1e. Approve Agreement with Xcel Energy
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952,227,1100
Fax: 952,227,1110
Building Inspections
Phone: 952,227.1180
Fax: 952,227,1190
Engineering
Phone: 952,227,1160
Fax: 952,227,1170
Finance
Phone: 952,227,1140
Fax: 952,227,1110
Park & Recreation
Phone: 952,227.1120
Fax: 952,227,1110
Recreation Center
2310 Coulter Boulevard
Phone: 952,227.1400
Fax: 952,227.1404
Planning &
Natural Resources
Phone: 952,227,1130
Fax: 952,227,1110
Public Works
1591 Park Road
Phone: 952,227,1300
Fax: 952,227.1310
Senior Center
Phone: 952,227,1125
Fax: 952,227,1110
Web Site
www.ci.chanhassen.mn.us
ie.
....n:J
MEMORANDUM
TO:
Todd Gerhardt, City Manager
d ()(
Paul Oehme, Director of Public Works/City Engineer "\ t
May 11, 2009 O~.
FROM:
DATE:
SUBJ:
Approve Agreement with Xcel Energy for Peak Electrical Control
at City Hall - Admin. File No. 183
PROPOSED MOTION
"Approve Electric Service Agreement with Xcel Energy for Peak-Controlled
Tiered Services at City Hall."
City Council approval requires a simple majority vote of the City Council
present.
BACKGROUND
This spring the City installed a standby generator at City Hall for temporary
power in case electrical service is disrupted. The generator will be able to supply
power to City Hall for the entire building. Xcel Energy has a voluntary program
that allows a customer to have a reduced yearly electrical rate if the consumer
agrees to run on generator power when Xcel requests to have the customer
removed from the grid. This request would be made by Xcel during high demand
periods. The estimated annual electrical saving for the City Hall is $3,389. This
does not include the fuel that would be needed to run the generator or any
maintenance costs. The City currently has this service agreement with Xcel for
the water treatment plant. The City records show Xcel has not requested the City
to go on standby power at the treatment plant for the last two years. The City
attorney has review the agreement.
Attachments
g:\eng\publie\pwO 16\city hall generator - adm file 183\051109 xeel agreement for peak eontroI.doe
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Account No.
5636006
Electric Service Agreement
Peak-Controlled Tiered Services
THIS AGREEMENT, Made this ~day of May, 2009 by and between NORTHERN STATES POWER COMPANY,
a Minnesota Company, doing business as Xcel Energy, hereinafter called the "Company," and CITY OF CHANHASSEN.
hereinafter called the "Customer," engaged in the business of.
WITNESSETH: That the parties hereto, each in consideration of the agreements of the other, agree as follows:
I. KIND OF SERVICE: Company agrees to supply and Customer agrees to accept electric service in the form of ~ Phase, Wire,
Alternating Current at a nominal frequency of 60 Hertz and at a nominal voltage of , for Customer's use solely for the operation of
electric equipment now installed or to be installed by Customer on the property known as located at 690 CITY CENTER DR ,
CHANHASSEN. MN 55317.
2. ANNUAL MINIMUM DEMAND CHARGE: In consideration of the capacity commitment by Company and its investment in
facilities to serve Customer, Customer agrees that if the net demand charge payments during any contract year hereunder, in
accordance with the rate selected specified in Section 4 below, amount to less than the minimum demand charge specified in this
rate schedule, the difference between such minimum demand charge and said net demand charge payment shall be included in the
bill following the contract anniversary month and Customer agrees to pay same as a charge for service rendered.
3. TERM: This Agreement shall commence at 12:01 A.M. on May 22, 2009 and shall continue for a period
ending at 12:0 I A.M. May 22,2014 and ifnot then terminated by at least six months prior written notice by either
party for Tier 2 customers or by at least 36 months prior written notice by either party for Tier 1 customers, shall continue further
until so terminated.
4. RATE: Customer agrees to qualify for and elects the rate schedule for PEAK CONTROLLED TIERED SERVICE (SECONDARY),
Tier 2.
Customer agrees to pay Company's established rate schedule in effect from time to time in this locality for such Service, the
established rate schedule now in effect being the one attached hereto. Effective with the term commencement date, the rate code is:
A23. However, the specific rate and rate code are subject to change following an annual evaluation of Performance Factor based
on Customer's previous 12 months usage. This rate and rate code change does not require Customer authorization.
5. TERMS AND CONDITIONS: The service hereunder shall be supplied for Customer's use subject to the General Rules and
Regulations of Company on file with the state regulatory commission as they now exist or may hereafter be changed. A copy of
such rules and regulations is available from the Company. This agreement is also subject to Sections(s) N/A appearing under the
heading "Additional Terms and Conditions" which are attached to this Agreement. Customer agrees to use electrical service only as
herein stated and will not assign this Agreement except upon written consent of Company.
6. MINIMUM DEMAND CHARGE DIFFERENTIAL: Company agrees that during the term of this agreement, the minimum
average annual demand charge differential wilI be the average annual differential between the fmn demand and controllable
demand rates resulting from application of the variable interruption credit determination ofthe currently effective rate schedule as
of the date ofthis agreement and listed in Section 4 above.
7. MAXIMUM HOURS OF INTERRUPTION: Company agrees that the total intentional interruptions of controlled demand will
not exceed 80 hours per calendar year for Tier 2 customers, 150 hours per year for Tier 1 customers, and 300 hours per year for
Tier I Energy-Controlled Service Rider customers.
8. CONTROL PERIOD NOTICE: Company will endeavor to give Customer one hour notice of commencement of control period.
9. EXPECTED MAXIMUM DEMANDS: For the term of this agreement, Customer's expected maximum annual adiusted demand
is 102 kW. The expected maximum annual demand less the predetermined demand level is the expected maximum controlIed
demand. The Customer's expected maximum summer season adiusted demand is 102 kW.
10. PREDETERMINED DEMAND LEVEL (PDL): Customer may elect either the standard or optional arrangement as specified
below.
Standard: Customer agrees to limit adjusted demand to Q kW during control periods.
Optional: Customer agrees to reduce adjusted demand by N/A kW during control periods. Customer's PDL will be the
monthly adjusted demand less the agreed to load reduction.
Any customer with generating equipment which is operated in parallel with Company must comply with all requirements
associated with Parallel Operations specified in the General Rules and Regulations of Company.
The PDL may be revised within or after the trial period subject to approval by Company. If the revision of the POL
occurs WITHIN THE TRIAL PERIOD, the Customer pays the demand charge differential for the corresponding months of the
contract in the trial period multiplied by the number of kilowatts (kW) the Customer increases the PDL. Charges for the failure to
control to their PDL are forgiven. The Customer will be credited any paid penalties against the recalculated amount. If the revision
of the PDL occurs AFTER THE TRIAL PERIOD, the same calculation is made for the most recent months up to but not to exceed
18. In this case, however, the Customer is responsible for the greater of the following: (a) the amount determined by multiplying
the demand charge differential by the PDL increase, as described above, or (b) the total amount of any penalties paid/owed for
failure to control load to the previous PDL.
1 I. TRIAL PERIOD AND CANCELLA nON CHARGE: Company agrees that the first twelve months of this agreement will be a
trial period. Customer must notifY Company in writing to terminate this agreement during the trial period. If Customer terminates
this agreement during the trial period, Customer's Peak-Controlled Tiered Service or Peak-Controlled Tiered Time of Day Service
bills will be recalculated using the corresponding firm rate (General Service or General Time of Day Service). Customer will be
charged the difference between the recalculated amount and the amount charged under the corresponding Peak-Controlled rate.
Also, Customer will receive a refund for any additional charges which were assessed during the trial period due to Customer failure
to control load. A trial period for Peak-Controlled Tiered Service or Peak-Controlled Tiered Time of Day Service will not be
available to any Customer account that has previously received either service, or the closed Peak-Controlled or Energy-Controlled
Services.
Customer will pay a cancellation charge after the twelve month trial period if Customer terminates this agreement and
elects to receive service from NSP on a non-interruptible basis or this agreement is terminated as a result of any default of
Customer. Customers no longer receiving service from NSP upon termination of agreement will not be assessed the cancellation
charge. The cancellation charge will be the difference between the billing amounts described above, for the most recent 18 months
for Tier 2 or 36 months for Tier 1 of Peak-Controlled Tiered Service or Peak-Controlled Tiered Time of Day Service. Customer
will not receive a refund for any additional charges which were assessed during this 18 or 36 month period due to Customer failure
to control load.
Additionally, if at any time this agreement is terminated in any above described manner, Customer will be charged all
installation and removal costs for special equipment and facilities provided by Company for Peak-Controlled Tiered Service or
Peak-Controlled Tiered Time of Day Service.
12. FAILURE TO CONTROL: If in any month Customer fails to control load to predetermined demand level when requested by
Company, the additional charge specified in the Rules for Application of Peak-Controlled Tiered Services and Peak-Controlled
Services (Closed) shall be applied to the amount by which Customer's maximum adjusted demand during any control period
exceeds predetermined demand. If Customer incurs three failures to control load to predetermined demand level when requested by
Company, the Company reserves the right to renegotiate the predetermined demand level or remove Customer from Peak-
Controlled Tiered or Peak-Controlled Tiered Time of Day Service. In a case where Customer is removed from Peak-Controlled
Tiered or Peak-Controlled Tiered Time of Day Service, Customer will be subject to a cancellation charge specified in Customer's
Electric Service Agreement.
13. GENERATING CUSTOMER CHARGE: Customer choosing the Optional Predetermined Demand Level agrees to pay
Company $ N/ A per month for additional metering and billing expenses related to the use of Customer-operated generating
equipment to reduce adjusted demand during control periods, as described in the Rules for Application of Peak-Controlled Tiered
Services and Peak-Controlled Services (Closed).
NORTHERN STATES POWER COMPANY
CUSTOMER
By:
By:
Ti tie:
Title:
Date:
Dllte:
Peak-Controlled Tiered Rate Agreement Worksheet (MN)
Contact Information
ccount Name: CITY OF CHANHASSEN Account #5636006
First Contact ..:. "-::--. ...... .... ". ":.' .,..,.
Contact 1 Name: Please pro/lide clistomer address for
Customer Address COlltact 1 if differeJlt fro!11 S eroke
City, State Zip
Address.
Work Phone: I Extension
Home Phone:
Please provide two additiollal cuI/tad methodJ',
Cell Phone
E-mail
Numeric Pal2:er
Text Pal2:er
SMS
Fa.x
S~cond Conta~t'::'" ":".:,' . . . ......<.. .
.. " . ....
.. .". . .....
... ....
.. .. ...
.. ,',
Contact 2 Name
Work Phone: l Extension
Home Phone:
Please provide two additional contact methods.
Cell Phone
E-mail
Numeric Pager
Text Pager
SMS
Fax
Third Contact- .. . :,' .
. .... . .'. . .....
Contact 3 Name
Work Phone: I Extension
Home Phone:
i Please rovide two additiot/al fOllta~"t Inethods.
Cell Phone
E-mail
Text Pa r
SMS
Fax
Prepared For:
XCELENERGY
Prepared By:
City Of Chanhassen
690 City Center Dr
CHANHASSEN, MN 55317
4/15/2009
Phone:
Fax:
CITY OF CHANHASSEN
5636006
Rate Comparison Summary
Wednesday, April 15, 2009
Meter E00000361 030 1
Current Rate Projected Annual Billing *
General Service (MN Elec)
Proposed Rate Projected Annual Billing
Peak Controlled Tiered Service
Tier 2A
Annual Projected Savings (Dollars)
Annual Projected Saving (percentage)
............................................. ........... $
32,647
............................................. ........... $
29,258
$
3,389
10%
Annual Projections Based on The Following:
Annual Maximum Demand
Voltage Type / Phase
PDL: Standard
118.4
Secondary/3
o
Monthly Savings
$700
$600
$500
$400
$300
$200
$100
$0
* Note: Projections based on twelve months of historical data.