1g. Lift Station No. 24 Pump Replacement: Approve Quote
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
ij
MEMORANDUM
TO:
Todd Gerhardt, City Manager
v'-
<(v
FROM:
Paul Oehme, Director of Public Works/City Engineer
November 9, 2009 ~1f(Y
Lift Station No. 24 Pump replacement: Approve Quote
DATE:
SUBJ:
PROPOSED MOTION
"The City Council approves a quote in the amount of $33,349.41 to Electric Pump for
piping and pump replacement at Lift Station 24."
City Council approval requires a simple majority vote of the City Council present.
BACKGROUND
On February 9,2009, the Council approved a quote for replacement of a failed pump at Lift
Station 24. Funding for replacement of this pump came out of the 2009 Lift Station
Rehabilitation CIP project.
DISCUSSION
Another lift station pump has failed at Lift Station 24. Lift Station 24 is located at the
intersection of Lyman Boulevard and Audubon Road and was built in 1995. The failed pump
was an 88 hp pump that was 13 years old. The pump cannot be rehabilitated cost effectively.
The backup pump for list station 10 is currently being used at Lift Station 24. Lift station 24
is the largest lift station in the City. The pumps at this station need to be in good working
condition due to the amount of flow and run time they experience. The station has four
pumps which are as large as 90 hp. Staff has reviewed the needs of the station and is
requesting to replace the failed 88 hp pump with a 65 hp pump. Newer pumps are more
efficient and can offer some of the same pumping characteristics as older larger pumps.
Staff has received three quotes for this work as follows:
Pump and Piping
Quality Flow Systems, Inc.
(KSB Pum )
$39,937.50.25
Braun Pump & Controls
(ABS Pum )
$38,120.89
All the quotes include necessary piping, freight, tax and startup.
Staff had originally programmed to replace the pumps at Lift Station 24 along with some
electrical equipment in 2010. Staffis requesting to advance the replacement of one more
pump to 2009.
Attachment: CIP Sheet
c: Kevin Crooks, Utility Superintendent
g:\eng\public~glhi~~_~8iWJw)'lIiffg- fm~00-1g21p~rWJJlg&9ning for Tomorrow
Capital Improvement Program
City of Chanhassen, MN
Project # SS-017
Project Name Sanitary Lift Station Rehabilitation Program
Account # 1 701-0000-4751
Account #2
Account # 3
. 2009 thru 2013
Contact Paul Oehme
Department Sanitary Sewer Improvements
Type Improvement
Useful Life Unassigned
Category Utilities
Priority nla
Total Project Cost $480,000
Description
The f~l!lJlitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment. The
City currently maintains 31 lift stations. Many of these lift stations are high service pumps and need frequent servicing. The program will service
or replace pumps, pipe gallery, and electrical components as needed. The proposed lift stations scheduled for improvements over the next 5 years
are as follows:
2009 - #7, #9
2010 - #8 and #24
2011 - #10 and #11
2012 - #16 and #21
2013 - #1, #22 and #25
Justification
Reduce emergency calls and potential sewer backups.
Expenditures
Maintenance
Total
. Funding Sources
Sewer Utility Fund
2009
75,000
75,000
2009
75,000
Total 75,000
2010
200,000
200,000
2010
200,000
200,000
2011
90,000
90,000 .
2011
90,000
90,000
95
2012
. 50,000
50,000
2012
50,000
50,000
2013
65,000
65,000
Total
480,000
480,000
2013
65,000
65,000
Total
480,000
480,000