Loading...
1e. Audubon Road Reconstruction: Award Preliminary Design Consultant Contract CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227,1110 Building Inspections Phone: 952.227.1180 Fax: 952,227,1190 Engineering Phone: 952,227,1160 Fax: 952.227,1170 Finance Phone: 952.227,1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952,227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952,227.1400 Fax: 952,227.1404 Planning & Natural Resources Phone: 952,227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952,227,1300 Fax: 952.227,1310 Senior Center Phone: 952.227.1125 Fax: 952,227.1110 Web Site www.ci.chanhassen.mn.us 1e r 1'"~-, MEMORANDUM TO: Paul Oehme, Director of Public Works/City Engineer (!(J , t~ FROM: Alyson Fauske, Assistant City Engineer DATE: ()~ August 10, 2009 SUBJECT: Audubon Road Reconstruction Project No. 10-02 - Award Preliminary Design Consultant Contract PROPOSED MOTION "The City Council is recommended to award the Preliminary Design Consultant Contract for the Audubon Road Reconstruction Project No.1 0-02 to SRF Consulting Group, Inc. in the amount of$26,150. City Council approval requires a simple majority vote of the City Council present." BACKGROUND On July 13 2009, staff discussed next year's proposed street reconstruction projects with the City Council at the work session. PROJECT OVERVIEW Audubon Road from Lake Drive West to Lyman Boulevard (CSAH 18) is a municipal collector roadway and is planned to be reconstructed next year. The pavement is in poor condition and shows severe pavement distress. The roadway is a rural section with gravel shoulders. On the steep hill portion of the roadway, the gravel washes out after large rain events and can become a safety problem if not regraded several times a year. Audubon Road should be urbanized and widened to the same pavement width as is currently north of Lake Drive. The Parks Department Trail Comprehensive Plan calls for extending a trail down to Lyman Boulevard. A small area of land may need to be acquired at the south end of Audubon Road to accommodate the roadway and trail. Minor repairs to the watermain are proposed and depending on the. profile of the roadway may need to be lowered in some areas. The pond on the south side of Lyman Boulevard was oversized in conjunction with the Lyman Boulevard reconstruction project to treat the runoff from this section of Audubon Road when it is improved. A storm sewer pipe has been stubbed on the north side of Lyman Boulevard for the future reconstruction of Audubon Road. DISCUSSION On July 24, 2009, a Request for Proposals (RFPs) for this project was emailed to Kimley- Horn and Associates, Inc. and SRF Consulting Group, Inc. The RFP included preliminary design, surveying, cost estimation and easement acquisition documentation for the project. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme Audubon Road Reconstruction Project August 10, 2009 Page 2 Once this work is completed, staff is planning to complete final design, feasibility report, assessments, land acquisition, bidding and construction management services. Kimley-Horn & Associates, Inc. has successfully designed street improvement projects within the City, including the Laredo Drive Area reconstruction project in 2008, the Dogwood Road reconstruction project in 2007 and the Bluff Creek Boulevard project in 2005. SRF Consulting Group, Inc. has completed several projects within the City including the Lyman Boulevard reconstruction for Carver County. SRF Consulting Group, Inc. is familiar with the area and the need for the project. Both consultants submitted proposals that included the basic requirements of the RFP and met the criteria as outlined. Kimley-Horn and SRF Consulting Associates, Inc. Group, Inc. Submitted prior to the deadline ./ ./ Proposal format ./ ./ Transmittal letter submitted ./ ./ with required information Members of the consultant ./ ./ team identified Understanding of project ./ ./ Base Fee $26,880 $26,150 SRF's proposed fee is $730 less than Kimley-Horn's. SRF's proposal included a detailed description of project tasks and has allocated 32 more person-hours to complete these tasks. In addition, SRF is very familiar with the project area as they were the consultant engineer for the Lyman Boulevard project, which included re-design on the intersection with the northern segment of Audubon Road. SCHEDULE Ifthis project moves forward, staff anticipates the following project schedule: Award Consultant Contract August 10, 2009 Neighborhood Meeting November, 2009 Public Hearing January, 2010 Bid Opening March, 2010 Neighborhood Meeting April, 2010 Assessment Hearing! A ward Contract April, 20 I 0 Start Construction May, 2010 Construction Complete August, 20 I 0 G:\ENGIPUBLIC\..2010 ProjectsllO-02 Audubon Road Implapprove consultant contract 08-10-09.docx Paul Oehme Audubon Road Reconstruction Project August 10, 2009 Page 3 FUNDING The preliminary budget for the proposed street reconstruction work was included in the 2010 CIP at $3,000,000. The budget will need to be reviewed and updated based upon preliminary design cost estimates included in the scope of services. Funding for the project will be from municipal bonds and assessments. Properties with driveway access to Audubon Road are proposed to be assessed. The assessment methodology and estimated assessments will be determined by a Consultation Report. The contract will be a time and materials based work not-to-exceed amount. As with all engineering contracts, the consultant must submit periodic invoices that staff will review before processing. The consultant will be required to submit time sheets verifYing the hours worked on the project and expense sheets. Staffwill review the invoices and expense sheets for accuracy and conformance to the contract. Attachments G:\ENGIPUBLICI_201O Projectsll 0-02 Audubon Road Implapprove consultant contract 08-1 0-09.dacx AUDUBON ROAD IMPROVEMENT AREA I I Capital Improvement Program City of Chanhassen, MN 2009 thru 2013 Contact Paul Oehme Department Street Improvements Type Improvement Useful Life Category Streets/Highways Priority nfa I Project # ST -022 Project Name Audubon Street Project Account # 1 601-0000-4751 Account # 3 I Account #2 I, Description Annual project to rehabilitate and reconstruct streets in the City. Total Project Cost $3,000,000 2010 - Audubon Road Lyman Blvd, to Lake Drive West I: I: Ii Justification The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life ofthe street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. Rehabilitation projects extend the life of the street. In cases with utility or poor subgrade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to consider the mertis of the project and scope of work. I Expenditures Construction 2009 2010 2011 2012 2013 Total 3,000,000 3,000,000 I' ~' : Total 3,000,000 3,000,000 I I Funding Sources 2009 Assessment/Revolving Assess 2010 2011 2012 2013 Total 3,000,000 3,000,000 Total 3,000,000 3,000,000 I I Operational Impact/Other This project may decrease maintenance costs. I I I I I 107