1e-1. Apple Tree Estates: Final Plat Approval
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
MEMORANDUM
TO:
ie
Todd Gerhardt, City Manager
FROM:
Bob Generous, Senior Planner V(y(.,-
June 8, 2009 2::Y~
DATE:
SUBJ:
Final Plat Approval for Apple Tree Estates
Planning Case No. 09-01
PROPOSAL SUMMARY
The applicant is requesting final plat approval for seven lots, one outlot and public
right-of way on 7.43 acres of land located at 8600 Waters Edge Drive. The
proposed subdivision complies with all the requirements of the RSF district
regulations. Staff is recommending approval of the final plat for Apple Tree
Estates subject to the conditions of the staff report.
EXISTING CONDITIONS
The site contains an existing single-family home site on Lake Susan. A large
shed is located on the south side of the property, which shall be removed as part
of the subdivision. The site slopes from a high point along the east central
property line with an elevation of 930 and a high point in the southwest comer of
the property with an elevation of 922, to a low point on the lake at elevation 882.
There is an area of bluff between the new house location on Lot 2, Block 1, and
the lakeshore. The top of the bluff
follows approximately the 908
contour. There are scattered trees
throughout the property. A double
row of apple trees is located down
the middle of the site. There is a
wetland located in the southeast
comer of the property, adjacent to
Waters Edge Drive.
BACKGROUND
On April 13, 2009, the Chanhassen
City Council approved a seven-lot
subdivision (preliminary plat) with
a variance for access off a private
street for the two lakeshore lots.
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 2 of 14
SUBDIVISION REVIEW
Apple Tree Estates consists of seven lots, one outlot and right-of-way for Apple Tree Lane and
Waters Edge Drive.
GRADING AND DRAINAGE
The majority of the site currently drains overland to Lake Susan. The remainder of the site
drains to the wetland located on the southeast comer of the site.
The developer proposes to mass grade the site, with the exception of Lots 1 through 3, Block 1.
The home on Lot 1, Block 1 will remain on the site and Lots 2 and 3, Block 1 will be custom
graded when a home is built on the respective parcel.
The site presents a challenge with respect to stormwater management. A stormwater pond
cannot be located near Lake Susan since the bluff area along the shoreline cannot be disturbed.
A previous plan submitted by the developer included a filtration basin on Lots 2 and 3, Block 1
and connection to the existing storm sewer west of the site. Staff did not support this proposal
since the filtration basin would have been perched above the existing home west of the
development. Staff was also concerned that discharge from the filtration basin could have
entered into the tuckunder garage on the property to the west of the development.
All of Lots 1 through 3, Block 1 and the majority of Lots 4 through 6, Block 1 will drain
overland to Lake Susan. The public street and Lot 1, Block 2 will drain to the proposed pond
adjacent to the wetland.
The developer has submitted hydrology calculations which models back-to-back 100-year events
as required by the Chanhassen City Code.
According to the grading plan, the emergency overflow (EOF) for the wetland is 904.45 feet
which is located on the gravel driveway to the east of wetland. Ideally, an EOF discharges to an
area that is within a drainage and utility easement; however, this proposal is unique in that the
area surrounding the development is already developed and the flow pattern from the overland
EOF is fixed. Based on the hydrology calculations, the wetland elevation should not exceed the
EOF elevation for any of the events modeled.
SURFACE WATER MANAGEMENT PLAN (SWMP) CONNECTION CHARGES
Water Quality Fees
The water quality fees for this proposed development are based on single-family residential rates
of $2,360 per acre. Total area less that portion which is within stormwater pond, wetland and
public right-of-way equals 5.744 acres. Therefore, the water quality fees associated with this
project are $19,587.04.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 3 of 14
Water Quantity Fees
The SWMP has established a connection charge for the different land uses based on an average
city-wide rate for the installation of water quantity systems. This cost includes land acquisition,
proposed SWMP culverts, open channels, and stormwater ponding areas for runoff storage.
Single-family residential developments have a connection charge of $2,360 per developable acre.
This results in a water quantity fee of approximately $13,555.84 for the proposed development.
SWMP Credits
This project proposes the construction of one NURP pond. The applicant will be credited for
50% of the water quality charge for each acre draining to the NURP pond on site. Subcatchment
1 drains to the NURP pond and has a watershed area of 2.85 acres. This is equivalent to a water
quality credit of $5,677.65. The developer proposes one outlet structure with energy dissipation
BMPs. This structure results in a $2,500 credit.
At this time, the estimated total SWMP fee, due payable to the City at the time of final plat
recording, is $24,965.23
STREETS AND ACCESS
The property is adjacent to Waters Edge Drive which was reconstructed by the Minnesota
Department of Transportation (MnDOT) in conjunction with the Highway 101 realignment in
2006. Waters Edge Drive is still under MnDOT jurisdiction and will be turned back to the City
of Chanhassen later this year. As such, the developer is required to obtain the appropriate
permits from MnDOT to construct the local street connection.
The developer proposes to construct a public cul-de-sac with the development. The proposed
street will connect to Waters Edge Drive at the approximate location of the existing driveway.
A portion of the existing driveway alignment to Lot 1, Block 1 will remain and will be surfaced
with bituminous. This driveway will also provide access to Lot 2, Block 1; therefore, it must
meet a seven-ton design.
A building permit for Lot 2, Block 1 may be issued prior to installation of the public street and
utilities. A final Certificate of Occupancy will not be granted until the public utilities are in and
the first lift of asphalt has been installed on the street.
The developer must submit a plan showing how access to the existing home on Lot 1, Block 1
and the proposed home on Lot 2, Block 1 will be maintained throughout construction.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 4 of 14
RETAINING WALLS
The developer proposes to construct a retaining wall on the east side of the cul-de-sac within the
right-of-way. The maximum height of this retaining wall is 3.5 feet. Retaining walls over four
feet high require a building permit and must be designed by an Engineer registered in the State of
Minnesota.
UTILITIES
The developer proposes to extend eight-inch diameter public watermain from the existing
watermain within Waters Edge Drive. Based on the location and alignment of the existing
watermain, it does not appear that the watermain connection will require cutting into Waters
Edge Drive.
Eight-inch diameter public sanitary sewer is to extend from the existing sanitary sewer to the
west of the property and within the proposed public cul-de-sac. The sanitary sewer will extend
between Lots 3 and 4, Block 1, then south within the proposed public street.
The existing sanitary sewer lies within a drainage and utility easement over a private driveway.
The developer must notify the affected property owners a minimum of seven days before
mobilizing to complete the sanitary sewer connection. The developer must ensure that the
property owners will have access while the utility crew is working in the area. A security will be
collected with the final plat to ensure that the disturbed area will be restored to the current
condition. An outside drop must be constructed at the proposed sanitary sewer connection.
The sanitary sewer service for Lot 2, Block 1 is proposed to extend from the existing sanitary
sewer along the west property line. Lot 1, Block 1 is currently serviced by the lateral that
extends along the shore of Lake Susan. The service for Lot 3, Block 1 will extend from the
proposed lateral along the common lot line with Lot 4. The remaining lots will be serviced from
the proposed lateral within the public street.
A portion of the City water and sanitary sewer hook-up fee must be paid with the final plat and is
calculated as follows:
Water: 6 new units x $1,526/unit = $9,156
Sanitary sewer: 6 new units x $568/unit = $3,408
The developer proposes to install storm sewer and catch basins at the low point of the public
street. The storm sewer will extend to the proposed pond. Storm sewer will extend to the
southeast comer of Lot 6, Block 1 to capture off-site drainage.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 5 of 14
P ARKS AND RECREATION
This property is located within the neighborhood park
service area for Chanhassen Hills Park. Future residents of
Apple Tree Estates are afforded access to the park via the
Waters Edge Drive pedestrian trail that connects to
neighborhood streets in the Chanhassen Hills subdivision.
Chanhassen Hills Park is 7.7 acres in size and features a
playground, picnic area, sand volleyball, trails, skating rink,
basketball court, and a ballfield. Off-street parking is
available at the park. The playground was updated and
expanded within the past few years. No additional parkland
acquisition is being recommended as a condition of this
subdivision.
TRAILS
The subject site has direct access to the Waters Edge Drive pedestrian trail. No additional trail
construction is being recommended as a condition of this subdivision. Full park and recreation
fees shall be collected for each new lot at the time of final plan recording. The fees shall be
$34,800.00 (6 x $5,800).
MISCELLANEOUS
Final grading plans and soil reports must be submitted to the Inspections Division before
building permits will be issued. Engineered design and building permits are required for
retaining walls exceeding four feet in height. Demolition permits must be obtained before
demolishing any structures. Existing home(s) affected by new street/cul-de-sac will require
address changes.
COMPLIANCE TABLE
Lot Area non- Frontage Lake
riparian/ Depth
riparian(square regular/private (feet) Frontage Notes
feet) street (feet) (feet)
Code 15,000/20,000 90/100 125 90 0.344/0.459 ac.
respectively
L1 Bl 76,393 120 at bldg 530 179 at 1.754 ac., Riparian lot,
setback survey line existing house; access
via private street
L2 Bl 77,206 100 at bldg 475 206 at 1.772 ac. Riparian lot,
setback survey line bluff (30-foot setback);
access via private street
L3 Bl 19,035 140 169 NA 0.437 ac.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 6 of 14
Lot Area non- Frontage Lake
riparian! Depth
riparian(square regular/private (feet) Frontage Notes
feet) street (feet) (feet)
UBI 18,618 100 188 NA 0.427 ac.
L5 Bl 18,673 100 186 NA 0.429 ac.
L6Bl 18,884 107 202 NA 0.434 ac.
Ll B2 20,790 133 173 NA 0.477 ac. Corner lot
Outlot A 28,302 0.65 ac., Storm water
pond and wetland
ROW 45,500 1.04 acres
TOTAL 323,856 7.434 acres
REVIEW CONDITIONS OF APPROVAL
1. Additional six-inch address numbers will be required at the entrance to the driveway of Lots
1 and 2, Block 1, where it comes off the cul-du-sac.
* This condition still applies.
2. Additional six-inch address numbers will be required at the driveway where it splits between
Lots 1 and 2, Block 1.
*This condition still applies.
3. Contact Chanhassen Fire Marshal for exact locations and numbering requirements.
*This condition still applies.
4. No burning permits will be issued for trees to be removed. Trees and scrubs must be
removed from site or chipped.
*This condition still applies.
5. A three-foot clear space must be maintained around fire hydrants and nothing be placed in
front of the outlets to hinder firefighting operations. MN Fire Code Sec. 508.5.4.
*This condition still applies.
6. Fire apparatus access roads and water supply for fire protection is required to be installed.
Such protection shall be installed and made serviceable prior to and during time of
construction except when approved alternate methods of protection are provided. MN Fire
Code Sec. 501.4.
*This condition still applies.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 7 of 14
7. Temporary street signs are required to be installed as soon as construction begins. Signs
shall be of an approved size, weather resistant and be maintained until replaced by permanent
signs. MN Fire Code Sec.505.2.
*This condition still applies.
8. A 30-foot wide private easement, cross-access and maintenance agreement must be
submitted for the private street.
*This condition still applies.
9. Final grading plans and soil reports must be submitted to the Inspections Division before
building permits will be issued.
*This condition still applies.
10. Retaining walls over four feet high require a building permit and must be designed by an
Engineer registered in the State of Minnesota.
*This condition still applies.
11. Each lot must be provided with a separate sewer and water service.
* This condition has been met
12. Demolition permits must be obtained before demolishing any structures.
*This condition still applies.
13. Existing home(s) affected by the new street/cul-de-sac will require address changes.
*This condition still applies.
14. The existing shed on proposed Lots 4, 5 and 6, Block 1, Apple Tree Estates must be removed
concurrently with the installation of the street improvements.
*This condition still applies.
15. Full park fees in lieu of parkland dedication and/or trail construction shall be collected as a
condition of approval for Apple Tree Estates. The park fees shall be collected in full for all
new homes at the rate in force upon final plat submission and approval.
*This condition shall be modified as follows: Full park fees in the amount of $34,800.00
shall be collected in full prior to the final plat recording.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 8 of 14
16. Applicant shall remove Colorado spruce from the planting list and transfer the quantity to
other evergreens in the Plant Schedule or add a third evergreen species. A revised planting
list shall be submitted to the city.
*This condition still applies.
17. All trees proposed to be preserved shall be protected by tree preservation fencing. Fencing
shall be installed prior to site development or grading and excavation for homes on each lot.
Any trees shown as preserved on plans dated 1/15/09 and revised 2/25/09 must be replaced at
a rate of 2: 1 diameter inches if removed.
*This condition still applies.
18. The applicant shall locate the existing row of trees along the east side of Apple Tree Lane
north of Lot 1, Block 2 relative to the proposed retaining wall and develop a plan to protect
the trees. The survey and plan shall be submitted to the city for approval.
*This condition shall be modified as follows: The applicant shall locate the existing row of
trees along the east side of Apple Tree Lane north of Lot 1, Block 2 relative to the proposed
retaining wall and develop a plan to protect the trees and confirm their structural integrity.
The survey and plan shall be submitted to the city for approval before a notice to proceed is
issued.
19. The building permit survey for Lot 2, Block 1 shall include the tree survey for the lot. Any
additional tree removal on the lot greater than what is shown on subdivision plans
dated1/15/09, revised 2/25/09, will need prior approval from the city and additional plantings
may be required.
*This condition still applies.
20. The applicant shall revise the landscape plan to show river birch and balsam fir or black
spruce near the wetland rather than red oak and white spruce.
*This condition still applies.
21. The plans and hydrology calculations must be revised so that the pond will hold back-to-back
100-year storms.
*This condition has been met.
22. Correct the location and elevation of the wetland emergency overflow.
*This condition has been met.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 9 of 14
23. A piped EOF is required for the wetland. The developer's engineer shall examine possible
locations for this connection and work with and obtain the necessary permission from the
property owner/agency.
*This condition has been met.
24. The driveway grades for Lot 3, Block 1 must be adjusted so that there is positive drainage
along the entire driveway.
*This condition no longer applies.
25. A building permit for Lot 2, Block 1 may be issued prior to installation of the public street
and utilities. A final Certificate of Occupancy will not be granted until the public utilities are
in and the first lift of asphalt has been installed on the street.
*This condition still applies.
26. The developer must submit a plan showing how access to the existing home on Lot 1, Block
1 and the proposed home on Lot 2, Block 1, will be maintained throughout construction.
*This condition still applies.
27. The top and bottom of wall elevations must be shown on the plans.
*This condition has been met.
28. The plan must show the existing trees on the property to the east of the development,
adjacent to the proposed retaining wall. The plans must be revised so that the off-site trees to
the east of the development are not impacted with the retaining wall construction.
*This condition has been met.
29. The developer is required to obtain the appropriate permits from MnDOT to construct the
local street connection.
*This condition still applies.
30. The developer must notify the affected property owners a minimum of seven days before
mobilizing to complete the sanitary sewer connection.
*This condition still applies.
31. A security will be collected with the final plat to ensure that the disturbed area will be
restored to the current condition.
*This condition still applies.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 10 of 14
32. The storm sewer between the public street and the pond must be shifted to either the north or
south property line of Lot 1, Block 2 to eliminate the drainage and utility easement through
the property.
*This condition has been met.
33. Any excavation within the wetland cannot result in a maximum inundation greater than six
(6) feet in depth.
*This condition has been met.
34. The finished bottom of the wetland shall be undulating providing varying depths.
*This condition has been met.
35. Side slopes shall be no greater than 5: 1 on average and no greater that 3.5: 1 in any location.
*This condition has been met.
36. Bottom of the wetland shall have a minimum 0.8 feet of organic soil materials or otherwise
hydric soils.
*This condition has been met.
37. A vegetation establishment plan must be developed and implemented for the wetland and the
buffer area. In the event that no excavation occurs within the wetland, a vegetation
management plan need only be developed and implemented for the buffer area.
*This condition still applies.
38. Sequencing of erosion control measures need to be incorporated into the plan. This includes
placement of perimeter controls prior to earth disturbing activities and excavation of the pond
during the initial grading activities to be used as a temporary basin.
*This condition still applies.
39. Silt fence must be included down gradient of all exposed soils.
*This condition still applies.
40. Inlet protection shall be required within 24 hours of setting the structures on site.
*This condition has been met.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 11 of 14
41. Erosion and sedimentation BMPs must be placed to protect the structures in Waters Edge
Dri ve.
*This condition has been met.
42. A concrete washout area needs to be shown on the plan and must comply with the NPDES
permit requirements.
*This condition has been met.
43. A rock construction entrance, at least 75 feet in length, must be indicated on the plan.
*This condition has been met.
44. An NPDES Permit will be required for the project. This must be obtained prior to
commencement of any earth disturbing activities.
*This condition still applies.
45. The pond and wetland should be put into an Outlot. This will result in a further reduction of
SWMP fees. That portion of Lot 1, Block 2 east of the westerly normal water level
elevation for the stormwater pond shall be included in a separate Outlot to facility pond
maintenance.
*This condition has been met.
46. City staff shall work with the applicant to make sure that the new proposal for drainage meets
the City of Chanhassen Engineering Department's requirements including:
a. The lOa-year storm event must be stored on site. This requirement presents a challenge
because of the elevation of the culvert under the neighbor's driveway to the wetland.
b. The peak elevation noted for the back-to-back lOa-year storms is higher than the
driveway to the east.
c. The exfiltration assumption used in the model must be verified.
d. The discharge pipe must meet the minimum pipe slope requirement.
*This condition has been met.
Based on review of the final plans, staff is recommending the following conditions be added:
1. The developer must ensure that adjacent property owners will have reasonable access to their
property while the utility crew connects to the existing sanitary sewer. A security will be
collected with the final plat to ensure that the disturbed area will be restored to the current
condition.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 12 of 14
2. An outside drop must be constructed at the proposed sanitary sewer connection.
3. A portion of the City water and sanitary sewer hookup charges must be paid with the final
plat and is calculated as follows:
Water: 6 new units x $1,526/unit = $9,156
Sanitary sewer: 6 new units x $568/unit = $3,408
RECOMMENDATION
Staff recommends that the City Council adopt the following motion:
"The Chanhassen City Council approves the final plat for Apple Tree Estates creating seven lots,
one outlot and public right-of-way, plans prepared by Plowe Engineering, me., dated 5/4/09, subject
to the following conditions:
1. Additional six-inch address numbers will be required at the entrance to the driveway of Lots
1 and 2, Block 1, where it comes off the cul-du-sac.
2. Additional six-inch address numbers will be required at the driveway where it splits between
Lots 1 and 2, Block 1.
3. Contact Chanhassen Fire Marshal for exact locations and numbering requirements.
4. No burning permits will be issued for trees to be removed. Trees and scrubs must be
removed from site or chipped.
5. A three-foot clear space must be maintained around fire hydrants and nothing be placed in
front of the outlets to hinder firefighting operations. MN Fire Code Sec. 508.5.4.
6. Fire apparatus access roads and water supply for fire protection is required to be installed.
Such protection shall be installed and made serviceable prior to and during time of
construction except when approved alternate methods of protection are provided. MN Fire
Code Sec. 501.4.
7. Temporary street signs are required to be installed as soon as construction begins. Signs
shall be of an approved size, weather resistant and be maintained until replaced by permanent
signs. MN Fire Code Sec.505.2.
8. A 30-foot wide private easement, cross-access and maintenance agreement must be
submitted for the private street.
9. Final grading plans and soil reports must be submitted to the Inspections Division before
building permits will be issued.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 13 of 14
10. Retaining walls over four feet high require a building permit and must be designed by an
Engineer registered in the State of Minnesota.
11. Demolition permits must be obtained before demolishing any structures.
12. Existing home(s) affected by the new street/cul-de-sac will require address changes.
13. The existing shed on proposed Lots 4,5 and 6, Block 1, Apple Tree Estates must be removed
concurrently with the installation of the street improvements.
14. Full park fees in the amount of $34,800.00 shall be collected in full prior to the final plat
recording.
15. Applicant shall remove Colorado spruce from the planting list and transfer the quantity to
other evergreens in the Plant Schedule or add a third evergreen species. A revised planting
list shall be submitted to the city.
16. All trees proposed to be preserved shall be protected by tree preservation fencing. Fencing
shall be installed prior to site development or grading and excavation for homes on each lot.
Any trees shown as preserved on plans dated 1/15/09 and revised 2/25/09 must be replaced at
a rate of 2: 1 diameter inches if removed.
17. The applicant shall locate the existing row of trees along the east side of Apple Tree Lane
north of Lot 1, Block 2 relative to the proposed retaining wall and develop a plan to protect
the trees and confirm their structural integrity. The survey and plan shall be submitted to the
city for approval before a notice to proceed is issued.
18. The building permit survey for Lot 2, Block 1 shall include the tree survey for the lot. Any
additional tree removal on the lot greater than what is shown on subdivision plans
dated1/15/09, revised 2/25/09, will need prior approval from the city and additional plantings
may be required.
19. The applicant shall revise the landscape plan to show river birch and balsam fir or black
spruce near the wetland rather than red oak and white spruce.
20. A building permit for Lot 2, Block 1 may be issued prior to installation of the public street
and utilities. A final Certificate of Occupancy will not be granted until the public utilities are
in and the first lift of asphalt has been installed on the street.
21. The developer must submit a plan showing how access to the existing home on Lot 1, Block
1 and the proposed home on Lot 2, Block 1, will be maintained throughout construction.
22. The developer is required to obtain the appropriate permits from MnDOT to construct the
local street connection.
Todd Gerhardt
Apple Tree Estates
June 8, 2009
Page 14 of 14
23. The developer must notify the affected property owners a minimum of seven days before
mobilizing to complete the sanitary sewer connection.
24. A security will be collected with the final plat to ensure that the disturbed area will be
restored to the current condition.
25. A vegetation establishment plan must be developed and implemented for the wetland and the
buffer area. In the event that no excavation occurs within the wetland, a vegetation
management plan need only be developed and implemented for the buffer area.
26. Sequencing of erosion control measures need to be incorporated into the plan. This includes
placement of perimeter controls prior to earth disturbing activities and excavation of the pond
during the initial grading activities to be used as a temporary basin.
27. Silt fence must be included down gradient of all exposed soils.
28. An NPDES Permit will be required for the project. This must be obtained prior to
commencement of any earth disturbing activities.
29. The developer must ensure that adjacent property owners will have reasonable access to their
property while the utility crew connects to the existing sanitary sewer. A security will be
collected with the final plat to ensure that the disturbed area will be restored to the current
condition.
30. An outside drop must be constructed at the proposed sanitary sewer connection.
31. A portion of the City water and sanitary sewer hookup charges must be paid with the final
plat and is calculated as follows:
a. Water: 6 new units x $1,526/unit = $9,156
b. Sanitary sewer: 6 new units x $568/unit = $3,408
32. Total SWMP fees due at final plat are $24,965.23."
ATTACHMENTS
1. Location Map.
2. Reduced Copy Pinal Plat.
g:\plan\2009 planning cases\09-01 apple tree estates\final plat documents\staff report. doc
Location Map
(Subject Property Highlighted in Yellow)
Apple Tree Estates
8600 Waters Edge Drive
Planning Case 2009-01
:II
I ~"
;. ::
SUBJECT
PROPERTY
~
i:.; ~
~~~ ~ ~
i~'-! !~~ i .1; :i
::J ~. i ~~ I I ~ \ ~ ! ~
~ ' c! }::~::.:J m j nil ~~
~. !~ ~ i '~i L!!~l~:i
~ -~: I ]f; ~ ~ ~ ~ ~ ~
o II I :1l:~ ~ ~ ~ ~ ~ ~
l!i .i-g:@-
ml>O .o~::ie ~
..
:I:
~~
o
z
~
"Z
;~
.0
~8
">
m
~~;2
z~~
~~; ml
g~~ :;
!ii
~:~
~~~
!~~
/!::>
" ,~,
- ,~,
'_' , n~
'\;'\::,
,;
.
i
J
f
~
~
_ ri
~ ~~E"~~ I
; !lil1! .
2 z
. 0
~ ~
"
.~
:;;;: :!
.
~z"
I! h
'Q:i
-= 3= "'_0: Zoo c",s ....0'5 '0 g~~c:o-.o15
! ~ g~~~~tI~ gi~ ~~~~l~]j~i~
.
" .
<
.~
"
J
,
~
,; !
;; "
!
..
~
~
j
.,
=~ i
l~
if ~
,
~ ~
II ! ";
52 b 'l
'i ~ .s:
~ ~ ~
.!!,>.!:
.,
Eo
:1
!~
...
..
0:5
go5
~~
<i.<'!
m
:h
:5'6~
m
i~:
"0;0
So'
J
I d.,
E ~~~
Ii .,g!: 0
= f~~
I.. ~~~
~lz
.. ~il
i ;
j ~!
! i ;~~
! __i ^-
_:.~~~~ v
,------.., :::s
I I '
: : 15
: "~ r 5~
'.... I I"'W
I 1
I I
I '.' I
J _~, I
__J I I
I I
I I
I _---I.-
, , ///.....J.............
(0) 18'[n 'W Sn9Zj 1l\..i:(.lO..QON '-:r:--I (;::~;-
I 'h_lI00~'I__. ,I ...........--
rt- ..J ," // "::}
l5,.:."]'!;i : "..."
I' ~:>. I" ::: I ."..
~~ <, ~~ ~~ : :~i
~~ I ~~ ~~ u,
~
JI!
iiil
il!1
<E"
~...~~
!:H
5~i:s.
ili~
C/.Qv>l!'"
mil
i ;~Im
I- !Ii
i'05~
ag!
530.21
J!
I~
;i
H
"
~
o
!
<
~
~
!
il
il
u.!'!
H
i
I
~
~ ~~
~
~ .'
,z
~~
~ .0
.!:::;j
~ Ail
~
~ ~~
J
j
J
~
1
"
0'
!
"
1
.
,
.
i:
i
ii J
]
~
i~
~
<
.
j
"
~
I~
~l
~~
III .
.. 5 I
i ~8
5ir
IP
II f
=
==
-
..
~i
~~
~~
~i
~~
o:i
III i I
I i~
e! I
IL