Loading...
1b. Purchase of 2009 CIP Equipment CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227,1100 Fax: 952,227,1110 Building Inspections Phone: 952,227,1180 Fax: 952,227,1190 Engineering Phone: 952,227,1160 Fax: 952,227,1170 Finance Phone: 952,227,1140 Fax: 952,227.1110 Park & Recreation Phone: 952,227,1120 Fax: 952,227,1110 Recreation Center 2310 Coulter Boulevard Phone: 952,227,1400 Fax: 952,227,1404 Planning & Natural Resources Phone: 952,227,1130 Fax: 952,227,1110 Public Works 1591 Park Road Phone: 952,227.1300 Fax: 952,227,1310 Senior Center Phone: 952,227,1125 Fax: 952,227,1110 Web Site www.ci.chanhassen.mn.us ib MEMORANDUM TO: <? 0- Paul Oehme, Public Works Director/City Engineer '( ~ FROM: Charlie Siegle, Equipment Superintendent o.f..A A . ftt'\'1' DATE: April 27, 2009 SUBJECT: Purchase of 2009 CIP Equipment - PWO 16000 '. PROPOSED MOTION "The City Council approves purchase of vehicles and equipment." City Council approval requires a simple majority vote of the City Council present. DISCUSSION Annually, the City considers replacement of vehicles and equipment that have reached their life expectancy and are showing signs of needing major maintenance. It has been the City's practice to replace these vehicles and equipment before major repairs are required. The vehicle and equipment needing to be replaced are used extensively and have to be reliable to maintain appropriate City services. JUSTIFICATION STREET DEPARTMENT - BLACKTOP TRAILER The 1994 Stepp blacktop equipment trailer to be replaced is 15 years old. This trailer is used to haul the bobcat and packer to job sites. The trailer has recently been underrated for the load it is hauling and has issues with the frame cracking. The trailer is not anticipated to pass DOT inspections this year for safety reasons. STREET DEPARTMENT - BOBCAT TRAILER The 1997 Felling bobcat trailer to be replaced is 12 years old. This trailer is very rusty and it has holes through the fenders and light mounts. The trailer would not pass the DOT inspection this year and is estimated to cost $3,000 to meet DOT standards. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme Purchase of 2009 eIP Equipment April 27, 2009 Page 2 STREET DEPARTMENT - HOT BOX PATCHER The asphalt hot box patcher proposed to buy would be used to keep the blacktop hot while patching reducing waste of cold blacktop. The hot box can hold 4 cubic yards of bituminous and is able to be used year round. The patcher would also be good for heating up cold mix for potholes in the winter andrepair of water main breaks. UTILITY DEPARTMENT - SUV The 1999 Dodge pickup #319 to be replaced has 80,000 miles and has severe rust. With 10 years of use the vehicle will need expensive repairs due to rusted brake and fuel lines and other underbody rusted parts. The estimated value of this pickup is $2000 to $3000. The new vehicle is proposed to be a smaller more efficient vehicle that would be used for utility locates. Funding for this vehicle is programmed from the Sewer Utility Fund. PARK DEPARTMENT - MOWER The 1996 580D Mower #451 to be replaced has 5,800 hours and is due for major repairs. This mower cuts grass seven hours/day, five days/week for the entire summer and is capable of the same amount of work as 2Y2 workers with the smaller 72" mowers. This mower would be traded on the replacement mower. PRICING Pricing for the vehicle and equipment is taken from the State of Minnesota bid pricing which is the most competitive pricing available to the City. STREET DEPARTMENT - BLACKTOP TRAILER 2009 Felling FT-20 Dropdeck Water tank and tool box Plus tax and license CIP (EQ-089) Budget Amount $10,035.00 $11,500.00 STREET DEPARTMENT - BOBCAT TRAILER 2009 Felling FT-12E Dropdeck Plus tax and license CIP (EQ-089) Budget Amount $ 4,145.00 $ 5,500.00 STREET DEPARTMENT - HOT PATCHER 2009 Stepp SSPH4.0 Asphalt Hot Patcher CIP (EQ-090) Budget Amount $30,424.92 $31,000.00 g:\eng\public\pwO 16\bkgd 042709 purchase cip vehicles. doc Paul Oehme Purchase of 2009 CIP Equipment April 27, 2009 Page 3 UTILITY DEPARTMENT - SUV 2009 Ford Escape with accessories Plus tax and license CIP (EQ-062) Budget Amount $21,247.69 $34,000.00 PARK DEPARTMENT - MOWER 2009 Toro Groundsmaster GM5900D 16 ft. Rotary Mower #451 Trade in CIP (EQ-028) Budget Amount $78,579.03 -$ 6,000.00 $87,000.00 SUMMARY The City's equipment continues to go past the normal replacement age of ten years. It is important to replace equipment at this time that is over 10 years old. Attachments g:\eng\public\pw016\bkgd 042709 purchase cip vehicles. doc I Capital Improvement Program 2009 thru 2013 Contact Paul Oehme City of Chanhassen, MN Department Major Equipment I Project # EQ-089 Type Equipment Useful Life I Project Name Asphalt Equipment Trailer Category Street Equipment Account # 1 Account # 3 Priority n/a Account #2 Total Project Cost $17,000 I Description ' I This trailer is used to haul asphalt equipment such as bobcat, paver and rollers to the job site. The last inspection identified a structural crack in the I trailer's frame. The crack was fixed, but the trailer should be replaced. I Justification 1 This trailer has structural deficiencies and should be replaced. I I Expenditures 2009 2010 2011 2012 2013 Total I Equipment 17,000 17,000 Total 17,000 17,000 I I Funding SOilrces 2009 2010 2011 2012 2013 Total Capital Replacement Fund 17,000 17,000 I i Total. 17,000 17,000 I Operational Impact/Other 1 I I I I I 44 I . I Capital Improvement Program 2009 thru 2013 Contact Paul Oehme I i City of Chanhassen, MN Department Major Equipment Project # EQ-090 Type Equipment I Useful Life Project Name Asphalt Hot Box Category Street Equipment Account # 1 400-0000-4705 Account # 3 Priority n/a I Account #2 Total Project Cost $31,000 Description I I This piece of equipment is used for pothole patching and small overlay work. The Hot Box keeps the asphalt warm so the material keeps longer and is easier to work with. The box is also used extensively in the spring to keep cold mix workable, when hot mix is not available. I Justification I I For better production during pothole patching and so asphalt material is easier to work with. I I I Expenditures 2009 2010 2011 2012 2013 Total Equipment 31,000 31 ,000 Total 31,000 31,000 I I Funding Sources 2009 2010 2011 2012 2013 Total I Capital Replacement Fund 31,000 31,000 Total 31,000 31,000 I I Operational Impact/Other I I I I I I I 45 I Capital Improvement Program 2009 thru 2013 Contact Paul Oehme I City of Chanhassen, MN Department Major Equipment EQ-062 Type Vehicles I Project # Useful Life Unassigned Project Name Light Duty Trucks: Utilities Category Utilities Accouut # 1 701-0000-4704 Account # 3 Priority n/a I Account #2 Total Project Cost $187,000 Description I I This allows for replacement of existing vehicles in the Water and Sewer department. 2009 - #319 1999 Dodge 3/4 ton 4x4 2011 - #302 1999 Ford F-450 3/4 ton pickup I 2012 - #317 1997 Chevrolet 3/4 ton pickup 2013 - #320 2003 Chevrolet 3/4 ton pickup Justification I I . This replaces pickups in accordance with the vehicle replacement plan. I I Expenditures 2009 2010 2011 2012 2013 Total Vehicles 34,000 70,000 55,000 28,000 187,000 Total 34,000 70,000 55,000 28,000 187,000 I I Funding SOiIrces 2009 2010 2011 2012 2013 Total I Sewer Utility Fund 34,000 70,000 55,000 28,000 187,000 Total 34,000 70,000 55,000 28,000 187,000 I I Operational Impact/Other I I I I I I 35 I I Capital Improvement Program City of Chanhassen, MN I Project # EQ-028 Project Name Groundsmaster 580 Mower Replacement Account # 3 Account # 1 400-0000-4705 I Account #2 2009 thru 2013 I Description I Provides for the replacement of an existing ToTO 580,15 foot, high volume grounds mower. I Coutact Todd Hoffman Department Major Equipment Type Equipment Useful Life Unassigned Category Park Priority nfa Total Project Cost $87,000 I Justification I The City currently has 3 high-production grounds mowers that cut a 15' pass. Each machine is used daily during the growing season and takes the place of 2 1/2 smaller machines used by the City. Due to additional park development, an additional high-capacity machine is needed. I I Expenditures Equipment I Total I I . Funding Sources Capital Replacement Fund Total I 2009 87,000 87,000 2010 2011 2012 2013 Total 87,000 87,000 Total 87,000 87,000 I Operational Impact/Other I This purchase will include a limited warranty and reduce maintenance and repair expenses as compared to the unit replaced. Also, each of these I machines takes the place of2 1/2 smaller machines and makes the mowing operation 150% more efficient. I I I I 2009 87,000 87,000 . 2010 2011 25 2012 2013