2j Change Order TH101 TrailCITYOF
CHANHASSEN
POBox147
C.hanh3s~, MN 55317
Administration
Phone: 952227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952227.1190
Englngdng
,':'hone: 952227.1160
Faxc 952.227.1170
Finance
Phone,: 952.227.1140
Fax:. 952.227.1110
Park & Recreation
P'no,,'~ 952.227.1120
Fa:,: §52.227.1110
R~;r~tion
2310 Co'J!~' Bcul~,,'ard
Ph. one: 952.227.1400
Fax: 952227.1404
Planning &
Natural Resources
~one: o,952227.1130
Fa,:: 952.227.1110
Public Works
1591 Park Road
Phone: 952227.1300
Fax: 952227.1310
Senior Center
Phone: 952227.1125
Fax: 952227.1110
Web Site
www. ci.chanhassen.mn.us
TO:
FROM:
DATE:
Todd Gerhardt, City Manager
Teresa J. Burgess, Public Works Director/City Engine9~
January 7, 2003
SUBJ:
Approve Change Order No. 1 for Highway 101 Trail (North)
Construction - Project No. 97-12-3
REQUESTED ACTION
Approve the attached change order in the amount 'of $36,966.00.
DISCUSSION
The attached change order is for field changes necessary during the construction
of the Highway 101 Trail (north). The change order amount of $36,966.00 brings
the total contract from $798,366.20 to $835,332.20. This is an increase of 4.6%
and is still within the amount allocated for this project.
The wood fence was added as part of a negotiated easement settlement previously
approved by the City Council. The remaining changes were due to condition
changes in the field.
Approval of the change order is recommended. Failure to approve the change
order could result in claim action by the Contractor to be compensated for work
completed.
c:
Ted Anderson, HTPO
Jeff Smith, Rosti Construction
G:W..NGh°UB LIC'Lqq- 12-3~staff t~lxa't 1-13-03.doc
The City of Chanhassen, A grc=,;'ing co.mmu~ity with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A gmat plato to live, work, and play.
Change Order 1
Date: 12/18/02
To: City of Chanhassen
Project Name: TH Hwy 101 Trail Construction
Contractor:
Engineer:
Rosti Construction
Hansen Thorp Pellinen Olson Inc.
Nature
of ChangesL~
1. Add 21fl' LF at 15" HDPE Storm Sewer
2. Install 672 LF at wood fence
3. Replace 2 existing curb stops
4. Install insulation over water main at storm sewer crossings
5. Install 221 ton of 3" clean rock to stabilize poor subgrade
6. Change 579 LF orB618 curb and gutter to B624
7. Add 150 CY of black dirt
8. Pour invert on addition catch basin
9. Remove and replace retaining wall at 10 Hill Street
Adjustments to Contract Price:
Install 216 LF ~ $17.00 per foot
Install 672 LF ~ $33.00 per foot
Replace 2 curb stops ~ $200.00 each
Install 320 SF ~ $1.50 per foot
Install 221 ton ~ $20.00 per ton
Change 579 LF @ $2.00 per LF
Add 150 CY @ $10.00 per CY
Add 2 CY ~ $131.00 per CY
Lump sum for redoing wall
$3570.00
$22,176.00
$400.00
$480.00
$4420.OO
$1158.00
$1500.00
$262.00
$3000.00
Contract Increase:
$36,966.00
Change in Contract Amount: $835,332.20
THE ABOVE CHANGES ARE APPROVED:
Hansen Thoq/Pellinen Olson Inc.
City of Chanhassen
By:
Date:
By:
Date:
THE ABOVE CHANGES ARE ACCEPTED:
..
Rosti Comtructioh -
By: × :" "
Date: ~. 2-,Z .-O 2.-