Loading...
1c. Public Works Facility: Approve Change Order CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952,227,1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952,227,1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952,227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952,227.1400 Fax: 952,227,1404 Planning & Natural Resources Phone: 952,227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952,227,1310 Senior Center Phone: 952,227,1125 Fax: 952,227.1110 Web Site www.ci.chanhassen.mn.us 1e- - MEMORANDUM TO: Todd Gerhardt, City Manager Paul Oehme, Director pfPublic Works/City Engineer"'? tJ ' ,,~. FROM: DATE: July 13,2009 SUBJ: Public Works Facility, Project 08-03: Approve Change Order PROPOSED MOTION "The City Council approves Change Order No.1 in the amount of $43,479.35 for the Public Works Facility. City Council approval requires a simple majority vote of the City Council present. BACKGROUND On February 23,2009, the City Council approved the plans and specifications and authorized the ad for bids. On March 23,2009, the City Council approved bids for steel and concrete for the facility and reviewed other bids and quotes. On April 13, 2009, the City Council approved bids and quotes for the remaining items of the facility. DISCUSSION Staff is requesting Council consider approving a change order for the Public Works facility. Included in this request are minor miscellaneous changes to the project caused by unforeseen site conditions or requested changes by the Building Department based upon interpretation of the building code. Contract changes like these are normal for large scale projects. The City's construction manager RJM Construction has reviewed the costs and finds them consistent with current market pricing. Below is a brief description of the changes requested: Men's and Women's Shower Revisions $644.00 This change was requested by the Building Department based on their interpretation of the plumbing code. The change reconfigures the shower stall and extends a wall. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Todd Gerhardt Public Works Facility: Approve Change Order July 13,2009 Page 2 Add Storm Sewer Catch Basins and Storm Sewer Piping $16,615.50 In the design that was bid, the roof leaders for the west side of the building drain off the building into a shallow swale which drains to the south. During construction of the footings in this area, the water table was observed higher than the soil borings indicated. It is believed if the rain water leaders are left as is and the runoff of the building is left to drain in the swale, the water table in this area could increase and potentially cause foundation problems in the future. The proposed change will connect the roof leaders to a storm sewer pipe and drain to the south. The storm sewer pipe is also proposed to be perforated so it will act like a drain tile to pick up groundwater. Add Practical Row of Recon Retaining Wall Block $728.00 The southeast wall next to the parking lot needed to be raised one course to better match the back of curb of the parking lot. Watermain Connection This change is a deduction in the piping contract for water service to the building. deduction of a wet tap. -$1,274.00 The change is for the Six Additional Skylights $20,985.00 This change is to include six skylights to the fleet storage area which were left out of the original contract. The fabrication of the skylight openings were added into the steel bid but were inadvertently not added into the roofing contract at the time of award. The skylights pricing was competitively bid out with the roofing contract. Deduct for HV AC Permit Fee This item is a deduction in the HV AC contract for the permit fee. -$6,018.15 Add Footing Steps $8,939.00 This item is to lower the footing and add steps to facilitate changes to the stormwater roof leads on the west side of the building. Add Resinous Flooring to Hallways 122, 13 Land 131 In Lieu of Tile $2,290.00 This item is requested by the public works staff. It is felt the resinous flooring will be easier to maintain and clean than the tile flooring that is currently in the contract. The office areas, bathrooms and lunch rooms all have the resinous flooring. The only area that will have tile is in the reception area. Underground Conduit for Future Fiber Optic Cabling $570.00 This item is to add conduit under the east drive and the west drive to plan for future fiber service to the facility. The City is currently working with Carver County on a fiber loop for the County. The City is looking at using the County's fiber loop in the future for City operations. The fiber will potentially be installed next year after the facility is open. Staff does not have a final plan from the County were the fiber will be installed. The facility will have a temporary network connection until the fiber is installed. Total Requested Changes $43,479.35 The change order amount is proposed to come out of the contingency amount budgeted for the project. The project is still projected to be under budget by $390,256. Attachment: RJM Letter of Recommendations g:\eng\public,,"-2008 projects\08-03 chanhassen maintenance (pw) facility\070209 bkgd col bw 08-03.doc ~ CONSTRUCTION ri::::::~.;~~!.~~~,:.:~ ~ ~./.\ir;;'~ ,. rl~' CORPORATE OFFICE HWY.7 CORPORATE CENTER 7003 W. LAKE ST. SUITE 400 ST. LOUIS PARK, MN 55426 PHONE 952-837-8600 . FAX 952-832-9600 SATELLITE OFFICES PLAZA VII MINNEAPOLIS, MN NORTHLAND EXECUTIVE OFFICE CENTER BLOOMINGTON, MN NORMANDALE LAKE OFFICE PARK BLOOMINGTON, MN July 2,2009 Mr. Todd Gerhardt City of Chanhassen 7700 Market Boulevard Chanhassen, MN 55317 Re: City ofChanhassen Public Works Facility Recommendation for Project Change Order 1 Chanhassen City Council Meeting Dear Mr. Gerhardt, At the next City Council meeting RJM Construction recommends that the City Council approve Project Change Order 01. The total amount of this Change Order will be for $43,479.35. Change Orders are a nonnal process in construction. A project contingency of $346,872 was budgeted for changes such as the individual Change Requests listed on the attached "Chanhassen Public Works Change Order # 1." This Change Order will be deducted from the project contingency which will leave $303,392.65 remaining. In addition to the project contingency, the overall Chanhassen Public Works project is under budget by $390,256. Attached is a list of individual Change Requests that comprise this proposed Change Order. Each of these proposed Change Requests have been reviewed for approval by RJM Construction and Oertel Architects for accuracy in quantities and market pricing for the requested work. Each of these proposed Change Requests have since been reviewed by proj ect team representatives from the City of Chanhassen. If you should have any questions, please feel free to contact me. Thank you for your assistance with this approval. sac&; Gerhardt Gliege Project Manager Cc: Jeff Oertel. Oertel Architects , I i "j Chanhassen Public Works Project Change Order #1 Description Proposal Request 1 - Men's and Women's Shower Revisions Proposal Request 3 - Added Catch Basins and Storm Piping Civil Revision - Added Partial Row of ReCon Block Civil Revision - Water Main Connection Six Additional Skylights Deduct for HVAC Permit Fees Proposal Request 3 - Added Footing Steps Resinous Flooring in Hallways 122, 131, & 131 in lieu of Porcelail Underground Conduit for Future Fiber Optic Cabling Total Change Order 1 'I ! CONSTRUCTION Amount $644.00 $16,615.50 $728.00 ($1,274.00) $20,985.00 ($6,018.15) $8,939.00 $2,290.00 $570.00 $43,479.35 CONSTRUCTIO'N ;}~:~::~:;!.:;!~m:~ r~Af' CORPORATE OFFICE HWY.7 CORPORATE CENTER 7003 W. LAKE ST. SUITE 400 ST. LOUIS PARK, MN 55426 PHONE 952-837-8600 FAX 952-832-9600 SATELI-ITE OF"F"ICES PLAZA VII .MINNEAPOLlS, MN NORTHLAND EXECUTIVE OFFICE CENTER BLOOMINGTON, MN NORMANDALE LAKE OFFICE PARK BLOOMINGTON, MN Chanhassen Public Works Bid Summary June 2,2009 Base DESCRIPTION Contractor Estimate Public Bids Awarded March 23, 2009 Categorv 3A - BuildinG Concrete and 4A Masonrv Combined Davco Concrete $994,200 Cateaorv 38 - Precast Structural Concrete Walls Fabcon $692,605 Cateaorv 3C - Precast Plank Molln $116,337 CateGory 5A - Structural Steef/JoistsfDeckina/Misc. Steel Material Thurnbeck $400 863 Public Bids Awarded ADril13 .2009 Cateaorv 58 - Structural SteeIlJoists/Deckina/Misc. Steel Erection Linco $132,500 CateGory 6A - Caro./Finlsh Cam.lMilfworklDoors, Frame, Hrdwr/Misc. Soe Frerichs Construction $197,600 Cateoorv 7A - Roofing/SheetmetallAccessories Palmer West $489,600 Cateaorv 8A - Aluminum Entrances/Storefronts Brin Northwestern $135,700 Cateaor v 9A - Gvosum Board Svstems RTL Construction $62,469 Caleaor v 98 - Palntina Steinbrecher Paintinn $99,300 . Catellor v 11 A - Vehicle Maintenance EGuioment Purnn and Meter $239.541 Cateaorv 11 B - Fuel Island GilOOs Construction $137,000 Cateaorv 15A - Plumbina and Pioina Svstems Minnetonka PlumbiM $696,000 Cateaorv 15B - HVAC and Control Systems General Sheetmetal $412500 Cateaorv 16A - Electrical Dvnamic Electric $551 ,490 Quotes Awarded A"r1113 2009 Earthwork Olson Construction $82,640 Site Concrete Caoltal Concrete $44,661 Precast Bunker Divider Walls Hanson Silo Comoanv $17,435 Fences & Gates Centurv Fence $2,000 Modular RetaininQ Walls Structures Hardscanes $24,232 Site Utilities S1. Paul Utilities and Excavatin $88,800 Sectional Overhead Doors API Garaoe Door Store $86,700 Overhead Coiling Doors Twin Citv Garaoe Door Co. $16,166 Acoustic Ceilinas Twin CitvAcoustics $7,605 Sianaae LereW STans $9,357 Overhead Crane Systems Aero Material Handlina $51,740 Window Treatment Prairie's Edae, Inc. $1,795 Fire Protection Service Rre Protection $82,540 Quotes Awarded April 27, 2009 Tile CD Tile and Stone $30,370 Camel/Resilient Mulliole Concent Interiors $1,771 Resinous Coatinos QC ComDanies $52,730 Allowance Awarded Mav 26, 2009 Salt Structure GrevstonefDavco/Olson $106.456.72 Change Order 1 Recommended for Award $43,479.35 .:-' Mise Budaets/Allowances Earthwork - Site Proiect Allowance $75,000 Asohalt Pavine ITo Be Bid at Later Datel Proiect Allowance $300,000 Landscaoe & Irriaation Prolect Allowance $20,000 Aooliances Proiect Allowance $12,000 Commercial Vacuum System Proiect Allowance $12,000 Alternates Awarded Altemate 6 - TPO roofina at all areas - $54,490 Included above Alternate 10 - Provide skvliahts - $22,627 Included above General Conditions RJM Construction $260,600 Temo Heatina Eaufnment RJM Construction $25,000 Survey RJM Construction $20,000 General Liability Insurance RJM Construction $68 652 Final Cleanina RJM Construction $18,500 BlueDrints RJM Construction $35,000 Subtotal Construction Cost $6,977,335 ContinGency $303,393 Construcllon Manaaement Fee $160,255 Total Construction Budget $7,440,983 (3) CONSTRUCTION :.1r~tg~m~~~r~: C~:;~;::;t.l:~iji;::};~.~t :~.;:: ,.:.;. z.~~~';;:S1 t) /.?.s:zzz.:,: '" ~<;;r-:~ rf.t~1 CORPORATE OFFICE HWY. 7 CORPORATE CENTER 7003 W. LAKE ST. SUITE 400 ST. LOUIS PARK, MN 55426 PHONE 952'837-8600 fAX 952-832-9600 SATELLITE OFFICES PLAZA VII MINNEAPOLIS, MN NORTHLAND EXECUTIVE OFFICE CENTER BLOOMINGTON, MN NORMAl-JDALE LAKE OFFICE PARK BLOOMINGTON, MN Chanhassen Public Works Bid Summary June 2, 2009 Owner Costs Soli Correction $310,000 Testina & Soeciallnsoectlons $25,000 Buildina Permit $54,276 SAC - 16 Units $32,000 Builders Risk Insurance $8,000 Furniture $60,000 Fiber Cotic $50,000 Subtotal $539,276 DeSign Fees Arch., Mech.lElec. Desion Fees $429,485 Subtotal $429,485 Total Project Budget $8,409,744 Original Project Budget Total Project Budget Savings $8,800,000 $390,256