Loading...
2. West-Central Lotus Lake Drainage Improvements: Award Contract CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us :l. MEMORANDUM TO: dO. Paul Oehme, Public Works Director/City Engineer \ ( FROM: Terrance Jeffery, Water Resources Coordin~tor "'10 February 9, 2009 o~ DATE: SUBJ: West-Central Lotus Lake Drainage Improvements Project No. 08-02: Award of Contract PROPOSED MOTION "The City Council approves a construction contract in the amount of $261,483.00 to Minnesota Dirt Works for work to be performed on the West- Central Lotus Lake Draiange Improvement proj ect." City Council approval requires a simple majority vote of the City Council present. BACKGROUND The City Council authorized the preparation of a feasibility study()nEehfllary 25, 2008. The City Council authorized preparation of plansandspecifi<;atiOIlson November 11,2008. A neighborhood meeting was held on Decel11berl,2008. The City Council approved the plans and specifications on December8,.2008alld authorized advertisement for bids. This project involves several improvements to the channel and storm sewer conveyance system between Kerber Boulevard and Carver BeachRoad. The following improvements will be included: 1. Installation of a two staged structure and appurtenantpipewesfof Kerber Boulevard to eliminate blockage of the storm sewer under Kerber and to stabilize the banks of the drainage channel. 2. Installation of four sheet pile and river rock ditch checks to reduce flow rates through the channel. 3. Replacement of existing 12" pipe immediately east of Kerber Boulevard with 24" pipe to address capacity issues. 4. Regrading of the channel to improve hydraulics. 5. Replacement of the befl11sout~andeast of Meadow Green wetland. 6. Replacement of the outlet structure from the pond as well as pipe work to improve hydraulics and reduce the flood risks. The City ot Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Paul Oehme West-Central Lotus Lake Drainage Imp. Project February 9, 2009 Page 2 7. Restoration of wetland south of the Meadow Green wetland to increase storage and decrease flow rates into the channel which discharges directly to Lotus Lake. 8. Replacement of the structure north of Meadow Green wetland. The project was identified in Second Generation Surface Water Management Plan. BIDS Bids for the project were opened on Thursday, January 29, 2009 at 10:00 a.m. Twelve (12) total bids were submitted. The bids received are as follows: $261,483.00 $328,364.09 $338,993.72 $357,328.04 $379,776.40 Kevitt Excavatin , LLC $388,788.57 Northdale Construction Co. The engineer's opinion of total project cost was $432,089.00. $399,360.00 $420,757.15 $432,020.35 $432,394.42 $476,376.35 $599,727.62 Minnesota Dirt Works has not worked in the City before. Staff has completed a reference check and their work in other cities has been found acceptable. Minnesota Dirt Works feels that they are in a unique position to provide the materials and equipment at a significantly reduced rate. This savings is reflected in their bid. The project is tentatively scheduled to start on February 16, 2009 with a substantial completion date of April 30, 2009. Staff will notify the property owners in the area prior to the start of construction with a project time line. This project was budgeted for 2009 in the CIP Project SWMP-031. Funding for the project is proposed from the surface water management fund. The City has sent a request to the Riley- Purgatory- Bluff Creek Watershed District requesting that they cost share on this project. Attachment: 1. CIP Page 2. Project Area Maps 3. Letter from WSB & Associates, Inc. dated 1/29/09 c: Gordy Stauff, Construction Manager Dan Ames, Minnesota Dirt Works g:\eng\public\_2008 projects\08-02 west-central lotus lake improvements\award construction_020909.doc Capital Improvement Program City of Chanhassen, MN I Project # SWMP-031 Project Name West Lotus Lake Drainage Improvements Account # 3 , De~ ~~.<'.. This improvement project addressess storm water quality and quantity issues in the Lotus Lake watershed. In 2005, the regional pond over topped I causing significant damage down stream. The storm water ponding in this area was discussed with the City Council during the review of the Lotus Woods development. The Watershed District has made Lotus Lake a high priority in their capital improvement plan. The city requested funds I from RPBCWD in 2008 and the request was denied as the Watershed had different priorities. The City will again request funds from the , Wm""'ed Di""" but .n.." tu be p'epoued m the e_ thm the W_hed', pdoriti" '" ";11 not ,!;gned .nth the City", I t Account #1 720-0000-4300 Account #2 Justification To improve water quality and quantity in the Lotus Lake watershed. Expenditures Construction 2010 2009 475,000 Total 475,000 Funding Sources Surface Water Utility Fund Total Operational Impact/Other 2009 475,000 475,000 2010 2009 thru 2013 2011 400,000 400,000 2011 400,000 400,000 117 2012 2012 il H 11 " .1 ij Contact Paul Oehme tl n i! \\ Ii " ! ij Department Surface Water Management Type hnprovement Useful Life Category SWMP Priority nfa Total Project Cost $875,000 2013 Total 875,000 875,000 2013 Total 875,000 875,000 '~:::--.::!:~ 1":_ :. ".1 0,:," .-:--::.:.-.~ N w-.-E . I S I . { WEST CENTRAL LOTUS LAKE I MPROVEMENT PROJECT PROJECT 08-02 1 inch = 1,000 feet J I' Ii' I I \ "\ ~ 4" \., \ \?V, \ ~":;;~'~;:.;;-:. " ,,'.'- ,'l,}. . .1 ,,\ ---.-.-r-n__.b._.,,_._-.:""'=:::::--.....,---2~_ . ~ \ \[ ~l.~\ \ \ "~~~!,,~. .,.. -- . t "'\, ". .---J.- """ .t f!r '" "'"~ - -...-"""'"--.,=--...y...~-~~';-;:.-:-;;-:, i:~ /-:-~ .1\ \\ f. ~ ~ "" \ ")\ .""l, ,.\' -~#r ~'~~~~11r' \.~ T~~ 1-;~--~\Y;~)f ~f \ \ ~ ~ " ~\~~. . . 'l~ ~k~'~"'~\ " ~ \ .~ ~ <I ,t'fll. U I J~ ' ,,,; r , l.l~ ~:~ ~~: / r{~ \ '\ '"'i~.' \ '\~ i \' > \1.; \\ ..._____B (>! 'f. ."' ~u . ' ~'~k \\ " A \ f( ,\lit ___ '-"'- ,.. ,~' -\~ i ~,i ~ ,,"1 It- " : :!i I:,' : 3 '1~' '~~~{.. '~_ j,,!.'::' -.i'-'-,,'~~';~ -'. ~ J,' ',,1'\\ "~'l I " {\'t ~J ll~ -~ "lit '" 1CIi'''''''j'~J'r.....!~'J r~ '-~~ ,,~I / 'l"l '. -~~5~' !@l'~\~~~ ~''',---~ /, ~~ ~ ~I ,}@ . J~ J4 ~ II -. .,~ "I' ~ ", . ~~.J' \"~-"',.P':~~~='-- \ /~' 1;} #!, ~,::.'~' .' ~ /'1, J!.~- " c\; ~. >": / ," ~ ~ . * ,~' ~::::-'- --.\ '\ ~t9l~ , , .: ,I/~~!~ ";~ {'Ill ~;/ . 'y, m 't!' 1 ~ ~'~-\'x. \ ; I ... jl)l · ~.';'l '" I~ I I I 'li---"-'---'-r--.L~'--rr1! "\' ~\ 5 . r. I iI' _, /~ . ,~'i,:1 f"-l1!/' -"..' . \' ~ "', d ~ '" '.' I--",-~' J.I .- """"".--' 'fj, ... -, , ~ '" ~ y .('~\"..,..." ':~ /-----. ~ ~ '"~ Ijl1.. .-- 1 ~-,' ~ . \ "r '\ ~ ~ / ~'III; .,~ .', ./' .-'i.~ ~ ~ \~~ / ~--~~tft.l' I r;~,,A i~l-- ;;-:;;!$~ ~'1' \ .' 0 '. .-. :y:" '. '{/,//-:\ 'l' I Ol" \ '\\:"<1 ,0 "" \......... / '1 ~t I ""3 _ \ ,."...~ /."," '.. ' .'~~ "(~,.; '\.. If \ :r . t I ..". 4 I' :"f'\:..... '! * . ~ f" ,~ \ " ;'~~.:~~."l.....,~...-'\\~,,-;,;,~/l A j'V) , · " 6' \ ,\..,:1 /~ '\1 \ \ '" ...". ....., ~ .~ ~ /, it ~ \ \. It/," t.:t:l .\ \ q · 'L '" j' \ \. "t..<. ~ .v~~~ ~l '\-',><l '" _ . "l I' .,~'" ',~ 41 ' _-\ \ '.~ \,;,' , , L ',. '. '-':;;~ .~~ -.' . F . f P, \ ' \'b;;, " ~ ~ ~. ,/ ...... e, O' I r ... ","\~; 7 \'!i! ... \ \ \}t'ft,r ,. t ',:' ' .... -';". I II' '\. ,; ~.l' ,\'lI. 7';:;P'{'" \. /:" ..-...... ~ "'h:" I '" ~"?<- -/', ~ ...."'it "I t'~ j /"~:>I-~' ~ 14; 6: ~ ~1 ~ \ '" v "'Y' ~-' '\ "'.. \ / . /.'.' \ \ \ . -. A';' , . 4\ ~.y ':P(?~?-' ":~'~";~ \ ~ ~~. L"t",t 1~ ..."......'(":::.~~1. /\ 'c', \ \ \~:.. ""'~_/~;4#r. " 0 cf~r """". ... ..... ""'~ 11',// '.'" ~~ . 1P/::)r \\ /' .f!iC'O' '. 't ~,5l1" ''i~ tP') " ,/ \ .\.( "~' /f! -;:-;:;~ \ \ \ \'~'v.::~1~",:,~-:;,"r " /\' ~~~: :~~"I *~::: ",. .:.~'!;\ #Jr?~~'G--'~ :\"~ 1"\ \ 3 J )f:lr~'.,~ ~,I' j ~1~~,.JV /~ ''v~~_ ;',~"":' .~ . '. ~i,~~7'~"1 !' ,~\.. ~\ \ ~"." _~ >/ I' ~ ~ 1;.-J.~~~'"'... \.~~(\;6.'" ." ,\ 1 ~I ~ /' ~... .~,,",,,,,w-'"~, ',~ \"? r ......'1: . ~ ~ . . V, '-.... . ~ ,.#; ~ .~~ \< 'i:, ~ ~ \. ~k 'l J , / O' ~!?". --I ' ~ ~ ~ ~ '1~ \ . : 11 .__n."'I_~" ~ 4 ,~"",,#c:./----.-.'l~ -, ~\\ \ / ,.. " "...... \ /'i "' . ," .. '" "I"' 'f, / ;7 ,/ ;,-".. '\) \ . V" , f:'~ .........,\" I !" .j.)~\. ...' ~/ / . ~ .... ~:t\ & '\- p" ~ ;V/' i "t I '" "J/ ,1' ,I( ....,..., """'. i \ l>>~. ~f}'~' ,:.. '" '-t~.. ,". i' l /' ,'" I .tIi\u;.' r- /:1 ~. "."'~ )", . .J \.. ..." , ~ ", ~. ... /' . II" t,{ -- . . """ 'i ,~ , , "~ ,. 4.n 7j ~ ' '.I~" ~ - t' "'. ",\..\ ~ '1,..... ") / .. ~,,,' /~;J~<\. t., "'~ · · I '~ t.. ac ac,"1 .... I 'l.. :I --. :-"1, \ .~\~ . ,~t7Y ~.;~. :....... · !.l' . J1.. I,: ~t....""." ~.~ lOit, . ~"~. '/' ~\ ~. ~~. ,.> -:.; .., ;;;'I;(~' . ~ 3\:~~. ";;il' fi~'" '. " "..', i ... ~"Ir~'" .:. ,- ~..x....... ... ~.~'//I "'Z ~,~ ~ .~~ " . · "'-""'l' " ,\ ~., ....' " ". -"". 1 .." ~. ". 1 ~ \ '/.~~... /t.. ",;>, "'. , ,1 I '. \~" C,;J",,~ '1.... I~ ~9" \1#.~'.q ~ '\~0'/1~':~"'\ ' ~ ~,,/~ !.--......,.,..' ! II f~ '''\ ,..I , '.....[, '1 t \ ' ". ''''.\ La? ,Y' ' '", l.~~---rr;Y!- "\~ " f!' I I . .~> -\ ~, '. ....., \ frt::----'/;iJ-j'{ ,:./ . <-"I'~ ~ {;'7' ""fii~~J' . '~'i;-k ~ i. !r;:;-.~jv"'~J...~ _ '''.~ "~_:. t ;~p,~~~~~\ 4~<~,//...~~ffI' \"f.>" ",..; -"'i'~~......;tJ I I y -1 ( . -~__::f:';,~--~~~---:;-..:::;---:~-r--...- -..- ",/ \ 1,~..'" ;. . ! ~J \ 'l%'i}< N wt'E WEST CENTRAL LOTUS LAKE IMPROVEMENT PRO.JECT PRO.JECT 08-02 1 inch = 200 feet W~B & AS,f(ICiate". lllc. Infrastructure _ Engineering _ Planning _ Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763541-4800 Fax: 763541-1700 January 29, 2009 Honorable Mayor and City Council Members City of Chanhassen 7700 Market Boulevard Chanhassen, MN 55317 Re: West Central Lotus Lake Drainage Improvements City of Chanhassen Project No. 08-02 WSB Project No. 1694-09 Dear Mayor and Council Members: Bids were received for the above-referenced project on Thursday, January 29,2009, and were opened and read aloud. A total of twelve bids were received. The bids were checked for mathematical accuracy and tabulated. The Engineer's Estimate was $423,089.00. Please find enclosed the bid tabulation indicating the low bidder as Minnesota Dirt Works, Inc., Lonsdale, Minnesota, in the amount of$26l,483.00. We have contacted Minnesota Dirt Works representation, Dan Ames, to discuss the project bid and to request reference for work performance. We have confirmed that Minnesota Dirt Works has completed similar work for Prior Lake/Spring Lake Watershed District, City of Lonsdale, and the City of Faribault. Each reference indicated that work was completed in a timely fashion and that the contractor exceeded their expectations in performance. We recommend that the City Council consider these bids and award a contract to Minnesota Dirt Works, Inc., based on the results of the bids received and references. Sincerely, WSB & Associates, Inc. -/~~ Todd E. Hubmer, PE Project Manager Enclosures cc: Daniel Ames, Minnesota Dirt Works, Inc. Terry Jeffery, City of Chanhassen ACEC 2008 Firm of the Year tsf Minneapolis I st. Cloud Equal Opportunity Employer