Loading...
1c. 2009 Sanitary Sewer Rehab Project: Award Contract CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us ie ~ MEMORANDUM TO: D, Paul Oehme, Dir. of Public WorkslCity Engineer <..( < Joseph Shamla, Project Enf!,ineer~ fA/} . f)~'1' May 11, 2009 FROM: DATE: SUBJ: 2009 Sanitary Sewer Rehabilitation (III) Project No. 09-03: Award Construction Contract PROPOSED MOTION "The City Council awards a construction contract for the 2009 Sanitary Sewer Rehabilitation (III) Project to Insituform Technologies USA, Inc. in the amount of$175,837.40." City Council approval requires a simple majority vote of the City Council present. DISCUSSION The 2009 III project was designed to eliminate areas in the sanitary sewer system that allows groundwater or surface water to enter. These improvements include lining sewer pipes, pipe joint sealing, grouting manholes and pipe joints. Repairs to the sewer pipes are scheduled to take place between the Chanhassen High School and Lift Station #24. This section of concrete sanitary pipe has been damaged due to the hydrogen sulfide released as the sewer flows through the pipe. The damage has caused the rubber gasket seals at most joints to become loose which has allowed ground water to drain into the pipe. Staff feels this area contributes some of the highest levels of III to the system. Attached is a map showing the repair areas proposed for 2009. The proposed budget for the project was $190,000.00. In order to meet budget, staff composed two alternates for the project. Alternate 1 included lining the section of pipe Manhole 40-006 to Manhole 40-007. Alternate 2 involved installing short liners north of the section of pipe to be lined. Due to the amount of funding allocated for the 2009 project, staff feels that Alternate 2 can be removed from the project for this year. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Mr. Paul Oehme 2009 Sanitary Sewer Rehabilitation (1/1) Project May 11, 2009 Page 2 On April 30, 2009 at 2:00 p.m., bids were received and opened. The bids and engineer's estimate are shown below: Insituform Technologies USA, Inc. $145,581.50* Lametti & Sons, Inc. $247,700.00 Veit & Com an , Inc. $265,864.00 En ineer Estimate $164,660.00 * Notes recommended items to be awarded. $30,255.90* $41,150.00 $36,575.00 $39,975.00 $48,300.70 $39,460.00 $42,700.00 $25,650.00 $224,138.10 $328,310.00 $345,139.00 $230,285.00 The low bidder for the project was Insituform Technologies USA, Inc. References for Insituform Technologies USA, Inc. were checked and other cities found their work acceptable. Funding for this project has been budgeted for in the 2009 CIP, Project SS-012, and will be paid for by the Sewer Utility fund. The amount budgeted for 2009 is $200,000. The total price for the Base Bid and Alternate 1 is $175,837.40. All the work associated with this project is eligible for offsetting the MCES surcharge. Attachment: 1. 2009 Sanitary Sewer Rehabilitation Project Location Map 2. CIP Page SS-12 g:\eng\public\.)009 projects\09-03 i & i repairs\award canst. contract 0511 09.doc ~~.~. (') (') ::r ::r Q ~ (j) ~O<1>Ol-o ^ :::5 Ol ::J 0 o 5"-::J6"-+ ~ G)(j)~ ~ <3 en 15 c -" _r+ ., s;?o I ::J en fii - s;?o OJ Ol ..., ..., (ii" ..., en DoE] ;!:: c. r- eo ~ 3" :3 ~ 3" Ol Ol 1.0 CD g ~ =It ::J ~ ->. =It 0 N .!:>- N o o \0 U\ Q ::s -. ,,-+ , Q ~.~ ~ U\ -+ (\') ~~ I ' 073 W(\') :s- Q CT -. - -. -+ Q -+ -. o ::s !I~. ~ r;;J '-::J (')-0""'" 5"0""'" :::5 to 0 :r 0 0 ~ X 3: ~ ~ ~ ?......,~ 3: -+ Z (P U1 <" U1 FL w ...... ......, Zp- ~ =+ l'l ., :::5 o -+ l'l :tt N // \}-e,u}f,.'\ / .~')1 \l"\~1 ~~ /~~~i ~~~ / / (fl g.~Z ,0 ~ ~ ~:r~ w -....I I o o -....I w ! w ";'l -....I 0 I ..... ~ 9-------------~\---\ ~----~~ \ tn /\ \ ~I)--- ~ /'/ \ L ~ ( \ J/~~ / r----~ ~~/ yv, -1 \~ \( ~~ ~~ -', j ~~_) 0~ r - ~ ---- -" ~~, ~ .'-'. ,,~ -.. ~ d or ~..," d' ~~~ c: <ii. '- / ~ ...., !!..dit6~"" ~ :.., . g 1--- J ~'!'{~~\ (Xl 'z,<O" l:> y~ , S' ~ ~ -\ (1) - ~ --!.I !.T, I" ,,< ." :b. --<.S)i:l(t.....~ I "Yt=- -- -1 ~i= a::: /1'-...........1..... \ \ -j cg -- ..,.. '" --..." I --" ""0 '-- U .~ ........ ".....1. -' 1 ~ ~ ............:::-.J [/"/' ". .== 2 t-_. Q. lit / ........._-..... r !~ Y' 0 s" .... / ..-..........l'~-c.~~J ) o --pn R ~- g I r---=QfJ9 .... - iil __..J o ...... ~ o I o o U1 OLI' )S,lJ _lJ 11// f\ / ~ ~ ,_~~field[:-J L ~qn -- ___I--~ r--n- I I ~ ~ Account # 1 701~-4751 "~I. )..1>- Account # 3 . 2009 thru 2013 Contact Paul Oehme Department Sanitary Sewer hnprovements Type Improvement i Useful Life Unassigned Category Utilities ., I Priority nla Total Project Cost $750,000 Capital Improvement Program City of Chanhassen, MN Project # 88-012 Project Name Inflow and Infiltration Abatement Account #2 Description I' This annual project includes televising, repairs and rehabilitation of existing sanitary sewer. 'The program also detects and eliminates points of entry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration Report. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees. i. · Justification I .. City staff has identified numerous older sewer lines that are in need of repair. The City ofChanhassen pays the Metropolitan Council for sewage treatment. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its way into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to the City for sewage disposal and increasing the load on the City's lift stations. Also, MCES would place a surcharge the annual charge if the City was not actively trying to reduce the inflow and infiltration problem. Expenditnres Maintenance 2009 200,000 Total 200,000 2010 200,000 200,000 2011 200,000 200,000 2012 75,000 75,000 2013 75,000 75,000 Total 750,000 750,000 , Funding Sources Sewer Utility Fund 2009 200,000 Total 200,000 2010 200,000 200,000 2011 200,000 200,000 2012 75,000 75,000 2013 75,000 75,000 Total 750,000 750,000 , 'Operational Impact/Other I !he efforts may decrease operational costs, MCES fees and emergency call outs. It is also the city's intent to use connection charges to help fund [or those costs. It is the city's belief that as new customers come on line those connection fees should help fund future infiltration problems. SiD 1- ~. </.. " ~t it; ~ ~f-- '1'-, fl%i' J::, 93 "'I'i,' " :1: Ii ,",,'.. :tgt '~:,:'; f~'