MEMORANDUM
Todd ~t, City
Teresa J. Burge~ Public Works Director/City,.~~ 0~g' ,,-
January 22, 2003
Authorize Well Siting and Consulter Wm'k Order for Well No. 9
Authorize Well Siting Study and approve c.c~multa~ work or&:r in the auxnmt of $19,600
with Boltan and Menk, Inc. for the wark neceasary to site Well No. 9.
DISC S O
During thc Mastrr Water Study it w~ _c<m~, u~d that d~ ~ty of Chanham~ will need a
neww~ll 0No. 9) in 2004 to meet the City'sneeds. Iris ~m6cipat~ that it will fak~ 15
2003 so that the well will be available for the summer months of 2004.
quotr to inolude obsawa~on of a test weal and increa~ the bidding servk~ to include a
pr~bid rmefing. T]~ ~ quo~ is atlachrd as wall as tt~ original quote.
Staffrecomme~ds selection of Bolton & Menk, Inc. for the pr~ect; howewr, sepora~
work orders will be issued for each of the three phases of the work. Th~ $19,600 is for
Phase I, Preliminary Design; Geot~hnical tnveztig~on f~r Well House; and Test Well
mad Test Well b~ done as part of Phase I ~ ofPlm~ 1I as m'iginally proposed.
Failur~ to autlxai~ the si,~S study or to approve the consutmm work c~k:r will delay
oompletion of the w~ll and may cauae a ~ for ~i~ficant ~ ~oa marauds
including a poteatial lawn irrigation ban in 2004.
RF_,~OMMENDED MOTION
II.l~r CIi
Phww: ~ro w/.1125
Far _~o 7;'7.1110
Move to authorize well siting study and approve consultsnt work order in thc amount of
$19,600 for Well Number 9.
Attachments:
1. Botton & Me:ak ~ ~ 1~1/03.
2. BoRon & MenkPropoaal dated 1/17/03.
3. SR~ Proposal a,,t~ 1/17/03.
4. Black & Vcat~h Proposal dat~l 1/16/03.
5. Bon¢~'oo Proposal ~ 1/15/03.
c: Kelley Janes, Utility Superin~
Marcus Thomas, Bolton & Menk, Inc.
Steve Nelson, SF, I:t; Inc.
Mark R~on, Bonestroo Rose~ ~ ~ Associates
Chad l~ill~ Bla~k aad Veatch C. arpamfion
'l'ke Clt/ot Ctaalm~an · A omlog ~ ~lth cle~ lak~ q~lty school, a cl~ doe~lo~ ~ ~ ~nO italY, md bmd~l im~. A gm~ piac~ Io I~ ae~, ~ ptay.
& K,
Engineers & Surveyors
1515 East Highway 13 · Bumsvtle, MN 55387-6857
INC.
January 21, 2003
Ms. Teresa Burgess, P.E.
Public Works Director/City Engineer
7700 Market Blvd.
Chanhassen, ~ 55317
Dem' Ms. Burgess:
Thank you for the opportunity to present this propoml for engineering ~rvices for th~ new well for tim
City of Chanhassen. We have developed ii thr~-phat~ work plan for completing thi.~ project in a cost
effective and tin~ly manner. This plan i~ outlined as follows:
[ Person ]].ours [ Fee
1. pre_llmlnnry Design ~
1.1 Project Workshop (Kick off~ w/City st~T) 12 $1r200
1.2 Site Evaluation (Evaluate hydro~ology, mat~, rl,t, from tl~ City) 40 $4,000
1.3 Field Data Collection (Site Sur~y~ Descriptions) 30 $3~400
1.5 City Council Meeting 4 $400
Tot~ Ph~e 1
2.1 Well Design 20
2.2 Well Hou~ ~ Controls I)csi~n 100 $8,000
2.3 Preparation of Contract I)ocumcn~ Estlrr~. 120 $9~600
2.4 C-cotechnical Invesril~ion for Well Hons~ $3,000
2.5 Test Well Construction Obscrvmion 16 $1,600
2.5 Bidding Services 32 $3~200
2.5 City Staff/Council Meetings 18 $1,800
3. Cong~ruction ~nd Fm-.lllty Stm~-Up
3. I Consa-uction Ea~ineerin~ and Contract Administration 90 $9~000
3.2 Well Conm'uction Observation ( part dine/as needed ) 80
3.3 Well House Construction Observ~ion (pa~t time,/as needed) 90 $7,200
3.4 Start-Up Service~ 24 $2,400
3.5 Operations M~mual 16 $1,280
3.6 As-Built Drawings 16 $1,?.80
TOT,~J. PRo~L'r FEE
Based on our exp~ence with water supply and treatmeot projects, we will work closely with the City
staff and the contractor throughout the.project to ideatib, y. a~s..f.or.cost sa,vln~., .F, or instance, on past
projects, we have identified water proauct~on projects mat quality tm- a reoam or me 6.5% State tax paid
on materials. We feel this project will meet the requirements for this rebate, and will work with thc City
to obtain this rebate.
We thank you for your consideration of our proposal, and look forward to working with you. Please give
me a call at 952-890-0509, or contact me by e-mail at marcusth@bolton-menk, com if you have any
questions or need additional information
Sincerely,
Marcus A. Thomas, P.E., Project ~
CADOCUMI~- ]VI'trtn~I~T[:mp~Wtt[ Pmponl O121G3.d~
cc: Jon Peterson, P.E., BM/
INC.
Sanuary 17, 2003
Ms. Teresa Burgess, P.E.
Public Works Director/City Engineer
7700 Market Blvd.
Ch~hassen. MN 55317
Tlmnk you for the opportunity to pre~nt this proposal for engin~a'~g ~rvie~ for the now well for the
City of Chanhassen. We have developed a three-pham work phm for compl~ ~ project in a cost
effective and tin'~ly manner. This plan is outlined as follows:
1. Preliminary Design Pha~
1.1 Project Workshop (Kick offme~r~ w/City start) 12 $1,200
1.2 Si~ Evtluafion (Ev~hmte hydrogeology, rna~, ,t~va fi'om th~ City) 40 $4,000
1.3 F~eld D~Ja Collection (Sim Survey/Legal ~pfiorm) 30 $3,400
1.5 City Council Meeting 4 $400
Tot~ ~ 1 $15~000
2,. Final l)t~llilln 8nd Colltrll~ ~t8 ....
2.1 Well Desi~ 20 $1,600
2.2 Well House and Controls I)esisn 100 $8,000
2.3 Preparation of ConUact Documents/Cost ~tim~ 120 $9~600
2.4 C,-eotechnical lnvesfiSn~l:ion for Well ~ $3.000
2.5 Biddin~ Service~ 32 $3371X1
2.6 City Staff/Council Meetings 12 $1,200
Total~ Phase 2 $26~600
3. Construction ,,nd F,,eUlty Start-Up
3.1 Construction Engineefin~ and Conm~-t ,a, drnlrfi.~tration 90 $9,000
3.2 Well Construction Observation ( part fine./as needed ) 80 $6,400
3.3 Well House Construction Observation (part ~ as needed) 90 $7,200
3.4 Start-Up Services 24 $2,400
3.5 Operations Manual 16 $1,280
3.6 As-Built Drawings 16 $1,280
Totsl~ Phase 3 $27r560
TOT,am PgOJECT $e ,zr,0
Based on our experience with water supply &nd tr~__~t projecta, we will work clo~ly with the City
stag and the contractor throughout the.project to identi.f-y .areas, for.cost sa,rings., for ~ on past.
projects, we have identified water proaucuon projects mat qualify for a reosxe ot me O.:~ ~tate tax paid
on materials. We feel this project will meet the requiremen~ for thi., rebate., and will work with the City
to obttin this rebate.
We thank you for your consideration of our proposal, and look forward to working with you. PI~ give
me a call at 952-890-0509, or contact mo by e-mail at marcu~th@bolton-m~nk.¢om if you have any
questions or ne~l additional information
Sincerely,
Marcus A. Thomas, P.E.
Project Manager cc: Jori l:~terson, P~.., BMI
3635 Yadnall Center Drive, Wt. Plel, Mid 55110-51~6 661.490.2000 651.460.2150 FAX
January 17, 2003
Professional Engineering Services
Well No. 9
City of Chanhasaen, Minnesota
SEH No. P-CHANH0103.00
Ms. Tore. aa Burgosa, P.E.
Public Worka Director/City Engineer
City of Chanhasson
690 City Center Drive
Chanhasaen, MN 55317
CITY OF CHAN~i,o,$~EN
JAN 1 7 ZOO3
E~GINEERING DE PI'.
Dear Ms Burgess:
Aa we discussed during our Monday 1/13Kr3 meeting, Short Elliott Hendrickson ~c.' (SE[-])
appreciates this opportunity to provide engineering services for Well No. 9. The following text
and attached table stunmarize the benefits and fees associated with retaining SElL
Experience/Insight/Cost Savings - SEll is familiar with Chanhassen's water system and the
regional ground water system through working with the City, preparing the Wellhead Protection
Plan, and working extensively in the area. This insight, coupled with our working relationships
(City Staff, Well Contractors, and Regulatory Agencies), positions us to groficienfly identify,
research, and implement options that will likely save Chanhassen money. One example we
d/scussed was the construction of a Glacial Drift Well with a piriess adapm' serving Well House
No. 3. This would elim/nate the need for the design/construction of a new well house. Another
example is our ability to work with well contractors to rapidly construct deep wells.
Local Presenee/Respo~ivene~Con~a'ueflon Services - SEH staff availability and location
enables us to meet the tight schedule, be responsive, and provide superior construction services.
Projected ~n~neertng Costs/~e.l~lule - Projected costs are summarized in the .--,"-hed table.
If a test well confirms that a well house is not require&, thc engineering costs (items IV and V)
would be greatly reduced and the timeline for completion could be b,o~ Even if a well
house and a deep well do prove necessary, SEll will still meet the June 15, 2004 deadline.
Thank you again. We look forward to a successful project.
Respectfully Submitted,
James P. Norton, P.E.
Principal/Manager, Water Practice Center
651.490.2115
Steven G. Nelson, P.E.
Project Mana
651.765.2989
Engineering Costs(i)
Chanhassen Well No. 9
January 17, 2003
Engineer:
Principal in Charge I Project M~
Teleptmne No.:
I, Teat W~ll ~nd Preliminary Well - All 8endce~
Estimated Number of Staff Hours:
8FJ-I
JImNorton I SteveNeleon
661.490.2116 I 661.766.2989
100
Total Labor Cost Estimate: $12,000
Total Fee: $14,000
II. W,,,il - Design
Estimated Number of Staff Hours: 65
Total m -hoe Coat F_.aflmate: $7,800
Total Fee: $8,000
III. Well - Bidding & Coneb'uetlon 8m'vloe~
F_sflmated Number a~ Staff Houm: 100
Total labor Cost Eeflmate: $12,000
Total Fee: $13,000
V. Welltmuae and Pump - Dealgn m
Est]mated Number of Staff Hours: 360
Total Labor Cost Estimate: $39,600
$41,600
Toal Fee:
V. WMIhotme - ConMructlon Sm'vlcee ~
Estimated Number o~ Staff Houm: 235
Total I nhor Caet EsUmate: $28,200
Total Fee: $30,000
T~I ~=
BLACK & VEATCH
BIiw, k · V~toh Corpot~ion
F-.- (952) S45-6~
City of Chanlaas~/vrmnesom
Propmed Well No. 9
B&V Project 901867.0002
B&V File B-1.0
Janum'y 16, 2003
D/rector of Public Works/City Engineer
7700 ~ Blvd.
Chanhas~.n, MN 55317
Dear T~msa:
~ OF
JAN 1 7 2OO3
ENGI~E~O O,:FT.
·here should th~ n~ well be located? Regardless of which direaion ~ C~ ~ on ~
~pl~on of ~~ ~ ~ of ~ ~ ~ ~ a ~ ~ of ~ ~j~ h
~fi~~m~~~a~~~~afi~yd~~on~ ~
l~on of ~ ~fl ~ ~ ~ ~ p~ ~ ~ ~ mw ~ ~fl~ ~
fi~, l~n~ ~ ~U ~ ~ ~ ~~ ~ of ~ ~~ of ~ ~ ~ ~
~y ~W ~ ~~on ~ ~ ~ ~dd ~ ~ ~~le ~ ~ ~ ~
~ ~ p~ ~ of ~mm ~ ~r ~ ~ ~~m m a p~ & ~~ ~
~ ~ o~ by ~ CiW ~ ~~ field ~~m ~ ~d ~ lmm~y. ~
system ;n'hastnlcb~. Tmlw'oper placaaxte~ of the well could lead to distfihxfion system ~onal
difficulties m:u:i waZm' quality problems. Thargflge., the distn'laition sysiem hydrmflic model will be
invB,Juable in ]::~n~licin~ reservoir replenishnem/exchm~ and ~ possible ~=d.qt/n~ system
Ms. Teresa Burgess
Page2
B&V File 901867.0002
Sanuary 16, 2003
Exper~nce/n we/l design/s an abso/ute nece. v.v/ty. Black & Ve~tch r~x:emty completed the design
and con.m-uction ~lministau/on of two 2,200 gpm w=lls for th~ City of Blo~rninEton. We also
designed 4 high capacity wells for the City of Ed~ Prdde. As a resutt of this wo~ we have
every step of the way. Meeting e~rly and often w/th the DNR and MDH has proven to be very
benefidai: The City can ill afford pennitt~ delay~.
Based on our und~t/xnding of the project, the followin~ is our proposed scope of services. These
services can easily be adjus~ as ~ necessary bythe City.
Preaward and Biddin~ Services.
· Issue-dd__~d_,-~-. as m:cesssry.
· Provide a recor~_~d.~on ~o the City regs~/ing award of the ~
Ms. Teresa Burgess
Page 3
B&V File 901867.0002
January 16, 2003
Construction Admin/sh~on
~ · Meet pefiodically with the contmc~.
Our team is comprised of the same indivioh~,l_, ~ preper~ the Water System ~ Plan and
designed two recent ~ for the City of Bloomi%otom
ProjecttDesi~ ~
Well Design/H~lo~
Distribution System Modeling
Denni., Trupka (B&V ~ fex Bloomingtan wells)
Tushie Mon~r~ ~V ~ for ~ M~s~r ?~)
Jeff' Henson ~ ground von~ analysis for ~
Mastex Phm and Bloomi%oion ~ design~)
Heath Pickm (/vfmmmpolis based B&V ~ for
wens)
~e
· Notice t~ Proceed - Maxc, h 1, 2003
· Siting Study- Mamh 1 ~ ~ 15, 2~3
· Field Exploration- Ma.w,h 15 to May 1, 2003
· Pr~nin~ Desi~- April 15 to M~y l, 2003
· Final Design- May 1 t~July 1,2003
· Advextise-J~y 15,2003
· Open Bids - August 15, 2003
· Well Constmcion- September 15, 2003 tn May. 1, 2004
Ms. Teresa Burge~s
Page 4
B~¥ File 901867.0002
Jnnnnry 16, 2003
· Bo[ldinE type slmilsr to Well No. 6.
· Vertical turbine ~ ~
· Ch~ol4.~ feed ~ _Ctm_~.~n_q ora 1~ Ib cylinder, scale,, ~ solution feeder.
· Water sysmm booster pump for chladue ~jector supply.
· ' Ventilation system
· I~~o comm~'J~O]~,
A~litional Service:
· Field explornfion pm/mm to kl~ subsoil strnm for f-all depth of v,e/l to id~
_Pro!x~xt Fee · Design/lh,~ Services- $90,000
· Consmiclion Phase Services - $45,000
· Resident ~.n~n~xing S~'vi~ - Hourly r~ and level of sexvice ~ upon City's
We hope you find our quslifl .,~ons to be the best suit~ fox this very i .m!xa-tant proje~ If tlm'~ m'e
any questions or if ~litional information is needed in the meangme, please conIact me at (952)
545-6695.
V~yyours,
BLACK & VEATCH CORPORATION
Bonestroo
Rosene
HA nderlik &
Engineers & Architects
Sammry 15, 2003
Ms. Teresa Bttrges~ PWD/CE
Cit7 of Cbani~n
7700 Market Blvd
Onnbassen, MN 5~317-0147
Dear Teresa:
JAN 1 ? ZOO3
~.~ilNEEI:IIN~ DEPT,
Tl~3k you ~r ~qu~t~g ou: ptopo~L K~-y elemem] of the WcH No. 9 scope .~! ot~ sendces a~e ottflked t~ tt~ letter.
Schedule and Co~t
We are available to beg~n Well No. 9 on $.m,.r7 28, 2003 s.d meet your project completion dat~ of June 1, 2004. Thc
prolx)sed ~ is a~ ~or you:r zeYiew. 'I'ne ~ ens~3~z~38 cost is $98,000. The it~ estate is
I--Ti~h i~41v~hi~l w~ll ca~citi~ ~ OV~ll~ w~t~" SUpply costs. We hnw a track record of achieving !~ well
as ~ by WeLls 7 ami 8, which each provid~ 150 to 200% thc c~--iI), of~ City's ~ wells.
W~Y Choose Bone~r~?
We will work closely with you ~ tl~ pool firms to szr/ve at a sohxtion for Well No. 9 that provides the best long-t;.,, wabsr
~ protection studies complet~ by thc City's engineering pool The project sdtedule is nggr~sive. Our imowlcdge of
We look forwtrd to working with you on the Well No. 9 pmje~L Solnfions to past well iaau~ and th~ leaaons letrn~d a~
Sincerely,
BONF~, OO, ~OSENE, ANDE~T-IK & ASSOCIATES, INC.
Mark Hanson, P.E., Vice Presidem John
2335 West Highway 36 · St. Paul, MN 55113 · 651 636 4600 · Fax 651 636 1311
Proposed Schedule
City of Chanha#en
Well No. 9
d~ 2~3 T~ ~11~ c~
J~y 2~3 ~ b~
Be~ ~g r~ility ~p dmwi~; ~in mnur~mfing el[mt~al g~r ~
Aunt 2~3 ~hi ~ ~
Cl~ of Cl~ulm~n
W~ll No. 9
T~ en~neer's cost estimate is based ona Jo~lan well end · complet~ n~w~ facility.
Test Well Design & Conlnctor Quotos 5,000
Te~t Well ~ & Evaluation 7,000
Well No. 9 Design a.ud Bidding 15,000
Well No. 9 Inspection and ~ p.n~ 13,000
Total ~,~ttnat~ S98,000
Well No. 7 ~nd Well No. 8
City of~
Well No. 9
We expected a 14,000-Ib. thrust besri~ in the Wel] No. 8 mot~, which would lmve provided an esOmslmi service li~
often yem to match resututy scheduled p,-~. rRmir im~rv~. However, ~n 8,000-1b. bem~r~ wu provided. This
Well No. 8
City.
t3at w~ n~d to maintain ~ornmunh:~ttan and lnttract~n at ail tim~, e~oecfal~ durb~ pe~iods of ~ff tumov~.