Loading...
1b. Lakeside at Bearpath: Approve Quote CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone 952.227.1125 Fax 952.227.1110 Web Site www.cichanhassen.mn.us ib ---~ MEMORANDUM Paul Oehme, Director of Public Works/City Engineer~ 0 TO: FROM: Alyson Fauske, Assistant City Engineer.. f....A v (~7 October 12, 2009 DATE: SUBJECT: Lakeside at Bearpath 1 s\ 2nd, 3rd Additions, Project Nos. 06-13, 06-13-2, 06-13-3: Approve Quote to Complete Punchlist Items PROPOSED MOTION "The City Council approves a quote in the amount of$84,706.50 from Chard Tiling and Excavating, Inc. for work to be performed at Lakeside at Bearpath 1 s\ 2nd, and 3rd Additions." City Council approval requires a simple majority vote of the City Council present. BACKGROUND The work consists of concrete sidewalk construction and repairs, concrete curb and gutter removal and replacement, and miscellaneous utility adjustments and repairs at the Lakeside at Bearpath development located north of Lake Riley. The street and utility work for all phases was included in the first phase of the development. All streets and utilities will be privately owned and maintained by the homeowners' association once the remaining work is complete. Project location The work was to be completed by the developer, Sienna Corporation, under the terms and conditions listed in the Lakeside Development Contract dated November 13, 2006. A letter of credit with an initial balance of $642.935.02 was posted when the project began to guarantee compliance with the terms of the development contract. The amount of the letter of credit was reduced to $210,910.00 based on the work completed on the site. G:\ENG\PRO.lECTS\K-O\Lakeside (Lakeview Hills site)\Award Punchlist Item Contract I01209.doc Chanhassen is a Community for Life. Providing for Today and Planning for Tomorrow Paul Oehme Lakeside at Bearpath Page 2 of2 Sienna Corporation has defaulted on the development and the City drew on the $210,910.00 letter of credit posted by Home Federal Bank in order to complete the remaining work. Based on field observation it appears that the street is still settling, therefore staff does not recommend paving the final lift of asphalt on the private streets this year. This work is planned to be complete in 2010; staffwill solicit quotes next year to complete the work. The outstanding inspection bills totaling $3,400.50 have been paid from the letter of credit draw, leaving $207,509.50 to complete the remaining work. The City has agreed to complete the remaining inspections in-house. The City Attorney has been involved throughout this process. QUOTES A request for quotes was submitted to three contractors on September 29, 2009. Two quotes were received. The quotes received are as follows: Chard Tiling and Excavating, Inc. submitted the low quote. Chard Tiling recently completed the 2009 Mill and Overlay Project, City Project 09-01. The Lakeside project should start October 13,2009 with substantial completion by October 30, 2009. FUNDING Funds for the proposed work were secured by drawing on the letter of credit submitted with the development contract for the first addition. A summary of current expenditures of the letter of credit draw is as follows: Amount drawn on Letter of Credit Payment of outstanding inspection bills Cost to complete remaining utility work (Based on quotes received, pending Council approval) Remaining Balance $210,910.00 ($3,400.50) ($84,706.50) $122,803.00 Quotes to pave the final lift of asphalt will likely be solicited in 2010. Staff estimates that this work will cost approximately $70,000.00. Staff also anticipates that approximately $9,000.00 of the letter of credit draw will be required to pay Pioneer Engineering, the developer's engineer for the street and utility as-builts. Pending Council approval of the utility quotes, the remaining balance of the letter of credit draw will adequately cover the remaining engineering costs and the cost to pave the final lift of asphalt. Any remaining funds from the drawn letter of credit will be given back to the bank after all the requirements of the development contract are complete. G:\ENG\PROJECTS\K-O\Lakeside (Lakeview Hills site)\Award PunchIist Item Contract I01209.doc