7. Public Works Facility: Approve Bids
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952,227,1110
BuildingJnspections
Phone: 952.227,1180
Fax: 952,227,1190
Engineering
Phone: 952,227,1160
Fax: 952,227.1170
Finance
Phone: 952,227,1140
Fax: 952,227.1110
Park & Recreation
Phone: 952,227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952,227.1400
Fax: 952.227,1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227,1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952,227,1310
Senior Center
Phone: 952.227.1125
Fax: 952,227,1110
Web Site
www.ci.chanhassen.mn.us
~I
-
MEMORANDUM
TO:
Todd Gerhardt, City Manager
FROM:
Paul Oehme, Director of Public Works/City Engineer
~.c).
DATE:
March 23,2009
SUBJ:
Public Works Facility: Approve Precast and Steel Bids; Review
Other Bids and Quotes - Project No. 08-03
PROPOSED MOTION
"The City Council approves bids for:
. Category 3A and 4A - Building Concrete and Masonry to Dayco
Concrete in the amount of $994,200.
. Category 3B - Precast Structural Concrete Walls to Fabcon Inc. in the
amount of $675,686.
. Category 3C - Precast Plank to Molin Concrete Products Company in
the amount of$116,337.
. Category 5A - Structural Steel/Joists/Decking/Misc. Steel- Materials to
Thumbeck Steel Fabrication Inc. in the amount of$400,863.
City Council approval requires a simple majority vote of the City Council
present.
BACKGROUND
On January 6, 2009, the Planning Commission approved the site plan.
On January 26,2009, the City Council approved the site plan.
On February 23, 2009, the City Council approved the plans and specifications and
authorized the ad for bids.
DISCUSSION
This project used the construction management approach to obtain bids and
quotes for the project. This approach allows each of the specialty trade
contractors to bid separately on portions of the project. In all, 16 trade areas or
bid packages were bid out. Staff also obtained quotes from contractors for
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Todd Gerhardt
Public Works Facility
March 23,2009
Page 2
smaller items in the project that meet quoting requirements. The only bid item left for the project
is bituminous paving. This item will be bid out later this summer.
On Tuesday, March 17, 2009, quotes were received for this project. On March 19, 2009, public
bids were received for the 16 advertised public bid categories.
The City's construction management service company, RJM Construction (RJM), worked with
the City to receive the quotes and bids. For tonight's meeting, staff is requesting Council
approve concrete and masonry, precast walls, precast plank and steel material bids. These items
have a long lead time to fabricate. To meet the construction schedule, these contracts should be
approved at this time. On April 13, 2009, the Council will be asked to approve the rest of the
bids and quotes for the project along with alternates to the bids. However, for tonight's meeting,
staff will be prepared to review the bids and quotes received.
Attached is RJM recommendation for award of the concrete and masonry, precast walls, precast
plank and steel material bids. A budget summary for the project will be sent out prior to the
Monday night Council meeting.
Attachments: 1. RJM Recommendation Letter
2. crp Pages
c: Jeff Oertel, Oertel Architects
Brian Recker, RJM Construction
g:\eng\public'-2008 projects\08-03 chanhassen maintenance (pw) facility\032309 bkgd award bids steel conc.doc
CONSTRUCTION
CORPORATE OFFICE
HWY.7 CORPORATE CENTER
7003 W. LAKE ST.
SUITE 400
ST. LOUIS PARK, MN 55426
PHONE 952.837.8600
FAX 952.832.9600
SATELLITE OFFICES
PLAZA VII'
MINNEAPOLIS, MN
NORTHLAND EXECUTIVE
OFFICE CENTER
BLOOMINGTON, MN
NORMANDALE LAKE
OFFICE PARK
BLOOMINGTON, MN
March 19,2009
Mr. Todd Gerhardt
City of Chanhassen
7700 Market Boulevard
Chanhassen, MN 55317
Re: City ofChanhassen Public Works Facility
Recommendations for Award of Contracts - Partial
Dear Mr. Gerhardt,
On March 19,2009 public bids were received for the sixteen (16) advertised public bid
categories.
RJM Construction is in the process of reviewing and qualifying all bids received for
accuracy and completeness. In the interest of maintaining the currently anticipated start
date of April 27th RJM Construction has prioritized and completed its review of bid
categories critical to the project schedule. These bid categories include 3A Building
Concrete, 3B Precast Structural Concrete Walls, 3C Precast Plank and 5A Structural
Steel/Joists/Decking Materials. Based on the results of these reviews we recommend to
the City Council that they award these critical contracts as follows:
Bid Category 3A Building Concrete and 4A Masonry - Combined Bid
DayCo Concrete Company, Inc.
1850 Lake Drive West
Chanhassen, MN 55317
Base Bid Amount:
$ 994,200
Bid Category 3B - Precast Structural Concrete Walls
Fabcon, Inc.
6111 West Highway 13
Savage, MN 55378
Base Bid Amount:
$ 675,686
Bid Category 3C - Precast Plank
Molin Concrete Products Company
415 Lilac Street
Lino Lakes, MN 55014
Base Bid Amount:
$ 116,337
Bid Category SA - Structural Steel/Joists/Decking/Misc. Steel - Materials
Thumbeck Steel Fabrication, Inc.
23790 Goodview Circle, N.
Forest Lake, MN 55025
Base Bid Amount:
$ 400,863
~
CONSTRUCTION
CORPORATE OFFICE
HWY.7 CORPORATE CENTER
7003 W. LAKE ST.
SUITE 400
ST. LOUIS PARK, MN 55426
PHONE 952-837-8600
FAX 952-832-9600
SATELLITE OFFICES
PLAZA VII
MINNEAPOLIS, MN
NORTHLAND EXECUTIVE
OFFICE CENTER
BLOOMINGTON, MN
NORMANDALE LAKE
OFFICE PARK
BLOOMINGTON, MN
Enclosed you will find a copy of the bid results for each of the Bid Categories listed
above. The contract amounts above include accepted Alternate 7 and Alternates 10.
RJM is continuing its review process of the remaining bid categories and will submit its
recommendations for award for these reaming contracts at the City Council meeting.
If you should have any questions, please feel free to contact me.
Brian G. Recker
Vice President
Cc: Jeff Oertel, Oertel Architects
Chanhassen Public Works
Bid Summary by Trade
March 19, 2009
Bid Category
3A - Building Concrete
Company Base Bid Bid Addenda Total Contract
Security 4
Kelson Concrete $667,186.00 y 4 $667,186.00
DavCo Concrete $687,400.00 y 4 $687,400.00
Hollenback Nelson $688,900.00 y 4 $688,900.00
Northland Concrete $698,700.00 y 4 $698,700.00
Axel Ohman $712,000.00 y 4 $712,000.00
Kasella $719,000.00 y 4 $719,000.00
Kelleher Concrete $734,831.00 y 4 $734,831.00
Steenbura-Watrud $740,000.00 y 4 $740,000.00
Stellar Concrete $809,800.00 y 4 $809,800.00
Maanev $821,300.00 y 4 $821,300.00
Construction Conceots $835,877.00 y 4 $835,877.00
Donald R. Frantz $847,000.00 y 4 $847,000.00
Serice $849,000.00 y 4 $849,000.00
Crosstown Masonry $945,000.00 y 4 $945,000.00
Combined Bid 3A Building Concrete and 4A Masonry
Da co $994,200.00 y 4 $994,200.00
Donald Franz $1,232,000.00 y 4 $1,232,000.00
Serice $1,233,600.00 y 4 $1,233,600.00
Crosstown $1,295,000.00 y 4 $1,295,000.00
Chanhassen Public Works
Bid Summary by Trade
March 19,2009
Bid Category
4A . Masonry
Company Base Bid Bid Addenda Total Contract
Security 4
Nothland Concrete $327,750.00 y 4 $327,750.00
Davco $334,200.00 y 4 $334,200.00
William Bunn $342,369.00 y 4 $342,369.00
Steenburg $343,600.00 y 4 $343,600.00
Weiss $358,780.00 y 4 $358,780.00
Hollenback Nelson $362,800.00 y 4 $362,800.00
Axel Ohman $368,000.00 y 4 $368,000.00
Stellar $379,800.00 y 4 $379,800.00
Serice $384,600.00 y 4 $384,600.00
Donald Frantz $385,000.00 y 4 $385,000.00
Rovl Masonry $385,250.00 y 4 $385,250.00
TCR Enterprises $415,000.00 y 4 $415,000.00
Hines and Sons $418,700.00 y 4 $418,700.00
Crosstown $430,000.00 y 4 $430,000.00
Magney $430,700.00 y 4 $430,700.00
Combined Bid 3A Building Concrete and 4A Masonry
Da co $994,200.00 y 4 $994,200.00
Donald Franz $1,232,000.00 y 4 $1,232,000.00
Serice $1,233,600.00 y 4 $1,233,600.00
Crosstown $1,295,000.00 y 4 $1,295,000.00
Chanhassen Public Works
Bid Summary by Trade
March 19,2009
Bid Category
3B - Precast Structural Concrete Walls
Company Base Bid Bid Addenda Alt#7 Total Contract
Security 4 Standard
grey west
elevation
Fabcon $692,605.00 y 4 -$16,919.00 $675,686.00
Hanson $850,339.00 y 4 -$10,000.00 $840,339.00
IPC $983,000.00 y 4 -$20,000.00 $963,000.00
Combined Bid Categories 3B Precast Structural Concrete Walls and 3C Precast Plank
Hanson
$945,163.00
$
-$10,000.00
$935,163.00
Chanhassen Public Works
Bid Summary by Trade
March 19,2009
Bid Category
3C - Precast Plank
Company Base Bid Bid Addenda Alt#7 Total Contract
Security 4 Standard
grey west
elevation
Molin $116,337.00 y 4 $116,337.00
Hanson $128,343.00 y 4 $128,343.00
County Materials $130,920.00 y 4 $130,920.00
Combined Bid Categories 3B Precast Structural Concrete Walls and 3C Precast Plank
Hanson
$945,163.00
$
-$10,000.00
$935,163.00
Chanhassen Public Works
Bid Summary by Trade
March 19,2009
Bid Category
SA - Structural Steel/JoistslDecking/Misc. Steel Material
Company Base Bid Bid Addenda Alt #10 Total Contract
Security 4
12 Skylights
Thurnbeck $396,641.00 y 4 $4,222.00 $400,863.00
American Structural $418,265.00 y 4 $3,160.00 $421,425.00
Daka Corporation $444,670.00 y 4 $4,007.00 $448,677.00
Linco Steel $470,000.00 y 4 $1,920.00 $471,920.00
Capital Improvement Program
City of Chanhassen, MN
Project # EQ-087
Project Name Public Works Facility Equipment
Account # 1
Account #2
Account # 3
2009 thru 2013 Contact Paul Oehme
Department Major Equipment
Type Equipment
Useful Life
Category Public Works
Priority nla
Total Project Cost $500,000
Description
Provides the eqiupment for the Public Works facility. This equipment includes the vehicle lifts, computer system, fiber optic connection, security'
, system, fuel system and office equipment.
Justification
ecessary for the operation of the Public Works facility.
Expenditures
Equipment
2009
500,000
Total 500,000
Funding Sources
Capital Replacement Fund
Total
2009
500,000
500,000
Operational Impact/Other
2010
2011
Total
500,000
500,000
2013
2012
2010
2011
2012
2013
Total
500,000
500,000
42
,~
I
Capital Improvement Program
I City of Chanhassen, MN
Project # MB-003
I ProJect Name Public Works Facility Improvements
2009 thru 2013
Contact Paui Oehme
Department Municipal Buildings
Type Improvement
Useful Life Unassigned
Category Street Equipment
Priority n/a
Account # 1
Account # 3
I Description I
I The existing Public Works facility is over capacity and is in need of major repairs. The City is expected to grow an additional 30% before ultimate
build out. The existing facility is located on a 5 acre site which is alrC!ldy cramped for storage and operation space. The City completed a facility
needs study in 2007 and completed an exhaustive search to try to make an existing warehouse type building work. It was decided to move the
Public Works building because the existing site is too small for expansion and no warehouse type building was economically feasible to remodel.
Account #2
Total Project Cost $8,300,000
I
Justification
I
I The Operations and Maintenance Department needs additional space for repairs, meeting facilities, files, locker rooms, storage, supervisory offices
and proper equipment storage. In addition, the current facility does not meet many City building codes.
I
I
Expenditures
Construction
2009
8,300,000
Total 8,300,000
2010
2011
2012
2013
Total
8,300,000
8,300,000
I
I
I
~
,
Funding Sources
GO Bonds
Sewer Utility Fund
Surface Water Utility Fund
Water Utility Fund
2009
2010
2011
2012
2013
Total
7,000,000
700,000
400,000
200,000
8,300,000
7,000,000
700,000
400,000
200,000
8,300,000
Total
,';
, Operational Impact/Other , I
: rTItis project may increase operational costs. However, the new facility is planned to be very utility efficient compared to the existing facility.
~,
11':
~;,
~;
!f;
~.,
~'lk..
~;
~,
~:i..
49