Loading...
1g. Lift Station No. 24 Pump Replacement: Approve Quote CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us ij MEMORANDUM TO: Todd Gerhardt, City Manager v'- <(v FROM: Paul Oehme, Director of Public Works/City Engineer November 9, 2009 ~1f(Y Lift Station No. 24 Pump replacement: Approve Quote DATE: SUBJ: PROPOSED MOTION "The City Council approves a quote in the amount of $33,349.41 to Electric Pump for piping and pump replacement at Lift Station 24." City Council approval requires a simple majority vote of the City Council present. BACKGROUND On February 9,2009, the Council approved a quote for replacement of a failed pump at Lift Station 24. Funding for replacement of this pump came out of the 2009 Lift Station Rehabilitation CIP project. DISCUSSION Another lift station pump has failed at Lift Station 24. Lift Station 24 is located at the intersection of Lyman Boulevard and Audubon Road and was built in 1995. The failed pump was an 88 hp pump that was 13 years old. The pump cannot be rehabilitated cost effectively. The backup pump for list station 10 is currently being used at Lift Station 24. Lift station 24 is the largest lift station in the City. The pumps at this station need to be in good working condition due to the amount of flow and run time they experience. The station has four pumps which are as large as 90 hp. Staff has reviewed the needs of the station and is requesting to replace the failed 88 hp pump with a 65 hp pump. Newer pumps are more efficient and can offer some of the same pumping characteristics as older larger pumps. Staff has received three quotes for this work as follows: Pump and Piping Quality Flow Systems, Inc. (KSB Pum ) $39,937.50.25 Braun Pump & Controls (ABS Pum ) $38,120.89 All the quotes include necessary piping, freight, tax and startup. Staff had originally programmed to replace the pumps at Lift Station 24 along with some electrical equipment in 2010. Staffis requesting to advance the replacement of one more pump to 2009. Attachment: CIP Sheet c: Kevin Crooks, Utility Superintendent g:\eng\public~glhi~~_~8iWJw)'lIiffg- fm~00-1g21p~rWJJlg&9ning for Tomorrow Capital Improvement Program City of Chanhassen, MN Project # SS-017 Project Name Sanitary Lift Station Rehabilitation Program Account # 1 701-0000-4751 Account #2 Account # 3 . 2009 thru 2013 Contact Paul Oehme Department Sanitary Sewer Improvements Type Improvement Useful Life Unassigned Category Utilities Priority nla Total Project Cost $480,000 Description The f~l!lJlitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment. The City currently maintains 31 lift stations. Many of these lift stations are high service pumps and need frequent servicing. The program will service or replace pumps, pipe gallery, and electrical components as needed. The proposed lift stations scheduled for improvements over the next 5 years are as follows: 2009 - #7, #9 2010 - #8 and #24 2011 - #10 and #11 2012 - #16 and #21 2013 - #1, #22 and #25 Justification Reduce emergency calls and potential sewer backups. Expenditures Maintenance Total . Funding Sources Sewer Utility Fund 2009 75,000 75,000 2009 75,000 Total 75,000 2010 200,000 200,000 2010 200,000 200,000 2011 90,000 90,000 . 2011 90,000 90,000 95 2012 . 50,000 50,000 2012 50,000 50,000 2013 65,000 65,000 Total 480,000 480,000 2013 65,000 65,000 Total 480,000 480,000 I i:1 li!.I. Ii I'i dl ii! 'if 1'1 I, Ii H' !i: