1j Change Order 4 LibraryCITYOF
CHAI B
7700 Market Boule,,'ard
POBox147
Ci'mnhassen. f&155317
Admlnlsb"atlon
Phof~: 952227.1100
Fax.: 952227.1110
Building Inspections
Phone: 952227.1188
Fax: 952.227.1190
Engineering
Phone: 952227.1160
Fax: 952227.1170
Finance
PC, om: o,952.227.1140
Fa,,:: 952.227.1110
Park & Recreation
~.~,~.-': 952227.1i20
F~.': 952.227.!110
R~75alio"..
.....,,i,.,, -,,:-
£3!0 C,...:. B~-,,~,',,.,,
P~'.~e: 952227.1400
Fax. 952.227.14'34
Planning &
Natural Resources
,~. c,'".~: 952-.'_-.. ,;0'3
F-'.',. ~.2.227.1110
Public Works
1591 ~rk Rcad
Pnoee.: 952227.13.90
Fax: 952.227.1310
Senior Center
952227.1125
Fax: 952.227.1110
Web S~e
~,,;,:,,.'.ci.cha nlm.~,.n.m.~, us
TO: Mayor & City Council
FROM: Todd Gerhardt, City Manage~/[~ .
·
/
DATE: December 3, 2002
SUB J:
Change Order No. 4, Chanhassen Library Project
Attached for the City Council's consideration is Change Order No. 4 for the
Chanhassen Library project. Staff is requesting the City Council approve this
change order by increasing the original contract sum by $67,383.91, which will
bring the total contract to $5,103,626.35. The attached change order provides a
breakdown of the costs associated with each change order item.
If you have any questions, please contact me prior to Monday night'.s meeting.
The City of Chanhassen · A g:c;;in~ :cmmJa;b' with c~an lakes, q~ality s:hools, a charming downtown, thriving businesses, winding trails, and beautiful pa,dm. A grot place to li~. werk, and play.
Change Order
· Contractor
· Owner
· Architect
· M + E Consults
· Structural Consults
Proiect:
Contractor:
Chanhassen Public Library
690 City Center Dr.
Chanhassen, MN 55317
Kraus Anderson Const'n Co.
2500 Minnehaha Ave
Mpls, MN 55404
Change Order Number: 4
Date: 21 November 2002
Architect's Project No.: 2001021.00
Contract Date: 28 May 2002
Contract For: General Construction
The Contrac~ is changed as ]%flows:
ASI 2 Change to column locations to accommodate the fireplace add $162.00
ASI 5 Duct changes to accommodate enlarging the garage add $1,702.00
PR 3 Changes to Storm and Sanitary lines in southeast corner of the site add $3,558.00
PR 4 Delete utility sink in the Mechanical Room deduct $620.00
PR 6 Delete unnecessary fire / smoke dampers and associated controls deduct $2,825.00
CCD 4 Geopier solution to the soils problems along the southern xvall add $29,973.41
CCD 6 Soil corrections, dewatering and footing modifications for the ramp add $35,433.50
Attachments: Due to the complicated nature of this additional work all the
back-up data has been included with this Change Order for your convenience.
Not valid until signed by the Owner, Architect and Contractor
The original Contract Sum was ............................................................................................. $4,865,000.00
Net Change by previously authorized Change Orders ................................................................. $171242.44
The Contract Sum prior to this Change Order was ................................................................... $5036242.44
The Contract Sum will be increased by this Change Order in the amount of ............................... $67,383.91
The new Contract Sum including this Change Order will be .................................................. $$,103626.35
The Contract Time will be increased by ........................................................................................... 0 Days
The date of Substantial Completion, resulting from this Change Order is ............................... 22June, 2003
Archit~ k Contractor Owner
Meyer,~_~S~:herer 8c ~o~castle, Ltd. Kraus And~
119 ~~t ~ 2500 ~n~
Minn~l Mpl~~ ~
Date
Kraus Anderson Construction Co.
City of Chanhassen
690 City Center Dr
Chanhassen, MN 55317
By.
Date
L:k2001021CHAklock2001021co04.doc
KRAUS-ANDERSON. CONSTRUCTION COMPANY
CONTRACTORS & CONSTRUCTION MANAGERS
November 11, 2002
Mr. Barry Petit
Meyer, Scherer & Rockcastle, Ltd.
119 North 2nd Street
Minneapolis, MN 55401-1420
Re:
Chanhassen Public Library
Chanhassen, MN
Construction Change Directive No. 4
Dear Barry:
We have reviewed Construction Change Directive No. 4 dated September 13, 2002
issued by your office for the above referenced project and submit the attached cost
breakdown for your review and action.
As directed, we are'not proceeding xx4th Items 1 and 2 and consequently are not reflected
in the attached costs.
We are enclosing copies of our subcontractors' and material suppliers' cost proposals for
your records as applicable.
If you have any questions concerning our response, please contact me.
Sincerely,
KRAUS-ANDERSON CONSTRUCTION COMPANY
BUILDING DIVISION
Project Manager
WMC/lah
Enclosures
cc: Todd Gerhardt, City Manager
Building Division
2500 Minnehaha Avenue, Minneapolis, MN 55404
Phone: (612) 721-7581 FAX: (612} 721-2660
Chanhassen Public Library
Chanhassen, MN
Construction Change Directive No. 4
September 13, 2002
Drawings SK36 & 37, 38, 39 & 40
Earthwork
· Geopiers
· Survey
CCD #4
5% OH&P on $35,208.38
Perf. Bond
Deduct
Add
Add
($ 7,292.16)
$34,2OO.OO
$ 1,008.38
Subtotal $27,916.22
$ 1,760.42
Subtotal $29,676.64
$ 296.77
TOTAL ADD $29,973.41
· 10/04/02 I~Z 06:49 F'&.,T 8129340901 Z~G]~,&]['ITX'C&¥&'Z"ZHG ~001
·
189O0 Ploneer~ Tel (852) 884-0917
Eden PralrM, MN 55~47 Fax: (952) 934-0901
SOIL CORRECTION CREDrr
OcbMmr 3, 2002
MlnneapMb, Mlnnmmla
Pr~t ~an~oer
Chanh,~. Lh-ary
................... . ._ .... ~ ............. m ....... I mm ' m m m , [
.
Ama of building not c~rrected measures 910 a.f. Average cormctkm
depth per the' boringa equals 4.~. Avenage ~ ~ f~ over-
size per spec .equals .a 3~. 1~ s,f. x 182 I.f.
910 s.f. x 4.7G divided ~ ~
Overs~
TOTAI~
405,12- o,y,
.
Px~t~.Edmat:_l
, 405.12 c.y.
405.12 c..y.
ToT.M. CREDIT:
MT,ZB2.1e)
IY-_ ~I~-D'IT-li'OR itOli' CORREOTION
JayS. Waltem
Project Manager
~O/04/OZ
FRI 06:~0 FA.~ 6~2934090Z
IN~ ~CAVATIN~
t~O02
Phi:me: 319-345-2277
FOUNDATiON SERVICE CORP.
302 Blactdm~ Slmet
P.O. Box23
Reinbeck; Iowa 50669
Fax: 319-345.2658
KRAUS-AND. ERSON CONSTRUCTION CO
2500 MINNEHAHA AVE
MINNEAPOUS MN 55404
PROJECT INVOICE
Project: CHANHASSEN LIBRARY CHANHASSEN MN
~3921-B-4611 P02-PUM-00367
Please provide payment to us for work completed through 10-12-02 es .follows:
Geopler Foundation System
100% Complete
Less: 5% Retainage
Previous Payment Applications and Credits:
AMOUNT DUE:
Thank you for you consideration.
Todd S. Peterson
Vice President
_ % $70
KRAUS-ANDERSON. CONSTRUCTION COMPANY
CONTRACTORS & CONSTRLJCTION MANAGERS
October 29, 2002
: I
Mr. Barry Petit
Meyer, Scherer & Rockcastle, Ltd.
119 North 2"d Street
Minneapolis, MN 55401-1420
Chanhassen Public Library
Chanhassen, MN
Proposal Request No. 6
Dear Barry:
We have reviewed Proposal Request No. 6 dated October 3, 2002 issued by your office for the
above referenced project and submit the attached cost breakdown for your review and action.
-We will not proceed xvith any of the listed modifications unless directed to do so.
We are enclosing copies of our subcontractors' and material suppliers' cost proposals for your
records as applicable.
If you have any questions concenfing our response, please contact me.
Sincerely,.
KRA,,~-ANDERSON CONSTRUCTION CO,MPANY
BUrN
William M. Cox
Project Manager
WMC/lah
Enclosures
Building Division
2500 Minnehaha Avenue, Minneapolis, MN 55404
Phone: (612) 721-7581 FAX: (612) 721-2660
Chanhassen Public Library
Chanhassen, MN
Proposal Request No. 6
· Mechanical/HVAC - Metropolitan Mechanical
Deduct ($2,825.00)
· Electrical- Larson
No Change
PR #6 Subtotal Deduct
Sa~es Tax Included
($2,825.00)
TOTAL DEDUCT ($2,825.00)
October 10, 2002
Mr. Bill Cox
Kraus-Anderson Construction Company
Building Division
2500 Minnehaha Avenue
Minneapolis, MN 55404
Re:
Chanhassen Public Library
--_
Proposal Request No. 6 dated October sro, 2002
Dear Bill:
The following cost changes are for the Proposal Request No. 6 dated October 3fa, 2002.
Delete Fi're/Smoke dampers and controlS
($2.825)
Contract Summary:
· Base Contract:
· Previoug Change Orders (add):
This Change Order (add):
Revised Contract to Date:
$519.000
$2,100
($2,825)
$518,275
Sincerely.
Brian M. Gieseke
Project Manager
BG/sks
METROPOLITAN MECHANICAL CONTRACTORS~ INC.
7340 Washington Avenue South. Eden Prairie, Minnesota 55344-3582 · Phone: (952) 941-7010 · Fax: (952) 941-91 lCl~6
0CT-28-2002 HON I2:02 Pli L/~LSON ELEOTRIC SEEVICE;
NO. 783 788 5884
P. 01
(763) 780-8658 FAX (763) 786-~5864
To: Rill Cox
___ - ! . i -- - ,,- ~ ,1 __
From: Nf.d~Oelfid
L_ - gm il i _
CC:
11 - , i .. i i _
~A
· l, .i __ _
1
· _ - _ - _ .t 11
Wc have reviewed 1~ ~, thie if eno ~ ~mour ~ as'~ cam~ot
find any ~ m our invo~ wil:h lbo fire / smoke dmnpem list~ on the
KRAUS-ANDERSON~ CONSTRUCTION COMPANY
CONTRACTORS & CONSTRUCTION MANAGERS
October 2, 2002
Mr. Ban'y Petit
Meyer, Scherer & Rockcastle, Ltd.
119 North 2nd Street
Mi~meapolis, MN 55401-1420
Re,'
Chanhassen Public Librao,
Chanhassen, MN
Proposal Request No. 4
Dear Barry:
We have reviexved Proposal Request No. 4 dated July 23, 2002 issued by your office for the
above referenced project and submit the attached cost breakdown for your review and action.
We will not proceed with any of the listed modifications unless directed to do so.
We are enclosing copies of our subcontractors' and material suppliers' cost proposals for your
records.
if you have any questions concerning our response, please contact me.
Sincerely,
KRAUS-ANDERSON CONSTRUCTION COMPANY
BUI~N
Willimn M. Cox
Project Manager
WMC/lah
Enclosures
Building Division
2500 Minnehaha Avenue, Minneapolis, MN 55404-
Phone: (612) 721-7581 FAX: (612) 721-2660
Chanhassen Public Library
Chanhassen, MN
Proposal Request No. 4
October 2, 2002
· Door Opening- Gardner Hardware
No Change
· Gypsum Board-Custom Drywall
No Change
· Caulking
Add - $60.00
· .Plumbing- Buchman
Deduct ($680.00)
· Mechanical/HVAC - Metropolitan Mechanical
No Change
Electrical- Larson
PR g4 Subtotal Deduct
Sales Tax Included
No Change
($620.00)
TOTAL DEDUCT ($620.00)
.~al~/13/-2Bia2 15:;25 CUSTI3~ 9RY~ % c_~5:1.2'7212EE~ I',10.1a39
,i
4B5 A~rWATER GIRO:kg · ~T, ~&UL, MINNi~$OTA-'SJ5103 · (551) 4BB-O~.IZ
FACSIMILE TRANSMITTAL.
DATE:- .A.u.,,ctuat 13, 20...02
TO: BILL COX
FIRM: KRAUS - ANDERSON BUILDING DIVISION
FAX #: 812-721-2260 ..
FROM: DAN LYNCH
FAX #: 651 488-8432
TOTAL NUMBER OF PAGES INCLUDING COVER:
-- III I I I
RE: CHANHASSEN PUBLIC LIBRARY PR #4 '
--..
NO COST
D*"~N--L~NCH
I_. Ji iii .11 .. i IJ
IF YOU DID NOT RECEIVE ALL OF THE PAGES INCLUDED WTI'H THIS PAX
PI-EA.tE CALL 651 4a8-05~ AS SOON Aa PO~IBLE. THANK YOU..
"_m=c~ued Oooortunitv Ern~over-Contmotof'
/tlE--07-02 ~ 11:18 ~ BUCHH~ PLUNBI~ CO INO F'~ ~, 1 P, 02
P.O. BOX 11070
M O $s MN 55411
61 ~-,.51~..4707'
FAX 612~88-0833
A u~.~ 7, 200~.
I~ ta~.s,.Audu, r~t,n Co~l:~0'uctlon Co.
AtliJ; Willimn Cox
'l'h,,: h~lh~wi~)g is our response to yo~r Proposal I~cst//4.
1.) I~i.mitufl~: fl~u utility sink and all associated plumbing in Mechanical Room 100.
We will ~llow ~ cralit dr S680.00.
2.) C'lumg~ Door I01B iz~ a, ~pmpi~tely lab¢lod door ['or one-hour l'aod wall.
No Chsmge.
3.) Cl~nilgo thc gyp bi] on tho we, st a~y,[ soulh wnlls oflho r~i~ Dock 101
comittuok~>'ly cmuik t~lx~en the cl~king md ~p both
No Cbnng~
l'.t:.,i~:l,l'ull~t ,,,ubmi. tted.
'f'~n) P~d~kola
'rwP/I,-I
September 18, 2002
Mr. Bill Cox
Kraus-Anderson Construction Company
Building Division
2500 Minnehaha Avenue
Minneapolis, MN 55404
Re:
Chanhassen Public Library
Proposal Request No. 4
Dear Bill:
The follo,~Sng cost changes are for the Proposal Request No. 4 dated July 31 ~t, 2002.
"NO Change"
Contract Smmuary:
· Base Subcontract:
· Previous Change Orders (add):
· This Chm~ge Order (add):
Revi~ed Contract to Date:
$519,000
$2,100
$0
$$21,100
Sincerely,
Brian M. Gieseke
Project Manager
BG/sks
METROPOLITAN MECHANICAL CONTRACTORS~ INC.
7340 Wmhington Avenue South, Eden Prairie, Minnesota 55344-3582 · Phone:. (952) 941-7010. Fax: (952) 941-9118
--', ttUG-08-2002 TUE 07:26 ~ L~0N £LEOTRIO SERVICE
F,~ NO, 783 788 ~84 P, O1
~U'S-ANDER,..qoNo CONSTRUCTION COMPT
' CONTI~*,L'TOR:S & CONS'TRUCT1ON MANAGERS
I I ~. I[ [~ ~ ~ I I I IBm I~
!
· .M' mora du.m
.'
:
(v~a fa~ and hard copy to follow
Far.. 763-786-5864 Total t~,~:
~N Ig.,BC"II~C SVCS. CO.
7928 U~~~ A~ N~
..
I
I
I
lf~ ia :~o ol!an~e to ~ttr re~pecti-~ work, plca~ ~ '~ ~". Plea~
respon~ t~ eaclt item individually. ·
Ityou have'my ques~ms cone. chUg the above, please eontnet m~,
[ .
KRAUfl-ANDERSON CONSTRUCTION COMPANY
I
2~00 Mlnnehaha Avenue, Mirumapolb, MN $5404
Phorm: (612) 121-7581 FAX; (61Z) 721-2f~0
October 9, 2002
KRAUS-ANDERSON® CONSTRUCTION COMPANY
CONTRACTORS & CONSTRUCTION MANAGERS
Mr. Barry Petit
Meyer, Scherer & Rockcastle, Ltd.
119 North 2nd Street
Mim~eapolis, MN 55401-1420
Chanhassen Public Library
Chanhassen, MN
Proposal Request No. 3 (Revised)
Dear Barry:
We have reviewed Proposal Request No. 3 dated June 20th, 2002 issued by your office for the
above referenced project and submit the attached revised cost breakdoxvn for your review and
action.
We have completed the described work as directed in CCD No. 2.
We are enclosing copies of our subcontractors' cost proposals for 3'our records as applicable.
If you have any questions concerning our response, please contact me.
Sincerely,
KR_AUS-ANDERSON CONSTRUCTION COMPANY
i~~SION
Project Manager
WMC/lah
Enclosures
Building Division
2500 Minnehaha Avenue, Minneapolis, MN 55404 .
Phone: (612) 721-7581 FAX: (612) 721-2660
C~.,~I t'~.-*..~-'... I-~l .....
Chanhassen Public Library
Chanhassen, MN
Revised - Proposal Request No. 3
October 9, 2002
Drawings SK 141 thru 146
· Survey-Sunde Land Survey
Add $1,220.00
· Site Utilities- Voson
Add $ 954.00
· Remove & Reinstall Erosion
Control Fence- Ingram Excavating
Add $1,215.00
PR # 3 - Revised - Additional Items Subtotal $3,389.00
5%OH&P $ 169.00
TOTAL ADD $3,558.00
9001 Eest Bloomington Freeway GSW) - Suite 118
Bloomington MlnneSot~ 55420-3435
952/881-2455 · F~x: 952/888-9526
INVOICE FOR SERVICES
Bill Cox
Kraus-Anderson Building Division
2500 Minnehaha Avenue
Minneapolis, MN 55404
Proje, ct No: 2002070
West 78th St. & Kerber Blvd. - Chanhassen, MN
"Chanhassen Library"
Invoice number
Date
Customer: K608
28586
August 21, 2002
Professional Services 1.) Restaked grid li~es.
2.) Staked watermains.
3.) Staked storm se~er.
Stake Watermain
Larry Alman
Natalie North
Se, an Narveson
Stake Storm Sewer
Larry Alman
Natalie North
Scan Narveson
Mark A. Peterson
Keith $ohnson
Stake Watermain subtotal
Stake Storm Sewer subtotal
Stake Grid Lines
Mark A. Peterson
Pete Goers
Stake Grid Lines subtotal '
Const. Plan Computations
.
Lenny Carlson ·
Lermy Carlson
Const. Plan Computations subtotal
Date Hours
Rate /k~otmt
08/07/02 1.00 76.00 76.00
08/07/02 1.00 68.00 68.00
08/07/02 1.00 66.00 66.00
3.00 210.00
08/07/02 3.00 76.00 228.00
08/07/02 3.00 68.00 204.00
08/07/02 3.00 66.00 198.00
08/12/02 4.50 74.00 333.00
08/12/02 - 4.50 66.00 297.00
18.00 1,260.00
08/19/02 3.00 74.00 222.00
08/19/02 3.00 72.00 216.00
6.00 438.00
08/06/02 5.00 76.00 380.00
08/07/02 2.00 76.00 152.00
7.00 532.00
Surveying Services subtotal
Reimbursable Expenses
Hubs & Laths
Hubs & Laths
Mileage
Mileage, ~ ~
For I~yment by c~dlt ~rd oonteot
34.00 2,440.00
'AmouRt
08/07/2002 21.00
08/12/2002 25.20
08/07/2002 10.20
08/12/2002 5.78
TERMS: Due and payabla upon moa{pC'Please refer to contraot dooumonte If o
credit terms apply or call Ac, counts Pey~bla wl~k,.v~ur crpdJ~,~.~cl Informet[
Payment Is aubJect to a delinquent FINANCE CHARi~-'of 1 l'/2'A'13er'month, whl~
ADDITIONAL WORK AUTHORIZATION
OSTING CONTRACT NUMBER
}~'rATE
VOSON PLUMBING, INC.
1515-A 5th Street South
HOPKINS, MN 55343
(952) 9~.~
FAX (952) 938-8910
You are authorized to perform the following specifically described additional work:
CHARGE FOR ABOVE WORK IS: $ ~
~ayment will be made as follows:
additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
Authorizing Signature
hereby agree to furnish labor and materials - complete in accordance with the above specifications, at above stated pdce.
'uthodzed Signature ~- ~--~'~'%, ~_~~_
HIS IS CHANGE ORDER NO.
DewateHn._ at watertable for correction:
A, (2) 18"x 20' steel culverts delivered @ $15.00 per I.f. -
B. Install culverts, place rock & removals
300 Hoe, 5 hours @ $170.00 per hour
C. Laborer, 4 hours ~ $60.00 per hour $240.00
D. Drainage rock, (2) loads, 42 ton ~ $19.78 per ton
TOTAL:
$600.00
$830.76
$2,520.?$
Erosion control fence re-Installed as requested due to utility_ Installation:
8/22/02 - 810 I.f. ~ $1.50 per I.f. ..~_l.,~
TOTAL: $1,215.00
--
Regards,
Todd A. Ingram~-----~
Vice President
Ingram Excavating Inc.
./
KRAUS-ANDERSON. CONSTRUCTION COMPANY
CONTRACTORS & CONSTRUCTION MANAGERS
October 2, 2002
Mr. Barry Petit
Meyer, Scherer & Rockcastle, Ltd.
119 North 2nd Street
Minneapolis, MN 55401-1420
Re:
Chanhassen Public Library
Chanhassen, MN
ASI No. 5
Dear Barry:
We have reviewed ASI No. 5 dated August 13, 2002 issued by your office for the above
referenced project and submit the attached cost breakdown for your review and action.
We will not proceed with any of the listed modifications unless directed to do so.
We are enclosing copies of our subcontractors' and material suppliers' cost proposes for
your records as applicable.
If you have any questions concerning our response, please contact me.
Sincerely,
KRAUS-ANDERSON CONSTRUCTION COMPANY
BUILDING DIVISION
William M. Cox
Project Manager
WMCHah
Enclosures
Building Division
2500 Minnehaha Avenue, Minneapolis, MN 55404
Phone: (612) 721-7581 FAX: (612) 721-2660
Chanhassen Public Library
Chanhassen, MN
ASI No. 5
October 2, 2002
Drawings SK147, 148, 149
· Mechanical
· Electrical
No Change
Add $1,605.00
Subtotal $1,605.00
Sales Tax Incl.
Subtotal' $1,605.00
5% OH&P on $1,605.00 $80.00
Subtotal $1,685.00
Perf. Bond $17.00
TOTAL ADD $1,702.00
Architect's
Supplemental Instructions.
Contractor ·
Fidd' []
Other []
Projecn
To:
Contract
Contract
Chanhassen Public Library
690 Center City Drive
Chanhassen, MN 55317
City of Chanhassen
690 Center City Drive
Chanhas~n, MN 55317
ICraus Anderson
2500 Mimaehaha Ave
Mpls, MN 55404
For:. General Construction
Date: May 1, 2002
ASh No ~
Date of Issuance: 12 Aug, 2002
Architect: Meyer Scherer&: Rockcastle, Ltd.
Architect's Project No.: 2001021CHA
The Work sball be carried out in accordance ~ the [ollowing instructions.
in accordance with the Contract Documents udtbout c. bange in Contr~ Sum or Contract Time.
Proceeding udtb the Work in accordance with these ilts'truagions ilu].icates your acknowledgment
that tbere will be no change in the Contract Sum or Contra~t Time.
Descriptions:
SK147, 148 Modification to the 36 x 24 supply air duct leaving the m~hanical room and associated
changes to branch ducts
SK 149 Relocating electrical panels within the mechanical room to accommodate the duct change..
Please forward to mechanical and electrical subcontractors so they may modify their shop drawings.
Si( 147, 148, 149
Issued By: BarryPetit, Proi~a Manager MSdrR
~N. FLR.
ss.'.-o:' '~'
'F'iCE
38x24
I I
//
18xl 4.
Chanhassen Library and Parking Deck
MS&R Architect~ 612-375-0336'
ASi
CCD
PR
v I
FLEX CONNECTION
100x24
56x24.
2-1/2~' I-IWS
-30x20 UP
GRAVITY RI
·
iHOOD
i
I
·
I
I
!
!
-- TRANSmON. 44x24 TO
56x24. IN VIDRTICAL
·
F/S DAMPER
FOR PANE]. LOCATIONS.
TOILET
Chanhassen Library ~nd Parking Deck
MS&R Architects 612-375-0336
CCD
PR
SK/¥
,
PAN
6
9,21,23
R1N-NW2
4-,6
R1N-NW
T1N-NW1-
P3N-
L3N-NW1
lIGHTING CONTROL PANI
8(~18"
5HIdU I I ON
HEAD
[102
lB'
MICROWAVE~i
SMOKE
DAMPER
TOILET I
l_
TORt
117
Chanhassen Library and Parking Deck
MS&R Architects 612-375-0336
ASI
CCD
PR
September 18, 2002
Mr. Bill Cox
Kraus-Andcrson Constriction Company
Building Division
2500 Minnehaha Avenue
· Minneapolis, MN 55404
RtL'
Chanhassen Public Library
ASI N~ $ dated August 13a, 2002
Dear Bill:
The following cost changes are for the ASI No. 5 dated August 13th, 2002.
"No Change"
SEP-11-2002 14SD 10:37 ~ LP~tSON SLSOTRIO SERVIOS
FAX NO, 783 788 (5884
PI
O1
7928 UNIVER~I'TY AVENUE NE
MINNEAPOI..I:S, MN 55432
(763) 780-a658 FAX (763} 786-5864
To: Bill Cox
· ,
~_.
Fax 9:
From:
Chanha.ssen A~I ~
~ln K/A
Da~: 9/11/02
· -- - _ _ 11 _. _ ,,
Pages:
Cos~ for ASI 5 change is $1,60~.00, Estimate summary atta~d,
64
3.1382
783 '786 6864 P, 02
KRAUS-ANDERSON® CONSTRUCTION COMPANY
CONTRACTORS & CONSTRUCTION MANAGERS
October 2, 2002
Mr. Barry Petit
Meyer, Scherer & Rockcastle, Ltd.
119 North 2nd Street
Minneapolis, MN 55401-1420
Re,'
Chanhassen Public Library
Chanhassen, MN
ASI No. 2
Dear Barry:
We have reviewed ASI No. 2 dated June 24, 2002 issued by your office for the above
referenced project and submit the attached cost breakdo~vn for your re,,4ew and action.
We will not proceed with any of the listed modifications unless directed to do so.
We are enclosing copies of our subcontractors' and material suppliers' cost proposals for
your records as applicable.
If you have any questions concerning our response, please contact me.
Sincer.ely,
KRAUS-ANDERSON CONSTRUCTION COMPANY
BUILDING DIVISION
William M. Cox
Project.Manager
WMC/Iah
Enclosures
Building Division
2500 Minnehaha Avenue, Minneapolis, MN 55404
Phone: (612) 721-7581 FAX: {612) 721-2660
Chanhassen Public Library
Chanhassen, MN
ASI No. 2
October 2, 2002
Drawing SK35
· Earthwork
· Reinforcing Steel
· Concrete & Masonry
'Material
Labor
No Change
Add $120.00
Add 24.00
No Change
Subtotal $144.00
Sales Tax 8.00
Subtotal $152.00
5% OH&P $8.00
Subtotal $160.00
Perf. Bond $2.00
TOTAL ADD $162.00
Architect's
Supplemental Instructions
Owner ·
Architect ·
Consultant []
Contractor ·
Field []
Other []
Project:
OxvIler:
To:
Contract
Contract
Chanhassen Public Library
690 Center City Drive
Chanhassen, MN 55317
City of Chanhassen
690 Center City Drive
Chanhassen, MN 55317
Kraus Anderson
2500 Minnehaha Ave
Mpls, ~ 55404
For: General Construction
Date: May 1, 2002
ASI: No 2
Date of Issuance: 24 June, 2002
Architect: Meyer Scherer & Rockcastlq Ltd.
Architect's Project No.: 2001021CHA
Tbd Work shall be carried out in accordance with the following instructions
in accordance with the Contract Documents without change in Contract Sum or Contract Time.
Pro~:eeding with the Work in accordance with these instructions indicates your acknowledgment
that there will be no change in the Contract Sum or Contract Time.
Descriptions:
Please review and distribute the structural .information from M.BJ
Attachments:
MBJ Transmittal dated 5-20-02
Structural Sketch: SK 35
Issued By: BarryPetit, I'roievt Manager MSdvR
IIII1 1
Meyer, Schemr& Rockcasfle, inc.
~n: Bany Petit
Fax= 342-2216
'Phm'm: 375-8714
Re-- Chanhassen l. Jbmry
MEYER, BORGMAN AND J
12 8OI. J'I'H ~ ;~ I m:~ ~ SUITE l~810
MI~, MINI~=SOTA 55402
612-338.0713
FAX,~12-337.5325
[] Urg .~lt [] For Review .1:"1 ~ Com~
OHNSON, INC.
,,
!
1
I
!
I
!
i
·
i
!
!
..
pa~ 2 ( Includ~ ~is page )
I
I
· !
1
Please pass the attached infonnal~3n along to Kraus Andemon. lop. of footing elevation for the
column Iom~d l~n grid~ 5 and 6, near B ~:mld i~ ~ at 97'.-~'. A 20'~tY ~ pl~' I~r
5/S501 should be provided to elevation 99'-0'.
I
I
!
T.F.F.,
11
I
T.F.& -
8'-8' 6'-!0' 7'-8" 7'-8" 7'-8"
illll,I,
MEYER, BORGMAN AND JOHNSON, INC.
CONSULTING STRUCTURAL ENGINEERS
SOUTH s~x'm smr_z-r surrE
IdlNNEAPOLI~, MINNESOTA 55402
(612) ~B-0713 FAX (612) 337-5325
CHANHASSEN LIBRARY
t~O TIAI~, AJOPI?ICATI ~W5
~ ,
'Comm. No.
01.528
_ __
'Drown:
I~ued:
Checked:
RCK
IShe~ No.
ZO~l 'd t~St'oN 'Al(] BNl(]Ilflg V/~4 'l~dfll,'Z :Zfl~Z 'R '~nv
27, 2002
~US-ANDERSON. CONSTRUCTION COMPANY
CONTRACTORS & CONSTRUCTION/vlANAGERS
Memorandum
(via fax and hard copy to follow tn mall)
Fax: 651-426-8074 Total Pages: 4
TO:
Gary Michalski
EMPmE CORPORATION
2320 East County Rd. ir
White Bear Lake, MN 55110
Chanhassen Public Ltbnu~
Chanhassen, ~
·
ASl N~ 2
Please review the almched ASI No. 2 by MS & R Architects dated irune 24, 2002 for the
above referenced project and submit your written cost proposal to our office by
Wednesday, .luly 3rd, 2002.
If there is no change to your respective work, please indicate "No Change". Please
respond to each item individually.
If you have any questions concerning the above, please contact me.
Sine=ely,
KRAUS-ANDERSON CONSTKU~ON COMPANY
BUILDING DIVISION
William M. Cox
Project Manager
Building Division
2500 Mlnnehaha Avenue, Minneapolis, MN 55404
Phone: (612) 721-7581 FAX: (612) 721-2660
27, 2002
KRAUS-ANDERSON. CONSTRUCTION COMPANY
CONTRACTORS & CONSTRUCTION MANAGERS
I
Memorandum
fax and hard ct~ to fat/aw/n ~
Fax,: 952-954~0901_ Tottd Pa~: 4
TO:
Jay Walters
I~GRAM EXCAVATING
18900 Pioneer Trail
Eden Prairie, .MN 55347
Ckan/ta~tn Pub//c L/b~
Ckanhasst~, MN
No. 2
Please review the ma~ched ASI No. 2 by MS & R Architects dated June 24, 2002 for the
above r~ereaced project and submit your writmn cost pmpo~ to our office by
·
Ifthe~ is no change to your respective wozk, please indicate "No Change". Please
respond to each item indiMd.~ly.
If you have any questions concerning the above, please contact me.
Sinc~ly,
KRAUS-ANDERSON CONSTRUCTION COMPANY
BUll.DING DIVISION
2500 Minnehaha Avenue, Mln .rgapoi~, MN 55404
Phone: [612) 721-758T FAX: 1'612) 721-2660
Stme 27, 2002
~US-ANDERSON. CONSTRUC~ON CO.ANY
.CONTRACTORS & CONSTRUCTION MANAGERS
Memorandum
(via fax and hard copy to follow In mail)
Fax: 763..434-76~3 Total Pages: 4
TO:
lay Bird
CROSSTOWN MASONRY, INC.
1322 159th Ave. NE
Ham Lake, MN 55304
Chanhassen Public Lib~
Chanhassen, MN
No. 2
Please review the attached ASI No. 2 by MS & R Amhitects dated June 24, 2002 for the
above referenced project and submit your written cost proposal to our office by
~es~ 2002.
· .
If there, is no change to your respective work, please indicate "No Change". Please
respond to each item indi .vid .ual/y.
If you have any questions concerning the above, please contact me.
Sincerely,
KRAUS-~~ON CONSTRUCrION COMPANY
BUILDING DMSION
William M. Cox
Project Manager
Attachment
Building Division
2500 Minnehaha Avenue, Minneapolis, MN 55404
Phnn~: tR12~ 771-75R1 FAY: (61 ?1 721-76R(!
November 13, 2002
KRAUS-ANDERSON. CONSTRUCTION COMPANY
CONTRACTORS & CONSTRUCTION MANAGERS
Mr. Barry Petit
Meyer, Seherer & Rockcastle, Ltd.
119 North 2nd Street
Minneapolis, MN 55401-1420
Chanhassen Public Library
Chanhassen, MN
Construction Change Directive No. 6
Dear Barry:
We have performed the additional activities as outlined in GME Consultants, Inc.'s letter
dated September 19, 2002 as part of CCD No. 6 to facilitate the construction of the
parking ramp footings including mucking out of unsuitable soils, pouring concrete mud
slabs to create a workable surface platform, and modifying the footing construction per
Drawing SK41 prepared by Meyer Borgman Johnson.
The following is a cost summarization of the work.
Muckine Out
As the m-ud slab pours needed to immediately folloxv the mucking out of the unsuitable
soils, it was necessary to focus on the removal of the materials and stockpile the spoils
adjacent to the excavated trench. When a significant segment, of mud slab was poured, '
the unsuitable soils were then loaded into tracks and hauled off site. This close
coordination with the concrete activities necessitated double handling of the unsuitable
soils.
Unit Price #1
Structurally unsuitable soil removal.
396 Cu. Yds. @ $7.50/Cu. Yd. =
Other Costs as summarized in Ingrara E~cavating's
letter dated October 9, 2002.
Subtotal Excavation
$2,970.00
$6,395.73
$9,365.73
Reinforcing Steel
Empire Corporation
$319.50
Building Division
2500 Minnehaha Avenue, Minneapolis, MN 55404
Phone: (612) 721-7581 FAX: (612) 721-2660
Barry Petit Letter
Nov. 13, 2002
Page 2 of 2
Cast-In-Place Concrete
Crosstown Masonry, Inc.
Scope of work as summarized in Crosstoxvn
Masonry's letter dated October 21, 2002.
Dewatering
Kraus-Anderson
Kraus-Anderson
Labor
Material (1) Pump
Portable Generator
Third Party Rental (Pump)
Subtotal Dewatering
Subtotal (All Work Categories)
10% O.H. & P. on K-A Work
$6,627.18 x 10% =
5% O.H. & P. on Subwork
$23,640.73 x 5% =
Subtotal
1% Performance & Payment Bond
$16,925.50
$5,425.92
$ 171.60
$ 510.00
S 319.50
$6,627.18
S33,237.91
$ 662.72
$ 1,182.04
$35,O82.67
S 350.83
TOTAL ADD
$35,433.50
Documentatiol~ is attached to sttbstantiate the above-mentioned additional cost.
If you have any questions or comments concerning the above, please contact me.
Sincerely,
KRAUS-ANDERSON CONSTRUCTION COMPANY
iV~ii~~~x~IOs
Project Manager
cc: Todd Gerhardt, Chanhassen City Manager
Attachments
18900 Pioneer Trail
Eden Prairie, MN 55347
Tel: (952) 934-0917
Fax: (952) 934-0901
CHANGE ORDER REQUEST
October 9, 2002
Kraus Anderson
2600 Mlnrmhaha Avenue
Minneapolis, Minnesota
Chanlmasen Ubrary
. ! --- . ., . .
111 . i i __ i ~ ~ i i ii .... i i · ii i i
Additional work ~ req.~ to ~ll_ow p]a___m~llant of footi _11~ roi' .l~aykln~_ r~.:
1. Exc_-avate ~ urmuitable soils and export off sll~ from alrm, dy excavated trenchea:
09/27/02
09/30/02
200 Hoe - Mobilization
200 Hoe, 8 1/2 hours ~ $150.00 per hour (~D~2~ ~ ,I~I/~T~
Truck # 97, Td-Axel, 10 loads ~ 12 c.y. per load, 120 c.y. ~ $7.50 per c.y.
Truck # 98, Td-Axel, 7 loads ~ 12 c.y. per load, 84 c.y. (~ $7:50 per c.y.
200 Hoe, 8 1/2 hours ~ $150.00 per hour C~.DoIp~=~L~ ~ ~~)
Truck # 98, Tri-Axel, 7 loads ~ 12 c.y. per Io~1, 84 c.y. ~ $7.50 per c.y.
10/02/02
10/003/02
200 Hoe, 5 hours ~ $150.00 per hour
200 Hoe, 8 hours ~ $150.00 per hour
Truck # 97, Tri-Axel, 9 loads ~ 12 c.y. per load, 108 c.y. '~.$7.50 per c.y.
Roller Compactor, 6 houm ll~ $115.00 per hour
2. C~---r rock im..,orted for am through mud to ?tiring ramp for cement Wuc. ks:
09/27/02
3" rock, (2)loads, 29.92 ton ~l $19.78 per ton
3" clear rock, (1) load, 15.87 ton ~ $19.78 perm
TOTAL THIS CHANGE ORDER REQUEST: $9,386.73 j
$300.00
$1,275.00
$900.00
$630.00
$1,275.00
$830.00
$750.00
$1,200.00
$810.00
$59'1.82
$9,34~.73
f .
Todd A. In~
Vice President'
;)ect Location:
Start'Time
I GRAM EAL;AVAI
Daily Time Sheet
Lunch: 'Yes
.;cst
;ode
Description
I
i00 iMobilization
200 ]C!eafing/Grubing
300 ISil[ Fence
270 JBlacktop Removal
·
500 !Concrete Removal
J003 ~Miscellaneous Site Removals
G30__lBuildin9 Demolition
;
· }~! .... .._3t'_a_ki_n_~t / Layout
.-'-"'0 :...T_.o~_s_oil S. trip/Respread
.,J. Common Excavation
:5.:, -F "~
oo,,..o Excavation I Backfill
~3:, 'Sand Cushion/Finish Grade Floors
! ~ ~_-....-
!'l~O'- "m~ort /EXpoH Topsoil
i
~.0_'.d. ..... :[.,"n,port / Export Common
:5O it,,-nDo,'1 / Ex~ort Sand
· O00 {Draintile
·
.;,30 ~,,,_ggre_gate Base Class §
,·400 Snow Plowin§ / Removals
'i00 ;Finish Grade Sil, e
...r.,..%, ~Ofiice Work
1600 .Shop Work
· ,,-) ~. :,~ ,
,.d... ,~.:,fi Correction
· :l~. Cons!ruction Entrance
Equipment
Description
Eq~pment I ~hor
Hours Hours
iii trucks must include haul sheet
·
Project Location:
Start Time
INGRAM EXCAVATING INC.
Track Haul Sheet
I
Stop Time. ~,'.~ 0
Llmch: Ye.
T~ndem End Dump
Tri-Ax~! i~ Belly Dump
Quad-.Ax~l
Tmller # '~
.,.. i .,.. i -
Time I ~1 Fr~m To { _'nme I MiItllr~ IH~uled
, From I I-~uledTo
i' 12" ' '" ' '
; ~' :
i -
J!4 ,.-,',',-c '~ ,' " ~4 ' ' I
'i~,;;~:''' I.,' ,, ~, ~ ,.. ' .... T
I
,
:is, ~"~ I '~ ,~ ~, ~ i ] I
I . ....
'i9.:;0[".' I ,r ,~ .. ,, ~...
I i'~o ! ,. ..
;.I11i 41
13 J ,43 _
14 I 44 i
15 45
. ~s I . ~ ..
,
~8 48 " '!
· ' ."
21 61 __
--
....
i l~ I ._ ~ ....
INGRAM EXCAVATING INC.
Truck Haul Sheet
Stop Time "~ ii ~
End Dump [
Belly Dump [
Date: ~ ' 2~,.-I .. 0,,2-
Lunch: Yes
Total Hours
Truck # ~(
Trailer #
Time I Material
Hauled I Hauled
From To
Time
7 /I ~,,T/.. '137
I j39
40
41
il3
119
i20
124
· 125
~ 126
',2fl
43
Material
Hauled
From
Hauled
To
45 "
46
47
48
49
5O
51
52
·
53
55 '
57
58
J59
INGRAM EXCAVATING INC.
Dally Time Sheet
)Ject Name: ~ ~
Lunch: Yes
Total Hours:
:ost I -
~ode I Description
'1 O0 IMo ,bilization
~00 IClearinglGrublng
1300 ISilt Fence
O0
O0
J Blacktop Removal
IConcrete Removal
IMiscellaneous Site Removals
30. IE~uilding Demolition
80 IStaking / Layout
..
190 ITop.soil Stri~lRespread
600 ICommon Excavation
IFooting Excavation I Backfill
ISand Cushion~l~inlsh Grade Floors
)0
i oo
I000
Import ! Export Topsoil
tlmport / Export Common
Import I Export Sand
IDraintile
IAggregate Base Class 5
400 ISnow Plowing.! Removals
100 {Finish Grade Site
500 }Office Work
600 IShop Work
200 ISoil Con'ection
Construction Entrance
Equipment
Description
Fq,,~prn~t
Houm
J..a.bor
Hours
larks
,I trucks must Include haul sheet
INGRAM EXCAVATING. INC.
Truck Haul Sheet
Tandem
Tri-Ax.l
Qu~d.Axel
End Dmnp !
Truck#
Troller# ,
']- I''0''~' "'~ ]1' I ""'~ I
Time : .Material . . F..ro~. . .To .~ Time Material From To
~'7 .'-~ o ,c:'.~ ~_.,~-~-~,~, ~.~,~.~ ~ i
._ . ~_.,~..~. ,
I~ ')*~/~;-. - ! '/ ~' ~ , -
61 ~ :.~ ~,' 1I' . .i ;-
· _ 38 .1 ...
! ~ i.~.~ I-, 3e I ,
i~o "~'-3.5" ~. t ~o
~ . 4~ ! ....
I 12 _ .. 42 i
13 43 .~ ......
/
14 44
~ . , ! . . .
15 45
16 46
...... , . ...
I
....
18 48
'' I ....'~
19 _ 49 '1. _
20 ,. 5O-I ..
21 ..... 51 i .. . ..
........
J26I~ ... 56 .;
}2'7 I
I 57 .
I 28 I [58
._'l '1 .. --"'" ! .. -
INGF M EXCAVATING INC.
Dally Time Sheet
· o
Lunch: Yes ~N~
Total Houm:
Co. stI
Code i Description
100 IMobilization
200 ICleafinglGrubing
300 ISilt Fence
I Blacktop Rem oval
iConcrete Removal
Equipment
Description
Houm I
!9000 IMiscellaneous Site Removals,.,
630 IBuilding Demolition
IStaking /. Layout
!Tops.oil StfipIRespread
ICommon Excavation
IFootingExcavation /Backfill
ISand Cushioh;/Finish Grade Floors I
Ilmport i Export Topsoil
I
,0
7OO
65O
1000
Ilmport I Export Common
Ilmport I Export Sand
iDraintile
930 IAggregate Base Class 5
1400 ISnow Plowing i Removals
.1100 IFinish Grade Stte
500 Ioffice Work
600 IShop Work
200 ISoil Correction
300 IConstruction Entrance
l~hor
Houm
·
.,
.marks
.I trucks must Include haul sheet
]oyee Name:
Project Name:
Project Location:
Start Time~
INGRAM EXCAVATING INC.
Dally Time Sheet
Date:. /~')"
Lunch: Yes
Total Hours:
Cost
Code
100
200
300
270
500
"9000
"630
180
190
600
250
900
)0
700
650
Description
IMobilization
I CleadnglGrubing
ISilt Fence
Blacktop Removal
IConcrete Removal
IMiscellaneous Site Removals
IBuildin9 Demolition
{Staking / Layout
iTopsoil StripIRespread
ICommon Excavation
FOoting Ex(~a~/ati°n '1 Backfill
JSand Cushion/Finish Grade Floors
IImport / Export Topsoil
Ilmpo~ / Export Common
Jlmp~rt / Export Sand
1000 jDraintile
930
1400
JAggregate Base CJass 5
Snow Plowing / Removals
Finish Grade SEe
Equipment
Description
F._qulpment ]
Hours
I
1100
1500 Office Work J
Sh9p Work
1600
· 1200 Soil Correction
· 1300 Construction Entrance
.
.I
~l ~hor
Hours
'emarks
trucks must. include haul sheet
INGRAM EXCAVATING INC.
Truck Haul Sheet
-oJect Location:
,tart Time "1 ~C3 Stop Time
Date:
Lunch: Yes
Total Houm
Tandem
TH-Axe]
Quad-Axe]
End Dump I Truck
Belly Dump
Troller
Time . . Marterlal ..... From. To . .Time Material . F. ro.m , ._ To
.. _ .,., ~ ~ ~,.,~.~ ~.32 .
I
3~';;L~ J 33
!~) I 3s I .... I
12 J 42
....
13 .. I .... 43 ~, .
14 I 44
, .
15 I 45
il7 I '- _47 .... ' .... i'
~, I ..I ,~ .........I
~, I ., .I. ,~,
, = ,
20 I 50 -
· . . ~ .
23 I 53
--
24 54
_
·
i25 55 _
.~ .........
1~7 .I '" ~ "1' I -
· . ,
8 i .....
I
~29 I 59 _
I~o !. . ~o .. _
WM. MU£LLER & ~,<;: INC.
GRAVELING & BLACKTOP ~RA'~TOR$
831 Pa.fl< Ave. - P.O. Bo~ 2.~'7
CARVER Hamburg, MN 553,.'3~) WECKMAN
952-448-4175 952-467-2720 952-445-3588
AN EQUAL OPPORTUNITY '.:-",,II~'I.OYER
Ta ..e
C~ANTI.TV
OPJ:)EREr3 ~
' ~'0XNw::'
RECEIVED ~
QUANTr;',.' ·
REMAININg.
The algnmtur~ ;
me,ti the ip.):i:
..
,.
· -:~ .
...~. '
-:. ,
.:
.:-..
WEIGH'I !,.'. ',.',~ :~R
· .
'.i.~:! -:.:'.pi EXL;Ab -.
·
= TRUCK
I 4. AUL RATE [INIT P'
· -F--- ~."~"~,v. '--
I
HAUl.
CHAR.~ES
I:-, E_[ ~., .
,SALE.~
..
:".ftllla! thlit thl- ~-.:
-.-.mract. apac~llcallo~,
.I-,4E NO RESP(; .:~;
TOT~ "-. :
'Y FO' i:)AMAGES ~tESb.
DRIV
?.".TI' PRICE . .-
· -~G. TAX-
1
WM. MUELLER & SC:~':,:i INC.
GRAVELING & BLACKTOP COb -':-Iv.. ,'-ORS
831 Park Ave,- P,O. Boz ':-.'7
CARVER Hamburg, MN 5533,c WECKMAN
952-448-4175 952-467.-2720 952-445-3588
AN EQUAL OPPORTUNITY i!"-:' '.:)YER
· ...:.:i::~?, . J '1:: · If, I F.E/,L;A',
I
- . .:'" ;.PURCHA,::li
.. ' ',". ',. '~L5 ORDEa kC
TRUCK
-AUL ::;,-*,TIE
Uhill' P!
:.:Q..E~....ERED
'- QI~ANTi'! ', HAUL
REGEIVED 3HARGES
-' QOANTrr Y
RE~AINII'I(~
" [.
The algnatur[ it:;.'. -ar[ilia. that thta ami' :hi '.~RANO
mel{~ the apl !'c: o'e :'311tract, apec~.alfl3na .i¢1 ,
/
~ TOTAL . ,,.
.......
W'~ '..::.,[ Jk, lE NO RESPOI .~;',~_ Y FOR DAMAGES RESU:
SALES i.-,.'
!
:
:
·
i
]
!
!
I
I
I
I
IT!
i
18900 Pioneer Trail
Eden Prairie, MN 55347
FAX TRAN,.RMITTAL COVER SHEET
Tel: (952)934-0917
Fax: (952) 934-0901
If you experience any problem receiving this fax transmittal or need assistance,
please call the sender.
DATE:
ATTN:
CO:
FROM:
RE: '
FAX #:
We are transmitting
Io.q.o
/ ~.------~_ .. pages including this cover
Comments'
7 '08AU
K/A BUILDING DIV.
KRA~ERSON
CONSTRUCTION C0M~P~
I~AX REQ~ST CO~gR SKEET
No, 7977 P. I
FAX#:
~ndud~ co~): ' _. ~ .. _
If you have problems recehdngo plmue call: (6_12) 721-7581
].322 159TH AVENUE N.E. HAM LAKE, MINNESOTA 55304
(763) 434-6371 FAX (763) 434-7693
October 21, 2002
Attn: Bill Cox
Kraus-Anderson Building Division
2500 Minnehaha Ave
Minneapolis, MN 55404
RE: Chanhassen Public Library -- Soil corrections at parking ramp
Extra work orders, due to soil corrections at the parking ramp. Below is the break down:
9/18 & 9/19 - Put in forms for parking ramp but due to ground water seeping into footing & contaminating
soil had to stop. 1 Forman
2 Forman
3 Laborers
8.50 hrs (~ $57.00/per hr $ 484.50
3.00 hrs/ea ~ $57.00/per hr $ 342.00 ll~'~.J~~ ~y'!,I,~F_~
8.50 hrstea ~ $49.o0/per hr $1,249.50
4 Laborers 6.00hrs/ea ~$49.00/perhr $1,176.00 ~~,~ ~'/~" 1~~
2 Finishers 6.00 hrs/ea ~ $53.00/per hr $ 636.00 ~ ~ 1/~-"~.
9/23 --Advised of water contamination, removed forms for soil correction or alternative solution for GME
engineer.
1 Forman 6.00 hrs @ $57.00/perhr $ 342.00
I Laborer 6.00 hrs ~ $49.00/per hr $ 294.00
! 49er 6.00 hrs ~ $51.00/per hr $ 306.00
9,'27 - AX advised by GME and reissued drawing for soil problem, poured mud sill on grid CD.
1 Forman 3.50 hfs (~ $57.00/per hr $ 199.50
3 Laborers 3.00 hrs/ea ~ $49.00/per hr $ 441.00
I Finisher 3.00 hfs (~ $53.00/per hr $ 159.00
30 yds concrete (~ $75.65/per yd $2,269.50
9/30 - Poured mud sill base on north wall &parking romp(ali of grid ID).
I Forman 2.50 hrs ~ $57.00/per hr $ 142.50
3 Laborers 2.50 hrs/ea
2 Finishers 2.50 hrs/ea
56 yds concrete (6 wheel drive)
10/2 - Poured mud sill west wall grid AD, from north
1 Forman 3.00 hrs
3 Laborers 1.50 hrs/ea
I Finisher 2.00 hrs
$49.00/per hr $ 367.50
$53.00/per hr $ 265.00
$77.50/per yd $4,340.00
3D grid.
$57.00/per hr $ 171.00
$49.00/per hr $ 220.50
$53.00/perhr $ 106.00
$1,860.00
24 yds concrete(6 wheel drive)
10/3 - Poured mud sill base on grid A-D
1 Forman 3.00
3 Laborers 3.00
I Finisher 3.00
~ $77.50/per yd
from 3D to 4D.
hrs (~ $57.00/per hr
hrs/ea ~ $49.00/per hr
hfs (~ $53.00/per hr
10 yds concrete (4000 psi) i~ $78.30/per yd
TOTAL ADD
If you have any questions, please feel free to contact me.
$ 171.00
$ 441.00
$ 159.00
$ 783.00
$16,925.50
Sincel ,
JeffLan~
President
888888
~88888 IR8 [~'
000000
000~00
888888
·
· · · · · · · · · · · · · ·
· · · · · · · · · · · · · · · ·
OOCXDC~OOOCX~O
88888888888888
88 oooooooo 88 o
00000000
'' ~M~M~ ~.'
88
ooooooo0 ooo0
ooo0o0o0 oo00
oooooooo 888~
.0o8888888
o88888~8c
·
00 v- ~q' 0 ~
K~US.ANDERSON, CONSTRUCTION COMPANY
· ' BUILDING DIVISION
CON.TRACTORS & CONSTRUCTION MANAC~RS
2500 MINNEHAHA AVENUE. MINNEAPOMS, MINNESOTA ,55404 · (612) 721-7~81
.,-'"'.Tune 24, 2002
DATE ' ,19
3 Bloomington Rentsl Center
9349 Bryant Ave. S.
Bloomington, MN 55420
-.P TO Chanhassen Library
PURCHASE ORDER
58756 4611
This order number must be specified and
shown on all packages, cases, shipping
documenl= and Invotces and must be referred
to in all ca..rmspo~ence pertaining thereto.
ROUTE
F.O.B.
· . Plaaae fumlsh b'le following subject to aa Instructions .nd condltlmm hert4n nnmed and on back hnreoi':.
,i
)DE QUANTIFY ' DESCRIPTION UNIT PRiC~. PRICE
1 2" Trash Pump ~-. '
'~' } 2 2' x 50' Dischar~ Hose '~ "'~nt )
1 2" x 20' Suction Hose/'""' '"' 2 $ 2'-~'g}-
[
co o
I A~ INVOIC~ MUST INCLUDE ~ T~ ~E AP~B~.
FURNISH THIS OFFICE WITH A
IRC, ATE OF INSURANCE INDICATING
RAGES IN ACCORDANCE WITH THE
IRCATION REQUIREMENTS.
for merchandi~m delivered under
mtmt be certified by the vendor
been made In accordance with the
AMENDMENT TO PAYMENT PROVISION: FOR
PAYMENT THE 15TH APPROXIMATE OF THE
FOLLOWING MONTH, ALL MATERIAL AND
SERVICE INVOICES AND PAY ESTIMATES
MUST BE RECEIVED ON OR BEFORE THE 4Tlt
TUESDAY OF THE CURRENT MONTH.
INVOICE IN DUPUCATE
ALL SPECIAL CONDmONS AND GENERAL CONDmONS OF THE
SPECIFICATIONS FOR THIS PROJECT ARE A PART OF THIS
PURCHASE ORDER; FURTHER, NO ADDt'I"iONAL WORK CAN BE
ALLOWED UNDER THIS' PURCHASE ORDER. IF ADDITIONAL
WORK IS ENCOUNTERED, APPROVAL MUST BE SECURED
FROM THE WRITER'OF THIS PURCHASE ORDER.
SPECIF1CALY, THE RELD SUPERINTENDENT HAS ONLY THE
AUTHORITY TO ISSUE AN ADDITION TO THE CONTRACT IN
CASE OF AN EMERGENCY. -
I~ i. ':'3 · ~ I I II I I Ill I I I I
. ·
~ ''~;*~*~1~** o "~' ".' ,..z~....?. ~.n.~.~..lr_t~' '3".'-~**: r;.y,, ** .:.-,~ . . . . J . . . . ...'~ · . . .. . · ~_.
· . _ ..¥~. ,...:..., ::,-_. -*.::-::... ,... · .... . . . ..'.",:.~-~!.:.,~'-~,..~::~.'.-':~'.-, ,-:.:'
-. ....~..,..,'.~~: :.. .
· . .... ~:~i:':'~~~-...:-.,*.-*'."- . : . ...... ., ~._:_.._..: ........ ~ ....... "
II
:,-:~-
:."
.~ "~1";.." ,~'~,'
~'::i'
:'.
:
:.-.
· .,,',-'. "'.*-.,'i"?;:-~,-.?'.-'.":'~ - ~';k:. "f,- ",' .-'" ..:-.' ":- - 4'. '. ... ' : ~ ·:. . -
:;'...,. ~:." "' ::;.~?::.~:?.;,:~'; .... .. i~-. :~. 'ov~/~ ~, ~,~s'.oF. ~:~v~~ ,~ ~U, . '' ~ :''~ :-'
. .. .~~:~:,:...;,;~.... ........ ::_- . .~. ..- . . ... -.. . .. ..: . ":-* :.:,.. :..:..:~:.-"' ~.;,~.~,..;. ,.
';.'- -:-'-~ :'-. ~..~.~..-::.: :". .... :'..~- ?i-'.-~- ':-..-
_ :" .. :-~...~"~'./.~,. .-, :~'.'~¥ ,T~,-:. ' :::"'"'~L'' .... ' ............ "*'-'*:: >'-':::': ': ' ":'"':';'"'~'~-:
" ..~. :~' ':. ;~ · ': ~':- - '-'L~ '-:*r -;'- ;~ .
· ': ""- .... "-' "'" ::.?',.--
:~." '..''
- ':, -.?~.e4:::~.~.~-.L..~-.~./-':~..-'~.'-.-": ~.'.:-~ .' -. "" ." :' - ' ; -- '. . . -
· . . ~.,.~..~ ~ .~,¥-:.~,~.~¥~-~ _~.~.-- ~,-~.. ~ .. ~, . ..... , ......... . .... -, .. ....
.....?.~i ..... '. ".-,:--'.'. -..~'..~, "~'.~ :"'. ..... ' ...... .'~ " . i:.,:.7.; ,.:'~',~,~.:.T 0'~' .~ '
· ~!.~...,~~/~~:;.-., ,, . .~ , .... ... _.,.:.._...,.-. ,:-....-...:,....;...:.:: .:.:.. ~.~,~~~,,.~
WE SELL TIME
We charge for all 1Jme that equipment ia out
Including Sat, Sun. & holidays.
YOUR PROMPT RETURN WILl. SAVE YOU MONEY.
1~0440
i%0/03/02 '. KRAUS-ANDER$OH BIJ::[I. DTNQ CO.
KR.~US--ANDERS~'N ,~UI[.DING t;O. ;.'50~ ~ilNN. EHAHA AV
25.~0 MZNNEHAHA ~V ~INNEAPOLZ'3, MN
H~NN~,'~POL:ZS, NN
612--72[-7581
't'ERHS .... '.).'~ T~.Zl,~. 0A':":.~, NET 20 ON I"HZ$ CONTR.ACT,
~...5~ F'rN/~NB[:, C;-I~Rr~E ON CONTRACTS OVF. R 3i r:,AY5.
..
' <~.,L_/Z~O-Oc~ ~_T .
, uL, Lt£: ~__ . - .....
. ~. ~,, ~ ~ ~ :~
...... ~~~~,~~-'~ ..................... ~ u m m ~.~ r y ...... ~
tO/~3/O2 02 Charge 3!9,50
MN SkS TaX :~9.5e
. ..
'S~)>~m'C 0ue ~h.1~ ZnvoZc~- 3%9,5~ ~'
/~.~a3 Unpaid ~hi~ Contra.::~;~ 319.5~ Total -~ "' als.se
:,.:.:.-,~r'-:~ %~':': ,:i.T_-.;_':-t~!;::,..'.'-'~.;.~. ~'. '7.;'~;:-:~.: ~.'f--'.:;~:-: :".' ,"-:: v' '..--;,:: '.."....'. . . - . ,...: - ~m,u,N .
i:~]~~.-.'~',Ai~i:~~,~.~~CT ~.~ o:,,:'~£' aXC[.:o~:~:~..,:
CO~ .o~...~.;~a~mS. CCmalST, OF..OUR.;~~::A_~.~ ,Eft,. ~: ~00.N~..u~.'- , ~ - ,,
...~m3E:~,~ ..BA~....OS~W~mmN 'R~RES ..EN~..'~O .~S..~Oa~=ro~~o'r mCLUB~n mi: X ~' ''~' L%_/Z', ~: / z, ,.
· ::''" :-" ':" ' '"-' L.'':. ..' -' ' ' ' ~ - ' 81GN^TURE
- :-: ; v. S"- ?::. .' ." ' -'-:.::
, '-~..~" '-". ~--'=: v. [;.....' THIS I$ YOUR CO~
· ' '~" -":. '-''.': ~ ...... '::". KR:-i.,':-...".'f :~' ?'.";U:',I ":ti'.: ' ~.~','.~f'.4, '-'~'?-- ?:~;~..~.;:;',
· , ,.., --~L~. I ~ I I I I .... ~' ---
KRAUS-ANDERSON. CONSTRUCTION COMPANY
BUILDING DIVISION
CONTRACTORS & CONSTRUCTION MANAGERS
2500 MINNEHAHA AVENUE · MINNEAPOLIS, MINNESOTA 55404 · (612) 721-7581
DATE September 27, 2002 19
Construction Midwest, inc.
3531 Nevada Ave. N.
New Hope, MN 55427
;HIP TO
Chanhassen Library
C/O K.A.B.D:
7711 Kerber Blvd.
Chanlmssen, MN 55317
[':'~ If this box la checked you
MUST acknowledge thla order.
PURCHASEORDER
58793 4611
This order number must be specified and
shown on all packages, cases, shipping
documents and Invoices and must be referred
to In ail correepondence pertaining thereto.
Ship cheapest way
unless otherwJ~ specified.
ROUTE
F.O.B.
TERMS
Please furnish the following subject to all Inetructlona end conditions herein named ~nd on back hereof:
:~ODE QUANTTTY DESCRIPTION U Nr;l' PRICE PRICE
I Roll 4" x 250' Drain Tile w/soek~'
I Roll 4"x 100' Drain T
2 Each 4" Tee Fittings ~ kJ ~74 ~t~ ~
4 Each 4" 90' Elbows
4 Each 4" Couplers .
I .
.
[ CONTINU~G PURCHASE ORDER
~ ~LL fl~I¥OK~EB MUST H~¢LHD~ SALF~ TAX WH£R~ ~P~MC~BLE
FURNISH THIS OFFICE WITH A
RTIFICATE OF INSURANCE INDICATING
Ic ERAGES IN ACCORDANCE WITH THE
IRCATiON REQUIREMENTS.
oices for merchandise delivered under
3eer must be cerlffied by the vendor
n made In accordance with the
ILal or Standards. Act of 1 g38.
AMENDMENT TO PAYMENT PROVISION: FOR
PAYMENT THE 15TH APPROXIMATE OF THE
FOLLOWING MONTH, ALL MATERIAL AND
SERVICE INVOICES AND PAY ESTIMATES
MUST BE RECEIVED ON OR BEFORE THE 4TH
TUESDAY OF THE CURRENT MONTH.
INVOICE IN DUPUCATE
ALL SPECIAL CONDITIONS AND GENERAL CONDITIONS OF THE
SPECIFICATIONS FOR THIS PROJECT ARE A PART OF THIS
PURCRASE ORDER; FURTHER, NO ADDITIONAL WORK CAN BE
ALLOWED UNDER THIS PURCHASE ORDER. IF ADDITIONAL
WORK IS ENCOUNTERED, APPROVAL MUST BE SECURED
FROM THE WRITER OF THIS PURCHASE ORDER.
SPECIFICALY, THE RELD SUPERINTENDENT HAS ONLY THE
AUTHORITY TO ISSUE AN ADDITION TO THE CONTRACT IN
CASE OF AN EMERGENCY.