Loading...
1d. Well No. 4: Approve Plans and Authorize Ad for Bids CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration P~one: 952,227,1100 Fax: 952,227,1110 Building Inspections Phone: 952,227,1180 Fax: 952,227.1190 Engineering Phone: 952,227,1160 Fax: 952,227,1170 Finance Phone: 952,227,1140 Fax: 952,227,1110 Park & Recreation Phone: 952,227,1120 Fax: 952,227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952,227,1400 Fax: 952,227,1404 Planning & Natural Resources Phone: 952,227,1130 Fax: 952,227,1110 Public Works 1591 Park Road Phone: 952,227,1300 Fax: 952,227,1310 Senior Center Phone: 952,227,1125 Fax: 952,227,1110 Web Site www.ci.chanhassen.mn.us let MEMORANDUM (). TO: Paul Oehme, Director of Public Works/City Engineer '<;! t FROM: DATE: October 12, 2009 SUBJECT: Well No.4 Project No. 09-02: Approve Plans & Specifications; Authorize Advertisement for Bids PROPOSED MOTION "The City Council Approves Plans & Specifications and Authorizes Advertisement for Bids for Well No.4 Improvements, Project No. 09-02". City Council approval requires a simple majority vote of the City Council present." BACKGROUND On September 28,2009, the City Council approved a consultant contract for the Well No.4 Improvements. At the January 12,2009 worksession, staff reviewed with the Council a groundwater well study and water quality improvement report. This report included options to improve the water quality from Well No. 4 located in Lake Susan Park. This well is currently not being treated for naturally occurring minerals such as iron or manganese. The well is used only during peak use times during the summer during peak demand periods in which the water is blended with the other water in the system. The test data of the water from Well No.4 shows that the radium levels are at the upper end of the Minnesota Department of Health's (MDH) guidelines. Well No.4 is high in iron and manganese which gives the water a rusty color and can cause odor problems. Staff still receives complaints from residents when this well is used mainly because of the manganese in the well water. OPTIONS FOR IMPROVEMENTS Several options for improving water quality at Well No.4 were evaluated. The options were discussed in the September 28th and January 1th backgrounds. The best and most cost effective solution was determined to treat the water at the east water treatment plant which requires installing a raw watermain from Well NO.4 to an existing raw watermain on the south side ofTH 5 east of the pedestrian bridge. g:\eng\public'-2009 projects\09-02 well #4 water quality improvements\bkgd app plans & spec IOl209.docx Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Well #4 Water Quality Improvement Project October 12, 2009 Page 2 This project will consist of extension of a proposed 16" diameter raw watermain from Well No.4 in Lake Susan Park to an existing raw watemlain on the south side ofTH 5 by the pedestrian bridge. The majority of the pipe will be directionally bored. Also included in the project is an extension of a 4" irrigation pipe and a 1" service pipe. The raw watemlain alignment and design will consider future wells to be connected to the pipe. SCHEDULE If this project moves forward, staff anticipates the following project schedule: A ward Consultant Contract Approve Plans and Spec. 's; Authorize Ad for Bid Bid Opening A ward of Contract Construction Start Substantial Completion Final Completion (Restoration) September 28, 2009 October 12, 2009 November 13,2009 November 23, 2009 December, 2009 February, 2010 May, 2010 FUND IN G This project will be funded by the Water Fund and was budgeted for in the 2009 Capital Improvement Program (W -025). Attachments: CIP Page Resolution g:\eng\public~2009 projccts\09-02 well #4 water quality improvcl11cnts\bkgd app plans & spec IOl209.docx Capital Improvement Program .City of Chanhassen, MN ". Project # W-025 Project Name Well #4 Improvements Account # 1 700-xxxx-4751 Account #2 2009 thru 2013 Contact Paul Oehme Department Water System Improvements Account # 3 Type Improvement Useful Life Unassigned Category Utilities Priority nla Total Project Cost $930,000 Description Engineering has reviewed the test data of the water from Well #4 and currently, the radium levels are at the upper end of the Minnesota Dept of Health (MDH) guidelines. In 2004, staff reviewed the radium problems with the MDH. The well is currently used as a peak well during high demand periods which blends the Well #4 water with the other well water in the system. This well is also high in iron and manganese levels which creates rusty water complaints. If the radium levels continue to rise, the City may have to enter into a monitoring program with the MDH on a temporary basis if the issue is not addressed. The MDH at that time determines the acceptable amount of water that can be pumped into the City system from Well #4. Staffwill draft a study to identify the best solution to address the poor water quality issues at this well. Options for improvements include redevelopment, abandoning the well, installing a small treatment plant at the well site or treating the water at the East Water Treatment Plant. Extendin a new water i e from Well #4 to the East Water Treatment Plant's existin raw watermain is bud eted for 2009. Justification Well #4 continues to test high for radium and is a high producer of iron and manganese which creates "rusty" water complaints. Expenditures Construction Total Funding Sources Water Utility Fund Total Operational Impact/Other This project will not increase operations cost. 2009 930,000 930,000 2011 2013 Total 930,000 930,000 2010 2012 2009 930,000 930,000 2010 2011 2012 2013 Total 930,000 930,000 132 . . . . . . . . I I I I :1 :1 :1 \1 II (I II........' ! ~ . CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: October 12. 2009 RESOLUTION NO: 2009- MOTION BY: SECONDED BY: A RESOLUTION APPROVING PLANS AND SPECIFICATIONS; AUTHORIZE AD FOR BIDS FOR THE WELL NO.4 PROJECT NO. 09-02 WHEREAS, the City Engineer has prepared plans and specifications for the Well No.4 project and has presented such plans and specifications to the Council for approval; NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council: 1. Such plans and specifications, a copy of which can be reviewed at the office of the City Engineer, are hereby approved. 2. The city clerk shall prepare and cause to be inserted in the official city newspaper and Construction Bulletin, an advertisement for bids upon the making of such improvement under such approved plans and specifications. The ad shall be published at least twice, shall specify the work to be done, shall state that bids will be opened and that the responsibility of the bidders will be considered by the Council at 7:00 PM on Monday, November 23, 2009, in the Council Chambers of the City Hall. Any bidder whose responsibility is questioned during consideration of the bid will be given an opportunity to address the Council on the issue of responsibility. No bids will be considered unless sealed and filed with the clerk and accompanied by a bid security payable to the clerk for 5% ofthe amount of such bid. Passed and adopted by the Chanhassen City Council this 12th day of October, 2009. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT