Loading...
1d. 2009 Street Rehabilitation Project 09-01: Accept Feasiblity Report and Call PH CITY OF, CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952,227. 1100 Fax: 952.227,1110 Building Inspections Phone: 952.227.1180 Fax: 952,227.1190 Engineering Phone: 952,227. 1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952,227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952,227.1404 Planning & Natural Resources Phone: 952,227.1130 Fax: 952,227,1110 Public Works 1591 Park Road Phone: 952,227.1300 Fax: 952.227,1310 Senior Center Phone: 952,227.1125 Fax: 952,227,1110 Web Site www.ci.chanhassen.mn.us .icL - MEMORANDUM <1~' TO: Paul Oehme, Director of Public Works/City Engineer Alyson Fanske, Assistant City Engineer rJ!f: January 12, 2009 a ~ . FROM: DATE: SUBJECT: 2009 Street Rehabilitation Improvement Project No. 09-0 I: Accept Feasibility Report and Call the Public Hearing PROPOSED MOTION "The City Council is recommended to adopt the feasibility report for the 2009 Street Rehabilitation Project and Call the Public Hearing for January 26,2009. City Council approval requires a simple majority vote of the City Council present." BACKGROUND Staff and City Council reviewed the proposed 2009 Street Improvement Project areas at the October 13, 2008 work session. City Council authorized the preparation of the 2009 Street Improvement Project at the October 27,2008 City Council meeting. For the 2009 Street Improvement Project, staff is proposing to rehabilitate approximately 3.1 miles of streets, including: Project Area # I: Urban Residential Chaparral Court Chaparral Lane Redwing Court Redwing Lane (S. of Kerber Blvd.) Pima Lane Pontiac Lane Pontiac Court Buckingwood Court Project Area #2: Rural Residential Lakota Lane Mandan Circle V ogelsburg Trail Project Area #3: Commercial/Industrial West 78th Street (Hwy. 101 to City Limits) 77th Street West 18ih Avenue Quattro Drive Chanhassen is a Community for Life. Providing for Today and Planning for Tomorrow Paul Oehme January 12,2009 Page 2 I '!<-::'t.- . I. -"t, ".. .- ......UJ'1 - -.J'"'1"l.."-CC';~~- ~ ..) , ~- ~ ~ ~ll o!'!"' .. r'1 rl ""...... J / r::."t-lj:- r. ")'--8) I ~' b ....... 1/- ,::r~-.., ,#'" ~ L . 'J'- .- b. L , .. m"" f "'lr-1;.... , I · I ' r\ I "--... ~..:'" -_1 -. <:.~ Project Area #3 ~ " r. 1-- /~/~ ":1"- ~-\:.~ '.~ r-f--l ~ I'; I ... ~"'''_ ,/' I ("- '.1-. -.. ( · L ,,"---' "-., .,.".,,1 1 \ -.,' '1~? .. (J..-- "l,- v'-- ... \.~.;J:2....~'>-,1 ""'.) \~''-?-r.( fir.' I ~---J\_/'- ;;.~tJ~). '\"~~~~ 1_ \ '\'::11 I \.;. " .' . . \ ......7 J I ,. .:.{-<- \., f ".... '- r I . { .... ( , It 't \ .. _pO t--~,;p~ "-~ Project Area #2 '..... ..-=t ,'/"" ._,,-,,;> .L{ '" ;..1-.'-."'\'" II \ - .. '-,.....J f t~ J(;;91'1 ". " ai; ---,' 1--...... -- f l .~ . . { I 1 . .~ 'i 1.-- -~ ..,... I.f,' ' -- ) ~.,. -",' <' (~. j '\ ~ I .", I ' Paul Oehme January 12, 2009 Page 3 c~f~{~r'~~f~~trr~~~.,~~~! " .............,...,...... , .'. \.-r. "-," ",..,~. llG\~ '."\ril~~~~~1t~H;~ji~!ltl~:~:,;~. c > ..J III VI Cl:; Ill' ~i 01 (; ., \ ,,' ) .~'.. \:, ~1' \./ ' I~'~/ .f-,ONTfAC= .,I.j 'I''''~''," .'''~~m~" ~ h_J Me3dow Green Park z.. {}~~~" UJ I '1~[' (j I 'ct.! ~ ~,,__,_..j.:... IO~l ,~._L_~=_li KERBER BLVD Project Area #la: Urban Residential (Low Density) Project Area #lb: Urban Residential (Medium Density) :; J ..' A\f;::~~~ .. ,J . 1[;:'''''''_',( J h '~: :~;'<{~:< :;:;:'0:/; ~ ! <"1'111~~;~~~;~7'~~: 'rw~1;:t::;.~;(,. ...: ~.....-: I l 18i30 , ,,' l ~ ~ : " ,.\.,~~'.,~ rJ :..~ ". ,I gl: 'I ~ // ..::;~t.,~....- L 80 I 78 .14 l I~ I;' ~ 7no ( ....~: ....,..J'~W[5TT8rnSTR[[t~I.." ___~r_l- / Project Area #2: Rural Residential Project Area #3: Commercial-Industrial The street segments within the proposed project were identified by the City's Pavement Management software in conjunction with site investigations, The proposed improvements generally consist of milling and overlaying the pavement surface, removal and replacement of severe pavement distresses and minor drainage improvements within the project areas. The project also includes miscellaneous sidewalk and concrete curb and gutter replacement at various locations throughout the City and the replacement of the TH 5 pedestrian trail from Dell Road to TH 101. The original proposal presented to City Council in October, 2008 included directionally boring a replacement sewer forcemain within 77th Street Subsequently, in November, 2008 there was a break in the watermain within 77th Street Given the condition of the exposed watermain, staff requested funding G:\ENG\PUBLlC\"'2009 Projects\09-01 2009 Street improvements\01-12-09 accept feasibility call public hearing.docx Paul Oehme January 12, 2009 Page 4 to replace the waterrnain within 77th Street using the directional bore process. Once funding was granted, staff felt that the utility improvements within 77th Street should be bid separately from the 2009 Street Improvement Project, therefore, the replacement of the sanitary sewer forcemain within 77th Street is not proposed under this project. The City of Eden Prairie has budgeted to overlay Dell Road north of Highway 5. A portion of this road lies within the City of Chanhassen, specifically the western lane between the northern Chanhassen City Limits to Highway 5. The City of Eden Prairie estimates that Chanhassen's share of the overlay cost is $75,000. This work is proposed to be paid entirely through City funds, therefore, is not included in this project or the proposed assessment roll. A neighborhood open house was held on November 12,2008. Over 27 property owners attended the open house. The following summarizes the residents' questions/issues: . How long will the project take to complete? . Will I have access to my property during construction? . Why can't this project wait? . Why doesn't the City pay 100% of the project cost? . Will the assessment amount change? . How are the assessments paid? . Why was my street chosen for improvements? . I do not want the proposed sidewalk. All of the residents' questions were answered at the meeting or with a follow-up phone call. The proposal presented at the open house included a sidewalk connecting the north-south and east-west segments of Kerber Boulevard to Meadow Green Park. The entire cost to construct the sidewalk was proposed to be assessed to the units within the medium density project area. The residents present at the open house overwhelmingly objected to the proposed sidewalk, therefore, Staff sent a questionnaire to the property owners who would be assessed for the sidewalk construction asking their opinion. The following summarizes the neighborhood response: Number of questionnaires sent: 249 Number of responses: 135 Opposed to sidewalk construction: 120 (54% responded) (89% of those who responded) Based on the neighborhood feedback, staff recommends eliminating the sidewalk construction from the project. Residents at the end of Lakota Lane requested that the area of the cul-de-sac be increased. Currently, the pavement area of the cul-de-sac is only approximately 40 feet in diameter which requires a passenger vehicle to make a three-point turn to turn around. Staff proposes that the project incorporate the construction of a standard 90-foot diameter cul-de-sac at this location, including the necessary right-of- way acquisition. Public hearing notices will be mailed to property owners on January 14,2009 if this item is approved. G:\ENG\PUBLlC\"'2009 Projects\09-01 2009 Street improvements\01-12-09 accept feasibility call public hearing.docx Paul Oehme January 12,2009 Page 5 A copy of the feasibility report is available in the Engineering department. SCHEDULE The anticipated project schedule is as follows: Public Hearing/Order Plans & Specifications: Approve Plans & Specifications/Order Ad for Bid: Assessment Hearing: Project Begins: Substantial Completion: FUNDING January 26, 2009 February 9, 2009 Apri127,2009 May, 2009 August, 2009 The Engineering staff prepared the feasibility report. Staff proposes to prepare the construction plans and documents and perform the construction observation for the proj ect. The benefit of completing this work in-house is a $85,000 to $100,000 savings in the project cost. Forty percent (40%) of the street rehabilitation cost will be assessed to the benefiting property owners. The remainder of the project cost will be paid from the storm sewer enterprise fund and revolving street assessment account. Fundinl! Source Revolving Assessment Fund (Assessments and City Share) Storm Sewer Fund Total Funding: Amount $1,225,000.00 50,000.00 $1,275,000.00 The estimated assessments for the benefitting residential properties are as follows: Proiect Area #la- Low Density Urban Residential #1 b- Medium Density Urban Residential #2- Rural Residential Estimated Assessment per Feasibility Report $1,432.64 per unit $634.30 per unit $2,430.75 per unit The total assessments for Project Area #3- Commercial-Industrial are estimated to be $126,210. As outlined in the feasibility report properties within this project area are proposed to be assessed based on parcel acreage, which is summarized as follows: G:\ENG\PUBLlC'--2009 Projects\09-012009 Street improvements\Ol-12-09 accept feasibility call public hearing.docx Paul Oehme January 12, 2009 Page 6 Assessable Percentage of Total Estimated Property Address Property Area Assessable Assessment Property Area 7580 Quattro Drive 1. 71 acres 2.56% $3,234 7600 Quattro Drive 2.37 acres 3.55% $4,483 7640 Quattro Drive 3.91 acres 5.86% $7,395 7700 Quattro Drive 2.18 acres 3.27% $4,124 18400 77th Street 6.59 acres 9.88% $12,465 18780 77th Street 13.32 acres 19.96% $25,195 7770 Dell Road 0.875 acres 1.31 % $1,655 18800 West 78th Street 18.34 acres 27.49% $34,690 18930 West 78th Street 7.45 acres 11.17% $14,092 78 West 78th Street 3.91 acres 5.86% $7,396 80 West 78th Street 2.67 acres 4.00% $5,050 City Properties 3.4 acres 5.10% $6,431 (2 total) 66.725 acres 100% $126,210 Attachments: 1. CIP Pages 2. Resolution c: Gordy Stauff, Engineering Technician N G:\ENG\PUBLlC'--2009 Projects\09-01 2009 Street improvements\01~12-09 accept feasibility call public hearing.doex '~;';~"~"-"'4-' Capital Improvement Program City of Chanhassen, MN 2009 thru 2013 Project # ST-012 Project Name Annual Street Improvement Program Account # 1 601-0000-4751 Account # 3 Account #2 Contact Paul Oehme Department Street Improvements Type Improvement Useful Life Unassigned Category Streets/Highways Priority n/a Total Project Cost $7,400,000 Description I Annual project to rehabilitate and reconstruct streets in the City. Current 5-year plan shows the following neighborhood areas: Residential 2009 - Chaparral, W 78th St, Quattro Dr, Dell Rd, Lakota Ln and Vogelsburg Tr 2010 - Erie Ave area, Red Cedar Pt and Audubon Rd (Lk Dr to Lyman) 2011 - Carver Beach Rd, Timberwood, Saratoga, Santa Vera, Chippewa, Picha and Kerber (S ofW 78th) 2012 - Greenbriar, Fir Tree, Elm Tree, Dogwood and Shore Drive 2013 - Frontier Tr (Highland to W 77th), Great Plains (W 78th to Santa Fe), W 77th, Erie Ave (N ofW 77th), Highland (E of Laredo) and Greenwood Shores MSA 2011 - West 78th Street (Powers to Market) Justification I The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. Rehabilitation projects extend the life ofthe street. In cases with utility or poor subgrade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. Expenditures Construction 2009 1,300,000 1,300,000 2010 1,900,000 1,900,000 2011 1,500,000 1,500,000 2012 1,500,000 1,500,000 Total Funding Sources 2009 2010 2011 Assessment/Revolving Assess 1,300,000 1,900,000 1,200,000 MSA 300,000 Total 1 ,300,000 1 ,900,000 1,500,000 2012 1,500,000 1,500,000 Operational Impact/Other I This project may decrease maintenance costs. 2013 1,200,000 1,200,000 Total 7,400,000 7,400,000 2013 1,200,000 Total 7,100,000 300,000 7,400,000 1,200,000 Capital Improvement Program City of Chanhassen, MN 2009 thru 2013 Contact Paul Oehme Department Surface Water Management Account # 1 720-0000-4702 Account # 3 Type Improvement Useful Life Unassigned Category SWMP Priority nla Project # SWMP-019 Project Name Street Improvement Projects - Storm Water Mgmt Account #2 Total Project Cost $850,000 Description I An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. Justification I Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Expenditures Construction 2009 50,000 50,000 2010 400,000 400,000 2011 2012 400,000 400,000 2013 Total 850,000 850,000 Total Funding Sources Surface Water Utility Fund Total 2009 50,000 50,000 2010 400,000 400,000 2011 2012 400,000 400,000 2013 Total 850,000 850,000 Operational Impact/Other I Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: January 12. 2009 RESOLUTION NO: 2009- MOTION BY: SECONDED BY: A RESOLUTION ACCEPTING FEASIBILITY STUDY; CALL PUBLIC HEARING FOR THE 2009 STREET IMPROVEMENT PROJECT NO. 09-01 WHEREAS, pursuant to resolution of the Council adopted October 27, 2008, a report has been prepared by the Engineering Department Staff with reference to the above-referenced project, and this report is being received by the Council on January 12,2009, and WHEREAS, the report provides information regarding whether the proposed project is necessary, cost-effective, and feasible, NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The Council will consider the improvement of such project in accordance with the report and the assessment of abutting property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the improvements of$1,275,000. 2. A public hearing shall be held on such proposed improvement on the 26th day of January, 2009 for the 2009 Street Improvement Project in the Council Chambers of City Hall at 7 :00 PM and the clerk shall give mailed and published notice of such hearing and improvement as required by law. Passed and adopted by the Chanhassen City Council this 12th day of January, 2009. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT