Loading...
1b Marsh Glen Trail Change OrdeC1TYOF CHANH4SSEN PO 13ox 147 Clmnl~n, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Bulldlmg Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phorm: 952.227.1160 Fax:. 9,52.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & RecreaUon Phone: 952.227.1120 Fax: 952.227.1110 ~oo Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.~1.1125 Fax:. 952.227.1110 Web Site www. d.~.mn.~ FROM: Todd Gerhardt, City Manager Todd Hoffman, Director of Parks and Recreation DATE: March 19, 2003 SUBJ: Approval of Change Order No. 2, Marsh Glen Trail Attached please find a memorandum from Paul Paige of Hoisington Koegler Group detailing the need for a substantial change order on the Marsh Glen Trail. This trail connector is situated adjacent to Rice Marsh Lake, affording future trail users some inspiring views. Unfortunately, tmilway ali~tmments situated near marshes are also prone to exhibiting poor soils. In this case, soil borings were conducted that identified some unstable soil would be encountered in the construction of this trail. The trail desi~ and bid package accounted for the amount of poor soils estimated to be encounterecL The amount of poor soil actually present tamed out to be substantially greater than initially anticipated. In order to "get to the bottom" of the bad soil deposits under the trail alignment, an additional 609 cubic yards of soil was excavated at a cost of $15 per cubic yard. Backfilling this sub-cut trench necessi~ the import, placement, and compaction of select granular fill at a cost of $28.54 per cubic yard. Other added costs include $4,757.50 in equipment and labor to haul and grade these additional soils, and $350 for a culvert extension. On the bright side of things, staff was StW. c. essful in negotiations to dispose of the majority of this excess material on private property adjacent to the project site. In doing so, the City avoided significant tmeldng costs to haul the material off site. The original contact sm for this project was $99,655.00. Change order No. 1 for an additional culvert cost $3,927.00. This Second change order for soil correction cost $31,623.36, bringing the total conuact to date to $135,205.36. RECOMMENDATION It is recommended that the City Council approve change order No. 2 for the Marsh Glen Trail Project in the amount $31,623.36, bringing the total contract award to $135,205.36. ATTAC~NT Change Order No. 2, Marsh Glen Trail The City of Chanhassen * A growing community with clean lakes, quality schools, a chaJming downtown, thriving businesses, winding trails, and beautiful padre. A gmat place to live, wodr, and play. Hoisington Koegler Group Inc. To: Todd Hoffman, Park and Recreation Director, City of ~ Minnesota Paul Paige Change Order g2 for Marsh Glen Trail and Pedestrian Bridge March 18, 2003 The Marsh Glen Trail and Pedes~ Bridge is being built directly adjacent to a wetland complex. Due to the proximity to the wetland, the soils are wet and unstable and special subgmde preparation is needed. Prior to construction, American En~neering Testing, Inc., a geotechnical consulting firm, took soil bc~-ings in the trail area and recommended subgrade preparation to ensure that the trail would be stable and resist frost heave. American Engineering Testing recommended that all organic topsoil be removed and that the resulting subcut should be filled with select granular borrow wrapped in geotextile fabric. The ~nimum depth of subcut in unstable areas was to be 1'-~" to allow for at least 1' of select granular borrow under 6" of Class 5 Aggregate Base. The original contract sum is based on this cross section. During construction, to ensure that the Contractor had completely removed the organic topsoil layer, American Engineering Testing was asked to inspect the trail subcut. Upon inslw~on, American Engineering Testing found that along much of the ~ the organic topsoil layer extended several feet deeper than originally anticipated. A representative from American En~neering Testing was on site supervising the necessary removal of organic topsoil from the subbase from December 18, 2002 to December 28, 2002. During this time, 609 C.Y. of od_difional organic soil needed to be removed and then filled with select granular borrow in order to ensure a stable subbase for the trail. The Conlract~ then had to relocate the removed organic material to an on site location. All of this work was outside of the original contract sum, In addition to the above work, Sunram Construction has been asked to extend a 12" CMP culvert that has been placed under the trail in a low spot to allow the flow of water under the trail. The 10' culvert extension will allow for a safer, more gradual slope away from the finished trail edge at this location. I have reviewed excavation information from American Engineering Testing, and select granular borrow receipm from Sunram Construction and have determined that 609 C.Y. of additional subeut was removed to properly prepare the trail subgrade. In addition, I have reviewed the costs of additional subeut, placed select granular borrow, moving the additional organic topsoil on the site, and the cost of the culvert extension and feel that the prices are fair. I recomm~d that the City Council approve the change order sum of $31,623.36. Due to proper preparation of the subbase, the City can be assured that the Marsh Glen Trail will remain in excellent condition with minimal additional maintenance for many years to come. 123 North Third Street, Suite 100, M'rrme-atxflis, MN 55401-1659 Ph (612) 338-0800 Fx (612) 338-6838 www.hk~.com Direct (612) 252-7133 F..mafl msty@hk~_com Change Order OWNER LANDSCAPE ARCHITECT CONTRACTOR City of Chanhassee H~lngtoe Koegler Group Inc. Sunram Cor~stmction Inc. OTHER THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN A'I'rORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. PROJECT: Marsh Glen Trail and Pedestrian Bridge chanhaasan Park and Recreation Department Chanhassen, Minnasota TO CONTRACTOR: Sunram Cmstrucfio~ Inc. 20010 75~ Avenue North Corceran, MN 56340 CHANGE ORDER NUMBER: 2 DATE: 2/21/2003 PROJECT NO: 00-81 CONTRACT DATE: 10/7/2002 VENOOR NO: I~A The Contract is changed as follows: (see attached sheets) Not valid until algned by the Owner, Land~capa Architect and Contractor. The original (Contract Sum) (Guaranteed Maximum Price) was Net change by previously authorized Change Orders The (Contract Sum) (Guaranteed Maximum Price) prior I~ this Change Order was The (Contract Sum) (Guaranteed Maximum Price) will be (Increased) (decreased) (unchanged) by the Change Order in the amount of The new (Contract Sum) (Guaranteed Maximum Pdce) Including this Change Order will be The contract'nme will be (Increased) (decreased) (un,haneda:Il by ( ) days The date of Compl~on as of the date of this Change Order therefore is Note: This summary does not reflect changes In the Contract Sum, Contract Time or Guaranteed MaxJmum Pdce which have been authorized by Construction Change DiredJve. $ 99,655.00 $ 3,927.00 $ 103,582.00 $ 31,623.36 $ 135,205.36 lO-Jun-03 LANDSCAPE ARCHITECT Hoisington Ko~ler Group inc. CONTRACTOR Sunrarn Construction, Inc. OWNER Chanhassen Park and Recrealt~ Department City of Chanhaasen Address 123 North 3rd Street, Suite 100 Minneapolis, Minnesota 55401 20010 75th Avenue North Corcoran, MN 55340 69o my Chanhassen, MN 55317 Change Order - 2002 Edition - HKGi Copyright 2002 M.'~Chenh__~___WIG_TralADocumm'g~ Con' Summary of Change Order No 2. You are directed to make the following changes in the Contract Documents: Description' Additional Trail Subcut 609 CY @ $15 CY Result in Contract Price: add Additional Select Granular Fill, Placed 609CY@ 28.54 CY Result in Contract Price: add Dirt moved on site 1/8/03 & 1/9/03 Result in Contract Price: add Extend 12" CMP 10 LF to Swamp Side Result in Contract Pdce: add $9,135.00 $17,380.86 $4,757.50 $350.00 Net Contract change for Change Order No. 2. Add $31,623.36 Change Order - 2002 Edition - HKGi Copyright 2002 Pro' ect Area 1.7 ~TW j L ti ¢¢t oca on $ MI,9910~ I. IILL~ DR