Loading...
1b. Audubon Road Watermain Project No. 08-13: Award of Contract CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us !J?. MEMORANDUM TO: Todd Gerhardt, City Manager Paul Oehme, Public Works Director/City Engineer ~ 0 December 8, 2008 ~. Audubon Road Watermain Project No. 08-13: Award of Contract FROM: DATE: SUBJ: PROPOSED MOTION "The City Council approves a construction contract in the amount of $131,451.88 to Ellingson Drainage Inc. for work to be performed on the above- referenced project." City Council approval requires a simple majority vote of the City Council present. BACKGROUND The City Council authorized the preparation of plans and specifications on October 27,2008. This project is for the construction of approximately 2,200 LF of10" HDPE (High Density Poly Ethylene) watermain along Audubon Road from 900 ft. south of Lyman Boulevard to Lincoln Lane (private drive in Liberty at Bluff Creek Development). The 10" HDPE has an internal pipe size equivalent to 8" DIP (ductile iron pipe). This project will provide a second water connection to the 2005 MUSA area. The project was identified in the 2005 MUSA AUAR Study and the recently completed 2008 Water Comprehensive Plan. BIDS Bids for the project were opened on Thursday, November 20,2008 at 2:00 p.m. Nine total bids were submitted. The bids received are as follows: $131,451.88 $136,280.00 $142,619.34 $144,380.00 $146,722.00 $149,044.00 $149,065.50 $159,760.00 $181,399.00 The engineer's total project cost was estimated at $145,000. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme December 8, 2008 Page 2 Ellingson Drainage has not worked in the City before. We have completed a reference check and their work in other cities has been found acceptable. The project is tentatively scheduled to start on December 10, 2008 with a completion date of April 30, 2009. Staff will notify the property owners in the area prior to the start of construction with a project time line. This project was budgeted for 2008 in the CIP Project W-039. Funding for the project is proposed from the water utility fund. The single family residents along Audubon are not planned to be assessed for the project at this time, however they will be required to pay a lateral and hook up charge when they connect to City water service. Attachment: 1. CIP Page 2. Project Area Map c: Joseph Shamla, Project Engineer Kevin Crooks, Utility Superintendent Ellingson Drainage, Inc. g:\eng\public'--2008 projects\08-13 audubon wm (between lyman blvd. and Iincoln In)\award construction contract.doc Capital Improvement Program City of Chanhassen, MN Project # W -039 Project Name Audubon South Watermain Loop Account # 1 . 700 .- C>CXx) - Y-ffl Account # 3 Account #2 2008 thru 2012 Contact Department Water System Improvements Type Unassigned Useful Life Category Utilities Priority n/a D~cripwn 1 This watermain project will extend watermain from the intersection of Lyman Blvd and Audubon south along Audubon to connect to the Liberty on Bluff Creek development. Service will be provided to the existing homes along Audubon. Total Project Cost $150,000 Justification I To service existing homes along Audubon and profice a watermain loop for properties in the area. To provide a loop watermain system for the area Expenditures Construction 2008 150,000 150,000 2009 2010 2011 2012 Total 150,000 150,000 Total Funding Sources AssessmenURevolving Assess Water Utility Fund 2008 20,000 130,000 150,000 2009 2010 2011 2012 Total 20,000 130,000 150,000 Total Ope1Y1tionoJ Impact/Other 1 I I I I 126 I Proposed Directional Bore Watermain along Audubon Road N Directional bore approx. 2,200 I.f. of 8" watermain Not to scale