VVayzata.~ 55391
(952)473-5650 Fax (952)473-7058
~o-" 3/12-JO~
EXHIBIT "B"
Arboretum Business Park - 7th Additition
(2) Phases of City Trail I Bid Specifications
Chanhassen, MN
July 29, 2008
CONTRACT DOCUMENTS:
Schoell & Madson
(West Trail)
MFRAsheet C4.2
(East Trail)
Grading & Erosion Control Plan, sheet C 1, dated 10-8-07
Trail Grading Plan East, sheet C4.2, dated 2-4-08
Braun Intertec
Shallow Boring results & recommendations dated 6-11-08
SECTION 1000 - GENERAL REQUIREMENTS
All site general requirements needed to complete this scope of work are included
including but not limited to, the following:
. Office, Administration & Project Management.
. Printing costs for construction site plans.
. Site Supervision
· Soil and Materials Testing and Inspection Services (Allowance of $8,000).
. Portable Toilet Facilities
. Traffic control as needed
. Storm Water Management
SECTION 2000 - SITE CONSTRUCTION
2200 Earthwork
. Silt Fence Installation.
. Clear & grub site - Remove all brush and trees from the trail area approved for
removal by the City of Chanhassen including brush cuttings generated by the soil
boring operation.
. Strip and stockpile I re-use or export topsoil from the trail area.
. Sub-cut the west trail 12" and the east trail~.r in preparation fOr ptacement of c1ass-S.
Any additional sub-cut or import materials required shall be charged in a change
. order with unit costs.
. All sub grade preparation shall be In accordance with the soils engineer of record.
. Finish grade both sides of the trail as needed.
2501 Site Utilities
. Supply and install the storm water piping as specified in the contract documents.
2701 Asphalt Paving
. A six inch section of limestone c1ass-5 is included for the east trail to accommodate
the 9" overall blacktop section specified in this scope of work. . .
. A nine inch section of limestone class-5 is included for the west trail to accommodate
the 12" overall blacktop section specified in this scope of work.
. Install a 3" bituminous section over the east and west trails per plans and
specifications.
2830 Retaining Walls
. An allowance. of 700 sf of keystone retaining wall has been included in this scope of
work.
2951 Site Restoration
. Supply and install seed and mulch to all soils disturbed and exposed as a result of
this scope of work.
. Restore all areas damaged or altered as a result of permission access granted from
adjacent properties.
SECTION 5000 - METALS
5520 Handrails and Railings
. Handrails not included in this scope of work. (See Alt #1)
CLARIFICATIONS & EXCLUSIONS .
. City permit or inspection fees of any sort are not included.
· Class 5 or bituminous beyond the sections specified in this scope of work.
· Additional Class 5 or any other materials required by or lost to weather conditions.
unknown soil conditions or as a result of repeated construction traffic are not
included. .
· Any work not specificaUy included in this specification is not included.
--"'--:.-"""
6\1 -~."" . .. .."",
~:'-Invoice
Invoice Number: 62725
July 22, 2008
CHASKALLC
To: Chaska Gateway, LLC
3610 South Hwy 101
Wayzata, :MN 55391
Project: 16942
Chaska Gateway LLC - Arboretum Trail, Arboretum 7th Addition,
Chanhassen, MN - Survey east property line and neW trail location -
Draw new trail
Schoell Madson merged with MFRA, Inc.
General Research, Ditch Culverts Sizing, Safety Railing I
.!
I
Professional Services
Development Plan
Project Manager
Project Manager
Project Manager
Project Manager
Grading
Reg Engineer
Reg Engineer
Reg Engineer
Utilities (Water/Sewer/Storm)
Project Manager
Bill Hours Rate Charl!e
2.00 108.00 216.00
2.00 108.00 216.00
1.00 108.00 108.00
1.00 108.00 108.00
1.00 129.00 129.00
2.00 95.00 190.00
0.50 95.00 47.50
1.50 108.00 162.00
. Professional Services Totals: $1,176.50
Project Totals:
*It* Total Project Invoice Amount:
$1,176.50
14800 28th Avenue N - Suite 140 - Plymouth, Minnesota - 55447
phone 763/476-6010 - fax 763/476-8532 - e-mail: mfra@mfra.com
An Equal OpportliiJity Employer
TERMS: Due on receipt Past due accounts subject to finance charge of 1 %
per month (12% APR).
RECEIVED
McCombs Frank RODS
Associates, Inc.
SEP 1 5 2008
STEINER DEVELOPMENT, INC.
Invoice Number: 63232
September 0],2008
CHASKALLC
Invoice
To: Chaska Gateway, LLC
3610 South Hwy 101
Wayzata., MN 55391
Project: 16942
Chaska Gateway LLC - Arboretum Trail, Arboretum 7th Addition,
Chanhassen, MN - Survey east property line and new trail location -
Draw new trail
Schoell Madson merged with MFRA, Inc.
Please note new address and make check payable to MFRA, Inc.
Note new project number for MFRA
Your reference of SMI project - 61809-023
Project Manager: Gerald L. Backman
Professional Services thru: 8/31/2008
. -1Jil!in~(Jl'(itlJ{:OO 1.
Professional Services
Easements
Survey Crew
Survey Crew
Bill Hours Rate Charf!e
1.50 160.00 240.00
4.50 160.00 720.00
Bill Hours Rate Charge
1.00 98.00 98.00
Bill Hours Rate Charge
1.00 95.00 95.00
Professional Services. Totals: $1,153.00
Easements
Senior Technician
Grading
Reg Engineer
Project Totals:
*** Total Project Invoice Amount:
$1,153.00
An Equal Opportunity Employer
14800 28th Avenue N - Suite 140 -Plymouth, Minnesota - 55447
phone 763/476-6010 - fax 763/476-8532 - e-mail: mfra@mfracom
TERMS: Due on receipt Past due accounts subject to finance charge of 1%
per month (12% APR).
.. r
. 6/IIJ JIll BITUMINOUS
..,~ ROADWAYS, INC.
9050 JEFFERSON TRAIL WEST
INVER GROVE HEIGHTS, MN 55077
(651)686-7001
RECEIVED
>_ 'C.'-,'" ,',_,'-...
+;~,*,;,!~4Q~9s,N!J~.\:lsf!...",'".,.,.'
NOV to 2008
10/31/08
STEINER DEVELOPMENT, INC.
3
I
L
L
r
J
Steiner Construction Services, lLC
Attn: Galen Tongen
3610 County Road 101
Wayzata, MN 55391
J L
00
B C
A
T
I
o
N
Customer No. 74371
. BRI Project No. 884449
Project Description: Arboretum Business Park 7th Addition
Estimate #2 & Final through 10/31/08.
Purchase o,der # 992-01-329-01
Contract Completed Completed
Amount To Date This Estimate
Original Contract Amount $135,650.00 $135,650.00 $4.8,~75.()().
Total Change Orders $4,804.00 $4,804.00 $4~804~00 .
$140,454.00 $140,454.00 $53,679.00
Less Retainage ($14,045.40) ($5,367.90)
$126,408.60 $48;311.10
Less Previous Payments $0.00 $0.00
Balance Due $126,408.60 $48,311.10
~'~-""
.... :-..- ".,.
. , ,"
..... .. .~.,.c.
~ .' .
. .
. ,
INVOICE DUE UPON RECEIPT. A FINANCE CHARGE OF 1'h%PER MONTH (18% ; .
PER YEAR) WILL BE CHARGED ON ANY BALANCE OVER 30 DAYS PAST DUE.
ORIGINAL INVOICE - CUSTOMER COpy'
0:::
I-~
.s 0 0
c: 0::: ~ ~
~ ~:Cl-
.0 > 0 Z
~ e5~8
i5 DD[gIDD
..-
Q)
Cl
lU
a.
~c;
iijOd,
c: (:! N
U:T-,?
~O
NT-N
m
m
'11:::;
Z 0::: U;
0:C'1l:
~I-I-
Oo~
:JO.,
a. a:: 0
a.wo:::
<(a. a.
C
"0
~
.c
t:::
i:
tIS
a.
Ul
Ul
Q)
c:
'iii..
::I
Cl:l
E
.a
ij
CXl.;c
0"
I-ZZ
O<(Q
~W!;C
0:2E0
0:::<(0
a.Z-l
z~
O~
~ .~
O~
:J l5
a..'B
a..~
<C l5
...~
Z .~
WCi)
:E
~
a..~
CXl
o
o
(:!
It)
~
o
~
o
~
I-
Z
o
o
u.
o
W
~
~
W
I-
:r:
o
0:::
<(
I'-
I'-
o
o .... :g
C:gjz
C; ~~~:2E
"(- 0; co co "- u)
~~i~~~l5
0::: It) UlOc:'ii5'B
>-ZCo:::g:Cb::l
C:2E::IUl"'CD_
::I .0::lJ!!~Ul
otlS8g-a;...c:
o ai <( .- ., (!) 8
o ~.. Eo
co~ii:E:g
C')><(Cl:lm
~
o 0::
0::: 0
u. u.
&..:.!!!
... 0...
.e .00
"0 .!!!'O
~ '-~
a. .E 1:
a.UlUlO
tlIE;;;o
.5~8fn
e- -
CDiii~"O
..c'-"'oc:
c~'OtIS
CD . 1!! ...:
ejg"'J2
>-c:c:
tIS GlOO:2
a. E tIS
~G~~
...... 0 Q.Ui
0100::1
c_.....O
E ~i.~
4>......(1)'-
OC:::Ia.
c:oc:~
80Gl5 '
.GlGl~ '
~ii~ ~ ~
o.='01!!~
i ~i~ h~
~lQO~ ~
:gij~';:: :g
tlSE';::Gl 0:::
U).....Q)ao
:E.g"OS ::I
.!!!CDS~E ~
""a....OGl E
i)c:o:;::;E
Qj*~~>-
..c ..0 J:;:= ~
l!?lQl5-8Ul
.a.cOQj:E
~ ~..s;;.-;;
.21 0"00....
Ul~'(ij"Oij
_~CI)o..~:2
OS~(/)C
o'-"'~1U Q)
!~o.t:~
c i; ":;:$ ca
OtlSl!?tlSOI
0:5 a.E.,g!
Gl>'"
.~
-=1-
~
0:::
o
~
u.
o
~
<(
:E
:E
:)
en
en
~
o
I-
o
~
I-
Z
o
o
3!i
o
Qj
.0
c:
~
.c
Ul
Ul
tIS
....
c: .
Gl"O
[~
:g,g
5~
-Ul
Gl'-
"OGl
tIS 01
E~
.!!! c:
c:.g
.Q to
':;:::1
g:s
a.c:
0.0
<(0
b..
~
:"'\'
~
~'-
"
0::
o
I-
o
~
I-
Z
o
o
o 0
o 0
o -.i
It) 0
<0 CXl
.0 ..,f
C') ~
;;;
I-
Z
:J
o
:2E
<(
I-
o
~
I-
Z
o
o
~
.!
tIS
o
.2
!!!
S!i
c:
'E
~
'0
tIS
~
o
o
ai
::I
\1
E
tIS
a.
>.
Cl:l
o 0
o 0
-.i -.i
lO lO
"'" "'"
ci ci
"'" "'"
;; E;
N
i-
CD
c:
d
~
W
o
0:::
o
W
(!)
Z
<(
:c
o
.J
.J
<(
U.
o
:i5
:J
(/)
N
o
W
I- 0::: Q)
~ ~ g>
o (/) a.
:i5 0 c:
<( Z 0
I- <( 1ii
o 0 ~
~ W:;::;
I- I- c:
% ~ 8
o a. c: .
o :i5 0 u.i
I- 0 (!) C)
%OC:<(
w.JEz
~~-=~
:JOOw
OI-~O:::cU
..; -.i .0
o
"'"
iri
"'"
o
-<i
......
~
o
o
o
~
Q)
01
tIS
a.
c:
.g
~~
o .5
~ C
"0 0
.!O
Gl c:
"Q.o
Ew
o +
00
'0 Ul
*- E
g ::I
00
......~
Q)
01
tIS
a.
"0 c:
~ .2
o ai
en ~
~'E
.! 0
tIS 0
~ l5
o u.
*- E
g ::I
00
~"iii
~
.ci
Q)
... 01
o tIS
.oa.
lO l5
+ :;
tIS ::I
~:S
c: c:
d8
Gl c:
g> 0
c: -
'(ij E
2 ::I
"""0
o
z
o
~
o
u::
~
w
o
en
t-
O
w
!::
::I:
o
0:::
<(
....
c:
c: ::I
_0)00_
.2~~~:ii
"OUl.!! E
.!!! tIS tIS.c ~
"Q..c E -;;; a.
lit i: -g .!! ~
c:~tIS.l!!==
.~ .c .9- ;:. c:
GlO.c-O
.c::l~.!!lQ
t:U)ca~Q)
Gl~E::I'"
E~i:8g
~cOtlS_
a..g == C 0
~1ij'OGl~
....=.2;>Eo
01 0.= ~ c:
.5~~a.:;
E(I)CT....~
4).-co.2.....
gS..c:c::E
o ~:::.2 e
o-~....<(
...:"0 ai t'l-
Gl Gl .= "'"
c: 'E 5 8::;;
~lll:;::;<(c:
GltlSUltlS
O'-U.- ..
..... ~:a= 0
~ ..... o..-'a)
c~<(ecu
tIS 0 Ul ..c
... >.- Ul....
~>scQ)
UlGlc:Gl::l
tIS.c'- E"O
U)....."C:::J.....
:Eij.!!g:ii
.!!!'O Bo E
==8.=g'O~
OUl.-tlSa.
CD .5 "E ~ "0
.oUlGl c:
GltlSXOtlSqj
S.cGlO"O"O
....'OGl GlGl tIS
~Gl.c:5]iE
CJ) ~ ..... ..c 0..
'iii"fi.9~E~
Ul<("'"O == 0....
.. Q)CI)OO
~~]!E-c~
~"""'a.oo-
"fi';':Et:~5
.;c,s88'O"5i
o 0
"'" <0
.0 tri
"'" 0
o "'"
-<i <Ii
;;; N
;;;
o
lO
r-:
m
o
cO
I'-
~
w
C)
<(
%
~
W (/)
0::: Z
~ 0
W ~
.J 0
o ::i
w a.
0::: a.
o <(
I- l-
(/) Z
~ 'iij W
<( 15 :i5
o I- ~a.
WlO
lu :g (/)
.J:::i :J
a. Ul 0
:i5 ::I :>
o c: w
O'E 0:::
.J "'" a.
<(I- Gl (/)
c: (/)
~ d ~
cO
r-:
c:
.0
iii
l::
.!!!
~
o
l::
CO
13
.!!!
10
32::r
5~
~O
:;:,e
~~
ai'~
:;:,'-
-oiji
li~
E:S
~.(:;
Q..s
CD ~
:s""
e.9
.gal
....g>
l:: CO
~13
~l!!
.~~
.....: .... CO
% ~:S
::::) 0 l/)
o e l!!
:i5 CO:;:,
<( al~
ril ~~
u: ~=ai
E 0-
u.. s~
w ....._
o :;::.s
-
o
"":
....
....
M
cO
~
'--
o
"'"
.0
"'"
o
..,f
;;;
W
:J
o
I-
Z
w
:i5
~
a.
tri
Z
o
i=
w
.J
a.
:i5tO
o :g
O:::i
~ ~
~ .~
%C')
~ Gl
<( c:
Cl:ld
oi
~
W
I-
:r:
o
0:::
<(
"iii
.c'"
Ul"O
5is
E5
>-'0
~1!!
~~
~O
:gO
01'"
GlGl
c:C:
...==
00
Gl_
:CO
tlSJ!j
.~"5
mot:
lQ~
.!!! tIS
c: 0
"!~
Gl._
.c"O
...::1
J2"~
"0 a.
Gl....
=::1
0.0
a.:; .
tIS._ Gl
C ==.!!!
Gl.!!! ~
E"O Gl
>-c:.c
:g,tlS15
....."':1-
g~ ~
af!!"E
1iig~
,gO G
8:.9 8
<( ~....
.!!! l5 g
;Q).P
CD ~ a
:5EO
>.'ii5Gl~
Cl:l z.o....
jg
tIS
o
en
Z
o
i=
o
:J
o
W
o
o ss
o 00
o 0 0
~ lO lO
NN
c<ic<i
ee
(/)
Z
o
i=
is
o
<(
o 000
o 000
o -.i -.i -.i
~ lOlOO
OOCXl
cOcO..,f
~~~
en
0:::
w
o
0:::
0.5 :5
W"O c:
~ ~ ~
<( a. Ul
5lit~~
u.. gj C Gl
og'~~
~ ~ ~ ~
<( 0 0 tIS
:2E "iii '> "iii
:2E15l!?15
:J I- a. l-
(/)
(/)(/)
-lW
~(!)
OZ
I-~
o
I-
w
Z
I-
Z
w
:2E
:J
o
o
o
c.j
~
u)
(/)
o
Z
o
~
o
:J
a.
a.
<(
I-
Z
w
:2E
~
C\l
-
o
C\l
(I)
Cl
III
a.
w
C>
<(
a.
z
o
i=
<(
~
z
i=
z
o
o
~~o
aiool
U.05 ~ ~ gj
..........C')
N~~c;
T""T""N
0>
0>
~~~~
O~:Cb
~O~~
0::::i00
::::i0.ii:0::
a. o.w a.
0.<(0.
<(u.
o
w
~
o
C
"C
"C
<(
.s:
;:::
~
11l
a.
Ul
Ul
CD
C
00
::J
1Il
E
::J
~~
;.8
::8<
t
w
....
o
0::
a.
-ci
CD
.s:
o
11l
~
o!!!
~
::J
iii
c
01
00
Ul
.....
o
o
jg
c
o
o
01
C
Oc
]j
c
8
c
oQ
iii
.Q
a.
D-
<(
'E
CD
E
:>.
I1l
a.
w~
C)~
<(.0
z.!!!
~~
W:=
o::~
J:
z
w 0
o i=~
zowC)
:5l-cto
<( :2E ~
1Il 0
o
C)
0.:6
~:2E-.
o 0
()Q..
o
z
<( ~
...l00u.
<:(ww+
I-I-O::w
o~H~+
1-0.(1)0
:E ~
o
()
u.
w
o~o::
w:g;o
0::0::0
OWz
1-1--
(I)~b
~
o
I-Q
zo::
w~ :Jw
0:: 0 a.
o :2E (I)
$ <(:i:
o I-
w
I-
W
...l
a.
:2E
00
o
I-
1-(1)(1)
z:Jo
:JQo
0>-
:2EwO::
<(o::w
0.0.
o
o
WI-
...lz
:J:J
00
W:2E
5<(
C/)
1Il
z
o
i=
a.
ii:
()
(I)
w
o
~
0::
o
$
<(
=II:
:2E
w
!::
o
o
o
~
~
b
o
.....
o
o
o
o
o
..;
~
o
o
o
~
o
o
o
o
o
..;
~
o
o
o
~
o
o
o
o
o
..;
~
:>.
Q)
2:
::J
(I)
o
o
o
~
~
o
o
.....
o
o
o
o
LO
rD
~
o
o
o
~
o
o
o
~
o
o
o
o
LO
rD
~
o
o
o
o
LO
<0
~
8
c
CD
U.
-
i:i)
N
o
o
o
~
~
o
o
.....
o
o
o
o
o
ri
;;
o
o
o
~
o
o
o
~
o
o
o
o
o
ri
*
o
o
o
o
o
ri
*
.0
::J
C5
~
:;;
Q)
u
C')
o
o
o
~
~
o
o
.....
o
o
o
o
.....
ri
N
*
o
o
o
*
o
o
o
*
o
o
o
o
.....
ri
N
*
o
o
o
o
.....
ri
N
W
ai
$
01
C
'c
'm
a;
0::
'<t
o
o
o
~
~
o
o
.....
o
o
o
o
LO
ri
;;
o
o
o
w
o
o
o
~
o
o
o
o
LO
ri
*
o
o
o
o
LO
ri
.....
~
Q)
D-
ii:
a.
o
0::
LO
o
o
o
~
~
o
o
o
.....
o
o
.0
I'-
CD
o
C')
~
o
o
o
~
o
o
o
~
o
o
.0
I'-
CD
o
C')
~
o
o
.0
I'-
CD
o
C')
~
CD
Ul
11l
1Il
Q)
iii
01
~
01
01
<(
CD
o
o
o
~
~
o
o
.....
o
o
.0
I'-
IX)
..;
C')
~
o
o
o
~
o
o
.0
I'-
IX)
..;
C')
~
o
o
o
~
o
o
.0
I'-
IX)
..;
C')
~
01
C
os;
I1l
a.
I'-
o
o
o
~
~
o
o
.....
o
o
o
o
o
o
;;
o
o
o
~
o
o
o
o
o
o
*
o
o
o
~
o
o
o
o
o
o
.....
UT
c
~
e!
.s
Ul
&
IX)
o
o
o
~
~
o
o
.....
o
o
~
r:::
~
o
o
o
~
o
o
~
r:::
~
o
o
o
~
o
o
~
r:::
~
s:-
~
o
r--:
*
@)
>-
o
N
~
::;
o
.0
::J
(I)
e!
X
w
0>
o
o
o
~
~
o
o
.....
o
o
o
CD
C\!.
*
o
o
o
~
o
o
o
CD
N.
;;
o
o
o
~
o
o
o
CD
C\!.
*
@)
>-
o
N
~
CD
iii
01
~
8lS:-
<(0
"So
00
.go
(I)~
o
.....
o
o
o
~
~
o
o
.....
o
o
o
o
*
o
o
o
~
o
o
o
o
*
o
o
o
~
o
o
o
o
*
@)
>-
(I)
o
o
.....
~
o
0;:
.0
11l~
u.>-
_(I)
138
.00
::J.....
(I)~
.....
.....
o
o
o
~
~
o
o
.....
o
o
o
IX)
0>.
.....
~
o
o
o
~
o
o
o
IX)
0>.
*
o
o
o
*
o
o
o
IX)
~
*
>-
o
CD
!2.
.s:
iii
a.
...
.E
~ @)
Ul~U.
.!!! >- ...l
00 0
-0 0
cu 0 ~
02 0 01
:a~ ~
~@) ~
N C')
..... .....
o
o
o
~
o
o
o
~
~
o
o
.....
~
o
o
.....
o
o
o
o
o
..;
~
s
o
o
LO
N
ri
~
o
o
o
~
o
o
o
~
o
o
o
o
o
..;
~
s
o
o
LO
N
ri
~
o
o
o
~
o
o
o
~
o
o
o
o
o
..;
~
s
o
o
LO
N
ri
~
LL
..J
2>
o
o
'<t
~
01
C
os;.
~
::J
(I)
o
c
...
.E
o
::J
"C
Q)
o
'<t
.....
o
o
o
~
I-
Z
w
:2E
:J
o
o
o
cj
~
en
(I)
o
~
o
o
.....
o
o
~
LO
'<t
o
'<t
*
o
o
o
~
o
o
oj
I'-
CD
ri
LO
~
o
o
.0
I'-
I'-
rD
IX)
~
o
o
~
LO
'<t
o
'<t
*
z
o
~
o
::::i
a.
a.
<(
I-
Z
w
:2E
>-
~
0::
o
u.
w
C)
~
z
o
~
:J
Z
i=
z
o
()
(J)
....J
~
o
I-
J\
. -'6i/I JIll BITUMINOUS
..~ ROADWAYS, INC.
9050 JEFFERSON TRAIL WEST
INVER GROVE HEIGHTS, MN 55077
(651)686-7001
RECEIVED
SEP 0 2 2008
STEINER DEVELOPMENT, INC.
08/29/08
B
I
L
L
T
o
Steiner Construction Services, LLC
I
Attn: Galen Tongen
3610 County Road 101
Wayzata, :MN 55391
J L
00
B C
A
T
I
o
N
Customer No. 74371
BRI Project No. 884449
Project Description: Arboretum Business Park 7th Addition
Estimate #1 through 08/25/08.
Purchase Order # 992-01-329-01
Contract Completed Completed
Amoutit To Date This Estimate
Original Contract Amount $135,650.00 $86,775.00 $86,775.00
Total Change Orders $0.00 $0.00 $0.00
$135,650.00 $86,775.00 $86,775.00
Less Retainage ($8,677.50) ($8,677.50)
$78,097.50 $78,097.50
Less Previous Payments $0.00 $0.00
Balance Due $78,097.50 $78,097.50
7~"_,
INvorCE DUE UPON RECEIPT. A FINANCE CHARGE OF 1'h%PER MONTH (18%
PER YEAR) WilL BE CHARGED ON ANY BALANCE OVER 30 DAYS PAST DUE. .
. ORIGINAL INVOICE .; CUSTOMER COpy. .
~
13 t;~
.~ ~ I!:! ~
E ~ ~ ~
~ 0 <( 0
is DDIBIDD
.....
Q)
C>
t'O
n.
co .....
00
o I
~~
~<?
<t-tno
oN
m
m
~:J
z ~ Ui
O:I:~
~I-I-
oa@
::]0..,
o..oco
O-w~
<(0..0..
c:
"0
"0
<(
.c
r:::
-"
lii
0-
III
III
Gl
c:
'iii
::>
In
E
mE
v ~
v 0
v-e
~<(
a"
I-zz
o<(Q
~w~
O:iEo
~<(O
o..Z..J
zo
0::1
i=~
<c .~
O~
:Jg
Q.~
Q.2
iii
<cg
1-0
Gi
Zc:
W~
:E
~
Q.~
co
o
o
~
LO
o
03
o
t
~
I-
Z
o
o
LL
o
W
I-
C3
t
w
I-
J:
o
~
<(
r--
r--
o
LO
o ....111 LO
EGlZ
C; ~ui~:iE
~ ~ ~ iU'.- ur
al~III;:l!:Ec:
o LO 0.. al I- .2> 0
~LOIIIOc:Gl~
~ZC~0:I:....2
c::iE::>IIIf!!Gl
5ai85~~l!!
o Iii ~ .5 ~ (5 8
o ~ .. E 0 Gi
T"'" cu.5.a1.O >"e
~~~iiig.51-
~
o 0:::
~ 0
LL LL
...:.!!
.... 0....
.2 .DO
"0 .!!!'O
~ .....e
Co J2 1:
a. III III 0
IIIEiiio
.5 ii: 8M
~- -
GlCij~"O
..c.-.,oc:
c~'O III
Gl - III ...:
EJ!!.b.g
>.c:C:
IIIGl,9.:l2
a. E..... III
~G~~
-;8 :;~
.5'0.....2
Ef!~ii
CD_en.....
o C:::J a.
C:0c:-"
8 0 Gl l5
...:~~~
~~Q)o
;:.- >-
0"0111....
Gl.co
.s .s ~ ~
~nr J:> g
C:"'C:O
l!1II8Gl
::>111 .c
(I)"'CCI)+-I
(l)Q).t:.....
:Ei~
:c.g-g5
.~Q)::J~E
;:a....OGl
oc:.2:;:;E
CD:R~~>.
..c.c ..... -- co
Q)(I)C:Oa.
....11100111
~.coGiS
c:-l!:.2:S0
010"00....
.iii~.iij"Oal
~~ 0.;5
O_~(I)c:
u-~'iiQ)
e~o.t:~
c:u"S;.!!m
85 KE~
~
0:::
o
~
u.
o
~
<C
:!:
:!:
::::>
UJ
UJ
it:
o
I-
o
~
I-
Z
o
o
3i
o
CD
.D
c:
~
.c
III
III
III
C.
Gl"O
~~
~.M
Cia;
-Ill
Gl'-
"OGl
11101
E~
.~ C
c.2
.Q 1U
....::>
,g~
a.c:
a.o
<(0
~
~i'-
~~
~ .9
I l!
~
E c:
- 'E
!;'x "0
~ ( ~
1J,j
E
~
ii;\.
o
I-
~
I-
Z
o >.
o In
o 0
o 0
o 0
LO ~
\0
.0
..,
;;
I-
Z
::l
o
:aE
<(
I-
o
~
I-
Z
o
o
j!i
III
a
o 0
o 0
o .n
LO r--
\0 r--
.0 cD
.., co
;; ~
N
-.!.
+
.....
Gl
c:
2
~
w
c
~
o
w
C)
z
<(
:I:
o
..J
..J
<(
LL
o
:aE
::l
en
c
W
I- ~ Gl
z 0 01
::l I- III
o en 0-
:aE c c:
<( Z.2
I- <( Iii
o c ::>
<( w.5
0::: I- c
I- W 0
Z ..J 0
o 0-
o :aE g
I- 0 C)
Z 0 c:
W ..J E
~ .:.a
::l 0 0
o I- Q.
.,...: N C"i -<i
o 0
LO 0
r..: 0
r-- ~
\0
as
~
Gl
01
III
0..
c: Gl
o g>
-,,1a 0..
o ::J -c c
> .5 ~ 0
>"Eo1ii
$8Ci)~
~ c: Cij 'E
a.o'~o
EwfJo
8+:iEC:
_ a _ 0
UjOIllOLL
(!)~c(f!.C:
<(oEoE
Z 0 ::> 0 ::J
0000
~.....Q. Q.
w
~ cO ..ci
.n
Gl
l5 ::l
0-
~ c:
+ .2
as ~
LO .5
~ E
d.8
Gl c:
::l 0
c: -
'iij c:
Q) ~
0:::0
CijO
~
z
o
i=
<C
o
u:
i=
0:::
w
o
UJ
j:...
o
w
!::
::J:
o
0:::
<C
....
c:
c: ::J
"':Gl~~c
.2 ~.ll! III Gl
"0111$ E
.~ III 1II.c i'U'
Q..c E -;;; 0-
a.1II -l!:"O Gl >.
oc.....oC
.5~1II~;:
e.s::.'Q.>.,c
~Q~CDg
-c......aJ
c:U)CU!CD
Gl--E::>'"
E~-l!:8g
~.::Olll_
a..2 ;: c 0
~~'15Gl~
....=~~o
g> l5::'iii III J2
.-<( ::JO-....
ECI)C'"s....~
Q)o_epJ2_
g==5~
8~-g1a~
Giallllg~
c: C g 8:~
;:lll:;:;<(c:
OGl 111111 III
0..... 0._ ..
_ 0..= J:: .....
~. e 8:~'i
c:~<(eCii
III 0 III -.c
:;>:cJ!!.....
1II>....CGl
IIIGlc:Gl::J
III .c .- E "0
0-"0:::1-
:cal$g~
1II'Of3aE
'i:g,:g'Oi'U'
o 111.- III 0-
m .5 c E "'C
.DIIIGl c:
GlIllXO III cD
:;.cGlo"O"O
-'OCDQ)Q)cu
~Gl.c:S]iE
C)~ ""'..c a.
'iii.g.2::: E~
111.5"0;:0....
.......... O)U) (,)0
g~]iE-c~
:!:::-a.o 0-
.g....Et:~5
~588'15~
o 0
LO LO
r..: r..:
r-- m
\0 0
as as
~ r--
~
o
o
o
~
w
~
Z
~
w en
~ Z
en 0
~ ~
c ::i
w 0..
0::: 0..
o <(
I- I-
en Z
~ 'iij w
<( '15 :aE
c I- ~o..
WLO
lu ~ en
..J::i ::l
a.. III 0
:aE ::> :>
o c: w
O'E 0:::
..J v a..
<(I- Gl en
c: en
g d ~
cO
r..:
c:
.0
15
s::
..!!!
~
<I>
s::
10
1i
oS
<5
~:;-
o~
..c::o
fl)e
:::J<u
~"O
C1i'~
-61i
....0
:ii<l>
E:S
~"fi
Q.....
~~
e.9
0"0
':;:<1>
....01
s::S::
e~
;/go
'6~
.~ ......
....10
!z ~:S
::l 0 /I)
o e e
:aE <U:::J
<( ~.g>
IiJ ~~
u:: ~~
6 <1>-
""" s~
W .....-
U '==- S
.--
o
10
r-:
0)
o
as
r--
~
-
o
LO
N
LO
LO
r-:
LO
~
W
::l
C
I-
Z
w
:aE
~
0..
Z
o
i=
w
..J
0-
:aECO
o ~
O::i
o III
I- ::J
~ .~
z..,
<( Gl
..J c:
i!d
ai
cri
t
w
I-
J:
o
0:::
<(
Cij
~G>
c"g
Q)::J
~.9
~~
.9!~
~c:
eO
01 ...
GlGl
c:C:
...;:
00
Q)-
::co
111111
.~~
U).C
gj~
.!!I1II
.5.s
~ Gl
Gl.g
.c"O
... ::>
.2'PX
"0 a.
<II....
=::>
a.o
0.5 .
111._ Gl
c ;:.!!l
Q).!!l i:
E"OQ)
>'c:.c
[111'15
L- ...: L-
000
C:oU)
aee:
~~~
gOG
a.00
a."" a
<( .2;>....
.~ g ~
SCl).b
Qi"ga
:SEo
>. 'ijj Gl ~
lD zoO....
jg
III
C
cn
Z
o
~
::l
a
w
a
o 0 0
o 0 0
o 0 0
~ ~~
cn
Z
o
i=
i5
a
<(
o 000
o 000
o 0 0 0
~ ~ ~~
cn
~
w
a
~
o .5
w"O
e> ~
Z e
~ 8: ~
o III 1! "0
u.rI)'EQ)
o:g,o>
>-~Ee
~.ggj2:
~Cij'~i
:iE '15 ~ 0
::l I- a. I-
en
encn
..JW
j:5e>
OZ
.cl-~
g 0
E lu
Z
I-
Z
w
:iE
::l
o
o
a
(,)
~
cti
cn
o
Z
o
~
::]
0..
0..
<(
I-
Z
w
:iE
>-
~
N
....
o
N
Q)
C)
to
a..
w
C>
~
z
o
i=
<(
:)
z
i=
z
o
o
:g:gc;
aOe>>
aU~ ~
T-~~c;
cON
0)
(J)
:jj;z::iUi
zo,,'It:
O~F=b
~()OW
o:JOQ
::io..o::"
o..o..wo..
0..<(0..
<(LL
o
W
~
o
c:
"t:J
~
.<::
~
..>:::
tv
0..
U)
U)
Q)
c
"iii
~
co
E'
(J)E
; ~
"""-e
:8<(
t3
w
""')
o
"
0..
w~
Ch!!!
<(.0
zo!!!
~~
Wl!:::
,,~
J:
z
w 0
() i=~
zowc>
:5l-ito
<( :iE ~
co 0
()
C>
0:6
~:iE_
o 0
()~
o
z
<( ~
....IOOLL
<(WW+
!-'I-"w
o~g+
1-0..(/)0
:2E ~
o
()
LL
w
o~"
w~o
0::,,0
Owz
1-1--
(/)~b
~
w~
o
s:
o
I--W
Ii:i
....I
0..
:iE
00
()
o
I-Q
z"
::>w
00..
:iE(/)
<(-
J:
I-
I-(/)(/)
z::>o
::>Qo
0>-
:iEW"
<("w
0..0..
-t:i
Q)
.<::
o
to
1il
"!!!
~
~
1ii
c
Cl
Oiii
U)
-....
o
"0
l!!
C
o
()
Cl
C
"c
!
c
8
c
oQ
1ii
og
Q.
0.
<(
C
Q)
E
>.
to
0..
o
WI-
....Iz
::>::>
00
W:iE
5<(
(/)
()
co
z
o
i=
0..
0::
()
(/)
W
o
~
"
o
s:
<(
'It:
:iE
W
!::
o
o
c:i
o
o
~
ER-
'*"
o
o
o
c:i
ER-
o
o
c:i
ER-
o
o
c:i
ER-
o
o
c:i
ER-
o
o
c:i
o
o
~
ER-
>.
~
~
(/)
o
o
c:i
ER-
'*"
o
o
....
o
o
c:i
o
10
<<i
ER-
o
o
c:i
ER-
o
o
c:i
o
10
<<i
ER-
o
o
c:i
ER-
o
o
c:i
o
10
<<i
ER-
8
c
Q)
LL
-
Ci)
N
o
o
c:i
ER-
'*"
o
o
....
o
o
c:i
o
o
M
....
ER-
o
o
c:i
ER-
o
o
c:i
o
o
M
;;
o
o
c:i
ER-
o
o
c:i
o
o
M
;;
.0
~
(5
o!l
tv
Q)
(3
(')
o
o
c:i
ER-
'(fe.
o
o
....
o
o
c:i
o
....
M
N
ER-
o
o
c:i
ER-
o
o
c:i
o
....
M
N
ER-
o
o
c:i
ER-
o
o
c:i
o
....
M
N
ER-
Cii
s:
Cl
c
Oc
Om
(j)
"
'<t
o
o
c:i
ER-
'*"
o
o
....
o
o
c:i
o
10
M
....
ER-
o
o
c:i
ER-
o
o
c:i
o
10
M
;;
o
o
c:i
ER-
o
o
c:i
o
10
M
;;
Q)
0.
c:
0..
()
"
10
o
o
c:i
ER-
'*"
o
o
....
o
o
.0
"-
<0
ci
(')
ER-
o
o
c:i
ER-
o
o
.0
"-
<0
ci
(')
ER-
o
o
c:i
ER-
o
o
.0
"-
<0
ci
(')
ER-
Q)
U)
to
co
Q)
1ii
Cl
~
Cl
:t
<0
o
o
.0
"-
CX)
~
(')
ER-
a
o
c:i
o
o
ci
;;
'*"
o
'*"
o
o
o
c:i
ER-
o
o
c:i
ER-
o
o
c:i
ER-
o
o
c:i
ER-
o
o
c:i
ER-
o
o
c:i
ER-
o
o
c:i
ER-
o
o
c:i
ER-
o
o
.0
"-
CX)
~
(')
ER-
o
o
c:i
o
o
ci
....
ER-
Cl
C
0;;:
to
0..
c
o
~
.B
U)
Q)
"
"-
CX)
o
o
.0
"-
co
cD
'<t
ER-
I-
Z
W
:iE
::>
()
o
o
o
~
en
(/)
o
'*"
'<t
<0
o
o
.0
"-
"-
<<i
co
ER-
o
o
c:i
ER-
o
o
.0
"-
"-
<<i
co
ER-
o
o
c:i
ER-
o
o
c:i
10
<0
.0
(')
;;
z
o
8
::i
0..
0..
<(
I-
Z
W
:iE
>-
it
"
o
LL
W
C>
it
z
o
~
z
i=
z
o
()
(j)
...J
i:5
o
I-
BRAUN
INTERTEC
PLEASE REMIT TO
Braun Intertec Corporation
NW 7644. P.O. Box 1450
Minneapolis, Minnesota 55485-7644
(952) 995-2000 . Fax (952) 995-2020
Tax I.D. #41-1684205
Galen Tongen
Steiner Construction Services, LLC
3610 County Road 101
Wayzata, MN. 55391
Invoice Date : 9/15/2008
Invoice # : 299041
Project #: BL-08-01539A
Client #: S38207
Client Ref:
REC€JVF.:D
S~ SEP 1 6 20()B
ciNE/? DfVcl
~OPMtNT, INC,
Bike Trail Arboretum Business Park
Excavation Observations
Century Boulevard and Water Tower Place
Chanhassen, MN
For Professional Services rendered through 9/5/2008
Amount Due This Invoice
958.00
1,924.75
2,882.75
Project Management
Soil Observations & Testing
Amount Previously Billed
0.00
Pleas pay from this invoice.
Terms: Du on r c ipt, 1 1/2'0 per month after 30 days, 18% annual percentag rate.
w accept _ [ VISA )[.
. . _' PROVIDlNG ENGINEERING AND ENVIRONMENTAL SeLUTION,S SINCE ] 957. . '
FORM NO. BI12-o1 (llO8)
. . ' " . . " INV.ICE " :.', .
BRAUN
INTERTEC
PLEASE REMIT TO
Braun Intertec Corporation
NW 7644. P.O. Box 1450
Minneapolis, Minnesota 55485-7644'
(952) 995-2000. Fax (952) 995-2020
Tax 1.0, #41-1684205
Project: BL-08-01539A - Bike Trail Arboretum Business Park
Project Management
Invoice #: 299041
Consulting Services Detail
Project Manager
Sr. Project Engineer
Word Processing
Hours
Rate
140.00
160.00
72.00
3.50
2.25
1.50
Phase.: . Project Management
Amount
490.00
360.00
108.00
958.00
958.00
Soil Observations & Testing
Consulting Services Detail
Compaction Testing
Excavation Observations
Hours
Rate
68.00
89.00
4.00
11.25
Non-Salary Expenses Detail Qty Rate
Nuclear moisture-density meter charge,
per hour 1.00 16.50
Standard Proctor Test(ASTM D 698)
1.00 155.00
Trip charge
10.00 48.00
Phase: Soil Observations & Testing
Amount
272.00
1,001.25
1,273.25
Amount
16.50
155.00
480.00
651.50
1,924.75
2,882.75
Total Project: BL-08-01539A -- Bike Trail Arboretum Business Park
Pleas pay from this invoic .
T rms: Du on receipt, 1 1/2% per month after 30 days, 18% annual percentag rate.
W accept. [ VISA] .
FORM NO. 8112-01 (1108)
, ,
, PROVIDING ~NGINEERING AND ENVIRONMENTAL SOLUTIONS SINC~.1957.
Page
BRAUN
INTERTEC
RECEIVED
PLEASE REMIT TO
Braun Intertec Corporation
NW 7644. P.O. Box 1450
Minneapolis, Minnesota 55485-7644
(952) 995-2000 . Fax (952) 995-2020
Tax !.D. #41-1684205
ocr 31 2008
STEINER DEVELOPMENT, INC.
Galen Tongen
Steiner Construction Services, LLC
3610 County Road 101
Wayzata, MN. 55391
Invoice Date: 10/30/2008
Invoice #: 300868
Project #: BL-08-01539A
Client #: 538207
Client Ref:
Bike Trail Arboretum Business Park
Excavation ObselVations
Century Boulevard and Water Tower Place
Chanhassen, MN
For Professional Services rendered through 10/24/2008
Amount Due This Invoice
436.80
436.80
Project Management
Amount Previously Billed
5,495.50
Please pay from this invoice.
Terms: Due on receipt, 1 1/2"10 per month after 30 days, 18% annual percentage rate.
_.~raal__ ..
We accept ~ ~
FORM NO. 8112-01 (1108)
: PReVIDING ENGINEERING AND ENVIReNMENTALSeLUTleNS SINCE'1957.
BRAUN
INTERTEC
PLEASE REMIT TO
Braun Intertec Corporation
NW 7644. P.O. Box 1450
Minneapolis, Minnesota 55485-7644
(952) 995-2000. Fax (952) 995-2020
Tax 1.0. #41-1684205
Project: BL-08-01539A -- Bike Trail Arboretum Business Park
Project Management
Invoice #: 300868
Consulting Services Detail
Project Manager
Sr. Project Engineer
Word Processing
Hours
2.50
0.25
0.65
Rate
140.00
160.00
72.00
Amount
350.00
40.00
46.80
436.80
Phase: Project Management
436.80
Total Project: BL-08-01539A -- Bike Trail Arboretum Business Park
436.80
Please pay from this invoice.
Terms: Due on receipt, 1 1/2% per month after 30 days, 18% annual percentage rate.
-~..-..
We accept ~
FORM NO. 8112-01 (1/08)
PROVIDING ~NGINEERJNG AND ENVIReNMENTAL SOLUTleNS SINCE 1957.' .
.
g
BRAUN
INTERTEC
PLEASE REMIT TO
Braun Intertec Corporation
NW 7644. P.O. Box 1450
Minneapolis, Minnesota 55485-7644
(952) 995-2000 . Fax (952) 995-2020
Tax !.D. #41-1684205
Galen Tongen
Steiner Construction Services, LLC
3610 County Road 101
Wayzata, MN. 55391
RECEIVED
Invoice Date: 10/9/2008 '. .
Invoice #: 299989 OCT fo' 2008
Project #: BL-08-01539A
Client #: S38207 STEINER DEVELOPMENT INe
Client Ref: I .
Bike Trail Arboretum Business Park
Excavation Observations
Century Boulevard and Water Tower Place
Chanhassen, MN
For Professional Services rendered through 10/3/2008
Project Management
Soil Observations & Testing
Amount Due This Invoice
1,766.00
846.75
2,612.75
Amount Previously Billed
2,882.75
Please pay from this invoic .
rerms: Du on receipt, 1 1/2% per month after 30 days, 18,"0 annual percentage rate~
Weaccept _ [ VISA J.
. . pReVIDING ENGINEERING AND ENVIReNMENTAL SeLUTleNS SINCE ]957.
FORM NO. Bll2-l11 (1/08)
. ' . ~' ,,' . , " ", " ,:" , -,' ',' If':JVeICE . ' '. ' ,
"'" -. ~" - ~
BRAUN PLEASE REMIT TO
Braun Intertec Corporation
NW 7644. P.O. Box 1450
INTERTEC Minneapolis, Minnesota 55485-7644
(952) 995-2000. Fax (952) 995-2020
Tax I.D.#41-1684205
Project: BL-08-01539A -- Bike Trail Arboretum Business Park
Project Management
Invoice #: 299989
7.00
3.75
1.25
Rate
140.00
160.00
72.00
Amount
Consulting Services Detail
Project Manager
Sr. Project Engineer
Word Processing
Hours
980.00
600.00
90.00
1,670.00
Non-Salary Expenses Detail
Trip charge
Qty
Rate
Amount
2.00
48.00
96.00
96.00
Phase: Project Management
1,766.00
Soil Observations & Testing
Consulting Services Detail
Compaction Testing, Non-Nuclear
Project Engineer
3.00
3.75
Rate
68.00
133.00
Amount
Hours
204.00
498.75
702.75
Non-Salary Expenses Detail
Trip charge
Qty
Rate
Amount
3.00
48.00
144.00
144.00
Phase: Soil Observations & Testing
846.75
Total Project: BL-08-01539A -- Bike Trail Arboretum Business Park
2,612.75
Please pay from this invoice.
Terms: Due on receipt, 1 1/2"10 per month after 30 days, 18"10 annual percentage rate.
Weaccept _ [ VISA] [eJ
FORM NO. 8112-01 (1/08)
-
, , " PReVIDING ENGINEERING. AND ENVIRONMENTAL SeLUTleNS SINCE 1957. ..'
age