Loading...
2j Change Order TH101 TrailCITYOF CHANHASSEN POBox147 C.hanh3s~, MN 55317 Administration Phone: 952227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952227.1190 Englngdng ,':'hone: 952227.1160 Faxc 952.227.1170 Finance Phone,: 952.227.1140 Fax:. 952.227.1110 Park & Recreation P'no,,'~ 952.227.1120 Fa:,: §52.227.1110 R~;r~tion 2310 Co'J!~' Bcul~,,'ard Ph. one: 952.227.1400 Fax: 952227.1404 Planning & Natural Resources ~one: o,952227.1130 Fa,:: 952.227.1110 Public Works 1591 Park Road Phone: 952227.1300 Fax: 952227.1310 Senior Center Phone: 952227.1125 Fax: 952227.1110 Web Site www. ci.chanhassen.mn.us TO: FROM: DATE: Todd Gerhardt, City Manager Teresa J. Burgess, Public Works Director/City Engine9~ January 7, 2003 SUBJ: Approve Change Order No. 1 for Highway 101 Trail (North) Construction - Project No. 97-12-3 REQUESTED ACTION Approve the attached change order in the amount 'of $36,966.00. DISCUSSION The attached change order is for field changes necessary during the construction of the Highway 101 Trail (north). The change order amount of $36,966.00 brings the total contract from $798,366.20 to $835,332.20. This is an increase of 4.6% and is still within the amount allocated for this project. The wood fence was added as part of a negotiated easement settlement previously approved by the City Council. The remaining changes were due to condition changes in the field. Approval of the change order is recommended. Failure to approve the change order could result in claim action by the Contractor to be compensated for work completed. c: Ted Anderson, HTPO Jeff Smith, Rosti Construction G:W..NGh°UB LIC'Lqq- 12-3~staff t~lxa't 1-13-03.doc The City of Chanhassen, A grc=,;'ing co.mmu~ity with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A gmat plato to live, work, and play. Change Order 1 Date: 12/18/02 To: City of Chanhassen Project Name: TH Hwy 101 Trail Construction Contractor: Engineer: Rosti Construction Hansen Thorp Pellinen Olson Inc. Nature of ChangesL~ 1. Add 21fl' LF at 15" HDPE Storm Sewer 2. Install 672 LF at wood fence 3. Replace 2 existing curb stops 4. Install insulation over water main at storm sewer crossings 5. Install 221 ton of 3" clean rock to stabilize poor subgrade 6. Change 579 LF orB618 curb and gutter to B624 7. Add 150 CY of black dirt 8. Pour invert on addition catch basin 9. Remove and replace retaining wall at 10 Hill Street Adjustments to Contract Price: Install 216 LF ~ $17.00 per foot Install 672 LF ~ $33.00 per foot Replace 2 curb stops ~ $200.00 each Install 320 SF ~ $1.50 per foot Install 221 ton ~ $20.00 per ton Change 579 LF @ $2.00 per LF Add 150 CY @ $10.00 per CY Add 2 CY ~ $131.00 per CY Lump sum for redoing wall $3570.00 $22,176.00 $400.00 $480.00 $4420.OO $1158.00 $1500.00 $262.00 $3000.00 Contract Increase: $36,966.00 Change in Contract Amount: $835,332.20 THE ABOVE CHANGES ARE APPROVED: Hansen Thoq/Pellinen Olson Inc. City of Chanhassen By: Date: By: Date: THE ABOVE CHANGES ARE ACCEPTED: .. Rosti Comtructioh - By: × :" " Date: ~. 2-,Z .-O 2.-