TO:
Todd Gerhardt, City Manager
FROM:
DATE:
SUBJ:
Teresa J. Burgess, Public Works Director/City En~n,~r~
April 23, 2003 ~
2004 Project Consultant Work Orders (Roads) - Project No. 04-01
REOUESTED ACTION
Approve Consultant Work Orders for Phase I (Feasibility Study) of the 2004
Street Improvement Projects.
DISCUSSION
Staff solicited quotes from the Engineering Pool Consultants for the two (2) 2004
Street Improvement Projects. All five (5) firms submitted proposals.
Staff is recommending that City Council authorize work orders for Phase I
(Feasibility Study) at this time with:
Total
Firm Project Phase I
Project
Bonestroo, Rosene, Residential Street Project
Anderlik & Associates City Project No. 0401 $5,581 $77,988
Short Elliot HendricksonMSA Street Project
Inc. (SEH) City Project NO. I)442 $18,900 $181,800
Park & Recreation
Phone: 952227.1120
Fax: 952.227.1110
Recrmtion Center
2310 CmJIter Boulevard
Phone: 952.227.1400
Fa~ 952227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax:. 952.227.1110
Public Works
1591 Park Road
Phone: 952227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
The criteria used to rank the proposals were: Completeness of scope, Cost, and
special skills and qualifications of the firm.
Staff considered potential cost savings of having both projects under one
consultant en~neering contract. It is Staff's opinion that potential cost savings
would be outweighed by the advantages of having different points of view
brought by having separate consultants on the projects.
FUNDING
The projects are identified in the CIP for construction in 2004. The funding for
these projects is a combination of MSA, General Fund, and Assessment dollars.
Enclosures:
1. Consultant Proposal Summary
2. Project 04-01 Proposals
3. Project 044)2 Proposals
c:
Marcus Thomas, Bolton & Menk Coy e-mail)
Phil Gravel, Bonestroo Coy e-mail)
Laurie Johnson, HTPO (by e-mail)
Jon Horn, Kimley-Hom (by e-mail)
Mike Foertsch, SEH COy e-mail)
The City of Chanhassen · A orowin~,~~~, winding trails, and beautllul parks. A gJeat place to INa, work, and play.
Z
0
Z
0
C]TYOF'
CITY OF CI~ANItASSEN
CONSULTANT WORK ORDER PROPOSAL FORM
Project No. 04-
2004 MSAS Street Improvements
CH It SEN
PO ~ 147
~~, MN ~17
Adndnl~allkm
~ ?J22271100
F~ ~2.~Z T11~
Building Inspecllons
P~I~ 9.~.~711u0
Fax: 952 ~7 IIS0
Eaglaeedng
~,~')ne 952.2271169
Fax ~2.227.1170
RllaflCl
F~x 95Z2271110
Fad( & RlcraaUon
F~c~. 95,?. ~7 I1~
Fax-952.~7 1110
Planning &
Natural Resoa~es
City Contact Consultant Contact
Teresa Burgess
Public Works DirJCity En~neer
PO Box 147
7700 Market Boulevard
Chanhassen, MN 55317
(952) 227-1169
tburgess @ ci.chanhazsen.mn,us
Mike Fo~rtsch, P.E.
Client Sexvice Manager
Jason Sprague, P.E.
Project Manager
(612) 758-6805
jsprague@sehinc.com
Project Description:
Rehabilitation/Reconstruction of City MSAS Streets. Allocated Funds for this project
are:
$1,000,000 MSAS Funds ($1,667,000 with Assessments)
$250,000 State Tumbaek Funds ($416,000 with Assessments)
Projects are anticipated to be assessed to abutting pmtxa'ty owners at a rate of 40% of
project cost for existing feannv, s and 100% for new amenities.
I I Person Hours I Fee
1. Feasibility Study ... :... :...-~.... ;.: i..'. ~.-.:..-.." :....;.:... .:.
1.1 Project Kick-off meeting 10 $900 '
1.2 Feasibility Report 120 $10,800
1.3 Mn/DOT Coordination 20 $1,800
1.4 City Staff Meetings/Weekly Updates 20 $1,800
1.5 Project Open House 30 $2,700
1.6 City Council Meeting 10 $900
Total, Phase I $18,900
2. Prenminar7 nesign and Contra.'etDoeument~' ' .' .'-'" '-:" := :~'.:" ;:.:" "-': '-'- ":"""-"'--" '-'
2.1 Preliminary Design/Design Survey 366 $32,940
2.2 Final Design 350 $31,500
2.3 Project Specifications 100 $9,000
2.4 Mn/DOT Plan Approval/Variances 70 $6,300
2.5 City Staff Meeting~eek~y Updates 60 $5,400
2.6 Bidding Services 24 $2,160
2.7 Assessment Heating 24 $2,160
2.8 City Council Meetings 12 $1,080
Total, Phase n $90,540
3. Constrn~on Ealgaee~ and'is:~rlh~.'~:'.- 'i': ........ ":.".i-i'."i .' ........ ' ' ' ..... ' ....... "~
3.1 Pre-Construction Meeting 24 $2,160
3.2 Construction Inspection 376 $33,840
3.3 city staff MeethgstWeek~7 Updates36 $3,240
3.4 Construction Survey 260 $23,400
3.5 Coordination 68 $6,120
3.6 As-built Drawings 40 $3,600
Total, Phase 111 $72,360
· o~ ~j~.i,a'.. '." "--'.-..' .... .'-'-.i$lSl~'.--'.'
Pf~rle: 952~27.1130
Fax 96~ 7.Z71110
Public Wod(s
1591 Park Read
PP,~le. 9~2271300
~ 95Z227.1310
Saaiot Centur
Phorle' 952.227,1125
Fax- 962.2271110
Web SHe
Total Project Fee
[--]does
[~ does not
include mileage and copy fees.
C OF
PO Box ldl
~~ MN ~11
Adlde~lmflon
Phone. 9522271100
Faz ~52.7/? 1110
6ulldlng Inspections
Phone 952,22;' !190
Fox: 952 2271190
Eqlaudq
Pr, one 9522..211160
Fax: 9~2227.1170
Pflone..o~ 227 i140
Fax 952.2271110
Pad~ & RBfeatlon
Pt,z~: 952 ~7 II20
Fax' 95~.227 III0
~10 Cou~ 8oulevm'd
Prmne: 952.~:~7' 1400
Fax' e.62 2~11404
Plamllng &
Natural Resources
PIx."qle: 952_227,1130
Fax 9~ 22.? 1110
I~ll~ WO~
1591 Pak R~ad
Pl'~c~e. 952~? 1300
F~. 9~...227.1310
Sealol' CHter
Pllorm' ~7.1125
Fax-95,?..2~71110
Web SHe
www. cl.cflaJdi~sefl mn ~
Consultant Statement of Special Sidll~ and Q-ultfications:
Our understanding is the MSA Street project includes the following
components:
· Market Blvd. (MSA)
· Great Plains Blv& (MSA)
· W. 78t~ Street (MSA and State Tumback)
· W. 79~ Stzect (local street)
· South Shore Drive and Court (local)
· Hill Street (curb & gutter, street, and storm sewer)
· Possible utility repairs in W. 79~h Street
Our preliminary construction cost estimate indicates sufficient budget to
complete the improvements as indicated.
Please contact your neighbors at Minnetonka and Eden Prairie for an
indication of the quality service we can provide the City of Chanhasscn.
flTYOF
CITY OF CIZANttASSEN
CONSULTANT WORK ORDER PROPOSAL FORM
Project No. 04-02
2004 MSAS Street Improvements
7700 Mar~
Po Bo~ 147
C~. MN 55317
MmLqlflml~n
Plwe _~2.2271100
Fax [~2.~7 ;110
BaiMIng Inspections
Plate- 952,22? 1180
Fax: ~2 2271190
Eaghleednll
Pr, uae-.~5~2.27116~
Fax. 952 227. I 170
FlflallCI
~..9r-~. 2271140
Fax 95Z.22711 I0
City Contact
Teresa Burgess
Public Works Dir,/City En~neer
PO Box 147
7700 Market Boulevard
Chanhassen, MN 55317
(952) 227-1169
tburgess @ ci.chanhassen, mn,us
Mr. Son Horn, P.R.
Project Manager
Kimley-Hom and Associates, Inc.
2550 Univea~ty Avenue West
Suite 345N
St Paul, MN 55114
(651) 645-4197
j,on.h .om @ki.'.mley-ho .rn.com
Project Description:
Rehabilitation/Reconstruction of City MSAS Streets. Allocated Funds for this project
are:
$1,000,000 MSAS Funds ($1,667,000 with Assessments)
$250,000 State Tumback Punds ($416,000 with Assessments)
Projects are anticipated to be assessed to abutting property owners at a rate of 40% of
project cost for existing fe, atmv, s and 100% for new amenities.
Park & Recreation
,~cr~: 952 2271120
Fax-952.227 1110
~:eahon Cen~
2310 Cou~ 8o~erd
Ptlofle': 952~i 1400
Fax: 952.2271404
P1aaning &
Natural Resolll~es
Ptk-W~: ~ 22Z, I130
Fax 95,?. ZZ71110
Pmlillc we~
1591 Park Road
PI,z~. 952227 13(XI
F~ .~..~7 1310
Saalor Centl. r
Plwle' e,/o2.227.1125
Fa 95222.71110
Web SHe
~r#w. ci.cflardlasSell rrm ~
J J Person HoursI Fee
1. Feasibility Study ·" ...::':... '-'.'":"' ":" ': ......
· . .: ;.. ... --.' .., :. ,:..:'!.Y'..:.,..: :?.' ...
·
1.1 Project Kick-offMeeting 4 $ 600.00
1.2 Data Collection including: 4 $ 400.00
1.2.1 GIS Database
1.2.2 As-builts
1.2.3 Right-of-Way Maps/Agreements
1.2.4 Pictures/Video
1.2.5 Field Review
1.3 Prepare Draft and Final Feasibility 80 $8,900.00
Study including:
1.3.1 Intro/S~
1.3.2 Proposed Improvements
1.3.3 Cost Analysis/Financing
1.3.4 Project Schedule
1.3.5 F. asements and Permits
1.3.6 Summary and Recommendations
1.3.7 Pre~ Assessment Roll
(Prepared by City Staff)
1.4 Mn/DOT Ctmrdination 2 $300.00
1.5 City Staff Meetings/Weekly Utxiate, s 16 $2,400.00
1.6 Project Open House 8 $1,200.00
1.7 City Council Meeting 4 $600.00
1.8 Reimbursable F.,xpemes $800.00
Total, Phs~ I 118 $15,200.00
~, mn~ nes~.nd Contmct.~~.....';".:~i>" '.'::.'"':':::~ '..:-.,i?/'':' .i:' :':i~': -".:?-
2.1 Prepare Final Plans and Specifications 600 $66,000.00
including:
2.1.1 Title Sheet
2.1.2 Construction Details and Notes
2.1.3 Estimated quantifies Tabulation
C 0F
PO Box 147
C1'~har~.~n, MN ~17
.~ie-.~.~7.11oo
Fax ~.~7 3110
BufldMl Iw~ons
P~' ~.~? !1~
Fax: ~2 ~?. 11~
~Wedng
P~.one ~.~7 I1~
Fax: ~7.1170
~flal
~, ~? i?~
Fax. ~71110
~ & Recre~on
~:~711~
Fax- ~.~71110
Flemea1~n Cenmr
2310 .CmJItef 8otJl, evard
RlO~. 95222i.1400
Fax' 952 2271404
~m~ &
~1 Resowces
~ ~7,11~
~ ~.~71110
Public Works
1591 ~k
Phr, ee: 95222? 1300
Fax. 952.2271310
SmliOr Cllt!. r
Ph:ne' 952227, ! 125
Fax-9522211110
~b SHe
arww.~.~~ mp ~
2.1.4 Removals
2.1.5 Erosion Control
2.1.6 Roadway Plan and Profile
2.1.7 Storm Sewer Plan
2.1.8 Sanitary Sewer and Watermain Plan
2.2 Permits including: 16 $2,400.00
2.2.1 Watershed District
2.2.2 NPDES
2.2.2 Health Dept (if necessary)
2.2.3 MPCA Dept. (if necessary)
2.3 Prepare Final Engineers Estimate 8 $800.00
2.4 Mn/DOT Plan Approval/Varian~ 20 $3,000.00
2.5 City Staff Meetings/Weekly Ulxlates 24 $3,600.00
2.6 Bidding Services 20 $3,000.00
2.7 Assessment Hearing 8 $1,200.00
2.8 City Council Meetings 8 $1,200.00
2.9 Reimbursable Bxpenses $4,500.00
Total, Phase 1I 704 $85,700.00
3. Construction E~llneering and ..~S-.'bUilt:-BfaWlngs' .":~' ."- ~:': ~ ..? : :.. ' :'.~
,.
3.1 Pre-Construction Meeting 8 $900.00
3.2 Construction Inspection 1,500 $135,000.00
3.3 City Staff Meetings/Weekly Updates 40 $4,800.00
3.4 Prepare Monthly Contractor Payment 40 $4,800.00
Vouchers and Final Payment Document.
3.5 Construction Staking 260 $34,000.00
3.6 As-built Drawings 40 $4,500.00
3.7 Reimbursable Expenses $10,000.00
Total, Phase IX[ 1,888 $194,000.00
· '?".': ' . ..... ,"'" '.00 ·
Total Project Fee
[5~ does
[-~ does not
include mileage and copy fees.
SPECIAL NOTES FOR CLARIFICATION:
Section 1 Feasibility Study
h.
B.
C.
D.
We will provide the estimated project costs and assessments amounts to
City staff for staff preparation of Assesranent Roll.
A detailed field survey is not included. Depending upon the final project
scope a more detailed survey may be needed.
We will provide project information for the Open House but assume that
the City will cxmaflinate the invitation mailing, postage, etc. We can
We have assumed that the feasibility study will include an investigation
of the need for watermain and sanitary sewer i ~mprovements; however,
our estimated fees for thi~ and subsequent phases of the project do not
include any watermain or sanitary sewer repair/replacement work We
can provide these services as additional services ff necessary.
Section 2 Final Design and Contract Documents
h.
As per your e-mail, we revised the title of this section from preliminary
C OF
CHANHASSEN
C~ [vIN 5~317
Adlmlnllbalton
Pf~.- .Q5,?.2~71100
F,1..x ~2.2~? 1110
Building inspections
Plate- 9.5~. 227.1180
Fax: 952 221.11~
r:e411nNdng
~.o~e' 9522.271160
Fax: 952~27.1170
PflGnr 95~227 i140
Fax-~:~ ~71110
Pad[ & Rl~lUon
Pl'~e: 95,?. 22711~
Fax-9~.227 1110
I:le~eaho, Cerlle[
~1o Cou~ 8obaaJ'd
P~. 952.~? 140~
Fa~ ~ 2~11404
Plalfllng &
Natural Resources
Phohe: ~227.113e
Fa 9~71110
Pldlli~ ~
1591 ~k Read
Pllc, ae: 952227' 1300
Fa. LF/L2.,?./.1310
smorcmm/
Phorle' 9~ L~7. 1125
Fa 95,2.22.71110
Web Site
B.
We have assumed one assessment hearing only without any appeals or
additional requirements. We will be happy to assist staff beyond one
hearing (if necessary) as additional services.
Section 3 Conslxuction Rn~neering and As-built Drawings
A.
B.
We have assumed full time construction inspection for the majority of
the project schedule. If part time inspection is allowed, it would
substantially reduce our proposal cost.
We have asstmx~l full field staking of line and grade. An alternative is
to provide control point "only" staking to the contractor and malco, it their
responsib~ty for line and grade staking. If we make line and grade
staking the contractor's responsibility, it would substantially reduce our
proposal cost
Consultant Statement of Special ~-illR and Qualifications:
ffFYOF
CHAN SEN
77~ M,~[~ BaJleva~O
PO [lox 147
Ct~'d',as~. MN 55317
MmbllmlUon
Pl'elle-952~71100
Fax 957_2271110
BufldlMI In~pe~ons
P~one g~-~.~71180
Fax: gS? 2271190
r:qlUldni
Pl~e 95~2.27 llGO
Fax. 952227.1170
Phone' 952.22? 1140
F~ 9~? 1110
Pek & RmaUon
P~ne: 952 2271120
Fax ~2227 1110
~.'e.a~On C.~r'de [
~1o Coulw 8ou~,,-m'd
Pllope: 9S7..2271400
Fax ~ 2271404
PlaJmLqD a
Natural Resources
Phb-~: 95,?. 227. 1130
Fax 95ZZ27.1110
Pullli~ Wo¢o
1591 ~k Road
PI'x'd. 9522271300
Fax 9~?..227.1310
S#i~r Cenl!r
Iqleoe-~/-j2~7.1125
Fax" 9~2.2~71110
Web SHe
Kimley-Horn and Associates, Inc. is pleased to have the oppommity to provide
professional consulting services to the City of Chanhassen for the 2004 MSAS
Street Improvements, City Project 04-02. Our special skills and qualifications
specific to this particular project are highlighted below.
PROJECT TEAM
Specific staff assigned to this project for project leadership, management and
delivery are Jon Horn and Gary Ehret. Between Jon and Gary, we offer over 40
years of combined consulting engineering experience in the Twin Cities, with a
majority of that experience in providing general municipal consulting services.
Jon and Gary have provided residential street reconstruction and MSAS street
construction/reconstruction services for numerous communities in the past
including Chanhassen, Shoreview, Roseville, Bumsville, Anoka, Columbia
Heights and Inver Grove Heights.
A lesson learned from each of these communi~ experiences is this; Always
keep an open mind, do not have preconceived solutions, listen to the input of
staff and the public and over-communicate.
CHANHASSEN XPERmNCE
Jon and/or Gary were the primary engineers of record for improvements made to
most of the streets in the project area between 1987 and 1992. These streets
included West 78th Street, Market Boulevard, West 79t~ Street, Great Plains
Boulevard, and TH 101 north of TH 5. We are very familiar with the project area,
the past improvements made to these streets, and the assessment methodologies
used for these past projects. Our past experience and knowledge of the project
area would provide a benefit not offered by the other consultants.
PUBLIC INVOLVEMENT
Successful pubhc involvement is one of the keys to the successfifl implementation
of a street reconstruction program. This public involvement needs to start early in
the feasibility study phase of the project and continue through the completion of
construction. We understand the need for public involvement as a part of this
project and are committed to working with City staff to develop a proactive public
involvement process. We are experienced in all types of public involvement
including open house meetings, public hearings, preparation of project mailings,
field communication with residents and using the City website as a public
involvement tool.
AVAILABILITY
Jon, Gary, and our en~neering production staff are immediately available to
begin work on this project. We axe committed to providing you with quality
services and to working with City staff for the successful delivery of this project.
CITYOF
CHAN EN
PO Box 147
C, Pm,'dl,~S~, MN 55317
Adnlin~Talkn
P~.: ff3~.2271100
F~ .~,2.ZZ7 II10
6iikllng Imections
P~ ~m ~ ~ I1~
FaX: 952 227 1190
Engineering
I~qre 952.22711~
Fax. 9~2_227.1170
F]fiIlli
I:q~4~' 952.2271140
Fa~' 952~7 1110
Padr & Rme,ltion
I>~m: 952.22711~
Fax' 962.2271110
~f~oq Cemer
2310 Coumw B~Ecc~'d
Phor, e:. 952227.1400
Fax' ~2 2271404
Planning &
NltmiI ~
PIXY: 952.227.1130
Fax 9522271110
Public WofkI
1591 I~k Road
Pb¢~: 9~7 BOO
F3x 952.227.1310
~liOr Center
Photo- ~2227.1125
Fax' 95Z2271110
'Nib SHe
CITY OF CHANHASSEN
CONSULTANT WORK ORDER PROPOSAl. FORM
Project No. 0402
2004 MSAS Street Improvements
City Contact Consultant Contact
Teresa Burgess
Public Works DirYCity EnCneer
PO Box 147
7700 Market Boulevard
Chanhassen, MN 55317
(952) 227-1169
tburgess @ci.chanhassen. mn.us
Marcus Thomas, P
l~-o.i~t Manag~
Bolton & Mcnk~ Inc.
1515 Fast Highway 13
Bumsville, MN 55337
Office: (952) 890-0509 Cell: (612) 859-6526
marc~@bolton-menk.c0m
Project Description:
Rekabilitati~truction of City M_SAS Streets. Allocated Funds for this project
$1,000,6O0 MSAS Funds ($1,667,000 with Assessments)
$250,000 State Tumback Funds ($416,000 with Assessments)
Projects are anticipated to be assessed to abutting pmpea'ty owners at a rate of 40% of
project cost for existing features and 100% for new amenities.
Ii_[ iPerson Flou_.~ I Fe~
1. Feasibility Study mm ' ' :' ' '' mm m: m m : II ~ m m ' '' ~ ' ::'':I : m 'm:: : m( : . m ' ' m m .:.. .
1.1 Project Kick-off meeting 4 $ 360
1.2 Property Owner Input
1.2.1 Prepare resident quesfiom for
City ma~l~ng 2 $ 180
1.2.2 Summarize results for leas. repart 6 $ 390
1.3 Obtain & review GIS, ROW and As-built info. 32 $ 2,080
1.4 Gootechnical Evaluation & Rlw.~mmm~dafion8
(Braun contract directly with City. See
separate l~epo~)
1.5.1 Two (2) City Staff review meetings 6 $ 465
1.5.2 Weekly Updates 4 $ 360
1.6 Mn/DOT Coordination 4 $ 360
1.7 Prepare written report 160 $ 10,500
1.8 Project Open House
1.8.1 Preparation for meeting 16 $ 1,040
1.8.2 Meeting attendance 8 $ 620
1.8.3 Prepare minutes for feasibility report 2 $ 130
1.9 City Coun~ Meeting 4 $ 36O
(Present Feasibility Report)
Total, Phase I $ 16,845
2. Final Design and Contract Doeum~i :" ::.' . '"'- '":.'.'.., · -'-' '--.--:. ' ' .
2.1 Topo~rephic survef ' 260' ' $ 14,000
2.2 Preparation of construction plansx 720 $ 48,800
2.3 Preparation of construction specifications 80 $ 7,200
2.4 Mn/DOT Plan Approval/Variances 60 $ 4,000
2.5 City Staff Meefinga/Weeidy Updates
2.5.1 Two (2) City Staff review meetings 12 $ 930
C YOF
CHANH SEN
PO Box 147
~. MN
kdilllmllllon
PicNic. 95~,2271100
F~ 952.2271110
Bulng ImPorts
P~ne' ~,~; I1~
F~: ~ 22? 11~
Englaeerlng
.~,.lne 9,52.2.271160
Fax: 952_2Z7.1170
P!l~fle, 9r.~..2~7114o
F~-952~? 111o
2.5.2 Weekly UlxJate~ 4 $ 360
2.6 Bidding Services 10 $ 550
2.7 Assessment Heari~ 4 $ 360
.
2.8 City Council Meetings
2.8.1 Present final plans 4 $ 360
2.8.2 Present contractor bids 4 $ 360
Total, Phase II $ 76,920
3. Conslxucflon Enotm~ring and ,~s~bUilt
~ ,.~..-~....
3.1 Pre-Construction Meeting
3.1.1 Prepare agen~ 2 $ 180
3.1.2 Meeting a~ce 8 $ 620
3.1.3 Prepare minutes 2 $ 130
3.2 Construction Inspection 800 $ 60,000
(Basis = One observer for 16 weeks @
50hrs week)
3.3 Construction Administration 112 $ 10,080
(Project Manager involvement)
(Basis = 16 weeks @ 7 hrs l~r week)
3.4 Construction Newsletters I0 $ 900
3.5 Construction Staking~ 260 $ 14,300
3.6 City Staff Meetings eeidy Updates
3.6.10n~on-sit~~l~rweek, 16total 48 $ 4,320
3.6.2 Weekly utxtates 8 $ 720
3.7 As-built Drawtn~~ 80 $ 5,200
Total, Phase Ill $ 96,450
Pro.leCtFee- -
PIrk & RlemaUofl
Ph~: 952.2271120
Fax-952.2271110
R~'m~.alJ. oq Ce,nlm'
2310 C .ouJW 8m. Jev'a'd
I:'nooe. ~.2271400
Fax' 9f2 22?. 1404
~1 Rim
P~: ~.~7.11~
~x .~ 7~? 1110
~1~ W~
I~1 ~k ~d
~.,~. ~? 1~
Fax.~?.1310
~~r
Iqld:Xe' ~7.11~
Fax.. ~ 1110
Wlb Site
www. ci.dlaJlnassea ri'in u~
Total Project Fee
does
does not
include mileage and copy fees.
1Line items are based on the following design & construction assumptions and a
magnitude of $1.1 million in construction costs.
Mill & Overlay Street Segments
- West 78~ Street
- Ore~t Plains Boulevard
Recomtmction Street Se?nents
- Market Boulevard
- West 79z Street
- T.I-L 101
- South Shore Drive
- South Shore Court
Hill Street
C:~q~nen~ and _Seflln~er~q___b~ocal Settin~Temixra~ htemet Fjlm~OTXT~1004 MSA ~dec
CFFYOF
CH H SEN
PO Box 147
Clwda~, FiN 5531
AdlablmmUon
Pl-lale. _~d2 2271100
Fax 9~,...2.~.? II10
Bufldlflg IosllecUons
Phone' 95Z2~,~ 1180
Fax: 9~.~27 1190
Eqlneednll
Pr, ale 9522271160
Fax: 9'~7.1110
Fhlaflel
Phofe- 952 22711,40
Fax' 9522271110
Pek & RBmatlon
Pt'~: 952 ~? 11g0
Fax-952.~71110
Planning &
him'II RIiilta
P'h~: 952227.1130
Fax 9[~. 7271110
PUklic Wats
1591 Flak Read
IC~. 952~71300
Fax. L:~52.~?.1310
Senior Cente. r
Pholle-952.227.1125
Fax. ~:~2.~71110
Web SHe
~',,w,,.ci.chafdlBS.,qen rrm u5
Consultant Statement of Special Skills and Qualifications:
Bolton & Menk's MSA experience is really an extension of our
municipal street rehabilitation experience. We encourage you to review our
Statement of Special Skills and Qtmlificatiom detailed in our proposal for
Chanhassen's 2004 Residential Street Improvement Project, and consider
those qualifications in concert with the following information:
Bolton & Menk's objective, when managing an MSA project, is to use
our Mn/DOT relationships to our Client's advantage. Most of our Clients
designate us to handle those additional St_a_t¢ Aid administrative duties
including project initiation, plan reviews and discussions, payment requests,
and construction documentation. We are very familiar with State Aid's roles
and procedures and are s~sful in obtaining plan approvals. We can also
assist the City with State Aid's Variance Process ff necessary.
As the City's Project Manager, Marcus Thomas has good working
relationships with Metro State Aid Office staff. He has personally worked
with them in addressing project-specific nee.~ and concerns for numerous
communities and recogniT~s the need to adhere to Mn/DOT's standards on
MSA projects. Jon Huseby, BMI's Transportation Group Manager and former
Mn/DOT District En~neer, offers valuable assistance with municipal projects
associated with state highways.
Bolton & Menk's Project Engineers have been formally trained in the
design and preparation of Mn/DOT State Aid plans and therefore play an
effective roll in the plan approval process. Our Construction Observers are
Mn/DOT certified and, again, are formally trained in the materials testing,
construction documentation, and administration requirements of Mn/DOT
State Aid projects.
Our Statement of Qualifications submitted to the City last November
outlines numerous MSA projects and communities that Bolton & Menk; Inc.,
has success~y managed. We encourage you to review this information for
further details. We would also encourage you to contact Steve Stadler, the
City of Hopkins' Public Works Director (952-939-1338), as a specific
reference for Bolton & Menk's qualifications as a consultant on MSA projects
and municipal street rehabilitation projects in general. Marcus Thomas has
worked with Mr. Stadler and the City of Hopkins since 1995 on the City's
annual MSA street improvement projects. We believe our work for the City of
Hopkins is representative of the commitments we make to each of our client
communities including the City of Chanhassen.
C OF
CITY OF CI-IANHASSEN
CONSULTANT WORK ORDER PROPOSAl. FORM
Project No. 04-02
2004 MSAS Street Improvements
7700 Idarke{ Boolc-va{d
PO Box 147
Admlaitlrmllon
.Phone' 95~.22711o0
Fax 9r'~.22t 1111:)
Building Inspecllofls
P~rle 952.22," I lU0
Fax: 9~ ~? 11~
Engineering
P~ne-95~2.2.71169
Fax: 9~?.~?.1170
Phone, 95~..~71140
Fax 952.2271110
Plft &
PI'~:~: 9~ ~7.11~
Fax- 952.2271110
qecfealm Cerllef
2310 Cou~ 8ot, Jlev,e. rd
I:l'lOl'le:. 9:52.~7.1400
Fax. ~62 2211404
Planning &
Natulll Resources
City Contact Consultant Contact
Teresa Burgess
Public Works DirYCity En~nee~
PO Box 147
7700 Market Boulevard
Chanhassen, MN 55317
(952) 227-1169
tburgess @ ci.chanhassen, mn.us
Project Description:
Kevin L. Hoglund, P.E.
Transportation Team Lead~
Bonestroo, Rosene, And~rlik & Associates
2335 West ~way 36
St. Paul, MN 55113
Kevin Hoglund Direct (651) 6044837
Fax: (651) 636-1311
kho~tmd@bonestroo.com
Rehabilitation/Reconstruction of City MSAS Streets. Allocated Funds for thi,~ project
are:
$1,000,000 MSAS Funds ($1,667,000 with Assessments)
$250,000 State Turnback Funds ($416,000 with Assessments)
Projects are anticipated to be assessed to abutting ~ owners at a rate of 40% of
project cost for existing featta~ and 100% for n~w amenities.
] ] Person Hours ] Fee
Feasibility Stady ' ' .... :' "
le:' ' ":''fi'" ' ':'""" '" '
1.1 Project Kick-off Meeting 6 $512.00
1.2 Report Preparation 32 $'2,184.00
1.3 Mn/DOT Coordination 6 $500.00
1.4 City Staff Meetings/Weekly Updams 24 $2,184.00
1.5 Project Open House 16 $1,360.00
1.6 City Council Meeting 10 $1,020.00
Total, Phase I 94 $7,760.00
2. PmUmlnary Dealt and'Contr~ ~t~" ."' ':~',.:.'..:... .--. :..,..: ,.-.~..~:<
2.1 Field Inve~tisation 146 $8,220.00
2.2 Plan Preparation 596 $39,200.00
2.3 Railroad Coordination 18 $1,700.00
2.4 Mn/DOT Plan Approval/Variances 28 $2,760.00
2.5 City Staff Meetings/Weekly Updates 40 $4,080.00
2.6 Bidding Services 56 $2,880.00
2.7 Assessment Hearing 40 $3,488.00
2.8 City Council Meetings 16 $1,304.00
Total, Phase 11 940 $63,632.00
3. Construction Engineering and ':.~bnflt:llra~; / '.- . ;.'.'.'....... :..- ". .......,
3.1 Pre-Construction Meeting 14 "$1,23~.00
3.2 Construction Inspection 1,334 $84,724.00
3.3 City Staff Meetings/Weekly Updates 100 $8¢264.00
3.4 Bi-Weekly Newsletters (no fee) 0 $0.00
3.5 Web-Page Support (no fee) 0 $0.00
3.6 As-built Drawings 154 $8,668.00
Total, Phase llI 1,602 $102,888.00
Tota]!~eetF-Jy~e:: (.;~..' -.......~:~6,,..36. -': .:$::174:,28b,,Oo
Phone: 952227.1130
Fax 9S,? Z271110
Public Works
15.61 Park Road
Plr.~e: ~2:227 1300
Fax 952.~'?.1310
Slaior Clntel'
Phd:ne- 952.2'27.1125
Fax; ff"a2.,n")71110
Web SHe
www. CI.C~ il'Iff. ,,~
Total Project Fee
does not
include mileage and copy fees.
CITYOF
CHAN EN
PO Box 1,47
Admlmld~
Pl't'~e' 95~.227.1100
F~ ~..27_71110
Building Inspeclion$
F'~i~. 952.22711~
Fax: ~2 zq ~1~
Engineering
I:~l~ 9,5~71160
Fax. D52.ZZTA 170
Fhmmee
~ 9S2.~711-40
Park & Rw#Uon
I:q,~: 95,? 22711~
Fax- 952.227 I110
2310 CoulW
I~ore:. 952.~?.1400
Fax' 952271404
Planning a
Natural Resources
PhOi~: 95,?.~7.1130
Fax. 952 Z271110
Pubflc Works
1591 P~fk I:~'~ad
Plww 9522271300
Fax. 95Z227.1310
snior buter.
Photo' 952.~7.1125
Fa-9r"~-.22.7- !110
Web SHe
wwW. Cl.~ nm ~
Consultant Statement of Special Sldlh m,d Qualifications:
The City of Chanhassen is seeking Professional Consulting Services to assist
in administering its 2004 Municipal State Aid System Street Improvement
Program. The program will consist of $2,083,000.00 in rehabilitation and/or
reconstruction improvements. The successful consultant must have a solid
understanding of the State Aid System, must be familiar with the 429
Assessment process, must have a working relationship with Chanhassen, and
must be cost-effective for the community.
Kevin Hoglund, P.R., will lead the Bonestroo team. From 1996 to 2000, Kevin
was a Project Manager in Mn/DOT's Metro District State Aid Office. Kevin
worked on more than 100 projects coordinating and mana~ng all processes
including planning, funding, preliminary design, final design, project
documentation, agreements, mmbacks, bid letting and construction
administration. As a Project Manager with Bonestmo, Kevin continues to
work on State Aid projects and has maintained relationships with key
personnel in the Metro District State Aid Office. Kevin will also lead the
public involvement proc. ess and use the Systematic Development of Informed
Consent (SDIC) methodology. Kevin has experience working with Railroad
Authorities, is trained and experienced in Context Sensitive Design, and has
proven experience in Consmmtion Administration while working as a
Mn/DOT Construction Project Engineer.
Kevin Kielb, P.E., will assist Kevin Hoglund on the project. Kevin Kielb has
administered the State Aid System for several communities, and has close ties
with Mn/DOT's State Aid Department. He has administered numerous 429
Assessment projects during his tenure as a City Engineer, and has obtained
rights to work in the railroad right-of-way for State Aid and Cooperative
Agreement projects. He will be responsible for overseeing the preparation and
submittal of the following documents required for the State Aid Process:
Request for State Aid Project Number, State Aid Plan Submittal, Plan
Review Checklist, drainage area maps and calculations, soils and
ESAL data, horizontal and ve~'tical information, Proposal, Special
Provisions and Specifications, Engineer's Estimste with splits, Lab
Testing Services Request Form, No Parking Resolutions, SJRs,
Variance Approval Letter, Hold Harmless Resolution, copies of Corps,
DNR, PCA and Watershed Permits and their applications, Payment
Request Form (initial), Payment Request Form (partial), Payment
Request Form (final), Weekly Construction Diaries, Technical
Certifications and Certificate of Performance upon project completion.
Tom Fidler, P.E., will serve as the Lead Design Engineer. Tom specializes in
designing State Aid roadways. Phil Gravel, P_E., brings familiarity of
Chanhassen's wants and needs to the project team, Eric Lembke will serve as
Project Inspector. Eric has inspected both public and private sector work in
Chanhassen.
CffYOF
CITY OF CI-IANFIASSEN
CONSULTANT WORK ORDER PROPOSAl. FORM
Project No. 04-02
2004 MSAS Street Improvements
C SEN
PO Box 147
(:3'aflh,15~. MN 55317
Mmbilstratlon
~ ?-------------~2 J2 ?. 1100
Fax ~2_7~? il ID
City Contact
Teresa Burgess
Public Works DirJCity Engineer
PO Box 147
7700 Market Boulevard
Chanhassen, MN 55317
(952) 227-1169
tburgess @ci.chanhassen.mn.us
Consultant Contact
Laurie Johnson
Principal
HTPO Inc.
7 510 Market Place Drive
(952) 829-0700
ljotmson@htpo.com
Bufldlal Inspedlons
Phene 952,2271180
Fax: ~i2 227 11~
EnOlaeedflg
Hame ~.2271160
Fax' 952227'.1170
~' 95~. 227.1140
F~ 95Z22711 I0
Pad[ & RlefelUon
Phew: 95272__7 I1~
Fax- 952.22'71110
F~ 652.2271404
Plamalflg &
Malml R~
Ph~: 952 227.1130
Fax 9522271110
Pllklic Works
1591 Pa~ Read
Ptv31e. 9522271300
Faa ~:~2.227.1310
sedo~ Cmd!.r
PIIorm' 9522~7,
Far 952.~.71110
Web Site
Project Description:
Rehabilitation/Reconsma:fion of City MSAS Streets. Allocated Funds for this project
are:
$1,000,000 MSAS Funds ($1,667,000 with Assessments)
$250,000 State Tumback Funds ($416,000 with Assessments)
Projects are anticipated to be assessed to abutting property owners at a rote of 40% of
project cost for existing features and 100% for new amenities.
1.1 Project Kick-off meeting 4 400
1.2 Analysis of existing conditions 40 3,300
1.3 Analysis of alternatives 8 600
1.4 Cost Estimate 16 1,200
1.5 Assessment Roll 16 1,100
1.6 Report Preparation 16 1,300
1.7 Mn/DOT Coordination 0 0
1.8 City Staff Meetings/Weekly Updates 6 600
1.9 Project Open House 10 800
1.10 City Council Meeting 4 400
Total, Phase I 120 9,700.00
2. PreUmina~ oesign and Contra. e~'~_~.. '..-...- "" ": ":':.,":..,:: ..-.i..'. ":" '"' :'"' :'"" ~ '"'.
2.1 Plans and Specifications 420 27,600
2.2 Bid Quantities/Engineer's Estimate 30 2,200
2.3 Prmit Applications 8 500
2.4 Mn/DOT Plan Approval/Variances 16 1,200
2.5 City Staff Meetings/Weekly Updates 20 1,900
2.6 Bidding Services 30 2,100
2.7 Assessment He, rig 4 400
2.8 City Council Meetings 8 800
Total Phase II 536 36,700.00
3. Coz~n]ctioo ~P,,ee~-g-amt: ~b~.t'~'~ii'::: ,'" :",~.::" ':', "-: .' ....... "~ .,"i"'.." -":-::'"'--
3.1 Pre-Consm]cfion Meeting 8 600
3.2 Construction Inspection 165 14,000
3.3 City Staff Meetings/Weekly Updates 16 1,600
3.4 Construction Administration/Pay Request 30 1,900
3.5 As-built Drawings 40 2,700
Total, Phase 1TI 259 20,800.00
?otai~?:~lee~.iree:--" -', .0.,200...00. ·
C:kDoalments rout Settinl~~~ Sptin~\~ hternet ~TX~City of Ch..h.m~e~ 4-22-03 2004
MSAS Stxeets.doc
Total Project Fee
[--]does
[~ does not
include copy fees.
C OF
CHANHASSEN
POBox 147
~qh~3.~L~l. MN ~17
AdmLqlstrltJon
Pt&'~: ~_52.2271100
Fa ~.~Z t110
Building Inslmdlons
t:~ne' 9~.2271180
Fax: e~222711~
Englaeertng
~u-ne' 952.227 !160
Fax: ~ 22.7.1170
P~. 952 2271140
Fax- 95~....~? 1110
Park & RlcreaUon
Pi'tone: 952.22711~0
Fax' 95Z2271110
~lmn C, efller
2~10 Cou~ 8o~kwzd
F~' ~2 ~211404
~N &
Ilalgral Resources
Pho~: ~1,11~
F3x 9~.~.71110
Pukllc Wodcl
1591 I~k Fioad
PI~,~, 952.227 1300
F3r ~Z2~?.1310
Senior Cente. r
952.227.1125
F~x- 9f~2.27../1110
WIb Site
Thc above fees are based on the follov,4ng assmrnptions:
· This project is for bit~minous mill and overlay ouly, and does not include
d_rainage, subgrade, or utility i~ements. We have ass~ that some curb
i .mprovemenLs will be required.
· This project will include/~ppro:~imstely 12,000 feet of street i .mprove, n~flts with
a construction duration of 25 working days.
· The City has adequate as-built plans for all thc roadways so that topographic
surveys and road grofile drawings will not be required.
· Geote~hnical service~, if required, will be l~'ovided by others.
PO 8o% 147
C~'i11,ts.~. MN 5531
Building Inspections
P.~.re' g52.~," !!80
Fax: 952 227' 1190
Engileedng
9522.271160
Fax: 952_227.1170
FJnnlll~
P'm:~. g52_221 !140
Fax 95?_227 1110
Park i ReCl'eatJon
Pl'~ore: 952..~71120
Fax' 95Z227 1110
~lea~ Ceme
Lq 0 Coulter 8ouevard
Pno~. 952.227.1400
Fax-c~71404
Manning &
Nmral Res~l~es
Phcxe: 952227.1130
Fax. 9~? Z271110
Pallllc Welts
1591 ~k Road
Pbcae. 9522271300
Fax. ~2.227.1310
~Cemr
Ptlore- 952.227.1125
Fax-9f~..22J 1110
Web SHe
wWw. Cl cflalltTasse~ ,Tin ~
Consultant Statement of Special Skill~ and Qualffi~fionn:
;17
Engineering · Surveying
Landscape Architecture
HTPO's team consists of engineers and construction inspectors experienced in the
design of street and utility improvement projects for the City of Chanhassen and
other munidpalities. Recent pavement reconstruction/repair projects include:
City of Chanha~sen, MN - 2002 MSA Street Improvements
HTPO provided a fea~ility report, pre__liminary cost estimates and preliminary
assessment rolls for alternatives, preparation of plans and specifications for submittal
to MnDot for State Aid Funding, and for bidding and construction, permit
applications, bid administration, contract management, construction
inspection/observation, and construction administration for the overlay of Lake Lucy
Road, Saddlebrook Curve, Lake Drive/Lake Drive East, Audubon Road, and Coulter
Boulevard
City of Minnetonka, MN - Clearwater Drive and Townline Trail Improvements
HTPO provided dvil engineeza_ng services indu~ feasibility study, construction
documents, construction administration, project management, as well as surveying,
construction staking, landscape architecture and construction inspection/observation
services for the reconstm~on of Clearwater Drive. The state aid funded project
involved street reconstruction and 7-lane roadway widening at Highway 62. Other
characteristics of this project included extensive public involvement process, turn
lane/median improvements, pedestrian trail and sidewalk, MnDot permitting, and
extensive coordination with NSP, US. West and Minnegasco for relocation of private
utilities.
City of Minnetonka, MN - Meeting Street Public Utility Installation and
Street Reconatruction
HTPO provided a comprehensive package of services including dvil engineering,
surveying, landscape architecture, project management, construction inspection and
staking. This project presented a unique challenge requiring special focus on the
preservation of natural woodlands and wetland environment surrounding existing
privately owned estates while accomplishing the City's request for needed water,
sanitary sewer, stormwater collection and roadway improvements. HTPO worked
openly with and encouraged public involvement from the effected land owners in
this sensitive project from it's inception to completion.
City of Eden Prairie, MN - Lincoln Lane/Forest Hill Road
HTPO provided surveying and dvil engineering services for the completion of
preliminary design for a feasfbility study, construction documents and construction
administration. Construction staking and inspection services were also provided by
HTPO. These projects were street reconstruction/extension projects within existing
Eden Prairie neighborhoods. Design characteristics included coordination with
County improvements, sidewalk with steep connection to adjacent neighborhood
and storm sewer improvements.
We welcome the opportunity to work with the City of Chanhassen, and appreciate
you considering HTPO for this project.
C I SEN
1700 Maim Borland
PO 8oi 147
~.~11
BoNing Iflqlecllons
Pl,,~e.: 95ZZ271180
Fox: 95~ ~? 1190
Engineering
Photo 9.522.271160
Fax: 952..227.1171:}
Pixy.. 95227. ~ 1,40
Fax' 952.2'271110
Pad[ & Recreation
~ 95,?..2'2711~
Fax' 952.2211110
23~0 Cou~ 8oL,~d
F~' 9f~.~211~
CITY OF CHANHASSEN
CONSULTANT WORK ORDER PROPOSAl. FORM
Project No. 04-01
2004 Residential Street Improvements
City Contact Consultant Contact
Teresa Burgess
Public Works DirdCity En~neex
PO Box 147
7700 Market Boulevard
Chanhassen, MN 55317
(952) 227-1169
tburgess @ ci.chanhassen.mn .us
Project Description:
Phil Gravel, P.E.
Associate Principal
Bonestroo, Roscne, Andexlik & Associates
2335 West I-rtghway 36
St. Paul, MN 55113
Phil Cnavel Direct: (651) 6044885
Fax: (651) 636-1311
pgravel @bonestroo.com
Rehabilitation/Reconstruction of City Residential Streets. Allocated Funds for this
project are:
$515,000 Gen~ntl Fund ($858,000 with Assessments)
$300,000 Utility Fund ($500,000 with Assessments)
Projects are anticipated to be assessed to abutting ~ owners at a rate of 40% of
project cost for existing fcattae, s and 100% for new amenities.
I ......... !.pets°nH°urn I
1. Feasibility Study ' " "· ."-.',..'"., :.:::; '.:...:..~: ... :,': ",-..".~-.'.' ..... :..;i...'.'...
1.1 Project Kick-off Meeting 2 $170.00
1.2 Draft Report 20 $1,360.00
1.3 Final Report 26 $2,146.00
1.4 City Staff Meetings/Weekly Updates 8 $762.00
1.5 Project Open House 4 $381.00
1.6 City Council Meeting 8 $762.00
Total, Phase I 68 $5,581.00
2. P~liminaI~ Design ~ Contmct.~'ents ..... . '-:' ..:i' :-.'.' "" :.:".-: ..........
2.1 Project Management 24 $2,215.00
2.2 Plan Preparation 328 $20,286.00
2.3 City Staff Meetings/Weekly Ulxlates 16 $1,512.00
2.4 Bidding Services 24 $1,520.00
2.5 Assessment Hearing/Assessment Roll 36 $4,200.00
2.6 City Council Meetings 12 $915.00
Total, Phase II 440 $30,648.00
3. Construction En~n~'and ~.b~../i~.i!:`.:(~?~..`~:.-:`::::~.~:~.~:;....:.:~..:-.......`~;~.~:~...:.:..:.~:.:.....~:..~:::::.::;~... ·"
3.1 Pre-Construction Meeting 8 $680.00
3.2 Construction Inspecti~ 400 $27,574.00
3.3 City Staff Meetings/Weekly Updates 32 $3,601.00
3.4 Construction Surveys 140 $7,200.00
3.5 Newsletter/Web-Pase Support (no fee) 0 $0.00
3.6 As-built Drawings 50 $2,704.00
Total, Phase III 630 $41,759.00
T,,otai:~e~.Fee: :. ---...,:-.-:... '-.t,1~.8.. ..... .,., .$77ps&'oO',
Nllmal Resources
Pl'k.'qle: 952.221.1130
Fax 9:52 Z271110
Public Wl~ks
1591 Park Road
Pl'~. 952.,2271300
Fa~. LJSZ2271310
S~rCmm/
Phone' ¢JSZ227.1
Fax-952.22] 1110
Web SHe
Total Project Fee
does not
include mileage and copy fees.
C:kDocumeam and Sefdn?~ercsab~l.,txad SettingskT~ Interact Hlos~OLK2kBRA pwimsa104-01.doc
Consultant Statement of Special Skill~ and Qualifications:
CTrYOF
PO BO~ 147
c. ja,~. IrdN 55317
6ufldhlg Inspections
Plane: g~.~7.1100
F~;: ~2 22111~
Eqlfleedng
H, or~' 952.2271160
Fax: 9~227.1170
Filial
Phone' 9r-~..,~71140
Fax ~? :)27 '1110
Pa~'k & Rl~&lUon
Ph:me: 95,?. 2271120
Fax-952.2~71110
q~feal~, n Cefl~
2310 CouIler 80LjleV,ltd
Pnore.. 95222714t:)0
Fax' ~2 2211.104
PtLtmlflg &
NilW'II Resources
PII~: 952.~7.1130
Fax 9~ Z~? 1110
Plddh: Wo~s
1.591 Pa~k Fto~l
PI,cms: 9522:27 1300
Fax: 952.221.1310
Phofl~: 952.227. ! 125
Fro' 952.2~71110
Web Site
www. cl.~ ~ ~
Quieter is Better
The City of Chanhassen is seeking proposals for Professional Engineering
Consulting Services to assist in administering its proposed 2004 Residential
Su~,~et Improvement Project. The project was identified in the City's Pavement
Management Plan and includes a portion of Del Rio Drive, Santa Fe Trail,
Santa Fe Circle and Laramie Circle in the Western Hills area of town. We
understand the scope of the project may be adjusted to include Kiowa Avenue,
based on recent developments with the sanitary sewer system.
The Bonestroo team assigned to this project has a strong understanding of
Chanhassen's infrastructure, and an effective working relationship with City
staff. Phil Gravel, P.E., has worked in the community for more than 10 years
and will lead our team. Mark Stalz and Eric Lembke have each worked in the
community for more than six years, and will assist Phil with both project
design and inspection. Kevin Hoglund will provide assistance with traffic
control and staging, while Mark Hanson will provide overall quality
assurance.
Based on discussions with City staff and our site inspections, we anticipate the
need for street reconstruction and some utility replacement in the project area.
We have stmc~ our Feasibility Study Phase to include a Draft Report to
better define the actual project scope before preparing the Final Report and
preliminary assessment roll. This will be critical to allow the City to analyze,
review and define the project scope prior to any public meetings.
We understand that communication is a critical component of any project
undertaken by the City. Weekly email updates and meetings to discuss critical
path items will be important as the project progresses. Another key to
successfully completing this project will be excellent communication with the
neighborhood. We will facilitate a neighborhood meeting during the
Feasibility Phase to gather input from the residents. We also plan to have a
neighborhood meeting during the Design Phase to review the proposed
construction with the residents. Finally, we will have extensive
communication with residents and City staff during the Construction Phase by
handing out regular "Construction Notices," setting up a "Project Hofline,"
and establishing a project web page. In other communities where these
communication methods have been implemented, a significant drop in
construction related telephone calls to City officials have been noted.
Keeping the public involved and informed is critical since assessments to
benefiting properties will help fund the project. We will work with the City to
get the word out about the project early on, during the Design Phase, and as
work progresses. This will help minimi?~ surprises, and keep City staff phones
quiet.
C OF
CHANI E
PO Bo~ 147
CNk~, MN 5.5317
Building Inspections
Ph~e: 95~271180
Fax: 952.22111~
Eagineedng
Pr~om 9~2.271169
Fax: 952_227.1170
PI',oie' 9522271140
F~.- 952~7' ]110
Pad[ & Rlcreallon
P~cne: 95,?. ~11120
Fax' 952.227 1110
FIc-.cleabon Cerllef
2310 C .ouller 8r~lev~d
Ptlope:. 952.~71400
Fax' 952 ~71404
Plalnllg &
Ibtuml Resoarces
Ptx,-~: 952..227.1130
Fax 95,?. ~? 1110
Pldlllc Works
159'1 PaflL Road
Pl~.~e: 95222'71300
Fa. 952.227.1310
seainrCmm/
Phoqe' 952227.1125
Fax-~71110
Web SHe
chanhasse~, mn uS
CITY OF CHA_NHASSEN
CONSULTANT WORK ORDER PROPOSAL FORM
Project No. 04-01
2004 MSAS Street Improvements
City Contact Consultant Contact
Teresa Burgess
Public Works DirJCity Engineer
PO Box 147
7700 Market Boulevard
Chanhassen, MN 55317
(952) 227-1169
tburgess @ ci .chanhassen.mn.us
Laurie John~qon
Principal
7510 Market Place Drive
Eden Prairie, MN 55344
(952) 829-0700
ljohn~on@htpo.com
Project Description:
Rehabilitation/Reconstruction of City Residential Streets. Allocated Funds for thi~
project axe:
$515,000 General Ftmd ($858,000 with Assessments)
$300,000 Utility Fund ($500,000 with Assessments)
Projects are anticipated to be assessed to abutting ~ owners at a rate of 40% of
project cost for existing features and 100% for new amenities.
I I Person Hours I Fee
1. Feasibility Study : ... -.. ' ' :"' ·..
1.1 Project Kick-off meeting 4 400
1.2 Analysis of existing conditions 8 700
1.3 Analysis of alternatives 8 600
1.4 Cost Estimate 8 600
1.5 Assessment Roll 8 600
1.6 Report Prep~on 16 1,300
1.7 City Staff Meetings/Weekly Ulxlates 6 600
1.8 Project Open House 10 800
1.9 City Council Meeting 4 400
Total, Phase I 72 6,000.00
2. ~ ~ ,a~l Contm.~./ ~~~.. . . " " ~ .... "' .:?i...?.:.:.:· ..~,:: ' ~. ' ..... :':~i:..~:,--.
2.1 Topography 90 5,500
2.2 Phms and Specifications 220 14,500
2.3 Bid Quantities/Engineer's Esdmate 16 1,200
2.4 Permit Applications 8 500
2.5 Cit7 Staff Meetings/Weekly Updates 20 1,900
2.6 Bidding Services 24 1,700
2.7 Assessment Heating 4 400
2.8 Cit7 Council Meetings 8 800
Total, Phase I1 386 26,500.00
3. Combo. ~tneering ~ia a~-b~t'~~'~." .. :" i'i ~ ',:.- "" :"" '
3.1 Pre-Construction Meeting 8 600
3.2 ConsmmSon Inspection 275 23,400
3.3 City Staff Meetings/Weekly Utxtates 16 1,600
3.4 Consmmtion AdminLstration/Pay Requests 30 1,900
3.5 Consmmion Staking 140 8,800
3.6 As-built Drawings 30 2,100
C OF
CHANHASSEN
PO Box 147
C~, MN 5531
Admlmlf~lU~
t~: .~2..2271100
Fax ~..,2.Z27 i110
Suildl~ Inipe~do~
F~ne. ~,~? 1180
F~x: 962 22? !190
Eq~udflf
~ 952~71160
Fax: 9:5Z~7.1170
FJMm
i:~:~m'. 952.,~71 t40
Fax-952_22? 11 I0
Park & Ree~'eaUon
Phcne: 9522271120
Fax' 952.227 1110
Fi~:eal~[i C~iI~
2310 Co~l~ 8o~levm'd
Phor~ 952.2271400
Fax- 95222?. 1404
Pfa~niag &
Natural Resomfk'es
Phone: 9r----~227.11~
Fax. 9~ 227' 1110
Pldlllc Wodm
1591 Park Road
PIw~. 952.2271300
Fa~ g52.227.1310
P~ae' 95~27.1125
Fax. 95?_22.71110
Web Site
m,4w. Ci ct~a5.~ mn ~
Total Project Fee
does
does not
include copy fees.
Thc above fees are based on the following assumptions:
· This project is for complctc rec. ons~on including street, sanitary sewe~,
watermain and storm sewer. Assumes stormwat~ ponding/tre, atment will not be
· This project will inclnde approximamly 1,500 feet of street and utility
recons~on with a construction duration of 45 working days.
· Additional rigJ~s-of-way or eascn~nts will no~ be required.
· Ge, otechnical testing services will be provid~l by others. R is our understanding
tha~ soil borings have already been completed on Santa Fe Trail.
CITYOF
CHAN EN
ThX) I~,~J~ Ikq. Jlevato
C~'d',a~, MN 55317
AdAmmmlm~n
.q, me' _Q52 227' llOO
F~x 952.227' !110
BulMi, I inspmclJons
PI~,-95~2271180
Fax: 952 227' I1~
Pr, ore ~711 ~
F~- ~Z. 1
Ptwe' 9522271140
Fax- ,7a2_2271110
Pad[ & RecfeaUon
Pf'e, ne: 952.227119
Fax- 952.2271110
Z310 CouJler 8Ol,~levaJ'd
Prlope: 952.ZZ71400
F~: 952 2211404
PfaJmlng &
Ihturll Resources
Phtqle: 952 227,.!130
F;~ g52 ~Z 1110
Pldlllc Wnfkl
1591 ~k Read
I:~: 952.2271300
F~x. ~2.22Z.1310
Siiior Cefltlr
Ph~. 952~7.1125
Fax; ~:~7...2Z71110
Web SHe
w'#,,.ci cflarlh~ ri'ir, ,A
Consultant Statement of Special Sldl]R and Qnnlificafions:
'Po
Englneedng- Surveylng
Landscape AJ'chitecbJm
HTPO's team consists of engineers and construction inspectors experienced in the
design of street and utility improvement projects for the City of Chan_hassen and
other municipalities. Recent pavement reconstruction/repair projects include:
City of Chanhassen, MN - 2002 M_SA Street Improvements
HTPO provided a feasibility report, p~lirrtinary cost estimates and prelimina~
assessment rolls for alternatives, preparation of plans and specifications for submittal
to MnDot for State Aid Funding, and for bidding and construction, permit
applications, bid a~trati~ contract management, construction
inspection/observation, and construction administration for the overlay of Lake Lucy
Road, Saddlebrook Curve, Lake Drive/Lake Drive East, Audubon Road, and Coulter
Boulevard
City of Minnetonka, MN - Clearwater Drive and Townline Trail Improvements
HTPO provided civil engineering services including feasibility study, constzuction
documents, construction adn~:mti~ project management, as well as surveying,
construction staking, landscape architecture and construction inspection/observation
services for the reconstruction of Clearwater Drive. The state aid funded project
involved street reconstxuction and 7-lane roadway widening at Highway 62. Other
characteristics of this project included extensive public involvement process, turn
lane~median improvements, pedestrian trail and sidewalk, MnDot permitting, and
extensive coordination with NSP, U.S. West and Minnegasco for relocation of private
utilities.
City of Minnetonka, MN - Meeting Street Public Utility Installation and
Street Reconstruction
HTPO provided a comprehensive package of services including civil engineering,
surveying, landscape architechxre, project management, construction inspection and
staking. This project presented a unique challenge requiring special focus on the
preservation of natural woodlands and wetland environment surrounding existing
privately owned estates while accomplishing the City's request for needed water,
sanitary sewer, stormwater collection and roadway improvements. HTPO worked
openly with and encouraged public involvement from the effected land owners in
this sensitive project fax)m it's inception to completion.
City of Eden Prairie, MN - Lincoln Lane/Forest Hill Road
HTPO provided surveying and civil engineex4.ng services for the completion of
preliminary design for a feasibility study, construction documents and construction
administration. Construction staking and inspe~on serv~_'c~_ were also provided by
HTPO. These projects were street reconsmaction/extemion projects within existing
Eden Prairie neighborhoods. Design characteristics included coordination with
County improvements, sidewalk with steep connection to adjacent neighborhood
and storm sewer improvements.
We welcome the opportunity to work with the City of Chanhassen, and appreciate
you considering HTPO for this project.
ClTYOF
CHAN SEN
147
~.MN55317
Admlalflrallon
Phone.' .Q52.2271100
Fax 952.Z27 II I0
Bulldlfll Inspections
PII~i~' 9~.227118~
Fax: 95~) 22111~
Ellgioe~dng
Pflcme 95222.71160
PI'o~: 9522271140
F~- 9~Z.,~? 1110
Park & Recr#Uon
P~c~: 952 ~71120
Fax-957..2~? 1110
Re:realm Ceme[
~10 Couller 8ot,devetd
Ptmrle: 9522L~' 1400
Fax 9~'~? 1404
Ptamllng &
11110111 RIIolnas
Phone: 95,?. 227.1130
Fax 9522211110
Pldlllc WOlfS
1591 Park ~
P~4~e: 952.,~7 1300
Fax. 952.227.1310
Senior Center
CITY OF CHANHASSEN
CONSULTANT WORK ORDER PROPOSAL FORM
Project No. 04-01
2004 MSAS Street Improvements
City Contact Consultant Contact
Teresa Burgess
Public Works DirdCity Engineer
PO Box 147
7700 Market Boulevard
Chanhassen, MN 55317
(952) 227-1169
tburgess @ci.chanhassen.mn. us
Mike Foertsch, P.E.
Client Service Manager
Jason Sprague, P.E.
Project Manager
(612) 7584805
jsprague@sehinc.com
Project Description:
Rehabilitation/Reconstruction of City Residential Streets. Allocated Funds for this
project are:
$515,000 General Fund ($858,000 with Assessments)
$300,000 Utility Fund ($500,000 with Asse, ssrn~nts)
Projects are anticipated to be assessed to abutting property owners at a rate of 40% of
project cost for existing features and 100% for new amenities.
I I Person Bouts I Fee
1. Feasibility Study ' " '~: " ..~..'." ..,-.: .:!:. . ::.:'.' .- .-
1.1 Project Kick-off meeting 20 $1,800
1.2 Design Survey 340 $30,600
1.3 Report 160 $14,400
1.4 City Staff Meetings/Weekly Upd~te~ 30 $2,700
1.5 Project Open House 30 $2,700
1.6 City Council Meeting 20 $1,800
Total, Phase I $54,000
2. Pr~Uminary neagn ami. ContraCt.'. ~~ :':!:., ?.' '"'..' :~' ":: .... "' '/' ·
· ~
2.1 Final Design 450 $40,500
2.2 Project Specifications 120 $10,800
2.3 City Staff Meetings/Weekly Update~ 20 $1,800
2.4 Bidding Services 30 $2,700
2.5 Assessment Heating 60 $5,400
2.6 City Council Meetings 20 $1,800
Total, Phase 1I $63,000
~. constru~on ~.ngin~ anala~,b.'uilt~~'~ :.::'.-L .:.- -'.. '.-:'. .... .-... '- .'..'"'-:
3.1 Pre47;onstrucfion Meeting 50 4,500
3.2 Construction Inspection 330 29,700
3.3 City Staff Meetings/Weekly Updates 30 2,700
3.4 Construction Survey 340 30,600
3.5 ~on 50 4,500
3.6 As-built Drawings 70 6,300
Total, Phase 1II 78,300
· ?. . ..
'~' 'i ~ '~ ' '
Ph~- 952227.1125
Fax 952.22] 1110
Web Site
v, vW. Cl.d'ard'.men mn ~.
Total Project Fee
does
does not
include mileage and copy fees.
Ad~bl~'M~
Pll~-.~.2271100
Fa~ ~? t110
Ihdldlnl Inspection
Pr, one 952227' 11~
Fax: 952 221.1190
Eaginudng
PI?me 9~2.2711~
Far 952.227.1170
FJMIIC$
Ptlefe. 952 227.1140
F~' 952.2271110
Pad[ & RlcreaUon
PI'~: 9r-~.22711~
Fax' 95E2211110
ilr,,,eation Center
23]0 CoulW 8ooevad
PIi(~. 95~,227 1400
Fa-952.2271404
Manning &
Natural Resoufees
Pi~-qle: 952.221.1130
Fax 962.2271110
Ptdlllc Wefts
1591 Palk ~
Plwe. 9522211300
Fax 952.2211310
Fax' 95222-71110
Web Site
'a',~Aq,".ci Ct'LaJlha~efl n"m c~
Consultant Statement of Special ~cills and Qualifications:
Our philosophy for local street and utility reconstruction is to involve the
public early on in the process. Input from the public is crucial to the success of
a local 429 project.
We believe in a thorough design survey in thc feasibility report stage of thc
project so accurate cost estimates can be tabulated and design concerns
identified before thc actual design beCns. When accurate design information
is obtained early on, fewer problems during construction result.
Our preliminary construction cost estimate indicated the City has allocated
budget to include the following:
· Santa Fc Trail and Circle,
· Iq[iowa,
· Iroquois,
· Huron.
Preliminary budget estimates show consideration can be given to W. 76"'
Street and Chan View as well.
Please contact your neighbors at Minnetonka and Eden Prairie for an
indication of the quality of service we can provide thc City of Chanhassen.
C OF
7700 I~ Bo~(I
~ Box 147
~, MN 55317'
Adibl~tmUml
Phone- _~.2271100
Fax 9~.~.2~? 1110
CITY OF CI-IAN~ASSEN
CONSULTANT WORK ORDER PROPOSAL FORM
Project No. 04-01
2004 Residential Rehabilitation/Reconstruction Improvements
Teresa Burgess
Public Works Dir./City Engineer
PO Box 147
7700 Market Boulevard
Chanhassen, MN 55317
(952) 22%1169
tburgess @ci.chanh0ssen-mn.us
Mr..Ion Horn, P.E.
Project Manager
Kimley-Hom and Associates, Inc.
2550 Unive~ty Avenu~ West
Suite 345N
St Paul, MN 55114
(651) 645-4197
ion.horn@.kim!ey-.hom.com
BuDding inspections
Pl~rle-952.22," 1180
Fax: 95~ 227.1190
r:qlneeflng
I:~,e 952227' 1160
Fax: 95Z2.27.1110
FIMm
Pl~0~. 952.2271140
Fax' 952_2271110
..
&
PI~: 9522271120
952.2271110
Recle,2m Cerller
~10 CoLJl~r
Pllom. 95~.227'.1400
Fax: 952 2271404
Plamdlql &
illttnl Resources
Phorl~: 952 :~[.I131)
Fax. 952 2211110
PMdic Winks
1591 Park P~cI
Pl'zm 9522271300
F~t ..qSZ.2211310
Senior Cemr
PhCXle- r.~,~..227.1125
Fax-952..2271110
Web Site
www. ci Ctla~ ,'rm.
Project Description:
Rehabilitation/Reconstruction of City Residential Streets. Allocated Ftmds for this
project are:
$515,000 General Fund ($858,000 with Assessments)
$300,000 Utility Pund ($500,000 with Assessments)
Projects are anticipated to be assessed to abutting property owners at a rate of 40% of
project cost for existing features and 100% for new amenities.
1. I Project Kick-off Meeting 4 $600.00
1.2 Data Colle~don including: 4 $400.00
1.2.1 GIS Database
1.2.2 As-Builts
1.2.3 R.O.W. Maps/Agreements
1.2.4 Picture,qVideo
1.2.5 Field Review w/City Staff
1.3 Prepare Draft and Final Feasibility 60 $6,000.00
Study including:
1.3.1 Intro/Summary
1.3.2 Proposed i ,mprovements
1.3.3 Cost Analysis/Financing
1.3.4 Project Schedule
1.3.5 Easements and Permits
1.3.6 Recommendations
1.3.7 Preliminary Assessment Roll
(Prepared by City Sta~
1.4 City Staff Meetings/Weekly Updates 12 $1,800.00
1.5 Project Open House 8 $1,200.00
1.6 City Council Meeting 4 $600.00
1.7 Reimbursable Expenses $600.00
Total, Phase I $11,200.00
2. Final ~ and Contraet"~t~i :.,, :":?:.., '" ';.. "~;_.-.. ':".,,.,. "~:~:. '",,, :'".. ':::'-" '...,.. ': ...' .... "' :"
including:
2.1.1 Title Sheet
2.1.2 Cons~on Details and Notes
CffYOF
CHANHASSEN
PO Box 147
C~hassen. k~N 56317
~mlmlmbitlon
Ptl3)~l 9r'd~,227.1100
95222? i110
Building Inspections
P~.ne 952.227 i180
Fax: 952 227.11~
En01meering
F~fJ~ 952.2271160
Fax: 9Lr~ ~'27.1170
PIXy' 9c,~.2271140
Fax' ~:~ ~71110
Pad[ & Rw#flon
F~: 95,?. 2271120
Fax 952.227111o
231o Co~ller 8oulev~d
~ or~.. 952,227.1400
Fa~: 952 2271404
Planning &
Natural Resources
Fq~: 952_227.1130
Fax 952227.1110
Nklic Win'ks
1~1 Park P.~I
P1',d~e: 9522:271300
Fax. ,~:~..227.1310
S~ior Cruder
Phore' 952227.1125
Fax' 95'!2271110
Web SHe
w~:ci.~ ri'u1 uS
2.1.3 Removals
2.1.4 Erosion Control
2.1.5 Roadway Plan and Profile
2.1.6 Storm Sewer Plan
2.1.7 Sanitary Sewer and Watermah Plan
2.2 Permits including: 16 $2,400
2.2.1 Watershed District
2.2.2 NPDES
2.2.3 Health I:L-=~L (if necess~)
2.2.4 MPCA (ff necessary)
2.3 Prepare Final Ell~ncer~ Estimate 6 $600.00
2.4 City Staff Meetings/Weekly Updates 16 $2,400.00
2.5 Bidding Services 20 $3,000.00
2.6 Assessment Hearing 8 $1,200.00
2.7 City Council Meetings 8 $1,200.00
2.8 Reimbursable Expenses $3,500.00
Total, Phase li $59,300.00
~-!mli, ii~~_,..:-":"-'-.~:.:":';--i .... : ":':':'
3. Co-,traCon ~:.~,,_~.r~.e,.nd :~) ~.._-,., · ..... .;.~.?.'?.i~.,.':'. --"'"-
3.1 Pre-Construction Meeting 8 $900.00
3.3 City Staff Meetings/Weekly Updates 24 $3,600.00
3.4 Prepare Monthly Contractor Payment 32 $3,800.00
Vouchers and Final Payment Document
3.5 Construction Staking. 160 $21,000.00
3.6 As-built Drawin~ 24 $2,700.00
3.7 Reimbursable Expenses $7,500.00
Total, Phase III $111,500
· '~' " ~'-:'" .$~i~060.00'..
?o~ ~j:ea'l~ee' ,.. :... ..
Total Project Fee
[--[ does not
Include mileage and copy fees.
SPECIAL NOTES FOR CLARIFICATION:
Section 1 Feasi~ty Study
h.
a.
C.
D.
We will provide the estimated project costs and assessment amounts to
City staff for staff preparation of Assessment Roll.
A detailed field survey is not inclnde~ Depending upon the final project
scope a more detailed survey may be needed.
We will provide project information for the Open House but assume that
the City will coordina~ the invitation mailing, postage, etc. We can
provide these services as ~_ddifional services ff requested.
We understand that this project will likely include sanitary sewer and
watermain i .mprovements; however, the scope of these i ~mprovements is
not currently defined. We have assumed that the feasibility study will
include an investigation to determine the need for sanitary sewer and
watermain i ~mprovements. Our estimated fees for subsequent phases of
the project do not iucl-~e any fees for wamnnain and sanitary sewer
i .mprovements. We can provide these estimated fees at a later date after
the scope of the work has been deterrnin~
C:~wam~ats ami Se~n~s~wes~fl Settings\~ lnmmet Files~~.n~,q~a-:Resifleotial Recem
C OF
7700 IVi~k~
PO Box 1,47
cr~qh,:Y~..~ml. MN 55317
Adnllalsb'aflen
l~.:~e' 962.22? 1100
Fz~ 9~.,2.7~' ;110
Buildlfll Inspections
P~ne' 952,2271180
Fax: 952 221 !190
Engineering
P~,ne-95~2.271160
Fax: 95222.7. I 170
F'r,o~' 95Z~71140
Fax-~? ~71110
..
Pa~k & Racraatlon
F~:~o: 957. 221.11~
F~- ~.~71110
F~' ~.~7.1~
PManlng &
Nattlml Resom'ces
Pl'k.'~qe: 952.221.1130
Fax. 9r~ ~? 1110
Pk-klic Worts
1591 i~k Road
Pl,~e: 95~Z~'713~
Fax. 9~:~..22 ? 1310
S~ldor Cenler
PI~' 95~7.1
Fax- 952.7)? 1110
Web Site
Section 2 Final Design and Contract Documents.
A,
B,
As per your e-mail, we revised the rifle of this section from preliminary
We have assumed one assessment hearing only w'ithout any appeals or
additional requirements. We will be happy to assist staff beyond one
hearing (if necess~) as s_d~difional services.
Section 3 Construction Engineering and As-built Drawings
ho
B,
We have assumed full time construction inspection for the majority of
the project schedule. If part time inspection is allowed, it would
substantially reduce our proposal cost.
We have assumed full field staking of line and grade. An alternative is
to provide control point "only" staking to the contractor and make it
their responsibility for line and grade staking. If we make line and grade
staking the contractor's respomibility, it would substantially reduce our
proposal cost.
kdmLidl#lUon
Pt~. ~?.1100
Fax 952.2271110
BulMiq I~dions
Phol~- ~.~? I1~
Fax' c3~.~? ~190
Engln#dng
~ 9522271160
952227.~170
FhialiC6
Fax- 9~,_~? 1110
Pad[ & Rt~felUon
Plm~e: 952 ~71120
Fax. 952.227 11 I0
~eallOn Ce~llel
2310 COLJP~ 8OL,,evaJ'd
Fax 952 22? 1404
PImmlng &
Natural Resom'ces
PixY: 952.227.1130
Fax 952.227,1110
PMIII~ Worn
1591 Pa~k R~
Ply. m, 9522~71300
F~. ~..22 ? 1310
Phore' 952..227.1125
Fax- 9f9_2271110
Web Site
Consultant Statement of Special Sidll~ and Qualffications:
Kimley-Horn and Associates, Inc. is pleased to have the opportunity to provide
professional consulting services to the City of Chanhassen for the 2004
Residential Street Rehabilitation/Reconsmaction Project, City Project 04-01. Our
special skills and qualifications specific to this particular project are highlighted
below.
PROJECT TEAM
Specific staff assigned to this project for project leadership, management and
delivery are Jon Horn and Gary Ehret. Between Jori and Gary, we offer over 40
years of combined consulting engineering experience in the Twin Cities, with a
majority of that experience in providing general municipal consulting services.
Jon and Gary have provided residential street reconstruction and M_SAS street
construction/reconstruction servi~ for numerous communities in the past
including Chanhassen, Shoreview, Roseville, Burnsville, Anoka, Columbia
Heights and Inver Grove Heights.
A lesson learned from each of these community experiences is this; Always
keep an open mind, do not have preconceived solutions, listen to the input of
staff and the public and over-communicate.
CHANHASSEN EXPERIEN~
Jon and Gary have served as the project manager for numerous projects for the
City of Chanhassen since 1987. These projects have included street
reconstruction projects (both residential and MSAS streets), sanitary sewer
rehabilitation projects, parking lot and site improvement projects, building
demolition, and park improvements. We are very familiar with the City and many
members of City staff.
PUBLIC INVOLVEMF~NT
Successful public involvement is one of the keys to the successful implementation
of a street reconstruction program. This public involvement needs to start early in
the feasibility study phase of the project and continue through the completion of
construction. We understand the need for public involvement as a part of this
project and are committed to working with City staff to develop a proactive public
involvement process. We are experienced in all types of public involvement
including open house meetings, public hearings, preparation of project mailings,
field communication with residents and using the City website as a public
involvement tool.
AVAn~ABTIJTY
Jon, Gary, and our en~neering production staff are immediately available to
begin work on this project. We are committed to providing you with quality
services and to working with City staff for the s~sful delivery of this project.
and $ _eq"fi n ~o~n~e:resab~Loca]
CITYOF
CHANHASSEN
~00 ~ Bcv, Jl~va~d
PO BOX 147
Cll~ll,,at~. MN 55317
Admlll~lTItlen
Pie',ne: .Q52~71100
Fax ~..,2.22Z {118
Bufldlflg Inspections
Phone: 952.2271180
Fax: 95~ 227.11~0
EngLqeedng
95222.71160
Fax: ~ P27'.II70
FIMIICI
P..l~ne' 952~7 ! 140
Fa]( 95Z.Z271110
Park & RecreaUon
Pf,~: 952. 2~7 !120
Fax-952.2271110
RecleahO]l C~lef
2310 Cou~ 8~w,lJ'd
Pllooe:. {~22271400
Fax 952. 2271404
Plamfllng &
Natural Resomces
Phone. 952227.1130
Fax 8522271110
PMiIIc Works
1591 Park Rcad
I~.:~e; 9r-:J2 2271300
F3x 952.227.1310
SedorCem. r
I:qlorle- 952 ~7,11~
F~_ 952.2271110
Web SHe
'~,vzC{.~ mr, ~
CITY OF CItANHASSEN
CONSULTANT WORK ORDER PROPOSAL FORM
Project No. 04-01
2004 Residential Street Improvements
City Contact
Teresa Burgess
Public Works DirJCity Engineer
PO Box 147
7700 Market Boulevard
Chanhassen, MN 55317
(952) 227-1169
tburgess @ ci.chanhassen-mmus
Consultant Contact
Marcus Thomas, P.E.
Project Manager
BoRon & Menk, Inc.
1515 East Highway 13
Burnsville, MN 55337
Office: (952) 890-0509 Cell: (612) 859-6526
marcusth @bolton-menlccom
Project Description:
Rehabilitation/Reconstruction of City Residential Streets. AII~ Punds for this
project are:
$515,000 General Fund ($858,000 with Assessments)
$300,000 Utility Fund ($500,000 with Assessments)
Projects are anticipated to be assessed to abutting property owners at a rate of 40% of
project cost for existing featur~ and 100% for new amenities.
I I P...e~son Hours I Fee
· . .. .
1. Feadbility Study " . ... .. ..~ .... --:- . --'.-.'-.....
1.1 Project Kick-off meeting 4 $ 360
1.2 Prope~ Owner Input
1.2.1 Prepare residemt questionnaire for
City ma~ling 2 $ 180
1.2.2 Summarize results for feas. report 4 $ 260
1.3 Obtain & review GIS, ROW and As-built info. 16 $ 1,040
1.4 Geotechnical Evaluation & Reammmendations
(Braun contract directly with City. See
separat~ proposal)
1.5 City Staff Meetings/Weekly Updates
1.5.1 Two (2) City Staff review meetings 6 $ 465
1.5.2 Weekly Updates 4 $ 360
1.6 Prepare written report 80 $ 5,705
1.7 Project Open House
1.7.1 ~on for meeting 8 $ 520
1.7.2 Meeting attendance 8 $ 620
1.7.3 Prepare minutes for feasibility report 2 $ 130
1.8 City Council Meeting 4 $ 360
~nt Feasibility Report)
Total, Phase I 128 $ 10,000
· ... . · ...-.- . . .'.. ..
2. Final Deli,tm and Contract Doenments'" ... ..-'.;-.... .- .. .'...' .- -.
2.1 Topographic survey 150 $ 7,500
2.2 Preparation of construction plans 400 $ 26,400
2.3 Preparation of construction specifications 40 $ 3,600
2.4 City Staff Meefings/Weeldy Updates
2.4.1 Two (2) City Staff review meetings 12 $ 930
2.4.2 Weekly Updates 4 $ 360
2.5 Bidding Services 10 $ 550
CITYOF
CHANIJA SEN
PO Box 147
~,1dN55317
Mmlnl~rMlon
P~, 952.22? 1100
F~.x ~,,2.~7' !110
Building inspection
?r~ne 952.221.1180
Fax: ~2 2~1.119(}
Engineering
Fax. ~..~?.1170
Finaftc~
P.~m~e' 952.227 it40
Fax ~ 1110
~ & Re~'~aUon
Plw'~; 952.2271120
Fax' 952.227 1110
Planning &
Natural Resources
Pht'~: 95,?.~?.i130
Fax 9522271110
Pablic welts
159'1 Palk Poad
PI~. 952227.1300
F~ L~:~2.227.1310
S#ior Ceate. r
Pt~-952.227.1125
Fax 952.2271110
Web Site
www. C& ci'Larilla~sefl nm
2.6 ~ent ltearing 4 $ 360
2.7 City Council Meetin~
2.7.1 Present final plans 4 $ 360
2.7.2 Preacnt contract~ bids 4 $ 360
Total, Phase IT 638 $ 40,420
3. Conntruction En~n~rinEnnd A~bUJ]~i~~-i:'.' -~ .'* '--'i'.:?~'' · -": .' ".'-.-'i' ~:'''
3.1 Pre-construction Meeting
3.1.1 Prepare agenda 2 $ 180
3.1.2 Meeting atte~~ 8 $ 620
3.1.3 Prepaxe minut~ 2 $ 130
3.2 Construction lnnpeetion 500 $ 30,000
(Basis = One obsexver for 10 weeks @
50hrs per week)
3.3 Construction Administration 70 $ 6,300
(Project Manager involvement)
(Basis = 10 weeks @ 7 hfs per week)
3.4 Constructio~ Newsletters 8 $ 720
3.5 Construction Stnldng 180 $ 9,900
3.6 City Staff Mee~eekly Updates
3.6.10n~ on-site ~g pex week, 10 total 30 $ 2,700
3.6.2 W~kl_¥ update~ 5 $ 450
3.7 As-bnilt I)rawln~ 40 $ 2,600
Total, Phase RI 657 $ 53,600
, , ,;' ..
Total Project Fee
does
[-I aoe, s not
include mileage and copy fees.
This proposal is based on the reconstm~ction of one of the following groups of resi~
streets with a magnitude of $600,000 in consmiction costs.
Or0up 1
Del Rio Drive
Santa Fe Trail
Santa Fe Circle #1
Santa Fe Circle ~2
Gronp 2
Kiowa Avenue
Iroquois Avenue
Huron Avenue
CITYOF
CHANHAS EN
Make BaJlevar~
PO Box 147
C~. UN 5~317'
Admhllstrlllon
Plefle- _~j~ 227 ! 100
Fax 9-~.22Z' $110
Bulldtnl InlpecUons
Phone' 952,2271180
Fax: ~ 227' 1190
E.ell~eednl
P~ll. Jrle 9.5222.7116,0
Fax; 952_227.1170
Fhllllll
P:'~e- 952.227' 1t40
Fax 952.22711 I0
Park & Rlf, matlon
Pl~e: 952.2271120
Far 9~.~71110
~10 Couler
Prime.. 952.22.7.1400
Fax 952 227' 1404
Plmudng t
Natural ResOlrees
PI1L~: 952.227.1130
F3x 9~ 2~7 ltlO
PMdi~ Wod~
1591 Pak R~
Plwe: 9522271300
Fa 9~2271310
Sealer Center
Phone- 952227. il25
Fax- 952.227 II10
Web Site
Consultant Statement of Special ~ctll~q ami Qualffications:
Bolton & Menk, Inc., has built its reputation on municipal street
rehabilitation projects by focusing on those ideals which define the success of
these projects. These ideals include:
~ Our Client's residents are our customers too. We recognize the residents'
vested interest in the value, function, and aesthetics of our designs, and
insist on meaningful commmcation and input from them.
~ Successful infrastructure management demands cost-effective design. We
analyze the initial capital investment and consider the potential life-cycle
costs of various rehabilitation techniques.
1~ Successful coordination with regulatory agencies is critical to the succ~s
of municipal projects. Our experience and relationships with Mn/D~,
counties, watershed districts, railroads, and permitting agencies facilitates
the cooperation needed to keep a project on schedule and to obtain its
necessary approvals.
Bolton & Menk, Inc., encourages early communication with residents by
soliciting their input on local cone, eras. On past projects, we have worked
with City staff in developing questionnaires that are distributed to the property
owners that would be assessed. The input generated by this questionnaire is
given consideration during the feasibility phase of the project and is included
in our report for the benefit of the City Council. We also include minutes of
any neighborhood or public meetings in the feasibility report. During
construction, we typically prepare newsletters as necessary informing affected
property owners of the project's stares, giving them direction on construction
related issues such as safety, parking, garbage collection and bus stops., and
offering our project representatives as resoumes for questions and concerns.
By coordinating necessary underground utility improvements with surface
improvements, Bolton & Menk, Inc., evalumes cost-effective design. We give
consideration to the life expectancy of those existing utilities beneath proposed
mad improvements, and we recognize the effectiveness of trenchless
technologies where they are appropriate. When offering recommendations for
pavement rehabilitation techniques, consideration is given to all available data
on current pavement and underlying soils conditions. As a cost-effective
approach to street reconditioning, our designs consider the existing integrity of
pavements, and our reconstruction designs focus on longevity and low
Bolton & Menk's experience with Mn/DOT and other regulatory agencies
gives us a thorough understanding of the regulatory requirements associated
with municipal street projects. We have a reputation of quality work with
watershed districts, the Department of Health, the MPCA and other permitting
agencies and stay apprised of their current requirements. Our understanding
of these requirements and our relationships with these agencies allow us to
complete projects efficiently while complying with regulatory requirements.